HomeMy WebLinkAbout6. Village Manager's Report 10/07/2014Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM
TO: VILLAGE MANAGER, MICHAEL E. JANONIS
FROM: SUPERINTENDENT OF STREETS & BUILDINGS
DATE: SEPTEMBER 30, 2014
SUBJECT: 2014/2015 ROAD SALT CONTRACT — STATE BID ACCEPTANCE ($409,266)
BACKGROUND
The public works department utilizes road salt for street de-icing operations during the snow season. The
department typically utilizes approximately 4,500 tons of a salt during a winter season. We routinely
purchase road salt for our winter snow and ice control efforts through the State of Illinois Joint Purchasing
Program. It has been our experience that vendors supplying salt for this program have consistently
maintained adequate stockpiles and offered acceptable delivery terms at competitive prices.
As previously stated, salt usage during a snow season has averaged 4,500 tons. The 2013/2014 snow
season proved to be an exception. The village purchased the maximum amount of salt allowed by
contract, which was 5,400 tons and purchased an additional 600 tons outside of the state contract. The
village's total salt usage in 2013/2014 was 6,000 tons which represented the most salt ever utilized by the
village in snow fighting efforts.
Over the last five winter seasons the village has received favorable pricing through the State contract with
an average price per ton of $56.53. The highest price in the last five years was $60.41 during the
2011/2012 winter season. The lowest price paid for salt in the last five years $52.74 during the winter
seasons of 2012/2013 and 2013/2014. Listed below is the cost per ton of salt and tons purchased over
the last five winter seasons.
Snow Season
Supplier
Cost/Ton
Tons Purchased
Total Expended
2009/2010
Morton Salt
$58.37
4,364
$254,726.68
2010/2011
Morton Salt
$58.37
5,532
$322,929.10
2011/2012
Morton Salt
$60.41
4,299
$259,702.59
2012/2013
Morton Salt
1$52.74
2,765
$145,826.10
2013/2014
Morton Salt
1$52.74
5,426
$286,325.46
BID RESULTS
The State of Illinois opened bids for road salt on July 1, 2014. The village was notified on August 15,
2014 that the State did receive a responsive bid to provide road salt to the village for the 2014/2015 snow
season. The successful bidder was Morton Salt, Inc. of Chicago, IL with a bid of $75.79 per ton.
Page 2 of 2
2014/2015 Road Salt Contract — State Bid Acceptance ($409,266)
September 30, 2014
DISCUSSION
The 2013/2014 snow season was one of the worst winters on record for the Chicago metropolitan area.
Specifically the Village experienced the third snowiest winter season since the advent of modern
meteorological records has been recorded. The severity of last winter depleted regional salt stores
potentially causing a short supply for the 2014/2015 snow season.
The State of Illinois let a bid for road salt on behalf of 562 Illinois government bodies with 367 receiving
bids and 195 communities not receiving a bid. Prices received ranged from a low of $70 a ton to over
$140 a ton. The village received a bid from Morton Salt for $75.79 representing one of the lowest costs
on the state bid. Neighboring communities also experienced a significant increase in pricing with prices
ranging from $77.06 in Arlington Heights to $109.94 in Park Ridge. The bid received represents a 44%
increase over last winter's price of $52.74 per ton. The region faced a similar salt shortage in 2008/2009
in which the village experienced a 41% increase in prices from $45.81 in 2007/2008 to $64.42 the
following season. It should be noted that communities that do not participate in the state bid have seen
significant increases in salt pricing. The Village of Schaumburg recently opened a bid for bulk road salt
and received a price of $93.00 per ton.
The bid received was for a total of 4,500 tons of salt with the contract requiring the Village to purchase a
minimum of 80% of the bid quantity (3,600 tons); however, the contract allows for the village to purchase
a maximum of 120% of the contract quantity (5,400 tons). Currently the Village has approximately 1,200
tons of salt in storage, which in conjunction with the state contract would give the village access to 6,600
tons of salt for the 2014/2015 snow season. Initial winter weather predictions foresee above average
snow amounts and below average temperatures.
Morton Salt has provided road salt to the village the last five (5) winter seasons and has met the
contractual requirements.
RECOMMENDATION
Staff recommends that the village accept the State of Illinois Joint Purchasing Contract unit price of
$75.79 per ton for bulk road and enter into a contract with Morton Salt, Inc. of Chicago, IL. Salt purchases
will not exceed $409,266 without further Village Board approval.
With your concurrence, please forward this to the Village Board for their approval
Director of Public Works
pb/PB
cc: Director of Public Works Sean P. Dorsey
Deputy Director of Public Works Jason Leib
��
Paul Bures
Superintendent of Streets & Buildings
Mount
Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM
TO: VILLAGE MANAGER MICHAEL E. JANONIS
FROM: DIRECTOR OF PUBLIC WORKS
DATE: OCTOBER 2, 2014
SUBJ: RFP RESULTS FOR COMBINED SEWER SYSTEM EVALUATION STUDY
($112,400)
BACKGROUND
In 2004, the village conducted a combined sewer system evaluation study (CSSES). This study
was performed by consulting engineer, Baxter & Woodman of Crystal Lake, Illinois. It identified
almost $15 million worth of combined sewer repair work including manhole rehabilitation, pipe
replacements and pipe lining. Repair work was further prioritized and categorized as follows:
• Approximately 8% of the pipes were in severe structural condition (Category 5). The
report recommended that repairs be completed within one (1) to two (2) years. The
estimated cost to repair sewers in this classification was $2,481,600.
• 10% were in poor structural condition (Category 4). Completed repairs were
recommended within the next three (3) to four (4) years. The estimated repair cost for
sewers in this classification was $2,547,600.
• 20% had moderate structural defects (Category 3) requiring rehabilitation within the next
five (5) to ten (10) years. The estimated repair cost for sewers in this classification was
$4,957,920.
• 34% had minor structural defects (Category 2) that did not require repairs. However, the
report recommended these pipes should be periodically re-examined to assure that
noted defects do not worsen. The estimated cost to repair these defects was
$4,158,000.
• 24% were in very good condition (Category 1). No discernable defects were observed.
No repairs were recommended.
To date, the bulk of the major defects (all of categories 5 and 4, with a large portion of category
3) have been corrected. The remaining pipe was identified in 2004 as being of low to moderate
risk (categories 1 to 3).
Page 2 of 3
RFP Results for Combined Sewer System Evaluation Study ($112,400)
October 2, 2014
The funding mechanism for combined sewer rehabilitation work has been a $5 per month
charge to each water/sewer customer; generating approximately $800,000 per year. This fee
was initiated in 2006 and is set to expire in 2016.
On August 5, 2014, the Village Board awarded a sewer televising contract to Visu-Sewer Illinois,
LLC of Bridgeview, Illinois in the amount of $404,706.67. The purpose of this project is to
gather observations necessary to assess the current condition of combined sewers.
Televising work will include 190,600 lineal feet of unlined combined sewers which were initially
ranked in the lower risk categories of 3, 2 and 1. It will also include a quality control review of
approximately 10% of the combined sanitary sewer segments that have been lined since 2006.
Staff requires assistance from a qualified and experienced engineering consultant to review the
video generated by the televising work. Ultimately, the selected consultant will create a final
report denoting condition assessment and projected cost estimates for any remaining combined
sewer rehabilitation work. This report will be presented to the Village Board in spring 2015.
REQUEST FOR PROPOSALS
Chapter 4 of the village's purchasing policy and procedures manual states:
F. Requests for Professional Services
Some contracts, by their nature, are not adapted to award by competitive bidding. These
contracts generally result from a request for proposal (RFP). A request for proposal is
utilized when professional services are being sought such as engineering, legal, audit, or
consulting services.
Pursuant to this policy, staff requested proposals for specified combined sewer system
evaluation engineering services from Baxter & Woodman Consulting Engineers of Crystal Lake,
Illinois, Christopher B. Burke Engineering, Ltd. of Rosemont, Illinois, and Gewalt Hamilton
Associates, Inc. of Vernon Hills, Illinois.
These consultants submitted documentation that indicated their ability to perform the necessary
services. All of the consultants also included references for past work and qualifications of
personnel who will be reviewing video and assessing pipe condition.
All three (3) firms were interviewed and evaluated utilizing the following weighted criteria:
Response to proposal request
PointsCriteria
10
Education and experience of key personnel
25
Project understanding, implementation plan, and methods
25
Local Experience on similar projects
25
Cost control on similar projects
15
Total
100
Page 3of3
RFP Results for Combined Sewer System Evaluation Study ($112,400)
October 2, 2014
With a maximum best score of 100 points possible, the proposals and presentations were rated
yielding the following results:
DISCUSSION
Staff established that Baxter & Woodman Consulting Engineers (Baxter & Woodman) was the
most qualified firm and can perform the necessary services within budget limits.
It is noteworthy that Baxter & Woodman gained considerable advantage by the depth of their
experience with sewer system evaluation studies, their advanced training in sewer pipe
condition assessment, and the curricula vitae of personnel proposed for this project.
We subsequently contacted Baxter & Woodman and engaged its representatives in a
negotiation process which produced a proposal for final scope and compensation. Their cost
proposal for the specified work is in a not -to -exceed amount of $112,400.
Analysis indicates that this fee is based on approximately 560 hours of work for a senior
engineer at a cost of $200/hour. It is the opinion of staff that the work hours allotted are
reasonable and the rate for a senior engineer is competitive.
Additionally, Baxter & Woodman's cost proposal is attractive when directly compared to costs
incurred when the initial CSSES was performed in 2004. At that time, engineering fees
associated with condition assessment cost $1.17 per foot. Baxter & Woodman's cost for this
project is $0.54 per foot.
Finally, Baxter & Woodman has performed a wide range of engineering services for the village.
All of their work has been acceptable.
RECOMMENDATION
I recommend that the Village Board accept the proposal for the Combined Sewer System
Evaluation Study from Baxter & Woodman Consulting Engineers of Crystal Lake, Illinois in an
amount not to exceed $112,400. Sufficient funds for thi propose expenditure exist in the
current budget.
Sean P. Do sey
CC: Deputy Director of Public Works Jason Leib
Water/Sewer Superintendent Matt Overeem
Administrative Superintendent Kristina Jakupovic
C:\Users\sdorsey\Documents\Sewers\Combined Sewers\CSSES 2014\CSSES CONSULTANT RECOMMENDATION MEMO 2014.docx
Mount
Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM
TO: VILLAGE MANAGER MICHAEL E. JANONIS
FROM: SUPERINTENDENT OF STREETS & BUILDINGS PAUL BURES
DATE: SEPTEMBER 24, 2014
SUBJECT: ACCEPT BID FOR THE PURCHASE OF SUPER MIX ANTI -ICING FLUID
AWARD ($44,200)
BACKGROUND
Pre -wetting agents are used as accelerants to make rock salt work faster, extend the effectiveness of salt
at lower temperatures, and stick to the road surface longer. The current product we use is known in the
industry as super mix, which is a proprietary blend of organic polymers, salt brine, and calcium chloride.
In addition to pre -wetting salt, super mix is used as an anti -icing agent applied directly to pavement. The
anti -icing program involves applying super mix directly to the pavement before it snows to prevent the
snow from bonding with the pavement. Pre -treating the pavement is especially important during rush
hour when it is difficult to salt the roads thereby buying us time. During minimal snows it actually saves
us from going back and salting the roads thus reducing our salt usage.
Staff prepared a detailed set of bid documents necessary to effect the procurement and delivery of pre -
wetting agents for a 1 -year term concluding at the end of 2015, with a possibility of extending the contract
for two (2) one year extensions based on performance and price agreement.
BID RESULTS
Sealed bids were opened at 1:00 PM on September 22, 2014 for the proposed pre -wetting agents
contract. Seven invitational bids were mailed, and a bid notice was placed in the local paper. Three bids
and one NO BID call were received with results as follows:
Super Mix
Bidder
Price/Gal
Tanker Price
SNI Solutions Inc.
$.68
Industrial Systems, LTD
$.73
The Klink Group of
$1.09
Companies
Page two
Accept bid for the purchase of super mix anti -icing fluid ($44,200)
September 24, 2018
DISCUSSION
SNI Solutions Inc. meets the specification requirements and was the low responsive bidder. SNI
Solutions Inc. provided super mix to the Village between 2007 and 2009 performing satisfactorily with
product performance and timely deliveries of the product. The current bid price is $.11 lower per gallon
representing a 14% decrease from last year's price of $.794 per gal.
Staff expects an anticipated order volume of 65,000 gallons. The estimated annual expenditure for pre -
wetting agents is $44,200 ($0.68/gallon X 65,000 gallons = $44,200).
RECOMMENDATION
I recommend acceptance of the lowest qualified bid of $.68/gal as submitted by SNI Solutions Inc. for the
procurement of super mix anti -icing fluid in an amount of $44,200. Sufficient funds are available in the
current budget to facilitate this contract.
(
Paul Bures
Superintendent of Streets & Buildings
I concur:
Sean P. Dorsey
Director of Public Works
PB
c: Director of Public Works Sean P. Dorsey
Deputy Director of Public Works Jason Leib
file
\\Pwl\pwlhpw$\Administration\BIDS\RESULTS\SuperMixAnt.ingFluid9.24.2014.res.doc page 2 of 2
Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM
TO: VILLAGE MANAGER MICHAEL E. JANONIS
FROM: DIRECTOR OF PUBLIC WORKS
DATE: OCTOBER 2, 2014
SUBJ: PROPOSAL TO INCREASE STUMP REMOVAL CONTRACT ($30,000)
BACKGROUND
On February 5, 2013, the Village Board awarded a parkway tree trimming contract to Kramer
Tree Specialists, Inc. of West Chicago, Illinois (Kramer) in an amount not to exceed $177,000.
This contract facilitates routine pruning of parkway trees on a 5 -year cycle. The award was
made pursuant to a public bidding process. In compliance with contract provisions and Village
Board authorization, this contract was extended in 2014 in the amount of $191,841.
On February 18, 2014, the Village Board also awarded a parkway tree stump removal contract
to Kramer in an amount not to exceed $152,634. This contract requires grinding tree stumps to
10"-12" depth, removing the grindings, and restoring the area with topsoil and grass seed. This
award was also made pursuant to a public bidding process.
PROBLEM STATEMENT
Presently, staff estimates that Kramer's 2014 tree trimming contract will be completed at a total
expenditure of $161,000 (approximately $30,000 under the contract amount). Staff also
estimates that a total of $182,000 will be needed to grind all of the stumps left after tree
removals this year (approximately $30,000 over the 2014 contract amount).
PROPOSAL
Staff proposes to address this problem by reducing the contract award for tree trimming by
$30,000 and increasing the contract award for stump removals by $30,000.
DISCUSSION
The Village Board award for the 2014 stump removal contract was made in a not -to -exceed
amount ($152,634). Increasing this award requires Village Board approval.
Page 2 of 2
Proposal to Increase Stump Removal Contract ($30,000)
October 2, 2014
The proposed transfer of funds can be facilitated among existing General Fund accounts. This
type of intra -fund transfer is permitted by village's fund accounting policy. There will be no net
increase in General Fund expenditures as a result of this proposed transfer.
Kramer has verbally agreed to accept both the reduced quantity of trimming work and the
increased quantity of stump removal work.
The shortage of funds for stump removals this year can primarily be attributed to the following:
• In an unanticipated late year development, the 2013 stump removal contractor
did not agree to continue into a second year at their bid price. The contract was
bid again. 2014 pricing is considerably higher than 2013. As a result, budgeted
funds have not been adequate for the volume of stumps.
• Due to Emerald Ash Borer (EAB) infestation, tree losses have been accelerated.
In an effort to remove dead trees as quickly as possible, tree removals continued
well into December 2013. As a consequence, 2014 started with a backlog of
stumps that needed to be removed with the current budget.
The surplus of funds in the tree trimming account can primarily be attributed to a high incidence
of EAB tree loss and storm damage in the 2014 trim area. The high rate of removals
appreciably decreased the volume of pruning.
RECOMMENDATION
I recommend that the Village Board authorize a $30,000 increase in the 2014 contract with
Kramer Tree Specialists, Inc. of West Chicago, Illinois for parkway stump removals. Sufficient
funds for this proposed expenditure exist in the current budget.
Sean P. Dorsey
CC: Finance Director David Erb
Deputy Director of Public Works Jason Leib
Forestry/Grounds Superintendent Dave Hull
Administrative Superintendent Kristina Jakupovic
C:\Users\sdorsey\Documents\Forestry\STUMP REMOVAL INCREASE RECOMMENDATION MEMO.docx
Mount Prospect
Mount Prospect Public Works Department
6/ m
INTEROFFICE MEMORANDUM TREE CM USA
TO: VILLAGE MANAGER MICHAEL E. JANONIS
FROM: FORESTRY/GROUNDS SUPERINTENDENT
DATE: SEPTEMBER 29, 2014
SUBJECT: BID RESULTS - HOLIDAY TREE LIGHTING - $24,000
BACKGROUND
Funding has been included in the 2014 budget for contractual installation, and later removal, of
white lights on selected trees in the downtown. The specifications describe a possible three-year
contract, although we reserved the right not to renew the second or third year if we are not
satisfied with the work, or if funds are not available.
For the 2014 contract, our specifications state that we plan to have white holiday lights installed
and later removed on 216 downtown trees. Approximately 2,300 strands of lights are expected
to be required to decorate the trees. However, the specifications clearly state that we may elect
to reduce the number of trees decorated and/or the number of strands installed per tree, or opt not
to award the contract at all, providing the bid prices are higher than expected.
BID RESULTS
We mailed out 21 sets of bid specifications for this work, and placed a bid notice in the local
paper. A mandatory pre-bid meeting was also held for interested contractors on August 16,
2014. Sealed bids were opened on September 22, 2014. Four bids and one "No Bid" letter were
received. Bid results were as follows:
Bidder
Cost to install and later remove
one strand of holiday lights
25
2014
Kinnucan Tree Experts and Landscaping Company, Inc. $9.19
Illuminight Lighting, LLC $9.45
Landscape Concept Management $9.50
RW Hendrickson Co. $18.00
Meeting House No Bid letter
Also, note that McFarlane Douglas did not attend the mandatory pre-bid conference; they later
sent a bid but it was not read or considered.
Page 2 of 2
Bid Results — Holiday Tree Lighting — $24,000
9/29/14
DISCUSSION
The low bidder, Kinnucan Tree Experts and Landscaping Company, Inc. installed lights for us
over the past two years and performed satisfactorily. Additionally, Kinnucan submitted several
municipal references documenting that they completed multiple holiday lighting contracts.
Approximately 2,300 light strands are expected to decorate our trees. (Note that this would
achieve the lower intensity of lighting which the Village Board ordered in 2009 as a cost-saving
measure). Because of tree growth, we may need to add some additional strands to achieve the
proper coverage, so we are adding a $2,800.00 contingency. Therefore, the total contract amount
for 2014 would be $24,000.00.
BID RECOMMENDATION
I recommend award of contract to the lowest qualified bidder, Kinnucan Tree Experts and
Landscaping Company, Inc. I also recommend that the Village Board authorize staff to execute
up to two (2) one year contract extensions provided the work is performed satisfactorily and the
contractor agrees to hold prices. Expenditures in years two and three will be in whatever amount
is appropriated in the future budgets.
I concur:
CC: Public Works Director Sean Dorsey
Public Works Deputy Director Jason Leib
Administrative Superintendent Kristina Jakupovic
fount I'tospect
Mount Prospect Public Works Department
' INTEROFFICE MEMORANDUM
TO: VILLAGE MANAGER MICHAEL E. JANONIS
FROM: DIRECTOR OF PUBLIC WORKS
DATE: OCTOBER 1, 2014
SUBJ: PROPOSAL TO EXTEND PARKWAY TREE REMOVAL CONTRACT FOR
ONE (1) YEAR.
BACKGROUND
On January 17, 2012, the Village Board awarded a contract for the removal of parkway trees to
Homer Tree Care, Inc. of Lockport, Illinois (Homer). This contract facilitates the timely and cost-
effective removal of dead and diseased trees from village -owned property and rights-of-way.
The award was pursuant to a public bidding process.
The term of the initial contract was one (1) year. However, the contract terms and the Village
Board award included authorization to extend the contract in one (1) year intervals for a second
and third year provided Homer agreed not to increase rates and the village was otherwise
satisfied with the work. In compliance with these terms, the contract was extended in 2013 and
again in 2014. The current and final extension of this contract terminates at the end of
December 2014.
The funds expended under this contract during the last three (3) years are delineated in Table 1
below:
Table 1
2014 $290,556
2013 $266,127
2012 7$216,523
PROPOSAL
Homer recently submitted a proposal to extend the existing parkway tree removal contract for
an additional one (1) year term commencing January 1, 2015 and concluding December 31,
2015. Prices and all other terms from the initial 2012 contract remain unchanged.
Page 2 of 2
Proposal to Extend Parkway Tree Removal Contract for One (1) Year
October 1, 2014
DISCUSSION
The impetus for Homer's extension proposal is rooted in their participation in the Kensington
Business Center Private Property Tree Removal project. As part of this project, Homer has
agreed to extend village contract rates for private property tree removals to Kensington
Business Center property owners. This project, and Homer's role, was discussed in some detail
at the September 9, 2014 Committee of the Whole meeting.
Staff presently harbors concerns that logistical issues associated with gaining access to private
property might delay Homer's work on this project past the current contract termination date
(December 2014). To alleviate these concerns, Homer has proposed extending the contract
term for one (1) year.
It is the opinion of staff that Homer's participation is an important component of the project's
financial appeal for Kensington Business Center property owners. Furthermore, if the parkway
tree removal contract is re -bid, there is no guarantee that a new contractor would honor tree
removal rates already offered to property owners. More importantly, a new contractor might not
agree to extend contract rates to Kensington Business Center owners and requiring same as a
contract condition might increase the village's costs for routine parkway tree removals.
In addition, staff perceives an upward pressure on tree contractor rates next year. In large part,
this is due to the high demand for tree services due to storms, disease, and insect infestation in
recent years. Consequently, as a stand-alone proposal, Homer's offer to extend the existing
contract rates for another year is attractive.
The proposed expenditure level for parkway tree removals in 2015 is approximately $240,000.
RECOMMENDATION
I recommend that the Village Board accept the proposal from Homer Tree Care, Inc. of
Lockport, Illinois to extend the parkway tree removal contract for a one (1) year term
commencing on January 1, 2015 and concluding on December 31, 2015. Expenditures under
this proposed extension will be limited to amounts authorized in th 2015 budget.
Sean P. Dorsey
Cc: Deputy Director of Public Works Jason Leib
Forestry/Grounds Superintendent Dave Hull
Administrative Superintendent Kristina Jakupovic
File
C:\Users\sdorsey\Documents\KBC TREES\HOMER CONTRACT EXTENSION MEMO.docx