Loading...
HomeMy WebLinkAbout08/19/2014 HVAC Maintenence Contractfount Prospect Mount Prospect Public Works Department INTEROFFICE MEMORANDUM TO: VILLAGE MANAGER MICHEAL E. JANONIS FROM: SUPERINTENDENT OF STREETS & BUILDINGS DATE: AUGUST 12, 2014 SUBJECT: BID RESULTS FOR HVAC MAINTENANCE CONTRACT (NOT TO EXCEED $47,326) BACKGROUND This proposed contract will provide for quarterly scheduled maintenance on all HVAC (heating, ventilation, and air - conditioning) units in Village -owned buildings. In addition, it will also provide an emergency rate per hour for emergency service call work. The term of this proposed contract is one (1) year. It also includes two (2) one -year extensions (2015 and 2016) if both parties agree to terms. BID RESULTS Sealed bids were opened at 1:00 P.M. on August 11, 2014. Sixteen (16) invitational bids were distributed to qualified local contractors and a bid notice was placed in a local paper as required by the Village purchasing policy. Seven (7) bids were received. The results are as follows: Bidder Annual Fee Emergency Average annual Estimated (for Scheduled Rate/Hour Call Back Bid Total Maintenance) 280 hours (&E.R. Annually Bedco Mechanical Inc. $16,525.00 110.00 $30,800 $47,325 Mechanical Inc. $30,810.00 110.00 $30,800 $61,610 Air Comfort $29,272.00 118.00 $33,040 $62,312 Delta Heating and Air $47,550.00 120.00 $33,600 $81,150 Hayes Mechanical $44,760.00 132.00 $36,960 $81,720 Season Comfort Corp. $47,130.00 125.00 $35,000 $82,130 Edwards Engineering $66,020.00 135.00 $37,800 $103,820 Page 2 of 2 BID RESULTS FOR 2014 HVAC MAINTENANCE CONTRACT (NOT TO EXCEED $47,326) August 12, 2014 DISCUSSION The low bidder, Bedco Mechanical Inc., has provided scheduled maintenance and emergency service work to the Village for the last thirteen (13) years. The annual maintenance fee covers quarterly inspections on all units which includes; checking the belts, oil, bearings, pressures, fluid levels, condensers, filter changes and correcting any problems found during the inspections. The bids were also based on an average annual call back for non - scheduled work or emergency services which averaged two hundred and eighty hours per year over the last several years. Bedco Mechanical Inc. has responded in a timely manner and all work was performed in an acceptable manner during this contract. RECOMMENDATION I recommend acceptance of the lowest qualified bid as submitted by Bedco Mechanical Inc. of Glenview, Illinois for the HVAC Maintenance Contract in an amount not to exceed $47,326. Awards for subsequent years of this contract (years 2 and 3) will be limited to funds appropriated for HVAC maintenance in approved budgets. (�ti '_cy1t_6e9 Paul Bures Superintendent of Streets & Buildings c: Director of Public Works Scan P Dorsey Deputy Director of Public Works Jason Leib File TTY I�—nT4TNTISTP ATVV.i \P v TS\HV CCC)I ,iTR 2/11d APC Director of Public Works