HomeMy WebLinkAbout6. MANAGERS REPORT 3/16/04
,.'
Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM
*-
TREE CITY USA
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
~b. M:n,
~ ',to for
FROM:
PROJECT ENGINEER
DATE:
MARCH 5, 2004
SUBJECT:
2004 STREET RESURFACING CONTRACT AWARD - $3,028,000
Background
This year's project represents the eighth year of the accelerated street improvement program and includes
the resurfacing of approximately 8.8 miles of Vi l1age streets. Again this year we also combined both the
MFT funded program and the Village Street Improvement funded program into one project in order to
secure an early and more favorable bid.
Bids Results
A notice to bidders was published in a local newspaper. Since this project uses MFT funds it was also
published in the lOOT construction bulletin.
On February 24th, at 10:00 AM. sealed bids for the 2004 Street Resurfàcing Program were publicly
opened and read aloud.
Ten contractors received bid documents and six contractors submitted bids. The bids ranged from a low
of$3,074,543.70 by Arrow Road Construction Company to a high of$4,027,333.00 by R.W. Dunteman
Company. The Engineer's estimate for the project was $3,246,094.00.
Below is a summary of the bids.
Bidders
Total Bid
Arrow Road Construction Co.
Plote Construction, Inc.
Johnson Paving Co.
A-Lamp Concrete
Callaghan Paving
RW. Dunteman Co.
$3,074,543.70
$3,288,962.70
$3,492,109.20
$3,689,640.00
$3,899,090.90
$4,027,333.00
Average = $3,578,613.25
Engineer's Estimate
$3,246,094.00
PAGE 2
2004 STREET RESURFACING CONTRACT A WARD - $3,028,000
MARCH 5, 2004
Discussion
All bidders submitted IDOT Local Agency Bid Bonds in the amount of 5% of their total bids as required
by the Bid Documents. All bids were checked for accuracy. Minor elTors were found in the bid
submitted by Johnson Paving, but this did not affect the outcome. An bidders colTectly signed their bids
and bid bonds. The low bidder Arrow Road Construction Co. has previously completed street
improvements for the Village including the 2002 and 2003 Street Resurfacing Programs and their work
was acceptable.
Recommendation
The Village budget limit for this project is $3,028,000.00. The low bid is $3,074,543.70, and is 1.0%
over the budget limit. Since the low bid exceeds the budget limit, we must reduce the contract to the
budget limit. The bid quantities include contingencies that al1ow for unforeseen circumstances such as
additional base repair, additional asphalt required because of thickness variation, etc. The fun projected
quantities for these items may not be needed. Based on my experience in previous years, I anticipate that
this year's program can be completed with the available funds.
I therefore recommend that the low bidder, AlTOW Road Construction Co. be awarded the contract for the
2004 Street Resurfacing Program in the amount not to exceed $3,028,000.00.
Funding for this project is shown on Pages 300 of the 2004 Budget where there are sufficient funds for
this proposed expenditure. Funding for this project is as follows:
Account Code No. 0507706-690049
Account Code No. 5607706-690084
$1,195,000
$1,833,000
$3,028,000
ð:~~k~Ü l-
I concur with the above recommendation.
d!:ú;t/;;
Attachments: Project Map
~
~ .
"'-
-
.
.
0
0
~
...-z 0
" "'",
" Jif,"
£
""",;om
"'1m"
-)Ii] [
E
f!
""0)
u 0
GI ...
a. a.
I/) 0)
f c
a.'- ç
u-
.... C\'I C\'I
c't:C
~=.c
01/)1::
:EGlo
...a:z
0....-
GI GI
O)GI
C\'I ...
-""
::U)
>~
Q
Q
N
....z
-
E
~
""0)
u 0
GI ...
a.D"
I/) 0)
fc-
.. .-'"
"'u-
.... C\'I'CI
§'t:C
o~.c
111:1/)....
.:;GI~
...a:o
O....U)
GlGI-
O)GI
I'CI ...
-""
::U)
>~
Q
Q
N
'" lJ,,50Od "
~
:f'
-
~
0
0
'" '" " "'O><1J
:If ", """"'"
IF!
~
,,;]'OM
" """
[
j'
W'
~~" '
.0".
INTEROFFICE MEMORANDUM
@)
TIEE em USA
Mount Prospect Public Works Department
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
~\). ~}-r~
~ lIt. 01-\
FROM:
SUPERINTENDENT OF STREETS & BUILDINGS
DATE:
MARCH 8, 2004
SUBJECT:
SEALED BID RESULTS FOR THE 2004 ASPHALT RESTORA nONS
CONTRACT (NOT TO EXCEED $35,000)
BACKGROUND
Asphalt restoration to driveways, parking lots, and streets are necessary due to damage as a
result of water main breaks, storm and sanitary sewer repairs. We accept an annual bid to
establish unit prices for the year, which allows us to do replacements monthly, thus reducing the
time our residents are waiting for restorations.
BID RESULTS
Sealed bids were opened at 10:00 A.M. on March 4, 2004 for a proposed asphalt restoration
contract. Bid prices were based on estimated quantities. Nine invitational bids were mailed, and
a bid notice was placed in the local paper.
Six bids were received and the results are as follows:
Bidder
Quality Blacktop, Inc.
Brothers Asphalt Paving, Inc.
Chicago land Paving Contractors Inc.
Meridian Construction Co., Inc.
Paveman, Inc.
RA. Peterson Company
Bid Price
$33,700.00
$44,400.00
$52,600.00
$65,275.00
$83,261.00
NO BID letter
X:\FILES\FRONTOFF\BIDS\RESUL TS\ASPHAL TREST.2004.RES
Page two
Bid Results Asphalt Restorations 2004
March 8, 2004
DISCUSSION
The low bidder; Quality Blacktop Inc., had last years contract and performed satisfactorily.
There is $35,000 available in this year's budget for this proposed contract. Quantities will be
adjusted so as not to exceed the budgeted amount. Funding for this proposed contract will come
from the following budget accounts:
.
on page 262, account code 6105510-540777, in the amount of$17,OOO.OO
on page 256, account code 6105505-540701, in the amount of$18,000.00
.
RECOMMENDATION
I recommend acceptance of the lowest bid as submitted by Quality Blacktop Inc. for asphalt
restoration in an amount not to exceed $ 35,000.
9~ GltvWJ
Paul Bures
Superintendent of Streets & Buildings
I concur: . ~
¿~441er
Director of Public Works
Pb
c:
Director of Public Works Glen R. Andler
Deputy Director of Public Warks Sean P. Dorsey
file
X:\FILES\FRONTOFF\BIDS\RESUL TS\ASPHAL TREST.2004.RES
2
/iF:)
INTEROFFICE MEMORANDUM
~
TREE em liSA
Mount Prospect Public Works Department
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
~b. ~19
ôll~ /0-1
FROM:
SUPERINTENDENT OF STREETS & BUILDINGS
DATE:
MARCH 8, 2004
SUBJECT:
SEALED BID RESULTS FOR THE 2004 BRICK PAVER-SEALING
CONTRACT (NOT TO EXCEED $25,000)
BACKGROUND
This bid is for our third annual contract for sealing of brick pavers in our downtown streetscape
walk area. The sealing of brick pavers is necessary to keep the brick color from fading and seal
out moisture, dirt, oil and paint that may get imbedded into the brick pavers. Sealing extends the
life expectancy of the brick walk and makes cleaning easier.
BID RESULTS
Sealed bids were opened at 10:00 A.M. on March 4, 2004 for the proposed 2004 brick paver-
sealing program. Bid prices were based on estimated quantities of 30,000 square feet. Six
invitational bids were mailed, and a bid notice was placed in the local paper.
Eight bids were received, the results are as follows:
Bidder
Seal-It-Rite *
Advanced Pavement Technology
Surface Protectors *
Brickscapes, Inc.
Intrinsic Landscape, Inc.
Paver Care, Inc.
Fuerte Systems
Landscape Resources, Inc.
Bid Price
$21,000.00
$21,300.00
$22,800.00
$25,500.00
$25,500.00
$28,500.00
$29,000.00
$52,500.00
* Did not meet all specification requirements.
X :\Administration \BIDS\IŒSUL TS\brickpavseaJ .2004.res.doc
Page two
2004 Brick Paver-Sealìng Bid Results
March 8, 2004
DISCUSSION
The apparent low bidder, Seal-It Rite did not meet bid specification requirements. Specifically,
their bid took exception to the required five (5) year warranty on material and workmanship.
Instead, they offered only a two (2) year \varranty. The third 10\vest bidder, Surface Protectors,
submitted a similarly structured bid. Since no other bidders took this exception, and the cost
variance between Seal-It Rite and the next lowest bidder is only $300, staff feels that this
exception is unreasonable.
The low, qualified bidder, Advanced Pavement Technology, took no exceptions to specification
requirements. Advanced Pavement Technology held this contract last year and completed the
contract satisfactorily. Funds for this proposed contract are in the current budget, on page 215,
account code 0015104-540510, in the amount of $25,000. Quantities will be adjusted so the
total expenditure will not exceed the budgeted amount.
RECOMMENDA TION
I recommend acceptance of the lowest qualified bid as submitted by Advanced Pavement
Technology for the 2004 brick paver-sealing contract in an amount not to exceed $25,000.
_9~ GJ WWJ
Paul Bures
Superintendent of Streets & Buildings
I concur:
~~
'Glen R. Andler .
Director of Public Works
PB
c:
Director of Public Works Glen R, And1er
Deputy Director of Public Works Sean P. Dorsey
file
X: \Administration \B] DS\RES U L TS\brickpavseal.2004.res.doc
e
NOT TO SCALE
Legend
Roads
__-hm prroads
Brick Sealing
Brick Status
- Old Brick
- Sealed in 2003
- To Be Sealed
Sealed in 2002
.. Hydrology
c=J Parcels
c=J corp -'in
Village of Mount Prospect
--Brick Sealing Project--
03-12-04
State Plane NAD83
Illinois East, FIPS 1201 Feet
INTEROFFICE MEMORANDUM
@)
TREE em USA
Mount Prospect Public Works Department
FROM:
STREETS & BUILDINGS SUPERINTENDENT
~b. H-n,
ðIU./O'"
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
SUBJECT:
SEALED BID RESULTS FOR THE2004 PA VEME~T rv1~RKING
CONTRACT (NOT TO EXCEED $46,750)
DATE:
MARCH 8, 2004
BACKGROUND
Annually a contract is let to repaint crosswalks, centerlines, lane dividing lines, parking stalls,
and stop bars throughout the village. The village is divided into north and south sections by
Central Road. These areas are serviced every other year, with the exception of the downtown
area and parking lots, which are done annually. On the state highways we are only responsible
for painting some of the crosswalks and stop bars. Pavement markings require repainting and
installation of glass beading to maintain their reflectivity after two years of wear.
BID RESULTS
Sealed bids were opened at 10:00 A.M. on March 4, 2004 for the proposed contract to install
pavement markings. The pavement marking work contemplated this year will be for all areas
north of Central Road, the downtown business district, Wolf Road, and State Highways. Four
invitational bids were mailed, and a bid notice was placed in the local paper.
Four bids were received, and bid results are as follows:
Bidder
Bid Price
Preform Traffic Control System, LTD.
Marking Specialists
AC Pavement Striping Co.
Flint Trading, Inc.
$45,164.08
$51,717.95
$80,964.04
No bid letter
X:\ADMINSTRA TION\BIDS\RESUL TS\P A VEMKING2004.REC.DOC
Page two
Sealed Bid Results for Pavement Marking 2004
March 8, 2004
DISCUSSION
Prefonn Traffic Control Systems, LTD. has had Mount Prospect's pavement marking contract
from 1997 thru 2003. They completed the work successfully each year.
The bids received were based on estimated quantities, which will be adjusted so the total
expenditure does not exceed the budgeted amount. Funds for this proposed contract are in the
current budget on page 215, account no. 0505104-540535, in the amount of $41,600.00, page
221, account no. 6205110-540565, in the amount of $3,090.00 and on page 222, account no.
6305111-540565, in the amount of$2,060.00. Total budgeted amount for 2004 is $46,750.00.
RECOMMENDA TION
I recommend acceptance of the lowest bid as submitted by Prefonn Traffic Control Systems, Ltd.
for an amount not to exceed $46,750.00.
9~ 6J WWJ
Paul Bures
Streets & Buildings Superintendent
I concur:
PB
c:
Director of Public Works Glen Andler
Deputy Director of Public Works Sean Dorsey
file
X:\ADMINSTRA TIONIBIDS\RESUL TSIP A VEMKING2004.REC.DOC
INTEROFFICE MEMORANDUM
@
TREE em USA
Mount Prospect Public Works Depal1:ment
SUBJECT:
SEALED BID RESULTS FOR THE 2004 STORM SEWER CATCH BASIN
AND INLET CLEANING CONTRACT (NOT TO EXCEED $35,535)
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
FROM:
SUPERINTENDENT OF STREETS & BUILDINGS
DATE:
MARCH 8, 2004
BACKGROUND
Annually a contract is let to clean and inspect one sixth (l/6th) of the Village's storm sewer catch
basins and inlets. This annual program helps minimize the potential for stom1 sewer flow
restrictions caused by clogged sewer structures. This program also provides an opportunity to
assess the structural condition of inlets and catch basins on a scheduled, cyclical basis.
BID RESULTS
Sealed bids were opened at 10:00 A.M. on March 4, 2004 for this proposed sewer catch basin
and inlet cleaning contract. This year's area is depicted on the attached map. The bid prices
were based on an estimated quantity of 250 sewer catch basins and 250 inlets to be cleaned.
Seven invitational bids \vere mailed, and a bid notice was placed in the local paper.
Four bids were received, and the results are as follows:
Bidder
A-K Underground
Elgin Sweeping
National Power Rodding Corp.
c.T.R. Systems, Inc.
Bid Price
$ 25,250.00
$ 29,975.00
$ 35,000.00
$ 76,250.00
X :\Administration \8 I DS\RESU L TS\BSINLCL2004 REC .doc
Pagc two
Sewer Catch Basin & Inlet Cleaning Program Bid Results
March 8, 2004
DISClJSSION
The low bidder, A-K Underground, Inc., had this contract in 2000 & 2001 and performed
adequately. Quantities will be adjusted so the total expenditure will not exceed the budgeted
amount. Funds for this proposed contract are in the current budget, on page 261, in account code
6105509-540779, in the amount for S30,000.00 and on page 219, in account code #0015108-
540520, in the amount of$5,535.00. The total amount of funds for this year is $35,535.00.
RECOMMENDA TION
I recommend acceptance of the lowest bid as submitted by A-K Underground, Inc. for a sewer
catch basin and inlet cleaning contract for an amount not to exceed $35,535.00.
9~ GJ~
Paul Bures
Superintendent of Streets & Buildings
I concur: ~
/~'-RAn 'ler .
Director of Public Works
Pb
c:
Director of Public Works Glcn R. Andlcr
Dcrllty Director of Public Works Seun P. Dorsey
file
X:\Admi nistralion\BIDS\RESUL TS\BSINLCL2004REc.doc
N
Á
Catch Basin & Inlet Cleaning
Project Area 2004
INTEROFFICE MEMORANDUM
~
TREE em USA
Mount Prospect Public Works Department
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
'èb. ~~
~llc.IO*
FROM:
SUPERINTENDENT OF STREETS & BUILDINGS
DATE:
MARCH 8, 2004
SUBJECT:
SEALED BID RESULTS FOR THE 2004 SEWER CATCH BASIN & INLET
REP AIR CONTRACT (NOT TO EXCEED $30,000)
"
BACKGROUND
This bid is for our annual contract for sewer catch basin and inlet repair. Many of our older
structures are made of brick and, with time, the mortar or brick deteriorate, requiring patching,
reconstructing or total replacement. The repairs are usually made with concrete adjustment rings
or precast cones to eliminate future deterioration of the mortar joints. This work is usually
completed by late August to make sure all structures are in good repair for the fall rainy season
and to minimize any possible winter failures.
BID RESULTS
Sealed bids were opened at 10:00 A.M. on March 4, 2004 for proposed sewer catch basin and
street inlet repairs. Bid prices were based on estimated quantities of 30-35 structures to be
adjusted, reconstructed or replaced. Eight invitational bids were mailed, and a bid notice was
placed in the local paper.
Seven bids were received, and bid results are as follows:
Bidder
Martam Construction, Inc.
S. Schroeder Trucking, Inc.
Lifco Construction
A Lamp Concrete Cont., Inc.
Lenny Hoffman Excavating
Pontarelli Construction Co., Inc.
Neri Brothers Construction, Inc.
Bid Price
$29,950.00
$40,575.00
$40,875.00
$41,775.00
$49,405.00
$48,805.00
$55,900.00
X: \Administrati on \B ID S\RES UL TS\BASNREP2004 RES. doc
Page two
Sewer Catch Basin & Inlet Repairs Bid Results
March 8, 2004
DISCUSSION
The low bidder Martam Construction, Inc. has worked for the village for many years and has
performed satisfactorily in a wide variety of municipal construction projects including Phase 1 of
the Weller Creek Streambank Stabilization project and, more recently, the Downtown
Streetscape projects.
Quantities will be adjusted so the total expenditure will not exceed the budgeted amount. Funds
for this proposed contract are in the current budget, on page 261, account code 61 05509-540777,
in the amount of$30,000.
RECOMMENDA TION
I recommend acceptance of the lowest bid as submitted by Martam Construction, Inc. for a sewer
catch basin and inlet repair contract for an amount not to exceed $30,000.
9~ 6JWWJ
Paul Bures
Superintendent of Streets & Buildings
I concur: ~
~
Director of Public Works
PB
c:
Director of Public Works Glen R. Andler
Deputy Director of Public Works Sean P. Dorsey
File
X: \Administration \BIDS\RESUL TS\BASNREP2 004 RES. doc
Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM
~
TREE Cl1Y USA
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
DATE:
FEBRUARY 25,2004
CONTRACTUAL MOWING/LANDSCAPE MTCE
CONTRACTUAL P ARKW A Y RESTORA nON
$97,000.00
$71,000.00
FROM:
FORESTRY/GROUNDS SUPERINTENDENT
SUBJECT:
BACKGROUND
Over the last two decades, we have increasingly contracted out our grounds maintenance responsibilities as
opposed to using in-house personnel. Contractual turf mowing began in 1994, contractual parkway sod
restoration began in 1990 and contractual landscape maintenance of streetscape sites began in 2000.
For each type of contract, by accepting the low bid we have at times in the past experienced difficulties with
certain contractors, due to poor quality of work and lack of responsiveness. Although this can happen with
many types of contracts, I believe it is more common when grounds maintenance work is bid out. This is
because labor and equipment costs to start up such a business are relatively low compared to many other
businesses.
Over the years, two landscape contractors have stood out in terms of quality of work and responsiveness to our
requests, in many cases going above and beyond what their contracts specifically required. They are American
Landscaping Inc. (ALl) and Lundstrom's Nursery Inc. ALl has held our parkway restoration contract a total of
eight years. Lundstrom's has held our turf mowing contract a total of 11 years, and our landscape maintenance
contract almost since its inception in 2000. (An exception was early in 2001; then Lundstrom's was the second
low bidder on the landscape maintenance contract, but we asked them to take over after the low bid contractor
failed to perform.) In 2003, both ALl and Lundstrom's completed their final year of our most recent multi-year,
publicly bid contracts for mowing, landscape maintenance and parkway restoration.
Over time, both contractors have so impressed us with their performance that we have nominated each company
for a "Contractor of the Year" Award from the American Public Works Association; both subsequently won the
award.
In order to continue the same excellent level of quality, several months ago Public Works Director Glen Andler
received permission from the Village Manager to pursue an alternative to the bidding process for 2004.
Specifically, he proposed that we seek price quotes for all three types of work from only these two exceptional
contractors, rather than risk getting a contractor who cannot perform.
RESULTS
The following price quotes were received:
Lundstrom
ALl
Mowinl!:
Total cost, 30 mowings of
113 sites.
$61,727.73
$84,108.00
Lundstrom
ALl
Landscape Maintenance
Total annual cost to maintain
42 sites
$29,960.00
$35,363.00
Parkway Restoration
Reg. and Utility Sodding (6750 sq.yds.) $70,875.00
$56,700.00
DISCUSSION
ALl submitted the lowest overall quote for Parkway Restoration, while Lundstrom submitted the lowest quotes
for Mowing and Landscape Maintenance. In comparison with 2003 bid prices, Lundstrom's landscape
maintenance quote reflects a 2.8% increase, which I believe is reasonable due to inflation, and inclusion of the
new heavily landscaped Village Hall in the contract. Lundstrom's quote for mowing actually reflects a slight
decrease over their 2003 bid prices. Finally, ALl's quote for parkway restoration reflects a reasonable 1 %
increase over their 2003 bid prices.
Note that, with all three contracts, we have reserved the right to adjust quantities of work upwards or downwards
from our estimates, in order not to exceed available funding. Additionally, with all three contracts, we have
included provisions allowing us to extend the contract for a second year.
RECOMMENDATION
I request that the Vi1lage Board waive the formal bidding process and accept the proposals from American
Landscaping Inc. and Lundstrom's Nursery Inc. as detailed below.
For the Landscape Maintenance Contract, in the 2004 budget there is a total of $30,000.00 available (p. 231,
Acct. #0015202-540691). I recommend award of year one of a Landscape Maintenance Contract to
Lundstrom's Nursery Inc., in an amount not to exceed $30,000.00.
For the Mowing Contract, in the 2004 budget there is a total of $67,000.00 available (p. 254, Account #
6105503-540685 andp. 231, Account # 0015202-540685). I recommend award of year one ofa two year
mowing contract to Lundstrom's Nursery Inc., in an amount not to exceed $67,000.00.
For the Parkway Restoration Contract, in the 2004 budget there is a total of $62,480.00 available. (p.256
Accoúnt # 6105505-540700, p. 240 Account # 0015401-540581, and p. 262 Account # 6105510-570777). I
recommend award of year one of a possible two-year Parkway Restoration Contract to American Landscaping
lnc, in an amount not to exceed $71,000.00.
For each of the above contracts, if extended to 2005, the contract amounts will not exceed the available funds
appropriated for these purposes in the 2005 budget.
,I
~." //~ .' I' /i /'.", /'
_....~¡;Ze rlt"""'>/ L- LéL¿.{;<-_...
Sandy Clárk
I concur:
~/.~
GLEN R. ANDLER
Director of Public Works
X: FORESTR Y\ WORD\2004/MEMO-LMC-MOW -SOD.DOC
INTEROFFICE MEMORANDUM
~.
"
~
TREE CITY USA
Mount Prospect Public Works Department
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
~b. Mrré;>
ð I tø 0'1
FROM:
PROJECT ENGINEER
DATE:
MARCH 12,2004
SUBJECT:
2004 MATERIAL TESTING CONTRACT AWARD - $50,000.00
Background
In conjunction with our 2004 Street Resurfacing Program, we requested proposals from material
testing consultants. These proposals were to provìde the following:
. Cost to perform the testing of concrete material for the new curbs and driveway aprons.
. Cost to perform the testing of asphalt binder and surface mix material at the asphalt plant
and the testing of the asphalt binder and surface as it is placed.
Results
On Tuesday, March 9, 2004, we received nine proposals to complete the material testing for the
2004 Street Resurfacing Program.
Listed below are the consultants and their proposed cost to provide the required services:
American GeoEngineering, Inc.
Great Lakes Soil Consultants
Applied GeoScience Inc.
Material Testing Laboratories
Soil & Material Consultants
Testing Service Corporation
O'Brien & Associates
$41,820.00
$44,320.00
$45,280.00
$46,402.00
$69,540.00
$87,787.00
$94,230.00
Engineer's Estimate
$50,000.00
Page 2
2004 Material Testing
March 12, 2004
Discussion
All of the proposals fulfilled the requirements requested by the Village. All of the proposals also
included references of past work and qualifications of the personnel who will be evaluating the
material samples.
Based on a review of the proposals, American GeoEngineering, Inc. offers the best overall
services for the cost. American GeoEngineering, Inc. has previously completed material testing
for the Village in conjunction with the 2001 and 2002 Street Resurfacing and Reconstruction
Programs and their work was acceptable.
Recommendation
The quantities listed in the proposal are estimated quantities based on averages from previous
years and prorated for the anticipated work for this year. Many factors can influence the actual
quantities for material testing, especially weather and unanticipated soil conditions. Therefore, I
recommend that the proposal from American GeoEngineering, Inc. be accepted at the March 16,
2004 Village Board meeting for the full budgeted amount of $50,000.00.
This work will be funded with the budget account listed below and as shown on page 300 of the
2004 Budget Book:
Account Code
0507706-540545
Amount
$50,000.00
ðl~i~~~lt ~ Þ--
I concur with the above recommendation
JM
X:\Engineering\ TESTlNG\2004\MEMO _JAN .DOC
J
..
Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM
~
TREE crrv USA
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
~t:.. ~~
a Ir..¡u'f
FROM:
VEHICLE/EQUIPMENT MAINTENANCE SUPERINTENDENT
DATE:
MARCH 4, 2004
ACCEPT STATE OF ILLINOIS BID FOR THE PURCHASE OF ONE TRUCK CAB A
CHASSIS - $45,350.00
SUBJECT:
Back!:lround
In the current budget, there are funds available to replace unit 4557. 4557 is a 1988 International 35,000
lb. GWVR dump truck with snow and ice control equipment. This unit is used by the Public Works
Department maintenance crews to haul miscellaneous materials, such as asphalt, black dirt, sand, stone,
etc. to job sites throughout the Village. The unit is also equipped with a snowplow, underbody scraper,
and salt spreader for winter snow and ice control.
Replacement Schedule
4557 was purchased in 1988. The vehicle/equipment replacement schedule for large dump trucks is 15
years. 4557 has entered its 16th year of service and has logged 51,280 miles. In addition, the hour meter
on the engine has logged 4534 hours of operation (equivalent to 136,020 road miles). This vehicle
satisfies the Vehicle/Equipment Replacement Schedule criteria for replacement.
Life Cycle Cost Analysis
Life cycle cost analysis has been completed on 4557 and is attached for your review. The optimum
economic replacement point has been calculated at year 6. The modified economic replacement point
has been calculated at year 10.
Other Factors
The existing truck requires the following work:
Engine Rebuild
Replace Hydraulic Components
Refinish Entire Unit
Total Cost
$ 6,700.00
$10,200.00
$ 7,500.00
$24,400.00
Replacement Recommendation
It is my recommendation that a replacement vehicle for 4557 be purchased during the 2004 budget year.
Bid Recommendation
I am recommending the purchase of one 2005 International 7400 Series,35,OOO# GWVR cab and
chassis from the State of Illinois contract (PSD 4009654) award winner Prairie International Truck Sales,
Springfield, Illinois. I request that the Village Board authorize the purchase of one new 2005 International
7400 Series 35,000# GWVR truck cab and chassis at a cost not to exceed $451350.00. Funds for this
proposed purchase are available in account no. 6707709 - 660115 ($81,560.00), page 300 of the current
budget.
í
Accept State of Illinois Bid For The Purchase of One Truck Cab and Chassis
March 4, 2004
Page 2 of 2
The remaining funds will be used for equipment (underbody snow plow, dump body, salt spreader, and
hydraulic components) to make the vehicle completely functional. The unit being replaced will be sold at
the NWMC auction in fall 2004.
~[ h -
ames E. GU~he~ -
-l
~
../
I concur.
AJÇ~
Glen R. Andler
Director of Public Works
JG
Attachment
c:
Deputy Director of Public Works Sean Dorsey
X:\Administration\BIDS\RESUL TS\StatePurchase1TruckCab&Chassis2004 - 4557.doc
Mount Prospect Public Works Department
Life Cycle Cost Analysis for 19881ntemational Dump Truck. Vehicle # 4557
Value at Beginning of Year:
Estimated Value at Year End:
1
46100
41490
2
41490
39090
3
39090
36690
4
36690
34290
Actual Dollar Depreciation for Year:
Downtime Costs/Mile:
Hours DownlYear:
4610
2400
2400
2400
200
2
200
29
200
50
200
45
Downtime Costs per Year:
Cost of Maintenance and Repairs per Year:
(including labor, parts, etc.)
Fuel Costs per Year:
Total Variable Costs:
400
5800
9900
9000
51
1200
2390
1650
400
730
485
581
Total Lifetime Variable Costs:
5,663 10,359 15,424 13,876
Miles:
Year
~~¡I!I!P
7
29490
27090
8
27090
24690
9
24690
22290
10
22290
19890
11
19890
17490
12
17490
15090
13
15090
12690
14
12690
10290
2400
200
38
7500
2388
1467
:::: ':::: 3;:~ ~:: ~:;::!'!18 ::::: ::: :::1':::1'::: ':::: '::: '::::: '::::
::::::::c .
2:~;il!I!il
':iljl¡¡IC
2400
2400
2400
2400
2400
2400
2400
15
10290
7890
16
7890
5490
200
18
200
12
200
26
200
98
200
13
200
23
200
18
2400
2400
3600
2360
5100
19600
2600
4500
3500
200
23
200
16
1065
1553
1374
6993
563
1243
2220
4600
3150
822f.!:m.~1T
19,4261::H~;~w:
540
437
1219
388
2052
1464
1500
1118
1004
7,823
6,961
10,3181 29,679
7,828
9,829
9,838
13,992
1259
988
9,600
7,758
184,065
51,280
Cumulative Cost per Mile:
(Divide Total Lifetime Variable Costs by Mileage)
$ 4.40 $ 4.41 $ 6.05 $ 6.42 $ 6.67 IJ:M~:I $ 4.70 $ 4.72 $ 4.351 $ 5.40 1 $ 4.46 $ 4.14 $ 3.88 $ 3.78 $ 3.67 $
3.59
$8.00
G>
=æ $7.00
:¡¡ $6.00
a.
ti $5.00
0
() $4.00
~
;¡:¡ $3.00
III
:¡ $2.00
E
a $1.00
$-
m
:
.
:
,
2
3
4
5
6
7
8
9 10 11 12 13 14 15 16
Year
~Ð.ê~:QP.tïl!i~rif~R:epJ~qe_:.:::::::.
Modified Optimum Economic Replacement Point Analysis
I Modified Optimum Economic Replacement Point I
Purchase Price of New Vehicle:
LESS: Estimated Value of New Vehicle at Optimum Economic Replacement Point:
Estimated Depreciation Cost of New Vehicle:
LESS: Estimated Value of Present Vehicle:
Net Depreciation Cost of New Vehicle:
Estimated Total Miles on Replacement at Optimum Economic Replacement Point:
Estimated Depreciation Cost CosUMile of New Vehicle:
Existing Vehicle Cumulative Cost per Mile at Optimum at Optimum Economic Replacement Point:
ADD: Estimated Depreciation CosUMile of New Vehicle:
Cumulative CosUMile at Modified Optimum Economic Replacement Point:
$81,560
$66,500
$15,060
$5.490
$9,570
15,000
$0.64
$4.73
$0.64
$5.37
.ç
INTEROFFICE MEMORANDUM
@
TREE em USA
Mount Prospect Public Works Department
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
~b. ~~.
~//I..(O~
FROM:
VEHICLE/EQUIPMENT MAINTENANCE SUPERINTENDENT
DATE:
MARCH 4, 2004
ACCEPT STATE OF ILLINOIS BID FOR THE PURCHASE OF ONE TRUCK CAB
CHASSIS FOR A HYDRAULIC LOG LOADER- $45,350.00
SUBJECT:
Backqround
In the current budget, there are funds available to replace unit 4558. 4558 is a 1988 International with a
hydraulic log loader and flatbed body.
4558 is used by the Forestry/Grounds Division of Public Works to load logs onto flatbed truck, remove
logs off sites were a tree was cut down, removal of chip debris from the stump hole of a tree that was
removed, and also, to remove debris from creek sites through out the Village.
Replacement Schedule
4558 was purchased in 1988.The vehicle/equipment replacement schedule for an aerial and a crane truck
is 15 years. 4558 has entered its 16th year of service and has logged 40,779 miles. In addition, the hour
meter on the engine has logged 7115 hours of operation (equivalent to 213,450 road miles). This vehicle
satisfies the Vehicle/Equipment Replacement Schedule criteria for replacement.
Life Cycle Cost Analysis
life cycle cost analysis has been completed on 4558 and is attached for your review. The optimum
economic replacement point has been calculated at year 7. The modified economic replacement point
has been calculated at year 12.
Other Factors
The existing truck requires the following work:
Engine Overhaul
Rebuild or Replace Flatbed
Rebuild Loader
Replace Hydraulic Valve, Hoses, Pumps
Total Cost
$ 8,800.00
$ 8,600.00
$12,500.00
$ 7,500.00
$37,400.00
Replacement Recommendation
It is my recommendation that a replacement vehicle for 4558 be purchased during the 2004 budget year.
Bid Recommendation
I am recommending the purchase of one 2005 International 7400 Series 35,000# GV'NR cab and chassis
from the State of Illinois contract (PSD 4009654) award winner Prairie International Truck Sales,
Springfield, Illinois.
Accept State of Illinois Bid For The Purchase of One Truck Cab anq Chassis
March 4, 2004
Page 2 of 2
Bid Recommendation Continued
I request that the Village Board authorize the purchase of one new 2005 International 7400 Series
35,000# GVWR truck cab and chassis at a cost not to exceed $45,350.00. Funds for this proposed
purchase are available in account no. 6707709 - 660115 ($106,30000), page 300 of the current budget.
The remaining funds will be used for the hydraulic log loader, flatbed body, and other equipment to make
the vehicle completely functional. The unit being replaced will be sold at the NWMC auction in fall 2004.
"'ò' ~ U7 ~
ames E. Guenther----
;;Jt/ ø
Glen RAndier
Director of Public Works
JG
Attachment
c:
Deputy Director of Public Works Sean Dorsey
X:\AdministrationIBIDSIRESUL TSIStatePurchase1TruckCab&Chassis2004 - 4558 doc
Mount Prospect Public Works Department
Life Cycle Cost Analysis for 1988 International Flatbed With Log Loader. Vehicle # 4558
.,
Value at Beginning of Year:
Estimated Value at Year End:
1
61000
54900
Actual Dollar Depreciation for Year:
Downtime Costs/Mile:
Hours DownlYear:
Downtime Costs per Year:
Cost of Maintenance and Repairs per Year:
(including labor, parts, etc.)
Fuel Costs per Year:
Total Variable Costs:
9,478
Total Lifetime Variable Costs:
2,899
Miles:
9,478
Cumulative Cost per Mile:
(Divide Total Lifetime Variable Costs by Mileage)
2
54900
51900
6100
200
10
2000
267
901
3
51900
48900
3000
200
27
5300
15800
1044
9,728 22,593
157
4
48900
45900
3000
3000
200
79
200
30
Year
5 6 7
45900 42900 :@ßßPP
42900 39900::}~~QQ
3000
3000H:)pOQ
8
36900
33900
9
33900
30900
10
30900
27900
11
27900
24900
12
24900
21900
3000
200
24
4800
19600
13
21900
18900
14
18900
15900
200
27
635
13,016
104,332 116,811 131,805 142,9971176,0311182,180 193,124 201,762
39,939
15
15900
12900
16
12900
9900
6000
2317
1940
7,252
1197
574
200
85
2~~I¡¡¡I¡¡I¡¡~~Þ
3000
200
14
2800
1002
892
7,908
12,480
3000
3000
2378
790
33,034
32,685
3000
3000
3000
3000
3000
11,744 25,441
3,404
19,206 41,798 53,543
9,099
16900
3900r¡¡I¡:i~~~Þ
7821:::H:'~1~
21,046
24,293
200
25
200
42
200
98
200
6
200
17
200
27
4039
1218
4961}jHp~
5000
8450
1200
5400
3400
5400
78,984
8,397[i:!!m~~r
87,382[:::~~A~4
3245
2196
9422
945
1682
1198
893
14,611[¡!¡~~'~~r
1010
1105
714
798
823
165
14,994
11,192
6,149
10,944
8,638
9,685
27,848
30,390
35,251
37,292
211,446
40,469
$ 3.27 $ 5.64 $ 5.76 $ 5.88 $ 6.07 $ 5.98 UH),~Q] $ 4.96 $ 4.81 $ 4.73 $ 4.711 $ 5.391 $ 5.17 $ 5.18 $ 5.05 $
5.22
"'."""." ---"..","'"
$-
2
3
5
4
6
7
8
$7.00
CD
¡¡¡j $6.00
æ $5.00
~ $4.00
0
.~ $3.00
~ $2,00
§ $1.00
0
Year
9 10 11 12 13 14 15 16
IPenQtè50f>ti~:~~~QnQ~~j~~I~~~ê~.:::} I Modified Optimum Economic Replacement Point I
Modified Optimum Economic Repl::tçernent Point Analysis
Purchase Price of New Vehicle:
LESS: Estimated Value of New Vehicle at Optimum Economic Replacement Point:
Estimated Depreciation Cost of New Vehicle:
LESS: Estimated Value of Present Vehicle:
Net Depreciation Cost of New Vehicle:
Estimated Total Miles on Replacement at Optimum Economic Replacement Point:
Estimated Depreciation Cost Cost/Mile of New Vehicle:
Existing Vehicle Cumulative Cost per Mile at Optimum at Optimum Economic Replacement Point:
ADD: Estimated Depreciation Cost/Mile of New Vehicle:
Cumulative Cost/Mile at Modified Optimum Economic Replacement Point:
$100,000
$88,500
$11,500
$9,900
$1,600
18,000
$0.09
$5.30
$0.09
$5.39
At .
f
Request to Purchase 2004 Computers, Printers and Software
March 5, 2004
Page 3
Recommendation
The Village standardized on Gateway computers in 1997. After some recent problems with
Gateway hardware staff chose to buy one Dell server for document imaging in 2003 as a test.
Since the test server has worked out well and Dell's pricing is very good, staff would like to
switch to Dell at this time. I recommend that the Village purchase the PCs, laptops and servers
from Dell, purchase the network printers from COW, and purchase Microsoft Office software
from ASAP Software. A summary of the costs is provided below.
" Account Numbers ""
" 680771 O~650822 0604102-650003 5107701-670072
Vendor litem Computer EQuip~ (GranÜ (Grant Matching) Total
Dell
25 PCs-at $1373 34,325 34,325
1 Laotoo (0 $1837 1,837 1,837
6 Laotops :v $1837 11,022 11,022
, 1 Servers ( v $7487 7,555 7,555
Dell Subtotal 54,739
CDW
9 Printers @ $1757 15,813 I I 15,813
ASAP Software .
6 Microsoft Office Professional 1502 274 1776
licenses for new laptops @ $296
Total $59,530' $12,524 $274 $72,328
I recommend that the Village purchase 25 PCs, seven laptops, and one server from Dell for an
amount not to exceed $54,739. I further recommend the purchase of 9 network printers from
COW for an amount not to exceed $15,813 and the purchase of six copies of Microsoft Office
from ASAP Software for an amount not to exceed $1,776. I will be happy to respond to any
questions or concerns.
~
~Middleton
IT Director
I:\VB Request Memos\2004 Requests.doc
Village of Mount Prospect
Mount Prospect, Illinois
INTEROFFICE MEMORANDUM
FROM:
IT DIRECTOR
~b . ~ '9
~ \ I '"' 1°lJ-
TO:
ASSISTANT VILLAGE MANAGER DAVE STRAHL
DATE:
MARCH 10, 2004
REQUEST TO WAIVE BID TO PURCHASE RUGGEDIZED LAPTOP
COMPUTERS, MODEMS AND SOFTWARE
RECOMMENDATION TO PURCHASE LAPTOPS, MODEMS AND
SOFTW ARE
SUBJECT:
The Police Department has nine ruggedized laptops and modems that are scheduled for
replacement in 2004 and Public Works has budgeted to purchase one new ruggedized laptop. Staff
is requesting that the bid process be waived to purchase the ten Panasonic CF29 laptops, nine
Motorola VRM-850 radio modems for the Police laptops and nine copies of Shutdown NOW!
software for the Police laptops. The Panasonic laptops are listed under the cu rrent Illinois state bid
award; Motorola is the only modem supplier for Northwest Central Dispatch's proprietary system;
and Dynamic Worlds is the only supplier for the requested ShutDown NOW! software.
Backqround
The Village began using laptops mounted in the police squad cars in 1997. Northwest Central
Dispatch System (NWCDS) dispatches emergency, non-emergency, and routine police beat
information to the squad cars through the laptops' radio modems. Patrol Officers use the NWCDS
system for the LEADS program (to run checks on license plates, drivers licenses, warrants and
criminal history), for the ALERTS program (state-wide communications), and to communicate with
dispatch and other units.
To date the department has equipped 29 squad cars with laptops. The Motorola Pentium 233 MHz
laptops, which are recommended for replacement here, were purchased in 1999. The Police
Department has since switched to Panasonic laptops for better reliability. After the nine
replacements this year, all 29 squad cars will have the Panasonic laptops.
Public Works has budgeted for one new ruggedized laptop to be used by one of the foremen to
allow field entry of data related to work orders, customer service and asset management and to
eliminate double entry.
Laptops
The laptops requested are Panasonic CF29 Pentium 4, 1.2 GHz computers with 512 MB of memory,
a 40 GB hard drive, and the Windows XP Professional operating system. The laptops are offered
from CDS Office Technologies under the CMS Illinois state bid award. Prices are shown in the chart
on the next page.
Request to Waive Bid to Purchase Replacement Ruggedized Laptop Computers, Modems and Software
Recommendation to Purchase Ruggedized Laptops, Modems and Software
March 10, 2004
Page 2
Modems
The modems currently used with the old Motorola laptops, which are recommended for replacement
here, are not compatible with the new Panasonic laptops. The modems requested are Motorola
VAM-850 radio modems offered directly from Motorola, the only modem supplier for the proprietary
system, at $1382 each.
Software
Dynamic World's ShutDown NOW! software is currently has been used on the Police Department's
ruggedized laptops in the past and has been found to be a cost-effective means of limiting the drain
on the car battery. Dynamic World is the only supplier of this particular software.
Recommendation
I request that the bid requirement be waived for the purchase of ten Panasonic ruggedized laptops,
nine Motorola modems, and nine copies of ShutDown NOW! software. The entire purchase request
is summarized in the chart below.
Vendor Item Price Acct Number
Public Works
CDS Office Technologies 1 Panasonic CF 29 Laptop wi desk port replicator
and DVD-ROM/CD-RW Combo Drive (no touch 3962 6105501-650003
screen) @ $3962
Police
CDS Office Technologies 9 Panasonic CF 29 Laptops wi touch screen,
docking station and keyboard light @ $3826 plus 34,754 6807710-650822
one DVD-ROM/CD-RW Combo Drive @ $320
CDS Subtotal 38,716
Motorola 9 Motorola VRM-850 Radio Modems @ $1382 12,438 6807710-650822
Dynamic Worlds 9 copies of ShutDown NOW! vA.51 @ 20 180 6807710-650822
Total $51,334
I recommend that the Village purchase the ten Panasonic ruggedized laptops from CDS Office
Technologies for an amount not to exceed $38,716. I also recommend that the Village
purchase nine Motorola radio modems for the laptops at a price not to exceed $12,438 and nine
copies of Dynamic Worlds' ShutDown NOW! software at a price not to exceed $180. The total
cost of these purchases is $51 ,334. Funds are available for the purchases in account numbers
shown in the chart above. Please feel free to contact me with any questions or concerns.
- ~
~ Middleton
IT Director
I:\VB Request Memos\2004 Rug Laptop Requests.doc
Village of Mount Prospect
Mount Prospect, Illinois
INTEROFFICE MEMORANDUM
TO:
VILLAGE MANAGER MICHAEL E.JANONIS
1ST> . ~
'õ II" IO~
FROM:
ASSISTANT VILLAGE MANAGER
DATE:
MARCH 9, 2004
SUBJECT:
AUDIO/VISUAL EQUIPMENT PURCHASES - NEW VILLAGE HAL
The Village Board approved a contract for audio/visual consultanting services with
Swiderski Electronics on September 2,2003. As you may recall Swiderski was brought in
for their expertise in setting up TV and audio systems. This type of service was necessary
as a special service outside of the architectural services due to the unique expertise
necessary. The Village also desired to have more direct control over the equipment and
set-up through the use of a consultant contract directly with the Village.
As part of the consulting service contract Swiderski was to provide a list of recommended
new equipment and coordinate the installation of the any new equipment and the existing
equipment for TV broadcasts in the new Village Board room, TV control room, and studio.
In addition, audio related devises would be installed for the Community Center rooms for
any Village Board meeting overflow and general usage for the variety of community events
that would likely take place in the space.
Swiderski worked closely with the architect, contractor, and the electrical subcontractor to
work out the details of the necessary equipment and the required power and installation
details. The Village also brought in an acoustical consultant to assist with the coordination
of the recommended equipment. After Swiderski provided an outline of the recommended
new equipment, Village staff met with both Swiderski and the electrical contractor to clarify
the purpose and alternatives of some recommended equipment.
The final cost for the equipment, installation, and testing is $305,189. There is $227,000
set aside in the 2004 Capital Improvement Program (CIP) for this project. The remaining
expense can be included as part of the capital building budget for the Village Hall project.
The amount recommended to be utilized from the Village Hall construction account is
$78,189.
AUDIONISUAL EQUIPMENT PURCHASES - NEW VILLAGE HALL
March 9, 2004
Page 2
Recommendation:
Staff would request a waiver of bids for the purchase of audio/visual related equipment for
the new Village Hall. This waiver is requested due to the unique and specialized nature of
the equipment and related installation services from the vendor.
The original contract for consulting services was undertaken through an RFP for
professional services. Staff has also reviewed the proposed prices for the recommended
equipment and feels the prices provided by Swiderski are within a reasonable range.
Staff '.tv ould a Iso recommend t he approval 0 fa contract f or equipment purchase and
installation from Swiderski in an amount not to exceed $305,189. CIP and Village Hall
capital construction funds would be utilized for this contract.
If you have any questions, please contact me.
~ ~ s;-tf{f
David Strahl
c: Cable Production Coordinator Howard Kleinstein
H:\VILM\Viliage Hall\Swiderski Equipment Purchase Memo - VB.doc
!
Village of Mount Prospect
Mount Prospect, Illinois
"
INTEROFFICE MEMORANDUM
DATE:
MARCH 12, 2004
LANDSCAPE/STREETSCAPE BID PACKAGE APPROVAL
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
FROM:
ASSISTANT VILLAGE MANAGER
SUBJECT:
Attached are two spreadsheets summarizing the bid package for landscape/streetscape
work and a proposal to utilize MFT funds for part of the project. WB Olson worked with
DLK and V3 Engineering to put together the bid package and bids were received and
summarized by WB Olson for Village consideration. WB Olson received numerous
subcontract bids for specialty work necessary for the project completion. Martam
Construction also submitted a bid to WB Olson for the same scope of work, but compiled
all their projected bids into numbers that accounted for all the various trade specialties and
did not separate out the subcontractors as was bid by WB Olson. Some of the specialty
bids are higher for Martam than WB Olson, however, the final cost was lower overall for
Martam than WB Olson. The difference in the projected costs were the general conditions
fees, masonry, and construction management fee ofWB Olson. Martam built that cost into
their total cost number. A 5% contingency was added to both bid packages for equitable
comparison purposes. Any contingency savings would be returned to the Village if not
utilized under either contractor.
As you know WB Olson has performed exceptionally well in the construction of the Village
Hall and parking Garage and they were asked to coordinate the bids since the coordination
between the Village Hall completion and the landscape/streetscape seemed like a logical
extension of the project. However, Martam has performed all the existing streetscape work
throughout the downtown and has worked well with Public Works and have been very
responsive on any issues that have arisen in the completion of previous work. The Public
Works Director has worked closely with Martam in the past for streetscape and some utility
work and is very satisfied with their quality of workmanship.
It is estimated that an additional $325,688 could be necessary to complete the
landscape/streetscape construction. These funds are requested to be taken from existing
MFT funds. The use of MFT funds for part of this project is justified due to the need to
reconstruct curb and street on both Busse and Emerson, which would be paid out of MFT
funds when the streets were originally scheduled for this type of work. By utilizing MFT
funds for the work on the streets at this time the necessary work is accelerated.
"
LANDSCAPE/STREETSCAPE BID PACKAGE APPROVAL
March 12, 2004
Page 2
The anticipated use of MFT funds is currently projected at $325,688, but could be less
depending on the amount of contingency that is used or not used to complete the work.
Recommendation:
1) Staff is requesting that bids be waived due to the need to get the project started
and completed within this landscape season and based on the special qualifications
of the contractor.
2) Staff is requesting authorization from the Village Board to execute a contract for
construction services between the Village and Martam Construction in an amount
not to exceed $1,477,900.
The base construction fee is $1,407,000 plus the $70,900 contingency to be utilized
only as necessary.
3) Staff is requesting authorization to enter into a contract with V3 Engineering
Services for Layout and Survey work related to the landscape/streetscape work in
an amount not to exceed $10,600.
This layout and survey work would be necessary under either contractor and would
need to be covered by a separate contract for services.
4) Staff is requesting authorization to utilize up to $325,688 from existing MFT funds
necessary to complete the landscape/streetscape project for the civic block.
5) Staff is requesting authorization to pay WB Olson up to $10,000 for the work
related to compiling and reviewing the landscape/streetscape bid packages.
This is reimbursement for work if the contract is awarded to Martam Construction.
Staff will be present at the March 16 Village Board meeting to answer any questions and
provide any additional details as requested by the Village Board.
~~ ~-t(j
David Strahl
c: Public Works Director Glen Andler
H:\VILMWiliage Hall\Landscape Streetscape VB Memo.doc
Summary of LandscapelStreetscape Bids Prices
Description of Work Martam wao
General Conditions * $ 77,543
Traffic Control * $ 4,300
Layout Survey *** $ 10,600 $ 10,600
Demolition,Excavation & Grading $ 759,000 $ 141,200
Aspahlt Paving * $ 42,950
Aspahlt Patching (Allowance) * *
Site Plumbing * $ 27,166
Irrigation $ 60,000 $ 39,400
Landscaping $ 241,000 $ 186,734
Hardscape Paving * $ 217,265
Site Furnishings * $ 44,865
Flagpoles * $ 4,940
Concrete * $ 212,500
Ornamental Railings * $ 6,975
Masonry $ 18,400 $ 89,075
Sign Lettering ** $ 4,108
Electrical $ 329,000 $ 286,976
Sub Total $ 1,418,000 $ 1,396,597
Construction Management Fee 4% * $ 55,864
Permit (By Owner)
CGL Insurance 1% * $ 13,966
Total $ 1,418,000 $ 1,466,427
Construction Contingency 5% $ 70,900 $ 69,830
Total $ 1,488,900 $ 1,536,257
WBO Bid Fees 10,000
Revised Total $ 1,498,900 $ 1,536,257
Contingency is Accounted for only for Comparison, any savings will be returned to Village.
* Note: Subcontractor Price Included in the Combined Price
** Note: Subcontractor Price Included in the Combined Price wi Masonry
*** Note: This contract for services will be seperate of the construction pricing and will be removed
from the base construction price.
Landscape Bids Cost Summary
3/12/2004
Summary of Landscape/Streetscape Cost and Proposed Allocation for Project Completion
Summary of Available Funds Amount
Village Hall Landscape Stipend $ 300,000
2004 Streetscape CIP $ 650,000
2003 Streetscape CIP Carryover $ 350,309
Funds Available $ 1,300,309
Funds Available $ 1,300,309
Architectual/Engineering Costs $ (120,184)
Phone Ped Relocation Cost $ (6,913)
Funds Available for Construction $ 1,173,212
Project Construction Cost $ 1,498,900
Amount from MFT $ (325,688)
3/12/2004
Landscape Bids Cost Summary