HomeMy WebLinkAboutRes 01-88 01/05/1988
RESOLUTION NO.
1-88"
A RESOLUTION AUTHORIZING EXECUTION OF AN AGREEMENT
BETWEEN THE VILLAGE OF MOUNT PROSPECT AND
ILLINOIS DEPARTMENT OF TRANSPORTATION
RELATIVE TO THE IMPROVEMENT OF CENTRAL ROAD
WHEREAS, the corporate authorities of the Village of Mount
Prospect have determined that it would in the best interests of
the Village to participate with the State of Illinois and the
City of Des Plaines to improve that portion of Central Road
between Rand Road and Wolf Road; and
WHEREAS, in order to proceed with the improvement of Central Road
it has been determined that an Agreement should be executed
between the parties involved, specifically, Phase 1 (Preliminary
Engineering) and Phase 2 (Design Engineering).
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND BOARD OF TRUSTEES
OF THE VILLAGE OF MOUNT PROSPECT, COOK COUNTY, ILLINOIS:
,
SECTION ONE: That the Mayor is hereby authorized to sign and the
Clerk authorized to attest her signature on the Agreement between
the Village of Mount Prospect and the Illinois Department of
Transportation relative to the first phases of improving Central
Road, as set forth hereinabove.
SECTION TWO: That this Resolution shall be in full force and
effect from and after its passage and approval in the manner
provided by law.
AYES:
Arthur, Farl~y, Floros, Murauskis, Van Geem
NAYS:
None
ABSENT:
Wattenberg
PASSED and APPROVED this
5th
day of
January
, 1988.
ATTEST:
~*. fr/fs~
Mayor
.1~Y~
Carol A. Fields
Village Clerk
SCOPE OF ENGINEERING SERVICES
Phase I - Project Developement
1. Project Coordination and Data Collection
Preliminary conference with Village and City Staff to
discuss goals and objectives of the project.
Preparation and submittal of State and Sub-State
Clearinghouse notifications.
Obtain utility atlases and aerial mapping.
Obtain average daily traffic volume counts and accident
data from the Village/City.
Soils consultant selection and initiate soils
investigations.
Obtain traffic growth data and improvement plans for
adjacent improvements from the Village, City, and IDOT
2. Field Survey
Obtain local field survey data.
Perform field survey of existing conditions including
topography, cross sections, right-of-way and drainage.
Plot and ink design survey at a In = 20' scale.
3. Traffic and Accident Analysis
Summarize accident data by location, type and severity.
Prepare collision diagrams at high accident locations
and evaluate accident patterns.
Analyze wet/dry accident rate.
Reduce and adjust traffic volume data for seasonal
variances and develop existing average daily traffic
volumes.
Develop design year traffic volume forecasts for Central
Road through a study of adjacent arterial highway and
coordination with the Chicago Area Transportation Study
traffic forecasts.
Evaluate traffic and accident statistics to determine
improvement need (i.e. design classification, roadway
channelization, signalization).
Perform a pedestrian gap study to determine school
crossing signal warrants at Horner Avenue.
4. Preliminary Design Studies
Develop improvement cross-section alternatives including
but not limited to the no-build, four lane, and five
lane improvement, including median treatment study.
Evaluate traffic and accident impacts for each
alternative
Rev. 12/10/87
Aate environmental impacts for
tree loss and replacement
Match intersection improvements at Rand Road and Wolf
Road.
Prepare intersection design study at Horner Avenue based
on school crossing signal warrants.
Evaluate need for continuous sidewalks and street
lighting system to provide continuity with adjacent
roadway sections.
Meet with Village to review design alternatives and
recommend preferred improvement plan.
Conduct public informational meeting, to obtain local
input regarding preferred improvement plan.
Develop right-of-way requirements.
5. Soils Report and Pavement Analysis
alternat~ including
Obtain soils investigation and report from
sub-consultant.
Review soils report and pavement analysis
Prepare proposed pavement structure design
6. Drainage Studies
Perform drainage analysis of existing drainage patterns
Identify and study storm sewer outfall locations.
Develop drainage plan and preliminary design of main
drainage system. Drainage system design shall be in
accordance with the City of Des Plaines Storm Water
Management Plan - 1985.
Water quality and flood plain encroachment evaluation
7. Draft Project Report
Prepare draft of project report in accordance with IDOT,
Bureau of Local Roads, Federal-Aid Procedures for Local
Highway Improvements. The report will include a
discussion of the project location and existing
conditions¡ discussion of improvement plans, alternative
designs, traffic and accident analysis including
exhibits, environmental studies¡ estimate of cost and
maintenance of traffic¡ and summary of and public
involvement.
8. Report Review and processing
Submit report for Village, City and State review and
approval.
Perform revisions to draft report based on agency
review.
Rev. l2/l0/87
nì
9. Public and Local Meetings
Meeting with Village and City staff as necessary during
project to discuss project
Presentation of preferred improvement plan to the
Village and City Board.
Prepare and conduct public informational meeting.
Prepare draft letter for public meetings and draft legal
notice for publication in local newspaper
10. Final Project Report
Update report based on agency and public comments
Incorporate disposition of comments from public meeting
into the Project Report
Submit final report Impact and obtain Design approval
Prepare Design Approval notifications for publication by
the Village/City in a local newspaper
.
Number Oofrars ($) % ~. )
ITem of Overhead In- House
ð .Di rect Services
Mai1ours Payroll Frinoe Stb- Total Net Fee By Others Tatal Total
Benefi1s Costs
(A) (8) (C) (D) (E) (F) (G) (H) (I)
1 ProJect Coord~natlon 18 291 304 185 780 115 0 895 2.6
. & Data Collection
2. Field Survey 172 2453 2566 360 5379 789 0 6168 17.9
3 Trattlc & Acc~dent -
. Analysis ç4 911 953 0 1864 273 0 2137 6.2
4 pre.pm~nary Roadway 197 2884 3016 0 5900 864 0 6764 19.7
. DeSlQn
5 SO~~~1¡¡' Pavement 12 192 201 0 393 58 3850 4301 12.5
. Anal S~S
6. Environmental 18 266 278 0 544 80 0 624 1.8
Studies
7. Drainage Studies 152 2151 2250 0 4401 644 0 5045 14.7
8 OraL1: t'ro]ec1: 112 1597 1670 225 3492 512 0 4004 11. 6
. ReDort
9. Public and Local 58 952 996 85 2033 6.8
Involvement 298 0 2331
10 F~g~l Project 55 800 837 240 1877 276 0 2153 6.3
. Re ort
,
.'"">
858 12497 13071 1095 26663 3909 3850 34422 10,0.,0
ROUTE:
SECTIOO:
PROJECT:
COST ESTIMATE OF CONSULTANT SERVICES
CENTRAL ROAD FAUS IMPROVEMENT
RAND ROAD TO WOLF ROAD
VILLAGE OF MOUNT PROSPECT
CITY OF DES PLAINES
Central Road
Cook
COUNTY :'
JOB NO.:
EXHIBIT B
IV
...¡
DATE: 12-10-$7
HOMER L. CHASTAIN a AssocrATES