Loading...
HomeMy WebLinkAbout10/15/2013 Retention Basin Dredging Project 2013X / Mount Prospect Public Works Department INTEROFFICE MEMORANDUM TO: VILLAGE MANAGER MICHAEL E. JANONIS FROM: ENGINEERING ASSISTANT DATE: OCTOBER 8, 2013 SUBJECT: 2013 RETENTION BASIN DREDGING PROJECT KENSINGTON BUSINESS PARK — BASIN #511 CONTRACT AWARD - $186,763.00 Background The Village of Mount Prospect is responsible for maintaining the 11 retention basins in the Kensington Business Center. Per the agreement made with the business park in the 1980s, Village maintenance includes sediment dredging, slope erosion protection, and outlet structure upkeep. Staff has identified Basin #513 on Business Center Drive (map attached) to be this year's dredging project. The project will involve pumping water out of the basin into the adjacent Feehanville Ditch, loading accumulated sediment, and hauling it to an offsite landfill. The bottom and sides of the basin will then be reshaped to. conform to the original design. At project's end the shoreline will be stabilized with stone, silt basins will be constructed near inflow structures, and the site will be restored with sod. Subsequent rainfall will naturally refill the retention basin. Bids Results A Notice to Bidders was published in the local newspaper and several local contractors were sent invitations to bid on the project. At 1:00 p.m. on October 7, 2013, sealed bids were publicly opened and read aloud. Four (4) contractors submitted bids for this project. Bids ranged from a low of $169,785 by Copenhaver Construction, Inc. to a high of $193,294 by Berger Excavating. The Engineer's Estimate is $178,662.50 All bidders submitted a bid deposit in the amount of 10% of their total bids as required by the contract documents. All bids were checked for their accuracy. No errors were found. All bidders correctly signed their bids and bid bonds. Below is a summary of the bids. Bidders Total Bid Copenhaver Construction, Inc. (Gilberts, IL) $169,785 V3 (Woodridge, IL) $174,000 Martam Construction, Inc. (Elgin, IL) $177,016 Berger Excavating Contractors, Inc. (Wauconda, IL) $193,294 Engineer's Estimate $178,662.50 Page 2 of 2 2013 Retention Basin Dredging Project October 8, 2013 Discussion The low bidder, Copenhaver Construction, Inc., completed similar projects for the Village including Retention Basins #7, #5a, and #4 in 2008, 2011 and 2012 respectively. Along with those successful projects, the Village of Highland Park, Wheeling Township, Glenview and South Barrington Park Districts all indicated Copenhaver has done quality work in their communities in recent years. Copenhaver meets the requirements of the contract documents and their references show their workmanship to be good. Since the contractor's bid is based on estimated quantities, I recommend a 10% contingency of $16,978 be added to the proposed contract to account for variable sediment thickness and possible increases in the amount of sediment removed. The revised total contract award would be $186,763.00 Recommendation I recommend that the low bidder, Copenhaver Construction, Inc. of Gilbert's, IL, be awarded the construction contract for the 2013 Retention Basin Dredging Project in the amount not to exceed $186,763.00. There are sufficient funds in the 2013 Budget to cover this proposed contract. Please include this item on the October 15 Village Board Meeting Agenda. Daniel J. Randolph, P.E. I concur with the above Works Sean P. Dorsey Attachments: Project Location Map c: Village Clerk Lisa Angell H:\ Engineering \Ponds\kbc_basin_5b \Construction \construction rec memo.doc �z w� 3 0 m IL' L9 z 0 w 0 z m Q m z 0 z w w m v Q a m m w z m m z 0 0 z m z w v JL