HomeMy WebLinkAbout05/21/2013 Shared Cost Sidewalk Program 2013Mount Mount Prospect Public Works Department INTEROFFICE MEMORANDUM TO: VILLAGE MANAGER MICHAEL E. JANONIS FROM: VILLAGE ENGINEER DATE: MAY 8, 2013 SUBJECT: 2013 SHARED COST SIDEWALK PROGRAM (CONTRACT AWARD NOT TO EXCEED $72,000.00) Background The Shared Cost Sidewalk Program is a cooperative effort between the residents and the Village to share in the cost of replacing eligible public sidewalk throughout the Village. Information about the Shared Cost Program was published in the village newsletter, giving residents an opportunity to have sidewalk replaced at a discounted cost. This year's cost to the resident is $62.50 per sidewalk square, approximately half of the total cost of one square. This program is dependent upon resident participation. Bid Results Sealed bids for the 2013 Shared Cost Sidewalk Program were publicly opened and read aloud on May 6, 2013 at 1:30 P.M. A Notice to Bidders was published in a local newspaper as required and invitations were sent to contractors familiar with this program. Eight (8) contractors submitted bids for this project. The bids ranged from a low of $68,588.70 by Mondi Construction, Inc. to a high of $134,340.00 by Alliance Contractors, Inc. The engineer's estimate for the project was $66,900.00. Each of the bidders submitted a bid bond in the amount of 10% of the total bid as required in the bid proposal packet. All bids were checked for their accuracy. One error was found in one of the bid totals but it did not affect the overall results. All bidders correctly signed their bids and bid bonds. Below is a summary of the bids: Bidders Total Bid Mondi Construction, Inc. $ 68,588.70 Addison Concrete, Inc. $ 69,420.00 Globe Construction, Inc. $ 70,681.50 Triggi Construction, Inc. $ 91,175.00 Schroeder and Schroeder, Inc. $ 91,685.00 ALamp Concrete Contractors, Inc. $114,500.00 D'Land Construction, LLC $122,109.50 Alliance Contractors, Inc. $134,340.00 Engineer's Estimate $ 66,900.00 Page 2 of 2 2013 Shared Cost Sidewalk Program May 8, 2013 Discussion The low bidder, Mondi Construction, Inc., is prequalified by the Illinois Department of Transportation for concrete construction projects and meets the requirements of the contract documents. The Villages of Buffalo Grove and Glen Ellyn both indicated Mondi Construction, Inc. has done quality work in their communities in recent years. The 2013 Shared Cost Sidewalk budget amount is $85,000.00. This year, $13,000.00 will be set aside for reimbursements to residents for the Village's share for work completed by their own contractors replacing public sidewalk in front of their homes in conjunction with driveway replacements. Therefore, the total amount available for the Shared Cost Sidewalk Project is $72,000.00. Recommendation I therefore recommend the contract for the 2013 Shared Cost Sidewalk Program to be awarded to the low bidder, Mondi Construction, Inc. in an amount not to exceed $72,000.00. There are sufficient funds in the 2013 Budget to cover this proposed contract. Please include this item on the May 21"Village Board Meeting Agenda. I concur with the above recomfnendation. Director &Ab c Works Sean P. Dorsey cc: Village Clerk Lisa Angell H:\Engineering \Sidewalk\2013 \Shared Cost \recommend memo.doc