HomeMy WebLinkAbout03/19/2013 Concrete Restoration ContractMount Prospect Public Works Department t INTEROFFICE MEMORANDUM TO: VILLAGE MANAGER MICHAEL E. JANONIS FROM: SUPERINTENDENT OF STREETS & BUILDINGS DATE: MARCH 11, 2013 SUBJECT: SEALED BID RESULTS FOR CONCRETE RESTORATION CONTRACT ($45,235) BACKGROUND This contract provides for concrete restoration following emergency repairs on Village -owned and privately -owned water and sewer lines installed in Village rights of way. Concrete restoration of driveways, curbs, and sidewalks is necessary throughout the year following emergency repair excavations. This contract provides for monthly services, thus reducing the time our residents are waiting for restoration. The contract is for a 2 -year agreement including the years 2013 and 2014. It also includes an optional third year (2015) for the same prices if both parties agree. BID RESULTS Sealed bids were publicly opened at 1:00 P.M. on March 4, 2013 for a proposed concrete restoration contract. Bid prices were based on estimated quantities. Nine (9) invitational bids were mailed, and a bid notice was placed in the local paper. Nine (9) bids were received, and the results are as follows: Bidder Bid Price Whiteline Construction, Inc. $23.675.00 Globe Construction $24,300.00 Strada Construction Co. $31,450.00 Mondi Construction, Co. $46,000.00 Concrete Etc. $46,070.00 A Lamp Concrete Contractors Inc. $49,500.00 Copenhaver Construction $50,300.00 D' Land Construction L.L.C. $65,000.00 Schroeder & Schroeder Inc. $69,000.00 Page 2 of 2 Sealed Bid Results for Concrete Restoration Contract ($45,235) March 11, 2013 DISCUSSION The apparent low bidder Whiteline Construction, Inc., did not meet the terms specified in the bid documents. Specifically, they failed to provide any work experience references. The contract documents required three (3) references on projects of similar scope and scale to verify their experience and assess overall ability complete work contemplated in this proposed contract. Therefore, I recommend that their bid be considered non - responsive. In addition, D' Land Construction L.L.C. and Schroeder & Schroeder Inc. also failed to provide required references with their bids. Consequently, I also recommend that these bids be considered non - responsive. The second low bidder Globe Construction has never worked for the Village before but they supplied us with adequate references. All references were contacted and said that Globe Construction completed their contracts performing satisfactorily and that they would hire them again. Because the bid is based on estimated quantities, I am requesting approval to adjust the quantities up to the budgeted funding level $45,235. RECOMMENDATION I recommend the Village Board award a two (2) - year contract with an option for a third year to the lowest qualified bidder, Globe Construction. Year one would be in an amount not to exceed $45,235. Years two and three would be in amounts not to exceed appropriations in the 2014 and 2015 budgets. � Paul Bures Superintendent of Streets & Buildings I concur: Sean P. Dorsey Director of Public Works c: Director of Public Works Sean P. Dorsey Deputy Director of Public Works Jason Leib File