HomeMy WebLinkAboutCOW Agenda Packet 03/28/2000 COMMITTEE OF THE WHOLE
AGENDA
Meeting Location: Meeting Date and Time:
Mount Prospect Senior Center Tuesday, March 28, 2000
50 South Emerson Street 7:30 p.m.
I. CALL TO ORDER - ROLL CALL
Mayor Gerald L. Farley
Trustee Timothy Corcoran Trustee Dennis Pdkkel
Trustee Paul Hoefert Trustee Michaele Skowron
Trustee Richard Lohrstorfer Trustee Irvana Wilks
I1. ACCEPTANCE OF MINUTES OF MARCH 14, 2000
III. CITIZENS TO BE HEARD
IV. PROSPECT HEIGHTS ARENA
Since approximately 1997, the City of Prospect Heights has been working to realize the
development of a Sport/Entertainment Arena on the east side of the City. For the past
three years, those efforts have included property acquisition, securing financing, site design
and development and marketing. Throughout the process, the Village of Mount Prospect
has kept in regular contact with Prospect Heights monitoring progress of the development
and expressing concerns that we have regarding traffic impact generated by the Arena.
Mount Prospect staff reviewed the initial traffic study and offered extensive comment which
was then taken under advisement by Prospect Heights.
The project has now reached a point where groundbreaking is anticipated in early April.
Traffic concerns previously expressed by staff were recently addressed as part of the final
draft Parking Study issued by the developers' consultant. The Traffic Study along with
information regarding the Arena development will be presented to you for review and
consideration. Representatives from the developer as well as Prospect Heights' City
Officials will be in attendance to answer questions and facilitate discussion. Additionally,
staff has attempted to advise residents at the north end of the Village of the meeting and
have invited them to attend.
NOTE: ANY INDIVIDUAL WHO WOULD LIKE TO ATTEND THIS MEETING BUT BECAUSE OF
A DISABILITY NEEDS SOME ACCOMMODATION TO PARTICIPATE, SHOULD
CONTACT THE VILLAGE MANAGER'S OFFICE AT t00 SOUTH EMERSON, MOUNT
PROSPECT, ILLINOIS 60056, 847/392-6000, EXTENSION 5327, TDD ~47/392-6064.
V. CORRIDOR DESIGN GUIDELINE UPDATE (CONCEPTUAL DESIGN)
Wolff Clements and Associates and Graf/x Communications Group have been working with
Community Development staff to develop a comprehensive set of guidelines to assist in the
revitalization of important commercial corridors within the Village. At a previous Committee
of the Whole meeting, pdmary and secondary corridors were identified along with other key
focal points. Examples of design concepts from other communities were also presented
for illustration purposes.
Since that time, the consultants have continued to work with Community Development staff
to develop conceptual designs for entry signs, banners and improvements for specific
locations within Mount Prospect. Those concepts will be presented at the Committee of the
Whole meeting.
Like the previous Committee of the Whole meeting, the Plan Commission has been invited
to sit in on the presentation and participate in the discussion. Representatives from the
consulting firm and Community Development staff will also be in attendance to answer
questions and facilitate discussion.
VI. VILLAGE MANAGER'S REPORT
VII. ANY OTHER BUSINESS
VIII. ADJOURNMENT
CLOSED SESSION
Labor Negotiations
5 ILCS 120/2 (c) (2) -"Collective negotiating matters between the public body and its
employees or their representatives, or deliberations concerning salary schedules for one or
more classes of employees."
MINUTES
COMMITTEE OF THE WHOLE
MARCH 14, 2000
I. CALL TO ORDER
The meeting was called to order at 7:'32 p.m. by Mayor Gerald Farley. Present at
the meeting were: Trustees Timothy Corcoran, Paul Hoefert, Richard Lohrstorfer,
Dennis Prikkel and Michaele Skowren. Absent from the meeting was Trustee
Irvana Wilks. Staff members present included Village Manager Michael E. Janonis,
Assistant Village Manager David Strahl and Public Information Officer Maura
Jandris.
II. APPROVAL OF MINUTES
Approval of Minutes from February 22, 2000. Motion made by Trustee Wilks and
Seconded by Trustee Lohrstorfer to approve the Minutes. Minutes were approved
unanimously.
III. CITIZENS TO BE HEARD
Richard N. Hendricks, 1537 East Emmerson Lane, spoke. He stated when he
was elected in 1993, the Village Board sold some property to Pontarelli Builders
instead of Norwood based on the preferred design even though Norwood offered
more money for the purchase price. He voted no to sell the property to Pontarelli
and has forwarded the materials including the tape of the meeting to the State's
Attorney for an investigation. He is also requesting a continuance on the Zoning
Case that is scheduled to be heard before the Board on North Yates due to pending
travel plans on March 22. He also stated the Village Manager refuses to see him
and he was recently arrested for returning phone calls to the Daily Herald.
IV. CREATION OF SISTER CITIES COMMISSION
Mayor Farley requested a modification to the proposed draft Ordinance whereby
there would be 15 members instead of 5 as depicted in the draft Ordinance.
Consensus of the Village Board was to increase the number of Commission
members from five to '15 and forward the Ordinance to the Village Board for
action at its next regularly scheduled Village Board meeting.
Barbara Persenaire, Two North Lancaster, spoke. She stated that she has been
very excited about participating in the program as a sub-committee of the Special
Events Commission and would like to thank the Village Board for considering
establishing the Commission as an official Commission.
Lil Floros, 111 North Emerson, spoke. She provided an outline of the schedule
of events regarding the six visitors that are expected from Sevres, France. They are
expected to arrive on May 16 and come to the Village Board meeting that evening
and enjoy dinner at a local restaurant. May 17 is Mount Prospect Day, which
includes a tour of the town, a visit to a local school and a banquet that evening.
May 18 is a Chicago tour throughout the City. May 19, there is a breakfast and a
Historical Museum tour and a signing ceremony pdor to their departure from O'Hare.
Melanie Karsen, 2005 Kiowa Lane, spoke. She stated that she is excited to
participate in the opportunity to exchange culture with people from France and is
looking forward to the visit.
IV. MANAGER'S REPORT
Village Manager Janonis stated the Village recently received correspondence from
the Northwest Municipal Conference offering participating members the opportunity
to join with other municipalities in pumhasing electrical power in bulk.
Assistant Village Manager Strahl provided a general background regarding this
proposal and stated the Village needed to formally act by forwarding a letter of
intent by March 31 and a follow-up letter by April 21.
Consensus of the Village Board was to submit accounts for consideration of
bulk purchase that were not included as part of the free service that the
Village enjoys as part of the Franchise Agreement with ComEd.
Village Manager Janonis requested a short Closed Session for litigation
discussion.
VI. ANY OTHER BUSINESS
Trustee Prikkel urged all citizens to complete their Census form.
CLOSED SESSION
Motion made by Trustee Hoefert and Seconded by Trustee Skowron to move into
Closed Session to discuss Litigation. Motion was approved. Meeting moved into
Closed Session at 8:03 p.m.
Meeting reconvened into Open Session at 8:18 p.m.
2
II. ADJOURNMENT
No other business was transacted and the meeting was adjourned at 8:18 p.m.
ReSpectfully submitted,
DAVID STRAHL
Assistant Village Manager
DS/rcc
H:\GEN\Cow\Minutes\031400 COW Minutes.doc
3
Village of Mount Prospect
Mount Prospect, Illinois
INTEROFFICE MEMORANDUM
TO: VILLAGE MANAGER MICHAEL E. JANONIS (~ ~"~
FROM: ASSISTANT VILLAGE MANAGER
DATE: MARCH 23, 2000 ~)
SUBJECT: PROSPECT HEIGHTS ARENA
As you are aware the Prospect Heig ht Arena is scheduled for a groundbreaking on April 11
and representatives from the developer, traffic engineer, and Prospect Heights have been
invited to a presentation before the Village Board to highlight the traffic study illustrating the
proposed traffic flow into and out of the arena. The arena project is solely within the
boundaries of Prospect Heights, so the Village has limited direct influence over any
perceived issues with the proposed project. However, the Village has always enjoyed a
positive and cooperative relationship with Prospect Heights' officials and has utilized that
relationship to suggest possible revisions to the project to minimize the traffic impact upon
Mount Prospect residents.
Attached to this memorandum is a copy of the revised traffic study dated February 10,
2000. A copy of previous Village staff comments regarding the original traffic study is also
attached. It is important to note that a number of significant changes have been made to
the traffic flow configurations partly in response the issues identified by staff. Please note
the following highlights of the report.
Burning Bush is not extended beyond the existing end point.
· All traffic in the southern lot of the arena is physically directed north to Palatine
Road or east Apple Lane.
· Palatine Road is the main entrance and exit point for traffic and additional curb cuts
are anticipated to be installed to facilitate traffic movements.
· There is no southern entrance to the arena as to discourage traffic through Mount
Prospect residential streets. Since all traffic has to from the north from Palatine
Road, from the west offWolf Road via Piper Lane, or from the east off Milwaukee
via Apple Drive there should be limited traffic through the residential areas cutting
over to these entrances due the inconvenience.
· Traffic control officers will be stationed at critical traffic points throughout the site to
ensure efficient traffic flow.
ROSPECT HEIGHTS ARENA
March 23, 2000
Page 2
· A physical barrier will be installed along the southern property boundary of the
property to further discourage parking in the residential areas and walking to the
arena. The barrier will consist of a bream, landscaping and a fence.
· All tickets will be sold with a parking pass included to eliminate vehicles cueing up
for payment of parking fees and creating bottlenecks at the entrances of the arena.
· Majority of the events will be staged after the typical rush hour traffic periods.
A site plan and traffic flow summary will be presented by the following individuals.
· Brian Bradley, Vice President of Operations, Prospect Development
· Rob Olson, Senior Transportation Planner, Barton-Aschman Associates
The developer has obviously put in a great deal of thought into the traffic flow pattern and
has been responsive to the Mount Prospect issues. Once the arena operation is underway
there may be a need to revisit the traffic plan to determine whether the proposed plan is
functioning as designed and recommend modifications. The developer has also offered to
create an Arena Liaison Committee consisting of Mount Prospect representatives and
citizens along with the counterparts from Prospect Heights to continue a dialogue on any
issues that may arise and create joint solutions to such issues.
Residents who have previously expressed an interest in this topic have been notified by
either letter or e-mail along with recent press announcements.
DAVID STRAHL
H:\GEN\Prospect Heights~Arena Cover Memo.doc
o3/20/00 10:55 '~3129171326 BARTON-ASCHI~kN ~002/031
P~ospect. Heights APena
Access, Circulation
& Pa~king Study
P~ospect Heights, Tllinoi$
Conducted for
Peospect Development
February :~000
Parsons Transportation Group, Xnc.
03/20/00 10:55 ~129171326 BARTON-ASCH.~AN ~003/031
A. Inlirp~iuCtion:
A traffic access and circulation study was conducted for the arena to evaluate the
impact on the surrounding transportation system and determined what roadway and
operations improvements and modifications would be necessary to accommodate the
traffic generated by the arena during the roadway system's evening peak hour and the
arena's peak hours of ingress and egress.
Based on the analyses, it is our conclusion that with the implementation of the roadway
and operations improvements listed below, the roadway system and adjoining
intersections can accommodate arena-generated traffic volumes and still maintain an
acceptable level service during the peak hours. In addition to the development of the
arena, the Illin0is Department of Transportation (IDOT) has proposed modifications to
the frontage roads along Palatine Road on the north side of the arena including on and
off-ramp modifications and the replacement of the Wolf Road interchange. These will
have a significant impact on the arena access plan. Because the full package of
proposed IDOT improvements would likely not be in place by the proposed opening date
of the arena, the recommended improvement program has been developed in a phased
format. Phase One is those improvements that would be required beyond the existing
street system to open the arena and maintain an acceptable level of operation. Phase
Two would be the complete future improvement program required to accommodate the
arena traffic with the full IDOT program in place.
B. E ist' n ii ns:
The arena site is currently served by Palatine Road and Burning Bush Lane to the north;
Milwaukee Avenue to the east; Wolf Road and Piper Lane to the west; and Apple Drive
to the east, Piper Lane curly,asses through the middle of the site. The primary
roadway system, shown in ~, is described below:
1. Existing Roadway Network
Palatine Road is an east-west major arterial that is under the jurisdiction of IDOT, The
roadway, which is classified by IDOT as a Strategic Regional Arterial (SRA), is a limited-
access facility in the arena vicinity, where it is grade-separated at Milwaukee Avenue
and Wolf Road, with a signalized diamond interchange provided at each location.
Palatine Road, which has two through lanes in each direction, is served by a pair of one-
way frontage roads, with slip ramps provided for traffic traveling between Palatine and
Milwaukee Avenue or Palatine and Wolf Road. IDOT is in the final design stages of a
proposed modification to the Palatine Road access system. Those modifications would
improve operating conditions between Wolf Road and Milwaukee Avenue by lengthening
the weaving area between the on and off-ramps in that section and would replace the
existing diamond interchange at Wolf Road with a new single-point urban interchange.
Other improvements are also proposed to the west of Wolf Road. IDOT projects that
construction of those improvements could begin sometime in year 2002.
Prospect Heights Arena DRIIFTFORIIEVIEW February 10, 2000
Prospect Development Corp. / Persons Transpor;ation Group, Inc. Page I
03/20/00 10:55 ~312g171326 BARTON-ASCItMAN ~004/031
Milwaukee Avenue (IL 21) is a north-south diagonal roadway that is under the
jurisdiction of IDOT and is also classified~as an SRA. Near the arena, the roadway has
throe southbound through lanes and two northbound through lanes with a 16-foot
median. South of Des Plaines River Road, the roadway has a four-lane undivided cross
section. The intersections of Milwaukee Avenue with the Palatine Road ramps, Apple
Drive, and Des Plaines River Road are signalized. Left-turn lanes are provided on
Milwaukee Avenue at these intersections, except on the south approach of Milwaukee
at Des Plaines River Road, where northbound left-turn movements are prohibited. North
of Palatine Road, Milwaukee Avenue has a five-lane cross section with left-turn
channelization at driveways and intersecting streets,
De$ Plaines River Road (U,$, Route 45) is a north-south roadway that extends south
from Milwaukee Avenue through several communities. AS it approaches Milwaukee
Avenue it has a two-lane cross section. Some streets, such as Seminole, and Camp
McDonald Roads, extend between Des Plaines River Road and Wolf Road through the
City of Prospect Heights. The land uses along Des Plaines River Road are residential to
the west and forest preserve on the east.
Wolf Road is a north-south major arterial with a two-lane undivided cross section
widening at its signalized intersections With the Palatine Road frontage roads to provide
two through lanes in each direction, An improvement plan to widen Wolf Road is
currently being programmed. That plan includes widening Wolf Road between Palatine
Road and Euclid Avenue.
Apple Drive is an east-west roadway that extends between Milwaukee Avenue and
Burning Bush Parkway. Apple Drive is approximately 30 feet-wide, The roadway
provides Palwaukee Plaza with signalized access to Milwaukee Avenue and access to
the residences along its frontage. Recent development plans have included a new hotel
to be located on the south side of Apple Drive near Milwaukee Avenue.
Piper Lane is an east-west twoqane roadway providing the industrial area west of the
arena site with access to Wolf Road. At Wolf Road, Piper Lane is under stop-sign
control.
Pinecrest Lane is a north-south two-lane roadway providing the land-uses at the west
side of the arena site with access to the frontage road. Pinecrest Lane is under stop-sign
control at its intersections with both the frontage road and Piper Lane.
It should be noted that in addition to Apple Drive and Piper Lane, which provide the
current uses within the arena site,boundaries with access to the roadway system, direct
access driveways to the eastbound Palatine Road frontage road are also currently
provided for the existing land-uses. ~ illustrates the existing roadways, traffic
controls and lane configurations, and the locations of the existing land-uses in the arena
vicinity.
2. Transit Service
The site is currently served by Pace transit service (Route 221) along Piper Lane
between Wolf Road and Milwaukee Avenue. This service operates on weekdays
Prospect Heights Arena DRAFT FOR REVIEW February 10, 2000
Prospect Development Corp. / Parsons Transportation Group, Inc. Page 2
03/20/00 10:$6 '~5129171325 BARTON-ASCIt~AN ~005/031
uJ
DRIVE
~L~ ROAD
o3/20/0o i0:56 83129171326 BARTON-ASCH~AN ~006/031
between approximately 5:15 AM and 7:00 PM. To the southwest of the site, Matra
North Central service is provided. While Metre runs a limited schedule at this time, plans
are to expand service in the future, which could' generate more use by arena-related
people.
3. Off-Arena Site and Neighborhood Considerations
The arena will be located adjacent to several residential complexes, The arena access
system will be using streets, Apple Drive and Piper Lane, that provide the sole access
for several of these developments. To the south, the arena site is bordered by residential
development. The proposed arena access system has been designed to minimize the
impact on these developments and to minimize the potential for significant vehicles
queuing on the external street system that would block the access drives for these
developments. Also the system is designed to minimize the potential of using private
streets to gain access to the arena.
The arena parking system has been sized ~o accommodate the arena traffic for nearly
all arena events. The proposed parking system will have about 3,300 spaces for patrons
and employees. For the few instances that the arena parking demand would exceed the
capacity of the on-site system, off-site employee parking will be available at the Metre
commuter parking lot, the Palwaukee Plaza, as well as other facilities if additional
parking is deemed to be necessary. The Metre end Palwaukee plaza lots can
accommodate up to about 500 vehicles if necessary.
A new Wingate Hotel is proposed for the southwest corner of the Milwaukee Avenue
and Apple Drive intersection. Based on traffic gen. eration estimates using rates published
by the Institute of Transportation Engineers, the hotel would likely generate about 50
to 60 vehicles in total during the peak arena ingress period. During the busiest hour of
the evening, it could generate up to 70 vehicles during the busiest hour. This relatively
limited amount of traffic to and from the hotel should not significantly impact traffic
operations for the arena,
4. Existing Traffic Volumes
Parson Transportation Group, Inc., conducted manual traffic counts at the following
intersections:
Milwaukee Avenue and Apple Drive
· Milwaukee Avenue and Palwaukee Plaza Driveway
· Eastbound frontage road and Plaza Drive
· Eastbound frontage road and apartment complex driveway
· Eastbound Frontage Road and Burning Bush
· Wolf Road and Palatine Road frontage roads
· Wolf Road and Piper Lane
The intersection traffic counts were conducted during September through January over
the past several years. The counts were conducted on Fridays from 4:00 to 10;00 P.M.
Prospect Heights Arena DRAFT FOR REVlEW February 10, 2000
Prospec[ Development Corp. / Parsons Transportation Group, Inc. Page 3
03/20/00 10:57 ~'3129171325 BARTON-ASCH~AN ~007/031
Additional =ount data for the intersections of Milwaukee Avenue and the frontage
read/ramps were also obtained from IDOT and utilized. Discussions with City and IDOT
staffs indicated that traffic volumes have not changed significantly since the counts
were conducted, especially during the late evening hours.
From summaries of the count data, three peak hours were selected for the analyses
presented in this study. These were:
· 5:00 to 6:00 P.M. = Street system evening peak hour
· 6:00 to 7:00 P,M. = Arena-generated inbound traffic peak hour
· 9:00 to 10:00 P.M. = Arena-generated outbound traffic peak hour
~ illustrates the existing weekday peak-hour traffic volumes for the three time
periods indicated above.
C. Arena Charac~e¢istics:
In order to evaluate future traffic conditions at the proposed access drives for the dev~el-
opment, it was necessary tO determine what the characteristics of the development
would be. These characteristics included 1). The configuration of the site; 2). The
directional distribution of traffic approaching and departing the site; and 3). The volumes
of traffic that would be generated by the proposed development during the peak street,
ingress, and egress hours.
1. Arena Site Plan
~ illuStrates the proposed arena site plan. The arena will be located in
southeasterly portion of the site with parking on three sides and service on the fourth.
Piper Lane traverses the site in an east-west direction. During arena events, Piper Lane
will be open only to transit and emergency vehicles. During non-event times, the street
will operate as a public street, Up to three acCess drives between the north parking ares
and the Palatine Road frontage road will be provided. The drives will be gated and used
only for emergency vehicle access and during arena egress one drive will be used for
north lot egress.
In the west central portion of the site is a fire protection district station. The station will
house two units. One ambulance and one fire truck. Access to the station will be
provided at all times. The transportation system improvements have been developed to
have one lane open in each direction for emergency vehicle use and traffic and parking
control people stationed st key Iooations to maintain access across any traffic queues.
Other elements of the site will be discussed in the relevant sections following.
2. Directional Distribution
The directional distribution of Arena-generated trips is a function of several variables,
including the distribution of population within the development's area of influence, the
Prospect Heights Arena DR,4FTFOR REVIEW February 10, 2000
Prospect Development Corp. / ParSons Transportation Group, Inc. Page 4
03/20/00 10:57 ~'~3129171326 BARTON-ASCHI~Mfi' ~008/031
pLAZA
DRIVE
zo(~o)[~o]< uJ
IBURNIR(~ ~
03/20/00 10:57 ~g~3129171326 BARTON-ASCI:II~,N ~009/031
o~/lo/oo lo:B8 ~'012~171~lo BARTON-ASCH~AN ~ OlO/O31
operational characteristics of the street system, and the ease with which drivers can
travel over various sections of the road system without encountering congestion.
The directional distribution of future Arena-generated traffic was based on an analysis
of population distribution within the market area developed for the project by others.
This primary market area extends from IL 176 on the north to Dempster Street on the
south and from the Lake County/McHenry County border on the west to Lake Michigan
on the east. Based on the population analysis, the=~;,.,.,~dir?,ctions of approach~a~d departure
were determined; the resu ts are, ustrated in ~ and sted n .~.~.
Table 1
ESTIMATED DIRECTIONAL DISTRIBUTION
Direction Percentage
To and from the north on Milwaukee Avenue 10%
To and from the east on Palatine Road 32
To and from the south on Milwaukee Avenue' 20
To and from the south on Wolf Road
To and from the west on Palatine Road 22
To and from the north on Wolf Road
Total 100%
* Includes traffic from south on River Road.
Primary access routes were identified based on the likely directions of approach. These
p~mary routes near the site include Palatine Road, Milwaukee Avenue, Des Plaines River
Road, Wolf Road. Farther from the arena access routes would include 1-294, Elmhurst
Road, and Euclid Avenue. As you move geographically away from the arena site the
number of roadways that will carry some arena traffic becomes very large. However,
the major impact will be most felt on the primary streets adjacent to the site.
The directional split, of traffic will also change from event to event. Because the
management group 'has such a diver~;e program of events, the demographic range of
viewers is large. This means that the people who will attend one type of show will be
different than for another type of show and will likely approach from different
directions. The key element in the ultimate assignment of traffic is can improvements
or management strategies be developed to accommodate those fluctuations?
Some concern has been raised regarding the uae of local residential streets for arena
access. Because the arena has no vehicles access from the south and the site will be
well fenced, the amount of parking in the surrounding residential areas should be
minimal. It is likely that some people will try it to avoid paying for parking. However, the
circuitous access path to the arena should discourage most patrons. Alternatives are
presented in the recommendations to address those people that do park off site.
Arena Traffic Generation
Prospsct Heights Arena DRAI='I' FOR REVIEW February 10, 2000
Prospect Development Corp. / Parsons Transportation Group, Inc. Page 5
03/20/00 10:58 83129171326 BARTON-ASCH.~.AN ~011/031
03/20/00 10:$9 '~3129171326 BARTON-A$CI~II~AN ~012/031
Arena access and off-site street improvement requirements for the proposed facility
were based on an analysis of a combined assignment of arena-generated and through
(non-arena) traffic movements on the adjacent streets for the three traffic periods
discussed previously.
The estimate of future arena-generated traffic was based on the size and character of
the proposed facility and on the traffic generation characteristics of other facilities in the
region that hos~ similar types of events.
The fol)owing are the parameters of the analysis:
Mode Use:
a. Transit and other captive markets (walking, etc.): 10 percent of patrons.
b. Transit use: average bus occupancy approximately 30 persona per bus.
c. Auto use: 90 percent of patrons, with average auto occupancy varying between
:2.75 and 3.2_5 depending on the type of event.
Traffic Distribution;
a. The bulk of traffic arrives or departs within the hour before and after the event.
b. Arrival rates are lower than departure rates, i.e. arrivals are more uniformly
spread out with 75 to 80 percent arriving in the 45 to 60 minutes before the
event, while 75 percent of the people depart in the first 30 minutes after the
event.
Arena Attendance:
a. While the arena will have a seating capacity of approximately 12_,000, few, if
any, events will likely exceed 11,500.
b. The average (mean) event will have an attendance of approximately 6,000
people with the 95th percentile event hosting about 11,000 patrons.
c. The arena will host approximately 170 events annually with a projected total
annual attendance of about 1.1 million people.
d. Approximately 200 to 300 employees will be needed for larger events. This will
generate an employee and player parking demand of about 150 spaces at an
average event and about ,200 spaces at a full-house event.
Based on These characteristics, the arena-generated traffic volumes were estimated for
the street system peak hour (5:00 to 6:00 P.M.); for the arena's inbound peak hour
(6:00 to 7:00 P.M.); and the arena's outbound peak hour (9:00 to 10:00 P.M.). These
traffic Volumes are shown in
The analysis considered conditions at both a full-house event (11,500 patrons) and
average attendance event (6,000 patrons). The analysis assumed a 7:00 P.M. start for
events at The arena, though under most conditions events would probably start at 7:30,
a peak arrival rate of 75 percent during the hour before the start of the event, and a
egress discharge 'rate of 75 percent during the first half-half hour after the end of the
event and a 100 percent discharge rate for the hour after the event. This departure rate
is the equivalent of 150 percent of the actual volume exiting the arena during the hour.
However. This assumption is necessary To account for the surge effect That will be
experienced after most events. Therefore, the volume of traffic shown in the
Prospect Heights Arena DRAFT FOR REVIEW February la, 2e$~
Prospect Development Corp. / Parsons Transportation Group, Inc. Page 6
03/20/00 i0:~9 ~3i29171326 BARTON-ASCItMAN ~013/031
assignments and figures may reflect more traffic than the arena would actually generate,
but it would be the equivalent impact as if the arena continued to discharge traffic for
and entire hour.
Table 2
ARENA-GENERATED TRAFFIC VOLUMES (WEEKDAY P.M.)
Street System Arena Inbound · Arena Outbound
Peak Hour{~ Peak Hour{bi Peak HourI=~
6:00-7:00 P,M. 9:00-10:00 P,M,
5:00~6:00 P.M.
In Out In Out In Out
Full House - 970 25 2,940 50 25 5,860
11,500{d)
Avg. House - 460 10 1,400 25 10 2,790
5,000~"~
So~rce: Parsons Transportation Group,/nc.
a - Assumes ;~5% arrive during the hour.
b - Assumes 75% arrive during the hour,
c - Assumes 75% exit during the first half-hour, Equivalent of 150% during the hour.
d - Assumes 10% non-auto, and an avg. auto occupancy of 2.90 persons per vehicle, 40 buses, and
300 non-patron vehicles.
e - Assumes 10% non-auto, and an avg. auto occupancy of 2.75 persons per vehicle, 20 buses, and
200 non-pat~on vehicles,
3. Auto Occupancy Surveys
To verify the auto occupancies used in the traffic generation calculations, surveys were
conducted at several of the area arenas and theaters for events similar to those
proposed for the Prospect Heights venue. The following summarizes the facility
surveyed, the type of event, and the average auto occupancy obtained:
Rosemont Horizon Chicago Wolves Hockey 3.12
Rosemont Theater Music Concert 2,79
UIC Pavilion Ameritech WTA Tennis 2,73
United Center Chicago Bulls Basketball 3.13
United Center Chicago Blackhawks Hockey 3.23
Prospect Heights Arena DRAFT FOR REVIEW February 10, 2000
Prospect Development Corp. / Parsons Transportation Group, Inc. Page 7
03/20/00 10:59 8312917132§ BARTON-ASCH~AN ~014/031
D. Arena Inaress and Earess~
1. Inbound and Outbound Travel Paths
Auto ingress to the arena will be provided off Milwaukee Avenue via Apple Drive, off
Wolf Road via Piper Lane, and on the eastbound frontage road via Plaza Drive and
Burning Bush Lane to Apple Drive as i ustrated in ~, For traffic traveling to the
arena from the east on Palatine Road, two alternative paths are available. For eastbound
traffic, Palatine Road can be accessed from either Wolf Road or from Milwaukee
Avenue. The first would be to exit at Milwaukee Avenue, then travel south to Apple
Drive and then turn right and follow Apple Drive to Burning Bush Lane to the arena. The
second route would be to continue on Palatine Road past Milwaukee Avenue and exit
at. Wolf Road. At Wolf Road, traffic would turn left to travel south and then either turn
left onto the westbound frontage road to the site or continue south on Wolf Road to
Piper Lane, then turn left to access the site. For traffic from the west, patrons can either
exit at Wolf Road to travel south to Piper Lane, or they can continue east an use the
Milwaukee Avenue exit to the frontage road to either Plaza Drive or to Milwaukee
Avenue. Northbound and southbound traffic can use either Wolf Road or Milwaukee
Avenue.
To facilitate faster ingress into the site, Piper Lane will be closed to general public
through traffic during 'arena events. Barricades will be placed across Piper Lane near the
front of the arena to prohibit non-authorized through traffic. This will also minimize
conflicts between through vehicle traffic and pedestrian traffic passing between the
arena and the north parking lot. Parking attendants will be stationed near the front of
the fire station make sure that the entrance to the station driveway is not blocked with
queuing traffic.
Shuttl'e and charter buses needing to enter the site will be able to do so from either the
eas~ or the west sides via Apple Drive or Piper Lane. Buses will drop off passengers
along the drive along the north side of the arena or along the turn-around loop at the
northeast corner of the building. During busy events, charter buses will then continue
through the site and to an off-site staging location, Shuttle buses will continue on there
prescribed routes. An alternative drop-off for charter bus' passengers is also being
evaluated where passengers would be dropped off et Harper College near the southwest
corner of the site and would walk to the arena.
As previously mentioned, the site is also serviced by the Pace #221 bus during the
morning and early evening hours. The last bus currently passes through the site about
7:00 P.M. along Piper Lane to Apple Drive. These buses will be allowed to continue
through the site at all times. There may be the potential for extending Pace service if it
appears to be useful for arena patrons.
At least one lane through the site will be maintained at all times for emergency vehicle
access and through movement. Entrance/exits for emergency vehicles only will be
provided along the frontage road from the north parking lot. In addition, turning radiuses
along the path through the site from Piper Lane to Apple Drive are being modified to
accommodate large emergency vehicles. Capacity is being provided at the ticket
Prospect Heights Arena DP..~FT FOR REVIEW February 10, 2000
Prospect Development Corp. / Parsons Transportation Group, Inc. Page 8
03/20/00 11:00 '~3129171326 BARTON-ASCIt~AN ~ o15/o31
03/20/00 11:00 83129171326 BARTON-ASCI:I~AN ~ 016/051
collection gates to the parking lots to minimize the length of the queues of standing
traffic. As an alternative to passing through the site, eastbound emergency vehicles
could circumvent the site by using Pinecrest Drive to the frontage road to Burning Bush
or Plaza to Apple. For westbound vehicles, wider lanes are being provided on Apple
Drive and police point control will be positioned to minimize any delay that emergency
vehicles may encounter,
During arena ingress, Pinecrest Drive will be controlled to minimize the volume of arena
traffic using it. This will be accomplished by not allowing southbound to eastbound left
turns from Pinecrest Drive onto Piper Lane. If arena traffic does enter Pinecrest Drive
from the frontage road, it will be required to continue south and then proceed west on
Piper lane back to Wolf Road. Also, westbound to northbound right-turns will also not
be permitted until the end of events. These restrictions should minimize the impact of
arena traffic to land-uses along Pinecrest Drive.
Egress from the site for the general public will be controlled to minimize any cut-through
traffic on the adjacent residential streets. Vehicles exiting the north parking lot will exit
via Piper Lane, Pinecrest Drive, or an exit gate located east of the on-ramp to Palatine
Road directly onto the frontage road, As was previously mentioned, only one of the
three proposed access drives can be used for egress at one time. This is because of
capacity considerations on the frontage road and its intersection with Milwaukee
Avenue. Traffic exiting vis Pinecrest Lane will be able to either proceed east on the
frontage road to Milwaukee Avenue or use the on-ramp to Palatine Road. The amount
of traffic going each location will need to be monitored to be sure the capacity of one
of these locations is not exceeded.
Patrons from the south lot will exit either via Piper Lane or Apple Drive. These routes
are illustrated in ~.'~.~. Police point-control personnel will control the rate that traffic
exits the lots to minimize queuing on the external streets.
2. Parking Collections
Parking collection booths will be located on both the east and west sides of the site. For
peak events, up to 13 collection lanes for general, club, and suite parking will be used.
Four single-sided booth3 (four lanes) for general parking will be located on the east side
of the site and will be served by dedicated lanes from Piper Lane- Three single-sided
booths (three lanes) will be used on the west side and will be located just west of the
fire station. Four collection booths will be available for club and suite parking on the east
side of the arena. Two single-sided booth (two lanes) will be located on the west side
of the arena.
The number of collection lanes was determined by dividing the projected peak access
demand by the average service rate of a manual ticket taking operation. For manual
ticket lanes where money is taken in exchange for a ticket, the average service rate can
vary between 275 and 325 vehicles per hour. For a peak arrival rate of 2,940 vehicles
and an average service rate of 275 vehicles per hour 11 collection lanes would be
required. Additional lanes were added in the suite and club area parking to help minimize
the lengths of the queues entering the site. Not all of these will be used at one time,
however, the extra lanes are necessary to accommodate potential load shifts from one
Prospect Heights Arena DRAP'TFOR REVIEW February 10, 2000
Prospect Development Corp. / Parsons Transportation Group, Inc. Page 9
03/20/00 11:01 83129171326 BARTON-ASCHMAN ~ o17/o31
PLA?..A DR.
03/20/00 11;01 '~3129171526 BARTON-ASCH~LN ~018/o31
parking area to another and minimize the amount of inbound vehicle queuing outside of
the site. Projections are that inbound arena traffic should not queue beyond Piper Lane
on both the east and west sides of the site (See ~.). Because the number of
parking spaces is more heavily oriented to the north than the south, more collection
booths are located to serve to serve other areas. In addition, the suite and club seat
patrons will have a prepaid parking placard so that no money needs to be collected at
those booths.
E. Traffic Assionment.'
The estimated weekday 'peak-hour equivalent' traffic volumes that would be generated
by the full-house and average-house arena events were assigned to the area roadways
servi.ng, the arena in accordance with the previously described directional distribution
(~'e .F'~g~te~..B'ia~]~"~). The =,ddition of arena-generated traffic to background traffic, as
shown in FigtJr~'s~ 1 ~i ae.,-f ~I. was analyzed to determine the impact of the development
on the adjacent roadways and to evaluate the arena access drives.
Traffic from the exJsting land-uses on the site was not subtracted from the bacJ~round traffic
volumes. Because the traffic generated by these uses is normally generated outside of the
arana's peak traffic generation hours, deducting the existing traffic would not have a
significant impact on traffic operations in the area.
F. Traffic ImoactAnalvsis:
The traffic impacts generated by a development are typically assessed in terms of the
ability of the area roadway system to accommodate site-generated traffic, particularly
at adjacent critical intersections. This ability of the intersections to accommodate the
new traffic is expressed in terms of level of service. However, because some of the
arena events will require point control at several key intersections during the peak
ingress and egress periods, standard level of service performance analysis cannot be
used for those peak events. Fo~ ial~r-m~..._~ns where an acceptable level of service
cannot be achieved under ~ {;o~t~ol eltly, ~ if the resui.t'.m.g queue length would be
too long, then manual point will be necessary, To evaluate the perf.0[mance of those
locations, an average lane Capacity II assumed arid the intersection ia evaluated with
respect as to whether the pro!acted volumes would exceed those lane capacities,
For a standard level of serve,ce analysis, there are six levels of service (A through F),
which relate to driving conditions ~r0m' be~'to~ ~st', r~$p~Cti~ly. Levels of service for
signalized intersections are defined in term~ of 'd'~la~/'~ Which'is a measure of driver
discomfort and lost travel time. The level of Servi~e'Crit~ri~'~; d~flned in the Highway
Capacity Manual is shown in ~~.
Capacity analyses were conducted for critical intersections in the vicinity of the arena.
The following combinations of street networks and land-uses were evaluated:
· Existing conditions.
· Existing conditions plus arena traffic for a full and average event with the
minimum amount of roadway improvements necessary :to open the arena.
P~oi~oS Helel~e &rer~ DIi~iI~'7'~OR REVI.~14~ Feb~u~ 10, 2000
Proepeot Bsvslellme~t eerp, I Imsreone ?ftfllpeF~lllep ~fol~e, II,e, Plill t e
0~/2o/o0 11:02 ~3129~7~326 BARTON-ASCH~,N ~019/o31
PLAZA DP,,
BUSH
~ 5(5)L1OSs~
WOLF
03/20/00 11:02 ~'3129171326 BARTON-ASCHMAN ~ogu/031
PLAZA
H
03/20/00 11:02 ~i29171316 BARToN-ASCHII~ ~021/031
pLAZA DR.
03/20/00 11:03 ~/~3129171326 BARTON-ASCHMAN ~022/031
03/20/00 11:03 '~3129171328 BARTON-ASCH.¥.AN ~o23/o31
· Existing conditions plus arena traffic for a full and average event with the
roadway improvements proposed in IDOT's Palatine Road Improvement Program.
Table 3
LEVEL OF SERVICE CRITERIA FOR SIGNALIZED INTERSECTIONS
Level of Interpretation Delay per Vehicle
Service (seconds)
A Very short delay, with extremely favorable progression. Most ~5.0
vehicles arrive during the green phase and do not stop at all.
B Good progression, with more vehicles stopping than for Level 5.1-15.0
of Service A, causing higher levels of average delay.
C Light congestion, with individual cycle failures beginning to ap- 15.1-25.0
pear. Number of vehicles stopping is significant at this level.
D Congestion is more noticeable, with longer delays resulting 25.1-40.0
from combinations of unfavorable progression, long cycle
lengths, or high V/C ratios. Many vehicles stop, and the
proportion of vehicles not stopping declines.
E Limit of acceptable delay. High delays result from poor progres- 40.1-60.0
sion, high cycle lengths, and high VIC ratios.
F Unacceptable delays occurring,, with oversaturation. ~ 60.0
Source: Highway Capacity Manual, 1994.
Table a,
LEVEL OF SERVICE CRITERIA FOR UNSIGNALIZED INTERSECTIONS
Level of Service Average Total Delay (seconds per vehicle)
A
B 5.1-10.0
C 10,1-20.0
D 20.1-30.0
E 30.1 -a~5.0
F
Source: Highway Capacity Manual, 1994.
Prospect Heights Arena J~iL4FTFOR REVIEW February 10, 2000
Prospect Development Corp, / Parsons Transportation Group, Inc. Page 11
03/20/00 11:03 ~3129171326 BARTON-ASCItMAN ~024/031
03/20/00 11:04 83129171326 BARTON-ASCH~AN ~025/031
TABLE - 6
INTERSECTION IMPROVEMENT NEEDS
INTERSECTION EXt"lNG PHASE PHASE
ONE TWO
MILWAUKEE / PALATINE
MILWAU~ I ~P~
~ ~ "tt ~ ~ ~tt
wo~ ~ .~T~.E
WOLF / P~TINE
SOUTH ~MP
~ ~ INTERGH~GE
PINEC~ST DRI~
.....
LEG~
~ ~E ~Y BE OPEneD ~ A S~D THROUG~ ~E DU~ P~ ~HDITIONS.
~ ~ NO RIG~ ~R~ DU~NG ~ ~S.
Pa~s Tm~p~afion ~up J
03/20/00 11:o4 '~3129171326 BARTON-ASCH~AN ~026/031
~,~ summarizes the levels of service and delays for the intersections analyzed under the
above-mentioned scenarios. ~ illustrates the lane configurations for the intersections ana-
lyzed.
1. Intersection Improvements
As indicated by the analysis results listed in the tables, the following minimum
improvements will be needed.to accommodate the arena:
a. Milwaukee Avenue and Palatine Road North Ramp
Phase One Improvements:
Widen the westbound off-ramp to provide a second left-turn lane.
Phase Two improvements:
Widen the westbound off-ramp to provide an exclusive right-turn lane.
b. Milwaukee Avenue and Palatine Road South Ramp
Phase One Improvements;
Provide an exclusive eastbound left-turn lane and eastbound right-rum lane and a
northbound fight-turn lane.
Phase Two Improvements: None.
c. Milwaukee Avenue and Apple Drive
Phase One Improvements:
Provide a southbound right-turn lane and a second eastbound left-turn lane.
Phase Two Improvements; None.
d. Wolf Road and Palatine Road Ramps
Phase One Improvements:
At the intersection with the westbound frontage road (north intersection), a
westbound right-tam lane should be added. At the intersection with the eastbound
frontage road (south intersection), an eastbound right-turn lane and a nor[hbound
right-tum lane should be provided.
Phase Two Improvements:
The IDOT improvement program for the Palatine Road corridor indicates that the
existing diamond interchange is proposed to be replaced with a single point urban
design that would provide one through lane, one leff-tum, and one right-turn lane on
the frontage road approaches and two through lanes, and two leff-tum lanes on the
Wolf Road approaches with the two existing traffic signals being replaced with a
single traffic signal. In addition, a northbound right-turn lane would be provided.
Prospect Heights Arena .ORAFI' FOR REVIEW February 1 O, 2000
Prospect Development Corp./ Parsons Transportation Group. Inc. Page 12
03/20/00 11:05 '~3129171326 BARTON-ASCItMAN ~027/031
e. Wolf Road and Piper Lane
Phase One Improvements:
Widen Wolf Road to provide two through lanes in each direction plus one
northbound and one southbound left-turn lane. In addition, a northbound
exclusive right-turn lane should also be provided. Piper Lane should be widened
to provide two through lanes in each direction with one right-turn lane. one
through lane, and one left-turn lane at the ~ntersecticn.
Phase Two Improvements:
Provide a second northbound through lane if not done already and provide a traffic
signal that is interconnected with the traffic signal(s) at Palatine Road.
f. Pinecrest Drive and Palatine Frontage Road
Phase One Improvements:
Provide right-in/right-out channelization on Pinecrost Drive with a northbound to
eastbound lane at least ~. feet wide to accommodate t~= outbound lanes during
arena egress periods. ~' on~
Phase Two Improvements:
None.
It should be noted that all of the existing signals would have to be modified and/or
upgraded to accommodate these improvements.
While some sections of Palatine Road east and west of the study area are currently
experiencing some congestion problems during the evening peak hour, the proposed
improvements to Palatine Road and the arena-related improvements identified here should
minimize any additional impa¢t in those locations from arena traffic.
2. Roadway Improvements
The following roadway widening projects will be required to accommodate the arena
traffic demand and to match future roadway projects proposed for the area:
a. Piper Lane
Piper Lane should be widened to provide two through lanes in each direction.
b. Eastbound Palatine Frontage Road
IDOT future plans are to modify the frontage road and access system along the
site frontage. This proposed modification would reduce the frontage road to one
lane from its current two lanes between the on and off ramps (approximately
Pinecrest to Burning Bush). The single frontage Road lane will mean that only
one direct connection to the frontage road could be used at one time.
Discussions with IDOT indicated that they are considering modifying the frontage
road design based on comments and plans they have seen to date. if the design
should change, then some minor change to the egress plan will be needed.
However, no maior changes would be required.
Prospect Heights Arena DR.~FT FOR REV/EW February 1 O, 2000
Prospect Development Corp. / Parsons Transportation Group, Inc. Page 13
03/20/00 11:05 83129171326 BARTON-A$CItMAN ~028/031
c. Pinecrest Drive
Pinecrest Drive should be modified to accommodate one lane of traffic in each
direction during non-event days end emergency vehicle access and two-lane
egress during arena events.
d. Apple Drive
Apple Drive should be widened to accommodate three moving lanes of traffic
.with one dedicated through lane in each direction and a reversible lane in the
center. During peak arena ingress, Apple Drive will operate with two westbound
lanes and one eastbound lane, During peak egress, the roadway will have two
eastbound lanes and one westbound lane. During non-event times, the center
lane will operate as a continuous left-turn lane.
Purchase by the City an~ improve the street surface.
3. Intersection Traffic Point Control
During arena event ingress and egress, traffic point control will be required or in some
cases preferred at some intersections in the area. The number of locations that will
require point control will vary by event size, day of week, and. type of traffic that is
expected to be attracted, Events with a larger peak attendance will have a greater
impact on local intersections than smaller events and will require more traffic control.
Events on weekdays will have a different impact than Saturday and Sunday events
because of the different characteristics of the' background, or non-arena, traffic in the
area and may require more traffic control. Also, events that attract more first time users
versus repast users, such as sporting events with season ticket holders, may need
additional guidance and control for traffic accessing the arena.
The specific locations and duties of traffic point control personnel will be identified in
the final Arena Traffic Operations Plan. That plan will identify the processes and
procedures for each traffic control location and will develop the arena access signing
plan. Discussions with the City of Prospect Heights Police Department ha~e identified
the following locations as probable traffic point control locations for many of the events:
· Milwaukee Avenue and Apple Drive
· Milwaukee Avenue and Palatine Road Ramps (2 locations)
· Milwaukee Avenue and Des Piaines River Road
· Wolf Road and Piper Lane
Wolf Road and Palatine Frontage Roads (2 locations)
· Eastbound Palatine Frontage Road and Pinecrest Drive
· Eastbound Palatine Frontage Road and north parking lot gates
Eastbound Palatine Frontage Road and Burning Bush Parkway
· Eastbound Palatine Frontage Road and Plaza Drive
· Apple Drive and Plaza Drive
- Burning Bush Parkway and Piper Lane
Burning Bush Parkway and Apple Drive
Prospect Heights Arena DR. AJ=T FOR REVIEF~f February 1 O, 2000
Prospect Development Corp. ! Parsons Transpo~.ation Group, Inc. Page 14
03/20/00 11:05 'g~3129171325 BARTON~ASCHMAN ~029/031
Parking for the arena will be provided primarily on site. The proposed plan will
accommodate approximately 3,300 vehicles on-site. In addition, off-site parking for
approximately 500 additional vehicles has been coordinated with the City and local
businesses. The arena's on-site parking will be divided into distinct sections. The first
is the general parking area (north lot) which will also accommodate most of the
employee parking. The second is suite and club ticket holder parking (south lot), and the
third is off-site and bus parking.
Based on a peak attendance of 11,500 people, an average auto occupancy of 3 people
per car, 10 percent non-auto users, and 300 spaces for employee parking, the peak
parking demand at the site should be about 3,750 spaces (3,450 patron and 300
employee). Table 7 lists the projected parking demand for a series of events proposed
for the arena. With the proposed off-site parking, the total supply of spaces would be
about 3,800 spaces. As was previously mentioned, if additional parking is deemed
necessary at a later date other commercial facilities in the area should be available for
overflow parking. Based on current information, the site should accommodate parking
for over 95 percent of the projected events on site.
1. General Parking
General parking will be located along the north side of the arena and will accommodate
both the general ticket patrons and parking for the some part-time employees. The
parking lot will contain approximately 2,450 parking spaces, The general parking area
will be access via two driveways, The first will be located on the east side of the site
and the second will be located on the west side of the site next to the fire station, The
eastern drive will have for four ticket collection booths. The western drive will have
thre'e ticket collection booths. Up to three access drives are proposed from the north lot
onto the Palatine Road frontage road. These drives would only be used for emergency
vehicle access and one drive could be used for post event egress.
2. Suite and Club Parking
Suite and club seat parking will be provided along the south and east sides of the arena.
This parking will be reserved initially for suite and club ticket patrons but could be made
available to general ticket patrons as additional parking if the general parking fills and
suite and club attendance was Iow, or offered at a premium cost as an upgrade
alternative to general parking. This reserved parking area will contain approximately 850
parking spaces and will be accessible by two access drives. The first will be located on
eastern side of the site opposite the entrance to the general parking area. The second
will be located on the western end of the site adjacent to the service area drive. Parking
for disabled patrons will also be available in this reserved lot.
Two additional parking lots will also be provided on site. The first is a 15-space private
parking lot adjacent to the fire station. The seconds is a parking Jot located at the
northwest comer of the arena. This lot will be used for player, referee, and VIP parking.
In addition, the lot can also be used as a drop-off area and for patrons not parking on
the site.
Prospect Heights Arena DRAFT FOR REVIEW February 10, 2000
Prospect Development Corp. / Parsons Transportation Group, Inc. Page 15
03/20/00 11:06 '~'3129~71326 BARTON-ASCH~L~ ~o3o/o31
03/20/00 11:06 '~3129171326 BARTON-ASCItMAN ~031/o31
3. Off-Site and Bus Parking
During peak arena events some employees will be shuttled in from off-site employee
parking. This parking is proposed for the existing city Metre parking lot located at Camp
McDonald and Wolf Roads. The lot holds over 350 vehicles and has very Iow usage
during the evening. In addition, off-site parking arrangements have also been discussed
with the owners of Palwaukee Plaza, That parking facility is within walking distance of
~he arena.
Buses will generally be loaded and unloaded along Piper Lane near the arena but will be
parked during many events at a remote local:ion. Several sites are available for bus
parking during events depending on the day of the week. For events where parking
demand is expected to be less than capacity, buses can be parked at the outer edge of
the either on-site parking lot. During many events, buses will travel off*site for other
services rather than park and wait for returning patrons.
4. Parking Control
Parking lot attendants who will direct patrons into the marked parking areas will staff
the arena parking lots. Some off-site parking enforcement may be required, especially
in the residential neighborhoods along Apple Drive. Because the arena does not have any
direct access to and from the south connecting to the residential neighborhoods the
amount of patron parking in those neighborhoods should be small. However, it would
not be unexpected for some patrons to try and parked in those areas and walk to the
arena. To minimize the frequency of this occurring, some off-site surveillance before
and during arena events may be necessary from time to time.
Prospect Heights Arena DR/iFTFORR£VlEVIf February 10, 2000
Prospect Development Corp. I Parsons Transportation Group, Inc. Page 16
Village of Mount Prospect
Mount Prospect, Illinois
INTEROFFICE MEMORANDLJM
TO: MAYOR GERALD L. FARLEY AND BOARD OF TRUSTEES
FROM: VILLAGE MANAGER MICHAEL E. JANONIS
DATE: APRIL 9, 1999
SUBJECT: PROSPECT HEIGHTS ARENA UPDATE
At Tuesday evening's Village Board meeting, concerns were raised regarding the
potential impact of the Prospect Heights Arena on residential neighborhoods at the
northern end of the Village. Several Board members requested that the Mayor and
Village Manager contact our counterparts in Prospect Heights to request updated
information regarding any traffic studies or operational plans developed in conjunction
with this project as well as to request an informational meeting with the Prospect
Heights City Council and the developers of the Arena.
On Wednesday morning, April 7, Mayor Farley relayed this request to Mayor Rotchford
at the Northwest Municipal Conference Executive Committee meeting. According to
Mayor Farley, Mayor Rotchford was amenable to the idea of an informational meeting.
However, he said that a meeting could probably not be arranged until sometime in June.
I will be following up with City Administrator Ken Bonder regarding the logistics of such
a meeting.
As a refresher, I am also enclosing all of the correspondence and staff reviews, which
have taken place since 1997 when the concept for the Arena really got off the ground.
As you can see, I believe the Village has been very diligent in making its concerns
about potential impacts from the Arena known to the City of Prospect Heights. You will
note that the most recent correspondence between Mr. Bonder and me includes his
transmittal of a draft traffic study. This is the same traffic study which we received in
June of 1997, which has already been reviewed by staff and questions forwarded back
to Prospect Heights.
s we have done throughout, staff will continue to monitor activities related to the
development of the Arena and seek additional information, especially about potential
traffic impacts as it becomes available.
MEJ/rcc
c: Community Development Director William ~;oon~
Village Engineer Jeff Wulbecker
Public Works Director Glen Andler
Police Chief Ronald Pavlock
Fire Chief Michael Figolah
Assistant Village Manager David Strahl
Village of Mount Prospect
Mount Prospect, Illinois
INTEROFFICE MEMORANDUM
TO: MAYOR GERALD L FARLEY AND BOARD OF TRUSTEES
FROM: VILLAGE MANAGER
DATE: JULY 24, 1997
SUBJECT: PROSPECT HEIGHTS' ARENA
The attached information package is provided in an effort to keep you up to date on the status
of the proposed Prospect Heights' Arena and our efforts to minimize any negative impacts that
that facility might have on adjacent Mount Prospect neighborhoods.
The package is arranged chronologically from most recent communication back to our eadiest
official contacts. You will note that we have regularly made inquiry regarding the status of the
project and have expressed special interest in potential traffic impacts to Mount Prospect
residential neighborhoods which border Old Seminole/Willow Road. Also included in the package
is the draft Traffic Study and our staff comments including questions and concerns about what
is and is not included in the Study.
On June 30, Mayor Fadey and I met with Mayor Rotchford and City Administrator Ken Bonder to
specifically discuss this topic. We were pleased with their receptiveness and they committed to
passing our comments and concerns along to their Traffic Consultant so that they could be
considered as part of the final report. It is our intention to contact the Traffic Consultant directly
to make sure that our comments are being considered and addressed.
Dudng the June 30 meeting, Messrs. Rotchford and Bonder expressed optimism that the project
would eventually move forward. However, they admitted that there were numerous hurdles to be
overcome as well as some strenuous opposition from a few City Council members. Under their
most optimistic scenario, a ground breaking was tentatively scheduled for sometime this fall.
However, that time line is in considerable jeopardy due to the fact that the properties necessary
to provide parking for the facility have not yet been acquired.
This constitutes the latest information that I have. If you have any questions or comments, please
do not hesitate to contact me.
ME J/fcc
c: Public Works Director Glen Andler
Community Development Director William Cooney
Police Chief Ronald Pavlock
Assistant Village Manager David Strahl
Village of Mount Prospect
Mount Prospect, Illinois
INTEROFFICE MEMORANDUM
TO: COMMUNITY DEVELOPMENT DIRECTOR WILLIAM COONEY
PUBLIC WORKS DIRECTOR GLEN ANDLER
POLICE CHIEF RONALD PAVLOCK
ASSISTANT VILLAGE MANAGER DAVID STRAHL
FROM: VILLAGE MANAGER
DATE: JUNE 4, 1997
SUBJECT: PROSPECT HEIGHTS' SPORTS ARENA
PRELIMINARY TRAFFIC STUDY
As you may be aware, the City of Prospect Heights is contemplating the construction of a
12,000 seat Sports and Entertainment Arena in the area immediately north of
Seminole/Old Willow Road, bounded by Piper Lane and Palatine Road. We have
previously expressed our concerns regarding the potential for adverse traffic impact on our
residential neighborhoods which border Seminole/Old Willow Road.
In response to our concerns, the City of Prospect Heights has forwarded to us their
preliminary traffic study for the arena. I would ask that each of your Departments review
this document and provide me with your comments no later than Monday, June 23. Please
copy each other with your comments and, if necessary, we will schedule a meeting for
final discussion during the week of June 23. Thank you for your attention to this item.
MI~IS
MEJ/rcc
c: Mayor Gerald L. Farley
INTEROFFICE MEMORANDUM TREE CIT~' USA
TO: VILLAGE MANAGER MICHAEL E. JANONIS
FROM: DIRECTOR OF PUBLIC WORKS
DATE: JUNE 24, 1997
SUBJECT: PROSPECT HEIGHTS ARENA
The Public Works Department has reviewed the referenced study and offers the following
comments:
· The report concedes that the identified road system improvements will not be
completed all at once and therefore, offers a phased improvement plan. In addition,
the report notes that the arena opening will probably not be postponed until after all
the needed road improvements are complete. However, the plan does not examine the
impact on area side streets during the time period that the arena is open but road
improvements are incomplete. Where are the likely short-cuts? What is the time
frame of the phased road improvement program? When will the arena open?
· The study suggests that only 29% of the arena traffic will come from the south. This
seems unrealistic. It also suggests that only 7% will come from the south on Wolf
Road. That really seems unrealistic. What are these figures based on?
· Besides intersection improvements, the study does not talk about the need to improve
Wolf Road. We think they should go on record and tie Wolf Road improvements and
cross section expansion to their arena.
· Seminole Lane (Old Willow Road) will experience additional traffic due to this arena
development. As traffic backs up waiting to enter the arena's parking lot or as the
parking lot is emptying, motorists will see Seminole Lane as a traffic free route. The
impacts to Seminole Lane and the intersections of Wolf Road/Seminole Lane and
River Road/Seminole Lane should be included in the report. The level of service,
queue lengths and delays should be determined for the existing condition and the
proposed improvements.
age 2.
Prospect Heights Arena
June 24; 1997
· The report only looks at traffic impacts immediately adjacent to the arena site.
Impacts to Wolf Road and the Wolf Road/Camp McDonald Road intersection should
also be analyzed and any necessary improvements recommended.
· The traffic volumes for River Road and Milwaukee Avenue were combined into one
number. Projected impacts should be shown separately for Milwaukee Avenue and
for River Road.
· The report states that "The arena parking system has been sized to accommodate the
arena traffic for nearly all arena events; For the rare instances that the arena parking
demand would exceed the capacity of the on-site system, offsite employee parking
will be available at a designated location". The parking lot for the arena should be
designed to handle all demand for all occasions. The employee parking demand is
estimated at 300 cars for full house events. Based on approximately 3 persons per
car, that leaves room for only an additional 900 event attendees. That is less than 1%
of the full house attendance and leaves a rather small margin of error in unanticipated
crowd size estimates. Also if off-site parking is to be utilized the location should be
specified and the traffic impacts should be analyzed.
· We would like to see the data used to develop the Directional Distribution. Only
percentages were provided in the report.
· The report is inconsistent is its estimation of average event attendance. The report
states on page 10 that the average event attendance will be approximately 5,000
people. It also states that the arena will host approximately 170 events annually (that
is one every other day) with an annual attendance of 1.1 million people. That results
in an average attendance of approximately 6,500.
GRA/eh
x: files\frontoffkadmin\pharena
Village of Mount Prospect
Mount Prospect, Illinois
COMMUNITY DEVELOPMENT DEPARTMENT
INTEROFFICE MEMORANDUM
TO: Michael E. Janonis, Village Manager
FROM: William J. Cooney Jr., Director of Community Development ~'~
DATE: June 9, 1997
SUBJECT: Prospect Heights Sports Arena Traffic Study
I have reviewed the traffic study for the above-mentioned project in Prospect Heights and
offer the following comments:
1. There is a mention of off-site parking for overflow events in the study. I
would request that they provide further detail where this off-site parking will
be located.
2. The traffic study references a market study that indicates the southern
boundary of the arena's market to be Dempster Street. The traffic study
goes on to further state that they anticipate the south leg of Wolf Road to
provide 9% of the overall traffic to the arena. My gut feeling is that this figure
may be Iow and the market for the arena is likely to be further south than
Dempster Street. It is my feeling that depending on how well the
Palatine/Wolf and the Palatine/Milwaukee intersections function during
events, that the south leg of Wolf Road could be a conduit to much greater
than 9% of the overall traffic.
3. The study indicates a widening of Wolf Road to three lanes at Piper Lane.
If Wolf Road will be widened in this location, it should also be widened from
Euclid to Camp MacDonald Road.
4. There is no mention of River Road in the study. The study states that 20%
of all traffic will come from the south leg of Milwaukee Avenue. However,
it does not indicate how much of that traffic will come from River Road. It is
likely that River Road will become a fairly significant north/south roadway
that will serve this arena.
Page Two
June 9, 1997
5. I believe that the greatest impact on Mount Prospect will be the result of the
"water theory." The only access points to the facility are located off of Wolf,
Palatine and Milwaukee Roads. However, if major arterials become
congested, it is likely that patrons of the arena will utilize the side streets (i.e,
Mohawk, Alderman, Seminole, etc.) to avoid congested intersections. From
the Village's standpoint, we will have to monitor this activity and take
methods to mitigate any problems. It may be appropriate to barricade some
of these streets during the peak exiting times for the arena.
These are my initial comments based on my review of the arena traffic study. If you have
any questions, please contact me directly at X5307.
WJC:sz
c: All Department Heads
Carol Fields
Village of Mount Proapect
Mount Prospect, Illinois
INTEROFFICE MEMORANDUM
TO: MICHAEL E. JANONIS, VILLAGE MANAGER
FROM: CHIEF OF POLICE
SUBJECT: PROSPECT HEIGHTS' SPORTS ARENA
PRELIMiNARY TRAFFIC STUDY
DATE: JUNE 24, 1997
At your request, Crime Prevention staff reviewed the potential impact on the Village of Mount
Prospect relative to a new Sports Arena located in Prospect Heights. My staffagrees with Director
Cooney's report expressing concerns with customers and attendees at the Arena who will be
traveling and/or parking in our community.
In checking with Des Plaines Police staff, it was found they have a tremendous resoume problem
when dealing with the Rosemont Horizon in that people will park in Des Plaines, one to two miles
away from the Horizon, rather than pay parking fees at the stadium. This has led to the infamous
permit parking in Des Plaines, adjacent to the Rosemont Horizon.
Consequently, even though the Arena is some distance from Mount Prospect, there could be an
adverse impact on our neighborhoods as alluded to in Director Cooney's memo. I suggest that we
have Traffic Engineering and Conununity Development staff work closely with our Crime
Prevention Officers as the plans evolve for this type of facility.
RWP:jd ~~
c: All Department Heads
Village Clerk
Village of Mount Prospect
Mount Prospect, Illinois
INTEROFFICE MEMORANDUM
TO: Village Manager Michael E. Janonis
FROM: Assistant Village Manager
DATE: June 26, 1997
SUBJECT: Prospect Heights Arena Traffic Study Comments
I have reviewed the draft report provided and have a number of comments. Below is a
summary of those comments.
1) The projected traffic volumes appear to light. Also, the arena location near major
roadways which require the use of some residential streets would seem to cause
the patrons to look for shortcuts to avoid the major roadways. This would be most
severely pronounced for the streets which would feed into the access streets into
the arena. While much of the traffic can be directed to the specific arena feeder
streets through signage it would be unrealistic to assume that traffic volumes would
not increase on the residential streets.
2) Since the arena would be charging a fee for parking some plan should be
considered for persons who park on the residential streets and walk to the arena to
avoid the parking fee. This pedestrian traffic could increase the possibility of
cdminal activity and most certainly traffic volumes of patrons attempting to find their
way through the residential areas to a major street during the night time hours.
3) The extension of any streets in Mount Prospect into streets in Prospect Heights
would obviously make the possibility of cut through traffic more likely.
This is not an exhaustive list by any means, but it represents an overview of the possible
issues gleaned from the traffic study.
DAVID STRAHL
X:~U S E RS\DAVES\W~ N\OFFIC E~PH HTSTA F.WPD
MAYOR ~~ VILLAGE MANAGER
Gerald L. Fadey ~ Michael E, Janonis
TRUSTEES VILLAGE CLERK
George A. Clowes Carol A. Fields
Timothy J. Corcoran
Richard N. Hendricks
Paul Wm. Hoefert Phone: 847/392-6000
Adene A. Juracek Fax: 847/392-6022
Irvana K. Wilks TDD:'847/392-6064
Village of Mount Prospect
100 South Emerson Street Mount Prospect, Illinois 60056
March 4, 1997
Mr. Kenneth M. Bonder
City Administrator
City of Prospect Heights
1 N. Elmhurst Road
Prospect Heights, IL 60070-1592
Dear Mr. Bonder:
Thank you for providing the Prospect Heights Arena plans for my review. Although the plans are
preliminary, they do provide a general indication of how the development will be designed. While
I believe this development will have a positive impact on the entire region, there are some issues
that I would appreciate further clarification on prior to the development of final plans. These issues
include the following:
1. Traffic Impact - You indicated that a traffic impact study had not been completed
to date. I would appreciate a copy of this document when it is finalized. The
Village's primary concern relates to the potential extension of Burning Bush Lane
south to Seminole Lane. As you are aware, this roadway does not currently exist
and would likely create a significant traffic impact on the residential neighborhoods
to the south of the proposed development. In addition, Mount Prospect is very
interested in how the traffic flow will be directed around the area roadways for large
events at the arena.
2. Public Transportation - What level of public transportation is proposed for the
arena? Are there, plans to interface with the newly established Metre station on
Wolf Road or other public transportation nodes? This development may be the
impetus to further discuss an overall bus network with PACE. I would welcome the
opportunity to sit down jointly with representatives from the City of Prospect
Heights, Metra and PACE to design a public transportation network that would
serve our two communities.
age Two
Mamh 4, 1997
3. Arena Events - What types of events are proposed for the arena? It would appear
that a basketball court and hockey rink are illustrated on the floor plans for the
arena. I would appreciate information on the proposed type and number of events
and the hours of operation for the arena.
4. Security - What types of security measures are being proposed for the arena? Will
there be private security for the arena or will additional police be required to patrol
the arena?
5. Palatine Road Reconstruction Project - How does the proposed construction
schedule for the arena coincide with the proposed Palatine Road improvements?
If there is a conflict, what types of temporary measures will be utilized to address
traffic issues during this time period.
After you have had the opportunity to obtain additional information regarding this project, I would
welcome the opportunity to s. it down with you and your staff to discuss these issues further. If you
have any questions regarding these issues, please do not hesitate to contact me directly at 818-
5307.
Sincerely,
Director of Community Development
WJC:sz
c: Michael E. Janonis, Village Manager
X:\USERS\COMDEV~B ILL~BONDER.WPD
Village of Mount Prospect
Community Development Department
MEMORANDUM
TO: MICHAEL JA~qONIS, VILLAGE MANAGER
DA~: ~CH 24, 2000
CO DO DES a O.ID L .PD T
Representatives of Wolff Clements ~d Associates ~d ~af/x Communications Group will be at ~e M~ch 2g, 2000
Village Bo~d meethg to present concep~al designs for en~ signs, b~e~, ~d improvemems for specific focus
~e~. Like the previous COW meethg, ~e PI~ Commission has been invited to sit h on the presen~tion ~d
p~icipate in ~e discussion.
Prel~in~ eoncep~al desi~s were presented to ~e PI~ Commission and Village s~ e~lier this mon~. ~e
consulting te~ has since revised the desi~s per PI~ Commission and staff commems. ~e M~ch 28* presentation
will reflect ~ese ch~ges. For yo~ convenience, a copy of the March 1, 2000 PI~ Commission minutes and a file
memo ~at summarizes ~e meethg wi~ ~ff ~e aRached.
ARer reviewing ~e concep~al designs ~d receiving feedback from ~e Village Bo~d ~d PI~ Commission, the
consulting te~ will present final desi~s at ~ upcoming Village Bo~d COW meeting. Instead of focusing
improvements on only ~e No,west Hi,way Co~idor, ~e designs will detail improvements for specific focus
~e~. ~ese focus ~eas were selected because of ~eir location h relation to en~/exit into ~e Village, ~o~t of
space available for e~cement, ~d its potemial to se~e as a model improvement ~ea.
Please fo~d ~is memo ~d aRac~ents to ~e Village Bo~d for ~eir review ~d consideration at their M~ch 28~
meeting Pl~hg st~ will be at ~e meeting to p~icipate in the discussion and help answer any questions ~e
Village Bo~d has reg~ding the process.
Willim Cooney, Jr.
mb
MINUTES OF THE REGULAR MEETING OF THE
MOUNT PROSPECT PLAN COMMISSION
March 1, 2000
CALL TO ORDER:
The regular meeting of the Mount Prospect Plan Commission was called to order by Chairman
Michael Zadel at 7:32 p.m. at the Village Hall, 100 South Emerson Street, Mount Prospect,
Illinois.
ROLL CALL:
Present upon Roll Call: Michael Zadel, Chairman
Antoinette Astreides
Gary Orouwinkel (7:45 p.m.)
Edwin Janus
William Reddy
Carol Tortorello
Absent: Frank Boege
Louis Velas¢o
Village Staff Present: Michael Blue, AICP, Deputy Director of Community Development
Judy Connolly, AICP, Planner
Misty Das, Planner
Others in Attendance: Robert Bush
Ed Dowling
Craig Famsworth
Tom George
Mike Hildebrant
Mark Lattner
Don McLean
Janice Stone
Gerry Stone
Ben Trapani
Nancy Uxa
APPROVAL OF MINUTES:
Chairman Zadel opened the meeting and asked for comments on minutes from November 17,
1999 and December 1, 1999. As there were none, Bill Keddy moved to approve the minutes from
November 17 and Carol Tortorello seconded the motion. The motioned carried 4-0 with Michael
Zadel abstaining. Tonie Asterieds moved to approve the minutes from December 1, 1999 and Ed
Janus seconded the motion. The motioned carried 4-0 with Bill Keddy abstaining.
SUBDMSIONS:
NONE
OLD BUSINESS:
NONE
MOUNT PROSPECT PLAN COMMISSION
Minutes of March 1, 2000 Meeting Page 2
NEW BUSINESS:
Development Code Exceptions - St. Ragmond's Parish/301 S, I-Oka
Chairman Zadel introduced the first item of business and asked Judy Coanolly to present an
overview of the case, PC-01o2000. Ms. Connolly said that St. Raymond's Parish is in the process
of expanding its facility and is subject to current code requirements. She said the petitioner is in
the initial stages of applying for a building permit and is seeking relief from Development Code
requirements for storm water detention and stre. etlight installation.
Ms. Coanolly reviewed the storm water detention exception first. She said that the Development
Code recognizes St. Raymond's proposed addition as a new development and requires detention
for the whole site. The petitioner proposes to provide storm water detention for the new
structures only. The petitioner would like to modify the parking lot along Elmhurst Road/Route
83 so the parking lot will store water on-site and not increase the amount of discharge into the
combined sewers. She said that the project also presents the Village with an opportunity to
incorporate corridor improvements along Elmhurst Road/Rt. 83. The improvements could be a
combination of landscaping and new fencing to screen the parking lot and enhance the Rt. 83
corridor. She said a landscape easement along the east side of the parking lot was not required
for approval of the storm water detention exception request but that the request would be in
keeping with the proposed Corridor Guidelines. She said that providing detention for the new
impervious surface only would be consistent with previous projects that included expansion of an
existing facility. Therefore, staff recommends approval of the petitioner's request for an
exception to the Development Code's storm water detention requirements.
Ms. Connolly discussed the second part of the case, the petitioner's request to not install
streetlights, as is required by the Development Code. She said that the petitioner feels that there
is sufficient lighting at the site now and does not want to install new lights. Ms. Connolly said
that although the existing lighting is consistent with the amount of lighting in the neighborhood,
the source does not meet Development Code standards. She said that the existing streetlights are
on CornEd poles and on the petitioner's property. According to the Development Code, the
existing CornEd lights would be replaced with aluminum standard poles and would be placed at
the intersections and mid-block where necessary. Ms. Connolly said that the current lighting
sources were on private property or owned by CornEd and that the Village could not guarantee
that the light source would always be available. She said that the petitioners request does not
meet the standards for a hardship and that granting the exception would be inconsistent with
previous Village policy when other petitioner's sought relief from this requirement. Therefore,
staff recommends denial of the petitioner's request for an exception to Development Code
requirements for streetlights. At a minimum, the petitioner could record a covenant agreeing to
pay for the installation and fmtures if the Village determines that streetllghts are necessary.
Ms. Connolly said that representatives from St. Raymond's were in the audience to answer Plan
Commission's questions and that Chuck Lindelof of the Village Engineering Division was also in
attendance if the Plan Commission had questions about the storm water detention design.
The Plan Commission asked for clarification on the storm water detention design. Mr. Lindelof
reviewed the Development Code regulations relevant to the project. He said that increasing the
amount of discharge to the Elmhurst Avenue sewer, decreasing the rate of discharge to the sewer
from the parking lot, and storing water in the parking lot, would not impact the overall sewer
system. Mr. Lindelof said that no more than eight inches of water would be stored in the
"pooling-area" of the parking lot and that the proposed design meets code. He said that the
parking lofs current elevi~tion changes appear minimal because the changes are spread over the
MOUNT PROSPECT PLAN COMMISSION
Minutes of March 1, 2000 Meeting Page 3
length of the parking lot and that the existing topography is conducive to the petitioner's proposal.
Plan Commission asked about the additional mn-off that would result from increased impervious
surface at the church site. in relation to a reduction of green space. Mr. Lindelof said that there
would be sufficient storage in the parking lot to off-set the additional mn-off created by the new
impervious surfaces. Plan Commission asked about the impacts on the adjacent neighbors and
said they were concerned that the existing capacity of the I-Oka sewer, the sewer in closest
proximity to the addition, may not adequately handle the additional mn-off. They said they were
concerned that the neighbors would get water on their property if the sewer backed up. Mr.
Lindelof said that past experience has shown that IDOTs sewer (in Route 83) which the I-Oka
sewer empties into, has occasion to back-up. However, the petitioner's design would not
aggravate the situation.
The Plan Commission said they were not comfortable making a decision on the storm water
detention exception without knowing the I-Oka Avenue sewer capacity and impacts on the
neighboring properties from the additional mn-off in the church area. As the petitioner's
engineering representative did not have this information, there was discussion about researching
the Plan Commission's question and continuing the case to the next meeting. Ben Trapani
explained the petitioner's tight timetable and asked that, since the design was reviewed and
approved by the Village's Engineering Division, that the Plan Commission make a decision
tonight. The Plan Commission said that they needed more information about the sewer capacity
to make a decision about the Development Code exception request and Bill Reddy moved to end
the discussion at this time and to continue further discussion of PC-01-2000 at the March 15,
2000 Plan Commission meeting. Tonic Asteriedes seconded the motion and the motion carried 6-
0. Mike Blue asked the Plan Commission if there were other questions or issues for the petitioner
to research for the next meeting. Chairman Zadel polled the Plan Commission. The capacity
issue was the only issue that had to be researched for the next meeting, and the Plan Commission
would be supportive of the petitioner recording a covenant to pay for the strcetlights at a later
date if the Village determined that the lights were necessary.
Corridor Design Guidelines - preliminary designs
Chairman Zadel introduced the next item of business and asked Judy Connolly to summarize the
status of the project. Ms. Connolly said that the Plan Commission toured the corridors with the
consulting group, Wolff Clements & Associates and GraffX in early December. Based on that
tour and their own research, the consultants presented preliminary findings and corridor
conditions at the January 25* Committee of the Whole meeting, Mike Blue said the purpose of
tonight's presentation was to give the consultants feedback on their preliminary conceptual
designs. He said the consultants would revise the concepts according to tonight's discussion. Mr.
Blue said that the Plan Commission was invited to the March 28t~ Committee of the Whole
meeting and that the consultants would present concept designs for Village Board and Plan
Commission review.
Frank Clements introduced his associates, Craig Farnsworth and Don McLean, of Graf/X
Corporation. Mr. McLean presented preliminary sign and banner concepts. He explained the
thought process behind the designs and said that colors in the sign could be modified. He said
that the revised sign would have a greater emphasis on "Mount" to distinguish Mount Prospect
from neighboring communities. The Plan Commission said that they agreed with the direction of
the concepts. There was discussion that the "picture" banners would be unique and help
differemiate the village from other communities while Promoting loeai activities and reflect the
seasons or other events.
MOUNT PROSPECT PLAN COMMISSION
Minutes of March 1, 2000 Meeting Page 4
Mr. Famsworth presented information about the focus areas. He said that the site in relation to
entry/exit to the Village and the amount of space available determines the level of improvement.
In some areas there was more space available and allowed for a more elaborate sign or gateway
feature. Mr. Farnsworth presented several locations for new signs and explained how existing
sign locations could be modified. His presentation included examples of possible low-lying wall
designs, landscaped areas, and improvements in the median. The main idea was that the signs,
enhancement features, and landscape would be different throughout the Village, depending upon
the amount of land available, the topography, of the area and the relationship to entry into the
Village. The improvements would be constructed of similar materials or incorporate elements of
the sign presented by Mr. McLean. Therefore, the Village had flexibility in making corridor
improvements as budget constraints, redevelopment, or new businesses oppormnitles were
presented, while still implementing unified corridor improvements.
The Plan Commission agreed with the consultants' designs with minor changes and ideas for
improvement to particular sites.
Sub-recipient Monitoring Plan (CDBG)
Chairman Zadel asked Misty Des, Planner, to begin the discussion of the CDBG subrecipient
Monitoring Plan. Ms. Des explained that the new monitoring plan entailed four different
procedures. The first was a monthly status report from each public service sub-recipient, that
detailed program expenditures, number of participants and accomplishments for that month. Ms.
Des stated that all subreeipients had submitted their status reports for January 2000.
The second monitoring procedure would be a semi-annual site visit from staff. Ms. Das said that
the first of the semi-annual staff site visits was scheduled for June, 2000. At that time, staff
woutd compile a formal report for the Plan commission, detailing findings from the visit as well
as a form summarizing the subrecipients monthly status reports from the previous six months.
The third monitoring visit was a site visit from the Plan Commission CDBG sub-committee,
made up of Tonic Asterides, Carol Tortorello, Bill Reddy and Gary Grouwinkel. Ms. Des asked
that, after each site visit, 'sub-committeee members report the visit to staff in order to keep a log
of the visits. Tonic Asterides verified she would monitor Camp Fire, Club RecPlex and Boy
Scouts and Carol Tortorello verified she would monitor Cia?ground and the Mentor Program. Ed
Janus asked to be relieved of monitoring Access to Care and Bill Reddy volunteered to take his
place. Gary Grouwinkel volunteered to monitor Resources for Community Living and the
Resource Center for the Elderly.
Ms. Das explained to Plan Commission members that the fourth monitoring procedure was a
questionnaire for the recipients of public service funding. This questionnaire would be completed
anonymously during staff's site visit. Bill Reddy and Carol Tortorello asked that all applications
and monthly status reports from each public service program also be sent to the appropriate
CDBG sub-committee member.
COMMENTS AND OTHER BUSINESS:
Michael Blue explained that HUD has just recently visited the Village for a monitoring Visit duc
to the fact that the Viltage had not been monitored by HUD in ten years. The monitoring visit
was successful and HUD representatives reported no negative findings, only suggestions about
record keeping and file management. Mr, Blue stated that HUD representatives had inquired
about attending a Plan Commission meeting in order to give CDBG allocation suggestions.
Chairman Zadel stated that Plan Commission would be interested in inviting HUD representatives
OUNT PROSPECT PLAN COMMISSION
Minutes of March 1, 2000 Meeting Page 5
to a future Plan Commission meeting and the matter would need to be discussed at a future
meeting.
Mr. Blue also distributed information and registration materials for Plan Commission training
being conducted by the local professional planners association.
Ed Janus moved to adjourn the meeting and Bill Reddy seconded the motion. The motion carried
6-0 and the meeting was adjourned at 9:57 p.m.
Deputy Director of Community Development
Ju~th M. ~2~'n1(oI~, .~ICP, Planner
Misty l~a~, Planne~J -
Village of Mount Prospect
Community Development Department
MEMORANDUM
TO: FILE
FROM: JUDY CONNOLLY, AICP, PLANNER'~_,~
DATE: MARCH 2, 2000
SUBJECT: CONCEPTUAL DESIGN WORKSHOP (MARCH I MEETING)
Frank Clements and Craig Farnsworth of Wolff Clements & Associates and Don McLean of Graf/x
Communications met with Village staff (Glen Andler, Bill Cooney, Mike Blue, Sandy Clark, Judy Connolly and
Jeff Wulbecker) yesterday and presented preliminary conceptual designs.
Don McLean presented a sign/banner concept. The shape of the sign was a keystone and the sign face
incorporated elements that were intended to describe the Village. It included the Village eagle, tree canopied
streets, single family homes, "hands" that represented community involvement, with the large picture taking on
the form of the water tower and a "Mount Prospect label" in a reflective blue color, tying the sign together. The
background colors ranged from gradients of yellow to orange to black. Mr. McLean presented examples of
possible banners. He scanned pictures from the History of Mount Prospect book and said that the final set of
banners could be different for each season, but that the idea was to use actual pictures of the Village, and
community events for each season. Mr. McLean said that banners should be double sided, approximately 3' xS'
and included the blue-reflective Mount Prospect label from the sign.
Staff comments included increasing the size of "Mount" in the Mount Prospect label to distinguish the Village
from its neighbor, Prospect Heights. There was discussion about toning down the background colors, slightly
modifying the tree canopies (more outward to be more like a tree). The consensus was that Mr. McLean captured
the basic essence of the Village but the final design needed to be modified.
Mr. Farnsworth presented sketches of certain focus areas that showed the general enhancement idea for each site.
The designs were based upon factors specific to each site such as amount of available space, the site in relation to
an entry point into the Village, the adjacent land uses, and utility (overhead power lines) constraints. The designs
included a combination of Iow-level walls (varying shapes, sizes and materials subject to previous listed
constraints), landscaping, signs, or elements of the sign, in addition to hard-scape elements. Mr. Clements asked
staff questions about IDOT's proposed improvements for the intersection of Rand/Kensington and Rt. 83, Rand,
Mount Prospect and Central Roads and the Village's proposed Loop Road designs.
As the intersection improvements and the loop road concepts were not finalized, staff said to omit that aspect
from the presentation to the Plan Commission. They answered Mr. Clements questions about the proposals and
discussed how much land would be needed to implement the changes. Staffs comments about Mr. Farnsworth's
sketches were generally very positive and that the designs were appropriate for the Village.