Loading...
HomeMy WebLinkAboutTab 7: Public WorksVILLAGE OF MOUNT PROSPECT 2014 - 2018 CAPITAL IMPROVEMENTS PLAN SUMMARY OF PROJECT REQUESTS Department: Pub &c Works F(Iof2) Page Project Dept. Project Name No. Type 2014 Priority 2015 2016 2017 2018 Total Street Improvement Program (E) F -1 705 2,472,500 1 4,091,000 4,213,500 4,340,000 4,469,500 19,586,500 Combined Sewer Improvements (E) F -2 701 800,000 2 1,000,000 0 0 0 1,800,000 Flood Control Program (E) F -3 702 300,000 3 50,000 1,550,000 50,000 80,000 2,030,000 Sidewalk Cost Share Program (E) F -4 705 145,000 4 150,000 155,000 160,000 165,000 775,000 New Sidewalks (E) F -5 705 120,000 5 140,000 160,000 180,000 200,000 800,000 Traffic Improvements (N) F -6 710 50,000 6 50,000 50,000 50,000 50,000 250,000 Other Public Buildings (E) F -7 706 95,000 7 95,000 95,000 95,000 95,000 475,000 Streetlight Improvements 2 (E) F -8 710 75,000 8 575,000 125,000 125,000 125,000 1,025,000 Detention Pond Improvements (E) F -9 703 100,000 9 800,000 840,000 490,000 280,000 2,510,000 Ash Replacement Plantings (N) F -10 710 163,364 10 129,939 91,642 48,570 0 433,515 Ash Tree & Stump Removals (N) F -11 710 250,002 11 187,502 125,000 62,494 0 624,998 Water Facility Roof Rehab (N) F -12 706 42,500 12 35,000 45,000 47,500 0 170,000 Storm Sewer Inspection Program (N) F -13 703 100,000 13 100,000 100,000 100,000 100,000 500,000 Booster Station (N) F -14 700 50,000 14 50,000 50,000 50,000 50,000 250,000 Levee 37 (E) F -15 702 75,000 15 30,000 35,000 35,000 35,000 210,000 VH Parking Deck Maintenance (N) F -16 706 50,000 16 50,000 50,000 50,000 50,000 250,000 Wireless Telemtetry Upgrade (N) F -17 700 52,000 17 61,000 45,000 65,000 65,000 288,000 Residential AMR/AMI (N) F -18 700 500,000 18 1,000,000 0 0 0 1,500,000 HVAC Replacement Program (N) F -19 706 446,000 19 0 0 0 0 446,000 Traffic Signal Replacement (E) F -20 704 50,000 20 50,000 305,000 50,000 50,000 505,000 Brick Sidewalk Sealing (E) F -21 705 75,000 21 75,000 75,000 75,000 75,000 375,000 Tree Planting Program (E) F -22 710 137,079 22 145,305 154,023 163,263 173,059 772,729 Neighborhood Drainage Improv. (N) F -23 702 100,000 23 100,000 100,000 100,000 100,000 500,000 Infrastructure Aesthetics (N) F -24 710 40,000 24 40,000 40,000 40,000 40,000 200,000 Streetscape Improvements (N) F -25 705 930,000 25 0 0 200,000 0 1,130,000 Sewer Main Rehabilitation (E) F -26 701 375,000 26 500,000 525,000 550,000 550,000 2,500,000 KBC Jogging Path Rehab (N) F -27 710 240,000 27 350,000 205,000 0 0 795,000 Stand -By Pump Power Supply (E) F -28 700 525,000 28 0 0 0 0 525,000 Melas /Meadows Ped. Bridge (N) F -29 710 120,000 29 140,000 2,900,000 0 0 3,160,000 NW Hwy Bike Rte /Ped Signals (N) F -30 705 770,000 30 0 0 0 0 770,000 PW Roof Repair (N) F -31 706 0 N/A 595,000 0 0 0 595,000 Water Main Replacement (E) F -32 700 0 N/A 1,200,000 500,000 500,000 500,000 2,700,000 Salt Storage Building (N) F -33 706 0 N/A 600,000 0 0 0 600,000 Lift Station Rehab (N) F -34 701 0 N/A 325,000 350,000 650,000 450,000 1,775,000 Water Tank Rehabilitation (E) F -35 700 0 N/A 530,000 0 555,000 0 1,085,000 Parking Lot Improvements (E) F -36 706 0 N/A 58,000 0 25,000 0 83,000 Deep Well Rehab (E) F -37 700 0 N/A 257,750 275,000 0 300,000 832,750 PW Radio System (N) F -38 709 0 N/A 50,000 0 0 0 50,000 Leak Detecting Euipment (N) F -39 700 0 N/A 0 75,000 0 0 75,000 HVAC Upgrade - VH F -40 706 0 N/A 0 370,000 0 0 370,000 PW Vehicle Lifts (N) F -41 708 0 N/A 0 55,000 57,200 0 112,200 Public Safety Garage Sprinkler (N) F -42 706 0 N/A 0 0 40,000 0 40,000 F(Iof2) VILLAGE OF MOUNT PROSPECT 2014 - 2018 CAPITAL IMPROVEMENTS PLAN SUMMARY OF PROJECT REQUESTS Department: Public Works (N) = New Project (E) = Established Project Project Type Codes: 700 = Water System 701 = Sanitary Sewer 702 = Flood Control Projects 703 = Storm Sewer 704 = Street Construction and Reconstruction 705 = Resurfacing/Curbs and Gutters /Sidewalks 706 = Construction of and Improvements to Public Buildings 707 = Computer Hardware /Software 708 = Vehicles and Automotive Equipment 709 = Non - Automotive Equipment 710 = Miscellaneous F (2 of 2) Page Project Dept. Project Name No. Type 2014 Priority 2015 2016 2017 2018 Total Levee 37 Emer Generators (N) F -43 702 0 N/A 0 0 205,000 0 205,000 Public Safety Parking Deck (N) F -44 706 0 N/A 0 0 200,000 0 200,000 Televising System Upgrades (N) F -45 709 0 N/A 0 0 75,000 75,000 150,000 Hydro Excavator (N) F -46 709 0 N/A 0 0 0 105,000 105,000 Total 9,248,445 13,610,496 13,659,165 9,434,027 8,182,559 54,134,692 (N) = New Project (E) = Established Project Project Type Codes: 700 = Water System 701 = Sanitary Sewer 702 = Flood Control Projects 703 = Storm Sewer 704 = Street Construction and Reconstruction 705 = Resurfacing/Curbs and Gutters /Sidewalks 706 = Construction of and Improvements to Public Buildings 707 = Computer Hardware /Software 708 = Vehicles and Automotive Equipment 709 = Non - Automotive Equipment 710 = Miscellaneous F (2 of 2) File Name: Street Improvement Program 2014- 2018.xls (E) = Established Project F -1 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Street Improvement Program (E) Project Type Code: 705 Department: Public Works 2014 Dept. Priority: l Description: Resurfacing of Village streets to maintain 20 -year life. Location: Various Justification /Comments: Repair of Village streets to provide safe and smooth pavement for motorists and to prevent necessity of complete street reconstruction. Materials testing will be conducted as part of this project to verify compliance with project designs and Village codes. Due to a shortage in the street improvement fund in 2010, 2011 and 2012, the amount of miles resurfaced were reduced from 6.8 miles to 5 miles in 2010, 4.9 miles in 2011, 4.7 in 2012 and 5.2 in 2013. 2014 was to be the first year of the new annual funding level necessary to maintain 6.8 miles annually for an average 20 -year life for all Village streets. This will now be deferred until 2015 pending sufficient funds. Note: 20 year life funding level formula: 6.8 miles x 5,280 feet/mile x $109 /foot. Annual Dollar Impact Upon the Operating Budget: Annual crack sealing cost is $52,000 (2013) Project Costs: 2014 2015 2016 2017 2018 Totals Construction 2,412,000 4,029,000 4,150,000 4,275,000 4,403,000 19,269,000 Materials Testing 60,500 62,000 63,500 65,000 66,500 317,500 2,472,500 4,091,000 4,213,500 4,340,000 4,469,500 19,586,500 Sources of Funds: 2014 2015 2016 2017 2018 Totals Motor Fuel Tax Fund 860,000 1,380,000 1,400,000 1,420,000 1,440,000 6,500,000 Street Improvement Fund 1,612,500 2,711,000 2,813,500 2,920,000 3,029,500 13,086,500 2,472,500 4,091,000 4,213,500 4,340,000 4,469,500 19,586,500 File Name: Street Improvement Program 2014- 2018.xls (E) = Established Project F -1 File Name: Combined Sewer Improvements 2014- 2018.xls (E) = Established Project F -2 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Combined Sewer Improvements (E) Project Type Code: 701 Department: Public Works 2014 Dept. Priority: 2 Description: Evaluate and repair main line sewers and appurtenances in combined sewer service areas. Location: Various Justification /Comments: Recent inspections of combined sewer service areas have revealed significant structural deterioration of main line pipes and manholes. A combined sewer evaluation study was completed in 2005 and the results of this study were used to identify problems and prioritize repairs. Repairs were initiated in 2006 starting with the most serious (category 5). Category 3 defects to be corrected between 2011 - 2014. Category 2 defects to be corrected between 2014 - 2015 Sewer construction fee is due to expire in 2016 Annual Dollar Impact Upon the Operating Budget: None Project Costs: 2014 2015 2016 2017 2018 Totals Design and Construction 800,000 1,000,000 0 0 0 1,800,000 800,000 1,000,000 0 0 0 1,800,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Water & Sewer Fund 800,000 1,000,000 0 0 0 1,800,000 800,000 1,000,000 0 0 0 1,800,000 File Name: Combined Sewer Improvements 2014- 2018.xls (E) = Established Project F -2 File Name: Flood Control Program 2014- 2018.xls (E) = Established Project F -3 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Flood Control Program (E) Project Type Code: 702 Department: Public Works 2014 Dept. Priority: 3 Description: Sewer improvement projects designed to minimize area -wide flooding problems that were identified in the 1990 Flood Study. Location: Various Justification /Commen ts: High incidence of sewer surcharging, basement back -ups and area -wide flooding associated with high frequency rain events in following areas: 1) Village Creeks: Remove /trim trees on creek banks, remove debris (2042 - 2018). 2) Prospect Meadows Storm Sewer & Ditch Improvements (2014). 3) McDonald Creek Bank Stabilization ($1,500,000 - 2016). 4) Feehanville and Higgins creeks stabilization scheduled for outlying years (Pending - $3,700,000). NOTE: Stabilization Maint. = Repair /Replace a jacks, monoslabs, rip -rap, permanent erosion control blankets, etc., used to stabilize banks. 6) Weller Creek silt removal. ($30,000 2018- 5 year cycle) Hatlen Heights to be constructed in 2013 Annual Dollar Impact Upon the Operating Budget: None Project Costs: 2014 2015 2016 2017 2018 Totals Creek Tree Trimming 25,000 25,000 25,000 25,000 25,000 125,000 Stabilization Maint. 25,000 25,000 25,000 25,000 25,000 125,000 Haden Hgts Storm 0 0 0 0 0 0 McDonald Creek 0 0 1,500,000 0 0 1,500,000 Prospect Meadows 250,000 0 0 0 0 250,000 Weller Creek Silt Rem 0 0 0 0 30,000 30,000 300,000 50,000 1,550,000 50,000 80,000 2,030,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Flood Control Construction Fund 300,000 50,000 1,550,000 50,000 80,000 2,030,000 300,000 50,000 1,550,000 50,000 80,000 2,030,000 File Name: Flood Control Program 2014- 2018.xls (E) = Established Project F -3 File Name: Sidewalk Cost Share 2014- 2018.xls (E) = Established Project F -4 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Sidewalk Cost Share Program (E) Project Type Code: 705 Department: Public Works 2014 Dept. Priority: 4 Description: Remove and replace public sidewalk at resident request. Residents share cost. Location: Various Justification /Comments: Expands sidewalk improvements at minimal cost. Project costs reflect level of resident participation. Cost/ Cost / Resident Village Year Square Foot Square Share Share 2012 No Cost Share Program 2011 No Cost Share Program 2010 4.40 110.00 55.00 55.00 2009 4.45 112.25 49.00 62.25 2008 3.90 97.50 48.00 49.50 Annual Dollar Impact Upon the Operating Budget: None Project Costs: 2014 2015 2016 2017 2018 Totals Construction 145,000 150,000 155,000 160,000 165,000 775,000 145,000 150,000 155,000 160,000 165,000 775,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals General Fund 108,750 112,500 116,250 120,250 124,250 582,000 Contributions from Residents 36,250 37,500 38,750 39,750 40,750 193,000 145,000 150,000 155,000 160,000 165,000 775,000 File Name: Sidewalk Cost Share 2014- 2018.xls (E) = Established Project F -4 File Name: New Sidewalks 2014- 2018.xls (E) = Established Project F -5 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: New Sidewalks (E) Project Type Code: 705 Department: Public Works 2014 Dept. Priority 5 Description: Install new sidewalk at locations where none currently exist. Location: Various Justification /Comments: Large backlog of locations where sidewalks are discontinuous or nonexistent. Currently estimate $800,000 to install missing sidewalk. Backlog a result of not funding program for the past several years. Annual Dollar Impact Upon the Operating Budget: None Project Costs: 2014 2015 2016 2017 2018 Totals Construction 120,000 140,000 160,000 180,000 200,000 800,000 120,000 140,000 160,000 180,000 200,000 800,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals General Fund 120,000 140,000 160,000 180,000 200,000 800,000 120,000 140,000 160,000 180,000 200,000 800,000 File Name: New Sidewalks 2014- 2018.xls (E) = Established Project F -5 File Name: Traffic Improvements 2014- 2018.xls (E ) = Established Project F -6 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Traffic Improvements (E) Project Type Code: 710 Department: Public Works 2014 Dept. Priority: 6 Description: Implementation of Traffic Improvement Programs including the Traffic Calming Program. Location: Throughout the Village. Justification/Comments: These programs are intended to reduce speeding and neighborhood cut - through traffic. Annual Dollar Impact Upon the Operating Budget: Approximately $2,500 to maintain signage, striping and traffic calming measures. Project Costs: 2014 2015 2016 2017 2018 Totals Traffic Calming Engineering & Construction 50,000 50,000 50,000 50,000 50,000 250,000 50,000 50,000 50,000 50,000 50,000 250,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Street Improvement Construction Fund 50,000 50,000 50,000 50,000 50,000 250,000 50,000 50,000 50,000 50,000 50,000 250,000 File Name: Traffic Improvements 2014- 2018.xls (E ) = Established Project F -6 File Name: Other Public Buildings 2014- 2018.xls (E) = Established Project F -7 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Other Public Buildings (E) Project Type Code: 706 Department: Public Works 2014 Dept. Priority: 7 Description: Improvements at Village -owned buildings Location: Various Justification /Comments: Miscellaneous improvements and remodeling at P/F HQ Building, Public Works, Village Hall and outlying fire stations. Upgrade PW training room, and siding for outside garages PW refinish/replace carpeting, tile & ceramic floors as needed, desks, conference tables and chairs, carpeting at PW as needed. Annual Dollar Impact Upon the Operating Budget: None Project Costs: 2014 2015 2016 2017 2018 Totals Miscellaneous 45,000 45,000 45,000 45,000 45,000 225,000 Public Works 50,000 50,000 50,000 50,000 50,000 250,000 95,000 95,000 95,000 95,000 95,000 475,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Capital Improvement Fund 95,000 95,000 95,000 95,000 95,000 475,000 95,000 95,000 95,000 95,000 95,000 475,000 File Name: Other Public Buildings 2014- 2018.xls (E) = Established Project F -7 File Name: Streetlight Improvements 2014- 2018.xls (E) = Established Project F -8 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Streetlight Improvements (E) Project Type Code: 710 Department: Public Works 2014 Dept. Priority: 8 Description: Installation of streetlights Location: Various Justification/Com m ents: Install new streetlights to improve traffic safety at various locations on Village streets. Central Road - install roadway lighting from Emerson to Albert. Staff seeks to consider the conversion of existing mercury vapor streetlights to energy saving LED technology. The Village owns and maintains over 900 streetlights. This effort will be a multi -year project and staff will perform a cost - benefit analysis prior to LED retrofits. Annual Dollar Impact Upon the Operating Budget: Approximately $3,000 per year for energy costs for the new lights The conversion to LED lights will have both energy and labor savings. Project Costs: 2014 2015 2016 2017 2018 Totals Various 75,000 75,000 75,000 75,000 75,000 375,000 Central Road 0 450,000 0 0 0 450,000 LED retrofit 0 50,000 50,000 50,000 50,000 200,000 75,000 575,000 125,000 125,000 125,000 1,025,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Capital Improvement Fund 75,000 575,000 125,000 125,000 125,000 1,025,000 75,000 575,000 125,000 125,000 125,000 1,025,000 File Name: Streetlight Improvements 2014- 2018.xls (E) = Established Project F -8 File Name: Detention Pond Improvements 2014- 2018.xls (E) = Established Project F -9 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Detention Pond Improvements (E) Project Type Code: 703 Department: Public Works 2014 Dept. Priority: 9 Description: Improve capacity and operation of detention pond system. Location: Kensington Business Center Justification /Comments: Village is responsible for maintaining depth of Kensington Business Center detention ponds. 2014 Pond 1 Design / Construction 2015 Pond 2 Design / Construction 2016 Pond 8 Design / Construction 2017 Pond 6 Design / Construction 2018 Pond 6A Design / Construction Annual Dollar Impact Upon the Operating Budget: None Project Costs: 2014 2015 2016 2017 2018 Totals Dredge Detention Ponds 100,000 800,000 840,000 490,000 280,000 2,510,000 100,000 800,000 840,000 490,000 280,000 2,510,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Capital Improvement Fund 100,000 800,000 840,000 490,000 280,000 2,510,000 100,000 800,000 840,000 490,000 280,000 2,510,000 File Name: Detention Pond Improvements 2014- 2018.xls (E) = Established Project F -9 File Name: Ash Replacement Plantings 2014- 2018.xls (E ) = Established Program F -10 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Ash Replacement Plantings (E) Project Type Code: 710 Department: Public Works 2014 Dept. Priority: 10 Description: Planting of replacement trees necessitated by the expected removal in the next 4 years of all but about 792 Ash trees from the public right -of -way, due to Emerald Ash Borer. Location: Various - As of March 2013 there were 2,474 ash trees on Village parkways. Approximately 792 of these are routinely treated by the Village and 1682 will likely die. Justification /Comments: EAB was found in Mount Prospect in Fall 2010. The estimated average cost of a 2.5" tree is $229.00 in March 2013, though we have actually only offered 1.5" replacements thus far. (The estimated average cost of a 1.5" tree is $165.00 in March 2013.) However, the figures below project for 2.5" replacements. We estimate a 6% per year price increase due to shortages caused by increasing nursery demand for replacing trees lost due to EAB. NOTE: There is now enough evidence about how EAB spreads to know that losses typically follow a predictable "death curve ". Based on this, we expect our loss rate to continue increasing exponentially for awhile, but then taper off. Thus, we have adjusted our predictions to show that we will remove and replace 40% of our remaining 1682 ashes in 2014 (673 trees), 30% in 2015 (505 trees) , 20% in 2016 (336) and 10% in 2017 (168 trees). Annual Dollar Impact Upon the Operating Budget: Not known at this time. Project Costs: 2014 2015 2016 2017 2018 Totals Ash Replacement Plantings 163,364 129,939 91,642 48,570 0 433,515 163,364 129,939 91,642 48,570 0 433,515 Sources of Funds: 2014 2015 2016 2017 2018 Totals General Fund 163,364 129,939 91,642 48,570 0 433,515 163,364 129,939 91,642 48,570 0 433,515 File Name: Ash Replacement Plantings 2014- 2018.xls (E ) = Established Program F -10 File Name: Ash Tree and Stump Removals 2014- 2018.xls (E) = Established Program F -11 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Ash Tree and Stump Removals (E) Project Type Code: 710 Department: Public Works 2014 Dept. Priority: 11 Description: Systematic tree removal and stump grinding of all but about 800 Ash trees from public right -of -way over a 4 year period due to the infestation of Emerald Ash Borer. Location: Various - As of March 2013 there were 2474 ash trees on Village parkways. (Approximately 792 of these are routinely treated by the Village and 1682 will likely die.) Justification /Comments: EAB was found in Mount Prospect in Fall 2010. This plan assumes we will remove the remaining 1682 EAB - infested trees over the next 4 years and plant one replacement for each removal. Now that EAB is in Mount Prospect, once a parkway tree is infested, it must be removed between 10 and 30 days after confirmation (depending on time of year). (A small number of these may be delayed temporarily if residents opt to treat them.) There is now enough evidence about how EAB spreads to know that losses typically follow a predictable "death curve ". Based on this, we expect our loss rate to continue increasing exponentially for awhile, but then taper off. Thus, we have adjusted our predictions to show that we will remove and replace 40% of our remaining 1682 ashes in 2014 (673 trees), 30% in 2015 (505 trees) , 20% in 2016 (336) and 10% in 2017 (168 trees). Total Cost to remove and grind the 1,682 remaining Ashes not being treated by the Village, starting with 2013 contract prices, but increased annually with a 4% inflation rate would be $624,998. See below for yearly projected costs over time. Annual Dollar None Impact Upon the Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Tree & Stump Removal 250,002 187,502 125,000 62,494 0 624,998 250,002 187,502 125,000 62,494 0 624,998 Sources of Funds: 2014 2015 2016 2017 2018 Totals General Fund 250,002 187,502 125,000 62,494 0 624,998 250,002 187,502 125,000 62,494 0 624,998 File Name: Ash Tree and Stump Removals 2014- 2018.xls (E) = Established Program F -11 File Name: Water Facility Roof Rehab 2014- 2018.xls (N ) = New Project F -12 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Water Facility Roof Rehab (N) Project Type Code: 700 Department: Public Works 2014 Dept. Priority: 12 Description: Roof repairs /replacement for the water booster and lift station buildings. Location: Various Justification /Comments: In 2012, Staff hired a roofing consultant to inspect and inventory all reservoir and lift station roofs. Based on this analysis, a prioritized capital plan was prepared to spread out the repair /replacement costs over the next several years. Here is the order of repairs, based on need: Station 17 - 2014, Station 4 house - 2015, Huntington Lift - 2015 Station 11 - 2016, Station 16 - 2017 Staff will inspect each roof for minor repairs each year and have the roofing consultant re- evaluate all roofs in 2015. Annual Dollar Impact Upon the Minor roof repairs are currently in the operating budget. Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Station 17 42,500 0 0 0 0 42,500 Station 4, Huntington 0 35,000 0 0 0 35,000 Station 11 0 0 45,000 0 0 45,000 Station 16 0 0 0 47,500 0 47,500 42,500 35,000 45,000 47,500 0 170,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Water & Sewer 42,500 35,000 45,000 47,500 0 170,000 42,500 35,000 45,000 47,500 0 170,000 File Name: Water Facility Roof Rehab 2014- 2018.xls (N ) = New Project F -12 File Name: Storm Sewer Inspection Program 2014- 2018.xls (E ) = Established Project F -13 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Storm Sewer Inspection Program (E) Project Type Code: 703 Department: Public Works 2014 Dept. Priority: 13 Description: Clean, televise and inspection of all Village owned storm sewers. Location: Various Justification/Comm ents: With the new NPDES (National Pollutant Discharge Elimination System) regulations we are required to inventory and inspect all storm sewers on a regular basis. We have already inventoried our existing storm sewer system to identify any potential problems and prevent future failures. This satisfies one of the Best Management Practices required under the NPDES standards for MS4 systems to minimize and prevent any unnecessary infiltration of pollutants. There are approximately 123 miles of storm sewers. Proposed 10 -year inspection cycle. Annual Dollar Impact Upon the Operating Budget: None Project Costs: 2014 2015 2016 2017 2018 Totals Storm Sewer Inspection 100,000 100,000 100,000 100,000 100,000 500,000 100,000 100,000 100,000 100,000 100,000 500,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals General Fund 100,000 100,000 100,000 100,000 100,000 500,000 100,000 100,000 100,000 100,000 100,000 500,000 File Name: Storm Sewer Inspection Program 2014- 2018.xls (E ) = Established Project F -13 File Name: Booster Station Pump Rehabilitation 2Ul4- 2Uli3.xls (tr ) = t;staonsnea rroject F -14 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Booster Station Pump Rehabilitation (E) Project Type Code: 700 Department. Public Works 2014 Dept. Priority: 14 Description: Maintenance and rehabilitation of the Village's existing high service pumps Location: Booster Stations Justification /Comments: The Village's five (5) booster stations house fifteen (15) high service pumps that range in size from 15 hp to 100hp. An outside contractor annually inspects and tests each pump to recommend overhauls based on declining performance or other noted issues. The typical repair includes the removal of each pump and electric motor, pump disassembly and repair, motor testing, repair or replacement, re- assembly and re- installation. It costs up to $50,000 for a new pump -motor assembly while a repair may cost up to $35,000. The work is set at $50,000 as staff reviews the consultants report and performs a repair vs. replacement analysis following industry guidelines. All motor replacements will use a premium efficient electric motor. The Village is averaging 15 years of useful life from its motors and over 20 years from the pumps. The increase in annual cost from 2013 is primarily for the inspection which now includes thermal imaging to identify insulation and connection issues with the motor that can lead to failure and for the laser aligning of the pump and motor upon re- installation which help ensure more efficient coupling. Annual Dollar Impact Upon the Approx. $6,500 is spent each year performing the inspection and testing of Operating Budget. the high- service pumps. Project Costs: 2014 2015 2016 2017 2018 Totals Contract Services 50,000 50,000 50,000 50,000 50,000 250,000 50,000 50,000 50,000 50,000 50,000 250,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Water & Sewer Fund 50,000 50,000 50,000 50,000 50,000 250,000 50,000 50,000 50,000 50,000 L 0,000 250,000 File Name: Booster Station Pump Rehabilitation 2Ul4- 2Uli3.xls (tr ) = t;staonsnea rroject F -14 File Name: Levee 37 2014- 2018.xis (E) = Established Project F -15 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Levee 37 (E) Project Type Code: 702 Department: Public Works 2014 Dept. Priority: 15 Description: Complete construction of Levee wall. Local (Mount Prospect) share of costs to construct levee. Does not include costs for off -site compensatory storage of flood waters. Location: West side of River Road / Milwaukee Avenue from Euclid Avenue to Palatine Road, within Mount Prospect and Prospect Heights. Justification/Comments: The levee will prevent flooding from the Des Plaines River into the adjacent neighborhoods to the west. In 2012, the Village began the operation and maintenance of two (2) pumping stations along the levee. Staff began the installation of remote telemetry to monitor these two (2) stations and integrate them into the Village's SCADA system. In addition, the Village has long -term maintenance responsibilities that include the testing, inspection, and maintenance of motors, pumps, valves, and the wall structure. In 2017, staff will install standby generators at both levee stations which require remote monitoring by the Village's SCADA system. Annual Dollar Impact Upon the No ongoing costs for telemetry. Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Contractual Services 30,000 30,000 35,000 35,000 35,000 165,000 Telemetry - Design 5,000 0 0 0 0 5,000 Telemetry Installation 40,000 0 0 0 0 40,000 75,000 30,000 35,000 35,000 35,000 210,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Flood Control Const. Fund 75,000 30,000 35,000 35,000 35,000 210,000 75,000 30,000 35,000 35,000 35,000 210,000 File Name: Levee 37 2014- 2018.xis (E) = Established Project F -15 File Name: Village Hall Parking Deck Maintenance 2014- 2018.xls (E) = Established Project F -16 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Village Hall Parking Deck Maintenance(E) Project Type Code: 706 Department. Public Works 2014 Dept. Priority: 16 Description: 2010 report revised in 2012 by an engineering firm inspect and recommend a maintenance program for the 5 year old parking deck attached to the Village Hall. Based on this inspection and report the maintenance needs over the next five years will be $250,000. Location: Village Hall Parking Deck Justification /Comments: Based on engineering recommendation and adjustment for inflation and escalation we are recommending a budget of $50,000 annually for such maintenance items as floor spalls, maintenance to caulk and floor joints, water proofing as needed, expansion joint replacement, and miscellaneous other repairs as needed due to the natural aging and wear an tear. Annual Dollar Impact Upon the None Operating Budget. Project Costs: 2014 2015 2016 2017 2018 Totals Parking Deck Maint. 50,000 50,000 50,000 50,000 50,000 250,000 50,000 50,000 50,000 50,000 50,000 250,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Village Parking System 50,000 50,000 50,000 50,000 50,000 250,000 50,000 50,000 50,000 50,000 50,000 250,000 File Name: Village Hall Parking Deck Maintenance 2014- 2018.xls (E) = Established Project F -16 File Name: Wireless Telemetry System Upgrade 2014- 2018.xls (E) = Established Project F -17 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Wireless Telemetry System Upgrade (E) Project Type Code: 700 Department: Public Works 2014 Dept. Priority: 17 Description: Upgrade SCADA telemetry to improve water quality and system operation. Location: Justification /Comments: The Village's water and wastewater system is monitored by a wireless telemetry system, commonly referred to as a SCADA system. This system was initially installed in 2003 and has performed exceedingly well over the years helping to monitor the utility systems' pumps, motors, backup generators, lift stations, relief stations and other vital parts of the Village's infrastructure that need monitoring. To address new or pending IEPA and EPA regulations on water quality issues, staff will complete the installation of chlorine residual analyzers at each booster station to ensure proper disinfection of our drinking water. In 2014, we begin the installation of remote pressure monitoring stations to assist the Village in meeting pressure requirements, along with the archiving of this data. for regulatory purposes. Each chlorine analyzer installed is $12,000, each remote pressure monitoring station is $9,000 along with associated design and SCADA programming costs. In 2017 -18, staff will begin updating the PLCs and other equipment as the gear is over 15 years old and used 24/7. Impact Upon the Less than $800 worth of chemicals, parts, labor and other materials will be Operating Budget: needed annually to calibrate the sampling equipment. Project Costs: 2014 2015 2016 2017 2018 Totals Design, SCADA integration 10,000 10,000 10,000 10,000 10,000 50,000 Remote Pressure 27,000 36,000 10,000 0 0 73,000 Electrical 15,000 15,000 25,000 25,000 25,000 105,000 PLC upgrades 30,000 30,000 60,000 52,000 61,000 45,000 65,000 65,000 288,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Water & Sewer Fund 52,000 61,000 45,000 65,000 65,000 288,000 52,000 61,000 45,000 65,000 65,000 288,000 File Name: Wireless Telemetry System Upgrade 2014- 2018.xls (E) = Established Project F -17 File Name: Residential AMR AMI 2014- 2018.xls (E ) = Established Project F -18 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Residential AMR/AMI (E) Project Type Code: 700 Department: Public Works 2014 Dept. Priority: 18 Description: Expand the commercial /multifamily AMR/AMI system to include all residential properties Location: Various Justification /Comments: The expansion of the AMR/AMI system to include all properties would provide greater fiscal control and accountability of our water revenues. The system would allow residents to no longer read their water meters and would provide multiple readings per day that would allow for timelier final reads and less inconvenience to the customers. Approx. 10,000 residential units would need conversion @ $300 ea. (2013 prices) Annual Dollar Impact Upon the The annual software /hardware maintenance fee is up to $20,000. Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Water & Sewer Fund 500,000 1,000,000 0 0 0 1,500,000 500,000 1,000,000 0 0 0 1,500,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Water & Sewer Fund 500,000 1,000,000 0 0 0 1,500,000 500,000 1,000,000 0 0 0 1,500,000 File Name: Residential AMR AMI 2014- 2018.xls (E ) = Established Project F -18 File Name: HVAC Replacement Program 2014- 2018.xis (E ) = Established Program F -19 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: HVAC Replacement Program (E) Project Type Code: 706 Department: Public Works 2014 Dept. Priority: 19 Description: Replacement of +/- 20 year old roof top HVAC units. Location: Public Works, Police & Fire Headquarters and Village Hall Justification/Comments: Carrier estimates the life expectancy of a roof top unit to be +/- 20 years dependent on usage, overheating, weather exposure and ventilation. We currently have 7 roof top units at Public Works which were put in in 1988, 7 roof units at Police & Fire headquarters put in 1993, 5 roof top units put in at Village Hall in 2006 and 8 outside ground units at the new Fire Station 14. 2014 - Replace 8 units at PW Building Annual Dollar Impact Upon the Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Replace HVAC units 446,000 0 0 0 0 446,000 446,000 0 0 0 0 446,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Capital Improvement Fund 446,000 0 0 0 0 446,000 446,000 0 0 0 0 446,000 File Name: HVAC Replacement Program 2014- 2018.xis (E ) = Established Program F -19 File Name: Traffic Signal Replacement 2014- 2018.xls ( E) = Estaolisnea rroject F -20 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Traffic Signal Replacement (E) Project Type Code: 704 Department: Public Works 2014 Dept. Priority: 20 Description: Replace existing traffic signal equipment with equipment to meet current standards including installation of pedestrian signals. Location: Various signalized intersections Justification/Comments: Standardization of signalized intersections by installing current equipment and pedestrian signals where they are missing. Provide back -up generator connections for operation of traffic signals during power outage for Village maintained signals. Annual Dollar Impact Upon the Operating Budget: None Project Costs: 2014 2014 2015 2016 2017 Totals Design and Construction 50,000 50,000 50,000 50,000 50,000 250,000 Back -up Generator Conn. 0 0 255,000 0 0 255,000 50,000 50,000 305,000 50,000 50,000 505,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Motor Fuel Tax Fund 50,000 50,000 305,000 50,000 50,000 505,000 50,000 50,000 305,000 50,000 50,000 505,000 File Name: Traffic Signal Replacement 2014- 2018.xls ( E) = Estaolisnea rroject F -20 File Nmne: Brick Sidewalk Sealing 2014- 2018.xls ( E) = Established Project F -21 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Brick Sidewalk Sealing (E) Project Type Code: 705 Department: Public Works 2014 Dept. Priority: 21 Description: Annual Brick Sidewalk Sealing Program Location: Various Locations Justification /Comments: The Public Works Department has been sealing brick pavers on an, annual basis for the eight years. Due to the increase in the number of brick sidewalks and price increases for materials costs have risen. We have 352,240 square feet of brick sidewalks which should be sealed every 5 years Annual Dollar Impact Upon the Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Seal Brick Paved Sidewalks 5 year cycle 75,000 75,000 75,000 75,000 75,000 375,000 75,000 75,000 75,000 75,000 75,000 375,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Downtown Redevelopment 75,000 75,000 75,000 75,000 75,000 375,000 Fund 75,000 75,000 75,000 75,000 75,000 375,000 File Nmne: Brick Sidewalk Sealing 2014- 2018.xls ( E) = Established Project F -21 File Name: Tree Planting Program 2014- 2018.xls (E) = Established Project F -22 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Tree Planting Program (E) Project Type Code: 710 Department: Public Works 2014 Dept. Priority: 22 Description: Planting trees in public rights -of -way and Village -owned properties. The Village currently owns approximately 23,835 parkway trees. Location: Various - There are roughly 3,266 vacant planting sites available. Justification/Comments: Goal is to plant approximately 610 trees each year. 450 -660 trees removed each year, not including EAB removals. The estimated 2013 average cost of a 2 1/2" tree is $229.00. Estimated 6% per year price increase due to shortages caused by increasing nursery demand for replacing trees lost due to EAB. (The figures below assume a return to the planting programs /quantities we had proposed prior to the major budget reductions of the past few years). Programs 2014 2015 2016 2017 2018 Reforestation 34,980 37,079 39,304 41,662 44,161 Tree Repl (V) 43,682 47,638 51,831 56,276 60,988 Tree Repl (S) 50,488 52,183 53,979 55,882 57,900 Public 7,929 8,405 8,909 9,443 10,010 Note: Reforestation =1 1/2" free trees; Tree Repl (V) = Tree Replace Village and includes cost share (village portion), hazard, misc., and ComEd replacements. Tree Repl (S) = Tree Rep] Shared and these are paid with donated funds; they include cost share (resident portion), accidents, new construction, and ComEd trees. Public = Trees planted on public property for beautification. (Estimated planting totals: 160 C /S, 50 utility, 30 hazards, 100 new const., 20 beautification, 10 accident, 40 misc. and 200 reforestation). Annual Dollar None - The addition of new trees is expected to be approximately offset by the removal Impact Upon the of old or decaying trees. Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Tree Planting 137,079 145,305 154,023 163,263 173,059 772,729 137,079 145,305 154,023 163,263 173,059 772,729 Sources of Funds: 2014 2015 2016 2017 2018 Totals General Fund 86,591 93,122 100,044 107,381 115,159 502,297 Contributions from Residents and/or Developers 50,488 52,183 53,979 55,882 57,900 270,432 137,079 145,305 154,023 163,263 173,059 772,729 File Name: Tree Planting Program 2014- 2018.xls (E) = Established Project F -22 File Name: Neighborhood Drainage Improvements 2014- 2018.xls (E) = Established Project F -23 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Neighborhood Drainage Improvements (E) Project Type Code: 702 Department: Public Works 2014 Dept. Priority: 23 Description: Construction of drainage improvements to alleviate neighborhood flooding problems. Location: Village -wide Justification /Comments: Utilize funds collected from "Fee in Lieu of Detention" on smaller developments to resolve long- standing neighborhood flooding issues. Note: This will allow construction at approximately 4 locations per year. Currently there is a backlog of 128 locations. Annual Dollar Impact Upon the Operating Budget: None Project Costs: 2014 2015 2016 2017 2018 Totals Neighborhood Drainage Improvements 100,000 100,000 100,000 100,000 100,000 500,000 100,000 100,000 100,000 100,000 100,000 500,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Flood Control Fund 100,000 100,000 100,000 100,000 100,000 500,000 100,000 100,000 100,000 100,000 100,000 500,000 File Name: Neighborhood Drainage Improvements 2014- 2018.xls (E) = Established Project F -23 File Name: Infrastructure Aesthetics 2014- 2018.xis (E ) = Established Project F -24 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Infrastructure Aesthetics (E) Project Type Code: 710 Department: Public Works 2014 Dept. Priority: 24 Description: Cleaning, repair and/or painting of weather -worn streetlights, ped lights, bases, sign posts, cabinets and controllers. Location: Various Justification/Comments: As the black painted infrastructure ages and becomes weather -worn staff has attempted to maintain the large number of fixtures located throughout the Village. This a seven year program to paint approximately 700 street lights, pedestrian lights, sign posts, cabinets, etc. Staff will review and assess whether to replace or repair items annually. Annual Dollar Impact Upon the There will be a minor impact on the operating budget each year. Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Contractual Services 40,000 40,000 40,000 40,000 40,000 200,000 40,000 40,000 40,000 40,000 40,000 200,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Downtown Redevelopment 40,000 0 0 0 0 40,000 Fund General Fund 0 40,000 40,000 40,000 40,000 160,000 40,000 40,000 40,000 40,000 40,000 200,000 File Name: Infrastructure Aesthetics 2014- 2018.xis (E ) = Established Project F -24 File Name: Streetscape Improvements 2014- 2018.xls (E ) = Established Project F -25 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Streetscape Improvements (E) Project Type Code: 705 Department: Public Works 2014 Dept. Priority: 25 Description: Parkway improvements including installation of brick sidewalks, planter beds, street lights, and site furniture in the downtown commercial district and other commercial corridors. Location: Justification /Comments: The streetscape improvements in the downtown and other commercial corridors greatly enhance the appearance of the commercial areas thus increasing the economic viability of the commercial businesses within these commercial districts. Illinois Transportation Enhancement Program (ITEP) funds were applied for and received in the amount of $678,000. The ITEP grant requires the Village to pay for project up front and the Village is reimbursed for the cost after the project is complete 2013 Phase I and II Engineering ($157,000) 2014 Install streetscape along Northwest Hwy between Maple and Louis, George and Albert, and Forest and Fairview and the Village is reimbursed for the cost after the project is complete 2017 Install streetscape along Northwest Hwy between Wille and Main Annual Dollar Impact Upon the Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Construction 930,000 0 0 200,000 0 1,130,000 930,000 0 0 200,000 0 1,130,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals ITEP Grant 678,000 0 0 0 0 678,000 Downtown Redevelopment 144,000 0 0 200,000 0 344,000 fund Capital Improvement fund 108,000 0 0 0 0 108,000 930,000 0 0 200,000 0 1,130,000 File Name: Streetscape Improvements 2014- 2018.xls (E ) = Established Project F -25 File Name: Sewer Main Rehabilitation 2014- 2018.xls (E) = Established Project F -26 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Sewer Main Rehabilitation (E) Project Type Code: 701 Department: Public Works 2014 Dept. Priority: 26 Description: Sewer main relining, spot repairs and manhole repairs. Location: Various Justification /Comments: Maintain structural integrity of sewer pipes. Remove excess infiltration and inflow to minimize basement back -ups and sewer surcharges. Note: Projects to be determined. Projects will be selected based on need. Annual Dollar Impact Upon the Operating Budget: None Project Costs: 2014 2015 2016 2017 2018 Totals Spot Repairs 375,000 500,000 525,000 550,000 550,000 2,500,000 375,000 500,000 525,000 550,000 550,000 2,500,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Water & Sewer Fund 375,000 500,000 525,000 550,000 550,000 2,500,000 375,000 500,000 525,000 550,000 550,000 2,500,000 File Name: Sewer Main Rehabilitation 2014- 2018.xls (E) = Established Project F -26 File Name: KBC Jogging Path Rehab 2014- 2018.xls (E ) = Established Project F -27 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: KBC Jogging Path Rehab (E) Project Type Code: 710 Department: Public Works Department 2014 Dept. Priority: 27 Description: Rehabilitate asphalt jogging/bike paths in the Kensington Business Center (KBC). Location: Kensington Business Center Justification/Comments: The jogging /bike paths in the Kensington Business Center are the Village's maintenance responsibility. The paths are presently over 20 years old and have begun to deteriorate. The asphalt pavement requires reconstruction. The Kensington Business Center jogging path lighting project will be a 3 part effort to install new wiring, install new controllers, bases, poles and fixtures along the path throughout the center. 2014 - Phase 1 / West of Feehanville Drive 2015 - Phase 2 / Between Feehanville Drive and Business Center Drive 2016 - Phase 3 / East of Business Center Drive Annual Dollar Impact Upon the Electricity costs are already accounted for. Operating Budget. No additional costs for the operating budget. Project Costs: 2014 2015 2016 2017 2018 Totals Construction 80,000 190,000 45,000 0 0 315,000 Path lighting rehab 160,000 160,000 160,000 0 0 480,000 240,000 350,000 205,000 0 0 795,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Capital Improvement Fund 240,000 350,000 205,000 0 0 795,000 240,000 350,000 205,000 0 0 795,000 File Name: KBC Jogging Path Rehab 2014- 2018.xls (E ) = Established Project F -27 File Name: Standby Pump Power Supply 2014- 2018.xls (E) = Established Project F -28 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Stand -By Pump Power Supply (E) Project Type Code: 700 Department: Public Works 2014 Dept. Priority: 28 Description: Install emergency power generator for stand -by deep well pumps Location: Various Justification /Comments: Deep wells are the Village's emergency water source in the event that flow from NWSMJAWA is disrupted. This work is part of a continuing upgrade program. 2014 - Emergency generator and fuel tank installation Station 11 (See Gwun) Annual Dollar Impact Upon the Operating Budget: None Project Costs: 2014 2015 2016 2017 2018 Totals Well 11 525,000 0 0 0 0 525,000 525,000 0 0 0 0 525,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Water & Sewer Fund 525,000 0 0 0 0 525,000 525,000 0 0 0 0 525,000 File Name: Standby Pump Power Supply 2014- 2018.xls (E) = Established Project F -28 File Name: Melas Meadows Park Pedestrian Bridge 2014- 2018.xls (N) = New Project F -29 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Melas /Meadows Park Pedestrian Bridge (N) Project Type Code: 710 Department: Public Works 2014 Dept. Priority: 29 Description: Construction of a Pedestrian / Bike bridge over Northwest Highway and the Union Pacific Railroad tracks. Location: From Meadows Park to Melas Park. Justification/Comments: Bridge will allow safe pedestrian / bike access across the railroad tracks and the highway. Will apply for federal funding through the ITEP Program when the Phase I and II Engineering is complete. Federal share would be 80 %, local share would be 20 %. Mount Prospect Park District, Arlington Heights Park District and Arlington Heights have expressed support for the project. 2014 - Phase I Engineering Study 2015 - Phase II Design Engineering 2016 - Construction and Construction Engineering Annual Dollar Impact Upon the Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Phase I Engineering 120,000 0 0 0 0 120,000 Phase II Engineering 0 140,000 0 0 0 140,000 Construction 0 0 2,900,000 0 2,900,000 120,000 140,000 2,900,000 0 0 3,160,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Federal Funding 0 0 2,320,000 0 0 2,320,000 MP Park District Share 30,000 35,000 145,000 0 0 180,000 AH Park District Share 30,000 35,000 145,000 0 0 180,000 AH Share 30,000 35,000 145,000 0 0 180,000 Capital Improvement 30,000 35,000 145,000 0 0 180,000 Fund 120,000 140,000 2,900,000 0 0 3,160,000 File Name: Melas Meadows Park Pedestrian Bridge 2014- 2018.xls (N) = New Project F -29 File Name: Northwest Highway -MP Road Bike Path -Ped Sigs 2014- 2018.xls (N) = New Project F -30 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Northwest Hwy/Mount Prospect Road (N) Project Type Code: 705 Bike Route and Pedestrian Signals Imp 2014 Dept. Priority: 30 Department: Public Works Description: Install Pedestrian Signals and construct bike path. Location: Northwest Highway / Mount Prospect Road / Prospect Avenue Intersections. Justification /Comments: This project will complete a portion of the Village's Bike Route Plan and in conjunction with a Des Plaines project it will provide a link to the Metra Cumberland Station in Des Plaines. The Village has received CMAQ funds which will provide 80% federal cost share and 20% local cost share (Mount Prospect and Des Plaines). The ICC will participate in the cost of railroad pedestrian gates and IDOT will participate in the cost of traffic signal improvements. 2014 - Construction and Construction Engineering Annual Dollar Impact Upon the Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Construction and 770,000 0 0 0 0 770,000 Construction Engineering 770,000 0 0 0 0 770,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals ICC share 100,000 0 0 0 0 100,000 Federal share 296,000 0 0 0 0 296,000 IDOT share 240,000 0 0 0 0 240,000 Des Plaines share 59,000 0 0 0 0 59,000 Village share - CIP 75,000 0 0 0 0 75,000 770,000 0 0 0 0 770,000 File Name: Northwest Highway -MP Road Bike Path -Ped Sigs 2014- 2018.xls (N) = New Project F -30 File Name: PW Roof Repair 2014- 2018.xls (E) = Established Project F -31 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: PW Roof Repair (E) Project Type Code: 706 Department: Public Works 2014 Dept. Priority: N/A Description: Replace original public works facility roof. Originally installed in 1988. Location: 1700 W. Central Road Justification /Comments: Existing roofs over original public works facility will be almost 25 years old when replaced. 2014 replace roof covering main garage, administration, and vehicle maintenance areas. Annual Dollar Impact Upon the Operating Budget: None Project Costs: 2014 2015 2016 2017 2018 Totals Roof Replacement 595,000 0 0 0 0 595,000 595,000 0 0 0 0 595,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Capital Improvement Fund 595,000 0 0 0 0 595,000 595,000 0 0 0 0 595,000 File Name: PW Roof Repair 2014- 2018.xls (E) = Established Project F -31 File Name: Water Main Replacement 2014- 2018.xls (E) = Established Project F -32 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Water Main Replacement (E) Project Type Code: 700 Department: Public Works 2014 Dept. Priority: N/A Description: Water main replacement Location: Various Justification/Comments: Replace deteriorated water mains prone to leakage to minimize service disruptions and preserve water quality: PENDING IMPROVEMENTS: 2014 - Evergreen Ave and Maple Street (Increase from 2013 -2017 CIP due to 45% increase over last two years in water main material cost). 2015 - 800 thru 900 block of S. Owen Street (upgrade 1,000 l.f. from 6" to 8 ") 2016 - 600 thru 800 block of S. Albert St. (upgrade 1,000 l.f. from 6" to 8 ") 2017 - 600 thru 800 block of S. George St. (upgrade 1,000 IS. from 6" to 8 ") 2018 - Busse Road interconnect (1,1501.f. 10 ") 2019 - Rand Road (2,000 IS. 8 ") Work may change depending on hydraulic water modeling. Annual Dollar Impact Upon the Operating Budget: None Project Costs: 2014 2015 2016 2017 2018 Totals Water Main Replacement 0 1,200,000 500,000 500,000 500,000 2,700,000 0 1,200,000 500,000 5 00,000 500,000 2,700,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Water & Sewer Fund 0 1,200,000 500,000 500,000 500,000 2,700,000 0 1,200,000 500,000 500,000 500,000 2,700,000 File Name: Water Main Replacement 2014- 2018.xls (E) = Established Project F -32 File Name: Salt Storage Building 2014- 2018.xls (E ) = Established Project F -33 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Salt Storage Building (E) Project Type Code: 706 Department: Public Works 2014 Dept. Priority: N/A Description: Construct 6,000 -8,000 ton road salt storage facility. Location: Public Works Northeast Corner of Facility Justification /Comments: Create ability to store an entire winter season worth of road salt (app. 6,000 -8,000 tons) locally. Capability would lessen risk of not being able to obtain salt deliveries during severe winters when salt becomes regionally scarce. In addition, pre - purchased, advanced delivery of road salt in large bulk quantities should dramatically decrease transportation costs. Annual Dollar Impact Upon the Operating Budget: $1,000 maintenance per year Project Costs: 2014 2015 2016 2017 2018 Totals Construct Salt Storage Bld 0 600,000 0 0 0 600,000 0 600,000 0 0 0 600,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Capital Improvement Fund 0 600,000 0 0 0 600,000 0 600,000 0 0 0 600,000 File Name: Salt Storage Building 2014- 2018.xls (E ) = Established Project F -33 File Name: Lift Relief Station Rehab 2014- 2018.xls (E) = Established Project F -34 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Lift Relief Station Rehab (E) Project Type Code: 701 Department: Public Works 2014 Dept. Priority: N/A Description: Rehab sanitary sewer lift and relief stations Location: Various Justification /Comments: An engineering study performed in 2007 concluded that the underground wet well type of lift stations have reached the end of their useful life. Some of these lift stations are over 30 years old. Staff is recommending replacing these stations with submersible pump style stations and performing electrical upgrades to meet current codes and safety rules. Stations include: 2015 - Louis Street ($325,000) 2016 - William Street ($350,000) 2017 - Huntington ($650,000 2018 - Fairview ($450,000) Future years - Lincoln Street ($300,000), Lincoln/We -Go ($250,000), Maple/Berkshire ($250,000), Cottonwood ($325,000). Annual Dollar None Impact Upon the Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Complete Station Rehab 0 325,000 350,000 650,000 450,000 1,775,000 0 325,000 350,000 650,000 450,000 1,775,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Water & Sewer Fund 0 325,000 350,000 650,000 450,000 1,775,000 0 325,000 350,000 650,000 450,000 1,775,000 File Name: Lift Relief Station Rehab 2014- 2018.xls (E) = Established Project F -34 File Name: Water Tank Rehabilitation 2014- 2018.xis (E) = Established Project F -35 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Water Tank Rehabilitation (E) Project Type Code: 700 Department: Public Works 2014 Dept. Priority: N/A Description: Inspection, repair, and recoating of interior and exterior surfaces of existing water storage tanks. Location: Public Works Justification /Comments: Maintenance of water storage tanks is necessary to maintain sanitary conditions and preserve structural integrity. Existing water storage capacity is required to satisfy IEPA and JAWA requirements and maintain ISO fire ratings. Water tanks are inspected and repaired/repainted on a rotating basis. Annual Dollar Impact Upon the Approximately $3,000 per year for cathodic protection system maintenance Operating Budget: Approximately $6,000 for one tank per year for structural integrity inspections Project Costs: 2014 2015 2016 2017 2018 Totals Reservoir 5 -1 (1 MG) 0 530,000 0 0 0 530,000 Reservoir 5 -2 (1 MG) 0 0 0 555,000 0 555,000 0 530,000 0 555,000 0 1,085,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Water & Sewer Fund 0 530,000 0 555,000 0 1,085,000 0 530,000 0 555,000 0 1,085,000 File Name: Water Tank Rehabilitation 2014- 2018.xis (E) = Established Project F -35 File Name: Parking Lot Improvements 2014- 2018.xls (E) = Established Project F -36 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Parking Lot Improvements (E) Project Type Code: 706 Department. Public Works 2014 Dept. Priority: N/A Description: Resurface and repair pavement at various Village -owned parking lots Location: Various Justification /Comments: Parking lot pavements have begun to fail and are in need of resurfacing before deterioration progresses to a point where complete reconstruction is required. 2015 - Well House #8 and 9 2017 - Fire Station #12 Parking Lot Annual Dollar Impact Upon the Operating Budget: None Project Costs: 2014 2015 2016 2017 2018 Totals Well House # 8& 9 0 58,000 0 0 0 58,000 Fire Station #12 0 0 0 25,000 0 25,000 0 58,000 0 25,000 0 83,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Capital Improvement 0 58,000 0 25,000 0 83,000 0 58,000 0 25,000 0 83,000 File Name: Parking Lot Improvements 2014- 2018.xls (E) = Established Project F -36 File Name: Deep Well Rehabilitation 2014- 2018.xls (E ) = Established Project F -37 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Deep Well Rehabilitation (E) Project Type Code: 700 Department: Public Works 2014 Dept. Priority: N/A Description: Maintenance and rehabilitation of the Village's five (5) emergency standby wells Location: Justification/Comments: The Village's five (5) deep wells were last rehabilitated in the 1990's and the industry recommended interval is 20 years. The rehabilitation process includes pulling the deep well column assembly and bowl assembly, cleaning and inspecting the components and replacing or repairing any deficient or defective parts. This effort will involve one (1) deep well every other year and conclude when they all have been checked. The following is a cost estimate of the work. (2014 est.) Mobilize, pull pump and inspect - $46,500 Televise well hole - 6,000 Disassemble, clean and inspect pump - 52,000 Replacement parts (estimate) 45,000 Sandblast & coat column piping - est. 800ft at $30 /ft - 25,000 Replace est. 2001.f. column piping at $2,860/20'- 30,750 Reinstall, chlorinate, demobilize, sampling 52,500 Annual Dollar Impact Upon the No ongoing annual costs. Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Well 16 0 257,750 0 0 0 257,750 Well 17 0 0 275,000 0 0 275,000 Well 11 0 0 0 0 300,000 300,000 0 257,750 275,000 0 300,000 832,750 Sources of Funds: 2014 2015 2016 2017 2018 Totals Water & Sewer Fund 0 257,750 275,000 0 300,000 832,750 0 257,750 275,000 0 300,000 832,750 File Name: Deep Well Rehabilitation 2014- 2018.xls (E ) = Established Project F -37 File Name: P.W. Radio System 2014- 2018.xls (N) = New Project F -38 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: P.W. Radio System (N) Project Type Code: 709 Department: Public Works 2014 Dept. Priority: N/A Description: Upgrade P.W. base radio to digital capable repeater, replace antenna, replace 17 remote desktop radios, replace non - digital mobile radios in vehicles and add repeaters where signal is low. Replace outdated portable radios. Location: Public Works - Fire Station 13 (antenna locations) Justification /Comments: To improve Public Works radio communication through out the village. Comply with future FCC narrow- banding requirements. Annual Dollar Impact Upon the None Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Replace PW Radio System 0 50,000 0 0 0 50,000 0 50,000 0 0 0 50,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Capital Improvement Fund 0 50,000 0 0 0 50,000 0 50,000 0 0 0 50,000 File Name: P.W. Radio System 2014- 2018.xls (N) = New Project F -38 File Name: Locating and Leak Detection Equipment 2014- 2018.xls (N ) = New Project F -39 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Locating & Leak Detection Equipment (N) Project Type Code: 700 Department: Public Works 2014 Dept. Priority: N/A Description: Replacement of existing locating equipment and leak detection equipment. Location: Various Justification/Comments: This equipment is used to locate the Village's underground utilities. It also aides crews in determining the location of water main breaks out in the field. The Village last purchased the current system in 2006. The normal replacement cycle for this type of equipment is roughly 10 years. We are looking to replace the existing equipment with a more modern, up -to -date system and stay current with industry trends. Annual Dollar Impact Upon the There will be minor impact (less than $100) on operating budget. Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Leak Detecting Equipment 0 0 75,000 0 0 75,000 0 0 75,000 0 0 75,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Water & Sewer 0 0 75,000 0 0 75,000 0 0 75,000 0 0 75,000 File Name: Locating and Leak Detection Equipment 2014- 2018.xls (N ) = New Project F -39 File Name: HVAC Upgrade Village Hall 2014- 2018.xls (N ) =New Project F -40 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: HVAC Upgrade Village Hall (N) Project Type Code: 706 Department: Public Works 2014 Dept. Priority: N/A Description: Upgrade of Village Hall HVAC system to eliminate overheating problem. Location: Village Hall Justification /Comments: Per recommendation of mechanical engineer raising the HVAC units should solve the over heating problem by providing more circulation of cooler fresh air. It would require raising 3 units and possibly replacing one unit if need be due to the extra strain caused by the over heating problem. Annual Dollar None Impact Upon the Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Upgrade HVAC units 0 0 370,000 0 0 370,000 0 0 370,000 0 0 370,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Capital Improvement Fund 0 0 370,000 0 0 370,000 0 0 370,000 0 0 370,000 File Name: HVAC Upgrade Village Hall 2014- 2018.xls (N ) =New Project F -40 File Name: P.W. Vehicle Lifts 2014- 2018.xls (N) = New Project F -41 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: P.W. Vehicle Lifts (N) Project Type Code: 708 Department: Public Works 2014 Dept. Priority: N/A Description: Replace all major lift components - two (2) in- ground truck lifts Location: Public Works - Vehicle Maintenance Facility Justification /Comments: The in- ground truck lifts were originally purchased and installed in 1988 when the Public Works building was built. This lift replacement program will replace aging vehicle lifts that have exceeded their twenty (20) year life expectancy. If we fail to replace these lifts in a timely manner, we will compromise our safety and significantly increase the possibility of expensive major failures. 4% cost increase in 2017 Annual Dollar Impact Upon the None Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Replace two (2) truck lift 0 0 55,000 57,200 0 112,200 major components 0 0 55,000 57,200 0 112,200 Sources of Funds: 2014 2015 2016 2017 2018 Totals Capital Improvement Fund 0 0 55,000 57,200 0 112,200 0 0 55,000 57,200 0 112,200 File Name: P.W. Vehicle Lifts 2014- 2018.xls (N) = New Project F -41 File Name: Public Safety Garage Sprinkler Replacement 2014- 2018.xis (N ) = New Project F -42 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Public Safety Garage Sprinkler Project Name: Replacement (N) Project Type Code: 706 Department: Public Works 2014 Dept. Priority: N/A Description: Replace all dry system sprinkler pipes in garage. Pipes are rusting from excessive moisture. Location: Public Safety Underground Garage Justification /Comments: Due to deck leaks and humidity the black iron pipes are rusting away causing pin holes These pin holes can cause the dry system to trip from lack of air pressure which can lead to frozen pipes. Annual Dollar Impact Upon the Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Garage Sprinkler 0 0 0 40,000 0 40,000 0 0 0 40,000 0 40,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Capital Improvement Fund 0 0 0 40,000 0 40,000 0 0 0 40,000 0 40,000 File Name: Public Safety Garage Sprinkler Replacement 2014- 2018.xis (N ) = New Project F -42 File Name: Levee 37 Standby Emergency Generators 2014- 2018.xls (N ) = New project F -43 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Levee 37 Standby Emergency Generators (N) Project Type Code: 702 Department: Public Works 2014 Dept. Priority: N/A Description: Install backup emergency power for Levee pumping stations Location: Along levee 37 on River Road Justification/Comments: In 2012, the Village took over control of two of the three storm water pumping stations that were built along Levee 37. The Village is responsible for the operation and maintenance of these pumping stations and recommend the installation of backup emergency generators to provide secondary power in case of local utility failure. There are two storm water pumping stations, one with a duplex pump setup and one with a tri -plex pump setup. The project would include the design, acquisition and installation of two generators; one for each station. Annual Dollar Impact Upon the Annual fuel and maintenance costs are highly dependent on use and weather Operating Budget: Staff estimates an average cost of $5,000 per year. Project Costs: 2014 2015 2016 2017 2018 Totals Design and Engineering 0 0 0 25,000 0 25,000 Construction 0 0 0 150,000 0 150,000 Telemetry Design/Install 0 0 0 30,000 0 30,000 0 0 0 205,000 0 205,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Flood Control Const. Fund 0 0 0 205,000 0 205,000 0 0 0 205,000 0 205,000 File Name: Levee 37 Standby Emergency Generators 2014- 2018.xls (N ) = New project F -43 File Name: Public Safety Parking Deck Maintenance 2014- 2018.xls (N) = New Project F -44 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Public Safety Parking Deck Maintenance Project Name: (N) Project Type Code: 706 Department: Public Works 2014 Dept. Priority: N/A Description: The parking deck at the Police and Fire Headquarters was last resurfaced in 2006 and the warranty period has expired. And will require resurfacing in three years. Location: Police /Fire upper parking deck Justification/Comments: Based on engineering recommendation and the expected life of the deck surface we are recommending resurfacing the Public Safety deck on an eight year cycle. The deck was last resurfaced in 2006 and the warranty has expired we will face increasing maintenance costs as the age of the surface extends beyond the estimated eight year life. Annual Dollar None Impact Upon the Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Parking Deck Maint. 0 0 0 200,000 0 200,000 0 0 0 200,000 0 200,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Village Parking System 0 0 0 200,000 0 200,000 0 0 0 200,000 0 200,000 File Name: Public Safety Parking Deck Maintenance 2014- 2018.xls (N) = New Project F -44 File Name: Sewer Televising Equipment 2014- 2018.xlsx (N) = New Project F -45 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Televising Camera System Upgrades (N) Project Type Code: 700 Department: Public Works 2014 Dept. Priority: N/A Description: Purchase of new televising cameras /transporters for CCTV truck 2737 to upgrade current system. Location: Various Justification /Comments: This equipment is used to televise various sized sewers that the Village maintains throughout town. Our last camera purchase was in 2007. The current camera/ transporter system has had numerous repairs that has prohibited staff from televising sewers during the repair downtime. With new technology, the new Pan and Tilt cameras /transporters are more durable and can withstand more wear and tear. The new Pathfinder camera transporter that is capable of televising sewers 6" to 24" in diameter. This will enable staff to continue televising sewers in the event one of our systems becomes damaged and needs repair. The new Lateral Evaluation Televising System (LETS) which will allow staff to televise service laterals for up to 150' from the mainline sewer. This would be a benefit to property ownersby being informed of issues with hteir service lateral. I &I sources could also be investigated. Annual Dollar Impact Upon the The annual maintenance cost is about $5,000 -7500 per year. Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Sewer Televising Equipment 0 0 0 75,000 0 75,000 (LETS) Camera System 0 0 0 0 75,000 75,000 0 0 0 75,000 75,000 150,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Water & Sewer 0 0 0 75,000 75,000 150,000 0 0 0 75,000 75,000 150,000 File Name: Sewer Televising Equipment 2014- 2018.xlsx (N) = New Project F -45 File Name: Hydro Excavator 2014- 2018.x1sx (N) = New Project F -46 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Hydro Excavator (N) Project Type Code: 700 Department: Public Works 2014 Dept. Priority: N/A Description: Purchase of new vacuum excavating system. Location: Various Justification /Comments: This equipment will be used to excavate in areas where multiple utilities are buried. In many areas of our system fiber optic, gas, and electric lines are above our water and sewer mains. The use of this equipment will allow us to safely and quickly excavate around these utilities. It will help avoid costly emergency repairs, outages, injuries or worse. Annual Dollar Minor costs associated with filters and lubrication are needed (less than $1,000 per Impact Upon the year). Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Hydro Excavator 0 0 0 0 105,000 105,000 0 0 0 0 105,000 105,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Water & Sewer 0 0 0 0 105,000 105,000 0 0 0 0 105,000 105,000 File Name: Hydro Excavator 2014- 2018.x1sx (N) = New Project F -46