Loading...
HomeMy WebLinkAboutTab 6: PoliceVILLAGE OF MOUNT PROSPECT 2014 - 2018 CAPITAL IMPROVEMENTS PLAN SUMMARY OF PROJECT REQUESTS Department: Police Page Project Project Name No. Type 2014 Furniture Replacement (E) E -2 709 33,000 Restroom Renovations (N) E -3 706 21,000 Total 54,000 Dept. Priority 2015 2016 2017 2018 Total 1 44,000 40,000 0 0 117,000 2 21,000 21,000 0 0 63,000 65,000 61,000 0 0 180,000 (E) = Established Project (N) = New Project ( *) = Federal Mandate Project Type Codes: 700 = Water System 701 = Sanitary Sewer 702 = Flood Control Projects 703 = Storm Sewer 704 = Street Construction and Reconstruction 705 = Resurfacing/Curbs and Gutters /Sidewalks 706 = Construction of and Improvements to Public Buildings 707 = Computer Hardware /Software 708 = Vehicles and Automotive Equipment 709 = Non - Automotive Equipment 710 = Miscellaneous E -1 File Name: 2014 Furniture Replacement Revised.xls (E) = Established Project E -2 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Furniture Replacement (E) Project Type Code: 709 Department: Police Department 2014 Dept. Priority: N/A Description: 2007 Replace desk chairs at all work stations and replace first floor lobby furniture 2008 Replace furniture in records, Supervisor office, Acct. Clerk office, soft interview furniture 2009 Redesign & replace Patrol Sgts' - Cmdrs' office furniture, 2nd Floor lobby furniture 2010 Redesign of the front desk area with furniture replacement included 2012 Redesign & replace all Investigator, Investigative Supervisors' office furniture 2014 Replace & update Inv. & Adm. reception area furniture, Replace Chiefs Adminstrative secretary furniture, replace administrative conference room furniture 2015 Redesign and replace furniture for Chief, 2 Deputy Chiefs, Ops. Cmdr offices 2016 Redesign and replace furniture for Adm. Service Sgt., Tech support, & CPU offices Location: Police Department Justification /Comments: The furniture in the Police building was the original furniture from 1993 when the building opened. This furniture replacement program will replace all funiture by 2016. 2007 Chair replacement and lobby furniture - DONE 2008 Records Section, Clerk's, Interview Room, & interview furniture - DONE 2009, 2010 Patrol Sergeants' and Commanders' offices (2009), Front desk (2010) - DONE 2012 Investigative Section - DONE 2014 Investigations & Administration reception area, Adm Sec. office, Adm. Conference room 2015 Chief, Deputy Chiefs, Ops. Cmdr. Offices 2016 Administrative Service Sergeant & Tech. support area, CPU office Annual Dollar Impact Upon the None Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Office Furniture 33,000 44,000 40,000 0 0 117,000 33,000 44,000 40,000 0 0 117,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Capital Improvement Fund 33,000 44,000 40,000 0 0 117,000 33,000 44,000 40,000 0 0 117,000 File Name: 2014 Furniture Replacement Revised.xls (E) = Established Project E -2 File Name: 2014 Restrooms Renovations.xls (E) = Established Project E -3 VILLAGE OF MOUNT PROSPECT CAPITAL IMPROVEMENTS PLAN 2014 -2018 Project Name: Restrooms Renovations (N) Project Type Code: 706 Department: Police Department 2014 Dept. Priority: N/A Description: Remove and replace all sinks, counters, faucets, and toilets, and all wall and floor tiles in the men's and women's rest rooms. Location: Police Public Safety Building Justification /Comments: The public safety building was opened in 1993. Both the men's and woman's rest rooms located on the first floor in the secured area of the patrol section are used by each of the three patrol shifts, seven days a week, and by records section personnel during regular business hours. Fixtures and tiling have become worn and unsightly. It is staffs recommendation to replace all fixtures, and tiling so as to improve the hygiene and suitability of the facilities for use by police personnel. Additionally, we will endeavor to use water saving plumbing fixtures to reduce energy costs. 2015 - Renovate Investigative Section Restrooms 2016 - Renovate Police Administration Restrooms Annual Dollar Impact Upon the Operating Budget: Project Costs: 2014 2015 2016 2017 2018 Totals Restroom Renovations 21,000 21,000 21,000 0 0 63,000 21,000 21,000 21,000 0 0 63,000 Sources of Funds: 2014 2015 2016 2017 2018 Totals Capital Improvement Fund 21,000 21,000 21,000 0 0 63,000 21,000 21,000 21,000 0 0 63,000 File Name: 2014 Restrooms Renovations.xls (E) = Established Project E -3