SUBJECT: 2013 SHARED COST SIDEWALK PROGRAM
(CONTRACT AWARD NOT TO EXCEED $72,000.00)
Background
The Shared Cost Sidewalk Program is a cooperative effort between the residents and the Village to share in
the cost of replacing eligible public sidewalk throughout the Village. Information about the Shared Cost
Program was published in the village newsletter, giving residents an opportunity to have sidewalk replaced at
a discounted cost. This year's cost to the resident is $62.50 per sidewalk square, approximately half of the
total cost of one square. This program is dependent upon resident participation.
Bid Results
Sealed bids for the 2013 Shared Cost Sidewalk Program were publicly opened and read aloud on May 6,
2013 at 1:30 P.M. A Notice to Bidders was published in a local newspaper as required and invitations were
sent to contractors familiar with this program.
Eight (8) contractors submitted bids for this project. The bids ranged from a low of $68,588.70 by Mondi
Construction, Inc. to a high of $134,340.00 by Alliance Contractors, Inc. The engineer's estimate for the
project was $66,900.00.
Each of the bidders submitted a bid bond in the amount of 10% of the total bid as required in the bid proposal
packet. All bids were checked for their accuracy. One error was found in one of the bid totals but it did not
affect the overall results. All bidders correctly signed their bids and bid bonds. Below is a summary of the
bids:
Bidders
Total Bid
Mondi Construction, Inc.
$ 68,588.70
Addison Concrete, Inc.
$ 69,420.00
Globe Construction, Inc.
$ 70,681.50
Triggi Construction, Inc.
$ 91,175.00
Schroeder and Schroeder, Inc.
$ 91,685.00
ALamp Concrete Contractors, Inc.
$114,500.00
D'Land Construction, LLC
$122,109.50
Alliance Contractors, Inc.
$134,340.00
Engineer's Estimate
$ 66,900.00
Page 2 of 2
2013 Shared Cost Sidewalk Program
May 8, 2013
Discussion
The low bidder, Mondi Construction, Inc., is prequalified by the Illinois Department of Transportation for
concrete construction projects and meets the requirements of the contract documents. The Villages of
Buffalo Grove and Glen Ellyn both indicated Mondi Construction, Inc. has done quality work in their
communities in recent years.
The 2013 Shared Cost Sidewalk budget amount is $85,000.00. This year, $13,000.00 will be set aside for
reimbursements to residents for the Village's share for work completed by their own contractors replacing
public sidewalk in front of their homes in conjunction with driveway replacements. Therefore, the total
amount available for the Shared Cost Sidewalk Project is $72,000.00.
Recommendation
I therefore recommend the contract for the 2013 Shared Cost Sidewalk Program to be awarded to the low
bidder, Mondi Construction, Inc. in an amount not to exceed $72,000.00. There are sufficient funds in the
2013 Budget to cover this proposed contract.
Please include this item on the May 21"Village Board Meeting Agenda.
I concur with the above recomfnendation.
Director &Ab c Works Sean P. Dorsey
cc: Village Clerk Lisa Angell
H:\Engineering \Sidewalk\2013 \Shared Cost \recommend memo.doc
Mount Prospect Public Works Department
LL $/ INTEROFFICE MEMORANDUM
TO: VILLAGE MANAGER MICHAEL E. JANONIS
FROM: VILLAGE ENGINEER
DATE: MAY 8, 2013
SUBJECT: 2013 CDBG SIDEWALK PROGRAM CONTRACT AWARD - $40,067.50
Background
The Community Development Block Grant (CDBG) Sidewalk Program includes the installation of new
sidewalk at eligible locations in the Village where sidewalk is missing. Staff has identified the north side
of Kensington Road, from Hemlock Lane to Westgate Road, to be this year's project location.
Bid Results
A Notice to Bidders was published in a local newspaper as required and invitations were sent to
contractors familiar with this program. At 1:30 P.M. on May 6, 2013 sealed bids were publicly opened
and read aloud.
Seven (7) contractors submitted bids for this project. The bids ranged from a low of $40,067.50 by Globe
Construction, Inc. to a high of $76,745.90 by D'Land Construction, LLC. The engineer's estimate for the
project was $36,160.00.
Each of the bidders submitted a bid bond in the amount of 10% of the total bid as required in the bid
proposal packet. All bids were checked for accuracy. No errors were found. All bidders correctly signed
their bids and bid bonds. Below is a summary of the bids:
Bidders
Total Bid
Globe Construction, Inc.
$ 40,067.50
Addison Concrete, Inc.
$ 45,845.00
Mondi Construction, Inc
$ 47,932.25
Triggi Construction, Inc.
$ 54,267.50
Schroeder and Schroeder, Inc.
$ 54,660.00
ALamp Concrete Contractors, Inc.
$ 63,675.00
D'Land Construction, LLC
$ 76,745.90
Engineer's Estimate
$ 36,160.00
Discussion
The low bidder, Globe Construction, Inc., is prequalified by the Illinois Department of Transportation for
concrete construction projects and meets the requirements of the contract documents. The Villages of
Westchester, Glen Ellyn, and City of Naperville all indicated Globe Construction, Inc. has done quality
work in their communities in recent years.
Page 2 of 2
2013 CDBG Sidewalk Program
May 8, 2013
Recommendation
I recommend the low bidder, Globe Construction, Inc. of Addison, IL, be awarded the contract for the
2013 CDBG Sidewalk Program in the amount not to exceed $40,067.50. There are sufficient funds in the
2013 Budget to cover this proposed contract.
Please include this item on the May 21" Village Board Meeting Agenda.
I concur with the above
Director of ?9 id'Works Sean P. Dorsey
cc: Village Clerk Lisa Angell
H:\ Engineering \Sidewalk\2013 \CDBG \recommend memo.doc