INTEROFFICE MEMORANDUM
TO: MICHAEL E. JANONIS, VILLAGE MANAGER ?:>� 6
FROM: FINANCE DIRECTOR t a1
DATE: DECEMBER 12, 2012
SUBJECT: 2013 PROPERTY AND WORKERS COMPENSATION INSURANCE PROGRAM
PURPOSE:
To present a recommendation for the property and workers compensation insurance program for the policy
beginning January 1, 2013 and ending December 31, 2013. ♦r
DISCUSSION:
The Village's current property and workers compensation insurance policies are set to expire on December 31,
2012. With the assistance of the Village's insurance consultant, staff sought quotes with the existing broker and
insurance companies to secure coverage for 2013. We did not seek alternative proposals for the 2013 renewal
because of the continued narrow market for municipal risks. There is still only one competitive insurer for the
excess WC - Safety National. Federal Insurance (Chubb) has been the most competitive on cost and coverage
for property. The following is a brief summary of our expiring insurance program, an analysis of the proposals
received, and a summary of the insurance package being recommended by staff and its consultant.
Expiring Program
Attachment I provides a listing of the current schedule of insurance in force, showing the type of coverage, the
carrier, policy limits, and the broker of record.
Village buildings and vehicles were insured this past year by Federal Insurance (Chubb) Company. Property
values on which the premium was based totaled $88,958,031. A $25,000 deductible is in place for this
coverage. The annual premium was $93,500. The broker offering the coverage was Arthur J. Gallagher and
Co.
Excess workers compensation coverage was purchased from Safety National, which insured the Village for
individual claims in excess of $550,000. There is a $1 million aggregate limit for worker compensation claims.
The annual premium was $52,848. The broker again was Arthur J. Gallagher and Co.
Proposal Received
Nugent Consulting Group assisted the Village in securing proposals from our current broker and underwriters.
Attachment II presents a summary of renewal options offered by Arthur J. Gallagher and Co. for the upcoming
policy period. A breakdown of premium by coverage type for policy year 2012 is also included.
The initial renewal quote for property coverage increased 6.4% from the prior year and totals $99,466.
Insurable values increased 3.0 %. The initial renewal quote for excess workers compensation coverage
increased 31.9% from the prior year from $52,848 to $69,702. Cost for WC coverage is being driven by
Safety National municipal book of business in Illinois as a whole. Due of the poor condition of the
Illinois municipal WC marketplace and benefits in place for sworn police and fire personnel, there are no
other competitive insurers doing excess WC.
Property and Workers' Compensation Insurance Program
December 12, 2012
Page 2
Due to the size of the proposed increase we requested additional coverage options from the broker. The self -
insured retention (SIR) levels were adjusted in the various options to determine if a savings in the annual
premium could be realized. SIR /Deductible levels are found in the lower half of Attachment II.
As expected, increases to the SIR for property and WC coverage resulted in a lower premium. Staff discussed
with the consultant what an appropriate level of exposure would be for a village of our size and claims
experience. It was decided that the village would increase the SIR for WC coverage to $600,000 (Option 1) for
all classes of employees at a savings of $3,982. The savings for increasing the SIR further were relatively low
against the additional risk to be taken with a higher retention level. The deductible for property was increased
from $25,000 to $50,000 (Option 3) resulting in a savings of $5,487. This deductible has been at the $25,000
level since before 2003.
The total for all premiums and commissions for selected coverage levels is $172,081, an increase of 8.4% from
the 2012 premium. The village realized a savings of $9,469 by adjusting SIR /Deductible levels without a
significant amount of additional exposure.
The insurance companies being recommended are very sound financially and have an excellent claims payment
history. Federal Insurance is rated A + +, XV (Superior) by A.M. Best, a recognized insurance company rating
service. Safety National Casualty Corp. is rated A, IX (Excellent).
RECOMMENDATION:
It is recommended the Village purchase property and excess workers compensation insurance from Arthur J.
Gallagher and Co. with premiums and broker's fees totaling $172,081.
David O. Erb
Finance Director
DOE/
Attachments
I: \Insurance \Memos \2012 \2013 Renewal - Property and WC.docx
Attachment I
VILLAGE OF MOUNT PROSPECT
SCHEDULE OF INSURANCE IN FORCE
December 31, 2012
Type of Coverage
Property & Inland Marine
Workers' Compensation
Self - Insured Liability Program
General Liability
Auto Liability
Employment Practices Liability
Police Professional Liability
Public Officials Liability
(Errors and Omissions)
Excess Liability
Fiduciary Liability - Police Pension
Fiduciary Liability - Fire Pension
Public Employee Dishonesty
Depositors Forgery
Public Officials Bond - President
Public Officials Bond - Manager
Public Officials Bond - Treasurer
Contingent Tax Interruption
Employee & Retiree Health Ins.
Third Party Administrators
Workers' Comp Claims Administration
Liability Claims Administration
CCMSI
Gallagher Bassett
I: \Insurance \Schedule of Coverage \December 31, 2012.xlsx
Deductible/
Specific
Aggregate
Self- Insured
Excess
Excess
Expiration
Policy
Carrier
Retention
Limit
Limit
Date
Number
Broker
Premium
Federal Insurance / Chubb
$25,000
$88,958,031
none
01/01/13
35826710
Arthur J. Gallagher
$93,500
Safety National Insurance Co.
$550,000
Statutory
$1,000,000
01/01/13
SP- 11-174 -I1-
Arthur J. Gallagher
$52,848
N/A
$2,000,000
$0
$0
-
$0
N/A
$2,000,000
$0
$0
-
$0
N/A
$2,000,000
$0
$0
-
$0
N/A
$2,000,000
$0
$0
-
$0
N/A
$2,000,000
$0
$0
-
-
$0
High -level Excess Liability Pool
$2,000,000
$12,000,000
$12,000,000
04/30/18
n/a
n/a
$74,453
Federal Insurance / Chubb
$25,000
$5,000,000
$5,000,000
08/01/13
8158 -5499
Arthur J. Gallagher
$10,000
Federal Insurance/ Chubb
$25,000
$5,000,000
$5,000,000
08/01/13
8169 -8992
Arthur J. Gallagher
$11,416
Travelers
$5,000
$500,000
none
05/01/13
105779765
Arthur J. Gallagher
$2,330
Travelers
$1,000
$100,000
none
05/01/13
105779765
Arthur J. Gallagher
Incl. in above
ITT Hartford
$0
$100,000
$100,000
05/01/13
83BSBDK7589
Hobbs Group
$400
ITT Hartford
$0
$100,000
$100,000
05/01/13
83BSBCQ9763
Hobbs Group
$400
ITT Hartford
$0
$250,000
$250,000
05/01/13
83BSBAK8746
Hobbs Group
$1,150
Federal Insurance / Chubb
$25,000
$9,000,000
$9,000,000
01/01/13
35826710
Arthur J. Gallagher
Incl. in Prop
Intergovernmental Personal
$30,000/
Benefit Cooperative
$75,000
none
none
06/30/14
n/a
n/a
Varied
CCMSI
Gallagher Bassett
I: \Insurance \Schedule of Coverage \December 31, 2012.xlsx
Attachment II
VILLAGE OF MOUNT PROSPECT
2013 INSURANCE RENEWAL
SIR /Deductible Levels
Property Values
Initial
92,717,046 $
92,717,046 $
92,717,046 $
92,717,046 $
Expiring
Renewal
Option 1
Option 2
Option 3
Option 4
Coverage 2012
2013
2013
2013
2013
2013
Property $ 93,500
$ 99,466
$ 99,466
$ 99,466 1
$ 93,979 1
$ 89,863
Excess Workers Compensation 52,848
69,702
65,720
54,434
54,434
54,434
Gallagher Fee 12,382
12,382
12,382
12,382
12,382
12,382
$ 158,730
$ 181,550
$ 177,568
$ 166,282
$ 160,795
$ 156,679
SIR /Deductible Levels
Property Values
$ 88,958,031 $
92,717,046 $
92,717,046 $
92,717,046 $
92,717,046 $
92,717,046
Property Deductible
25,000
25,000
25,000
25,000 50,0001
100,000
Auto Physical Damage Deductible
100,000
100,000
100,000
100,000
100,000
100,000
WC Self- insured Retention
550,000
550,000 600,000
750,000
750,000
750,000
WC Self- insured Retention - Police /Fire
550,000
600,000
600,000
750,000
750,000
750,000
Total 2013 Property and WC Insurance Program $ 172,081
Savings from Initial Renewal Quote $ 9,469
I: \Insurance \Memos \2012 \mt prospect 2013 renewal.xlsx
Mrs- M
Mount Prospect Public Works Department
�M�/ INTEROFFICE MEMORANDUM
TO:
FROM:
DATE:
SUBJ:
Background
VILLAGE MANAGER MICHAEL E. JANONIS
DIRECTOR OF PUBLIC WORKS
DECEMBER 10, 2012
DESIGN ENGINEERING SERVICES AND BIDDING ASSISTANCE FOR 2011
COMPREHENSIVE FLOOD STUDY PHASE 1 IMPROVEMENTS ($109,069.94)
The Village Board recently approved $2.5 million in financing for the construction of the 2011
Comprehensive Flood Study Phase 1 improvements. This group of improvements includes the
following projects:
Hatlen Heights Storm Sewer Improvements
$1,610,000
Hatlen Heights Sanitary Sewer Improvements
$105,000
Lonnquist Combined Sewer Improvements
$200,000
Lonnquist Storm Sewer Improvements
$135,000
Golfview Estates Stormwater Improvements
$400,000
Lawrence Lane Storm Sewer Improvements
$50,000
Total:
$2,500,000
Staff proposes to construct all of these projects during the 2013 construction season.
Plans and specifications for the Golfview Estates Stormwater Improvements ($400,000) are
nearly complete and are presently under review. Bidding documents are being drafted and will
be finalized in the first quarter of 2013. Staff anticipates that this project will be let for bidding in
April 2013 and presented to the Village Board for contract award in May 2013. Construction will
start in June 2013 and reach final completion in September 2013.
This project was designed in -house by engineering division staff. Staff proposes to bid and
award this work as a stand -alone project. In addition, staff proposes to provide all bidding
services, engineering layout, and construction inspection utilizing in -house staff. Consequently,
staff does not anticipate utilizing consulting engineers on this project. This project will be
distinctly referred to as the Golfview Estates Stormwater Improvements Project.
The scope of work for the Golfview Estates Stormwater Improvements Project primarily involves
re- grading existing ditches and replacing culvert pipes. The means to perform this work (ditch
Page 2 of 3
Design Engineering Services and Bidding Assistance for 2011
Comprehensive Flood Study Phase 1 Improvements ($109,069.94)
December 10, 2012
re- grading) is materially different than the means (open -cut excavation) necessary to construct
the other Phase 1 projects. Consequently, staff does not anticipate that any cost savings or
efficiencies will be gained by including this project with the other Phase 1 projects.
The remaining projects, including the Hatlen Heights Storm Sewer Improvements ($1,610,000),
the Hatlen Heights Sanitary Sewer Improvements ($105,000), the Lonnquist Combined Sewer
Improvements ($200,000), the Lonnquist Storm Sewer Improvements ($135,000), and the
Lawrence Lane Storm Sewer Improvements ($50,000) will all likely be constructed utilizing
similar means (open -cut excavation). Consequently, staff anticipates that cost savings may be
realized by combining these projects into a single project. Staff refers to this compiled project
as the 2011 Comprehensive Flood Study Phase 1 Improvements Project (the Phase 1 projects).
The total estimated cost for these projects is $2,100,000.
Staff proposes to let bids for the Phase 1 projects in April 2013 and present bid results to the
Village Board in May 2013. Construction should start in June 2013 and all projects should
reach final completion by November 2013.
Unfortunately, staff lacks the resources and expertise to prepare satisfactory plans,
specifications, and bidding documents necessary to construct the Phase 1 projects.
Consequently, staff asked Burns & McDonnell consulting engineers of Downers Grove, Illinois
for a proposal to provide specified design engineering services and bidding assistance for the
Phase 1 projects.
Proposal
Burns & McDonnell has submitted a cost proposal to provide the requested professional
services at a cost not to exceed $109,069.94.
Discussion
Staff has reviewed Burns & McDonnell's proposal and determined that they have allotted
adequate and qualified resources necessary to design all of the proposed improvements in a
manner consistent with the proposed project schedule. In addition, their cost proposal includes
appropriate allocations for requisite sub - contracted technical assistance. Their fee includes
$99,069.94 for Burns & McDonnell labor and expenses as well as $9,000 for subcontracted
geotechnical drilling services and $1,000 for subcontracted environmental laboratory analysis
services.
Burns & McDonnell has successfully performed a variety of civil engineering projects for the
Village over the course of 20 years. Of particular relevance to the Phase 1 projects design work
is their experience with the 2011 Comprehensive Flood Study. Burns & McDonnell authored
that study and developed its recommendations; including all of the Phase 1 projects. Because
of this experience, Burns & McDonnell is intimately familiar with the Village's sewer systems,
drainage patterns, and, most importantly, the flooding problems endured by Mount Prospect
Page 3 of 3
Design Engineering Services and Bidding Assistance for 2011
Comprehensive Flood Study Phase 1 Improvements ($109,069.94)
December 10, 2012
residents. Consequently, it is our opinion that Burns & McDonnell is uniquely, arguably
exclusively, well qualified to design these improvements.
The Burns & McDonnell fee is approximately 5% of the anticipated construction cost for the
Phase 1 projects ($2,100,000). Typically, we expect design fees to be approximately 8% of
construction costs. As such, Burns & McDonnell's fee avails a 3% ($58,930) savings from the
norm. When queried on the steadfastness of this savings, Burns & McDonnell responded that
the savings is a consequence of their familiarity with the Village and the problems addressed by
the Phase 1 projects. They advised that this familiarity manifests real savings because they
have already completed substantial portions of the data collection and conceptual layout work.
In addition, they are already familiar with the Village's standard specifications, sewer
construction codes, and bidding documents.
Perhaps most importantly, Burns & McDonnell staff, including the project manager Randy
Patchett, have established relationships with residents that will be impacted by these proposed
improvements.
Recommendation
I recommend that the Village Board accept the proposal from Burns & McDonnell consulting
engineers to provide specified design engineering services and bidding assistance for the 2011
Comprehensive Flood Study Phase 1 Improvements for a fee not to exceed $109,069.94.
Sufficient funds for this proposed expenditure are available in the 2013 budget.
Cc: Director of Finance David Erb
Deputy Director of Public Works Jason Leib
Village Engineer Jeff Wulbecker
Water /Sewer Superintendent Matt Overeem
Streets /Buildings Superintendent Paul Bures
Village of Mount Prospect
Mount Prospect, Illinois
INTEROFFICE MEMORANDUM
TO: DAVID ERB, FINANCE DIRECTOR
FROM: DEPUTY FINANCE DIRECTOR
DATE: DECEMBER 13, 2012
SUBJECT: COPIER LEASES
PROPOSAL
IZ.IISI IZ
The Finance Department is requesting a waiver of the bid process to lease five copiers.
BACKGROUND
The Village began the practice of leasing copiers in 2002. Overall, staff has been very
pleased with the leasing arrangement. Through the years the Village has negotiated
leased copiers from companies such as Imagetech, Chicago Office Technology, and
Nexus Office Systems, Inc.
Currently all of the Department copiers are leased. In 2010, the Village negotiated lease
agreements with Nexus Office Systems, Inc. to provide Canon equipment for the Finance,
IT, Human Services departments, as well as, two copiers in the Police Department. Nexus
has provided outstanding customer service and the departments have been very pleased
with the reliability of the Canon equipment.
The Police Department, Fire Department, and Clerk's Office copier lease agreements are
up in January 2013. The lease agreements are with Chicago Office Technology Group
(COTG) for the leasing and service of four Toshiba and one Xerox copiers.
Personnel from the Police, Fire, Finance and Clerk's Office began discussing the
replacement of the copiers in October. The points of discussion included reliability, speed,
functionalities, types of print and copy jobs, print volume, space constraints, upgrades
needed and any other comments and concerns. The discussions determined that all
departments need copy, print, fax, and scan functionalities. Feedback on the Toshiba
color copier regarding its reliability and the service received from COTG for all of the
Departments is less than desirable. The Finance Department was asked to research new
copiers that provide the functionalities needed and to negotiate another lease for new
copiers.
Copier Leases
December 12, 2012
Page 2
We received proposals form COTG, Gordon Flesch and Nexus. Due to the reliability and
the service issues that we've had with COTG, we felt it necessary to move away from
COTG and to research the Canon equipment for the departments. Both Nexus and
Gordon Flesch lease Canon copiers. The main goal is to standardize the service, and
provide the departments with reliable equipment with the functionality needed. To date, we
have struggled with providing all departments or divisions with good quality service, due to
the various service providers. Nexus has proven to provide good quality equipment and
service to the departments and divisions in which the copiers are located.
Nexus provided a proposal with good pricing. Nexus is a small company founded in 1982
with forty employees. Their corporate office is located in Rockford, and the technicians are
dispatched from an Elgin office. The Nexus solution includes four Canon iR C5255
copiers, and one Canon iR 4051 copier which will provide copy, print, scan, and fax
functionalities. The Gordon Flesch Company is a larger company with the corporate office
located in Geneva and six branch offices in the area. The Gordon Flesch solution is also
the same as above; and, their pricing for service is lower than Nexus. The Canon iR
C5255 copiers are color copiers which will be located in the Police Department
Administration and Investigations Divisions, Fire Department, and Clerk's Office. The
Canon iR 4051 copier is a high speed black and white copier which will be located in the
Clerk's Office. The copiers will be replacing existing copiers. Our research and experience
found that Canon is a superior brand when compared to the Xerox brand.
RECOMMENDATION
Although the cost of service is higher, we recommend leasing the Canon products from
Nexus Office Equipment Inc. for the five copiers in need of replacement. Nexus has
provided outstanding service over the two year period and the Canon copiers have proven
to be reliable. We will obtain the main goal which is to provide standardization of
equipment and to provide quality service of the equipment. Funds are included in the
operating budgets of the three departments to continue the leases and pay the service
contract fees.
4 -Year
Nexus Gordon Flesch
(1) Canon Black -White Digital Copier &
(4) Toshiba Color Copiers
$ 62,928.00 $ 63,144.00
Annual Maintenance Agreement (4- years) $ 52,560.00 $ 38,376.00
Copier Leases
December 12, 2012
Page 3
As indicated above, pricing was obtained for four -year lease agreements. Included with the
memorandum are the proposals from Nexus Office Systems, Inc. and Gordon Flesch on
the pricing for the five copiers and specifications. Nexus recommended a four year lease
agreement for the Canon copiers.
After reviewing the needs of the departments, the average life of the machines and the
cost, it is recommended that we lease the five Canon replacement copiers from Nexus for
a four -year period at an amount not to exceed $62,928.
Lynn Jarog
Deputy Finance Director
ATTACHMENTS
H:WCCT\Copiers\2012 Board ProposaRProposal VB 2012 Memo.doc
Village of Mount Prospect
Mount Prospect, Illinois
INTEROFFICE MEMORANDUM
TO: MICHAEL E. JANONIS, VILLAGE MANAGER
FROM: FINANCE DIRECTOR
DATE: DECEMBER 17, 2012
SUBJECT: SUPPLEMENTAL MEMO — COPIER LEASE AND MAINE
AGREEMENT
In a memo dated December 13, 2012 provided to the Village Board by the Finance
Department, staff recommended the lease of five replacement copiers from Nexus
Office Equipment for an amount not to exceed $62,928. The term of the lease is four
years at $15,732 per year. In addition to the annual lease payment staff is also
requesting approval of a one year maintenance agreement, also with Nexus. The cost
of the annual maintenance agreement is $13,140. The maintenance agreement covers
all scheduled preventive maintenance work and includes all parts, supplies, service,
labor and guaranteed service response time. Toner is included in the cost of
maintenance.
Item C under the Village Manager's Report is a motion to approve an agreement with
Nexus Office Systems to lease five copiers for a four year period in an amount not to
exceed $62,928. 1 would like to add to this item as a second motion to approve a one
year maintenance agreement with Nexus Office Equipment in an amount not to exceed
$13,140. While an alternate quote for annual maintenance received from Gordon
Flesch Company came in $3,546 below that of Nexus we feel that the benefits provided
by utilizing a single vendor for service and strong customer service from Nexus justify
the additional cost.
David 0. Erb
Finance Director
H: \ACCT \Copiers \2012 Board Proposal \Supplemental Copier Memo.docx
canon
Proposal by:
1�1�4(J
Office Systems, Inc.
In vestiga tio ns
New Canon R C5255
55 Pages B/W
51 Pages Color
Color Print/Fax /Color Scan
4 x 550 Sheet Trays
1 x 100 Sheet Bypass
50 -Sheet Staple Finisher
2/3 Hole Punch
O
Color Touch Screen
Fire Department
New Canon R C5255
55 Pages B/W
51 Pages Color
Color Print /Fax /Color Scan
4 x 550 Sheet Trays AN
1 x 100 Sheet Bypass
50 -Sheet Staple Finisher
Color Touch Screen
Large Capacity Tray
2/3 hole punch
Police Administration
New Canon R C5255
55 Pages B/W
51 Pages Color
Color Print/Fax /Color Scan
4 x 550 Sheet Trays
1 x 100 Sheet Bypass
50 -Sheet Staple Finisher
2/3 Hole Punch
L
Color Touch Screen
Clerks - B[W
New Canon R 4051
51 Pages per minute
Print/Fax /Color Scan
4 x 550 Sheet Trays ,
1 x 80 Sheet Bypass � a
1 x 2,700 Sheet Paper Deck
50 -Sheet Staple Finisher
Color Touch Screen
2/3 Hole Punch
Clerks -Color
New Canon R C5255
55 Pages B/W
51 Pages Color
Color Print /Fax /Color Scan
4 x 550 Sheet Trays
1 x 100 Sheet Bypass
1 x 2,700 Sheet Paper Deck
50 -Sheet Staple Finisher
Color Touch Screen
2/3 Hole Punch
,...M
Nexus Total Solution
48 -Month Municipal Lease with Fiscal Funding Addendum
$ 1 /Month
Monthly Blanket Maintenance
$1,095 Includes 39,000 b/w and 13,000 color copies.
Overages at .0095 and .059
GORDON
C O M P A N
Technology that works. People who perform.
FIESCH®
Y, I N C .
Product Release Date: October 2012
• 55 Pages Per Minute - Black and White
• 51 Pages Per Minute - Color
• Network Printing
• Network Color Scan to E -mail, File, FTP
• Scan as Searchable PDF
• Scan directly to Microsoft Word, PowerPoint
• Cloud - Enabled: Scan and Print to /from the Cloud
• Hard Drive Lock and Erase
• 2 x 550 Sheet Standard Paper Cassettes
• 100 Sheet Duplexing Automatic Document Feeder
• Up to 12x18 Size Paper and 140 lb. Index
• 100 Sheet Bypass Tray
• Automatic Duplexing
• 2GB Standard RAM + 160GB HDD
• Delivery, Installation & Training
• Access To Our Technical Support Center Picture May Not Represent Final Configuration
Optional Accessories Included
Cassette Feeding Unit
Inner Finisher
213 Hole Puncher
Paper Deck
GFC Investment Options
(1) Canon iR Advance 4051
(4) Canon IR Advance C5255
(2) C5255 w /Inner Finisher, 213 Hole Punch and Cassette Feeding Unit
(2) C5255 w /Inner Finisher, 213 Hole Punch,Cassette Feeding Unit and Paper Deck
GFC Leasing
48 Month
$2,115.00
Toner Inclusive Maintenance Agreement
Includes Maintenance for (5) machines (4) C5255 and (1) 4051
Includes 39,000 B &W Images and 13,000 Color Images
B &W overages @ .0055 and Color overages @ .045
The Village of Mount Prospect
December 131h 2012
Canon iR Advance C5255
Includes toner, drum, all parts, labor, travel time, technical updates and emergency calls. Also included is on -site
Preventive Maintenance through Gordon Flesch Company's Quality Assurance Program.
Technoloav that works. People who perform.
GORDON FLESCH®
C O M P A N Y, I N C.
Technology that works. People who perform.
Canon imageRUNNER Advance 4051
• 51 Pages Per Minute - Black and White
• (2) 550 Sheet Standard Paper Cassettes
• 100 Sheet Bypass Tray
• 8.4" full- color, high resolution TFT Screen
• Up to 12x18 Size Paper and 14 lb. Bond to 140 lb. Index
• 150 Sheet Single Pass Duplexing Document Feeder
• Automatic Duplexing
• Network Printing - UFR II
• Network Scan to E -mail, File, FTP
• Scan as PDF Compact - Decreases File Size of Color Scans
• Scan with 128 Bit Encryption
• 2 GB Standard RAM + 80 GB HDD
• Toner and Paper Can Be Replaced on the Fly
• 1,200x1,200 dpi Resolution
• Delivery, Installation & Training
• Access to Our Technical Support Center
Optional Accessories Included
• Inner Staple Finisher w1213 Hole Puncher
• 2,700 Sheet Paper Deck
• 2 Additional 550 Sheet Adjustable Paper Cassettes
The Village of Mount Prospect
December 13th 2012
11
(1) Canon iR Advance -4051
Optional Accessories Included:
Cassette Feeding Unit
Paper Deck
Inner Finisher with 213 Hole Punch
Technology that works. People who perform.