HomeMy WebLinkAboutVB Agenda Packet 12/23/2002Next Ordinance No. 5300
Next Resolution No. 62-02
Meeting Location:
Central Community Center
1000 W. Central Road
Mount Prospect, Illinois 60056
I. CALL TO ORDER
I1.
III.
IV.
V.
VI.
VII.
ORDER OF
SPECIAL
ROLL CALL
Trustee Timothy Corcoran
Trustee Paul Hoefert
Trustee Richard Lohrstorfer
PLEDGE OF ALLEGIANCE
INVOCATION
BUSINESS
MEETING
Meeting Date and Time:
Monday
December 23, 2002
7:00 P.M.
Mayor Gerald "Skip" Farley
Trustee Michaele Skowron
Trustee Irvana Wilks
Trustee Michael Zadel
NEW BUSINESS
A. REVIEW AND APPROVE BID PACKAGE FOR VILLAGE PARKING DECK
AT 50 SOUTH EMERSON STREET
ANY OTHER BUSINESS
ADJOURNMENT
ANY INDIVIDUAL WITH A DISABILITY WHO WOULD LIKE TO ATTEND THIS MEETING SHOULD CONTACT THE
VILLAGE MANAGER'S OFFICE AT 100 SOUTH EMERSON STREET, 847/392-6000, TDD 847/392-6064
illage of Mount Prospect
Mount Prospect, Illinois
INTEROFFICE MEMORANDUM
TO:
MAYOR FARLEY AND VILLAGE BOARD MEMBERS
FROM:
ASSISTANT VILLAGE MANAGER
DATE:
DECEMBER 19, 2002
SUBJECT: APPROVAL OF CONSTRUCTION BIDS FOR PARKING DECK - REVISED
The Village's contractor, W.B. Olson, has obtained the subcontractor bids for the construction of the
parking deck. The total projected cost is $6,256,844. The preliminary estimate for the parking deck
construction was placed at $6.8 million earlier this year. The project cost includes allowances for the
following.
· Winter Conditions, $25,000
· Ground Water Pumping, $15,000
· Library Building Protection and Utility Protection, $25,000
· Library Drive Reworking, $10,000
These allowances are included in the total price and the overall cost of the construction could be
reduced if these expenses are unnecessary. Also, there is a construction contingency that is
available in an amount of $297,945 (4% of the construction cost) for unforeseen changes. The
contractor has recommended the lowest qualified and complete bidder in all cases and illustrated in
the summary of bidders for your information. The total project cost also includes the field applied
masonry brick which the Village Board had previously expressed an interest in including pending
appropriate budget flexibility. The Village Board will need to determine the type of brick during the
month of January 2003 to stay on schedule for the ordering and application of brick for the deck and
Village Hall. A brick allowance has been established within the masonry base bid and assuming the
brick selection is not too exotic there should be no need to adjust the cost for purchase and
application.
Based on the contract for services between W.B. OIson and the Village the projected cost is
guaranteed maximum price in which we pay W.B. OIson for the project and they accept the risk and
guarantee the performance of the subcontractors. Representatives from W.B. Olson will be
attendance to answer any questions that may arise from the bid package review.
I recommend Village Board approval to expend a maximum of $6,256,844 to W.B. Olson for the
construction of a 372 space parking deck.
David Strahl
C:
Village Manager Michael E. Janonis
Finance Director Doug EIIsworth
Community Development Director Bill Cooney
H:\GEN\Village HalI\VB Memo to Approve Parking Deck Bid Price.doc
Or-SON, INC.
The Construction People
12/18~02
JOB:
A&E:
PROJECT ESTIMATE
Mount Prospect Parking Garage
DLK/Desman S.F.: 145,425
Cars: 384
DESCRIPTION TOTAL. $/SF
1.0 GENERAL CONDITIONS 420,678 $2.89
1.1 FINAL CLEANING 9,500 $0.07
1.2 WINTER CONDITIONS (blankets,htrs) A. 25,000 $0.17
1.3 GROUNDWATER PUMPING A. 15,000 $0.10
2.0 EXCAVATION 461,955 $3/18
2.4 LANDSCAPING None shown
3.0 LIBRARY BLDG. PROTECT.& UTILITY COORD. A. 25,000 $0.17
3.2 LIBRARY DRIVE REWORKING A. 10,000 $0107
3.3 CONCRETE 790,000 $5~43
3.4 PRECAST CONCRETE 2,003,000 $!3.77
4.1 MASONRY 517,700 $3.56
5.1 MISC. STEEL 200,000 $1:38
5.2 FENCING 19,144 $0.13
6.1 CARPENTRY 52,971 $0.36
6.2 WOOD TRUSSES 2,609 $0.02
7.3 WATERPROOFING 24,734 $01'17
7.4 ROOFING & SM 38,200 $0126
7.5 CAULKING 10,900 $0.07
8.0 HOLLOW MTL & HRDW 16,365 $0.11
8.1 GLASS &ALUMINUM 44,590 $0.31
9.1 DRYVVALL 8,861 $0.06
9.2 RESILIENT 1,200 $0.01
9.3 PAINTING 117,150 $0.81
10.1 SIGNAGE 5,720 $0.04
14.0 ELEVATOR 78,980 $0.54
15.1 PLUMBING 152,500 $1.05
15.2 SITE PLUMBING 68,000 $0147
15.3 FIRE PROTECTION 216,500 $1.49
15.4 HEATING &VENTILATING 35,091
16.1 ELECTRICAL 287,416 $1.98
FEE
PERMIT ALLOWANCE
CGLINSURANCE
BOND
CONSTRUCTION CONTINGENCY
Line items are for information only and
are not guaranteed
SUB-TOTAL 5,658,764
4.00% 226,351
By Owner
0.50% 29,426
0.75% 44,359
5.00% 297,945
TOTAL 6,256,844
$ 16,294
$38.91
$43.02
per stall
W.B. OLSON INC.
The Construction People
12/18/02
PROJECT CLARIFICATIONS
JOB: Mount Prospect Parking Garage
A&E: DLK/Desman
Qualifications
1)
Estimate is based on DLK plan sheets G1.0,Gl .'1 ,T1, C1-C8, GA1.1 - GA5.4, GS001 ~ GS403,
MGI.1 ,MGI.1 ,GE0.1 - GE3.1, GP1.1-GP2.2,GFPI.1 - GFP2.1 & the Project Manual
dated 11/22/02. Addendum #1 dated 12/9/02.
2) Water and electricity to be provided by owner at no charge
3)
Precast concrete products will have' a standard grey concrete mix except for the spandrels and
columns on the north elevation which will have a 50% white 50% gray cement mix.
1)
2)
3)
Underground obstruction removal (i.e. rocks, old foundations & other debris,
To be performed on a time & material basis.
Unsuitable soil removal and replacement & hazardous matedal removal.
Relocation of transformer
4)
5)
6)
Concrete retaining wall & steel railing from Library to garage at west side.
Library loading dock
Excess facility charges including energy consumption charges.
7)
8)
9)
Relocation of existing utility services, if required, which are located
in the way of new construction.
Removal of buried tank.
Water repellent work (deleted in Addendum #1)
10) Items required by code but not shown on the drawings are not included.
11) Items contained in the specifications but not shown on the drawings are not included.
12) Landscaping work (garage landscaping to be part of Village Hall phase)
People
SUB LIST & BID RECAP
JOB:
A&E:
Mount Prospect Parking Garage
DLK/Desman
12/18/02
EXCAVATION
HF Vegter
Lenzini Excavating
Budron Excavating
Meyer Mtl
Lindahl Bros.
Martan, Inc
Lenny Hoffman
Base Bid
$ 461,955
$ 467,000
$ 537,900
$ 591,900
No Bid
No Bid
No Bid
CONCRETE
Corona Construction
Degraf Concrete
R. Olson
Cerami Construction
Howard Concrete
Elliot Construction
Martam, Inc.
Martin Cement
Base Bid
$ 790,000
$ 794,279
$ 819,875
$ 844,500
$ 861,000
$ 933,000
No Bid
No Bid
pRECAST CONCRETE
Dukane Precast
JW Peters
Spancrete
Rinker Materials
Mid Amedca Precast
Base Bid
$ 2,003,000
$ 2,012,000
$ 2,290,511
$ 2,312,574
No Bid
Incomplete
(12' tees)
MASONRY
J&E Duff
Illinois Masonry
Hansen-Hempel
Crouch-Walker
JAC Masonry
Ma[tam, Inc.
Base Bid
$ 517,700
$ 524,675
$ 548,885
$ 600,400
$ 685,000
No Bid
MISC. STEEL
Douglas Iron
Western Architectural
David Amh. Metals
Mutual Services
Interstate Welding
Base Bid
$ 200,000
$ 220,000
$ 228,600
$ 144,500
No Bid
Incomplete
FENCING
Midwest
Action
Tru-Link
Peerless
Fence Store
CARPENTRY
W.B. Olson
Base Bid
$ 19,144
$ 19,240
$ 17,364
No Bid
No Bid
Base Bid
$ 52,971
Incomplete
WOOD TRUSSES
Custom Components
Hines Material
Base Bid
$ 2,6O9
$ 3,325
WATERPROOFING/DAMPPROOFING
Base Bid
Streich Corp
All Sealants
Sager Sealant
$ 24,734
$ 27,114
$ 19,595
Incomplete
Spec not
followed
ROOFING & SHEET METAL
Base Bid
Popko Roofing
EW Olson
RE Burke
Raby Roofing
A-1 Roofing
$ 38,200
$ 11,650
Pending
No Bid
No Bid
Incomplete No sheet mtl
CAULKING
Base Bid
TNA Sealants
Sager Sealant
Triumph Restoration
Streich Corp
All Sealants
$
$
$
10,900
13,649
14,600
No Bid
No Bid
HOLLOW METAL & HARDWARE
Base Bid
Laforce
Stauber
Tippet
16,365
16,469
12,677
Incomplete
( No stain.: steel door)
GLASS & ALUMINUM
Base Bid
Trainor
Frontrunner
CAD Contract
Desplaines Glass
NGG Limited
Illinois Huber
Christopher Glass
$ 44,590
$ 46,600
$ 46,859
$ 47,6OO
$ 49,179
$ 50,663
$ 59,600
PAINTING
Base Bid
Spray Specialists
Continental Painting
Ascher Bros.
A. Gramer
All Tech Decorating
Soutsos Decorating
$ 117,150
$ 132,365
$ 153,900
$ 173,641
No Bid
Pending
Paint precast included.
SIGNAGE
Base Bid
ASI Signs
Nelson Harkins
$ 5,720
Pending
ELEVATOR
Otis Elevator
Kone Elevator
Schindler
Thyssen Krupp
Base Bid
$ 78,980
$ 81,650
$ 86,000
No Bid
PLUMBING
LV Stutz
Ostman Plumbing
Advance Mechanical
Cecchin Plumbing
Robert F. Phillips
Sherman Mech
Base Bid
$ 152,500
$ 160,323
$ 165,000
$ 165,320
$ 119,725
No Bid
Scope
uncertain
SITE PLUMBING
Cecchin Plumbing
Pat McNally
Lenny Hoffman
Advance Mechanical
Base Bid
$ 68,000
$ 89,000
No Bid
Pending
FIRE PROTECTION
Base Bid
United States F.P. $ 216,500
Global F.P. $ 216,660
Windy City F.P. $ 229,440
Nelson F.P. $ 224,531
FE Moran $ 295,428
Fire Protection Co. $ 168,317
Cybor No Bid
K & S Sprinklers No Bid
Incomplete
No galv pipe
HEATING & VENTILATING
Base Bid
Atomatic $ 35,091
Air-Rite $ 37,400
Edwards Engineering $ 37,553
Northern Weathermakers $ 37,636
Advance Mechanical $ 25,916
VA Smith No Bid
Incomplete
No control
widng
ELECTRICAL
Base Bid
Malko Electric $ 287,416
Nu Line Electric $ 292,235
Shoreline Electdc $ 319,800
Jamerson & Bauwens $ 405,071
Mamn Electdc $ 407,800
Kilbar Electric $ 436,000
NOTE: Above bids subject to change pending scope review.
MAYOR
Gerald L. Farley
TRUSTEES
Timothy J. Corcomn
Paul Wm. Hoefer~
Richard M. Lohrstorfer
Michaele W. Skowron
Irvana K. Wilks
Michael A. Zadel
VILLAGE MANAGER
Michael E, Janonis
VILLAGE CLERK
Velma W. Lowe
Village of Mount Prospect
100 South Emerson Street Mount Prospect, Illinois 60056
Phone: (847) 392-6000
Fax: (847) 818-5336
TDD: (847) 392-6064
VILLAGE OF MOUNT PROSPECT
FINANCE COMMISSION
CANCELLATION NOTICE
THE FINANCE COMMISSION MEETING
SCHEDULED FOR DECEMBER 26, 2002
HAS BEEN CANCELLED
Happy
Holidays!
NOTICE:
The December
meeting of the
Mount Prospect
Planning ez '
Commission has
been cancelled.
of Mount
Community
Development
Department
November 27, 2002
O
The next planning
&. Z. oning
comrmSslon m
wilt be held on_