Loading...
HomeMy WebLinkAbout05/29/2002 VB minutes workshopVILLAGE BOARD WORKSHOP MA Y 29, 2OO2 MINUTES The meeting was convened at 6:11 p.m. at the Police and Fire Headquarters by Mayor Farley. Present at the meeting were Trustees Paul Hoefert, Michaele Skowrcn, lrvana Wilks and Michael Zadel. Trustee Timothy Corcoran arrived at 6:22 p.m. and Trustee Richard Lohrstorfer ardv. ed at 6:53 p.m. Staff present included: Village Manager Michael Janonis, Assistant Village Manager David Strahl, Community Development Director William Cooney, Finance Director Doug EIIsworth, Production Coordinator Ross Rowe, MIS Coordinator Joan Middleton and Deputy Finance Director Carol Widmer. There were representatives present from W. B. Olson and DLK Architects. Village Manager Janonis provided an overview of the previous meeting whereby the Village Board directed the staff to utilize a preferred parking count of 372 spaces and determine what the revised budget would be with the additional architectural features. He stated there is a need to get the deck moving in terms of design development and its integration appearance with the Village Hall. He stated the next Workshop meeting would focus on the Village Hall details. Kevin Kemp from DLK Architectural provided a general overview of the site and highlighted the 30' vertical structural appearance that is carded over from the Library. He also highlighted the anticipated landscaped areas between the Library and the Parking Deck. He highlighted the two options that have been drafted for consideration and highlighted the bdck detailing of each option. He stated that Option A can be built with the face bdck precast into the concrete panels and is within the budget that was previously discussed. He stated Option B would be a masonry bdck walt that is attached to the exterior of the Parking Deck giving it a fuller appearance but is estimated at approximately $300,000 above the previous Parking Deck budget estimate. General discussion of the Village Board members included the overall appearance of the two options and the need to make sure the Deck is built in such a way that it conveys a statement about the community. There was also discussion regarding the critical element of the Deck being utilized for downtown parking. onsensus of the Village Board was preferred as Option B which is the masonry brick attached to the precast concrete exterior. The Village Board also reached consensus on the proposed architectural entrance feature to the Village Hall with the stair tower from the Parking Deck attached to the main entrance of the Village Hall. The Village Board also accepted the proposal from the architect regarding the general appearance of the Village Hall's exterior, however, there was some discussion regarding the wing that points toward Busse and the need to address some architectural needs so the wing does not appear to be substantially different than the main part of the building which hides the Parking Deck. The meeting adjourned at 8:04 p,m. Respectfully submitted, DAVID STRAHL Assistant Village Manager DSlrcc