HomeMy WebLinkAbout07/17/2012 2012 Retention Basin Dredging Project- Kensington Business Park - Basin #4Mount • • ' Public Works ' • INTEROFFICE MEMORANDUM TO: VILLAGE MANAGER MICHAEL E. JANONIS FROM: ENGINEERING ASSISTANT DATE: JULY 10, 2012 SUBJECT: 2012 RETENTION BASIN DREDGING PROJECT KENSINGTON BUSINESS PARK — BASIN #4 CONTRACT AWARD - $120,257 Background The Village of Mount Prospect is responsible for maintaining the 11 retention basins in the Kensington Business Center. Per the agreement made with the business park in the 1980s, Village maintenance includes sediment dredging, slope erosion protection, and outlet structure upkeep. Staff has identified Basin #4 on Business Center Drive (map attached) to be this year's dredging project. The project will involve pumping water out of the basin into the adjacent Feehanville Ditch, loading accumulated sediment, and hauling it to an offsite landfill. The bottom and sides of the basin will then be reshaped to conform to the original design. At project's end the shoreline will be stabilized with stone, silt basins will be constructed near inflow structures, and the site will be restored with sod. Subsequent rainfall will naturally refill the retention basin. Bids Results A Notice to Bidders was published in the local newspaper and several local contractors were sent invitations to bid on the project. At 1:30 p.m. on July 9, 2012, sealed bids were publicly opened and read aloud. Three (3) contractors submitted bids for this project. The bids ranged from a low of $109,325 by Copenhaver Construction, Inc. to a high of $149,835 by Earth Werks Corp. The Engineer's Estimate is $140,110 All bidders submitted a bid deposit in the amount of 5% of their total bids as required by the contract documents. All bids were checked for their accuracy. No errors were found. All bidders correctly signed their bids and bid bonds. Below is a summary of the bids. Bidders Total Bid Copenhaver Construction, Inc. (Gilberts, IL) $109,325 Martam Construction, Inc. (Elgin, IL) $115,925 Earth Werks Corp. (Batavia, IL) $149,835 Engineer's Estimate $140,110 Page 2 of 3 2012 Retention Basin Dredging Project July 10, 2012 Discussion The low bidder, Copenhaver Construction, Inc., completed similar projects for the Village including Retention Basin #7 in 2008 and Retention Basin #5a in 2011. Along with those successful projects, the Village of Highland Park, Wheeling Township, Glenview and South Barrington Park Districts all indicated Copenhaver has done quality work in their communities in recent years. Copenhaver meets the requirements of the contract documents and their references show their workmanship to be good. Since the contractor's bid is based on estimated quantities, I recommend a 10% contingency of $10,932 be added to the proposed contract to account for variable sediment thickness and possible increases in the amount of sediment removed. The revised total contract award would be $120,257. Recommendation I recommend that the low bidder, Copenhaver Construction, Inc. of Gilbert's, IL, be awarded the construction contract for the 2012 Retention Basin Dredging Project in the amount not to exceed $120,257. There are sufficient funds in the 2012 Budget to cover this proposed contract. Please include this item on the July 17` Village Board Meeting Agenda. Dan Randolph, P.E. I concur with the above Director of ubliWorks Sean P. Dorsey Attachments: Project Location Map c: Village Clerk Lisa Angell H : \Engineering\Ponds\kbc_basin_4 \Construction \construction rec memo.doc � � . \ . 0 0 En w Ln « � z z In � D I + � � Z . � 0 � 1 ,,.. � � \ �§ l �