HomeMy WebLinkAbout07/17/2012 2012 CDBG Side Walk Program Contract AwardMount 1 ll Mount Prospect Public Works Department INTEROFFICE MEMORANDUM TO: VILLAGE MANAGER MICHAEL E. JANONIS FROM: PROJECT ENGINEER DATE: JULY 10, 2012 SUBJECT: 2012 CDBG SIDEWALK PROGRAM CONTRACT AWARD - $45,304 Background The Community Development Block Grant (CDBG) Sidewalk Program includes the installation of new sidewalk at locations in the Village where sidewalk is missing. Staff has identified the north side of Kensington Road, from Brentwood Lane to Hemlock Lane, to be this year's project location. Bid Results A Notice to Bidders was published in a local newspaper as required and invitations were sent to contractors familiar with this program. At 1:30 P.M. on July 9, 2012 sealed bids were publicly opened and read aloud. Ten( 10) contractors submitted bids for this project. The bids ranged from a low of $41,186 by Copenhaver Construction, Inc., to a high of $75,260 by Mondi Construction, Inc. The Engineer's estimate for the project is $49,005. Each of the bidders submitted a bid bond in the amount of 5% of the total bid as required in the bid proposal packet. All bids were checked for accuracy. No errors were found. All bidders correctly signed their bids and bid bonds. Below is a summary of the bids: Bidders Total Bid Copenhaver Construction, Inc. $ 41,186.00 ALamp Concrete Contractors, Inc. $ 44,700.00 Globe Construction, Inc. $ 48,524.50 C -A Cement Construction Co., Inc. $ 48,680.00 D'Land Construction, LLC $ 50,092.50 Alliance Contractors, Inc. $ 52,502.80 Schroeder and Schroeder, Inc. $ 54,495.00 G & M Cement Construction, Inc. $ 59,020.00 Triggi Construction, Inc. $ 62,920.00 Mondi Construction, Inc $ 75,260.00 Engineer's Estimate $ 49,005.00 Page 2 of 2 2012 CDBG Sidewalk Program July 10, 2012 Discussion The low bidder, Copenhaver Construction, Inc., is prequalified by the Illinois Department of Transportation for concrete construction projects. They meet the requirements of the contract documents and completed the 2010 Shared Cost Sidewalk Program with the Village and their workmanship was good. Since the Contractor's bid is based on estimated quantities, I recommend a 10% contingency of $4,118 be added to the proposed contract. This amount would be used to cover the cost of unanticipated construction issues and final measured installed quantities. The revised total contract award would be $45,304. Recommendation I recommend the low bidder, Copenhaver Construction, Inc. of Gilberts, IL, be awarded the contract for the 2012 CDBG Sidewalk Program in the amount not to exceed $45,304. There are sufficient funds in the 2012 Budget to cover this proposed contract. Please include this item on the July 17` Village Board Meeting Agenda. Donna M. Brown, P.E. cc: Village Clerk Lisa Angell H: \Engineering \Sidewalk\2012 \CDBG \recommend memo.doe