HomeMy WebLinkAbout3. 2011 Comprehensive Stormwater StudyMount Prospect Public Works Department
1 INTEROFFICE MEMORANDUM
TO: VILLAGE MANAGER MICHAEL E. JANONIS
FROM: DIRECTOR OF PUBLIC WORKS
DATE: MARCH 5, 2012
SUBJ: 2011 COMPREHENSIVE STORMWATER STUDY FINAL REPORT
Background
This memorandum transmits a copy of the 2011 Comprehensive Stormwater Study final report
as prepared by the Village's engineering consultant, Burns & McDonnell of Oak Brook, Illinois in
conjunction with Village staff. This report culminates five (5) months of data collection, and
analysis pertaining to the extensive flooding that beset the Village following torrential rain on
July 23, 2011. The report also presents a series of recommendations intended to cost -
effectively mitigate defined and recurrent flooding problems.
At over 100 pages, the attached report is an expansive and compendious examination of the
subject. However, the essence of the report can be distilled to the following central themes:
The July 23, 2011 rainstorm was an extraordinary event. Analysis of official National Weather
Service data indicates that rainfall received in the early morning hours on that day was the most
intense ever recorded in the Chicago area. Technically, the storm is considered a "400 + - year"
event; a storm that has a 0.25% statistical probability of occurring in any given year.
Although technically feasible, constructing sewer improvements to convey a 400 -year storm is
cost prohibitive. Conservative estimates place the financial cost of such a feat in excess of
$200 million. Furthermore, even if the local sewer systems could collect and convey the storm,
downstream conduits such as the Metropolitan Water Reclamation District of Greater Chicago
( MWRDGC) interceptor sewers, MWRDGC "Deep Tunnel" system, and local waterways do not
have the capacity to accept the discharge. Consequently, substantial additional expenditures
would be required to procure property and construct detention facilities to temporarily store the
excess volume.
Rainfall- induced flooding is not a new, or even recent, development in the Chicago area. The
entire region has been plagued with flooding problems dating all the way back to initial
settlements. In Mount Prospect, flooding issues predate incorporation of the Village and
highlight each of the intervening decades until this day. Locally, tens of millions have been
spent in efforts to mitigate the problem. Regionally, billions have been expended on projects
such as the "Deep Tunnel ". Inevitably, all of these improvements have been rendered
ineffective by storms that exceed their designs. The common thread uniting all of these efforts
has been the unequivocal pursuit of a "build a bigger pipe" solution. That is, all of these
Page 2 of 3
Transmittal of Comprehensive Stormwater Study Final Report
March 5, 2012
improvements have featured the construction of larger pipes, or the installation of relief sewers
and pumping stations, designed to handle the last big storm.
Burns and McDonnell recommends, and staff concurs, that the most effective and cost - efficient
go- forward stormwater management s trategy involves a combination of private sector and
public sector improvements:
➢ Recommended private sector improvements include the disconnection of footing
tile drains and the installation of overhead sewers in the 379 homes that reported
sanitary backup. These improvements will eliminate the prevalent pathway for
sanitary sewer water to enter basements and below -grade living spaces — the
gravity drain. In many cases, these improvements will also eliminate the
introduction of clear water into separate sanitary sewers. The estimated cost of
this work is $9,475,000.
➢ Recommended public sector improvements include the installation of larger
pipes, and /or the construction of relief sewers, at specified locations. These
improvements will be constructed where engineering evaluation revealed severe
and geographically concentrated flooding associated with a pronounced lack of
local sewer conveyance capacity. Improvements will be designed to provide a
25 -year level of protection. The estimated cost of this work is $14,440,000.
➢ Four (4) drainage basins were identified that warrant additional engineering
evaluation. The estimated cost for this work is $28,000.
The total cost for all improvements recommended by the attached 2011 Comprehensive
Stormwater Study is $23,943,000.
Discussion
Staff seeks Village Board direction on the following items:
Is there support for Village participation in the cost of footing tile disconnection and
overhead sewer installation on private property?
a. If there is support, at what level?
i. Should the Basin 14 model be applied? (50% grant, 50% simple- interest
loan payable upon sale of the home, $18,000 cap per home.)
ii. If the Basin 14 model is inadequate, how should the Village participate in
the cost of private sector improvements?
2. Several property owners affected by the July 23, 2011 flood have subsequently installed
overhead sewers and removed footing tile connections. Should these property owners
be retroactively eligible to access Village financial aid?
3. Is there support for the construction of recommended public sector improvements?
Page 3 of 3
Transmittal of Comprehensive Stormwater Study Final Report
March 5, 2012
4. It is the opinion of staff that sufficient capacity does not presently exist in the
water /sewer enterprise fund to facilitate recommended repairs. As such, serious
consideration of this report and its findings inevitably will broach the issue of financing
options. To this end, staff suggests that the following alternatives might be worthy of
deliberation:
Increase water /sewer rates The current water /sewer rate structure provides little
capacity to address long -term capital improvements. Historically, our
water /sewer rates have demonstrated the capability to fund only operational
costs and satisfy Northwest Suburban Municipal Joint Action Water Agency
(NWSMJAWA) commitments. However, recent rate increases by the City of
Chicago, our water supplier, has severely curtailed the potential for funding
improvements with user fees.
Extend or Increase Sewer Maintenance Flat Fee The existing flat fee applied to
water /sewer bills to finance the sewer improvements is set to expire in 2016.
This fee typically generates approximately $800,000 per year. The sunset on
this fee could be extended and /or the fee could be increased to fund
recommended improvements.
Utilize available capacity on the quarter -cent sales tax In the past, a number of
flood relief and sewer improvement projects have been funded utilizing this
mechanism. However, much of the revenue generated from this tax is currently
being utilized to service existing debt. The Finance Department forecasts that
capacity will start to become available from this revenue source in 2013.
Typically, it generates $1.2 million per year. At the present time, approximately
half of the revenue is applied to retire debt incurred to fund sewer improvements
implemented following the 1990 flood study. The other half is utilized to fund
flood control capital projects. We will continue to retire debt until 2019 when all
loans will be repaid.
Create a special service area The entire Village could be defined as a special
service area. This classification would enable access to the property tax levy for
the purpose of funding stormwater improvements. This solution has the potential
to be an acceptable long -term solution if it can be structured to replace Special
Service Area 5. Special Service Area 5 is due to expire in 2017. It was originally
implemented to pay for the costs of bringing Lake Michigan water to the Village.
Recommendation
With your concurrence, staff asks that this matter be presented for the Village Board's
consideration at the April 10, 2012 Committee of the Whole meeting. )
Sean P. Dorsey
EXECUTIVE SUMMARY
The Village of Mount Prospect (Village) contracted Burns & McDonnell Engineering Company, Inc.
(Burns & McDonnell) to determine the reasons for the significant impacts to the Village that occurred
with the July 23, 2011 storm event and identify potential improvements to the Village's stormwater
management system that would help to diminish the impact that a future storm of this magnitude would
generate. The Village provided storm flood survey information to Burns & McDonnell which was
gathered from the residents through an extensive public outreach program. This outreach program
included having Village employees and Burns & McDonnell representatives visiting residents' homes or
contacting them via telephone to gather information regarding the magnitude and type of flooding
experienced by each affected resident.
Further, the intent of the study was to quantify and analyze the various drainage basins within the Village
based on the findings of the flood surveys. Using the information gathered, areas that experienced the
highest density of flooding were selected to be studied in greater detail using hydraulic modeling
software. Basins that were not modeled were analyzed based on the types of flooding reported in each
area. This study is intended to serve as a tool to assist the Village in evaluating and prioritizing capital
improvements and in maintaining its storm and combined sewer system, as well as its separate sanitary
sewer system.
It is important to emphasize that the July 23r storm was an extreme rain event in terms of rainfall
intensity and quantity. According to the hourly rainfall data obtained from the rain gauge at Chicago
O'Hare International Airport, a total of 6.78 inches of rain fell during the peak 3 hours of the storm. Over
a 24 hour period, a total of 8.27 inches of rain fell over the area. The storm can be classified as
approximately a 400 -year storm (or a storm that has a probability of occurring once every 400 years)
based on the 3 -hour peak intensity and volume of rainfall. Current industry standard is to design a typical
storm sewer system to handle a 10 -year storm event using Bulletin 70 Rainfall Data. Much of the Mount
Prospect storm and wastewater collection system was constructed prior to when these standards were
implemented, and as such, may have a lower conveyance capacity. This circumstance is typical for older
communities including the City of Chicago and most "inner ring" suburbs. Therefore, flooding of the
local conveyance system during a storm with a magnitude like that of the July 23 2011 storm is
unavoidable.
A low end conservative estimate of the capital cost to mitigate the flooding from an event similar to the
July 23r storm using public sector improvements only is in excess of $200,000,000. This cost would
include the construction of relief storm sewers, combined relief sewers, underground detention, sanitary
relief stations and other related improvements. Purchasing property to create additional detention would
increase these costs further. Additional operation and maintenance costs would also be incurred by the
Village. Even with all these improvements, protection against sewer backups from a storm event similar
to the July 23 2011 event would not be as reliable as private property improvements such as installing
overhead plumbing or backup prevention systems.
The Village performs a very thorough maintenance and flood relief effort on an ongoing basis.
Inspections of the stormwater system outfalls at detention basins and creeks are made on a twice a year
Village of Mount Prospect ES - 1 February 2012
Stormwater Management Study
Cost for mitigating flooding from seepage and private sector surface flooding in these basins was not
determined as part of this study. It is recommended that each property owner contact a company that
specializes in mitigating basement flooding caused by seepage.
Based on the results of the flooding questionnaires, additional assessment and hydraulic modeling was
performed for several areas where the most severe and geographically concentrated amount of flooding
occurred. Based on this additional assessment improvements to upgrade the capacity of the existing
combined and separate sewer systems were developed. Budgetary costs for implementing these public
sector improvements are $14,440,000.
Several separate sewer areas were also identified for additional assessment. These areas have a relatively
low occurrence of reported flooding; however several localized areas of concentrated flooding were
reported. A budgetary cost for completing the recommended evaluations is $28,000.
Cost Summary
The total budgetary cost to implement the recommendations presented in this study is $23,943,000. A
breakdown of these costs is presented in the following table.
Summary of Recommended Stormwater Management Improvements
Village of Mount Prospect ES-3 February 2012
Stormwater Management Study
Budgetary
Area
Type of Improvement
Improvement
Cost
Haden Heights
Public Sector
Storm Sewer Improvements for 25-
$1,500,000
Subdivision
year Level of Service
Hatlen Heights
Public Sector
Sanitary Sewer Improvements for
$105,000
Subdivision
25 -year Level of Service
Isabella Street Area
Public Sector
Combined Sewer Improvements for
$12,500,000
25 -year Level of Service
CS31 Combined Sewer
Lonnquist Boulevard
Public Sector
Improvements for 25 -year Level of
$200,000
Area
Service
Lormquist Boulevard
Public Sector
Adding Inlets and Televising
$135,000
Area
Village -wide
Private Sector
Disconnection of 379 Foundation
$9,475,000
Drains with Overhead Plumbing
Further Investigation
Basin SS21, Basin SS41, Basin
and Additional
SS45 and Illinois American Basin
$28,000
Analysis
Total
$23,943,000
Village of Mount Prospect ES-3 February 2012
Stormwater Management Study
MAYOR
Irvana K. Wilks
TRUSTEES
Paul Wm. Hoefert
Arlene A. Juracek
A. John Kom
John J. Matuszak
Steven S. Polit
Michael A. Zadel
Village of Mount Prospect
50 South Emerson Street, Mount Prospect, Illinois 60056
TO VIEW THE:
VILLAGE MANAGER
Michael E. Janonis
VILLAGE CLERK
M. Lisa Angell
Phone: 847/392 -6000
Fax: 847/392 -6022
TDD: 847/392 -6064
www.moun tprospect.org
2011 COMPREHENSIVE STORMWATER STUDY
IN ITS ENTIRETY GO TO:
mountprospect.org/floodstudy