HomeMy WebLinkAboutRes 21-86 06/17/1986
RESOLUTION NO.
21-86
A RESOLUTION AUTHORIZING EXECUTION OF AN AGREEMENT
BETWEEN THE VILLAGE OF MOUNT PROSPECT AND
BAXTER & WOODMAN, INC.
WHEREAS, the corporate authorities of the Village of Mount Prospect
have determined that a study should be undertaken for the
possible installation of public improvements on South George and
Albert Streets between Central Road and Lincoln Street in the
Village; and
WHEREAS, the corporate authorities of the Village of Mount Prospect
have determined that in orqßr to review the scope of the proposed
project and the various requirements involved it would be in the
best interests of the Vill~e to enter into an Agreement with Baxter
& Woodman, Inc. to conduct sûch a stùdy.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND BOARD OF TRUSTEES
OF THE VILLAGE OF MOUNT PROSPECT, COOK COUNTY, ILLINOIS:
SECTION ONE: That the Mayor is hereby authorized to sign and the
Clerk authorized to attest her signature on the Agreement between
the Village of Mount Prospect and Baxter & Woodman, Inc. for the
purpose of conducting a study and preparing all the necessary
reports for the possible improvement of a portion of South George
and Albert Streets in the Villageo
SECTION TWO: That this Resolution shall be in full force and
effect from and after its passage and approval in the manner
provided by law.
AYES:
Arthur, Farley, Floras, Murauskis, Van Geem, Wattenberg
NAYS:
None
ABSENT:
None
PASSED and APPROVED this 17th
day of
June
, 19860
A'rTBST:
&æ?~ ;f. ¡¿~
Carolyn~. Krause
Hayor
~ ~Y~4j
~cY - I ¡?--t~!-Æ:L
-Carol A. Fields
Village Clerk
VILLAGE OF MOUNT PROSPECT, ILLINOIS
PAVING AND DRAINAGE IMPROVEMENTS
FOR
GEORGE AND ALBERT STREETS
ENGINEERING DESIGN SERVICES AGREEMENT
THIS AGREEMENT is made as of the day of ,
1986, by and between the Village of Mount Prospect, located in the
County of Cook of the State of Illinois, hereinafter called the
VILLAGE, and Baxter & Woodman, Inc.., Environmental Engineers, an
Illinois corporation, hereinafter called the ENGINEERS, for engi-
neering services in connection with the construction of drainage
and roadway improvements for George and Albert Streets, herein-
after referred to as the PROJECT, which is to be financed through
Special Service Area procedures..
WITNESSETH that in consideration of the mutual covenants
hereinafter set forth, the parties hereto agree as follows:
SECTION 1.. The ENGINEERS agree to perform or be responsible
for the performance of the following engineering services for the
PROJECT as described in Exhibit A of this Agreement.
1..1 Meet with the VILLAGE staff to review project scope
and requirements..
1..2 Make or cause to be made such soil borings as required
to determine existing pavement thickness and to .forecast the.
extent of unsuitable subgrade materials..
1.3 Make field surveys necessary for the preparation of
plans and specifications..
1&4 Prepa~e plans, special provisions, contract documents,
and an opinion of construction cost.. Contract documents shall
include Advertisement. to Bidders, Instructions to Bidders
Proposal, Perfo.rmance Bond, Articles of Agreement, General and
Detailed Specifications..
1..5 Provide documents for bidding and assist the VILLAGE
in receiving and evaluating bids, and make recommendation for
award of contract&
1..6
Attend one Public Hearing for the Special Service Area&
L 7 Maintain close liaison with the VILLAGE staff during
preparation of the plans and specifications..
- 1 -
.. .
4.5 The VILLAGE may, at any time, by written order, make
changes within the general scope of this Agreement in the services
or work to be performed by the ENGINEERS.. If such changes cause
an increase or decrease in the ENGINEERS' costs of, or time
required for, performance of any services under this Agreement,
whether or not changed by any order, an equitable adjustment shall
be made and this Agreement shall be modified in writing according-
ly. The ENGINEERS must assert any claim for adjustment under this
provision in writing within 30 days from the date of receipt by
the ENGINEERS of the notification of change, unless the VILLAGE
grants a further period of time before the date of final payment
under this Agree-ment. No service for which an additional compen-
sation will be charged by the ENGINEERS shall be furnished without
the written authorization of the VILLAGE.
IN WITNESS WHE.REOF, the parties hereto have caused the execu-
tion of this Agreement by their duly authorized officers as of the
day and year first above written.
VILLAGE OF MOUNT PROSPECT
(SEAL)
By
Mayor
ATTEST:
Village Clerk
BAXTER & WOODMAN, INC.
(SEAL)
By C;~-<::~~dt;
President
ATTEST:
/' .. /' C',/ /'4. '", //
l ....:;j,',...;¿', ,-l >-¥""'-":'j/'-'~
/...~¿.<'.-¡
Secretary
- 4 -
,
EXHIBIT A
Project Limits:
George Street
- Central Road to Milburn Avenue
Albert Street
- Central Road to Northwest Highway
Busse Avenue
- 1/2 block west of George Street to 1/2
block east of Albert Street
Evergreen Avenue, - 1/2 block west of George Street to Mount
Prospect Road
Project Description:
Install a low profile curb and gutter throughout (27 feet
back to back); construct new inlets, catch basins, and new
storm sewer, as required; widen existing pavement; strip off
(mill) the exiting bituminous surface; place reflective crack
control material (petroment); repave the entire surface (24
feet); make partial replacement of all driveway aprons; and
landscape parkwayse
VILLAGE OF MOUNT PROSPECT, ILLINOIS
PAVING AND DRAINAGE IMPROVEMENTS
FOR
GEORGE AND ALBERT STREETS
ENGINEERING DESIGN SERVICES AGREEMENT
THIS AGREEMENT is made as of the day of ,
1986, by and between the Village of Mount Prospect, located in the
County of Cook of the State of Illinois, hereinafter called the
VILLAGE, and Baxter & Woodman, Inc.., Environmental Engineers, an
Illinois corporation, hereinafter called the ENGINEERS, for engi-
neering services in connection with the construction of drainage
and roadway improvements for George and Albert Streets, herein-
after referred to as the PROJECT, which is to be financed through
Special Service Area procedures.
WITNESSETH that in consideration of the mutual covenants
hereinafter set forth, the parties hereto agree as follows:
SECTION 1. The ENGINEERS agree to perform or be responsible
for the performance of the following engineering services for the
PROJECT as described in Exhibit A of this Agreement..
1..1 Meet with the VILLAGE staff to review project scope
and requirements..
1.2 Make or cause to be made such soil borings as required
to determine existing pavement thickness and to .forecast the.
extent of unsuitable subgrade materials.
1.3 Make field surveys necessary for the preparation of
plans and specifications.
1.4 Prepare plans, special provisions, contract documents,
and an opinion of construction cost. Contract documents shall
include Advertisement to Bidders, Instructions to Bidders
Proposal, Performance Bond, Articles of Agreement, General and
Detailed Specifications.
1..5 Provide documents for bidding and assist the VILLAGE
in receiving and evaluating bids, and make recommendation for
award of contract..
1..6
Attend one Public Hearing for the Special Service Area..
1..7 Maintain close liaison with the VILLAGE staff during
preparation of the plans and specifications.
- 1 -
L 8 Copies of survey notes and sketches, charts, computa-
tions and other data prepared or obtained by the ENGINEERS pursu-
ant to this Agreement will be made available, upon request, to the
VILLAGE by the ENGINEERS at their actual cost of reproduction..
SECTION 2.. The VILLAGE agrees to appoint an employee as Pro-
ject Manager who shall be the VILLAGE's representative in respons-
ible charge and direct control of the PROJECT at all times.. The
Project Manager will provide to the ENGINEERS all available
reports, maps and data pertaining to the proposed improvements..
SECTION 3.. The VILLAGE agrees to compensate the ENGINEERS
for the professional services enumerated in Section 1 hereof as
follows:
3..1 The ENGINEERS shall be paid for their services on the
basis of the following standard hourly rates of compensation for
actual work time performed:
Principal
Senior Engineer
Engineer
Engineer Technician
$64 to $76 per hour
$50 to $62 per hour
$40 to $50 per hour
$20 to $40 pe~ hour
3..2 The ENGINEERS shall be reimb~rsed for automobile
travel expense at $0..21 per mile plus any out-of-pocket expenses
at actual cost..
3..3 The ENGINEERS' total fee for services listed under
Sections 1..1 through 1..8 shall not exceed. $50,000..
3..4 The ENGINEERS' total fee for engineering services
stated in Subsection 3..3 hereof shall not exceed the stated amount
unless the ENGINEERS justify and the VILLAGE conCurs that the in-
creased time or effort and/or incurred expenses are neceEsary and
essential to complete the PROJECT.. During progress of work under
this Agreement, the ENGINEERS shall.. continuously monitor their
costs and anticipated future costs, and if such monitoring indi-
cates possible costs in excess of the amounts stated, the ENGI-
NEERS shall immediately notify the VILLAGE of such anticipated
increases so that a proper adjustment to the agreed compensation
for engineering services can be made; however, if the ENGINEERS
fail to so notify the VILLAGE of anticipated increases of engi-
neering costs, the ENGINEERS waive any claim for extracompensa-
tion after the work has been completed..
3..5 The ENGINEERS may submit monthly statements for pay-
ment of services as the PROJECT progresses..
- 2 -
4*5 The VILLAGE may, at any time, by written order, make
changes within the general scope of this Agreement in the services
or work to be performed by the ENGINEERS * If such changes cause
an increase or decrease in the ENGINEERS! costs of, or time
required for, performance of any services under this Agreement,
whether or not changed by any order, an equitable adjustment shall
be made and this Agreement shall be modified in writing according-
lYe The ENGINEERS must assert any claim for adjustment under this
provision in writing within 30 days from the date of receipt by
the ENGINEERS of the notification of change, unless the VILLAGE
grants a further period of time before the date of final payment
under this Agree-ment. No service for which an additional compen-
sation will be charged by the ENGINEERS shall be furnished without
the written authorization of the VILLAGE.
IN W.ITNESS WHEREOF, the parties hereto have caused the execu-
tion of this Agreement by their duly authorized officers as of the
day and year first above written.
VILLAGE OF MOUNT PROSPECT
(SEAL)
By
Mayor
ATTEST:
Village Clerk
BAXTER & WOODMAN, INC.
(SEAL)
By ~d£ ;:;
President
ATTEST:
(//1 j~ /J éi.. ç(/'¿-.L/;A::;.1....../i
~ """-'- "'-'C' j
/"'r"'<~
7'
Secre tary
- 4 -
3~6 Payments to the ENGINEERS shall be due and payable
within thirty (30) consecutive calendar days from the date of the
ENGINEERS' invoice to the VILLAGEs
307 The ENGINEERS will complete all work as outlined in
Section l~l to 108 within 90 calendar days after receipt of a
notice to proceed from the VILLAGE~
SECTION 4~
The parties hereto further mutually agree:
4~1 This Agreement may be terminated, in whole or in part,
in writing by either party if either of the other parties substan-
tially fails to fulfill its obligations under this Agreement
through no fault of the terminating party; or the VILLAGE may
terminate this Agreement, in whole or in part, in writing, for its
convenience~ However, no such termination may be effected unless
the terminating party gives the other party (I) not less than ten
(10) calendar days written notice (delivered by certified mail,
return receipt requested) of intent to terminate, and (2) an
opportunity for a meeting with the terminating party before
terminations If this Agreement is terminated, the ENGINEERS shall
be paid for services performed to the effective date of termina-
tion, including reimbursable expenses~
4~2 Neither party shall hold the other responsible for
damages or time delays in the performance of the PROJECT caused by
acts of God, strikes, lockouts, accidents, or other events or
circumstances beyond the control of the other party.
4.3 The ENGINEERS shall acquire and maintain statutory
worker's compensation insurance coverage, comprehensive liability
insurance coverage, and professional liability insurance cover-
age~ The ENGINEERS agree to hold harmless, indemnify and defend
the VILLAGE and each of its officers, agents and employees from
any and all liability claims, losses, or damage arising out of or
alleged to arise from negligence in the performance of the ser-
vices under this Agreement, but not including liability that may
be due to the sole negligence of the VILLAGE, or other consul-
tants, contractors, or subcontractors working for the VILLAGE, or
shall be for any warranties for which the VILLAGE may be found
liable to third parties by reason of having hired the ENGINEERS
for this PROJECT; however, the VILLAGE agrees not to require the
ENGINEERS to maintain professional liability insurance coverage of
more than one million dollars ($1,000,000) for such warranties due
to the ENGINEERS! professional negligent acts, errors, or omis-
sions.
4e4 The ENGINEERS shall be responsible for their profes-
sional quality, technical accuracy, timely completion, and
coordination of all services furnished or required under this
Agreement, and shall endeavor to perform such services with the
same skill and judgement which can be reasonably be expected from
similarly situated professionals.
- 3 -
"
EXHIBIT A
Project Limits:
George Street
- Central Road to Milburn Avenue
Albert Street
- Central Road to Northwest Highway
Busse Avenue
- 1/2 block west of George Street to 1/2
block east of Albert Street
Evergreen Avenue. - 1/2 block west of George Street to Mount
Prospect Road
Project Description:
Install a low profile curb and gutter throughout (27 feet
back to back); construct new inlets, catch basins, and new
storm sewer, as required; widen existing pavement; strip off
(mill) the exiting bituminous surface; place reflective crack
control material (petroment)¡ repave the entire surface (24
feet); make partial replacement of all driveway aprons; and
landscape parkways.