The new Village Hall will provide a home for the IT Division, a centralized computer center for
the V1iIage offices, and a new server room that will house most of the Village servers. To
accommodate the changes, modifications to the existing network design are needed including
the purchase of two network switches. Staff has been working with RMS Business Systems on
the network redesign since last year and would like to continue to work with them for the project
implementation. Staff is requesting that the bid process be waived for the required network
services due to the uniqueness of the services and vendor knowledge of the Village network.
Staff is also requesting approval to purchase the network hardware needed for the infrastructure
modifications. This memo provides the background information and specifies the recommended
solution.
BackQround and Current Conditions
IT staff members are currently housed in three different buildings with one person in Public
Works, one person in Fire, and one person in Village Hall. IT staff is managing servers located
in four different buildings.
Currently the center of the Village network topology is at the Police and Fire Headquarters. At
that location network infrastructure connections include a fiber line from Public Works, a fiber
line from Village Hall, T1 lines carrying voice and data from each of the outlying fire stations, a
56 Kbps data line that connects to Human Services' temporary location, the Police Department's
connection to Cook County, and the Village Internet connection. One router at Police and Fire
handles all routing between Public Works, Police and Fire, and Village Hall. Seven servers are
housed in the Police and Fire server room. See Figure 1 on the next page for a diagram of the
existing layout.
Proposed Plan
Last year Village staff began working with RMS Business Systems to redesign the Village's
computer network to provide connectivity to the new Village Hall and its centralized computer
center. The center of Village computer operations, along with IT staff, will be moved to the new
Request to Waive the Bid Process for Network Design Services and Recommendation to
Purchase Hardware for Network Backbone Improvements
May 21,2004
Page 2
computer center. Servers will be relocated to the new computer center with some exceptions. A
file server/domain controller would always be located at Public Works because of the potential
for the fiber connection to go down. Fire and Police file servers would not be moved at this time
since each of these departments has sworn personnel serving as network administrator.
Connections to the outlying fire stations would not be changed. See Figure 2 below for the
proposed layout.
Figure 1: Existing
Conditions
Village Hail
GEMS Server,
Víllaae Hall File Server
Fire Sta 12
~e Sta 14~
~tern~
Ponce and Fire
Headquarters
Police File Server,
Fire File Server,
E-mail Server,
Document Imaging
Server, Web Server,
Firewall, Proxy Server
*************************************************************************************************************
Fiaure 2: ProDosed Plan
Fire Sta 12
2 New Switches to be
installed at this location
~Iern~
Public Works
Public Works File Server
VíI!age Hall
GEMS Server, Village Hall
File Server, E-mail Server,
Document Imaging Server,
Web Server, GIS Server,
Firewall, Proxy Server,
Domain Controller
l:ìVB Request Memos\New VH Backbone Upgrades.DOC
Request to Waive the Bid Process for Network Design Services and Recommendation to
Purchase Hardware for Network Backbone Improvements
May 21,2004
Page 3
The new design includes the addition of two Layer 3 Cisco switches with an external redundant
power supply. Both switches would be located in the new server room and would become the
physical focal point of the network. The Layer 3 functionality would provide routing capabilities
within each switch, which should noticeably improve network speed between locations. The
existing router at Police and Fire would be configured as a "hot standby" to provide redundancy.
Existing switches would be reallocated to the various floors and existing hubs would be re-used
as needed until they can be phased out at a later date.
Networkinq Services
Staff would like to purchase network services from RMS Business Systems to configure and
install the new hardware and to assist in relocating network equipment. RMS provided the
network design and staff has been pleased with their work. An estimate of costs for RMS'
consulting services is provided in Table 1 below. On past projects with RMS, the actual number
of hours used has always been below the estimate.
Table 1
RMS Time and Materials Estimate
Hours Price/Hour Total
Implementation and Troubleshootina 24 $185 $4,440
Documentation and Trainina 16 $185 $2,960
WAN Eauipment Miqration 44 $185 $8,140
Total $21.460
Hardware
Table 2 below provides a price comparison for the equipment specified in the network design.
Staff would like to purchase the hardware from COW since their quote is the lowest.
Table 2
EQuipment list and Price Comparison
RMS Resource COW
Communications, Inc.
2 ea - Cisco 3550 48-port 10/100 Base T Switch
w/ connectors and converters $12,929 $13,221 $12,521
1 as - Cisco Remote Power SuDclv with cables
2 as - Cisco SmartNet maintenance contracts :
i
Recommendation
The network infrastructure redesign is necessary to provide connectivity to the new Village Hal!
building and computer center. The new hardware required to implement the proposed plan
designed by RMS would provide the needed connectivity while improving network performance.
I:\VB Request Memos\New VH Backbone Upgrades.DOC
Request to Waive the Bid Process for Network Design Services and Recommendation to
Purchase Hardware for Network Backbone improvements
May 21,2004
Page 4
I request that the bid process be waived to purchase networking services from RMS Business
Systems at an amount not to exceed $21,460. I further recommend that the Village purchase
network hardware for the project from COW at a price not to exceed $12,521. These costs have
been budgeted through the Capital improvements Program and would be paid from account
number 5107701-640013. Please contact me if you have any questions or comments.
~~
IT Director
1:\V8 Request Memos\New VH Backbone Upgrades.DOC
INTEROFFICE MEMORANDUM
(¥).
TREE em' USA
Mount Prospect Public Works Department
FROM:
~b.~~
bltslei
VEH ICL E/E QUI PME N T SUP ERI NTEN DE NT ~
JUNE 9, 2004 ~~)
SUBURBAN PURCHASING COOPERATIVE FUEL BID CONTRACT
EXTENSION~ CONTRACT AMOUNT NOT TO EXCEED $99,888.00 FOR 2004
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
DATE:
SUBJECT:
Backaround
In 2003, the Village accepted the Northwest Municipal Conference (NWMC)/Suburban
Purchasing Cooperative (SPC) fuel contract extension with Texor Petroleum Company,
Riverside, Illinois. The current contract extension was in effect until June 5, 2004.
Bid Award
On June 1, 2004, we were notified by the NWMC (see notice attached) that the SPC fuel bid
contract with Texor Petroleum Company, Riverside, Illinois, was extended for one year with all
terms remaining the same as the original bid. The cost of fuel per gallon will vary according to
market conditions, as reflected in the Oil Price Information Service (OPiS) data sheets. Texor
Petroleum's bid was for $0.070 over the OPtS low cost of fuel for both #2 diesel and unleaded
gasoline. The provision to extend the contract an additional three years, one year at a time was
included in the 2003 bid. The 2004/2005 extension is the first with two remaining.
Discussion
The NWMC/SPC fuel bid award is in effect from June 6, 2004 to June 5, 2005.
Texor Petroleum Company has been our supplier of fuel for the past seven years and has
performed well.
Recommendation
It is my recommendation that the Village Board waive the bidding process and accept the
NWMC/SPC fuel contract extension and execute a new 2004/2005 fuel contract with Texor
Petroleum Company. Riverside, Illinois, to be in effect from June 18, 2004 to June 5, 2005.
Funds for this proposed contract are available in the current 2004 budget and will be in the
proposed 2005 budget.
Suburban Purchasing Cooperative Fuel Bid Contract Extension
June 9, 2004
Page 2 of 2
Remaining funds available for the 2004 budget year in the Fire Department Vehicle
Maintenance Fuel Account #0014206-570635 is $12,019.00 on page 202 and in the Public
Works Vehicle Maintenance Fuel Account #6605702-570635 is $87,869.00 on page 281.
-~ { J¡ ~~{-====
mes E. Guenther
¡ concur with the recommendation.
Glen R. Andler
JG
Attachment
c:
Director of Public Works Glen R. Andler
Deputy Director of Public Works Sean P. Dorsey
X:\Administration\8IDS\RESUL TS\FueIBid2004.doc
SUBURBAN PURCHASING COOPERATIVE
A Joint Purchasing Program For Local Governments
To:
NWMC Public Works Directors, Purchasing Agents, Managers, and Supervisors
From:
Lìzette Rivera, NWMC
Program Associate for Administrative Services
Date:
June 1,2004
Subject:
2004-2005 Diesel / Gasoline / Ethanol Fuel Program
On behalf of the Suburban Purchasing Cooperative (SPC), the NWMC Program Services
Committee has approved a one-year contract extension with Texor Petroleum Company. This
contract was originally bid and awarded in June of2003.
The one year contract extension will begin on June 6, 2004 and end on June 5,2005. The SPC
reserves the right to extend this contract for 2 additional one year periods under the same terms and
conditions of the original contract.
With this program participants will pay the OrIS (Oil Pricing Information Service) price for the
day of delivery, plus applicable taxes, and profit margin. The savings vary depending on the
performance of the orIS index. All billing is handled through the vendor.
To participate in this program please contact the vendor directly:
Arnie Berg
Texor Petroleum Company
708~442-4 720
Attached is a complete copy of the contract and an SPC Fue! Request Form. Please feel free to
contact me directly with any questions or concerns at 847-926-9200 x 37.
Northwe.~t Municipal
Conference
/6/6 East Golf Road
Des Plaines, lL 60016
Lizeue V. Rivera
Phone: (847) 296-9200
Fax: (847) 296-92()7
South Suburban Mayors
am! Managers AssociatÜm
1904 West 174'h Street
East Hazel Crest. lL 60429
Judy Johnson
Phone: (708) 206-1155
Fax. (708) 206-1133
We.~t Centra! iUunicipal
Conference
J J 27 S. Afannheim Road
Suite 102
Westchester, 1L 60i5.J
Theresa Dobers:::tyn
Phone: (70B) 450-0JOO
Fax: (708) .J50-()655
Will County
Govemmental League
50 Em;! Jefferson Street
Suite 1 (Jj
Joliet, IL 60432
Anna Bunger
Phone: (815) 722-728()
Fax. (8i5) 722-0528
Village of Mount Prospect
Mount Prospect, Illinois
INTEROFFICE MEMORANDUM
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
~.~
(ø 115/ oy
FROM:
ASSISTANT VILLAGE MANAGER
DATE:
JUNE 1O, 2004
WINDOW TREATMENTS FOR NEW VILLAGE HALL
SUBJECT:
Staff has been working with the architect and furniture vendor in coordinating the purchase
and installation of window treatments for the new Village Hall. Staff determined that the
type of window treatment should be of a variety that requires no maintenance, but is
visually appealing. Therefore, the type of treatment that was chosen is a coated fabric that
allows some light through, but allows for privacy and eliminates glare. Staff has also been
working with the two vendors to determine the type of motorized window treatment for the
Board Room. The Board Room treatment is of a special nature due to the need to control
sound and address light interference during meetings.
Staff received proposals from Martin Feig (architect recommended) and Indecor (furniture
vendor recommended) for these treatments. Both vendors have been out to the site to
measure the windows and recommend a density to meet Village needs. The results of the
proposal is as follows:
Martin Feig - $14,531, the Board Room treatment has not yet been submitted
Indecor - $16,860, includes the Board Room treatment
The office treatments only proposed price -
Martin Feig - $14,531
Indecor - $12,314
Therefore, while the Indecor price was higher overall their price included the Board Room
and the direct comparison between the vendors for the office window treatments between
vendors illustrates that Indecor is lower. Staff would recommend accepting the proposal
from Indecor for window treatments for the new Village Hall in an amount not to exceed
$16,680.