HomeMy WebLinkAbout7. MANAGERS REPORT 04/08/2009
Mount Prospect
~
Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM
DATE:
APRIL 2, 2009
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
FROM:
PROJECT ENGINEER
SUBJECT:
ALGONQUIN ROAD - BUSSE ROAD - DEMPSTER STREET PEDESTRIAN
SIGNAL IMPROVEMENT PROJECT
. RECOMMENDATION TO ACCEPT CONSTRUCTION BID FOR AN
AMOUNT NOT TO EXCCED $266,231.73
. RECOMMENDATION TO ACCEPT ENGINEERING INSPECTION
PROPOSAL FOR AN AMOUNT NOT TO EXCEED $19,728.00
Back2round
The area where Algonquin Road, Busse Road and Dempster Street come together form three closely
spaced but distinct intersections. There is currently only one leg at one of the three intersections that has
a marked crosswalk and pedestrian signals. The combination of multi-family housing and shopping leads
to a lot of foot traffic. Unfortunately, many pedestrians are crossing these busy roads without the
protection of pedestrian signals. Working together, the Community Development Department and Public
Works Department identified a need in this area for additional pedestrian signals.
To increase pedestrian safety in the area, the Village applied for and received approval for a Community
Development Block Grant (CDBG). This grant is expected to fully pay for both the design and
construction of pedestrian signal and sidewalk improvements. Last year, the Village hired an engineering
consultant to provide design services. And both mOT and the Cook County Highway Department
(CCHD) have reviewed and approved the engineering drawings. The traffic signals at all three
intersections as well as the roadways of Algonquin Road and Busse Road are under the jurisdiction of
IDOT; Dempster Street is under the jurisdiction of CCHD.
The design includes upgrading and adding LED countdown pedestrian signals at the three intersections.
Filling in missing sidewalk segments, constructing sidewalk ramps and adding painted crosswalks will
also be part of the project scope. In addition, the intersection of Algonquin Road and Busse Road will
receive decorative brick sidewalk treatments at the four comers to enhance the area. With approval from
both mOT and CCHD, the Engineering Division bid the project in early March.
Bid Process
The bid opening for the project was on March 16,2009. Sealed bids were publicly opened and read aloud
at 10:00 a.m. A Notice to Bidders was published in the local newspaper and four companies were sent
invitations to bid on the project. Seven companies picked up bid packages and three submitted bids. The
prices were as follows:
Company
Lyons Electric Company
Home Towne Electric Company
Gaffney's PMI
Bid Amount
$255,992.05
$261,637.00
$270,851.55
The consultant's estimate for the project was $291,462.19. The bids were checked for accuracy and there
wprp nn prrnrs:
page 2 of2
Algonquin-Busse-Dempster Pedestrian Signal Improvement Project
April 2, 2009
Construction Discussion
The decision to go out for bids early in the year resulted in favorable bids for the Village. The schedule is
to begin construction this summer once the necessary paperwork has been completed including securing
permits from mOT and CCHD, and once the contractor has received the ordered construction materials.
The low bidder, Lyons Electric Company of LaGrange, Illinois, has previously performed electrical work
in the Village. They were the contractor on the Village's 1996 Street Lighting Project, the Ida Court
Lighting Project and the Central Road Phase 2 Lighting Project. I have spoken with representatives from
the Village of Oak Park and City of Berwyn regarding recent traffic signal work performed by Lyons
Electric Company. Both said they have done extensive work in their respective communities and will
continue to consider them on future projects. In addition, they are prequalified with mOT to perform
electrical work on State projects.
The low bid of $255,992.05 is based on anticipated quantities. While many of the quantities are not
expected to change, a few quantities such as the amount of electric cable and concrete work can fluctuate
and affect the final construction cost. To cover any unexpected overages, it is recommended that a
contingency of 4% of the bid price be added to the contract. This equates to an additional $10,239.68.
Therefore, the total contract awarded to Lyons Electric Company would be for an amount not to exceed
$266,231.73.
Ens!ineerine: InsDection Discussion
Gewalt-Hamilton Associates, Inc. of Vemon Hills, Illinois was requested by the Village to submit a
proposal to provide part-time inspection services for this project. Being the design engineer for the
project, their field personnel will be able to work closely with their office staff. This will allow for a good
working relationship so that construction related decisions can be effectively made. Gewalt-Hamilton
Associates, Inc. has performed well thus far. They provided a quality design, met deadlines and have
kept project costs within budget.
Gewalt-Hamilton Associates quote to provide inspection services for this project is $19,728.00. The
work includes on-site inspection of the contractor's work, construction layout and staking, material
testing, record keeping, verifying measurements and keeping the project on schedule and within budget.
The proposal is acceptable to Staff and the cost is in line with the scope of the project.
Recommendation
It is Staff's recommendation that Lyons Electric Company of LaGrange, Illinois be awarded the
construction contract for the Algonquin Road - Busse Road - Dempster Street Pedestrian Signal
Improvement Project in the amount not to exceed $266,231.73.
It is also Staff's recommendation that Gewalt-Hamilton Associates, Inc. of Vernon Hills, Illinois be
awarded a contract for engineering inspection services in the amount not to exceed $19,728.00.
Funding for this project is available in the 2009 Budget as part of the CDBG fund. The total amount of
the CDBG funds remaining for this project is $286,816.00 which will cover both the construction and
engineering inspection contracts. Please include this item on the April 8th Village Board Meeting
Agenda.
,
~
U II
~
(y
~~
~~
~~
(j')Z -, t
~~
~~
~~
0>
..........0
~~
~~
:J~
r:Cl~
..........~
Z<
~Z
~S2
z{j')
oZ
~<
~~
<~
(j')
~
b 0
.u ~
c..
Vl ~
0
~
c..
~
::J
0
:::;
....
0
.u
(j
-<
....J
....J
-
>
..
Mount Prospect
Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM
DATE:
APRIL 2, 2009
f>\).N\iGJ
~10IO~
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
FROM:
PROJECT ENGINEER
SUBJECT: RAND ROAD - CENTRAL ROAD - MOUNT PROSPECT ROAD PEDESTRIAN
SIGNAL IMPROVEMENT PROJECT
. RECOMMENDATION TO ACCEPT CONSTRUCTION BID FOR AN
AMOUNT NOT TO EXCCED $176,996.09
. RECOMMENDATION TO ACCEPT ENGINEERING INSPECTION
PROPOSAL FOR AN AMOUNT NOT TO EXCEED $19,563.00
Back2round
The area where Rand Road, Central Road and Mount Prospect Road come together form three closely
spaced but distinct intersections. The Mount Prospect Shopping Plaza is adjacent to the north sides of
Rand Road and Central Road, and to the south and west are primarily single family homes. The three
intersections have a partial pedestrian signal system making the roads somewhat difficult and inefficient
to cross. Over the years the Village has received requests from residents to enhance the crossings in order
to make it easier to access the shopping center. That is why in 2007 the Village hired an engineering
consultant to design complete pedestrian signal systems at a few intersections including this location.
Due to the size and scope of the necessary work at this location, however, the project was not budgeted
until 2009.
The design for all three intersections includes LED countdown pedestrian signals, sidewalk, ADA
handicap accessible sidewalk ramps and crosswalks. The traffic signals are maintained by the Village but
the sequencing is regulated by lOOT. In addition, both Rand Road and Central Road are under the
jurisdiction of lOOT. lOOT has reviewed and approved the engineering drawings.
Also, a portion of the project will take place within the corporate limits of the City of Des Plaines. Staff
has had discussions with City representatives regarding the proposed work. Through a resolution, the
City has agreed to reimburse the Village for the portion of the project that will take place in Des Plaines.
With support from the City of Des Plaines and approval from lOOT, the Engineering Division bid the
project in early March.
Bid Process
The bid opening for the project was on March 16,2009. Sealed bids were publicly opened and read aloud
at 10:00 a.m. A Notice to Bidders was published in the local newspaper and four companies were sent
invitations to bid on the project. Seven companies picked up bid packages and three submitted bids. The
prices were as follows:
Company
Gaffney's PMl
Lyons Electric Company
Home Towne Electric Company
Bid Amount
$170,188.55
$176,700.00
$189,084.40
The consultant's estimate for the project was $223,146.60. The bids were checked for accuracy and there
were no errors.
page 2 of2
Rand-Central-Mount Prospect Pedestrian Signal Improvement Project
April 2, 2009
Construction Discussion
The decision to go out for bids early in the year resulted in favorable bids for the Village. The schedule is
to begin construction this summer once the necessary paperwork has been completed including securing a
permit from mOT and once the contractor has received the ordered construction materials.
The low bidder, Gaffney's PMI, has not performed electrical work in the Village. They have bid on
previous traffic signal projects but was never the low bidder. Gaffney's PMI has been in business for
many years with a majority of their work taking place in the western suburbs as their office is located in
Batavia. I have spoken with representatives from the City of Geneva, City of Aurora and City of St.
Charles regarding recent work perfonned by Gaffney's PM!. All said they have done satisfactory work
and will continue to consider them on future projects. In addition, they are prequalified with mOT to
perform electrical work on State projects.
The low bid of $170,188.55 is based on anticipated quantities. While many of the quantities are not
expected to change, a few quantities such as the amount of electric cable and concrete work can fluctuate
and affect the final construction cost. To cover any unexpected overages, it is recommended that a
contingency of 4% of the bid price be added to the contract. This equates to an additional $6,807.54.
Therefore, the total contract awarded to Gaffney's PMI would be for an amount not to exceed
$176,996.09.
En2ineerinl! Insoection Discussion
Civiltech Engineering, Inc. ofItasca, Illinois was requested by the Village to submit a proposal to provide
part-time inspection services for this project. Being the design engineer for the project, their field
personnel will be able to work closely with their office staff. This will allow for a good working
relationship so that construction related decisions can be effectively made. Civiltech Engineering, Inc.
has performed well thus far. They provided a quality design, met deadlines and have kept project costs
within budget.
Civiltech Engineering's quote to provide inspection services for this project is $19,563.00. The work
includes on-site inspection of the contractor's work, construction layout and staking, material testing,
record keeping, verifying measurements and keeping the project on schedule and within budget. The
proposal is acceptable to Staff and the cost is in line with the scope of the project.
Recommendation
It is Staffs recommendation that Gaffney's PMI of Batavia, Illinois be awarded the construction contract
for the Rand Road - Central Road - Mount Prospect Road Pedestrian Signal Improvement Project in the
amount not to exceed $176,996.09.
It is also Staffs recommendation that Civiltech Engineering, Inc. ofltasca, Illinois be awarded a contract
for engineering inspection services in the amount not to exceed $19,563.00.
Funding for this project is available in the 2009 Budget. Please include this item on the April 8th Village
Board Meeting Agenda.
T
Attachment: Map
h.\PnolnpPrino\tmffil"\c:.ion~l~\npilpf:.tr1!:11n\'mntl-C'Pntml_nm\vh l"nntmrtnr T'PC" ilnro
t3
~
Q..
(/l
o
~
Q..
~
:::J
o
~
~
o
~
c.:J
<t:
...J
...J
:>
f-l
U
~
f-ley
U~
~~
Cf)f-l
Oz
~~
~~
f-l~
z>
:JO
O~
~~
----~
~........c
~~
f-lZ
Z~
~Ci)
Uz
----<
Q........c
Z~
~~
Q
~
~
j
f)
,
f)
.,
Mount Prospect
Village of Mount Prospect
Mount Prospect, Illinois
~
INTEROFFICE MEMORANDUM
FROM:
MICHAEL E. JANONIS, VILLAGE MANAGER
FINANCE DIRECTOR
~~./~/~
e.f B Cfi'
TO:
DATE: MARCH 30, 2009
SUBJECT: ERP PROJECT MANAGEMENT CONSULTANT RECOMME
UPDATE
At the March 24 Committee of the Whole meeting Finance staff presented to the V' e
Board a recommendation to retain the services of Plante & Moran to provide ERP project
management consulting services. The original fee proposal for providing this service to the
Village was $114,720.
Staff met with Plante & Moran to discuss the project workplan and settle on a not-to-exceed
fee for the engagement. The total number of hours for the engagement was adjusted from
478 to 460. It was felt that staff could assume responsibility for completing certain tasks in
lieu of having them performed by the consultant. In addition, Plante & Moran agreed to
lower their blended hourly rate from $240 to $225. The total savings from the original
proposal resulting from these changes is $11 ,220. The final not-to-exceed fee for Phase 1
and Phase 2 work is now $103,500.
I am recommending that we retain Plante & Moran to provide ERP project management
consulting services for the Village for a not-to-exceed amount of $103,500.
~& VC-
David O. Erb
Finance Director
H:\ACCT\Financial Software RFP\Final ERP Consultant Recommendation.doc
Molmt Prospect
Village of Mount Prospect
Mount Prospect, Illinois
~
INTEROFFICE MEMORANDUM
TO: MICHAEL E. JANONIS, VILLAGE MANAGER
FROM: FINANCE DIRECTOR
DATE: MARCH 18, 2009
SUBJECT: ENTERPRISE RESOURCE PLANNING (ERP) PROJECT MANAGEMENT
CONSULTANT RECOMENDA TION
PURPOSE:
Present for the Board's consideration a recommendation to retain the services of a project
management consultant to support the analysis/design and vendor selection phases for a village-
wide ERP system. Enterprise resource planning is an enterprise-wide information system designed
to coordinate all the resources, information, and activities needed to complete business processes.
ERP software works to promote integration and process automation and better provides for tools
and data useful for the end user.
BACKGROUND:
The Village currently utilizes a suite of software applications to administer its general ledger, payroll,
accounts payable, utility billing, accounts receivable and other financial management systems. In
addition, there are several other third-party and internally written programs that assist the Village in
managing its various business processes. The main suite of programs is over 10 years old and has
reached the end of its useful life. Connectivity and similar obsolescence issues are apparent with
the third-party and internally written programs which have also reached the end of their useful life
necessitating replacement as well. The 2009-2013 Capital Improvement Plan (CIP) identifies
budget needs for the replacement of this software. In the 2009 and 2010 Capital Improvement
Fund budgets there are monies allocated for the hiring of a consultant to take the Village through
the steps of selecting and implementing the new software.
DISCUSSION:
In February, Request for Proposals (RFP) were sent out to twelve (12) ERP project management
consultant firms to solicit their interest in assisting the Village with the selection and implementation
of a village-wide ERP system. We feel that a village-wide ERP system, in lieu of the current system
configuration, will permit improved connectivity throughout the departments and increase
efficiencies in operations. Tasks to be provided by the selected firm include assessment of the
Village's current business information system, identify the computing needs and associated
applications of its users, recommend a system design, develop a Request for Proposals (RFP) for
the new integrated ERP system, evaluate the vendor's proposals, recommend a vendor solution,
and manage the implementation. The project is broken down into three phases. Phase 1 is for
analysis and design of the existing system and proposed ERP system. Phase 2 is for vendor
selection which includes preparation of an RFP. Phase 3 covers the implementation of the selected
software. A copy of the RFP is included as Attachment 1. The RFP strictly stated that only
independent consultants would be considered for the engagement. Consultants could not have an
affiliation or be a reseller of any software or enterprise system proposed.
ERP Project Management Consultant Recommendation
March 18, 2009
Page 2 of 3
The Village received responses from five (5) firms. The five firms that returned a proposal were
Clerestory, Conlon Group, IT Advocates, KPMG and Plante & Moran. Each of the firms has
performed the scope of services listed above for other governmental entities. After a review of the
proposals, four firms were invited for interviews before a core selection team. The core team
included Dave Strahl and Mike Dallas from the Manager's Office, Joan Middleton from IT and Lynn
Jarog and myself from Finance. A set list of questions was asked each firm to easily compare
qualifications and experience. In addition, several follow-up questions were asked related to the
proposals and information that came out during the interview process. After the interviews there
was consensus among the core team of a first and second choice to provide the consulting service.
Calls were then made to listed references to further assess the firm's capabilities and get insight
into their interaction with staff. Finally, the fee structure and time commitment section of the
proposal was addressed. Attachment 2 lists the total fees and hours allocated for each phase of
the project.
Some of the factors considered when determining the most qualified, best suited firm include
staffing and other resources available to the firm, experience in providing similar services for other
clients, understanding of and approach used to address the Village's needs outlined in the RFP and
compatibility with Village staff. Based on these factors it was decided that Plante & Moran (P&M)
was most qualified and best suited to provide the consulting services for this engagement. Below
are some of the ways P&M was able to address the needs outline in the RFP.
. Staffing and Resources: P&M is a management and consulting and public accounting
firm with a staff of over 1 ,600 professionals, 150 of which support the Management
Consulting Services Group. The project team that would have a part in the engagement
with the Village includes professionals from the consulting, governmental accounting,
technology and software sectors of their organization. Based on the size and complexity of
the engagement we felt that the resource demands would not overwhelm P&M as it could
some of the other firms interviewed. The core team also felt the number of hours allocated
to the project were sufficient for a successful completion within the desired timeframe.
. Relative Experience: Each of the members of the consultant team has considerable
experience working with governmental clients. The scope of work for projects P&M team
members have been involved in matches what the Village is looking to accomplish with its
village-wide ERP system.
. Project Approach and Understanding: Through the interview process P&M was best
able to convey their business approach to our project. They were able to outline their
project work plan that addressed the requirements outlined in the RFP. The project work
plan proposed by P&M is very methodical and includes measurable objectives for each
phase of the project. Defined roles and expectations were outlined for staff as well as for
the consultant.
. Compatibility: Understanding the importance of complete buy-in by the end user has on
the success of the project we wanted to make sure that the consultants would be able to
interact well with staff while balancing the need for the project to move along. Phase 1 of
the project is for analysis and design of the existing system and proposed ERP system.
This phase will consist of inter-department and inter-function meetings with end users. A
high level of interpersonal skills will be needed by the consultant. Based on the interviews
and reference calls we believe that P&M staff possesses the needed skills in this area.
H:\ACCT\Financial Software RFP\ERP Consultant Recomendation.doc
i
ERP Project Management Consultant Recommendation
March 18, 2009
Page 3 of 3
As staff worked through the proposals and firm interviews it became apparent that to address all
three phases at this time might not be cost effective for the Village. There are currently a number of
questions regarding the final phase that are dependent on the system configuration and software
that is ultimately chosen. The difficulty among the firms in pricing and setting hour commitments for
this final phase is obvious in the pricing proposals received. Hours ranged from 76 to 2,330. The
number of hours that P&M has allocated for Phase 3 (576) appears to be most in line with the
successful completion of the project. However, since it is not necessary to commit to the Phase 3
work at this time we felt it is in the best interest of the Village to delay final decision for this work
until better information is available. P&M and the Village have agreed to hold off on setting the
scope and pricing on Phase 3 activities until a software vendor is selected.
The original fee proposed by P&M for Phases 1 and 2 is $114,720. This is based on 478 hours of
consultant staff time. The average number of hours allocated for the first two phases by all five
firms was 590 with a low end commitment of 162 hours and a high end commitment of 1,1 00. Staff
has had follow-up conversations with P&M and their final fee is negotiable while we firm up roles
and responsibilities between the Village and the consultant. Results of our discussion with the
consultant will be provided to the Board at the Committee of the Whole meeting. Although the fee
for P&M is not the low quote we feel that there is better overall value being received from a more
qualified firm.
The 2009 and 2010 budgets includes $90,000 for consulting services. The original scope of work
that the budget was based consisted of a simple village-wide financial management system, similar
to what we currently have, along with the implementation of an integrated suite of programs for
Community Development. The scope as presented in the RFP was expanded to address the
issues we are having with the third-party and internally written programs that are best addressed
using an ERP system. As a result the budget will need to be adjusted to accommodate the
additional work. Funds to support the additional cost are available from the Community
Development budget for Other Professional Services. These funds are intended for process review
in the Building Division that will now occur in the analysis and design phase of the ERP project.
RECOMMENDATION:
Request authorization from the Board to retain the services of Plante & Moran to provide ERP
project management consulting services for an amount not to exceed $114,720.
David O. Erb
Finance Director
DOE!
H:\ACCT\Financial Software RFP\ERP Consultant Recomendation.doc
Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM
DATE:
MARCH 31, 2009
5 \) .ff(\(?
J-{ loel 09
~~
REPLACEMENT OF PLAN COPIER AND SCANNER ($16,236)
DEPUTY DJRECTOR OF PUBLIC WORKS
TO:
FROM:
VILLAGE MANAGER MICHAEL E. JANONIS
SUBJ:
Background
The Public Works Department seeks to replace one (1) large format document copier
and one (1) large format document scanner. These devices are primarily utilized by the
Engineering Division to manage and duplicate construction plans, permits, and plats.
The large format document copier is a K+E 3036 analog copier capable of copying
documents ranging in width from 8-1/2" to 36". The machine has no memory and
multiple copies must be hand-fed into the machine multiple times. Additionally, the
machine is not networkable and it is the only large format copier in the Public Works
Department. More significantly. it is one of only two large format document copiers
owned by the Village. The other is in the Building Division of the Community
Development Department. This copier was originally purchased in 1995. It has entered
its 14th year of service. Staff research indicates that it would cost approximately $8,000-
$10.000 to replace this machine as a stand alone unit.
The large format document scanner is a Vidar Tru Scan machine capable of creating
uncompressed tagged image file format (TIFF) files from paper documents ranging in
width from 8-1/2" to 36". This scanner is primarily utilized to create digital files of plans,
technical drawings, and plats for electronic archiving. Electronic archiving significantly
reduces the space needed to store large format documents and minimizes data retrieval
times. Unfortunately, this device is not networkable and can only operate in conjunction
with a dedicated PC running the dated and problematic Windows 2000 operating
system. This PC is the only PC in the Village currently running on Windows 2000. In
addition, the files created by this scanner are extremely large (70 MB for a single BIW
plan sheet) and must be compressed with third-party software after imaging. This
machine has been out of production for many yearsj has no technical support, and
cannot be repaired if broken. It was originally purchased in 1994 and has entered its
17th year of service. Staff research indicates that it would cost approximately $9,500 to
replace this machine as a stand alone unit.
Page 2 of 3
Replacement of Plan Copier and Scanner ($16,236)
March 31, 2009
Both the K +E copier and Vidar scanner were purchased prior to the establishment of the
computer replacement internal service fund and have not previously been eligible for
replacement as part of this program. Rather, these machines were considered
components of the Engineering Division office equipment inventory. Staff proposes that
these replacements, if authorized by the Village Board, will be included in the computer
replacement program and replaced at 7 -year intervals.
Due to the limited space available in the Engineering Division office area, staff desired
to replace these two separate machines with a single, combination machine capable of
. ,effectively performing both copying and scanning functions within a reduced floor
footprint.
Request for Proposals
Staff has obtained the following cost proposals for large format document
copier/scanner combination units:
Distributor Brand Cost
FOS 1ma in
FDS Ima in
Oce
KIP 36" 3100 color co ier/scanner
Xerox 36" 6204 color co ier/scanner
Oce 36" TDS 450 color co ier/scanner
$16,236
$21,592
$26,990
Discussion
Staff researched a number of combination units and determined that the KIP 3100 color
large format copier/scanner, Xerox 6204 color large format copier/scanner, and the Dce
TDS 450 large format copier/scanner all met our needs. All of these machines are
digital, networkable devices capable of up to 36" wide scans or copies at a rate of 8" per
second. Both machines can scan images to portable document format (POF),
compressed tagged image file format (TIFF), or AutoCAD .dwg drawing files.
Both the KIP and Xerox wide-format combination copier/scanner machines are
marketed via exclusive regional distributors. That is, specific dealers are granted an
exclusive license to market these products within a specified geographic boundary.
Distributors from other regions are not encouraged to compete for sales in areas
licensed to other dealers. The authorized dealer in the Chicago area is FDS Imaging
Solutions in Elk Grove Village, Illinois.
Staff has visually inspected the apparent lowest cost unit, the KIP 36" 3100, at the FDS
Imaging showroom in Elk Grove Village. It is the opinion of staff that this machine can
provide specified imaging functions (scanning and copying) at an acceptable rate and
quality.
Page 3 of 3
Replacement of Plan Copier and Scanner ($16.236)
March 31, 2009
The KIP 3100 is currently the subject of marketing incentive program. It's normal price
is approximately $18,236. However, if purchases are made prior to the end of April
2009, FOS Imaging will reduce the price by $2000 (to $16,236).
KIP is an industry leader in wide format imaging products including copiers, scanners,
and specialized printing technologies for engineering and technical design firms. KIP
America is headquartered in Novi, Michigan and has office throughout North America
and in over 140 countries throughout the world.
Technical support and service for the KIP 3100 is provided by FOS Imaging Solutions in
Elk Grove Village. lIIinos.
Recommendation
Staff recommends replacing .the existing K+E 3036 analog large-format copier and the
Vidar Tru Scan wide-format scanner with a KIP 3100 36" large-format combination
copier/scanner from FDS Imaging Solutions in Elk Grove Village, Illinois for an amount
not to exceed $16. 236. Sufficient funds for this proposed purchase re available in the
current budget.
Sean P. Dorsey
I concur.
Glen R. Andler
Director of Public Works
Co: Administrative Superintendent Jason Lelb
Village Engineer JeffWulbecker
File
Molmt Prospect
Village of Mount Prospect
Mount Prospect, Illinois
~
INTEROFFICE MEMORANDUM
FROM:
MICHAEL E. JANONIS, VILLAGE MANAGER
DIRECTOR OF FINANCE
~~~
TO:
DATE:
MARCH 31, 2009
SUBJECT: GENERAL AND AUTO LIABILITY THIRD-PARTY CLAIMS
ADMINISTRATION
PURPOSE:
To present a recommendation for renewal of the annual service agreement for third-p rty
claims administration for the year beginning January 1, 2009 and ending December 31,
2009.
BACKGROUND:
To assist in the administration of general and auto liability claims the Village has contracted
out the service to a third-party administrator. The Village's current agreement for claims
administration expired on December 31 ,2008. A new agreement is needed at this time to
have the current provider continue to service the Village.
DISCUSSION:
GAB Robins (GAB) is the current service provider for general and auto liability claims
administration. GAB has provided this service to the Village since 1997. The agreement
for 2009 contains no changes to the terms and conditions or minimum annual fee from the
prior year. Below is a summary of fees for the prior year and 2009.
Service 2009 Rates 2008 Rates
Claims Administration $ 1,000 $ 1,000
Minimum Annual Fee 8,000 8,000
ACT Charae 1,009 1,009
Total Fee $ 10,009 $ 10,009
The claims administration fee is a flat fee paid to GAB for utilizing their services in
administrating claims. The Village is also subject to an $8,000 minimum annual fee. Time
and expense charges are invoiced against the annual fee during the 12-month period until
the balance is exhausted. Any remaining funds not applied to time and expense charges
are credited to GAB for the performance of their contract for the 12-month period. If during
the 12-month period the entire annual fee is depleted, the Village will begin making
'\
General and Auto Liability Third-Party Claims Administration
March 31. 2009
Page 2
payments for charges incurred in managing the claims. The ACT (automated cash
transfer) charge is the annual fee for processing and making payment of claims charges.
This service relieves the Village from having to process payments internally.
Our experience with GAB has been very positive. Communication between the Finance
Department, Corporation Counsel and GAB is strong and helps with controlling overall
claims costs. Based on our satisfaction with the service provided and no changes to the
funding schedule I recommend we continue our relationship with GAB.
RECOMMENDATION:
It is recommended we approve the agreement for GAB to provide general and auto liability
claims administration services during 2009 according to the proposed funding and fee
schedule.
U~&~ ~,
David O. Erb
Director of Finance
DOEI
Attachment
1:\Insurance\GAB\Renewal- 2009.doc
(
.G\B
RobblS
~
GAB Robins North Am:rica, Inc.
9 Campus Drive. Suite 7
PO Box 316
Parsippany, NJ 07054-0316
T: 973-993-3722
F: 973-993-3419
March 18, 2009
4>~a
~.p ~ (e'~~
~:I.
<~
Mr. David Erb
Village of Mount Prospect
50 South Emerson Street
Mount Prospect, IL 60056
Re: Village of Mount Prospect cc#453061
Contract Period - January 1. 2009 throUGh December 31. 2009
Dear Mr. Erb:
Enclosed are two (2) originals of the above referenced contract.
Please forward for execution by an individual authorized to contractually bind your
organization. In order for this document to be properly executed, the following items must
be completed:
. The authorized individual must sign (with job title) and date the signature page.
Upon execution, please return both originals to my attention; but before doing so please
fax me a copy of the signature page to my attention. My fax number is 973-993 -3419 attn:
Len Mier. Once we receive the two originals in the mail we will execute the contracts and
return one original to you for your records.
Sincerely, ~
/~r~ ~
Contract Administrator
Contract Management Division
GAB Robins, North America
GAB Robins North America, Inc.
449-6-03.doc (01104)
Page II .
GAB Robins North America, Inc.
Client: Villasr:e of Mount ProsDect
Customer Code #: 453061
SCHEDULE C
GAB Robins will Drovide claim services in the following areas:
Auto Liability at Time & Expense
General Liability at Time & Expense
Auto Physical Damage at Time & Expense
All time and expense charges shall be on the basis of the hourly rate existing at the time of file closure and full
reimbursement for all reasonable expenses incurred.
a. GAB Robins will provide claims administration in connection with services outlined above, for claims occurring
during a twelve (12) month period commencing 01/0112009 through 11/3112009. SaleslExcise Tax in those
states where levied shall be in addition to the service fee unless Client presents a valid exemption certificate.
b. This twelve (12) month period is subject to an $8,000 minimum annual fee. The $8,000 minimum will be
invoiced to Client on the inception date of this agreement. Time and Expense charges for claims concluded
during the twelve (12) months shall be applied to the $8,000 until exhausted. Any of the $8,000 annual fee that is
not applied to Time and Expense charges for claims concluded within the twelve (12) months shall be credited to
GAB Robins as fees for the performance of this contract for the twelve (12) month period. If at any time during
the twelve (12) month period, the $8,000 is depleted, Client will begin making payments based on statements
prepared by GAB Robins. Client will promptly remit these stated charges to GAB Robins North America, Inc.
at P.O. Box 7247-7589, Philadelphia, PA 19170-7589. Payments required by this sub-paragraph shall be due
and payable not later than thirty (30) days from the invoice date to Client. Interest shall accrue at the rate of
1.5% per month or the maximum allowed by law and shall be due and payable on all undisputed unpaid
balances after the initial due date.
c. Annual Claims Administration Fee:
51,000.00.
This fee will be invoiced to Client on the inception date of this agreement.
Annual Automated Cash Transfer (ACT) Charge: 51.009.00