Loading...
HomeMy WebLinkAbout08/27/2026 P&Z Agenda PacketVillage of Mount Prospect Planning and Zoning Commission Regular Meeting Agenda 50 S. Emerson St. Mount Prospect, IL 60056 August 27, 2026 Village Hall - 3rd Floor Board Room 7:00 PM 1. CALL TO ORDER 2. APPROVAL OF MINUTES 2.1. PZ-18-26 / 505 S Wa Pella Ave / CU: 18-Foot-Tall Garage 3. NEW BUSINESS 3.1. PZ-22-26 / 50 S Emerson Street / Text Amendments (Distribution centers, cartage, courier, parcel distribution, and last -mile delivery facilities) / Village Board Final 3.2. PZ-20-26 / 50 S Emerson Street / MP2040 Comprehensive Plan /Village Board Final 4. CITIZENS TO BE HEARD 5. QUESTIONS AND COMMENTS 6. ADJOURNMENT ANY INDIVIDUAL WHO WOULD LIKE TO ATTEND THIS MEETING BUT BECAUSE OF A DISABILITY OR NEEDS SOME ACCOMMODATION TO PARTICIPATE, SHOULD CONTACT THE VILLAGE MANAGER'S OFFICE AT 8471392-6000, EXTENSION 5307 Page 1 of 164 I MINUTES OF THE REGULAR MEETING OF THE PLANNING & ZONING COMMISSION CASE NO. PZ-18-26 PROPERTY ADDRESS: PETITIONER: PROPERTY OWNER: PUBLICATION DATE: REQUEST: MEMBERS PRESENT: MEMBERS ABSENT: STAFF MEMBERS PRESENT: INTERESTED PARTIES: Hearing Date: August 13, 2026 505 Wa Pella Avenue AndrewVenamore 602 Academy Drive, Northbrook, IL John Thornton 505 Wa Pella Avenue J u ly 29, 2026 Conditional use approval for an 18-foot-tall garage. Joseph Donnelly Ewa Weir Walter Szymczak Fay Costa Michael Fricano Donald Olsen William Beattie Richard Rogers Charlie Hogan —Senior Planner Catherine Cook— Community Development Planning Intern John Thornton Chairman Donnelly called the meeting to order at 7:01 PM. Chairman Donnelly then moved to Item Two, Approval of Minutes. Commissioner Szymczak made a motion, seconded by Commissioner Fricano, to approve the minutes of the July 23, 2026 Planning and Zoning Commission meeting. Chairman Donnelly noted a conflict in the details of the minutes. Mr. Hogan replied that staff would look into Chairman Donnelly's concern. Chairman Donnelly made a motion to modify the minutes as required to reflect what was approved versus what was written. He asked Commissioner Szymczak and Commissioner Fricano whether they accepted the amendment, and both agreed. The minutes were approved 3-0, with Commissioner Weir and Commissioner Costa abstaining. Planning & Zoning Commission Meeting — August 13, 2026 PZ-18-26 Page 2 of 164 Chairman Donnelly then introduced Case No. PZ-18-26, 505 Wa Pella Avenue, a request for conditional use approval to build an 18-foot-tall garage at the Subject Property. He confirmed with staff that the case is Planning and Zoning Final. Ms. Cook presented the case. She explained that the Petitioner is Andrew Venamore of Heartland Garage Builders and that the Property Owner is John Thornton. The Petitioner requested approval to install an 18-foot-tall (18'-0") garage with a lofted storage space. Under Village code, detached garages are permitted a maximum height of 15 feet (15'-0"). Staff recommended approval, subject to the conditions contained in the staff report. Ms. Cook stated that the Subject Property was annexed into the Village in 1925 and is improved with a single-family residence, constructed in 1958. She stated that the property consists of approximately 0.22 acres and has frontage on South Wa Pella Avenue, south of West Shabonee Trail. The property is zoned R-A Single Family Residential, and all surrounding properties are also zoned R-A and developed with single-family homes. She stated that the Property Owner has resided at the Subject Property since 2016. Ms. Cook noted that the Staff Report incorrectly identified the existing garage as 15-feet-tall (15'-011 ) when it is in fact 13-feet-tall (13'-0"). The Petitioner proposed to replace the existing 13-foot-tall garage with a new 18-foot-tall (18'-0") garage. Pursuant to the Village's Zoning Ordinance, detached garages are not permitted to exceed 15 feet (15'-0") in height. The Petitioner stated that he wanted to build the taller garage to accommodate additional storage space. Staff found the proposed garage to conform with other village code relevant to the property and project. Specifically, staff noted that: • The proposed garage would only be used for approved garage uses, including parking and storage of household goods. • The garage was proposed at 720 square feet, the maximum allowed for a detached garage (recently increased from 672 to 720 square feet under PZ-01-26). • The proposed garage would bring the property to a lot coverage of 44.4%, below the maximum 50% lot coverage requirement. • The proposed garage conformed with all setbacks required for accessory structures on R-A zoned properties. Ms. Cook said the Petitioner provided images of the principal structure before and after the exterior renovations. The new garage was designed to complement the architecture of the Property Owner's existing home. She showed the current 13-foot-tall garage, renderings of the proposed garage, and elevation drawings. Ms. Cook shared that the owners of the immediately adjacent properties at 503 and 507 South Wa Pella Avenue submitted written support for the proposal. Staff received a signature sheet from the Planning & Zoning Commission Meeting — August 13, 2026 PZ-18-26 Page 3 of 164 V Property Owner with seven signatures of support, two of whom were the adjacent property owners who provided letters. Staff received three verbal comments, two in support and one in opposition, and two letters of opposition. Ms. Cook explained that those opposed cited concerns that an increase in garage height would set a precedent, resulting in more properties seeking increased garage height. Staff noted that all conditional use requests are reviewed on a case -by -case basis and are not determined by precedent. One commenter asked why the Petitioner could not simply rent a storage unit. Opponents also expressed concern that the garage would degrade nearby property values, viewing it as ill-fitting to the neighborhood and more commercial than residential in appearance. Lastly, those opposed cited concerns that the additional space would be used as office space, in violation of Village code. Ms. Cook shared that staff evaluated the request against the seven Conditional Use standards contained in the Zoning Ordinance. Staff found that the proposal: • Would not negatively affect public health or safety, • Was compatible with the surrounding neighborhood, • Would not impede future development, • Required no additional public infrastructure, • Would not create traffic impacts, • Was consistent with the Comprehensive Plan, and • Complied with all other applicable R-A regulations, except for the relief specifically requested. Staff therefore recommended approval of the motion for a new garage, subject to the conditions outlined in the staff report. Under the authority granted through the text amendments earlier this year, the Planning and Zoning Commission serves as the final decision -making body for this request, and no Village Board action was required following the hearing. Ms. Cook concluded her presentation, noting that both Staff and the Petitioner were available to answer questions. Chairman Donnelly asked for questions from the Commissioners. Commissioner Weir asked what the 8' x 8' concrete pad was intended for. Chairman Donnelly said they would ask the Petitioner. Mr. Hogan noted that staff had not specifically asked about the concrete pad, but that the Petitioner was allowed to install it regardless of the Conditional Use. Commissioner Weir asked how staff evaluates when to modify Village requirements to increase garage height. Planning & Zoning Commission Meeting — August 13, 2026 PZ-18-26 Page 4 of 164 Mr. Hogan explained that, as part of the text amendments, all changes to accessory structures became Conditional Uses, with final authority given to the Planning and Zoning Commission. It was the Petitioner's right to apply for a larger garage; he could theoretically have applied for a smaller or larger one and would still receive a hearing. He applied for an 18-foot garage because he felt it was appropriate. Commissioner Weir asked how the proposal related to the height of the house. Mr. Hogan said they could ask the Petitioner what the current height of the house was. He added that he did not imagine it was taller than 30 feet or so. Commissioner Weir thanked Mr. Hogan for his response. Commissioner Costa noted that, regarding an objection from a neighbor about office space, the owner had mentioned headroom in the garage attic in his own statement. She asked whether that implied the space was, or could be, more of a living area than a storage space, and how staff evaluated storage space versus living space. Mr. Hogan explained that the intent of the code provision preventing office space was to prevent people from operating home -based businesses in their garage - for example, a situation where customers came to the property, which staff did not want addressed by allowing an office building in a resident's backyard. As far as staff understood it, the entire space was intended for storage, and hobby activity in a garage was not explicitly prohibited. Commissioner Costa thanked Mr. Hogan. Seeing no further questions from the Commissioners, Chairman Donnelly invited the Petitioner to the podium. He swore in the Petitioner, Andrew Venamore of 602 Academy Drive, Northbrook, Illinois, and the Property Owner, John Thornton of 505 Wa Pella Avenue. Both the Petitioner and the Property Owner introduced themselves. Mr. Venamore explained that he was both the applicant and the builder of the project. Chairman Donnelly asked whether both the Petitioner and the Property Owner owned the property. Mr. Venamore clarified that he applied as the applicant and that his company would build the garage, while Mr. Thornton was the Property Owner. Chairman Donnelly thanked him for the clarification. Mr. Venamore thanked the Chairman and explained that the goal of the project was to construct a replacement two -car garage designed to match the architectural style and colors of the house. He noted that the existing garage was falling into disrepair, that the driveway dropped appreciably from the middle of the house downward, and that water entered the front of the garage with nearly every rainfall, causing long-term detrimental impact to the structure as a result, the structure needed to be replaced. Planning & Zoning Commission Meeting — August 13, 2026 PZ-18-26 Page 5 of 164 Mr. Venamore continued that the new garage would meet all remaining zoning requirements relating to setback and lot coverage. He noted that the proposed garage would also remedy the issue of the current garage being less than 3 feet from the property line. Following the Village trustees' approval of the recent text amendments, the maximum allowable garage size increased to 720 square feet the size of the proposed garage and, as staff had noted, the Petitioner could seek approval for the increased garage height through the Conditional Use application process. Mr. Venamore noted that the Commissioners had already raised questions about the attic level. He explained that the height increase was specifically designed to accommodate Mr. Thornton's height while he used the storage space. He said the letter submitted as part of the application package conveyed the intent of the space. He pointed out that areas exceeding 6 feet accounted for less than 40% of the square footage of the space and, as such, were not intended to be used as living space now or in the future. Mr. Venamore then discussed the exterior design of the proposed garage, with the goal of reflecting the architecture of the principal structure on the property. He said they chose a gabled roof, similar to the principal structure, with intersecting gables from each of the four sides of the proposed garage. He explained that this decision gave the structure architectural merit and visual interest, rather than having it appear as simply a large structure in the backyard. He said the color scheme, siding, trim, and other elements were designed to replicate the house. Mr. Venamore then asked Mr. Thornton to explain how he intended to use the space. Chairman Donnelly asked for clarification as to whether a 15-foot-tall garage was available that could accomplish the same architectural goals as the one proposed while still resolving the Property Owner's storage issues. He noted that the Petitioner's presentation indicated that matching the house was the reason the 18-foot-tall garage was needed. He felt that a 15-foot-tall garage could achieve the same outcome and still meet code. Mr. Venamore explained that the architectural aesthetic could be achieved at 15 feet, but that the intended use of the space was to provide enough room to store the homeowner's radio equipment. He said a 15-foot-tall structure would provide only 3.5 to 4 feet of clearance under the ridge beam, meaning neither the Petitioner nor the Property Owner would be able to stand in the area. Chairman Donnelly explained that the intent of his line of questioning was to determine whether the Petitioner was building what he would consider an attic or a second story. He continued that his question was whether the Commission would approve a height in which the Property Owner could stand, or whether a 15-foot-tall garage that met code could achieve everything the Petitioner had described architecturally. Mr. Venamore acknowledged that, architecturally, this was correct, but noted that the exterior was unrelated to the interior use of the space. He said he used the term "attic" because the amount of Planning & Zoning Commission Meeting — August 13, 2026 PZ-18-26 Page 6 of 164 space above 6 feet in height was less than 40% of the first floor, making it a half story by his own definition and, thus, an attic, since the area was not considered overly functional. Chairman Donnelly thanked Mr. Venamore for the clarification. The Property Owner, Mr. Thornton, then explained his goal forth eincrease in garage height. He said he had been a longtime volunteer with the Mount Prospect emergency response team, was now retired, but continued to volunteer with the Salvation Army, including with a radio team called the Salvation Army Team Emergency Radio Network. He said he would use the additional storage space to test equipment before deployment, and he noted a Salvation Army exercise with the Air National Guard scheduled for later in the month. Mr. Thornton confirmed that the space would not be used to run a business or as office space, and that it would instead support his volunteer activities with the Salvation Army. He said he would spend limited time in the storage room other than prior to deployments. He noted that the principal structure was rather small, with an unreliable basement due to flooding events, and that having his emergency preparedness equipment ready to help his neighbors and the Salvation Army was important to him. He further cited his height as another reason for the 18-foot-tall request. Chairman Donnelly confirmed that this would not be a heated or air-conditioned space. Mr. Thornton said there would be no heating or air-conditioning, that windows would provide ventilation, and that he could bring a space heater into the space during the winter. Mr. Venamore concluded the presentation by noting that, when the project started, he and Mr. Thornton had conversed with staff since they knew it would be a challenge, with the Property Owner having worked with staff for roughly six months before Mr. Venamore joined the project. He felt it was important to note that, in discussions with staff, staff had shared that they had received comments from residents over time about increasing the size and height of accessory structures, and that staff felt there was a rationale to approach the trustees with the amendment tied to somewhat larger garages than previously permitted, as well as to the height provision. He felt it was relevant that this Conditional Use process, based on his conversations with staff, was an attempt not to solve every possible situation, since not everyone wanted a large garage, but staff felt the change was reasonable enough to bring to the Village trustees. He thanked the Commission. Commissioner Weir expressed appreciation for the aesthetic of the garage, agreeing it would be nice for it to match the house, and noted that the zoning code prevented this in a similar situation she had faced. She asked, since the proposed space would carry forward to future owners of the property, about the use and need for the additional storage space, given that ample room appeared to exist on the first floor of the proposed garage if the staircase were removed. She also referenced her earlier question to staff about the 8' x 8' concrete pad, and noted a storage shed currently located in the rear yard. Planning & Zoning Commission Meeting — August 13, 2026 PZ-18-26 Page 7 of 164 Mr. Thornton said the 8' x 8' concrete pad would provide a supportive base for the hot tub currently on the property. He explained that the stairs provided a safer way for him to move heavy equipment up to the storage space, as he was approaching 70 years old. Chairman Donnelly noted the two increases in garage size since he joined the Planning and Zoning Commission, and expressed sensitivity to how residents use garage space for hobbies. He felt the recently added 50 square feet would provide enough space for the intended storage need without additional space above the garage. He noted that future owners might use the space differently, and that the Commission remained sensitive to setting precedent. Mr. Thornton shared that the additional first -floor space would be used for additional workbench space to perform household work, and to store bicycles and items that could not be stored in the shed. He noted that propane cylinders, gas containers, garbage cans, two cars, and items associated with being a grandparent would also be stored on the first floor. Mr. Thornton reiterated that basement flooding was the main issue, with three instances of backup from the combined sanitation and storm sewers. Chairman Donnelly asked whether there was a reason for frequent flooding at the property, such as being in a flood plain. Mr. Thornton explained that the street's combined sanitation and storm sewers became overloaded, backflowing into the house. He said he had subsequently installed a flood protection system in the front yard to prevent water from entering the house, but water still entered. He noted that water had entered the house through the window wells while the roof was being worked on, as the drain tiles had overflowed. Commissioner Weir said the flooding issue was irrelevant to this discussion. She pointed out an additional 12 feet beyond the nose of the cars and a significant amount of space dedicated to circulation, noting that a redesign of the space would create more opportunities for storage on the first floor. She added that, if the stairs were for safety, storing items on the first floor would eliminate the need for Mr. Thornton to carry heavy equipment upstairs. She asked whether the needed square footage for the use could be examined further. Mr. Thornton shared that he intended to use the entire second floor for amateur radio equipment and emergency preparedness equipment, while the first floor would store items commonly kept in a garage. Chairman Donnelly recalled his earlier question regarding the height of the house. Mr. Thornton shared that the height of the house was 18 feet. Chairman Donnelly noted that the garage and house would therefore be the same height. Mr. Venamore explained that this would only be the case if both structures were on a level plane. He noted that a difference in grading part of the problem causing water to enter the garage Planning & Zoning Commission Meeting — August 13, 2026 PZ-18-26 Page 8 of 164 caused the detached garage to sit 20 to 22 inches lower than the house, so the garage would remain physically lower than the house on the Subject Property. Chairman Donnelly asked whether there was a reason for the sided oorin the garage. Mr. Venamore explained that the site plan showed functional patio space adjacent to the garage, with the door providing access to that area and creating an indoor -outdoor space. Chairman Donnelly noted an area of grass between the patio and garage that kept the two from connecting. Mr. Thornton explained that the current grass area would be covered once the garage was moved closer to the patio, as the garage was currently too close to the neighboring property. He said he hoped to use the patio as an entertaining space for neighbors. Commissioner Costa referenced the earlier point that the garage would remain lower than the house and asked whether drainage issues would still be present as a result. Mr. Venamore pointed out that a trench drain would be installed at the front of the garage apron, intended to move water away from the garage and onto the Subject Property. Commissioner Costa asked where the trench drain would lead. Mr. Venamore explained that the drain would skirt around the adjacent patio in an easterly direction, with water absorbed into the backyard. Chairman Donnelly opened the floor to anyone present to discuss the case. Mr. Hogan reiterated to the Commission that they were assessing whether the proposed garage met the standards of a conditional use, not whether the proposed height was needed. He pointed out that a lower bar applied because the request was a conditional use, and that garage sizing and the ability to perform certain activities in the space were less relevant than whether the proposal would be detrimental to the overall public good, in addition to the standard conditional use conditions. Commissioner Costa said that, regarding overall public good, she wanted to discuss drainage further, especially given the existing flooding issues on the property. She was unsure whether water from the trench drain draining into the backyard would be appropriate, given the Property Owner's history of flooding issues, and she was uncertain about the water situation on neighboring properties. Mr. Thornton explained that water issues in the backyard had occurred only directly in front of the existing garage. He noted that a drain installed by previous owners had since filled with mud, and no remedy had helped. He said he had asked Mr. Venamore to develop a solution to the drainage issue. Planning & Zoning Commission Meeting — August 13, 2026 PZ-18-26 Page 9 of 164 Mr. Venamore described a black corrugated pipe with perforations across the bottom, through which water would run instead of entering the garage. He said a silt sock would be installed to keep earth out of the pipe while still allowing water to drain. He noted that the pipe would navigate around 30 to 35 feet of ground cover near the patio, and that water would daylight at the back of the patio, depending on rainfall intensity. Chairman Donnelly asked whether this solution would be required for any new garage built in this location, and whether the water issue was the reason for the increased garage height. Mr. Venamore noted the change in grading, as the driveway slopes down toward the garage. He clarified that he was not asserting that water was a reason for the increased garage height, but rather that the trench drain was a solution to a condition that had long existed on the property, causing damage to the existing garage over time. Chairman Donnelly clarified that the drainage issue would be resolved once the garage was replaced. Mr. Venamore confirmed that was correct. Chairman Donnelly commented that he had experienced flooding issues in his own basement, which installing overhead sewers had resolved. Mr. Thornton explained that plumbers had told him it would be cost -prohibitive to install an overhead sewer for his home, which was why they instead had the flood protection system in the front yard. He said the only drainage issues in the backyard had involved pooling of water in front of the garage, and he felt the solution Mr. Venamore designed would help resolve that issue. Commissioner Costa asked staff whether the Village Engineer had reviewed the plans. Mr. Hogan replied that the Village Engineer had reviewed the plans and had no issues with them. Commissioner Costa thanked staff. Hearing no further comments or questions, Chairman Donnelly closed the hearing and asked for a motion to approve the conditional use based on the conditions listed in the staff report. Commissioner Szymczak made a motion, and Commissioner Weir seconded it. Chairman Donnelly opened the floor to discussion. Chairman Donnelly shared that his concerns pertained to the recently approved increase in garage size, noting that the amendments were meant to accommodate a situation like this one. He said the Commission did not want residents creating a second story above their garages and would rather see wider garages than taller ones. Seeing no further comments, Chairman Donnelly called for a roll call. Planning & Zoning Commission Meeting — August 13, 2026 PZ-18-26 Page 10 of 164 10 Seeing no further comments, Chairman Donnelly called for a roll call. UPON ROLL CALL AYES: Szymczak, Costa, Fricano NAYS: Donnelly, Weir The Planning and Zoning Commission approved the request (3-2). After continuing another item of new business, Chairman Donnelly asked if there were any citizens to be heard. Hearing no further discussion, Commissioner Szymczak made a motion seconded by Commissioner Weir and the meeting was adjourned at 7:42 PM. Catherine Cook, Planning Intern Planning & Zoning Commission Meeting — August 13, 2026 PZ-18-26 Page 11 of 164 MORA r Item Cover Page Subject PZ-22-26 / 50 S Emerson Street / Text Amendments (Distribution centers, cartage, courier, parcel distribution, and last -mile delivery facilities) / Village Board Final Meeting August 27, 2026 - REGULAR MEETING OF THE MOUNT PROSPECT PLANNING AND ZONING COMMISSION Fiscal Impact (Y/N) N Dollar Amount Budget Source Category NEW BUSINESS Type Action Item Information The Community Development Department is recommending text amendments to the zoning ordinance of the Village Code to allow ""Distribution center, cartage, courier, parcel distribution, and last -mile delivery facility" as a conditional use in the I-1 Limited Industrial District. Staff has received complaints related to recently approved distribution centers located in close proximity to residential neighborhoods. The chief complaints include increased truck traffic, concerns regarding the safety of pedestrians and vehicles on existing roadways, and nuisances related to odor, noise, and vehicle emissions associated with this use. The Community Development Department reviewed the Village's Zoning Code and is recommending the following text amendments to address these concerns. Discussion Article VI, Section 14.604: Land Use Table 2 The commercial and industrial zoning districts land use table currently allows distribution centers as a permitted use in the I-1 Limited Industrial District. Staff is recommending removing distribution centers as a permitted use in the I-1 Limited Industrial District and instead creating a new land use category "Distribution center, cartage, courier, parcel distribution, and last -mile delivery facility" as a conditional use in the I-1 Limited Industrial District. The conditional use process would require notification of surrounding property owners and a public hearing before the Planning and Zoning Commission. As part of its review, the Planning and Zoning Commission would evaluate the proposed use and may recommend conditions of approval to address potential impacts before forwarding its recommendation to the Village Board for final consideration. In general, the conditional use process provides a transparent, public review of uses that, due to their operational characteristics or potential impacts, warrant case -by -case evaluation to ensure compatibility with surrounding uses and development patterns. Village Board approval of the conditional use would be required prior to the issuance of a business license or Certificate of Occupancy authorizing the use to operate. Page 12 of 164 This process would provide for public and case -by -case review of distribution -related uses whose operational characteristics, including truck and delivery vehicle traffic, loading and staging, hours of operation, and proximity to surrounding uses, may vary significantly from one facility or location to another. In determining whether a proposed operation falls within the new land use classification or constitutes another permitted use, staff would consider the overall character of the operation, including the volume and frequency of shipments, duration of storage, extent of sorting or transfer activities, vehicle activity and staging, and relationship of these activities to other uses on the premises. Article XXIV Definitions, Section 14.2401: Purpose The proposed modification to Section 14.2401 includes the addition of the following definition of DISTRIBUTION CENTER, CARTAGE, COURIER, PARCEL DISTRIBUTION, AND LAST - MILE DELIVERY FACILITY: A facility where the receipt, transfer, sorting, routing, staging, consolidation, deconsolidation, redistribution, or dispatch of packages, parcels, goods, merchandise, or other materials for subsequent distribution or delivery constitutes a principal function of the premises. Such use includes facilities where goods are received by truck or other commercial vehicle and subsequently transferred, whether directly or following temporary storage, to other vehicles for further distribution or delivery. Associated activities may include temporary storage or staging of goods; cross -docking; sorting; fleet parking; vehicle or trailer staging; fleet management; and dispatch operations. A facility meeting this definition shall be classified as such notwithstanding that it may also meet the definition of a warehouse or other permitted use. The receipt, storage, distribution, or delivery of goods that is subordinate to and conducted in direct support of another principal use, such as manufacturing or retail, shall be considered accessory and shall not independently constitute a distribution center. Staff also recommends modifying the definition of warehouse so that it is complementary to the distribution center definition: WAREHOUSE, STORAGE: A building or portion thereof principally used for the storage of goods, merchandise, materials, or commodities, where such storage, rather than the sorting, transfer, redistribution, dispatch, or delivery of such goods, constitutes the principal function of the facility. STANDARDS FOR TEXT AMENDMENTS The Planning and Zoning Commission shall review the standards and findings of fact outlined in Exhibit A and 1) accept them without changes, 2) accept them with changes, or 3) reject the findings. The Planning and Zoning Commission shall use the findings of fact to guide their recommendation to the Village Board. STAFF RECOMMENDATION The proposed text amendments are intended to further the objectives of the Zoning Ordinance by establishing appropriate land use controls for a distribution center, cartage, courier, parcel distribution, and last -mile delivery facility based on their operational characteristics and potential impacts on surrounding properties, roadways, and other land uses. The proposed text amendments are applicable to the Village at large and not intended to benefit a specific Page 13 of 164 property. The proposed amendments would result in existing distribution centers, cartage, courier, parcel distribution, and last -mile delivery facilities that were lawfully established as permitted uses becoming legal nonconforming uses. The amendments would make the Zoning Ordinance more restrictive by requiring future distribution centers, cartage, courier, parcel distribution, and last -mile delivery facilities to obtain conditional use approval, thereby allowing the Village to evaluate each proposed facility on a case -by -case basis and impose appropriate conditions to mitigate potential impacts. Based on the foregoing, staff finds that the proposed amendments satisfy the standards as required in Section 14.203(D) of the Zoning Ordinance and recommends approval of the text amendments. Alternatives 1. Adopt the text amendments to Chapter 14 of the Mount Prospect Village Code. 2. Action at the discretion of the Planning and Zoning Commission. Staff Recommendation The proposed text amendments meet the standards contained in Section 14.203(D) of the Zoning Ordinance. Staff requests that the Planning and Zoning Commission make a motion to adopt staffs findings as the findings of the Planning and Zoning Commission and recommend approval of the following motion: 1. "To adopt the text amendments to Chapter 14 of the Mount Prospect Village Code." The Village Board's decision is final for this case. Attachments 1. PZ-22-26 Staff Report 2. PZ-22-26 Administrative Content 3. PZ-22-26 Attachment 1_Chapter 14 Article 6_Land Use Table 2 4. PZ-22-26 Attachment 2—Chapter 14 Article 24_Definitions Page 14 of 164 VILLAGE OF MOUNT PROSPECT 50 S. Emerson Street, Mount Prospect, IL 60056 STAFF REPORT FROM THE DEPARTMENT OF Community Development Jason C Shallcross, AICP, CEcD Ann Choi Director of Community Development Senior Development Planner DATE: August 20, 2026 CASE NUMBER PZ-22-26 PUBLIC HEARING DATE August 27, 2026 BRIEF SUMMARY OF REQUEST PETITIONER/PROPERTY OWNER Village of Mount Prospect PROPERTY ADDRESS/LOCATION 50 S. Emerson Street The Community Development Department is recommending text amendments to the zoning ordinance of the Village Code to allow "Distribution center, cartage, courier, parcel distribution, and last -mile delivery facility" as conditional use in the 1-1 Limited IndustrialDistrict. STAFF RECOMMENDATION APPROVE APPROVE WITH CONDITIONS DENY PROPOSAL Staff has received complaints related to recently approved distribution centers located in close proximity to residential neighborhoods in Mount Prospect. The chief complaints include increased truck traffic, concerns regarding the safety of pedestrians and vehicles on existing roadways, and nuisances related to odor, noise, and emissions associated with these industrial users. The Community Development Department reviewed the Village's Zoning Code and is recommending the following text amendments to address these concerns. The proposed text amendments to the zoning code are contained in the attached documents. Modifications to each of the chapters are indicated as ®, and add iiiiii° iiiii iiii . • Attachment 1: Chapter 14,Article 6—Land Use Table 2 • Attachment 2: Chapter 14, Article 24 — Definitions Article VI, Section 14.604: Land Use Table 2 The commercial and industrial zoning districts land use table currently allows distribution centers asa permitted use in the 1-1 Limited Industrial District. Staff is recommending removing distribution centers as a permitted use in the 1-1 Limited Industrial District and instead creating a new land use category "Distribution center, cartage, courier, parcel distribution, and last -mile delivery facility" as a conditional use in the 1-1 Limited Industrial District. The conditional use process would require notification of surrounding property owners and a public hearing before the Planning and Zoning Commission. As part of its review, the Planning and Zoning Commission would evaluate the proposed use and may recommend conditions of approval to address potential impacts before forwarding its recommendation to the Village Board for final consideration. In general, the conditional use process provides a transparent, public review of uses that, due to their operational characteristics or potential impacts, warrant case -by -case evaluation to ensure compatibility with surrounding uses and development patterns. Village Board approval of the HAPLAN\Planning & Zoning COMM\P&Z 2026\Staff Reports\PZ-22-26 50 S Emerson Street (Text Amend ments).docx Page 15 of 164 conditional use would be required prior to the issuance of a business license or Certificate of Occupancy authorizing the use to operate. This process would provide for public and case -by -case review of distribution -related uses whose operational characteristics, including truck and deliveryvehicletraffic, loading and staging, hours of operation, and proximity to surrounding uses, may vary significantly from one facility or location to another. In determining whether a proposed operation falls within the new land use classification or constitutes another permitted use, staff would consider the overall character of the operation, including the volume and frequency of shipments, duration of storage, extent of sorting or transfer activities, vehicle activity and staging, and relationship of these activities to other uses on the premises. Article XXIV Definitions, Section 14.2401: Purpose The proposed modification to Section 14.2401 includes the addition of the following definition of DISTRIBUTION CENTER, CARTAGE, COURIER, PARCEL DISTRIBUTION, AND LAST -MILE DELIVERY FACILITY: A facility where the receipt, transfer, sorting, routing, staging, consolidation, deconsolidation, redistribution, or dispatch of packages, parcels, goods, merchandise, or other materials for subsequent distribution or delivery constitutes a principal function of the premises. Such use includes facilities where goods are received by truck or other commercial vehicle and subsequently transferred, whether directly or following temporary storage, to other vehicles for further distribution or delivery. Associated activities may include temporary storage or staging of goods; cross -docking; sorting; fleet parking; vehicle or trailer staging; fleet management; and dispatch operations. A facility meeting this definition shall be classified as such notwithstanding that it may also meet the definition of a warehouse or other permitted use. The receipt, storage, distribution, or delivery of goods that is subordinate to and conducted in direct support of another principal use, such as manufacturing or retail, shall be considered accessory and shall not independently constitute a distribution center. Staff also recommends modifying the definition of warehouse so that it is complementary to the following definition: WAREHOUSE, STORAGE: A building or portion thereof principally used for the storage of goods, merchandise, materials, or commodities, where such storage, rather than the sorting, transfer, redistribution, dispatch, or delivery of such goods, constitutes the principal function of the facility. STANDARDS FOR TEXT AMENDMENTS The Planning and Zoning Commission shall review the standards and findings of fact outlined in Exhibit A and 1) accept them without changes, 2) accept them with changes, or 3) reject the findings. The Planning and Zoning Commission shall use the findings of fact to guide their recommendation to the Village Board. HAPLAN\Planning & Zoning COMM\P&Z 2026\Staff Reports\PZ-22-26 50 S Emerson Street (Text Amend ments).docx Page 16 of 164 The proposed text amendments meet the standards contained in Section 14.203(D) of the Zoning Ordinance. Staff requests that the Planning and Zoning Commission make a motion to adopt staffs findings as the findings of the Planning and Zoning Commission and recommend approval of the following motion: 1. "To adopt the text amendments to Chapter 14 of the Mount Prospect Village Code." The Village Board's decision is final. ATTACHMENTS: ADMINISTRATIVE CONTENT PLANS (Zoning Request Application, Responses to (Plat of Survey, Site Plan, etc.) Standards, etc...) 1 concur: Jason C Shallcross, AICP, CEcD Director of Community Development OTHER (Supplemental Information, Public Comments Received, etc...) HAPLAN\Planning & Zoning COMM\P&Z 2026\Staff Reports\PZ-22-26 50 S Emerson Street (Text Amend ments).docx 3 Page 17 of 164 Exhibit A Standards and Findings of Fact TEXT AMENDMENT STANDARDS Section 14.203.D.8.b of the Village of Mount Prospect Zoning Ordinance provides that when a text amendment is proposed, the planning and zoning commission shall make findings based upon the evidence presented to it in each specific case with respect to, but not limited to, the following matters: 1. The degree to which the proposed amendment has general applicability within the village at large and not intended to benefit specific property. 2. The consistency of the proposed amendment with the objectives of this chapter and the intent of the applicable zoning district regulations. 3. The degree to which the proposed amendment would create nonconformity. 4. The degree to which the proposed amendment would make this chapter more permissive. 5. The consistency of the proposed amendment with the comprehensive plan. 6. The degree to which the proposed amendment is consistent with village policy as established in previous rulings on petitioners involving similar circumstances. Staff's Findings: The proposed text amendments are intended to further the objectives of the Zoning Ordinance by establishing appropriate land use controls for a distribution center, cartage, courier, parcel distribution, and last -mile delivery facility based on their operational characteristics and potential impacts on surrounding properties, roadways, and other land uses. The proposed text amendments are applicable to the Village at large and not intended to benefit a specific property. The proposed amendments would result in existing distribution centers, cartage, courier, parcel distribution, and last - mile delivery facilities that were lawfully established as permitted uses becoming legal nonconforming uses. The amendments would make the Zoning Ordinance more restrictive by requiring future distribution centers, cartage, courier, parcel distribution, and last -mile delivery facilities to obtain conditional use approval, thereby allowing the Village to evaluate each proposed facility on a case -by - case basis and impose appropriate conditions to mitigate potential impacts. Based on the foregoing, staff finds that the proposed amendments satisfy the standards as required in Section 14.203(D) of the Zoning Ordinance and recommends approval of the text amendments. HAPLAN\Planning & Zoning COMM\P&Z 2026\Staff Reports\PZ-22-26 50 S Emerson Street (Text Amend ments).docx 4 Page 18 of 164 �tit P., Village of Mount Prospect Community Development Department 50 S. Emerson Street Mount Prospect, Illinois 60056 Phone: (847) 818-5328 Zoning Request Application Official Use Only (To be completed by Village Staff) Case Number: P&Z - 22 - 26 Date of Submission: 08-01-2026 Hearing Date: 08-27-2026 Project Name/Address: Text Amendments: Cartage, courier, parcel distribution, and last -mile delivery facility I. Subject Property Address(es): 50 S. Emerson St, Mount Prospect IL Zoning District (s): n/a Property Area (Sq.Ft. and/or Acreage): n/a Parcel Index Number(s) (PIN(s): n/a II. Zoning Request(s) (Check all that apply) ❑ Conditional Use: For ❑ Variation(s): To ❑ Zoning Map Amendment: Rezone From To EZ Zoning Text Amendment: Section(s) 14.604, 14.2401 ❑ Other: III. Summary of Proposal (use separate sheet if necessary) Amending text pertaining to distribution centers in Chapter 14. Adding "Distribution center, cartage, courier, parcel distribution, and last -mile delivery facility" as a conditional use in the 1-1 Limited Industrial District. IV. Applicant (all correspondence will be sent to the applicant) Name: Jason C. Shallcross Corporation: Village of Mount Prospect Address: 50 S. EMERSON STREET City, State, ZIP Code: MOUNT PROSPECT IL 60056 Phone: 847-818-5328 Email: comdev@mountprospect.org Interest in Property: Director of Community Development (e.g. owner, buyer, developer, lessee, architect, etc...) 1 Page 19 of 164 V. Property Owner ❑ Check if Same as Applicant Name: N/A Corporation: Address: City, State, ZIP Code: Phone: Email: In consideration of the information contained in this petition as well as all supporting documentation, it is requested that approval be given to this request. The applicant is the owner or authorized representative of the owner of the property. The petitioner and the owner of the property grant employees of the Village of Mount Prospect and their agent's permission to enter on the property during reasonable hours for visual inspection of the subject property. hereby affirm that all information provided herein and in all materials submitted in association with this application are true and accurate to the best of my knowledge. o . 08-01-2026 A licant.. .. ppw Date. (Signature) Jason C Shallcross (Print or Type Name) If applicant is not property owner: hereby designate the applicant to act as my agent for the purpose of seeking the zoning request(s) described in this application and the associated supporting material. Property Owner: N/A (Signature) (Print or Type Name) Date: 2 Page 20 of 164 ATTACHMENT 1 PZ-22-26 Attachment 1-Chapter 14 Article 6-Land Use Table 2_Redline.docx Modifications to each of the chapters are indicated as detetkmts and add iiiii° iiiii LAND USE TABLE 2 COMMERCIALAND INDUSTRIAL ZONING DISTRICTS Land Use B-1 B-2 B-3 B-4 B-5 B-5C 1-1 1-2 1-3 ...................................................................................................................................................................................... ........................ in.. ir, c a irt .. coui.iiiii.....i., it iiiii ° iriiiii ° iiiii i ii�da . . last imillite fac ............................................ iiiii.. �.iiiii.." ., Warehouse, P distrftatkyft and storage facilities PZ-22-26 Attachment 1-Chapter 14 Article 6-Land Use Table 2_Clean.docx LAND USE TABLE 2 COMMERCIAL AND INDUSTRIAL ZONING DISTRICTS Land Use B-1 B-2 B-3 B-4 B-5 B-5C 1-1 1-2 1-3 Distribution C center, cartage, courier, parcel distribution, and last -mile delivery facility Warehouse and P storage facilities 1 Page 21 of 164 ATTACHMENT 2 PZ-22-26 Attachment 3-Chapter 14 Article 24_Definitions_Redline.docx Modifications to each of the chapters are indicated as detetkmts and add iiiil° iiiii Add the definition of "Distribution center, cartage, courier, parcel distribution, and last -mile delivery facility" to Section 14.2401 in the appropriate alphabetical location. Modify the existing definition of "Warehouse, storage" as follows. 14.2401: PURPOSE Assoc iino"twll*ll�"t�hs"tain..d..ii'ii� TheIII °° IIIII " " i IIIII " Ir IIIII " IIIII Ii IIIII Ir " " IIIII Ii IIIII ......................................................................................................................................... ............................................................................................................................................................................................................................................................................ ............II.......I....I ......II....I.r ........... Ir" Ir rIn II l InIIr IIII In Ir r IIIII l shall IIIIr r l IIII li " I° ° IIIII IIIIrIIIII IIIII li II A �b u ' Id e of ®....................................................................IIIII............................ IIIII.. I................ Ilr Ir" IIIII Ir Ir IIIII In IIIII Ir Ir go IIIIIIIIIII.IIIIIl III IIIIII II �I II Il ................................................................................................................................................................................................ III ............ ............... . ....... .. ...................................................................................... , �.................................................................................................. cons0i���� Ir IIIII II IIIII l ° I °IIIII III IIIII l IIIII° . Page 22 of 164 PZ-22-26 Attachment 3—Chapter 14 Article 24_Definitions_Clean.docx 14.2401: PURPOSE DISTRIBUTION CENTER, CARTAGE, COURIER, PARCEL DISTRIBUTION, AND LAST -MILE DELIVERY FACILITY: A facility where the receipt, transfer, sorting, routing, staging, consolidation, deconsolidation, redistribution, or dispatch of packages, parcels, goods, merchandise, or other materials for subsequent distribution or delivery constitutes a principal function of the premises. Such use includes facilities where goods are received by truck or other commercial vehicle and subsequently transferred, whether directly or following temporary storage, to other vehicles for further distribution or delivery. Associated activities may include temporary storage or staging of goods; cross -docking; sorting; fleet parking; vehicle or trailer staging; fleet management; and dispatch operations. A facility meeting this definition shall be classified as such notwithstanding that it may also meet the definition of a warehouse or other permitted use. The receipt, storage, distribution, or delivery of goods that is subordinate to and conducted in direct support of another principal use, such as manufacturing or retail, shall be considered accessory and shall not independently constitute a distribution center. WAREHOUSE, STORAGE: A building or portion thereof principally used for the storage of goods, merchandise, materials, or commodities, where such storage, rather than the sorting, transfer, redistribution, dispatch, or delivery of such goods, constitutes the principal function of the facility. Page 23 of 164 Subject Meeting Fiscal Impact (Y/N) Dollar Amount Budget Source Category Type I nfnrma+inn Item Cover Page PZ-20-26 / 50 S Emerson Street / MP2040 Comprehensive Plan / Village Board Final August 27, 2026 - REGULAR MEETING OF THE MOUNT PROSPECT PLANNING AND ZONING COMMISSION N N/A N/A NEW BUSINESS Action Item This is the public hearing for the Village of Mount Prospect's MP2040 Comprehensive Plan. A Comprehensive Plan guides planning and development policy and is generally updated every ten years. Regarded as a community's primary planning document, a comprehensive plan describes goals and objectives for existing and future development and provides an implementation strategy for achieving those goals. MP2040 succeeds Envision Mount Prospect, the Village's previous comprehensive plan, adopted in 2017. Envision Mount Prospect guided a period of significant Downtown revitalization, the South Mount Prospect annexation, and meaningful infill investment, but conditions have changed enough since 2017; an aging and diversifying population, tightening regional housing affordability, and an increased focus on sustainability. The planning process for MP2040 spanned from May 2025 to August 2026 and included extensive review of existing conditions and a comprehensive community engagement strategy to maximize public input. Engagement activities included the following: • Steering Committee - Comprised of Village trustees, the Planning and Zoning Commission Chair, and representatives from the Library, School District 2141 the Park Districts, and the local business community, the steering committee helped guide the development of the Plan. • Community Survey - A community survey covering housing, mobility, commercial areas, parks, sustainability, and quality of life was offered in Page 24 of 164 English, Spanish, Polish, and Korean, and received 565 responses. • Engagement Stations - Held at community events including the Mental Health Matters event, Aging in Mount Prospect event, Randhurst Street Fest, the Mount Prospect Block Party, the Community Connections Center Resource Fair, John ]ay School parent open house, and the Celebration of Cultures. • Visioning Workshops - Held in Downtown Mount Prospect, South Mount Prospect, and North Mount Prospect, along with a dedicated youth workshop at Prospect High School. • Stakeholder Interviews and Focus Groups - Engaged Village staff, local organizations, and community partners across the Village. In total, the engagement process recorded approximately 1,200 points of engagement, including 665 in -person discussions, 565 survey responses, and 25 official meetings (5 focus groups, 4 visioning workshops, 7 engagement stations, and 9 stakeholder interviews). nigmj-q-qinn Plan Summary The Plan ties in closely with the Village's long-range priorities and is based on public input and current best practices for comprehensive plans. The Plan provides a vision statement, covers six topic areas relevant to Mount Prospect today, and includes a Future Land Use Guide and a detailed implementation matrix. The Plan's vision statement reads, in part: "In 2040... Mount Prospect will continue to embody the very best of community living as a forward -thinking, family - centered village that sets the standard for quality of life in the region. " The following six topic areas, each with its own goals and strategies, form the framework of the Plan: • Land Use - 8 goals guiding coordinated growth, redevelopment, and infill in a largely built -out community. • Housing & Neighborhoods - 4 goals expanding housing choice while protecting neighborhood character. • Commercial & Industrial Areas - 10 goals strengthening Downtown, Randhurst, corridors, and industrial districts. • Transportation & Mobility - 6 goals building a safer, more connected, multimodal network. • Community Facilities - 7 goals modernizing infrastructure and public facilities. • Parks & Environment - 5 goals improving park access, quality, and environmental resilience. Page 25 of 164 Together these chapters total 40 goals and 154 implementing strategies, organized in an Implementation Matrix (Chapter 9) that assigns a potential lead and partner group to each action and phases them across short-term, long-term, and ongoing ti mefra mes. The Plan also includes a Future Land Use Guide, identified Opportunity Sites throughout the Village, and three potential subareas (North MP, Downtown MP, and South MP) for more focused future planning attention. Altp-mativps 1. Recommend approval of the MP2040 Comprehensive Plan to the Village Board as presented. 2. Recommend approval with specific modifications directed by the Commission. I Action at the Discretion of the Planning and Zoning Commission Staff Recommendation Staff recommends that the Planning and Zoning Commission recommend approval of the MP2040 Comprehensive Plan to the Village Board. The Plan reflects extensive community input and technical analysis and provides an actionable framework to guide Village land use and policy decisions over the coming years. Attachments 1. MP2040 Comprehensive Plan DRAFT September 2026 (For Screens) 2. MP2040 -Existing Conditions Report -September 2025 3. MP2040 -Community Engagement Report Page 26 of 164 m uuuuui uu uuuuuuui uuuum� uuuuuuui luuui ii 16 Page 27 of 164 PILLAGE BOARD • Paul Wm. Hoefert, Mayor • Vincent,. Dante, Trustee • Beth DiPrima, Trustee • Terri Gens, Trustee • William A. Grossi, Trustee • John ,. Matuszak, Trustee • Colleen E. Saccotelli, Truste PLANNING AND ZOk COMMISSION • Joseph P. Donnelly (Chair) • William Beattie (Co -Chair) • Donald Olsen • Walter Szymczak • Ewa Weir • Richard Rogers • Michael Fricano • Fay Costa STEERING COMMITTI • Vincent J. Dante, Village Try • Colleen E. Saccotelli, VillagE • Joeseph P. Donnelly, Planni Commission Chair • Su Reynders, Mount Prosper • Scott Rowe, School District • Genrae Giese_ Mmint Prn-qnF CONTENTS INTRODUCTION & COMN VISION & GOALS .............. LAND USE ......................... HOUSING & NEIGHBORHi COMMERCIAL & INDUSTI TRANSPORTATION & MO COMMUNITY FACILITIES. PARKS & ENVIRONMENT IMPLEMENTATION .......... The MP2040 Comprehensive Plan is the Village of Mount Prospect's official statement of long-range policy. Authorized under the Illinois Municipal Code (65 ILCS 5/11-12-5), a comprehensive plan is meant to be updated approximately every 10 years and provides the policy foundation for zoning, subdivision regulation, capital investment, and economic development. The Comprehensive Plan articulates what kind of community Mount Prospect intends to be over the next accelerated. Housing affordability tightened across the Chicagoland region. Mount Prospect's residents are aging, and the community is becoming more racially, ethnically, and linguistically diverse. New regional opportunities, including the potential redevelopment of the Arlington Park site in neighboring Arlington Heights, are reshaping the Village's competitive context. A refreshed plan is needed to respond to these conditions. PLANNING PROCESS MP2O4O was developed through phase process designed to comb broad community input. The plan 2025 with a Village Board kickoff th expectations, and the overall direct following months, the planning tea of existing conditions, met with sta community events, hosted workshi findings into the framework that or COMMUNITY GAG - Community engagement is the fou Village pursued an inclusive, multi - strategy intended to reach resident at community events, in focus grOL outreach to populations that are of in planning processes. Over the COL period, the project recorded appro> engagement, including: • 665 in -person discussions workshops, and community ( • 565 community survey rest Spanish, Polish and Korean) ( commercial areas, parks, sus life. • 2,100 unique website visits • 25 official meetings, includi visioning workshops, seven E nine stakeholder interviews. Engagement stations were held at including the Mental Health Matter! Prospect event, Randhurst Street F Block Party, the Community Conne Fair, John Jay School parent open of Cultures. Visioning workshops were held acre ensure a broad range of voices info za ti NO s ssmaes `s e ti -M �hu - .. M �s MK_ I � WO s 1. MA JAI if \dam � z ft Mvrm LF 1% INK rA ILL Sir KIft - - i e = et M s 0 �00� - - _ - �� _- _ - - _ - _ 5 _ is � - ��� - - _ - _ - _ A ' y � Aff F' � - — REA V o ti v -= �, �_ - s , = - Jar MAN AN a LS c 51 c X\,` s } gmoat, IDAce - PO c --A Y U 1: 0 At - F ,- _ 3 Pin vi JEN On �"K CENT 4 Ito INNn F _ - -v Q s s \ \ A ye - -_%PQ _41 :,w s Or WHAT WE HEARWIlk D Several consistent themes emerged from the engagement process: Residents love Mount Prospect and want to protect what works. Survey responses showed 91% satisfaction with the Village as a place to live, with parks, the library system, and emergency services rated as community strengths. Walkability and safer streets matter. 74% of survey respondents said they would walk more if safe sidewalks and trail connections were more plentiful. Commercial areas outside Downtown need reinvestment. Downtown is widely viewed as a community asset, while aging retail corridors and underutilized commercial spaces were identified as priorities. COMMUNITY PROFI1 Mount Prospect is a mature, prim, of approximately 56,852 resident: in northwestern Cook County, Illir approximately 10.7 square miles a Arlington Heights, Prospect Heigl Grove Village. Incorporated in 191, rapidly in the post -World War II erc current population by the early 19 52,63 4,009 POPULATION After decades of post-war growtl^ population has been essentiall) Village had 55,037 residents in 2C an increase of approximately 3%. population has changed little - frc Prospect saw essentially no net c contracted by approximately 2.8� grew by approximately 4.7%. This long-term stability is both a consideration. It reflects the dura neighborhoods and the high quali provides. It also means that the V defined less by overall population chooses to live here, what kinds c they need, and how the existing b RACE, ETHNICITY, & LANGUAGE INCOME & EMPLOYMENT HOUSING Mount Prospect is racially and ethnically diverse community that has become more diverse overtime. Per 2023 American Community Survey data, the population is approximately67 % White, 14.6% Asian, 2.5% Black, and 16% other or multiracial. The Village's Asian community (approximately 8,000 residents) is proportionally larger than the Cook County average (8.9%). Approximately 16% of residents identify as Hispanic or Latino, and nearly 30% are foreign -born. LANGUAGES SPOKEN AT HOME 8.3 % Soan- 12.5% Other 1.8% 210210 ACS- ti gates Linguistic diversity is also notable. Approximately42% of residents speak a language other than English at home, including nearly 20% who speak a European language other than English (such as Polish),12.5% who speak Spanish, and 8.3% who speak an Asian language. Since 2000, the share of non -Hispanic White residents has declined from approximately 74% to approximately64%, signaling a steady trend toward greater diversity. Mount Prospect is a relatively high -income community. The median household income is approximately $103,911, well above the Cook County median of $87,800. Approximately 29% of households earn $150,000 or more — a larger share than the county overall. At the same time, approximately23% of households earn less than $50,000, and approximately 6% of residents live below the poverty line. While this poverty rate is roughly half the county average, it represents approximately 3,300 residents who may need support from Village human services, food pantries, and area non -profits to meet basic needs. The Village's economy is anchored by retail, manufacturing, and professional services. Major employment centers include Downtown, Randhurst Village, the Kensington Business Center, the South Mount Prospect industrial area, and commercial corridors along Rand Road, Golf Road, and Busse Road. Top local employment sectors include retail trade (approximately 21% of local jobs), administrative and support services (12%), manufacturing (12%), and wholesale trade (7%). Mount Prospect residents work across the Chicago region in healthcare, retail, professional and technical services, manufacturing, and education. HOUSEHOLDS BY 11NCOME BRACKETS 500 "1000 1500 2,000 2500 3,000 3,500 4f000 Mount Prospect has approxima units, of which 95.5% are occup rate that reflects strong demar of households are owner-occupie County rate of 57.5%. Single-fami account for nearly 58%of all unit.c housing — including buildings wit multifamily, and townhomes — m� The Village's housing stock is over Nearly half of all homes were built 1979, with another 5,225 units bui 1959. Post-1980 construction haS fewer than 5,000 homes over the pattern means that most of Moun is approaching or has exceeded a with implications for accessibility, reinvestment needs. Home values reflect a healthy suk average owner -occupied home vc, $403,985, above the Cook Count) and home values have risen appr( past five years. Affordability is mi) upper -income households are no - approximately 27% of all househo of their income on housing, with t among lower -income renters and NUMBER OF HOUSING UNIT r_- _-er 8/ INFLOW/OUTFLOW i0B COUNTS Mount Prospect is fundamentally a commuter community. Of approximately22,765 employed residents, only1,292 k,-%+h -%r,,4 11ei�rL ir% +kr% -100Z �f REGIONAL CONTEXT Mount Prospect sits within the Chicago metropolitan p p 9 region,, the third -largest metropolitan area in J g p the country, and is shaped by regional economic, demographic, and infrastructure forces. The Village is approximately 24 miles northwest of downtown Chicago and immediately north of O'Hare International Airport, one of the largest employment hubs in the region. Mount Prospect is served by the Metra Union Pacific Northwest line, with stations providing approximately 30-minute access to downtown Chicago, and b Pace bus service connectingto surrounding Y g communities. Interstate 90 (the Jane Addams Memorial Tollway) crosses the southern edge of the Village, and Illinois Routes 12,14, 58, and 83 provide regional arterial Mount Prospect's neighbors — Arlington Heights, Prospect Heights, Des Plaines, and Elk Grove Village — share many of the same opportunities and challenges. Coordination with these communities, Cook County, the Illinois Department of Transportation, and regional agencies including the Chicago Metropolitan Agency for Planning (CMAP), the Regional Transportation Authority (RTA), Metra, and Pace is essential to advancing the Village's goals. The potential redevelopment of the former Arlington Park site as a Chicago Bears stadium represents a articular) g p particularly significant regional opportunity, with implications for KEY TRENDS & CHAI ............ Mount Prospect's median age has longtime residents age in the comp median age trends). The proportion now exceeds the county average, a to continue. Many older residents li, that may become less suitable as p change. The Plan responds to thi; diversity, accessibility, walkabilit service planning. Mount Prospect has experienced s- ethnic, and linguistic diversity. Neai foreign -born, and over 40% of hou.c other than English at home. This tr importance of inclusive public cc responsive services, and meanin residents to participate in civic a Mount Prospect's housing inventor occupied single-family homes, witr new construction. Vacancy rates ar values have risen sharply, and affor increasing concern for renters, first income households. Continued rel housing alone is unlikely to meet and economically diverse popula with strategies to support a broade price points in appropriate location: LIMITED RECENT HOUSING AGING STOCK Community input serves as the foundation of the Comprehensive Plan. This chapter captures community aspirations in three parts: a vision statement, a set of goals, and a Future Land Use Map. The VISION STATEMENT describes the kind of place Mount Prospect aspires to be by 2040. It was shaped by extensive input from residents, business owners, and community stakeholders and reflects shared values around GOALS and STRATEGIES translate that vision into a plan of action across six topic areas — Land Use, Housing and Neighborhoods, Commercial and Industrial Areas, Community Facilities, Transportation and Mobility, and Parks and Environment — providing a consistent standard for evaluating zoning decisions, capital investments, and development proposals over the life of the plan. GOALS BY TOPIC AREACOMM.RC-AL- - = - ----- _-- - - - - - - - � -_ _ � � - - - - _ _ - -- - - - - -- Support active, resilient, and well-connected commercial Create a safe, connected, and mu and industrial districts that sustain a diverse economy, network that facilitates mobility fi A-D US- attract investment, strengthen Mount Prospect's identity, congestion, and ensures access t Guide community growth and improvement in a coordinated and provide services, jobs, and amenities for residents and Mount Prospect. manner that strengthens Mount Prospect's neighborhoods, businesses. 23. Address Safetyfor All Road supports economic vitality, and improves quality of life. 13. Strengthen Downtown as the Village's Primary 24. Invest in Multimodal Trans Economic & Social Hub 1. Protect Neighborhoods While Focusing Development 25. Support Public TransitAccE in Key Areas 14. Cultivate Distinct &Walkable Secondary Activity Centers 26. Reduce Congestion & Mod( 2. Promote Mixed -Use, Walkable, &Connected Develo ment Patterns in A ro riate Areas p pp p 15. Beautify Commercial Districts 27. Embrace Emerging Mobility 3. Support Economic Vitality & Reinvestment pp Y 16. Investigate the Feasibility of Neighborhood -Scale 28. Rejuvenate Wayfinding, Coi Corner Stores Experience 4. Integrate Sustainability &Resilience into Land Use Decisions 17. Rejuvenate Industrial Areas &Improve Compatibility 5. Strengthen Compatibility Between Residential, 18. Revitalize Aging Retail Centers & Corridors COMMU---Y � - -L-- -- Commercial, & Industrial Areas 19. Diversify the Village's Business Base Support high -quality, accessible, 6. Coordinate Land Use with Infrastructure, Facilities, & 20. Advance Mount Prospect's Identity & Branding facilities, utilities, and services th; Services 21. Champion Business Retention & a Strong Investment needs of Mount Prospect's reside 7. Evaluate Annexation of Remaining Unincorporated Climate sustainability, and long-term corn Areas 8. Create Subarea Plans for Key Areas in the Village 22. Leverage Regional Assets & Major Developments 29. Modernize Critical Infrastru 30. Reinforce Public Safety Sei _0-- -- - -- -- --- -_- -- -- _ _ - -_ -_ - 31. Revitalize Community Facil 32. Increase Access to Free, WE Ensure Mount Prospect's neighborhoods remain Gathering Spaces, Especial strong, accessible, and well-connected by expanding Teenagers housing choices, supporting infill and reinvestment, and 77 AA,,��^� C% 4. L%;I;4„ 0 M Land use is the foundation of comprehensive plan. The decisions a community makes about where housing, businesses, parks, and infrastructure are located shape nearly every aspect of daily life — how far residents travel to work or school, whether neighborhoods feel safe and walkable, how well the tax base supports public services, and whether municipality is positioned to compete for investment over the long term. This chapter establishes Mount Prospect's land use policy framework through 2040. It is organized around the Land Use Goals and Objectives adopted as part of the MP2040 Vision, Goals and Objectives Report, and is accompanied by a Future Land Use Map that provides parcel -level guidance for how land throughout the Village should evolve. Together, these tools will inform zoning decisions, development review, capital investment, and economic development strategies for the next two decades. VISION BACKGROU- Mount Prospect's land use vision what residents value most; stable and a strong sense of community conditions for strategic growth ar areas. The Village should not purs sake, however it should evolve inc ongoing needs of residents. Coml invest in themselves, and this c framework for doing so in a fisc conscious way. EXISTING CONDITIONS & KEY TRENDS Mount Prospect encompasses approximately 10.3 square miles. The Village's land use pattern reflects its post - World War II development history: a walkable Downtown core anchored by the Metra UP -Northwest station, a predominantly single-family residential fabric, auto - oriented commercial corridors along major arterials, and concentrations of industrial and office uses in South Mount Prospect and the Kensington Business Center. Several trends are reshaping the Village's landscape and inform this chapter's direction: Suburban office market softening. Remote and hybrid work patterns have weakened demand for traditional suburban office space, particularly at the Kensington Business Center and South Mount Prospect. Older, lower - amenity office product faces pressure from two directions: reduced overall demand and competition from higher - quality space in neighboring communities that can attract tenants willing to maintain a physical presence. The Village's response requires a two -track approach —supporting reinvestment and modernization where office use remains viable, and pursuing updated land use strategies that allow adaptive reuse and non-residential mixed -use conversion where it does not. Housing demand and mismatch. Mount Prospect's housing stock is aging and skewed toward larger single- family homes that do not align with the preferences of younger households or the needs of aging residents seeking to downsize. A broader range of housing types — particularly in walkable, transit -accessible locations — is needed to remain competitive. Transit -oriented opportunity. Land within a half -mile of the Mount Prospect and Prospect Heights Metra stations is well -positioned for transit -oriented development that can add residents and activity without dependence on FUTURE LAND USE GUIDE The Future Land Use Guide outlines how different parts of the Village are intended to grow and change overtime. It establishes a framework for where housing, businesses, mixed -use development, and community spaces are most appropriate, while reinforcing the protection of established residential neighborhoods. The Guide describes the general character, intensity, and mix of uses appropriate for different areas over the next 20 years. It is intended to be flexible and advisory, providing guidance for long-term decision -making while leaving room for case -by -case evaluation as conditions and opportunities evolve. It should be read alongside the goals, strategies, and recommendations throughout this plan. Primary: 3+ Story Multi Family Buildings, Townhomes, Duplexes, Triplex/Quadplex Supporting: Retail, Parks, Professional Offices Primary: Business Offices, Small- Daycares, Professional Services, Residential Above Commercial Supporting: Townhomes, Small Al Housing, Health Services, Commun Squares, Pocket Parks, Other Comn Primary: Single Family Homes, Townhomes, Duplexes, Triplex/Quadplex Primary: 1-6 Story Mixed Use Buildings, Retail, Restaurants and Outdoor Dining Primary: Large Format Retail, Cai Supporting: High Density Reside Primary: Parks, Recreational Facilities, Golf Courses Primary: Metra Right -Of -Way, Electrical Substations, CornEd Corridors OPPORTUNITY SITES The map on page 29 identifies properties throughout Mount Prospect with potential for development, redevelopment, or improvement over the plan horizon. Most sites are currently vacant or underutilized, representing near -term opportunities to accommodate new housing, commercial activity, or other uses consistent with the Future Land Use Guide. Several sites on the map are occupied but flagged for longer -term improvement (with the support of property owners). These sites should be improved as properties turn over and market conditions shift. Others have been identified because they are non -conforming with current zoning standards, often as a result of annexation, and present an opportunity to bring land use and development patterns into greater alignment with Village goals overtime. O2400 E Rand Rd -High-traffic corner lot. Currently used for vehicle parking. Q1450 River Rd -Vacant commercial lot. QEuclid/Elmhurst Parcel (Northwest) -Grass parcel adjacent to golf course, residences and across from bank. QEuclid/Elmhurst Parcel (Southeast) -Former bank outlot of Randhurst Village; building has been 1 E Rand Rd Unoccupied, former convenience store at the Rand/Kensington/Elmhurst intersection O800 Biermann Ct -Aging warehouse building in the Kensington Business Center. , 1600 Bishop Ct - Vacant four-story office building in the northeast corner of the Kensington Business Center. 1660 Feehanville Dr -For-sale four-story office building on the eastern end of the Business Center. 1100 W Northwest Hwy - P; space facing Northwest Higr 800 W Central Rd -Mix of o 708 W Central Rd -Self-sto parking lot. 704 W Central Rd - Contrac 604 W Central Rd -Flexible space. 300 W Central Rd -Large M building with front and rear r Mt. Prospect Plaza Parkinc currently used for parking. Empty Palm Drive Lot- Property made vacant in a multifamily community by a tragic fire. New residential would be appropriate. 1602 W Golf Rd -Vacant lot near high -traffic Golf/ Busse Intersection. 1101 Linneman Rd -Former church school building near a new assisted living facility in a residential area. 401 W Golf Rd -Undeveloped grass lot behind Golf Plaza II. 1881 W Algonquin Rd -Auto-dealership and parking use on a major corridor. 1701 W Algonquin Rd -Auto service use at the high - traffic intersection of Algonquin Rd and Busse Rd. Dempster/Redwood Parcel (vacant lot next to Cloud HIS -Large undeveloped property along a high - traffic road near industrial properties. 1699 Wall St (Lake Center Tower) - Aging and partially -vacant 7-story office tower adjacent to office, industrial, residential, and commercial uses. 301 Lasalle St -Undeveloped grass parcel along Elmhurst Rd, near industrial and commercial uses. Imperial Ct Industrial Properties - Mix of non- conforming and aging industrial uses off Busse Rd. Storage Facility -Self-storage facility on a major road. James Dr Industrial Properties - Mix of non- conforming and aging industrial uses off Busse Rd. Kenneth Dr Industrial Properties - Mix of non- conforming and aging industrial uses off Busse Rd. Busse/Interstate Industrial Properties -Mix of non- conforming and aging industrial uses off Busse Rd. The Tank Farms -Very large collection of fuel tanks in South Mount Prospect. As the parcels age, they should be improved with new industrial development. 2032 S Elmhurst Rd -Large vehicle maintenance/ storage property on ahigh-traffic corridor. 3400 Badger Rd -Industrial property at the northwest corner of Badger Road and Oakton Street. �i 2424 E Oakton St -Industrial property. f C-1 1 33 m Ln o0000000on inew000 �_ Nag �0 GOAL 1: PROTECT NEIGHBORHOODS WHILE FOCUSING DEVELOPMENT IN KEY AREAS Mount Prospect's residential neighborhoods are a great part of our community and define who we are as a community. Tree -lined streets, well -maintained homes, quality schools, and a strong sense of community identity are consistently what residents value most about living in the Village. Protecting that character is key when evaluating growth. Neighborhoods that feel stable and safe attract the reinvestment that sustains a community over the long term. At the same time, Mount Prospect has a number of locations that are well -suited to absorb higher -intensity development without threatening established neighborhoods. Vacant or under -developed parcels in Downtown, the Randhurst area, major commercial corridors, transit station areas, and identified opportunity sites can accommodate growth in ways that add tax base, housing options, and commercial vitality without disrupting the fabric of surrounding neighborhoods. The Village will pursue a deliberate, strategic approach: concentrate change where it is most appropriate, actively protect areas where stability is the priority, and carefully manage the transitions between the two. STRATEGIES GOAL 2: PROMOTE ff A. Preserve the character, scale, and stability of WALKABLE, & CONN1 established residential neighborhoods by enforcing zoning standards that maintain compatible building DEVELOPMENT PATT� forms, lot coverage, massing, and setbacks in APPROPRIATE AREA single-family and low -density areas. B. Direct higher -intensity - hi herdevelopment, g y p including Walkability is an amenity and an e multi -story mixed -use buildings, larger multifamily life driver. Communities where ri residential, and significant commercial uses, to daily needs, transit, parks, and i p arts of Downtown, Randhurst, major corridors, and foot or by bike attract younger parcels designated on the Opportunity Sites Map. independent mobility for older i commercial activity different fi C. Require compatible transitions between higher- development. Mount Prospect's intensity and lower -intensity land uses through demonstrates what walkable mix( stepped building heights, landscape buffers, offer. The challenge is extending g g design standards, and thoughtful site planning pattern inappropriate locations tl that minimizes operational conflicts and preserves Mixed -use development — integr� residential livability. y services, and public space in com D. Utilize Planned Unit Developments, other existing — is a proven model for reinvestin zoning rules, and financial incentives to ensure corridors and underutilized sites. new development is contextually appropriate in infrastructure costs b concentra y scale, materials, and orientation, particularly at the services already exist, and it genE edges of neighborhoods and in areas where higher- tax revenue that su orts the Vill pp intensity uses border lower -density residential. health. Transit -oriented development pai near train stations, represent a sp These locations allow housing an( GOAL 3: SUPPORT ECONOMIC VITALITY & REINVESTMENT Land use policy and economic development are inseparable. Where the Village allows development to occur (and in what form) directly shapes the types of businesses, employers, and investments that will locate here. Mount Prospect competes for investment with dozens of other suburban communities. Aland use framework that is predictable, flexible, and aligned with market realities gives the Village a competitive advantage. Mount Prospect's commercial and industrial areas vary significantly in their condition and market potential. Downtown is performing well and has clear momentum. Randhurst, the Golf Road corridor, Route 83, and South Mount Prospect each face distinct challenges and require tailored strategies. The Kensington Business Center, historically a strong office and light industrial district, is being reshaped by remote work trends and requires a flexible, forward -looking land use designation that allows it to evolve. STRATEGIES A. Align land use designations and zoning standards with economic development goals to attract new businesses, support job creation, and encourage reinvestment in aging commercial and industrial areas. B. Promote flexibility in land use designations and development formats, inappropriate locations, particularly with increased use of planned unit developments, to adapt to changing market conditions and accommodate emerging industries. C. Encourage redevelopment of underutilized and obsolete sites, including aging office buildings, and under -performing big -box retail, to maximize long-term community and fiscal benefit. D. Use financial tools, including Tax Increment Financing (TIF), sales tax incentives, and low - interest financing programs to support quality projects in important reinvestment areas (such as aging areas of South Mount Prospect), that would not proceed without financial support. E. Continually work to streamline permitting and development review processes to provide clarity, predictability, and efficiency for property owners and investors. GOAL 4: INTEGRATE S & RESILIENCE INTO DECISIONS Land use decisions have long -ter consequences that can be difficu reverse. How and where developn stormwater runoff, urban heat, tr( community's long-term infrastruc Prospect has significant stormwa the integration of sustainable infr and site design decisions. Sustainability is treated as a praci the plan: walkable development p more resource -efficient than sprc- existing buildings reduces constr infrastructure can address floodir aesthetic quality of commercial ai GOAL 5: STRENGTHEN COMPATIBILITY BETWEEN RESIDENTIAL, COMMERCIAL, & INDUSTRIAL AREAS Mount Prospect's land use pattern, like most suburban communities, includes areas where different uses are located in close proximity, sometimes by design and sometimes by natural land development overtime. Industrial uses in South Mount Prospect and along the Kensington Business Center border residential neighborhoods in ways that create compatibility challenges: noise, truck traffic, lighting, and visual quality are recurring concerns. Addressing industrial -residential conflicts requires a combination of regulatory tools such as performance standards, buffering requirements, and design guidelines, and longer -term land use transitions in areas where the market supports a shift to less intensive uses. The goal is not to eliminate industrial uses, which provide employment and tax base, but to ensure that their operation is compatible with adjacent residential areas and that aging industrial sites are positioned for reinvestment. STRATEGIES A. Support the gradual transition of aging industrial areas to a mixture of light industrial, commercial, and residential uses where market conditions, site constraints, and infrastructure capacity support it, particularly in South Mount Prospect. B. Require adequate buffering, landscaping, design standards, and mobility improvements at industrial -residential edges to minimize the visual and operational impacts of industrial uses on adjacent neighborhoods. C. Continually evaluate and strengthen performance standards to address noise, lighting, truck routing, hours of operation, and outdoor storage, to minimize impacts of commercial and industrial uses on nearby residential areas. D. As the suburban office market evolves, support the ongoing transition of the Kensington Business Center into a mixed -use business area capable of accommodating a broader range of uses, including complementary commercial, recreation, and service uses. GOAL 6: COORDINATI USE WITH INFRASTR FACILITIES, & SERVI Land use decisions should occur 1 considerations. Every developmei demand for water and sewer capc- and public safety services. The W growth is directed to locations wr can support it, and that new infra is aligned with the land use patter achieve. This means coordinating land use improvement programming, utilit, transportation network investmei realistic about infrastructure con: aging systems, limited road capac and water service are not appropi development without correspond investment. GOAL 1: EVALUATE ANNEXATION OF REMAINING UNINCORPORATED AREAS A small number of unincorporated pockets remain adjacent to the Village's boundaries. These areas present both opportunities and challenges. Annexation can expand the Village's tax base, extend high quality village services into under served areas, and bring development standards into alignment with the broader community. However, annexation also involves costs: extending infrastructure, increasing service demands, and potential changes to residents' existing service providers and tax rates. The Village should approach annexation decisions analytically and case -by -case, weighing fiscal impacts, service feasibility, and community interest before initiating or responding to annexation proposals. STRATEGIES A. Conduct thorough fiscal impact analyses for potential annexation areas, including projections of tax revenue, service costs, utility extension requirements, and net fiscal impacts to the Village. Kensington Rd ti ,ate �� NorIN e shy Central Rd7 — �, l gg Golf Rd GOAL 8: CREATE SUB S M": IMON FOR KEY AREAS IN 1 M Keyareas of Mount Pros ect wou Euclid Ave p focused planning lens than the C( alone can provide. "Subarea plar -� develop tailored land use, desig recommendations for geograpt �IN WMI strategically significant locatio centers, important corridors, and areas. Potential Annexation Areas Subarea plans translate broad Co into actionable, site -specific guid, zoning decisions, capital investmi conversations with property own( B. Evaluate the feasibility of infrastructure investment, including water, sewer, and road POTENTIAL SUBAREAS * Mount Prospect's land use and development patterns vary significantly across the Village. To reflect these differences, the plan identifies three subareas where focused planning attention is warranted. Each subarea has a distinct character, set of opportunities, and set of challenges that call for strategies tailored to local conditions. I NORTH MP SUBAREA The North MP Subarea encompasses the commercial areas of the Village's north side, including Randhurst Village, the Rand Road retail corridor, and the Kensington Business Center. This subarea contains some of Mount Prospect's most active shopping destinations and employment centers, making continued investment in its long-term vitality a priority. Key opportunities include supporting design and aesthetic improvements where necessary, attracting complementary retail and service uses that strengthen the overall mix, and ensuring that infrastructure and connectivity keep pace with the demands of a busy commercial district. Tloe note that s o yoe -utqect to chonge In turn planning effbrts- D0W__0W_MDSUBAHA The Downtown MP Subarea follows the Central Road, Main Street, and Northwest Highway corridors through the heart of the Village, including the Metra station area and the traditional commercial core. Downtown is Mount Prospect's most walkable district and its civic and cultural anchor, home to local businesses, community institutions, and public spaces that define the Village's identity. Key priorities include strengthening the mix of uses, improving the public realm, supporting transit ridership, and reinforcing downtown's role as a year-round destination for residents and visitors. . ................... 14 SOUTH MP SUBAREA The South MP Subarea encompasses the Village's southern commercial and industrial districts, bounded roughly by Elmhurst Road and Golf Road and extending to the Elk Grove Village border. This subarea contains a significant share of Mount Prospect's employment base and tax -generating commercial activity, making its long-term economic health a Village -wide priority. Key priorities include sustaining and growing the economic vitality of existing businesses, supporting reinvestment in aging commercial and industrial properties, and improving the visual character of corridors and sites where aesthetics may detract from the subarea's competitiveness. As commercial and industrial real estate markets continue to evolve, the subarea is well -positioned to attract new uses and investment while retaining the lz� Mount Prospect's neighborhoods are the foundation of the Village's identity. Tree -lined streets, well -maintained homes, quality schools, active park districts, and a strong sense of community are consistently the qualities residents value most. These attributes reflect decades of investment, stewardship, and planning that have sustained Mount Prospect as one of the Chicago metropolitan region's most desirable suburban communities. Community engagement throughout the MP2040 process confirmed that residents love their neighborhoods and want to maintain them, but they also recognized that the Village needs a broader range of housing options to remain competitive and inclusive over the long term. Ninety-one percent of survey respondents rated Mount Prospect's quality of life favorably. At the same time, unaffordable housing related to rising costs, senior housing, and options for young adults were among the most frequently cited weaknesses. BACKGRO_.,._____ _ _ Mount Prospect's housing and ne continuing what works while prep The Village's established neighbor backbone of community life - stal desirable - while new developmer the long-term vitality of the comr The strategies in this chapter a housing choice without imposh increases, to support reinvestn existing residents, and to stren quality and livability of everyne Village. But the housing landscape is shifting. The Village's housing stock is aging: nearly three-quarters of all homes were built before 1980, and relatively little new construction has •-- - -•-L-1----1-- AA-...-L P>.---•-- LF- .1-L:-.- This chapter establishes Mount Prospect"s housing and neighborhood policy framework through 2040. It is EXISTING CONDITIONS & KEY TRENDS Mount Prospect has roughly 23,000 housing units, of which 95.5% are occupied, a clear indicator of sustained demand. The Village's housing stock is dominated by single-family detached homes, which account for nearly 58% of all units. Multifamily buildings of 10 or more units make up 26%, with the remainder comprising townhomes, duplexes, and smaller multifamily structures. The homeownership rate is approximately 70%, well above the Cook County average of 57.5%, reflecting the community's strong tradition of owner -occupied, family - oriented neighborhoods. Several trends are reshaping the Village's housing landscape and inform this chapter's policy direction: An aging housing stock with limited new construction. Almost half of all homes were built between 1960 and 1979, with another significant wave dating from 1940 to 1959. Post- 1980 construction has been modest — fewer than 5,000 units across four decades. This aging stock does not meet current needs for accessibility, energy efficiency, or modern design. Reinvestment and selective infill will be increasingly important. NUMBER OF HOUSING UNITS CONSTRUCTED BY DECADE A growing senior population with evolving housing needs. The Village's median age has risen steadily — from 37.4 years in 2000 to 41.2 in 2023 — and 18.3% of residents are now 65 or older, above the Cook County average of15%. Many seniors live in larger single-family homes that may become less suitable as physical needs change. Accessible, age -friendly housing near transit, healthcare, and daily services is a growing need. Housing mismatch and limited entry-level options. Mount Prospect's housing stock is skewed toward single- family detached homes that do not always align well with the entry-level needs of younger households or the needs of residents seeking to downsize. Entry-level ownership options, such as starter homes, townhomes, condos and smaller -format units, are in short supply. "Missing middle" housing types that bridge the gap between single-family homes and large apartment buildings are largely absent from the Village's current inventory. Changing household sizes and i Prospect's household compositio from the era when most of its hOL half of all housing units date from community was growing rapidly largely by young families seeking Today, the population looks differ( to 34 make up just 17% of the pop Cook County average of 24%, whi now account for 18%, above the c households, empty nesters, and to downsize are a growing share ( result is a mismatch between a h( families and the smaller, more var increasingly define Mount Prospe Strong market demand and risii values have increased 34% since County. The Village's vacancy ratE well below typical healthy market constrained supply. While rising v, homeowners, they compound the for prospective buyers and renter occurring both in Mount Prospeci incentivizing homeowners not to 1969 or earlier 7 HOUSING AND NEIGHBORHOODS GUIDE The majority of Mount Prospect consists of well -established single-family neighborhoods with a mix of ranch homes, split-levels, and two-story housing built primarily between the 1950s and 1980s. Maintenance and upkeep of these properties is the priority. To enhance these areas, the Village should focus on public improvements like sidewalks, streets, curbs, trees, and lighting where appropriate, while ensuring new construction and renovations complement the neighborhood's established character. MULTIFAMILI These areas contain the Village's existing multifamily housing stock (outside new Downtown buildings), ranging from garden apartments to larger complexes. The Village should leverage code enforcement, capital improvement programs, and partnerships with IHDA, Cook County and property owners to ensure these properties remain well - maintained and attractive residential options for a range of household types. Downtown has the greatest potential for walkable mixed -use development. The Village should encourage . . ... . .. ... . ... .. .. As retail formats continue to evolve, outlots, aging strip centers, and underutilized parking fields along Rand Road, Golf Road, and Elmhurst Road present opportunities to introduce residential uses into otherwise car -oriented commercial corridors. Residential development in these locations should be concentrated on upper floors, with active commercial uses retained at the street level to maintain the corridor's economic function and support a more cohesive pedestrian environment where possible. The mixed -use building at Elmhurst Road and Algonquin Road illustrates the kind of compact, context -sensitive redevelopment that can work in a corridor setting. Randhurst Village is a longer -term candidate for residential integration as the property diversifies beyond traditional retail. New development in these locations should improve the pedestrian environment and contribute to a more cohesive streetscape overtime. UNINCORPORATED EVALUATION These areas represent unincorporated land adjacent to Mount Prospects municipal borders. The Village should assess these neighborhoods to determine whether annexation is appropriate, evaluating infrastructure condition, service costs, housing quality, and fiscal impacts GOAL 9: UPHOLD NEIGHBORHOOD CHARACTER & QUALITY Mount Prospect's residential neighborhoods are defined by qualities that residents consistently identify as their primary reason for living here: attractive tree -lined streets, well - kept homes and yards, and a palpable sense of community. These qualities are the product of consistent building standards, code enforcement, public investment in streets and infrastructure, and a community culture that values property maintenance and civic engagement. Protecting neighborhood character is about ensuring that the new development is compatible with and additive to the existing environment. New construction and renovation should reinforce the architectural quality, scale, and streetscape patterns that define Mount Prospect's neighborhoods. The condition of sidewalks, street trees, lighting, stormwater infrastructure, and public spaces also shapes how residents experience their neighborhoods on a daily basis. Community engagement underscored these priorities. The Block Party engagement station generated extensive feedback around maintaining neighborhood character while supporting thoughtful reinvestment. Residents raised concerns about sidewalk conditions, traffic calming, and the need for more informal gathering opportunities. Visioning workshop participants emphasized public art, streetscape improvements, and a desire fora stronger sense of place across the Village's residential areas. STRATEGIES A. Maintain the attractive tree -lined streets, pleasant sidewalks, and other distinguishing qualities of Mount Prospect's existing residential neighborhoods through sidewalk maintenance, right of way tree care, and zoning standards that ensure compatible building forms, setbacks, lot coverage, and massing. B. Promote high standards of building design and construction that are consistent with the Village's character, scale, and charm for all residential development. C. Invest in neighborhood public spaces and key corridors through thoughtful design and streetscape improvements, including wider sidewalks, enhanced crossings, street trees, lighting, stormwater upgrades, and potentially public art to strengthen livability, reinforce neighborhood identity, and improve transitions between residential and commercial areas. D. Investigate the possibility of moving overhead utilities underground where feasible to reduce interference with the tree canopy, improve aesthetics, and enhance service reliability. E. Beautify community gateways with special signage, landscaping, and entry design features that convey a strong and welcoming sense of arrival into Mount Prospect. F. Consider sponsoring additional programs, activities, events, and celebrations that stimulate public involvement and participation, foster strong and unified community spirit and identity, and bring together residents from the Village's various neighborhoods on a regular basis. G. Improve and expand existing community rin+hprinri cnnr-pc in nn%A/ntn%A/n to hpttAr h GOAL 10: EXPAND SEI HOUSING OPTIONS Mount Prospect's senior populati( growing demographic segments, implications for housing policy. K who raised their families in the Vil Mount Prospect as they age, but i served them well during their wor well -suited to their changing neei homes with stairs, deferred mains locations that require driving for E barriers to aging in the communit older residents to remain in their I through home modifications, acci services, is a community priority t transportation, and public investr At the same time, the Village's sur housing - independent living, ass units near transit and services - i; the growing demand. The Aging it engagement station generated e) the challenges older residents fac options, difficulty maintaining larc for housing that allows them to re staying connected to the commu of for decades. GOAL 11.: EXPAND ENTRY-LEVEL HOUSING AIMED AT YOUNG PROFESSIONALS & GROWING FAMILIES Mount Prospect's long-term competitiveness depends on its ability to attract and retain the next generation of residents. Young professionals, first-time home buyers, and growing families are a key group for sustaining school enrollment, patronizing local businesses, and supporting the social and economic vitality of a community. But these households are increasingly unable to find suitable housing in the Village. The problem is structural. Mount Prospect's housing inventory is heavily weighted toward larger detached single-family homes, and the limited supply of smaller, more affordable housing types, such astownhomes, duplexes and triplexes, meaning there are few rungs on the housing ladder between renting an apartment and purchasing a $400,000+ single-family home. This is the "missing middle" housing challenge, and it is a regional phenomenon that Mount Prospect can seek to address. The community survey found that residents are open to modestly increasing housing diversity, with neutral -to - positive views toward duplexes, triplexes, and townhomes, particularly in locations near Downtown and transit STRATEGIES GOAL 12: SUPPORT Q A. Encourage a broader range of entry-level and & MANAGEMENT IN missing middle housing options - including MULTIFAMILY 9 & TOW duplexes, triplexes, quadplexes, and rowhomes - through strategic zoning refinements and design HOUSING AREAS standards inappropriate transitional areas. B. Support incremental increases in housing pp g Mount Prospect's multifamily and opportunities within ahalf-mile walking house approximately 30 percent i distance of the Metra stations by prioritizing rioritizin infill Many of these developments are development, redevelopment, and adaptive reuse maintained, and stable. Others, p; of underutilized and/or aging properties. g g p p complexes with deferred maint building systems, and managen C. Investigate allowing greater flexibility in experience higher call volumes, housing types, densities, and mixed -use activity, and resident turnover formats, particularly in walkable areas and life for tenants and surroundini designated subareas, without imposing uniform The Village has a direct interest in densityincreases across established residential of its existing multifamily housing, neighborhoods. deteriorating buildings depress vi D. Evaluate fiscally responsible funding tools public services, and undermine tr and incentive programs that help offset rising of life. Stakeholder interviews witl construction and financing costs while protecting public safety officials highlighted p y the . Village's long-term fiscal stabilit g g y building management quality and Police and fire leadership noted tl number of properties generate a c E. Support regional housing planning efforts service calls, and that proactive e by participating in initiatives such as CMAP:s owners is more likely to produce Homes for a Changing Region program, which than purely reactive enforcement helps communities forecast housing demand onrl nlirin Innol nnlinx/ \A/i+h rianinnol nrnXA/+h 1�6\00 \ \EWA 01 1110A L M"s NX0000, LN Mount Prospect's commercial and industrial districts generate the sales tax revenue that funds public services, provide jobs that anchor working households, and supply the goods, services, and gathering places that define daily life. Sustained investment and thoughtful land use decisions are what keep these areas competitive overtime. The Village's economic geography spans several distinct districts. Downtown is the civic and social heart of the Village, with growing residential development and a walkable mixed -use character. Randhurst Village anchors the nnrthPa-qt and rnntini IPS to navingtP the gtri irti iml Mount Prospect benefits from strong regional connectivity, proximity to O'Hare International Airport, an educated workforce, and a stable population base with above - average household incomes. But traditional retail is under pressure from e-commerce, the suburban office market remains soft, and several aging commercial properties need active strategies to remain viable. This chapter establishes the policy framework to help the Village compete for investment, support existing businesses, and shape its commercial districts into places residents and visitors actively seek out. BACKGR0_.,._____ _ _ Communities that thrive econo term are the ones that actively conditions: by aligning land use by deploying incentive tools strati partnering with property owners projects that move districts forwc- of distinctive places that business customers want to visit. This chapter approaches commer policy as a portfolio. Downtown is deserves continued investment b Randhurst Village requires proact the challenges facing traditional k Aging arterial corridors need stral selective redevelopment. Industri infrastructure investment to mair quality employers. Across all of th role is to be a credible, predictabl( EXISTING CONDITIONS & KEY TRENDS Mount Prospect's economy is anchored by a mix of retail, manufacturing, professional services, and wholesale trade. According to Census data, retail trade accounts for approximately 21 percent of jobs located in the Village, followed by administrative and support services (12 percent), manufacturing (12 percent), wholesale trade (7 percent), and construction (6 percent). The Village's commercial districts include Downtown, Randhurst Village, the Kensington Business Center, the South Mount Prospect industrial area, and key arterial corridors along Rand Road, Golf Road, Elmhurst Road, and Busse Road. Several trends are reshaping the Village's commercial and industrial landscape and inform this chapter's policy direction: Suburban office market softening. Remote and hybrid work patterns have weakened demand for traditional suburban office space, particularly affecting the Kensington Business Center and aging office buildings in South Mount Prospect. These properties require updated land use strategies that allow adaptive reuse and mixed -use conversion rather than waiting for an office market recovery that may not materialize. Downtown momentum and continuing opportunity. Downtown Mount Prospect has benefited from sustained investment, including completed mixed -use projects, residential growth, and active programming. The district is performing relatively well, but opportunities remain to add foot traffic, support small businesses, expand dining and entertainment options, and activate underutilized parcels. High development costs and co landscape. Stakeholder interviev highlighted that rising constructic rates, and tight underwriting star commercial and mixed -use projec without meaningful public partne Regional investment catalysts. developments, most notably the I stadium in nearby Arlington Heigr significant spillover demand for hi entertainment, and service-sectc Prospect is geographically well -pi demand if it has the right land us( sites, and business incentive stra- COMMERCIAL & INDUSTRIAL GUIDE [:3DOWNTOWN CONTINUED ENHANCEMENT Downtown Mount Prospect has clear momentum. Completed and underway residential and mixed -use projects have added density, activity, and investment to the district's walkable core. The Village should continue to support Downtown's evolution by encouraging ground - floor retail and restaurant uses, improving the public realm, and facilitating infill development on underutilized parcels. Maintaining Downtown's role as the civic and social heart of the Village requires sustained attention to design quality, programming, and the business environment. SOUTH MOUNT PROSPECT COMMERCIAL AREAS The commercial areas along Elmhurst Road Golf Road and Algonquin Road serve as important retail and service nodes for surrounding neighborhoods. These corridors share similar characteristics: aging strip commercial development, auto -oriented site design, and a mix of local and national tenants facing ongoing market pressure. Near -term priorities should focus on stabilizing viable businesses, improving site conditions, and encouraging quality infill on vacant or underutilized parcels. Over the long term, as market conditions and land ownership evolve, key intersections along these corridors have potential for modest mixed -use redevelopment that better connects surrounding neighborhoods to goods and services. RAND .. D CORRIDOR & RANDHURST VILLAGE Rand Road and Randhurst Village together form the Village's primary regional commercial spine. Rand Road's diagonal alignment and aging strip commercial development present both challenges and opportunities; the Village should focus on stabilizing viable businesses, improving access and site design where possible, and guiding properties toward formats more compatible with adjacent neighborhoods as they turn over. Randhurst Village remains Several intersections in North Mount Prospect, near the Prospect Heights Metra Station at Wolf Road and Euclid Avenue, as well as along Northwest Highway, are well - suited for small-scale neighborhood commercial nodes. As properties turn over, the Village should encourage one- to two-story mixed -use development with ground -floor retail or services and potentially residential above, scaled to the surrounding neighborhood. Built form should prioritize parking, walkability, and reinforce the street edge to create convenient, neighborhood -serving destinations within walking distance of nearby residents. gi ... >... is � � .... � -:... �... >... �.. The South Mount Prospect industrial area along Algonquin Road and Oakton Street, as well as the Industrial Park on West Central Road are critical parts of the Village's employment and tax base. The Village should focus on retaining existing employers, attracting quality infill uses on vacant and underutilized industrial parcels, and positioning the area for higher -tech, higher -wage users in sectors such as advanced manufacturing, life sciences, and logistics technology. Infrastructure quality, access management, and zoning flexibility will be key tools in making the area competitive for the next generation of industrial tenants. KENSINGTON BUSINESS CENTER The Kensington Business Center on the Village's north side is an established employment hub that has been reshaped by the broader softening of the suburban office market. The Village should support the Center's transition by encouraging adaptive reuse of under -performing office space, attracting technology, research, and professional service users, and maintaining the district's infrastructure and public realm. Kensington's regional accessibility and established identity remain genuine competitive GOAL 13: STRENGTHEN DOWNTOWN AS THE VILLAGE'S PRIMARY ECONOMIC & SOCIAL HUB Downtown Mount Prospect is the Village's most important commercial asset and its strongest economic development success story. Anchored by the Metra UP - Northwest station, supported by walkable street grid, and increasingly populated by new residential development, Downtown has the building blocks of a thriving mixed -use district. Recent investments, including completed mixed - use projects, restaurant openings, and active programming, have reinforced its role as a community gathering place and dining destination. But Downtown is not finished developing and it has even more potential. Vacant or underutilized parcels remain, lunchtime foot traffic is uneven, parking is a frequent point of contention, and the district's evening and weekend activity could be substantially expanded. There is opportunity to build on Downtown's momentum with sustained, focused investment that adds housing, expands the restaurant and retail mix, and continues to enhance the public realm. STRATEGIES A. Reinforce Downtown's role as a dining, shopping, entertainment, and residential hub through infill development, upper -floor activation, attractive streetscapes, and incremental development of parcels as appropriate. B. Prioritize and encourage active, publicly - oriented first -floor uses — such as restaurants, experiential retail, and service businesses — to facilitate walkability, vitality, and a lively Downtown experience. C. Continually upgrade pedestrian infrastructure, lighting, parking access, and wayfinding to foster all -day commercial activity and improve the experience of visiting Downtown on foot. D. Continue to support Downtown programming, events, and partnerships with local community organizations to attract residents and visitors and reinforce the district's identity as the Village's civic and social heart. GOAL 14: CULTIVATE I WALKABLE SECONDJ CENTERS Downtown cannot be the only pla where commercial activity, walkal development come together. The economic vitality depends on ci activity centers in locations th; combination of land availability market potential. Two locations Village and South Mount Prospec- Randhurst Village is the most con first regional shopping malls in thi once a defining feature of suburb, Its partial reinvention as Randhur but the district remains dominate and a scale that limits walkability. opportunity to transform Randhu mixed -use destination that integr entertainment, plazas, and trail cc competes with newer lifestyle cer GOAL 15: BEAUTIFY COMMERCIAL DISTRICTS The physical quality of commercial districts directly affects how often people visit them and how long they stay. Wider sidewalks, street trees, attractive lighting, comfortable seating, and active public spaces can be aesthetically pleasing, and they also serve as economic infrastructure. Visual amenities and the built environment make districts feel safer and more inviting, support outdoor dining and retail, and create the conditions for the kind of unstructured browsing and lingering that drives sales. STRATEGIES A. Upgrade streetscapes with wider sidewalks, greenery, shade, lighting, bike amenities, and pedestrian -focused design in Downtown, Randhurst, and along major commercial corridors. B. Integrate public art, plazas, outdoor dining areas, and seasonal programming to activate commercial districts and create destinations that attract repeat visits and longer stays. C. Establish updated design guidelines for commercial corridors that address building orientation, facade quality, signage, landscaping, and the relationship between buildings and the street. D. Over the coming decades, prioritize corridors for streetscape enhancements and incrementally improve each corridor through investments in landscaping, bike lanes, expanded sidewalks, enhanced traffic management and other design improvements as appropriate. E. Develop a public art plan that identifies priority locations for installations, establishes design and curation standards, and creates a funding strategy to integrate art into streetscapes, gateways, and public spaces as a place -making tool. GOAL 16: INVESTIGAT FEASIBILITY OF NEK SCALE CORNER STG Seventy-six percent of survey i favorable views toward neighbc stores — an unusually strong sii to a use type that is currently a Mount Prospect's residential ar neighborhood -serving retail can walkable amenities, and reinforce without disrupting residential chi is to evaluate the concept careful uses or a pilot program — with str standards that ensure compatibil homes. GOAL 17: REJUVENATE INDUSTRIAL AREAS & IMPROVE COMPATIBILITY Mount Prospect's industrial areas, provide significant employment, tax base, and economic diversity and the Village's long-term economic strategy depends on keeping them viable. But viability requires active management. Aging buildings, deferred infrastructure investment, and changing tenant requirements mean that simply maintaining the status quo will not preserve these districts over the long term. The Village should seek to attract high -quality employers such as technology firms, engineering companies, advanced manufacturing, and professional services, that pay better wages and generate economic spillover. Doing so requires infrastructure upgrades, improved site access, updated land use frameworks, and selective redevelopment of obsolete properties. STRATEGIES A. Attract investment in industrial districts through infrastructure upgrades, improved site access, and active outreach to growing employment sectors. B. Increase the number of businesses with larger employment counts and higher wages, such as technology, engineering, and advanced manufacturing firms. C. Revitalize South Mount Prospect with new investments in infrastructure, updated land use requirements, and strategic incentives that support the area's evolution into a more competitive employment district. D. As the suburban office market evolves, continually transition the Kensington Business Center into a mixed -use business area capable of accommodating a broader range of complementary commercial and service uses. GOAL 18: REVITALIZE CENTERS & CORRIDI Mount Prospect's arterial commei retail, services, and aging strip ce competitive pressure. Some prop while others are struggling to attr The Village cannot sustain failir deploy strategic financial incen improvement grants, interior bi and other economic developme viable tenants get established reinvest in place. GOAL 19: DIVERSIFY THE PILLAGE'S BUSINESS BASE Community engagement made the gaps in Mount Prospect's business mix clear. Residents want more original restaurants, specialty retail, entertainment venues, multicultural businesses, and family -friendly destinations. These are the kinds of businesses that thrive in walkable, diverse communities and Mount Prospect has the population base to support them. STRATEGIES A. Advocate for unique restaurants, specialty retail, entertainment venues, multicultural businesses, and family -friendly destinations to fill identified market gaps and respond to community demand. B. Promote flexible commercial space models such as incubators, co -working spaces, pop -ups, and start-up retail environments that lower barriers to entry for new businesses and reduce vacancies. C. Proactively support 6b tax classifications and renewals as a recruitment and retention tool to attract new businesses and support the long-term viability of existing ones, leveraging the property tax reduction to ensure Mount Prospect is a competitive place to do business. GOAL 20: ADVANCE h PROSPECT'S IDENTI I Mount Prospect's competitive po: on how the Village is perceived by businesses considering where to considering where to invest. Stak consistently identified Mount P modernized economic brand as Other suburban communities hav branding, marketing, and distinct them as destinations. Mount Pros the same. GOAL 21: CHAMPION BUSINESS RETENTION & A STRONG INVESTMENT CLIMATE Business retention is critical to the Village's long-term advancement. Existing businesses are the foundation of the local economy and serve as credible advocates for the Village among prospective investors. Improving the investment climate requires action on multiple fronts: continually working to streamline permitting and development review, providing predictable and transparent processes, deploying incentives strategically and competitively, and maintaining ongoing communication with the businesses that drive the local economy. STRATEGIES A. Continually streamline permitting and development processes to provide clarity, predictability, and efficiency for property owners, businesses, and investors. B. Use incentives, including grants, Tax Increment Financing (TIF), sales tax incentives, and other financing alternatives to strategically create catalytic projects that would not otherwise be possible, particularly in key activity centers. C. Reinforce communication and partnerships with business owners, developers, and regional economic organizations through ongoing outreach, business retention visits, and proactive coordination. D. Proactively support 7b and 7ctax classifications where applicable to support the rehabilitation and re -occupancy of underutilized commercial and mixed -use properties, reducing carrying costs for investors and making redevelopment more financially feasible in key activity centers. E. Promote and consider expansions to the facade improvement and interior buildout program to help existing businesses reinvest in their properties, improve the visual quality of the community, and riarli inn ♦hn nnc♦ horrinr fnr MMIAi ♦ian0n+c nnni irwinry GOAL 22: LEVERAGE I ASSETS & MAJOR DE Mount Prospect does not exist in economic future is affected by including the strength of the CI economy, the activity of O'Hare and Chicago Executive Airport, investments at the regional scc- development projects in nearby Village is home to an increasingly which could have positive spillovE Prospect. And the most consequE is perhaps the proposed Chicago Heights, which has the potential t spillover demand for hospitality, d and service -sector businesses. M geographically well -positioned to share of that demand if it has the infrastructure in place. 11111INN"M The Village's transportation network is its circulatory system: when it works well, residents have choices, businesses thrive, and neighborhoods feel connected. When it falls short, the consequences show up as congestion, safety hazards, limited access for non -drivers, and a diminished quality of life that no amount of good land use planning can overcome. Mount Prospect benefits from strong regional connectivity. Interstate 90 runs along the Village's southern boundary, major arterials like Rand Road and Elmhurst Road carry to attract both recreational and functional users. Pace bus service operates at frequencies and coverage levels that limit its usefulness for daily trips. And traffic congestion at key intersections, particularly along Rand Road, Central Road, and Northwest Highway, remains a persistent frustration for residents and commuters alike. Community engagement was emphatic on these points. Seventy-four percent of survey respondents said they would walk more if additional safe sidewalk and trail connections existed. Sixty percent wanted better bike lanes BACKGRO-.,.----- _ Mount Prospect's transportation most residents will continue to dr the Village's road network Must fL a transportation system that wort system that fails seniors who can who cannot yet drive, residents w car or cannot afford one, and anyi walk to the store without crossinc A genuinely multimodal network transit are safe, convenient, and c advantage that attracts residents and improves property values. EXISTING CONDITIONS & KEY TRENDS Mount Prospect's transportation network reflects its post-war suburban origins: a hierarchical roadway system designed primarily around automobile circulation, with pedestrian and bicycle infrastructure added overtime. The Village maintains approximately28 miles of signed bike routes and has implemented marked bike lanes and #Isharrows" on several streets, but no fully protected on - street bicycle facilities yet exist. A shared -use path was completed along a portion of Rand Road in 2024, and additional paths are planned along Rand, Busse, Algonquin, and Kensington. Several trends are reshaping the Village's transportation landscape: Incomplete pedestrian networks. Sidewalk gaps persist in several residential neighborhoods, particularly in areas developed or annexed before the Village required sidewalks. These gaps limit safe walking routes to schools, parks, transit stops, and commercial areas. A growing bicycle system. The Arterial Bike Network Study inventoried existing facilities across fourteen corridors and identified connectivity gaps between neighborhoods, schools, parks, and transit. Expanding the network will require a range of treatments suited to each corridor, including off-street paths on arterials and enhanced wayfinding on neighborhood streets. M e mri Signed Bike Routes \� 0 Mimles Fully-Protected Bike Routes Limited transit frequency and c routes serve the Village but opera coverage levels that do not suppc mobility. Metra provides strong PE service, but off-peak and weeken, utility for non -work trips. A Mount was completed in 2025 to assess improvements. Congestion at key intersection: complex intersection geometry, a create persistent congestion alor Intersections along Rand Road, G Northwest Highway are consister problem areas. ,, it z 3 z TRANSPORTATION & MOBILITY GUIDE Mount Prospect's key corridors - including Elmhurst Road, Main Street, Central Road, Busse Avenue, Golf Road, Algonquin Road, Dempster Street, Oakton Street, Rand Road, Wolf Road, and Euclid Avenue - are guided by design standards that no longer fully reflect contemporary best practices. Updated standards should address boulevard treatments, landscaping, traffic calming, signal timing and pedestrian access, with a framework that can be tailored corridor -by -corridor and revised overtime as market conditions and development patterns continue to evolve. ARTERIAL BIKE NETWORK PROPOSED ROUTES The Village's Arterial Bike Network Stud identifies 18 Y corridors for side -paths, shared -use paths, and on -street facilities connecting residential areas to Downtown, Metra stations, schools, and regional trails. Implementation should be phased based on corridor readiness, right-of-way availability, and proximity to key destinations, with priority given to routes that close existing gaps or improve transit access. FILLING SIDEWALK GAPS The Mount Prospect Metra station is the Village's most valuable transit asset and a downtown anchor. The Village should invest in the station's surrounding environment — bicycle parking, wayfinding, lighting, and pedestrian connections — and engage Metra on improving off-peak and weekend service frequency consistent with Metra's regional rail vision. Pace's Revision Plan designates Golf Road as a future Pulse corridor with 15- to 30-minute frequencies, significantly improving its usefulness for non -commute trips. The Village should support the Pulse designation, coordinate on bus stop infrastructure upgrades, and ensure land use patterns alongthe corridor support hi her-fre uenc transit over pp q Y g time. RAND/KENSINGTON/ELMHURST INTERSECTION The intersection of Rand Road, Kensington Road, and Route 83 is among the most congested in the Village, with peak wait times reaching six minutes. The Village recently secured a $7 million grant for intersection improvements and should advance design and construction in coordination with IDOT, ensuring the project addresses pedestrian and bicycle crossings alongside vehicle throughput. GOAL 23: ADDRESS SAFETY FOR ALL FORMS OF TRANSPORTATION Traffic safety is a daily concern for everyone. Pedestrian and bicycle crashes, near -misses at poorly designed intersections, and speeding on residential streets affect quality of life and the sense of security that defines a walkable community. Community survey results identified unsafe crossings, poor intersection visibility, and school - area conflicts as top concerns -- findings consistent with the Village's own crash data and the ongoing work of the Central Road Pedestrian Corridor Study. Mount Prospect has invested significantly in safety over the past two decades through its Traffic Calming Program, school -area improvements, and targeted infrastructure projects. Continuing that progress requires a balanced approach: engineering solutions where physical conditions create risk, combined with education and enforcement where behavior is the primary factor. Street design should reduce vehicle speeds where conflicts with pedestrians and cyclists are most likely, improve visibility at intersections and crossings, and provide infrastructure that physically separates vulnerable road users from high-speed traffic where feasible. STRATEGIES A. Implement street design improvements that reduce vehicle speeds and enhance visibility at high -risk intersections and corridors, including curb extensions, raised crosswalks, median refuge islands, grade separations, and signal timing adjustments. B. Incorporate pedestrian safety features - including Rectangular Rapid Flashing Beacons, pedestrian -activated signals, improved lighting, and high -visibility crosswalk markings -- at priority locations identified through crash data and community input. C. Continue Safe Routes to School initiatives, addressing circulation conflicts, pickup and drop- off congestion, and bicycle and pedestrian access near school campuses, with particular attention to emerging e-bike safety considerations. D. Pursue corridor -level safety improvements on state and county routes through coordination with IDOT and Cook County, advocating for designs that balance regional throughput with local safety and access needs. GOAL 24: INVEST IN TRANSPORTATION A connected multimodal network infrastructure that makes walkab Without safe sidewalks, protectec transit connections, even the bes developments remain auto-deper has made meaningful progress and pedestrian infrastructure, remain, particularly between re and the schools, parks, commei stops that residents need to rei The Arterial Bike Network Study p for the bicycle network's next phi recommendations, including prot roads, shared -use path extensior intersection treatments, will be ec network from a collection of discc coherent, usable system. Simulta gaps in residential areas and impr infrastructure along commercial c mobility options for the one -quart either too young or too old to drive E. Expand education and enforcement efforts targeting distracted driving, speeding, and failure- +n-winirl hohoxiinrc in nr%nrrlinn+inn inii+h +kn Dnlinn GOAL 25: SUPPORT PUBLIC TRANSIT ACCESS & RELIABILITY Public transit is key to regional mobility in the Chicago Metropolitan Region. Residents who cannot drive, including seniors, people with disabilities, and zero and one -car households, depend on transit for access to employment, healthcare, and daily services. Metra's Union Pacific Northwest Line provides strong peak -period commuter service, but off-peak and weekend frequencies limit its usefulness for non -work trips. Pace bus service covers several corridors but operates at intervals that make transit an impractical choice for most daily needs. Pace's proposed Pulse bus rapid transit service along Golf Road represents a significant opportunity for Mount Prospect to anchor high -quality transit service with supportive land use and station -area investments. The Village should position itself as a proactive transit partner with these agencies. STRATEGIES A. Reinforce Metra's and Pace's efforts to increase service frequency, expand weekend service, and refresh station facilities, advocating for improvements that serve Mount Prospect residents' evolving travel patterns. B. Support the potential Pace Pulse bus service along Golf Road, Elmhurst Road, and other corridors, and prepare station -area streetscape and access improvements to maximize ridership and development potential. C. Update transit stops with improved shelters, seating, lighting, heating pads, and real-time arrival information to enhance rider comfort and attract new users. D. Align land -use decisions with transit improvements to encourage transit -supportive development patterns, including higher densities and mixed uses within a quarter -mile of high - frequency transit stops. GOAL 26: REDUCE CD MODERNIZE TRAFFIC Traffic congestion along Mount Pr is a quality -of -life issue that resid rank among their top frustrations, uncoordinated intersection opera traffic volumes, particularly along Central Road, and Northwest Higr outcomes that affect commuters operators, and emergency respor continue to work with IDOT and refinements in the road system operational improvements, and GOAL 27: EMBRACE EMERGING MOBILITY & SUSTAINABILITY PRACTICES The transportation sector is undergoing rapid technological change. Electric vehicles are approaching mainstream adoption, autonomous vehicle technology continues to advance, and micro -mobility options such as a -bikes and e-scooters are emerging. Mount Prospect should prepare for these shifts proactively rather than reactively, building the infrastructure and regulatory frameworks that allow emerging technologies to serve residents effectively. At the same time, transportation is the Village's largest source of carbon emissions. Shifting trips from single - occupancy vehicles to walking, biking, and transit, and facilitating the transition to electric vehicles, represents the most impactful sustainability strategy the Village can pursue through its transportation investments. STRATEGIES A. Reinforce walking, biking, and transit as preferred modes for short and medium -distance trips to reduce per -capita vehicle miles traveled, emissions, and congestion. B. Foster electric vehicle charging infrastructure in public facilities, commercial developments, and redevelopment areas, working with private partners to ensure charging access keeps pace with adoption rates. C. Plan for autonomous vehicle readiness through updated curb management strategies, designated pickup and drop-off zones, and regulatory frameworks that can adapt as the technology matures. GOAL 28: REJUVENAT CONNECTIVITY, & TR EXPERIENCE The experience and ease of movir Prospect matters as much as the network. Clear wayfinding, attract lit corridors, and cohesive signag( easier, encourage walking and bik Village's identity across its distinc commercial districts. Communitj identified wayfinding gaps and quality as barriers to comfortal for pedestrians and cyclists nai neighborhoods and commercia Community facilities and infrastructure are the physical backbone of public life in Mount Prospect. Village Hall, fire stations, police headquarters, the public library, schools, recreation centers, and the Village Resource Center all serve functions residents depend on everyday. Their condition, capacity, and location directly affect public safety, educational quality, recreational opportunity, and the Village's ability to serve an increasingly diverse and aging population. But real pressures exist. Much of the Village's water, sewer, and stormwater infrastructure dates to the post- war building boom and will require ongoing reinvestment. Flooding remains a recurring concern in areas with undersized drainage systems. Police and fire departments face rising call volumes, growing mental health -related calls, and recruitment challenges. And residents consistently expressed a desire for more indoor gathering spaces, youth programming, and multigenerational amenities. This chapter establishes the policy framework +r► ru i;r4,n r+nmmi ir%i+v fnr-ili+,,i nnA ir►frnc+ri in+i iro irioc+men+ BACKGRO_.,._____ _ _ Mount Prospect's community faci straightforward: maintain the higl residents have come to expect wl systems and spaces that support investment is not always exciting important things a municipality di often compounds overtime in wa expensive to address later. The st prioritize proactive reinvestment, and facility planning that reflects EXISTING CONDITIONS & KEY TRENDS Mount Prospect's community facilities reflect the Village's maturity as a built -out suburban community: the foundational infrastructure is in place, but some of it likely requires investment to meet current standards and future demand. Several trends are driving the need for updated facilities planning: Aging water, sewer, and stormwater infrastructure. Much of the Village's underground infrastructure dates to the 1950s through 1970s and is approaching or exceeding its design life. As of 2026, the Village Public Works Department is developing a Stormwater Management Master Plan to prioritize drainage improvements, evaluate green infrastructure opportunities, and guide long-term capital investment. Rising and diversifying public safety demand. Police and fire departments report increasing call volumes and growing complexity, including a significant rise in mental health - related calls. Both departments face recruitment challenges that affect staffing levels. Emerging risks, including lithium - ion battery fires in residential and commercial settings, are adding new response and prevention requirements. Growing demand for indoor community gathering spaces. Residents across all engagement activities - from visioning workshops to the Prospect High School student session - expressed a strong desire for more indoor spaces for recreation, youth programming, teen hangouts, and multigenerational activity. The Community Connections Center in South Mount Prospect serves a critical function but cannot meet Village -wide demand alone. School facility modernization n interviews highlighted aging builc gaps, and the need for long -rang( aligns with enrollment trends and Park district capital investment authorized major improvements ca RecPlex and at Lions Memorial Pa improvements include a new corn recreation center, arts spaces, an These investments will significani recreation infrastructure and reps opportunity to position parks as c COMMUNITY FACILITIES GUIDE MAINTAIN VILLAGE BUILDING7 Village Hall, the police station, fire stations, and other municipal facilities require ongoing investment to remain functional, safe, and efficient. The Village should continue a proactive capital maintenance program that addresses building systems, accessibility improvements, and energy efficiency upgrades before deferred maintenance becomes costly. Facility condition assessments should inform annual capital budgeting to ensure resources are allocated based on need. NEW VILLAGE RESOURCE CENTER -0-Mi The Village recently purchased a property at 1601 E. Algonquin Road to serve as the future home of a new Village Resource Center. The existing center, a partnership between the Village's Human Services Department and the Mount Prospect Public Library, has served South Mount p Y Prospect residents since 2009, providing social services, library access, health services, and police outreach. A needs assessment completed in August 2025 will guide the expansion's programming and scope. The new facility represents a long-term commitment to serving the diverse needs of South Mount Prospect residents in a modern, purpose-built space. [:3LIONS PARK AND LINCOLN MIDDLE SCHOOL November 2024 was a landmark moment for community facilities in Mount Prospect. Voters approved a $46.2 million Mount Prospect Park District bond referendum to replace the aging Lions Recreation Center, replace the Big Surf Wave Pool with a new all -ages community pool, add outdoor courts and amenities at Lions Memorial Park, and add air conditioning and a turf field at RecPlex. Separately, voters also approved an $85 million District 57 referendum to construct a new 127,000-square-foot Lincoln Middle School — replacing a building originally constructed in 1953 — and expand Westbrook School for Young Learners to accommodate full -day kindergarten, with construction aiming for completion by the 2027 school year. Together, these investments represent a generational reinvestment in the community's parks and schools. MAINTAIN UTILITIES Water, sewer, and stormwater infrastructure underpin everything the Village does. The Village should continue systematic water main replacement, sewer rehabilitation, and stormwater management improvements, prioritizing areas with aging infrastructure or known capacity constraints. Capital programming should be guided by infrastructure condition data and coordinated with street and sidewalk improvements to minimize disruption and cost. GOAL 29: MODERNIZE CRITICAL INFRASTRUCTURE The condition of Mount Prospect's underground and surface infrastructure determines the reliability of the services residents depend on most: clean water, functioning sewers, passable roads, and drainage systems that keep homes and businesses from flooding. The Village's Public Works department manages these systems on a daily basis. Flooding is the most visible infrastructure challenge and the Village has dedicated significant resources to addressing it. Intense rainfall events overwhelm portions of the storm sewer system, leading to street flooding, basement backups, and damage to public and private property. The Stormwater Management Master Plan currently in development will provide the analytical foundation fora prioritized, phased program of drainage improvements. The comprehensive plan supports and reinforces that effort as a top Village priority. STRATEGIES A. Upgrade aging water, sewer, roadway, and stormwater systems through a capital reinvestment program that addresses the highest - risk and highest -impact infrastructure first. B. Mitigate flooding through a combination of traditional infrastructure upgrades, green infrastructure (including bioswales, permeable paving, rain gardens, and naturalized stormwater systems) and strategic capital projects informed by the Stormwater Management Master Plan. C. Align infrastructure upgrades with designated opportunity areas and the Village's capital improvement program, ensuring that infrastructure investment supports and enables the land use patterns envisioned by the Future Land Use Guide. D. Evaluate the infrastructure and utility impacts of large-scale energy and water -intensive land uses, such as data centers and distribution facilities, when reviewing development proposals, and ensure that any approvals reflect realistic assessments of system capacity, cost recovery, and long-term operational implications for the Village. GOAL 30: REINFORCE SERVICES & FACILIT Mount Prospect's police and fire c regarded by residents and consis- quality service. Maintaining that increasing call volumes, evolvir recruitment challenges require in staffing, training, equipment, GOAL 31: REVITALIZE COMMUNITY FACILITIES Community facilities are places to gather, learn, recreate, and connect. The Community Connections Center, the Mount Prospect Public Library, recreation centers operated by the park districts, and school buildings all serve overlapping functions as community anchors. Ensuring that these facilities are accessible, well -maintained, and responsive to changing needs is essential to the Village's quality of life. Referendum -funded capital projects for the Mt. Prospect Park District represent a transformative investment opportunity. Lions Memorial Park improvements will deliver a new community pool, expanded recreation center with arts and fitness programming, and an indoor walking track - directly addressing the community's most frequently requested amenities. The Village should leverage these investments as catalysts for broader neighborhood improvement and community identity. STRATEGIES A. Expand Village Resource Center programming and capacity for multigenerational recreation, health, and social amenities in South Mount Prospect, ensuring equitable access to services across all parts of the Village. B. Improve ADA accessibility across all Village facilities, parks, schools, and public spaces, coordinating with partner agencies to ensure that accessibility upgrades are prioritized in capital planning. C. Modernize schools and learning environments through collaboration with local school districts, and park districts, including coordinated long- range facility planning, enrollment forecasting, and joint -use agreements that maximize community benefit. GOAL 32: INCREASE 1 FREE, WELCOMING C GATHERING SPACES FOR CHILDREN & TE The demand for gathering spaces outdoor) was one of the most con all engagement activities. Resider informally, attend events, and par and cultural programming, but thi came from young people. Teens School visioning event and acrc described a shrinking landscap without being expected to sper free -to -enter indoor malls and sir a real gap in recent decades, and children, teens, and young adults on welcoming, low-cost public sp These needs cannot be met by a require a distributed network of g public and private, indoor and out neighborhoods, commercial distri projects throughout the Village, s programming that gives residentIc GOAL 33: ADVANCE SUSTAINABILITY & RESILIENCE IN PUBLIC FACILITIES The Village's own buildings and operations represent an opportunity to lead by example on sustainability and resilience. Energy -efficient systems, renewable energy installations, and environmentally responsible building practices reduce long-term operating costs while demonstrating the feasibility and value of sustainable design to the broader community. The Sustainability Committee's engagement feedback called for clearer leadership on these issues. STRATEGIES A. Incorporate energy -efficient systems, renewable energy, and sustainable design practices into new and renovated Village - owned facilities, prioritizing investments with demonstrable life -cycle cost savings. B. Incorporate environmentally responsible building and site design practices where feasible at Village -owned buildings and properties, including native landscaping, stormwater management features, and waste reduction measures. C. Evaluate and consider supporting green infrastructure approaches, including bioswales, rain gardens, and permeable paving - when designing and reconstructing streetscapes, parking lots, public open spaces, and Village - owned facilities, where feasible and consistent with maintenance and operational considerations. D. Continue to Support the Green Building Grants Program to incentivize property owners and developers to incorporate energy -efficient systems, sustainable materials, and environmentally responsible design practices into new construction and renovation projects throughout the Village. GOAL 34: CATALYZE P & COMMUNICATION Mount Prospect does not deliver c alone. Park districts, school distric and regional partners all play essE of coordination among these er service delivery, capital efficier ability to respond to emerging r interviews throughout the engag( communication gaps between loc theme because institutional struc facilitate proactive alignment. GOAL 35: BOOST COMMUNITY GROWTH THROUGH STRATEGIC INVESTMENT In addition to being a service delivery mechanism, community facilities can be an economic development tool. High -quality schools, parks, public safety, and civic amenities are among the most important factors that attract and retain residents and businesses. Strategic facility investments in key districts, particularly Downtown, Randhurst, and South Mount Prospect, can serve as catalysts for broader reinvestment and community improvement. S' R A Z-AS' A. Ensure that facility planning reflects demographic trends, including the needs of seniors, youth, families, and diverse populations, and that investments are calibrated to serve the community Mount Prospect is becoming, not just the community it has been. B. Leverage redevelopment opportunities to incorporate new or improved civic facilities, including community rooms, public restrooms, event infrastructure, and public art, in key districts where new development is occurring. Parks and open spaces are among the most tangible expressions of a community's quality of life — where children play, families gather, seniors walk, and neighbors connect in ways that build social fabric. In a built -out community like Mount Prospect, every acre of open space matters. Mount Prospect's park system is a genuine strength. The Mt. Prospect Park District and River Trails Park District together manage more than 60 acres of parkland across community, •ter A r ,%A.,r, Cirvk�lI �1,11/1 e%-F incomplete. South Mount Prospect and portions of the northeast lack the same level of access as central neighborhoods. And residents consistently identified a desire for more nature trails, passive recreation spaces, and year-round programming beyond organized athletics. Environmental stewardship is equally central to this chapter. Flooding and stormwater management are inseparable from how land is used and developed. The Village's tree canopy and natural areas provide measurable �kr�I Iry k�,%4- re%Ai o^�i�r% BACKGRO-.,.----- Mount Prospect's parks and envir in two complementary objectives improving the physical park syste and strengthening the Village's er in ways that are practical, measur fiscal realities. The Village already active park districts, and a growin sustainability. This chapter focus( strengths to close remaining acc( aging facilities, connecting the sy pathways, and integrating enviroi everyday land use and developmE EXISTING CONDITIONS & KEY TRENDS Mount Prospect's park system includes six large multi- use parks (15+ acres each), 21 neighborhood parks (1-14 acres each), five mini parks (under1 acre each), multiple recreation and fitness centers, aquatic facilities, and the Mount Prospect Golf Club. The system is supported by several independent park districts with their own taxing authority, governance, and capital planning processes. Several trends are shaping the park and environmental landscape: Two independent park districts primarily serve Mount Prospect, each with its own taxing authority, governance, and capital planning. The Mount Prospect Park District covers the majority of the Village, while the River Trails Park District serves the northern portion of Mount Prospect and neighboring Prospect Heights. River Trails operates nine parks and a range of facilities including the Weiss and Burning Bush Community Centers, Woodland Trails Pool and Aquatic Facility, and Rob Roy Golf Course, offering programs in athletics, arts, fitness, and recreation for all ages. Strong coverage with remaining access gaps. While 97 percent of residential parcels are within a half -mile of a park, approximately 3 percent (concentrated in South Mount Prospect) are more than a half -mile from the nearest park. These gaps represent opportunities for pocket parks, trail connections, or creative use of redevelopment sites to expand access. Aging park infrastructure requi Playgrounds, athletic fields, aquai buildings across the system requi 2024 Lions Park referendum auth improvements, including a new cc recreation center, arts space, and that will address some of the corn requested amenities. The project will be completed in 2027. Growing demand for passive rei access. Engagement activities c( trails, gardens, native landscapes nature -based recreation as high I presents a particular opportunity and naturalization, subject to fea! maintenance considerations. PARKS & ENVIRONMENT GUIDE MAINTAIN PARKS Mount Prospect has a well -distributed park system serving the majority of residents within a quarter mile of open space. The Village and Park District should continue proactive maintenance of existing parks, prioritizing safety, accessibility, and programming quality. As facilities age, capital reinvestment should focus on upgrading amenities, improving ADA accessibility, and ensuring parks remain functional and attractive for a range of ages and abilities. CREEK IMPROVEMENTS Weller Creek, McDonald Creek and Higgins Creek are important drainage corridors in Mount Prospect and represent important opportunities for environmental stewardship, flood mitigation, and recreational connectivity. The Village should prioritize naturalized bankings, native plantings, and trail connections along Weller Creek and McDonald Creek. Along Higgins Creek, the Village should focus on flood mitigation efforts - including stormwater detention, channel improvements, and coordination with neighboring municipalities - to reduce risk and improve resilience in affected neighborhoods. LIONS MEMORIAL PARK IMPROVEMENTS Voters approved a $46.2 million Mount Prospect Park District referendum in November 2024 to reinvest in the FOCUS AREAS FOR NEW PARKS Ideally, every resident lives within a 5 minute walk from a ark (approximately a 1 4 mile radius). Most of the Village p C pp Y ) g already meets that standard, but gaps remain. The Village should prioritize these underserved areas when evaluating land acquisition, pocket park opportunities, or public access agreements as redevelopment occurs. Weller Creek and its corridor present additional opportunities to expand linear green space connections between existing parks. Even modest additions in gap areas would meaningfully improve access for residents currently without a nearby option. non Da rk D'strict I ON Tamarak Park Robert Frost Pa Redwood Park GOAL 36: IMPROVE ACCESS TO PARKS, OPEN SPACE, & RECREATION Park access is a foundational quality -of -life issue. Every resident of Mount Prospect should be able to reach a park, playground, or recreational opportunities within a reasonable walk. The Village's park coverage is strong overall, but the remaining gaps, particularly in South Mount Prospect and areas with limited pedestrian connectivity, deserve thoughtful attention. Closing these gaps does not necessarily require large new parks. Pocket parks, trail extensions, shared -use agreements with schools, and green space requirements in redevelopment projects can all contribute to a more equitable distribution of park access. STRATEGIES A. Explore land acquisition, redevelopment partnerships, and new pocket parks in underserved areas, prioritizing locations in South Mount Prospect and neighborhoods more than a half -mile from existing park facilities. B. Link parks, schools, neighborhoods, and commercial areas through trail, sidewalk, and wayfinding networks that create a connected green infrastructure system, not just a collection of isolated park sites. C. Support year-round and all -ages recreation opportunities, including indoor and outdoor amenities that respond to evolving community needs, from splash pads and pickleball courts to nature trails and quiet gardens. GOAL 37: REJUVENATI FACILITIES The quality of park facilities affeci them. Outdated playgrounds, poo aquatic facilities, and parks that I� restrooms, shade, and seating dis by seniors, young children, and PE The Lions Park referendum reprec single investment in the park syst funding a new community pool, e: center, arts space, and indoor wal will also undergo significant impr( referendum, enhancing one of the used community facilities. The Ri) continually pursuing facility imprc its parks and community centers. with the park districts to ensur extends to system-widefacilit) GOAL 38: ADD NATURAL AMENITIES & PASSIVE RECREATION Not every park visit is about organized athletics. Many residents want access to quieter, nature -oriented spaces such as walking trails, gardens, and areas where they can simply sit and enjoy being outdoors. Weller Creek, which runs through the Village, presents a notable opportunity for trail improvements and naturalization that could create a signature linear green space connecting multiple neighborhoods. Environmental education and interpretive programming also emerged as community interests during engagement. Connecting residents to local ecosystems through signage, storytelling, and partnerships with schools and environmental organizations builds the long-term stewardship ethic that sustains community investment in natural resources. STRATEGIES A. Assess and prioritize opportunities to create or enhance nature trails, quiet zones, gardens, and access to water features and natural amenities, through strategic reforestation, edge treatments, and access improvements, to support wellness, environmental education, and ecological function. B. Evaluate the feasibility and naturalization of trail improvements along Weller Creek, including environmental benefits, access, maintenance considerations, and coordination with relevant agencies. C. Explore interpretive and educational strategies, including signage, environmental storytelling, and partnerships with schools, park districts, and environmental organizations, to strengthen connections between residents and local ecosystems. D. Explore flood mitigation and naturalization opportunities along Higgins Creek in coordination with relevant agencies, including channel improvements, native vegetation, and stormwater management features that reduce flood risk, improve water quality, and enhance the creek corridor as a natural amenity for adjacent neighborhoods. GOAL 39: POSITION F COMMUNITY DESTIN CULTURAL ASSETS Parks are more than recreation civic gathering spaces, cultura shaping community assets. Lioi Veterans Memorial and bandshell, seasonal festivals all demonstratE in building community identity an park districts' referendum improv expanded arts and performance Ic significantly enhance the Village'. as cultural destinations. Public art was one of the most f desires across all engagement sculptures, fountains, and culturce parks and green spaces would str identity and create destinations tl within and beyond the Village. GOAL 40: SUPPORT ENVIRONMENTAL STEWARDSHIP & CLIMATE RESILIENCE Environmental stewardship is a practical response to real challenges. Flooding, tree canopy loss, urban heat, and stormwater management affect property values, infrastructure costs, and daily quality of life. The Village's approach should be grounded in measurable actions with demonstrable benefits — green infrastructure that reduces flooding, tree planting that lowers cooling costs, and sustainable site design that limits runoff are investments that pay for themselves over time. Climate resilience means preparing for conditions the Village already experiences and that are projected to intensify over the plan horizon. Heavier rainfall strains the storm sewer system, hotter summers affect all residents and infrastructure, and drought stress threatens the tree canopy. MP2040 takes a grounded approach: identify vulnerabilities, integrate stormwater and climate improvements into capital projects, coordinate with regional partners, and keep codes current so new construction reflects evolving standards. The SustainabilityCommittee's engagement feedback called for a clearer long-term sustainability vision supported by stronger programs, policy leadership, and community STRATEGIES A. Encourage green infrastructure — including F. Support sustainability i bioswales, rain gardens, and naturalized conservation programs, c stormwater systems — integrating stormwater energy integration, and e management into park, streetscape, and site responsible maintenance design where feasible. resources allow. B. Preserve and expand the Village's tree G. Encourage sustainable canopy by protecting existing trees, planting efficient building practi new trees, and incorporating native landscaping industrial redevelopment and habitat restoration in parks, public spaces, and development areas where consistent with H. Regularly review and ur maintenance and operational considerations. and development codes standards for energy effic C. Integrate green infrastructure and stormwater readiness, and resilient ci improvements into public capital projects, including streetscape reconstruction, park I. Evaluate opportunities renovations, and parking lot redesigns where existing buildings to rec feasible. when consistent with ecc redevelopment objective: D. Continue working with the Metropolitan Water Reclamation District and other regional agencies to coordinate watershed -scale resilience efforts that exceed the Village's individual capacity. E. Continually assess the vulnerability of parks, open spaces, and infrastructure to extreme weather — including flooding, heat, and drought — and factor climate impacts into capital decisions. MP2040 reflects years of technical analysis, community engagement, and policy deliberation, but translating that work into lasting change requires sustained action across Village departments, partner agencies, and the broader community. This chapter bridges the plan's goals and strategies with steps the Village will take to realize them. Implementation does not proceed at a uniform pace. Some actions are immediate priorities that Village staff can advance within existing authority and resources. Others rl�r.�r.rl ter` -Fi iv%A;r%r �r rv•�rL�� Realizing the vision for Mount Prospect's future will require the active engagement of the Village Board, the Planning and Zoning Commission, Village staff, partner agencies, and the private sector. HOW TO USE THIS This chapter is organized in two p that explains the framework for pl the MP2040 Implementation Mati they are intended to serve three functions. FOR VILLAGE STAFF The matrix is a day-to-day referer staff reports, evaluating developn capital projects, or initiating polic, use it to identify the relevant plan that proposed actions are consist direction. The chapter's sections i plan maintenance, and interageni guidance on how the plan should over time. FOR THE PLANNING A COMMISSION AND VI The matrix provides a policy base individual decisions can be evaluc- binding commitments on specific Board retains full authority over c zoning changes, and all policy act What the matrix does provide is a plan's implementing priorities, orc supports annual prioritization anc FOR RESIDENTS, DEV_m PARTNERS The plan and this chapter are pub property owners, businesses, and use MP2040 as the Village's offici� policy and development priorities, PRIORITIZATION AND ANNUAL REVIEW MP2040 covers a 20-year planning horizon, and not all 154 implementing strategies can or should be pursued simultaneously. Priority and timef rame for each action will be determined by the Village Board on a year-to-year basis, informed by available resources, emerging opportunities, changing conditions, and ongoing community input. When preparing for annual strategic planning, Village staff should: Review the Implementation Matrix and identify actions ready for initiation or advancement based on current resources, funding availability, and strategic priorities. • Evaluate progress on actions already underway, noting completions and flagging items that may need to be reprioritized, restructured, or deferred. • Coordinate with partner agencies to align Village priorities with their own capital programs, service plans, and grant application cycles. PLAN MAINTENANCE AND UPDATES MP2040 is a long-range policy document, but should be updated continually. Conditions will change, opportunities will emerge, and some strategies will prove more or less effective than anticipated. The plan should be reviewed regularly and updated as needed to ensure it remains responsive to the community it serves. Village staff should regularly review the plan to assess whether its goals, strategies, and implementing actions remain relevant given current conditions, and to determine whether any amendments are warranted. A more comprehensive update — addressing major policy questions, revisiting the Future Land Use Guide, or responding to significant shifts in the regional context — should be initiated approximately every seven to ten years, or sooner if circumstances warrant. The matrix on the following pages represents the Village's best current assessment of what needs to be done, by whom, and in what domain. It will evolve as implementation proceeds. INTERAGENCY COON PARTNERSHIPS Many of MP2040's goals extend b( can accomplish alone. Park distric- authorities, Cook County, IDOT, CIN Reclamation District, and neighbor roles in the transportation networl community facilities, and economi the plan addresses. Sustained coc key to implementing many of the r Key partner categories identifie include: • Regional transportation IDOT for transit investmer intersection improvemeni projects. • Park districts. The Mt. Pr Trails Park District for party connections, and environs • School districts. District Township High School Dis School, joint facility use, a Mount Prospect Public L outreach, programming a • Cook County. For properl abatements), infrastructu housing and economic de • CMAP and regional plane technical assistance, grar fora Changing Region), at transportation, housing, a • The Metropolitan Water FUNDING IMPLEMENTATION PARKS, TRAILS, AND OPEN SPACE THE IMPLEMENTATIC Implementing a 10+ year comprehensive plan requires sustained investment from multiple sources. The Village can lead on many initaitves, but federal, state, and regional funding programs are essential for larger infrastructure investments, transportation projects, and targeted economic development initiatives. Key funding categories relevant to MP2040 implementation are sorted by category below: Tax Increment Financing (TIF) districts, sales tax incentives, Business Development Districts and fagade improvement programs are tools already in the Village's economic development toolkit. The bb, 7b, and 7c Cook County property tax classifications, targeted to industrial rehabilitation and commercial reinvestment respectively, should be proactively supported for qualifying projects. CMAP, the Illinois Department of Commerce and Economic Opportunity (DCEO), and regional economic development organizations are additional resources for business recruitment, technical assistance, and small business support. Federal Surface Transportation Block Grant Program (STBGP) and Congestion Mitigation and Air Quality Improvement (CMAQ) funds, administered through CMAP and IDOT, are the primary sources for major roadway, bicycle network, and pedestrian infrastructure projects. The Highway Safety Improvement Program (HSIP) supports targeted safety interventions. Safe Routes to School (SRTS) funds pedestrian and bicycle improvements near school campuses at up to 100 percent reimbursement. The Illinois Motor Fuel Tax (MFT) Fund provides annual distributions for roadway maintenance and improvement. The Illinois Department of Natural Resources (IDNR) administers the Open Space Land Acquisition and Development (OSLAD) program, the Park and Recreational Facilities Construction (PARC) program, and the Illinois Trails Grant Programs — each providing cost -share funding for land acquisition, park development, and trail construction. The federal Recreational Trails Program and Land and Water Conservation Fund (LWCF) are additional sources for trail - related and open space investments. ff-"w"OMMUNITY FACILITIES AND GREEN INFRASTRUCTURE Community Development Block Grant (CDBG) funds through the Cook County HOME Consortium support housing rehabilitation, accessibility improvements, and community facility investments serving lower -income populations. The Illinois Environmental Protection Agency (IEPA) administers several green infrastructure and water quality grant programs relevant to the Village's stormwater management priorities. Energy efficiency programs through DCEO and the Illinois Environmental Trust Fund can support sustainability investments in Village -owned facilities. Funding programs, eligibility requirements, and application deadlines change overtime. Village staff should continue to monitor rant announcements through CMAP IDOT IDNR g g , DCEO, and Cook County on an ongoing basis, and should coordinate the Village's grant application calendar with the annual implementation review process to ensure priority projects are ready when funding opportunities become available. The MP2040 Implementation Mat pages identifies 154 specific impl( from the plan's six topical chapter and Neighborhoods, Commercial Transportation and Mobility, Comr and Environment. • Each action is keyed to a in the plan using the refe introduced in this chap to 1.A refers to Goal 1 StratE chapter). • Actions are grouped basE years), long-term (5+ yea timeframes. Land Housing - L —1 rans-pollaxi-on-unity t Use Neighborhoods Environment 8.A 8.113 8.11) 8.E 9.11) 9.E 9.F 9.0 11.0 Identify subarea plan candidates Identify subarea based on redevelopment potential, Land Use Community plan candidates infrastructure needs, transit Development proximity, or land use pressures Engage Engage stakeholders within Community stakeholders in and adjacent to subarea plan Development subarea planning boundaries in the planning process Use subarea Use subarea plans as a tool for plans to shape shaping developer conversations Community development p and establishing community Development p expectations expectations before proposals come forward Adopt subarea Adopt subarea plans as official Community plans as official Village policy and reference them Development policy p Y in zoning and development review g p Investigate moving overhead Investigate utility utilities underground where Housing undergrounding feasible to reduce tree canopy � .Public Works eighborhoods interference, improve aesthetics, and enhance reliability Beautify Beautify community gateways with Public Works community special signage, landscaping, and Housing / Community gateways entry design features that convey - h Development a welcoming sense of arrival Expand Consider sponsoring additional community programs, activities, events, and Housing Village Manager's programs and celebrations that stimulate public Neighborhoods Office events involvement and foster community spirit Improve and expand existing Improve community gathering spaces He-usingCommunity Downtown in Downtown to better host Neighborhoods Development gathering spaces events and support seasonal programming Investigate greater flexibility in Investigate housing types, densities, and housing type mixed -use formats in walkable Housing & Community flexibilityareas and subareas, without = rho Development uniform density increases in established neighborhoods Evaluate fiscally responsible Finance / Evaluate housing funding tools and incentive Housing & Community funding tools programs that help offset rising rho Development nnnOn intinn nnri finnnninn nn-qt-q Village Board; P&Z Commission Residents; property owners; businesses Developers; property owners Village Board; P&Z Commission ComEd; utility providers; Finance Park Districts; IDOT Human Services; Park Districts; Library Park Districts; business community Village Board; P&Z Commission IHDA; Cook County; Village Board Land Housing Use Neighborhoods Establish Est commercial gu 15.0 corridor design on guidelines Sig bu De Develop a public ide 15.E art plan esi stc- str Eve Evaluate corner prc 16.A store regulatory col approaches sm cai De Develop context- opi 16.113 sensitive corner stc- store standards sits Iigl Assess parking As and access for str 16.0 neighborhood col retail ani str Bu Investigate inv 20.A an updated Vill economic brand Mo de! Evaluate Village Eve 20.6 logo and branding ani updates col col Expand facade Pr( 21.E and interior to buildout program int it a Consider Co 26.A adaptive signal wig technologies t ra art PIC- Plan for up 27.0 autonomous %or% Ie% P-e%.%.4i r%�e+e+ de -VnI Land Use Housing - - rho - - --- ( crans-l �€ _ --unity t PEa _ -L- - v _ _ t is "p"row A 9 Expand Village Resource Center Expand Village programming and capacity for i - - Library; Park 31.A Resource Center multigenerational recreation, � � Faci Human Services Districts; Cook capacity health, and social amenities in - County South Mount Prospect Evaluate leveraging the Lions Leverage Memorial Park Community Center 32.0 Lions Park and and expanded Village Resource - --u -ity Human Services Park Districts; Resource Center Center as anchors for youth and t Library as anchors multi -generational programming and gathering Evaluate the feasibility Evaluate Weller and naturalization of trail Community 38.113 trail improvements along Weller - - � Development / Park Districts; .Creek feasibility Creek, including environmental - -vg€ie- Public Works MWRD; Finance benefits, access, and maintenance considerations Explore p Explore interpretive and environmental educational strategies — signage, Parks _ Park Districts School Districts; 38.0 education environmental storytelling, - - R / Community Library strategies partnerships with schools and Development p environmental organizations Explore flood mitigation and Explore Higgins p gg naturalization along Higgins MWRD; 38.113 flood Creek in coordination with Parks - Public Works neighboring .Creek mitigation relevant agencies, including � t municipalities; channel improvements and native Finance vegetation Collaborate with park districts Explore public art and public partners on public Parks Community Finance; arts 39.113 and placemaking art, placemaking elements, and EnvironmentDistricts Development / Park organizations in parks identity -focused features in major parks and green spaces Land Housing Use Neighborhoods Transform Su Randhurst pal 14.A into a walkable tra destination of spi Ov Prioritize pri corridors for enl 15.11) streetscape iml enhancement Ian iml Pr( Prepare for by 22.A regional inc development Be spillover ho gr( Inc act 23.6 Install pedestrian ligl safety features crc loc da- Pursue corridor Pu 23. D safety on state i m l and county routes rOL ID( Expand off- p ExI street trails peg 24.B and pedestrian inc infrastructure wi( be - Fill Fill sidewalk gaps iml 24.0 on arterials str scl col Str Streamline be- 24.113 last -mile transit Ste - connections de! bik inf Su Land Use Housing Neighborhoods -( lx€ -unite ti Paz ks L Environment is "p"row A 9 Update transit stops with improved 25.0 Upgrade transit shelters, seating, lighting, heating _o-tation Public Works Pace; Finance stop amenities pads, and real-time arrival information Support efficiency, queuing, and Improve safety interventions at the most Cook 26.113 congested congested intersections, including i Public Works County; Finance County; intersections turn -lane modifications and signal phasing adjustments Expand wayfinding with consistent Expand the pedestrian, bicycle, and vehicular Public Works 28.A Village wayfinding signage that facilitates navigation - / Community Finance system to parks, neighborhoods, transit, Development and commercial districts Improve ADA accessibility across Improve ADA all Village facilities, parks, schools,unitv - School Districts; 31.B accessibility and public spaces, coordinating Public Works FaCilities - Park Districts; across facilities with partner agencies on capital Finance priorities Leverage redevelopment Incorporate p opportunities to incorporate 35.B civic facilities in new or improved civic facilities p u Community Village Board; redevelopment p — community rooms, restrooms, a Development developers event infrastructure, public art — in key districts Explore new parks Explore land acquisition, Community 36.A in underserved redevelopment partnerships, and - �Development Park Finance; Village pocket parks in underserved areas, _ _ _- Districts Board areas prioritizing South Mount Prospect Link parks, schools, Link parks neighborhoods, and commercial 36.113 through areas through trail, sidewalk, and Parks & Public Works / Park Finance; IDOT; connected wayfinding networks creating a Districts Cook County networks connected green infrastructure system Partner with park districts on Support park planning and enhancing amenities Parks & Community 37.A amenity — restrooms, water stations, Park Districts Development; enhancements lighting, seating, shade, accessible Environment Finance pathways Coordinate Coordinate with park districts and reinvestment public partners on reinvestment _ - Park Districts / Finance; School 37.B in aging ark g g p in playgrounds, athletic fields,ronment -g 4- Public Works Districts infrastructure aquatic facilities, and recreation centers Land Housing Use Neighborhoods En - Preserve mC_ 1.A neighborhood for character sei dei Direct higher- Dir intensity Iari 1.113 development to col key areas Ra0 p Re Require lan 1.0 compatible stc- transitions pla ova Uti Leverage PUDs ani 1.11) for contextual ne, development apl on Su Support mixed- col 2.A use development col wii formats off col Co Improve ani 2.113 design and use tra regulation in to walkable areas apl a rr Prioritize infill Pri 2.0 near Metra rec of stations haI Co Coordinate land wii 2.113 use with transit inv investments of l col Require Re pedestrian- tre 2.E oriented bi k Land Use Housing Neighborhoods -( lx€ -unite tCo - L - Environment maim= Housing Neighborhoods is Rpmrmy A 9 Promote flexibility in land use Support Su Promote designations and development Community Board; the 3.B flexible land use formats, particularly through .Village Development P&Z Commission 5.D .Kensington Business Center int designations increased use of PUDs, to adapt to evolution ace changing market conditions of Encourage g Encourage redevelopment of Alii 3.0 redevelopment of underutilized and obsolete sites,LandUse Community Finance; Align land use Vill obsolete sites including aging office buildings and Development developers 6.A with capital prc under -performing big -box retail planning tra Deploy financial Use TIF, sales tax incentives, and col tools for low -interest financing programs Finance / Village Board; Co 3.D reinvestment to support quality projects in Community Cook County Require adequate deg important reinvestment areas that Development 6.B infrastructure by areas would not otherwise proceed before approval inf Streamline Continually work to streamline apI 3.E permitting and permitting and development Land Use Community Village Manager's Secure Us development review processes to provide clarity, Development Office infrastructure ani review predictability, and efficiency 6.0 through inf Continue Continue to incorporate development col to integrate stormwater management, green Community Sustainability agreements prc 4.A stormwater and infrastructure, and climate Land Use Development / Commission; Co resilience into site resilience into land use planning Public Works MWRD Conduct fiscal an; review and site design review 7.A impact analyses arE Promote infill development for annexation sei Promote efficient patterns that make efficient use of Community pr( 4.B infill development existing land and infrastructure, Development Village Board Evaluate Eve patterns reducing per -capita costs and annexation inf environmental impacts 7.B infrastructure see Protect and enhance natural feasibility ani Protect natural areas, open spaces, and the Park Districts; to 4.0 and tree Village's tree canopy through landLandUse Community Public Works; Ensure En .areas canopy use designations, development Development MWRD consistency arE standards, and agency 8.0 with the Co coordination Comprehensive prc Evaluate Evaluate adaptive reuse of Plan on 4.D adaptive reuse existing buildings as an attractiveLandUse Community Village Board; ciri as demolition alternative to demolition where Development developers Maintain Ma alternative consistent with economic viability neighborhood sid Encourage sustainable site 9.A streetscape qu Encourage design practices, including green Community Public Works; qualities rig 4.E sustainable site space maximization and drainage Land Use Development Sustainability col design practices infrastructure in development, Commission Pr( where feasible Promote high bu Support the gradual transition of 9.113 residential design coi Support industrial aging industrial areas to a mixture standards ch; C A transitions in „,C 1;,yk4- ;�,4, ,��r;.,, ,,,,,�.,.,,,,,...,;.,, .% -%,4 Community Village Board; res Land Use is Housing Neighborhoods - ---( "p"row A lx€ -unity t L Environment Housing Neighborhoods Support pp 9 Support investment in non - accessible restricted market -rate housing Upgrade 10.B market -rate that is accessible and near H= Community Village Board; 15.A commercial housing near healthcare, transit, Downtown - _ i Development developers district amenities, and community streetscapes services facilities Facilitate aging -in -place by Integrate Facilitate aging- encouraging universal design Housing Community Public Works; 15.B art and 10.0 in -place features and first -floor living Neighborhoods Development / Park Districts .public programming configurations, paired with Human Services walkability improvements Ensure new Strategically Encourage duplexes, triplexes, neighborhood encourage quadplexes, and rowhomes Housing Community Village Board; 16.D retail 11.A missing middle through strategic zoning � = ds . Development P&Z Commission complements housing options refinements and design standards existing anchors in appropriate transitional areas Support housingSupport pp incremental increases Village g Attract industrial 11.B Metra in housing within a half -mile of Community Board; Metra; 17.A district .near stations Metra stations by prioritizing infill, Neighborhoods Development developers investment redevelopment, and adaptive reuse Participate in p Support regional housing CMAP; IHDA; 11.E housing planning efforts by participating in Housing Community neighboring higher - .regional planning initiatives such as CMAP's Homes Neighborhoods Development communities 17.B .Recruit wage employers for a Changing Region program Encourage Encourage rehabilitation and IHDA; Cook 12.A modernization of aging multifamily Hu Community County; property Revitalize South .multifamily rehabilitation stock through code requirements Nbh Development owners Prospect and available incentive programs 17.0 .Mount employment Reinforce Downtown's role as a district Reinforce dining, shopping, entertainment, i � � -� � -- Community Village Board; 13.A Downtown's hub and residential hub through � -�� ��� � Development business role infill, upper -floor activation, and community Transition attractive streetscapes 17.113 Kensington Prioritize and encourage active, Business Center 13.113 Prioritize active publicly -oriented first -floor uses Commercial & Community Village Board; first -floor uses such as restaurants, experiential Indust --a- - Development property owners retail, and service businesses Upgrade Continually upgrade pedestrian Public Works Business Support reinvestment 13.0 Downtown infrastructure, lighting, parking m- _r - _ _ _ - � /Community community; 18.A in aging retail pedestrian access, and wayfinding to foster �� Development Finance corridors infrastructure all -day commercial activity Support Continue to support Downtown - CommunityPark Districts; 13.D Downtown programming, events, and - - � - Development / Library; business Introduce programming and partnerships with local community Industrial Village Manager 18.B complementary partnerships organizations .community uses in Land Use Housing - - rho - - - ( crans-l �€ _ --unite t PEa _ -L- - v _ _ t is "p"row A 9 Promote incubators, co -working Promote flexible spaces, pop -ups, and start-up Commercial & Community Cook County; 19.B commercial space retail environments that lower In ri - Development SBA; property models barriers to entry and reduce owners vacancies Proactively support 6b tax Finance / 19.0 Support 6b tax classifications and renewals as a = r - - Community Cook County classifications recruitment and retention tool for -� Indus-�ri- Development Assessor industrial businesses Maintain Maintain consistent branding, Public Works 20.0 consistent signage, district markers, andCommercial - __ /Community Finance brandingand corridor design standards to unify g y Industrial Development signage design across the Village Continually streamline permitting Streamline and development processes to - - Community Village Manager's 21.A permitting for provide clarity, predictability, and - - - -��� Development Office; Building businesses efficiency for owners, businesses, Division and investors Use grants, TIF, sales tax Use incentives for incentives, and other financing mo- Finance / Villa Board; a g ' 21.B catalytic projects alternatives to strategically create - - - urn - Community Cook County catalytic projects, particularly in Development key activity centers Reinforce Reinforce communication and business partnerships with business -1 l Community Village Manager's 21.0 communication owners, developers, and regional _ u t-' l Development Office; chambers and partnerships economic organizations through outreach and retention visits Proactively support 7b and 7c Support 7b and 7c tax classifications to supportFinance Commercial - / Cook County 21.D tax classifications rehabilitation and re -occupancy Community Assessor; Village of underutilized commercial and - Develop ment Board mixed -use properties Support transportation Support transit pp connections to major regional - 22.B to commercial and employment - -l Public Works Pace; Metra; .connections regional centers centers, including new bus Indust —a-- IDOT services and event -day frequencies Advocate Position Mount Prospect in regional proactively in regional economic Commer6al Village Manager's CMAP; Cook 22.0 economic development conversations, Industrial Office / Community County; IDOT y conversations advocating for transportation and Development infrastructure investments r" r► 44 4- Implement street design 4-k e% 4- r � A m i e� e� Land Housing Use Neighborhoods Expand traffic ExI 23.E safety education en, and enforcement dri yie Advocate for a bic 24.A connected bicycle nei network pai iml Stt Advocate for Re Metra and eff 25.A Pace service exi improvements ref Alii Align land use tra 25.113 with transit hic improvements wii fre En Ensure adequate cir 26.0 internal col circulation ev( int Re Promote walking, tra 27.A biking, and transit shi to col Fo: Foster EV in I 27.113 charging del infrastructure arE pai Construct Co 28.113 corridor lighting Sig alo and amenities col Build regional g Bu 28.0 connectivity thr partnerships Co nei Up Upgrade aging roc 29.A infrastructure e,% re+4e-%w%e, thr r%re• Land Housing - L —1 rans-pollaxi-on-unity t Use Neighborhoods Environment Align Align infrastructure upgrades infrastructure with designated opportunity areas Coo- - - itv 29.0 with opportunity and the CIP, ensuring investment Facilities supports the Future Land Use areas Guide Evaluate infrastructure and utility Evaluate impacts impacts of large-scale energy nit- --� Y 29.D of intensive land and water -intensive uses, such Faccilities uses as data centers, when reviewing development proposals Provide staffing, training, and Sustain public equipment for Police and Communi'll 30.A safety staffing Fire, including competitive Facilities and equipment compensation and recruitment strategies Support Continue to support interagency 30.0 interagency communication and coordination Communitv emergency for emergency response and long- Facilities coordination term public safety planning Modernize schools and Support school learning environments through Community 31.0 modernization collaboration with school and Facilities coordination park districts, including joint -use agreements Support year-round indoor and Support youth outdoor spaces — teen lounges, _ _ 32.11) and teen youth activity rooms, flexible -t gathering spaces gathering areas — providing drop- in, no -cost environments Integrate plazas, open spaces, Integrate public and community rooms into _ -�� t v 32.E amenities into development projects through Facilities 4F development design standards, partnerships, and incentives Partner with the park districts, Activate Library, and school districts 32.F community to activate community spaces Communitv spaces through through regular programming, Facilities programming events, leagues, and drop -in activities Incorporate energy -efficient Incorporate systems, renewable energy, and Community 33.A energy efficiency sustainable design into new FaCilities in Village facilities and renovated Village facilities, prioritizing life -cycle savings Public Works / Community Finance Development Community Finance; Village Development / Board Public Works Police / Fire Village Manager's Office; Finance Neighboring Police / Fire jurisdictions; School Districts Village Manager's School Districts; Office Park Districts Human Services Park Districts; / Community Library; School Development Districts Community Village Board; Development developers Human Services / Park Districts; Village Manager Library; School Districts Finance; Public Works Sustainability Commission Land Housing Use Neighborhoods Co Continue Green Bu 33.113 Building Grants inc Program sy� pri Co Align capital scl 34.A planning with for partner agencies usl for Advance outreach Co to( 34.113 and multilingual communication err col Reflect En demographic dei 35.A trends in facility yol — planning ` Mo Support year- Su 36.0 round, all -ages rec spI recreation to Su Support catalytic cal 37.0 joint capital libi projects joir ou, As Prioritize nature for 38.A trails and passive gai fec- amenities edi iml Co Use parks as ani 39.A event and cultural Sul venues ev( pei cel Identify new Wo lev 39.0 green spaces ide through e6 reinvestment ani C r. Use Neighborhoods Integrate green infrastructure and Integrate green stormwater improvements into _ _ 40.0 infrastructure in public capital projects, including Environment4- capital projects streetscape reconstruction and parking lot redesigns Continue working with MWRD Coordinate and other regional agencies to Parks 40.113 watershed -scale coordinate watershed -scale vmlronment resilience resilience efforts exceeding the _ Village's individual capacity Assess climate Continually assess the vulnerability vulnerability of parks, open spaces, and Pal-ks 40.E of parks and infrastructure to extreme weather Env'ilr- - infrastructure and factor climate impacts into capital decisions Support sustainability initiatives Support pp — conservation programs, 40.F sustainability composting, renewable energy Parks - � initiatives integration, responsible Environment maintenance practices — as capacity allows Encourage g Encourage sustainable site design sustainable and energy -efficient building Parks 40.0 commercial site practices in commercial and _ Environment design industrial redevelopment where appropriate Regularly review and update Update codes for p local building and development energy efficiency codes to align with current Parks40.H 9 H and resilience standards for energy efficiency,Environment renewable readiness, and resilient construction Evaluate adaptive p Evaluate opportunities for adaptive 40.1 reuse to reduce reuse of existing buildings to Parks & waste reduce demolition waste when F nvironment consistent with economic viability Public Works MWRD; Finance MWRD; Cook Public Works County; neighboring municipalities Public Works / Park Finance; Districts Sustainability Commission Sustainability Public Works Commission; Finance Community Sustainability Development Commission; P&Z Commission Community Sustainability Development Commission; Village Board Community Village Board; Development P&Z Commission w Intentionally Blank Page 92 of 164 MOUNT PROSPECT 2040 CONTENTS COMMUNITY CONTEXT....................................................................................................................... 01 PASTPLANS & STUDIES........................................................................................................................ 02 DEMOGRAPHICPROFILE....................................................................................................................... 06 LANDUSE & ZONING............................................................................................................................. 16 TRANSPORTATION & MOBILITY........................................................................................................... 20 COMMUNITY FACILITIES....................................................................................................................... 26 PARKS& ENVIRONMENT...................................................................................................................... 30 KEY CONSIDERATIONS......................................................................................................................... 36 Page 93 of 164 Camp McDonald Rd .- E Euclid -Ave' O . . ................................. ...... . . . ...... E. Kensington Rd Al Wnvitle ex 4-J e ;;�iiii, If1„�f//% ill ................ Ii j 4-J C RON SPA z ................. ................... E .-Central: Rd W. Lonnquist BlvdI - - - --------------- OF/ W.Go lf Rd Qj MOUN Ow 000 ........... mfidoow .. . . ......... rks -- W Dempster S t *0 SIR, E 0 a kto n St "I ' 0 1/4 1/2 1 Wes L-L-L-L-L-L-L-L-i Page 94 of"% Q COMMUNITY CONTEXT The Village of Mount Prospect is located in northwestern Cook County, Illinois, within the Chicago Metropolitan Region. It is situated north of 1-90 and O'Hare International Airport, approximately 24 miles northwest of Downtown Chicago. The Village has access to major transportation routes, including Interstate 294, as well as two Metra commuter rail stations, providing connectivity to Chicago and surrounding areas. Mount Prospect is a primarily residential and commercial community with a mix of single-family homes, multi -family developments, and several business districts. The Village has a diverse economic base, including retail centers, office spaces, and industrial areas, supported by its proximity to O'Hare and regional highways. With ongoing investment in infrastructure and amenities, Mount Prospect has continued to evolve while maintaining a high quality of life for its residents. MOUNT PROSPECT 2040 1 Existing Conditions Report Page 95 of 164 Q PAST PLANS & STUDIES This section reviews and summarizes past plans in the Village of Mount Prospect. Evaluating these plans helps assess the goals that have been achieved and identify areas for further progress. Additionally, this review ensures consistency across planning efforts, addresses past challenges, and highlights emerging trends. By understanding these factors, the Village can develop a more tailored and effective plan that meets the needs of Mount Prospect residents. An overview of all major Village plans is listed below. Detailed descriptions of the 2017 Comprehensive Plan, as well as the 2020 Connect South Mount Prospect Plan and the 2013 Downtown Plan are also described in detail in this section. The Village's annual internal strategic plan is interwoven into these documents. Envision Mount Prospect -Planning Our Future Together (2017) -Updated the 2007 plan with a renewed vision and strategic goals. >> Comprehensive Plan (2007) - Served as the primary planning document before the 2017 update. Comprehensive Plan (1976) -Laid the groundwork for development in Mount Prospect as the Village continued post-war single-family residential buildout. Comprehensive Plan (1943) - The original comprehensive plan that established foundational planning principles in the Village. >> Connect South Mount Prospect: 2020 Sub -Area Plan (2020) -Focused on the development and infrastructure needs of Mount Prospect south of Golf Road. Downtown Implementation Plan (2013) - Offered strategies for downtown revitalization. >> Arterial Bike Network Study (2025) -Provides a strategy to construct bike facilities along arterial and other high - traffic streets to create a complete bicycle network. Rand Road Corridor Study (2017) -Discussed recommendations for improvements along the Rand Road corridor. Bicycle Plan (2012) -Outlined strategies to enhance bicycle infrastructure and connectivity. Northwest Highway Corridor Plan (2011) - Addressed development and enhancements along the Northwest Highway corridor. » Public Transportation System Plan (2009) -Assessed transportation needs and proposed system improvements. Corridor Design Guidelines (2000) -Established design standards for various commercial corridors. These documents provide a historical foundation for planning decisions and will help guide the development of the Mount Prospect 2040 Comprehensive Plan. Existing Conditions Report I MOUNT PROSPECT 2040 Page 96 of 164 uuuuuuuu uul IIIIII uuuuul I I mill uuumll uuumuml uuuuul I III uuuuu IIIIII uuumllllulu"' uuuulll� uuuuuuul uuuuuuul uuuuuuul '0jI uuuuuuuu uuumV uuuuum The Envision Mount Prospect Comprehensive Plan, adopted in 2017, was the last Comprehensive Plan guiding the Village's planning and development over 10 to 15- year period. As the Village's primary long-term planning document, it provided a framework for decision -making on land use, transportation, economic development, and community well-being. Envision focused on six guiding principles, which shaped policies and strategies: a livable built environment, improved mobility, community well- being, health and safety, environmental resilience, and economic vitality. Through these principles, the plan established measurable goals and implementation steps, allowing the Village to track progress and guide future growth. Key Recommendations from the 2017 Plan: • Downtown & Economic Development - Supported mixed -use redevelopment, encouraged business growth, and revitalized commercial corridors. • Mobility & Transportation - Improved pedestrian and bike access, enhanced public transit, and addressed traffic congestion. • Housing & Community Needs - Expanded housing options to accommodate diverse populations, including seniors and young professionals. • Health, Safety& Resiliency - Strengthened public safety initiatives, improved stormwater management, and integrated sustainable practices. • Implementation & Regional Collaboration - Prioritized key development sites, streamlined zoning and permitting, and coordinated with regional agencies. ttttrre n v s o �l��l����������%/ll�t�tl frtltl ���r�t����>��>ll�ll ��lllllll ���� ,Mount Prospec I lllll�il�l�l�lll%1�i111 )1,����l���i��i �i� ��„ l���lll%%ll�l ,i 1i1 ��/�,/„/////,//////�////%�/%//�„���%����%/,//%i , A Comprehensive Plan for the Village of Mount Prospect ADOPTED on November 7, 2017 Ordinance Number: 6346 Envision Mount Prospect focused on enhancing community identity, encouraging sustainable growth, improving infrastructure, expanding transportation options, promoting housing diversity, and supporting economic vitality. This action -oriented plan guided Village policies and investments, shaping development patterns and community initiatives in the years that followed. MOUNT PROSPECT 2040 1 Existing Conditions Report 3 Page 97 of 164 uuuuul mIIIIVo, uuuuuuuu C1111111111116uuuuulsou uuuuu The South Mount Prospect Sub -Area Plan, first developed in 2009 and updated in 2020 as Connect South MP, provides a long-term framework for guiding growth and development in the southern portion of Mount Prospect. The 2009 plan set a vision fora more accessible, vibrant, connected, and sustainable area that balances development with community needs. The Connect South MP update builds on this foundation, focusing on economic development, improved connectivity and mobility, public space enhancements, housing and neighborhood revitalization, and environmental sustainability. The plan's goals were established through public engagement and reflect community needs and priorities. Key Recommendations from the Plan: • Land Use and Zoning - Support mixed -use development and balanced growth. • Transportation and Infrastructure - Enhance roadways, expand public transit, and improve pedestrian and bicycle access. • Housing and Neighborhoods - Diversify housing options and encourage revitalization efforts. • Economic Development - Attract new businesses, support existing enterprises, and create job opportunities. • Public Space and Sustainability -Improve parks, public gathering spaces, and promote environmental initiatives. CONNECT III UTHp�exar+orv�:� 0 OMPAL 1 Flan Adopted On: December 1st, 2020 Ordinance Number: 6546 Since the adoption of this plan, several goals have been successfully implemented, including the Oakton Corridor Annexation, which expanded the Village's boundaries and strengthened its economic base. Additionally, key development site have begun transformation or have a clear plan of action. These include the former United Airlines Site at 1401 Dempster (CLoudHQ), the property at 2040 Algonquin (Prospect Senior Lofts), and 1798 Elmhurst (Dunkin' mixed use building). The Connect South MP Plan continues to serve as a guiding document for future improvements in South Mount Prospect. 4 Existing Conditions Report I MOUNT PROSPECT 2040 Page 98 of 164 l Vl� uuuuuuuuuui mi uuuuum uuuuuum m uuuuuuuuuui milluuii m The Downtown Implementation Plan, adopted in 2013, is a corridor -specific plan focused on guiding development in Downtown Mount Prospect. The plan builds upon the 1998 Downtown Strategic Plan, emphasizing transit - oriented development (TOD) around the Metra station, which provides direct access to Downtown Chicago. The accessibility and convenience of this location make Downtown Mount Prospect a desirable destination not only for local residents but also for visitors from neighboring communities. The plan prioritizes infill development, green spaces, improved streetscapes for active transportation, enhanced signage and wayfinding, and the strategic prioritization of projects within the defined downtown district to attract more people and increase economic activity. Key Recommendations from the Plan: • Land Use and Zoning - Encourage high -density, mixed -use developments combining residential, retail, and commercial spaces to enhance the downtown's vibrancy. • Transportation and Connectivity - Improve pedestrian and bicycle infrastructure, enhance public transit accessibility, and address parking needs to ensure seamless connectivity within the downtown area. • Urban Design and Streetscape - Implement streetscape enhancements, including landscaping, lighting, and signage, to create an inviting and cohesive downtown environment. • Economic Development - Attract and retain businesses by providing incentives and support, fostering a diverse economic base in the downtown area. Since the adoption of this plan, many goals have been completed, strengthening Downtown Mount Prospect's role as a thriving community hub. MOUNT PROSPECT 2040 1 Existing Conditions Report 5 Page 99 of 164 41E) DEMOGRAPHIC PROFILE This section presents an overview of Mount Prospect's demographics and economic profile. It examines key factors such as population trends, age distribution, racial and ethnic composition, housing, income levels, employment, education, and current market conditions. This helps to inform the plan with a clear picture of the community as it stands today, while identifying areas where progress has been made and areas that may need further attention. Additionally, the report compares Mount Prospect with Cook County and the state of Illinois. This comparative analysis helps to contextualize the state of the Village within the broader regional landscape, ensuring that future planning efforts are grounded in realistic and relevant benchmarks. IIIW111IM6111111 Unless otherwise specified, data presented in this report is sourced from the American Community Survey (ACS), a household survey conducted annually by the U.S. Census Bureau. The ACS collects responses from a sample of the population to produce demographic, social, and economic estimates. The 2023 ACS 5-year estimates are used as the primary data source for Mount Prospect, as they represent the most reliable and comprehensive data available at the time of this report's preparation. More recent data (such as the 2024ACS 1-year estimates) are less reliable for smaller geographies like Mount Prospect. While the ACS provides valuable information on characteristics such as age, sex, race, and ethnicity, the U.S. Census Bureau recommends using the Decennial Census for official population counts. Population data indicates that the Village population has remained steady after growing significantly in the post-war period. Data also suggests that future growth is anticipated. 60,000 Mount Prospect experienced rapid growth in the post-war 50,000 era (1950-1980) when most of its housing was built. Over the last 50 years, however, the Village's population has been 40,000 relatively stable, with only minor fluctuations. , 000 POPULATION OVER TKE 56,265 56FB52 ��u�������Qu��u��u��...................... 52,634 n u � �° 54,167 53,170 34,995 Recent population data shows modest growth. According to 20,000 18r906 � U.S. Census figures, the Village had 55,037 residents in 2010 and 56,852 in 2020, an increase of about 3%. More recent 10,000° estimates indicate a slight decline post-2020: the 2022 44j,009 ACS estimated around 56,191 residents, while 2023 figures 1980 „ 2 show a dip to roughly 54,300.Overall, the population has essentially leveled off since 2008-2010. A comparative analysis confirms that long-term demographic change in Mount Prospect has been minimal. The Village saw a 3.7% decline from 2000 to 2010, followed by a 3.7% increase from 2010 to 2022, resulting in virtually no net change (-0.1%). In contrast, Cook County's population shrank by about 2.8% during the same period, while the region grew by roughly 4.7%. Ce Existing Conditions Report I MOUNT PROSPECT 2040 Page 100 of 164 uuuo� u� uuu uu uuuuuum Mount Prospect is a family -forward community with high levels of middle-aged adults and children. Although, the Village has an older -than -average age profile with more seniors and fewer younger adults than Cook County at large. The population pyramid (see chart) shows a balanced mix across age groups: 25% of residents are under 20, 20.2% are ages 35-49, only 17% are 20-34 (compared to 24% in the County), and 18% are seniors 65+ (compared to 15% in the County). Local experience shows two additional trends: many adults who grew up in Mount Prospect are returning after college and early careers elsewhere to raise their families, and the Village has attracted new residents during and after the Covid-19 pandemic, as professionals of all ages relocated to the Village due to shifts in employment and workplace flexibility. These dynamics help balance the age profile and reinforce Mount Prospect's appeal as a place to live long-term. The Village's aging trend is clear in median age figures: 37.4 years in 2000, 39.5 in 2010, and 41.2 in 2023. This steady rise reflects the aging of large cohorts who moved to Mount Prospect decades ago and have remained, alongside patterns of returnees and post-Covid migration. 85 years andover 80 to 4, years 75 to 79 years 70 to 74 irs 65 to 69 years g to 64. years 55 to 59 years 50 to 54. years 45 to 49 years 40 to 44 irs 35 to 39 years 30 to 34. years 25 to 29 years 20 to 24 years 15 to 19 ears 10 to 14years 5to 9 years Under 5 years 5 15 50-64 19.4% POPULATION PYRAMID 15002F000 2,5001 MOUNT PROSPECT 2040 1 Existing Conditions Report 7 Page 101 of 164 ���pp I ��������������� um�, ilililililililililililililili uuuuui uuuuuuui III III Mount Prospect is racially and ethnically diverse community. While the majority of residents are White, the Village is home to sizable Asian, Hispanic/Latino, and other minority populations. Per the 2023 ACS data (the most recent high -quality data available), the population breakdown is approximately 67% T IIII 8.6% Some other Race 6.9% White, 14.6% Asian, 2.5% Black, and 16% other/multiracial. Asian The Asian community (nearly 8,000 residents or14.6%of 14.6% the Village) is proportionally higher than the Cook County average of 7.6%. American Indian and/or Alaskan Native ETHNIC DIVERSITY 0.3 Overall, about one in six residents is Hispanic/Latino (16.2%), and nearly 30% of residents are foreign -born. Linguistic diversity is also notable: 42% of residents speak a language other than English at home. According to the latest data, nearly 20% of residents speak a European language other than English (such as Polish),12.5% speak Spanish, and 8.3% speak an Asian language. This range of languages reflects the Village's active immigrant communities and deepening cultural diversity. Since 2000, the share of non - Hispanic White residents has declined from 74%to around 64%, signaling a steady trend toward greater diversity. LANGUAGES SPOKEN AT HOME Asian Languages 8.3% IIIIII� ���� IIIIIII IIIIII � �°°°IIIIIII 12.5% Other 1.8% IIIIIIIIIII la&llk °AlIIIIII °° IIIIII""� IIIIII ""'R �! IIIIII 2.5% Hispanic or Latino 16.2% IIIII4011111t lllh � t,111111 in �Illllu°°° L °°i,U������IlllIII 83.8% 8 Existing Conditions Report I MOUNT PROSPECT 2040 Page 102 of 164 HOUSING Housing in Mount Prospect is characterized by stable, predominantly owner -occupied housing stock with a range of housing types. While single-family homes remain the most common, the community also includes townhomes and multifamily options. Home values have risen in recent years, reflecting strong demand, though affordability challenges persist —especially for renters and lower -income households. Mount Prospect has roughly 23,000 housing units, of which 95.5% are occupied - a very high occupancy rate, indicating strong housing demand. The Village's housing is dominated by single-family homes. About 57% of units are single-family detached houses, higher than the share in Cook County (40%). Townhomes and multifamily dwellings (apartments and condos) make up the rest. The homeownership rate in Mount Prospect is about 70% (owner -occupied households) vs 30% renter. This is higher than Cook County (57.5% owner). Overtime, homeownership has ticked down slightly (it was 71.5% in 2010), but the Village remains primarily a community of homeowners. The high ownership rate is a sign of neighborhood stability with many families that have settled long-term. Rental housing comprises 30% of households and includes both large complexes and smaller apartment buildings. 4.5 IIIIII IIIIIII �liiiii Units HOUSING OCCUPANCY HOUSING TENURE 95.5 Housing Units MOUNT PROSPECT 2040 1 Existing Conditions Report 9 Page 103 of 164 40mill �► HOUSING TYPES Mount Prospect includes a mix of housing types, shaped largely by post-war development patterns and gradual infill overtime. Most homes are single-family, but there are also townhomes, duplexes, and a variety of multifamily buildings. Mount Prospect's housing stock is overwhelmingly mid-century in both type and age. Single-family detached homes account for nearly 58% of all units, while multifamily dwellings make up about 38%. This includes buildings of 10 or more units (26%), 5-9 units (9%), and townhomes (4%). In terms of construction era, almost half of all homes (10,930 units) were built between 1960 and 1979, with another significant wave (5,225 units) dating from 1940 to 1959. Post-1980 development has been modest, adding just under 4,000 homes from 1980-1999 and fewer than 1,000 units in each of the past two decades. Only 879 homes predate 1940. HOUSING CONSTRUCTION DECADE 1939 iiir earlieiiir IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII879 1940 to 1959 1960 to 1979IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII a t IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 4-:7 503 IIIIII47 0 2,000 4000 10+ Unit Multifamily 26.1 S nqIIIIII ° 'IIIIII ltti of Igod 3.8% ..�� ,����� ..��� w������ ei P!��I" �o�,,,,,,� .... °°'�'�"'��' ��� �m'"h . � in,"t ill."�uV' te�,��°."� W Existing Conditions Report I MOUNT PROSPECT 2040 Page 104 of 164 Mount Prospect's housing values reflect a healthy suburban market. According to zillow.com, the average home value (owner - occupied) is about $403,985, which is above the Cook County median of $307,157.Over the past five years, the average home value in Mount Prospect increased by 34% from $300,963 in 2020. During this period, Mount Prospect outpaced Cook County home values, which increased by an average of 29% The housing value distribution shows a large share of homes in the $300K-$500K range, with some higher -end properties and fewer homes under$200K. Newer or larger homes can exceed $500K, while older condos or townhomes may be below $250K. This diversity in values means Mount Prospect offers both starter homes and move -up homes, accommodating a range of income levels. Affordability is mixed. On one hand, household incomes are relatively high (see Income section), helping many homeowners comfortably afford their houses. On the other hand, housing costs have outpaced incomes for many. A key metric is cost burden (the share of income spent on housing). In Mount Prospect, about 24% of homeowners with a mortgage and 46% of renters spend more than 30% of their gross income on housing (indicating cost burden). They represent 27% of the entire community. By income bracket, lower -income households face the greatest burden. For example, among households earning $20,000-$49,999, roughly 76% spend over 30% on housing. Even in the $50- 75K bracket, about 39% are cost -burdened. Higher -income households ($75K+) mostly stay under the 30% threshold. The table shows cost burden by income bracket. These figures show that while most middle- and upper - income families can find affordable options, low -to - moderate income residents often face affordability challenges. The Village's high occupancy and low vacancy (only -4.8% of units vacant) suggest strong demand, which can drive up rents and prices. To address this, past plans have identified needs for more diverse housing types, such as senior housing and new rentals that would increase the housing supply. Recent developments, especially Downtown, have added apartments that help fill those gaps. The Plan may consider approaches to further affordability in the Village. HOUSING VALUE DISTRIBUTION 5,000 4�,7 4, 4,000 3,500 3,000 2,500 2,308, 263 2,000 1,534 1,500 1,000 5 m �,., „ 4.4 01 HOUSING PAYING >30% INCONE GN HOUSING 1, 2 0 0 o iim� ��� s ) 76% 27% of entire Community 2,6 010 III 1 i„°"ie s) (. '(° „ °"ff[ a"lJ, 0 III han c �e «t, 7 11, 0 2,2 IIh rr,°;f °tip/ oe es) IIII - dII """° + MOUNT PROSPECT 2040 1 Existing Conditions Report Page 105 of 164 uuu�pp uuuu IIIIIIIIIIIIIII Mount Prospect is a high -income community with a median household income well above the county average. The median household income is about $103,911. This exceeds the Cook County median ($87.8K) by a significant margin. Over the last decade, local incomes have risen; in 2010 the median was around $76K, so the growth to $100K+ reflects wage growth and possibly higher -income households moving in. The chart for median income shows Mount Prospect trending upward and consistently above county/state averages. The Village's income distribution skews higher-incomL-, yet is fairly broad. About 29% of households earn $150,000+, which is a Iarg( share than the county (22.7%). At the same time, around 23% of households earn under $50,000. The middle tiers a well -represented too: roughly 14% earn $50-75K,12% earn $75-100K, and 21% earn $100-149K. This distribution indicates a solid middle class and upper -middle class presence. The household income chart (likelya bar chart of income brackets) highlights the bulge in the $100K+ ranges. The per capita income is about $47,600, another indicator of relative affluence (slightly above state average). Mount Prospect's income levels reflect its professional workforce and dual - income families - a notable portion of residents work in well - paying sectors (healthcare, professional services, etc., as seen in Employment). Mount Prospect maintains a low poverty rate. Approximately 6% of residents live below the poverty line. This is about half the poverty rate of Cook County (around 11-12%). In raw numbers, that's roughly 3,300 people in poverty in Mount Prospect. The poverty rate has edged down in recent years, thanks in part to rising incomes and employment. It's noteworthy that the Village's poverty level is relatively low for the region, indicating fewer residents in severe economic hardship. However, those who are below the poverty line - including some seniors on fixed incomes and lower -wage workers - may require support through local services (food pantries, assistance programs). The Village's Human Services Department and area non -profits playa role in assisting these residents. Overall, Mount Prospect is still a predominantly middle-class, economically stable suburb, with a sizable affluent segment and a comparatively small, though important, low-income population. MEDIAN HOUSEHOLD INCOME OVER TIME 2010 12 2014 2016 2018 2020 2022 2024 mmnouuuuuum ��l�miouuuuuuuuu, �It F)rospect anmmiuiurv0u-.Cook rit HOUSEHOLDS BY INCOME BRACKETS $200k or more $1501cIIII illll6lliiil uu $100111ktttt tt IIII IIII (Is 71 "" IIII III iiiuiu�iiiuliluuu ul iii illlllllllllu ttt IIII - IIII 5 - $34,9k� I i �iuul l $15111kIIII a Iillu ull $10111ktttt$14.91111c6IIIliil q' Less „ h n IIII 12 Existing Conditions Report I MOUNT PROSPECT 2040 Page 106 of 164 uuuuuuuu uuuuml� uuuuuui °°ppp III uuuuuuui uuuum u Mount Prospect's economy is anchored by mix of retail, manufacturing, and professional services. Mount Prospect's major employment centers include: • Downtown, which hosts professional offices, Village Hall, the library, and small businesses. • Randhurst Village, a hub for retail, dining, and entertainment. • The Kensington Business Center, an industrial, office, recreational and general services area in the north. • The South Mount Prospect Industrial Area, a concentration of industrial users focused around Algonquin Road, Elmhurst Road and Dempster Street. • Key commercial corridors along Rand Road, Golf Road, and Busse Road that offer a mix of retail, restaurants, and office space. According to the Census, the top employment sectors in Mount Prospect (jobs located in the Village) are: • Retail Trade (-21 % of local jobs) • Administration/Support services (-12%) • Manufacturing (-12%) • Wholesale Trade (-7%) • Construction (-r6%) Retail is a major employer thanks to shopping centers like Randhurst Village, big -box stores, and numerous small businesses. Manufacturing and wholesale trade benefit from the Village's proximity to O'Hare Airport and major highways. Industrial parks on the south and north side host companies in these sectors. Other sectors in the Village include professional services, healthcare, finance, and government, but each of those individually accounts for smaller portions of the local economy. :1 m uuuumAG����111111111111 uul 101 3l uu: mum u. . .. .. . b Meanwhile, Mount Prospect residents themselves work across the Chicago region, with the top sectors for residents' employment being: • Healthcare (14%) • Retail (10.7%) • Professional/Technical services (9.7%) • Manufacturing (9.3%) • Education (8.2%) This list for residents indicates many commute to corporate offices, hospitals, warehouses/factories, and schools in the region. MOUNT PROSPECT 2040 1 Existing Conditions Report 13 Page 107 of 164 Mount Prospect is commuter community. Only a small fraction of residents both live and work in the Village. Data shows the top work destinations for Mount Prospect residents are Chicago (18% of residents work in the city), followed by other suburbs like Arlington Heights, Des Plaines, Schaumburg and then Mount Prospect itself. In fact, Chicago employs about 4,462 Mount Prospect residents (nearly one in five), whereas only 1,292 residents both live and work in Mount Prospect. Conversely, many people commute into Mount Prospect for work - the largest group of those commuters live in Chicago (-2,600 people), and others come from nearby towns. This dynamic means daytime population swells in commercial areas, while many residents are on the road or train to jobs elsewhere. Mount Prospect is part of the broader Chicago job market, with excellent transportation links (Metra rail, interstates) enabling this mobility. Mount Prospect has low unemployment. Mount Prospect has a labor force participation rate of about 66.8%, which is above the cook county average (-r64.7%), and generally enjoys low unemployment. Pre -pandemic unemployment was approximately 3-4%. As of 2022, the unemployment rate in Mount Prospect was roughly3%, which is below the Cook County average (-4-5%). The community consistently tracks better than the regional average in employment, reflecting its educated workforce and proximity to job hubs. Currently, unemployment is near historic lows (close to 3%), indicating a healthy job market, that employers in and around Mount Prospect have been hiring, and many residents have stable employment. INFLOW/OUTFLOWIOB COUNTS (ALL WORKERS - 2022) . . 4 Il15r595 11f:.::.::llployed in IMount i,3respect, Ill,,,,,,,,iiive Outside 21473 Live in MOUnt F lirospect, Eimlployed Outside IIJJJJJJJI,JJJJJJJJJJJJ�JJJJJJ�I1,292 - Employed AND Live in Mount Fresl eet 14 Existing Conditions Report I MOUNT PROSPECT 2040 Page 108 of 164 uuuuuum uuuuuuu uuuoii� "'��I Mount Prospect is a well-educated community. Over 47% of adults (25+) hold a bachelor's or higher degree, which is above the county (41%) and regional (42%) averages. Breaking it down: 30.5% of adults have a Bachelor's degree and 16.6% have a Graduate/Professional degree. Additionally, about 7.1% have an Associate's degree. At the other end, the share without a high school diploma has been shrinking - currently 9.0% of adults lack a high school diploma, down from 14.3% in 2000. The educational attainment chart shows a strong increase in college -educated residents overtime, reflecting Mount Prospect's appeal to professionals. The community's investment in education is also seen in local schools' performance and library usage. EDUCATIONAL ATTAINMENT 10,000 9tO82 Bachelor"s Graduate or Degree Puy°°ofessionail Degree Mount Prospect is served by several overlapping elementary districts (21, 25, 26, 57, 59) and five high school districts (Prospect High, Elk Grove High, Wheeling High, Rolling Meadows High and John Hersey High, with Prospect acting as the primary High School in the Village), together educating several thousand K-12 students. School -aged children (5-17) make up roughly 20-25% of the population (about 17.7% aged 5-19), with another 6.3% under age five poised to enter kindergarten. At the post -secondary level, around 28% of 18-24-year-olds from Mount Prospect attend nearby colleges —many at Harper or Oakton—reflecting a strong continuing -education presence among young adults. MOUNT PROSPECT 2040 1 Existing Conditions Report 15 Page 109 of 164 Q LAND USE & ZONING This section examines Mount Prospect's existing land use and development patterns to generate an understanding of the Village's existing built form. The information presented in this section will serve as a guide for future land use planning in the comprehensive plan. Existing land use in Mount Prospect was documented through April 2025 aerial imagery, field research and supplemented with data from the CMAP 2018 Land Use Inventory. All parcels within the Village have been classified into one of the designated land use categories. SINGLE—FAMILY DETACHED Single-family homes on individual lots with private yards. This low -density use is the most common in Mount Prospect. Allows a mix of retail, services, offices, and apartments in walkable, pedestrian -scaled areas connected to surrounding neighborhoods. Townhomes, duplexes, and rowhomes with shared walls and private entrances. These medium -density homes fill the gap Supports car -oriented retail and services along major roads, between single-family and multifamily housing. including strip malls, big -box stores, and gas stations, with a focus on vehicle access, visibility, and ample parking. MULTIFAMILY RESIDENTIAL INDUSTRIAL Apartment and condo buildings with three or more units, often with shared amenities like parking or laundry. Several legacy Support uses from small-scale manufacturing to large multifamily buildings exist along major corridors in the Village. distribution facilities, typically near major roads or freight corridors. Buildings and sites used by government, educational, religious, or nonprofit organizations, such as schools, libraries, community centers, and places of worship. Support jobs in professional, medical, and administrative services, typically in low to mid -rise buildings geared toward daytime activity. Includes public or private land preserved for recreation, conservation, orstormwater management. Includes parks, trails, natural areas, and open green spaces. Land used for essential infrastructure such as power lines, substations, water and sewer facilities, and communication towers. These areas support public services and operations. Corridors and facilities that support the movement of people and goods, including rail lines, major roadways, and transit infrastructure. Parcels with no active use or permanent structures. These sites may be undeveloped, underutilized, or awaiting future development. Existing Conditions Report I MOUNT PROSPECT 2040 Page 110 of 164 ymengff ,II/ -------------- @,,, �� I11�11�JJJJJJJJJmul E Kensi IIIIII 4-J 4-J jig /z IN 1 77 -------------- SS4 55 "Elk 3 W. Central Rd II1111 aaaa E. Central Rd F'] Camp McDonald Rd` CE to r 2 E. Euclid Ave BONN.; M Y7,yn/ Downtown, Mount Prospect 6? W. Linc*olnSt `----,----------e�`�,ry� � ,1 W. Lonnquist MONP r� � W. Golf Rd� *. r 4A� Single Family Detached Single FamilyAttached Multifamily Institutional = office INS Parks & open space ones& 0 "/, 4, 1/2 1 Wes L-L-L—L-L-L-L-L4age 111 of""'T'`6 uuuuuuuu . IVm. ill uuuuuuuui �I uuuuuuuu°�iilll i uuuuui uuuuui uuuuuuuui The Village's municipal zoning code, regulates the built environment in Mount Prospect. Detailed descriptions and regulations for each zoning district are available in the code. A selection of these district descriptions is provided for reference (some have been abbreviated for clarity). Intended to accommodate existing single-family residential development in older, established sections of the Village. Intended to provide areas for low density, single-family Y residential and other compatible uses on standard lots. Intended to provide areas for low density single family residential and other uses on compatible large lots. p g R-2 ATTACHED SINGLE-FAMILY RESIDENCE DISTRICT Intended is to provide areas for limited concentrations of single-family attached dwellings, such as townhomes. Intended to provide areas for medium to low density multi- family residential development and compatible uses. Intended to provide areas for limited concentrations of medium to higher density multifamily development. Intended to provide for office development in areas adjacent to retail commercial zoning classifications. Intended to provide shopping and basic needs for persons residing in adjacent residential areas. Intended to provide for the needs of a much larger consumer population with a wider range of uses for daily shopping. This district is located along major roadways. Intended to accommodate motorist oriented commercial activities which may be incompatible with uses encouraged in other business districts. This district is located along major roadways. Y Includes the Downtown core area. Allows mixed -use transit oriented commercial, retail, restaurant and office uses. Intended to provide space for off-street parking. i Intended to provide an area suitable for industrial, manufacturing, warehousing and research facilities that do not create major nuisance or hazards. Intended to provide an area suitable for railroads and associated services Intended to provide an area for the management, handling and transfer of solid waste and recycling materials and the Y g storage of equipment associated with such use. Intended to provide for the location of public arks golf p p p courses, and other open spaces or resources to serve the recreational needs of the citizens of the Village. 18 Existing Conditions Report I MOUNT PROSPECT 2040 Page 112 of 164 11 Im Camp McDonald Rd R1 2! E.- Euclid ... ........./rr i1JJii%%%%%%%%%%%All /' 41 R1 -Ke.......,D ... nsingtmild Eli A114, jille ee 4-J A C 0 n A ra z L IN rigm. r„ r - E C. . . ....... - . .... ....... - B051 40 entraV 'd oG LI FIA n A F%^ Mi nA R 1 Lincoln St 4-0 01, gggggg go g/ -C R1 - a ' E Lonnquist Blvd, iomzs/ . . ..... . R ANS// .. . ....... W, Golf. Rd RA ME ZONING DISTRICTS HIM W, RA B I " w Dempist r St" o R I B3 10P, R2 B4 CWU A, lllll �I 0 14 y W, R3 B5 12 R4 B5C %,, RX PI rrr RX-1, Ris . . . . . . . . . .. . . . . . . . . . W.-Central PA CR 1/2 1 Wes L—L—L—L—L—L—L—L4age 113 of Is, )-6 Q TRANSPORTATION & MOBILITY A balanced, efficient, and well-connected transportation system is essential for providing residents with access to goods, services, and community resources in Mount Prospect. The Village's transportation network includes roadways, regional public transit services, pedestrian facilities, and a growing bicycle network. This section outlines the existing transportation system in Mount Prospect, covering its roadway network, public transit services, and accommodations for pedestrians and cyclists. JURISDICTION Road jurisdiction is a key aspect of comprehensive planning, as it determines which level of government —local, county, state, or federal —is responsible for planning, developing, maintaining, and regulating roads in the community. Effective coordination among these authorities ensures that road improvements are strategically implemented. In Mount Prospect, major travel corridors such as U.S. Route 12 and Illinois Route 83 fall under the jurisdiction of the Illinois Department of Transportation (IDOT), while other important arterials are managed by local or county agencies. The Village controls the local neighborhood streets, ensuring that improvements directly address the needs of Mount Prospect residents. 0j11111111 ' e Ilp "I10° ofAl i��ii �s t' i����ii ���!'IIII� ����� uV °"" �u"�opI ������ �"11V'11l ���� ��t� c Existing Conditions Report I MOUNT PROSPECT 2040 Page 114 of 164 4-J Qj CL 0 CL 4 z 144 W."'Central W. Lincolln St 4-J . ..... .. .. . . . .... .. W, Loinnquist BlvdE , ULJ G, 0 If Rd WmCie mpsterStam QJ 0* E ))l{sO kton'St a I.. on, 4— anville'16� 1 Centra I Rd r . ..................nnnnn 010� 16,41, 0, Ise, ROAD JURISDICTION .............. ---. Federal Interstate aiaiiiaiii State of Illinois Cook County Village of Mount Prospect 0 4 I Mdes 10 �j ...........................................III .......................................... I ........................................... I ............................... .......... I .......................................... I ........................................... I .................................. N1111% 0" �age 115 of 1-64 mill I uuuuuVll pp IIIIIIIIIIII uuumum, a IIII� uuuuuuuuuul � uumiii°luu pug All roadways in Mount Prospect are classified according to the Village's Municipal Code, which assigns designations based on the roadway's intended use and level of service. These classifications are as follows: Interstates are high-speed roadways designed for long-distance travel that provide high levels of mobility with limited direct land access. They connect major activity centers, employment hubs, and other important destinations. In Mount Prospect, 1-90 connects the Village with the regional and national transportation network. ARTERIAL ROADS Arterials carry the highest volumes of traffic and are designed for longer -distance travel with limited access points. They prioritize mobility over direct land access and often serve commercial and regional travel needs. In Mount Prospect, examples include U.S. Route 12 (Rand Road) and Elmhurst Road, which connect key destinations within and beyond the Village. Collectors serve as links between arterials and local streets, balancing traffic flow with property access. They support moderate travel speeds and typically run through residential and commercial areas. Roads like West Lonnquist Boulevard and other mid -level corridors in Mount Prospect function as collectors, channeling local traffic toward major routes. Local streets are intended to connect neighborhoods to the broader roadway network. They typically experience low traffic volumes and have lower speed limits. These streets are designed with safety in mind, often featuring sidewalks, on -street parking, and pedestrian -friendly features, providing a safe environment for residents and their children. Mount Prospect has an extensive network of local streets that contribute to the community's overall quality of life. 22 Existing Conditions Report I MOUNT PROSPECT 2040 Page 116 of 164 MEMO �WmDe psterStam QJ ....................... Camip Mcb"O"nald Rd E.,,4 E'u c 11 i d Ave mm" 0 �/4 I Mdes ...........................................III .......................................... I ........................................... I ............................... .......... I .......................................... I ........................................... I .................................. �age 117 of 1-64 AC uuuuuuuuuui uuumuuu °ipl uuuuu mpIVu� uuuuui Active transportation refers to non -vehicular travel, such as bicycling, skateboarding, running, jogging, walking and using public transportation. Benefits of active transportation include a healthier population and reduced emissions resulting from fewer total vehicle miles traveled. There is pedestrian infrastructure throughout Mount Prospect, however there are some gaps. Historically, when new neighborhoods were developed or annexed, sidewalks and other pedestrian amenities were not always mandated, leaving these decisions largely to developers based on market demands. While pedestrian facilities are located throughout many commercial and nonresidential areas, several gaps still exist that hinder safe navigation throughout the Village. Enhancing sidewalk connectivity is a key priority in multiple planning documents, with planned investments in capital improvements aimed at bridging these gaps and improving safety. Bicycle infrastructure in Mount Prospect has grown significantly in recent years and is now in a mid -stage of development. The Village maintains approximately 28 miles of signed bike routes and has implemented marked bike lanes and sharrows on several streets. While there are still no fully protected on -street bike facilities, progress has been made in expanding connections. In 2024, a shared use path was completed along a portion of Rand Road, and additional shared use paths are planned within the next two years along sections of Rand, Busse, Algonquin, and Kensington. The community also features multiple off- street recreational trails, which currently see greater use for leisure than for daily transportation. The recently completed Arterial Bike Network Study provides a detailed inventory of existing bicycle facilities — covering sidewalks, bike lanes, signage, lighting, land uses, traffic counts, transit stops, and crash history —across fourteen of the Village's main arterial roads. By coordinating with IDOT, Cook County, Pace, Metra, and Union Pacific Railroad, the study identifies key connectivity gaps between neighborhoods, schools, parks, and transit hubs. It also offers phased recommendations, cost estimates, and funding strategies to guide future improvements, with a focus on building a more connected and accessible bicycle network. In Mount Prospect, public transportation options are somewhat limited but do provide important regional connections. Several Pace Bus Routes operate around the Village. These lines link residents to nearby communities as well as the Mount Prospect Metra station on the Union Pacific Northwest Line. From this station, commuters can easily access Downtown Chicago and surrounding suburbs. Further, a nearby Park & Ride facility offers an alternative way to reach Downtown Chicago. Commuters can take bus routes from the facility that connect directly to the city center, providing a convenient option for those who prefer to combine driving with public transit. Additionally, the Mount Prospect Transit Study is underway as of this writing. It will provide a detailed inventory of existing village -wide transit services, including documenting current Pace bus routes and Metra connections, mapping service areas and schedules, and pinpointing coverage gaps using both spatial analysis and rider feedback. Community input, including closed focus groups at senior living facilities, an open workshop at the Community Connections Center on February 26, 2025, an online survey, and an interactive mapping tool, is summarized to establish a baseline understanding of transit accessibility and performance. 24 Existing Conditions Report I MOUNT PROSPECT 2040 Page 118 of 164 mwa t 110 i,a lm i fi . / V rrr/ J 0*1 Ln e ir f f J i r / / r / r r r r r /, r r r / / i i / r /r c, ,.v r„ r (,.., l r qgg rr Rd / i( F Yr go Cen �I / '4 W/ //�/M& 1,694 i r / r / / / / r i / r / o /„/ // errDID 11 / r l / a / a / / r / r / f l l J l iii /lily r „r ON Jill Itlron r -,.. .. Sri/rv/iii/ aii�%�%/i%r p//r/; /// e„ icccccccccrri f/ J/r AT UU IU�IUIIUIUIUI� llllllllllluul ' ''a 1 0 IF qvv/ ' Ca m P M C Db a d Rd ; taC ,rrrr, r 1 i a lop] /icrarr ra/ .) Erruci/i/ii/r„.r„�du% /a�f 1Ar /JJVi e/ /r/JJ"E la /%% %%%/ r /JJrJii . / i ., ter, r ,,,,,ail: � � / / 1, rriii�riai/%%� o /, r iii::,%///////iiJ r'r � „„�/,r rii „r�Jli/ i,,, ,, ,, / 1.. r .. �/�" �'�y �`'' ,,,iii/„�,,,,,ra aoiiiiiiaiiaiiaiiaiiaiiaiioiiiiiia�i j� e 1 1 �7 r roa/ ri r „viaaiaia,,, /iii, viaiucf// ,;iiaav)) ///!oirrrrn ,,,ic/ slit r v / IM- 61 rMvl G o; o%s ,/ rJill / r////! J%/ % r r 0 f 1 f r/� //p �y t � �� r rr iF{� r ri/ rii/// r/ 1 rrr r f / / l NEW oil. rrr / I r rr . %/ 0= JI ,,, 1 ra �;. j /✓/%///////iii ,u�r%///// ; / o, / [ [ oo / r / /, f rrr,rr/ / / r, ,,,,, ,,,, / ..r ,,, rrr , iiciiiii��✓, r. /. / ii // /i,, ar ,aiii�//%i,,,,, /%%/%%�„riaa , ,�„i/J,r>iii�%%///��:,<Y" / rr„ / to//�//� ✓/ r / / r I / / / r / r o/ / / I ri / / ai , / i f r/ / riri,r/r%///c!/%!%//��ia/ , ii%//�� ri , .a r .J///ri i ///////� o f mm loll 44 r �r r ?�//j//ii � I/,�/iii/ � �� • / / , , ; ,'„ j i® / 1 /r %< �a / 1 mew / F / ff IJill / / 1 I / Wtlau / r 1 r / ///��r��l%//ii/%G////////��/ice%/ /i)i,/iii%//�% r.. + `- " ai%///%%%/�//// ✓i r q/ ///% , r r / / r /. r r r l / / a.it ,,, it l / r 1 v / J / i / r r / 1, ra i i / r I f I.. II .,. , .,, I / a� I2����rrr,rmH �� "- % , ., _ �/'► �. � III mmu , u /.m;, /rii v , � ✓i/ / / /„ „via///. ���� ii ,,,,. l ) ill r; i r a. / / t ure %€ /,/,/ .✓!: //i�'. ii:.,////r/r �ir �.�"„ �'%,.-��� /1/r %i .., J// I.... � it ,III r '%f,, r r , =,a l , ii J it ,, ,, ,,,,, r ✓ %////// � If iiif€ / i i r o:; o ;;'n' l! � r / / ii% 1✓ ss r /G.���,�/// Jl%%����ij�j/r/r%/�� ' r/ �/. rii; n n; i r, �„I / / ,...,. ; f, i.. ,l„ / tr: '� € ti //r Jii...v, �/ „r.: ra IIO I / l I �(/�,,,, ,/,// N ,v Golf, c';/, �; ;; r ;„; r 8 / J � J n% / ass ass ass r / / f / i /% // /i / / 1 ' IJ / a/// �%////%/// of f r V l / � ri fii/ i///, � ✓9„1%///ACTIVE TRANSPOR ON AIAP / J �/fir � j Ope�/y.. Metro ^/�"�/y*/^'y Lines (/�'''"�/+''y"�� 117 o/oce J l/r / /! riGr Dd.lr/ia%/ of / /i /////r rrrroirar/ U /%voii0/ r l i//1 / .,� mm / i'r iar - /ia�/vf ri / mmO / , rii //i J J / �/ rill ri Sidewalk Metro i mow/ J rrrr/i/i dI'rr/ ram" irii%///a/�i i/ iiii r //ill rill rr ///%//r / / J 1 r/ r 'r r � oiiir J ns rlr f% F ' /ioiioiioiioiioiioiioiioo i /Street / Route QQ @R IQG IVl IQQ . Pace 4 4w. Bus s Routes 1 r r �hy, ri/ r arm' 4""' r lrr /��// ,� 1 lei (�f /i rit a r� � //r 1 V 's /,.rrr, lr r, 4i.��. %i„r +//�"^'�� u Bike u� enim wuvus t� ira ,� 7m� au»n ox�� ,a yr �mu�� gy 1 Off i Pace �" � �W� "� � N?wl �� ��� � ndW �� ilQl "z N�rc,�� � IN a6 q V V Y 4t�xrn /M�, ,icii IA f �"t2 @s - d d ) f d i, r// r' l/lr/l/r/% /: is..///m/1ry r, IIII °"t 22w'' 0 y'i kt ) -1, s t,. i [a 3 41 sr u y/ q a .a oaton,Stj11111111l11 223 v6, NASt( t a -Vu�yYMt. �!�r„ aui 641 vi „N ' W .,„,� Wes„ ME `10 age 119 of 4 Q COMMUNITY FACILITIES Community facilities and services are designed to support a high quality of life for Mount Prospect residents. These services are primarily provided by the Village, supplemented by public and semi-public partner organizations and other local service providers. As part of the Comprehensive Plan, an inventory of service providers was completed, focusing on key areas such as local government, emergency services, education, and healthcare. The Village of Mount Prospect operates under a Mayor/Trustee form of government. The Mayor is elected to a four-year term, presides over board meetings, and executes official documents, serving as the chief administrative officer of the Village. The Village Board of Trustees, composed of elected members serving staggered four-year terms, works with the Mayor to form the governing body. Together, they enact ordinances, manage municipal finances, levy taxes, set policies for Village services and procedures, and oversee all governmental functions. Village Administrative Departments are essential to the effective functioning and governance of Mount Prospect. This section provides an overview of the key departments that work together to deliver services and support the community's quality of life. The Village Manager's Office is responsible for overseeing the daily operations of Mount Prospect. It coordinates efforts across departments, implements policies set by the Village Board and provides strategic leadership to ensure efficient - p g p and effective service delivery. The Finance Department manages the Village's fiscal resources. It is responsible for budgeting, accounting, revenue collection, and financial reporting, ensuring that funds are used effectively. The Public Works Department oversees the maintenance and improvement of the Village's infrastructure, including streets, utilities, and public spaces. It is tasked with managing capital projects, ensuring safe and efficient transportation networks, and maintaining environmental services. The Human Services Department provides a range of social services and community programs to support vulnerable populations. It works to ensure that residents have access to essential support, resources, and opportunities that contribute to their well-being. Human Services offers services in Village Hall, as well as at the Community Connections Center in South Mount Prospect. The Community Development Department is comprised of two different divisions: E C ii: P� i,I w 11111 CDtiiIII''I"'"EI V1111 III/ Tip III III ' The Economic Development, Planning & Zoning division of the Community Development Department oversees land use planning, zoning, economic development, and housing initiatives to support sustainable growth and neighborhood revitalization. It partners with developers and local businesses to facilitate mixed -use projects, retain small businesses, and target key areas for infill and redevelopment. The Building & Inspection Services enforces construction and occupancy standards by reviewing permits, examining plans, and conducting inspections. This ensures public safety and code compliance while tracking permit volumes and common enforcement challenges to streamline processes. 0 Existing Conditions Report I MOUNT PROSPECT 2040 Page 120 of 164 uuumll� uuuuuu uumuuu IIII� � uuumuum uuuluu "'llpp uuum Vuv uuuuuu uuuuuuu This section outlines the essential services dedicated to ensuring the safety and well-being of Mount Prospect's residents. The Mount Prospect Police Department includes full- time officers and civilian staff across divisions such as Administration, Patrol, and Support Services. The department is CALEA-accredited and has added units like a Drug Task Force and Tactical Unit to address emerging public safety concerns and strengthen interagency coordination. The Mount Prospect Fire Department provides fire protection and emergency medical services from multiple stations throughout the Village. Investments in equipment and training help ensure timely, effective response to emergencies across the community. "'Iliillllllll RIIIIIIIIIII IS1111111111111111111111 iiii IIIIII IIIIIIIIIII IIIIIIIIIII IIIIIIIIIII IIIIIIIIIII Mount Prospect is home to a diverse range of religious institutions that provide spaces for worship, education, and community programs. Christian congregations include Catholic parishes such as St. Emily, St. Raymond de Penafort, and St. Thomas Becket, as well as Protestant and non -denominational churches like Trinity United Methodist, St. Paul Lutheran, and Northwest Covenant Church. The Muslim community is served by the Islamic Society of Midwest and Faizan E Madina Islamic Cultural Center (also known as the Mount Prospect Cultural Center, located at 960 Northwest Highway), as well as the Turkish American Chamber of Commerce. While Mount Prospect has limited Jewish congregations, nearby communities offer access to synagogues and other places of worship. Together, these represent only a portion of the diverse religious facilities serving the community. Plaint Pa"), Spiir P(`)1ice1 ar )d Firs w m� L ill I hiIIII ro Chi lr fu ) and Pry II ° MOUNT PROSPECT 2040 1 Existing Conditions Report 27 Page 121 of 164 uuuuuuuu uuumuul uuuui� ICI "'�IIIIIIIII Illui"" Education in Mount Prospect is supported by several public school districts offering quality instruction from early childhood through high school. Multiple elementary, middle, and high schools serve the community, ensuring a range of academic programs and resources for students. Grade schools in Mount Prospect provide foundational High schools in and around Mount Prospect offer education to young learners, fostering academic growth and comprehensive academic and extracurricular programs social development in a supportive environment. designed to prepare students for post -secondary education and career success. They provide opportunities Grade Schools include: for advanced placement, technical training, and college readiness. Prospect High School is the primary high school • Euclid Elementary School for Mount Prospect residents and is critical to the quality of • Fairview Elementary School life in the community. An overview of the school follows. • Forest View Elementary School • Frost Elementary School (Aspen) IIII Illlh°°°°°°i IIIII Illh°°°°°°IIIII Illh IIIII • Indian Grove Elementary School • John Jay Elementary School • Lions Park Elementary School • Robert Frost Elementary School (Cypress) • Westbrook School Middle schools serve as a bridge between elementary and high school education, offering programs that support both academic and personal development during the transitional adolescent years. Middle Schools include: • Holmes Middle School • Lincoln Middle School • River Trails Middle School Prospect High School, located at 801 W. Kensington Road, is a public secondary school serving grades 9-12.Originally opened in 1957, the school today enrolls approximately 2,100 students from Mount Prospect, Arlington Heights, and nearby communities. The campus occupies approximately 30 acres and includes a main academic building, athletic fields, a stadium, and parking areas. Prospect is known for its strong academic programs, extensive extracurricular offerings, and competitive athletic teams. Recent facility upgrades have focused on improving classroom technology, athletic amenities, and building systems. In addition to the numerous schools, the Mount Prospect Public Library (MPPL) is a cornerstone of Village education and community life, providing resources, programs, and services that support enrichment, and connection for residents of all ages. Each year, the Library circulates over 1 million items and welcomes more than 350,000 visitors through its doors. Over 30,000 residents (more than half of the community) hold an MPPL library card. Additionally, MPPL offers a wide range of programs, including early literacy initiatives, cultural events, technology training, and lifelong learning opportunities. These services help the Library support academic success as well as creativity and community connection. 28 Existing Conditions Report I MOUNT PROSPECT 2040 Page 122 of 164 S E . . . . ...... ... . ........ 51 . . ................................. .......... E.,­' Ken 51 ngto n Rd .......... 4- 111111411/1 -6 4191 "Ibil HIV �m "Ilk A11110 IiJP 0. dU 4-J 4-J C iit it it it it it it it it it it t o it ................. ................... 'a ............-W""Central Rd EQ- Central: Rd 'F/a 0,0, I`?h. El incoln St IS-t IN, MEN M141110 I ............................. /0's 4-J /,/////�//////////////�f�,r, /� 1, r//°r � , . . . . . .. .. . E W. Lonnquist Blycl�., 5g 5 Bill .......... ........... ............ ........... I ............. .............. W. Golf- Rd --------- Qj vg Camp McDonald Rd 0 2! 0 E Euclid -Ave''",/ 0 CCC COMMUNITY FACILITIES .................................... John Jay Elementary School 'Dempster St Frost Elementary School Drive) CU (Cypress Fire Department Station 12 . . . . . . 4*0 y W, Forest View Elementary School & Holmes Middle School IfIfffiff . ...... Public Works HQ 0 Westbrook Elementary School Lincoln Middle School Lions Park Elementary School Village Hall Mount Prospect Public Library Fairview Elementary School Prospect High School Fire Department Station 13 Police Department HQ Euclid Elementary School River Trails Middle School Fire Department Station 14 18 Indian Grove Elementary Schoo19 l Frost Elementary School (Aspen Drive) ►Fire Station I I Community Connections Center 0 Religious Institutions 0 1/4 1/2 1 Wes L-L-L-L-L-L-L-L4age 123 of )-6 41)1 PARKS & ENVIRONMENT Mount Prospect benefits from quality parks and open space that enhance residents' quality of life and attract visitors. The Village is responsible for maintaining most of its green spaces, and an inventory of park supply, along with environmental considerations, has been completed as part of the Comprehensive Plan process. The parks in the Village are managed by the Mt. Prospect Park District and the River Trails Park District (residents also have access to surrounding park districts, however they are not the focus of the M P2040 Comprehensive Plan). These organizations oversee more than 60 acres of parkland distributed across multiple locations within the Village. For example, the largest park in the Village, Melas Park, includes amenities such as sports fields, playgrounds, and picnic pavilions. Additionally, a discussion of flooding and stormwater management is included in this section. oiiium� IIuuIV�l IIVuI. II uuuuVl uuuuuuu III In addition to the number of parks, their location is critical for ensuring adequate service across the community. An analysis measuring the distance from residential parcels to park facilities finds that approximately: • 82% of residential parcels are located within a 1/4 mile walk ofa park • 97% of residential parcels are within a 1/2 mile walk of a park • 3% of residential parcels are more than a 1/2 mile from a park* The Comprehensive Plan can explore opportunities to expand park access and enhance existing green spaces to better serve all residents of Mount Prospect. 'Please note some residents may have access to parks in nearby municipalities, but those facilities are outside the scope of this planning process. Community parks in Mount Prospect are larger parks that serve multiple neighborhoods and provide a broad range of recreational opportunities and amenities. These parks are designed to support both organized sports and informal activities, and often include facilities that attract users from across the Village. With features such as athletic fields, walking paths, playgrounds, aquatic centers, and event spaces, community parks accommodate a variety residents. Mount Prospect's community parks include: • Location:1500 W. Central Rd. • Acreage: 70 acres • Amenities: Athletic fields, Canine Commons Dog Park, concessions, 5 football fields • Location:1401 W. Gregory St. • Acreage:15 acres • Amenities: Aquatic Center, Baseball Fields • Location: Dempster St. & Linneman Rd. (including ComEd ROW) • Acreage: 25.5 acres • Amenities: 2 ball diamonds, %-mile walking path, playground IIIII IIIII """"""" IIII i IIII IIIII IIII'' IIII' "'IIIII IIIII IIIII' IIII IIIIIC • Location: 411 S. Maple St. • Acreage: 20.5 acres • Amenities: 2 lighted ball diamonds, 8 tennis courts, Veterans Memorial, bandshell, playgrounds, surf pool IIIII.IIIII�IIII IIIII IIII iIIIIIi IIII IIII • Location:1717 W. Lonnquist Blvd. Acreage: 23 acres Amenities: Playground, %-mile walking path, lake, seasonal restrooms IIIIC° i IIIIC° Illf°°°'IIIII°°61m. IIII IIII IIIII • Location:1500 E Euclid Ave. • Acreage: 46.7 acres • Amenities: Playground, Skate Park, Sports Courts all Existing Conditions Report I MOUNT PROSPECT 2040 Page 124 of 164 Neighborhood parks in Mount Prospect provide space for both passive and active recreation and are designed to serve residents within surrounding neighborhoods. These parks function as local gathering places and typically range in size from one acre to 14 acres. While each park varies in character, most offer mix of amenities such as playgrounds, picnic areas, ball fields, athletic courts, open green space, walking paths, and shelters. Intended to support a variety of ages and activities, these spaces often concentrate recreational features within a compact footprint. Mount Prospect's neighborhood parks include: • Aspen Trails Park • Bluett Park • Burning Bush Trails Park • Busse Park • Countryside Park • Devonshire Park • Emerson Park • Fairview Park • Gregory Park • Hill St Park • Maple Trails Park • Owen Park • Prospect Meadows Park • Robert Frost Park • Sunrise Park • Sunset Park • Sycamore Trails Park • Tamarack Trails Park • We -Go Park • Weller Creek Park • Westbrook School Park Mini parks are small parks or outdoor spaces designed for public leisure. They often take the form of plazas, courtyards, or landscaped areas with seating, public art, or other features that encourage community gathering. In Mount Prospect, several mini parks enhance the community, providing accessible green spaces and opportunities for informal recreation. These parks often include amenities such as seating areas, gardens, and public art. Mount Prospect's mini parks include the following: • Centennial Green • Evergreen Trails Park • Meyn Busse Park • Tamarack Park • Village Green MOUNT PROSPECT 2040 1 Existing Conditions Report 31 Page 125 of 164 i Mount Prospect offers a variety of recreation and fitness centers that provide indoor spaces for health, wellness, and year-round physical activity. These facilities serve as hubs for fitness programs, sports leagues, aquatics, and community events. From full -service fitness centers to specialized sports and aquatic facilities, these venues support residents of all ages and abilities. Major recreation and fitness centers in Mount Prospect include: 1IIIlIIIIII IIIII ,III, I..„„M II II l �II IIi lol IIIII( (IIIII: • Location:1000 W. Central Rd. • Amenities: Youth gymnasium, fitness center, indoor turf, mens and womens locker rooms, preschool classroom, rental spaces, NWSRA Pursuit Program Location: 420 W. Dempster St. Amenities: Triple -court gymnasium,1/10-mile indoor track 25- and 8-lane indoor pool with tot ool fitness center with cardio and strengthequipment p separate free weight room fitness studios, ace studiearl childhood and youth room lockerooms rentals aces Y - - p IIIII IIIII0 III IIIIIIi " "I"IID III1°IIIIIIi II�IIIIIIIi • Location: 411 S. Maple St. Amenities: Full -court gymnasium, dance studios, multipurpose room, preschool classrooms, small meeting room, stage, Veterans Memorial Bandshell. A 2024 referendum passed that will result in the improvement of this space. umuu umm uumm m� ImmoIIlli� Ipmim �puuuuu 1 uum (IIIII llpuu°00lllllu h IIIhpIIIII �I�� w Iu, io IIIIIu "IIIOI NIA III m IIIppIu IIIIIp • Location:1500 E. Euclid Ave. • Amenities: Preschool rooms, multipurpose spaces, program classrooms III��������"'Io°i' ��I � �Iluo' I �n u�������o�ll � IIII � IpIIpI Illlu pu�u����� I IIIII 3 Illlf°°I,I IIII1°IIIIIIi IIIII IIII1°IIIIIIiIIII IIIII U IIIII i �� Iw� IIII IIIII i IU IIIII Illllli IIIII IIII II IIII IIIII lli i IIIII IIIII • Location:1313 Burning Bush Ln. Amenities: Gymnasium, fitness area, activity spaces, preschool Aquatic facilities in Mount Prospect offer residents a wide range of year-round water -based recreation, fitness, and instructional opportunities. Operated by the Mt. Prospect Park District and River Trails Park District, these venues include both indoor and outdoor pools for swimming lessons, lap swims, open swims, and special events. A 2024 Lions Park referendum approved the removal of the existing wave pool and the addition of a new splash pad and community pool. These facilities support aquatic activities for all ages, from cooling off in summer to training with swim teams or participating in water fitness classes. Mount Prospect's primary aquatic facilities include: „� III �� IIIII uu III�� ���„�, ����������m Ii W)III S A �. o�����u�l I�u�, 'llllpi w.mllli�. �OjIIIIII • Location:1401 W. Gregory St. • Amenities: 1-meter diving board, 8-foot drop slide, 8-lane lap pool, spacious zero -depth area, interactive water attractions, vending machines with tables and umbrellas, picnic turf area, large bathhouse with two family changing rooms, private party rental room III' � � IIII'° III. IIIII'°°°° IIII """"' "IIIII II IIII IIIII IIIII IIII """"" IIIII'°°°° IIII IIIII IIIII IIIII IllsIIIII IIIII IIII IIIII IIIII IIIIII�. IIIIk�I IIIII I������ II� I����I�IIII���I II� Location: 411 S. Maple St. Amenities: Wave pool with 3-foot cresting waves, zero - depth entry, picnic areas concessions note: this pool is p Y. p - C part of the referendum project and will be updated with a multi -purpose pool). 111 "� Illlf IIIIIA III IIIIIII1 IIIIf Illf IIIII III • Location:1500 E. Euclid Ave. • Amenities: Outdoor pool with water play elements I����� III��� IIIIIII''i° IIIIIII IIIIIIIIIIIIIi i Illlf°°° IIIf IIIII Illlf°°°° IIII'„IIII i IIIII Illlf°°° I1 IIIII IIII'3 • Location: 600 See-Gwun Ave. • Amenities:18-hole public golf course, over 25,000 sq. ft. of practice greens, bent grass driving range WJ Existing Conditions Report I MOUNT PROSPECT 2040 Page 126 of 164 .ate, Wedgewood Park Eveween Trails Park p g III III �� rt �u� �� �Ww,w � �Yr�,auulwuvr�x� "P1JIWeJd u1WUl'pW to laps pyW�m°w" '. Hi'll Maple 111, ils Park Park »�rt� l� d I� IIV�III Trail Park ulru A n'rp�„w 'Wm�u1111uuW�wueW.ux^ � ,w " �"�mw,,� �,uouaoouuu °;"w,; VIOM +P, MM=Wm%%, `,% ng I ulu �uulluuuullll���� hu��ll � � � P �fVUpuIUIIVIuuU )"I'l I1 Trails Park UI� �of � � f 1 � Hllu ' u��l�r uw1uW mlulm ou; munrl 4 t y,1 ,Sycamore T��arack v.� III1IIII I Trail JJI"'M �i �illlullmllli rrrrrrr , 1 IIII roup�Jlll �l1JIJJ)�� ilJl l l irview Park 11,11 UII"III � �I�1DU�II Park Centennial Park �UU Ilumlr y„IIIIIIIIIIIII s Utl L U �oV 'm^"" ""tiWbllWA WW'1A�'IU.✓If.„ 11� pVark �9ulUIpW�U �rt n�Vu, ,w, fFVI� V�I V�p� UlOU� ;qua . 'I 3 II Park ���n �� 06, �Walu� t °Iu ilipaill 1 � �y� � ,IIIONn� Poicket ParkIf �. mnm�uu� ��g "qr^ o " w I�IN IF @gam ' q U I 10.N�'�UlllllU�yi% �/. I�f /i Vllll�o u w WU �, o��d�Ji Y J2 .+y�N�N, � � �OIIIVIIIOOUIII ,�1000 �Ummmm�ul '�Mp� r III WTI pqw 4VIVIOIVIV � �A �yY uuiuouiuuui Flu o9' 4111" 6? gyp, � p 'W7"`evv*c; ��IIIIIIIIIIII���I ,il� Full f Clea arkSi Park S� ouumuuum VUV�uUUUU�uuuauuUO�Dlluuiuu ��III � - mwmnuxmNMIMFl Ctr3i"I'de. Park " D1ND � 1 y//�/I � i k1G. rtuaii mory .waryNf v�� 4�'�uWW IpµPo11UMp11 � m� ^fir rt „ a' V�p � rt� nd� mW uu�,u amarak Park flolo�„�r Iti���ffrD, oI ark f� �.� Frost POP 0000000000 ���IIIIIIII Redwood Park F NN.... JOIN) f i WII�ORR i r I I FA fill W 4 1 &1 Wit 112 Mile from a Park Residential 112 Mile from a Park 4 I M des 10 �j III II II II II Iq N1111% 0 age 127 of 1-64 uuuuum III pll uuuuu IIIIIIIIII plllllm Flooding remains a recurring concern in several areas of Mount Prospect, affecting residents, businesses, and infrastructure. While flood risks are not unique to the Village, local topography, historic development patterns, and the age of the stormwater system contribute to vulnerabilities that merit closer evaluation. Understanding existing conditions, including the extent of mapped floodplains, drainage capacity, and past investment, provides important context for future planning efforts. Mount Prospect, like many suburban communities, experiences localized flooding due to a combination of topographic conditions, aging infrastructure, and development patterns that predate modern stormwater standards. Intense rainfall events can overwhelm the storm sewer system, leading to street flooding, basement backups, and impacts to public and private property. These issues are most commonly reported in low-lying areas or neighborhoods with limited drainage capacity. Flood hazard areas in Mount Prospect have been delineated by the Federal Emergency Management Agency (FEMA) and are shown on the adjacent map. These include regulatory floodways,1% annual chance floodplains (commonly referred to as 100-year floodplains), and 0.2% annual chance floodplains (500-year floodplains). Flood zones are primarily concentrated along the Village's southern edge near Weller Creek and along several creek corridors that cross the community. Additional areas with flood risk appear throughout the central and northern parts of the Village, including portions of residential neighborhoods and commercial districts. Stormwater management in Mount Prospect is overseen by multiple agencies, including the Village, the Metropolitan Water Reclamation District of Greater Chicago (MWRD), and various drainage districts. In recent years, Village plans and capital improvements have incorporated sustainable stormwater practices, including green infrastructure elements aimed at reducing runoff and improving water quality. Recent projects include levee and pumping station improvements, Burning Bush Trails Park Drainage Improvements, and Aspen Trails Park Drainage Improvements, all aimed at increasing system capacity and reducing flood risk. k/16fler °Free spec Village staff and its stormwater consultant are currently developing a Stormwater Management Master Plan, which will build on data from past flooding events, FEMA mapping, and regional watershed studies to guide future infrastructure investments and flood mitigation strategies. This plan will identify priority projects, evaluate funding options, and outline phased implementation to address both existing problem areas and anticipated future challenges. 34 Existing Conditions Report I MOUNT PROSPECT 2040 Page 128 of 164 Camp McDonal....... . . . ...... . "' 0 &;,R'd�rctYr E E u c I i d -A .-Central Rd C Ir W. Lincoln St O . . ................................. ...... . - - ------ ............... E.- Kensington Rd 05 J111 'Iblij fl as iJ a Al e IN 4-J ................ 4-J C MEN ra Z eaa Id E.- Central: 11 4-J `°!ii% ��//r/ri/�/Oii/�i�,l ���r .,,....,,.,.�,� fly ,,. , �� .. / �iu�� � Nrmi; � µ,a, �luME E W. Lonnquist B v LLJ 0 allYID rrr%���J t 4 � r,Jt r ............... .............. .............. .............. .............. .............. ............. W. Golf -Rd --------- Qj Flood Hazard Areas Regulatory Floodway W, D e rn p ste rr St 1 Vo Annual Chance Flood Hazard 6 Annual Chance Flood Hazard CU 0.2% IPA ace Water Y W, Surf SIR, Parks Source., 0 ""cial Flood Insuronc-e Ral,e Map - creoted 4V the F�deral Emergency MonqgementAgency (FEMA) 0 1/4 1/2 1 Wes A L-L-L-L-L-L-L-L4age 129 of )-6 4 1 KEY CONSIDERATIONS After reviewing a wide range of existing conditions in the Village of Mount Prospect, several key considerations, issues, and opportunities have emerged that may inform the planning process. Summaries of each key consideration follow: An Aging Population That Will Shape Future Service and Housing Needs Mount Prospect's median age has steadily increased as longtime residents "age in place'; resulting in a growing senior population. The proportion of residents aged 65 and older is now higher than the county average, and this trend is expected to continue. Many of these households live in older single-family homes, which may become less suitable as physical and family needs change. The Comprehensive Plan could consider strategies to support aging in place, such as accessible home design, local transportation options, and nearby services. It could also evaluate the need for new senior housing types and even healthcare facilities to serve this demographic shift. These efforts should dovetail with the ongoing Aging in Community Action Plan. A More Diverse Community with Evolving Cultural and Language Needs Mount Prospect has experienced steady growth in racial, ethnic, and linguistic diversity over the past two decades. The Village is now home to large Hispanic and Asian populations, and nearly 30% of residents are foreign -born. Over 40% of households speak a language other than English at home, with especially high rates of Spanish and Polish speakers. These trends reflect an exciting, multicultural community but also highlight the importance of inclusive community development. The Comprehensive Plan could consider ways to prioritize accessible public communication, culturally responsive services, and opportunities for all residents to engage meaningfully in civic and community life. Predominantly Single -Family Housing, High Occupancy, and Affordability Pressures Mount Prospect's housing inventory is dominated by owner - occupied single-family homes and there is little remaining land for new single-family construction. This has resulted in high homeownership rates. At the same time, strong and sustained demand has driven vacancy rates to historic lows and pushed home values upward. While this stability benefits many existing homeowners, it has made it more difficult for renters, first-time buyers, and lower -income households to find affordable options. Recent infill efforts, particularly in Downtown, have added multifamily and rental units, but new development opportunities are limited, and continued reliance on single- family housing alone may not be sufficient to meet the needs of growing and economically diverse population. The Comprehensive Plan could explore strategies to support a broader mix of housing types and price points to ensure that young adults, seniors, and lower -wage workers can continue to live in the community. Limited Recent Housing Construction and Aging Stock Most of Mount Prospect's housing was built between 1940 and 1980, with relatively little new construction in recent decades. This aging stock may not fully meet current demands in terms of accessibility, energy efficiency, or design preferences. While the existing homes support neighborhood character and stability, reinvestment and rehabilitation will be increasingly important. The Comprehensive Plan could identify locations and consider strategies for infill development, redevelopment, or adaptive reuse to modernize housing options. 0 Existing Conditions Report I MOUNT PROSPECT 2040 Page 130 of 164 Strong Income Growth and Low Unemployment, But Not All Residents Share Equally Mount Prospect enjoys relatively high household incomes, low unemployment, and a strong labor force. Wages have grown over the past decade, and a large share of residents are employed in professional and healthcare sectors. However, a meaningful portion of the population still faces economic hardship —especially lower -income households and seniors on fixed incomes. These disparities underscore a need to balance economic growth with strategies that lift up lower -income residents. The Comprehensive Plan could propose strategies that ensure access to housing, healthcare, and supportive services for all residents. Downtown as a Community Anchor with Untapped Potential Downtown Mount Prospect has seen notable investment and revitalization, benefiting from its Metra station, pedestrian scale, and mix of civic, retail, and residential uses. Completed development projects have enhanced its vibrancy, but opportunities remain to increase foot traffic, support small businesses, and activate vacant or underutilized parcels. As the Village continues to evolve, Downtown can serve as a model for walkable, transit - oriented development, and the Comprehensive Plan could consider ways to further support housing, events, and public realm improvements in this key district. Retail and Industrial Hubs Drive the Local Economy, While South Mount Prospect as a Strategic Growth Area Many Residents Commute out of the Village for Work Key economic nodes such as Downtown, Randhurst Village, South Mount Prospect, and the Kensington Business Center support local employment in retail, manufacturing, and logistics. However, Mount Prospect remains a commuter suburb and a small share of residents work in the Village, while thousands commute daily to Chicago and other suburbs. The local economy benefits from inflow workers and retail spending, but the Comprehensive Plan could explore ways to attract more employers, support existing businesses, and increase opportunities for residents to work closer to home. Corridor Commercial Areas Facing Competitive Pressures Many of Mount Prospect's commercial corridors —such as Rand Road, Golf Road, and Elmhurst Road —were developed in a car -oriented, mid-century format. While these are still important retail areas, some properties are underutilized and face increasing competition from newer suburban centers. Updating land use regulations, incentivizing reinvestment, and exploring mixed -use or residential conversions could help these areas remain viable and relevant to changing market conditions. The Comprehensive Plan could explore strategies to achieve this. The southern portion of the Village has long-term development potential due to its available land, industrial corridors, and recently annexed areas. The 2020 Connect South Mount Prospect plan outlined a vision for balanced growth, including new business development, improved infrastructure, and neighborhood investment. Continued implementation of this plan will be crucial to attracting investment, creating jobs, and supporting a more viable southern district. The Comprehensive Plan could explore ways to build on the South Mount Prospect Plan. Strong Regional Connectivity Supporting Economic and CommuterAccess Mount Prospect benefits from excellent regional transportation access, including proximity to Interstate 90, major arterial corridors like Rand and Elmhurst Roads, and Metra's Union Pacific Northwest rail line. This connectivity enhances the Village's attractiveness for employers, commuters, and shoppers, and supports strong links to O'Hare International Airport and downtown Chicago. Maintaining and enhancing these regional connections will remain important for economic development and continued integration with the broader metropolitan area. MOUNT PROSPECT 2040 1 Existing Conditions Report 37 Page 131 of 164 Ongoing Active Transportation Expansion Needed Despite regional car connections and the Metra line to Chicago, travel within Mount Prospect presents challenges for pedestrians, cyclists, and transit users. Sidewalk networks remain incomplete in some residential areas, and while the Village now has approximately 30 miles of signed and marked bike routes —including shared -lane markings, marked bike lanes, and off-street recreational trails —connectivity between key destinations such as parks, schools, and commercial areas is still limited. Pace bus coverage is also limited, making many destinations difficult to reach without a car. Continued expansion of pedestrian and bicycle networks, including closing sidewalk gaps, extending bike routes, and enhancing intersections, paired with better integration between walking, biking, and transit, will be critical to improving safety, accessibility, and convenience for all users and reducing reliance on automobiles.The Comprehensive Plan can playa role in guiding this long-term, phased expansion of active transportation infrastructure. Extensive Park Network, with Some Opportunities for Enhancement The Village has a robust park system, with most residents living within a short walk of public green space. Larger community parks, numerous neighborhood sites, and mini parks together offer a variety of recreational opportunities. This strong foundation supports the Village's high quality of life, but the Comprehensive Plan could still investigate ways to improve the system, including closing remaining access gaps, upgrading amenities, and integrating trails and natural areas. Enhancing the park system also has the potential to advance health, equity, and environmental goals. Well -Served by Schools, Safety, and Amenities Mount Prospect is served by a range of school districts and service providers, offering quality education, public safety, and community resources. The Police and Fire Departments are well-equipped, the Village maintains a dynamic Human Services Department, and residents have access to a strong library and numerous recreational offerings. The Comprehensive Plan could consider demographic shifts, aging infrastructure, and intergovernmental collaboration to sustain service quality and adapt to changing needs. Building on Past Plans' Progress to Guide Future Development Mount Prospect 2040 can build on decades of prior planning work, including the 2017 Envision plan, the 2020 South Mount Prospect plan, and the 2013 Downtown Implementation Plan. Many goals have been achieved, especially in Downtown revitalization and South Mount Prospect annexation. However, key challenges like housing affordability, south side investment, and corridor enhancements remain. The planning process could carry forward successful strategies while adapting to current conditions, ensuring the plan is both grounded in community priorities and responsive to emerging opportunities. Environmental Resilience and Stormwater Management Needs Mount Prospect, like many suburbs, faces persistent challenges related to localized flooding and aging stormwater infrastructure. To address these issues, Village staff and a consultant team are developing a Stormwater Management Master Plan that evaluates the existing system and establishes a prioritized program of improvements. Drawing on past flooding reports, FEMA mapping, monitoring data, and hydrologic modeling, the plan will assess system capacity, set service targets, and identify both traditional and green infrastructure opportunities. Coordinated with partner agencies such as the MWRD and local drainage districts, and guided by regulatory requirements and community input, the plan emphasizes sustainable strategies to reduce flood risks, improve water quality, and strengthen long-term resilience. Building on this effort, the Comprehensive Plan can link stormwater priorities to land use and transportation planning, encourage development practices that limit runoff, and integrate stormwater solutions into parks, streets, and redevelopment projects to advance both infrastructure and environmental goals. 38 Existing Conditions Report I MOUNT PROSPECT 2040 Page 132 of 164 Intentionally Blank Page 133 of 164 Moul it I MOUNT PRuSPE,cT 20il m""l Immw E iiiiiiiiiiiiiiii) qo 111111111111 OWN i I,? I i i uuli' .............................. Al I'l, I I (MrP IMMUNITY ENGAGEMENT REPORT , IIIII "'iIIIIIIIIIII 2026 Page 135 of 164 COmmunity Engagement by the Numbers 665 ,I e oo s o i "I ........... m 'illl IVpuuuuuuo i Po4, ints of Engagement C'1'l'J Surve Rep j 2*11 Webs j 0 S lilt V S (U q u e ............... 0 r rr/ r r / . ✓rrr,,. ,,,,,,,,, ///,,,,,,,, rrr rrrrrrrr rrrr %% rrrrrrrrrrrrrrrrrrrrrrrr rii mom,,,,,,,,,, r r, r/irrrrrrrr /// r r /r r i rrrrr���r r rrr r � rrrrrrrr r i Focus r / Groups Engagement 9 Stat , ions Page 136 of 164 MOUNT PROSPECT 2040 CONTENTS TIMELINE................................................................................................................................................ 04 FOCUS GROUPS & KEY STAKEHOLDER INTERVIEWS......................................................................... 06 ENGAGEMENTSTATIONS..................................................................................................................... 10 VISIONING WORKSHOPS...................................................................................................................... 12 COMMUNITYSURVEY........................................................................................................................... 14 PROSPECT HIGH SCHOOL VISIONING WORKSHOP........................................................................... 16 COMMUNITY FEEDBACK...................................................................................................................... 18 Page 137 of 164 TIMELINE This timeline summarizes the first phase of the planning process, highlighting key milestones, community engagement, and the progression from early coordination to vision development. Over these months, the planning team met with Village leadership, attended public events, facilitated workshops, and gathered extensive input from residents, businesses, and stakeholders. Together, these activities helped build a strong foundation of ideas, insights, and direction that will guide the next steps of the comprehensive plan. e oj e a y �I a c ed witli a WII I a g e IIB o &� d IIId cko fftI i at e st a b l i s [) e d gc Is, ex p e cta t i ori s, o v e r a III &ir e mll .''iI ii�i� (""") ii �� e MAY uuuuuuuuuuuuuuuuuuuuuu IF "iu e te a rr ir) atte m," e(,J n�i n� �jr r'l�l lii ty e ve r "ii s t [n�'i ro t,.j g h o t �t Ih rr7 e n, )i �x�u�� it 'i �������nu1i1 ��t (:�1u�4 y i 41f ��u� � bP �r� � � rr � � �r ��u ri � r� ail II[` �' �l,�r �I�, ��°�� � � u}e y 1 o� 0\��� m" � rP �num� rP i � �''a� �n � flv, Rtnm� i' Illd rr e s i ere itts w h � u�` in w w'ks [''i o p a � id �ID 4 Engagement Report I MOUNT PROSPECT 2040 Page 138 of 164 G I III BRAINSTORMIN C. o irn"ir"i r"in � r"i i'�t y i r,.irt a r))i d c: o r"�)) c e Ilp t (�,:Jl e a- w e r" e, it i e s i z e d airA rrr d rg a r'))i i z e d i r')vt o e e r g i r"'il g [")i e ire e s t g i i� i d e Ilp I a iir ii iiri i rr i�i g. .............. lu"I'll ...... . .... ..................... I A G wl S mill I d e a s a �r i d o Ilh:')l �11'1'1)' (") iii"ll", 1"'), ll`�l lit r e s were de,vdq,'.')ed air�iid tested as 1[1,"ie 1) e g a e a i 1�y stages af t["�iie visiiodr ig IIharc)cess. MOUNT PROSPECT 2040 1 Engagement Report Page 139 of 164 r !9� 1, f� / 1, / f r / / � I 1 / l r / 1. /i,,.... .. .............;; l r P / r/ / l r / i / a / tlhCf l l� y l .rrrr, y I 1 r � i I r r f f / 1 � r � �, »» iollllllll � /i l / , , / / i //////0%/// r r /r ,/� / Sri . /i �u . �. r 1. / r .,... i1 111�I � ,, >! i r i %I111f l ,. / //.. ,..% ! /,. / _ i ��/ / f , � i vlll� � � y ., rr / r / / �1. G� r / ////% . ll // 1�J i l / / /rrrr f l / - 4I4f � >r> � a low 0 of",1 r/ t v A fi 11A� N wry 1 � / J / l PNi k ��IY AI rvvr'nrmmrWu'aw %III// // P / W / 1 tt� / r e / r 1 r /J i ( f I/ r911 l / t rr ll i / / / / i i FOCUS GROUPS &STAKEHOLDER MEETINGS The focus groups and stakeholder meetings provided essential insight into how residents, business owners, community leaders, and partner agencies experience Mount Prospect today. Through conversations with a wide range of participants, this phase of engagement helped identify shared priorities, persistent challenges, and emerging opportunities that will shape the MP2040 Comprehensive Plan. The summaries that follow highlight the key themes and perspectives gathered across each discussion. IIIIIIIII IIIIIIIII III IIIIIIIIIIIIIII IvuIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII III � � uuuuum uuuuum mill� uuuuuuul uuuuu uuuuum uuuuum. uumuul uuuuuuul llllm: llluo, Village staff from multiple departments participated in a workshop to provide early input for the Mount Prospect Comprehensive Plan, identifying major issues, community strengths, and priority actions to guide policy development. Participants highlighted top priorities including continued financial stability, walkability, flooding and stormwater management, aging infrastructure, housing affordability, economic vitality, public safety, and senior needs. IIIIIu IIIIIIII IIIIIIIIIu„IIIIIIIIIII IIIIIIIIIII OW����Sl(IIIIIIIIIII IIIIIIIIIII IIIIIIIIIII IIIII IIIIIIIIIIIIIIIIIIIIII iiiiiiloiil ���III IIIIIIIIIV IIIIIIIIIIIIIIIII IVi" IIIIIIIIIIIIIIII IIIIIIIIIIIIIII ���III;;;IIII IIIIIII� IIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIII, IIIIu IIIIIII� IIIIII IIIIIIIIIIIII IIIIII IIIIIIIIIII During the Downtown Merchants Association focus group, business owners described Mount Prospect as a friendly, engaged, and fast -evolving community where strong relationships with the Village and a pro -downtown attitude are major strengths. Participants praised the cleanliness of downtown and the supportive partnership with the Village, but also highlighted concerns about limited parking, insufficient business diversity, unclear procurement processes, low lunchtime foot traffic, and a lack of spaces and activities for kids. Merchants emphasized the importance of maintaining downtown's character while enhancing walkability, activating streetscapes, improving signage, and continuing to attract young residents through apartment growth. IIIII 46 IIIIIIIIIII illIlllllll uuuuu uIIIII uuuuul� uuu m u IIIII IIIIIIIIIII uuuuuuul Illuu` uuuuuuul uuuuuul uuuuuuul IIIllllllm III�IIII uuuuu Ill�lllllllluu" uuuuuuul iiulu� uuuuuuul During the Chamber of Commerce focus group, participants described Mount Prospect as a friendly and charming community undergoing rapid change, with new residents, increasing density, and shifting expectations. While they saw exciting potential in the Village's growing vibrancy and evolving identity, they also expressed concern that business activity, infrastructure, and long-term planning have not fully kept pace with this growth. Members emphasized the need for stronger ongoing business support, modernized marketing, improved mobility and parking solutions, expanded programming beyond downtown, and a clearer, more intentional community brand to position Mount Prospect as a true destination. Co Engagement Report I MOUNT PROSPECT 2040 Page 140 of 164 SUSTAINABILITY COMMISSION During the Sustainability Commission focus group, participants called for a clearer long-term sustainability vision supported by stronger programs, policy leadership, and community education. Key concerns included excessive waste and packaging, pesticide use, limited composting options, slow renewable energy adoption, and gaps in walking and biking infrastructure. Their shared 2040 vision centers on a cleaner, healthier, low -waste, and resilient Mount Prospect built on native landscaping, zero -emission practices, and community -wide environmental stewardship. Illllk���� uuullu II uuuuo IIII Participants in the Economic Development Commission focus group emphasized the need for Mount Prospect to continue to modernize its economic development approach, strengthen its identity, and continue creating a more flexible, business -friendly environment. Major concerns centered on rising development costs, the perception that it is difficult to do business in the Village, and the challenges facing key corridors like Randhurst and the Route 83 area. Attendees stressed the importance of improving walkability, reducing congestion, supporting mixed -use redevelopment, and elevating Mount Prospect's branding to compete with peer communities. Looking toward 2040, commissioners envisioned a community known for its flexibility, strong connectivity, thriving commercial districts, modernized infrastructure, and a clear reputation as a welcoming place for innovative business concepts. uuiuml� uu uuuuum IIIIIIIVVVV upIIIIW, IIIIIIIIIIIIIIII Vu" uuumiu° IIIIIII uuuuum uuuu The Police and Fire interviews focused on evolving public safety needs, service -demand trends, code and development considerations, and operational challenges linked to changing demographics, technology, and built - environment patterns. Both departments emphasized the importance of coordination with planning as the Village grows denser and more complex. The Public Works discussion focused on the Village's infrastructure systems, day-to-day operational challenges, and long-term needs related to stormwater, transportation, utilities, and coordination with regional agencies. Staff described increasing pressure on aging systems and highlighted the need for more proactive planning as weather patterns, land use, and service demands evolve. MOUNT PROSPECT 2040 1 Engagement Report Page 141 of 164 ul uuuuuul uuuuuV °'lllllm�. " IIII The Library staff interview explored how Mount Prospect's cultural, social, and physical environment shapes residents' needs, including gathering spaces, youth amenities, mobility options, and access to resources. The conversation emphasized the Library's role as a central "third place" and its perspective on community identity, equity, and long- term quality of life. IIIII IIIII uumum uuuuum mllp uuuu10 IIII IIII uuuuuluu IIII uuuuuuul lllm, uuuuuuuu uuuuuuul IIIII„ Representatives from Metra, Pace, and RTA shared major regional trends, opportunities, and considerations for Mount Prospect's future transit planning. All three agencies emphasized that the region is undergoing a major transformation driven by post -pandemic travel behavior, fiscal pressures, and the need for stronger land-use/transit integration. luuuo 25,26,5111171,5 Sir uuu Im The Superintendent interviews focused on district operations, facilities needs, and the relationship between school planning and village development. Leaders discussed enrollment trends, long-range facility planning, transportation and queuing challenges, and opportunities for stronger collaboration with the Village. uuuuul vu'A'A'�, u111111111111uuuuu uuuuuul uuuuul ����11111111111S uuuuul uuuuuluuuul uuulm uuuuu uuuuul ouuu o ul Von, uuuuu The Mount Prospect Park District (MPPD) and River Trails Park District (RTPD) emphasized the strength of Mount Prospect's community fabric, the major capital projects already underway, and the opportunities to expand recreational offerings to support quality of life and community identity. Much of the Park Districts' input aligns with in -person engagement themes and highlights how forthcoming referendum - funded improvements will position Mount Prospect as an even stronger destination for recreation, arts, wellness, and multigenerational experiences. Engagement Report I MOUNT PROSPECT 2040 Page 142 of 164 I lug uuuuulllllui"' uuuuuul m uuuuuul pl mpllilllll uuuuuuul uuuuuuul IIIII uuuuuul uuuuuul IIIIIIIIIIIIIII uuuuuuul uuuuuuul uuuuuul uuuuuuul IIIII A group of representatives from recent Mount Prospect development firms shared insight into the real estate climate, opportunities, and challenges shaping investment in the Village. Participants representing retail, multifamily, sports and recreation, office/industrial, and mixed -use portfolios offered candid observations about development feasibility, market trends, the Village's processes, and future opportunities. I I ,uuuuu uuuuul II uuuol uuuo uuuuuuul II � uuuuul uuuuu IIIIIIIIII uuuuuuuuull luulumu uuu� IIII uuuuul uuuuuuul uu' uuuuu°°I i� uuuuuul IIllllui�° uuuuuuul uuuuuuuuulu"°IIIIIIIIIIIIIII The Historical Society interview explored Mount Prospect's historic character, preservation challenges, community identity, and opportunities to integrate local history more visibly into public spaces, development, and cultural programming. The conversation emphasized both the Village's rich but understated heritage and the Society's resource constraints. MOUNT PROSPECT 2040 1 Engagement Report 0 Page 143 of 164 %,r' ,,.j � 90' y l INa. �, �, , ` ,y , a " ��°iXr m pI I 'i Vb'iN!` � v� � Arrr� P S u, IKtrd i,,1 0 (IIUJ f1f� ��- I l I'w~E II4 F � !!U!, r�,w.N� 6 o uN , , isa �' �° J is 1 jr i r� ENGAGEMENT STATIONS The engagement stations provided opportunities for community members across Mount Prospect to share their experiences, priorities, and concerns related to daily life in the village. Residents were often eager to share insights into how they interact with their neighborhoods, public spaces, and municipal services. The feedback collected helped illuminate recurring themes such as quality -of -life needs, accessibility issues, desired amenities, and aspirations for future development. Participants shared perspectives on the growing need for accessible mental -health resources, highlighting both service gaps and opportunities for stronger community support systems. Feedback pointed to a desire for more coordinated partnerships between schools, providers, and local organizations to ensure residents of all ages can receive timely and effective care. Residents discussed the challenges and opportunities associated with aging in place, particularly around housing options, mobility, and service accessibility. Many participants expressed interest in expanding senior -friendly housing, offering more transportation choices, and improving walkability within neighborhoods. Conversations also underscored the importance of social connection, emphasizing programs, facilities, and public spaces that help older adults remain active and engaged in the community. u " IIIIIIIIIIpVI IIIIIIIIVVVI VpI11111111 11111111111 S111111I11111 Vo. °pp 'illll Vpi IIIIIIIIIIIIIIII IIIIIIIIIIIIIIII III IIIIIIIIIIIIIIIII Visitors to the Randhurst Street Fest engagement station provided insights into how community events contribute to Mount Prospect's cultural vibrancy and economic activity. Participants highlighted the importance of lively, accessible gathering spaces and expressed enthusiasm for more festivals, outdoor dining, and family -friendly programming. Feedback also touched on the need to improve pedestrian safety and create stronger connections between event areas and nearby businesses. The Block Party was the most active engagement station of the summer. Feedback emphasized residents' desire for safe, welcoming neighborhoods with strong community ties. Participants raised topics such as traffic calming, improved sidewalk conditions, and more opportunities for neighbors to gather informally. Many also shared perspectives on maintaining the character of residential areas while supporting thoughtful reinvestment and ensuring public spaces remain comfortable and accessible for all ages. E Engagement Report I MOUNT PROSPECT 2040 Page 144 of 164 G9' r 1, IN o m r i Jf I HyJI`I f11fV"lo'F �i;1� a r lilig m r, ,1r:fr (ff61J 1 1%rof /�llrrr, �� �' fl � p 1i!!�� /� I "'J�� ' l j0Y a r � ���ti, 11f%Y111�Ii � i � ; �1 � aJ, , � i Nw I NV ' "' ,f ,"W i I rr'V4 a r s Ir� g,% fii ? ru,,,", :, , f vo I /c ll/l f l IFl it o 1/0 itm„ 141, I �% H % fir, ', �� I �, �/ �,x�4a �! i 1%: llflNr, �a lbe �Ivi✓�ny�.'�"N� s i" I�. �� ,, , IG flrna I IDNI P � f r/r/lllf f % l (JWs, /poiKS ! f 9 A7 r ;, ' � � „ „ I � / r � / � i ,�, I, �a, o, H/SPafH r � ��, �1��/'r'%/>l f�;iia: `i � ;11/0 rr� „ �r� A�,J�t, I i Q( u OPP I ,,CK,TD9,8/ �,,, ' U ,. "s ' , V ? a „� i 9 NI �Jr � I'� i At, IMIN� I�!` �� if i;a�14 � ' �� r lkwj r (E EA n � r F ,. � IIWWWWWWMM J a ;fir A 1 a f,: 4ifi fiio Zo 0' erVp t » i � r i avr , iA r o� # f / "Aaa' S sproiv IUI,iJ . r J ; I ' I ' � � f : � �Vit N� c'r ,li �,� I f �� �(+ n,, N-` � 1 f j �r li x° �u� /,1I� 1 i ✓ f . ;IIY)7 'r 1 i � „ li,, �`„�+ 'Okra "s� l;a��' Y, frr,, :,. ;.��`91-.1: ,....�. 's ��,. ;, ;Nk,( ,, r,i !,f i/ a" 9 p oW ' 1 / i, „y i s i H a N < i i a� 1 i , i . : „ r,,, �1111�, H/r !, r,� !� � � l , IJ II '� 1 f 1 ' I r � ° 'I )a�` 1 " � � x x� ���' i � , , " f 1 r 1 f ioH i 1, lf` I , , , ➢� � ` f � ti m'` i l " p. i/r („ ✓,� �i, 'Vr °Jan TRAI , A'fi, :;x - r '!� ,n �„ o/! i ('la' 9�f111 �� ,,....� o �c ,�i f', , ,� 1rr,li � r , ,G A a, p . , a A!' tf , Ifilf " f�US, "Jill"iflJ iU ,,, % rnr ,/r f„ ' .� (V H �v f1i �Jr H �� n J(Vn� ,� �e�ail �r%. l �. / / G r j,l,ffl" I ay,ir,., jo /a k Jar lii A.. i f. (,. ".., C ,.. �.. „ Hr �- /% lr%r ��� 2.. �1j ff;H %,fl, I/! a aff; %% „ 1. fi% y ;. j H j, 1,,, y r %I% AL H �' ,ill lit H, i% I f/tl//r fr„ I � 1x '1r r i� � �� M' 1ka'l r ,x.. t//`t;��1('' %'� `/ 9.fJ„?ill 7J/ T /� �III r 1 0"yH i '��'h�alvi�'��"r.; aMi �l`�"/ 1, �r,� T11,11 o� ��H%j� �H ll.. fa�D, 1 � 1� % % f ,j1 9 I � ri/��j/ � � p��I//1 all, f' ,r Ulf Oil i1/4 iiii iiiii (IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII C11111111111 IIIIIIIIIIyIIIIIIIIIII IIIIIII�CI(I IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIilll IIIIIIIIIIIIIIII i ullllll uuuuuuul Iluuul uuuuuuul °1IIIIVo Residents who engaged at the Resource Fair discussed the importance of equitable access to services, programs, and information across Mount Prospect Is diverse population. Participants noted challenges related to language barriers, awareness of available resources, and navigating various support systems. They also expressed a desire for expanded outreach, improved communication channels, and stronger collaboration across community -serving organizations. uuuuuuul (III IIIIII�VIIIIII uuuuuul uuluml� uIIIIIVo, uuuuuuul uuuuul uuuuul IIIIIIIII IIIIIII I�VIIIIII uuuuu uuuuuuul uuuuuluul III Parents at the event shared feedback focused on youth needs, school -area safety, and family -oriented amenities. Many emphasized the importance of safe walking and biking routes, after -school programs, and well -maintained parks. Conversations also highlighted opportunities to strengthen communication between the Village, schools, and families to better address concerns and support a high quality of life for children. ,Vldai cu �,idI enierated ftn III IIIIIIIIIIIIIII IIIIIIIIIIIII IIIIIIIIIIIIIIII R�������II Illllllilllll. iiiil IIIIIIIIIIIII 11�141illlll� R������������I IIIIIIIIIIIIIII IIIIIIIIIIIIII IIIIIIIIII II� At the Celebration of Cultures, participants underscored Mount Prospect's growing diversity and expressed strong support for cultural programming, inclusive community events, and spaces that reflect the village's multicultural identity. Feedback emphasized the need for accessible communication, representation in public spaces, and continued efforts to celebrate cultural traditions. Attendees also highlighted how diversity strengthens the community and should be reflected throughout the comprehensive plan. MOUNT PROSPECT 2040 1 Engagement Report Page 145 of 164 rr w� r / I I� r r r �j OF, 161 WON 77, luGk�Nrn�, , � I at < ,r r / r , / VISIONING WORKSHOPS /f psosm 0,2048 v+'I r, r rrlI u , " / I si u All fy "' r I 'ea'/ " I I / / 40 I The Visioning Workshops brought community members together to share their ideas, priorities, and aspirations for Mount Prospect's future. Through a series of interactive exercises, participants identified what they value most today, discussed challenges and opportunities facing the Village, and outlined their hopes for2040. The summaries that follow highlight the major themes that emerged across all three workshops and illustrate the community's vision for a more connected, and people -centered Mount Prospect. "�iii Iu IIIII IIIII uuumi" ' mppIIVm�, Illlm��. � uuuuuuui III uuu10� uuuolll uuolll uuuiiuui Participants in Visioning Workshop #1 provided a range of ideas focused on improving Mount Prospect's parks, mobility, commercial areas, and community amenities. Across groups, several clear themes emerged: a strong desire for more walkable and connected neighborhoods, reinvestment in aging parks and open spaces, expanded recreational and youth -focused facilities, and creative reuse of industrial or underutilized areas. Attendees expressed enthusiasm for arts, culture, and gathering spaces, and emphasized the need for improved riverwalk areas, bike trails, and public art. Collectively, these ideas reflect a vision fora more vibrant, accessible, and community -centered Mount Prospect. 12 Engagement Report I MOUNT PROSPECT 2040 Page 146 of 164 umu uuuui uuiuulllllVu,,,, uuuuil uu°i uuuu uuui uuui uumum uum� IVm, uuuuuuui uuu°°� uuuu uuui uuui uullliiiluuuuuui Participants in Visioning Workshop #2 focused primarily on parks and open spaces, neighborhood amenities, public art, and concerns related to industrial uses. Themes centered on expanding and improving recreational spaces, enhancing trail systems, increasing street lighting, and growing community event opportunities. Public art emerged as a significant repeated idea, as did the desire for more connected and accessible green spaces. Feedback also highlighted concerns about industrial impacts on adjacent neighborhoods and the need for proactive oversight. Overall, the workshop emphasized a desire fora more vibrant, safe, and connected community with strong recreational and cultural amenities. IIIII IIIII uuuu°°� ' oui�. Illllm�. uuuuuuui I uuuu°I� uuuu) uuuil uuuill uuu Visioning Workshop #3 gathered community perspectives using a simplified worksheet format. Participants identified their favorite aspects of Mount Prospect today, what they believe the Village needs by 2040, their top priorities for future improvements, and a one -word vision for Mount Prospect's future. Themes centered on walkability and bike -friendliness, stronger parks and open spaces, more community events —especially in South Mount Prospect — and enhanced safety and infrastructure. Public art and cultural vibrancy again emerged as notable community desires. Overall, Workshop #3 participants emphasized a future that is healthy, connected, and enjoyable, with more festivals, amenities, and accessible recreation. MOUNT PROSPECT 2040 1 Engagement Report 13 Page 147 of 164 COMMUNITY SURVEY This section summarizes the results of the Mount Prospect 2040 Community Survey, capturing resident perspectives on housing, mobility, commercial areas, community services, parks, and overall quality of life. The survey findings highlight both the strengths that define Mount Prospect today and the challenges that will require thoughtful action over the coming years. Together, these insights form a key foundation for the MP2040 Comprehensive Plan. The Mount Prospect 2040 Community Survey paints a picture of a community that deeply values its neighborhoods, parks, and overall quality of life, while also recognizing the pressure points that will shape future planning decisions. Residents overwhelmingly describe Mount Prospect as a welcoming, high -quality place to live — with strong confidence in its services, excellent libraries, parks and other amenities At the same time, respondents highlighted several areas where proactive planning is needed. Housing affordability and diversity emerged as major concerns, particularly for young adults and seniors, while many felt that aging commercial corridors and limited retail options outside Downtown require reinvestment. Transportation comments pointed to missing sidewalks, difficult crossings, gaps in bike infrastructure, and congestion challenges —yet a strong desire for more walkability if safe connections were provided. Environmental sustainability and green space preservation ranked highly, with broad support for tree planting, recycling, and renewable energy initiatives. Overall, the survey results reflect a community that is proud of its identity and amenities but ready to address long- term challenges related to housing, mobility, economic vitality, and environmental stewardship. These insights will help guide policy direction throughout the MP2040 Comprehensive Plan. 14 BIG MESSAGES Residents love Mount Prospect's quality of life —and want to protect what works. High satisfaction (91%) and strong ratings for parks, libraries, and emergency services demonstrate deep attachment to the community's strengths Housing availability, affordability, and diversity are major pressure points. Many feel priced out of certain housing types, and options for seniors and young adults are viewed as insufficient. Residents want safer, more connected transportation options. Despite high car reliance, walkability improvements are in great demand. 74% say they would walk more with safe sidewalks and paths Commercial areas outside Downtown need reinvestment. Downtown is a clear asset that should continue to grow, but other shopping areas, job opportunities, and aging retail corridors are seen as weaknesses. Sustainabilityand green space preservation are top community priorities. Environmental initiatives such as tree planting, recycling, renewable energy, and water conservation, receive strong majority support. Engagement Report I MOUNT PROSPECT 2040 Page 148 of 164 IIIII G uuuuuuui uuuuui mm� "°IIII uuuiuu mi a our uuuuuum HOUSING & RESIDENTIAL AREAS • Neighborhood character and housing quality score strongly as community assets. • Major weaknesses include affordable housing, senior housing, and options for young adults. • Nearly49% support policies to improve housing attainability. Residents are open to modest) increasing housing diversity: neutral -to -positive views toward 2-3 fiats and townhomes. • Personal vehicles dominate use (97%), but roughly 60% want better bike lanes and pedestrian connections. • Public transit is generally rated "good:' but a minority use it (43% use Metra and 1% use the bus). • 74% would walk more if safe sidewalk or trail connections existed. • Congestion and long signal cycles remain a recurring frustration. JOBS, DEVELOPMENT • Downtown scores strongly; it's widely viewed as a strength. • Other shopping areas and office/employment opportunities lean heavily toward weakness. • 67% say attracting new businesses is "very important:' • Residents support incentives for redevelopment, though with mixed certainty (50% yes / 34% unsure /16% no). • Corner stores located within neighborhoods is highly desired in the Village (76% like or love it) PARKS, RECREATION, & COMMUNITY AMENITIES • Neighborhood and community parks, playgrounds, and the library system are among the community's strongest assets. • The tree canopy, water -based amenities, and recreational programming score well. • Comments highlight desires for expanded park amenities, improved maintenance, and enhanced accessibility. • 87% say preserving green spaces is "very important:' • 71% say sustainability should be central in future planning. • Top desired initiatives: » Tree planting (81%) » Recycling and waste reduction (70%) Renewable energy projects (63%) Green building incentives (59%) » Water conservation (59%) COMMUNITY SERVICES & INFRASTRUCTURE • Emergency services are a standout strength (rated 4.65/5). • Water service and road maintenance are viewed positively, though residents expect continued investment. • Lighting and road conditions received mixed ratings, emphasizing the need fortargeted upgrades. MOUNT PROSPECT 2040 1 Engagement Report 15 Page 149 of 164 PROSPECT HIGH SCHOOL WORKSHOP The Prospect High School Visioning Event was a fast -paced, youth -focused workshop designed to gather student insights for the MP2040 Comprehensive Plan. Students identified what they value in Mount Prospect today, highlighted challenges they experience, from walkability and traffic to limited teen spaces, and shared ideas for future amenities, recreation options, and community gathering places. The session ensured that young residents, who often have different daily experiences and mobility needs, had a clear voice in shaping the Village's long-term vision. "Parks, events, and businesses should help attract people of all ages.,, "We need more sidewalks and safer ways to get around." "Mount Prospect should add more restaurants, bike trails, and places to explore." I Ws Engagement Report I MOUNT PROSPECT 2040 Page 150 of 164 "We want more spaces for teens to hang out." "We'd love more fun places to go like concerts and festivals." "Randhurst could be a more walkable shopping district with trees, trails, and better connections." MOUNT PROSPECT 2040 1 Engagement Report 17 Page 151 of 164 COMMUNITY FEEDBACK This section examines Mount Prospect's existing land use and development patterns to generate an understanding of the Village's existing built form. The information presented in this section will serve as a guide for future land use planning in the comprehensive plan. ,1OU S I I lluu" &. I'VIVVVVVV ""I'l I'VIIIIIIIII� ����' ii VVVVVVVI 00����pII)s • Limited housing affordability and diversity. The Village lacks starter homes, missing -middle units, and senior -friendly options to support a range of household needs. (Survey, Engagement Stations, Developers KSI) • Rising development costs. High construction, labor, and interest rates prevent most residential projects from becoming profitable without major public assistance. (Developers KSI) • Underutilized redevelopment sites. Areas like Randhurst, Metra parking lots, Wolf Road, and aging commercial parcels are not achieving their land -use potential. (Developers KSI, Transit KSI, Engagement Stations) • Rigid zoning limits flexibility. Prescriptive code requirements constrain mixed -use, higher -density housing, and innovative development formats. (Engagement Stations) • Uneven access to amenities. Certain neighborhoods —especially north and south MP — lack walkable access to parks, retail, and daily services. (Survey, Park District KSI) • Industrial land compatibility issues. Older industrial pockets create noise, traffic, and single - use activity patterns incompatible with adjacent neighborhoods. (VW1, VW2, Developers KSI) • Safety and management concerns in multifamily buildings. Higher service calls and building -level challenges arise in some denser developments. (School KSI) • Lack of family -friendly indoor destinations. Households and teens lack accessible, year-round indoor places to gather. (VW3, PHS) • Neighborhood character inconsistencies. Some areas have weak transitions between residential, commercial, and industrial uses, diminishing walkability. (Engagement Stations) • Limited senior -oriented housing near services. Older adults struggle to find accessible housing close to transit, healthcare, and amenities. (Survey) • Under-amenitized corridors. Key streets lack shade, greenery, sidewalks, and public spaces that support housing desirability. (VW1, Engagement Stations) 18 Engagement Report I MOUNT PROSPECT 2040 Page 152 of 164 POTENTIAL PROJECTS • Expand missing -middle housing options. Enable ADUs, 2-3 fiats, townhomes, and courtyard buildings throughout walkable areas. (Survey, Engagement Stations) • Redevelop Metra parking areas for TOD. Transform excess commuter parking into housing, retail, and public space. (Transit KSI) • Reimagine Randhurst as a mixed -use neighborhood. Add housing, plazas, trails, and destination retail to rebuild its identity. (Engagement Stations, Developers KSI) • Update zoning for mixed -use flexibility. Adopt modern standards that expand density, walkability, and incremental development opportunities. (Engagement Stations) • Expand senior -friendly and accessible housing. Promote development near transit, healthcare, and community centers. (Survey) • Encourage higher -density housing Downtown. Add apartments, condos, and mixed -use buildings to support restaurants, retail, and transit use. (Developers KSI, Engagement Stations) • Cluster development in targeted nodes. Focus growth in Downtown, Randhurst, Wolf Road, and industrial transition areas. (Developers KSI, VW1) • Promote workforce and attainable housing. g Partner with nonprofits, employers, and developers to increase affordable ownership and rental units. (Engagement Stations) • Coordinate redevelopment with school planning. Align long-term growth forecasts with enrollment and facility capacity. (School KSI) • Transition industrial sites into mixed -use districts. Convert obsolete industrial blocks into arts, recreation, office, or housing -driven neighborhoods. (VW1, VW2, Developers KSI) • Encourage family -friendly indoor destinations. Integrate play spaces, recreation, learning centers, and teen hangouts into redevelopment projects. (VW3, PHS) • Improve neighborhood public realm. Add sidewalks, trees, lighting, public art, and pocket parks along residential and mixed -use corridors. (VW1, Engagement Stations) MOUNT PROSPECT 2040 l Engagement Report H9 Page 153 of 164 uumuuu IuiiiuVlllll............. • Aging retail centers and vacant storefronts. Older shopping areas cannot compete with modern retail patterns and lack strong anchors to drive activity. (Engagement Stations, Developers KSI) • Insufficient restaurant and entertainment variety. Residents desire more dining, nightlife, bookstores, toy stores, and independent retail. (Engagement Stations, VW1) • High development and financing costs. Current construction and lending conditions make most commercial or mixed -use projects financially infeasible without major support. (Developers KSI) • Incentives not always competitive regionally. Some reported that other communities are offering stronger financing tools, grants, and upfront incentives than Mount Prospect. (Developers KSI) • Weak support for small businesses. New and existing businesses struggle with startup costs, limited assistance, and lack of incubator or pop-up opportunities. (Engagement Stations) • Lack of complementary business clustering. Commercial districts have gaps in retail categories and lack the synergy needed for all -day activity. (Developers KSI) • Business climate concerns. Some developers express perceptions that Village processes can feel slow, complex, or inflexible. (Developers KSI) • Limited tourism and destination identity. The Village lacks a compelling brand or draw that positions it as a regional attraction. (Survey) • Weak coordination with community partners. Schools, cultural groups, and businesses often operate independently rather than collaboratively. (School KSI) • Underutilized big -box properties. Large retail footprints built for past retail formats no longer match modern tenant needs. (Developers KSI) • Limited programming in commercial areas. Corridors and districts lack frequent events that stimulate foot traffic and economic activity. (VW3) • Competition with online retail. E-commerce contributes to vacancies and reduced local shopping. (Economic Trends) 20 Engagement Report I MOUNT PROSPECT 2040 Page 154 of 164 iiiiiiiii iiiiiiiii III i • Reimagine Randhurst as a walkable mixed -use district. Integrate housing, open space, outdoor retail, trail connections, and placemaking to create a new destination. (Developers KSI, Engagement Stations) • Strengthen Downtown as a dining and shopping hub. Expand restaurant variety, support infill development, and activate upper floors. (Engagement Stations) • Provide stronger, more flexible incentives. Use grants, upfront TIF, gap financing, or low -interest loans to make transformative projects feasible. (Developers KSI) • Support pop -ups, incubators, and flexible commercial spaces. Enable short-term uses, start-up retail, and seasonal markets to fill gaps and reduce vacancies. (Engagement Stations) • Leverage proximity to the Bears stadium. Capture spillover demand from major events with restaurants, hotels, entertainment, and specialty retail. (Developers KSI) • Recruit unique restaurants, cafes, and specialty shops. Fill missing retail categories such as bookstores, toy stores, boutiques, and multicultural offerings. (Engagement Stations) • Redevelop big -box or aging retail centers. Replace older formats with multi -story mixed -use developments that include housing and public space. (Developers KSI) • Increase cultural and family -friendly destinations. Introduce indoor entertainment, recreation venues, and all -age activity spaces. (VW3, PHS) • Strengthen collaboration with the Library, schools, and cultural groups. Create shared programming and district -wide economic initiatives. (School KSI) • Add seasonal programming to commercial districts. Host food truck nights, craft markets, concerts, and festivals to increase foot traffic. (VW3) • Introduce identity -focused branding and signage. Use cohesive wayfinding, lighting, and districttheming to strengthen economic areas. (Engagement Stations) • Support nonprofit and community -serving businesses. Provide space, financial support, and partnerships that meet local social and cultural needs. (Engagement Stations) MOUNT PROSPECT 2040 1 Engagement Report 21 Page 155 of 164 ull mill uuuuuuu • Chronic flooding and drainage problems. Undersized and aging stormwater systems cause persistent neighborhood flooding and strain public facilities. (Public Works, Survey) • Aging roads, utilities, and sewer networks. Infrastructure across the Village requires significant long-term reinvestment. (Public Works) • Rising emergency and mental -health related calls. Police and Fire departments see increasing complexity and volume in service demands. (Public Safety KSI) • Staffing shortages in Police and Fire. Recruitment challenges and declining applicant pools make it difficult to maintain full staffing. (Public Safety KSI) • Emerging fire -safety risks from lithium -ion batteries. New technology introduces additional response and prevention challenges. (Public Safety KSI) • Aging and non-ADA-compliant school facilities. Many school buildings require modernization, accessibility upgrades, and long-term planning. (School KSI) • Limited indoor community gathering spaces. Residents lack year-round recreation, event, and youth spaces across the Village. (VW3, PHS) • Siloed communication between schools and the Village. Coordination and planning across agencies often lack alignment. (School KSI) • Insufficient amenities at parks and public facilities. Many locations lack restrooms, shade, water fountains, or seating. (Engagement Stations) • Underused or outdated facilities at key districts. Civic spaces in Downtown, Randhurst, and other core areas need modernization or reinvestment. (Engagement Stations) • Strain from widespread sump -pump discharge. High discharge volumes overwhelm local stormwater systems and contribute to flooding. (Public Works) • Growing senior population needs. Increasing demand for senior programs, accessible facilities, and mobility options is outpacing supply. (Survey, Senior Feedback) • Declining or fluctuating school enrollment. Shifting demographics create uncertainty in long- term development and facility planning. (School KSI) 22 Engagement Report l MOUNT PROSPECT 2040 Page 156 of 164 iiiiiiiii iiiiiiiii III i • Create a stormwater utility to fund upgrades. A dedicated funding mechanism would support drainage improvements across the Village. (Village Priorities) • Develop a new senior/community center. A centralized hub for recreation, programs, and multigenerational use can meet emerging needs. (Village Priorities) • Expand emergency service staffing, equipment, and analytics. Improve service reliability and enhance readiness for complex calls. (Public Safety KSI) • Modernize school buildings. Align facility upgrades with demographic forecasts, accessibility needs, and safety improvements. (School KSI) • Improve ADA accessibility across all public facilities. Expand ramps, elevators, accessible pathways, and inclusive programming. (School KSI, Engagement) • Create new indoor recreation and gathering spaces. Opportunities include teen hangouts, multipurpose rooms, indoor walking tracks, and flexible community spaces. (VW3, Park District KSI) • Add basic amenities to parks and civic facilities. Public restrooms, water stations, shade structures, and seating would enhance usability. (Engagement Stations) • Expand green infrastructure practices. Bioswales, permeable paving, and rain gardens can improve drainage and sustainability. (Sustainability Engagement) • Strengthen interagency coordination. Formalize communication channels among the Village, Park District, schools, and public safety departments. (School KSI) • Leverage Park District referendum projects. New investments at Lions Memorial Park will strengthen arts, fitness, aquatics, and community spaces. (Park District KSI) • Improve public facilities in redevelopment areas. Future projects at Downtown, Randhurst, and 111 Busse can incorporate civic and community uses. (Developers KSI, VW1) • Introduce community -wide communication improvements. Enhance event notifications, emergency alerts, and engagement tools. (Survey, Engagement Stations) MOUNT PROSPECT 2040 1 Engagement Report 23 Page 157 of 164 • Traffic congestion and poorly timed signals. Key intersections experience backups due to outdated signal timing, confusing geometry, and inconsistent signage. (Public Works, Engagement Stations) • Unsafe or difficult pedestrian crossings. Intersections such as Central/Emerson, Golf/ Elmhurst, and parts of Northwest Highway create safety risks for walkers. (Engagement Stations, Survey) • Missing sidewalks and incomplete networks. Sidewalk gaps limit walkability in several neighborhoods and corridors. (Survey, Engagement Stations) • Fragmented and unsafe bike network. Lack of protected bike lanes and off-street facilities reduces safety and connectivity. (Engagement Stations) • Limited Pace bus frequency and weekend service. Low headways hinder convenience, particularly for riders who need all -day mobility. (Transit KSI) • Underused and aging transit amenities. Many stops lack shelters, lighting, or real-time arrival information. (Transit KSI, Engagement Stations) • Weak last -mile connectivity. Gaps between Metra, Pace, CTA, and neighborhood destinations reduce the usefulness of transit. (Transit KSI) • Traffic and queuing issues at schools. Pickup/ drop-off congestion and a -bike conflicts create safety and flow challenges. (School KSI) • Parking pressure neartransit areas. Balancing TOD goals with community expectations for parking continues to be challenging. (Transit KSI) • Mobility challenges around Randhurst and major commercial areas. Auto -dominated streetscapes reduce comfort for pedestrians and cyclists. (Engagement Stations) • Street lighting and visibility issues. Poor nighttime visibility impacts both safety and emergency response. (Public Safety KSI) • Limited shuttle viability. Suburban shuttles struggle due to low density, insufficient frequency, and high operating costs. (Transit KSI) • Emerging technology gaps. EV infrastructure, autonomous vehicles, and modern mobility tools are not yet fully planned for. (Transit KSI) 24 Engagement Report I MOUNT PROSPECT 2040 Page 158 of 164 iiiiiiiii iiiiiiiii III i • Modernize traffic signals and corridor operations. Adaptive signal technology and intersection redesigns can reduce congestion. (Public Works) • Build a connected, protected bike network. Create separated lanes, off-street trails, and safe crossings to improve bike mobility. (Engagement Stations) • Improve pedestrian safety with enhanced crossings. Add RRFBs, raised crosswalks, curb extensions, underpasses/overpasses, and better lighting. (Engagement Stations) • Expand transit frequency and all -day service. Support Metra's 30-minute service goal and Pace's shift toward seven-day corridors. (Transit KSI) • Advance Pulse or rapid -bus service on Golf Road. Prepare corridor design, stops, and land use to support future arterial rapid transit. (Transit KSI) • Create a Downtown circulator or shuttle. A small -loop service could connect Metra, Downtown, Randhurst, and civic destinations if ridership goals are clear. (Transit KSI, Engagement Stations) • Improve last -mile connections to regional hubs. Strengthen links to Jefferson Park and other transfer points. (Transit KSI) • Add modern transit amenities. Upgrade stops with shelters, heating, pads, and real-time signage to enhance rider comfort. (Transit KSI) • Implement Safe Routes to School improvements. Add signage, protected crossings, bike parking, and circulation fixes around schools. (School KSI) • Enhance multimodal access in commercial areas. Wider sidewalks, street trees, and safer crossings can make Randhurst and Downtown more walkable. (Engagement Stations) • Plan for EV charging networks. Expand stations at civic facilities, corridors, and redevelopment sites. (Sustainability Engagement) • Prepare long-term strategy for autonomous vehicles. Plan curb zones, pickup areas, and regulatory frameworks as technology matures. (Transit KSI) • Use wayfinding and signage to improve navigation. Add consistent pedestrian and vehicular wayfinding across the Village. (Engagement Stations) MOUNT PROSPECT 2040 1 Engagement Report 25 Page 159 of 164 • Need for more parks in underserved areas. South Mount Prospect and several neighborhoods lack walkable access to parks or open space. (Engagement Stations, Park District KSI) • Aging or underutilized park facilities. Portions of the park system, including RecPlex frontage areas, are outdated or not maximizing their potential. (Park District KSI) • Playgrounds needing upgrades. Many playgrounds lack shade, varied equipment, sensory features, or modern surfacing. (Engagement Stations) • Limited recreational amenities. Residents expressed desire for pools, splash pads, turf fields, basketball courts, pickleball courts, and dog parks. (Survey, Engagement Stations) • Field drainage and maintenance challenges. Melas Park fields suffer from poor drainage, limiting their reliability for athletics. (Park District KSI) • Uneven access to nature and quiet spaces. Residents want more trails, gardens, native landscapes, and passive recreation areas. (Engagement Stations) • Insufficient amenities in parks. Many locations lack restrooms, shade, water fountains, and seating, reducing comfort for users. (Engagement Stations) • Connectivity limitations between parks. Gaps in sidewalks, bike trails, and wayfinding make it difficult to link parks into a cohesive system. (Engagement Stations) • Rising expectations for parks as community destinations. As Mount Prospect grows as a place to "eat, play, and stay," demands on parks continue to increase. (Park District KSI) • Competition for field space. Youth sports and community groups struggle to secure adequate athletic field availability. (Park District KSI) • Aging aquatics infrastructure. Existing pools need long-term reinvestment or modernization to meet community demand. (Park District KSI) 26 Engagement Report I MOUNT PROSPECT 2040 Page 160 of 164 iiiiiiiii iiiiiiiii III i • Expand park access in underserved neighborhoods. Use land acquisition, redevelopment, and partnerships to add new parks or pocket parks. (Engagement Stations) • Deliver transformational referendum projects. Major improvements at Lions Memorial Park will create a true all -ages destination with a new pool, expanded rec center, arts space, indoor walking track, and enhanced amenities. (Park District KSI) • Revitalize RecPlex frontage. Add a free -to -use splash pad, upgraded outdoor areas, and welcoming entry spaces. (Park District KSI) • Improve fields and drainage at Melas Park. Turf conversion and drainage enhancements will expand athletic capacity and usability. (Park District KSI) • Add new recreation amenities. Introduce pickleball, turf fields, basketball courts, shaded playgrounds, and dog parks in strategic locations. (Engagement Stations) • Expand trail and nature networks. Add walking loops, nature paths, gardens, native landscaping, and quiet spaces. (Engagement Stations) • Increase park amenities for comfort. Provide bathrooms, shade structures, seating, water fountains, and accessible pathways. (Engagement Stations) • Connect parks through an improved trail and sidewalk network. Create a unified system linking parks, schools, neighborhoods, and commercial areas. (Engagement Stations) • Leverage redevelopment to create green space. Integrate plazas, pocket parks, and green corridors into mixed -use districts like Randhurst or 111 Busse. (Developers KSI) • Expand community gardens and sustainability programs. Promote native planting, pollinator habitats, and composting at parks and public sites. (Sustainability Engagement) • Add year-round outdoor activation. Host winter markets, concerts, outdoor fitness, and seasonal events to maximize park use. (VW3) • Strengthen parks as part of Mount Prospect's identity. Use upgrades and programming to reinforce the Village as a regional recreation destination. (Park District KSI) MOUNT PROSPECT 2040 1 Engagement Report 27 Page 161 of 164 uuu uuuuui uuuuui uuuuui °°�pp II uuumumu uui III 111 • Lack of a cohesive visual village -wide identity. Mount Prospect does not have a strong or consistent visual identity that ties districts together. (Survey, Engagement Stations) • Insufficient public gathering spaces. There is no signature plaza, town square, or major public space that defines the community. (Engagement Stations, VW1) • Limited public art and cultural expression. Residents want murals, sculptures, fountains, and culturally inclusive displays across the Village. (Engagement Stations) • Outdated or inconsistent streetscape elements. Lighting, benches, landscaping, and signage vary widely across corridors and districts. (Engagement Stations) • Some Corridors lack character and walkability. Many commercial streets feel auto -oriented and lack shade, greenery, seating, or pedestrian infrastructure. (VW1, Engagement Stations) • Historic buildings continue to be lost. Demolitions and redevelopment have reduced visibility of the Village's historic fabric. (Historical Society KSI) • Underrecognized cultural and community heritage. Indigenous stories, longtime resident histories, and diverse cultural narratives are not well represented. (Historical Society KSI) • Gateways and major intersections lack identity. Arrival points into the Village do not convey a strong sense of place. (Engagement Stations) • Limited youth -oriented third places. Teens lack accessible, inclusive public spaces that encourage positive social interaction. (PHS, VW3) • Public spaces lack amenities. Many lack shade, seating, lighting, or design elements that encourage everyday use. (Engagement Stations) • Few district -level placemaking initiatives. Downtown, Randhurst, and key corridors lack consistent branding or event activation. (Engagement Stations) • Lack of storytelling in the built environment. Physical spaces do not reflect Mount Prospect's history, culture, or community values. (Historical Society KSI) 28 Engagement Report I MOUNT PROSPECT 2040 Page 162 of 164 iiiiiiiii iiiiiiiii III i • Create a downtown plaza or town square. A central, flexible public space would support community events, everyday gathering, and a stronger downtown identity. (Engagement Stations, VW1) • Develop village -wide design standards. Streetscape, signage, lighting, and landscape guidelines can unify the look and feel of key corridors. (Engagement Stations) • Expand public art and cultural displays. Install murals, sculptures, fountains, and inclusive cultural expressions throughout the Village. (Engagement Stations) • Enhance corridor appearance and comfort. Add street trees, landscaping, wider sidewalks, pedestrian lighting, and traffic -calming improvements. (VW1) • Create culturally inclusive placemaking programs. Support events, displays, and installations celebrating the Village's diversity. (Engagement Stations) • Launch a historic marker and storytelling system. Highlight significant people, sites, and eras across the community. (Historical Society KSI) • Improve gateways and arrival points. Redesign Village entry locations with signage, landscaping, lighting, and public art. (Engagement Stations) • Introduce youth -friendly third places. Create inclusive indoor/outdoor spaces for teens such as lounges, creative labs, and multiuse hangout areas. (PHS, VW3) • Add public realm amenities to high -traffic areas. Increase seating, shading, water features, and comfortable pedestrian spaces. (Engagement Stations) • Strengthen placemaking in commercial districts. Enhance Downtown, Randhurst, and neighborhood nodes with branding, lighting, and activation. (Engagement Stations) • Integrate history into redevelopment projects. Use interpretive displays, plaques, and design elements to embed local heritage into modern spaces. (Historical Society KSI) • Expand festivals, art walks, and neighborhood events. Build recurring programming that reinforces identity and increases foot traffic. (VW3) • Create a modern wayfinding and signage system. Establish district markers, pedestrian directions, and branded signage. (Engagement Stations) MOUNT PROSPECT 2040 1 Engagement Report 29 Page 163 of 164