HomeMy WebLinkAbout9.2 Motion to accept the proposal from Christopher B. Burke Engineering LTD of Rosemont, Illinois for Rand/Kensington/Elmhurst Road (IL Route 83) Intersection — Phase III Construction Engineering Services for an amount not to exceed $1,656,576.Item Cover Page Subject Motion to accept the proposal from Christopher B. Burke Engineering LTD of Rosemont, Illinois for Rand/Kensington/Elmhurst Road (IL Route 83) Intersection — Phase III Construction Engineering Services for an amount not to exceed $1,,656,,576. Meeting July 21, 2026 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD Fiscal Impact (Y/N) Dollar Amount Budget Source Category Type Information Y $136567576 Capital Improvements Fund VILLAGE MANAGER'S REPORT Action Item A key component of the Mount Prospect Strategic Plan is to partner with appropriate government agencies to resolve troublesome intersection issues. One such area that has received attention in recent years is the three closely spaced intersections involving Rand Road (US 12), Illinois Route 83 and Kensington Road. The traffic -signalized intersections form a triangle that experiences operational issues on a daily basis. Long delays to get through the intersection is a common complaint from motorists. As a result, nearby local streets experience increased cut through traffic. Timing adjustments and small road improvements have been made over the years with minor improvement. The Village is committed to developing a plan that will provide significant enhancements to the transportation system and benefit motorists, pedestrians, bicyclists, nearby businesses, and our residents. The scope of construction work consists of adding a northwesterly through lane on US Route 12 at IL 83 and Kensington Road, a northbound and southbound right -turn lane on IL 83 at Kensington Road, a second northbound left -turn lane, a second southbound left -turn and a southbound right -turn lane on IL 83 at US Route 12, an eastbound and westbound left -turn lane on Kensington Road at IL 83, an eastbound right -turn lane and a westbound left -turn lane on Kensington Road at US Route 12. All traffic signals, traffic signal poles, and the traffic signal controller at the triangle intersection will be replaced with new equipment. New streetlights will be installed for the project limits. In addition, sidewalks are proposed along all legs of the triangle intersection, with a shared -use path proposed along the west side of US Route 12 from Isabella Street to Wedgewood Lane. The Village completed a Phase I Preliminary Engineering study with the services of an engineering consultant. The study was approved by IDOT in March 2022. This phase was Village funded. A Phase II Design Engineering contract was approved by the Village Board of Trustees in January 2022. This ongoing phase is partially funded by a US Congressional Appropriations grant from Congresswoman Jan Schakowsky and a Surface Transportation Program (STP) grant. Pre -final construction plans and specifications are currently being reviewed by IDOT and Village staff. The Village has also received federal funding commitments from the Illinois Transportation Enhancement Program (ITEP), Surface Transportation Program (STP), and US Congressional Appropriation from Congresswoman Jan Schakowsky for Construction and Phase III Construction Engineering. To date, the Village has secured $15 Million in State and Federal funding. The project is currently scheduled to let by IDOT in November 2026 with construction to start next Spring. Work is anticipated to be completed in 2028. The Phase III Construction Engineering Agreement must be submitted to IDOT by July 27, 2026, to meet the November 2026 letting. As federal funds are being used for this project, the Village must follow the federally mandated Qualification Based Selection (QBS) process with this project. Staff is seeking to enter into a contract with an engineering consulting firm to provide Phase III Construction Engineering services. The Village lacks sufficient resources to perform this work utilizing in-house staff. Staff is only recommending approval of the Phase III Construction Engineering contract at this time. It is a requirement of the federal funds that the Village enter into a contract with a consultant prior to bidding the construction contract. The consultant selected by the Village will provide full-time inspection during construction. The Village will be responsible for paying the consultant using local funds and seeking reimbursement from IDOT for the federal share. Request for Statement of Qualifications As required by the QBS process, the Village solicited a Statement of Qualifications from engineering consulting firms to provide services for Phase III Construction Engineering. A notice was posted on the OpenBids bidding website. Firms were asked to submit, as part of their proposal, the following information: • Resumes of key personnel • Related experience on similar type project • Summary of the firm's approach to the project • Prequalification status with IDOT • Project schedule Tasks identified in the Request for Statement of Qualifications (RSQ) include: • Become familiar with the traffic operations at the intersections and surrounding access to Rand Road, IL 83 and Kensington Road within the project limits. • Fully understand the Project Development Report, pre -final plans, pre -final specifications, and estimate of cost. • Assist the Village with applying for additional funding as necessary. • Complete all tasks related to providing Construction Engineering meeting Federal, State & Village requirements. • Participate in a Preconstruction Meeting with IDOT, Village Staff and the Contractor. • Review shop drawings and other equipment/material submittals as may be required. • Coordinate with private utility companies to relocate facilities as necessary prior to construction. • Provide horizontal and vertical construction layout of the proposed improvements as necessary. • Coordinate material testing and QA/QC with the Contractor during construction. • Coordinate private property work with property owners to minimize disruption. • Respond to inquiries from various stakeholders and address issues in a timely manner. • Attend and conduct weekly construction coordination/status meetings. • Prepare pay estimates for contractor work performed. IDOT will pay the contractor directly and seek reimbursement from the Village for our share of the project. • Complete all necessary paperwork during construction. • Prepare invoices for consultant work performed on IDOT forms. • Create a construction punch list and ensure all outstanding items are completed to the satisfaction of IDOT and the Village. • Coordinated final inspection and paperwork with IDOT and the Village. • Prepare as -built drawings. RSQ Results The consulting firms' Statement of Qualifications were reviewed on the basis of their understanding of our goals and their methodology for completing the tasks. They were rated (with a maximum score of 100 points) according to these specific categories: project understanding and technical approach, similar project experience, project team capabilities, IDOT prequalification status, and overall completeness of submittal. The rankings are: Technical Proposals Project Understanding Similar Project IDOT Pre- Overall & Technical Project Team qualification Completeness Firm Approach Experience Capabilities Status of Submittal Total Max. 30 25 25 10 10 100 Points CBBEL 29 25 25 10 10 99 Patrick 29 24 24 10 9 96 Thomas 28 23 23 10 10 94 Bowman 28 21 23 10 9 91 Ciorba Group 27 23 21 10 8 89 Tecma 26 20 22 10 8 86 DLZ 24 18 22 10 8 82 Discussion Staff conducted interviews with the top three consultants and determined Christopher B. Burke Engineering Ltd. (CBBEL) to be the preferred consultant for the project. They have put together a very strong project team with extensive construction engineering experience on various public infrastructure projects, including the recently completed Rand -Central -Mount Prospect intersection improvements. They also have a working relationship with IDOT and understand the process to meet all State and Federal requirements. We believe that CBBEL has the project coordination, communication and documentation skills needed to successfully accomplish the project within the proposed schedule. CBBEL meets the IDOT prequalification requirements to perform this work and has recently completed construction engineering services for similar projects for the Village of Franklin Park, Village of Skokie, and Village of Arlington Heights. The QBS process is required for this contract as it uses federal funds. Like other Village projects using federal funds, it does not permit cost proposals to be submitted with the Statement of Qualifications. Upon selection of CBBEL as Village staffs highest ranked firm, they provided a detailed cost proposal including a breakdown of hours by task. Village staff negotiated with CBBEL to assure the cost proposal has sufficient hours for each task, is reasonable in price, meets the goals and schedule of the project, and is in the best interest of the Village. Village staff supports the cost proposal submitted by CBBEL in the amount of $1,656,,576 to provide construction engineering services for Rand -IL 83-Kensington - Phase III Construction Engineering. It is staffs opinion that CBBEL is best qualified to perform the requisite work, has allotted appropriate work effort, and requested a reasonable, competitive fee (9,966 hours / $166 per hour). The current cost estimate for construction is $13,804,800. The cost proposal for construction engineering services submitted by CBBEL in the amount of $1,656,,576 represents 12.0% of the current construction cost estimate. This is within a typical range for the scope and complexity of the project. As mentioned above, the Village will pay invoices directly to the consultant and seek reimbursement from IDOT for the federal share. Federal funding will cover 77% of the Construction Engineering contract, the total being $1,272,728. The Village is responsible for the 23% local share, the total being $383,848. Alternatives 1. Accept proposal CBBEL for Rand/Kensington/Elmhurst Road Intersection Improvements - Phase III Construction Engineering. 2. Action at the discretion of the Village Board. Staff Recommendation Staff recommends that the Village Board accept the proposal from Christopher B. Burke Engineering, Ltd. (CBBEL) of Rosemont, Illinois to provide construction engineering services for the Rand -IL 83-Kensington Intersection Improvements for an amount not to exceed $lf656f576. Attachments 1. R-83-K Plan 2. R-83-K Phase III RSQ 3. CBBEL Technical Proposal 4. CBBEL Cost Proposal 5. CBBEL Scope of Services A v� S lip w W, ja to 00 U Dw LLJ v qp All 4 jill jor'A POP F S, im 0 U 4/0 h U) o Z RO�DWAY �'AOJ�CT IT ILLINOIS 83 Als r/M th, 0:1 44 e, /isioll W/ w 14" am ol/ V Y%/ 00 OF 'p, p,01, r fi/10 A A M LI J 1 rk. . .... . . . .. la" a", al "A 2/V 44I.V "N . . . . . . . . . . . 0 V9 r S g, N� ?M /2, j ,miaaz jq V a FAV a v , , , , , / / , I 4 OR 2, ;/Axs A ANNA Opp IS IS S T A All v 10/0001/10 jellpplplloo��m�r I , !"Fi, dams ugg g 'M 1161, P/ . ........ ..... Aft "K . ... . A", WINVAll M e C, .. .. . . .. .. .. - g/ . ......... 3, o"t, dffilbllya U 01 ly I I � I/ IFF,11;; S 'a, , 11P, lls IL A w I E b J, LI M/ M, m �4wT Mll g, rr v ul, ol, ..................... g Al % IV -,), j I/ > ai hV W', g sum 'M - Is of &g,,(,//,j,, I'll . . . . . . . . . . . . wilviarldI Sim M/ 4 A/ ,9 J11" Mary,"', j now)), M, 2 :j 9,11,1111, ral 2, sil a Ml g JUDI 11 Ell j /l/g/j, INAFF/r/K 9 oolr,-Z M; "A j Wal jM, MORY !77 "I'll", Joel W ;,r M m S1, R Si, M7 a"Ir"oll 10,00001 F j A wim/Al it vildi/l/ VILLAGE MANAGER MAYOR Paul Wm. Hoefert TRUSTEES Vincent J. Dante Elizabeth B. DiPrima Terri Gens William A. Grossi John J. Matuszak Colleen E. Saccotelli DATE: May 26, 2026 ®����•�� Michael J. Ca ssa dy Mount Prospect DIRECTOR OF PUBLIC WORKS Sean Dorsey Phone: 847/870-5640 Fax: 847/253-9377 www. mountprospect.org Village of Mount Prospect Public W• 1700 W. Central Road, Mount Prospect, Illinois 60056 Request for Statement of Qualifications FROM: Matthew Lawrie, P.E. Village of Mount Prospect Public Works Department RE: Request for Statement of Qualifications Rand -IL 83-Kensington Phase III Construction Engineering The Village of Mount Prospect seeks Statement of Qualifications from engineering firms for Phase III Construction Engineering services for roadway improvements at and around the intersection of Rand Road, IL 83 and Kensington Road. Attached to this memo are: 1. A list of materials and information that should be included with your Statement of Qualifications (Exhibit A). 2. A general definition of the scope of work and requirements for your submittal (Exhibit B). 3. The evaluation process and tentative schedule (Exhibit C). 4. A map identifying the project limits (Exhibit D). 5. Project Development Report (Exhibit E). 6. Pre -final construction plans (Exhibit F). 7. Pre -final construction special provisions (Exhibit G). 8. Pre -final Estimate of Time (Exhibit H). 9. Pre -final construction Estimate of Cost (Exhibit I). Your Statement of Qualifications should be emailed to the following address and received no later than 5:00 p.m. on Friday, June 12, 2026 to the attention of: Mr. Jason Leib Deputy Director of Public Works Village of Mount Prospect ileib@mountprospect.org Village of Mount Prospect Public Works Department I Page 2 Requirements for Statement of Qualifications Agency: Village of Mount Prospect Project: Rand -IL 83-Kensington Phase III Construction Engineering Location: Three Closely Spaced Intersections Involving Rand Road, IL 83 & Kensington Road Your Statement of Qualifications should include the following information: 1. Name, address and brief history of firm. 2. Organizational chart and resumes of key personnel to be assigned to this project. 3. Related experience during the last five (5) years. For example: a. Phase III Construction Engineering services for the Illinois Department of Transportation (IDOT) and local municipalities. b. Experience working with the Illinois Department of Transportation (IDOT) on roadway, traffic signal, utility, pedestrian/bicycle infrastructure, and access management projects. c. Projects involving STP, ITEP and Congressional Appropriation funding. 4. Description of the process to accomplish the required tasks of the project. This should include: a. An understanding of the project. b. Objectives to be met as part of the project. c. Your approach to completing the project. d. A project schedule. 5. Pre -qualification status with IDOT. Village of Mount Prospect Public Works Department I Page 3 Fxhihit R General Scope of Work Agency: Village of Mount Prospect Project: Rand -IL 83-Kensington Phase III Construction Engineering Location: Three Closely Spaced Intersections Involving Rand Road, IL 83 & Kensington Road A key component of the Village's Strategic Plan is to partner with appropriate government agencies to resolve troublesome intersection issues. One such area that has received attention in recent years is the three closely spaced intersections involving Rand Road (US 12), IL 83 (Main Street) and Kensington Road. The traffic -signalized intersections form a triangle that experiences operational issues on a daily basis. Blocked intersections and poor vehicle progression are common complaints from motorists. Timing adjustments have been made over the years with minor improvements. The Village of Mount Prospect is committed to developing and implementing a plan that will provide significant enhancements to the transportation system that will benefit motorists, pedestrians, bicyclists, nearby businesses, and our residents. Rand Road (US 12), IL 83 (Main Street) and Kensington Road east of IL 83 are under the jurisdiction of the Illinois Department of Transportation (IDOT). Kensington Road west of IL 83 and Business Center Drive are under local jurisdiction. All traffic signals within the project limits are operated and maintained by IDOT. The Village of Mount Prospect completed a Phase I Engineering study in 2022. The Village's Phase II Engineering consultant has completed pre -final plans, pre -final specifications and an estimate of cost. These documents are made part of the RSQ. The scope of construction work consists of adding a northwest -bound through lane on US Route 12 at IL 83 and Kensington Road, a northbound and southbound right -turn lane on IL 83 at Kensington Road, a second northbound left -turn lane, a second southbound left -turn and a southbound right -turn lane on IL 83 at US Route 12, an eastbound and westbound left -turn lane on Kensington Road at IL 83, an eastbound right -turn lane and a westbound left -turn lane on Kensington Road at US Route 12. All traffic signals, traffic signal poles, and the traffic signal controller at the triangle intersection will be replaced with new equipment. New streetlights will be installed for the project limits. In addition, sidewalks are proposed along all legs of the triangle intersection, with a shared -use path proposed along the west side of US Route 12 from Isabella Street to Wedgewood Lane. The Village has applied to and received multiple grants for this project including: • STP funding for Phase II Engineering, Land Acquisition, Construction and Construction Engineering • ITEP funding for Construction and Construction Engineering • Congressional Appropriations funding for Phase II Engineering, Land Acquisition and Construction At this time, the Village seeks to enter into a contract with an engineering firm to provide Phase III Construction Engineering services. IDOT plans to let the project in November 2026 with utility relocation to begin in the winter and construction the following spring. The project is projected to take two construction seasons to complete with final completion in 2028. The successful firm will be responsible to meet all Federal/State/Village requirements for these services. Village of Mount Prospect Public Works Department I Page 4 At a minimum, the following tasks are to be included in the scope of services. Additional tasks, at the consultant's recommendation, will be considered by the Village. 1. Become familiar with the traffic operations at the intersections and surrounding access to Rand Road, IL 83 and Kensington Road within the project limits. 2. Fully understand the Project Development Report, pre -final plans, pre -final specifications, and estimate of cost. 3. Assist the Village with applying for additional funding as necessary. 4. Complete all tasks related to providing Construction Engineering meeting Federal, State, County & Village requirements. 5. Participate in a Preconstruction Meeting with IDOT, Village Staff and the Contractor. 6. Review shop drawings and other equipment/material submittals as may be required. 7. Coordinate with private utility companies to relocate facilities as necessary prior to construction. 8. Provide horizontal and vertical construction layout of the proposed improvements as necessary. 9. Coordinate material testing and QA/QC with the Contractor during construction. 10. Coordinate private property work with property owners to minimize disruption. 11. Respond to inquiries from various stakeholders and address issues in a timely manner. 12. Attend and conduct weekly construction coordination/status meetings. 13. Prepare pay estimates for contractor work performed. IDOT will pay the contractor directly and seek reimbursement from the Village for our share of the project. 14. Complete all necessary paperwork during construction. 15. Prepare invoices for consultant work performed on IDOT forms. 16. Create a construction punch list and ensure all outstanding items are completed to the satisfaction of IDOT and the Village. 17. Coordinated final inspection and paperwork with IDOT and the Village. 18. Prepare as -built drawings. Village of Mount Prospect Public Works Department I Page 5 Fxhihit r Evaluation Process Agency: Village of Mount Prospect Project: Rand -IL 83-Kensington Phase III Construction Engineering Location: Three Closely Spaced Intersections Involving Rand Road, IL 83 & Kensington Road Your letter and Statement of Qualifications should be emailed to the following address and received no later than 5:00 p.m. on Friday, June 12, 2026 to the attention of: Mr. Jason Leib Deputy Director of Public Works Village of Mount Prospect ileib@mountprospect.org The Statement of Qualifications will be evaluated based on the following factors: • Project Understanding & Technical Approach • Similar Project Experience • Project Team Capabilities • IDOT Prequalification Status • Overall Completeness of Submittal The Village will conduct interviews with the shortlist firms. Those selected for an interview will be contacted by the Village to arrange a date/time at the Mount Prospect Public Works Department, 1700 W. Central Road or virtually via Microsoft Teams. The Village of Mount Prospect appreciates your interest in this project. Any request for information or questions regarding this Request for Statement of Qualifications can be directed to Matthew Lawrie, Village Engineer, by phone at 847-870-5640 or email at mlawrie@mountprospect.org. Tentative Schedule Submit Statement of Qualifications June 12, 2026 Select firms for interviews June 19, 2026 Complete consultant interviews June 24, 2026 Select firm and negotiate contract June 26, 2026 Award contract July 21, 2026 Engineering Agreements Due to IDOT July 27, 2026 Construction Letting November 6, 2026 Start Construction Winter 2026-2027 End Construction Fall 2028 (O';6'HR1STOPHER B., BURKE ENGINEERING, LTD. June 12, 2026 Village of Mount Prospect 1700 W. Central Road Mount Prospect, IL 60056 Attention: Mr. Jason Leib, Deputy Director of Public Works Subject: Rand Road - IL 83 -Kensington Road Request for Statement of Qualifications Phase III Construction Engineering Services Dear Mr. Leib: Christopher B. Burke Engineering, Ltd. (CBBEL) is pleased to submit our qualifications to provide Phase III Construction Engineering Services for the Rand Road - IL 83 - Kensington Road project. The material presented is in accordance with the information requested in your RFQ. Also included for your use is CBBEL's current IDOT prequalification letter. CBBEL acknowledges receipt of Addendum #1. CBBEL understands this project will address the three closely spaced, signalized intersections forming the Rand Road, IL 83, and Kensington Road triangle, widening each leg for added turn and through lanes, replacing all signals and the controller governing the triangle, and adding sidewalks and a shared -use path. We bring directly relevant local experience: CBBEL recently completed the adjacent Rand Road/Central Road improvements (IDOT Contract #61H44) in the Village, a triangle -intersection improvement with a single signal controller and complex utility coordination in shared IDOT right-of-way. The primary contact person for this submittal is Kevin Wilson, PE, Vice President and Assistant Head of our Construction Engineering Department. He is available to answer any questions regarding this submittal and can be reached at„k................ii..............................i ........................... b b , ,,,,,,,,,,,,,,,,,,,,,,,fir „ or on his cell at 847.833.02 74. Kevin will be assigned as Project Manager for this project. CBBEL is proposing Tracy Wais, PE as Resident Engineer. Tracy is a civil engineer with 24 years of construction engineering experience, is well versed in CMMS, and has delivered federally funded roadway reconstruction projects with signalized intersections, including Gross Point Road (IDOT Contract #61H23). The material provided in this submittal reflects our ability and eagerness to perform the required services for the Village, and our Project Team welcomes the opportunity to build on our work along the Rand Road corridor. If you have any questions or need additional information, please do not hesitate to contact Kevin or me. Sincerely, Mi I err, PE President ADDENDUM NO. 1 DATE: May 27, 2026 ENGINEERS' ACKNOWLEDGMENT OF RECEIPT ADDENDUM NO, 1 VILLAGE OF MOUNT PROSPECT, ILLINOIS RAND -IL 83-KENSINGTON PHASE III CONSTRUCTION ENGINEERING ENGINEER hereby acknowledges receipt of Addendum No. 1 Note: This Addendum shall be included with and is considered part of the proposal documents. Failure to return this form may result in disqualification of the Engineer. Include this in your proposal. Page 2 of 2 ADDENDUM NO, 1 VILLAGE OF MOUNT PROSPECT, ILLINOIS RAND -IL 83-KENSINGTON PHASE III CONSTRUCTION ENGINEERING DATE: May 2711, 2026 PROPOSALS DUE: June 1211, 2026 at 5:00 pm To: All Prospective Engineers. All Engineers for the above contract shall carefully read the enclosed addendum and consider its impact in the preparation of their proposal. Cover Letter: Replace the Cover Letter with the attached version of the Cover Letter. This corrects the last paragraph; "Statement of Qualifications" should be submitted, not "Technical and Cost Proposals". Cost proposals are not required and will not be accepted as Phase III Engineering is partially federally funded. VILLAGE MANAGER MAYOR Paul Wm. Hoefert TRUSTEES Vincent J. Dante Elizabeth B. DiPrima Terri Gens William A. Grossi John J. Matuszak Colleen E. Saccotelli DATE: May 26, 2026 Michael ). Cassady Mount Prospect DIRECTOR OF PUBLIC WORKS Sean Dorsey Phone: 847/870-5640 Fax: 847/253-9377 www. mountprospect.org Village of' Mount rrospect Public 1700 W. Central Road,, �Mount Prospect., Illinois 60056 Request for Statement of Qualifications FROM: Matthew Lawrie, P.E. Village of Mount Prospect Public Works Department RE: Request for Statement of Qualifications Rand -IL 83-Kensington Phase III Construction Engineering The Village of Mount Prospect seeks Statement of Qualifications from engineering firms for Phase III Construction Engineering services for roadway improvements at and around the intersection of Rand Road, IL 83 and Kensington Road. Attached to this memo are: 1. A list of materials and information that should be included with your Statement of Qualifications (Exhibit A). 2. A general definition of the scope of work and requirements for your submittal (Exhibit B). 3. The evaluation process and tentative schedule (Exhibit C). 4. A map identifying the project limits (Exhibit D). 5. Project Development Report (Exhibit E). 6. Pre -final construction plans (Exhibit F). 7. Pre -final construction special provisions (Exhibit G). 8. Pre -final Estimate of Time (Exhibit H). 9. Pre -final construction Estimate of Cost (Exhibit I). Your T ec*Ri GI & rest PY/lN/l G1__r Statement of Qualifications should be emailed to the following address and received no later than 5:00 p.m. on Friday, June 12, 2026 to the attention of: Mr. Jason Leib Deputy Director of Public Works Village of Mount Prospect ileib@mountprospect.org 0'O i r TAB 1I I I IIIIIIIIII IIIIIIIIII' '�, IIIIIIIIIIIIII IIIII IIIIIIIIIIIIIIG��RMA C�iuulllpl uuu umuu luuuu I Ca�l uum uum°1uouu uuumuuuu �I ', �pa I',�I�'�� � I, u u uu 'um uumou uuum uuuuu uuumn uuum l le �re q, u alum 'I,ouu i i�i! 0 �1 u uuuum m TAB 2 IIIIIII��III�� � IIIIIII��III�I I,IIIIIII IIIIIII��III�� �IIIIIIIIIIIIIII� j I uuuuuu i ����Iesu�mes '�, IIIIIIIIII IIIIIIIIII I,IIIIIIII (IIIII ''�, IIIIIIIIIIIIIIIII i''�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I,V IIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII TAB 3 �I,II �I,IIIIIIIIIIIII �'�, �I,III mud mi ,mm''','Its eel"' uuuumiuuuuuu TAB 4 IIIII IIIII '�, I,,IIIIIIIIIIIIIII IIIIIIIIII Illllllllf '�, I, I,,IIIIIII I,,IIIIIIIIIIIIIII IIIII IIIIIIIIII (,,IIIIIIIIII I,,IIIIIII ''�, IIIIIIIIII I,,IIIIIIIII'� I,,IIIIIIIIIIIIIII pl IIIIIIIIIIIIII �''�, IIIIIIIIIIIIII �I IIIIIII I,, (IIIII � � I, , �''�� IIIIIIIIIIIII�'�, i �''�� IIIIIIIIIIIIII IIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIII � ', IIIII '�, '�, �'�' �'', IIIIIIIIIIIIIIII �''�� IIIIIIII �''�� IIIIIIIIIIIIIIIII I,I IIIIIIIIIIII�'�, uu oum , S&��iiedule uuuVuu IIuuuu a'� � � � IIV) um IIIII ''�� �''�� uuum IIIII IIIII IIIII � ''�� � ''�� IIIII IIIII �� uuum � IIIII � uuuuu uuuuu �� IIIII �''�� Vu m Vuuuu Vuum H CBBEL is a multidisciplinary consulting engineering firm designed to support complex infrastructure projects from start to finish. Our team of more than 260 professionals serves public and private sector clients throughout Illinois, including municipalities, counties, townships, utilities, and private developers. What differentiates CBBEL is our depth of in-house expertise. Rather than outsourcing key disciplines, we integrate civil design, water resources, environmental services, traffic operations, urban planning, structural engineering, surveying, construction engineering, and more within a single team. Our staff includes three PhDs, more than 100 licensed professional engineers, 22 Certified Floodplain Managers, 11 Certified Professionals in Erosion and Sediment Control, and nine Certified Professionals in Stormwater Quality, as well as professional traffic operations engineers, Board Certified Water Resources Engineers, licensed professional land surveyors, licensed structural engineers, American Institute Certified Planners, and a licensed landscape architect. CBBEL supports infrastructure projects at every stage, from early planning and feasibility studies through design, permitting, and construction. Over four decades, we have built long-term relationships with clients across Illinois by delivering practical, well -coordinated solutions to complex engineering challenges. We have served as lead engineer on a wide range of municipal and county projects, including roadway and transportation improvements, bike and pedestrian facilities, bridges, pump stations, stormwater systems, and water infrastructure. CBBEL provides professional reviews, grant assistance, GIS services, environmental assessments, and regulatory support, helping clients confidently navigate funding requirements, permitting processes, and reporting obligations. CBBEL has obtained thousands of permits from the U.S. Army Corps of Engineers, the Illinois Department of Natural Resources, and FEMA, and is prequalified by the Illinois Department of Transportation for public involvement. M11111"'17 / %% At CBBEL, engineering is about responsibility to communities. Founder and CEO Christopher Burke describes this mindset as being a "citizen engineer": someone who takes an active role in improving the world beyond the immediate scope of a project. F/W/oo �f� vvvvvv�0000moi /00%/ i�l1J o Community Involvement Our team actively supports organizations that promote STEM education, environmental stewardship, health and wellness, and community development. Through these efforts, CBBEL strengthens connections with the communities we serve and supports initiatives that create long-term, positive impact. Learn more at cbbel.com community-invoivement. Bike to Work Program CBBEL's multi -award -winning Bike to Work Program reflects our commitment to sustainability, employee wellbeing, and thoughtful transportation planning. Employees earn $1 for every mile commuted by bike and, since its launch in 2006, more than 200 employees have commuted nearly half a million miles by bike. By supporting active transportation, CBBEL encourages firsthand understanding of multimodal infrastructure, insight that informs how our teams design safer, more accessible transportation systems. Learn more at c e .co lie -to -work. Sustainability From internal practices to community engagement, sustainability is embedded in how CBBEL operates. Our Rosemont headquarters features company -wide composting and recycling programs, electric vehicle charging stations, shared fleet vehicles, and energy -efficient building upgrades. Employees are encouraged to participate in community clean-up events, sustainability initiatives, and car -share programs that reduce environmental impact. Learn more at cbbel.com Is t Since 1986, CBBEL's values have guided how we work with clients, colleagues, and communities. These values are reflected not only in our culture, but in how projects are planned, designed, and delivered. 13 i 111inotspa ��� rA of lMnspor tat'i � i April 6, 2026 Subject: PRELIMINARY ENGINEERING Consultant Unit Prequalification File Michael Kerr BURKE, CHRISTOPHER B. ENG., LTD. 9575 W. Higgins Road Suite 600 Rosemont, IL 60018 Dear Michael Kerr, We have completed our review of your "Statement of Experience and Financial Condition" (SEFC) which you submitted for the fiscal year ending Dec 31, 2024. Your firm's total annual transportation fee capacity will be $77,600,000. Your firm's payroll burden and fringe expense rate and general and administrative expense rate totaling 145.92% are approved on a provisional basis. The rate used in agreement negotiations may be verified by our Bureau of Investigations and Compliance in a pre -award audit. Pursuant to 23 CFR 172.11(d), we are providing notification that we will post your company's indirect cost rate to the Federal Highway Administration's Audit Exchange where it may be viewed by auditors from other State Highway Agencies. Your firm is required to submit an amended SEFC through the Engineering Prequalification &Agreement System (EPAS) to this office to show any additions or deletions of your licensed professional staff or any other key personnel that would affect your firm's prequalification in a particular category. Changes must be submitted within 15 calendar days of the change and be submitted through the Engineering Prequalification and Agreement System (EPAS). Your firm is prequalified until December 31, 2025. You will be given an additional six months from this date to submit the applicable portions of the "Statement of Experience and Financial Condition" (SEFC) to remain prequalified. Sincerely, Jack Elston, P.E. Bureau Chief Bureau of Design and Environment SEFC PREQUALIFICATIONS FOR BURKE, CHRISTOPHER B. ENG., LTD. CATEGORY STATUS Hydraulic Reports - Waterways: Two- Dimensional Hydraulics (2D) X Special Plans - Lighting: Complex X Special Plans - Lighting: Typical X Special Services - Mechanical X Special Studies - Signal Coordination & Timing (SCAT) X Special Services - Construction Inspection X Hydraulic Reports - Waterways: Typical X Hydraulic Reports - Pump Stations X Hydraulic Reports -Waterways: Complex X Special Studies- Location Drainage X Special Services - Surveying X Special Services - Electrical Engineering X Highways - Roads and Streets X Structures - Highway: Advanced Typical X Special Plans - Pumping Stations X Location Design Studies - New Construction/Major Reconstruction X Highways - Freeways X Special Services - Public Involvement X Special Services - Sanitary X Environmental Reports — Environmental Assessment X Special Services — Landscape Architecture X Location Design Studies - Reconstruction/Major Rehabilitation X Structures - Highway: Typical X Structures - Highway: Simple X Special Studies - Safety X Special Studies - Feasibility X Location Design Studies - Rehabilitation X Special Plans - Traffic Signals X Special Studies - Traffic Studies X Environmental Reports — Environmental Impact Statement X X PREQUALIFIED A NOT PREQUALIFIED, REVIEW THE COMMENTS UNDER CATEGORY VIEW FOR DETAILS IN E PAS . S SUSPENDED, WILL NOT ACCEPT STATEMENTS OF INTEREST I / f Christopher B. Burke Engineering, Ltd. (CBBEL) has assembled a team of construction engineering professionals specifically suited to the RAND ROAD -IL 83-KENSINGTON ROAD Phase III Construction Engineering project. Each individual proposed below has direct, recent experience with IDOT administered roadway and traffic signal construction, documentation under IDOT's Construction & Materials Management System (CMMS), and the kind of close stakeholder coordination this triangle of busy, closely spaced intersections will demand. The team brings the full multidisciplinary depth the contract requires, spanning construction observation, traffic signal and ITS, electrical and lighting, and landscape restoration. Several members bring firsthand experience working within the Village of Mount Prospect (Village) and along the Rand Road corridor itself will serve as Project Manager. Kevin will lead the project and serve as the Village's primary point of accountability. A Vice President and Assistant Department Head for Construction Engineering with 24 years of experience, all while at CBBEL, Kevin has managed and served as Resident Engineer on large, IDOT administered roadway reconstructions, including the $25 million Franklin Avenue reconstruction in Franklin Park. The project involved staged construction, three new signalized intersections, traffic signal modernization, new roadway lighting, and extensive utility and railroad coordination, all documented in IDOT's CMMS. His work on the Chicago Avenue/Sheridan Road reconstruction in Evanston (Federal, ITEP, and Local funding) added new traffic signals, ADA improvements, protected bike lanes, and water main replacement on an accelerated schedule, closely paralleling the scope and funding profile of this project. will serve as Resident Engineer and the Village's primary day-to-day point of contact, managing construction operations on site from preconstruction through closeout. With 24 years of construction engineering experience, she has served as Resident Engineer across roadway reconstruction, streetscape, traffic signal, and utility projects. Her reconstruction of Gross Point Road in Skokie (IDOT Contract #61H23) included new storm sewer and traffic signal modernization documented per the IDOT Construction Manual, directly mirroring the drainage and signal work on this corridor. Tracy is recognized for clear, proactive communication with residents and business owners, using project websites, regular meetings, and hand -delivered updates, an essential strength given the daily traffic and adjacent businesses surrounding these intersections. On this project she will direct the field inspection team and coordinate daily across the Village, IDOT District One, and the Contractor, keeping the three -signal triangle moving through both construction seasons. WILLIAM (BILL) SCHULTZ, El and will provide on - site construction observation and inspection in support of the Resident Engineer. Bill, a Senior Resident Engineer with 21 years of experience and an IDOT certified bridge inspection team leader, has performed resident engineering on IDOT funded roadway, utility, and streetscape projects documented in CMMS. Bill brings valuable local familiarity from serving as Resident Engineer on the Aspen Trails Park Levee 37 and Burning Bush Trails Park projects in the Village; his combined construction and structural background supports the project's roadway, drainage, and lighting work. Jake, a Construction Engineer with the firm since earning his civil engineering degree in 2024, most recently served as Construction Engineer on the Arlington Heights Road reconstruction for the Lake County Department of Transportation, a full road and sewer reconstruction, where he prepared traffic, site, and erosion reports, resolved field layout issues, and verified Contractor compliance with the plans; he holds IDOT Documentation of Contract Quantities certification. Together they give Tracy the daily inspection coverage this staged, multi -intersection work requires. will lead project documentation as Documentation Engineer, focusing on CMMS contract administration: managing contract documentation, quantities, pay estimates, and project closeout. She brings directly relevant corridor experience as Documentation Engineer on the Rand Road —Central Road —Mount Prospect Road project (IDOT Contract #61H44), where she handled documentation for the modernization of three intersections in this very same Rand Road corridor; with 24 years specializing in resident -engineer documentation and trained in IDOT's CMMS, she is well versed in the federal documentation standards required for STP funding. Supporting Kristen on CMMS documentation is AMY TURN of Material Solutions Laboratory (MSQ. Amy will support contract documentation, materials documentation coordination, and closeout efforts; on IDOT's District One CMMS program (PTB 211-016) she has supported 207 contracts and 49 Resident Engineers since August 2024, helping secure 49 Materials Certifications and advancing 56 additional contracts to Ready - for -Review status. , Head of CBBEL's Traffic Operations Department, brings the specialized signal and ITS expertise central to this project. A Professional Traffic Operations Engineer with 15 years of experience, she has led traffic signal modernization and replacement programs across IDOT, CDOT, Cook County, and DuPage County, including multi -intersection signal replacements, Flashing Yellow Arrow safety improvements, AIMS deployment, and fiber-optic interconnect. Her current IDOT traffic engineering services contracts and her familiarity with IDOT operated signal systems position her to support the full replacement of the signals, poles, and the single shared controller at the triangle, the most technically demanding element of the work. ANTHONY (TONY) DERICCO, PE, , Head of CBBEL's Electrical Department and an NCQLP Lighting Certified professional, will oversee the corridor's roadway lighting and electrical service work, a major share of this contract. Tony served as Project Engineer on the IDOT let Rand Road, Central Road, and Mount Prospect Road lighting improvements for the Village, giving him direct, same -corridor experience with the pole foundations, luminaires, controllers, service connections, and underground conduit this project will install. With 35 years of experience, 26 of them at CBBEL, he ensures the lighting and electrical systems are witnessed and documented to IDOT standards without pulling the Resident Engineer off roadway and traffic -staging duties. IIIII IIII�IIII�������� II01 � II �I���II10 IIII4 11i11�illlll�������� , a Senior Landscape Architect, will oversee tree protection, plantings, and parkway restoration. With more than 45 years of experience, Doug brings streetscape, shared -use - street, and native -restoration projects that directly parallel this corridor's 8-foot shared -use path and its extensive parkway -restoration and tree - planting program. He will confirm plantings match the species schedule and monitor restoration and establishment through closeout, protecting both the design intent and the community's streetscape. CBBEL is subcontracting with MSL for Materials QA. As an IDOT DBE -certified Professional Civil Engineering Firm prequalified in Quality Assurance and Quality Control, MSL provides field and laboratory materials testing and documentation support for roadway construction, including aggregates, hot -mix asphalt, portland cement concrete, and soils. On this project, MSL will support materials documentation, coordinate required sampling and testing, track test results and certifications, and help keep materials records current for CMMS closeout and IDOT review. MIKE BOYLE will serve as Materials Coordinator responsible for overseeing that effort and coordinating with the Resident Engineer and documentation staff to keep the project records current, accurate, and audit -ready through final approval by ID OT. This core team is backed by the full depth of CBBEL's in-house departments, including Phase III Construction (63 staff), Traffic Operations, Electrical/ Lighting, Survey, Drainage, Water Resources, and Municipal, along with Material Solutions Laboratory (MSL) for CMMS materials documentation and QA material testing. As a full -service local firm, CBBEL can draw on these resources at any time to meet the project two -construction -season schedule, so the Village is never waiting on an outside specialist to keep the work moving. IIIII IIIIII IIII IIIII IIII IIII IIII IIIII IIIII IIIII IIII JIII IIIII IIIII IIII IIIII IIIII IIII IIIII IIIII IIIII IIII IIII IIIII IIII IIIII IIII IIIII IIIII IIIII IIIII IIII IIII IIIII IIIII IIII IIII llll IIIII IIII IIII IIII IIII IIIII IIII Illll111illlll1IIII YEARS EXPERIENCE: 24 YEARS WITH CBBEL: 24 EDUCATION Bachelor of Science, 2002 Civil Engineering University of Illinois at Urbana -Champaign PROFESSIONAL REGISTRATION Professional Engineer, IL, m 062.0595527 2006 m CERTIFICATIONS Documentation of Contract Quantities, IDOT, 25-23467 Material Management of Job Sites, IDOT PROFESSIONAL DEVELOPMENT DOT QC/QA Courses: Mixture Aggregate Technician m Course m Bituminous Concrete Level 1 Technician Course Bituminous Concrete Level 2 Technician Course Portland Cement Concrete Leve 11 Troxler Nuclear Gauge Safety Training Class m STTP-S11 Hot Mix Asphalt Field Inspection STTP-S33 Soils Field Testing and Inspection TT - ADA/PROWAG IIIIIII� IIIIIII� 'slt&��111't a�rllt��l e��lilt C&��! ��� IIIIIII�1 9 Civil Engineer with over 20 years of construction engineering experience related to highway construction and utility installations. Responsibilities include construction observation, project reports, documentation of quantities, review of contractor pay estimates, coordination of materials testing and inspection, site surveys and interaction with the contractor and client. Observed activities include roadway, water main, sanitary sewer, storm sewer, streambank stabilization, and retaining wall construction. Civil design experience consists of resurfacing and reconstruction projects which have included water main, storm sewer, sanitary sewer, and combined sewer design. CONSTRUCTION FAU Route 3533 (Franklin Avenue Reconstruction) [IDOT Contract #61H14], Franklin Park: Resident Engineer for the $25 Million reconstruction and widening of Franklin Avenue from a 2 lane roadway to a new 5 lane composite pavement section from 2022 thru 2024. The project scope included staged construction, installation of a new closed sewer system, precast box culvert along north side of the Franklin Avenue, sheet piling, temporary and permanent erosion control, water main installation, traffic signal modernization with three new signalized intersections, new roadway lighting, signing, pavement markings and landscaping improvements. The work required coordination with ComEd to relocate multiple poles and overhead/underground lines, coordination with Canadian Pacific to replace two railroad at grade crossings, and coordination with the Illinois Tollway on adjacent contracts. The project was funded using National Highway Freight Program and Local Funds. The contract was administered by IDOT using CMMS. CBBEL coordinated inspection services with multiple subconsultants throughout the project. Neighborhood Storage Project - Phase 3, Wilmette: Project Manager responsible for the successful delivery of construction engineering services related to the installation of a 13.9 AC -FT StormTrap Doubletrap Vault (with approximately 47,500 cubic yards of excavation) at Thornwood Park and installation of various utilities and roadway improvements to reduce flooding. The utility improvements included approximately 7,500 linear feet of box culvert and storm sewer (12" to 60" diameter), 2,400 linear feet of 10" sanitary sewer installation, 1,750 linear feet of 6" and 8" water main, and landscaping restoration. Upon completion of the underground utilities, the neighborhood roadways were restored with new PCC curb, sidewalk, and driveways before HMA pavement reconstruction or resurfacing with patching was completed. The engineering team coordinated with various stakeholders throughout the project, including the Wilmette Park District and School District 39. FAU Route 3533 (Franklin Avenue Advanced Contract) [IDOT Contract #61G76], Franklin Park: Resident Engineer responsible for the construction engineering and observation of the removal and reconstruction of the Silver Creek Box Culvert; two 12x7 box culverts were placed using precast and cast -in -place methods. Additional work under this contract included roadway reconstruction with HMA pavement, guardrail removal and installation, storm sewer, and a concrete retaining wall (using helical soil nails) under the 1-294 Bridge over Franklin Avenue. Final completion included pavement markings and landscaping restoration. This project was funded using National Highway Freight Program and Local Funds. The contract was administered by IDOT using CMMS and we utilized HeadLight inspection software to document daily site observations. Neighborhood Storage Project - Phase 2, Wilmette: Project Manager responsible for the successful delivery of construction engineering services related to the installation of a 10 acre-feet Doubletrap StormTrap underground storage basin with a Pump Station with backup generator at Hibbard Park. Additional work required to deliver this stormwater storage project included storm sewer ranging in size from 12" diameter to 60" diameter (PVC, DIP and RCP pipes), 1977x30" elliptical RCP storm sewer, installation of 8" water main, installation of 8" sanitary main, and various types of drainage structures required to complete the work. The roadways were restored primarily by resurfacing of existing pavement with spot curb removal and replacement. Hill Street required multiple utility replacements and required pavement reconstruction with full curb and gutter removal and replacement. Additional improvements on this project included sidewalk removal and replacement, park amenities, green infrastructure, pedestrian signal upgrades, and ADA upgrades. Neighborhood Storage Project - Phase 1, Wilmette: Project Manager responsible for the successful delivery of construction engineering services related to the installation of a 20.2 acre-foot StormTrap stormwater storage and detention facility and additional storm sewer ranging in size from 12" diameter to 60" diameter, and 3'x7' and 5'- 6' RCP rectangular box storm sewer. Upon completion of the underground utilities, the neighborhood roadways were restored with new PCC curb, sidewalk, and driveways before HMA pavement resurfacing was completed. The proximity of the project to Highcrest Middle School and within Park District property led to a heightened need for communication and coordination with the various stakeholders. Enhanced community outreach included the use of Constant Contact, a project website, and EarthCam streaming video. ristonher B. Burke Engineering. Ltd. 19575 W. Higgins Road. Suite 600 1 Rosemont. IL 60018 1847.823.0500 1 cbbel.com I kwilson@cbbel.com North Shore Avenue Sewer Separation, Lincolnwood: Resident Engineer responsible for the construction engineering and observation of storm sewer installation ranging in size from 12" to 607?; the purpose was to install a large diameter storm sewer system in a combined sewer area to reduce flooding and resident sewer backups. The project included a 60" storm sewer outfall to North Shore Channel; 256 feet of 60" storm sewer jacked in place under McCormick Boulevard; HMA pavement removal and replacement; and removal and replacement of PCC curb, sidewalk, and driveways. The project was funded by an MWRDgrant and local funds. Transmission Main Project, Lincolnwood: Engineering Manager and Resident Engineer (2019) responsible for the construction engineering and observation of the installation of approximately 14,000 lineal feet of 20" ductile iron water main, 4,000 lineal feet of 8" water main, and 387 lineal feet of horizontal directional drilling of 24" HDPE water main. The purpose of the project was to connect to a new water source in the City of Evanston and discontinue purchasing water from City of Chicago. Additional improvements to complete the project included storm sewer repairs; cured -in -place pipe liner; pavement patching and resurfacing; miscellaneous curb, sidewalk, and driveway repairs; landscaping; and mechanical improvements at the Village reservoir. Coordination was required with the City of Evanston, Village of Skokie, CTA, MWRD, and other various stakeholders. Sherman Avenue Improvements, Evanston: Resident Engineer for Sherman Ave Improvements from Church St to Davis St. This streetscape project included ductile iron water main replacement, replacement of brick paver sidewalk with concrete sidewalks and brick ribbon, curb replacement, roadway resurfacing, roadway and decorative lighting replacements in Downtown Evanston. Responsibilities included construction observation, material inspection, public relations with business owners and residents, and contract documentation. FAU Route 2853 (Chicago Avenue/Sheridan Road) [IDOT Contract #61D36], Evanston: Resident Engineer for construction of Chicago Ave through downtown Evanston and Sheridan Rd through the Northwestern University Campus to the Wilmette Village limit. Net length of improvements was 1.87 miles; Chicago Ave included HMA resurfacing, Sheridan Rd included 3 to 4 lanes of PCC reconstruction with new protected bike lanes. New items related to protected bike lane included bicycle traffic signals and radar detection. Additional work included new traffic signals, ADA improvements, water main replacement, and landscaping. Project was on an accelerated schedule in order to accommodate Northwestern University school calendar and was funded with Federal, ITEP, and Local funds. Twin Lakes Subdivision Sidewalk Improvements, Villa Park: Resident Engineer for construction of a new sidewalk in a subdivision with an existing rural ditch typical section. Sidewalk construction included approx. 74,000 SF of new PCC Sidewalk with ADA accessible crossings. Additional improvements included installation of pipe culverts, driveway replacements, and ditch regradingto accommodate new drainage patterns. A retaining wall was installed adjacent to the sidewalk in front of Target due to ROW space restrictions. Project was funded with Federal and Local Funds. 2016 Road Program, Wilmette: Resident Engineer responsible for construction engineering and observation for resurfacing or rehabilitation of 5,050 LF of roadways throughout the Village. Roadway construction included approx. 14,000 SY of HMA partial depth resurfacing, and approx. 1,300 SY of brick pavement reusing existing brick pavers. Additional improvements included reconstruction of sidewalks, curb and gutter, and additional drainage improvements as necessary. Project was funded with MFT and Local Funds. FAP Route 326 (IL 47)7 IDOT, Yorkville: Providing Phase III assistance to IDOT Resident Engineer and Inspectors from 2012-2015. Serving as Assistant Resident Engineer responsible for construction documentation and observation; managed CBBEL and subconsultant staff that assisted with documentation and observation. Project included 5.04 km of pavement reconstruction, lane additions, storm sewer, traffic signals, and other work along IL Route 47 from just north of IL Route 71 continuing northerly to just north of US Route 34. ADA Ramp Program, CDOT: Resident Engineer responsible for construction engineering and observation of replacement of previously constructed ADA ramp locations not meeting CDOT ADA requirements. Far South Area included 12 ramp locations and South Area included 40 locations. CDOT QC/QA requirements for ADA ramp replacements were followed. Engineering responsibilities included submittal review, daily observation, measurement of quantities, pay estimates, coordination of material inspection, and documentation on CDOT's online web system. Book Road LAPP Resurfacing, Naperville: Resident Engineer responsible for construction engineering and observation for resurfacing of Book Rd from 1111" St to 87t" St Roadway construction included 3.07 miles of partial -depth asphalt pavement. Resurfacing required approx. 2,700 tons of Polymer HMA N50 Leveling Binder and 6,300 tons of Polymer HMA N90 Surface Course "F" Mix. Additional roadway improvements included curb and gutter spot repairs, utility structure adjustments, and thermoplastic pavement markings. Sidewalk improvements were completed where necessary, including new sidewalk ramps meeting ADA standards at all roadway crossings within the project limits. Road and Relief Sewer Project, Wilmette: Project Engineer and Resident Engineer responsible for construction engineering and observation including: verifying that contractor was in conformance with plans and specifications, preparing pay estimates and change orders. Project consisted of partial depth resurfacing of over 1.1 total miles of various residential roadway improvements. Utility construction included 600' of 18" sanitary sewer removal and replacement, 396' of 18" Relief Sewer, 768' of 24" Relief Sewer, 984' of 42" Relief Sewer,14 Relief Sewer manholes and a 10' diameter junction chamber. Project was funded using MFT and Local Funds. Conway Park Sidewalk Improvements, Conway Park Owners Association, Lake Forest: Resident Engineer responsible for construction engineering and observation including: verifying that contractor was in conformance with plans and specifications, preparing pay estimates and change orders. Project consisted of constructing a 36,000 SF sidewalk to provide a continuous walking path throughout the Conway Park office park corridor. Additional improvements included removing and replacing curb and gutter, improving handicap accessibility, pavement markings, and landscaping regarding and restoration. Glenview Road Resurfacing, Wilmette: Resident Engineer responsible for construction engineering and observation including: verifying that contractor was in conformance with plans and specifications, preparing pay estimates and change orders. Project consisted of resurfacing over 0.5 miles asphalt pavement. Additional improvements included curb and gutter spot repairs, sidewalk replacement, and PCC Driveway replacement. Detector loop replacement was coordinated with CCHD. Project was funded using ERP funds. hristooher B. Burke Engineering. Ltd. 19575 W. Higgins Road. Suite 600 1 Rosemont. IL 60018 1847.823.0500 1 cbbel com I kwilson@cbbel.com 2 of 2 YEARS EXPERIENCE: 24 YEARS WITH CBBEL: 19 EDUCATION Bachelor of Science, 2002 Civil Engineering Valparaiso University PROFESSIONAL REGISTRATION Professional Engineer, IL, m 062.0635997 2011 m CERTIFICATIONS Documentation of Contract Quantities, IDOT, 25-22864 ICORS Training Seminar, IDOT S-33 Soils Field Testing and Inspection Course PROFESSIONAL DEVELOPMENT m OSHA 10 Hour Certification m IDOT Erosion Control Seminar Equipment Rate Class Tra cy Wa I i , �P �E Se��li;J��ia��;, t �Vla��l age��; I I I I I ec"I 11,11 1 1 Tracy's more than 20 years of construction engineering experience has provided her a wide variety of projects. She has provided resident engineering duties on many types of projects including flood mitigation, roadway reconstruction, streetscapes, traffic signal improvements, bridge reconstruction, and utility installation. She provides on -site construction observation, project documentation, management of material verification and testing, processing pay estimates, and coordination with contractor and client. She excels in communication with clients, residents, and business owners. Tracy has been trained in IDOT's Construction & Materials Management System. Olmsted Sewer Separation and Watermain Improvements, Village of Riverside: Resident Engineer. The Olmsted Sewer Separation Project and Watermain improvement updated the Village's infrastructure by the adding 7000 LF of a new dedicated storm sewer to discharged to the Des Plaines River, separating the storm water from the combined sewer system. The project also included several combined sewer improvements, and the installation of 7700 LF new 8-inch watermain with new water services to the b-box. Lakefront Bluff Stabilization and Access Ramp Improvements, Village of Glencoe: Resident Engineer responsible for the project administration for the reconstruction of the bluff retaining walls and access road to the Glencoe Beach and water plant. Project administration tasks included construction observation, documentation of contract quantities and coordination of material inspection. The project was awarded two Grants, DCEO and BAAD so careful attention was necessary to separate the quantities for each grant. Gross Point Road Reconstruction [IDOT Contract #61H23], Village of Skokie: Resident Engineer. Gross Point Road was reconstructed between Golf Road to the intersection of Old Orchard Road, approximately 0.7 miles. The roadway reconstruction also included the addition of a new storm sewer and traffic signal modernization. Resident Engineer responsibilities included construction observation, coordination of material inspection, shop drawing review, utility coordination, quantity verification, Pay Estimates, Change Orders, communication with residents and business owners, and documentation as outlined in the IDOT construction manual. Neighborhood Storage Project - Phase 3, Village of Wilmette: Resident Engineer responsible for the construction inspection, construction documentation, review of shop drawings, and public outreach related to the installation of a 13.9 AC -FT StormTrap Doubletrap Vault at Thornwood Park and miles of various underground utilities and roadway improvements. Coordination with residents was critical due to the complexity of the deep sewer installation. Daily on -site observations were documented utilizing Headlight inspection software, and all other documentation was completed as outlined in the IDOT contraction manual. Neighborhood Storage Project - Phase 2, Village of Wilmette: Resident Engineer. Phase 2 of the Neighborhood Storage Project included the installation of 12 AC -FT double decker StormTrap storage and detention facility comprised of approximately 552 pieces and panels at Hibbard Park. The project also included the installation of miles of underground utilities, roadway reconstruction and rehabilitation and traffic signal modernizations. Responsibilities included construction observation, coordination of material inspection, shop drawing review, quantity verification, pay estimates, change orders, daily documentation, and communication with residents. Old Green Bay Road Multi -Use Path [Contract #61G61] Village of Glencoe: Resident Engineer. The Old Green Bay Road Multi -Use Path project consisted of building a new stabilized decomposed granite material path through existing Glencoe Park District property from Park Avenue and extending north to Maple Hill Road where it connects to the existing Green Bay Trail. Responsibilities included construction observation, coordination of material inspection, shop drawing review, quantity verification, pay estimates, change orders, daily documentation, and communication with residents. Neighborhood Storage Project - Phase 1A, Village of Wilmette: Resident engineer of a flood mitigation project on the West side of Wilmette. Improvements consist of installation of approximately a mile of storm, sanitary and watermain utilities, roadway reconstruction and restoration. Responsibilities included construction observation, coordination, of material inspection, shop drawing review, quantity verification, pay estimates, change orders, daily documentation. Communication with residents was imperative, weekly updates were placed on a project website and critical updates were hand delivered. Main Street Bridge Reconstruction over Crystal Creek [Contract #61E49], Village of Algonquin: Resident Engineer for the full reconstruction of the concrete structure and superstructure with prestressed concrete deck beams. Due to proximity of neighboring buildings, drilled shafts were installed in lieu of piles. Vibration monitoring systems were installed to track the construction operations vibration frequencies. Responsibilities r B. Burke Engineering. Ltd. 19575 W. Higgins Rd.. Ste. 600 1 Rosemont. IL 60018 1847.823.0500 1 cbbel.com I twais@cbbel.com included construction observation, coordination, of material inspection, shop drawing review, quantity verification, pay estimates, change orders, daily documentation. Communication with business owners was very important, weekly updates were placed on a project website, bi-weekly meetings were held with business and contractor. All critical updates were hand delivered. Main Street Reconstruction and Streetscape, Village of Algonquin: Resident Engineer responsible for construction observation and documentation of contract quantities for S. Main Street reconstruction and streetscape between Algonquin Road and Route 31. Other responsibilities included coordination of material inspection, shop drawing review, and utility coordination. Communication with residents and business owners was very important, weekly updates were placed on a project website, bi- weekly meetings were held with contractor and critical updates were hand delivered. Fountain Square Renovations, City of Evanston: Resident Engineer for Fountain Square Renovations at the intersection of Sherman Avenue, Orrington Avenue, and Davis Street. Project included renovation of both the existing plaza north and south of Davis. The north plaza renovations included constructing a new fountain plus equipment vault, and veteran's memorial wall. Both the north and south plaza added decorative lighting, precast pavers, and landscaping. Traffic signals were modernized to accommodate a new traffic pattern. Responsibilities included construction observation, quantity verification, shop drawing review, material inspection, and documentation. Coordination with businesses included bi-weekly meetings, hand delivered updates and Constant Contact with the local Chamber of Commerce. hristopher B. Burke Engineering, Ltd. 19575 W. Higgins Rd., Ste. 600 1 Rosemont, IL 60018 1847.823.0500 1 cbbel.com I twais@cbbel.com I 2 of 2 wii I I'l a �m S c �h u I Itz El it l ee��r IIII'''' � m YEARS EXPERIENCE: 21 Bill is a Senior Resident Engineer experienced in the fields of construction engineering, certified IDOT bridge YEARS WITH CBBEL: 21 inspection team leader and structural engineering design of bridges. Responsible for performing resident engineering duties including on -site construction observation, documentation of quantities, shop drawing EDUCATION reviews, coordination and/or verified material testing and inspection, review contractor pay requests, Master of Science, 2004 preparation of change orders, and interaction with contractor and client. Recent projects included bridge Civil Engineering, Structures rehabilitation/replacement, roadway projects, sanitary and storm sewer jobs, water main projects and Southern Illinois University streetscape improvements. Proficient in documentation requirements for various types of funding including Bachelor of Science, 2002 IDOT FAU projects STP, MFT, and TIF Projects. Civil Engineering, Structures Southern Illinois UniversityCONSTRUCTION OBSERVATION m Copeland Manor Flood Reduction Project, Village of Libertyville: Resident Engineer for a $6 million flood PROFESSIONAL REGISTRATION reduction project involving installation of approximately 0.5 miles of 96 inch diameter and 9 ft x 5 ft concrete Engineer Intern, IL, box culvert storm sewer extending from the Des Plaines River west to Milwaukee Avenue through a residential 061.030701, 2003 neighborhood. Work included construction of several large 15 ft x 15 ft junction chambers at roadway intersections to connect to existing storm sewer systems. The project also involved installation of 8, 10, and 12 inch water CERTIFICATIONS main and residential water services. Due to storm sewer construction, 2,000 feet of 10 inch sanitary sewer and IDOT/NHI Approved Team all associated service connections were replaced. The full 0.5 mile project corridor received complete roadway Leader, Bridge Inspection, reconstruction. Responsibilities included coordination with the adjacent school, Lake County Soil & Water ID: 00590; National Bridge °„ Conservation District, U.S. Army Corps of Engineers, local residents, and Village staff. The project was part of Inspection Standards (NBIS) m Libertyville's longterm, village wide flood reduction program. Qualified m Spur Two Water Main, Village of Oak Lawn: Providing Resident Engineer services on Bid Package 7B. Documentation of Contract Performing full time construction observation of daily work in addition to the submittal review process of shop Quantities, IDOT, 22-19981 drawings and RFI's using Submittal Exchange software. Responsibilities also include being resident liaison. Contract features a 3 story cast in place concrete intake structure with architectural features. The project ACI Concrete Field Testing involves installation of approximately 11,000 LF of 30 inch ductile iron transmission water main through a Technician - Grade I residential neighborhood and ComEd corridor. The water main will connect to the Village of Orland Park existing 23,000,000 gallon underground reinforced concrete potable water reservoir and all restoration of the roadways. PROFESSIONAL DEVELOPMENT Downtown Car Streetsca a Improvements, Village of Cary: Resident Engineer. This project consists of STTP-S33 Soils Field Testing and Inspection Course, IDOT construction of new concrete curb and gutter, sidewalks, brick paver parking stalls, brick paver mini plazas, street lighting improvements, grind and overlay of the existing roadway, storm sewer, water main, site BBS - Bridge Inspection m furniture, and landscaping located in the Village of Cary, McHenry County, Illinois. Traffic control intersection Refresher Training, IDOT m improvements are included at the intersection of West Main Street and High Road. Responsibilities include construction observation, quantity verification, daily documentation, and communication with residents, local PROFESSIONAL AFFILIATIONS schools, and the park district. American Institute of Neighborhood Storage Project - Phase 3, Village of Wilmette: Resident Engineer. This project consisted of a Steel Construction 13.9 Ac-Ft StormTrap Double Trap vault requiring 47,500 CY of Earth Excavation, a lift station, baseball field American Society of restoration, and work throughout the surrounding neighborhood to install relief sewers. The work throughout Civil En ineers neighborhoods included 7,500 feet of large box culvert and storm sewer ranging from 12" to 60" diameter, g 2,400 feet of 10" sanitary sewer, 1,750 feet of 6" and 8" water main, and pavement rehabilitation through Tau Beta Pi National full -depth reconstruction or patching and overlay. Responsibilities included construction observation, quantity Engineering Society m verification, daily documentation, and communication with residents, local schools, and the park district. This m work was coordinated with multiple engineering team members including a project manager, documentation engineer, owner's representative, and multiple site inspectors. Aspen Trails Park Levee 37, Village of Mount Prospect: Resident Engineer. The project included earth excavation and construction of a 17 acre-ft corrugated/ perforated/84" diameter pipe in stone backfill underground detention basin system (approximately 15,000 feet of pipe total), curb and gutter removal and replacement, full -depth HMA pavement, concrete sidewalk removal and replacement, and additional storm sewer and structures. Other work to complete the project included topsoil and seeding, HMA path removal, tree removal, temporary erosion control, temporary dewateri n g/ bypass pumping, access management, and traffic maintenance. Bryn Mawr Pedestrian Bridge [Contract #61G51], Village of Rosemont: Resident Engineer. Responsible for construction observation, coordination of material inspection, documentation of quantities and contract administration in accordance with IDOT's Construction Manual. Documentation of all work is in accordance with IDOT guidelines using CMMS and MISTIC Databases. The pedestrian bridge will extend from the eastern Christopher B. Burke Engineering. Ltd. 19575 W. Higgins Rd.. Ste. 600 1 Rosemont. IL 60018 1847.823.0500 1 cbbel.com I wschultz@cbbel.com dead end of Bryn Mawr Avenue, parallel to the street's centerline, to the existing trail just east of the Des Plaines River. The bridge will be located on Village of Rosemont and FPDCC property and will be 2 - 150' long spans with approximately 50' of a boardwalk structure at the west end. The structures will be 12' wide prefabricated steel truss bridges with a concrete deck. Approximately 100' of the eastern river bank will be stabilized with a combination of stone riprap and native plantings. 2020 Road Program, City of Zion: Resident Engineer. The scope of work included reconstruction of 10 blocks of roadway utilizing 8" full depth reclamation with cement powder and HMA surfacing. The project also included construction of ADA compliant sidewalks and various storm sewer improvements through the City. Two additional alleys were also reconstructed to alleviate issues with flooding. Burning Bush Trails Park, Village of Mount Prospect: Resident Engineer. Responsible for the construction of a 16 acre-foot detention basin to alleviate ongoing flooding in the surrounding neighborhood. The project involved installation of 2 large cast in place junction chambers, 1,100 LF of 54" diameter concrete sewer and construction of 2 baseball fields and a soccer field in the detention basin. The project was coordinated with the Village of Mount Prospect, River Trails Park District and MWRD. The new baseball fields have extensive underdrain systems which allow the field to be playable even after significant rainfall. Also included was an irrigation system and pump station to increase the pressure from the Village watermain. Surrounding the entire basin are 8,000 SF of tiered retaining walls and ADA ramps down to the ballfields. 2019 MFT Construction Engineering Services, City of Des Plaines: Resident Engineer. The scope of work included complete reconstruction of 3 alleys utilizing permeable concrete pavement and construction of sidewalk, curbs and driveway aprons at approximately 375 separate locations in all eight wards of the city. The alleys were constructed to provide storm water storage in the 20" thick aggregate base course. The project included reprofiling the alleys, additional storm sewer, ADA compliant sidewalks, concrete curb and gutter replacement, additional signage and reconstruction of driveway aprons and roadway entrances. BRIDGE PROJECTS Balmoral Avenue over Tri-State Tollway (1-294), Village of Rosemont: Project involved design of a new exit ramp from NB Tri-State Tollway to connect Balmoral Ave. Project included widening the Balmoral Ave Bridge to accommodate additional traffic and provide dual turn lanes onto both NB and SB ramps. Responsibilities included preparation of design plans and specifications for bridge widening which included 63" pre -stressed bulb T beams, pile supported abutments and piers along with design of a vaulted concrete approach slab. 135th Street over Long Run Creek, Will County: Provided structural design and preparation of contract plans for a 112' long two span continuous rolled steel beam bridge. Superstructure consists of 11 composite steel beams which provides four 12' wide traffic lanes and a 16' wide painted median/turn lane. Bridge is supported by integral abutments and a solid concrete pier. Bridge was designed to accommodate 120,000 pound permit loads due to heavy truck traffic. Big Timber Road Bridge over Tyler and Pingree Creek, Kane County: Project involved design of a composite steel plate girder bridge. The 96' long single span bridge has a width of 86'-10" which accommodates 4 traffic lanes, shoulders, striped median and a 147 wide bicycle path. The plate girder superstructure is supported on piles and integral abutments. Responsibilities included review and design of superstructure/substructure and preparation of plans. Lake Lorin Pedestrian Bridge Over Tinley Creek, Village of Orland Hills: Project Engineer. Responsible for structural design, preparations of specifications and cost estimates of a weathering steel prefabricated truss bridge. Due to poor soil conditions, the bridge abutments are supported by a deep metal shell pile foundation. IL Route 53 Frontage Road Bridges, City of Rolling Meadows: Project consisted of replacement of existing bridge decks, substructure repairs and complete replacement of a failed wingwall on the East and West Frontage Rd Bridges. Responsibilities included an initial inspection, preparation of a BCR, structural design, reviewing design plans and assisting the Resident Engineer with shop drawing review. DuPage River Trail, City of Naperville: Structural Engineer. Responsible for design and preparation of contract documents for a 222' long pedestrian bridge over DuPage River. Two span bridge consists of a prefabricated steel truss with a concrete deck to reduce maintenance. The bridge is supported by concrete abutments and a center pier with spread footings. Due to close proximity of a parking lot, cast in place concrete retaining walls were designed to support the approach paths leading up to the bridge. Ust Street Reconstruction, Village of Burr Ridge: Project consisted of complete reconstruction including an extension across Flagg Creek to Wolf Rd. Proposed bridge was a two -span precast three -sided structure with architectural element to function as an entrance feature to the recently redeveloped business and retail center. Proposed design converted the low volume dead-end residential street to a two lane urban Federal Aid collector with a 28' surface width measured face-to-face from proposed curb and gutters. Responsibilities included structural design and preparation of plans for three sided precast arch supported on drilled concrete shafts that were drilled down to bedrock. Whitehall Avenue Bridge Rehabilitation, City of Northlake: Project consisted of complete superstructure replacement of existing bridge over Addison Creek. Single span bridge was designed using rolled composite steel beams to provide a deck with three lanes of traffic and a 5' wide sidewalk. Responsibilities included performing an initial inspection, preparation of a BCR to determine the extent of rehabilitation required and review of final design plans. Site visits and shop drawing review were also provided to assist the Resident Engineer. PARKING GARAGE PROJECTS North and Walnut Street Parking Garage, City of Danville: Responsibilities included inspecting 4 level post tension garage and documenting the areas of deteriorated concrete. Based on the field investigation, recommendations and cost estimates were prepared for repairs and maintenance to prolong the life of the garage. Donald E. Stephens Convention Center East Parking Garage, Village of Rosemont: Performed inspections and prepared repair plans with specifications for a 4 story single helix, 2 way precast parking garage. Inspections included chain dragging the garage decks and hammer sounding accessible areas of precast triple tee beams, ledger beams and columns to document areas of deteriorated. Repair plans included installation of a waterproof membrane system, joint repairs and replacement of several precast tee beams with cast in place concrete supported by steel beams. hristooher B. Burke Engineering. Ltd. 19575 W. Higgins Rd.. Ste. 600 1 Rosemont. IL 60018 1 847 m 2 of 2 YEARS EXPERIENCE: 2 Jake is adedicated and self -motivated civil engineer with apassion for planning and implementing innovative YEARS WITH C8BEL2 solutions to engineering challenges. He is particularly interested in the development, maintenance, and � improvement of roads and bridges but remains open to exploring all areas of civil engineering to broaden his EDUCATION � technical expertise. Skilled in structural engineering, teamwork, deuision'making, and problem -solving, Jake Bachelor ofSciance �O�4 ' � thrives in dynamic environments where he can effectively plan, priuritize, and process complex information to Civil Engineering � achieve impoctfu|results. Saint Louis University � ' � � : CERTIFICATIONS : Documentation ofContrao : �|���������,����O�������n:�n��on ' : Quantities, |DDT���2O4Q ' ' En�neerfor pnUe�that includes fuUmadand sewer �cons�uo�onbe�eenLake Cook Rd. and Ro�e83. ' � Responsibilities included preparing weekly reports on traffic, site, and erosion, as well as resolving issues � such as sewer and concrete form layout; ensuring contractor is in compliance with plans, and addressing hristopher B. Burke Engineering, Ltd. 19575 W. Higgins Rd.,, Ste. 600 1, Rosemont, I L 60018 1847 YEARS EXPERIENCE: 24 YEARS WITH CBBEL: 24 EDUCATION Bachelor of Science, 2002 Construction Engineering Management Purdue University PROFESSIONAL REGISTRATION m Engineer Intern, IN m CERTIFICATIONS Documentation of Contract Quantities, IDOT, 24-22754 IDOT BIDE - 2021 Regulated Substances, Construction Projects & Special Provisions Material Management of Job Sites m ICORS Training Seminar, IDOT PROFESSIONAL DEVELOPMENT DOT QC/QA Courses: Mixture Aggregate Technician Portland Cement Concrete Leve 11 STTP-S33 Soils Field Testing and Inspection Course m OSHA 30: Construction m Industry Outreach Training Course IN Kristen Marquie, El 1 IIIIIIII, °° I � m �'I,,um m IIIIIII� i� i, uuuuullm j Illlllk, I, Kristen is a Civil Engineer experienced in resident engineer duties, specializing in documentation. Her previous experience includes on -site construction observation, documentation of quantities and coordination and verification of materials testing and inspection. This allows Kristen to specialize in contract documentation, contract changes and pay requests, and her involvement in all aspects of the projects allows quick close out. Kristen has been trained and has experience using IDOT 7s Construction & Materials Management System (CMMS). Lake Water Receiving Facilities, Village of Shorewood: Resident Engineer. Responsible for construction observation and documentation of the Shorewood Lake Water Receiving Facilities, which includes construction of the five -million -gallon reservoir, pump station and connection to Shorewood's existing water facilities. Duties include construction observations, submittal reviews, documentation of quantities, preparation of change order and pay estimates and project closeout. Rand Road - Central Road - Mount Prospect Road [IDOT Contract #61H44], Village of Mount Prospect: Documentation Engineer. Responsible for construction documentation related to installation and modernization of three intersections in the Rand Road Corridor. Duties include documentation of quantities, preparation of change order and pay estimates and project closeout. Gross Point Road [IDOT Contract #611-123], Village of Skokie: Documentation Engineer. Responsible for construction documentation for roadway reconstruction of Gross Point Road. Duties include documentation of quantities, preparation of change order and pay estimates and project closeout. Neighborhood Storage Project - Phase 3, Village of Wilmette: Documentation Engineer responsible for construction documentation related to installation of a 13.9 AC -FT StormTrap Doubletrap Vault and installation of various utilities and roadway improvements to reduce flooding. Daily on -site observations were documented utilizing Headlight inspection software. Howard Street (IDOT Contract #6100), City of Evanston: Documentation/Assistant Resident Engineer for $10.6 million IDOT District 1, Local Roads project consisting of commercial district streetscape improvements including HMA resurfacing, new combination curb/gutter, sidewalk, water main replacement, roadway lighting and modernization of traffic signals at two intersections. Duties included construction observation, documentation of quantities, preparation of change orders and pay estimates and project close out. Broadway Street Reconstruction & Streetscape (IDOT Contract #87710), Village of Coal City: Documentation/Assistant Resident Engineer for Local Roads reconstruction and streetscape project. Duties included construction observation tasks and documentation of quantities. Metra Area Improvements (Contract #61E89), Village of Riverside: Resident Engineer for Local Roads downtown streetscape improvement project, including brick pavers, planters and bike racks around the Metra station. Duties included construction observation tasks and documentation of quantities. 1-90 Roadway and Bridge Reconstruction, Widening (Contracts 4206 and 4233), Illinois Tollway: Documentation Engineer for reconstruction of 1-90, including complete replacement and widening of a four -mile stretch. Daily duties included documentation of quantities and E-builder management. Other duties included inspection and closeout of the ITS and electrical contract items. Retaining Wall, Noise Wall and Drainage Improvements (Arlington Heights Road to Oakton Street), Illinois Tollway: Documentation Engineer. Project involved construction of retaining wall, noise walls and drainage improvements along 1-90. Daily duties included documentation of quantities and E-builder management. Other duties included contract administration and preparation of change orders and pay estimates. 1-90 at Cumberland Avenue, IDOT: Documentation Engineer. Project included widening and overlay of Cumberland Ave., drainage improvements, reconstruction of exit ramp and new traffic signals. Daily duties included construction observations, coordination of materials inspection, documentation of quantities on ICORS, and preparation of change orders and pay estimates. Other duties included coordinating with CTA, CDOT and utilities. IL 43 and North Shore Drive Intersection Improvements, Village of Lake Bluff: Resident Engineer. Project involved full depth widening on IL 43 to provide left turn lanes, realignment of North Shore Dr and Knollwood Dr and installation of new traffic signals at the intersection. Daily duties included construction observation, coordination of materials inspection, documentation of quantities and contract administration. NB__1-294_Exit Ramp at Balmoral, Village of Rosemont:_ Resident_ Engineer_ for new 1-294_exit ramp, including new toll plaza, roadway wideningand new traffic signals. Daily duties included construction observation, hristooher B. Burke Engineering. Ltd. 19575 W. Higgins Rd.. Ste. 600 1 Rosemont. IL 60018 1847.823.0500 1 cbbel.com I kmarauie@cbbel.com coordination of materials inspection, and documentation of quantities. Other duties included contract administration, and preparation of change orders and pay estimates. 1-80 Resurfacing (Harlem Avenue to 1-294), IDOT: Documentation Engineer. Project was constructed with federal funds, so all documentation and material inspections were completed in accordance with federal guidelines. Addison Creek, Village of Bensenville: Resident Engineer for stream bank improvements. Daily duties included construction observation, coordination of materials inspection, and documentation of quantities. Other duties included contract administration, and preparation of change orders and pay estimates. LAPP Program, Village of Glendale Heights: Resident Engineer. Daily duties included construction observation, coordination of materials inspection, and documentation of quantities per IDOT standards. Other duties included contract administration, and preparation of change orders and pay estimates. Illinois Tollway Contract No.1-08-5496: Resident Engineer. Project involved widening, patching and overlay of the Veteran's Memorial Tollway. Daily duties included construction observation, coordination of materials inspection, and documentation of quantities. Other duties included contract administration, and preparation of change orders and pay estimates. Illinois Tollway Contract No. RR-08-5547: Resident Engineer. Bridge rehabilitation included removal and replacement of the bridge deck, concrete diaphragms, and parapet wall. Daily duties included construction observation, coordination of materials inspection, documentation of quantities, and preparation of change orders and pay estimates. Other duties included coordinating with CTA, IDOT and Department of Aviation. hristopher B. Burke Engineering, Ltd. 19575 W. Higgins Rd., Ste. 600 1 Rosemont, IL 60018 1847.823.0500 1 cbbel.com I kmarquie@cbbel.com I 2 of 2 Elizabeth Jensen �P �E �PTO �Ee a d 1111111111111111���ra "Iff c 0 e ���Ira m YEARS EXPERIENCE:15 Liz is a registered Professional Engineer and the Head of the Traffic Operations Department. She has YEARS WITH CBBEL:14 extensive Phase I Traffic Studies and Phase II Traffic Signal design experience. Experience includes crash analysis, railroad coordination, PDR report development, intersection design studies, traffic impact studies, EDUCATION fiber optic interconnect and ATMS implementation. Bachelor of Science, 2008 Software Experience: VISSIM Microscopic Simulation program (PTV America), CORSIM Microscopic Simulation Civil Engineering program (McTrans), Synchro/Sim Traffic Modeling (Trafficware), HCS7 (McTrans), Eagle/Tactics, Econolite/ University of Illinois at Chicago Aries, ArcGIS Geographic Information Systems (ESRI), MicroStation V8i (Bentley), Microsoft Office PROFESSIONAL REGISTRATION 63rd Street Flashing Yellow Arrow Project, DuPage County Division of Transportation: Project Manager responsible for the Phase I and Phase II engineering services on the HSIP funded 63rd Street Flashing Professional Engineer, IL, m Yellow Arrow roject. The sco e of work includes four traffic signal modernizations with one traffic si nal 062.067808, 2015 m p� p g g modification to implement FYA signal indication and other safety countermeasures as well as revisions to the Professional Engineer, IN, County's fiber optic network to maintain connectivity during and after the project. The project is currently on PE12401062, 2024 the June 2026 letting. Various Traffic Engineering Design Services Contract, Illinois Department of Transportation (PTB 201-010 CERTIFICATIONS and PTB 207-018): Managing the contract, performing QAQC, invoicing and interfacing with the client. Work Professional Traffic orders include the IDOT Centracs Expansion #4 project which will add 90 signalized intersections to IDOT's ATMS Operations Engineer, #4197 system, Signal Coordination and Timing (SCAT) Studies, EMC plans which include urgent signal and signing Traffic Signal Technician, upgrades on State routes, temporary timing work, and updating the State's traffic signal inventory system. Level II Randall and Hopps Reconstruction and Grade Separation Project, Kane County Division of Transportation: m Engineer responsible for the traffic signal plans, IT network infrastructure plans, ICC/railroad coordination. PRO FESSI 0 NAL AFFI LIATI 0 NS m The project will replace two existing traffic signal installations and upgrade the County's IT Network Engineers Without Borders- throughout the project limits. Temporary traffic signal installations will be used to maintain traffic control Chicagoland Professional, during construction activities. Chapter President, 2014-2015 Traffic Signal Modernization Project, Chicago Department of Transportation: Project Manager and QA/QC for Institute of Transportation developing traffic signal and intersection improvements at 30 various intersections in the City of Chicago. The Engineers (ITE), Member project includes traffic signal design, lighting design, minor geometric design such as curb extensions, drainage modifications, CTA coordination and utility coordination. Tasks also included managing subconsultants. Women in Transportation Seminar (WITS), Member Traffic Signal Modernization and Replacement Project, Cook County Department of Transportation and Highways: Managed the development of CBBEL and subconsultant traffic signal, ADA, signage, and pavement PROFESSIONAL DEVELOPMENT m marking plan sheets for 13 traffic signal replacements and 10 traffic signal upgrades. The project included IDOT District 3: the installation of CCDOTH's inaugural ethernet system and ATMS set up. PCC Concrete Testers Course IL 38 Over 1-39, Diverging Diamond Interchange, Illinois Department of Transportation, District 2: Asphalt Inspection Class Completed Phase I traffic and crash studies as well as manage the traffic signal design for the DDI ramps p p including the DDI cabinet wiring. The plans include three new signalized intersections with interconnect. Pavement Patching Course 88th Avenue/Cork Avenue Reconstruction and 1-294 Interchange, Village of Justice: Developed Phase II Construction Survey Course Traffic Signal plans for the reconstruction of 88th/Cork Avenue and the new ramps for the 1-294 interchange. Safety Training Class Project included IDOT and CCDOTH signal installations and fiber optic interconnect. Four new traffic signals y g and interconnect will be installed with the project. Earth Excavation Course '�� m Rosemont HSIP Safety Corridor Project, Village of Rosemont: Managed the Phase I and Phase II Piling and Deep „m engineering contract for signal and pedestrian upgrades to 14 intersections along the Des Plaines River Road Foundations Course and Balmoral Avenue corridors. Improvements include implementing Flashing Yellow Arrow signal indications at six intersections, two replacement traffic signal installations, and one brand new traffic signal installation Small Drainage with interconnect upgrades. Structures Course Bolting &Structure Steel Des Plaines River Trail, Segment 2, Village of Rosemont: Responsible for the design and coordination of the g CDOT traffic signal modernization for the intersection of East River Road and Bryn Mawr Avenue. Placement Course Fall Protection Course 95th Street at Museum Drive, Village of Oak Lawn: Engineer responsible for traffic signal plans for the new railroad interconnected traffic signal at US 12-45/95th Street at Museum Drive. Assisted with ICC/railroad coordination. Traffic Signal Modernization, Wood Street Reconstruction Project: Project Engineer responsible for preparation of contract plans and specifications for the removal and replacement of eight existing traffic signal installations, temporary and permanent traffic signal interconnect, and two interconnected railroad at - grade crossings Project consisted of reconstruction of Wood Street (unmarked IDOT route) from 159th Street to 138th Street located in the municipalities of Harvey, Riverdale, and Dixmoor. Christopher B. Burke Engineering. Ltd. 19575 W. Higgins Rd. Ste. 600 1 Rosemont. IL 60018 1847.823.0500 1 cbbel.com I eiensen@cbbel.com ISO IIDIB YEARS EXPERIENCE: 35 YEARS WITH CBBEL: 26 EDUCATION Bachelor of Science, 1990 Electrical Engineering University of Illinois at Chicago PROFESSIONAL REGISTRATION Professional Engineer, IL, 062.0574847 2004 Professional Engineer, WI, 42880-6, 2013 CERTIFICATIONS Lighting Certified Professional NCQLP PROFESSIONAL AFFILIATIONS m Illuminating Engineering m Society of North America (I ES NA) Consulting Electrical Engineers (CEE), Division of the Electric Association IIIIIII�n IIIIIII�'� ��� IIIIIII�IIIIIII''� Tony is the Department Head of the Electrical Department with experience in a wide array of construction projects focusing on electrical applications. His experience includes design of roadway/site lighting, sports lighting, recreational facilities, wastewater and storm/flood control pump stations, potable water pump stations, generator applications and site irrigation. His responsibilities include assessing initial design criteria, evaluating design scenarios, creating photometric design submittals, creating exhibits, designing and constructing complete CAD drawings, generator sizing, developing cost estimates, shop drawing review, QA/ QC review and construction observation. Software Experience: AGI 32 for photometric calculations; MicroStation and AutoCAD for plan drawings; Excel and EDR (Electrical Designers Reference) for voltage drop calculations, panelboard circuit loads/schedules and fault current calculations; Kohler Spec Sizer, Caterpillar Spec Sizer and Cummins Power Suite for generator sizing; Power Point and Paint Shop Pro for creating exhibits and image manipulation. Bluebeam for project collaboration and plan review/markup. 2020 National Electric Code Review (Online), October 2020; Ethics in City Government, Ethics Training for CDA/OMP Contractors, Vendors & Employees; 2014 National Electric Code Review, Chicago - March 3-5, 2014; ACEC Illinois & IDOT - Highway Lighting Seminar, Naperville 2011; 2011 National Electrical Code Review, Schaumburg; AG132 Advanced Photometric Training Class, Lombard 2010; 2008 National Electrical Code Review, Oak Brook; ComEd New Business Services, Chicago, 2008; 2008 Chicago Electrical Code Review, Hillside; Writing at Work -Advanced Technical Writing, Rosemont 2008; 2005 National Electrical Code Review, Schaumburg; Emergency Power Generating Systems, Chicago 2006; ACEC Illinois & IDOT - Highway Lighting Seminar, Naperville 2006; Short Circuit and Arc Flash Analysis, Chicago 2005; Generator Reliability, Chicago 2005; 2002 National Electrical Code Review, Elk Grove; Design of Electrical Power Systems I & II, Chicago 2002. IL 72 (Higgins) -River -Devon Lighting Improvements, Village of Rosemont: Project Manager. Project included approximately 8,100' of roadway lighting improvements. Project consisted of removal of existing lighting and installation of 89 new decorative type light poles and one new lighting controller. New light poles were 40' tall with 178W decorative pendent type LED luminaires on a 10-foot decorative arm with a two-piece clamp on clam shell base, banner arms and GFCI receptacles. Rand Road, Central Road and Mount Prospect Road Improvements - Phase Vill, Village of Mount Prospect: Project Engineer. Project includes approximately 6,000' of roadway and street lighting improvements. Project consisted of removal of existing lighting and installation of 47 new decorative type light poles and one new lighting controller. New light poles were 40' tall with 18OW cobrahead type LED luminaires on an 8-foot truss arm with a breakaway transformer base, banner arms and GFCI receptacles. Project was let by IDOT. IL 72 (Higgins) -Devon Lighting Improvements, Village of Rosemont: Project Manager. Project included approximately 7,200' of roadway lighting improvements. Project consisted of removal of existing lighting and installation of 48 new decorative type light poles and one new lighting controller. New light poles were 40' tall with 249W decorative pendent type LED luminaires on a 12-foot decorative arm with a two-piece clamp on clam shell base, banner arms and GFCI receptacles. Project also included removal and installation of 30 new underpass type LED luminaires that were wall and suspended mounted for two tunnel underpasses. Hobble Avenue Reconstruction - Phase 1/11, City of Kankakee: Project Engineer. Project included approximately 4,500' of roadway lighting improvements. Project consisted of the installation of 55 new decorative type roadway light poles and one new lighting controller. New light poles were 30' tall with 13OW decorative teardrop type LED luminaires on a 6-foot decorative arm with a two-piece clamp on clam shell base. Project was let by IDOT. Randall Road and Stearns Road Intersection Improvements, Kane County: Project Engineer. Project includes approximately 6,000' of roadway and street lighting improvements. Project consisted of installation of 44 new roadway light poles and one new lighting controller. New roadway light poles were spun aluminum with 33OW cobrahead type LED luminaires on a 12-foot truss arm typically mounted at 47.5'. Project was let by I DOT. Rolf Road and Lily Cache Road Improvements, Village of Plainfield: Project Manager. Project included approximately 4700' of roadway lighting improvements. Project consisted of the installation of 24 new hristonher B. Burke Engineering. L roadway type light poles and one new lighting controller. New roadway light poles were spun aluminum tall with 84W cobrahead type LED luminaires on a 10-foot truss arm typically mounted at 30'. Project was designed in conjunction with the Village's Civil Engineering Department. Stage ID - Harrison and Main Streets, Village of Algonquin: Project Engineer. Project included approximately 2300' of roadway lighting improvements. Project consisted of removal of existing lighting and installation of 49 new decorative type roadway and pedestrian lighting units and one new lighting controller. Roadway lighting units were 25' and 30' tall with decorative LED type luminaires and GFCI receptacles. Pedestrian lighting units were 14' tall with decorative acorn LED type luminaires and GFCI receptacles. There were three roadway cross sections and one roundabout that required photometric calculations. Project was IDOT let. Plum Grove Road Improvements, Village of Schaumburg: Project Engineer. Project included approximately 2300' of roadway lighting improvements. Project consisted of removal of existing lighting and installation of 49 new decorative type roadway and pedestrian lighting units and one new lighting controller. Roadway lighting units were 25' and 30' tall with decorative LED type luminaires and GFCI receptacles. Pedestrian lighting units were 14' tall with decorative acorn LED type luminaires and GFCI receptacles. There were three roadway cross sections and one roundabout that required photometric calculations. Project was IDOT let. ITS/ELECTRICAL DESIGN Roadway and Bridge Reconstruction (1-294) Mile Long Bridge, Willow Springs/Hodgkins/Countryside: Project Engineer. Project included approximately 11,000' of interstate widening (5000' of which were on a bridge) including removal, temporary and proposed fiber conduit/cable for the tollway backbone communications and ITS devices. Project consisted of 5000' of suspended fiber duct package (four sets of 8" fiberglass conduit each with six sets of 1.5" inner duct), 2 bridge pier mounted fiber duct access platforms, 2 active traffic management gantries, 1 intermediate power distribution & communication Facility, 1 roadway weather information system, 1 Bluetooth detector, 1 microwave detector, 3 Closed circuit TV cameras, 2 construction web cams, and 2 ITS electric/communications controllers. Project was let by the Tollway. Duties included master plan design options, electrical design, creation of contract drawings and specifications, summary of quantities, engineer's cost estimate, and new electric service coordination. Abbey Harbor Marina Renovation, Fontana, WE Project Engineer. Project included the complete renovation of a 419 boat slip marina, removal and replacement of all boat slips, shore power infrastructure and existing site lighting. Include. Project consisted of 5 main distribution panels, 22 power distribution panel boards, 208 dual slip shore power pedestals, and 44 site light poles. Duties included inventory of existing infrastructure, electrical design, creation of contract drawings and specifications, summary of quantities and engineer's cost estimate. Police Station Carport, Village of Harwood Heights: Project Engineer. Project included the complete electrical, heating, and power design for a proposed parking structure. 3kW heaters were mounted on each end of the structure to melt snow and ice off the parked vehicles. Switches were installed at each parking bay to control the heaters as well as receptacles to plug in vacuums for easy vehicle detailing. New ceiling mounted luminaires were installed to better illuminate the walkway around the structure. Heating controls were also installed that include temperature and time delay controls. Duties included analyzing existing infrastructure, electrical design, creation of contract drawings and specifications, summary of quantities and engineer's cost estimate. 1-80 and 1-55 Dynamic Message Signs and Bluetooth Installation, IDOT: Project Manager responsible for electrical design. Project included design and coordination for 2 DMS along 1-55, 1 DMS along 1-80 and included 34 Bluetooth Roadside Detectors along 1-80. This project was done in collaboration with IDOT, CBBEL was responsible for design of DMS signs and Bluetooth Roadside Detectors were designed by IDOT. Each of the 3 DMS signs was located in a remote area adjacent to the expressway it serviced requiring coordination with ComEd for a new electric service to DMS sign with 1 service to be bored under Union Pacific's high speed railroad tracks. Scope included survey of proposed sites, soil testing at proposed sites, electrical design, creation of contract document, drawings and specifications, summary of quantities, engineers cost estimate, new electric service coordination, railroad coordination, structural analysis of overhead signs and design of impact attenuators at DMS location. SITE LIGHTING DESIGN Aurora Transportation Center East Parking Lot, City of Aurora: Project Engineer. Project included approximately 1,600' of parking lot widening and parking lot lighting improvements. Project consisted of removal of existing lighting and installation of 18 new area type light poles. New parking lot light poles were 30' tall with 104W area type LED luminaires. Project also included electrical and HVAC design for 2 warming shelters along each side of the Metra platform. g g g Additional lighting scope included monument lighting with (3) 20W flood type LED luminaires and retrofitting 12 existing recessed HID luminaires in a pedestrian tunnel to LED. Hodges Park Lighting Improvements, City of Park Ridge: Project Manager. Project included site lighting and site power improvements. Project consisted of removal of existing lighting and installation of 9 new decorative type light poles and one new lighting controller. New light poles were 10' tall with 37W decorative post top type LED luminaires and GFCI receptacles. Project also included USB charging stations, ground mounted receptacles, and flag up lighting. The controller and various receptacles were designed to provide vendor power for various community gatherings that happen in the park throughout the year. Duties included photometric calculations, electrical design, creation of contract drawings and specifications, summary of quantities, engineer's cost estimate, new electric service coordination, shop drawing review and construction observation. CPI Parking Lot Improvements, Abbott Park, Lake County: Project Engineer. Project included site lighting improvements. Project consisted of removal of existing lighting and reinstalling 55 existing light poles with 90 new 225W area type LED luminaires. Project also included monument lighting. Temporary conditions were needed to stage the parking lot to allow staff to actively park throughout project construction. Duties included photometric calculations, electrical design, creation of contract drawings and specifications, summary of quantities, and engineer's cost estimate. hristooher B. Burke Engineering. Ltd. 19575 W. Higgins Rd.. Ste. 600 1 Rosemont. IL 60018 1847.823.0500 1 cbbel.com I adericco@cbbel.com Douglas Gotham, RLA, ASLA m IIIIIIII'' IIIIIII ISO SeIIIIIII IIIIIII'' p„ IIIIIII IIIIIII'', 1B YEARS EXPERIENCE: 47 Doug is a Senior Landscape Architect with extensive experience in the planning and design of public open YEARS WITH CBBEL: 22 spaces, having led more than 200 park and recreation projects across the Midwest. His multidisciplinary experience includes public meeting facilitation, cost estimating, grant writing, project design and project EDUCATION management. Throughout his career, Doug has consistently community -focused, technically sound solutions, Bachelor of Science, 1979 and several of his projects have been honored with Outstanding Facility Awards from the Illinois Park and Landscape Architecture Recreation Association. University of Wisconsin at Madison Software Experience: AutoCAD, Sketchup, Lumion, Photoshop, Illustrator, InDesign, Word, Excel, Power Point Additional Studies, 2001 Taft Avenue Streetscape, Village of Berkeley: Designed new streetscape elements and created 3D Creating Wetland Parks: m renderings for presentations. Environmental Management m Village of Roselle Municipal Campus, Village of Roselle: Provided landscape plans and created custom site and Eco-Tourism feature details such as an arc pergola with a swing bench. Harvard School of Design Shelton Park- Tennis and Pickleball Courts, Glencoe Park District: Prepared construction documents and Additional Studies, 2001 assisted with bidding. Water Reuse in Site Design Harvard School of Design Palos Hills Gateway Sign, Village of Palos Hills: Developed concepts for a new gateway sign. Prepared 3D renderings. Created construction plans and details. PROFESSIONAL REGISTRATION Huntley Gateway Sign, Village of Huntley: Developed design concepts. Prepared 3D renderings of each g g Landscape Architect, IL, concept. Created construction drawings and details. 157000575, 1992 m Andretti's Landscape Plan, Village of Schaumburg: Prepared landscape plans for the new Andretti's Indoor PRO FESSI 0 NAL AFFI LIATI 0 NS m Karting facility. American Society of Landscape Architects Charles E. Brown Park Tennis and Pickleball Courts, Village of Deer Park: Developed concept plans, site details, specifications and construction documents for the replacement of existing tennis courts, and the IL Chapter -American Society construction of three new pickleball courts. of Landscape Architects Washington Street Shared Use Street, Village of Algonquin: Prepared design details and plans for the AWARDS redevelopment of Washington Street into a shared use street. The Haven, Lindenhurst Park park Street Shared Use Street, Village of Lombard: Developed various concept options and #D renderings District, IPRA Outstanding to illustrate the transformation of Park Street into a shared use street. Once approved prepared construction Facility Award, 2003 m details and specifications. Created a custom gateway element. Hunt Club Park, Gurnee Park m District, IPRA Outstanding Courts Master Plan, Village of Deer Park: Prepared detailed report regarding condition of all sport courts Aquatic Facility Award, 2000 within the community, including recommendations for renovations and reconfigurations. IPRA Outstanding Aquatic Cornell Landscape Plan, Village of Huntley: Prepared concept plans for the facilities renovation and Facility Award, prepared final landscape plans. National Winner, 2003 Elmgrove Park, Village of Elmwood Park: Landscape Architect for development of new neighborhood Hall Beach, Batavia Park park. Assisted with OSLAD grant application for acquisition of park site. Prepared construction plans for District, IPRA Outstanding development. Features include a water spray playground, bag toss, benches and monument sign. Aquatic Facility Award, 1993 Spring Road Tributary Streambank Restoration City of Oak Brook Terrace: Prepared landscape plans for p g Y � Y p p m restoration of the streambanks using native plants. Levitt Pond, Village of Bloomingdale: Assisted in preparation of DuPage County Stormwater Grant Application. Prepared design and construction documents for fishing nodes, native shoreline plantings and a deck overlook. McHenry Streetscape Master Plan, City of McHenry: Prepared master plan for three separate urban centers within the community. Facilitated public planning meetings and created illustrations of proposed improvements. SIGNATURE PROJECTS Lake Street Medians, Village of Bloomingdale: Landscape Architect. Prepared concept drawings, construction plans and details including the design of custom raised planters and a monument sign. Christopher B. Burke Engineering. Ltd. 19575 W. Higgins Rd.. Ste. 600 1 Rosemont. IL 60018 1847.823.0500 1 cbbel.com I dgotham@cbbel.com Material Solutions Laboratory Amy has over 6 years of Illinois Department of Transportation materials documentation experience. Including working with ICOR's, MISTIC, RFA program, IDOT Electronic Call Board and CMMS. Amy brings a positive energy and outstanding communication skills. PROJECT EXPERIENCE Various CMMS Construction/Material Documentation, Phase III Project, Region One/District One PTB 211-016 As Assistant Project Manager on the CMMS Team, Amy supported 207 IDOT contracts since August 2024, assisting 49 Resident Engineers across District 1. Responsibilities included collecting and entering material inspection documentation into CMMS, creating and submitting inventories for reviewed materials, and uploading evidence of compliance to reduce Materials' Deficiency Lists. Trained field staff on CMMS processes, monitored submitted inventories for feedback, and coordinated updates with Construction and Materials Supervisors. Played a key role in securing 49 Materials Certifications —32 for long -inactive contracts —and advanced 56 additional contracts to "Ready for Review" status to support project finalization. Illinois Department of Transportation CMMS Data Entry for Bureau of Materials for Various Phase III Projects -Region 3/ District 5 PTB 208-026; Supported construction project documentation and materials tracking through the Construction Materials Management System (CMMS). Assisted Resident Engineers by preparing inspection reports and managing inventory records to minimize material deficiencies. Collected and uploaded inspection documentation, created CMMS inventories, and submitted materials for final review and approval. Collaborated with supervisors to address project issues, implement process improvements, and develop a standardized CMMS workflow in partnership with District 5 staff. Various CMMS Construction/Material Documentation, Phase III Project, District Nine PTB 216-054 Responsible for overseeing the implementation of standardized CMMS documentation procedures across District Nine. Developed and managed workflows for Resident Engineers (REs) to efficiently submit and track inspection reports within the Construction Materials Management System (CMMS). Ensured data accuracy, consistency, and compliance with IDOT standards while coordinating communication between field staff, State representatives, and documentation teams. Provided leadership in process optimization, quality assurance, and training to enhance efficiency in material documentation and reporting. Illinois Department of Transportation QA Various, Various Contract, 2019 to 2024. PTB 192-0049 197-02 Administrative Assistant responsibilities within the Illinois Department of Transportation (IDOT) Bureau of Materials. Daily tasks include composing and editing various forms, letters, memos, and spreadsheets. Performs data entry of various technical lab reports on a mainframe system and electronic database including MISTIC and CMMS. Currently responsible for IDOT materials main callboard and recording vital information from producers and suppliers regarding inspection requests, and manages filing system. Constructionion * Laboratory Testing e Geotechnical EngineeringConstruction Material Solutions Laboratory Mr. Boyle has over 20 years of direct experience as a MIKE quality assurance Manager, material coordinator, documentation specialist, and construction inspector for BOYLE transportation projects. He has played a critical role in Pr 'ect Manager the success of many large-scale construction projects and has extensive field and laboratory materials inspection experience. In his role Mike has ensured contract document requirements are met for all construction materials such as asphalt, concrete, soils, steel, and electrical. He was responsible for management of QA personnel including scheduling, billing, and coordination with IDOT/ISHTA. In addition, Mike reviewed contractor submittals to ensure compliance with project specifications prior to submitting. Prior to becoming a integral member of a Phase III construction team, Mike worked as the lead QC/QA technician on various high -profile IDOT and ISTHA projects. In this role, Mike helped to ensure that the HMA material maintained consistency for favorable project performance and payment outcome. Mike also played a critical role on laboratory HMA mixture design teams for various contractors. As part of the design team, Mike completed hundreds of mix designs conforming to the specifications of various agency such as IDOT, INDOT, ISTHA, and the Department of Aviation. PROJECT EXPERIENCE Various CMMS Construction/Material Documentation, Phase III Project, Region One/District One PTB 211-016 As the project manager, Mike led a districtwide initiative supporting over Zoo active IDOT contracts and more than 45 Resident Engineers. He developed and implemented standardized workflows for material documentation, review, and certification within CMMS, ensuring consistency and efficiency across all participating projects. Mike supervised documentation and materials staff, managed workloads and budgets, and coordinated with subconsultant teams to meet production targets and quality standards. Under his direction, the team achieved 49 Materials Certifications-32 for long -inactive contracts —and advanced 56 additional contracts to "Ready for Review" status, significantly accelerating project closeouts. He also oversaw training initiatives for field personnel and continuously refined data -entry and inventory - tracking processes to support statewide compliance and documentation integrity. llinois Department of Transportation CMMS Data Entry for Bureau of Materials for Various Phase III Projects -Region 3/ District 5 PTB 208-026. Mike served in a supervisory role overseeing CMMS documentation operations for multiple Phase III construction projects. Developed and implemented standardized processes and workflows for the collection, coding, and submission of materials documentation in coordination with District 5 staff. Managed project workloads, budgets, and subconsultant staff to ensure timely and accurate delivery of materials certification packages. Supervised and trained team members supporting Resident Engineers, guided the resolution of documentation deficiencies, and collaborated with IDOT Bureau of Materials to streamline CMMS review and approval procedures. Various CMMS Construction/Material Documentation, Phase III Project, District Nine PTB 216-054 . Mike served in a supervisory capacity overseeing CMMS documentation operations and staff performance across District 9. Directed the implementation of standardized procedures for RE's to submit and track inspection reports through the Construction Materials Management System (CMMS). Developed and managed workflows to improve efficiency, ensure compliance with IDOT standards, and maintain data accuracy and consistency. Supervised staff workloads, coordinated communication between field teams, State representatives, and documentation personnel, and managed budgets and subconsultant participation. Provided leadership in training, process optimization, and quality assurance to strengthen overall materials documentation and reporting performance. Constructions cConstruction Material Solutions Laboratory Mr. Boyle has over 20 years of direct experience as MIKE a quality assurance Manager, material coordinator, documentation specialist, and construction inspector BOYLE for transportationprojects.j He has played a critical ProjectManager p - p Y role in the success of many large-scale construction projects and has extensive field and laboratory materials inspection experience. In his role Mike has ensured contract document requirements are met for all construction materials such as asphalt, concrete, soils, steel, and electrical. He was responsible for management of QA personnel including scheduling, billing, and coordination with IDOT/ISHTA. In addition, Mike reviewed contractor submittals to ensure compliance with project specifications prior to submitting. Prior to becoming a integral member of a Phase III construction team, Mike worked as the lead QC/QA technician on various high -profile IDOT and ISTHA projects. In this role, Mike helped to ensure that the HMA material maintained consistency for favorable project performance and payment outcome. Mike also played a critical role on laboratory HMA mixture design teams for various contractors. As part of the design team, Mike completed hundreds of mix designs conforming to the specifications of various agency such as IDOT, INDOT, ISTHA, and the Department of Aviation. PROJECT EXPERIENCE Illinois Department of Transportation, Contract #62R26, Partial reconstruction of Entrance and Exit Ramps at the I-80/I-55 Interchange. As Materials Coordinator for IDOT Contract 62R26, Mike Boyle oversaw all material documentation and testing operations supporting the partial reconstruction of the I-80/I-55 interchange. His responsibilities included coordinating materials sampling and submittals, managing CMMS documentation for project compliance, and facilitating communication between field inspectors, laboratories, and Resident Engineers. Mike ensured all PCC, HMA, aggregate, and structural materials met IDOT standards for the new SB I-55 to EB I-8o flyover bridge and reconstructed Mound Road corridor. Illinois Department of Transportation, Contract # 62R25; Reconstruction of the Larkin Avenue Ramps to and from I-8o including ramp and approach reconstruction, retaining wall, and noise walls, Will County. As Materials Coordinator, Mike managed all materials documentation and testing activities for the reconstruction of multiple Larkin Avenue ramps connecting to and from I-80. He coordinated sampling, submittals, and quality assurance testing for PCC, HMA, and aggregate materials, ensuring compliance with IDOT standards and project specifications. Mike oversaw CMMS documentation workflows and collaborated with Resident Engineers, contractors, and laboratories to maintain accurate material records supporting project certification and final acceptance. Illinois Department of Transportation, Contract # 60W35 Pavement Reconstruction along I-8o WB from Gardner St. to Rowell Ave., Replacement and Widening of Bridges. Mike Boyle acted as a Materials Coordinator and oversaw materials documentation and quality assurance testing for the 1.19-mile pavement reconstruction along I-8o westbound from Gardner Street to Rowell Avenue. His responsibilities included managing CMMS documentation, coordinating materials sampling and submittals, and ensuring compliance with IDOT standards for PCC, HMA, aggregate, and structural materials. Mike played a key role in supporting bridge widening and replacement operations over Hickory Creek and Rowell Avenue/WCL Railroad, as well as deck patching at multiple bridge structures throughout the corridor. Construction Inspection iConstruction Management * Landscaping / Christopher B. Burke Engineering, Ltd. (CBBEL) offers the Village a portfolio of Phase III Construction Engineering assignments that closely parallel the Rand Road —IL 83—Kensington Road improvement: IDOT jurisdiction roadway widening, full traffic -signal and controller modernization, dense utility coordination in shared right-of-way, federally -funded delivery, and pedestrian/bicycle accommodations all documented to IDOT standards through CMMS. The representative projects are profiled in the attached fact sheets; the summaries below highlight why each is relevant. Rand/Central/Mount Prospect Improvements (IDOT Contract #61H44). Our most directly comparable project, delivered in Mount Prospect. Same triangle - intersection challenge, same single -controller signal solution, same complex utility coordination, and the same IDOT project manager, LUKASZ BROZEK, PE. Franklin Avenue Reconstruction (IDOT Contract #61H14). A $25M federally -funded corridor reconstruction with signal modernization, lighting, a shared -use path, and extensive private -utility coordination, administered start -to -finish through CMMS. This project was also delivered under IDOT project manager LUKASZ BROZEK, PE. Gross Point Road Reconstruction (IDOT Contract #61H23). Roadway widening for bike lanes, modernized signals, and a State -to -local jurisdictional transfer at completion, again delivered with LUKASZ BROZEK, PE, as the IDOT project manager. Arlington Heights Road Reconstruction. A $16M reconstruction blending multiple federal/state/local funding sources, with signal, ADA, and pedestrian improvements. A proven, continuous team. The engineers and inspectors who delivered these projects are the same ones proposed here, Project Manager KEVIN WILSON, PE (Franklin Avenue, Gross Point Road), Resident Engineer TRACY WAIS, PE (Gross Point Road), KRISTEN MARQUIE, El (documentation/CMMS), and inspector (Arlington Heights). CBBEL arrives already fluent in the IDOT Phase III workflow and the conditions of Mount Prospect itself. IIIII IIII11 IIII1 AGI�11111111i 0I III 1 0I4 IIMIIII11) CQIiqs I 14lucIIIII IIIII IIII III IIII Rand/Central/Mount Prospect Improvements (IDOT Contract #61H44) 110 Mount Prospect, IL (2023-2024)1110 Project Type Providing Phase III Engineering services to improve traffic flow at triangle Phase I, II & III Engineering intersection. This project will see all three roadways widened to improve traffic flow through the intersections. RoadwayImprovements N BEER Additional aspects of the project include drainage improvements; turn bays constructed to increase the storage and flow of vehicular traffic into and out of the retail areas; milling and overlaying all Intersection Improvements . . . . . . . . . roadways within the project limits; new pavement markings an signage; traffic signal modernization system. for five intersections; and the installation of a new roadwaylightingY Traffic Signal Improvements The traffic signalization of the three intersections will be controlled from a single Traffic Signal Controller, which is the cornerstone of this project. The traffic signal improvement required the Drainage Improvements contractor to install underground conduits along and under the roadways, in an area of Mount Prospect that shared the ID OT right-of-way with many private utility companies, including ComEd, AT&T, Comcast, MCI, Verizon, AT&T Broadband, Astound, and Zayo Fiber Optic. Project Team ComEd and AT&T spent a year prior to the start of construction relocating their poles and lines, W. Daniel Crosson, PE while Comcast, MCl/Verizon and Zayo had to make improvements during construction. CBBEL Project Manager managed communication and construction coordination with these utility companies without any Patrick Kielty, PE damage to underground or overhead facilities. In addition, NICOR had an equally complicated Resident Engineer distribution system of 8-, 16- and 18-inch MOP natural gas mains that had to be crossed for the new Kristen Mar uie El q underground conduits. CBBEL coordinated with NICOR (Watch & Protect) to bore or push 16 Documentation Engineer crossings under the roadways of their gas mains. Client The contract also calls for the continuation and/or improvement of a shared -use bike path along the Village of Mount Prospect Rand Road arkwa . CBBEL is tasked with designing and ins ectin 40 new ADA ram s and other p Y g g P g P sidewalk improvements to ensure ADA compliance. Construction Cost $8.5 million Phase III Services Included: Fee . . Shop drawing review $633,000 (Phase III) • Preconstruction services Funding Source . Full-time construction observation CMAQ/Local • Coordination with utility companies . Preparation of change orders, authorizations, and pay estimates and documentation using CMMS IDOT Contact Lukasz Brozek, PE • Quality assurance of construction materials (PCC and HMA) Christopher B. Burke Engineering, Ltd. 19575 W. Higgins Rd., Ste. 600 1 Rosemont, IL 60018 1847.823-0500 1 cbbel.com Franklin Avenue Reconstruction (IDOT Contract #61H14) Franklin Park, IL (2022-2025)110 Project Type Phase III Engineering g 9 Roadway Improvements Storm Sewer Improvements Shared Use Path � PouiiuiN� l d 1P Traffic Signal& Lighting Improvements Project Team Kevin Wilson, PE Project Manager/Resident Engineer Louis Sommesi Inspector Client Village of Franklin Park Construction Cost $25 million Fee $995,000 Funding Source Federal (National Highway Freight Program, CMAQ)/Local IDOT Contact Lukasz Brozek Upgrading the existing two-lane roadway to afour-lane modernized corridor to coincide with the Elgin O'Hare Western Access expansion. The Village of Franklin Park has initiated a project requiring Phase III Professional Engineering Services for the proposed reconstruction and widening of Franklin Avenue from Mannheim Road to Runge Street and Williams Drive from Franklin Avenue to Belmont Avenue for a total distance of 1.76 miles. The improvements along Franklin Avenue consist of reconstruction and widening of roadway, construction of a shared use path, installation of new large diameter closed storm sewer, box culvert reconstruction, slope wall modification, traffic signal modernization, lighting, signing, and pavement markings. Phase III Services Included: • Shop drawing review • Preconstruction services • Full-time construction observation including verification that contractor conformed to plans & specifications, serving as liaison between Village and contractor • Coordination with utility companies, including ComEd, Nicor, AT&T, Verizon/MCI, and Magellan Midstream LLP • Coordination with the Canadian Pacific Railroad to replace two full railroad crossings with new rails, crossing panels, approaches, and traffic signal equipment including new gates and flashers • Project documentation of contract quantities according to IDOT standards • Preparation of change orders, authorizations, and pay estimates using CMMS • Coordination with subconsultants Com anies, Db Sterlin, EXP(Gonzalez P ) • Quality assurance of construction materials (Rubino Engineering, Inc.) • Record drawings Christopher B. Burke Engineering, Ltd. 19575 W. Higgins Rd., Ste. 600 1 Rosemont, IL 60018 1847.823-0500 1 cbbel.com JIM i • - 1 1 Project Type Widening the roadway to add bike lanes and increase green space. Phase III Engineering The Gross Point Road project included widening the roadway cross section to allow for two four - g foot bike lanes in either direction and reconfiguring the side street returns to allow for more green space. The project consisted of a full depth reconstruction of Gross Point Road from 400 feet north Stormwater Improvements of Golf Road to Old Orchard Road, approximately 0.7 miles. The intersection of Gross Point Road and Old Orchard Road was resurfaced. A majority of the existing roadway only had aggregate Bike Lanes & Pedestrian f .1 Improvements shoulders, so the proposed plans widened the roadway for the addition of bike lanes and paved parking lanes. To provide adequate drainage, the project also included 3,200 LF of mainline storm �H Hu lu�an� ii� Traffic Signal sewer and new curb and utters. The returns for the ad' acent roadways were reconfigured to rovide g J Y g P additional green space along Gross Point Road. Additional roadway improvements included ADA �\; Road Reconstruction ramps, thermoplastic pavement markings and landscaping. CBBEL coordinated with the Metropolitan Water Reclamation District (MWRD) on several key components of the project. Because the proposed storm sewer discharges into the downstream Project Team MWRD system, the proposed weir structure needed to be inspected by the MWRD to confirm that Kevin Wilson, PE the additional flow would not adverselyimpact stem capacity. The team also worked with MWRD P y Project Manager to address maintaining proposed manhole structure sizes and meet the rubber boots requirements at pipe penetrations. To avoid costly increases in manhole dimensions, MWRD approved the use of Tracy Wais, PE Resident En ineer g concrete collars at locations with large -diameter connections, allowing the proposed structure sizes to remain unchanged. Kristen Marquie, EI Documentation The intersection of Old Orchard Road and Gross Point Road also received new modernized traffic signals. At project completion, the roadway jurisdiction was transferred from the State of Illinois to Client the Village of Skokie. Village of Skokie Phase III Services Included: Construction Cost $6.62 million Awarded ) CBBEL provided a full-time resident engineer to serve as the Village's liaison with the contractor and the residents. Additional services include: Fee. Construction observation, includingverification that contractor conformed with contract 489 $ 000 documents, inspection of traffic control, inspection of erosion control measures, and measurement of quantities Funding Source STU, CMAQ, State &Local • Preparation of pay estimates and contract authorizations . Coordination material inspection IDOT Contact Lukasz Brozek • Project documentation as outlined in the IDOT construction manual . Act as Village liaison to local businesses and residents Christopher B. Burke Engineering, Ltd. 19575 W. Higgins Rd., Ste. 600 1 Rosemont, IL 60018 1847.823-0500 1 cbbel.com Arlington Heights Road Reconstruction �B Arlington Heights, IL (2024-Present) Project Type 'il Phase III Engineering lu�llu�llu�llu�ll�� ADA Improvements Pedestrian Improvements Roadway Improvements gI� �wg� ktt1!NyRNNNNq pIIII�IIIIIIVVII IIIIIIIIV1�IIfNI���11V1111�'� Storm Sewer Improvements Project Team W. Daniel Crosson, PE Project Manager Kevin Betke, PE Resident Engineer Jake Cullotta Construction Engineer Client Lake County Division of Transportation Construction Cost $16 million Funding Source LCDOT, Rebuild Illinois, Village of Buffalo Grove, Village of Long Grove, Motor Fuel Tax, County Bridge Improving roadway conditions while enhancing safety, mobility and accessibility. This project reconstructed Arlington Heights Road between IL Route 83 and Lake -Cook Road. Existing concrete pavement was replaced with new full -depth HMA pavement. Additional improvements included channelization improvements at Fremont Way, replacing storm sewer, widening Checker Road, filling a sidewalk gap between Brittany Lane and Checker Road, replacing traffic signal equipment, and enhancing the drainage system. Services Included: • Shop drawing review • Preconstruction services . Full-time construction observation, including verification that contractor conformed to plans & specs and serving as liaison between village and contractor • Coordination with utility companies • Project documentation of contract quantities according to IDOT standards • Preparation of change orders, authorizations, and pay estimates using CMMS • Quality assurance of construction materials • Record drawings Christopher B. Burke Engineering, Ltd. 19575 W. Higgins Rd., Ste. 600 1 Rosemont, IL 60018 1847.823-0500 1 cbbel.com / rr / II / r i r The Village of Mount Prospect (Village) is undertaking one of the most geometrically and operationally constrained intersection improvements in the northwest suburbs: the reconstruction of the triangle. Three closely spaced signalized intersections, operating off a single shared controller, carry roughly 22,500 vehicles per day on Rand Road, 15,000 on IL 83, and 7,750 on Kensington, through a corridor that recorded 398 crashes over five years (approximately 48% rear -end, 28% turning). CBBEL understands that the Phase III goal here is not simply to inspect a roadway contract; it is to shepherd a heavily traveled, fully built -out arterial junction through two construction seasons while keeping traffic moving, businesses open, and three agencies aligned. This is the kind of complex intersection and traffic signal improvement that CBBEL's Construction Engineering Department has successfully delivered for Mount Prospect and other clients in recent years. Our proposed Resident Engineer, TRACY WAIS, PE, will serve as the Village's primary day-to-day point of contact and brings direct resident engineering experience on comparable IDOT arterial reconstructions, including Skokie's Gross Point Road reconstruction (#61H23). She is backed by a department that has delivered Phase III Construction Engineering on related work for the Village and other local agencies: the Rand Road / Central Road improvement (#61H44) for Mount Prospect, the Gross Point Road reconstruction (#61H23) in Skokie, and the $25 million Franklin Avenue reconstruction (#61H14) in Franklin Park, a two -to -five -lane arterial widening with three new traffic signals, ComEd pole relocations, and staged maintenance of traffic directly analogous to this assignment. Because CBBEL delivered Phase III services on Rand/Central, our team already knows Mount Prospect's staff, the IDOT District One review process, and the federal -aid documentation this project requires, working familiarity that a team new to the Village cannot replicate. We have organized our understanding of the project's defining challenges below. Triangle Geometry &the Single Shared Controller The short segment lengths between the three signals leave almost no room for queue storage; a backup at one approach propagates through the entire triangle within a cycle. Because all three intersections time off one controller, any temporary -signal misstep or timing error has system -wide consequences. The design itself required numerous IDOT design exceptions (turn -lane storage, intersection angles, and acceptance of LOS E/F on some movements) to fit the improvement within a built -out footprint, meaning the as -built tolerances are tight and field decisions must protect the design intent. Our inspection focus will be on precise staking of the new lane geometry and disciplined coordination of every signal -timing transition. Maintenance of Traffic & Staged Construction With roughly 124 working days spread across two seasons and Rand Road designated a Strategic Regional Arterial and NHS route, maintenance of traffic (MOT) is the single greatest risk to both the schedule and the public's confidence in the project. The Special Provisions incorporate IDOT's Traffic Control Plan and explicitly waive certain standard weekend lane -closure restrictions, signaling that night and weekend operations will likely be needed for critical tie-ins, signal pole installation, and pavement transitions. CBBEL inspectors will verify each stage against the approved staging plan, document traffic control using the IDOT Form BSPE 726, and watch for queue spillback into adjacent signals. This is the same staged -arterial discipline our team applied on Rand/Central (#61 H44) and on Franklin Park's Franklin Avenue Reconstruction (#61 H 14). Private Utility Coordination, the Top Schedule Risk The corridor carries a dense utility burden, and the Status of Utilities tables identify dozens of conflicts that must clear ahead of their corresponding roadway stage: AT&T underground conduit and a manhole; CenturyLink fiber at 10+ locations; 20+ ComEd distribution and lighting poles; plus coordination obligations with Comcast, Crown Castle, WOW!, Zayo, and Nicor. Relocations must largely be complete by Winter 2026-27 to protect the Spring 2027 construction start; any slippage idles the Contractor and cascades into the second season. CBBEL will drive early utility coordination (field meetings, written status tracking, and JULIE verification) as a standing agenda item, exactly as we managed the comparable utility congestion on the Rand/Central and Skokie Gross Point Road (#61H23) corridors. IIIII IIII�IIIII1�1111111IIII 01111 ! ! IIII JIII IIIII�) 1111 Illl111) IIMIIII111��� IIIII IIII ! IIIII�������� IIIIIIIIII IIIII IIII ! 1114 0 IIIII IIIII IIII IIIII IIII 1111���������1111���������1114 IIIII IIII Illll11 11�illll��������� Traffic Signal & ITS Modernization The project replaces three signals and consolidates them under a new master controller with full -actuated control, accessible pedestrian signals, emergency vehicle preemption, video detection, LED indications, UPS backup, and mast arms up to approximately 64 feet. Temporary signals must keep all movements live while the permanent system is built and removed. We will enforce the 72-hour advance signal -work notification to IDOT, manage TO CS shop -drawing submittals, and require full coordinated -timing testing before final turn on so that no queue blocks an adjacent intersection. Our Traffic Engineer, LIZ JENSEN, PE, PTOE, provides in-house signal expertise to resolve field questions without schedule loss. Drainage, Regulated Substances & Confined Excavation New storm sewer ranging 12 inches to 42 inches with restrictor-plate manholes (MWRD watershed compliance) means deep, shored excavation adjacent to live utilities and traffic. The IDOT "Removal and Disposal of Regulated Substances" special provision identifies possible contaminated soil from adjacent auto and fuel uses; our inspectors will be prepared for special handling, documentation, and disposal coordination to prevent excavation - driven delays. Right -of -Way, Business Access & Public Outreach No full takings are required, but approximately 0.5 acre across 31 parcels is being acquired in strips and corners, and a private lot (Bullet Auto Repair) is reconfigured by the IL 83 widening. Maintaining driveway and business access, including the Randhurst Village commercial frontage, through staged, half -at -a -time driveway work is central to keeping the community supportive of the project. CBBEL will support the Village's public -information role with proactive notifications and responsive field problem -solving, the same posture we maintained through the active commercial frontage on Rand/ Central (#61H44). Pedestrian, Bicycle & ADA Facilities The project adds an 8-foot shared -use path along Rand Road and fills sidewalk gaps at all legs, with P ROWAG/ADA- compliant ramps throughout. Our ramp -compliance inspection experience, applied across our recent IDOT arterial reconstructions (Franklin Park Franklin Avenue #61 H 14, Skokie Gross Point Road #61 H23), provides accuracy in inspecting these facilities. IIIII IIII�IIIII1�1111111IIII 01111 I I IIII JIII IIIII�) 1111 Illl111) IIWIIII111��� IIIII IIII � IIIII�������� IIIII IIIII IIIII IIII l 1114 0 IIIII IIIII IIII IIIII IIII 1111��������� 1111��������� 1114 IIIII IIII Illll11 11�illll��������� Project Objectives CBBEL's Phase III effort will be measured against eight objectives: 1. Protect the traveling public through rigorous, daily traffic -control inspection across all stages, with heightened attention to the single - controller signal transitions. 2. Keep the project on schedule by treating utility relocation and weather - sensitive milestones as managed critical -path items, not passive observations. 3. Deliver the design intent despite the tight, design -exception -driven geometry, through precise layout verification and proactive resolution of field conflicts. 4. Maintain business and residential access at every stage, minimizing disruption to the Rand Road commercial corridor. 5. Ensure full federal -aid compliance, covering IDOT/FHWA QA/QC, DBE monitoring, certified payrolls, and complete documentation following IDOT Documentation standards. 6. Coordinate seamlessly across agencies (Village, IDOT District One, Bureau of Local Roads, IDOT Traffic, and the Contractor) via disciplined weekly progress meetings. 7. Control cost and quantities through accurate field measurements, timely pay estimates, and processing of authorizations as soon as changes are known. 8. Safeguard quality via independent QA materials testing and thorough as -built documentation. Technical Approach To successfully complete this project, CBBEL will perform, or be responsible for the performance of, the services outlined in the RFQ, furnishing qualified engineers, construction observers, and technical personnel. We have organized our work into the eight Scope of Services tasks below. Together, these tasks address every scope -of -services item identified in the RFQ Exhibit B while remaining tailored to the defining demands of this three -signal triangle: staged maintenance of traffic on a Strategic Regional Arterial, dense private -utility relocation, a single shared signal controller, and active commercial frontage. The project team is led by Project Manager , and Resident Engineer TRACY WAIS, PE, who serves as the Village's primary day-to-day point of contact. Tracy is supported throughout the project by experienced CBBEL construction staff on site, including Documentation Engineer KRISTEN MARQUIE, EI, and inspectors BILL SCHULTZ, , andJAKE CULLOTTA. On the traffic side, our Traffic Engineer, , will be a valuable resource, handling the traffic signal and ITS items that are central to consolidating the three intersections under a single controller. Because the contract carries a substantial street -lighting and electrical package and an extensive parkway -restoration and tree - planting program alongside the roadway and signal work, CBBEL staffs this assignment across disciplines: TONY DERICCO, PE, LC, Head of our Electrical Department, for the lighting and electrical service systems; DOUG GOTHAM, , a Senior Landscape Architect, for tree protection, plantings, and restoration; and an environmental specialist available on -call for regulated - substances handling and erosion control. IIII�IIIII11111111IIII IIII � IIII IIIII IIIII IIIII�������� � IIII JIII IIIII���� IIIIII Illl������i IIIII IIIII�������� IIII IIIII�������� IIIII IIIII IIII � IIII IIIII ��� IIII����� IIIII IIII � IIIII�������� IIIII IIIII IIIII IIII � 1114 q IIIII IIIII IIII IIII��������� IIII IIIII IIII 1111��������� 1111��������� 1114 IIIII IIII Illll11 11�illll��������� Task 1- Pre -Construction Services Prepare and submit IDOT agreements for construction and construction engineering to satisfy federal -aid funding requirements. Become familiar with the plans, specifications, and traffic operations at the three intersections and the surrounding access along Rand Road, IL 83, and Kensington Road. We will review the Project Development Report, Final plans, Final special provisions, Contractor bid unit prices, and advise the Village of potential conflicts or problems so solutions can be developed before construction. Review the project funding, including the project's STP, ITEP, and Congressional Appropriation grant programs. If necessary, discuss with the Village and Planning Liaison any anticipated additional funding that may be available if the Contractor awarded bid is higher than the current funding amounts. Our goal is to reduce the local cost burden at completion of the project. Participate in the Preconstruction Meeting with IDOT, Village staff, and the Contractor, and in any Village -administered informational meeting with impacted property owners and stakeholders. Lead early and continuous private -utility coordination with AT&T, CenturyLink, ComEd, Nicor, Comcast, Crown Castle, WOW!, and Zayo to relocate facilities as necessary prior to construction. Because relocations must largely clear by Winter 2026-27 to protect the Spring 2027 start, CBBEL tracks each conflict in writing and verifies it clears ahead of its dependent stage. This is the single greatest schedule risk on the corridor. • Review the Contractor's construction schedule for compliance with the contract, and produce a pre -construction video documenting existing conditions across the corridor and adjacent business frontage. Task 2 - Submittals 1 Requests for Information (RFI) Responses Review all shop drawings and equipment/material submittals for conformance with the Contract Documents and Engineering Drawings, returning comments to the Contractor within seven (7) days; maintain a submittal log and notify the Village of any deviation or substitution with a recommendation for acceptance or denial. • Give heightened attention to TOCS traffic -signal submittals: the new master controller, mast arms up to approximately 64 feet, accessible pedestrian signals, emergency vehicle preemption, video detection, and UPS backup. Review and coordinate timely responses to all Contractor RFIs, maintaining a separate file for each. Because consolidating three signals under a single controller is the most technically demanding element of this project, signal and ITS RFIs route to CBBEL's Traffic Operations Department, led by LIZ JENSEN, PE, PTOE, for in-house resolution so signal questions never become schedule delays. • Coordinate with the Phase II design team as the November 2026 letting date approaches. Task 3 - Construction Observation Layout Verification / Construction Layout • Verify the Contractor's horizontal and vertical construction layout of the proposed lane geometry and perform periodic check measurements against plan, which is critical given the tight turn -lane and intersection geometry. • Coordinate private property work with property owners to minimize disruption, including the Randhurst Village commercial frontage and the reconfigured Bullet Auto Repair lot. Construction Observation Inspect all contract work, including pavement, curb, storm sewer (12"- 42"), shored deep excavation, traffic signals and ITS, street lighting, PROWAG-compliantADA ramps, sidewalk connections, and the 8-foot shared -use path along Rand Road, keeping the Village informed, guarding against defects, and rejecting work that fails to conform to the Contract Documents. Attend and conduct weekly construction coordination/progress meetings with the Village, IDOT, and the Contractor, and provide weekly progress updates; monitor the Contractor's schedule and address deviations immediately. Traffic Controllnspection Perform Work Zone Traffic Control inspection per Section 700 of ID OT's Construction Manual: one detailed daytime inspection per week and two nighttime inspections per month, recorded on Form BSPE 726, with the Resident Engineer driving through the jobsite daily. Verify each maintenance -of -traffic stage against the approved Traffic Control Plan, monitor queue spillback between the three closely spaced signals, and manage permitted night/weekend operations (standard weekend lane - closure restrictions are waived for critical tie-ins). IIII�IIIII1�1111111IIII 01111 ! ! IIII JIII IIIII�) 1111 Illl111) IIMIIII111��� IIIII IIII ! IIIII�������� IIIII IIIII IIIII IIII ! 1114 0 IIIII IIIII IIII IIIII IIII 1111��������� 1111��������� 1114 IIIII IIII Illll11 11�illll��������� Task 4 - Construction Documentation Task 6 - Material QA Testing • Complete all Construction Engineering tasks to meet Federal, State, County, and Village requirements, following all IDOT guidelines, including the IDOT Construction Manual, BLR Manual, and Project Procedures Guide. • Complete all necessary paperwork during construction: maintain the daily project diary, daily inspection reports, field and quantity books, and all pertinent records; maintain and update CMMS; and keep an ongoing field mark-up set documenting every change from the design. Prepare pay estimates for Contractor work performed and provide the Village a recommendation for payment (IDOT pays the Contractor directly and seeks reimbursement from the Village); develop and process change orders as necessary. Prepare invoices for consultant work performed on IDOT forms, and manage DBE monitoring and certified payrolls. Documentation is led by , Documentation Engineer on both Rand/Central (#61H44) and Gross Point (#61H23). Task 5 - Area Resident and Business Owner Coordination Develop and distribute regular project notifications to impacted residents, businesses, and refuse/delivery companies, and support the Village's public -information role throughout construction. Respond to inquiries from various stakeholders and address issues in a timely manner, maintaining driveway and business access through staged work (driveways completed one half at a time) along the active commercial frontage. • Coordinate with the IDOT Bureau of Traffic on signal -timing and traffic- operations matters. • Coordinate material testing and QA/QC with the Contractor during construction. CBBEL provides subconsultant Material Solutions Laboratory (MSL), an IDOT DBE -certified firm prequalified in QA, for the material testing portions of the contract. The Resident Engineer coordinates QA material testing at the frequencies required by IDOT's Project Procedures Guide and reviews all reports submitted by the Contractor's QC subcontractor for compliance with the project specifications. Task 7 - Post -Construction / Project Close -Out • Create the construction punch list and ensure all outstanding items are completed to the satisfaction of IDOT and the Village. • Conduct the coordinated final inspection and complete final paperwork with IDOT and the Village; prepare the final pay estimate and a zero - balance final balancing change order for the Village's approval. • Verify all required material inspection documentation has been received, and submit the job box to IDOT with all pertinent project information. Task 8 - Record Drawings Prepare as -built record drawings reflecting all field changes, approved modifications, and final quantities, provided to the Village as one hard copy and one electronic copy in accordance with IDOT and Village documentation standards as part of project close-out. IIIII IIII�������� IIII�������� IIIII�������� IIII IIII � IIII IIIII IIIII IIIII�������� � IIII JIII IIIII���� 111111 Illl������i IIIII IIIII�������� IIII IIIII�������� IIIII IIIII IIII � IIII IIIII ��� IIII����� IIIII IIII � IIIII�������� IIIII IIIII IIIII IIII � 1114 IIIII IIIII IIII IIII��������� IIII IIIII IIII 1111��������� 1111��������� 1114 IIIII IIII Illll11 11�illll��������� Proj*ect Schedule IDOT plans to let the project in November 2026, with utility relocation beginning over the Winter and construction starting the following Spring. The work is projected to span two construction seasons with final completion in 2028. CBBEL has built its Phase III schedule around the milestone dates in the Village's tentative schedule, with the critical -path emphasis on clearing private -utility relocations before the Spring 2027 construction start. Islslsl CE Award July 21, 2026 Engineering Agreements to IDOT July 27, 2026 FIDOT Letting November 6, 2026 Utility Relocation Winter 2026-2027 Construction Start Spring 2027 Substantial Completion Fall 2028 Contract Execution &Staffing Jul —Aug 2026 Finalize CE agreement, mobilize key personnel, set up field office Pre -Construction Coordination Aug —Nov 2026 Plan review, utility kickoff, MOT staging review, IDOT/ Village alignment LettingSupport Nov 2026 Support IDOT District One letting and contractor PP onboarding UtilityRelocation Oversight Winter 2026-27 Monitor ComEd/AT&T/CenturyLink/Nicor relocations g ahead of construction Stage Construction & MOT 2027 season Staged widening/reconstruction, temporary signals, daily g traffic -control inspection Drainage & Roadway 2027 season Storm sewer, paving, curb, ADA ramps, shared -use path Signal & ITS 2027-2028 Temporary -to -permanent signal build, single -controller g integration & testing Final Stage & Restoration 2028 season Remaining stages, surface course, landscaping, punch list Final Inspection &Acceptance Fall 2028 Punch -list resolution, IDOT final inspection, project acceptance Documentation &Final Change Order Fall 2028 As -bunts, final quantities, zero -balance final change order, records closeout IIIII IIII��������IIII�������� IIIII�������� IIII 01111 � IIII IIIII IIIII IIIII�������� � IIII JIII IIIII���� IIIII IIII������ IIIIIIIIII�������� IIII IIIII��������IIIII IIIII IIII � IIII IIIII ��� IIII����� IIIII IIII � IIIII�������� IIIIIIIIII IIIII IIII � 1114 0 IIIII IIIII IIII IIII���������IIII IIIII IIII 1111���������1111���������1114 IIIII IIII Illll���lllll���illll��������� IIII��������� w (n ~ w 2 x 0 w w O X v w C� w U w CO Z Q H J D Z O t) LL H Q F- w CO O V E=0 o� =o L E Z v � � 00 m cn 0 M� W .. L 0 � E ca � Z O o > N -0 0 00 a �e n E J m E Z M .L Z �. � c: '� U W Vi u Q � O }W}�•� co V 0 m _ 0 L m a. 4.0 � 0 'A V O _� — 'L •� _r_ O J> aU C� L � N O Q Co Cll CU i_ E `-- Ca O C: Cu U) E� m� co U) 'VA � L o G� • .5 0 0 m o Lfi M w w F- Oco v Q LL LL O w � o wLU � > J Oa 2 O t) w J m � Q Q ~ w Z O p� a a J Q C0 Z V o � Z F- w O J J J � o 0 0 Q O v ` ` o Cl)cfl w Q a. LU LU LU F LU < F- < a M 0 V co z � F- w r V O V ♦1 o 0 0 0 V CM M C4 N M M M M O +�+ 00 4 V) ti r. M M N 0 0 V t r. CM d7 O Q I*-- 00 CY) N ♦, N N N O O O O N O (0 o0 CF) O O O O N N N i Q L,L L 4) O N CM Local Public Agency County Section Number [Village of Mount Prospect Cook 118-00170-00-CH Consultant / Subconsultant Name Job Number [Christopher B. Burke Engineering, Ltd. C-91-215-24 PAYROLL RATES EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CFCs) WORKSHEET FIXED RAISE MAXIMUM PAYROLL RATE 90.00 ESCALATION FACTOR 5.35% JOB SPECIFIC ® Classifications and Averaae Pavratesi . CLASSIFICATION IDOT AVG PAYROLL RATES ON FILE CALCULATED RATE Engineer VI $87.00 $90.00 Engineer V $73.73 $77.67 Engineer IV $60.59 $63.83 Engineer III $46.49 $48.98 Engineer 1/11 $39.08 $41.17 Survey V $90.00 $90.00 Survey IV $81.68 $86.05 Survey 111 $70.50 $74.27 Survey II $58.00 $61.10 Survey 1 $42.50 $44.77 Engineering Technician V $76.15 $80.22 Engineering Technician IV $57.28 $60.34 Engineering Technician III $50.50 $53.20 Engineering Technician 1/11 $36.40 $38.35 CAD Manager $75.65 $79.70 CAD Technician II $56.31 $59.32 CAD Technician 1 $28.33 $29.85 GIS Specialist III $63.00 $66.37 Landscape Architect II $72.00 $75.85 Environmental Resource Specialist V $79.21 $83.45 Environmental Resource Specialist IV $65.80 $69.32 Environmental Resource Specialist III $44.08 $46.44 Environmental Resource Specialist 1/11 $34.00 $35.82 Environmental Resource Technician $48.50 $51.09 Landscape Designer 1/11 $34.00 $35.82 Transportation Planner III $62.50 $65.84 Engineering Intern $20.92 $22.04 Printed 7/8/2026 B L R 05514 ( Rev. 1 /24/26 ) Page 2 of 7 RATES Local Public Agency County Section Number Village of Mount Prospect Cook 118-00170-00-CH Consultant / Subconsultant Name Job Number Christopher B. Burke Engineering, Ltd. C-91-215-24 SUBCONSULTANTS EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET Contribution to Prime NAME I (Payroll Direct Labor Total Consultant Only) Material Solutions Laboratory 1 35.805.00 3.580.50 Total 355805.00 3,580.50 NOTE: Only subconsultants who fill out a cost estimate that splits out direct labor may be listed on this sheet. Printed 7/8/2026 BLR 05514 (Rev. 1 /24/26) Page 3 of 7 SUBS Local Public Agency County Section Number Village of Mount Prospect Cook 118-00170-00-CH Consultant / Subconsultant Name Job Number Christopher B. Burke Engineering, Ltd. C-91-215-24 DIRECT COSTS WORKSHEET List ALL direct costs required for this project. Those not listed on the form will not be eligible for reimbursement by the LPA on this project. EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET ITEM ALLOWABLE QUANTITY CONTRACT RATE TOTAL Per Diem er Federal GSA Up to federal maximum $0.00 Lodging (per Federal GSA) Actual Cost (Up to Federal rate maximum $0.00 Lodging Taxes and Fees (per Federal GSA)$0.00 Actual Cost Air Fare Coach rate, actual cost, requires minimum two weeks' notice, with prior IDOT approval $0.00 Vehicle Mileage per Federal GSA Up to Federal rate maximum $0.00 Vehicle Owned or Leased (no mileage charge allowed) $45.00/half day (4 hours or less) or $90/full day 900 $90.00 $81,000.00 Vehicle Rental Actual Cost (Up to $55/day) $0.00 Tolls Actual Cost $0.00 Parking Actual Cost $0.00 Overtime Premium portion (Submit supporting documentation) $0.00 Shift Differential Actual Cost (Based on firm's policy) $0.00 Overnight Delivery/Postage/Courier Service Actual Cost (Submit supporting documentation) $0.00 Copies of Deliverables/Mylars (In-house) Actual Cost (Submit supporting documentation) 4292 $0.12 $515.04 Copies of Deliverables/Mylars (Outside) Actual Cost (Submit supporting documentation) $0.00 Project Specific Insurance Actual Cost $0.00 Monuments (Permanent) Actual Cost $0.00 Photo Processing Actual Cost $0.00 2-Way Radio (Survey or Phase III Only) Actual Cost $0.00 Telephone Usage (Traffic System Monitoring Only) Actual Cost $0.00 CADD Actual Cost (Max $15/hour) $0.00 Web Site Actual Cost (Submit supporting documentation) $0.00 Advertisements Actual Cost (Submit supporting documentation) $0.00 Public Meeting Facility Rental Actual Cost (Submit supporting documentation) $0.00 Public Meeting Exhibits/Renderings & Equipment Actual Cost (Submit supporting documentation) $0.00 Recording Fees Actual Cost $0.00 Transcriptions (specific to project) Actual Cost $0.00 Courthouse Fees Actual Cost $0.00 Storm Sewer Cleaning and Televising Actual Cost (Requires 2-3 quotes with IDOT approval) $0.00 Traffic Control and Protection Actual Cost (Requires 2-3 quotes with IDOT approval) $0.00 Aerial Photography and Mapping Actual Cost (Requires 2-3 quotes with IDOT approval) $0.00 Utliity Exploratory Trenching Actual Cost (Requires 2-3 quotes with IDOT approval) $0.00 Testing of Soil Samples Actual Cost $0.00 Lab Services Actual Cost (Provide breakdown of each cost) $0.00 Equipment and/or Specialized Equipment Rental Actual Cost (Requires 2-3 quotes with IDOT approval) $0.00 $0.00 $0.00 $0.00 TOTAL DIRECT COSTS: $813515.04 Printed 7/8/2026 BLR 05514 (Rev. 1/24/26) Page 4 of 7 DIRECT COSTS 9575 W. Higgins Rd. Rosemont, IL 60018 Code Description Price Per 111 8.5x11 RIP'd Color laser copies, Fiery's $ 0.55 per side 117 11 x17 RIP'd Color laser copies, Fiery's $ 0.95 per side 151 Premium color poster $ 3.00 sgft 155 Operator required-procesing charge $ 25.00 quarter hr 157 Color scan to pdf $ 1.40 sgft 400 8.5x11 B/W impressions $ 0.09 page 400W 8.5x11 B/W impressions (Walk Up) $ 0.07 page 403 8.5x11 Color paper stock $ 0.10 sheet 404 8.5x11 Card Stock $ 0.12 sheet 405 8.5x11 Sticky Back $ 1.00 sheet 409 Clear 4 mil mylar cover $ 0.50 sheet 413 8.5x11 Monochrome scan $ 0.07 side 413-1 11 x17 Monochrome scan $ 0.09 side 414 8.5x14 B/W impression $ 0.09 sheet 417 11 x17 B/W Impression $ 0.15 page 417W 11 x17 B/W Impression(Walk Up) $ 0.09 page 418 11 x17 Card Stock $ 0.19 sheet 419 11 x17 Colored paper $ 0.16 sheet 420 1/4 Plastic comb binding $ 1.40 each 421 3/8 Plastic comb binding $ 1.60 each 422 1/2 Plastic comb binding $ 2.40 each 423 5/8 Plastic comb binding $ 2.50 each 424 3/4 Plastic comb binding $ 2.75 each 425 7/8 Plastic comb binding $ 2.90 each 426 1 " Plastic comb binding $ 3.05 each 427 1-1 /8" Plastic comb binding $ 3.55 each 428 1-1 /4" Plastic comb binding $ 3.85 each 429 1-1/2 Plastic comb binding $ 4.00 each 430 1-3/4 Plastic comb binding $ 4.50 each 431 2" Plastic comb binding $ 4.70 each 438 Stapling $ 0.05 set 444-1 Plastic jackets $ 1.25 each 444 Misc. Charges $ 1.25 each 455 Imaging on tabs $ 0.15 impression 456 Tab card stock $ 0.75 sheet 470 Handwork $ 45.00 hour 472 Fan folding 11 x17 to 8.5x11 $ 0.03 sheet 473Inserting $ 0.04 sheet 474 Drilling -Standard 2 or 3 holes $ 2.50 500 sheets 500 8.5x11 Color laser copy $ 0.55 per side 502 8.5x11 small format color scan $ 0.15 per side 502-1 11 x17 Small format color scan $ 0.15 per side 517 11 x17 Color laser copy $ 0.95 per side 580 Mounting on 3/16 foamcore $ 3.45 sgft 73 overtime $ 50.00 hour 777777 Paper per case or package 8.5x11, 8.5x14, 11 x17 Subject to change 800 Digital bond prints/plots $ 0.16 sgft 800h Half size bond prints/plots $ 0.16 sgft 802 Scan Setup $ 0.50 sheet 822 Scan to file $ 2.00 sheet 850 Large document velium prints $ 0.40 sgft 872 Folding $ 0.05 sgft 870 Handwork $ 45.00 hour 885 Mylar reproduction $ 1.75 sgft 900 Digital bond prints/plots $ 0.16 sgft 900h Half size bond prints/plots $ 0.16 sgft 905 Color inkjet plots $ 2.70 sgft 905-2 EGG Scans $ 1.40 sgft 910 Mylar prints/plots $ 1.75 sgft 924 Burn a CD $ 12.00 each 925 File conversion processing $ 0.75 sheet 950 Velium Plots $ 1.25 sgft L = � U EOM O 0) O ja Z ti o E N o Lo .2 C� Z N Cl) 0 0 V � N V O 0 JI> 0 E m z i 0 V cn O V F- LU W 2 Y O 300 Q H N W H N 0 U W W U) O U) U W U U) W U_ W U) z Q J U) z O U LL O W Q U) W U) O U 0 m X W O w O V Q LL x W J C. G O U G o 0 0 0 0 0 0 0 0 0 ti 0 ti N O Q N0O N N 0000 (� - Gi O O O~ LL� LO O O 0 M M Nfl LO ,:I- LO 00 O M O M 00 O 't N� 00 Nt LO L OM M Q m CD� N ti C4 M ~ O 00 N CO H 00 m M O 00 v w ti � O w ao 00 oo O LO ti w N L() co M M - f` r-- N LO O 00 NA Ln O O O � � I` LO M N I� M 00 LO � N O N M p x N I` ' M 00 N O CO ti m - N It C~O a W Ln Ln T- CAI 00 Ln O Q Z NF) M N O I` CO ww ti m � ww O > Z—a, O U- LO CO CO CO O ' I` N ,r-- N CO CO CO CO O m J N r-- -r-- N CO m m N J LO B O O I` M O NO N N ti LO N 0 LO a a CD co O OCN CD m N co � �n M T.-- M CA N a Lid rn O Q O O LO O Ln CD co � LO 0000 N I` O LO 00 cn 'c c O H v 3 o o� 0 co 4-0 O o NU cn U O cn C: cn U O N U cU a� .o . 0 ° , Y N cn N? E Q nn ( U cn — o c� cn O z� O 0 0 }, N 0= 0 0a) +� cn 0 Q N C N M 't LO CO f` M O m m m m m m m m F--- F--- F--- I I I I I I I cn co N W N � � O �U NU CC M O m co N O N `, I,- co L� I` O N � n 0 C� 9• 2 9k v CY O JI> Cl) W Q F- U W n O w CL J O W Q W Q CO LU _U rw v! Z Q D Z O U LL O LU CQ G r� v! w rr� vJ O U 0 X w r U- O r M �C o � 0)Q CIO 00 o � CD� � N � L o � 0 t+ 00 0 o a C 0 r Q N i LO •� L O N m m 0 _ O N O N H C � oo N LO ti M CD C Q M f O o N a-+ \° r U E o o 0 O v a Co c6 co O N N O H O O O = 00 U') co r MO coO Cro co 00 Q N O O i co O O> c i a N I` N LOU o O ' N O M M O �C i O O O O O N 0 It 0 O 0 00 It m O 00 = CM T- M CD Co L _N Q N 00 N 6 4 (.0 M N N o 10-10 o 0 0 0 0 o N 00 N N N O m L 0 O co O � O O � O � = co O o �! > co Do L 0 o 0 o 0 U .�a .0 rn tiCD CD c6 o a 0 �` N r N .hC U) O O N O 00 M H = Lo to N C-0o N 0 0 N 0 ` 0 0 00 Q N O 00 O O O O O N O O ta co o o0 00 00 m O M M U-) O U-)co O M O O ti O a N O m r N 0 0 0 0 Co O O r M 0 IL L o 0 O o 6 O 0 0 0 0 0 0 0 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 QO = CNfl 00 LO� O't O O O 00 O O O O O O O O O O O N H o N O Cl) O O ti to M 00 00 M f` O O LO O ti N O ti I` N N 1- M O NCO LO O f` N M LO 00 ti M LO 00 LO � NItt M N 00 m O N 00 It� 00 O > Q O ti M 00 O 6 4 4 O O M o0 6 6 6 c.o 6 M 6 Co 6 � L6 Ln N 0 O-) I` Co 't '-I- O 00 ti co 'T 00 Co U-)M I,-U-) N co I` 00 Co W M U-) M co N (n cn cn U) Z 0 (z M cu co = L L L L L U U U U Q U U ���� o 2) a_ N U) U U - Q co � co � co � co � co � p O c H Q Cl) Cl)— >>>_ L L L L L > c •L c •L c •L c •L CDc s U U •U O N N N N c N O �cz L 0 c •L 0 CL Q N N O O O O N N N N >+ A ——— N N O O N N N N � N N N O" N O O O O c O co O Q N N J c c c c c N L N L O L N L N i c c c c Cn � �_ �_ i L_ i L_ i L_ i � cn c U W W W W W (n (n Cn cn cn W W W W U U U C� J W W W W W J W LO LO O m u V L V O J 0 E m Z O V cn O v/ LU Q w F- U LU O w a. J O LU LU V Q LU -44 LU LU 2 U) O Cn U LU U vJ w U_ �w vJ z Q J D U) z O U LL O LLI Q w �� vJ O U 0 m 2 x W LL O N F- LU LU o � Q o 0 a i � o O C) 0 � Q o ,40 0 a O o O O o � Q � 0 � a O i � O O O > M N O co CN N N o00 00 N N m M 4 bU) i 0 0 0 0 0 N 0 o0 cq o o \0 +.o L. 0 m Cfl CO C9 c9 LO 0 C) t0.1 a CD Lr) N No 4 N 00 C) N N CV N 00 i O o co00 � 00 � Q M � 00 � U') i O N � C N Oo 0 Cf) 0 co 0 0 N 0 M N 00 N CEO t� a M co r N o CD a •� , O ti a o N o 0 CD 0 CD 0 O O (a H _ O N O Q 6q 0 4) a o cfl � � o O C) 2 W O ti M M I` O LO 1` O 1` N It O In O N In ti LO LO N It N O N�� > O O o0 M O O N = 1` N CO N Cy) 1` (M 00 CM 00 �t Cr) 1- 00 O 00 00 O Q Q O 1` M o0 - O CO 4= 4 O O M o0 Ci CA 6 CO L6 M Oi (6 Lri= L6 6 N O O') 1` W q- M CO I` CO � CO CO Un CO 1` Un N CO 1` CO CO � CO U') CO W N (1) a) a) (D U Z _> _ Q CO Q cn Q cn Q cn � O > c _ (a U M U M U m U j O O O O O J Q V s= s= c — _ U) U) U) (n ( Co � Cl) J N N N C) c _� 0C ���� a Q 0 LL V> > > _ c c Aa Cl)> a. L L L L L > \ > c 'L � 'L � 'L c •L � U U ') Q E E E E E •L Q J a) m 0 a) a) a) a) a) a) a) >, � a) a� a) a� a) a� 0 a) (a 2 a) � a) � N m c O c O c O c O C O (a � O a a) a) U O •O •O ID L 0 L N L N L Q) L C O � '� C •O COC J � L L L L L n cn Co I.S W W W W W Cn Cn Cn Cn (n W W W W U U U C� J W W W W W J� W It LO O m a H W ~ LU W U) m = x W 0 Cl) W CO > V z Cl) W U) H z Q J D V) z 0 u LL LU Q F- w 0 v L L CL _ Z 0UO a0Co , � E � J � E of Z Z .-. 0 o E •� _ � U 0 Q M� Lw i ° i t O 0) 0— = a o AMA — �> amU C� O Q 0 U 0 J O 0 U) ca � N � Q O Q (U N N E co O C: N cn E� co co z L m E CC W J m Q H Z 0 H a J a v cn w J J 0 a a 2 z 0 2 N >- o W NLU Q M O � _i Z Z Q Lu � 0 v�� ~OC Z 0 V a W w IL Z 0 F— a J a V W H Z w 2 W W w CD a w H LL 0 F— _Z O a w H W Z w H w 0 00 F- L) a H Z 0 V W H LL 0 H Z a a 0 w H 0 F— w 0 F— V a LL Z 0 Q J Q V w w F— LU F- a J M V J Q C� 0 O LO ^z N _O N ~ CN Q r J � Q (1)U 0 w M LO O m (C) N O N 00 I` O � r 4-1 O ./�L ^^co o- 1 Local Public Agency County Section Number [village of Mount Prospect Cook County 118-00170-00-CH Consultant I Subconsultant Name Job Number [material Solutions Laboratory Corporation C-91-215-24 PAYROLL RATES EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET ANNIVERSARY RAISE MAXIMUM PAYROLL RATE 90.00 ESCALATION FACTOR 4.50% JOB SPECIFIC - Classifications . MOT AVG CLASSIFICATION PAYROLL RATES CALCULATED RATE ON FILE Materials QA Technician $56.59 $59.14 Pick -Up Techncian $38.90 $40.65 Lab Manager $41.00 $42.85 Material Coordinator $31.50 $32.92 Documentation Technician $41.50 $43.37 BLR 05513 (Rev. 1 /24/26) Printed 7/8/2026 RATES Page 2of6 Local Public Agency County Section Number lVillacle of Mount Prospect Cook Countv 11 8-00170-00-CH Consultant / Subconsultant Name Job Number Material Solutions Laboratory Corporation C-91 -215-24 SUBCONSULTANTS EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET ANNIVERSARY RAISE Total Direct Labor Total Name I (Payroll Only) I Contribution to Prime Consultant 0.00 0.00 NOTE: Only subconsultants who fill out a cost estimate that splits out direct labor may be listed on this sheet. BLR 05513 (Rev. 1 /24/26) Printed 7/8/2026 SUBS Page 3of6 Local Public Agency County Section Number Village of Mount Prospect Cook County 118-00170-00-CH Consultant / Subconsultant Name Job Number Material Solutions Laboratory Corporation C-91-215-24 DIRECT COSTS WORKSHEET List ALL direct costs required for this project. Those not listed on the form will not be eligible for reimbursement by the LPA on this project. EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET ANNIVERSARY RAISE ITEM ALLOWABLE QUANTITY CONTRACT RATE TOTAL Per Diem (per Federal GSA Up to the federal maximum $0.00 Lodging (per Federal GSA Actual Cost (up to the federal rate maximum) $0.00 Lodging Taxes and Fees (per Federal GSA)$0.00 Actual Cost Air Fare Coach rate, actual cost, requires minimum two weeks' notice, with prior IDOT approval $0.00 Vehicle Mileage (per Federal GSA Up to federal rate maximum $0.00 Vehicle Owned or Leased (no mileage charge allowed) $45.00/half day (4 hours or less) or $90.00/full day 86 $90.00 $7,740.00 Vehicle Rental Actual Cost (Up to $55/day) $0.00 Tolls Actual Cost $0.00 Parking Actual Cost $0.00 Overtime Premium portion (Submit supporting documentation) 40 $28.30 $1,132.00 Shift Differential Actual Cost (Based on firm's policy) 8 $8.49 $67.92 Overnight Delivery/Postage/Courier Service Actual Cost (Submit supporting documentation) $0.00 Copies of Deliverables/Mylars (In-house) Actual Cost (Submit supporting documentation) $0.00 Copies of Deliverables/Mylars (Outside) Actual Cost (Submit supporting documentation) $0.00 Project Specific Insurance Actual Cost $0.00 Monuments (Permanent) Actual Cost $0.00 Photo Processing Actual Cost $0.00 2-Way Radio (Survey or Phase III Only) Actual Cost $0.00 Telephone Usage (Traffic System Monitoring Only) Actual Cost $0.00 CADD Actual Cost (Max $15/hour) $0.00 Web Site Actual Cost (Submit supporting documentation) $0.00 Advertisements Actual Cost (Submit supporting documentation) $0.00 Public Meeting Facility Rental Actual Cost (Submit supporting documentation) $0.00 Public Meeting Exhibits/Renderings & Equipment Actual Cost (Submit supporting documentation) $0.00 Recording Fees Actual Cost $0.00 Transcriptions (specific to project) Actual Cost $0.00 Courthouse Fees Actual Cost $0.00 Storm Sewer Cleaning and Televising Actual Cost (Requires 2-3 quotes with IDOT approval) $0.00 Traffic Control and Protection Actual Cost (Requires 2-3 quotes with IDOT approval) $0.00 Aerial Photography and Mapping Actual Cost (Requires 2-3 quotes with IDOT approval) $0.00 Utliity Exploratory Trenching Actual Cost (Requires 2-3 quotes with IDOT approval) $0.00 Testing of Soil Samples Actual Cost 8 $905.00 $75240.00 Lab Services Actual Cost (Provide breakdown of each cost) $0.00 Equipment and/or Specialized Equipment Rental Actual Cost (Requires 2-3 quotes with IDOT approval) $0.00 HMA Testing (Voids, AC, Gradation) 6 $900.00 $5,400.00 HMA (Core Testing,Tack Coat,LJS) 6 $100.00 $600.00 PCC Cylinders Breaks 84 $25.00 $2,100.00 TOTAL DIRECT COSTS: $245279.92 BLR 05513 (Rev. 1 /24/26) Printed 7/8/2026 DIRECT COSTS Page 4of6 w E m Z O r L) a Cl) V .� C: �+ O m a. 4- _ O V O O J > U O ca O U L- 0 a O c�a J O 0 U) �a 4- j (6 F- LU W 2 Cl) Y O 3: H a w O C� LI (1) Q Q U) Lu z z Q Lu Lu >O () U Lu U Cn LI U_ Lu F- z Q F- J U) z O U LL O LI F- Q F- U) LI F- O U 0 F— m 2 X LI ol O N M N W F- LU W O • • • • 0 0 0 0 0 0 N O (fl CF) � CM N 00 1-7 00 �7 00 II II J _ U- 0 + c o 89DW � a m cn C� U)N LJJ N F-- CO � O �U M LO LO m N �Qo 00 ti o _0 LO 0 (1) i Ca n L E U Z o � � N r O O1" Lh Zr N CD V O r O cn n V O V V X t� t� O J W Q DC H C) LU n O w a J O W 0 Q W -44 LL O w Cn � Q Q U) w w > LU Z cn Z Q w w 2 O CO U w U w U_ w U) Z Q J Cn Z O U LL O w Q U) w O U 00 2 X w �,111,1111111111111111111111 �111111IIIIIIIIIIIIIII111111� �,111,1111111111111111111111 �111111111111111111111111111� �,111,1111111111111111111111 �111111IIIIIIIIIIIIIII111111� �,11��1111111111111111111111 �111��IIIIIIIIIIIIIIIIIIIIII� �,11��1111111111111111111111� ����1,1111111111111111111111 ����I1IIIIIIIIIIIIIIIIIIIIII� ������IIIIIIIIIIIIIIIIIIIIII� ������IIIIIIIIIIIIIIIIIIIIII� ������IIIIIIIIIIIIIIIIIIIIII M LO 0 m CHRISTOPHER B. BURKEENGINEERING, LTD. 9575 W Higgins Road, Suite 600 Rosemont, Illinois 60018-4920 Tel (847) 823-0500 Fax (847) 823-0520 July 13, 2026 Village of Mount Prospect 1700 West Central Road Mount Prospect, IL 60056 Attention: Matt Lawrie, PE, Village Engineer Subject: Phase III Construction Engineering Services Proposal for Rand -IL 83- Kensington Dear Matt: CBBEL is pleased to submit this proposal to provide Professional Phase III Construction Engineering Services for the above -referenced project. SCOPE OF SERVICES Task 1 - Pre -Construction Services • Prepare and submit IDOT agreements for construction and construction engineering to satisfy federal -aid funding requirements. • Become familiar with the plans, specifications, and traffic operations at the three intersections and the surrounding access along Rand Road, IL 83, and Kensington Road. Review the Project Development Report, final plans, final special provisions, Contractor bid unit prices, and advise the Village of potential conflicts or problems so solutions can be developed before construction. • Review the project funding, including the project's STP, ITEP, and Congressional Appropriation grant programs. If necessary, discuss with the Village and Planning Liaison any anticipated additional funding that may be available if the Contractor awarded bid is higher than the current funding amounts. • Participate in the Preconstruction Meeting with I DOT, Village staff, and the Contractor, and in any Village -administered informational meeting with impacted property owners and stakeholders. • Lead early and continuous private -utility coordination with AT&T, CenturyLink, ComEd, Nicor, Comcast, Crown Castle, WOW!, and Zayo to relocate facilities as necessary prior to construction. • Review the Contractor's construction schedule for compliance with the contract, and produce a pre -construction video documenting existing conditions across the corridor and adjacent business frontage. Task 2 -Submittals /Requests for Information (RFI) Responses • Review all shop drawings and equipment/material submittals for conformance with the Contract Documents and Engineering Drawings, returning comments to the Contractor within seven (7) days; maintain a submittal log and notify the Village of any deviation or substitution with a recommendation for acceptance or denial. • Give heightened attention to TOCS traffic -signal submittals: the new master controller, mast arms up to approximately 64 feet, accessible pedestrian signals, emergency vehicle preemption, video detection, and UPS backup. • Review and coordinate timely responses to all Contractor RFIs, maintaining a separate file for each. • Coordinate with the Phase II design team as the November 2026 letting date approaches. Task 3 - Construction Observation Layout Verification / Construction Layout • Verify the Contractor's horizontal and vertical construction layout of the proposed lane geometry and perform periodic check measurements against plan, which is critical given the tight turn -lane and intersection geometry. • Coordinate private property work with property owners to minimize disruption, including the Randhurst Village commercial frontage and the reconfigured Bullet Auto Repair lot. Construction Observation (based upon 125 Working Days by the Contractor as shown in the IDOT Contract) • Inspect all contract work, including pavement, curb, storm sewer (12"42"), shored deep excavation, traffic signals and ITS, street lighting, PROWAG-compliant ADA ramps, sidewalk connections, and the 8-foot shared -use path along Rand Road, keeping the Village informed, guarding against defects, and rejecting work that fails to conform to the Contract Documents. • Attend and conduct weekly construction coordination/progress meetings with the Village, I DOT, and the Contractor, and provide weekly progress updates; monitor the Contractor's schedule and address deviations immediately. Traffic Control Inspection • Perform Work Zone Traffic Control inspection per Section 700 of IDOT's Construction Manual: one detailed daytime inspection per week and two nighttime inspections per month, recorded on Form BSPE 726, with the Resident Engineer driving through the jobsite daily. • Verify each maintenance -of -traffic stage against the approved Traffic Control Plan, monitor queue spillback between the three closely spaced signals, and manage permitted night/weekend operations. Standard weekend lane closure restrictions are waived for critical tie-ins. Task 4 - Construction Documentation • Complete all Construction Engineering tasks to meet Federal, State, County, and Village requirements, following all IDOT guidelines, including the IDOT Construction Manual, BLR Manual, and Project Procedures Guide. • Complete all necessary paperwork during construction: maintain the daily project diary, daily inspection reports, field and quantity books, and all pertinent records; maintain and update CMMS; and keep an ongoing field mark-up set documenting every change from the design. • Prepare pay estimates for Contractor work performed and provide the Village a recommendation for payment. IDOT pays the Contractor directly and seeks reimbursement from the Village. Develop and process change orders as necessary. • Prepare invoices for consultant work performed on IDOT forms, and manage DBE monitoring and certified payrolls. Task 5 - Area Resident and Business Owner Coordination • Develop and distribute regular project notifications to impacted residents, businesses, and refuse/delivery companies, and support the Village's public -information role throughout construction. • Respond to inquiries from various stakeholders and address issues in a timely manner, maintaining driveway and business access through staged work. Driveways will be completed one half at a time along the active commercial frontage. • Coordinate with the IDOT Bureau of Traffic on signal -timing and traffic -operations matters. Task 6 - Material QA Testing • Coordinate material testing and QA/QC with the Contractor during construction. CBBEL will utilize Material Solutions Laboratory (MSL), an IDOT DBE -certified firm prequalified in QA, for the material testing portions of the contract, as a subconsultant for this task. • The Resident Engineer coordinates QA material testing at the frequencies required by IDOT's Project Procedures Guide and reviews all reports submitted by the Contractor's QC subcontractor for compliance with the project specifications. Task 7 - Post -Construction / Project Close -Out • Create the construction punch list and ensure all outstanding items are completed to the satisfaction of IDOT and the Village. • Conduct the coordinated final inspection and complete final paperwork with IDOT and the Village; prepare the final pay estimate and a zero -balance final balancing change order for the Village's approval. • Verify all required material inspection documentation has been received, and submit the job box to I DOT with all pertinent project information. 3 Task 8 - Record Drawings • Prepare as -built record drawings reflecting all field changes, approved modifications, and final quantities, provided to the Village as one hard copy and one electronic copy in accordance with IDOT and Village documentation standards as part of project close-out. ESTIMATE OF FEE We estimate the fee for these services to be $1,656,576.00 as shown on the attached Cost Estimate of Consultant Services (CFCs) worksheet. We look forward to working with the Village on this project. Sincerely, W. Daniel Crosson, PE Executive Vice President 2