Loading...
HomeMy WebLinkAbout6.3 Motion to approve a change order for the Algonquin Road Path & Lighting Project Phase II Design Engineering contract for an amount not to exceed $70,688.Subject Meeting Fiscal Impact (Y/N) Dollar Amount Budget Source Category Type Information Item Cover Page Motion to approve a change order for the Algonquin Road Path & Lighting Project Phase II Design Engineering contract for an amount not to exceed $70,,688. January 6, 2026 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD Y $705688.00 Cloud HQ Escrow CONSENT AGENDA Action Item Christopher B. Burke Engineering, Ltd. (CBBEL) is requesting additional money for Phase II Design Engineering services as part of the Algonquin Road Path &Lighting Project. The total amount requested is $70,688.00. Funding will come from escrow provided by the Cloud HQ development. No Village funds will be expended for the supplement work. The Village Board awarded CBBEL a contract for Phase II Design Engineering services in an amount of $370,856.00. CMAQ funds will cover $296,685.00 (80%) with the Village responsible for $74,171.00 (20%). CBBEL's contract includes preparing construction plans & specifications for a shared use path along the north side, sidewalk along the south side, and street lighting on both sides of Algonquin Road from Dearborn Court to Elmhurst Road. It also includes pedestrian signal and crosswalk improvements on Algonquin Road at its intersection with Dempster Street and Busse Road. Finally, CBBEL's contract includes preparing highway plats to acquire temporary construction easements and permanent right-of-way from properties to construct the project. Discussion CBBEL's contract did not include design work along the Cloud HQ frontage or pedestrian signal and crosswalk improvements at the Algonquin Road & Linneman Road intersection. This section was originally going to be designed and constructed by Cloud HQ as part of their development. It was expected to be completed in 2023 ahead of the Village project. However, the original Cloud HQ development did not move forward, and a redesign has only recently been approved by the Village Board, with a full building permit not expected to be issued until early 2026. To simplify the coordination and potential issues with IDOT, CBBEL has agreed to design this section and incorporate it into the construction plans and specifications. It will be constructed as part of the Village project. Cloud HQ has established a $1.,000,000 escrow to entirely pay for the design, construction, and construction engineering for the section along their frontage. The Village will pay CBBEL for the supplement work using the escrow funds. It will be separated from the current contract work using CMAQ and Village funds. The Village is currently on the November 2026 IDOT letting with construction expected to begin Spring 2027 and be completed by the end of the year. Alternatives 1. Approve the change order for Algonquin Road Path & Lighting Project - Phase II Design Engineering. 2. Action at the discretion of the Village Board. Staff Recommendation Staff recommends that the Village Board approve a change order from Christopher B. Burke Engineering, Ltd. of Rosemont, Illinois for Phase II Design Engineering as part of the Algonquin Road Path & Lighting Project for an amount not to exceed $70,688. Attachments 1. Project Location Map 2. CBBEL Supplement Request t.111 W), TJ z F17 �D 0 1,500 3,000 W Nl,a r t i ri L n Feet r W L,0r1nqWSi`t B tiv d 1 inch 1,500 feet P Ull 0. r4r'lih a r d P f0 63 F 0 t,,* Sttrizet F"af* W11 Pairk Rd C 0JI E ... .. . . . . w 1) 11 0 fl"t ojk > CAP"uU trig .... ... . . Oft 4, > . ... ... -/ Q 0 00 I till j W 110 . ...... W ..... . ..... .. ....... I > C), C tp, in ic',Je Z) r (J"t 111 L ri Part,,/., I� . ....... .. . .. < t-a W11 10 0 Al, 0 C, 0 WE d 0 W, T[wrnwacfl, I.L01 0 0 M (Ap 3i; 0 0 ("JA z 1 W1 o c, it Ln to Cllr� 4111) % r a R c W ft �i I ow L n, j E Fa[con !'11p, zQMmSO, Jai0 At fit W caot;,Mp,�,ja w W i I k,""vve L �1 Y'Ve, si t rn, er e R d f Ilia fV 'indy Ln S lid W lPol, a n o 0 LU vV4,jifl, V, ti'p (j oiCl IV W, A 1�3t�,,#am Di, p, A BEGIN PROJECT] A! 0 10) - .. .... . . W K ath W C it t o "Oo Al f <k C (( 'e" L'), ­J L n c e C ill'31'11 V, 0 V 6. 0 0111 W W W W W i� Arnblesi de % S C I (fol qU D fe te !V r Ave Mpslf ,r St DEMPSTERSTREE, 511 r W W-11-IN NO/ OR' b 0 a C,i C3 % 0 0 Bir i �f?iawood Af��REA Of���` ADDi rioNAI�- D Z �K i n k ir 3 D Ec� I �N I� IN G I N E, IE IR I N G frJ1 S, C ov e o ll!°'III a it A4 k/ 0 —j ............ k"I", V! LY r e S t C civv e ID f, W1 WIN ,01 LU r 1. 1 W W ji END PROJECT s Ci A -D In n, sD crnD )r pi z"I trp, I y [,flr W Kerfunjelh� [,7 W victc)ri . . .... ... ..... ..... 'J'I 1 1-11 1 marray C > C't 0 I,) �j I C t CL 1�w �z 0 410 ME- z Pacj, n: i r 0,r4 s Ih i r A Ell, I WN/ a '01,110? 1 VIP 110 EE/ aly 0 IN n �m ci I r 4 r V C", 6, 11 (p i e �D tef W Ill. i ro,� c o n in VIP W T fit. rn mzj I D r I uNttin, > > > > W, < Q 0 0 P ea) is < :f 0 E Oaklorl St . . ... . ...... n -S 4", li-I M i t 0 n, K e tv, j�i > < "o, 0 k W x C., y CL Ad 5 r ti illyi rn ery ir T7, 0 Hc'�vvzwrd S t Sources: Esr oiERE . ....... 0 '10 E51, min, USGS.",",,,�, Intermap, f ry v, yjj�,N le INCREMENT P,'NRcan, Esri,' x CLIENT: TITLE: C1313EL # 19-0109 V VILLAGE OF DATE: 9/14/2020 MOUNT PROSPECT LOCATION MAP SHEET 1 OF 1 EXH I CHRISTOPHER B. BURKE Engineering, Ltd. DWN. KEK SCALE: 1 1,500 5 9575 W. Higgins Road, Suite 600, Rosemont, Illinois 60018 (847)823-0500 CHKD. TGM PLOT DATE: 9/14/2020 FILE NAME: Project Location Map (*;'HIRISTOPHER B., BURKE ENGINEERING, LTD. November 2512025 Village of Mount Prospect 1700 W. Central Road Mount Prospect, Illinois 60056 Attention: Mr. Matt Lawrie, P.E. Village Engineer Subject: Cloud HQ Property Algonquin Road Bike Path Dearborn Court to Elmhurst Road Request for Additional Services (Local Funding) Dear Mr. Lawrie: Christopher B. Burke Engineering, Ltd. (CBBEL) is providing this contract per Village request for design updates and modifications related to the Cloud HQ (FKA United Yards) frontage. The frontage area was excluded from the original contract, as Village anticipated Cloud HQ to design (and construct) this section as part of their overall development project. This locally funded contract follows the terms and conditions of the original Phase II Engineering contract. Please see below understanding of the assignment, scope of services, schedule, and estimate of fee. UNDERSTANDING OF THE ASSIGNMENT CBBEL understands that the Village looks for CBBEL to include the Cloud HQ frontage and Linneman Signal upgrades into our Phase II Engineering Bid Set Documents, allowing for the path to be constructed in its entirety as part of the IDOT Let construction project. This design work was initially anticipated to be completed by the Developer and built via separate local contract via IDOT permit. The improvements include approximately 1,900 feet of 8' wide asphalt path along the north parkway of Algonquin Road, from Sta 97+00 (just west of driveway) to Sta 140+00 (just east of Linneman intersection). Within this area removals, turf restoration, driveways (remove old, install new), sidewalk (ADA corner, curb/gutter), signage, a —200 foot short retaining wall, and pavement markings will be designed and private utility conflicts will need to be identified (to be relocated by their respective owners). Phase 11 Additional Design Engineering Services Related to Cloud HQ Property Algonquin Rd (Dearborn Ct to Elmhurst Rd) Improvements Village of Mount Prospect, Section No 20-00172-00-BT SCOPE OF SERVICES Task 10 - PSE (Cloud HQ): CBBEL will develop construction contract documents building upon the approved Phase I Report and in conjunction with the other disciplines noted herein. These plans will be used to develop cost and time estimates, and utility coordination. These plans will be provided to the Village/IODT for review. Task 10.1—Design Updates: Cloudh HQ will provide AutoCAD plan view design showing dedication parcel (pr ROW) and path partially outside or ROW along their frontage (along with two proposed entrances) and with ADA/signal equipment outside of Linneman/Algonquin corner ROW. Their plan will include grading based on their design, and preliminary Pace Bus stop location. Cloud HQ will also provide IDOT's comments on their last submittal of intersection (from a few years ago). This information will be used as reference, as it is not directly translatable to Phase II plans. CBBEL will update our design plans to accommodate Cloud HQ new driveways and eliminate the existing driveways. New driveways shall not be in conflict with proposed lighting. The northwest corner of Linneman will be updated to accommodate sidewalk connection to Cloud HQ's Linneman west parkway sidewalk. Cross sections, temporary conditions, etc will be updated in Preliminary Plans for Village and Cloud HQ review. CBBEL will also update IDOT's PESA Response Form to include the Cloud HQ section. Form requires calculating earthwork and spoil for all elements of work, updating form, and providing exhibit showing corresponding areas. CBBEL will also update Utility Conflict Sheets to include the Cloud HQ section. Task 10.2 - Preliminary Plan and Cost Estimate: CBBEL will update the preliminary plans and cost estimate to include the path (including railings, segmental block retaining wall, turf restoration) work along Cloud HQ property and the ADA work (sidewalk and crosswalk) at the Linneman Ave intersection. CBBEL staff will design the approximately 200 foot long retaining wall near Sta 57+00 to Sta 60+00. It is anticipated that this will be a short segmental block retaining wall. It is anticipated that the plans will include a general plan/elevation/ wall details sheet. IDOT standard pay items will be used for a majority of the work. Task 10.3. Pre -Final PSE Submittal: CBBEL will prepare pre -final contract documents consisting of plans, specifications, estimate of time, status of utilities to be adjusted, and an estimate of construction cost for the Cloud HQ segment and incorporate into the overall project's PSE documents. CBBEL will also provide a disposition of comments. 2 Phase 11 Additional Design Engineering Services Related to Cloud HQ Property Algonquin Rd (Dearborn Ct to Elmhurst Rd) Improvements Village of Mount Prospect, Section No 20-00172-00-BT Task 10.4 - Final PSE Submittal: The Pre -Final submittal items for the Cloud HQ segment will be updated per Village and IDOT comments. Additional updates may be made based on utility coordination. Task 10.5 — Bidding Documents and Final Cost Estimate: CBBEL will make the final revisions to the final submittal based on Village and IDOT final review comments. Sheet Types Being Updated Number Sheets Hours per Sheet * Total Hours Existing/Utility Conflict Plan 2 6 12 Removal Plan 2 7 14 Proposed Plan/Profile 2 8 16 Staging/MOT 2 4 8 ADA corner 1 8 8 PMK/Signage (new) 2 6 12 Landscaping/SEC 2 6 12 Retaining Wall (new) 1 8 8 Cross Sections 11 5 55 Estimate 10 Dispositions 9 Total 164 * total for prelim/pre-final/final/bid Task 11 - Linneman Traffic Signal Design (Cloud HQ): CBBEL will develop Traffic Signal Modification plans for the intersection of Linneman Rd at IL 62 (Algonquin Road). The plans will detail the required traffic signal modifications for the new ramp configurations including removing and replacing pedestrian signal equipment, as well as modifying detector loop layouts based on final crosswalk and stop bar placements. The plans will also meet PROWAG policy requirements including accessible pedestrian signal (APS) placement and installation details. Task 11.1. Data Collection: CBBEL will conduct a field reconnaissance and inventory the existing traffic signal equipment for the intersection of Linneman Rd at IL 62 (Algonquin Road). A photo log will be created for the existing conditions. The existing traffic signal plans will be requested and reviewed from IDOT District 1 as well. Phase I Plans will be reviewed. Task 11.2. Base Sheet Preparation: CBBEL will develop the base sheets for the traffic signal plan sheets for this additional intersection at a scale of 1" = 20'. The base sheet information will incorporate topographic survey data, existing IDOT plan data for underground conduits, and the proposed intersection design. 3 Phase 11 Additional Design Engineering Services Related to Cloud HQ Property Algonquin Rd (Dearborn Ct to Elmhurst Rd) Improvements Village of Mount Prospect, Section No 20-00172-00-BT Task 11.3. Traffic Signal Removal Plans: This task includes the preparation of traffic signal removal plans for the intersection of Linneman Rd at IL 62 (Algonquin Road). The existing traffic signal equipment scoped for removal will be shown with notes designating which equipment is to be removed and disposed of outside the ROW or relocated. Notes will also be provided directing the Contractor which, if any, equipment will be salvaged by I DOT. Task 11.4. Traffic Signal Modification Plans: As part of the Shared Use Path and Lighting Improvement project, the intersection of Linneman Rd at IL 62 (Algonquin Road) will be modified to meet the proposed ADA curb ramp layout and current PROWAG requirements. This task includes developing the traffic signal modification plan sheets with revised equipment layouts, cable plans showing the new and existing signal cabling, existing and proposed phase designation diagrams, and emergency vehicle preemption sequences as appropriate. Task 11.5. TS Specifications and Estimates: This task includes creating any additional traffic signal special provisions for the project with the inclusion of Linneman Rd at IL 62 (Algonquin Rd). In addition, CBBEL will provide an engineer's opinion of probable construction cost estimate for the traffic signal work with each PS&E submittal. Sheet Type Number Sheets Hours per Sheet Total Hours Removal Plan 1 20 20 Modification Plan 2 26 26 Cable Plan 1 20 20 Specifications 6 6 Estimate 8 8 Dispositions 33 33 Total 139 * total for Task 11.2 —11.5 Task 12 — Land Donation Plat/Plan Updates (Cloud HQ) As Cloud HQ Donation Plats will not be completed prior to Pre -Final Submittal, and potentially not until after Final Plan Submittal, all work for IDOT letting must be within existing ROW. As a field change exhibit (pro/grad sheets), CBBEL will update ROW file to show Cloud HQ recorded Plat of Subdivision lands. CBBEL will revise plans to show work within this new ROW at Sta 57-00 to Sta 60+00 (eliminating segmental block wall), and at Sta 67+00 to Sta 70+00 (to show bus shelter pad and additional sidewalk at NW corner). CBBEL will coordinate with 4 Phase 11 Additional Design Engineering Services Related to Cloud HQ Property Algonquin Rd (Dearborn Ct to Elmhurst Rd) Improvements Village of Mount Prospect, Section No 20-00172-00-BT Pace to provide passenger waiting area outside of path, within ROW, ideally large enough for Pace to install a bus shelter. Task 13 — Coordination/PM/QAQC (Cloud HQ) Coordination. CBBEL will meet with Key Stakeholders and complete forms as needed to allow project to be advertised by IDOT. CBBEL will prepare agendas, lead/attend, and provide meeting summaries. No PowerPoint presentations are anticipated and therefore not included in this scope. Exhibits are anticipated to be from Phase I, Plan Set, and other submittal items. CBBEL assumes virtual meetings with the following key stakeholders. IDOT BLR (1 meeting), Cloud HQ(2 meetings), Utility Companies (approx. 15 companies in one combined meeting) (1 meeting). QAQC. The CBBEL QC/QA plan emphasizes an integrated project development process, with a guiding principal to ensure cost effective and practical infrastructure management that advocates a safe, constructible and cost effective design solution that minimizes change orders and schedule delays. The Project Manager manages the overall project quality control's process and, through the QC/QA Manager, assigns qualified senior quality reviewers for pending deliverables as required. The QC/QA Manager, will perform a comprehensive evaluation of the following items throughout the design process. Scoping/field checks, Submittals, Design calculations, Computer inputs/outputs, Documentation of decisions and directives, Pay items and quantity calculations, Project records, Compliance statements, Pre -Final and Final Plan format and content. Project Management and Administration. This effort includes overall project administration and work force planning/allocation, including development of monthly progress reports which will be submitted to Village each month in conjunction with submittal of project invoices. Excluded items (Cloud HQ) Entrance Permits, Land Acquisition, MWRD Permits outside of Exist ROW, and Lighting updates. 0 Phase 11 Additional Design Engineering Services Related to Cloud HQ Property Algonquin Rd (Dearborn Ct to Elmhurst Rd) Improvements Village of Mount Prospect, Section No 20-00172-00-BT SCHEDULE This work will be assimilated into the overall project schedule. 12/17/25 NTP 5/15/26 Pre -Final Submittal 7/27/26 Final Submittal 10/1/26 Field Change ESTIMATE OF FEE See the attachment for the workhours and estimated cost for Engineering services based on the scope of work listed above. If this proposal meets with your approval, please sign and return one copy of this proposal as an indication of acceptance and notice to proceed. Please feel free to contact us anytime. Sincerely, Michael E. Kerr, PE President THIS PROPOSAL ACCEPTED FOR THE VILLAGE OF MOUNT PROSPECT: 10 TITLE: DATE: 31 L• � a E L cn m m Z E .0 Z r t� O O cl) a O V LU LU vJ O 3: L U CO L U_ LU U) z Q J D CO z O U LL O LU Q Cn LU CO O U m X LU 0 N LO W H a a W LU O Q o 0 0 0 0 Z ti M ti o a 0 0 0 � cM O O ~ 0 CC) 00 O 4,jm ' ' ' ' ' ' 00 r q,;Im N O 00 L') CY) M CY) CC) a OCY) N � CC) O 0 F- mCl) (1)W LU LU U = LUO O O I� CC) I� ' ' ' ' ' ' O O cM w r CC) O (D 00 � 00 O CC) cM w LL c) cM 00 W x LL Cl) LO LO O N_ ' ' ' ' ' ' N ~ � LO 0000 CC) 0) Q w LO M cy'i cM (D a Z CY) w w ww cD O 2 LL M r CYO Lf) 1 1 1 1 1 1 a) O M J cM (D Nt J O O N N Ln O N a � 0000 � � M M O z cn F- LU _O U^ � Z:) U .� � 00 CU U U � Q Cl) C) 2 C 0, o � J a < 00 o_ O -0 cn ~ O m O 0 U E LU cC: 0 J J U 0 V O V r r N r CO V- co ^ Ln � N N LU F--- O U) O �U aN� It N O CN O .L n