Loading...
HomeMy WebLinkAbout8.1 Motion to waive the rule requiring two readings of an ordinance and adopt an ORDINANCE AMENDING ORDINANCE NO. 6634 GRANTING A CONDITIONAL USE FOR A PLANNED UNIT DEVELOPMENT AND A FINAL PLAT OF SUBDIVISION FOR THE PROPERTY COMMONLY KNOWN AS THE MOUNT Pr� Item Cover Page Subject Motion to waive the rule requiring two readings of an ordinance and adopt an ORDINANCE AMENDING ORDINANCE NO. 6634 GRANTING A CONDITIONAL USE FOR A PLANNED UNIT DEVELOPMENT AND A FINAL PLAT OF SUBDIVISION FOR THE PROPERTY COMMONLY KNOWN AS THE MOUNT PROSPECT TECHNOLOGY CAMPUS LOCATED AT 1200 EAST ALGONQUIN ROAD AND 1200 DEMPSTER STREET, MOUNT PROSPECT, ILLINOIS (PZ-21-25) Meeting October 28, 2025 - SPECIAL MEETING - AMENDED 10-27-2028 OF THE MOUNT PROSPECT VILLAGE BOARD Fiscal Impact (Y/N) Dollar Amount Budget Source Category Type Information 1►1 NEW BUSINESS Action Item TUR Ventures, LLC ("Petitioner""), received conditional use approval for a final planned unit development and final plat of subdivision approval on June 21, 2022 (Ord. 6634) to construct three data centers and a new electrical substation in conjunction with Commonwealth Edison ("ComEd"). The Petitioner now proposes an amendment to the approved planned unit development and is seeking a final plat of subdivision and conditional use approval for a final planned unit development as a major change for the construction of a two -building data center campus, second electrical substation, mechanical yard, satellite antenna yard, and related site modifications at 1200 East Algonquin Road and 1200 Dempster Street (""Subject Property"). The proposal requires Village Board approval for final plat and conditional use approval for the final planned unit development as a major change. The proposal meets the requirements and standards related to the Village Code, and staff is supportive of the requests. Discussion Background: The Subject Property, formerly the United Airlines world headquarters, was annexed into the Village in 2017. Portions of United Airlines operations moved to downtown Chicago in 2007. United Airlines relocated all headquarter operations to the Willis Tower in 2012. The campus in Mount Prospect shifted to Information Technology and limited training operations following the relocation. United Airlines constructed a 172,000 square foot data center west of the Subject Property in 2013; that facility is not part of the planned unit development (PUD), the subject of the requests. The Village approved a final PUD and a final plat of subdivision at the Subject Property for the development of three data center buildings (each totaling 566,767 gross square feet), an electrical substation (Substation # 1), and related site improvements in 2021 and 2022. Demolition of the former United Airlines campus has since been completed. Sediment basins west of Linneman Road and site improvements for the electrical substation have been constructed, and Substation # 1 is nearing completion. Per the Petitioner, the data center industry has experienced significant changes since the approval of the final PUD. Legislative changes that impact data center operations and the rapid acceleration of artificial intelligence increased demand for data infrastructure. The Petitioner is requesting approval of an amendment to the original PUD ordinance to make modifications that address these evolving industry needs. Proposal: The Petitioner proposes to modify the original PUD to construct a two -building data center campus, second electrical substation ("Substation #2"), mechanical yard, satellite antenna yard, and related site improvements. The amended plans consolidate two of the previously approved data center buildings into a single, larger building separated by a party wall ("ORD1") and propose to construct a second, smaller data center building (""ORD2"). Both buildings are increased to three -stories in height, as compared to the two-story buildings that were previously approved. The Petitioner has entered into an easement agreement with ComEd for Substation # 1 and will enter into a similar agreement for Substation #2, under which ComEd would construct and operate the substations. The data centers and Substation #2 would occupy the former United Airlines campus (1200 E. Algonquin Road or the "Data Center Parcel"), while Substation #1 is located across Linneman Road at 1200 Dempster Street. The Data Center Parcel consists of approximately 43.31 acres of land, and is bound by Algonquin Road to the south, Linneman Road to the east, and Dempster Street to the north. The Substation # 1 Parcel is approximately 6.14 acres in size and is located at the southeast corner of Dempster Street and Linneman Road. The staff report contains detailed discussions on the site plan layout, parking, building elevations, mechanical equipment, accessory structures, the satellite antenna yard, Substation #2, landscaping, traffic, lighting, signage, and phasing. The report also contains a summary of the economic impacts of the development, including municipal utility tax revenue, higher property tax contributions, new employment opportunities, and parks improvements donations. A discussion of the noise, emissions, and water usage is provided. The key takeaways are highlighted below: Cloud HQ's proposed 2025 amendment represents a major evolution from the original 2022 plan. Instead of three smaller buildings, the revised design consolidates into two larger three- story facilities—ORD1 (r%.41.3 million SF) and ORD2 (N872,000 SF) —totaling roughly 2.17 million SF, a 470,000 SF increase from the 2022 plan. The plan raises building heights (up to 138 feet), expands lot coverage (82% versus 68%), and reduces open space (18% versus 25%), while introducing a second substation and upgraded cooling systems capable of supporting a total electrical demand of 345 MW. The amended project is expected to achieve major sustainability gains, including an 84% reduction in projected water use and a 50% reduction in projected sewer discharge through closed -loop cooling technology, all within existing Village utility capacity. The amendment strengthens emissions, noise, and stormwater management controls. Cleaner generator technologies and advanced acoustic treatments ensure compliance with environmental and sound standards, new stormwater facilities and more than 300 trees will enhance site aesthetics and ecological performance. Economically, the project will deliver substantial fiscal benefits —projecting to generate over $8.4 million annually ($5.46 million annually from ORD1, $3 million annually from ORD2) in electricity tax revenue and an estimated $104.8 million in TIF revenues over the district's remaining life —along with up to 1,000 construction jobs per building and 225-450 permanent high -skill positions paying an estimated $78,500 in salary per job. Cloud HQ will also maintain its $2 million contribution toward the Rec Plex splash pad, with payments scheduled between 2026 ("$1.2 million) and 2028 ("$800,000) - funding that could be advanced by the Village to align with Mt. Prospect Park District's 2027 project timeline. This donation, along with other public improvements, will be memorialized via a Memorandum of Understanding (MOU), which will be reviewed by the Board. In the unlikely event the second data center is never constructed, reserve funding source would be the SMP TIF. The amendment streamlines the development into a higher - capacity, more efficient, and more economically impactful project that advances both Village infrastructure and community amenities. Ongoing Testing and Maintenance of the Generators: The attached ordinance will condition the project so that the routine testing and maintenance of the generators will comply with the noise limitations set forth in the zoning code, and shall only occur during the daytime hours between 7:00 a.m. and 7:00 p.m., Monday through Saturday, excluding Sundars and Village -recognized holidays. The attached ordinance will also restrict the operation of the generators such that no more than three (3) installed generators operate simultaneously for routine testing or maintenance purposes, unless other approved by the Village Manager. The project will be governed by state and federal EPA guidelines, which cap generator annual operating hours to 100 hours. Staff Recommendation: Staff has reviewed the Petitioner's requests for a final plat of subdivision and a conditional use to amend the final planned unit development as a major change and is supportive of the requests. The Petitioner has also worked extensively with staff to improve the buildings' architectural elevations by breaking down the mass and scale of the buildings, reducing repetition, and creating sufficient modulation and articulation to further minimize visual impacts on neighboring properties. Staff finds that the Petitioner has demonstrated good faith by developing strategies to mitigate potential impacts associated with the amended plans. Steps have been taken to minimize visual, acoustic, and air quality impacts produced by the data center development. The project will provide sufficient screening via substantial landscaping and screen walls to protect the livability and quality of life for adjacent residential and existing businesses. Additionally, the Petitioner will provide noise mitigation measures and will be required to produce documentation and special testing to verify compliance with all performance standards required by the I-1 Limited Industrial District. The proposal takes advantage of an underutilized site in South Mount Prospect, and is a high -quality industrial development. The project's long-term benefits to the Village are significant and will positively impact residents and existing businesses in South Mount Prospect. The 2025 amendment shifts the project toward fewer but much larger buildings, with enhanced utility and mechanical systems, while embedding significant environmental efficiencies —especially in water and sewer use —and maintaining strong fiscal, employment, and recreational benefits for the Village. The proposed use is compatible to the area and the development meets all long-range planning and policy documents related to the site. Public Comment: At the October 23, 2025, Planning & Zoning Commission meeting, a resident to the north of the proposed development, expressed concern about the project's impact on his electric bill and whether the existing power grid has sufficient capacity to serve the development. A representative of ComEd responded that costs would be recovered through the business customer category serving large -load users and would not impact residential customers, and confirmed that ComEd has adequate capacity to accommodate the project. Planning and Zoning Commission: At the Planning and Zoning Commission meeting on October 23, 2025, the Commission recommended approval of the request by a unanimous vote of 4-0 of the commissioners present. Waive Second Reading: The Petitioner is requesting that the Village Board waive the second reading and take final action at the October 28, 2025 meeting. Alternatives 1. Approve a final plat of subdivision titled ""PLANNED UNIT DEVELOPMENT MOUNT PROSPECT TECHNOLOGY CAMPUS NO. 2" prepared by Gewalt Hamilton Associates, Inc. and dated 10/09/2025. 2. Approve a plat of dedication prepared by Gewalt Hamilton Associates, Inc., and dated 10/07/2025, dedicating land to the Illinois Department of Transportation (IDOT) for public sidewalks, subject to the condition listed in the attached ordinance. 3. Approve a plat of dedication prepared by Gewalt Hamilton Associates, Inc., and dated 10/09/2025, dedicating land to the Cook County Department of Transportation and Highways for public sidewalks, subject to the condition listed in the attached ordinance. 4. Approve a conditional use to amend the final planned unit development as a major change, pursuant to Section 14.504(E)(1) of the Village Code, to construct a two - building data center campus consisting of a total combined gross floor area of approximately 2,172,000 square feet, including three hundred sixty-five parking spaces, two electrical substations, mechanical yard, satellite antenna yard, and related site improvements, as identified on the Petitioner's approved plans, subject to the conditions listed in the attached ordinance. 5. Action at the discretion of the Village Board. Staff Recommendation Approve: 1. A final plat of subdivision titled "PLANNED UNIT DEVELOPMENT MOUNT PROSPECT TECHNOLOGY CAMPUS NO. 2" prepared by Gewalt Hamilton Associates, Inc. and dated 10/09/2025. 2. A plat of dedication prepared by Gewalt Hamilton Associates, Inc., and dated 10/07/2025, dedicating land to the Illinois Department of Transportation (IDOT) for public sidewalks, subject to the condition listed in the attached ordinance. 3. A plat of dedication prepared by Gewalt Hamilton Associates, Inc., and dated 10/09/2025, dedicating land to the Cook County Department of Transportation and Highways for public sidewalks, subject to the condition listed in the attached ordinance. 4. A conditional use to amend the final planned unit development as a major change, pursuant to Section 14.504(E)(1) of the Village Code, to construct a two -building data center campus consisting of a total combined gross floor area of approximately 21172,000 square feet, including three hundred sixty-five parking spaces, two electrical substations, mechanical yard, satellite antenna yard, and related site improvements, as identified on the Petitioner's approved plans, subject to the conditions listed in attached ordinance. Attachments 1. PZ-21-25 Plans 2. PZ-21-25 Final Plats 3. PZ-21-25 Staff Report 4. PZ-21-25 Administrative Content 5. PZ-21-25 Request to Waive Second Reading 6. PZ-21-25 Technical Reports 7. PZ-21-25 village Review Letter (10. 17.2025) 8. PZ-21-25 Meeting Minutes 9. PZ-21-25 Ordinance redlined 10. PZ-21-25 Ordinance clean w o 0 e •O a_ w z w W o°DZ m Q w � 0 Q\=oz m D w Q w �c=n�w� m > m > m Q U -1 U o U G z W (D J 0 W y O a O a ry Q p Q p Z Z D O m 0 m Z z ~ 0 :2 :2 � W J W > W > a-D p Q a Q a- ll� DU) p DD pp O Z W p0 �0 QZ 0cf) �Z X O c):f Q D W~ olf 0E-- W m =m zm Z W 12 W > Q a_ Q W p U U m Z W 12 W Q a_ U U m J Q W p cn U U m (n (n Q J U a_ Orf a_ Of W Z 0 CIO Of 0 �1 Q cD LLJ ry Z 0 Q 0 Z 0 in m (' W W Q p Z Q (n Z � � D I � Q � m Q C� C� Um W . 3: 46 C�3 LU (U) Q(npW QN (n of- W -J m m of mp ofW (n Q p CD W C' Q � p� U J U W �O CCU OWE O�� U � N� �U N� �a- CD Q I W Q m�z W p CO o m� CO 0 m� b v V ._ems.. I O � Q V I oo D U Q U) z W WLLJ � U Q Z LLJ a- LL- W W p W 0 a_ 0 m NO � � co(n � rrjLoLo O (C) (D (D O _ Z Z Z Z w � w (D G) ,zaLO�w^w �w XQ 0 Lo 0_ 0 Q:f (D r� 00 �0 -J � cn� co m zg> . Q z _z- L L L W W W EE E V V V O O O m m m >*% >41 >41 U U U � CN CO qt LO QD r4k4ft CO CD 0 z ry Q Q Z D � O O LLJ m mzF-- LLJ zLLJ w O :2 12 > � J W W � LLJ 0 Q Q O D a a- Q z \ m �LLJ U) DC() 0 D D D D LLJ > LLJ U LLJ 00 O > > L z O >-z Q z OfQ c a- >:212 O QD D:fD U U C X Q:� LLJ F-- OF-- U U C Lu m =m zm m m c I a I b v V• I a• . to v D "J - a D Q •v v D a a 34 v a •D a WPCa V�• W ' a D a D a a • D a v a•. v '. Q.D Q J a x a Q. . D v • o a a w Qz LAI m w ���� :• � m m m� m m Z W � kz Ljj Z _— m W J w 00 Z W w V •, %, � m m m m � m m m Imm • m m m mm m m m Cjj a w o 13SCii �38 NFI un I v Q Q 3 Q Z W W v Z o j o to H I m I Jill IMIUM11,10"I'mm- 0 0 0 ^, 0 0 0 11 ..,...., 0 0 0 0 a� 00, .400 *01 MMI 2 U 0 n W Q cn cn Q J W ry 0 a_ > 0 � Z W W W W 0 W LU > W (n W W D C' 1 O z W (n Z p p p D W O p Q m m Q o ch Of UL,J p of 0 m of � Of of U U Z W � D D �� � F to cn Q U U U U w w O � 0 U � W � � m0 O z mo Q w N OO-1 Of O F-- p J 3: > w (D (D (D (D Q Q F--Il- m U cn (n cn (n O 0 m m m m m m QQ I � O O Q I .eOl � . o �. ,� 0 -eOOO 9 1 �o 0 o � � 40� o0z . . ............. 1 V 000 0 0 0 t 61. o . o ,�_, won .......... 0i Cl co co N LJ Lid Q) ......... . ........... . . .... .. . ................... . . . ..... . ..... ............. . ..... . . . . .... . ... C-41 ........... �� � � 6 1� . g 0 6 12 6 Hill QQ • 9� ..... . ....... . .......... . . . ...... .................. ................ . C�1111 .. . . ..... .... ... . ................ ................ ........ . . ...... . ... .......... . . .... . . ............ . m. . . . ...... o Hill '1114 ( Hill Hill QQ x .......... <Hill A6 a 1 I I � I I I I I I I I I 7, -r,6 S01 Cg*lZg I I I I I I 0o I I I I I I 7,f�6)f Jl 99 VZ9 I I I 7, P,i� '90PI 0 L9 I I • o I I I O o �LF) I O W � o � �. Z W I I I N 0 N 0 LO O LO O LO O co co I� Cfl CD Co Co Co Co Co I \ v` \ \ \ \ \ \ \ 7,-ry6'S0l 5'lL9 \ \ \ 7, f,6 *P Opl 99 VZ9 7, P,i� '90PI 0 L9 o I O W o �LF) I N WN � Q N Is: 0 N LO O LO O LO O co co I� (0 C0 (0 (0 Cfl co co co I O I I I O I I 7, f�6 '901 JZ I VZ9 7, Pi�'L0I j�Z ZL9 I I I I I o I 7, Pi� '90PI 0* L9 I I I I I 0 o I W N p 71c- .. N I 0 N LO O LO O LO O co co I� (0 C0 (0 (0 Cfl co co co I I I I I I I I \ \ \ 7, 61 -eel 69 VZ9 \ 7, 69 '�'Z1 1 J 'ZL9 \ 1 N I 0 N LO O LO O LO O co co I� Cfl CD Co Co Co Co Co � Z I � Q kla VQW I o I NV),LZ 00'S'S' 9f*' I L9 to �1 00 'L0, SZ'ZZ9 1 I I I I I I I I I LI I I I I I � I V I orf I w I ~ I aI �I W of I I O Ln O Ln O DO I� C0 Cfl CD Cfl co Cfl Cfl 9 O N O Ln Ln Cfl 0 0 Q A, '69 05'699 O I I � '0,9 '699 8, Z 6 OL 3ON3J I Qr, �I &, 0 *99 091699 I of &, 00 'Lf, 99'699 I I I I I I Ll I I I I I I I I I I I I I I I I I I I O Ln O Ln O co I� I� CD Cfl Cfl co Cfl Cfl co O N 0 LO I I N O Ln O Ln O DO I� C0 (0 0 LO wo am I I I O Ln O Ln O DO I� C0 (0 I I I O Ln O Ln O DO I� C0 (0 I I I O Ln O Ln O DO I� C0 (0 I I I I I I I 700 'Z9 �'Z'699 0 7, 00 '99 6Z'699 I I O O W� I o�w O I I I I I I I I I 1 O Ln O Ln O 00 I� I� Co Co Co Co Co Co Co 0 N Ln- LI Co Na. W Z 30J a i I I I I I I I I I I I I I I l v Qc I N 6(t95, 'OL9 &,f9o*9 Ll flL9 kft 0 90 -P 'Y 90 r 00 '+L9 l S I I LO O LO O LO DO 00 I� I� Co Co Co Co Co Co 0 N 0 0 0 oN 0 N OI Co Co Q N N W Z 0. WO.i a Na. W Z 30J a 1 1 b;LL'9Zl 1 Lf"lL9 ZI,LZ SZ lig,lzg ry� t1,L6 68 S'L9 5'Z'9L9 � 5Z'9L9 LO O LO O LO DO 00 I� I� Co Co Co Co Co Co 0 N 0 0 0 ON 0 N OI Co Co a V) N W Z 0. �OJ a b;99' f� 9)� OL� b;Sl *9P, 06 OL9I b;ZO 6'F f'P' L9 � 1 1 1 1 5'0 S'L9 � 50'SL9 1 LO O LO O LO OO OO I� I� Co Co Co Co Co Co 0 N 0 00 o(0 O N 0 N OI Co Co Q N W W Z � J i i i i i i i i 8,66 *J1 00L9 a b; 66 Z f Z f'L � OZ "rL9 LO O LO O LO co 00 I� I� Cfl CD co co CD co 0 N H • oN 0 N OI C0 co Q N N W Z 0. �OJ a INNINNINIMM 111m////O//////////////% 11110111mm lI=ICF1l0elNllwffw \I� Irl MD MD MD c �" ° � � Q � � UD ib III Waco zo�?3 Q O Crrc-)O o Mz 06 7- Q- 13S A O O . .. . .. . . . . .... . O Q6- C) • O O O ... . .. . . .O 06 O. 74, III "'At O PO W Lo O H O Z wor_ of Q � � W 3: N Z w Ld N z � W � a 0 Im Z w ol:f Q :2 :2 � :2 � < � J z C() Q W w 0 2 Luo o o a cn � o�oQ � J<= z oQQ w () n cn � c� o00o v v n n a � Q � � D > x m oW (� o J� .J F- (/) F- (/) F- (/) a- O a- O a- O a- O Otf O Of O Oif O or Q F-- Z > J J w � LLJ � 3: Z z X X X of Of of � � � � J Q Q Q � D � O CD J I o a � o O •■ e O m•� e+� -r >M ryl CD z N o 0 o a oZ (9 )D e � I X w a� Lij ............... .............. ............... .............................. ............... I Z I Z A� pON W Z b"-'-N �� / 3 • LZ ••�� Q co'co7� N ZZ N N„I , % 0 W N Z C l" J' � .................. jj� ............. lo ..'Par IIIIIjj� . .... .......IIIII IIIIVn ... . . .. . . ' Illyjj .. ..... . . ... . .. . . . � III III IIII 7e X, .. . . ....... >//o A � jj\11/211/110/0 k � j lnnry 1k, IIIIIIIIII �IIIII %IIIII 51101110110111M 511011101101M 51101110110111M 511011101101M 51101110110111M 511011101101M 51101110110111M �m� IlpWllll� w .: I MIN HIM 1 N HIM HIM HIM HIM HIM Z �o LZ HIM 111111 MH h h PRIM Ell QLij N O O � I� Z � N O a0 O V Z Z Q Z ao IIL.. V Q Z Q ....... ....... ������II� ����,�� .......... . Q Q . a ............ J A III �I ..w ,,..:,, , ,, , ..:,, .,, Ljj mill ...../........... V� IIIIII, IIII, Q I II�II h IIIII�II IL Ld h co �o Z . Z -.j co-.........- 0 ,,,,,,,,,,,,,,,, U I � U III` II''TII I olloullomm olloullomm olloullomm olloullomm olloullomm olloullomm olloullomm olloullomm olloullomm 0 z W m Muhl jj o� �o Illllllli III n,,.... M /H 1 Ppop , . . ,,, Ij t' kill,r„ r r . a. ,y....... ............. . . . ............. . . . ............. . . . ............. . .... . pp „ . „a.,.,, ......... . ........... jj� . .. �';' . . . ........... . . ... . . . ........... . . ... . . . .......... Q. _r. iq,lll�dl� � ,p J, p r> V IIIII i .* . •■ii�r "" HE 0 Oi u ct" E N ITJ Lli r > 0 V) 0 z 0 (-) F) z I t < 0 0 0 F- ;7 LLJ Lli MI cl) Vi :D Z cr r*) : z 00 < z C) 0 ry I. V) bi 0 > 0 z C) LLJ n Z < 0 n LL Vi LLJ :D co z V� ry LLI Lli Z -17 :D V) vi ry Li n n ry _j (f) 0 r4) z 0 n 0 x Y V) V) U) v 0 w y 0 0 Z Lli Z 0 m Z F- F<- L ::) ry < z 0 >- UJ > < CL CL <:_i LA7 0 z Z 0 Lj <roN, LAJ LJ _j - 0 w — F- 0:> .x 0(Lc,4 F- V) g Ln M 0Z Z) 0 wo rwn 1; 9 j o -CL e z Lli z 1-11 r, o z in C) ,j- < C"4 U- 0 :D 0 0, 0 o' 3; I-- 'r- Nt 3: w > 0 0 S-1 ca UJ C7 0 0 ruj jE Z v,) 04 M, ry 0 T < Z y Z Z < Z 0 Lli < n ry LLJ n ry 0 rs') LLI .4- x F- Lij w C/i 0 (-) �7 C) .x Z Lo 04 C) 1 0 V- C) T- m C1 0 - N M W Z ~� W C J< 5C Li ;. 7 LLJ W d W d Z 0 Z 0 Z 0 aw �� WL =C�0 Q Ct LL' W CL � 0 0 � 0 0 0�[ N < N � `O o 0 0� .• v JQ O� moo Wrz o�;vo�o off, �ZZ OW OO�u co�Z�,Ow N�O�000� •• �QO�u�uQ ��O OOP X J x 1 X X X X X X X X x X X Lil I o v Q � O I .. v JQ OLr) Nmoo WNZ , ao Wow O Z • �Wr •. Lr)ZZ''�WZ ZOO � OW N 0�000� J�000WW� Z�O�ZOO W�OOZ QZOZQ��� 00�o0�aD��z "I'l""I'll""I'll'll""I'���������������'ll""I'll""I'll",'ll""I����������������I 6 k f G l/ I V Vy a / m I I I X r„ 1 w Lu w Q l 1� z � ,� ,, c0 U O � Z LU � 0 cf) w o w w Q 0 Q o� O0 O z t ZLLJ0 � > if U LiQ w I w w i I IV \ N CO I` C4 .� . .... . . .... LLI J CO O P& V = J UIFW > W co ��� IIII II,I,I IIII� OHO Lo `-' o 4 J W Q w�«��� � �o > U) mnuuim p W O O z �mim , rrm —Q> Q N W Z p O Q �C) �rO .-.NCO M N 0') ZwJ _ U w Q u p � Q Q Z w Q z z 0 0 U J Q U Z Q H O m w w o w O � U U) O � m � � U � w U) 0 �O LLJ m m J Cn Q �Q zw w0 U Lu Q Q U w LU Q U W Q z z 0 75 2 0 U J Q U z Q 0 m W 0 0 U J 0 Cm G Cn W W DC U) D 0 D _0 U W 0 U Q w m Q U w w Q� m � 0� J Q m= O Lz �e 0 _Z Q w� Z� U) OU =0 � J Qw QO E = I-- U) Q U) LU w0 J C� Q LL U Q U) m � Q O 0 ~ — W Z:) W 9 3: J U) U) J w J Ury w W U py Z � Ow � Q OJ w az O J � Oz LL0 0� J LLI U �. Q z XO (� Q Z Q � J Q X 0- w U J z w 0 Q � 0 Q �w O Uw Q _j J � O U_ / r r rr r � r i / r„ r �r err I, ' U) W W z W W V W W U w z U �z w0 Z IL z W_ = W Q wZ �� Qw Z)0 DU) Z = U) Q a- U) � W U Q U _w 1 r i i r / o / w w = U) U) O CD U� ..CD ww 00 v) copo , U/Q r Q � w = co ti W Q z z 0 75 2 0 U J Q U z Q 0 m W 0 0 U J 0 Cm G Cn W W DC U) D 0 D _0 U W 0 U Q w m Q U w w Q� m � 0� J Q m= O Lz �e 0 _Z Q w� Z� U) OU =0 � J Qw QO E = I-- U) Q U) LU w0 J C� Q LL U Q U) m � Q O 0 ~ — W Z:) W 9 3: J U) U) J C L1J J Ury w W U py Z � Ow � Q OJ w az O J � Oz LL0 0� J LLI U �. Q z XO (� Q Z Q � J Q X 0- w U J z w 0 Q � 0 Q �w O Uw Q _j J � O U_ / r r rr r � r i / r„ r �r err I, ' U) W W z W W V W W U w z U �z w0 Z IL z W_ = W Q wZ �� Qw Z)0 DU) Z = U) Q a- U) � W U Q U _w 1 r i i r / o / W Q z z 0 75 2 0 U J Q U z Q 0 m W 0 0 U J 0 Cm G Cn W W DC U) D 0 D _0 U W 0 U Q w m Q U w w Q� m � 0� J Q m= O Lz �e 0 _Z Q w� Z� U) OU =0 � J Qw QO E = I-- U) Q U) LU w0 J C� Q LL U Q U) m � Q O 0 ~ — W Z:) W 9 3: J U) U) J w J Ury w W U py Z � Ow � Q OJ w az O J � Oz LL0 0� J LLI U �. Q z XO (� Q Z Q � J Q X 0- w U J z w 0 Q � 0 Q �w O Uw Q _j J � O U_ / r r rr r � r i / r„ r �r err I, ' U) W W z W W V W W U w z U �z w0 Z IL z W_ = W Q wZ �� Qw Z)0 DU) Z = U) Q a- U) � W U Q U _w 1 r i i r / o / Ime w a z z 0 75 U J Q U Z Q H O m C� w w w O 0� U � O � m 0 � U } W Q w m z O z Q w 0- 0 w U) J w m U) Z) z_ Q U w w Q Z w _0 Q Q m O J 00 O CD Z A% U) D U O J w Z O U) U) w J z O U) w Z U) O z Q U Q Q U) 0 LLI 75 O w w Q J LL U Q Q m Q 0 Z) 0 J w w ry w z Q J n Z O 0 z O J 75 Z O_ Q 75 Q J U x w w J U U z O O Q J O LL w U Q X U) Z) z Q Q z w 0 z_ J LL LLI J LLI J Q Q 0 O U Q J w z 0- LL LLI J O CO Q Q z U w CO Z) Z 0- U O J w z w U) Q w U) U) z w 0 Q z Q U Q C� U) N � M M � V- N O LO N N CM Ltd � U) T— � w w 0w0 — U O U U U Q m J � J U ~ w cn Q U C� C7 J `Z ! i 1 i r i l i i w ol LU LU H cc w W U ,� u Jr a Z w 0 Z J LL Q w J w J H H J Q w m Z It O Z Q w a O M D w 1 S J W 02 CO CL cc ON L I� Oco �W 0 CJZ V U W 0 W CO D m m W J H H O m VIA 1 cc J W z 0 0 _z Ile rr W w U) Q w W m (� � cn W Ww(n = W W ~ _ ry L�L.On O � r) o<< O o U Z wQ r_ LL~Cw� Ozo (Y w7- 0 7F O=Y Ln U N JO Q N O Q m ow o =mow w ��wQ o o U w o (Dmoz COoaz w O w C Da0= wCnw~ Li � = w J O F- Q _ � w Q � -<wQ Ll-Uw � cl� CIO C WQw U=o� Oo0w CIO~U) QOf _ .a- cr— ~ z 0 0 Ld � =QZZ Q -iQ=) o � 0 ZO LL P W V z � 0 o Z o I� O �pJ v Ljj a p Z W Gov I NW Wok O O ao � W oo v Cr I NZ v �-- QO C �Q�o 0 I co sysQ 0 O O W ry �-- U 0 p Q Z c Q J � W LLJ mQ�Q Of _ _ LL. m a > LLJ 0 (UU=Z Q (/) D M LLJ (j —U) of W 0 w w Li :20w 0 zw=z :2 Q z � wF- Q� pw=Q z =F-o� 0 z < U F- DQ O O LLI J w�=o W � Ow ww=o CD 0 QowQ (/) in 2 w0 U O~ lL wp � Z I wQ N U J 0� Im w I 0 � ^� O N m � o 1 2 w � I �� m wz j w� �O I�—m"w owof 0 cn I Ld � =Lu Q j �� w cr- oU) o U Q O 0 IO-i a I Lim�_� I Y o= Fr vi m JLd � Qo cn ~o J Q LLJ z z ' lI� �zmosQ a C)�cn w� oQQ F- LLJ y OW� = of Iw.�Uw� Z Q Q o IvvvU F- WZowcroao =0 w = U)Li m�O�OL J cn Q I D U 1= 0w O Zz cn 0 LU V) D w 0 1 00 N 00 N d' Z i Z w U z O 6 N O _ O � N F Q OLL- z Q � Q o Q a �L CIO w w >O w wo Va DC �0 I-- w Lu ~ z � z � _ w u)o Ld o I� J o o w z0LL aJ Q U Iw 0 —1 U o w o zV n IJ o W L� 0 0 mo o I� o ~ z zLL- Q J o w IJ — � W J J C 0 Ln O :4k U _ � U � of w � c� = two = ~ m 0 J— I W ~ W wz0� � zz (nO I LL Li 0 �� �Q wL�w I W V vi n oQ~0 <3: JD�Z ccl cn Of -1 -1� 2 jw j� LLJ W 0L�� Z cn Y w — p Y�0 0Lu I z I� (7 Z z O J U z O J ww >- ~� Q Icn I^ W J w cn 0LLJ mm� 0 C) I cn W w o = F Ld Iw z o VC)Q CIOz D Q�� 0 o(n G z W COD W J 0 W y O a O 9= >- >- Of ry 0^ Q < Q CD p LLJ ZO Z Z ry O D � Q ~ m � Q p m 12 (Z U m Ln Z Z Lv Q O U W W > J p z Z 0 :2 :Ld > > Q U co Q < U)z z > > ~ p Q Q m Q� w ^m Q w 0 D m >- a- Q z Ld y Q Um w(n � 43 �3^ Q Q cn � m �Cn D(n 3Ld Q wCn Q(npw w m_mp m p DD p> > w w ~p CnofN m �� �Ld (n ~ p U Lv 00 �0 — > p Of Qw DCD_j Q mQ �� z z w z 0 �z Qz p m (n w w� 0 Of C w w z 0 F- m >� �� z �O >�� W N� N� w U Q m O Q� �� U U U 0 CCU Of I-- � w w > z� O Ld [if w m =m Uzm m m m (~n Q I m�z p m m m � Of m I v Q O O o� O :O o I I ti O I 3: ........... / �I / / / / / / / / / / / / / / / / / / / 01 3�niomjis Ellyn AN 9'tic CO 00 L NOliViS 301Ab3S co 00 2JOAAS E)Nimino CD is` n SNINIHEM cfl co m x — -.mluuo.x .......................... x X--' Xx x — x Of 1-- z LLI X'11-0 LU 0 z LU LU U) —x --- il kx—x ------------------- ------------------- -------------------- -------------------- --------------------- -------------------- -------------------- ------ ------------- sionci �3m( - — - — - — - — - — - — - - - LU ui z w 0 z Z) w o .. .. .. ......LL. . . . . . . — —2:]3AA < Is iona 2]3AAOd z -ana d LU wr zs ionci U3AAOd z - — - — - — - — - — - — - —cs ionci 2j3mocr ES.LOn6 2QA:Ajdd:4— vs ionci HEMAOd vs ionci 2i3Mqd ------- ------------------------------------------------------------------------------------------------------------ ---------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------------------- I I : ------- ------- ------------------------------------------------------------------------------------------------------------ --------------------------------------------------------------------------------------------------------------------------- --------------- --------------------------------------------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------- A -------- 0 ---------------------------------------------------------------------------------------------------------------------------- ry ---------------------------------------------------------------------------------------------------------------------------- 0 > W < 1.0-.9z � O N 00 ' O 0 _ OW O / LO U Q co U Q 2 0 M „z-69 WN=1 l"W Lo� m c�l I � U) w ; _ I I� w cn �CUO)- 1>_� can ry w > Lo Co �l Ul �l E co � N COZ ce) Z co -cry] . 00 0 �l L[I �]E�-E CO- - N- M �I � Z Z Nt U D U D U m U CY 2 in r ()f ao 0 ruuuumuuuuuuuuuuuuuuuuuuuuuuuum 1 40 �I oouuuuuuuumoo miW'NI uuuuuul�ll61 uu�� Ul ruuuumuuuuuuuuuuuuuuuuuuuuuuuum 1 40 �I oouuuuuuuumoo miW'NI uuuuuul�ll61 uu�� Ul KT" vJ 75 Z) _Z 75 O 0 Z O U ��j W m (� � cn W Ww(n = W W ~ _ ry L�L.On O � r) o<< O o U Z wQ r_ LL~Cw� Ozo (Y w7- 0 7F O=Y Ln U N JO Q N O Q m ow o =mow w ��wQ o o U w o (Dmoz COoaz w O w C Da0= wCnw~ Li � = w J O F- Q _ � w Q � -<wQ Ll-Uw � cl� CIO C WQw U=o� Oo0w CIO~U) QOf _ .a- cr— ~ z 0 0 Ld � =QZZ Q -iQ=) o � 0 ZO LL P W V z � 0 o Z o I� O �pJ v Ljj a p Z W Gov I NW Wok O O ao � W oo v Cr I NZ v �-- QO C �Q�o 0 I co sysQ 0 O O W ry �-- U 0 p Q Z c Q J � W LLJ mQ�Q Of _ _ LL. m a > LLJ 0 (UU=Z Q (/) D M LLJ (j —U) of W 0 w w Li :20w 0 zw=z :2 Q z � wF- Q� pw=Q z =F-o� 0 z < U F- DQ O O LLI J w�=o W � Ow ww=o CD 0 QowQ (/) in 2 w0 U O~ lL wp � Z I wQ N U J 0� Im w I 0 � ^� O N m � o 1 2 w � I �� m wz j w� �O I�—m"w owof 0 cn I Ld � =Lu Q j �� w cr- oU) o U Q O 0 IO-i a I Lim�_� I Y o= Fr vi m JLd � Qo cn ~o J Q LLJ z z ' lI� �zmosQ a C)�cn w� oQQ F- LLJ y OW� = of Iw.�Uw� Z Q Q o IvvvU F- WZowcroao =0 w = U)Li m�O�OL J cn Q I D U 1= 0w O Zz cn 0 LU V) D w 0 1 00 N 00 N d' Z i Z w U z O 6 N O _ O � N F Q OLL- z Q � Q o Q a �L CIO w w >O w wo Va DC �0 I-- w Lu ~ z � z � _ w u)o Ld o I� J o o w z0LL aJ Q U Iw 0 —1 U o w o zV n IJ o W L� 0 0 mo o I� o ~ z zLL- Q J o w IJ — � W J J C 0 Ln O :4k U _ � U � of w � c� = two = ~ m 0 J— I W ~ W wz0� � zz (nO I LL Li 0 �� �Q wL�w I W V vi n oQ~0 <3: JD�Z ccl cn Of -1 -1� 2 jw j� LLJ W 0L�� Z cn Y w — p Y�0 0Lu I z I� (7 Z z O J U z O J ww >- ~� Q Icn I^ W J w cn 0LLJ mm� 0 C) I cn W w o = F Ld Iw z o VC)Q CIOz D Q�� 0 o(n ,a m, �f dim, 14) Ckl W 0 Lv 0 a Q Z w O �- O O O w LO O Q0 w _ �O LL w N► O ZLLI N M� w w Z0 co LLJ N /W Ix 0 - JQ / J U 0) 5 1 ao CY O w U) O U) o 000�. w Nv w of� Z O 00 JV) W QN W NV) (n �N W ww00 �iooQ LU I of Q >Nw= Ix H 0 00 L 0 .. � Z_ OO .. � N Z H,(0 m 4 CL c0 H Ix w � O Ix 0 CL W O O � v � W W ct Z OLLj^W o O O Q)oQL-.Li (.Z) 0 f O J \I O m Q) O �O \ "' J Lki O z w J U a z O z co U W O ()>- W V) ll� O QCz wJ Z O O J J Lij U J U QU%= W = Lv J 0 O 0 Q1z Lo LiJ N W Q CD co > <v�o W � Z ° O Z m' va (ls �f1 �d7 �1 B Etl p J i if('t Cl uw u f un S hwu"niiva hl"'I U2 44�vraf1Y' �a aq , a AZkP sGirclu1"N 1,e uA� � w P 4' �� ale dywc x"I I:1r 1, Wf r� of l r� VILLAGE OF MOUNT PROSPECT 50 S. Emerson Street, Mount Prospect, IL 60056 STAFF REPORT FROM THE DEPARTMENT OF Community Development Jason C Shallcross, AICP, CEcD Ann Choi Director of Community Development Development Planner DATE: October 16, 2025 CASE NUMBER APPLICANT/PROPERTY OWNER PZ-21-25 TUR Ventures, LLC PUBLIC HEARING DATE PROPERTY ADDRESS/LOCATION October 23, 2025 1200 E. Algonquin Rd, 1200 Dempster St BRIEF SUMMARY OF REQUEST TUR Ventures, LLC ("Petitioner"), received conditional use approval for a final planned unit development and final plat of subdivision approval on June 21, 2022 (Ord. 6634) to construct three (3) data centers and a new electrical substation in conjunction with Commonwealth Edison ("ComEd"). The Petitioner now proposes an amendment to the approved planned unit development and is seeking a final plat of subdivision and conditional use approval for a final planned unit development as a major change for the construction of a two -building data center campus, a second electrical substation, a mechanical yard, a satellite antenna yard, and related site modifications at 1200 East Algonquin Road and 1200 Dempster Street ("Subject Property"). The proposal requires Village Board approval for final plat and conditional use approval for the final planned unit development as a major change. The proposal meets the requirements and standards related to the Village Code, and staff is supportive of the requests. 2024 Aerial Image 2025 Village of Mount Prospect Zoning Map EXISTING EXISTING LAND USE/ SURROUNDING ZONING & LAND USE SIZE OF ZONING SITE IMPROVEMENTS North: R-X Single Family Residential, R-4 PROPERTY 1-1 Limited Vacated site of the Mount Multi -Family Residential 49.72 acres Industrial Prospect Technology East: 1-1 Limited Industrial Campus and former United South: 1-1 Limited Industrial Airlines headquarters West: 1-1 Limited Industrial, data center STAFF RECOMMENDATION APPROVE APPROVE WITH CONDITIONS DENY H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amen ded.docx BACKGROUND / PROPERTY HISTORY The Subject Property, formerly the United Airlines world headquarters, was annexed into the Village in 2017. United Airlines occupied the campus for several decades until 2007, when portions of its operations moved to downtown Chicago (77 West Wacker Drive). In 2012, United Airlines relocated all headquarter operations to Willis Tower (233 South Wacker Drive). Following this relocation, the campus in Mount Prospect shifted to Information Technology and limited training operations. In 2013, United Airlines constructed a 172,000 square foot data center west of the Subject Property; this facility is not part of the planned unit development (PUD) discussed below. In 2021 and 2022, the Village of Mount Prospect approved a final PUD and a final plat of subdivision at the Subject Property for the development of three (3) 84 MW data center buildings (each totaling 566,767 gross square feet), an electrical substation (Substation #1), and related site improvements. Demolition of the former United Airlines campus has since been completed. Additionally, sediment basins west of Linneman Road and site improvements for the electrical substation have been constructed, and Substation #1 is nearing completion. Per the Petitioner, since the approval of the final PUD, the data center industry has experienced significant changes. Legislative changes that impact data center operations and rapid acceleration of artificial intelligence have increased the demand for data infrastructure. In response, the Petitioner is requesting approval of an amendment to the original PUD ordinance to make modifications that address these evolving industry needs. PROPOSAL The Petitioner proposes to modify the original PUD to construct a two -building data center campus, a second electrical substation ("Substation #2"), mechanical yard, a satellite antenna yard, and related site improvements. The amended plans consolidate two of the previously approved data center buildings into a single, larger building separated by a party wall ("ORD1 ") and propose to construct a second, smaller data center building ("ORD2"). Both buildings are increased to three (3) stories in height, as compared to the two-story buildings that were previously approved. The Petitioner has entered into an easement agreement with ComEd for Substation #1 and will enter into a similar agreement for Substation #2, under which ComEd would construct and operate the substations. The data centers and Substation #2 would occupy the former United Airlines campus (1200 E. Algonquin Road or the "Data Center Parcel"), while Substation #1 is nearing completion at 1200 Dempster Street. The Data Center Parcel consists of approximately 43.31 acres of land, and is bound by Algonquin Road to the south, Linneman Road to the east, and Dempster Street to the north. The Substation #1 Parcel is approximately 6.14 acres in size and is located at the southeast corner of Dempster Street and Linneman Road. Site Plan: The revised site plan proposes a substantial departure from the previously approved PUD, most notably through the introduction of the two new data center buildings that are vastly larger in scale and massing. The two data center buildings are positioned at opposite ends of the Data Center Parcel. ORD1 is located along the length of Algonquin Road on the south side of the Subject Property. ORD1 is designed to allow occupancy by two separate tenants with a "zero lot line" subdivision at the mid -point of ORD1. ORD1 will have a footprint of approximately 445,000 square feet and a gross floor area of approximately1.3 million square feet, with approximately240 MWofdata center capacity. ORD1 spans more than 1,500 feet in length over a quarter mile that takes up nearly the entire length H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amen ded.docx of the Algonquin Road frontage and reaches a height of 85 feet, increasing to 109 feet when counting the mechanical penthouse, and up to 121 feet when including the rooftop units. ORD2 is designed to be a single occupancy building and is located at the southwest corner of Dempster Street and Linneman Road. ORD2 is proposed to have a footprint of approximately 296,000 square feet and a gross floor area of approximately 872,000 square feet, with approximately 105 MW of data center capacity. ORD2 reaches a height of 138 feet when including the rooftop units. Additional height is required for ORD2 due to the mechanical equipment's location on the rooftop, whereas ORD1 located the majority of its mechanical equipment in an outdoor yard behind the building. ORD2 will have its own administrative / office space, off-street parking, loading docks, and utility connections. Of the gross floor area, ORD1 proposes 56,725 square feet of office space, and ORD2 proposes 32,500 square feet of office space. Ancillary improvements associated with each building include internal security gates and fencing, underground fuel storage for generators, fuel polishing equipment, other support equipment and structures, and underground utilities, including electric, fiber optic, sanitary sewer, water, and storm drainage collection and conveyance. By comparison, the prior PUD limited the building heights to 52 feet, with parapets and penthouses reaching a maximum of 81 and 79 feet, respectively. The scale of the current proposal results in prominent structures along the Algonquin Road and Dempster Street frontages. Table 1 below provides a comparison of the bulk standards between the proposal and the previously approved PUD. Table 1: Comparison of Bulk Standards 2022 Final PUD Ordinance 2025 Amended Plans Number of Buildings 3(84MWeach) 2 (ORD 1: 240 MW & ORD 2:105 MW) Building Floor Area Each building: 566,767 SF ORD1: 1,300,000 SF (Footprint: 271,017 SF) (Footprint: 445,000 SF) Total: 1,700,301 SF ORD2: 872,000 SF (Footprint: 296,000 SF) Tota l: 2,172, 000 S F °' Max. Building Height Height of Building: 52' (to parapet) Height of Building: 85' (to parapet) (501) Equipment Penthouse 81' Equipment Penthouse: 109' Administrative Block: 52' Mechanicals: 121' (ORD1) Mechanicals: 138' (ORD2) Administrative Block (offices): 60' (to parapet) Lot Coverage (75%) 68.1 %''''°°°° InteriorSide Yard N/A � 111 ���������iii�'�'����� ��� iiiiii � ��� ���������lll���(0')������������ll� ����� ���� iiiiiii ��� iiiiii ��,� ������� � �iiiiii� �� Setback (15') Illlpll 211 ra n s i t i o n aL Setbacks 15' (pa r<i ng of) """"11117.81) 011 (Dempster Street) for buildings, parking 71' (ORD3) 82' setback (ORD2) Lots, and structures (40-1) Due to the larger building footprints and extensive mechanical and accessory structures required for data centers, the project cannot meet the current building height, lot coverage, and transitional setback requirements applicable to traditional light industrial uses. However, given the increased height of the new buildings, the new buildings are set back 10 feet further (from a 71 feet setback to 82.04 feet) than was originally approved along Dempster Street and more than 20 feet further (from a H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amen ded.docx 64.25-foot setback to 82.44 feet) along Algonquin Road. Located between the two data center buildings, just north of ORD1, is a mechanical yard containing dry coolers, thermal energy storage (TES) tanks and fuel polishing sheds that will be fully screened via a fully opaque acoustically louvered screen wall that serves ORD1; a central, walled surface stormwater basin located north of the mechanical yard; a satellite antenna yard; and Substation #2, Located at the northwest portion of the Subject Property, just west of ORD2, that is served by two separate surface storm water basins. Access to the Data Center Parcel will include two gated emergency only right-in/right-out access on Dempster Street (one existing and one proposed), a new full movement access on Linneman Road, and two new full movement gated emergency accesses on Algonquin Road. All truck traffic and primary vehicular access is proposed on Linneman Road and will be required to use the main entrance on Linneman Road for both ingress and egress. Manned security guard booths and gates will be provided at this entrance. An internal roadway system provides access around the entire perimeter of both data center buildings and serves as a fire lane connecting both sites. Sidewalks and other bicycle/pedestrian improvements that provide pedestrian access around the Subject Property will also be provided. Substation #1 is located on the east side of Linneman Road. After Substation #1 is complete, a switchgear yard will be constructed on the southern portion of the Substation #1 Parcel to feed electric service under Linneman Road to the Data Center Parcel. The switchgear yard will include a non - occupied GIS-control enclosure proposed at a height of 30 feet which requires relief from the height requirement of 20 feet for accessory structures in an industrial district. Parking: The Petitioner proposes a total of 365 parking spaces, including 16 electric vehicle (EV) spaces and 12 accessible ADA spaces. In accordance with the Village's off-street parking requirements, one parking space per 1.5 employees plus one space per company vehicle is required, with office areas calculated separately. ORD1 includes 89,225 square feet of office space, while ORD2 includes 32,500square feet. Atfull buildout,the Petitioner anticipates between 225and 450 permanent employees, with no company vehicles proposed. Based on this employment range and the total office area, the zoning code requires between 507 and 657 parking spaces. The Petitioner projects that approximately 240 employees will occupy the campus within a 24-hour period, with most (not exceeding 180 employees) working during standard daytime hours. The current plan proposes an additional 20 parking stalls when compared to the 2022 Final PUD approval. Because employee shifts are staggered, staff finds the proposed 365 parking spaces to be adequate to accommodate the anticipated demand. Similarly, the 2022 Final PUD anticipated anywhere between 75 to 150 permanent employees per building or a total of 225-450 permanent employees. Given the employment range, it was estimated that anywhere between 474 and 586 parking stalls would be required by Code. Only up to 75% of the total number of employees were considered as working during daytime hours. At the highest employment projection of 150 employees per building (or 450 employees total), peak daytime operation was projected to require 338 employees or 338 total parking stalls. The 2022 Final PUD provided a total of 345 parking spaces. HAPLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amend ed.docx Table 2: Parking Comparison 2022 Final PUD Ordinance 2025 Amended Plans Office Gross ORD1: 26,600 SF ORD 1: 56,725 SF Floor Area (SF) ORD2: 31,360 SF ORD 2: 32,500 SF ORDI 31,360 SF Total: 89,225 SF Total: 89,320 SF No. of 75-150 per building Total: 225-450 employees Employees Total: 225-450 employees 180 employees (during standard daytime hours) 240 employees (within a 24-hour period) Parking Based on office + number of employees: Based on office + number of employees: Required 474-586 parking stalls 507-657 parking stalls Based on 75% of total number of employees or Based on: 450 * 0.75 = 338 parking stalls Total number of employees during standard daytime hours: 180 stalls Total number of employees within a 24-hour period = 240 parking stalls Parking 345 parking stalls (including accessible stalls) 365 parking stalls (including 16 EV and 12 Provided accessible stalls) Building Elevations: The 2022 Final PUD approved elevations that were composed primarily of flat cement walls accented with climbing vines and exposed roof drains have been improved with the 2025 amended plans. The Petitioner worked diligently with planning staff through multiple iterations of building elevations to improve the architectural design of the data center buildings. The challenge was in breaking down the mass and scale of the new buildings, to reduce repetition, and to create sufficient modulation and articulation of the building facades through meaningful recesses, projections, and variations in form and material. Per the Petitioner, the proposed elevations pay tribute to the Chicago School of architecture using multiple layers of detail and variation in materials and color to articulate the individual buildings. The glazed areas were significantly increased; staircases, office spaces, and breakrooms feature full glazing, and the stair tower roof forms were lowered to reduce the overall massing. The facades are articulated through changes in plane, material transitions, and patterns to help break up the overall massing. ORD2 is the only data center building that is adjacent to the residential uses to the north of the Subject Property; ORD2 is located approximately 313 feet from the closest residential buildings on the north side of Dempster Street. The Petitioner worked to mitigate the height of ORD2 by strategically placing the shorter, two-story "administrative block" (height of 60 feet to parapet) closest to the Dempster Street frontage and locating the tallest portion of ORD2 further back from the closest residential buildings. Cable and vine climbing vegetation, stainless steel icicles, and architectural louvers are also key architectural elements of the building facades. The color scheme consists of cool, muted tones appropriate for industrial buildings of this scale and all rooftop mechanical units will be screened from public view. The proposed design is appropriately scaled to the surrounding industrial neighborhood. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK] H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amended.docx 2022 Final PUD Proposal (Typical Side Elevation) Current 2025 Proposal (ORD2 West Elev7' 67' 0" -f 67 Q` f ation) J� qn q , 3)­FHASi 1W11 EST ELEVATION, i=� wTwral,k5� Mechanical Equipment: The current 2025 proposal introduces a significant design change from the 2022 Final PUD approval by relocating the majority of the heat rejection equipment from the rooftops to a new at -grade mechanical yard. For ORD1, the Petitioner proposes 17 chillers (inside the building) and 102 dry cooler units within an at -grade mechanical yard. Locating the equipment at grade provides several advantages over the previously approved roof -mounted configuration. Performance is improved as the equipment draws in cooler air from ground level and is not affected by the hot exhaust emitted by the rooftop generators. The at -grade location also reduces the structural load of the building, eliminating the need for additional support to accommodate the equipment's weight. The mechanical yard will be fully enclosed by a 55-foot-tall acoustical louvered screen to provide complete visual screening and sound attenuation. ORD1 also includes 137 diesel -driven generators (including 8 Tomball Controls enclosed units) located within rooftop penthouses. ORD2 proposes 10 chillers (inside the building) and 62 diesel -driven generators, also housed within rooftop penthouses. A total of 199 generators are proposed across both buildings to operate the data center under normal and emergency conditions. The rooftop chillers will be screened from view by a 28-foot-tall sound barrier/parapet wall. By comparison, the 2022 Final PUD placed all mechanical equipment on the rooftops of both buildings, including 82 chillers and 49 generators per building. The generators were to be housed in penthouses on two sides of each building, with two units located in shared concrete rooms. Table 3 provides a comparison of the mechanical equipment between the 2022 Final PUD and the amended proposal. Several equipment quantities have been updated since the modeling and calculations for the sound assessment were completed. The Petitioner states that the original sound study dated October 2, 2025, evaluated 96 dry cooler units for ORD1. An updated study dated October 16, 2025, now reflects HAPLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amended. docx 102 dry cooler units to provide redundancy, though the total heat rejection remains unchanged. Because the load is distributed among more units operating at lower fan speeds, the overall sound levels are not expected to increase. As stated in the updated sound assessment report ("October 16th Update," page 9), these revisions result in only minor changes and do not affect the study's conclusions. Accessory Structures: Several accessory structures are proposed on the roof of each building, at grade level, and below grade in the event of an emergency or power outage to keep the data centers and electrical infrastructure operating. A total of 12 thermal energy storage tanks and 10 fuel oil polisher sheds are proposed at grade level, and a total of40dieselfuelstorage tanks are proposed underground. Each underground tank will be between 15' and 20' below grade. Thermal energy storage (TES) tanks: The TES tanks are designed to mitigate chilled water (CHW) temperature fluctuations and spikes resulting from sudden increases in IT load. They also provide additional thermal capacity during power outages, helping to maintain rack conditions while the chillers are brought back online. In the event of an outage, the pumps utilize water and a 32% propylene glycol solution within the tanks to cool the systems until the backup generators can run the chillers that ordinarily cool the system. Each TES tank is 60 feet tall and located above grade within the mechanical equipment yard. To preserve visual aesthetics, an 80-foot-tall screen wall is provided to conceal a pair of TES tanks that are located at the southeast corner of ORD2. Fuel oil polisher sheds: The fuel oil polisher sheds are a supplement to the rooftop generators in case of a power outage. During a power outage, the backup generators provide electricity to the system. As the generators run on diesel fuel, and outages are rare, the fuel must be periodically polished to remove water (that naturally accumulates from humidity) and prevent sediments from settling. Within each shed are mechanical pumps, valves, and a fuel oil polisher. The pumps periodically cycle the fuel from the underground fuel tanks to the fuel oil polisher to remove the water from the fuel. Underground fuel tanks: Below -grade storage tanks hold diesel fuel in the event of a power outage. Total fuel storage accounts for up to a 48-hour power outage. The underground tanks will have double - wall construction and leak detection systems. Each tank is approximately 12'-6" tall, with a minimum 3' cover, with the exact depth depending on topography and coordination with other site utilities. Adiabatic dry coolers: Adiabatic dry coolers use a "closed loop" heat rejection system that normally uses zero water to cool the servers. This system uses internal "fan walls" in the server halls that pull in hot air generated by the servers, and liquid -filled coils that then reject the heat. The system also includes the transfer of heated air, via similar liquid -filled coils, from the servers to outdoor chillers and coolers that then reject the heat to the ambient air. The liquid in the coils is water and food -grade (non -toxic) propylene glycol. Once a building's system is filled with water upon commencement of building operations, the system, when operated and maintained properly, does not require any additional water, unless the outdoor temperature reaches 92+ degrees Fahrenheit, at which time the system uses sprayers to further cool some of the cooler's elements. The following table summarizes the type and number of mechanical units and storage tanks between the previously approved PUD and the current proposal. H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amended.docx Table 3: Comparison of the No. and Types of Mechanical Equipment / Accessory Structures Previous PUD 2022 2025 Amended Plans Types of Equipment / ORD1 ORD2 ORD3 ORD1 ORD2 Storage Tanks Underground diesel fuel tanks 10 10 11 27 13 Thermal energy storage (TES) tanks 6 6 6 8 4 Fuel oil polisher sheds 2 2 2 8 2 Underground urea tanks 2 2 2 8 2 Dry coolers None None None 102 30 (meth yard) (rooftop) Generators 49 49 49 137 62 (rooftop) (rooftop) (rooftop) (rooftop) (rooftop) Chillers 82 82 82 17 10 (rooftop) (rooftop) (rooftop) (interior,1 st fl) (interior,1 st fl) Satellite Antenna Yard: As part of the amendment request, a new satellite antenna yard is proposed that will provide an 8-foot-tall antenna and a total of 40 satellite receivers that are between 4 feet to 6 feet tall. Since the zoning code restricts the number of ground mounted dishes to one per zoning lot, relief is required to permit more than one dish antenna on the property and staff is supportive of the request. A condition of approval will require the installation of an 8-foot-tall fully opaque screen wall around the north, south and east sides of the antenna yard to fully screen all antenna yard elements from public view. The public facing side of the solid 8-foot-tall wall shall incorporate a form -liner design, subject to the approval of the Community Development Director. ComEd Substation #2: To power each of the buildings and to meet current market capacity demands, it is necessary to install a second electrical substation with accessory improvements that satisfy ComEd requirements. An additional substation will be constructed on an approximately 3.2-acre parcel in the northwest corner of the campus. This second substation will be constructed and operated by ComEd at the northwest corner of the Data Center Parcel and access to this substation will use the existing right-in/right-out access drive on Dempster Street for emergency purposes only. Drawings that contain specifics on the number and height of the different substation elements for Substation #2 are not yet available, but it is expected that these elements will be similar in number and scale to the elements that were provided for Substation #1. For reference, the tallest equipment in Substation#1 includes 12 skinny static masts that are approximately86' in height, and the majority of the equipment is below 30' in height. Other notable equipment that were provided in Substation #1 included high busses, transformers, and a prefabricated metal control enclosure. In response to discussions with the Village, the north and west perimeter fences along the substation frontage have been revised to a 15-foot-tall solid wall that will be located along the north and west sides of the new substation. Additionally, Substation #2 will be screened by several layers of landscape plantings including the existing right-of-way trees, a row of deciduous trees, a mix of deciduous and evergreen shrubs, and a combination of perennials and ornamental grasses, along the north wall of the substation. Relief will be required to permit the 15-foot-tall wall as code only permits an 8-foot-tall fence in industrial districts. Staff is supportive of the request, and a condition has been added that will require the public facing side of the solid 15-foot-tall wall to incorporate a form -liner design, subject to the approval of the Community Development Director. H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amended.docx Due to reconfiguration of the data center buildings and Substation #2, the stormwater basins on the Data Center Parcel will be relocated as shown in the plans. A central, walled surface stormwater basin is proposed north of the mechanical yard ORD1, with supplemental underground stormwater storage below the parking area northeast of ORD1. Separate surface storm water basins will serve Substation #2. Landscaping: The Petitioner submitted a landscape plan which is intended to screen the proposed buildings, Substation #2, mechanical yard, and satellite antenna yard from public view as much as feasible. In total, 321 new trees, 1,521 new shrubs, over 500,000 square feet of sod (meadow seed mix), and over 129,000 square feet of detention basin plantings are proposed for the Subject Property. The project proposes continuous 6-foot-tall evergreen shrubs to screen the loading docks located at the northwest corner of ORD2, a combination of deciduous shrubs and evergreen shrubs that range from 3feet to 15feet, clusters of deciduous trees, and additional landscaping along the Dempster Street frontage to minimize ORD2's visual impact to the residential uses to the north. The Linneman Road street frontage (along the east side of ORD2 and the satellite antenna yard) is lined with deciduous trees that are spaced less than 75 feet apart with clusters containing 7 shrubs or ornamental grasses per cluster spaced at intervals of 35 feet or less to meet code. Continuing further south along the Linneman Road street frontage (along the east side of ORD1), clusters containing 7 shrubs or ornamental grasses per cluster are spaced at intervals of 35 feet or less are to meet code; and shade trees will be provided within the parking lot landscape islands and within the landscape butter along Linneman Road. A 24-foot-wide landscape buffer will be provided along the Algonquin Road frontage. A continuous 6- foot-tall evergreen hedge and additional landscaping will also be provided along the Algonquin Road frontage to screen the parking, trash enclosure and loading area of ORD1 from public view. The petitioner is requesting relief from strict conformance of the foundation and perimeter landscaping requirements. Foundation landscaping will not be provided along the north, south and east elevation of ORD1 due to site constraints. While a 3-foot-tall screen/buffer and shade trees spaced 50 feet apart are required when an exterior side yard is located across the street from a residential use (north side of ORD2), there are gaps in the screen/buffer, and shade trees are not provided along the entire length of ORD2. Code also requires an even 50/50 distribution of evergreen shrubs and deciduous shrubs. The petitioner requests a mix of43/57 mix of evergreen shrubs and deciduous shrubs as a precisely even ratio of evergreen and deciduous shrubs was not achievable in light of site constraints and design goals. These noncompliant items require relief from the landscaping requirements. As previously discussed, the project is requesting relief from the lot coverage requirement. A related but separate PUD standard requires that the area of open space provided in a planned unit development shall be at least that required in the 1-1 zoning district. The project is requesting an exception to permit a reduction in the area of open space from 25% to 18% and staff is supportive of the request. Traffic: The proposed use generally has a much lower employee count compared to other uses that utilize the same amount of gross floor area. Site access is clear and will be well defined by signage. Primary access is proposed on Linneman Road via two inbound lanes (one for auto traffic and a second for trucks) and a single outbound lane. Two right-in/right-out accesses are proposed on Dempster Street (one existing and one proposed) and two new full movement accesses are proposed on Algonquin Road. Algonquin Road and Dempster Street will be gated and used for emergency H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amended.docx purposes only. At its peak, the previous United Airlines headquarters accommodated over 3,500 employees. Per the traffic study, data centers are relatively low generators of traffic and will have a considerably lower impact on traffic in the surrounding area. The Petitioner also prepared a revised traffic impact study to evaluate the proposed use's impact on the areas roadways. The traffic study suggests the project will have little effect on the operations of the area roadway network. The study also proposes the following recommendations: • Stop signs will be installed for exiting traffic at all the proposed access driveways. • The Linneman Road access will provide two inbound lanes (one for auto traffic and a second for trucks) and a single outbound lane. • Access to Algonquin Road and Dempster Street will be gated and for emergency use only. Public Improvements: Public sidewalks will be constructed on all three frontages of the Subject Property, which will connect pedestrians to the retail uses at the intersection of Algonquin Road, Dempster Street and Busse Road, to Kopp Park and the trail within the ComEd right-of-way adjacent to Kopp Park. In addition, the development will provide direct or indirect pedestrian connections to several Pace bus stops for routes running southbound along Linneman Road and eastbound/westbound along Algonquin Road. These improved connections would directly impact Route 230 (southbound along Linneman Road), and Route 606 (eastbound/westbound along Algonquin Road). Lighting: The Petitioner provided a photometric plan for the existing site. Staff noted there are areas that exceeded the maximum illumination of 5 foot-candles. A fully compliant photometric plan will be required as part of the building permit submittal and will be included as a condition of approval. Signage: The Petitioner has stated in their response letters that no signage other than the building address is anticipated. Staff has added a condition of approval to ensure that any future signage relief shall be reviewed and approved as an administrative amendment to the PUD. Phasing: Mass grading of the site is anticipated to start in November 2025. Construction of ORD1 is anticipated to begin in November of 2025, with completion targeted for the end of March 2027. Construction of ORD2 is anticipated to begin in June 2029, with completion targeted for December of 2030. The Petitioner submitted a Construction Phasing and Logistics Plan for Phase 1 and 2. Phase 1 will consist of the early earthwork grading for the pond and the ORD1 pad, foundation and vertical construction, and fire apparatus access drive circulating ORD1. Foundation and vertical construction for ORD1 will begin on the west side of ORD1 and work east. Phase 2 will construct ORD2 along with Substation #2. The walled ComEd and data center detention basins will be constructed during Phase 2 along with the fire apparatus access road circulation for ORD2. After the walled basins and ORD2 fire Lanes are constructed, ORD1 and ORD2 parking lots and loading dock pavement will be installed. Economic Impact: The Petitioner provided an "Economic Impact Analysis" which is included in the agenda packet. As stated in the analysis, the project is expected to generate a range of community benefits for the Village and other local governmental entities, including additional municipal utility tax revenue, higher property tax contributions, and new employment opportunities. Village Electricity Consumption Tax: New consumption tax revenues to the Village are estimated to exceed $5.4 million annually within 5 years and exceed $8.46 million annually within 8 years. H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amend ed.docx SMP TIF Impact: On May 3, 2022, the Village Board voted to approve anew Tax Increment Financing (TIF) District in South Mount Prospect which includes the Subject Property. The project and request would not be possible but for TIF funds, and therefore the TIF area can benefit from the additional increment created from the project in the future. The site will generate $484,000 in increment annually after ORD1 is completed, increasing to $2.3 million in annual increment generation after ORD2 is completed. Even with the Class 613 incentive already granted for the project, staff estimates the project will generate $104.8 million in TIF revenues over the remaining life of the SMP TIF. Anticipated improvements to the TIF area, which are due in part to the proposed development, include infrastructure upgrades to stormwater and sanitary sewers, conversion of previously unincorporated properties from septic and well to Village water, and utility upgrades to accommodate the proposed development and future growth and redevelopment in the area. Other improvements include park district facility upgrades, sidewalk and multi -use path connection enhancements, and streetscape improvements which can be financed by the increased property tax revenue discussed below. The Petitioner is not currently seeking any tax increment finance incentives from the Village. Job Creation: The Petitioner anticipates that full build -out of both data center buildings will generate a comparable or slightly greater number of construction and permanent jobs than the 2022 PUD. For reference, the 2022 PUD projected between 75 and 150 permanent positions across three buildings (approximately 225 to 450 total) and a total of 900 to 1,000 temporary construction jobs. With the increase in scale, the Petitioner estimates that the revised project will create 225 to 450 permanent jobs across both buildings. Approximately 80 percent of these positions will be skilled, high -earning roles with an average annual salary exceeding $78,500. Anticipated positions include mechanical, electrical, and computer engineers, as well as security staff, maintenance personnel, and property management professionals. The economic analysis further projects that each building's construction phase will employ approximately 900 to 1,000 construction workers on -site. Additional Revenues: Both construction personnel employed during the construction phase and permanent operational staff will contribute to economic development and revenue growth within the Village. The Petitioner anticipates that a portion of the permanent workforce will reside in close proximity to the Subject Property. Employees, business travelers, and visitors associated with the facility are also anticipated to generate additional sales tax revenue through patronage of nearby restaurants, hotels, and retail businesses. Parks Improvements Donation: The Petitioner's agreement to make a park contribution in the amount of $2,000,000 to the Village will continue with the current proposal. The Petitioner will make the donation in two payments, with a payment to be made prior to issuance of a building permit for each building as contemplated in a Memorandum of Understanding (MOU). The monies will be used to create a new splash pad at RecPIex. Each payment will be proportional to the square footage of the building for which the building permit is issued divided by the total square footage of both buildings. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK] H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amen ded.docx Table 4: Economic Impact Impacts Comparison 2022 Final PUD Ordinance 2025 Amended Plans Electricity $142 million annually at full build -out >$5.4 million per year within 5 years & Consumption >$8.46 million per year within 8 years (full build - Tax out) SMP TIF ORD1 (completion 2027): $484,000 (annual) Increment ORD2 (completion 2031):$2,300,000 (annual) Generated $104.8 million total increment generated by 2045 Job Creation 225-450 full-time jobs ($70,000+) 225-450 full-time jobs ($78,500+ salary) 900-1,000 construction jobs over 6 No change years Park Donation $2 million park contribution No change Impacts on Adjacent Properties: Overall, the Petitioner has demonstrated a commitment to fully abide by, and meet all regulations set forth by local, state, and federal entities. Below is an assessment on the proposed impacts: Noise: The Petitioner submitted an updated sound assessment based on changes to the building designs, most notably a shift to two buildings, with the larger ORD1 building moving equipment to an outdoor mechanical yard and the smaller ORD2 building that proposes different equipment on the roof. Village Code allows sound frequencies at ten different octave band frequencies, measured in decibels (dB). dB sound pressure levels are unweighted. dBA levels are "A" weighted according to the weighting curves to approximate the way humans hear sound or noise. To properly attribute weighted decibel levels to Village Code standards, logarithmically, limits are weighted to a daytime dBA of 56, and a nighttime dBA of 52. Village Code also restricts any noise level within any 1-1 Limited Industrial property from exceeding 71 dBA. For reference, 52-56 dBA sound is similar in intensity to an electric fan, hair dryer, or a running refrigerator. Similar to the 2022 PUD, the Petitioner has not requested to waive any noise requirement set forth by Village Code. The Petitioner has proposed the following noise muffling measures: an acoustical louvered screen wall for the mechanical yard of ORD1, acoustical louvered wall for certain walls on the roof of ORD1, noise barrier panels for the rooftop of ORD2, a 28-foot-tall metal panel wall system extending between penthouses of ORD2, noise barriers for the coolers on ORD2, "hospital -grade" silencers for the generator exhaust pipes, parallel baffle silencers within the penthouses, and absorption panels for the interior of the generator rooms. The following table compares the noise levels from the original 2022 PUD with the current 2025 amended proposal: Table 5: Comparison of Noise Levels Previous PUD 2022 2025 Amended Plans Receiver Home Receiver Number Day Limit d B(A) Night Limit d B(A) Emergency Limit dB(A) Day dB(A) Night dB(A) Emergency dB(A) Day dB(A) Night dB(A) Emergency dB(A) Crystal Towers Condos 1 56 52 71 49 48 63 51 47 67 Myers Place 2 56 52 71 48 48 61 51 47 65 1510 Dempster St 3 56 52 71 51 50 66 53 49 68 Birch Manor Condos Northeast 4 56 52 71 49 48 64 50 46 65 Birch Manor Condos Southeast 5 56 52 71 52 51 69 54 50 70 Birch Manor Condos - North 6 56 52 71 47 46 64 49 46 65 Birch Manor Condos - South 7 56 52 71 50 48 69 53 51 70 636 Pickwick 8 56 52 71 44 43 60 47 45 60 648 Dempster St 9 1 56 1 52 71 52 51 67 53 1 51 66 H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amen ded.docx The project will meet the Village's daytime and nighttime noise limits during routine operations and will meet the Village's maximum sound level of 71 dBA during emergency operations. Emergency operations would occur only in rare circumstances, such as a full utility outage. The Village will require that periodic testing be performed. A restriction will also be placed so that generators will not be used as a primary power source and will only operate during emergency situations. Emissions: The proposed generators are diesel powered that emit particulate matter (PM) when operable. The Petitioner provided a gap analysis addressing the changes in the I-1 Limited Industrial zoning district's performance standards between the final PUD approved in 2022 and the current proposal and is included as part of the agenda packet. The gap analysis states that the proposed development will meet all performance standards for airborne emissions, and the current proposal will significantly reduce emissions of particulate matter and other air pollutants as compared to the 2022 Final PUD. The gap analysis also states that improved diesel engine generators and additional pollution controls are expected to reduce emissions per MW for Nox (nitrogen oxides), CO (carbon monoxide), VOCs (volatile organic compounds), and PM (particulate matter) by 15% to 98%annually. For more details, an Emissions Comparison is provided on page 4 of the gap analysis. The Petitioner has also responded that PM emissions typically will not exceed the 0.85 lb/1,000 lb gas at 12%CO2 content limit required by Village Code. Village Code also prohibits the emission, from all sources within any zoning lot, of particulate matter containing more than 10% by weight of particles having a particulate diameter larger than forty four (44) microns. The Petitioner also maintains that no PM emissions meeting said criteria is expected. Additionally, the Petitioner will use a 32.5%concentrated urea solution (urea is anon -hazardous substance stored in underground tanks) to remove nitrous oxide from the exhaust. To accomplish this, 10 underground urea tanks are proposed. The generators are only used in the event of an emergency or power outage, however each generator will be periodically run for testing 5-8 hours per year. The Petitioner is also required to obtain a permit from the Illinois Environmental Protection Agency (IEPA) and will have to meet all of their established criteria for allowable emissions from the generators. In order to meet the 1-1 Limited Industrial District's performance standards related to noise, vibration, smoke and particulate matter, fire and explosion hazards, toxic matter, odorous matter, and glare, the Petitioner shall be required to submit testing and data to the Village within 90 days of the issuance of a temporary Certificate of Occupancy for each building. Staff has included a condition of approval that will also restrict the use of generators for emergency power generation only and not asa primary or continuous source of energy for the data center development. Furthermore, the Petitioner will be required to submit quarterly compliance reports to the Village's Community Development Department summarizing generator operation logs, including dates, times, duration, and number of generators operated, to demonstrate adherence to this condition. Documentation and performance of all special inspections and testing shall be performed at the Petitioner's or contractor's expense. Sustainability: The amended plans propose an increase in the overall size and capacity of the data center facilities on the Subject Property, yet the current proposal is expected to result in a reduced environmental impact compared to the 2022 Final PUD plans. The revised design incorporates advancements in building technology and operational efficiency that allow the development to achieve greater capacity while minimizing its overall effect on the environment and natural resources. These improvements include reduced airborne emissions (as discussed above) and decreased water consumption. H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amended.docx Water and Sanitary Service Demands: According to the gap analysis, each data center building will implement the use of Adiabatic Dry Coolers. The Petitioner estimates that due to advances in data center design, the estimated annual water usage will be reduced from the originally approved design at 38 million gallons per year to 5.95 million gallons per year, a reduction of 84%. Similarly, estimated annual water sewer discharge for the project is reduced from its initially estimated 2.8 million gallons to 1.4 million gallons, a reduction of 50%. The Village's utility modeling consultant incorporated this information into its hydraulic model of the existing Village water and sanitary systems and confirmed that these existing systems are sufficient to accommodate the anticipated demands. The Public Works Department conducted flow testing and further confirmed that these results are accurate. Per these results, no upgrades to the Village systems will be necessary to accommodate the proposed data center development. Energy Usage: ORD1 has up to 240 MWs of data center capacity and will be serviced by Substation #1 (300 MWs) that will be in service by November 2025.ORD2 has up to 105 MWs of data center capacity (this maybe higher depending on tenant rack density requirements) and will be powered by the future Substation #2 (up to 300 MWs). Revised Final Plat of Subdivision and Plats of Dedication: The original PUD ordinance approved a final plat of subdivision for the Subject Property which divided the Property into five lots — three buildable lots (one for each data center building), one common area lot within the Data Center Parcel, and one lot for the Substation #1 parcel. The 2022 final plat was never recorded due to legislative changes happening at the state level. In connection with the requested PUD amendment, the Petitioner is seeking approval of a revised final plat that reflects the proposed reconfiguration of the data center buildings and Substation #2. The Data Center Parcel would be subdivided into five lots —three buildable lots, one common area lot, and one lot for Substation #2. Additionally, the Substation #1 lot would be subdivided into two lots, separating the ComEd substation improvements (northern portion) from the switch yard improvements (southern portion). The Petitioner has also submitted two plats of dedication dedicating Land for the construction of public sidewalks as part of an ongoing Village/IDOT road improvement project. One plat will dedicate a narrow strip of land within the Subject Property containing a portion of the public sidewalk and bus shelter along the Algonquin Road frontage to the Illinois Department of Transportation (IDOT). The second plat will similarly dedicate a narrow strip of land and two corner clips at the southwest and southeast corners of Dempster Street and Linneman Road containing public sidewalks to the Cook County Department of Transportation. Both plats of dedication will be required to be recorded prior to the recording of the final plat of subdivision. Additionally, as requirement of the amended PUD approval, a covenants/rights and easements agreement must be recorded to provide for cross access and perpetual maintenance of common improvements, and to ensure that the campus functions cohesively. Staff acknowledges that the Petitioner shall reserve the right to modify the dimensions of the Substation #2 site, if required to do so by ComEd. Any changes to the substation site configuration (area dedicated to the substation) shall be reviewed and approved as an administrative amendment to the PUD. A revised final plat will be required if the dimensions of the Substation #2 site are modified and the revised final plat shall be recorded prior to issuance of a final Certificate of Occupancy for ORD2. H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amen ded.docx List of Exceptions: A comprehensive list of exceptions from the zoning and subdivision codes are provided in Exhibit B of this staff report. Long Range Planning: The reuse or redevelopment of the United Airlines campus has been a priority for the Village since the property was annexed in 2017. The 2017 Comprehensive Plan, which is a guiding document for future development for the Village, notes this property asa `mixed use district' within the future land use map. The primary uses under that category include heavy industrial, manufacturing, and warehousing. Further, the 2017 Comprehensive Plan promotes minimizing the impact on traffic congestion, enhancing walkability, and including streetscape, safe connections, Landscape features, and pedestrian amenities for any new development. The amended proposal meets all of these goals. The 2020 Connect South Mount Prospect Sub -Area Plan offers an opportunity sites map that prioritizes development sites in the study area. The plan prioritizes the Subject Property as the number one opportunity site and recommends warehousing or an industrial park, and notes the existing property is underutilized. The proposal meets all of the plans recommendations for the redevelopment of the Subject Property. Finally, the Village's 2025-2026 Strategic Plan is a working document that is approved by the Village Board and provides staff with a collection of goals, policies, and priorities to adhere to and complete for the specified calendaryear.The plan identifies "Cloud HQ Project: PUD Amendments and Construction Monitoring" as a high priority management agenda item. STANDARDS AND FINDINGS The Planning and Zoning Commission shall review the standards and findings of fact outlined in Exhibit A and 1) accept them without changes, 2) accept them with changes, or 3) reject the findings. The Planning and Zoning Commission shall use the findings of fact to guide their recommendation to the Village Board. Staff finds that the proposed conditional use and final plat meets the applicable standards contained in the Mount Prospect Zoning Ordinance. Staff requests that the Planning and Zoning Commission make a motion to adopt staff's findings as the findings of the Planning and Zoning Commission and recommend approval of the following motion: "Motion to approve: 1. A final plat of subdivision titled "PLANNED UNIT DEVELOPMENT MOUNT PROSPECT TECHNOLOGY CAMPUS NO. 2" prepared by Gewalt Hamilton Associates, Inc. and dated 10.09.2025, attached as Exhibit A, subject to the following conditions: a. A plat of dedication conveying land to the Illinois Department of Transportation for public sidewalks shall be recorded with Cook County prior to the recording of the final plat of subdivision. b. A plat of dedication conveying land to the Cook County Department of Transportation and Highways for public sidewalks shall be recorded with Cook County prior to the recording of the final plat of subdivision. H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amen ded.docx 2. A conditional use to amend the planned unit development as a major change, pursuant to Section 14.504(E)(1) of the Village Code, to construct a two -building data center campus consisting of a total combined gross floor area of 2,172,000 square feet, including three hundred sixty-five (365) parking spaces, two (2) electrical substations, mechanical yard, satellite antenna yard, and related site improvements, as identified on the Petitioner's plans, subject to the following conditions of approval: a. Development in general conformance with the approved development plans which will consist of the following: i. PUD Site Improvement Plans (77 sheets) containing civil and landscape plans, titled "Mount Prospect Technology Campus PUD Site Improvements" prepared by Gewalt Hamilton Associates, Inc., Corgan, kW Mission Critical Engineering, and PASE, bearing the latest revision date of 10.15.2025, and extracted pages attached as Exhibit B. ii. Architectural drawings (8 sheets) containing floor plans, elevations, and sections, prepared by Gewalt Hamilton Associates, Inc., Corgan, kW Mission Critical Engineering, PASE, and Theseus Professional Services, bearing the latest revision date of 11.05.2025, attached as Exhibit C. iii. The Petitioner shall address all comments included in the Village review letter dated October 17, 2025 (PZ-21-25) attached as Exhibit D. b. The following conditions shall be satisfied PRIOR TO THE ISSUANCE OF A BUILDING PERMIT: i. The Petitioner shall submit permit drawings and documentation demonstrating compliance with all applicable Village -adopted building and fire codes, including Local amendments. Such submittal shall include a complete code analysis and life safety analysis addressing use, height, area, and occupancy classifications in accordance with the adopted codes. The required submittal shall, at a minimum, include the following: i. A full code analysis identifying building use, construction type, building height and area, penthouse and high-rise definitions, mixed -use classification (separated/non-separated), fire -resistance ratings of structural elements, fire separations, walls, partitions, smoke partitions, and protection of openings. ii. Identification of all electrical vaults, electrical loads, electric vehicle (EV) charging systems, solar systems, and electrical room locations. iii. Complete architectural, structural, mechanical, electrical, plumbing, and fuel gas drawings, including supporting documentation such as structural and electrical load calculations, solar design information, grounding and bonding diagrams (including concrete -encased electrodes), and bonding/grounding details for exterior or rooftop elements. iv. Foundation and structural details adequate to review and construct the building, including soils information, foundations, footings, pads, reinforcing, rebar, supports, anchorage, phasing, and access/bridging details. v. Documentation and performance of all special inspections and testing as required by the International Building Code shall be performed at the Petitioner's or contractor's expense, including, but not limited to, concrete testing (including slump), steel reinforcing, welding, bolting, bonding, high- HAPLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amen ded.docx rise/limited aerial access areas, pressure testing, mechanical testing and balancing, and stack or pressure tests as required by code. vi. Demonstration of compliance with the Illinois Accessibility Code and Illinois Barrier -Free Design Act. vi i. Submittal of all required lift and elevator design documents. No Certificate of Occupancy shall be issued until the Code Official verifies that all such analyses, drawings, and inspections have been reviewed and accepted as compliant with applicable Village codes and standards. ii. The Petitioner shall obtain all necessary permits for other entities including, but not Limited to, IDOT, IEPA, Metropolitan Water Reclamation District (MWRD), Cook County, Army Corps of Engineers, and the Illinois Department of Natural Resources. iii. The Petitioner and the Village shall enter into a Memorandum of Understanding delineating the costs and installation responsibilities of the off -site and public improvements (including, but not limited to, the $2,000,000 contribution to the Village toward the splash pad project at RecPlex, multi -use path, sidewalks, streetlights, signalization improvements, etc.) related to the proposed development prior to the issuance of a building permit. i. The Petitioner shall make a contribution to the Village in the amount of $2,000,000 toward the spLash pad project at the RecPlex. The donation shall be made on a pro -rats basis upon issuance of a building permit for each of the two data center buildings. iv. All signs shall be submitted, reviewed, and approved during the permitting process. All signs shall conform to Village Code. Any future relief requested for signage shall require an application for a minor amendment to the PUD. V. Submittal of irrigation and photometric plans that comply with Village codes and regulations. vi. Compliance with all applicable development, fire, and other Village Codes and regulations. c. The Petitioner shall submit any covenants/rights and easements agreement (REA) for staff review and approval prior to a temporary Certificate of Occupancy for each building. The covenants/REA shall provide for cross access and perpetual maintenance of common improvements, and to otherwise ensure that the campus functions cohesively as necessary. d. The Village reserves the right to require testing and data to be supplied to the Village within ninety (90) days of the issuance of a temporary Certificate of Occupancy of each building verifying that the performance standards of the I-1 Limited Industrial District are met. Once satisfied, the Village shall issue a final Certificate of Occupancy. Within ninety (90) days of the issuance of a temporary Certificate of Occupancy of each building: i. The facility will assess the outdoor light intensity using a light intensity meter around the parcel boundary. A report summarizing the findings will be shared for review and any corrective action if needed. Compliance with glare limitations will be considered satisfied upon review and acceptance of this report by the Village of Mount Prospect. ii. The facility will utilize the services of a contractor trained and qualified to collect both daytime and nighttime sound levels with instruments and methods implemented in accordance with the guidelines pursuant to Mount Prospect H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amended.docx Administrative Code (MPAC) Section 14.2104.G.1 which applies to the 1-1 Limited Industrial District. The report summarizing the findings will be submitted for review. Compliance with noise limitations will be considered satisfied upon review and acceptance by the Village of Mount Prospect. 1. Substitutions of the noise -mitigation products (acoustical, louvered walls, rooftop noise barriers, Titan cooler noise barriers, hospital grade silencers, parallel baffle silencers) identified in the Updated Sound Assessment of Cloud HQ Data Center Report, prepared by Thunder Hearing & Sound LLC, and dated September 24, 2025, shall be acceptable as long as the new models have noise reduction values (per octave band) that are equal to or greater than the units specified in said report. iii. The facility will acquire vibration data collected in accordance of the guidelines pursuant to Mount Prospect Administrative Code (MPAC) Section 14.2104.G.1 which applies to 1-1 Limited Industrial District. The report summarizing the findings will be submitted for review. Compliance with vibration limitations will be considered satisfied upon review and acceptance of this report by the Village of Mount Prospect. iv. The facility will acquire air toxics' concentrations at the parcel boundary through the use of a photoionization detector (PID), which will measure the concentrations at the parcel boundary. A summary of the findings will be shared for review and follow up actions. Compliance with toxic matter limitations will be considered satisfied upon review and acceptance of this report by the Village of Mount Prospect. v. Within ninety (90) days of the creation of the toxics' report, using the data generated by the PID, comparisons with odor limitations will be conducted and a report summarizing the findings will be shared for review and any corrective actions if required. Compliance with odorous matter limitations will be considered satisfied upon review and acceptance of this report by the Village of Mount Prospect. Documentation and performance of all special inspections and testing to determine compliance with the 1-1 Limited Industrial District's performance standards shall be performed at the Petitioner's or contractor's expense. e. The following conditions shall be satisfied PRIOR TO THE ISSUANCE OF A FINAL CERTIFICATE OF OCCUPANCY: i. The covenants/REA shall be recorded prior to a final Certificate of Occupancy for ORD2. ii. The Petitioner shall reserve the right to modify the dimensions of the Substation #2 site, if required to do so by ComEd. Any changes to the substation site configuration (area dedicated to the substation) shall be reviewed and approved as an administrative amendment to the PUD. If the dimensions of the substation lot are modified, a revised final plat of subdivision shall be submitted, reviewed, approved and recorded prior to a final Certificate of Occupancy for ORD2. The proposed privacy screen wall and landscaping shall be modified to reflect any changes in dimensions of Substation #2. iii. All rooftop mechanical equipment shall be completely hidden from view from adjacent right-of-way. If, at time of final inspection, any rooftop mechanical equipment is visible from ground level as viewed from the public right-of-way, screening shall be required, and it shall be a continuous, permanent, sound attenuating, and noncombustible screen of a color compatible with the principal H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amen ded.docx structure. Corrective measures will be required if any rooftop mechanical equipment is visible from ground level as viewed from the public right-of-way. iv. A fifteen -foot -tall (15'-0") fully opaque precast concrete wall shall be required along the north and west property lines adjacent to Substation #2. The public facing side of said wall shall incorporate a form -liner design, subject to the approval of the Community Development Director. v. An eight -foot -tall (8'-0") fully opaque precast concrete wall shall be located along the north, south and east sides of the satellite antenna yard. The public facing side of said wall shall incorporate a form -liner design, subject to the approval of the Community Development Director. vi. The proposed 7' + 1' chain link fence with barb wire atop along the southwest and east sides of Substation #2 shall be a black vinyl -coated chain link fence. vii. Parking lot lighting shall be on a steel pole with a black finish and shall be directed toward the lot and not adjacent properties. viii. All fuel sheds shall be black. Vehicle protection/bollards shall be provided around the fuel polishing sheds if installed in the parking lot. Bollards shall be black; ix. Solid screening in the form of a precast concrete panel that is consistent with the building's architectural design shall be provided for the thermal energy storage (TES) tank located at the southeast corner of ORD2. x. A maintenance plan for the climbing green vines on the building facades shall be provided prior to the issuance of a final Certificate of Occupancy for ORD1. A. The Petitioner shall make every reasonable and good -faith effort to coordinate with the owner(s) of the adjacent parcel(s) under common ownership to facilitate the following improvements, as generally depicted in Exhibit E, subject to all required Village, state, and other agency permits and approvals: 1. Removal of Driveway within IDOT Right -of -Way: The Petitioner shall depict removal of the existing ingress/egress drive located within the Illinois Department of Transportation (I DOT) right-of-way on the permit plans submitted to IDOT for review and approval in conjunction with the Petitioner's own driveway work. a. If IDOT concurs and directs removal of the driveway, such removal shall be included as part of the approved scope of work. b. If IDOT requires consent of the adjacent property owner, the Petitioner shall make a good -faith effort to obtain such consent and provide documentation to the Village demonstrating the efforts made. 2. Decommissioning of Lift Station: Removal and proper decommissioning of the unused sanitary lift station located on the adjacent parcel, in accordance with all applicable agency requirements (including MWRD and IEPA, as applicable). 3. Removal and Restoration of Private Drive: Removal and restoration of the private drive located on the adjacent parcel that is no longer in use. The Petitioner shall provide documentation to the Village demonstrating its good - faith efforts to obtain all necessary permissions and approvals to complete the above work. In the event that any of the improvements cannot be completed, the Petitioner shall submit written evidence, to the satisfaction of the Village, detailing the steps taken and the reasons such work could not be performed. HAPLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amen ded.docx f. ON -GOING TESTING AND MAINTENANCE: i. Generator Use, Limitation, and Compliance Reporting: The use of generators on the Subject Property shall not serve as a primary or continuous source of energy for the data center facility and shall be limited to emergency power generation only. Routine testing and maintenance of generators shall comply with the noise Limitations set forth in Section 14.2104(G)(1) of the Village Code and shall occur only during daytime hours between 8:00 a.m. and 7:00 p.m., Monday through Friday. For testing or maintenance purposes, the Petitioner shall coordinate generator operation such that the noise generated does not exceed the maximum allowable daytime noise levels, unless otherwise approved by the Village Manager. The Petitioner shall submit quarterly Generator use, limitation, and compliance reports to the Village's Community Development Department summarizing generator operation logs, including dates, times, duration, and number of generators operated, to demonstrate adherence to this condition. The Village Board's decision is final for this case. ATTACHMENTS: / ADMINISTRATIVE CONTENT (Zoning Request Application, Responses to � Standards, etc...) -.00 1 concur: �")o o.. Jason C. ShallcrossAICP, CEcD Director of Community Development PLANS (Plat of Survey, Site Plan, etc.) � OTHER � (Supplemental Information, Public Comments Received, etc...) HAPLAN\Planning & Zoning COMM\P&Z 2025\Staff Reports\PZ-21-25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amended.docx Exhibit A Standards and Findings of Fact CONDITIONAL USE STANDARDS Section 14.203.F.8 of the Village of Mount Prospect Zoning Ordinance provides that a Conditional Use shall conform to the following requirements: 1. That the establishment, maintenance, or operation of the conditional use will not be detrimental to, or endanger the public health, safety, morals, comfort, or general welfare; 2. That the conditional use will not be injurious to the uses and enjoyment of other property in the immediate vicinity for the purposes already permitted, nor substantially diminish and impair property values within the neighborhood in which it is to be located; 3. That the establishment of the conditional use will not impede the normal and orderly development and improvement of the surrounding property for uses permitted in the district; 4. That adequate public utilities, access roads, drainage and/or necessary facilities have been or will be provided; 5. That adequate measures have been or will betaken to provide ingress and egress so designed as to minimize traffic congestion in the public streets; 6. That the proposed conditional use is not contrary to the objectives of the current comprehensive plan for the village; and 7. That the conditional use shall, in all other respects, conform to the applicable regulations of the district in which it is located, except as such regulations may, in each instance, be modified pursuant to the recommendations of the planning and zoning commission. Petitioner's Findings: The Petitioner states that the proposed conditional use will not be detrimental to, or endanger the public health, safety, morals, comfort, or general welfare. The Village has previously approved a Final PUD Ordinance for a data center campus on the Subject Property, and the current request seeks only to adjust the size and configuration of the data center buildings and related site improvements. According to the Petitioner, these revisions will not create any adverse impacts on the public. Per the Petitioner, the conditional use will not adversely impact the value or use of any other property because the development is a light industrial use, within an area already zoned 1-1 and will be surrounded on three sides by other industrial uses, ORD2 will be separated from the closest residential buildings on the north side of Dempster Street by over 313 feet, data centers are a permitted use in the underlying 1-1 zoning district, and the Village previously approved data center development for this site. The Petitioner has responded that the surrounding properties in the 1-1 district are already developed, so the conditional use will not impede the development of that surrounding property and will generate a relatively low volume of traffic. The Petitioner also states that the project satisfies all perimeter building setbacks and includes appropriate screening and buffering. The Petitioner further states that adequate public utilities, access roads, drainage and/or necessary facilities are already in place or will be installed. Per the Petitioner, the proposed ingresses and egresses to and from the development will have a relatively minimal incremental impact on traffic congestion as established by the proposed plans and the traffic study. The Petitioner states that the conditional use is in keeping with several of the objectives and goals articulated in the Comprehensive Plan and South Mount Prospect Sub -Area Plan by redeveloping the former United Airlines campus into a modern, employment -oriented use that supports reinvestment and economic growth in the area. The project aligns with long-range planning goals promoting adaptive reuse, sustainability, and high -quality design, while enhancing pedestrian connectivity and providing extensive landscaping and buffering. The Petitioner also states that the conditional use conforms to the applicable regulations of the district in which it is located except as H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amended.docx modified via PUD. Staff's Findings: Staff has reviewed the petitioner's request for conditional use approval for an amendment to the previously approved planned unit development and finds that the applicable standards have been met. The conditional use is aligned with the Village's Comprehensive Plan's Future Land Use Plan's designation of the subject property within the Mixed -Use District. The development will generate between 225 and 450 permanent skilled jobs and additional construction employment, while incorporating high -quality architectural design, sustainable stormwater management practices, and extensive landscaping and buffering. Public sidewalks and streetscape improvements will be constructed along all street frontages, improving pedestrian connectivity and accessibility to nearby transit stops, parks, and commercial areas. Building orientation and facade treatments are designed to complement the surrounding context while providing appropriate transitions and screening from adjacent uses. The project is also consistent with the goals of the Connect South Mount Prospect Plan (South Sub -Area Plan), which identifies the Subject Property as the Village's largest redevelopment opportunity site. The proposed data center campus fulfills the Plan's vision for new industrial employment uses that strengthen the local tax base, increase job opportunities, and utilize underperforming land without generating significant traffic impacts. Overall, the proposed redevelopment aligns with the Village's long- range planning objectives by promoting economic growth, sustainable design, and reinvestment in the southern area of Mount Prospect. Based on the information submitted, the surrounding uses, and the proposed development's consistency with the Village's long-range planning documents, staff recommends approval of the conditional use request to amend the previously approved PUD. GENERAL STANDARDS FOR PLANNED UNIT DEVELOPMENTS Section 14.504.A of the Village of Mount Prospect Zoning Ordinance provides that a Planned Development (PUD) shall conform to the following requirements: 1. Except as modified by and approved in the final Planned Unit Development plan, the proposed development complies with the regulations of the district or districts in which it is to be located. 2. The principal use in the proposed Planned Unit Development is consistent with the recommendations of the Comprehensive Plan of the Village for the area containing the subject site. 3. The proposed Planned Unit Development is in the public interest and is consistent with the purposes of this zoning ordinance. 4. The streets have been designed to avoid: a. Inconvenient or unsafe access to the Planned Unit Development; b. Traffic congestion in the streets which adjoin the Planned Unit Development; c. An excessive burden on public parks, recreation areas, schools, and other public facilities which serve or are proposed to serve the Planned Unit Development. Petitioner's Findings: The Petitioner states that the proposed development complies with the regulations of the 1-1 district except as modified by the approved planned unit development. As outlined in the Petitioner's responses to Zoning Standards, the Petitioner states that the principal use in the proposed planned unit development is consistent with the recommendations of the Comprehensive Plan by redeveloping the former United Airlines campus into a modern, large-scale employment facility that will generate new jobs, and will support reinvestment and economic growth in the area. The project aligns with long-range planning goals promoting adaptive reuse, sustainability, and high -quality design, while H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amended.docx enhancing pedestrian connectivity and providing extensive landscaping and buffering. The Petitioner maintains that the proposed development presents an opportunity for the Village to replace a vacated corporate campus property with a comprehensive data center development to better meet current market demands and customer needs. Per the Petitioner, the project will serve the public interest by addressing the changing needs of business and the national and local economies, bringing redevelopment and economic growth to an opportunity site in South Mount Prospect, and will significantly increase the Village's tax base. Additionally, the Petitioner states that the proposed development will not include any new streets, will bea low traffic generator, and access improvements will provide safe and efficient access to the development. Staff's Fin dings: The development will conform tothe allowed uses in the 1-1 zoning district, provide sufficient off-street parking, adhere to the Village's Comprehensive Plan and Future Land Use Plan designating the subject property as a `mixed -use district' and industrial use, is in the public interest to adaptively reuse an underutilized site and provide several economic benefits to the Village, and will not create inconvenient or unsafe access, traffic congestion in the streets, or excessively burden public parks, recreation areas, schools, and other public facilities which serve the planned unit development. STANDARDS FOR PLANNED UNIT DEVELOPMENTS WITH OTHER EXCEPTIONS Section 14.504.0 of the Village of Mount Prospect Zoning Ordinance provides that a Planned Development which does not comply with the requirements of the underlying zoning district's regulations governing lot area, lot width, bulk regulations, parking and sign regulations, or which require modification of the subdivision design standards shall conform to the following requirements: 1. Any reduction in the requirements of this chapter is in the public interest. 2. The proposed exceptions would not adversely impact the value or use of any other property. 3. Such exceptions are solely for the purpose of promoting better development which will be beneficial to the residents or occupants of the planned unit development as well as those of the surrounding properties. 4. In residential planned unit developments the maximum number of dwelling units allowed per acre shall not exceed forty eight (48) units per acre for developments incorporating senior housing or assisted living facilities. 5. All buildings are to be located within the planned unit development in such away as to dissipate any adverse impact on adjoining buildings and shall not invade the privacy of the occupants of such buildings and shall conform to the following: a. The front, side or rear yard setbacks on the perimeter of the development shall not be less than that required in the abutting zoning district(s) or the zoning district underlying the subject site, whichever is greater. b. All transitional yards and transitional landscape yards of the underlying zoning district are complied with. c. If required transitional yards and transitional landscape yards are not adequate to protect the privacy and enjoyment of property adjacent to the development, the Planning and Zoning Commission shall recommend either or both of the following requirements: i. All structures located on the perimeter of the planned unit development must be set back by a distance sufficient to protect the privacy and amenity of adjacent existing uses; ii. All structures located along the entire perimeter of the planned unit development must be permanently screened with sight proof screening in a manner which is sufficient to protect the privacy and amenity of adjacent existing uses. H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amen ded.docx d. The area of open space provided in a planned unit development shall beat least that required in the underlying zoning district. Petitioner's Findings: The Petitioner provides that the requested exceptions are necessary and appropriate for the development of an emerging use that is vital to the continued growth of the local and national economies. The Project will serve the public interest by addressing changing business and economic needs, bringing redevelopment, quality jobs, and economic growth to a target opportunity site, and significantly enhancing the Village's tax base. The Petitioner also states that the exceptions will not adversely impact the value or use of any other property and points out that the development is a light industrial use, within an area already zoned 1-1 and will be surrounded on three sides by other industrial uses. The Petitioner asserts that while the exceptions allow a greater building height, the northern portion ofORD2that is closest to residential uses will be only 10feet taller (includingparapet wall)than the otherwise permitted height of 50 feet and will be separated from the closest residential buildings on the north side of Dempster Street by313feet, demonstrating that the height exception will not adversely impact the value of the residential properties to the north. Per the Petitioner, the exceptions are necessary for the project to be developed in a functional and cohesive manner that meets the needs of the market and end users. The Subject Property is currently a large vacant site, and its redevelopment with a state-of-the-art facility will be beneficial to surrounding properties and the community as a whole. Aside from the exceptions requested, the Petitioner asserts that the proposed development otherwise complies with all applicable perimeter front, side, and rear yard setback requirements. The Petitioner is requesting an exception from the transitional yard requirement along Dempster Street due to the site's irregular shape creating unique and specific challenges in the design and configuration of the improvements required to develop a data center campus that meets current market demands, including size and capacity of the facilities. The Petitioner states that the project proposes extensive Landscaping and screening, which is concentrated on the perimeter of the Subject Property, and particularly the northern yard adjacent to Dempster Street, which mitigates any potential adverse impacts on residential properties on the north side of Dempster. The Petitioner provides that the reduced transitional yard along the Dempster Street frontage incorporates a continuous evergreen hedge, supplemented by new plantings and existing mature trees, which together provide effective and appropriate screening and buffering. Per the Petitioner, the proposed transitional yards, landscaping, and screening measures are sufficient to protect the privacy and enjoyment of adjacent properties. OnlyORD2 is adjacent to residential uses, and its impact is minimized by its substantial setback over 313 feet from the nearest homes on Dempster Street and by orienting the shorter, two-story, "administrative block" closes to the street, with the taller portion of the building positioned to the rear of the building. ORD1 is surrounded by industrial uses on the east, south, and west sides and therefore does not present compatibility concerns. All accessory structures and equipment are situated within the interior of the site and will be appropriately screened both visually and acoustically. Staff's Findings: Staff finds that the requested relief serves the public interest and supports the goal of promoting better development that will benefit the Village as a whole. Staff finds that the Petitioner has demonstrated good faith by developing strategies to mitigate potential impacts associated with the amended plans. Steps have been taken to minimize visual, acoustic, and air quality impacts produced by the data center development. The project will provide sufficient screening via substantial landscaping and screen walls to protect the livability and quality of life for adjacent residential and businesses. Additionally, the Petitioner will provide noise muffling measures and will be required to produce H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amend ed.docx documentation and special testing to verify compliance with all performance standards required by the 1-1 Limited Industrial District. The Petitioner has also worked extensively with staff to improve the buildings' architectural elevations by breaking down the mass and scale of the buildings, reducing repetition, and creating sufficient modulation and articulation to further visual minimize impacts on neighboring properties. H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amen ded.docx Exhibit B List of Exceptions from the Zoning and Subdivision Codes Exceptions from the Zoning Code: 1. An exception from Section 14.305(B)(1) to permit an increase in the maximum number of ground mounted antenna towers or dishes located on a zoning lot from one to more than one. 2. An exception from Section 14.306(A)(3)(b) to permit an increase in the maximum height of accessory structures in the I-1 zoning district from twenty feet (20') to: a. Fifty-five feet (55'-0") for the acoustical screen provided at the mechanical yard; b. Sixty feet (60'-0") for the above -ground TES tanks; c. Not to exceed thirty feet (30'-0") for the non -occupied GIS-control enclosure in the switchgearyard. 3. An exception from Section 14.306(A)(5) to permit an increase in the maximum number of accessory structures from two accessory structures to ten (10) fuel polishing sheds and twelve (12) screened thermal energy storage tanks. 4. An exception from Section 14.309(A)(2) to allow temporary trailers or facilities to be located within the applicable setback requirements of the zoning ordinance. 5. An exception from Section 14.318(B)(7)(a) to permit an increase in the maximum height of a fence permitted in the I-1 zoning district from eight feet (8'-0") to fifty-five feet (55'-0") for the mechanical yard screening structure. 6. An exception from Section 14.318(B)(7)(a) to permit an increase in the maximum height of a fence permitted in the I-1 zoning district from eight feet (8'-0") to ten feet (10'-0") for perimeter security fencing. 7. An exception from Section 14.318(B)(7)(a) to permit an increase in the maximum height of a fence permitted in the I-1 zoning district from eight feet (8'-0") to fifteen feet (15'-0") for a solid style screening fence on the north and west sides of substation #2 (Lot 5). 8. An exception from Section 14.318(C)(2) to permit the barbed wire on top of the internal substation #2 fence to extend outward of the Property (Lot 5). 9. An exception from Section 14.2104 (C) to permit an increase in the maximum building height from fifty feet (50'-0") to eighty-five feet (85') to parapet (60'to parapet of administrative blocks); penthouse to one hundred nine feet (109'); and mechanicals to one hundred twenty-one feet (121') for ORD1 and one hundred thirty-eight feet (138') for ORD2. 10. An exception from Section 14.2206(E)(1)(a) to permit parking lot setbacks of less than 10 feet (10') from the property line. 11. An exception from Section 14.2304(B)(2) to permit a 43%/57% ratio of evergreen shrubs to deciduous shrubs. 12. An exception from Section 14.2306(B) to waive the perimeter landscaping requirements as illustrated in the proposed landscape plans. 13. An exception from Section 14.2307 to waive the foundation landscaping requirements as illustrated in the proposed landscape plans. 14. An exception from 14.504(C)(5)(d) to permit a reduction in the area of open space within the PUD from 25% (as required in the underlying I-1 zoning district) to 18%. 15. An exception from Section 14.2104(D) to permit an increase in the maximum lot coverage requirement in the I-1 zoning district from 75% to 82%. 16. An exception from Section 14.2104(B) to permit a reduction in the minimum side yard requirement from fifteen feet (15') to zero feet (0') for the lot line between Lots 1 and 2. 17. An exception from Section 14.2104(E) to permit a reduction in the minimum transitional setback requirement for parking lots from forty feet (40') to 17.8 feet along Dempster Street. H:\PLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amen ded.docx 18. An exception from Section 14.2207 to permit development of the Project with a total of 365 off- street parking spaces (including 12 accessible spaces and 16 EV spaces). 19. Any other Zoning Code exceptions required to permit development of the Property with the Project as depicted on the approved final PUD plans. Exceptions from the Subdivision Code: 20. An exception from Section 15.305(B)(2) to allow access to the arterial street for corner lots abutting an arterial street. Lots 1 and 2 each have an emergency access driveway on Algonquin Road, and Lot 3 has an emergency access driveway on Dempster Street. 21. An exception from Section 15.305(B)(6) to allow the depth -to -width ratio to exceed two and one- half to one (2.5:1) for Lot 4 (irregularly shaped) and Lot 5 (ratio is approximately 3.07:1). 22. Any other Subdivision Code exceptions required to permit development of the Property with the Project as depicted on the approved final PUD plans. HAPLAN\Planning & Zoning COMM\P&Z 2025\Staff Repo rts\PZ-21 -25 Cloud HQ (Major PUD Amendment, Final Plat of Subdivision)_amended.docx Village of!Vlount Prospect 1 0 ( 16%W F F Community Development Departmer�'t 50 S. Emerson Street Moun't Prospect, Illinois 60056 Phone�: (84117) 8,18-5328 Official Use Orly (To be completed by Village Staff) Case Number: PZZ25-000023 PZ-21-25 Date of'Subrnission: 09/03/2,025 Hearing Date: 10/23/2,1 Projelct Name,/Address: PZ-21 -25: CU: Major ��PUID Arnendrnen'tll Fn4l Plalt of Subdivision (1200 E. Algionquiiir�n Road,, 12,00 Dempster Street) for ,a 114113.33 AC Diiata Cent erCarnpus I. Suject Property Address(es)�: 1200 EAlgionqWn Rd Zo�ning District(s): 11 * Property Area (SqF't and/or Acreiage)�: Parcel Index (FIN(s): 08-23- 100-0, 18-0,000 Conditional Use�: For PUD Amendment (Major) E Variation(s): TO TO Zoniing Map Amendment: Rezo�ne From 0 Zoniing "Te,,Xtiime,niime,n't�: Siecti6n(s) 10ther: (''I''', .......... 11111111 rill I I I M1iq�q 1111 11 ,11 r reference, attached project narrative, foir, full sumrniary ofproposal. CHQ proposesto mod ff�the Original PAC Plansto provide for atwo- building data ,center carnpus, ratherthan a three- buildingi campus. The Grigin4l Plans included threedata center buildings.11 each havingi a, total grosy squarefbotage of approximately 566,767 squi,are f6e,tll with two buildings frontiing on Algonquin Road, aind one building at the southwest corner, of'Dempster Street an�d Linneman Road., The Amended Plans consolidate 'the, tvv,o b0ldinigs on Algonqu[n Road into a siingle, liarger building (thiat rniay include 'two separate saleable/ leasiable spaces separated ��by a partywall) ("Building I"). The buildiing at Dempster/ Linnemian ("B,uJldingZ`) will be, reconfigured slightly but hias a siiiiim�i�l��arfoot�pr,in't,'to that shown on the Original Plans. Both Building 1 ,and Buildingi 2, are increased to three stories in height, as cornpared to the 'tw- lo-story buildingisdepilicted oine Original Plans., Building I and ii1ding 2, ,are referred to collectivelly herej[n as. the "Data Center Buildiings,." Buildiing,l is proposed to have a footprint of approximately 445,000-Square fe,et anross floor area ofapproximately 1.3 ran illi6n square, feet, with qpto 214,10 MW oftliata center capalicity'. Building 1 is desigined 'to allow occupancy by1two separatetenant's witl zero lot line" subdivision at the mid -point of'B,uilding I. Each half oUBuilding 1 will have, its own administrative/ office space,, off-street parking, loadiing docks, and Wility connections. Anicillary improvements, associated with Building 1 iiniclude internal security gates and f6nicingll undergrou�nd fuel storage for generatiors, ground -level fine olii,shiiin�gi,e,�quiipm��ent (discussed further bellow).11 Other support equipme�nt aril strucWres,, ,and underground utilitiesll includingi eleictric.,, fiber optic, sanJtarysewerl water, and storm drainage collection ,and conveyaince. Buildiing 2 is proposed to have a footprint of approximately,296,000, square feet anross floor area oflapproximiately 81172,000 squiare f6etl with approximately, 105MW of data ,center capacity Buflding,2 is designedto Single- oliccupancy, buildingi., Building 2 will have its own� admiinistrative/ office -spar, Off -stre,et parkiing,, loading docks, anutility, connections. Anicill ary improverrieits assoiciated with Building 2 include [nterna] secuirity gates and� fenidng, underground 'fuel s,tior,age, for generators, fuel polishing equipmen(di 't scussed 'fuelow rther b), other suppoirt eqWpmenmindmind't d stmctures,, and underground utilitiesT includiing eleictricl fiber opticT sainitary sewer, water, aind storm drainage collectiion� and MAW Addition.ally, GHQ has determined that ,a second ComEd electrical substatilon is neenee t aim etthe licapacity demands of the relcon figured Data Cente �N MIN F71II � I �� 1 111111 �I 1111 11 1 i,I ; 11L IM1,111", � Il 11,11111 Z, ; Name: DonI Dixon Corporatibn: Gewalt Ha,iimiiiltoiin,Associa,,tes Address: City, State,,ZIP Code: PhoneEmail: Interest in Property: El Check If Si,ame as Applicant Name: TURVENTUICES LLC Clorplor,ation: Address: 12 12, New Y6rk, Ave ��NW Suite 1000 Gity,,Statell ZIP Clode:� WashingtlonI,, DC 2,00,05-612117 Fhlone:� Email: In consideration of the information contained in this petition as well as all supporting documentation, it is requested that approval be given to this request. The applicant is the owner or authorized representative of the owner of the property. The petitioner and the owner of the property grant employees of the Village of Mount Prospect and their agent's permission to enter on the property during reasonable hours for visual inspection of the subject property. hereby affirm that all information provided herein and in all materials submitted in association with this application are true and accurate to the best of my knowledge. Applicant: �6 a 1 W I� �^ d" v>� (Print or Type Name) Don Dixon If applicant is not property owner: Date: hereby designate the applicant to act as my agent for the purpose of seeking the zoning request(s) described in this application and the associated supporting material. Property Owner: (Print or Type Name) Date: V i I a ge of M! o tj at P tv,s 1�), e� (,,o�t h1cmano", X III Ll C 11 i �ty' D ev I o p m 0% n I TIl 0, r'll I p a 1, t,,, e n t 50 S., Ei,nomon Str(,,mt MoiI Prospect., Rlir,iols 60,056 '328 P h o, n e (8 Property Owner ............. . ..... . .. ................ . I . . ............ ...... I . I . I . ....... . .............. . . .. . .. . ........... . ...... . ......... . . ........ [ -c kif Sam e a�lls,Ap ptilc a rit Che — - --- --- - - - - - ------------------------------- - - - - - ------------ - - ------------ . ............. ...... . ...................... - N ,a ni, c Kelth P. Harney, AU'll"Witized Signatory C o 1"' p 0 10 at 10 [1), 101, "12 "t, 2 N EYV YOR IK" AVE N W, S w te "1000 Address,. . ... ...... . . . ............ . .......... . . . .............................. . .. . ........ . . . . .. ........... . .. . .. ......... .. ....... . ---- - ----------------- WASI-11NIG"R, IN,,, DC 2000S City, Slatet ZI P C o d e: ............... . . . ....... 2 I h ereby aff 01 rm that a tt in,fo rn mation provided, herein aniIdin aiaits subm'Ittedin association with this, applicaltion am true and! accurate to the best of my kniowtedge. ff,,�,12612025 Applicant............ ... . .. .. .... — . . .•. ........ .. ...... . ......... .............................................................. . Date,— Pignature) E.irian Spenct,5W (P ri ntot, Type N a nie) I f a, p U c a i,i; t', is r� p ro, p e it ty, ow ng i-.# I hereby diogn,,,(,,,it,e d eos c. r i b eod I ri, 'it h *1 S tl p w Property OwnerkIiii,ii j p i 'to I rais, my si:g(,-,fliA for tIhe, pu,,rpose olf seefldng fl,"ie zoning request(s) fted supli orflng matediaL. 0 rp ov,;-sociti P ­k(,� --", . -- a'. D 1 ci, t e:, 8,05/2025 1 P. ldarriey, ALAH"torized Signiatc.,,,iry fb TtI r Ve�irsh,.ires LIX (P to I " it o Ty I �r , pe, Name) p Kxjnit Pox I'M Ville),,,,ge I Mot) ntP;'os,, C o jin iTi� u n it , 'y Developnu,,lrit D capartnllent SOS. Mourlit Pr"ospec"t, Ittinois, 60056 P111ione: (847) 8,18-5328 m L 0 V 80 00 IAM�' om, 61 j . ...................... . . . . . ........ . ......................... ....... ......................................... . . . . . ............ . . ..... . . . ................ under oa E] the solex owner of the,. property aln owne,, r, of: the prope;rty ar"i, aL.i1thiorlizedofficer, flor-the o wrier olf th., pIMF ioperty . . ..... .. ... a nid that s u c h p ro p e, rty is own le d by Tu r Ve nt u re s L L C (p r i n t n cq- m e. pa bpi wrw 0 AP lop MY 01 M, xII idh MR 9 kn 5,1- %IJ sworn'to belfore rne this, 27th 11, day, of August, ......... . . . ...... 2 o 2 5 ............ ",. .......... Notary PLibtic NI IDIA, uw INJ RMIRIBM" "T'his Prepa.'red By: i Fe IchttejI Sidley Atist,itt J]", 11 One Soutli, Dea,ttoim Chicago, 1I , 60603 W1 icill"i Reco 17d ed-Rettini "ro: c/(,.) Clotivffl ' IQ 12JI/2, New S11"'lite 1000, wtish''ing, " 11) 20,005 Atti'I 1"Josseill, "I'a"tell #2 136,24IIE-4111 , 7 213621'AtI6082 Flee, I '� 1 �W�YrJ Y6'+m Itl � R-111SP FEE:1M.08 RPRF FEE: $1.100 KAREN A. YARBROUGH Tjjjjjj[1?v—=,:; m;I III 2021 T11p DEED 'Is ' ECI 1S . .. S ... .. ... Al 1] ... ... ..... IA(le aS of ("A . " ................. . . .. . .................. ............... ... ING, a I 101 0 "(j 11)y UNITED A1,111d, 1"NE-81"l, T)elalware 11,11, intn,v�)r'I ............ ............... .. ... . .. . . I . -i've 'I VENTIJIZES ti JD,Q1OU,, Chicago, Illinois 606016,atid, lin, J'A,`�fvior of J Dclaw(,,tre li�rnit, d, lia,bility, with, ar),, ot cielociat id at 1212 New York Avet-Im 'N'W,, S'ltit,c 1000, L ) ,05 (1-11c r Was"14,111,gt1 O19, 1� 200,-' ............ 111.1111 ............ ... M - "de, t`oili, Of I 10, SLI11 1 01" ""1 C11 "Ind r.o/` (11101 un, coi ist 11, A 1 d h, -d W� jirj�NN I AII, I S1 "I [I tilalt G )I, J, he i- ce"pit and -i,,d paid, 'by" C ui klera 1-toll,' I )"'N'.)l hars, (,$'1101.00) all1d, o1her good and valt,,iable n ha,i� stifficie'I'licy, wl"wreol' 'i's by'', a o'k,tiowledged-, by thiese (1,oJes hejeby, Gl,,�ANII"` S"! MAX,.11, to Its rild assigns, f"T I REM-'[ S-`E.,� IR11, 1 EASEAND, CON"VEY" t"I'll't"o (3,11.4, stjecessors, a all"I 01 -i, '1 11 Ild tim"t Jand err d,cs(,:1,ribe(J an, Exticibit A at, I'llei-vto a la,dc a pa.I l erco" III, ................. 71 7cs't in d, f(,',',1oo'k aii.d S11I Of"I"11,111 IS, Is j`lght, tiflc� in'te"i "y' a ""10 1,111 of( 1. SIT 1"'Itye(al P I it th'O Cotrnf, estate lil, ta"J"Id I (i) ri"Idings", StI.-tict UIVS"il latid fiXAILJ1-(`S locatI.ed -,,at fle La,l,,(,f 1. A ai'l(J. b1clioriging to, theLatid ar�id all. st, e y s �,,i d ticetit tiIiereVII) (thic wit''I pastsages atld ad, t`tie Land or Ole, Iten"ISI, "'1111,C]"Lided it"I clau,ses ("i"), (ii"i) ('11-lelusive) aftx)ve i,s colliectIII'vely tv, rred to hereli'n, asIt"I'le . . .. . ..... d", its, sucice,,ssiors, all �]"'O ''JAVI AND'YO1 TOLD the Rropcj,�Ity u,i--itio, Grttirttee art TWO assigns 1`10'11rc,�Ivel, jr R 0'. . . I . ...... a'nd, its, ch. Anti ("J17m,-it"or does, I'letelby co,"ven,ain.t, p�ro Se 111 gree "to anid, wit' I ("ir S1111'eicessoll"S. (Itt"I'd, Vf SSI S)"J" g 11's, I th-Lat It"I'lle irard,M has rmt dane, at, s", hu 11"I'ler d, 11'11�,oi be donlc*, a,tlyt'hing wlierel)y, 111"JIv Y 1, reby -veyed h,creby. 111, ti1c,11, ill, bered,, ot Prapall7ty 1 1 and, ccm,, IS ("It' 111ay be,, *111"), a"ll, -t tiercof (dic "Perl'i'litted, ctiarge,cl, except a..s,- refic,-eted on, 1`,',"x,1 1161)J,il, B attach,ed, lic,'I"e'to ti"luide a, mpv,)j�'-7,I;- .. . . . ...... G 'Y .. .. . . .. . .. .. . . .. N'DI e ji-ml s-f rred Pro -t tti, "I" lo c a - i wa "I i' 1 1" (K � 1M 1,1111,at I nUm, 11 WARRAN NNI" 1,''13"VER. L)f I 1�,i, ei, j`-,xc Girantee its stjcecsssors�, assigl"I'S,, agalunst e,- soris ot- etlitill"es, rnak" g any cla'",ci"ns m lernands, I. r aild, la e (bt(tt not (,),t.hcr,wi 4z;,e), subiect'', w,", v r lrantol•- I to the'Peri'llitted Exccq)tiarls. . . . . I, . . . ...... . . .. . . . . ... Off" V 11 22.3 6, ' X . . . . .. . 1, nialne 10 be, sti S 11q, Wj"I,"NI',S,S WHERE.'01"') xUltntot." 111cas cliused *ts gned to this, pec I f Warrai-tty I,,,)e,,,c,,d, as of"11:1ic III aY and ycar1'11n,-It abovewri Twa-re U-NIEJ) AIRLINES7 INCI, a, De'la; j -Od4 YY,y".Opp, ................. .................... . . . . . ........ .. .... . . . . . . . . ....................................... ......... ... . ............................... Nat]['Iiatti, Loj,)p vice PtVsldent Corpoj.-,atc,�� Real -E-Sat'c� I INDI S,' S S. C(YUNI Y OF 16" 4 D U PAG E st, I Nibl, licin �Jriid 111)r, the siald Co,u I ki I III t Laura A. Asmussen, a "Notary iity, itittie ite af res, a"d . . . . . . . . ............. ............. . . ................. . . . . .... . . . ................ . ....................................... . . . .. . . -oveld to, me onihe b siss <,,)f to nie do he'rob certify-tblall,'., Niathan,mm S Y pet"",,ona (or pt SLIff-101M)t evidence) IX), be, t1le Moe PresJden!.!qqMq(qjq Real Estate of United, Airlhu-,,%, Ia, Delawme, 11, in, pe'ris(M', fly known'U'.) 1,111e; to'be t'he sa,,rne persoll whose narn 'is subscribed tothe wit�l tlie/she execultd, the siza"Id c t1iis day ilf-t V appem,,ed, before, m erson, ancl acknowledgeld-to ine thu a ta 'I c, tssmcl) VWce r" resident Coorporate Real Estate ofs�,,fld corporatiot'i, arid 't,, d purposes set, fb,r�tl ittier a tb,,r the uses tis the '11"r'ee a,nd,v,ol'l,,U'ii,,t""a,)""y ct of said it," !t6j rIj ..... . ............ 2021 ,indet y, al G #1 � Y atid, o ff" c th aly, Of ........ ..mm- Y111 Nlot,�',tu`y P ub" 11, ic, ........... REAL, ESTATIE TRANSFER TAX •.. 22 Dec-2021 . ... ....... .. . .. . ... ... ..... . .. . ...... ... . .................. . ....... . ...... C'OUINTY: . ............. 2' , 71 � 0 0 . . .... . .......... - - -- - -------- ILUNOIS� T . ..... "' . 1142 54 .00 811,2113.00 08-23- "100- 0 18 -0 0 00, 202 1111210116 ................... . ......................................... �50 2 9 -4934,57-552 Send Future Tax Bills to: Tur Ventures LLC c/o CloudHQ LLC 1212 New York Avenue NW Suite 1000 Washington, D.C. 20005 Attn: Hossein Fateh -RICOFFICE m f rLI fir- RmMl, lri;�`d ISKM i A WU hCO A Parcel 1: Lot I in Friedrich Busse, Jr. Division of Land in Section 23, Township 41 North, Range 11, East of the Third Principal Meridian, according to the plat thereof recorded February 20, 1911 as Document No. 4709799, except (A) that part of said Lot I taken for highways, and (B) that pail falling in Blue Sky Subdivision according to the plat thereof recorded June 5, 2014 as Document No. 1415616048, in Cook County, Illinois. Parcel 2: The West 363.00 feet of Lot 2 in Linnernan's Division of part of the Northeast 114 of Section 23, Township 41 North, Range l I East of the Third Principal Meridian, and part of the Southeast 114 of Section 14, Township 41 North, Range I I East of the Third Principal Meridian, according to the plat thereof recorded September 10, 1953 as Document No. 15716544, in Cook County, Illinois. Parcel 3 : The North 120.00 feet of the west 363.00 feet of Lot 3 in Linneman's Division of part of the Northeast 114 of Section 23, Township 41 North, Range I I East of the Third Principal Meridian, and part of the Southeast 114 of Section 14, Township 41 North, Range l I East of the Third Principal Meridian, according to the plat thereof recorded September 10, 1953 as Document No. 15716544, in Coop County, Illinois. Property Address: 1200 East Algonquin Road, Mount Prospect, Illinois 60056, and 1200 Dempster St., Mount Prospect, Illinois 60056 PIN: 08--23-100-018-0000; 08-23-200-052-0000 Excluding all right, title and interest to that certain 3 0-foot and 3 5 -foot easement set forth on the plat recorded with the Coop County Recorder of Deeds on June 5, 2014 as Document Number 1415616048 described as the "Private Sanitary & ComEd Easement". CFjjr PERMITTED EXCEPTIONS All covenants, restrictions, conditions,, easements, reservations,, agreements and other matters of record. ICE ��,'A 41-a 1117 1 4 A 421., GOV . .... . yL O'j PA '10 PROJECT NARRATIVE MOUNT PROSPECT TECHNOLOGY CAMPUS PLANNED UNIT DEVELOPMENT PUD AMENDMENT APPLICATION INTRODUCTION Tur Ventures LLC ("Tur") owns the eastern portion of the former United Airlines Operations Center site located at 1200 E. Algonquin Road and 1200 Dempster Street (the "Data Center Parcel"). Tur, with its affiliates, including CloudHQ LLC (Tur and its affiliates are, collectively, "CHQ"), proposes to redevelop the Data Center Parcel as a data center campus (the "Project"). Additionally, CHQ owns a smaller parcel located at the southeast corner of the intersection of Dempster Street and Linneman Road (the "Substation #1 Parcel"), which is currently being developed for an electrical substation to serve the Data Center Parcel ("Substation #1 "). The Data Center Parcel and the Substation #1 Parcel are, collectively, the "Property." On June 21, 2022, the Village of Mount Prospect Board of Trustees approved Ordinance No. 6634, "An Ordinance Granting a Conditional Use for a Final Planned Unit Development and a Final Plat of Subdivision" for the Property (the "PUD Ordinance"). The PUD Ordinance granted final zoning and subdivision approvals for development of the Data Center Parcel with three data center buildings (each totaling approximately 566,767 gross square feet), off-street parking, and other ancillary site improvements as shown on the approved final plans (the "Original Plans"). The PUD Ordinance also approved development of the Substation #1 Parcel with Substation #1. To date, CHQ has completed demolition of the former United Airlines campus improvements on the Property and constructed sediment basins west of Linneman Road. CHQ also has constructed site improvements for Substation #1, including stormwater basins, drainage outfall, underground utilities, and foundations. Substation #1 is currently in the final stages of construction. Since approval of the PUD Ordinance, the data center industry has significantly evolved, including legislative changes that impact data center operations and rapid acceleration of artificial intelligence that has increased the demand for data. CHQ has determined that certain modifications should be made to the Original Plans to better meet the evolving needs of the data center industry. CHQ is requesting approval of an amendment to the PUD Ordinance to permit development of the Property in accordance with the amended plans and specifications (the "Amended Plans") set forth in this PUD amendment application. THE PROPERTY The Data Center Parcel consists of approximately 43.31 acres of land, and is bounded by Algonquin Road to the south, Linneman Road to the east, and Dempster Street to the north. The Data Center Parcel is currently vacant, with the exception of temporary construction trailers at the northwest corner of the site. Sediment basins with diversion swales and temporary drainage pipes have been installed to direct and manage stormwater runoff. All necessary utilities including Page 1 17800\00001\4930-4373-7715.v4 electric, telecommunications, fiber optic, gas, water, and sanitary sewer, are available to the Data Center Parcel. The Substation #1 Parcel is approximately 6.14 acres in size and is located at the southeast corner of Dempster Street and Linneman Road. Substation #1 is currently in the final stages of construction and, once completed, will be operated by ComEd. After Substation #1 is complete, CHQ will construct a switchgear yard on the southern portion of the Substation #1 Parcel to feed electric service under Linneman Road to the Data Center Parcel. The switchgear yard will include a non -occupied GIS-control enclosure. PROJECT SUMMARY CHQ proposes to modify the Original Plans to provide for a two -building data center campus, rather than a three -building campus. The Original Plans included three data center buildings, each having a total gross square footage of approximately 566,767 square feet, with two buildings fronting on Algonquin Road, and one building at the southwest corner of Dempster Street and Linneman Road. The Amended Plans consolidate the two buildings on Algonquin Road into a single, larger building (that may include two separate saleable/ leasable spaces separated by a party wall) ("Building 1"). The building at Dempster/ Linneman ("Building 2") will be reconfigured slightly but has a similar footprint to that shown on the Original Plans. Both Building 1 and Building 2 are increased to three stories in height, as compared to the two-story buildings depicted on the Original Plans. Building 1 and Building 2 are referred to collectively herein as the "Data Center Buildings." Building 1 is proposed to have a footprint of approximately 445,000 square feet and a gross floor area of approximately 1.3 million square feet, with up to 240 MW of data center capacity. Building 1 is designed to allow occupancy by two separate tenants with a "zero lot line" subdivision at the mid -point of Building 1. Each half of Building 1 will have its own administrative/ office space, off- street parking, loading docks, and utility connections. Ancillary improvements associated with Building 1 include internal security gates and fencing, underground fuel storage for generators, ground -level fuel polishing equipment (discussed further below), other support equipment and structures, and underground utilities, including electric, fiber optic, sanitary sewer, water, and storm drainage collection and conveyance. Building 2 is proposed to have a footprint of approximately 296,000 square feet and a gross floor area of approximately 872,000 square feet, with approximately 105MW of data center capacity. Building 2 is designed to be a single -occupancy building. Building 2 will have its own administrative/ office space, off-street parking, loading docks, and utility connections. Ancillary improvements associated with Building 2 include internal security gates and fencing, underground fuel storage for generators, fuel polishing equipment (discussed further below), other support equipment and structures, and underground utilities, including electric, fiber optic, sanitary sewer, water, and storm drainage collection and conveyance. Page 2 17800\00001\4930-4373-7715.v4 Additionally, CHQ has determined that a second ComEd electrical substation is needed to meet the capacity demands of the reconfigured Data Center Buildings. The second substation ("Substation #2") will be located on the Data Center Parcel to the west of Building 2. Due to reconfiguration of the Data Center Buildings and Substation #2, the stormwater basins on the Data Center Parcel will be relocated as shown on the Amended Plans. A central, walled surface stormwater basin is proposed north of Building 1, with supplemental underground stormwater storage below the parking area northeast of Building 1. Separate surface storm water basins will serve Substation #2. REVISED PLAT OF SUBDIVISION The Original PUD Ordinance approved a final plat of subdivision for the Property ("Original Plat"), which divided the Property into five lots three buildable lots and one common area lot within the Data Center Parcel, plus one lot for the Substation #1 Parcel. The Original Plat has not been recorded. In connection with the requested PUD amendment, CHQ is seeking approval of a revised plat ("Revised Plat") that reflects the proposed reconfiguration of the Data Center Buildings and Substation #2. The Data Center Parcel would be subdivided into five lots three buildable lots, one common area lot, and one lot for Substation #2. Additionally, the Substation #1 Lot would be subdivided into two lots, separating the ComEd substation improvements (northern portion) from the CHQ switch yard improvements (southern portion). CHQ will record covenants and easements to provide for cross access and perpetual maintenance of common improvements, and to otherwise ensure that the campus functions cohesively. DATA CENTER BUILDINGS AND IMPROVEMENTS CHQ is requesting approval of all necessary zoning and subdivision exceptions and variations to allow development of the Property as depicted on the Amended Plans. Notable deviations from the underlying 1-1 Limited Industrial District zoning requirements include: Regulation Zoning Code Required Proposed Section Ground -mounted antenna — 14.305(B)(1) Not more than one per lot Satellite antenna yard on Lot 1 number (north of Building 1) with multiple receivers. Height of screening structure 14.306(A)(3)(b) Accessory structures - 20' (max) 550" for mechanical yard 14.318(B)(7)(a) Fences — 8' (max) Number of accessory 14.306(A)(5) Not more than two per lot 10 fuel polishing sheds, 12 thermal structures storage tanks Fence type 14.318(C)(2) Barb wire fencing on industrial Internal ComEd fence for property must be at least 6' above Substation #2 contains barbed wire any sidewalk and extend inward of that extends outward of property. property. Page 3 17800\00001\4930-4373-7715.v4 Regulation Zoning Code Required Proposed Section Building height 14.2104(C) 50' Height of building: 85 feet (to parapet); Penthouse: 109'; Mechanicals: 121' (Building 1), 138' (Building 2) Lot coverage/ open space 14.2104(D), 75% 82% 14.504(C)(5)(d) Ratio of deciduous/ 14.2304(B)(2) 50% / 50% 57% / 43% evergreen shrubs Perimeter landscaping 14.2306(B) Landscaping required on lot lines; As shown on landscape plans see Code for design requirements Foundation landscaping 14.2307 4'-wide (min) landscaped area As shown on landscape plans around front and exterior side fagade of all buildings The Data Center Buildings will be constructed of high -quality materials including steel, concrete, and glass, with white metal cladding, stainless steel elements inserted into pre -cast panel reveals, and other outer surfaces. As depicted on the Amended Plans, the Data Center Buildings include meaningful architectural design elements to provide visual interest and break up the building mass. Each Data Center Building features an administrative and office area (also referred to as an "administrative block") with a proposed height of 60 feet (to parapet). Aesthetically, the administrative block breaks up the elevation of each Data Center Building. The administrative blocks feature large glass windows, glazed areas and stainless -steel cladding, providing a streamlined look that is more similar to an office building than an industrial building. To minimize visual impacts on the public right-of-way and residential neighbors to the north, Building 2 will be oriented so that the administrative block faces Dempster Street. The Data Center Parcel will be a secure facility with high -quality, black coated steel ornamental perimeter fence. Primary vehicular access is proposed off Linneman Road, with emergency vehicle access provided from Dempster Street and Algonquin Road. All truck traffic will be required to use the main entrance on Linneman Road for both ingress and egress. Manned security guard booths and gates will be provided at the main entrance. Emergency gates are proposed at the right -in/ right -out driveways on Dempster Street and Algonquin Road. The Project also will include construction of sidewalks and other bicycle/ pedestrian improvements that provide pedestrian access around the entire Data Center Property. On the Algonquin Road frontage, land will be dedicated for construction of a public sidewalk as part of an ongoing Village/ I DOT road improvement project. Parking will be provided around each Data Center Building and adjacent to each administrative block. For data centers, the most useful measure of parking demand is the anticipated number of full-time employees during the busiest shift, as opposed to a ratio based on building square footage. Based on historic data, CHQ estimates that approximately 240 employees could occupy the data center campus during a 24-hour period, with the majority (but not more than 180) working Page 4 17800\00001\4930-4373-7715.v4 within standard daytime hours. CHQ proposes to provide 365 parking spaces on site, including 16 electric vehicle parking spaces and 12 accessible ADA spaces. Parking for 18-wheeler and delivery trucks would be provided within a multi -bay, partially screened truck dock. The Amended Plans include updated screening and landscaping designs for the entire campus. Extensive landscaping will be provided throughout the Data Center Parcel, with an emphasis along the north property line. Landscape screening using evergreens in the transition setback is provided to help break up the visual sightline for neighbors to the north. Additionally, screening structures are proposed around the mechanical yards, which provide both visual and acoustical screening. Detention basins with additional landscaping are located on the north side of Building 1 to provide additional buffering and screening. Additional landscape screening is proposed along the north line of the Substation #1 Parcel. BACKUP SYSTEMS To ensure that its customers' mission -critical applications never go offline, CHQ utilizes layers of redundant electrical infrastructure, including emergency backup generators that provide backup electricity and thermal storage tanks that provide backup cooling. CHQ's generators will be located on the roofs of both Data Center Buildings, and tanks storing #2 diesel fuel to power the generators will be located underground. The underground tanks will have double -wall construction and leak detection systems. Each tank has an outer diameter of approximately 12' 6", with a minimum of 3' cover, with the exact depth depending on topography and coordination with other site utilities. CHQ's plans provide for sufficient fuel storage to allow for 48 hours of backup power, which is the minimum demanded by most of its customers. The backup electrical system also requires above -ground accessory structures, namely the "fuel oil polisher sheds" shown on the Amended Plans. In the event of an electrical outage, the backup generators (powered by #2 diesel fuel) provide electricity to the system. Because outages are rare, the fuel must be periodically "polished" to remove water that naturally accumulates from humidity and to prevent sediments from settling. To accomplish this, the Amended Plans include 10 accessory fuel oil polisher sheds that house mechanical pumps (which periodically cycle the fuel from the underground fuel tanks to the fuel oil polisher), valves, and fuel oil polisher equipment. The backup cooling systems for the Data Center Buildings include 12 "thermal storage tanks" as depicted on the Amended Plans. In the event of an outage, pumps with battery -backed power will continue to move a solution of 35% propylene glycol to cool the system until the backup generators can run the chillers that ordinarily cool the system. BENEFITS TO VILLAGE The Project will benefit the Village and other units of local government in multiple ways, including capital investment in redevelopment of the former United Airlines site including new public infrastructure, generation of significant new municipal utility taxes, increased property tax Page 5 17800\00001\4930-4373-7715.v4 revenues for the Village and other taxing bodies, and creation of new permanent jobs (including skilled professional jobs) and construction jobs. As demonstrated by the Traffic Study submitted with this application, the Project will generate significantly reduced traffic movements and impact on roadway infrastructure as compared to traditional industrial development. Additionally, the Project will produce lesser burdens on schools, police, fire protection, emergency, and other municipal services than would typically be experienced with other uses allowed in the 1-1 zoning district. CHQ will provide a detailed analysis of projected tax revenues, job creation, and other economic benefits to the Village as a supplement to its PUD amendment application. Page 6 17800\00001\4930-4373-7715.v4 ECONOMIC IMPACT ANALYSIS MOUNT PROSPECT TECHNOLOGY CAMPUS PLANNED UNIT DEVELOPMENT PUD AMENDMENT APPLICATION (Revised October 23, 2025) I. Introduction Tur Ventures LLC ("Tur") owns the eastern portion of the former United Airlines Operations Center site located at 1200 E. Algonquin Road and 1200 Dempster Street (the "Data Center Parcel"). Tur also owns a smaller parcel located at the southeast corner of the intersection of Dempster Street and Linneman Road (the "Substation #1 Parcel"), which is currently being developed for an electrical substation to serve the Data Center Parcel. The Data Center Parcel and the Substation #1 Parcel are, collectively, the "Property". In 2021 and 2022, the Village of Mount Prospect (the "Village") approved a PUD for a data center campus on the Property. Now, Tur, with its affiliates, including CloudHQ LLC (Tur and its affiliates are, collectively, "CHQ"), proposes an amendment to the approved PUD, that will allow it to continue to redevelop the Data Center Parcel as a data center campus (the "Project") as further detailed in CHQ's final PUD amendment application. The Project includes construction of a two -building data center campus as shown on the amended plans submitted with this application (the "Amended Plans"). The campus will include one building (that may include two separate saleable/ leasable spaces separated by a party wall) fronting on Algonquin Road ("Building 1," also referred to as "ORD1 "), and a second building at the corner of Dempster Street and Linneman Road ("Building 2," also referred to as "ORD2"), as follows: • Building 1 is proposed to have a footprint of approximately 445,000 square feet and a gross floor area of approximately 1.3 million square feet, with up to 240 MW of data center capacity. Building 1 is designed to allow occupancy by up to two separate tenants with a "zero lot line" subdivision at the mid -point of Building 1. • Building 2 is proposed to have a footprint of approximately 296,000 square feet and a gross floor area of approximately 872,000 square feet, with approximately 105MW of data center capacity. Building 2 is designed to be a single -occupancy building. The Project will benefit the Village and other units of local government in multiple ways, including new municipal utility consumption tax revenue, increased real property tax revenue, and job creation, while placing fewer demands on government services than other potential uses of the property, all as further outlined below. II. Revenue Generation for Village CHQ anticipates that the Project will generate revenue for the Village and other local governments 1 17800\0000 1\4897-5662-2187.v7 and promote local economic growth and development in several ways. A. Village Electricity Consumption Tax The Project will generate substantial new municipal electricity consumption tax revenue. Assuming completion and full occupancy of the Project in accordance with the Amended Plans, CHQ estimates that new consumption tax revenues to the Village will exceed $3 million per year within five years and will exceed $7 million per year within eight years. See chart below. Mount IIP r s I� ��ecl I l tr'i ii t IIP`irojecteid Annual Revenues 11 � alp UGI 01 gal The consumption tax projections shown above for year 2033 represent full build -out of the Project with data center operations at maximum design capacity for both Building 1 and Building 2. Once that benchmark is achieved, similar revenues would be generated year-to-year for as long as the campus is fully utilized. B. Real Estate Tax Development of the Project also will substantially increase real estate tax revenues to the Village and its South Mount Prospect TIF District and, eventually, to schools and other local taxing bodies. In connection with the Village's original approval of CHQ's data center project in 2021 and 2022, the Village also (i) adopted a resolution of support for the Class 6B property tax incentive and (ii) approved a redevelopment project area (i.e., a "TIF district") for the South Mount Prospect TIF District, which includes the Property and other property. The Class 6B incentive was, and continues to be, necessary for CHQ to undertake the Project. However, as in 2021-2022, CHQ is not currently seeking any tax increment finance incentives from the Village. Even assuming application of the Class 6B assessment rates, the Project will substantially increase the property tax base and revenues for the Village, the TIF, and other local entities. 2 17800\0000 1\4897-5662-2187.v7 The estimated 2025 taxes for the Property, in its current undeveloped condition, are approximately $1,080,698. Without the Project, property tax revenues will increase only to the extent of general growth in fair market value. Assuming completion of Building 1 in 2026, the projected annual property taxes for the Property (with a Class 6B incentive) would increase to approximately $22,356,469 for tax year 2027. Assuming completion of Building 2 by 2031, the projected annual property taxes for the Property (with a Class 613 incentive) would increase to approximately $40,005,120 for tax year 2032. A significant portion of the increased property tax revenue can be used by the Village to finance eligible improvements and costs incurred to redevelop the TIF district. III. Job creation The Project will create new construction and permanent employment opportunities within the Village. Although the exact number and type of jobs will depend on the ultimate users of the data center buildings, CHQ anticipates that a full build -out of both Building 1 and Building 2 will create a similar, or slightly higher, number of construction and permanent jobs as compared to the employment projections provided in connection with the original PUD approvals in 2021-22. A. Data Center Operational Employment CHQ estimates at least 225-450 permanent jobs will be created by the development of both Building 1 and Building 2. Approximately 80% of these jobs will be for skilled, high -earning professionals with an estimated annual salary of $78,500+. These operating employees will include mechanical engineers, electrical engineers, computer engineers, security personnel, maintenance personnel, and real estate property managers. CHQ anticipates that a significant number of these high -earning professionals will choose to live in close proximity to the Property, given the 24-hour nature of the facility. B. Data Center Construction Employment CHQ estimates that at least 900-1,000 construction personnel will be employed on -site during construction of each data center building, and full build -out of the Project will involve at least 6.4 million labor hours. C. Additional Revenues Both construction workers employed on the Project and permanent operational employees will support economic development and revenue growth within the Village. CHQ anticipates that a significant number of the permanent employees will choose to live in close proximity to the Property. Both resident and commuter employees, as well as business travelers and other visitors to the site, will generate increased sales tax revenues from purchases at local retail stores, restaurants, hotels, and other businesses. IV. Park Improvements Donation In conjunction with the 2022 Final PUD Approval, CHQ agreed to make a park contribution in the amount of $2,000,000, to be made in three installments (one per Building). Because the proposed amended PUD includes two buildings rather than three, CHQ proposes to make the donation in two payments that are proportional to the square footage of each of the two Buildings. The park 3 17800\0000 1\4897-5662-2187.v7 contribution will be further addressed in an agreement to be entered into between the Village and CHQ prior to issuance of a building permit for the construction of the first Building. El 17800\0000 1\4897-5662-2187.v7 2025-09-18 233 North Water St., 6 th Floor Milwaukee, WI 53202 USA wsp.com/data-centers The CIoudHQ ORD1 facility located at 1200 E Algonquin Road, Mount Prospect, IL targets limited water use by its heat rejection system. To accomplish this, the facility is pushing the boundaries of market practices to raise the temperatures within the critical spaces to the maximum that the equipment can support. This allows for increased water temperatures throughout the facility, reducing the power required by the chillers to transfer the heat. Additionally, this allows for more rapid transition off of the adiabatic trim system to full dry heat rejection of the system. The latest heat rejection design implements a cutting edge technology, Adiabatic Dry Coolers. This is a closed loop heat rejection system that normally uses zero water. Any time the ambient temperature is above the transition point, the equipment runs completely dry with no evaporative water used for heat rejection. During those short periods where the ambient dry bulb temperature raises above the full dry operational point, an adiabatic spray system engages to depress the inlet air temperature going through the equipment. This allows the facility to better balance energy efficiency with water use. The communicated Hourly Maximum values represent the peak design conditions that the facility is designed to. The heat rejection system is selected based on the ASHRAE 20-year extreme ambient temperature of 102. 1 'F for this location. That value does not represent a normal operating value. It is a historicI,l analysis performed by ASHRAE and represents the temperature that historically has a chance of occurring at some time during a given year. This does not indicate the temperature will be sustained for any period of time, but merely that there is a 5% chance of that temperature being reached for any period of time in a given year. The Daily Average, Max Daily, and Annual Sum values are all based off of TMY3 BIN data. This is data thIt has been compiled based on historical weather data for the area to build a representative 66 average" year with ambient data assigned for all 8,760 hours throughout the year. This BIN data is then utilized t* develop the Daily Average, Max Daily, and Annual Sum values to represent the expected water use A Worst Case 24 hour Diurnal curve will be provided graphically representing the Max Daily information. This is based off of the BIN data covering the highest temperature 24 hour period expected from an average year. This will show during an average year, only on the worst day, water will only operate during the hottest periods of the day. This is intended to clearly explain the apparent incongruities between design and expected water use, as well as describe how water is utilized for cooling on this site. Sincerely, Kevin Cooper, PE Vice President, Mechanical Engineer 518.795.0471 '°`"'"P"s"""' Mount Prospect Public Works Department \I INTEROFFICE MEMORANDUM TO: COMMUNITY & ECONOMIC DEVELOPMENT DIRECTOR JASON SHALLCROSS, AICP, CECD FROM: PROJECT ENGINEER CHUCK LINDELOF DATE: OCTOBER 10, 2025 SUBJECT: PZZ25-000023; CLOUD HQ PUD AMENDMENTS & PLAT OF SUBDIVISION (1200 E. ALGONQUIN ROAD AND 1200 DEMPSTER STREET WATER & SANITARY SERVICE DEMANDS We have received the anticipated peak demand information for water and sanitary services for the proposed CloudHQ development. Our consultant has incorporated this information into the hydraulic model of the existing Village water and sanitary systems and confirmed that these existing systems are sufficient to accommodate the anticipated demands. We have flow tested and further confirmed that these results are accurate. Per these results, no upgrades to the Village systems will be necessary to accommodate the proposed CloudHQ development. Please feel free to call if you have any questions. Chuck Lindelof Page 1 of 1 1-1 ZONING DISTRICT PERFORMANCE STANDARDS AND "GAP" ANALYSIS MOUNT PROSPECT TECHNOLOGY CAMPUS PLANNED UNIT DEVELOPMENT PUD AMENDMENT APPLICATION Tur Ventures LLC ("Tur") owns the eastern portion of the former United Airlines Operations Center site located at 1200 E. Algonquin Road and 1200 Dempster Street (the "Data Center Parcel"). Tur also owns a smaller parcel located at the southeast corner of the intersection of Dempster Street and Linneman Road (the "Substation #1 Parcel"), which is currently being developed for an electrical substation to serve the Data Center Parcel. The Data Center Parcel and the Substation #1 Parcel are, collectively, the "Property". In 2021 and 2022, the Village of Mount Prospect (the "Village") approved a PUD for a data center campus on the Property. Now, Tur, with its affiliates, including CloudHQ LLC (Tur and its affiliates are, collectively, "CHQ"), proposes an amendment to the approved PUD, that will allow it to continue to redevelop the Data Center Parcel as a data center campus (the "Project") as further detailed in CHQ's final PUD amendment application. The Village requested that CHQ provide a supplemental "gap" analysis addressing the changes in bulk, intensity, and 1-1 Zoning District performance standards between the plans approved by the 2022 Final PUD Ordinance ("Original Plans") and the proposed amended PUD plans (the "Amended Plans"). A. Bulk Standards The Amended Plans reflect the following changes with respect to bulk: 2022 Final PUD Ordinance Amended Plans Number of buildings 3 2 Building square Each building: 566,767 SF Total: Building 1: 1,3001000 SF footage 1,700,301 gross SF Building 2: 872,000 SF Total: 2,172, 000 SF Building height Height of building: 81' (to parapet) Height of building: 85' (to parapet) Equipment Penthouse: 79 feet Equipment Penthouse: 109' Administrative block: 54 feet Mechanicals: 121(Building 1), 138' (Building 2) Administrative block: 60' (to parapet) Lot coverage 75% 82% B. Performance Standards Both the Original Plans and the Amended Plans demonstrate compliance with all Performance Standards of the 1-1 Limited Industrial District under Section 14.2104.G of the 1 17800\0000 1\493 8-6522-9427.0 Village Zoning Code (the "Performance Standards," set forth in red below). Development of the project in accordance with the Amended Plans will achieve comparable or improved performance with respect to each Performance Standard, as specifically addressed below and in CHQ's application materials: 1. Noise Limitations- No industrial activity shall generate noise across any residential or business zoning district boundary line in excess of the levels shown in table I of this section, nor shall exceed seventy one (71) dBA when measured on the A -weighted scale. Noise limitations are addressed in the separate acoustical study provided by CHQ. As detailed in the acoustical study, the project will meet the Village's performance standards for daytime and nighttime noise limits during routine operations and will meet the Village's maximum sound level of 71 dBA during emergency operations. Emergency operations would occur only in rare circumstances, such as a full utility outage. Additionally, operational controls and mitigation measures will be implemented effectively to prevent excessive noise levels. CHQ will continue to evaluate site conditions to ensure compliance with applicable environmental and Village noise standards and community expectations. Should any changes arise, appropriate actions will be taken and communicated. See gap report table below comparing the noise levels from the original 2022 PUD submission with current 2025 PUD submission: Previous PUD - 2022 U dated - 2025 Receiver/Home Receiver Number Day Limit dB(A) Night Limit dB(A) Emergency Limit dB(A) Day dB(A) Night dB(A) Emergency dB(A) Day dB(A) Night dB(A) Emergency dB(A) Crystal Towers Condos 1 56 52 71 49 48 63 51 47 67 Myers Place 2 56 52 71 48 48 61 51 47 65 1510 Dempster St 3 56 52 71 51 50 66 53 49 68 Birch Manor Condos Northeast 4 56 52 71 49 48 64 50 46 65 Birch Manor Condos Southeast 5 56 52 71 52 51 69 54 50 70 Birch Manor Condos - North 6 56 52 71 47 46 64 49 46 65 Birch Manor Condos - South 7 56 52 71 50 48 69 53 51 70 636 Pickwick 8 56 52 71 44 43 60 47 45 60 648 Dempster 9 56 52 71 52 51 67 53 51 66 2. Vibration Limitations- b. No industrial activity shall be responsible for the transmission of earthborne vibrations across any residence or business zoning district boundary line in excess of the displacement limits established through use of the following formula- 2 17800\0000 1\493 8-6522-9427.0 D = The maximum allowable displacement in inches f = The vibration frequency in cycles per second The vibration generating equipment that will be used in this project (chillers and generators) have vibration isolators on each unit to limit vibration transmission to the ground contained within the building. Therefore, the equipment will not cause a nuisance or transmit earthborne vibrations across any residence or business zoning district boundary line. Both the Original Plans and the Amended Plans meet this standard, with no transmission of earthborne vibrations across residence or business zoning district boundary lines. 3. Smoke And Particulate Matter: StatesFor the purpose of determining the density or equivalent opacity of smoke, the Ringelmann chart as adopted and published by the United in circular no. 8333 shall be us-ed. No industrial operation shall cause or allow to be emitted into the open air from any process or control equipment or to pass any convenient measuring point in a breaching or stack, dust in the gases to exceed 0.85 pounds per thousand pounds of gases adjusted to twelve percent (12%) CO2 content for the products of The emission, from all sources within any zoning lot, of particulate matter containing more than ten percent (10%) by weight of particles having a particulate diameter larger than forty four (44) microns is prohibited. r 3 17800\0000 1\493 8-6522-9427.0 pmen The pro, osed cleve, t will meie�t all peffbii�r'Mance stanclwclfor MN MIN e'Missions., p Amended Plans. will sign cantly, red ucie emissions, of articu ate matte�ir and othe�r ,n p air poillutalcom�pared to ffie Original Plansi., ,n Emissil'ons Comparison 2025 Design 52.26 7.29 0.59 2.67 2022 Design 2,025 Des'ign Structures 3 2 MW per 84 24,0 & 120 Site, IMW 252 360 D ie s e, I ICI gin e Gen erato,rs Ca75- 6 3,516e, Cat C'175.-20 Number 150 -Cat 172 27 Anniiat SchedUted Ma4intenance Hours 8 8 8 An ICI U a t Emergency Hours (Est.) 100 100 '100 C I ntroils "0 SOR SCRADOC/UPF SGRI'DOCIDPF AnICI Uat emIssiolins estimate (To, n s) 2022 Des'ign II Ox 43.3 42.0 '10.,3 c 0 48.6 4.5 2.8 vocs 18.7 0.3 0.2 II M 12.0 2.5 OA �E mJ's s i o Ins Per MW 20,25% tower 4 emiss,ions NOx 0,172 0.1,17 0,,029 0.145 co 0.193 0,.,012 0.,008 0.020 vocs 0.074 0.,001 0.002 RM 0.048 0.007 0.,000 0.007 4 17'810,01",,,0,0,0,0,1"',4,93,181-6522-,9,,427,.v3 L Hazard. Fire And Explosion and all other applicable fire and explosion ordinances: those pertinent requirements contained in the Mount Prospect fire prevention code i i i (1) Said materials or products shall be stored, utilized, or produced within r Jr letely enclosed buildings or structures having wallsterior l"construction in accordance with other ordinances of this code. In response to a. and b., the three solutions that will be stored on -site are a propylene glycol solution (32% concentration), diesel exhaust fluid (32.5% urea concentration), and #2 diesel fuel. The propylene glycol solution and the diesel exhaust fluid do not have a flashpoint. The #2 diesel's flashpoint is 125.6 degrees Fahrenheit. Its use will comply with the standard above because (i) it will be stored within completely enclosed, underground structures (i.e., underground storage tanks) having exterior walls of fire resistive construction in accordance with applicable laws. i (1 ) That the final manufactured product does not itself have a closed cup flashpoint of less than one hundred eighty seven degrees Fahrenheit (1 87'F). (2) That the use and storage cFf such materials shall be in conformity with standards prescribed by the National Fire Protection Association i with the requirements of other ordinances of this code. (3) That the storage of said materials shall be prohibited aboveground. There will be no manufacturing processes occurring on the Subject Property. 5 17800\0000 1\493 8-6522-9427.0 The Data Center Buildings, Substation 2, and the other ancillary uses of the Subject Property will not release hazardous or toxic airborne materials. See also discussion above regarding airborne emissions. As part of CHQ's ongoing environmental monitoring and compliance efforts, an internal review has been conducted to assess potential odor impacts associated with the future operations at the property. Based on evaluation of existing sites and operational activities, CHQ confirms that no odorous matter shall be emitted from the site across any lot lines. Operational controls and mitigation measures will be implemented effectively to prevent the release of odorous substances (if they were to occur). CHQ will continue to evaluate site conditions to ensure compliance with the Performance Standards and any other applicable environmental and community standards. Should any changes arise, appropriate actions will be taken and communicated. Both the Original Plans and the Amended Plans meet this standard, with no transmission of odorous matter across lot lines or across residence or business district boundary lines that would cause a nuisance or discomfort to neighboring uses. The data center operations will be almost exclusively conducted within enclosed buildings. Rooftop and ground -mounted equipment will be visually screened, and outdoor maintenance and other outdoor activities will be infrequent. The data center use will generate significantly fewer vehicular traffic movements, and require fewer outdoor parking spaces, as compared to traditional industrial development. In short, CHQ expects that no operations on the Subject Property will result in direct or indirect illumination in excess of 6 17800\0000 1\493 8-6522-9427.0 one-half of one foot-candle when measured at any resident or business district boundary line. Both the Original Plans and the Amended Plans meet this standard. C. Sustai nabil ity Although the Amended Plans will increase the overall size and capacity of the data center facilities on the property, the current Project will have a reduced environmental impact, and be "greener" and more sustainable, as compared to the Original Plans and 2022 PUD approval. Advancements in design and technology allow the development to achieve greater capacity with an overall reduced impact on the environment and natural resources, including reduced airborne emissions (as discussed above) and water usage. Additional information regarding expected water use and efficiency improvements in the data centers' heat rejection system is provided under separate cover. Regarding water usage, each data center building will use a "closed loop" heat rejection system to cool the servers. The system includes internal "fan walls" in the server halls that pull in hot air generated by the servers, and liquid -filled coils that then reject the heat. The system also includes the transfer of heated air, via similar liquid -filled coils, from the servers to outdoor chillers and coolers that then reject the heat to the ambient air. The liquid in the coils is water and food -grade (non -toxic) propylene glycol. Once a building's system is filled with water upon commencement of building operations, the system, when operated and maintained properly, does not require any additional water, unless the outdoor temperature reaches 92+ degrees Fahrenheit, at which time the system uses sprayers to further cool some of the cooler's elements. Additional information regarding expected water use and efficiency improvements in the data centers' heat rejection system is provided under separate cover. Additionally, both Building 1 and Building 2 will be designed to a LEED Silver standard and will meet CHQ's Global Design Standards, which prioritize inclusion of sustainable building and site - design elements to reduce light pollution and increase energy efficiency, water efficiency, operational waste handling, embodied carbon, biodiversity, enhanced climate change resilience, sustainable transit provisions, and guidelines for use of alternative fuels, and a wide range of other aspects of building performance. CHQ's commitment to sustainable practices and environmental performance standards is detailed in its Sustainable Development Plan ("SDP," copy attached), which applies to all new CHQ developments, including the Project. The SDP establishes goals to, among other things, promote energy efficiency and optimize energy performance, reduce environmental emissions and waste, enhance biodiversity, and conserve natural resources. 7 17 800\00001 \493 8-6522-9427 A Cloual--iQ SD PDevelopment Plan -01.0 Sluistainial e 'i�� "'ICI ,�nnn��' �'�, �I°�'"u� ��ual"° 1�� IIII�"� �� � 'I�"' �� '� �k I°�� �� Moha m mad Ali, Keith Ha rney, And rew Ha rrison, Pele Hlohm,, if ny Lathe, M rich I e, Muito,, David McKeega n. B r'i an OH a ra 11 Pa t d ck Qu'i n n . Er' i n Ra rn a n a . A I ex, Til I ey,,, B r i a In Ze m ci k,, C,a r I os Cutting; i� �a � u ,��mm��I �I ^���I �l@ III°� ���u��� III, ; �'u������Jli Ybvl 0 N wit, 71"" 1,11 III ' C [i., () 1,,) D 1-11, Q B L.)', 11VI N E S S W 10 ........... ........... ii's ".0 j "'�l ,, � , " "Ia�J, I l'i -"'� �"'Jli""l b c t t JF)�� C P" 1" S"' t e v t CO'S t 111"'i o p t',;il Ivlv ","l, 00 Jl' tjj f" i 'S f o ( i �� w�,� ,���mm� �"w��' Illa,� ' .11C'IFIVES The purpose ofthe Sustainable evelopment, Policy (Sl Ip) isto establish the rniinIMIUM e envirionmental pefformianice levelthat CloudHQ developm nts miust meet, It appli'lesto aill Iniew C I o u d Q d ev e I o p m e nts. REVISION HISTORY 04/26/2022 1/202 2 Draft update Coimmitteei Draft 9/29/2022 ittee Draft — en ha nced language Co,imm, 22/ 2/2023 Finall Draft ClloudHIQ Thin do ciu me nit clointallins coinfidenitial I prop,rietairy and inloin-lp uilbll lic linforimat'lonii and lis lintenide,d f0ir thie solle use aind bin eflit of C-11ouidHIC). Any uinauth-anized iteview, use, disclosuire or distribution withouit thin e express wriliffen c,loinsentilof Gl-oulldHQ lis strilictly 1p rohillbilted. i///af111D�� amu � y�rf PIDr� ,Siu;s rye+ IG� f U �ilf�fiwifl%!�� SDP-01.0 Sustainable Development Plan 2.0.11. 1. A N Yalu,) A C �, �� !r L,) I IS I 10 N a. Select new sites for potential data center usage in consideration of SDP1.1 Sustainable Site Selection Guidelines, before acquisition. b. Support the development of sustainable cloud infrastructure and broader access to technology by selecting sites of strategic importance to sustainable cloud infrastructure providers. C. Prioritize sites of strategic importance within national and regional energy and heat networks, including availability of renewable energy infrastructure, where possible. d. Prioritize sites of strategic importance within international telecommunications networks. e. Assess the suitability of new plots as a data center site using the SDP1.1 Sustainable Site Selection Guidelines, and report the measured score to the CHQ sustainability committee. f. Engage with regional and local authorities and relevant stakeholders to understand environmental and social priorities to the local community and region, prior to land acquisition and brief definition. g. Establish the site masterplan in accordance with the identified environmental and social priorities. h. Complete a biodiversity pre -assessment using SDP1.2 Biodiversity Pre -assessment Guidelines and comply with the sustainable landscaping requirements identified in the CloudHQ Global Design Standards. i. Select new sites for enhanced climate change resilience in accordance with the criteria identified in the CloudHQ Due Dilligence Checklist. Define site design criteria for enhanced climate change Vulnerability and climate change risk assessment in accordance with CloudHQ Global Design Standards. Prioritize community engagement at an early stage, engaging in thoughtful conversations with the local neighbors, and incorporating feedback into the early design process where applicable — always with the intent of being a good neighbor. We take great pride in open dialogues with the public, often understanding the local needs of the area and finding opportunities to enhance (through landscaping, trails, ponds, etc) the local fabric of the community. k. Work with sustainable cloud infrastructure providers to design and deliver facilities that meet and exceed their sustainability requirements and deliver their infrastructure needs as sustainably as possible. I. Develop the facility design in accordance with the sustainable building design requirements defined in CloudHQ's Global Design Standards'. Record any deviations at key design milestones and obtain senior team sign -off. m. Incorporate applicable sustainability concepts from relevant green building rating systems such as LEED. Assess performance against an applicable rating system and identify opportunities for improving the development's environmental impact to a targeted goal of Gold or equivalent standard. Incorporate the measures necessary to achieve such a standard where these are feasible and consistent with the broader development objectives. n. Assess the site for compliance with LEED requirements or those of an equivalent green building rating system during the early concept design. Use the assessment to identify opportunities for improving the development's environmental impact up to a LEED Silver/Gold or equivalent standard and incorporate these measures where feasible and consistent with the broader development objectives. o. Reduce light pollution, and increase night sky access, improve nighttime visibility, and reduce the consequences of development for wildlife and people. ' The CloudHQ Global Design Standards stipulate minimum requirements related to sustainable building design. These include energy efficiency, water efficiency, operational waste handling, embodied carbon, biodiversity, enhanced climate change resilience, sustainable transit provisions, guidelines on the use of alternative fuels and a wide range of other aspects of building performance. CloudHQ Page 2 of 7 This document contains confidential, proprietary and non-public information and is intended for the sole use and benefit of CloudHQ. Any unauthorized review, use, disclosure or distribution without the express written consent of CloudHQ is strictly prohibited. i///af111D�� amu �» PIDr1,� ISium ry�m IG� f U �ilf�fiwifl%!�� SDP-01.0 Sustainable Development Plan p. Work with regional and local authorities and relevant stakeholders to identify potential users of waste heat. Incorporate facilities to provide heat free -to -use at the site boundary, according to the CloudHQ Global Design Standards and according to the identification of a suitable user. q. Assess opportunities to incorporate on -site renewable, zero -carbon and alternative energy storage and generation technologies into the development. r. Identify opportunities for the direct connection of off -site renewable energy infrastructure to the development. Incorporate suitable opportunities into the campus energy supply strategy where feasible. S. Ensure the sustainable and regionally -appropriate use of water in accordance with the CloudHQ Global Design Standards. Avoid the use of potable water for irrigation. Promote the use of alternative water sources that do not increase water stress and prohibit the use of potable water for cooling purposes in any area defined as having a water source stress level greater than "low" by the World Resources Institute2. t. Assess the market availability of HVO and alternative fuels and ensure that the generator system is suitable for compatibility with HVO in accordance with CloudHQ Global Design Standards. U. Identify local and national sustainability and energy efficiency programs. Assess opportunities to design and construct in accordance with their requirements and incorporate them into the development process where possible. V. Optimize energy performance according to LEED guidelines and identify ways to further design energy efficient data centers in an effort to achieve increasing levels of energy performance beyond the prerequisite standard to reduce environmental and economic harms associated with excessive energy use and greenhouse gas emissions that disproportionately impact frontline communities W. Incorporate advanced energy metering to support energy management and identify opportunities for additional energy savings by tracking building -level and system -level energy use, in accordance with LEED. X. Tender pre -construction and construction contracts in compliance with the CloudHQ Responsible Sourcing Guidelines'. Collect the identified sustainability metrics and evaluate these as part of the tender appraisal process. y. Work with potential tenants to identify strategies for the collection and recycling of electronic waste and to provision for these in the building design. Z. Ensure the materials used during the development processes are in accordance with LEED standards for low emitting materials to reduce concentrations of chemical contaminants that can damage air quality and the environment, and to protect the health, productivity, and comfort of installers and building occupants aa. Provide electrical vehicles and bicycle stations to promote bicycling and transportation efficiency and reduce vehicle distance traveled, and addition to improving public health by encouraging utilitarian and recreational physical activity. bb. In an effort to encourage adaptive reuse and optimize the environmental performance of products and materials, CloudHQ demonstrates reduced environmental effects during initial project decision -making by reusing existing building resources or demonstrating a reduction in materials use through life -cycle assessment through LEED approved guidelines and strategies. cc. Strive for considerate and thoughtful design practices for all employee and tenant office spaces, focusing on quality of daylight, quality views, and work environment as defined by LEED guidelines 2 "Low" is defined as the lowest category of baseline water stress (0-1) according to the World Resource Institute's Acqueduct tool. Where wet cooling is shown to provide significant greenhouse gas savings and water stress is low -medium or greater, alternative water sources may only be used where they do not are not suitable for utility potable or agricultural usage. ' The CloudHQ Sustainable Sourcing Guidelines seek to encourage the use of sustainable procurement options in construction and operation. They encourage the use of local community suppliers, and those that disclose and aim to reduce their environmental impact. They also encourage the use of sustainable alternatives to conventional consumables such as fuels, refrigerants and electricity tariffs. CloudHQ Page 3 of 7 This document contains confidential, proprietary and non-public information and is intended for the sole use and benefit of CloudHQ. Any unauthorized review, use, disclosure or distribution without the express written consent of CloudHQ is strictly prohibited. i///af111D0� amu �» PIDr� ISium ry�m IG� f U �ilf�fiwifl%!�� SDP-01.0 Sustainable Development Plan m l�lll� N 3, omwwuu; 1u�Ill E. � "�Il�i�u�o ��uxwi�I�'� �l "MIN, oulxrcRlll� IIVI �. �V�uuV11�,. �Niu��mtl@ wmux mt IIVI �V VNplipuinlU'II� � AhY'"°/ 11, 1 "MIN, ID �I��i �u���unniR�V� �� IIR' u��i�iYN IIV ���\V�1,. \\1��a�u�yr wtlllpu�o �u��VI��u V �h�ivafe� Ill AN4 dd. Carry out all activities in accordance with the CloudHQ Global Safety Guidelines for Development4, including air quality management, with organized strategies to increase cleaner and in conformance with LEED or equivalent. ee. Certify the development using LEED or an equivalent green building rating system where appropriate. ff. Minimize air -borne, water -borne and other forms of pollution through the selection of appropriate best practice demolition, remediation and construction methods. Administer these activities according to a construction pollution prevention plan, in accordance with the requirements of the green building rating system and/or local or national code where applicable. gg. Carry out demolition, remediation and construction activities in such a way as to maximize on -site re -use of demolition arisings, reclaim any recyclable materials and minimize waste to landfill. Administer these activities according to the requirements of a construction waste management plan, in accordance with the requirements of the green building rating system and/or local or national code where applicable. hh. Carry out demolition, remediation and construction activities in such a way as to minimize the impact of traffic, noise, dust and other nuisances on the surrounding community. Assess opportunities to reduce the impact of construction activities through the use of alternative construction practices. Where applicable certify the development using an appropriate local or national certification system [such as the LIK Considerate Constructors scheme].Record the total quantity of waste to landfill throughout the demolition, remediation and construction process. ii. Schedule and complete pre -development and pre -construction activities in accordance with the campus biodiversity strategy. jj. Provide LEED approved enhanced commissioning strategies to further support the design, construction, and eventual operation of a project that meets the owner's project requirements for energy, water, indoor environmental quality, and durability 4 The CloudHQ Global Safety Guidelines for Development seek to safeguard the well-being and safety of personnel involved in construction and construction -related activities. They do this by providing good practice guidance and describing the minimum requirements we expect CloudHQ employees and our partners and suppliers to observe in protecting one another's health, safety and environment. CloudHQ Page 4 of 7 This document contains confidential, proprietary and non-public information and is intended for the sole use and benefit of CloudHQ. Any unauthorized review, use, disclosure or distribution without the express written consent of CloudHQ is strictly prohibited. i///af111D�� amu �» PIDr1,� ISium ry�m IG� f U �ilf�fiwifl%!�� SDP-01.0 Sustainable Development Plan 3 0 13� 1 014, kk. Work with the tenant where applicable to develop a sustainable operating strategy, using the CloudHQ Standard Operating Procedure template for sustainable, climate -resilient facility operations5. Incorporate ISO 50001 (Energy Management) and ISO14001 (Environmental Management) principles where applicable to optimize the facility's energy consumption and environmental performance. II. Conduct periodic reviews of energy and water consumption in any facility we operate. Compare the measured values with facility design estimates and identify any discrepancies. Collaborate with the tenant to propose and establish potential strategies for corrective action. mm. Measure and record operational power and water consumption where applicable. nn. Plan and document routine maintenance and end of life planning for powered equipment to ensure reliability and energy efficiency. Incorporate Life Cycle Assessment (LCA) principles into the procedure for end of life planning, in a manner consistent with ISO 14040, ISO 14044 or an equivalent, internationally recognised standard. oo. Collect greenhouse gas data in accordance with the CloudHQ Inventory Management Strategy. pp. Provide facilities for, ensure and encourage the separation of municipally recyclable materials from general waste wherever we operate. Measure and record quantities of operational waste to landfill, and to each municipally collected recycling stream. Assess UL Zero Waste to Landfill (UL 2799) and TRUE Zero Waste certification for all new buildings that we operate and pursue certification wherever feasible. qq. Tender operational supply contracts in compliance with the CloudHQ Responsible Sourcing Guidelines'. Collect the identified sustainability metrics and evaluate these as part of the tender appraisal process. rr. Provide Tenant Design and Construction Guidelines to educate tenants about implementing sustainable design and construction features in their tenant improvement build -out ss. Review direct -appointed supply contracts on an annual basis in accordance with the CloudHQ Responsible Sourcing Guidelines. Identify sustainable alternative procurement options where feasible. tt. Incorporate CloudHQ Standard Operating Procedures for enhanced climate change resilience where applicable. Communicate with tenants in relation to climate change -related risks where appropriate. uu. Maintain and promote a safe and healthy work -place that promotes employee well-being and a positive, inclusive working environment. 5 CloudHQ Standard Operating Procedures provide a framework for sustainable, assured operations management. They include protocols that safeguard the environment and establish continual improvement in energy conservation, water usage, waste management and other key areas of operational sustainability. They also align with commonly recognised certification systems including ISO9001, ISO14001 and ISO50001, and can contribute to certification when implemented under an appropriate framework. ' The CloudHQ Sustainable Sourcing Guidelines seek to encourage the use of sustainable procurement options in construction and operation. They promote the use of local community suppliers, and those that aim to disclose and reduce their environmental impact. They also encourage the use of sustainable alternatives to conventional consumables such as fuels, refrigerants and electricity tariffs. CloudHQ Page 5 of 7 This document contains confidential, proprietary and non-public information and is intended for the sole use and benefit of CloudHQ. Any unauthorized review, use, disclosure or distribution without the express written consent of CloudHQ is strictly prohibited. i///af111D��� amu �» PIDr1,� ISium ry�m IG� f U �ilf�fiwifl%!�� SDP-01.0 Sustainable Development Plan 4 C 0 I It 1'u 11 (°,') RAIIf IIII AND Ii. ]III GA L., rm a �' d �°a Wip nu yu n a YN yuv ��v p tali iu a nm nm n�u,'u nll'T I �u> ��,�i� �� VWouS�� � �;t m,�,�,�a�� ����m� �� �� IIIL"lal ��,� IIII Q���n° 6� ���,° ��„� a �IU ��umr �i��,7� Illy iii � � ���,r IIII Q��„ I IIII IIII^nulil Illl IIIP 7il w vv. Encourage all employees, regardless of affiliation, position, or title, to provide suggestions for improving corporate sustainability. ww. Require designated employees to attend sustainability training as a mandatory component of their continuing professional development requirements. xx. Enable the use of virtual meetings, training and team building exercises. Provide facilities for video and telephone conferencing at all sites to facilitate effective remote working where possible and minimize the incidence of unnecessary business travel. yy. Enable hybrid and remote working models where appropriate in accordance with the CloudHQ Remote Working Policy. zz. Facilitate enhanced employee wellbeing throughout CloudHQ platforms through the CloudHQ Employee Wellbeing Policy aaa. Promote employee and partner wellbeing and a positive sense of team and community through inclusive team -building events, away -days and related initiatives. � I) om w umu � rcy � ' gnv � a n o a a i ao a maN � u � iim ioi om nu ao�� u u ��� �, n��u,�n ��u°��G � ��u n1 n nn nn mru°� 8 Iln nn 6�,� �u,;tii�� �� ii Il nn �u�� Leg a bbb. Ensure that all of our business and that of all suppliers to CloudHQ and affiliated companies is conducted in an honest and ethical manner. ccc. Keep records ensuring that all suppliers have received, acknowledged and committed to compliance with CloudHQ's family of legal policies, including: • CloudHQ Anti corruption and bribery policy • CloudHQ Modern slavery policy • CloudHQ Data privacy policy • CloudHQ Supplier code of conduct 4.3 1 ova t nn o iir'iii wne„uii ddd. Establish protocols for continual improvement and benchmarking of good practice guidance for sustainability performance. Complete reviews annually and report results to the CHQ sustainability committee. eee. Assess industry -wide best practice to identify best -in -class behaviors and commitments in sustainability. 4.4 wrN�yiii d D iiS cl o s ui,,,iirirm e M. Publish corporate sustainability targets and report annual performance against the identified objectives. ggg. All CloudHQ data centers shall be climate neutral in accordance with the provisions of the Climate Neutral Data Centre Pact. This includes the requirements for water consumption, circular economy, energy efficiency and matching of data centre electricity demand with renewable or carbon free energy, for all facilities globally. hhh. Measure and publicly report aggregated greenhouse gas emissions data and energy usage. iii. Measure and disclose aggregated corporate water usage alongside regional measures of water stress. CloudHQ Page 6 of 7 This document contains confidential, proprietary and non-public information and is intended for the sole use and benefit of CloudHQ. Any unauthorized review, use, disclosure or distribution without the express written consent of CloudHQ is strictly prohibited. i///af111D��� amu �» PIDr1,� ISium ry�m IG� f U �ilf�fiwifl%!�� sDP-01.0 Sustainable Development Plan jjj. Establish regional targets for net biodiversity gain. Target net biodiversity gain for all developments. kkk. Establish regional targets for waste, including operational waste to landfill. Measure and publicly report quantities of recycled waste and waste to landfill for all CloudHQ operations. III. Establish regional targets for sustainable sourcing. Measure and publicly report sustainable sourcing metrics for all CloudHQ operations. CloudHQ Page 7 of 7 This document contains confidential, proprietary and non-public information and is intended for the sole use and benefit of CloudHQ. Any unauthorized review, use, disclosure or distribution without the express written consent of CloudHQ is strictly prohibited. Zoning Standards Updated October 15, 2025 Tur Ventures LLC ("Tur") owns the eastern portion of the former United Airlines Operations Center site located at 1200 E. Algonquin Road and 1200 Dempster Street (the "Data Center Parcel"). Tur also owns a smaller parcel located at the southeast corner of the intersection of Dempster Street and Linneman Road (the "Substation #1 Parcel"), which is currently being developed for an electrical substation to serve the Data Center Parcel. The Data Center Parcel and the Substation #1 Parcel are, collectively, the "Property". In 2021 and 2022, the Village of Mount Prospect (the "Village") approved a planned unit development ("PUD") for a data center campus on the Property. Now, Tur, with its affiliates, including CloudHQ LLC (Tur and its affiliates are, collectively, "CHQ"), proposes an amendment to the approved PUD that will allow it to continue to redevelop the Data Center Parcel as a data center campus (the "Project") as further detailed in CHQ's final PUD amendment application. The Project meets all applicable standards for approval of the PUD amendment, including all requested zoning and subdivision exceptions and other relief in accordance with CHQ's application materials. As set forth below, the Project satisfies the applicable general standards for PUDs, standards for requested PUD exceptions, and conditional use standards. General Standards for Planned Unit Developments: The Project complies with the "General Standards for Planned Unit Developments" under Section 14.504(A) of the Village's Zoning Code, as follows: 1. Except as modified by and approved in the final planned unit development plan, the proposed development complies with the regulations of the district or districts in which it is to be located. Except to the extent modified by the exceptions that would be approved with the requested Planned Unit Development, and assuming approval of CHQ's other requested relief, the proposed development complies with the regulations. ® The principalin the proposed planned unitis consistenti recommendations of the Comprehensive i r the areacontaining jsite. On the "Future Land Use Map" within the Village's Comprehensive Plan (See Comprehensive Plan, p. 84), the Property is designated as "Mixed Use District." The Comprehensive Plan describes "primary" Mixed Use District uses to include "heavy industrial" (see Comprehensive Plan, p. 82), while the "Future Land Use" map in the South Mount Prosect Plan (discussed below) calls for "industrial" uses (without distinguishing between "light" or "heavy") in the Mixed Use District. The proposed development is consistent with the Mixed Use District "key characteristics" articulated in the Comprehensive Plan as follows: • "Encourages the adaptive reuse of older buildings and sites." • "Encourages larger sites to allow for large-scale employment facilities, with lot consolidation in areas that would benefit from redevelopment. Also encourages incorporation of pedestrian amenities, plazas and landscape features that improve the support the pedestrian environment." o The proposed development satisfies both the above characteristics by presenting a unique opportunity to replace the vacated United Airlines corporate campus with a 4935-7536-3955.v3 comprehensive redevelopment. CHQ expects the Project to generate between 225-450 permanent jobs (within the Data Center Buildings) as well as construction jobs. CHQ has submitted a separate "Economic Impact Analysis" for the Project, which addresses job creation and other economic benefits to the Village. o The Project will include extension of public sidewalks and other streetscape improvements, as well as extensive landscaping, screening, and buffering improvements along the adjacent rights -of -way. • "Encourages buildings to face the street frontage, be consistent with the quality and character of the area, aims to achieve green building performance standards, and includes sustainability best practices for stormwater management, native plantings, and site design." o The Data Center Buildings are oriented so that the shorter, office -like administrative blocks face public streets to the extent possible, given the site's shape and orientation. The administrative block for the eastern half of Building 1 faces the corner of Algonquin and Linneman Roads, and the administrative block for Building 2 faces Dempster Street. The only adjacent residential uses are on the opposite side of Dempster Street. o The exterior building materials reflect a high -quality light industrial project and include steel and glass, white metal cladding, and stainless steel elements inserted into the Data Center Buildings' pre -cast panel reveals and other outer surfaces. The administrative block of each Data Center building visually breaks up the elevation and includes large glass windows, glazed areas, and stainless steel cladding. o The Data Center Campus incorporates best practices for stormwater management, including on -site detention basins, supplemental underground storage, planting beds, and other improvements. • "Provides adequate buffering of loading areas and transitions in building scale between adjacent uses." o Only Building 2 is adjacent to residential uses. CHQ will install a continuous evergreen hedge and additional landscaping along Dempster. As shown in the cross-section plan included in the application, the two-story administrative block of Building 2, with a height of 60 feet (to parapet), faces Dempster and is over 313 feet south of the closest residential buildings on the north side of Dempster. • "Promotes well-defined and convenient vehicular site access while minimizing the impact on traffic congestion." o Site access to the campus will be clear and well-defined. Primary access, including access for all in -bound 18-wheelers, is proposed off Linneman Road via a full access entrance and exit with manned security booths and gates. Emergency vehicle -only access will be provided from driveways on Algonquin and Dempster with emergency gates. As borne out by the data in the Traffic Study, data centers are relatively low generators of traffic. • "Promotes walkability by including streetscape that is accessible for all users and provides safe connections through parking lots, to adjacent uses, bus stops, recreational amenities and neighborhood centers that are within walking distance." 2 4935-7536-3955.v3 o Public sidewalks will be constructed on all three sides of the Property, which will connect pedestrians to the retail uses at the intersection of Algonquin, Dempster and Busse and to Kopp Park and the trail within the ComEd right of way adjacent to Kopp Park. In addition, the development will provide direct or indirect pedestrian connections to several Pace bus stops, including Route 230 running southbound along Linneman and Route 606 running eastbound/ westbound along Algonquin. A bus shelter will be installed at the corner of Algonquin and Linneman. In addition to the Comprehensive Plan, the Village's "Connect South MP" plan (identified as "a cohesive planning document for South Mount Prospect") (the "South Mount Prospect Plan") assesses the development opportunities for the Property. The proposed development is consistent with several goals articulated in the South Mount Prospect Plan, including: • The Subject Property is identified as an "opportunity site" in fact, "South Mount Prospect's largest opportunity site," recognizing that it is "considerably underutilized" since United Airlines relocated its headquarters in 2009. (See South Mount Prospect Plan, p. 53). The South Mount Prospect Pan states that, "Should redevelopment occur, warehousing or an industrial park is recommended." The proposed Data Center Campus is an industrial park, adding significantly to the property tax base and creating good jobs, but without bringing the traffic congestion that could result from a traditional industrial park or warehousing facility. • "Increase employment opportunities in South Mount Prospect to meet the needs of existing and future residents." (See South Mount Prospect Plan, p. 59, Objective 7.1.3). As discussed in the Economic Impact Analysis, the Data Center Campus is projected to generate 225-450 permanent jobs once fully developed, approximately 80% of which will be skilled professional jobs. As identified in the South Mount Prospect Plan, existing top employers in South Mount Prospect have approximately 100-150 employees. (See South Mount Prospect Plan, p. 50). • "Expand the tax base by attracting new business to locate in South Mount Prospect." (See South Mount Prospect Plan, p. 59, Objective 7.2.1). The Data Center Campus will be a significant investment in redevelopment of the former United Airlines site, which will greatly enhance the Village's property tax base and utility tax revenues. CHQ has submitted a separate "Economic Impact Analysis" for the Project. ® The proposed planned unitis in the publicinterest and is consistentipurposes of this i ri . The proposed development presents an opportunity for the Village to replace a vacated corporate campus property with a comprehensive redevelopment of the entire approximately 50-acre site. The proposed development is consistent with the purposes of the Village Zoning Ordinance, including the purposes of the 1-1 zoning district, where data centers are a permitted use. In 2022, the Village approved an ordinance granting a conditional use for a final PUD for a data center campus on the Property (the "Final PUD Ordinance"). The current application seeks an amendment to the Final PUD Ordinance to approve amended plans ("Amended Plans") for a data center campus that will better meet current market demands and customer needs. The Amended Plans for the Project will serve the public interest by addressing the changing needs of business and the national and local economies, bringing redevelopment and economic growth to a target opportunity site in south Mount Prospect, and significantly enhancing the Village's tax base. CHQ expects the Project to generate new construction and permanent jobs, including skilled professional jobs, and substantial new property and utility taxes. CHQ has submitted a separate "Economic Impact Analysis" for the Project. 3 4935-7536-3955.v3 In general, data centers have minimal impact on municipal services. As detailed in CHQ's Traffic Study, the Project will generate significantly lower traffic volumes than other potential uses in the 1-1 zoning district, such as warehousing and distribution facilities. The Project will not require the Village to expend funds on public infrastructure and will not meaningfully increase the demand on the Village's fire protection or police services. Also, the Project will generate new tax revenues without a significant population increase. In conjunction with its approval of the original PUD, the Village Board of Trustees approved a resolution supporting a Cook County 6b Property Tax Incentive for this Project, which will be necessary in light of the substantial investment being made. designed4. The streets have been ® Inconvenient or unsafe access to the planned unit; ® Traffic congestionin the streetsi j in the planned unit development, c. An excessive burden on public parks, recreation areas, schools, and other public facilities which serve or are proposed to serve the planned unit development. The proposed development will not include any new streets. The Data Center Campus will be a secured facility, with primary vehicular access provided via the main entrance on Linneman Road. Additional access points for emergency vehicles only will be provided on Dempster and Algonquin. As demonstrated by the Traffic Study, data centers are relatively low generators of traffic, and the proposed access improvements will provide safe and efficient access to the development. Planned Unit Development Exceptions: CHQ requests approval of the following zoning and subdivision exceptions as part of the PUD approval, pursuant to 14.504(C) of the Zoning Code: Exceptions from the Zoning Code: a. An exception from Section 14.305(B)(1) to permit an increase in the maximum number of ground mounted antenna towers or dishes located on a zoning lot from one to more than one. b. An exception from Section 14.306(A)(3)(b) to permit an increase in the maximum height of accessory structures in the 1-1 zoning district from twenty feet (20') to: Fifty-five feet (55-0") for the acoustical screen; ii. Not to exceed sixty feet (60'-0") for the above -ground TES tanks; III. Not to exceed thirty feet (30'-0") for the non -occupied GIS-control enclosure in the switchgear yard. c. An exception from Section 14.306(A)(5) to permit an increase in the maximum number of accessory structures from two accessory structures to ten (10) fuel polishing sheds and twelve (12) screened thermal energy storage tanks. d. An exception from Section 14.309(A)(2) to allow temporary trailers or facilities to be located within the applicable setback requirements of the zoning ordinance. e. An exception from Section 14.318(B)(7)(a) to permit an increase in the maximum height of a fence permitted in the 1-1 zoning district from eight feet (8'-0") to fifty-five feet (55'-0") for the mechanical yard screening structure. 4 4935-7536-3955.v3 f. An exception from Section 14.318(B)(7)(a) to permit an increase in the maximum height of a fence permitted in the 1-1 zoning district from eight feet (8'-0") to ten feet (10'-0") for perimeter security fencing. g. An exception from Section 14.318(B)(7)(a) to permit an increase in the maximum height of a fence permitted in the 1-1 zoning district from eight feet (8'-0") to fifteen feet (15-0") for a solid style screening fence on the north and west sides of substation #2 (Lot 5). h. An exception from Section 14.318(C)(2) to permit the barbed wire on top of the internal substation #2 fence to extend outward of the Property (Lot 5). i. An exception from Section 14.2104 (C) to permit an increase in the maximum building height from fifty feet (50'-0") to eighty-five feet (85) to parapet (60' to parapet of administrative blocks); penthouse to one hundred nine feet (109'); and mechanicals to one hundred twenty- one feet (121') for ORD1 and one hundred thirty-eight feet (138') for ORD2. j. An exception from Section 14.2206(E)(1)(a) to permit parking lot setbacks of less than 10 feet (10') from the property line. k. An exception from Section 14.2304 (13)(2) to permit a 43%/57% ratio of evergreen shrubs to deciduous shrubs. I. An exception from Section 14.2306(B) to waive the perimeter landscaping requirements as illustrated in the proposed landscape plans. m. An exception from Section 14.2307 to waive the foundation landscaping requirements as illustrated in the proposed landscape plans. n. An exception from 14.504(C)(5)(d) to permit a reduction in the area of open space within the PUD from 25% (as required in the underlying 1-1 zoning district) to 18%. o. An exception from Section 14.2104(D) to permit an increase in the maximum lot coverage requirement in the 1-1 zoning district from 75% to 82%. p. An exception from Section 14.2104(B) to permit a reduction in the minimum side yard requirement from fifteen feet (15') to zero feet (0') for the lot line between Lots 1 and 2. q. An exception from Section 14.2104(E) to permit a reduction in the minimum transitional setback requirement for parking lots from forty feet (40') to 17.8 feet along Dempster Street. r. An exception from Section 14.2207 to permit development of the Project with a total of 365 off-street parking spaces (including 12 accessible spaces and 16 EV spaces). s. Any other Zoning Code exceptions required to permit development of the Property with the Project as depicted on the approved final PUD plans. Exceptions from the Subdivision Code: a. An exception from Section 15.305(B)(2) to allow access to the arterial street for corner lots abutting an arterial street. Lots 1 and 2 each have an emergency access driveway on Algonquin Road, and Lot 3 has an emergency access driveway on Dempster Street. b. An exception from Section 15.305(B)(6) to allow the depth -to -width ratio to exceed two and one-half to one (2.5:1) for Lot 4 (irregularly shaped) and Lot 5 (ratio is approximately 3.07:1). c. Any other Subdivision Code exceptions required to permit development of the Property with the Project as depicted on the approved final PUD plans. Standards for Exceptions Approved in a Planned Unit Development: The Project complies with the "Standards for Planned Unit Developments with Other Exceptions" under 5 4935-7536-3955.v3 Section 14.504(C) of the Village's Zoning Code, as follows: reduction in the requirements of thi t is in the publicinterest. The requested exceptions are necessary and appropriate for the development of an emerging use that is vital to the continued growth of the local and national economies. The Project will serve the public interest by addressing changing business and economic needs, bringing redevelopment, quality jobs, and economic growth to a target opportunity site, and significantly enhancing the Village's tax base. ® The proposed exceptionst adversely impact tt property. The exceptions as a whole will not adversely impact the value or use of any other property. The development is a light industrial use, within an area already zoned 1-1 and will be surrounded on three sides by other industrial uses. While the exceptions allow a greater building height, the portion of the northern Building 2 that is closest to residential uses will be only 10 feet taller (including parapet wall) than the otherwise permitted height and will be separated from the closest residential buildings on the north side of Dempster Street by the length of a football field. As such, the height exception will not adversely impact the value of the residential properties to the north. ® Such exceptionsthe purposepromoting better iwill be beneficial to the residentsthe planned unit development as well as those surrounding i . The exceptions requested by CHQ are necessary for the Project to be developed in a functional and cohesive manner that meets the needs of the market and end users. The Property is currently a large vacant site, and its redevelopment with a state-of-the-art facility will be beneficial to surrounding properties and the community as a whole. ® In residentialit developments the maximumi it r shall not exceed forty eight (48) units per acre for developmentsincorporating i t housing or assisted livingi iti . Not applicable. 5. All buildings are to be located within the planned unit development in such a way as to dissipate any adverse impact on adjoining buildings and shall not invade the privacy of the occupants of such buildings and shall conform to the following: ® The front, sider yard setbacks on the perimeter of the development shall not be less than that required in the abuttingi itit(s) or the zoning districti j t site,whichever is greater. The proposed development complies with all applicable perimeter front, side, and rear yard setback requirements. ® All transitionaltransitional r ing zoning district compliedit . CHQ is requesting an exception from the transitional yard requirement along Dempster Street. The Property is irregular in shape; specifically, the angles of Algonquin Road and Dempster Street and the United Airlines in -holding at the northwest corner of the Property create angles and configurations that diminish the Property's otherwise buildable area. This creates unique and specific challenges in the design and configuration of the improvements required to develop a data center campus that meets 6 4935-7536-3955.v3 current market demands, including size and capacity of the facilities. The Project includes extensive landscaping and screening, which is focused on the perimeter of the Property, and particularly the northern yard adjacent to Dempster Street, which mitigates any potential adverse impacts on residential properties on the north side of Dempster. Although the width of a portion of the northern transition yard is reduced due to the angle of Dempster, the yard includes a continuous evergreen hedge and other new plantings, as well as existing mature trees, that provide appropriate screening and buffering. C. If required transitional yards and transitional landscape yards are not adequate to protect the privacy and enjoyment of property adjacent to the development, the Planning and Zoning Commission shall recommend either or both of the following requirements: All structures located on the perimeter of the planned unit development must be set back by a privacydistance sufficient to protect the and amenity of adjacent existinq uses; ii® All structuresthe entireri t r of the planned unitt must be permanently reened with sightproofscreening in a manner which is sufficientrprivacy and amenity of adjacent existing For the reasons stated throughout CHQ's Application, the proposed transitional yards, landscaping plan, and screening measures are adequate to protect the privacy and enjoyment of adjacent properties. Building 2 is the only Data Center Building adjacent to residential uses. As shown in the cross-section plan included in the application, its height is mitigated by (i) its distance (over 313 feet) from the closest residential buildings on the north side of Dempster Street and (ii) its placement, so that the shorter, two- story "administrative block," with a height of only 60 feet (to parapet), faces Dempster Street, pushing the tallest portion of Building 2 back even further from the closest residential buildings. Building 1 is not adjacent to residential uses, but instead is adjacent to primarily industrial uses on the east, south, and west. Accessory structures and equipment are located in the interior portions of the site, and appropriate visual and acoustical screening measures are provided. ® The areaprovided in a planned unit development shall be at least thatrequired i the underlyingi i ri CHQ is requesting an exception to reduce the required area of open space from 25% (required by the LI District) to 18%. As compared to traditional industrial uses, data centers must be sized to meet escalating market demands, and the facilities require significant accessory structures and equipment for functionality and security, which cannot be provided under the current lot coverage limits. Significantly, to meet current market capacity demands, it is necessary to install a second electrical substation with accessory improvements that satisfy ComEd requirements. This is a unique need for data center development, which is not generally applicable to other properties or uses within the same zoning classification. Conditional Use Standards: The Project also complies with the standards for "Conditional Uses" under Section 14.203(F)(8) of the Village's Zoning Code, as follows: No conditional c for approval by the planningi commission unless i finds- 7 4935-7536-3955.v3 1. That the establishment, maintenance, or operationf the conditionali t be detrimentalr endanger the ihealth,, or general welfare. For the reasons stated throughout this Application, the conditional use (PUD for Data Center Campus) will not be detrimental to, or endanger the public health, safety, morals, comfort, or general welfare. In 2022, the Village previously approved the Final PUD Ordinance for a data center campus on the Property. The requested PUD amendment will modify the size and configuration of the proposed data center buildings and related improvements, but these changes will not adversely impact public health, safety, or welfare. 2. That the conditional use will not be injurious to the uses and enjoyment of other property in the immediate vicinity for the purposes already permitted, nor substantially diminish and impair property values within the neighborhood in which it is to be located. The conditional use will not adversely impact the value or use of any other property. The development is a light industrial use, within an area already zoned 1-1 and will be surrounded on three sides by other industrial uses. Building 2 will be separated from the closest residential buildings on the north side of Dempster Street by over 313 feet. Data centers are a permitted use in the underlying 1-1 zoning district, and the Village previously approved data center development for this site. For these reasons, the conditional use will not adversely impact the property values within the neighborhood. ® That the establishmentthe conditionali t impede the normal and orderly development and improvement of the surroundingr r uses permittedin the district. The surrounding property in the 1-1 district is already developed, so the conditional use will not impede the development of that surrounding property. In addition, even if those surrounding parcels are to be redeveloped, the proposed conditional use is self-contained within the Property. It will generate a relatively low volume of traffic. The Project satisfies all perimeter building setbacks and includes appropriate screening and buffering. As such, the conditional use also will not impede any redevelopment of the surrounding property for uses permitted in the 1-1 district. ® That adequate publicutilities, access roads,r ifacilities r will provided. Adequate utilities, roads, drainage, and other facilities are already in place or will be installed by CHQ. ® That adequatei taken to provideingress and egress so designedt minimize traffic i in the publicstreets. As established by CHQ's proposed plans and the Traffic Study, the proposed ingresses and egresses to and from the development will have a relatively minimal incremental impact on traffic congestion. ® That the proposed conditionalis not contraryobjectives rr Comprehensive for the Village. As stated in response to PUD Standard #2, the conditional use is consistent with the objectives of the Village's Comprehensive Plan. conform7. That the conditional use shall, in all other respects, the recommendations of the Planning & Zoning Commission. I district in which it is located, except as such regulations may, in each instance, be modified pursuant t 4935-7536-3955.v3 Except as modified in the approved PUD, and assuming approval of CHQ's other requested relief, the conditional use will conform to the applicable regulations of the 1-1 zoning district. 4935-7536-3955.v3 Development Schedule • Start date of construction: 11/1/2025 (MWRD early earthwork start) • Two construction phases: o ORD1: Start 11 /1 /25- Complete 3/31 /27 o ORD2: Start June 2029- Complete December 2030 13 Lj IV Olt 13 41 13 o 13 o =No t"I lk 49 IN ilDODO k pt" M 0 13% 0 40 W 116 604 13 Ab- mi- 10 0 + IF -0110010- q RIJN no I'M I I j WI A,1111 I I" J '; I e/ g U*4406 30AMM &OKWbwi�6 1MIR 111 -w"s a 13 0 0 1k 4p A S� qA 10 sip 0111 1 ® 6 + Q 4F a M" 0 9 Q 0 0, 0 -4 13 am 0+0 M+ 111 bill 0 9 ]rlq 'aid mniDNOOIV'3 COU sndY4VO A00110INH03i 103dSONd INnon MENNEN r4 pi %F P lit Ise 4L o. IMINNIM i&A %; X 1w, " F. j I PARCEL 1: LOT 1 IN FRI EDRICH BUSSE, J R. DIVISION OF LAND IN SECTION 23, TOWNSHIP 41 NORTH, RANGE 11, EAST OF THE THIRD PRINCIPAL MERIDIAN, ACCORDING TO THE PLAT THEREOF RECORDED FEBRUARY 20, 1911 AS DOCUMENT NO.4709799, EXCEPT (A) THAT PART OF SAID LOT 1 TAKEN FOR HIGHWAYS, AND (B) THAT PART FALLING IN BLUE SKY SUBDIVISION ACCORDING TO THE PLAT THEREOF RECORDED JUNE 51 2014 AS DOCUMENT NO. 1415616048, (C)THAT PART DESCRIBED AS FOLLOWS: BEGINNING AT A POINT ON THE EAST LINE OF SAID LOT 1 THAT IS 50 FEET SOUTH OF THE NORTHEAST CORNER OF SAID LOT 1; THENCE SOUTH 00 DEGREES 46 MINUTES 07 SECONDS EAST ALONG THE EAST LINE OF SAID LOT 1 FOR 40.01 FEET; THENCE NORTH 46 DEGREES 15 MINUTES 15 SECONDS WEST FOR 56.10 FEETTO A LINE 50.00 FEET SOUTH OF AN D PARALLEL WITH THE NORTH LINE OF SAID LOT 1; THENCE NORTH 88 DEGREES 15 MINUTES 36 SECONDS EAST FOR 40.01 FEET TO THE POINT OF BEGINNING, (D)THAT PART DESCRIBED AS FOLLOWS: BEGINNING AT POINT ON THE EAST LINE OF SAID LOT 1 THAT IS ON THE NORTH LINE OF ALGONQUIN ROAD; THENCE NORTH 63 DEGREES 23 MINUTES 45 SECONDS WEST ALONG THE NORTH LINE OF SAID ALGONQUI N ROAD FOR 28.30 FEET; THENCE NORTH 71 DEGREES 35 MINUTES 52 SECONDS EAST FOR 26.37 FEETTO THE WEST RIGHT OF WAY LINE OF LINNEMAN ROAD; THENCE SOUTH 00 DEGREES 46 MINUTES 07 SECONDS EAST FOR 21.00 FEETTO THE POINT OF BEGINNING, IN COOK COUNTY, ILLINOIS. PARCEL2: THE WEST 363.00 FEET OF LOT 2 IN LI N N EMAN'S DIVISION OF PART OF TH E NORTHEAST 1/4 OF SECTION 23, TOWNSHIP 41 NORTH RANGE 11 EAST OF THE THIRD PRINCIPAL MERIDIAN, AND PART OF THE SOUTHEAST 1/4 OF SECTION 14, TOWNSHIP 41 NORTH, RANGE 11 EAST OF THE THIRD PRINCIPAL MERIDIAN, ACCORDING TO THE PLAT THEREOF RECORDED SEPTEMBER 10, 1953 AS DOCUMENT NO. 15716544, EXCEPT THAT PART DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHWEST CORNER OF SAID LOT 2; THENCE NORTH 88 DEGREES 20 MINUTES 07 SECONDS EASTALONG THE NORTH LINE OF SAID LOT 2 FOR 25.00: THENCE SOUTH 43 DEGREES 47 MINUTES 00 SECONDS WEST FOR 35.63 FEETTO THE WEST LINE OF SAID LOT 2; THENCE NORTH 00 DEGREES 46 MINUTES 07 SECONDS WEST FOR 25.00 FEETTO THE POINT OF BEGINNING, IN COOK COUNTY, ILLINOIS. PARCEL3: THE NORTH 120.00 FEET OF THE WEST 363.00 FEET OF LOT 3 IN LI N N EMAN'S DIVISION OF PART OF THE NORTHEAST 1/4 OF SECTION 23, TOWNSHIP 41 NORTH, RANGE 11 EAST OF THE THIRD PRINCIPAL MERIDIAN, AND PART OF THE SOUTHEAST 1/4 OF SECTION 14, TOWNSHIP 41 NORTH, RANGE 11 EAST OF THE THIRD PRINCIPAL MERIDIAN, ACCORDING TO THE PLAT THEREOF RECORDED SEPTEM BER 10, 1953 AS DOCUMENT NO. 15716544) IN COOK COUNTY, I LLI NOIS. October 24, 2025 Jason C . Shallcro s s, AICP, CEcD Director of Community & Economic Development Village of Mount Prospect 50 S. Emerson Street Mount Prospect, IL 60056 Via email: jshallcrosskmountprospect.org Dear Mr. Shallcross, On October 23, 2025, the Village's Planning & Zoning Commission ("PZC") recommended approval of a final planned unit development for Mount Prospect Technology Campus by a vote (the "PUD"). The special use ordinance approving the PUD is scheduled to go before the Village Board of Trustees for the ordinance's first reading on October 28, 2025. We are requesting that the Village Board waive the second reading and take final action at its October 28, 2025 meeting. The reason for this request is that Tur Ventures LLC is ready to promptly increase its development activities on the site and wants to ensure that it has the final PUD approval before doing so. I appreciate your assistance in facilitating this request. Should you have any questions, feel free to contact me at 571-447-7255 or by email at urn . . Sincerely, Brett Burnette CloudHQ 1212 New York Avenue, NW, Suite 100 Washington, DC 20005 17800\00001 \4891-8176-4869.v2 1 Thunder Hearing & Sound, LLC 847 South Randall Road, #218 Elgin, IL 60123 855-566-7488 www.ThunderHearing.com Updated Sound Assessment of Cloud HQ Data Center October 16th, 2025 Prepared for: Gewalt Hamilton Associates, Inc. — Vernon Hills, IL Thunder Hearing and Sound examined the noise emissions expected from the operation of two data centers planned for the southwest corner of Dempster Street and South Linneman Road in Mt. Prospect, Illinois. The study was needed because the operation of adiabatic dry coolers and generators associated with these data centers has the potential to radiate excessive noise into the community. Adiabatic dry coolers will be installed in a mechanical equipment yard of ORD1 and on the rooftop of ORD2 to provide cooling for the servers and related electronic equipment. This equipment will operate continuously for 24 hours, 7 days a week, as the data storage systems and servers require uninterrupted operation. To ensure continuous operation in the event of a power failure, diesel generators will be on standby to provide emergency backup power. While an emergency operation would be rare, generators will be cycled individually for short periods throughout the year to ensure they will operate reliably when needed. To conduct an environmental noise assessment for this project, we identified the applicable city noise code, conducted a site inspection, assessed the ambient background noise, reviewed sound emissions data for the adiabatic dry coolers and generators, performed a propagation analysis of the noise from these sources to nearby receivers, and configured acoustical treatment necessary to meet the noise code. A preliminary report was issued on 10/5/2021 that presented an assessment of chiller noise for the building on Dempster Avenue. An updated report was provided on 11/12/2021 that included all three buildings and a noise emissions assessment of the diesel generators. A comprehensive report was issued on 12/1/2021 that included a full sound assessment based on the noise controls needed to meet the Village noise code and to respond to staff questions and concerns. These reports were issued by our sister company Acoustic Associates, Ltd. The present report was generated based on changes to the building designs, most notably a shift to two buildings, with the larger one (ORD1) moving equipment to a mechanical yard and the smaller building (ORD2) with different equipment on the roof than what was in the previous studies. Both buildings have generator rooms on the roof. Addtionaly, some equipment quanties have changes since the modeling was completed on October 2nd. These changes were minor and result in no changes to the expected inpact. See the "October 16th Update" section at the end of this report for more information. Thunder Hearing &Sound, LLC (an affiliate of Acoustic Associates, LLC) Page 1 The Village of Mt. Prospect has performance standards for industrial districts that are published in Article XXI, I-1 Limited Industrial Districts. Section, 14.2104(G)(1). In part, it states: "Noise Limitations: No industrial activity shall generate noise across any residential or business zoning district boundary line in excess of the levels shown in Table 1 of this section, nor shall exceed seventy-one (71) dBA when measured on the A -weighted scale." Specifically, Table 1 of the Village noise code sets decibel limits at each of ten octave -band frequencies from 16 Hz to 16,000 Hz, the range of human hearing. When no particular octave - band frequency dominates the sound spectrum, such as a tonal noise, these limits can be logarithmically summed to establish a single -number, overall noise level limit. Based on this calculation, the equivalent limit for noise radiating to residential properties is 56 dBA during the daytime hours and 52 dBA during the nighttime hours (10:00 PM to 8:00 AM). The Village's maximum sound level for emergency operation is 71 dBA. For reference, the State of Illinois limits noise radiated from industrial land to residential land to an equivalent of 61 dBA during the day and 51 dBA during the night from 10:00 PM to 7:00 AM. Regardless of the absolute noise level limits given in local or state noise codes, assessing the existing ambient noise is a critical element in preparing an environmental noise impact statement. Such data not only helps to identify if the regulatory code limits are reasonable, but when the projected sound levels are compared to the existing ambient noise levels, the impact of the noise can be evaluated. To assess the current ambient noise, we conducted a site visit on Thursday, October 21, 2021, where we inspected the site, examined the surrounding area, and set up professional -grade equipment to produce an audio recording of the ambient noise. The equipment was set up on the west side of the United Airlines building, about 200 feet from Dempster Street. The recording ran for 24 hours and was analyzed in our lab to determine the 1-minute and 10- minute time -averaged levels (called equivalent levels or Legs). Figure 1 shows the ambient noise over the 24-hour period. When the recording was auditioned, we noted that airplanes flew over the site during the night. Google Earth shows that O'Hare Airport is about 3 miles to the southeast and that the site is in line with two of its runways. By listening to the recording, we also heard lawn mowing equipment operating during the day. Finally, we noted that a helicopter hovered over the site for a short period around 9:30 AM on Friday. After we removed the extraneous noise of the mower and the helicopter from the data, the calculated daytime ambient Leq was 57 dBA. The nighttime ambient Leq (10:00 PM to 8:00 AM) was 54 dBA. These day and night sound levels compare well with the typical sound levels given in ANSI Standard 12.9, "Quantities and Procedure for Description and Measurement of Environmental Sound" for a densely populated suburban residential area. Specifically, ANSI indicates that a Thunder Hearing &Sound, LLC (an affiliate of Acoustic Associates, LLC). Page 2 typical daytime ambient Leq in such a populated area is about 55 dBA, while a typical nighttime Leq is about 49 dBA - without airplanes. Since the ANSI estimated ambient levels and the measured ambient levels are comparable to the Village's daytime and nighttime limits of 56 dBA and 52 dBA, respectively, the Mount Prospect limits should be considered reasonable limits to protect the health and safety of the residents in the community. 94 Lawn mower Leq (1 ) Daytime ( - io Pm) Leq- 57 dBA i (Excludes lawn mower and helicopter) Leq 10 mein) Ct Nighttime (0 P- 8 AM) Leq. 54 dBA Helicopter Hovering ,let Airplanes (Tp)Village Daytime 70 r U_ Noise Limit: 56 dBA r I V 7 l f Jw,w,w,w,w,w,w,w,w,w,w,w +wwwC ,,; i ,ri l f r 60 ]��4�d��Ci � 1 , � i I / ll l { >�. �;� �, ' � I ,"jul r �/ ii l � r 50 Dishwasher , i/1 ✓i Jr a , 1 , /i„ /i f r i f I Noise Limit: 52 dB 4� mtr��+r�ta� Location: West side of UAL parking lot 200t ram_ Dempster. :.......:w .......::.......: ......:w .......::........: ......:w .......::.......: ......:w .......::......... Nighttime httimwrme Hours per Village of Mt. Prospect ,. ......, f 1 G �r T Y T _T W ---- T 11 r V V w ........ , T -- "`T-11 1 ........I 101, 1 Thursday, Oct 21, 2021 Time of pay in H ►urs:Minutes Figure Ambient .se levels measured over a 24-hour weekday period . y &bT_'4=q 1, Cooling Equipment Sound Emissions Several different types of cooling units are now planned for this project: • ORD1 also uses ninety-six (96) dry cooler units, divided among four sectors in groups of twenty-four, located in the ORD1 mechanical yard. • ORD2 uses thirty (30) dry coolers, located on the rooftop of ORD2. To model the cooling equipment as acoustical sources, we used the sound data provided by KW Mission Critical Engineering. The equipment was tested following the Air -Conditioning, Heating, Thunder Hearing &Sound, LLC (an affiliate of Acoustic Associates, LLC). Page 3 and Refrigeration Institute (AHRI) Standard 370, "Sound Performance Rating of Large Air-cooled Outdoor Refrigeration and Air-conditioning Equipment." This data is expressed in terms of the equipment's sound power levels (that is, the sound energy radiated from the equipment), not its sound pressure level (as measured with a conventional sound level meter or heard with the human ear). See the sidebar for a more detailed explanation. Some data was supplied as sound pressure levels, with measurement positions. When this type of information was provided, we used it to calculate the sound power level for use in our modeling software. Based on the BAC Trillium Series Adiabatics Dry Cooler model, and the 51% fan speed "energy saving mode", the dry coolers (for ORD1) generate 97 dBA of sound power (dB ref 1 pW) per unit (1 unit has 4 fans). Based on the "Ultra Low Noise" model, the eco-Air Titian Coolers (for ORD2) generate 109 dBA of sound power (dB ref 1 pW) per unit (1 unit has 4 fans). Table 1 of Appendix A gives the sound data for each octave band frequency. Data given for each frequency band is necessary since the propagation of sound depends on the environmental factors listed in the sidebar, which are frequency -dependent. Generator Sound Emissions Because sound power and sound pressure both use the decibel (de) scale, they are often confused. Sound power is the energy radiated from a source, like the "wattage" of a light bulb. Sound pressure, however, is the effect that that energy has on a sound level meter or a person's ears after it has traveled to the receiver. For example, a 100 dB sound power source will emit the same sound power regardless of where it is located. However, the loudness of the sound -and its sound pressure level - depends on how far the listener is from the source. In addition to distance, the sound pressure level also depends on environmental factors such as atmospheric absorption, ground effects, diffraction around buildings, and reflections off large structures. One hundred and thirty-six (136) diesel -driven generators, divided among four sectors, are planned for the ORD1 data center building and are to be located in penthouses on the roof, on two sides of the building. Additionally, eight (8) Tomball Controls enclosed diesel -driven generators, divided among four sectors, are to be located on the roof of ORD1. Fifty-three (53) diesel -driven generators are planned for ORD2, also located in penthouses on the roof, along two sides of the building. The sound emissions data for the generators are given in Table 1 of Appendix A. The total A -weighted sound power level of the mechanical part of the 4-megawatt (MW) generator is 127 dBA; the intake side of the 3-megawatt (MW) Tomball Controls enclosed generator, with 3 dB of sound treatment is 114 dBA; and the mechanical part of the 3- megawatt (MW) generator is 125 dBA. The sound emissions for the radiators are 118 dBA. Thunder Hearing &Sound, LLC (an affiliate of Acoustic Associates, LLC). Page 4 The noise from each engine exhaust will pass upwards through the exhaust piping, which will emerge from the roof of the penthouse. The noise emissions data for the engine exhaust are given in Table 1 of Appendix A. The unsilenced exhaust noise is rated at a sound power level of 131 dBA (4 MW) and 130 dBA (3 MW). However, a "hospital -grade" silencer is planned that will provide about 33-39 dB of attenuation in the mid -frequency range. Therefore, the sound power, calculated by octave band, of the treated exhaust noise is 95 dBA (4 MW) and 92 dBA (3 MW). While there are a total of 197 generators, the only condition under which all these units would operate at the same time would be during a power outage. However, groups of generators would run intermittently for short periods for a few weeks before the building is occupied. This is to program and test the units to ensure they will operate as intended. After the pre -occupancy test phase, only one or two generators in each building/quadrant would run at a time for routine testing. When tested, they run for short periods, totaling 5-8 hours per year. In our modeling, we configured one generator running per building/quadrant, plus one Tomball Controls enclosed generator, for 15 minutes in any given hour. Note that this testing would only occur during the daytime hours of 9:00 AM to 5:00 PM and only during the weekdays. In the rare instance when power is lost, all the generators would need to run. This, of course, would significantly increase the noise level. The noise generated from this emergency situation is addressed below. Preliminary modeling indicated that mitigation would be necessary to meet the Village noise code for both the daytime (56 dBA) and nighttime (52 dBA) periods and to meet the 71 dBA maximum level during a power outage. Our acoustical mitigation plan is presented below. Acoustical Louvered Screen Wall (Industrial Acoustics Company SL-12) — is planned for the mechanical yard of ORD1. This 12" thick louvered wall will extend from ground level to 55 ft tall. Rooftop Noise Barrier (Noise Barriers HP-38) Panels —are planned for the rooftop of ORD1 and ORD2. A 28 ft tall metal panel wall system is planned that will extend from the penthouse on one side of the data center to the penthouse on the other side. These will be on the west side of ORD1 and the east &west sides of ORD2. Titan Cooler Noise Barrier (Noise Barriers HP-38) Panels —are planned for the cooler discharge of ORD2. This metal panel wall system will create achimney-like structure to reduce noise from the Titan coolers. This panel includes an acoustically absorptive side to dissipate Thunder Hearing &Sound, LLC (an affiliate of Acoustic Associates, LLC). Page 5 sound energy as it travels upward. To ensure good airflow to the coolers, this structure will start at 7 ft less than the top of the penthouse roof and then extend up 66 ft tall. Hospital Grade Silencers —are planned for the exhaust pipes of the diesel engines for the generators. This class of silencer offers the highest performance for diesel engine exhausts. Specifically, the silencers will provide 33-39 dB of sound attenuation for the noise radiated from the engine exhaust pipes. Parallel Baffle Silencers (Kinetics Noise Control) —are planned for the discharge air from each radiator fan. The discharge chute of these fans will be connected to the wall system to ensure this noise is radiated through the silencers, not around them. The same silencers are planned for the intake side of the room. The sizes vary in length from 3 ft, 5ft, or 7ft. Absorption Panels (Noise Barriers Quietperf 4" thick) —are planned for the interior of the generator rooms. These help reduce noise before it exits the room. Substitutions of the above -specified noise mitigation products may be necessary as the project moves forward. If new models have noise reduction values (per octave band) that are equal to or greater than the above -specified units, this is acceptable. To evaluate the propagation of sound from the coolers and generators, we used SounclPLAN, an internationally recognized and sophisticated computer program for generating contours of sound levels radiated into the community surrounding a project. With this software, we built a 3D model to determine how the sound from the chiller units and the generators for each of the buildings would propagate to nearby residential areas. This model incorporates the propagation factors of topography, atmospheric absorption, surface absorption, building reflections, and "acoustic shadows" caused by sound bending around buildings. Based on Google Earth and drone views, we estimated the size and heights of acoustically relevant buildings in the surrounding area and added them to the model. All the equipment was modeled based on the most recent site plans and the details noted in the "Equipment Sound Emissions" section and the sound power values found in Table 1. The accepted practice in preparing an environmental noise assessment is to use the time - averaging metric called the Leq. In fact, the State of Illinois stipulates that the 1-hour time - average (1-hour Leq) be used. While time -averaging does not apply to the coolers since they operate all the time, day and night, it would apply to the generators since a single generator in each building would run for only % of an hour at a time. At this reduced duration, the 1-hour Leq would be 6 dB less than if it ran for a full hour. This time -averaging is consistent with the impact of noise on humans and was used in our software modeling. Thunder Hearing &Sound, LLC (an affiliate of Acoustic Associates, LLC). Page 6 In an emergency where power is lost, all of the generators would need to run. This would, of course, significantly increase the noise level. The acoustical mitigation for this project was planned to limit the noise to the Village's maximum sound limit of 71 dBA. For reference, this is the loudness of a vacuum cleaner. If residents were inside their homes when such an emergency occurred, the indoor sound level with the windows partially open would be about 51-56 dBA. This is a level lower than normal conversation. Three noise contour plots were generated and are shown below (larger figures are included in the appendix of this report). Figure 2 is for the daytime noise levels, which reflect the constant noise of the coolers and a single generator per building/sector, plus one Tomball Controls enclosed generator, undergoing a 15-minute test. Figure 3 is for the nighttime noise, which reflects cooling equipment operation only. Figure 4 is for an emergency condition when there is a power outage. This reflects all the equipment running, including all the generators. Figure 2 — Audibility level contours for the daytime Thunder Hearing &Sound, LLC (an affiliate of Acoustic Associates, LLC). Page 7 Figure 3 —Audibility level contours for the nighttime wr 1 emergency Thunder Hearing &Sound, LLC (an affiliate of Acoustic Associates, LLC). Page 8 The blue circles in Figures 2-4 show the location number for nine residential locations, including the Birch Manor Condo residential buildings to the north, the Pickwick Apartments to the northeast, Meyers Place to the west, and the Crystal Towers complex to the southwest. Table 2 of Appendix A includes these sound levels. The sound levels given in this table represent the sound levels predicted at the marked location at 5%2 feet off the ground. As seen in Figure 2, the predicted daytime sound levels at the nine residential property lines are all below the Village daytime limit of 56 dBA (shown with a blue dashed line). Figure 3 shows that the predicted nighttime levels are all below the Village's nighttime limit of 52 dBA (shown by a blue dashed line). Finally, Figure 4 shows that during a power outage, the sound levels at the residential locations are all below the Village's maximum limit of 71 dBA (shown by a red dashed line). Additional figures are attached in the appendix showing sound levels before ORD2 is constructed. All these levels are lower and also meet the villages sound level limits. October 161h. Several equipment quantities have been updated since the modeling and calculations for this report were completed. However, these changes will only be minor. Table 3 summarizes the changes and lists the expected change in noise level. For reference, in a lab setting, the smallest change detectable by the human ear is 1 dB. In real world settings, the smallest detectable change would be even higher. While the figures and numerical values included in this report reflect the equipment quantities on 10/2/2025, based on these new equipment quantities I expect no change to the impacts or conclusions of this report. E111ti U i p�,M e hit QUi,,a hl C h an, 00S, 10 /16/2, 02 4 so u rtd St u dy NA W Ex pvmt,-tbarn ga q ip , ;1,� am itip Quallla,Ijfltv l�ii ft L ev,*II D '.'gym I i 'r .�fi Dry ' Ir i µ 2 31 • D Pllllr� t� rs . +°,0.111,0 D.. rirratw , r s 1112 1116.11110 RD2 i b .� tW Dry Coolets 10 RD2 Pllllgrit i() rs 53 62 0.11117P Table 3 — Equipment Quantity Changes and Associated Sound Level Thunder Hearing &Sound, LLC (an affiliate of Acoustic Associates, LLC). Page 9 Based on our site inspection, our ambient background noise study, our review of the sound emissions data for the coolers and generators, our sound propagation analysis using a sophisticated computer modeling program, and our planned acoustical treatment, the noise from the data centers will meet the Village's daytime and nighttime noise limits for routine operation, and meet the Village's maximum sound level for emergency operation. This is not to say that the noise will be inaudible at all times. For example, when a generator is tested, it would likely be audible to a nearby person. But as the US EPA advocates, to assess the long-term annoyance of a noise source, logarithmic time -averaging must be used in the analysis. And, as noted above, the State of Illinois noise code also stipulates a time average using a one -hour time reference. This was the approach we used. Submitted by: Steve Thunder, BS E Acoustical Engineer Thunder Hearing &Sound, LLC (an affiliate of Acoustic Associates, LLC). Page 10 mo/oo o// p� P Cu m r of y!Q/OO r r %"Oro ww CP o l%! ,� i d ;✓TOrP °ww°ww°ww°ww wimm � a rl i%r oor�io 22 o s u A, III III 10010, r djo a � YI� Q m, aN 0% dr ��a.� ry *MNW 4-0 s � �rrrr fir oJi °rl / iao C r AW&ANA'Affi 149, r rr ,www r V�� moo, M 0 'Cal r Jill Oil µ a err r� iN r OGa r C3 °0 0 ts u r o i/ / MMWwXwh ro MIX riii omr it -61 4.4 IN r 4-4 ,��w�uw tm,� w.... w.„ is ................................. C> 0 C 00 0 0 gpU1 jaAajpunos Ct a Z� db 0/0, - A wffi, ffffff % As"!/I ligm affif Am "g, P, ............... . ..... . Do pq q /4 'WWII uuuuuu AM A wo "Mal, v Alif ON/ IN /fe,........... fffff ct P-� C� ct IN ,111 N, IIA I 6q, All/ md", 77 Wj, �67' IN. gi, M8 POP 1 41" r-n ct Call 0 CA 0 CA CA Q CA Cal CD co Ln 0 ro ci & 6 W A U-1, 00 Vn QA U:� �01 �01 (I, I r- I00 M 09 ol 10 U LA V I 11 H 11 11 111 11 11, 11 tnf Sul (U c cu i i (U cu Ln co -0I V v v v V v V v v v 00 0 of 0, 101 0, 0 0 10 yi � vi, 1r06 r61 1�60�, 1lo4o c 1 -LEtc,wo 21:1 m 0 L-n: rlr-�, o4o c: ca ILEL) >m LU V) J fl fllo IIIIII I %/ � �, . .. .............. a jjl�, I$ all- II ii // r am / JN � 'I,I %j�//%l ! % ,roll.. r uu MI ' Ir of 0� ...... ..... I'll, . ....... ....... ..... . If Tyr -171 ........ . ol�,�// . a m � J/ � >/ ,I r-I cu c� all rd ma volk fil swIr ZIZII-1111-1-111)0,11) /j g!, ia/ 4doill" r lffiff,/// I AZ A 1w," Allyff ARE % A '1131 /All i jv We 7. PIN ct P-� r-n ct 7� 4" Ab dh db F77777", . . . . . . . . . . . . . . k IN //,X/ M 1,01" p/m/o" NN .......... 1, I OR M// -4 Alt -K T 11, 5'r PM, '%fff"o, Nw, ll �/j "MIN F/77/1/ AS olP . . . . . . . . . . ... mlM;.',-l:Tg;, ------------------------------ I'll a r m MINIM wt I maill ct P-� C� ct > 0 0 0 00 0, 0, 0 0 0 0 LO Ml rN Lno 00 t-A kol r- Irl- r%. 00 C jE LA 111 11 1, 1 H 11 1111 111 11 1 Ij 11, V V v v v v v v v v E LLJ 4-P < 0 It (u W, L- -1.4 E Fo, Ln '7o V V v v v v v v v v 00 00 0,10, 0, 0 C) 10 . . . . . . . . . . r*- 0 M L0 al IN� tn' 00 V-1 Rt On Qj, to CD c CO > 101mm o), m > M z Ln ko 0 �01 rll� rl� rll� 00 loo uj fq) OMI, /gll- p-i 0) le I j 4 j :, i 4elIII II 777�77/ 7f- ,,�k uV I . .. .. � ......... ROWN1 ...... . . . I I I ........... it � IIII .... ...... IN II //" i olllllil 11 �::: IIGII�� VI " ,, . CIO rs Nl "fff,", ..... . ....... /-';�,/,/ w o rm Jel'i 14 0 all 4, // � � „ � / y % � N N r AI If II bl rl— ct p-,,I1 C� O O O ct F— x Q) CL CL "IV Ch 0 Oa• 114 N wl N w4 0 W -0 0 E rlv_ M Gi cn w w w w Aw • 4-J -53 S 0 0 ai V) ai kD N 0 m w 7174 rl -1 101, HI E NP 06 0 44 m 717-1 m m 71-4 T-4 M Lh _0 I F4 do 00 th 00 60 0 0 _0 t-- 4-J o 4-J "b rl r14 r14 Lrl 0 01) V) Q) Ln r4 VA r4 wl 4-J -0 XA 0 po 00 m ri m w LJ) rmmml rl I rl r4 rl r4 r4 aj aj (IJ u on on w u,, pa mn m P4 w r,,-,, M 0 N 0 N v#4 cn 0 w4 N ifA N N w4 H ifA =3 E _0 *4 X 0 A 0 N M WD M 6M N M _0 > IWO *4 = N c 014 717-1 Jy _0 Gi 41111111110, > Gi :E41111111110, > In Ira 0 o— V) ai poll LI I.I•Jl: m 0L QI ml _0 Jt 'it Qj > V) :3 tj 6 LrL-j L� ELI V Q V 4-1 I, LIP kq w v r LIP w C� 01% ol CL CL IN fflww�w 4c IM Wjr,- 15 han § rq Ln co Ln Ln V m V F FLb t6% m z V Ln Ln Ln Ln V Ln V Ln 4A m r"�m r"% r"'�m r'% r"'�m r"'�m r"�m r"'�, Au LAM U Jt C: tL CL Ln F4 M— 13—J en W *T W HREMIIFIIEH��Mu IIIIIIIIIIIIIIIIII� lko �u """"0°"'N IN 7 4.00 =[I I III 9 Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois Part I. Introduction and Project Context Gewalt Hamilton Associates, Inc. (GHA) has conducted a Traffic Impact Study for the proposed Mount Prospect Technology Campus (MPTC) development to be constructed at 1200 E Algonquin Road (IL Rte 62) in Mount Prospect, Illinois. The approximately 44-acre site formerly contained the United Airlines Operation Center (OPC). Access to the OPC site was provided via a gated Right-In/Right-Out (RIRO) access on Dempster Street, three full movement (two gated) driveways on South Linneman Road and two full movement access drives on E Algonquin Road, as well cross access to the adjacent parcel to the west which also had full access to both Dempster Street and E Algonquin Road. Cloud HQ proposes to construct two (2) data centers on the site, with multiple floors comprising approximately 2,172,000 square feet of gross floor area. The project also includes the approximately 6-acre parcel at the southeast corner of Dempster Street and Linneman Road. This former remote parking lot for the OPC will be converted to a power substation for the proposed data centers. Controlled access to the substation will utilize the existing northern curb cut on Linneman Road. An additional power substation will be constructed on an approximately 3.5-acre parcel in the northwest corner of the campus. Access to this substation will be at the location of the existing RIRO access on Dempster. Per the June 30, 2025 Preliminary PUD Site Plan prepared by GHA, the two buildings will be arranged on the subject site to strategically share detention and circulation facilities as well as cross access, but are ultimately able to be individually secured. Access for the MPTC will include a new gated emergency only RIRO access on Dempster Street, a new full movement access on Linneman Road, and two new full movement, emergency only, gated accesses on E Algonquin Road. A separate left turn lane is proposed at the Linneman Road access point, which will be the primary point of access for the facility. The following summarizes our findings and provides various recommendations for your consideration. Appendices referenced are in the Technical Addendum at the end of this document. Part II. Background Information Site Location Map and Roadway Inventory Exhibit 1 provides a site location map. The existing traffic operations in the site area are illustrated on Exhibit 2. Appendix A provides a photo inventory of the site vicinity. Pertinent comments to the adjacent roadways include: E Algonquin Road (IL Route 62) • IL Rte 62 is an east -west Minor Arterial under the jurisdiction of the Illinois Department of Transportation (I DOT). • IL Rte 62 provides afive-lane cross section (two through lanes in each direction, with a wide (±16-ft) center lane), with a posted speed limit of 45 miles per hour (mph) in the vicinity of the site. • A dedicated right -turn lane is provided in the westbound direction at its signalized intersection with Linneman Road and at its signalized intersection with Busse Road. • Dedicated left turn lanes are provided within the median eastbound at the unsignalized shared access with the parcel to the west and at the signalized Linneman Road intersection. Note left turns from eastbound IL Rte 62 to northbound Busse Road are prohibited. • Dedicated left turn lanes are provided within the median westbound at the signalized Linneman Road intersection, the 1305 E Algonquin Road east access, and the signalized Busse Road intersection. • IL Rte 62 is designated as a Class II Truck route. • The Annual Average Daily Traffic (AADT), year 2023, on IL Rte 62 was 13,100 vehicles with 1,125 trucks (8.6%). Gewalt Hamilton Associates, Inc. P, I 111 11 - I I I , , , I ool`l/­ Axis, , 11"", I'S'' , I M I ;�/��/lrII/l�, - , 'I, Of ' 1 1 ,,, l//// I I I _1'/1/,'1" � I I 1/11, , , , - ''I l I ,/" " , "// 1 - � , "I'll", I I "I ­ - ,� I I, , , ;��� ,11 � e 0 x ,/-, I I , a ��� ... I lll l I I I I � �a "I'l " I Ill I i IF , /// lo,'/ 2/ "' ll� 11 I '/ 111/12 l/,/, v J g / / / / 11/1 441o, "', 10' / I /,I.J. E// //, , " , C � " , , o I lkanto / CL , ',,',///, � I , ­'/""",/,////,// " I I � I/ � 110OPF I "/,/ `/ - I /�,.V"�"""`��"��/�"�`�"�"""`��""`�"���` I I "Ill' 1C,, %�, I IN , : �11 11 "////",// ,/, 1� �Illl""_ AMINO to 11 :,/,/_ I - I-"/,/ ///'I�/­/A '' ,,, /' , " ,/,/ 17/ 1 ", , " a-, I / v 2!/,�/l 'I'll _"',":l';/, , ""'I"", / g/o 11 " I/ /111 I , I "" N, / / / � ''I'll, , Ig JW �, ''I ,"ll "///,/// / 'I'll/////////'' 'I",111,11,11"', I I ,,, 11 -A I 1­ , " " 11"Il , 0 0 "AIR // j ... ,( C� r/� W , ��I All I "/'/'/' I I ­_ "" " / ,/ " " "':11" I , Ol I_ I l,I/////,` I / IS, / , // "I t . q , ;,! ,,,,, I ME , ,/// , I I fi17/'//1 / 0 ,,,,� I, I / I A "'I'l"' I'll % - "" : " , T_ 11 / A 6, I gi/ I /5 I/ - I - , " S // -ww... � . . .............. /� 'I "/,/, "' 4, 4 �, M s , : - / I, �/, A " , * v a I I / 11 I ", 1/1 o ��,. , 'All"', ON- '),A/','l ,, , I lI`//�_, I "" ",////- ,// . . ...... / , g " , NO "I, I A I i 1 � I- 11 "I I'll, 'al, I at ,is I , ,f 10 / / 0 - , , , "I g � ,//�/, /` Ill 11/d/ I ,///// I / ,/IV / ......... ... I , is ,,, ,,, j /// , '91 . / //// , ", :I/ 11 � , de "I ,///""///, �// Iii IN 12 I I I/ ...... � 1�1 / , I /A "I � ,,, ,/�Ill///// 1, �� 11 is, Mo I it I ,/////// I 1-111",,/, , " ,/ " , , 11"'ll, ///C " " ao/ , /// `��i, Al 'I .... / � " "' _ , I I I i , .. .. 11 �/ �11 "l I I I ­ I ... . ... 1// I /I , - �11/ I_ ,://,// .... /-////////// l��l 7­ !:"­"//"/l " 11 "I �" , , .... , 1­1 I :', lll/ 1i ...... /I "//////////////,/ � , - /, ,�"'_�l�, ", /_11 011 l I , ,,, ,///// _// , ,�,/// `// I I I I 1� ik I ,iq, ii "U.0 / ""I"' 11 11 / f A // =71 , 1111loll I I " , /// / , ,; 1//// lii , , t / I , , ,/ / , ll, �/// §/1" ///�l/"­ ,/ 1 , 11's 'f"I I 1/1, - ... Em /// N� ", I // /./;/�,/ ,R, , /I/ , A ", :", ,//;///�//, ',,///1 !W6W � //// K I Ow To ,I#& I '11/, , I ii, " 1// 1, 11/1 I ,,, - 11 I/ ;://,/,/ ... / " I / _­//-// '' "I -1/l / /I I_/ � 4 ­/ '" , I IN I'll, I 'I,/ l /, 1/0" '1­1111111 I , // / g ,/;,� � 1, t 1111"oll !��­­,""',­ " /,/, I 11 /" " � / / /I ,,,� / / lo/ , ?/ ,// , "/ in," �il I w I I 11 , / 'll, a I "I & '' " 1� , /, A � , � '. , i / I I I 11 � I 11 1" , I I I I �1'1 i/,0;"//4, I/ / / I 11 " " ,- , J, - /I, I I'll / 4 , I � , 11 I 1� , , /11 I ,'I'll 1///­//��, ; I ,/, _""/�//"/,/,/­ / , , i/ /// I "I , , , , , , , - " , , , , , " /I , JOICIP � " " F , !l,;111fi1v(, 1, . I //,////, ' I ,,,��///n//�%//y, 11 ... 11 11// , o'/ I I I I / 'If I """""""", 11 , ,,, " C', /// ­ I, I /I I I ,// """ , , � I 1 I- ­ , /, '1'1;0�1151 11 I 11 t1l, �q / / /1 11, I i I //// I'll I 10, --- I , - ­/Im I I I I WIROO bl In '11z� I'll, -1 I "', l, /-"/,//-','//,/,/,,,///,//�//,',/-,,,/, 'I 11'//// IF' "i", . . . . . . . . . . . . I '01/1"Al 1111070111711111 11, I ,/ I I'll I I I -IV ... /I I F111 IV , �2 is I "I I a? f 11 ,� "' ' � ?� 1�� tl POW 1/11, Flllllll�IIIIIIIIIIIIIIIII�Illllllllllll�IIIIIIIIIIIIIIIII , , , /, - , 1/1111 %J- I g`g/ , " 7, 1 - 7l"'I l A,_ 01/l/ ,('l - // -7, ', 11 I I w � I 11111 7A /,/ I I " ' �Wpw, I , � ,/ A , "/, I / , " I I o , , , t / I � V F , . � 7 - - 7 7*111 - - " I I l'I'll", ICs 11/11, K/,,,/,///, : g/ ........... " 'I" " � 11 11LOII;0va/ ga , i� 71/)1////,",""", l/1 ! �,,,""`� ,,,, g l,l's" /I - , I " ) .` , 1111 Illlw� �/ , " , ,f , I " 1, -1 E " , I ;A O': .7" - - - /" 1'/ / 111111, I I I'm , "' , , /, / I/ s, , , 111 '1","',,'ll1'l'/', 11 ",", ,'' / , "I'' , C I , r � / , /l,"111,111 � , lid/O , ", ,// � / ,", I'll'-, I 9� I � i . . . . . . . . . . . . . . . . . 1,11 ff. i / / "'t , s gin 6wild 1 _ , 11 1 , " - asl I I 11 " jj/�� I I 1: �, A y ,. I ,. ,: 1. , / 1511,11 1/ I , 1, 'I', I'll I I � ,///// 5 41 , to ]MIN v 4 w ll, , /g/ " ­ 11 "I t, 0/�� � , I 0 I/ " N _1 - I / is,// Is , " 0 ,)�, I'll, Ill-ellIllIllfl�r�"Iffl-1111'eillIllee�e�flllll� , � � " J111 � �1 as � o - f / / A W, , 9/ - , f " , 15 / , 11 I � a E, - / � sl - l / ! I " 1'1�1'1' , 1 / " " , g 1111,11411 l 101 `��& , 1, 1/10/111/ `/ /','/',' :11 "/, I O"j), / , "/, / 1% A/ , �i, , , OK 5 J""/, 1, `/ �"` '111111 IMP/ � I " " Al' a I ­ I ", , I I gi, "I'S ,/ , , am 1 a , I " . go ,III, - E� I—, ,/ AN W jq;T go Ar � I'll, 00 ell I � / ,,, M I O' � s�,,_ �/////,,,,,�/,////,// ... //,/ , I � -, 11 sell I SO NET J's "I , 11 l I J110 I 1 A I , , ,// I J/1,11111" I :, I 1 115" / - �F/gw////gg ON l , I "r - I , 1 1 'g / / / , I , / F/ /, I - I a I Owl, , /21/ d , I F #0 of 0 "'R 11,1,1111111 , v 1 21 "I "" I 'i, "I �/? ` I'�011111111"")rflfrlll1111111,Mlf�111,11111zllllllllv�1,111111, I pl'f�,` , "I " :""'I' I g t I I1011 ` " I I v , / 1 711 4010 in - , I P0 w "Wo I'll "I 1 7 - ;Q N I � , ! ,�_/, I I elfl,�1011l,ll1il�I'l', ,40 I ­ 11, I ,l�'j - , I I 11/��11/ - t " 1' I I "'' 1/12, ad, 10, of ': Pigs, I I � I l I 0/1 I I /'/ , I t' 14 '11/11 / I "I ... ­/ , / /` arlo'lal's "//, , I � 1 _11/l," 1//.C///1//1 I If//- , % , /` OrIg" l/ I al , I I I / i Z I aI I "/,/ I I 111 41" I "I,/,/ I , 11 / , J , J/ " ` I'll, I 11'a""I�Illi��,11,11,�,��ll�l(I'lI A 11 I I /,//�/, "' '' I , - -, "////,///,//,//I,/ , I I ,11, INMF,4' " il 141i , I g// � -1 I :""",�, /""I IV 1/1/"/ �ioi, ME I � 1/1/) I I "" / , ", 11 k Ag , M/ a 1/11/1 I'll t L , / � ITIolomi! , , , 10 I/ ""I" ­,/,/A�l I'' mi i! I I I", ��, I / J/111 , 'm " / I, //, , lt "o, / / / � a /// / I I , ,/ / I"/ ,,�4 I / , / I I/ / ll ;// II a " d A "', , j/ / I � / , // " � / / I I ,/ - A // ": F/P I , I I I i I // " , VVIII-11 , 'O I , Ill , A � 1/, , ///, ",I/ , Mv 1 Ill ­ I r //////",/ is (( lig IS Jr *0 1 - n . �',, //_ ��,/ - I /l", giir ////////"�/ : I , t 1� ll".1l/ : ''i ///, , Ogg I I I , , 11 � I, /I I Ax/d/6 1� is k/ 11 I " �//, �J*wy a , / I I 'I I / ,", /, , / I 11 " (b I l so , :i l , Il_111", I ""////' I i ", , "', //I/ I ,/ I 11 o/ �, Ill/ I I"! I , � 101 � l, I , ­­l/// , � /// ,///////,//, // P 1/1, 'g Al ''I' I I I I - t, // ... , 1! ��� / " // A. ;l, I I I , i, " IN I I I I �1, Pl(/ " " /I , ///I 7 "I 1-1 ,,is I - . I , ", I I - I ,iF,////", , "I I I: , 45 � - i I' t" a I$ O 1// ill 111115 / 1/01" I -/ I I 9 0 "I 11 as, / ;� g I I 'J I I / IT -0 ,;,I I , I I ///" I Q - ,,,� It 11 - f l I 0 11,�� I, A ; "I'll; I , , " I/, I I I I s 13 " Iii, ; " , "I I 2 " /IP" I , Is I � j , � " g / ii� � �/ , , ,/ i 4:2 rIlill""�'ll", 111 / I/ I /, I I . . . . . I//'," �rlIll�11111,lfllllflllflfllt�flflllfl�ll� ... 1, , a , y/ /11 ,//,/",:, 1, /'///�, il " " ,,,, is xF,7111, ", , g ,// 11 , , /i"P A / , To /11 I //, " I/, , , / I , A II / � I I I lll�� / I " I I I �/ I I I , E I I/ "I I ... " 4 g1f ; , /I/ 46* 11 � r11 ­�I­ 1� I / �', ,/ // 11 � I I �iil[ 1 11 I I / ,/ / � - z///�,A//./", " ",K", 1 1 ­ _A/ E � I - , , I I I , I II ///z; I , 00*0b 4 , g b! I I f ,//�_ " ,_­�7',­ I ",//;/, � " SO I ;/////;/"///////,/,/,//,1// �z ... i z 11 /",/ // , I i,�� I "'' I � , ? 1 1 - I I I t "" �, - v reel � 411/1,I10111" Aw"loSh I!, , , ,,,,,,,,, , 1 t, ", ///' I " , IMI/I I �4 lo - " , "' * I � F// " I /,/ %;'Ivi " I I ""' ­/ t/` * g / , I'll 11 , "",/` q '/ � .... 1:1 " /// _/`111�` 10110/ 1, "I' 1, O t"11/1, I I " ,"", , 1/// W//Y/" / /I I `T,`/ X//C//// /,/,/, *'/" 1, k, � AT - Imms I Am - ; J� - I -1 7' 7V, "I o/ //�/`/ s ., - I I -- i ikom"Oliall"llar - R z I '///// /'111 � I �/ "I'll, 1, i i i , I I 1, i , J./i/r/ AM " AS-, Irelo"o, / , il ... �, , /// "I" 4 / " , 111 /'I I , - , - I 'OPIAIR11 "'Ig � i " "//,//, ,//,/ -, 0, q I I'll ,� a ,/ , 1, , " , // �� j, 11 '11/2" , , , " , / I , , ` "" " , , '/l 9 I ,/ 5, /, I ,,I E // / �/�� � " I I 11 ', "I " / , " E// I I " I av 111, "All"MI'll , , , /")/­/', kii 1/,// I , I I 'Ill/ / I I 0 , '56 � ! /, //, I'll g,' 11 s , a l 9 F /IV/ �,/l r '/� '/1 , I/ I "I l I ,/l " A' 11 I .W, 011 - I Is , ... §ii , P///// Ill/ 4/11 / Ill "" c . , A0111, , / // g " �) 116flo - low, `/ , � fllllk?'kll s �, mx/&,/,x� / f) . , i //) / ,"f/�//"&/ � ; 1 W//l///,//,// I / / I I I 11//l I,- Ov" I 0 1 1 1 1/1 "" , I //, - / ,a/�/ //// � 11 � , , Egg/n///, '/ I 11 �, l/ I .... I'll", I 1� to I I I, �,id l , - _S_.R 10" ,�,/� � "I , , "' I � I, - W i I � e I ; ,V "/g///lIl,/� ,,,, 11 , I 11/r/w , I , I 11 /// � .... ! ! ",/It , , 'g , , 5, "I'll, I i I / ;/ /// I , ��, l . . . . . 11 I ia, - I " I- I I / , / 11 I "I'll",-, '/ ��, , "', 'I', / I , I , '�' / 'I I , I / oll'' allrp))/"P))/,/ 1-111, 11 I ,///, I All 1)), ,/,aff //// 11 Yr;rll/z/�// I - / / / ,/ /I , 0 W, - ", , // III g I�lp/ / /�/f is is , is ,�/ /// IF I /�,, 11 11 w / ////,// ..... I/ ,,,,,,,, ), / "/,//,//, 11, " I I I"s I ,,, 'A 1, ,,, "/ . . . . . . . . . . . . . "I'll, / /// 5"', /// F /� , I I I I I I g, "I'll, 11,l, 1� , g� , I I - / I,)"' W- g " 10 / /I I U1j I'll //,/ //, : ,� //, ,/I I /� I, g /// I lar ///a` n I ",/ ,�, I ­­ �1� 1 "' l � W IN; / IN � .. . ... :, � is. "//, - 1­1 , � , ,ls, I is / I lI/�/", , lilt '/ , , "I I ll, I / ,/// , I I 7, /,/", , , "i / l, " , , ,, g " "I / , I "I I I 1-11 Y, �, g , W J4 /,// 4 � �, , � " , g ,�so , f , g ,�so , f , I ,,. , g ,�sg,l , f , , / , / " / " / 4 � , , // , 2 T I L %j 11 I l`/�',`�/,/],��g ......... l , �111111111111111111111111171l I 1111 I I �,,,, O", fl ,", ,/// a A 1'�_Wf 1i I o I .. .... / . . ..... .. // / / 0 . i , - , L, � , I, I il� /"/, " Ill-,1111,1111111110111 11 : ­ ­­ , , I " '­­­ -, " 11 I " / : I7 ", a /// I _ P'o , f '?,' - I 'a I /_ IY I //,/"",,/,/, , G"", I - .1 A "', , l. � �f I"" A. ,// 'l , , I/i // , , I / �, " " a is / z W � I // "I .' O', - , I� � I / k , I , -11 "'5""I'll"I'l 11 Z I, ,/�g I 1, jqj , I ; I 0 e 'If/fl�ii, , I ,/� / a, l, / I= - - // " "I am�//js qw, I I /11//� ry, J)", I , , , ", j g; 'a! Alp I jz__ � "l i ,r 'I " ,�,,,/ ""/,/,"",,/,/ 1�� , // ------- I 1 1 ,'�fiil ft, / / SEE, I r / I / / / W I 11? , I !, -a '- / All V, /,/ � I 'I 4 ; 1 I I " I I YO -I, _ ", Vfg/� ::: 1 � / �', ,�� / 7 , I I I F", I l'I", UN " , 1 7 Q,,/ .,,,,� 1/`i"/,�/,vg,lol" " I r,//"""""//,;""/,/,/,/,/,/,///�/��"', ./, " , I , J/P111/11/1" , I, f j 1011, " xy PIP ,/Ml I I �, , I "//"I ,'I 1/1 j , 1 /I W .1. , I Io / /, , I1.11,11"I", - � , / ­ o // W, l " , , I%tmrw , I 69116,111, gi r ... _,",I�,1"wmgA%1 / * // , "///, /AF`1/*/, � / / �%/, � A -5 J I l . M, W 0 . ad I _,g, , I 10 1� ' Olrb 17, ' " IC36 ,'," f &A - , 1 ye A "s, l"'lapp, A Or I , , lll� , 0(/ 1 IM-4 I ­6 I 11 1, 1 '11, 3' W. ild f 11 " , I I �1) I I I I 6, i;� l ­/ I/ " 'j- Is , , T Is 1 ,1/l//", I A 1,11,--f , h // ,/;?// F 1 600 " , I .2 I ,,, __�.L_ ,�, I I ga r a, - f In A / " l ,:11/'1"1_', I I W ; O " pi f sa I I I;: ! . ii / . haap , / 11 I 0 2 1/1481galm, 1q," "I'll, =111111 " W/l a v 11 I - � � "V/((//,�/"/"(/,'�',',�,/,��/"",// , _,/,_,,_ , ogll:,", , , 11 4b, 11,111,1111, I-, a �'// , / , """"'I"", "I I I 'i "Id/1" (" ////#, �, ", �,, P , I D f I ��, l ... � J,/�/ � / I is If j III Is 1// , / 1 4,41 f i 1 K I /// a a I I � I I I I ,� prog, , �'vm " ", l/, I Z I'll "I", L/ L / I/ __q "', ,,,,, `T111, I � � J , v J� � i �,,"""""'���� 11 S/ " I / I , I i VI I I , // , , / / " , 4) 'al 3 - " M I M g ig a " J,gj, 11" 61 / A / // i'l I I 11,0011 /I , I , / -_ I F" 11 I I I SO il I'll 1/1 41 31) , /K///// 1 : IS 11, IF I , "All " " /I :, - IV , I;el�ll�,,ill",��l �, / ,/Iklil , ii'; //n�s/ /",//"",/, , ///m//l"", , e, �, , / , 11 ,l I � 11111 a s/ , ; , , � f /" Ell ,�ap,/?,� //,/;;/"/1//1' ,/, / 11 I 11 "', ,Y/ ,/r/gs �,/ I'll , � // "I lypr�_ , / ll Is I'/ 'I'll" , "'NN"", - - I I W , " , , gpka, I /// Nj i, i lI,_ / r,l an. =40 - �`!/11,/,??O/`�, loo / ME a, I a) " ong " __ I , 1"/ , I / � - Ic 1- - ol It ,/ ... e'l,,", , " I I , , 11191 ; sla / , __ , .0 "" , I I'll " 11 I // I cm, 11 , II/" I 11 d 11Y j i , / , " PlEd/a/mvII c I " R , f / in I'll I'll I H a/fop"", - 11 I "I'll jwna,,�(Iaggg � I I ffig ,,,, ,,�, 0 1110 0 1 � I Ell I 1111 11 NOW I Ev / W/ 0 I c w L �" " g " ll "I,/, of , , ,I '11 iiij " Il/"/�;A/�""//­ - � I A A I Ak, I "I'div / " "'yPpy, I / " 1' : I / I , , CY) a yp/// , , I//, 11 I , , 11 11, , I ,,, f "Iblig ,11111 a I 1 , I gnl/ w 'g�l a, � I 11111, *_ Is, 11 'a " I W1 I I I , 7) 1 G _j I 11,11 - I � VERNON/@ ; 1 , i"', I , / / / s / / ; 7 / /, A/d/Ii ,/ Z I l 1 , il � ��, C E/E � l ��' "l 1 1 11 , AL , I � - � ! I " I, il, � 4 IN " I I ­ al, 1, Al , I ",''," U) ,�"/ IV I /, �,/ , � I i) I, /� - /// a " / g//, 5' III I I , I /11/1001 /, I I'll 5 , is II/ , I I //�/ I , gl "I /F,//"',/, " "l a ,//l, I I 'I'll Ir /", ,(/, // ll . / / ll , I , I - I � o is (D 11 , I//, 'IV ff I 11 61, 11 -, / �F/ o ` i3l, . /// A " / A - 11 I 1/// 1/1 w m my I IP6,Il 11 1� I 11" IN I �,N%/�O/ "", ff go, IKYI ­,/ > 0- " " - I 11 I I� I / E�1§1 7 " ) .0 , imp; 1 " , 0-" - , "I I l 11 all,;V Am 7AAME16/all I ,,, I __ n 14, . F,/, I � , 1//��, 1"111 " I g � "I //,' � 4/m/11 'o �, w ", L, "I �, S .... ", oil /1 11 ; III 1 /V l I ME /"I", , " I �, I po I 1,111�1;1111, ", I'll . .... 11 , 10/1, I V 1 1 el /// I I �_ " I -///-////"" ,� iI , I / , " B 1 i'llis " I�� ""', ://////�:`,/`,l""',/-// 41, /If/g/2111 I I ,,, I // I I 5 j l, ,l,I/�/'///'//, ,/"/,�/ L " , :�/, 11 , I 5 l 61 , NONE!"' /I I �//[ / IN, // / / a / , I I /, I , I, ilk A I R, 0 '/,, 'I �, . . ..... af " ll, ,,',� 1, F 1/11, , �, MEMO " ,C " /""/, ,/,/,swl///// Ill// C, , / / 11 / 111i /, If 11, , ,I, , 11p , 1 sl IS a, ............... I, ........ // " I Ii �, �i` I.- -2 ,/ 11 I , Ulll� , , -1 (n f 11 I "I I ", 501 E I 1,11 I II I 1, ( I I I I a, 11 " # "' , / I . A w ir 10 w �, d S/ / ,/, 14 / , l"Ill ­/ ­/// - 0 1 1 ; a/Ar"I&I ,�/,, :, , 1, // / H , , so IN 1 / N "XII, p l",/,/ ... f1flIO, :w- , a 11-/41 , �lf, - I My � IN Ed I g a r I I " I !// I ­­//­/�' ,,,,, I l 1, I ` �' I P, I "A" / I ­1 I , /I /"",/ "" . ;if , " l 1", I m�" lgj,�� I, , , �"/�,��//��//,;" "I ,g,//// Y P " l 11 � CF) CY) /, " g" / , / I / / & M, � , F4 5, , "Ill /!"'ll"", I/ "I " "I � I � 1 �l , _11/11 _lo///////// "I '', `/ ,/ , / I - L 1A ii?/ ,w I Idlyffill I ll", ,�,/g , C C / , r j'�' 11 I / /, / �Oii oll I i ", I , 'I � ...... v/1 I o- o- . . .... , ! " ,�, r "I I,/ i I '' // I_ f Ow 0, , I � , /�/// I , , // IWI " I ,, , , ...... 'j, ,I'll 11, I I 1., HOW - M" $ 114 " , fl I , " , / A , -F.- _#-_ I """2/ I t /,/ al i "I A I/,,/ ! ��, 11�/ " 0 a -000 / I/ is j , ags --As v I � � I L , w I 11 ;V J, - I "I U) U) I ////// /",/ . ....... �//// ,"/// �l , � 11 I', mm'l, ,'71�",Il�l',�"1111"1,111"���ll,��,"'�'l;�ll", 11 V.1; - W, I P" �"�I� a I , Iiii /g/ / , , 11 'I', /� / ", // 'or A v E I I _,' O" , " , I d/ a - ag,�111',&, 1/1, I "" / " F 1 � elll,l,�11111,1ill r m / , *5< 0 57< � - "I I I ,F',1,lgI / IS I 0 r/mmom Ell l�'ell��,(, 1/1,111, Aff / , m/m/ Ell 01 )/ ,////// 11 �, " E / "el�Ill� ........ //lI I ,,�­ .... . .......... . ­­ Nompompoom 'If,"",',,,-",/" m ?�///////l/ I , " , g I / , , //ag go I N N Ld LLI " , , " "' rs t 1, . " � El"i ,/ , " C I f� /, 0111 I 111111), I , F" "/" 's � 11 I �� , I _/� I lin E I , "I I'll, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , i'l ''I'll - I on _W` , / I / E I / / , I Asw I 1� " ,/",(/, mg/p�l , , I -0 I , 16 /,/"/ 11 )E I I'll, " ,� r / ,,� " , , , , , , , , , , , 'I , 11 " ,/ / IN I w I lE IY))lIPl I I I I I", /, , �,, , / A '04A I I c, "'I'l g l / / sw oll I , d k! 11'all""l, / 11/11, , I 1 l I I , l / mi w/m/wis r , , ­­'w's, sl ", falwom w1wel ami glt,o ­,, I I— III,,/, I 'a , if i ,/o, 0 I 1, l­ / , I I, " , , , -, // lg""I" I I t, gww" I 11 , ./ , / / w /j/011 , , , I , , , � 4, /W( , , ll I " ,I / � / 0,11 i '�, // ,::, , SO, , 1110 v,// , ", 1� " "I'll, nn//airrr� ,, , , ": Tr# /4 I " "I , , _ ; " 4 ill, ­11 A III I 11 'I', C. J///il��l/,/ , " /zz, ­/­/,;�///,, I/m/w/wil: , /,//,///"/ ;,//Ii E`�,` / If / / / / . / I / W1 111�11, /?// fS .. ... ... . i/ 11 - � FE //;, 1.1,1111 111 " , I I � _1 `g/1 ,,;, I / , M 14 "I o ", I g , N , ' � I W/ ///// ,/,/ I I I,,l/?//// i / , yq 9 n, , 1 "Ill, --'I'll, 11 '� /I W � ", " 11 IIA/l ­ v _W__ 1 , A , / // . .......... _ I , I /� O'w I, "", I ��, %111/1 I �/i/////////"�, "a/6", US// � II/F A ,I I I "/III A , / is I I , , I " well "", " " K ////,�, I Ifl/0�//////l '1� , ,�_ " "I, A " � " � g � � "I, ,./_ dmin I / / //A I ,�, I w I "I /, Ill I, a All ,1011 , , ... : , " /, /////// all 011, I f . � ­/ ; 70 I g a ior s// , , :a """'iII11111 - ,/ 6 ,/ I I , I � ..... ;,_ " //j i, ',I ;/! ____ 1711 "All, j , - " "If _M - I 4��� , _II/l/ I v I Q " I ,/'j, FT I / ...... I _',I',IIe/5I/�/l,1l' I /�;;;,,�,111' , l//l/"ll, , " , , , // , I ll", �,,,,­ii,'//l",,�", 0, 1� , ,;,/ /t/1,` � & "',/ O JFI , " - j, � g"", ago/ow-", -, I �� Afro ,�//,/, "I'll , , I / I �, ,I � .. . is 40, I ,l IS I �1 , illl!i � I WO , � �o I � ", , r "//;I,-,, - 11 , 1 7 10 '��W, Q, N / 0 , � I / ;, , : �, //,///// F11""'If I s � ;/// ///////////� n'/// (1) , r/////// , � // / ,/////////, //,/, /`­� � F F &/, , , " as, I `E` / I F I // , I , /, , , )// 11 / , z�,,, 1111,1111, all / 1, AS/ w rmy -n IN g / 4 ///// iP 1'1/ 1111 , "/ " '11 /, / / / . / I/ - I ,, I ,/� , /, Qj f , 11 g/a// -, - ,., I ­0 1, / /) OF/A , " ,/ ,/�,/,­ l /I NO -in /) ./ I 1 Am "I ... "I'll, "I ; I - -at, s 1/1, 0 , A am NF "I', ,Q , , AN � Ivh�, " f,"k, I M , I , I //// l(()�, 0 � - I,///� 7 Ig, r . ......... . / �Jfof/g ,I ,I"/ o' I " ,, , A ,I , s I I , ,/g -- A7 I I �: I g", " M fi, a VA I MI, /Of I _: 1/ 9 y , % 0 ," -1 �/g/_ � , sig " / it, I I t / "" N // , / 111 /// is / g',_ " / F / ,is 11 , ,,/// a j ! I Ifli�'PI(II'll",�191pl;l;��llfkllll;111111(1((��l(ffp�,'�111,� ,,,),//",I',, g l!/ / " , , // / I // , A , / , , , / /,/,," p " , ,,, � // I ", , A&II 1)1/1// // - 0 11 4) I , , I " Is a , Ill "I 7 og,/ I - I ,f x , 1/011, I I F 11 /� , A ," /I " I , I - / ) ) )/ /I ,( , I / 1,0`1 "a :!,/// " IIII/I / isgi a :_ , "'I"R/ , ,////,/"///� "Af lli/o V// Eg , Y, 1/1,11/1 / E / _ / Ai .. .... �//­ 5: // 'j" /, a/ � /1', A s"' I, I " , ",/,/, /, /I, / / /, , , , ,//, I I " i 11 A �//,711, I _rl "I"! " _111 I /I / 111 d "I _ / � O , Or iv IO /, /,/ / is /, // 11 NOR 11 /, f , d0bak. Y I , gii I lip r / / mmi 110 I , ;; -11, � " " a, F; 1111411 , ", , , I //; POW I I'll, : - 1/// ll I 1 �4 1 1 11 I I I � 'A",j) f/ is - 5111/1, , , 11 "I "I "R , I I IF AS . . . . . . . . / , I I 1015" I I �'_, OWNP 'l -, I I / T "O " 1-4 1 & I ONE A /111, /0 -1 IF I �,i,` � ,oj�"//�/`//`i� , 1 I � J,�IXFJIF�'.&_ , /, 1", ,� j /j/ I �;Ahjll, /I I I 1'� Il 51n, I/ list, /' �g _13 I g l', /�,'i, I . III isr 't 16"11TA-WOR "', ji I , / 11 11 I 'a �/ A- 1� 15,1,1111 I/ - l l! "I . . . . . . / / l l ,/ o N / ./ "'. / , , 1, I , , " I , R121111- , ywr , � I , , At,"/C, ,". 01" j/111"', , "a '1110 o' , , g i I I , "I , i �/ 'A , , 1/k d/f, ,I , , , " ... g / , �� , /, I i N I 9 is S4 , ll I ,"It"M 0 ", I rv/0 , , A ii I 11,, 11100voller", I " lil, g A .... 11 0 x 4D , /f/g I I / , , �,'�,�',Il­ lA///*w'1­1W/////IZ1/ I - YAP// ` " " , " IF ,�,�, gi�p,,',/'�//­ I l/1, / 'All ,/ - 1i 0 1 '/ g I //// I , I,/ ,��V/ ,/ 00 " I ,I /im/11 // I'll/ l, � I I //R/l, AM/ I , I �� I �, - I � M M /,,10 V ", , A, " I f�P P MR U /F I'll , 11 1,1111/111 I , 71 ko"Wiwi"i "I �Aji; ;Irtjot IF Al � I /I I IV" P/1 'I'll 1(1/// I'll/ I/ o's ,,, il JJO/�soorr /1% vIr'-, I /// lssploos , / . tIll ", It , " 110011, ,/ p I / - , '' II , l_l i////g/,//// g/I "I'' ? ii, v I I , i, I /,//"/, 11 " w-ml ,_ ,�I I I A , li , all � - , 1111EI, o I , '1/`10'", "'.", , 7 ''i "I I / /I/,', 4 1 %4; ,,/, I wor" /j, , / " I, I'l ///m '4,111111,s" / I /I dl �:,,` /I , /11111 � I I K, ... J/10 E 41 1, I , L() X I 111iC I I 11 "I / -, , , / I , O lull /l N&- a g a' � g YJ I , '131k. il //, 1, / " I M 2 , ,,,,,,/,,, � /_/ / , , / ,q " l, - " � ga �l / / , / O/ i 'Y A, R/ 1 ,g / or Inj , " / // 1i'll"! - M �/, , , / ", ll , ��ll��6liIlIIYII I Al // v ,I/ /// AU d , vc / ,/ 0140 11"I , i A ), / ll"', , A � / / "I I "I 1"" I / il �_//, g� sl / I f6w, . I . me , L, "'lli I , , , 1j, �, x Is 11 1 1 , 4 I�//// ,/,, ,P///' " /N "�_ I IF it ; "l 11 I ,� ll�/ /// / , I (0 .... . . f. , " /, // I Ws " ,,,,l , ,,, '_ � I , � "I" /� / , " 11, A/ CL r I plgllf�l /, VF I / /I,� ,i/ a " / 11 I I "Ill I , lot 21 1" "al ­� l"Ild-0 " //1.1'1/, Il / / vW91111v IN di , Ip, ,/ � , "'i, 7 Z! , / 16 v 1111 "I'll "/,/gm!ir It, - its " % //// l���/////�/l�i�llwo -to r I " , I , a �' lee ,/ ­� I'll 'I / ­­,­ll /Affiffl/l/11PIT , f , , IR s ill ,I " I 1p/fi/ I/A I I q/ ,". I - MIEW "I, - I .A a g,"'l, " l" 11'­'� ,// " "M ll///­� " WOM, �_ '11 s "" , , /I 5%r "j, x , am 1( /0,11 / p m / � , &I I /�d I g, ,L/ " , J//r /, /// , I'll, / 1j,/// - I d/ �,/ , / l lil Ii / � / � is If / � / / / / / � / NE / ll Il im "I Is is �, / , ia gin's R/W , gni, j a"', ,',,"I /,// , /,/ /"/ , I 1� , //// ,�s W/ , � Id/ i 'I'/// " 11 & I � , 14',�s 'ig/ im, mr, l f f"E!// l/ 'g " ,Eaa is I, ,,, g I / , si, "I 2! 0 11W I I, I #61,­ /I , ,/ ", I,/ 11"Ing I I'll / ix // ll I id d / iiiiiii / / - / � r / .� a / " "', lip , 0,2k, go IN - I " Ill ,/,l , , fl, ..... ", 11, 11 ,// III I I I"/"/,//, I I sed/11 1, III` � ", /a) 1 4 i, I iffi/e/ """ v / I 1, , 1- , //, , I ... , " I " ME ,ft" 11 I / / �, � 0 'r ��// I 1, a I , / I / /// I I I I I 1 ,,, I IISR "I I;�//" WO , 5 "r " � /( �,/� I/ I'll /I "' I A I ,f ,f 01,5 111 I e 2 ` 11 " a I I I a, I f, I— , F " ,I 111, "I'll op I "I I /, �,, " f0 ,,, !I/ i'l I //( - ", �Jgr r 11 � 1/11, // 1111 jr . ,/I/, gl, 1j)wf ... IF A I ,,,­g, / I "I, 11 - 11/1( I I I 1. / , " , ME' ��, , %,vmMMFisF`, I & WIbs"'I"I"eso", g I / I / A � I - 1P I � Z )11 ,", , , ,,,, , ,I, " , _� NO / "f/?0I p/l,"', j 0 9 F , " 11 ,/ , 1w ... 3 & P, 4 11,1YON , //" I I I , "' "I �,:,:­ - T, I . I I/01 j 11 - , ff/,,//g/////g,((//, I " ,, f , �kl` I -11 mov, pgqpp� ry I g A i( 5 , 11 / I S . , /, I Ll, /1, g" 1 'r V` if' fif��"I",I, E',J§ I I //// d " 111' I , " , , / I ( d I I I/ I I,//, - S " wlw 11 � I I I " 11 I I G I ""'/'I//, ." I I , W I'- "s I"/////,///i,i/////// , '� i " 1w1P11F�///s , , , I ­ k If ,/ " "MO/ �/,/�/ , E g/ /;/1 11j, r, ;1 ddg / ­� , ), / ­`_­_­­_ r I ''I l� ,/ , 11 , � / // , , . , , I III " I A , 11 ,/ ,) / / 0 "I" .I� , , g/. /0 / /,��,, / "I'll/ , . I 111 I I" I" I" f , " / a ! Al ,;/, / , ,10s./m, "I N1, , ///, � � I , / � i"' 6 1 Y1,11, 4 is 01 �/�/(ly,�//,�)���'; ` , , , / , , 'Ii , ,/;i, i /" E "/,//,( " , le4g, ((,� , / Ig , /�vm//�� �/ ­ q% /, I " "' " , , ai.,g// 11 71, _l` ir " I / 11 '/ , 'I'll , 'a � /// / 11111 I ,If, �/r '11' ,I 111 1� i I " Ill , 11 I " o"I" iwmik , 11 /r/0 / 1/��,�//�m�//"////��./�,/>///���.,/� , ffil, I , / , E J P � , ') , ,�l l l , " ... ... ... , , , , , , /_ I � I , I // , , l a r � , ,;,,,I'll , 1 A ; I I / ... Y " � ///, 1, OF/r/ " , I I I 11 , 4001/7 to I ::, , IS/ /­ ,/ 'Cgr ) Ill/ , ", / 111//; 11 11 11 I 7 I . 1 I IV, at " 11 I I 1, , /////V 11 ��/ I 1, , ",////, ///11 , I 'Y .... p Ill or./w.,12 I I A / , ,/;,/ ,/,/, ,/"///////////' ljo,l, . ... .. � , Ig�//�//I#//// ";", - - k,gg9g,­gWg / " I , " 11 ­ 'upil"r"I"; ,,//, ,/W,// - " " //, E, ,; , a1g,111/1111, , " "I'l, , , ,///// " 11 / glo.o. _ Ile / ll // ),;Fll // I", ,// , /p ,,,, , I - I a I, 11 /I I " o. , a f 0. AG," //,l/ "M , , �l O'C', � � � (WO ON , I %t, 1/1, 0 x " " I Weill A / IF If - , it , ; lilt " -, "," �k , I v" " ,//,/, "/ .. . . . .. I" "'4 11, , /Ji ! ,,,�/ / Ad grob A. ­/ v/1' ­,_ ....... , - /// - - I" " 11 " :16 ,// "',,", ... . .. // � a '. ,/ a g , ,,Z�, /, � //,/,/// ///� / AM /, I i I 'I / , I", . I U, s """ r /,� t, %, ­� I I M Eo I/ I'Mig, , ,,, / , d % /, " // ts"', , �l, 'I'll I I/ ,�fmf�" :2 v , " I � L,//L�s/ce ��,////,/b// // ,,, "' C s/ . al, I/ " /A , , I/,/ � """' `�::, "' ff"/11 11 ,,, ii - I " , " /"//, " O" , gi,l/,/­,�­ ,I �, , / l / s "I // //// 11 , ,�� / , '�/ 'lI / -11 ­_ 41i /, "�� - "I'll, � 11"I'lip ., ,/, l/ , , , / / " 'v1',%�ag1zggg,g11 ,/�,'Ws_ /// ol "/ ',,/"/I" /, s/Ig"s, ­/ / �,/, -4- - omeq"$-M"um /�/,/�% 1111/1" "I'll, " I 1� 't, w/o/ad/w/dOO/o/ /,//�//,,/;gg//sg// " /,//,/ �,'�?"IYIZ �/ - ­ " " 11// , "? li"01111 ', g _/ /" " 'j,/!., 1, I / ,� , // l mi, , " Is /� //,��e, : , " // /- I ... l , , �Ilwwae ...... " , , " -) I v/r/G11,11, "/­sI/,/,/,l, I ... I // jg " I n 11 I , , 11 % n _______, , = -" /,l , -1 I /1" .... I f, ",/,/,) /'' "' " , " "Il "I I ',� I I/ "// / 7 " / I I ,/,- " ,/1 , II", , `!i e / A I -7 , / ,I/ x , d I & I / / g_ I///,//, , � /2 // "/////, ,,,, , "17/,/, I'll laff ! // / / 's 0/011 I , / &I _/ , ) 1, 7 , ,/// / , , f P I �/,///�/////////�,//�;�,,/"/Y////', " - `// `11 "' ,� , # I , ,,�/",,//// /",/,///,// "//,/"/,I,l r rn "I ,/ I/ "//,/////,///1 117: -,///; //,- laC111111 I'�/�///",..,���/`��"��,�,�/"�"����,,.,�/��,�// , * 1/1/'1/1/111 A jim , W a 5" / q/­ ­ '/u// "S "I 11 I /, / 11"I'MMI", I I / ldl ( //'l;:',,,,/ I,/ i I ,,/ // Eii 111KAdfl ��w �]I/ I / ,/ r/////fm??,,/// li'Ai Ill/ I I/, ,III / I, F�////�///l//,/, 11 O O' I ", /,", ON- as: I , , Eq�//Fl "Proold" / 0 /'11/ A 7 1 �':iRi R01 10 , " / �, / ­1 "', /r/,, I/, ,/� I I'll ` R! , R Jr I`Klljldff� �111,/,: "' I / I UVW -- � I 10/1 a, , ,I wi w/[/,/,/ 11 /"/,/ i 0 / 16 , e , " , , f ­ "j.1f, " , " / , "I MAP',", , I ,, - I '� 11,11 " ',��,/""­ I 11 I I fl�" ,; I I, F, / ,1�1111` I �,Y, , , 1=11101011�9, I 11, , / � 011/0 , 11 ), "J's I I///, K � I, l "I,/,//,// A o '13/r, ,,, 11 �­­ " Am_ ... I, 111`%l,//'I "I ., " / T /, , ,� �,l j I � ", A . 1, 11 , / ,/l/l/111 ///"///v//" , i, �fIll'I�"I'�fll,?Zlll,l","", ,/ I/ 1,5/6, �/q��, I //1 - I I " l , ,�,, / al a`// I / I li / , in // �/ , NOV//// i /l E / iil ;! ""T 0 k�� I r , �, iiii AN/1 4 11 , ;" "s , " , 1_/ " , // III, , I", f I , ,,,, /,/ / , ,/ / - , , , // / ,/x �_ I � I E / , , g � "o , I / / Ni / E, / / is C , ,// � �, �j /� // g/� �11 ,_ " , , ,'d -, It- 1 , " ,��,Iig,/,// fP """ , ey 11 "I mmi , , " I & I / &M/1 11 I .... I "' ­ 11 � /1,1� "It ON I w IiIi 1111111010077 Ill �; ""I / , , ,A/l// , ,� 1� s) impmom4or " / lil, 1 //1 , , , - 111 / , ll P m, f t R� / ib , I ...,alk. _� Ill, 11 /l ii 11 , �qllll, �. " I "I'll, I's f ";AM 11 ,/", is I Alln, I- � 11?� 111//W ",/I 11N;,I(/P ,/ -1 I ': , , /// /I, 'rer, 11=01 �*- , "", ///ll, l,­/,////// - / % r, " Is / ,�,//, 'I" IN or r ,,, " I '" , , ,,// � Il'A"' '/�� , / ",z") .... . . , , & 111"' " sm, /' ,// ,,//l.11 ,/ 10150711 ":/ I b , / / l,/ //�/�q//f�//�//r/////,�//ro//�//���/V I, /I for f,/" I , "), - JU " 11 1111 , " I 11 11�wflw), ,� '' f� z ,0011111111 " / 116 Iii lall's 'Is"', a * I-41 A s F o`/I fl�,, II/I I _/�// 01 IN I 17RYAWI� IN --No- , , / I ll,l��,,C�, /W 1, /Fig , /" J I SIM , I 0 M '' , I /1" Ill"',/l, '� 11 /A , " � g P" " "W'.1, , IS 101 , I " I " 5 I", 1111 W I 0160,1, I/ , I , ', I , , I !/", 7f I, � I 1­ f", 4 � -, '31 I , , I I ,/,'�/ I / iii , �g "I ,/,/l//Il YI/ I /'o I at qj",�,/%/" I 9 I a w . I I - , I - R/ W 01 /// ""'s" 7 f, ,/ / , � , ,l 14 I- � 191, "I //X,// 5,1", ,,�',',"I` A "'g , � " as -A I I'll, 11 � I 1/111, � G /�/") ll, "I "' i 11 , 11 I �,il / , '/ it 41 A - 7/21/as "I C, "g"""`,�'­'1s11x1 I/Iggg/ - , 1 w 10 , AIC "I If , """ /, ""I'll", I // , I'll, g.11111,1111, ////g//o/1//1//' A , iddo I ��, . AW � ,, a � I , j I ! 111011011 , ,/, go ""'I"x"Ifig, 11/11 , g / 11/1 ,/ if 'S" ',,, S, � W, " " " , I ) g!" ­11 , , " 15 1010011/1 , " I, � ,� / ­­ I �l " � , , , ,/ " " Al / / , 7��j iio�itwso�i��' " , Ay',"", /,/ " 11 /J, II­I!,5� ,,� /""" "/ '11, :8, , 'Ii , I - ' I I � Ell,' - /F v/// , I., �', / ",///, � //,- I ­ l , / "', , ?I I /�/"/ W // l"l iii, "/"",";,// / /, " "'i, -­//ll­" l I, I J I ,//,/ 'i"""'p, Ag, 1A w M f,�,�""//,/�����/,�""",/"","� 111'1'1�1i' fIrlitte", __ , , ", g '' '' - s g r I W//,/ 111 I ,/ " ,/,IV/, � - ww , r/1 � /1 I , E , , fy 170,01111l" 11 / "', , W;, ?I, 10141 % 'u's"g, , 1/JJJ// I " g­o� , I o- , /,'g A 440� , o 11/l O/ I 111al , //",/ 11 It I 2 "I'll, . " ­­;i / i," / , 304 , , "/,//, �' j S Ff 's , , - A; ls 11 a, / /i , ,,* I ":III, A WAIRWAY ,/, 1/10 OF , � I " I , ii k, ,,� '!, S /,/// ". " ,�" 6- //, , I , S vo , I - ,/, I J."' , /I , "I 1 11 // " I , , I" /11 k / i It, ,, 11 //, , // I I!,//" �J/ I /; l�', I ­',­",",""' / / l/i/`1 I // , "/, - `?/ " / // , , I. � "al", (/ ... r , , , , , , 1", I " V " k: A 111. I/ , ///;/I v AMM gg - - I g l ..... in 1//l I I , , "" ll,/,� , I ... I ,// 7 I, / i " I 1,11111 , TAw"', - ", , �, / I/ � � /ag/p, a - i I'll i ; , E " / , p 'M , C F1 "I", di & - C 111.11,11, l w / & lw /Em I 11 9 / I ; gy o" � � � I , Im & ',/�, //;�/,F` , I'll / ,// , r /1g,,,& __ Is - . I, l i: I a,111,11211"', ��­Jpd/ , "S I ," (� Pre, " "" I I � I'll, l, `//111'l ia/v­ v , " 11/11 I // // 1/1 l,,,//1 / _// ... � - 1 : W, If / l, ig I / / / 1, Is M - 1 " // / is 7 1 I 11 its I I " " , , , , '111 1 "" "01,111" / /0 ,:, ,,,, / / ? I / , �i aw a 111// I II �, / I /, IN I l 'll , . -- 4 d , ,&I f, �� ,/"/ I�, i/ & n as , �/, E / / / , /, Y'l Il . I ! , ,� I / o", / / I i1i ,,,,,,,,, P is I , d/d/d/li. 0 � is I P( I Y�/ 'w/ e / /// V pl� Is lI 0`1 / Of' 1"' I I oll / , /I', I F / , ,g, , q � "I , M"'r !; "O , , Ill I la//F o',ff �, _­11 I I, ),/ le e r ,/,,/,I/" a ,//s I i )11 � ,1�1, "Ill", � - A" /11111/111�,/C/11,� )" � L , , Ig / / / /as /, I c ass /,/, /?mv(��///o,?�' a .., . ,,, s, I j , " , , ///, / is 11 / to & a 1/; ]F'11� " g I&v vp , J, JO ,yoll - L " nz, , /1 1, i/ 5 , " I, /Offilly , / I I I "U'l,ga I r, g , ! T ;. IV / I /I 11 / El " I '' I p f1A ,­,,'' - , �,,i�, ", ii I , "I'll-, ,",'om ///,d 't I IP/ S 1/1 I" I I I / / I I "I o"', III I g?, "I 11 1% ... �ii���!!!!� I I 1/� "I I I I / ,//, , , , I , ...... ...... ""777"', """'gl", /,/ " , , I 11, /o, I "i , '' ; " III— I , l 11 11) f //, , �� /, A , ,,, ,� 'MR 4 / , ////'/ o"we" / Eg`/-§1 "U/1'L, " &,fii�,, -, n R A , " " il /, f� , 'e, / , ;,", Is in �A, ',W / " _// "O g / jp W` , / Tf , "E ,,�, y ,fp, l, ''#/ / If' g , " IF/ 1/1 I I )� & - / , / 7 )/,//B ,// �,/s , ,// 9/ J 11 " 11 f/ �#/@///R � //" �­'�/ I " /( d , , p g , - '11 W4 yf V a ,,, / / "I " 1,5 // I'l ,/ / , I, / 11 I ill 5 /;, 7 I , �? l l ;, IIA'All "I' ///"" , / I s/ "�ee 11 -1/1111 IM ... I'll I" I - f1d, )" 1 1,I'll �11 1 /, , �, !, 11 W, ,&, 2 F 0 & F "V A, , - A /Ii r 1400/7' I s I I 11ii T . z1I, //1'; I , I-P " I d , 1/0" , ,l, t I I I I 11 / ,& � " I , i OF 11' I All 7 A / , /I 1/// , F , / I 11 / , /� � M2 I I ; , " , / , A / - ks,, fy'. )/ I '' 5, , � gy , zlv�l, idd W- lam 1 " I I 11///1 wn", I , ", I 0] 0! ,,, l Of I,gl / /, I , Of), , I All iA !"'JIV I/ ,,,,//,;I/, ��Igi�/X� i , s r // ?,////, ";/ ia , 110" , //// 1" // //r s , A . 11 ;/ , � F OF Is! P 1 / /, 0 /I /I///, /, A 0 1 /// 01 ,/�, 911ill / I " , I "I AN `l I 's/o I " l / Ml , //, I : I I I & I e ly 1, �, "' I 3I / l" v -&Now- A UJI, Ig , go, � /I " 11 ii k.", "'T111111 I 11/ d/1k l,3/W,i`,,//,'//I SW , ,/?,,,, L­ ,// // g mlri / / / llg "", , PY7 , ! '117 01F r , "' I w f / I / , A "I l/ , `� " ,P a ; a /� / A ,/, 11 11 ,'I .107 , 1//i/l. I I 1 700 1 " // � J , , /1'l/ /� r, I/ 11 I/ o" � , 2 I I I -, ///,//// Ads"go' Ia 11,//g I 11mg/' ii ioi/ �e 11 ill! " I " Ll " , , , Aw I/ 04 - mp " " I I'll, r 7 ", " �, V./ , �, i 'ITI,171, (i,/ 'Z/,/,/ ,,, aff7l , , , / , ii , // , , I/ IF ,?/ A Ig I/ T , , " , I ", ", 4 ff, 1 / I ", I l I I,,' ,/ /�/l ., r j)", ", ,� // I I I I A A " , , ar/l/ / g , 't /r &'.�,,'/, / I � II 4/6.107 , , � , 0 , /// ,, , ,,,, , ,,� I ll I , , 1/1 I , � I I __ , ,// It I ) . o "I ,'/, / "', l;11' �/ - - I .. 1,11a, 'I, , 11 , //// 1111/ffiffiW/F ! or, I MR/11/il`1 . ..... , g ­/ '� , j� 1/1////, / s / / � I , � _ I , , ,j -, , I � / , t I/ "i, I WI I W, 1/�,' � g �% IF I 7 / /l 'g �,, j 11 /,� lFw/.211, o' / "I I,/ 1,1, 'lls 1/1, "'; "Ill, I / , �1�11 ;" /" �I%�//, ,�/ , " , " I ON l,lmip , , 1/111 JOW �1 , � 1 4 � 11 ­ /� " / a,, 'L�,fj , I , /,� is I m iiol , " IxIlf 's li, I of , , / , I / / i� ! 0, �,/ If: , A ,f, I I fil , , " / 11 , ,/ 11 , I , kW " I , ,a I/ i( N/�//l/t��,//t�,/ "I'll, i , I, " _10F � , � I ///, I I 'l" /A 1,; , 11 - , ­111WI-11 I 111 11 A " li! , I , 11 , ; ia� 1 , s , , , , / 1`1 illip'l ",///-/ , � lel /j/ I ot /// / / / /" /, s , ... aq , ll , i , o g,)/W/ffi1F/4sI "'I', BOB i i� // I f ` d I 11 I 0 I I F � n, / /I , a s /, F / ,a I/ / / , ,/ / I // , OF - 11 il , MID "' w I �, I , I W �?g I RD - Ag I , 111. I ;111 w 10/1, I ", 'IF ,--- 'If ... T q( " V/ ( 'im , "I'm I _/ ll, I "" //, � / , 'r / / 11 1111kh"g. , , , ", 14/01 /1 ­­­ , is, I O / , "; ", "I 11,g _', 4" "I / I I I I I/ // - '#` /,/, , , , ", "'T : ''Ill , I l: l ll/l/ 14 , "��//, , w ; I ... /A /�, . 1 "_ 11 4 11 , e w- 6- 1 , :',') ,� n", 1 IF l ­ - I 31 .. S ",.,/ �"///��//�/l", ,/ l 0 /I''- / � vi'm U�,/,/;// low'I" l , j , g F �/� �1, ��,,,,,,In, � ,,, la / , A I/ I ,/51 " � 5 , d / " s gpp If ''I I ;i�/11,/ ,/,,,,IF/" , MTOW, I '111 ,I , ,/ f 4, , "",/�,�/" � POPP � :,I � ,'� /,�o: ll / fd1r, ,/ E"g, O 11 LFN Ylf � ,,e r , , I PW , , x ��,/, ,,,, g/ , �, " j/d// : If I " 11 //j "'I/" I , 11 .. /, 1, ,�l , � I /I /Y /111,;/'1/1'/,ll, // " y , "' -: 1 f, , //// I 0111" w ... p ,`�, il, 0�/o, mol, , ,p/n, " 1r'fIiIlll�" N / I �� I A ,// , , I ", ,,,, ,le a , , , ""' ,/ 'All, 11 I/Il ,ga, ,l " I / / /I/ r � is, I / � , ,­"///, ,,, , / "' l01111 ill /Ill , , , "a, / I 5 I as 11 I V/gl­ _1I � 11 11 /I //, I'll , / ( /o , , / I I ­/ Z' /I 11IN If ")" I I a, . � 1 , T/M '511 / 110 � , /I , �,Iz a 11 ""I'll, � 11 1-1 I A N" /: I 4)", It s , N, f'J, flkv, , AN , , , ,// , , " " , / " 111/s, :21 I/ 111�/, J, '( g - Is "'Ok"IF / 1. ; "/;/ ` I/// "I" " I ­ F I , // , I r 1/1 1/�//" a/1 w I '� I fy � , I 1 1 1 'IV// 0, 4 " 1/1 at , ��,/� , I I AGO/ ` "I , ""Al/ ­/ I// I / illp / `// ... 11 'M I ''I "', 11 /// 1'' " , "I re //g/r/ I " Ig�/" I/ , I 11 // / /, /1111// 11 - � s", ,/fRkl : I �0 I "I "" /// /1/1 I'd I I I , I ", N, 11, /1, ""'/ . ..... // "///"/ ", 1, " ,/,i��//l/l/i/ , �'­ I , rl ...... I � o_ ', /�/g"/,, ///`/ '' ���­ , ll 11 ; "/ I 7 , T 0 "", ,,/I// I / "'O, � I sqvi III, A x lb", , / / "' i//isi Ll, , - ,/ " / , ... ll , - 1/1 N /111 / // / I /, 7 I I ", "I " 11 1. ,e), , o's �/ " l, /,/I It I /lo I OWNS ,,�, ,,, I I ,� , 11 P 11 Al I , � p1r,", "; , 'fel"I - 7 , I I Ej , ", ""' .. .... . �, , 1/1 � " x Al"I z' 1 10 IF 2'/ ,,ip " ""!", , 1, I M ,11", Z's", !I / ...... . , a / ii ,,, I .A107, Aw , 11I... I A, ,j s" lI l ///// ,'_ I, ,; A ,//, " I , / Ili /� � , /)// 1,11i"I", " " I w /I d , I I " 'WOR'll / "' ilI I 0 " ,/",/ /// a '? ad" I I I I I'l-Or/11,111 .... 1/1'�,�,�,,"/,/,/,/,""""�//// ,,,, ., _.,,</�g/,'�,* " , f, ,/I,, /� I ,,,,I , , )11f , " 91 l"N", " r , ,, , i/��1/1/1 51 ,A, ,/",l &L/111111111111111l I ��1111 " , -//Y// / / / r , , / A, " li.//, ,!"w/r/ Rot" 11 I I , / "I / " 1 , " ", sp I ,�o , ,/,/ ,/ / / IF ;y / / 11 mf I /// , "I / ", go 1_1_/1 I I X - I I , 11. I /0// llyw - Ngs - , I I � " I �,go . . . . . . . . 11 � "i", " / ZN ti 4(r ,� , I v"p, "' //,/I la"ll "I'll , 11 ,�Kr /?/ . 1;,1, , 01 w ll, /Plys I - Al, N ,;/"III // " " I'll ........... , "is " gUl 1, d///W , , / as. I 11 a J,',�,/// // " 0 . , /1P , ff" / " W /I " A ""/"//, ­1* I" /111 /I " l // E ,/m , "I'll, ols"r I A "' " ,;iR � I ll, gOR &/(/"/�/ .,/Ill Ad / / / I , 1 JY' " S, / , " faw / / ,//I l //1/ `,' '/ 11101 ',';I d'do/b/ " # I wIlllli, lg'l I AL I �'/ I �­' -1 r/ I 'If , , A I � 11 ll " / , " r/"/" , / , I ... g, I I , I/ // , ri , '::' :,': ,,,� 'r , " /// I / si , / ,//! g ; / ­v , , "; ,//, ,,,,, /, " ,/,////""///// , /.// illl//� / / I " "' ,, Ox/ �l 11/10/1 , " I, J, 4 l F 1, " " w as ; " : , 11 /, , 101" /,/, , , I - , " ,�,fil , I I ifflF, - " 2 - "I Ev, ". he I� I's 'g - "'g, / I . I "I'll, I 1 Sig 111 , , 4 I SP`1111" 7 rf I, ,, � 11// I, , /, _7 - ww�d lel'/' ffl, 1­1 31/110 z 1 .. I , It is I - & , s "' I'll , , a / / , I ,is i ,/ ,/ l �, #/I / /I "//. , 1� I 3/11 A 511 lay ammcIsl 'r , , I " I " AN //// � / E � 10 / ,,I, lip " I a 0 "l, I ///////� ad , '111'�,/ /, I - I- " I , " , I'7111 �,g / / it / I Y & a- da" s"1111, , /�g I , I/ /// r!, ...... /, :001 , I 1�1 I /I /I/ 1, , , ''I'll I I "I I:: I'd I � , ,/C ",/ 1/1 �� �" , SEA,' dppoliq I I I 11 , I 11 P, �,/Ill "Ar , 11 it� ox C " i'� Ar I/ ­14% , , I Is' 'I/// /I / ,I ..... /l,I, /11 s , , "I I i , , I ////// PC , I, I 1111F I , "'' I , /// , Ill, &'I, I , , is ll// " - " I" ,� I C ////, ,/ a/ , � I ` " " I a" " , v " - 1� / / "//' I I / ac / / ,,,, // / / / ,/ " ,,� ... f" , ", , , //1 ,/, ,q* / / )ijiilolll�'I�f711, , ... " IN,/ lip 71 - , #11111 1/// g`1/gA!/,/l 5 a 11`1/11 ,/;,/;/�/�/�,�//,/��//��//�/�/////,', ,/ / 10611 "I "'111111 ,//( , , I / - An %, A OW/A I I "// - g I , I ,gyam I ,J // I / s / ", Ell , I, , Adfm AFE"W, ',///, ,,,,,,,, ,,�// -­1(1'i"'f,f" w. P 14 1 1 01, ... ////Aii��///i//, ///,////////o//� ;lI,1_, ""I, " 'l ,,, I / / " / I 1/// l , " a ''I , I Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois Dempster Street • Dempster Street is an east -west Minor Arterial under the jurisdiction of the Cook County Department of Transportation and Highways (CCDOTH). • Dempster Street provides a five -lane cross section (two through lanes in each direction) along the site frontage. The median narrows west of Linneman Road from approximately 16-ft to approximately 4-ft at the existing RI RO access serving the site. • A dedicated right -turn lane is provided in the westbound direction at its signalized intersection with Busse Road. • Dedicated left turn lanes are provided within the median eastbound and westbound at the signalized Linneman Road intersection the signalized Busse Road intersection. • The Annual Average Daily Traffic (AADT), year 2022, on Dempster Street was 9,950 vehicles. Linneman Road • Linneman Road is a local north -south roadway, extending northerly from IL Rte 62 and is under the jurisdiction of the Village of Mount Prospect. Further north of Dempster Street, Linneman Road becomes Church Street and terminates in a residential neighborhood. • In general, Linneman Road provides a three -lane cross-section (one through lane in each direction and a center lane for left -turns), with a posted speed limit of 30 mph. • Linneman Road widens to provide separate left and right turn lanes northbound and southbound at its signalized intersections with Dempster Street and IL Rte 62. • The Annual Average Daily Traffic (AADT), year 2022, on Linneman Road was 1,600 vehicles. Pedestrian Facilities • A sidewalk is provided along the north side of Dempster Street between Busse Road and Linneman Road but only along the south side of Dempster west of the subject site to Busse • A sidewalk is provided along the east side of Linneman Road between IL Rte 62 and Dempster Street. • A sidewalk is provided along the north and south sides of IL Rte 62 from Busse Road east to the subject site frontage. • There are no sidewalks along any of the subject site frontage on Dempster, IL Rte 62 or Linneman. However, a pedestrian crossing to the site is provided on Linneman Road approximately 375 feet south of Dempster Street. Transit • PACE Bus Route 606 runs east -west along IL Rte 62 with a marked stop at 1311 W Algonquin Road across from the subject site. • PACE Bus Route 230 runs north -south along Linneman Road with a marked stop at the Linneman Road and Algonquin Road intersection. Existing Traffic Exhibit 3 summarizes the existing weekday morning and evening peak hour traffic volumes. Peak period traffic turning movement counts were conducted by GHA on Wednesday April 9, 2025, from 7:00 to 9:00 AM and 4:00 to 6:00 PM. The observed weekday morning and evening peak hours generally occurred from 7:30 to 8:30 AM and 4:30 to 5:30 PM, respectively. Exhibit 3 also provides the AADT (24-hour volume) along Dempster, Linneman and IL Rte 62 from 2022 and 2023 as published by IDOT on their website: www.gettingaroundillinois.com. Gewalt Hamilton Associates, Inc. Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois No unusual activities (e.g., roadway construction, or inclement weather) were observed during our counts that would be expected to impact traffic volumes or travel patterns in the vicinity. Summaries of the existing traffic counts can be found in Appendix B. Gewalt Hamilton Associates, Inc. ro, LO0 co ii� 4r to AMC: ft9) (z CIO 2 4r 0 0,[ 00 00 00 L EL EL :2 :2 EL ®� LPL IID, N CO Z99 IIIV 9 IIV -*� � ro, pH assnq III III Z 9 co 0) o® (6 mmM 80L It r 1Ia z88 � '— 1 cv �- .�% 0 9 U,Im w 8 Cl) V m Q Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois Crash Analysis Crash data was obtained from the I DOT Division of Transportation and Safety for the last five calendar years, 2019 through 2023. A summary of the crash data is provided in Table 1 with the locations mapped on the exhibit contained in Appendix C. Table 1 2019-2023 Crash Summary(A) No. of PD Severit� F Crash Type Percent Location Crashes A B C A FO FT F FT R SSD T PED BIKE 0 Wet / Icy Intersections (Crashes within 250 ft of Intersection) Dempster St at Busse Rd 36 22 0 8 6 0 6 3 1 8 5 12 1 0 0 31 % Dempster St at Linneman Rd ........... ....... 14 ....... ........... .... ....... ........... ........... .. 6 0 5 2 1 2 1 0 2 1 7 0 1 0 36% Algonquin Rd at Busse Rd 122 88 2 17 14 1 8 6 2 39 4 58 0 1 4 20% Algonquin Rd at Linneman Rd 13 7 0 2 4 0 0 2 0 4 1 6 0 0 0 23% Segments (Crashes between signalized intersections) Dempster St from Busse to Linneman 8 7 0 0 1 0 1 0 3 0 0 3 0 0 1 13% Algonquin from Busse to Linneman 8 6 1 0 1 0 1 1 0 1 2 2 1 0 0 13% Total (2019-2023) = A- 201 136 3 32 28 2 18 13 6 54 13 88 2 2 5 21 % ru=rroperty Damage uniy, H= iype H kincapacitating injury), ts= iype is knon-incapacitating injury), u= iype u kpossioie injury), r= rani injury B A=Angle, FO=Fixed Object, FTF=Front=to-Front, FTR=Frontto-Rear, SSD=Sideswipe Same Direction, T=Turning, PED=Pedestrian, BIKE=Pedacyclist, O=Other As shown in Table 1, the intersection of Algonquin Rd at Busse Rd experienced the highest number of crashes within the study area over the five-year analysis period, with a total of 122 crashes or 24.4 crashes per year. Approximately 72 percent (88 of 122) of the crashes involved property damage only and approximately 48% (58 of 122) were turning movement crashes. There was also a fatal crash and a pedcyclist crash at Algonquin Rd & Busse. The fatal crash occurred during clear, dark, wet conditions and was a front -to -rear crash type. The pedcyclist crash was during the day with rainy and wet conditions, which resulted in an injury severity of B (non - incapacitating). Another fatal crash also occurred at the intersection of Dempster St at Linneman Rd. This crash was a turning movement during clear, daytime, and dry conditions. Three other crashes to note are a pedcyclist crash at Linneman & Dempster which occurred during daytime, clear, and dry conditions with a C-injury (possible injury), a pedestrian crash Algonquin Rd between Busse & Linneman during daytime, clear and dry conditions with an A -injury (incapacitating) and another pedestrian crash at Dempster Rd & Busse Rd during daytime, clear, and dry conditions resulting in a B-Injury. No -Build Traffic Traffic growth in the area is a function of expected land development in the region. Future traffic volume conditions were developed for the year 2032, build -out year of the development (year 2027) plus five years. Based on a review of historical traffic volumes and the Chicago Metropolitan Agency for Planning (CMAP) 2050 projections (see Appendix D), traffic volumes along the roadways surrounding the site are assumed to experience an overall annual, compounded growth rate of between 0.34% and 0.99% per year. Accordingly, the 2032 No -Build peak hour traffic volumes (see Exhibit 4) were developed by applying the projected growth rates to the existing traffic. Gewalt Hamilton Associates, Inc. 0 ItC\l LIM.- 14t 00 00 00 00LO 0 0 00 00 00 O O EL OL :2 :2 EL >- >- U U T) T) 2� 2� (1) (1) (1) Q) 9 91 0 CNI 9l 0 m rnv' CC) o 99-Vm ®oe / 999 a o " 114milool J �rN 8 III '� T ro" pH assng ... m 98 gym, co III 9 co N� n 8 8ZL U99) 4398CO1 I„,) Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois Part III. Traffic Evaluation Future Site Characteristics Proposed Development Plan Cloud HQ proposes to construct two (2) data centers on the site, with multiple floors comprising approximately 2,172,000 square feet of gross floor area. Access for the Mount Prospect Technology Campus (MPTC) will include two gated emergency only RIRO access on Dempster Street (one existing and one proposed), a new full movement access on Linneman Road, and two new full movement gated emergency accesses on E Algonquin Road. The following summarizes the proposed access points and locations from existing intersections. • The existing RIRO on Dempster Street is approximately 1,025 feet west of the signalized Linneman Road intersection with Dempster Street. • The proposed RIRO on Dempster Street is approximately 800 feet west of the signalized Linneman Road intersection with Dempster Street. • The proposed access on Linneman Road is approximately 750 feet south of Dempster Street and approximately 350 feet north of an existing access drive on the east side of Linneman Road. • The proposed accesses on IL Rte 62 are located approximately 700 and 1,300 feet west of the signalized Linneman Road intersection with Algonquin Rd. These dimensions are also illustrated on Exhibits 5 & 6. All internal and external circulation and access improvements are anticipated to be constructed with the first building which will be delivered to the end users in the second quarter of 2027. Building II is expected to come online in 2028. The June 30, 2025, Preliminary PUD Site Plan prepared by GHA is provided in Appendix E. Trip Generation Table 2 summarizes the traffic generation calculations for the proposed development. Trip generation rates published by the Institute of Transportation Engineers (ITE) in the 11th Edition of the Manual Trip Generation were used to determine the anticipated traffic generated by the proposed development. Given the total scale of the proposed development, GHA calculated the trip generations for two individual data centers of approximately 1,300,000 and 827,000 square feet independently and added them together for the overall development. See Appendix Ffor excerpts from the ITE manual. Gewalt Hamilton Associates, Inc. Cn-0 Cn � o 0 Er cu 0 0 o O)o � Q � ~ O O Cn CN t� IY� C10 um li to :) 6 �wllll lllw CIO cz 11° u III CD Y^^� ..... IIIIIIII O O1 IIIII E CO co co Ir- 00 O N � � Q O co ~ O N Cm °O O � M C W � � V C) C) Cn CD Oco N 00 L 0 N O CA cm N ' Z N N w L CL CD U M G) (U Q C) CU > � � 0 UL cn _o a) :t=f a) 0 cn -0 0 cn U � Cll CD CM N � � O � � � � O Cll .2) Ca to >, ♦--� > (� M O _cncn a O m CU to Cll U cn U) Ca O CD M-0 0 a ca -+--. a) CM (Un ca . �--� cn O U) Ca �-_• _N Ca U L U 0 0 Q Cll O C9 CU a) O CU O � � Ca U O � � U) CD Ca 0 cn (ll CQ Ur O Cll O W � � N O U �. ct 0 'cn Cn CO 4 -� Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois Trip Distribution Table 3 provides the anticipated distribution of site traffic. This was based on existing site travel patterns, proposed access and the operational characteristics of the adjacent street system. Table 3: Trip Distribution Route &Direction Percent Route To/From Site Algonquin Rd (IL Rte 62) Arrive Depart East of Linneman Rd 25% 25% West of Busse Road 25% 25% Dempster Street East of Linneman Rd 15% 15% West of Busse Road 10% 10% Linneman Road North of Dempster Street 5% 5% Busse Road North of Dempster Street 10% 10% South of Algonquin Road 10% 10% Totals= 1 100% 100% Traffic usage of the area roadway network is also illustrated on Exhibit 5. Site and Total Traffic Assignments Exhibit 5 illustrates the site traffic assignment for the development's trips, which is based on the traffic characteristics summarized in Tables 2 and 3 (traffic generation and trip distribution) and assigned to the area roadways. As previously noted, all external access improvements are anticipated to be constructed for the initial building completion (2027), but the complete development will not turn over to tenants until 2028. Therefore, we have considered the total impacts of the complete development for the year 2032, build out of the final Data Center plus five years The MPTC site traffic (Exhibit 5) and 2032 No -Build traffic (Exhibit 4) were combined to produce the 2032 Total traffic, which is illustrated on Exhibit 6. Gewalt Hamilton Associates, Inc. J W WC� N 0(D0 vi HWW u 0 w Z) n <2co C'3wZ) N 1 C� N N T T L, 9 _t LO T V Z J W Z N w cr H W W Q 2 (n c) w ::) 00 00 00 LO 0 0 0 0 00 00 LU O O I ov EL EL N < EL (0 >- >- U U T) T) 2� 2� (1) (1) (1) Q) q CV)X " Lab, �� Co C\j (n C'l 0 �ftilillOw LO C) I 00 0 (0) 0 OLLJ oz LIM.. w cc W W ro- 4-0 CO 4_0 (D Q. E a) cl < 2 U) CD w Z) 0 "lliv ............. a) 9 91 (0 i� P.1) 000 .4 9 9 V (9 9 Z.) r*-_ N N 9 0 J. [) 6 L (V Z; co C\l co 6 9) 2 Z L (V L) 0 9 co cc) ,affl Aft Ar- AW 1% N �i 0) z 0 N,_ Cl) W Z Q) 0 C) cc w w 2 U) w D (0) ® ®® Cl) QD �0Z1 (8 9 0 999 (CZ 6) Z; I c (9 Z. V) (\l NAW CV) < CL 00 00 LO 00 0 0 EL EL :2 :2 < EL T) T) � � (1) (1) (1) Q) Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois Capacity Analysis Capacity analyses are a standard measurement that identifies how an intersection operates. They are measured in terms of Level of Service (LOS). The concept of LOS is defined as a qualitative measure describing operational conditions within a traffic stream and their perception by motorists and/or passengers. A level -of -service definition provides an index to quality of traffic flow in terms of such factors as speed, travel time, freedom to maneuver, traffic interruptions, comfort, convenience, and safety. Six Levels of Service are defined for each type of facility. They are given letter designations from A to F, with LOS A representing the best operating conditions and LOS F the worst. LOS C is often considered acceptable for design purposes and LOS D is usually considered as providing the lower threshold of acceptable operations. Since the level of service is a function of the traffic flows placed upon it, the facility may operate at a wide range of levels of service, depending on the time of day, day of week or period of year. A description of the operating condition under each level of service, based on the analysis parameters as published in the Transportation Research Board's (TRB) Highway Capacity Manual (HCM), Sixth Edition, is provided in Table 4. Table 4: Level of Service (LOS) Summary Delay seclveh LOS Description Traffic Signal Stop Sign A Describes conditions with little to no delay to motorists. <10 < 10 B Represents a desirable level with relatively low delay to motorists. >10 and < 20 >10 and < 15 C Describes conditions with average delays to motorists. >20 and < 35 >15 and < 25 D Describes operations where the influence of congestion becomes more noticeable. Delays are still within an acceptable range. >35 and < 55 >25 and < 35 Represents operating conditions with high delay values. This level is often E considered within urban settings or for minor streets intersecting major arterial roadways to be the limit of acceptable delay. >55 and < 80 >35 and < 50 F Is unacceptable to most drivers with high delay values that often occur when arrival flow rates exceed the capacity of the intersection. >80 >50 Capacity analyses were performed using the methodologies outlined in the HCM, for the following scenarios: • Existing Traffic -Existing traffic (year 2025), • No -Build Traffic —Future (non -site, year 2032) traffic with background growth • Total Traffic— Future No -Build traffic volumes (year 2032) plus the addition of the MPTC site generated traffic. Table 5 summarizes the intersection capacity and queue analysis results. Capacity analysis summary printouts are provided in Appendix G. Gewalt Hamilton Associates, Inc. m E E cn .V L cQ — J LO i -_ C Cfl co 00 L iV O O N O N O N (j N 1 O N I i ♦"� Q LO CSQ LO N r C6 Q q co CV Q N r ti Q 00 co Q M M oo � co > O M a N (M O N co LO � 1l c� M a LO M c� LO , � r Lo a CO � ti 00 CD � o C- Q a a a a a co JQ�M QM mom m�� mN� mC6 V O m N CDm M m m 00 � m (37 U-) C.� O coiQ N N N CN o_ Q Z M Q M ti rco Q CO M CO Q O cn m O ti m N O r CD m N 0 Q O ...� ti .... co ...� I � N a o O m m m m Z J Q m Q ti coo Q � O7 m 0 00 N m N 0 I` m N � �.i N N Q C' ' i V 0o 0 O Liz 6� M N CIO 0 O M M ti ti CO 0 Ln ti cn LO Lf� 07 G� Z O CO . m N 0 0 LO LO °O � N O to N r O N O O N C6 0 N Lr) N M 0 Ui O M CO Lo LO � 0 O co LC) 1� CO CO � � > N 0 W W ti O O O Cfl LO" N O N O J W co (n W ti o M W ti O W M m W O M W O M CD N co co CO ti N ti ti J m O ";I- CO O ti ti j cD ti O o c0 Lo N LO _M N !Q M N p~j � M N CD LO O M � � M M :I- 0 LO ti cnM M L � co N� C0 -0O -4--• LO Lf7 LO U') L{) U-) N .. II U) co o 0 0 0 0 0 A w J c� 0 CO LO 0o � LO LO D� LO Ln Lo 0 co CO M 0 CV co N co O Ca M Ca Ca Ca �- •— a� o) M a) o) M 0,) o O)0 O)0 O)0 p cn C C JO� C LJOU) C/) m V ooJoU)JOU)JOU) JO FD JO O O aJO aJO V J D• - a) Ja) - cc • � U a � U oO • � U a • U � U�C) 0 • CZ m- � c O =� � O � � 0 LO CZ Q LO� LO LO LO LO Rill W W w 0 W 0 co W c W co cc m L cc •= Z ~ •� Z cn H W N N W N N r Im1 oo":% O �'i E E cn .2.11 0 cn 0 a� a� J LO i -_ C C� O7 N U') N oo m r O m N Cfl m N i m m Ln M m M M m I` CD N C� O CO N co co V N M N N N > r m coco r Ili m M co r M m Cfl M Ili m M, N� _ 0 O N N V� N N CO N N c o J co m N co m N N m U-)comN co co m mI,,- co m 0co i V� I� m Lf� Lc) m co m C6C.� co I-- COr co C.� N co o N N L. C C Z O O - M Ln m Cfl OO ti - m O Lt'� - ti CD m M C� . co O V M �V O - O N N 00 - Lo N V N�� C O r N m Z J m LC) N M m 4 N I` m Ln IV-T- m 0 co M O O T- C.i O N � V T- N N C CD � 'i V N m A O O m Ln OMO M m LO qr- O m ti O m CO m � Z N N ti r O 0) O 00 N M N r O ti r I` r O r m CO r O r m COE r � cn � m O m m m m m C0 J Q m m m co Q M Q� COQ m cn cn Cfl G � � M mod O mMU; CD�� m�� Q�r Q�0 00 Qm00 _0 F M N - O O oq co 1` m M N 00 m 0 0 N Q cn 00; r Q cnXO; Q Mm O; a m m m Q Q Q n'�JQ0m cq mCN Q0� QcoN Q�'N Q00N p`- ca `- ca `- cU `- ca `- ca `- ca AW .— 0) 0 0,) 0 o) 0 o) 0 o) 0 p to cu U) TJOU) cuIOU) mIO� LJOU) m o C� to O a� J O a) J O a� a) J O a� a) J O a� J O a) a� J v J 0 J 0 J 0 J 0 : J 0 J 0 c O O O O O O � m- � c = ca- --F= C� 0 Q Q Q Q m Q 0-) Q W W W 0 co W c W GC cn co .— U) i t� L t� L L O C� J lc F- � m 0 w F- � m G� O p O p cn W N N W N N N O ;i L E E co V it 0 C9 J LO - i — O i V O O ti iV N V N V co Um L6 M M co O }a�, i i cn V N M N U N p M CO "' co "' co co CO G' O N O V M N OO M V M Cq � V M N co D L C? O m� CO Lo r C9 W O M > N CO M N N CO M N M O LO O CO 0 V V V 0 G J m m o0 I` m o0 c I` m o6 00 N 0 CO� ti co V co S CO CO V M S CO CM V O 0 or M 0 m M 0 m M Co C-0 N m C9 co m V- co 0 Q c � T- IV- � T- IV- 'r-♦.+ O O F --ft% COoo I` cfl m,�rm���m��rC�N�NVNOMVNOM O to . co to OO . coOO Cfl ---% m M � ao coOO nj O N . O a Z-0 i N M N CO M N CO O m t� C.� m -aC� Z H M O 00 ti M O 0 ti co M O C.� I` O V? co p CD CD � W O E � CD W O O 0.0 N N N N O C' i V CD C� co � N coo V co V�� N co C� N O N C� ti C� N r N M CO V N N 0 Z �_ coN O C� O N � Lo O C� � I` CD M O V COC4 - 00 C� oo ":I-U O CDDD 00 O 06 U M co M CD V M N N N N II u) 0 O -:I- J C,� — CD CD N C� CD CD G M M M M N co N M N i� mCO CO O m�� M N m j O cq co U N M O U N M L U N M !� i O � m Uj N m CD CDm 00 co ~ CDm � � � CO N O � m M � M � m LO M � ti r o M �n m �--• N .. CD N .. N N .. N .. N N .. N II cn Ca m 0 0 V V V W n J O Co Ca M Ca M Ca A- ._ _ 4-=; N O C) N O 0 N O C) N O M N O 0 =F. a) O o O to cu 0Cf) gJOU) cJOU) —D igJOU) �JO� �JO V to O 5 a� J O 0 a� J O a� J O 0 a� J O aa� J O FD a� J V J D N J D J N J D J N J D a)' • � V ' • � U ' • � U ' • � V ' • � U ' • =3 U c 0 0 0 O 0 O ca- ca- 0-ML O LO Ca_ LO C:)_ LO LO LO LO M W W m 0 W x W c W � W t E cn co li N L C� L �..� m F- G� i O Z p H O Z p H � •= N M M ,� M M W N N W N N cr 0 a a M Imi oo":% 0 ;i ca E E cn a� .2.11 0 cn 0 a� a� J LO i — 0 i 00 Q ti m Q ti Q O7 07 Q CD 07 Q coQ 00 O a� i -0O:f V v v V v v V v v V v v V v v V v v G� m r m Ln °r° m CO C� M CMC� Ln j �y C� Ln Lo N > M N CV CV CV C0 m m m V V V c J m Ln 00 N m O M m O Ln C Ln � N coN C� C4 O CON U 6� I, t v v v V v v V v v V v v V v v V v v O Q C QU O _ r Lc) CD O M 1` Q Z m r m m � r V N CO N V M CDN V N� N Q D O m m m o 0 N U N 0 m a Z J n n n n n n n n n n n n n n n n n n CL C.i -- = 0 CD -= V-0 E Q� C� o Q Cfl Q 00 Q � Q Q cc N AW � E 0 Z r N 00 Q ti N r O O Q� cnQ Cfl ti co CI -OHO O I—Ln Q O O Q� Q co N Ln � Q 00 I 00 � � cn � Q Q Q Q Q Q 0 J Q C CD Q O Q N Q Ln oq Q Q N i co i� J QcoM QcoM Q�� QLI Q�� QCDti 0 00 Q m O CO CO CO .... 1` Q CO ti Cd CO CO ...� Q C ti ti ti .... N Q N Cfl Ln Ln ...� O Q O Ln Ln 1` Q~ to c a a a a a a Ca n 1U J CD CD QCDC-0 Q�� Q � CD Q� QCO� U) 0 `- co `- ca `- Co `- ca `- M `- ca AW a) =F. a a) =F. a a a) 0 to cu 0Cf) g JOU) c JO� —D g JOU) c JOU) mJO C.� to O 5 a� J O a) a� J O a) J O a) a) J O a� a) J O aD a) J V J D J D J J D J J D � >� ' • =3 V ' . =3 U' • =3 U ' • V ' • =:3 U ' • =3 U � � 0-ML Q Q Q Q Q Q M W W W (n W c W � E � W t s= cc cc cn m co O . - s= cc �� H w � j J H m _ ca H m _H cv G� i � •= O Z p H ,� O Z p H N M M M M W N N W N N cr O a a U N .cz U O cn CIO O cn - c __ Q 0 O E r 0 0 � Q 0-)o Q 0 0csq cn 0 t0 L E E cn c.� cn O ■ J m m LO H E Q N N r O O O o a a a a a a JQ�o Quo Quo Quo Quo Quo 0 o O CL z� � Q L >, 0 0 mz J ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ V ■ - 0' L L Q± O Z r Q CO O r Q CM O t0 Q co O N Q N Lo O N Q N� O Cfl Q CO Lo O cna a a a a a o J n ■ ■ ^ ■ ■ n ■ ■ n ■ ■ n ■ ■ n ■ ■ c� C/) CID A W J ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ Q -F= (D --F= (D --F= 0) =F, 0) mF, N --F= (D _ 0 AW m CD o U C� �J0 01) o N U LU 0 c:n o a) � �J0 01) o N� �Jocn cn o N� mIoU) ODo N� mIo C.� O� a� J =3 0 a) a) J =3 0 a) a) J =3 0 a� J =3 0 a) a) J =3 0 a) a) J = J o C) 0 o C) M c- U • . U • . U • . U • . U • . U • . U 0 0 0 0 0 0 O Q Q Q Q Q Q W W � W cn W W v W v . cn cn H N v co v O U) a� 0 0 0 ~ }+ ♦"' N N ♦"' N CV W N N W N N cn - c __ Q 0 O E r 0 0 � o 0-)o �Q� ~ 0 0csq Qcn oo":- t0 L E E cn c.� cn O J LO ca H E O O O t 0 o 0 Z . O ui . r N Q L � a a >, 0 O In � z J QP— LO QLq M Q V 0 .— i � � Z 0 J i m 0 0 Q O 00 CD C/) m Q LU U) rCL A •— 0 01) 0 0) M 0 mU) c J O U) ca J O V LL O N � J O NG J to O O c 0 Q Q to co � s w s w cn cn O -- ♦"' w H H U cc is i cn H H �+ N M CV M w N N Ecc V V CO Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois Total traffic conditions assumed the following, with Exhibit 7, illustrating future traffic operations: • The painted median along Linneman Road will be restriped to provide a separate left -turn lane. for northbound traffic. • Stop signs will be installed for exiting traffic at all site access driveways. • The Linneman Rd access will provide two inbound lanes (one for auto traffic and a second for trucks) and a single outbound lane. Access Spacing • The existing RI RO on Dempster Street is approximately 1,025 feet west of the signalized Linneman Road intersection with Dempster Street. • The proposed RIRO on Dempster Street is approximately 800 feet west of the signalized Linneman Road intersection with Dempster Street. • The proposed access on Linneman Road is approximately 750 feet south of Dempster Street and approximately 350 feet north of an existing access drive on the east side of Linneman Road. • The proposed accesses on IL Rte 62 are located approximately 700 and 1,300 feet west of the signalized Linneman Road intersection with Algonquin Rd. The following summarizes the findings of the Capacity Analyses. Dempster Street at Busse Road Under both existing and future (No -Build and Total) conditions all northbound and southbound movements at this signalized intersection operate at acceptable Levels of Service (LOS "C" or better) during peak hours. All eastbound and westbound movements experience longer than desirable delays and operate at LOS "D or E". Overall intersection operations are expected to remain at the same LOS and the development has a minimal impact on the intersection's operations. No changes to the existing signal timing and phasing are required to accommodate the development traffic. Dempster Street at Linneman Road Under both existing and future (No -Build and Total) conditions, all movements as well as the overall intersection operations at this signalized intersection are expected to function at acceptable Levels of Service (at LOS "C', or better) during the peak hours. Despite the proximity to one of the primary access points, the proposed site traffic has minimal impact on the intersection's operations. No changes to the existing signal timing and phasing are required to accommodate the development traffic. IL Rte 62 (Algonquin Road) at Busse Road Under both existing and future (No -Build and Total) conditions, all movements at this signalized intersection operate at acceptable Levels of Service (at LOS "C" or better) during the AM peak hour with the exception of the eastbound through and right turn movement which experiences longer than desirable delays and operates at LOS "D". However, overall intersection operations are expected to remain at the "Design" LOS C or better and the development has a minimal impact on the intersection's operations. During the PM Peak hour, some movements experience longer than desirable delays at LOS "D or E", but the overall intersection operations are Gewalt Hamilton Associates, Inc. Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois expected to remain the same between No -Build 2032 and Total (with development traffic) 2032. No changes to the existing signal timing and phasing are required to accommodate the development traffic. IL Rte 62 (Algonquin Road) at Linneman Road Under both existing and future (No -Build and Total) conditions, all movements at this signalized intersection operate at acceptable Levels of Service (at LOS T" or better) during the peak hours. Despite the proximity to one of the primary access points, the proposed site traffic has minimal impact on the intersection's operations. No changes to the existing signal timing and phasing are required to accommodate the development traffic. Linneman Road at Access Under both existing and future (No -Build and Total) conditions, all movements at this unsignalized intersection operate at acceptable Levels of Service (at LOS "A" or better) during all peak hours studied. Despite the proximity to one of the primary access points, the proposed site traffic has minimal impact on the intersection's operations. Linneman Road at Proposed MPTC Site Entrance Under future conditions, all movements at this unsignalized intersection operate at acceptable Levels of Service (at LOS "A" or better) during all peak hours studied except eastbound coming out of the site which operates at LOS B by an extra 0.1 seconds of delay. Gewalt Hamilton Associates, Inc. } U� z J W Z O ii <I W w w mm Q2 (1) (7wZ) } U} Z J W Z O C7 w ::) MINN 1 i T... Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois Part IV. Recommendations and Conclusions Analyses have been conducted under existing and future conditions to determine the impact from the proposed data center development on the study area intersections. The capacity analysis results indicate that the increase in project site -generated traffic has little effect upon the operations of the area roadway network with the recommendations contained herein: • Stop signs will be installed for exiting traffic at all the proposed access driveways. • The Linneman Rd access will provide two inbound lanes (one for auto traffic and a second for trucks) and a single outbound lane. • Access to Algonquin Road and Dempster Street will be gated and for emergency use only. Part V. Technical Addendum The following Appendices were previously referenced. They provide technical support for our observations, findings and recommendations discussed in the text. Appendices A. Photo Inventory B. 2025 Traffic Count Summaries C. Crash Summary Map D. CMAP Traffic Projections E. June 30, 2025 Preliminary PUD Site Plan F. ITE Trip Generation Excerpts G. Capacity Analysis Worksheets 5253.220 Mt Prospect Tech Campus TIS 07072025.docx Gewalt Hamilton Associates, Inc. Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois TECHNICAL ADDENDUM Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois APPENDICES A. Photo Inventory B. 2025 Traffic Count Summaries C. Crash Summary Map D. CMAP Traffic Projections E. June 30, 2025 Preliminary PUD Site Plan F. ITE Trip Generation Excerpts G. Capacity Analysis Worksheets fail, GH, d 1 Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois APPENDIX A Photo Inventory r m E i J t v m O L m cn L O L V m O Z O O J m E J t� m O L CL CL m AW cn L 0 E 0 O L V m f+ O cn cm O O J 0 a. O O AW O a. Q x CL CL CD cm cc a. O }. O Q x 13 4) CL CL L�J /W V m L. W AW OR MENEM E O L I.L O a O L m m O cn 0 O J CD C� m L W cn OR I.L cr r. O a O L m m Mt O z O O J CD C� m L W cn OR E O L I.L O a O ea m W O O J CD cm cc a. O O AW O Q x INIMMEME 13 CL CL I r,� CD V i L f+ r. W 4) 4a MENEM O L f+ cn L Q O L V m m Mt O Z O O J V L i W cn E O L cn L CL E 0 _O ii f+ CD O O J CD 0 MENEM i W cn .ENEM CD E O L vI L CL E 0 0 O W O O J CD cm cc a. O O AW O Q x INIMMEME 13 CL CL I V i L W 4) cn m L O Z MENEM OR CD E O L I.L i J O L v m t O cn cm O O J CD v L W cn t Mt O Z CD E O L J O ca t O Z O O J CD cm cc a. O AW O Q x CL CL I CD V L i W 4) AMEN .E MR CD E O L N� I.L i J O L v m t O cn cm O O J CD v L W cn _0 cm MR CD N� I.L i i J O L V W cm O O J v L W co CD E O L I.L m E J _O m W O O J CD cm cc a. O AW O Q x CL CL I 1 V m L. W O E O L I.L m E J O L C� m m W O O J t� L W cn t O cn 4a m m E J O L V CD O O J CD 0 r. L W cn O cn E O L I.L i J _O m t O cn O O J W cm cc a. O AW O Q x CL CL I Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois APPENDIX B 2025 Traffic Count Data X W QL QL El L. LO j N Q O N 0 N O E •• Co a) Z OZ �U N O�Co U c/) (3 n U) U C C) N co � N .� 0 > M .0 N 0 i �--� cm ^E cw i--+ _O to " �. � �O .00 CC G L _M Q C) N cn � 0 C� O I 00 1-1 70 -0 Q Z) m Co C }, O U) (.0 L I 4-N�.O LO ON0i 2 � ti H O r O Lo F7- Oi CN m 1 O o0 tico N N 00 LO ti N ' 1 L6 c.0 �v O v C M 't LO LO � Lf) � CO CO Cfl CO CO CO Cfl LO M O O L� O H Q LO N O co O M co I � co O) M Cl It M LO O I N rl-, f� 00 O Il- O ti r O O co LO O) f-- O 0o O m 00 co CD O , O O N N r N r N CV O O O O Q Q M r M r M M O N r C0 CO M ti LO ti N O N LO CO N N CO M CO ~ C)O N N r co CD O O O O E O L I_ O � Q- � M r co r N N f� N M 00 CO N ti N CO U*)� N Ln LO m ;I-LO M CO In M N CD LO oo Cc LO fl- O LO CO N r CO LO ti LO r O r r O CD O O O � W N CO ti ti LO LO co M CA , LO r MO M In O M ti 00 CD M M m ~ CV r- LO 0o r C:)J O r r r r r N N r N N r N O N N Cvy N r O CD O O O O O O O O O O r O O O r r O O O r N N O O O N O 6 O r O O C) O O O O C7 O CB 0 O N LO N (0 N CO M 't C) CO CD f— CO 't LO � N r r O N r N LO CO 00 f-- O M It LO N CO LO 't It 0') U) LO COO OM 1 M O 00 00 N N M O O C?O C) Q s? r r r r l,0 r r r r CO N N N N 0') N N N— 0') M N 0) r r Q � N N f� N LO N N M "t M 00 M CO M r N N , M In t CO N I` r ti 0')Cfl ti ti C) CO C)r C0 cD N CO o6 m 00 LO 00 N m LO C) O O C) r r N N N O i CA LO C� O O 00 00 O 00 (+) LO N r O N r r N r LO O r O 00 0) CO r r LO r O O r co O r 00 O ti 0) CO r M M r r 00 r r M r CO C0 N N N M r LO N (.0 r N O) O O CO N CN O O O m O z c- r M N M O M O O r CO M I-- N LO M M N m (o � O Lo 't 00 ti O r N O C)O C)J L :3 O O O O O r O O O r O O O N N r O r r CM (0 N O r O CO O 6 O O O O O O O O O O C6 N O CD N f- C) N N 00 47 O CDC) O cM C)r C)f� 1 r CD r O N N I` M r O) r CO M d7 C)i- 1 O C) 00 N O O O M O O O O QO r r r r r r r r r r r r r r N � a7 N Q Q I r r r r f` r M LO LO r � r LO r LO r O LO , CO N � N M ti N CO N ,I-M M M LO M N M ~ M O M Cj M N r O O O O O O O r r L j N Nt 0') M M U')I M LO It M It O CO I � , d7 It r It N It LO I � CO It O � M LO C)C,,)N LO CO r N M O O r r r r o0 ti CA N O C7 (U J CO M f� N CO I- N 00 M N In LO N It O O M NU-) In 00 r It CO M O LO 'tr CN CO N ti CO r ( ti r Lq C,4 M CDC:) O C7 C L CD C) Q Q CD CD CD C) C) C 1 (] Q CD CD CD C) CD CD CD n Q C) C:) C 1 Q 1 C)1 CD 1 0 LO LO r M O N r N CO O CO I--O 't CO W f— f— M M 00 00 CO O O C) CO 00 O I` CO CO CO CD O 00 O M N 't C) LO C) CV LO co ~ M LO ti LO 00 r CD O C) Q co M N O r Q O a0 r LO r f— In � r I r r N 00 r O Il , W r CD N U-) r N N LO I� O r 00 r CO r 00 r M (\ LO C> O r M m Cq LO N r C)q O C)CV O N N � C: a0 L M N m CO r CD m 00 � 00 N LO CO CO f-- It N � f-- CD O .I -CO 00 Cl 00 N CO I-- LO It N r r— CO r ti M r CO It r It LO N r O ti N 00 N � LO r C9 00 r ti O O O C:) m O co 00 N M w � r r ti r N LO O r r r 00 r f� r CO U-) , O M M N � M Cfl M co N r M N r N LO N CO N LO m r M co O? Or f'— M LO N CO CV M CO co r C:) O O C:)J O O C L Z3 O O O O O O O O O O O O O O O O O O O O O CDCD CD C) CD CD _ o z � U) L) ~70 Y Dco _006 0 O ~ Q Q Q Q o LO o LO O r M � Q Q Q Q o LO o O r M � Q w o LO o LO O r CO 't � " o � o LO O r CO � � H � C C) o L p J O (6 C: O ti ti ti r- p co 00 00 0o p m O i� i� O Q o o M U * Q m Q a m o O M L. LO j N Q o E N M 0 N o E .. cO Co��.. Z OriZ cm Co U c/) (n n O fn V C9 s` C � U) cA Cj -� i Co 4-5 M -�CO N -U �w C:� -I-- 0 cA U) �o °� Cow =o 2 +-+ N O) Coo =rn = 00 C� O It �\ Cll ~ 00 1-1 CU 70 -0 Q Z) m C Co C A.-P O U) ILO L I — O �NLO 0i 2 � ti 0 CM ti cu a--+ cu 0 O 2 W W W 5� G 1 r U-) O LO ti 't LO ) i ico N M M r u, CO C")v, CD C:)v CD C N O r H O co O O LO r co O O O O Q M M r t` C)r O C) C) Q Q r CO O op N Ln It O O C) O O C)O O O O O O O O O r U) -0 L I_ O i Q N N ti N 00 N r-- N � r N N M O r O r C:)CDO O O CD a) � W 0 N J r-r 00 ti N N ti O o 00 r C:)C) C:)C) C:)00 O O O O O C)0 o 0 o 0 CD O 1 O 1 ~ CO co M rl- m pN Q s? N r M r Cfl r CO r 00 Ln a7 N OMO O N Ln p oO co O r O O Q O LO LO co co M N Cfl r 00 O O O CD r N O r OO r (n -0 i 0') CA 00 0-)r U') O r r LO CO lf7 N 0 r 00 M r r O O L H N O m 00 N C)t m ° z 0 M M O 00 rl- 00 o O C O C JN O C) r CD L :3 O O r O r N C:)O O O N O r O 6 O r O O C)C)C)O O O O F (.0O 0 rl- Or 00 O O) O I N ti O N M p r M N LC) O O O O Q� Q r0 0 Q r r r-- r Lo r t r r` Lr) M 00 N 00 (Moo 00 N O O O O O O O O OD LSi j 0 L Q � M LO M In M t r CO N � 0 r N (.0 CO M C'7 r LO O C:)O CD N >O I � C\lN O C)Lq O r LC) C:)O J (9 't co V) r O� r m N O O L CD C) CD CD C) CDcs O pp O O O O O O ~ O N r N CO r- "t O O N C)� CD00, LO a) r Cfl 00 N LamO co LOC)C)C)Q SZ N N r r 00 O r` M Q ti p M O N 00 LO M O O O O r r r r CO I` M 00 O Lid 00 O C> 70 70 c (C) L r O O 00 N LO CO Cfl 00 O M (D M U) 00 00 00 Ln O N CO ti p O O a) m O CO N r r r r` CO CO p (o M a) r r` r O r r r N LO M CO Cfl N Cfl r.-:r` O CO M r— O O O C:,O C7 i O O O O O q q O p O CD C) CD CD ~ U o +� L - a) U ~ U m 0 C ° O O CDCDo M 't C)r o L �a O = a a, J J aa)i U C� f� f� 00 00 Q o U -0U Q o 0 N El LO j N Q o E N a Q) 1�1- N o E .. Co a) Z O�Z �U-t-, N O��(o Ucncnn Q) Q Z) U m C � _0 C }, O U U ILO L I �N ' O C i - LO M ON= ��ti(D O CM 14 cu a--+ cu 0 Z W W W 5� G 1 a0 ti N co '6`j N r,:cV O O O co co CO co O O 75 Q O r— T O m m O CO M M O M 6 M O O O O O 0- Q O� Lf) m N N d� O M r N O O O O O O p N _M O M O O U L Q M M In CO In CO Ln M (fl co ti cQ M o O O O O O O O N O M O N O O O O O � W J m r o CO m N r,- NC) LO N o? CM r` 00 0 Or M r o r CD 0 O O 0 O O O r O T ll' CDO O o N o T 0 O O r O O O CDCDCDO O O (B Q LO N w CV It N N N O T O d7 M LO O CO O r CO O) O O 00 O O O O Q Q O �-� N ti r ti M ti CO ti 00 O N T CO N r co O lf) O O O r M O N ti O O O O N 0 i cn = o O w o m CO M M o � m o r` ti m M o M Cfl CO co ~ 6> O O O r T r T r` CON o r` O O CD O m z ti O M 00 co 't wO O (=)O O O JM Cfl o — O r O O L O N r O M M O T CSO LO M O M O O r O O O O O O O O O r O (N M m M " T T- N � O r r T M N M COM O O O O Q Q - T r O Q � M co r r LO o 0') r-- r-: M O O O N cM T N 4 o (0 MC) O 70 L Si O L Q-0 = N ;t O 't co -t O -t N 00 ~ C~ 00 (O N � M co Cfl T N T T O p NOO o a) J LO In 00 "tM r CO T co M r-- O 00 = O Lo r � O N N r CO O O O O L CD O CD CD O o CD O OO O O ' O ' O ' O ' rn CD o 00 co CO co CD r- CO ' 00 O o M C ! if ) N M O N O r` 0-)M o 0 Q Q Ln r N N M r 00 T t Cq O 00 N 't Oq N ti CM N r� N O O O O O O 0 Of 0 L O o0 � tiILO O Ln ti O OD Lo r N M Lt7 N M CD O CD CD m O CO LO N O LO J I- co CO co M N r N r O m N O7 O co T r m r M O O O O O O O i O O O O O o o o OO o CD' O ' CD' CD ' F a c}a c U o .L a, cn E ��a Z Y U U O -O 0 m 0 C O O O V � OM O LO CD M Ln Ln O ~ O Q + O _� a O_ J J o -0 O N o 0 +� U (6 fn O 0+ w O U U � Q m m Q o 0 co tiAl El L. LO N Q O E N M C) N O E •• Co a) Z Or)Z �U (D O�Co Uco(5n U) U C C) cu .� 0 > cm a-0 • _0 0 co W � }' W (E^' `) W �--+ _O fA " �. � �O .00 C S L _M C:) C) N U 0 CD O I 00 1-1 CO O N N r O q cM O 3 O O cD N O 60 rx5 C7 N O O C r N N N 00 N N N r 00 N CM M M M M co co M r O H `N O O 00 O � N O 00 CO M M N O 00 O CD L( ) T O T O � M ti CD (0 M T T 00 N 00 W ti ti M N M C T O QN r M r r r r (D r r r r CO r r O Q Q O It O I-- (D N CD M M LO r M C\j O Lo N 't M M CD C) O O O O) U) -0 L I_ p Q O) M O CD O CO M CD ti N N M CD 00 Op r- f— N CD � 00 N 1 CO O r 00 N r f— It r M M r � r LO Lf) M't r CM r 6) M r N r r 6) N LO LO LO M � N LO � cq N 6) r M N O r T O 00 M 0) O � W � a) 0-) "t M O r CO NLO r CO N CM ' 00 r C:)f� N r C:) N Lo I� 0) N CO M CO N O N T N co Lf) N ~ C0 N C:)C)C:)O 0) L 0 0 0 0 0 0 0 0 0 0 I O O O O O O O O O O CD 0 0 o I o I p I p 1 O Q C)f� r r r r M CD r r 00 d7 N ' r N U)N r M f� r Lf) M O) N N N r M C)r M N r mr CD ' 00 LO ~ O L() O O N CD N r O I? Q O N N r N I` N r M 1 ti It Ln N ti M 00 CD CM N r LO O C O Q s= =3 Co O i N LO 00 N CO M LOr 00 ' M r M 0')O r O O r r r C)f� N r f- C0 N CV O co ti M � CO O r CO p Lq N O O p O Z J N J r r r LO W O r O O r 1 r M M M Or M M M M M T O N N CD O C) C) C) c L O O O O O O O O O O 1 O O O O O O O O O O O CD O O 1 p 1 p 1 p 1 O Qr f� CO O I� O O M 00 M M O 00 ti 00 00 O0 ti O) N M 1 LO r r It r r M M r 00 r r O 00 O r r M M r M r m M r m N Lf) M CD CD r 1 O CO M N r CD r O CD a7 r � T C6 In M 6 O O C) Q Q I Lm O 07 ti r N r NT It r ti r O N W LO , CO r M N f` N O N (0 00 I-- r LO r Lo NCO M O 0) ~ � Ch CD � ti r T CD O CD O C) N CV C� 7C3 L I_ j n Q r CD CD d7 ti N N r CD CD CD NT CD CD CD N , ti 0) CD M r I00 O M O 0) r r O r N It � 7- O 00 O M O or) 0) ~ N OLO N � O C:) O O N N +� a) J C) (0 It I LO ;I- C) LO 1 N LO r M r M U) N r M N r Lo LC) 00 Lf) r O O O O O C) C L O O O O O O O O O O 1 O O O O O O O O O O O C) O O 1 O 1 O 1 O 1 O Q (0 C'M � NT N � O N r O ti LO M Mr. , C0 N r CM CO M M � I` M't M 00 r 00 N CO T N CDM , M OD 00 O LO r O O O O O O Q Q r N I� r N N N N N W r r LON N r O r ti (0 ' r O mO r r LC) M r f� r C)mr r N N� �` LO N CD � N C:)C O D C:)C) O 70 70 co - L 00 O 00 M O N M co 00 1 CO N ti M N r r ~ O 00 coLO M 00 LO M LO O O O O O O O O � r r r r r r N M O r O O � O J CO J r r O CD r r N CD r M r r CO00 N co ' CD CD r Itr r r r M r m r CD O M 00 00 oq co CY) LO 00 CO M C:)CDC:) O C L O O O O O O O O O O 1 O O O O O O O O O O O CD 0 O 1 O 1 O 1 O 1 � Q Q Q -aQ � Q Q Q is � Q � a a � � o U) ~ c Yco � � 0 � o ~ C)U-)C) m , C) U-)C)U-)� W C)m C)Ln � CDm C)� Ln -a 0 �) ai ai O r CM 't " CDr CO C)r M � " C)r M � L O 0) J O ca O U U) ti ti ti ti O _ co o6 o0 0o O _ m 4 4� 4 O _ i-5 6 C6 L6 O _ a o �E Q m m Q o a L LO j N Q o E N M C) N o E .. M Coo Z . . O�Z C: N o��(� Un 10 M O fn V CD L N — � N U) -� a-j i 0 � .L U) N �w C: /=N\ _O to cn E0 00 0- MU- =o 2 +-+ N Uj O) C6 C0 = d-) = 00 CD O It �\ O ~ 00 1-1 a CCY J = � Co 5 }, o � U co L I a)N' o QN7� o C. q = C N N O N � N M N O O m o Ln CO L6 O O Q 00 ti N LO Lo cM M OMO 00 O O) M " � CD O 0 O O 0 O O Q Q O (fl O M M 00 r N Ln O N o Lo r*-: aO r 0 O O 0 O O 0 O O 0 O O O r U) -0 L I_ U)00 CO M CD Ln 00 Itr ti m N M Lr)M r Lq 0 O O 0 O CD � N O N m O W a) p r r O ti M O r r (0C� CO 0 or) O M M O O O O O O F- o 0 0 0 0 0 0 o 0 o 0 o o 0 1 0 F Q r r O r r N M CO (vj r` N r-:M O N o O CDO r 0 O 0 O O 0 O O Q Q M N N �t r O r M O O O O O O O O O CD-- N r Lo O O r O O CD 1 70 _0 (Y C: L O M ~ r r M r 00 O r,:r CD 0 O 0 O O 0 O O 0 O CD � O J z o r / a) J LO O r O CO O coO r O o CO O O r 0 O O 0 O O 0 O O i :3 O O O O O o Op o 0 1 O 0 1 0 1 H s? oO 0000 O r` M 00 M 0-) , M O M O O M In N CO O 0 O O Q Q N r r r- r O N (M (,0 00 O ti 00 aO ti Lo L() `� r— 0 O p 0 O p O 00 70 LSi Q E N ~ ti (4 (o (D It O N � r` O N co � O Ln N O O ~ N N CR o O O N J LO p M r CO M-- 't O LO co O O r p� (6 M r N O O O O O i F- O O O O O � O Op O O O O O F- O r Cfl r- Ln , N CD 00�LO O ch N 0 O p 0 O p Q Q Q N N r r LO N N r O ti 00 O O r*-:CO ti L M M O O O O O O CIDti O 70 70 cz 1= �CD i O p M 't M r M O 0p 6 O O O O E N r N 6 CO O � CDO r CDO O O O J CO J N r O r co r r M CO CO O CM ti N co Lq O ItCDN CO O M O O O O O O i O O O O O CD CS O pp o CD CD CD CD o� 0 U o LL +� L U ~ U U m 0 C O O LO O r M f� 00 00 00 0 0 L C �a O = (Z a_, J �' o a) ate) � a U 0 � C) U U � Q m m Q o 0 El LO j N Q O E N a C) 1�1- N O E .. Co a) Z O�Z �U-t-.' N O��(o Ucn(nn ry (1) C � M -0 Q CC) J = }, O - r) U U ILO L I �N ' O Q64 ONLO 0)= 0L)ti(D O CM 14 cu a--+ cu 0 Z W W W 5� G 1 Fz +; Z6 M N M M �6 M T T T w O co "! O O v O 0 00 CO CO LO Itt (c Itt 00 N � LI' ti O , r--T O T O T T O O O O Q Q T T T T (0 O CO O Q L M O LSD N T 00 T 00 O C) O (q T T T M 00 O O O O O O O U L O L r-- 't cM M u) M M 't o0 LID O O� O) r-- Ln M m O O O T N O O O O � T T T T 00 M O O O m W J ti T O N O� N Cfl CO NO T N LO T N � ao O � o N 0 O T CD O O CD O O CD O o 0 0 0 0 0 0 o 0 o 0 o CDo 0 Q N CO r- T m N N N 00 T T T 00 r` O O O o T O T O O O O O O Q Q CD Ln ti 0 CD p N O r--: m N T M O O O O 1 � � � O cu 0i E ~ O T TT VJ O T T T co m CD w LO T co CD r-LO O0 O O O O O O O Q O O O C O J z O T 0 N J M M co M T N T 00 O O OO T N O O CDO T O O O O O O O O L :3 O O O O O O OO o O O O O M a0 O M M 0 T N N O O O Q s? O Q d N o N r- T Lo T m r` 0 c0 L6 c i ti wr: r` 00 T M O o O O 0 p LNL O L N n O T T T O N N r— 0 00 000. Lo O M ti O N N Lf7 O O O CD � co N O 0-)N N >O O T ;I- CO T O co T co p (D 0 O 00 06 00 T T T O O O CD L CD O CD CD O � O OO O O I O O O O CO CO � CO r- M M � O T � � N 00 O O � CD O T O O CDCDO O CD O Q Q LO O M ti Itr*-:LID N - O O O O O O CD O T T T T Co 0 0q O Co O T CD O CD 70 _0 E � L r--T Nt T T T co Co O N M N Co Ln i` M M O CDO O CDO O O O O O N O T O J CO J T T T M T Lo T Co LO M CV) ti M co CO 00 O M Lo O p O T O O O O O O O O O OO O CD O CD CD F a c}a c U o L.L +�. � a, E � Z � Y U O " -O 0 m 0 C O CID O O C�6 OM O Ln Ln O ~ O Q +r O _ a O_ J J o O N o 0 +� (0 fn O rn O U U .0 Q m m Q o 0 ry W U) U) m LO N O N 0) CY) Q C:) N O E •• Co�a) Z O� Z U N cm 0 M Un U) cu U C C) N (n N > M .0 N 0 i �--� ^E cw �--+ _O c� �' �cn OCC �O .00 G M LL - N cA C) 0 � C� OIt L � 1 00 1-i -0 a--+ (3) Q ch Z) m 70 O� �Ucr)o �N't O O-N � M 0)N LO CY -rQlnf`(D H a0 O ~ CV r N O ' M N Or a0 O O CV 1 1 �,� CO c6 r O � C0 CO ti 00 N r` ti ti ti N O O) O 00 m m O w co T N r m CO 0 T I:t CV C4 M N It rl- LO co O 00 (D co N co cM r- T 00 00 r-- CD O r- 00 r- rI- M 00 or) O 00M Lo N C:) O Q Q r 7- M NI-- 0-) Q r` M LO T r O N T M i` O O� � 0) 00 N O O CDO T r N M a7 o0 O r O C)O O 00 O O d7 N 00 r d7 <,.� 00 CO LO N r N O O N N r C)O C)r r r T r r r r M r M r LO r r 0')CO 0 i M L(7 CO r LO O 07 CO M 00 , ti r N M M ti LO ti CO M m ti M , r C) r LO O L() O M � d7 r r 00 O It � r M p N r O0 O O ca _O W Q } C)a) J C) C) C) C) C) C)T C) CDr CD CD CD C) C) C) C) C) C) C)r C) O C)T O o C)O T 0 CDO 0 CD 0 C) c o C)r p 0 0 0 0 0 0 0 0 0 0 0 0 0 r o o O r 0 0 0 0 o r o C) o C) C) 0 0 0 0 r O C)N M r a) N C) N ~ r- r C)r T N N LO C, CD U') cc (fl It M Ln O � r 1 Ln O Ln N 00 Mt O 0000 m O 00 N � � T r O 1 Cp O cvj Lo m M r Cl Q Q N N N N O N N N N Or M M M ;I- M M M M W M O N r Q M l() T M In N � Lo N a0 N r M r N Cfl M M M r In C N mt CO r M M M r M ti N N M LO � M ti r N r O r r r r 7C3 O 0� =3 O 0 i M r- cy) M N r- 00 Cfl t Lo O O (0 O 00 (0 04 CM r- 00 � M r N CO M LO O� O � O r r O T r r N T CO t r M T M r O r N LO ' r N 00 T M N M N CO 00 T N M N O N CO T r 00 N In LO p N N 0� T r N O O O m 0 z N CO O O O r` r- CO r CO O LO � T Cfl (D 00 CD T O J O LO r- O r- 00 M N r-00 LO CO LO M M r T In T N M -- � T r 0) M O CO CO N O O L O O O O C?O O O T O r O O O O O O O O O O O O O O O r O C; r C; CDO CD CDO r O O M N O Lo Lo O O M CD ti LO C)r It O r 1 LO C:)M r- 00 � L[� ti N M ti ti N 00 M M N CO M � O C)O Q Q 0) 00 O� ti' M r r r N T N r ti N r r r r` N N M M O Q I M M r- O O LO T O r C) T M r r N T ti r N r N l() , 00 r 00 T r CO r N M 00 O CO O M Lo M r- r N T CM N LO N � N N O O O �-� C � O L N 0� r M LO O � M CO O O r O - N CO ti � O Cfl O � N N O ti It LO LO CO M ti O N ' M T O T In r O O O M r O r O r I 00 M � T N CO O T lfl M T CO O) r N CO r T O O _O Q LO M M O r M Lq N O J O N M N CO r O N 0') r- N N r M CM N M N 00 N In CO In ti M 00 ULO ') O � M It N M N O) � O M L{) N r CV C:)O C L O O O O O O O O O O 1 O O O O O O O O O O O C7 O O 1 O 1 O 1 O 1 r- M't't't mt't 00 r- N LO N 00 N 00 N O co C)O I N CO T't L() 00 00 N T LO O LO Cy) T't N C) 00 CD r- CD O r- Lf) 1 4 O M Co O N M O Q Q r N N N M T N T r I` T N N T M T N r T I- T M N N 0-)r Lf') O O Q N T N 0-)N C) M CO 00 O M 00 CO O) 00 00 r C)O C:)C)E N C) OO O r 70 70 � C: O L U LO t d7 00 N N CO N N 00 CO O r CO M CO ti O 00 �t CO 00 � r- LO t Ln M LO 0') It CM r- N CO r 'q LO N C) M Ln CO O M ti O ti O O � =3 :3 r r N N ti r N r T CO r r T T (9 T T r r CO N 00 N N O T M r O O m O O O O It M r- "t LO O LO GO Lo CO N 00 r M r� M 'tti ~ r CDr M J N N N N O� r r r r CO , r CM CM N r N N N N O7 M r N M It � r M O C:)O C7 O Z3 O O O O O r O O O r 1 T O O O r O O O O O N r O O O N 6 O O O O O O O O O O � r (n Y _0 m 0=s" co 0 O (a (6 (a (6 (0 Q Q Q Q Q Q Q Q Q a a a � � ~ o ~ o Ln o Ln >+ o Lf) o � � W o m o � �, o � o Ln � p a, cu O T CO " O r CO O T CO It " O r CO � L O J a� r� 0 co 66 60 06 O m 4 4 4 4 O iri 6 Sri Lri O� a H o Z3 M 0 U o * Q Q m m a o P., P I C LO N C o 0) N CY) Q 0 N o E .. cO CoCU�.. Z Or)Z �U� N o±:� Co U (5 n O fn U C9 L C N U) Cll to (j -� i 0 M -�CO N -U N � CU � �w C:� -I-- 0 to U) �O °� Cow =o 2 +-+ N cn O) Coo =rn = 00 C� O It (0 1-1 CU () Q ch Z) m 70 Or �Ucr)o �N� O 0-N � M 0) N di = Q Lo r` (D O CM ti cu a--+ cu 0 O 2 W W W\ 5� G 1 ~ ti 000 ti ti o o N N LO r O C co 0 N 00 C4 r CN f- � I� � ' (0~ 00 I` O O M O O Q CO O Lo r, r r O Q O 00 O LO M M 00 O O Ln CD M 00 M r CO N r-:r O r O O C;Lo r O M 00 r c r C)ti am N It O 00 r _ Ln o O Oo o Cl-r- C O co r O M O M r O Ca W Q } J O O O r r r O O O o N O r 0 O C) r p O C) O O C)O O O F- O O o 0 0 0 0 o 0 o 0 o o O' � r N N N Lf) N O NW i ti � �U') I-- r N C)� N r r Q M O N O Q Q r M r CO M M M V) O In r N 0 M N r c3 ti M N C) r r 00 O O d) r M N f� 00 C") f� N r10 M LO I� � 00 o) CD C'7 O r� O C)U) O 07 r r r r L1i r O 00 O O m z J O I� 00 00 CV ti LSD 00 M M 0 r 0 O N N 00 r CO r M O C) L F r O o O r CD O O lf) N O r O C) r C)r O C) O O O O O O F- Lo O M C:) r r-' co Lo 't N p M O o O 0-)I-- r 0) M N r O M N CA N m NC) N Q Q C) r C)r r r N r M Lq r (fl O 00 o C)r M N N ~ O O r p O 70 O C � ° L O Cfl O t o r--O It N N O 06 (D 00 m N M r U') r O O p 0 j I Q C) � a)C,4 N M 000 co co C)r M 00 ti O 000 O7 00 (0O ti M MC) O i F- CD C) CD CDO q O p O C)O O CD ~ 't LamO 000 0 N O ' CD000. LO N N r N O M O 00 � 0) U.)O C) C) Q Q 0) N It N C) 00 O) M O O C) Lq M O 6 O O O O O O O O O O O r C) 70 O L � N N C4 N � CO CDN r N CD M I,-O 0p M [I-� O M Ln O C:) (D m O CO N N r N 00 0-)N O 1- 0-) O r-- � Lf) M LO 00 p M LO ti O O O O J CV N r r I` CO N r.-:ti 0 � CO C:)C) Z3 O O r p r r C)O O o N O r 0 C)C)CDCDC)CD r O o O O ~ o o U o +� L ) Y U ~ ° m (Y C ° O O cM CU Lary Lary q O r ti ti 00 00 o o L Q O = CL a, J �' J0 o o U �, `� U U . Q m m Q o 0 W^ CL CL El C LO N C o N 0) CY) Q C:) N o E Co a) Z Or)Z CUV N O��Co U U) n 0 U) V CD L N U) N -� a-j i 0 � -� U) N � O �w C:� -I.-+ _N O to cn 0 0 0 0- MLL =o 2 +-+ N Uj O) C61-0 =d-) = 00 CD O It L r�- 00 1-/ Q ch Z) m C -00 co �N't O 0-N � M 0) N di = Q Lo r` (D 0 CM 14 cu -1--i cu 0 2 W W W\ 5� l^� i ~ C CN � M M M 0 p N M O p O co C9 00 Cfl M M co000 O ~ LO CV CA r O O C2 O N 00 ti Lr) CY) N c 7 O Q O r O M O N O T CO m O m r O O C� CY) r` r- LO M M O O O •E-i r r r CO T O M M r or) r O c � i 07� LO Ci) LC) O-) ItO 0 M T r a)O M T N O 00 O 00 M � Lr) N r O M In M r O O O C O Ln r O O W Q } i o 0 0 0 0 0 0 o 0 0 ' o' o' o' J p O O 0 0 0 o 0p o O ' O ' O ' CD ' O ~ Q (,4 00 M � O O) CO M CO 00 M r r ' O� co LO O O CO r f� (A m N T (D O r O O O Q Q 0) CD r f� M N O M In p In N O O It It M co r O 0 r r CO M O CU 0 i U)o L U) O Cfl M N co M N r N N M N o N M f� o LO COLO M N M O 0 Cif 00 00 o It O 00 O 0 O CD O m z / N O N � N � r O r co r C� Lr) LO r C6 LO T It C57 0 O J r r r r M T O CY) O C) i O O 0 O O O Op 0 0 ' O ' O ' O ' 0 00 ti (.0r N ~ O O O Q C1 N r N r 00 N O ti CA Q T r 0 0 N T r � o) M N O O 0 O CM N M M r C7 O r � O O 70 C 07� LO (0M O 000 O r N O 00 Cl? ti 0) 00 r CR O O O O \� C I LO r r Co T p Cy a) CO LO r� M 00 In O � r co M N m M N O O N � (A 00 N M O r O O O i O O O O O � O pp O O ' O ' O ' O ' O ~ O 00 � O � ' ti p Nco N M _ N O Q N r r N ti r O ti 0-) U) O O Q Q T O 00 Cfl C� co f� O O O O O O O r M O O M O r O O C) 70 Cll 0 � (n ti LO LO O t M � M M M N N (9 a) M O ~ M 00 M N p O fn m O CO r r r r CO 00 T O LO (A J M N N M N N Or M M r CO N co O ti O r OT O O T O r O O CDCDO O i O O O O O o p O O ' O ' O ' O ' F o_ a o_ Q_ ca OM a, � Y U U O m (Y O O � OM O r O ~ O +� O _ D_ O J J _� � Cll a)+ 0 Ca to O w (D U m U)In In Q o U �+ U o Q m m Q o 0 101 ^� W CL 0- El C LO � N O N _0) CY) Q 0 N O E •• Co a) Z Or)Z �U� N O±:� Co U (5 n L cu U C C) N U N > �--+ • _0 0 co W _r_ }' lE^' `) W �--+ _O c� � �' OCC �O .00 G M LL — C) N cn � 0 C� O I 00 1—/ H O O p ti CDLr) ' I- N LO M Oi �6 CD N M M ' ' a0 ao " O C N N N N N N N N M M ,t M M M M M LO co r 00 co O r � Cfl r M M M M O M M O T M LC) LO 00 6? O M N CD M M r M M ' M CD 00 LO LO LO CD LO LO CN ' CO N M O p r O Q T T T r LO r T T LO T r T r CD T T T T CD N CN p N O Q � M f� O M't N N T N N N O CD M M N T M r r r O M O (V N r O CDO O M O O O O O 0 r p N CD T N c � O i N N m N LC) O LO 00 M ti O CD CD M M T M T M OD 6) m CD O7 L!� O p� 00 W CD CD � T M M't't � ON M M O O T r T T r r r r T r T (D r r r T l() N � It � M r O W Q 00 O r 0') CN N T r O O't M O� N Cfl O O J 0) T 0') 0')00 r r r T M M LO r r CM r O T T r CD M r 00 O Lf) 00 LO O O L O O o 0 0 0 0 0 0 0 I o 0 0 0 Cl 0 0 0 0 0 0 0 0 Cl I p I p I o ' O QIt It N N = LO LO N M M N M It CO r N M M O N Q Q ~ O N N N r I` r N O O M r O T r M O M O r M O T r T O In LO O O O CM coE N O p CD O O CDO O CD O T T ' O r O O T O O CD O O N N 00 O 0 O O T O J z N N N N O r Lo M N N ' N r N M Op T M r T CD OM N CD CD J O N M CD N O c L O O O O O O O O O O O O O O O O O O O O O CD O 1 p 1 pCD 1 p 1 O I- M I� O CO LO O CD 't LO T CD O f— 't LO f-- 00 LO M LO 0')O r I` CD CD 0') CDT 1-00 N CD 00 M O 00 N ' Lf) r Ln p T M Ln O O Q Q T M r r T T N N T I` N N 0')M r Q I O M N N r 00 It It co O , CD M LO 00 't' T LC) 't CN 00 � r r LO O O M r N r T N r CD r T N T CD T 00 (•7 T 0') N O O C � O Z) O� r CM CD O M N CO r CD N M N O) LO ti N T Lo T 00 00 00 � M a) O 0) O 00 1 00 00 O') LO r O LO LO N M p rOC) LSD N O M T T M T T T T I` N T T T N (n � T \� '1: 00 i� O M T O M M N O CO 00 1 T T T M CD O O O O O r r 00 In M O J N O O r f` N O L O O O O O O O O O O O O O O O O O 1 O O O O O r O O O r T O O r O O CDO O O O T O T r O LO ti r O T CD CO O 00 NU) LO ti N LO CO 00 C) m N ti ti O Q T CO CO T 00 M N N T 00 , N T N r I` N N N N T M , CD M m Lo O Q Q O O 00 O r N N w ~ M N cm LOT co coCD M M 1 00 CD T M r T 0)O T M CV r M N T O O cT O i 00 r r CD O O O CDT CD N LO 1 r O CDN T CDr r O N O CD N I- ti r T T T O O � N O ti T T O O J Cf) O N M N CD r r N N N LON f` 00 J (.0O N T L!i N r T r CO CD , T T r T r T T Lf) N N M T Lo N CD CD C L O O O O O O O O O O 1 O O O O O O O O O O O CDCD1 CD CD1 O 1 CD 1 � is � � o " co 0 0 � Q Q Q Q Q Q Q Q Q a.2 0 a a~-0 c o ~ o Lo o Lo , o Lf) CD � LU CDLn o Lo , O Lo o Lo � -0o �, � O T M't "O CD T CO 't O T CO It O T CO ItL O J � O ca O U ti ti ti ti co o6 o0 0o O m 4 4 4 4 O"�—' i� 6 C6 i� O Q o Q Q .0 m a O ^W^ �.L El fy m J (a ry C =3 Ln 0- N C O N cm m Q 0 N O E .. cO CoN�.. Z OriZ �U� N O±:� Co U (5 n N f� N N N co C) O Crj O 'I, N p C) C r O r co Ci O Cfl r M r O r r r r M Ca Lo 1-: r Lo co 00 O M M LO 1-:O � m r M r r O N C, O O Q Q N N N N 00 [I- 0 p Cfl C)O N O O r O r L6 � O LCj N O c � O i _0 L O) � Lo N O N a) 00 � LUC) CC) � r 00 r Uf M r O C)07 O C - O r r r 7—LO ap) M m W Q 00 C)mt Cfl CV NMM o LO c"5 r N O O J r r r oa 4 0 N I O c O O o 0 0 0 0 p 0 o 0 o o O 0 N LO LO N 0 O� 0 CDO M CD QCD C;Q 06 N O Q r r N O't N 6 O o M O C)r U.)O C) I- C14 1 70 _0 0� C: O CD C)O O O 6 6 p p O O 1 O 1 O 1 O J z y' J r M N CD r f` cy)LO O C\l Cfl O M O O M O O N O O N O CD O i :3 O O O O O O Op o O C)O O F Q O r r M O r f— r r O It N 4 O Oj M O O O � O M O CV O M N Ln ti r O O C;C- Q N 00 It 00 O LO � O N C� O O O O r r M Ma; M CO O M LC5 O O C O L cn � LO C) N 0)C:)CT)~ r r O 00 M N m't 00 � co CO M � O r � M O N O r N CD(fl L6 co 7-C:)O O _O Q +� M M N C:) a) p ~ f— LO ti O r lf) N O J (Op O 00 r CD i C:) C) C:) C:) C:) C O pp O O O O O 0- 0 Q LO r r M O N r N f` 00 C) 00 04 CDp ti O 00 C)Cfl co M CD O O Q Q m M CD Cfl M 00 r ~ N r O LO r O In r M OD N T r r C. LO C:) O C) 70 70 ca O r O N M M co M N f� Cfl O r M M M O C)C)C9 O CO J N r ;I -It (�J r CO r CO co m r 6 co co CO M co Lo L6 N M r r O C:)CD i O O O O O O p O O O O O LO o LO 0 Y U O 70 f6 cu O � O r CO f� 00 00 00 0 ~ 0 L C �a O = D_ a_, J �' o 0 aa) 2 U 0 O 0+ U U o Q m Q o m 034 W Q Q El N0 L.f_ Co J (o ry C • � Ln N o N cm m Q 0 N o E .. Co a) Z Or)Z 4-0U� N O±:� Co U (5 n aM0 N4 LO M L 6j � Lf ) CA N N r O C) C O (o OCO ~ CD 000 M LO M T N T T N ti N O Q Q r T r r CD O CO CA M r O Q M N MIt o T M CA O O O O s= O i L O CO CO CD Cfl CA r T M N C5) O7 CO Ln O r (qT N r 00 C,C)C O O M M CSM W Q } N T CD00 M It N 0) M 00 r O O O J T r r M L6 N � O M CO 00 O r CV O F- O O O O O C) 0 O 0 o 0 o o O 1 0 N M r LO m o r O p O O Q (D C;Q 6 C) 0- M C)r r C)N O p r O O OLo N O O C) O O C) O O C) O O C) N O r 1 7C3 � O cor L ~ CD O CDT O O r T O C) LO N r C) O C) O O C) O O C)o O O O J z O T Jr NM r f-- C)6 I` M Lq O CO L6 00 r 4 T O O L :3 O O O O O O Op o O C) C)O FO C)r CD I ~ T N T r O (V O 00 Cfl r` (q O O N N r N 00 LO O I` m r T C)Q CZ Q CO N m � m � O O r LO O O �-� 00 O O O T C) ��o 00 O M C3) C)I. M 000 C5) (.0q O N O O CDC \U) I O J r r M O M CD C10~ p C; N O p O M O p (.0 D O p i F- CD C)O r r r C)O r O N O r O O C)O r O C)C:)C)O O O C) F 00 r N N LO r ti N N 00 CM L{j LO ti 00 1-4 T m C)O O C)O C)Q Q Q C) C) Cfl O ti N LO ~ N m N Lo O O O O C)O C:)O r r M CV O M C)CD T O CD 70 70 0 (D � L C:) C)r C:)r _ p C) N r C)ca O C:)CD C:)CD C:) C) O O r O J Cf) ~ I- r CM O J T T T 10 C6 O 00 CDO C) o 0 0 o O O Op O CD C) CD CD U o L.L +� L E Y U ~ O -0 m C cu O O cu LO O M O r M O Ln 0 O Q ~ Cl CJ) J J -0 O N a U C6 fn CU j, O U U_ � Q 2 m Q o 0 W QL CL I m o E Co N-1--j o . . Z O�Z �U� N Ocm ( Ucncl�n U) U C C) N cu .� 0 >4-1 M .0 N 0 i �--1 E Q cm^1 �� a)cw �--+ _O c� > O EO .00 CC G M U- — C) N cn � 0 C� O �\ L co 1-/ n _0 on C:N, O EN� M c Cq JLOrL(� ca O C CO N O U-)O m 00 co M O M O � M M T 1 T 't't T O U-)" O T m U) -t ,I- M U) f` U-)N N ~ f� 1 1 00 CO Cl lf) 00 T O T O O O (II O Q N T f� T T N O CO O 00 O� T CD T O� T O T O� O 1 O� T d� T M M O N T O N N N f� N T CO O O M ' CO c6 O M O coT U-) ol ol O T oq N O O Q Q O CD O M D ao O C 00 00 M CD ON 70 ca 0 � N O J z i CD 00 CO T T T M m O T CD ti N M 1 O T CO T N M M N O, O N T N ti N a0 N O CO Cfl CO O CD ti CO N LO T O O O T N ti M N O C L O O O O O O O O O O 1 O O O O O O O O O O CD O CD1 CD1 CD1 CD 1 O ~ Q CO CD 00 co N N CO It N 1 O) N I N co r N CO M O T 1 co T O O O o0 c) CO O t Oo M O O O Q Q 0)T O O N M O Co CD O 1 T N T O It O O N O r- T O m m N T ~ L6 N M 4 O CD O O Cj (n 0 a)O U Q j J O CD CO T N N M N 1 40 N O7 N T ti CD CD Cr) 0 Lq CD CO N T � O co 00 O "t O O I c L FD O O O O O O O O O O 1 O O O O O O O O O O O O 1 O 1 O 1 O 1 O H co ti O O O N CO O CO 1 M OO T T M O O O CO c 1 (6 N CO O ti O O O O M T - T T CO T T T T O T T T N CO M 67 M O O Q Q L f- M � ti T O fI- O CO ' N f� T T T O O � O O O CO O N O 00 O O O O N T T CO CO T T T I� T T T T O T T T N O N O M N 0-) T M O O _0 _0 Q� C: =3 C O E N O J U) r, N J T O T T M T T O T M 1 T T O O N O O O O O 00 M 00 O 00 T O CD Cj C L O O O O O O O O O O 1 O O O O O O O O O O O CD O 1 O 1 O 1 OCD 1 N (a (B � m(B _ _ ~ (B O O O ~ Q Q Q Q O U-)O O >, Q Q Q Q O O O O >- Q d W CD O O U)O H d d O O U-)�-0 H H U O D N -0 a) O T M 't O T M O T M O T M L O J U I` ti ti ti p 2 CO CO CO 00 p 2 m - p 2 O O O O p 2 U Q Q o o U U_ IE /U` , >+ .2 Q mQ o o 6 C":,) E .. c� Co a) Z O�Z �U� N cm 0 co Ucncl�n E Cfl O O U C L U N i4-1 (� M -� N �--� _O (n (n EO 00 Q MU- C:) 2 N vi C) coo -rn = 00 CD o 111- C 00 1-1 70 Or �Uc�o mN' O EN M s C .4 J Lo f` (� ca ~ O O w M ON i i co M Lq M ti LO c w q co O O O O (0 0 F- 1\ r r N C)m M r 1- w m LO N I'-r— 00 ~ m Cfl 1` LO C)O O Q Q O Q L O m M O� O r r f- �t C)V) N CA CM pp M N CA N CA I N C:)O O 70 70 � O O co 0 E O J z 00 00 7- CA q m N LO Cl MM COO N C C) C)� CD N O 00 L F � O O O O O p O OO O CD CD CD CD G Ca O ~ Q CO QO M N O r lC') 0; CA � P- rco r M L r M L6 C) O CD' ^ Li J Q Q O �00 cu 4-0 C) C)N O N Lfi p CD O o N O C)Q O C O 0CD U) O U U 2 Q � N CD O N � � CO � r N � 6 Lf) C)C)J C) N E i FD O O O O O CD O O OCD CD1 CD CD CD / O 5O G C • H 1` CD U-)N It, O co ti N CA N r O CD O L Q Q N N r M m O O) N O O CO LO L6 M p� co N N O C?O O N r r C, m (6 � O o) � N O CD 70 70 Q� C: O E -0 -r N C � C O J U) �, J C)r r M N M C) � O M C)N O O r C)O O O O O O O O i � O O O O O O p O O O O O Q Q Q Q o U a_' E ��-0 5 O -0 0 m C_ O O o co LO C) M't O I` ti ti C70 0cB ~ O Q O ~ = O J J N U O cn U U_ a 1E Q 5, m m Q o o W CL CL I E Co O O U CDU) L U N U) N -� a"' cm i4-1 CB -� N -U U) 0)t a-)_r_ �w -I.-+ _O to O 0 0 0- MU- =o 2 N vir- c6 1-0 = rn = 00 CD o C 00 1-1 U) (1) Z) U cy Q = -0Or �Uc�o C:N' O ENS M N .cIlp2 J Lo f` (� ca 0 ~ co Lo 4 U-)Lo N O O N C CD O CN O (II F In N N N f- N r M Lo m M co 00 M N O r O O Co Q Q O O r r O Co LoN co ti r p N p N p O CD O N 70 70 m 0 � N O J z i N r N fl- N 00 N O O N Lo N � O co O 00O O � N CDO N O O O O O L F O O O O O CD O Op O CD CD CD O G � O 00 � (D i M O � Lq M Lo N ti O O O O O O O CLN Q O O') C L6 ��j.� `V L O N O f� C7 co O f� O O Q O C O C> Q 70 r Ci C L O U) O U 2 ¢ � J r ~ O O M � O N (D CM N CD CDCDO rl \ O a_ N E L FD O O O O O O Op CD1 CD CD CD / O 5O G C • L U-)LU-) r � r CD N Cfl M CD CD O O co M ti O O CD CD CD 0-r Q O Q r Co O 00 O O ooq CD � co M CDO CDCDO NO r O 70 _0 Q� C: =3 C Co O E -0 N O J U) �, JO O O O O O Op O O O O O i � O O O O O O Op O CD CD CD CD d o U a, E � 5 � -0 O -0 0 m c O O o co Lo Ln Ln Ln H ca Q O ~ _ J810 N 2 U j, 0 U_ a i 1E Q m m Q o o Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois APPENDIX C Crash Summary Map Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois APPENDIX D CMAP Traffic Projections 4.33; West Van Buren� Street, Suite 450 II i 1 go, 116,0607 April 10, 2025 Daniel P. Brinkman, PE, PTOE Senior Transportation Engineer Gewalt Hamilton Associates 625 Forest Edge Drive Vernon Hills, IL 60025 Subject: Algonquin Rd, Busse Rd, Dempster Street, & Linneman Rd IDOT Dear Mr. Brinkman: In response to a request made on your behalf and dated April 9, 2025, we have developed year 2050 average daily traffic (ADT) projections for the subject location. ROAD SEGMENT Current ADT Year 2050 ADT Dempster Ave east of Linneman Rd 1000 12,300 Dempster Ave west of Linneman Rd 9,950 111900 S Linneman Rd south of Dempster Ave 100 100 E Algonquin Rd east of S Busse Rd 131100 171100 W Algonquin Rd west of S Busse Rd 261000 291000 S Busse Rd north of Algonquin Rd 1400 1800 S Busse Rd south of Algonquin Rd 251200 271600 Traffic projections are developed using existing ADT data provided in the request letter and the results from the December 2024 CMAP Travel Demand Analysis. The regional travel model uses CMAP 2050 socioeconomic projections and assumes the implementation of the ON TO 2050 Comprehensive Regional Plan for the Northeastern Illinois area. The provision of this data in support of your request does not constitute a CMAP endorsement of the proposed development or any subsequent developments. If you have any questions, please call me at (312) 386-8806 or email me at jrodriguezkcmgp.illinois. o�v Jose Rodriguez, PTP, AICP Senior Planner, Research & Analysis cc: Rios (IDOT) 2025_trafficForecasts\MountProspect\ck-34-25\ck-34-25.docx Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois APPENDIX E June 30, 2025 Preliminary PUD Site Plan I G z W COD W J 0 W y O a O 9= z O ry Q O Cf) (.D Q m Z OO w V) v m ZLLI ZLLI W Q � � U� � :2 :2 > J � z z w w Q U O Z- z p p > > .. (> _j Q Q CD 0Q Q Y Q w �m 46 � Q W J orf I --pp pcn w� � Z Q (n p � mm� pp w wQN^�> w nof - m o cn pQp m�pCQ� zJz Q UQ 0U) >-- Qp � w O i w > >L- U Np Nof QD �p U U U O C� Of I-- � �C� �� W O~ U U U C' w Q w CO CO _m Zm a- a- a- c/) Q a- z p mm� 'ya I 0 00 o R % 00 4 9'• ' o w 0O I a T 5 w U Z Z O U LLJ J w � J w a_ Q U p Z Z w D z o � a_ O w w c Q:� m e � Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois APPENDIX F ITE Trip Generation Excerpts 7/1/25, 2:02 PM itetripgen.org/query/PrintGraph2?code=160&ivlabel=QFQAF&timeperiod=TASIDE&x=1300&edition=685&IocationCode=General Urb... Appendix F Data Center (160) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 6 Avg. 1000 Sq. Ft. GFA: 267 Directional Distribution: 55% entering, 45% exiting Vehicle Trip Generation per 1000 Sq. Ft. GFA Average Rate Range of Rates Standard Deviation 0.11 0.03 - 0.22 0.06 Data Plot and Equation Trip Gen Manual, 11th Edition • Institute of Transportation Engineers https://itetripgen.org/query/PrintGraph2?code=160&ivlabel=QFQAF&timeperiod=TASIDE&x=1300&edition=685&IocationCode=General Urban/Suburb... 1/1 7/1/25, 2:02 PM itetripgen.org/query/PrintGraph2?code=160&ivlabel=QFQAF&timeperiod=TPSIDE&x=1300&edition=685&IocationCode=General Urb... Appendix F Data Plot and Equation Caution — Small Sample Size Trip Gen Manual, 11th Edition • Institute of Transportation Engineers https://itetripgen.org/query/PrintGraph2?code=160&ivlabel=QFQAF&timeperiod=TPSIDE&x=1300&edition=685&IocationCode=General Urban/Suburb... 1/1 7/1/25, 2:01 PM itetripgen.org/query/PrintGraph2?code=160&ivlabel=QFQAF&timeperiod=AWDVTE&x=1300&edition=685&IocationCode=General U... Appendix F Data Center (160) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday Data Plot and Equation 1,400 1,200 1,000 w 800 600 400 200 Caution - Small Sample Size 100 150 200 X = 1000 Sq . Ft. GFA Average Rate R2= **** Trip Gen Manual, 11th Edition • Institute of Transportation Engineers https://itetripgen.org/query/PrintGraph2?code=160&ivlabel=QFQAF&timeperiod=AWDVTE&x=1300&edition=685&IocationCode=General Urban/Subur... 1/1 7/2/25, 11:24 AM itetripgen.org/query/PrintGraph2?code=160&ivlabel=QFQAF&timeperiod=TASIDE&x=872&edition=685&IocationCode=General Urb... Appendix F Data Plot and Equation Trip Gen Manual, 11th Edition • Institute of Transportation Engineers https://itetripgen.org/query/PrintGraph2?code=160&ivlabel=QFQAF&timeperiod=TASIDE&x=872&edition=685&IocationCode=General Urban/Suburba... 1/1 7/2/25, 11:24 AM itetripgen.org/query/PrintGraph2?code=160&ivlabel=QFQAF&timeperiod=TPSIDE&x=872&edition=685&IocationCode=General Urb... Appendix F Data Plot and Equation Caution — Small Sample Size Trip Gen Manual, 11th Edition • Institute of Transportation Engineers https://itetripgen.org/query/PrintGraph2?code=160&ivlabel=QFQAF&timeperiod=TPSIDE&x=872&edition=685&IocationCode=General Urban/Suburba... 1/1 7/2/25, 11:27 AM itetripgen.org/query/PrintGraph2?code=160&ivlabel=QFQAF&timeperiod=AWDVTE&x=872&edition=685&IocationCode=General Ur... Appendix F Data Center (160) Vehicle Trip Ends vs: 1000 Sq. Ft. GFA On a: Weekday Data Plot and Equation Caution - Small Sample Size Trip Gen Manual, 11th Edition • Institute of Transportation Engineers https://itetripgen.org/query/PrintGraph2?code=160&ivlabel=QFQAF&timeperiod=AWDVTE&x=872&edition=685&IocationCode=General Urban/Suburb... 1/1 Appendix F Land Use: 160 Data Center Description A data center is a free-standing warehouse type of facility that is primarily used for off -site storage of computer systems and associated components including applications and secure data. Some data centers may include maintenance areas and a small office. Data centers may be occupied by single or multiple tenants. Data centers typically have a small number of employees and visitors. Additional Data For the two data sites with time -of -day data, the AM and PM peak hours for the sites were between 6:30 and 7:30 a.m. and 3:00 and 4:00 p.m., respectively. The sites were surveyed in the 2010s in Illinois and Virginia. Caution should be used when applying trip generation rates for data centers, as the database contains a small number of sites with limited data on the number of tenants and employees. To assist in the future analysis of this land use, it is important that this information be reported. Source Numbers its— General Urban/Suburban and Rural (Land Uses 000-399) 187 Mount Prospect Technology Campus 1200 E Algonquin Road Mount Prospect, Illinois APPENDIX G Capacity Analysis Worksheets HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst DB Analysis Date Apr 21, 2025 Area Type Other �"' °�I" Jurisdiction IDIIIIIIIIIIIOT Time Period IIIIIAM PHF 'IIII III0.95 �ll �1 �illillillillillillillillillillilliillillillillillil� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Urban Street DEMPSTER IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII llntersection IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIII Analysis IIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIFile 'IIIIIIII 'IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIIIII Year EXISTING 2025 Analysis Period IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII 1> 7:00 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII l �� �k ,c lllllIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII DEMP°IIIIIIIIIISTER @ BUIIIIIIIIIIIISIIIIIIIIIIIISIE Name 21IIIIIIII01IIIIIIIII25 DEMP-BUIIIIIIIIIIIIS AM.xus ...... Project Description CLOUD HQ "°I , t °III° �����- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 43 129 8 199 184 57 8 451 154 62 708 60 Signal Information IIII IIIIIIIIII21 'III IIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII IIIIIIII III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIC 'IIIIII IIIIII1°IIIIIIIIIIIII2°IIIIIIIIO� IIIIIIIIIIOIIIIIIIIIII IIIIIIIIIIRe°Illfllllllerence IIII II JIIII "'I "'II IIIIII y cll�lllllle s Phase IIL IIIIIIIIIIIIII' LIII %I Offset, s 0 Reference Point Beginllll IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated No Simult. Gap E/W On .Tr Green 3.5 69.7 3.7 8.3 12.4 0.0 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII.,. IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII Yellow 3.5 4.5 3.5 3.5 4.5 0.0 Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Traffic Information EB WB NB SI3 Approach Movement L T R L T R L T R L T R Demand (v), veh/h 43 129 8 199 184 57 8 451 154 62 708 60 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 1900 1900 1900 2000 1900 1900 1900 2000 1900 1900 1900 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 0 1 2 4 16 11 15 8 7 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 3 4 3 3 4 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 105 0 175 0 125 0 145 205 0 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 40 40 40 40 40 40 40 40 40 35 35 35 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 15.6 26.4 25.2 36.0 49.2 19.2 68.4 Yellow Change Interval (Y), s 3.5 4.5 3.5 4.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 0.0 1.5 0.0 1.5 1.5 0.0 1.5 Minimum Green ( Gm►n), s 3 8 3 8 15 3 15 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 3.0 5.0 3.0 5.0 2.0 3.0 2.0 Recall Mode Off Off Off Off Min Off Min Dual Entry No Yes No Yes Yes No Yes Walk (Walk), s 7.0 7.0 7.0 7.0 Pedestrian Clearance Time (PC), s 20.0 20.0 20.0 20.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 ,. III � �II� I � I l I I I I l i � � � �I ���I��� I��� ������ IIIIII � ,�II�� ���� ���� � ����� ��I� ��� ��� ����� � �I�i���l 'IIII IIIIII �I�������� ,I���'�� 'IIII 'IIII III�.���� 'IIII �� ��.�� 'IIII I�I�.�� � ��� ��� ��� ��� ������� � .... �� 'IIII � I� � I � �II� � II� II � � �I�� ��� � i��� iglu ����� ����������� ��� I��� �II �I� I I II� I II� �� � ������ � ������ � �� � �� �III�� III�� �� �II� ��� � I ��� �II�� � � � � II� I � �II�� � 'IIII 'IIII III 2 'IIII )'IIII''''''''''' IIII 'IIII °I �I S lui ,'IIII HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst DB Analysis Date Apr 21, 2025 Area Type Other �"' °�I" Jurisdiction IDIIIIIIIIIIIOT Time Period IIIIIAM PHF 'IIII III0.95 �ll �1 �illillillillillillillillillillilliillillillillillil� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Urban Street DEMPSTER IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII llntersection IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIII Analysis IIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIFile 'IIIIIIII 'IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Year II IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIIIII EXISTING 2025 Analysis Period IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1> 7:00 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII l �� �k ,c lllllIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII DEMP°IIIIIIIIIISTER @ BUIIIIIIIIIIIISIIIIIIIIIIIISIE Name 21IIIIIIII01IIIIIIIII25 DEMP-BUIIIIIIIIIIIIS AM.xus ...... Project Description CLOUD HQ "°I , t °III° �����- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 43 129 8 199 184 57 8 451 154 62 708 60 Signal Information IIII IIIIIIIIII21 IIIIIIIIIIIIIIIIIIIIIC 'III IIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII IIIIIIII III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 'IIIIII IIIIII1°IIIIIIIIIIIII2°IIIIIIII0� IIIIIIIIIIOIIIIIIIIIII IIIIIIIIIIRe°Illfllllllerence IIII II JIIII "'I "'II IIIIII y cll�lllllle s Phase IIL IIIIIIIIIIIIII' LIII %I Offset, s 0 Reference Point Beginllll IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated No Simult. Gap E/W On IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 'IIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII . Green 3.5 69.7 3.7 8.3 12.4 0.0 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII.,. IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII Yellow 3.5 4.5 3.5 3.5 4.5 0.0 Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 7 4 3 8 2 1 6 Case Number 1.1 4.0 2.0 3.0 7.3 1.0 4.0 Phase Duration, s 7.2 18.4 19.0 30.2 75.7 7.0 82.7 Change Period, ( Y+R � ), s 3.5 6.0 3.5 6.0 6.0 3.5 6.0 Max Allow Headway (MAH ), s 4.0 9.1 4.0 9.1 0.0 4.0 0.0 Queue Clearance Time ( g S ), s 4.7 6.4 15.1 7.6 3.8 Green Extension Time ( g e ), s 0.0 6.0 0.3 7.3 0.0 0.2 0.0 Phase Call Probability 0.78 1.00 1.00 1.00 0.89 Max Out Probability 0.01 0.27 0.16 0.08 0.00 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 7 4 14 3 8 18 5 2 12 1 6 16 Adjusted Flow Rate ( v ), veh/h 45 72 72 209 194 60 250 233 162 65 410 399 Adjusted Saturation Flow Rate ( s ), veh/h/In 1810 1885 1846 1875 1752 1409 1781 1664 1422 1697 1796 1746 Queue Service Time ( g S ), s 2.7 4.3 4.4 13.1 5.6 4.3 0.0 4.7 6.5 1.8 5.8 7.0 Cycle Queue Clearance Time ( g � ), s 2.7 4.3 4.4 13.1 5.6 4.3 4.7 4.7 6.5 1.8 5.8 7.0 Green Ratio (g/C) 0.13 0.10 0.10 0.13 0.20 0.20 0.58 0.58 0.58 0.63 0.64 0.64 Capacity ( c ), veh/h 240 194 190 242 706 284 1065 966 825 584 1148 1116 Volume -to -Capacity Ratio (X) 0.189 0.372 0.378 0.867 0.274 0.211 0.235 0.241 0.196 0.112 0.357 0.357 Back of Queue ( Q ), ft/In ( 95 th percentile) 54 97 96 291 113 77 79 78 104 31 92 104 Back of Queue ( Q ), veh/In ( 95 th percentile) 2.2 3.8 3.8 11.5 4.4 2.7 3.1 2.9 3.7 1.2 3.5 4.1 Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.52 0.00 0.00 0.00 0.62 0.00 0.00 0.72 0.15 0.00 0.00 Uniform Delay ( d i ), s/veh 46.2 50.2 50.2 51.3 40.5 40.0 6.4 6.2 11.9 8.9 3.6 4.6 Incremental Delay ( d 2 ), s/veh 0.4 2.5 2.6 15.4 0.4 0.8 0.5 0.6 0.5 0.1 0.9 0.9 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 46.6 52.7 52.9 40.9 40.8 6.9 6.8 12.4 9.0 4.5 5.5 Level of Service (LOS) D D D D D A A B A A A Approach Delay, s/veh / LOS 51.3 D 8.3 A 5.3 A IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Intersection Delay, s/veh / LOS IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 'IIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.31 B 2.30 B 2.40 B 2.24 B Bicycle LOS Score / LOS 0.64 A 0.87 A 1.02 A 1.21 A III �II� .I u li" ��� w IIII�� III � �, � � � � � .�� I� � I, I��, � .� I, � .�I � :� � I��� � �� a �� I �� � I� ��IIIII�������� �� IIIIII � ,�II�� I I � I� � ���� ����� �I� � I � ����� � ��III 'IIII IIIII�� ��� �„� ,I��'�� 'IIII 'IIII II�.���� � IIIIII � 'IIII �I�. � I � � �. ��� � � �� ����� � � I .�� � .�� � I� �I � � 'IIII � � �� � � ulu � �II II� II I II II I� II�� ���������������� � I I � I�� �. �. � � � � ���� I � ������� � �II �.� �I II I I �� �II� I �II� I I I ����� II��� � II��� �II� �II�I II II I I I I � III�� � � ����� I � I ���� �II�� � 'IIII 'IIII illl)25 'IIII' IIIIII IIII Illlf �11111l ,,,,ill, 11I I,I�u;PS I1u11!!°9i lull ° ° HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ���� �"���� �° °* Agency GHA Duration, h 0.250 Analyst DB Analysis Date Apr 21, 2025 Area Type Other ""'' �'" Jurisdiction IDIIIIIIIIIIIOT Time Period IIIIIAM PHF III0.95 �1 Urban Street DEMPSTER Analysis Year EXISTING 2025 Analysis Period 1> 7:00 ���� �N ,c IIIIIIntersection DEMP°IIIIIIIIISTER @ BUIIIIIIIIIIISIIIIIIIIIIISIE 111111111File Name 21IIIIIII01IIIIIIII25 DEMP-BUIIIIIIIIIIIS AM.xus Project Description CLOUD HQ ""�� °"°����� -°'°' �� ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I'll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll"�"I'll"�"I'll"�,'ll"�"�'ll"�"I'll"�"�I' Demand Information �ll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""I'll",,���������������'ll""I'll"'ll""I'll" EB "�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll"�"I'll"�,'ll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' ��','ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll WB NB ",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll"�"I'll"�"I'll"�,'ll"�"�'ll"�"I'll"�"I'll"�,lI SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 43 129 8 199 184 57 8 451 154 62 708 60 Signal Information ���������� IIIIIIIIIIIC ������� IIIIII1�IIIIIIIIIIIII2�IIIIIIII0� IIIIIIIIIIOII ��������� ���������� ���� ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... IIIIIIIIII21 mIIII :W �,'�I �w'�II . ". y cII�IIIIIIe s Re°IIIfIIIIIIe re n ce Phase �.��� I��� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I Offset, s 0 Reference Point BeginIlll IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green 3.5 69.7 3.7 8.3 12.4 0.0 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated No Simult. Gap E/W On Yellow 3.5 4.5 3.5 3.5 4.5 0.0 illillillillillillilliillilliillillillillillillillillilliillillil illillillillilli lillillilliillillillillillillilliil illillillilliilillillilillillillill illillilliillillillill illillilliillillillillillillilliillillill illillillillilliillilliil illiillillillillillillill llillillillillillillilliillillillillillilli �....I' Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 1.000 0.992 1.000 0.984 0.969 0.875 1.000 0.914 0.883 0.938 0.945 1.000 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 1.000 1.000 1.000 0.952 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 0.952 0.000 0.952 0.000 0.974 0.974 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.979 0.979 0.000 0.847 0.000 0.847 0.972 0.972 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) 1.00 Movement Saturation Flow Rate (s), veh/h 1810 3515 216 1875 3505 1409 60 3385 1422 1697 3266 277 Proportion of Vehicles Arriving on Green (P) 0.03 0.10 0.10 0.13 0.20 0.20 0.58 0.77 0.58 0.03 0.85 0.64 Incremental Delay Factor (k) 0.11 0.23 0.23 0.20 0.23 0.23 0.50 0.50 0.50 0.11 0.50 0.50 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 3.5 6.0 3.5 6.0 6.0 3.5 6.0 Green Ratio (g/C) 0.13 0.10 0.13 0.20 0.58 0.63 0.64 Permitted Saturation Flow Rate (sp), veh/h/In 1208 0 0 0 685 876 0 Shared Saturation Flow Rate (ssn), veh/h/In 0 Permitted Effective Green Time (gp), s 12.4 0.0 0.0 0.0 69.7 71.7 0.0 Permitted Service Time (gu), s 12.4 0.0 0.0 0.0 69.6 65.0 0.0 Permitted Queue Service Time (gps), s 0.0 0.0 0.5 Time to First Blockage (gf), s 0.0 0.0 0.0 0.0 40.0 0.0 0.0 Queue Service Time Before Blockage (gfs), s 4.7 Protected Right Saturation Flow (sR), veh/h/In 0 0 Protected Right Effective Green Time (gR), s 0.0 0.0 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.557 0.000 1.557 0.000 1.710 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.155 0.000 0.146 0.000 0.095 0.000 0.082 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 206.04 48.27 402.81 38.27 1161.01 10.56 1277.78 7.82 Bicycle Fw / F� -3. 64 0.16 -3. 64 0.38 -3. 64 0.53 -3. 64 0.72 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilliillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliilillilI Agency iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilI GHA Duration, h iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillI 0.250 Analyst iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillI DB Analysis Date Apr 21, 2025 Area Type Other Jurisdiction IDOT Time Period AM PHF 0.95 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillI Urban Street DEMPSTER Analysis Year EXISTING 2025 Analysis Period 1> 7:00 Intersectioniiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillili DEMPSTER @ BUSSE File Name iiiiiiiillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillilI 2025 DEMP-BUS AM.xus Project Description CLOUD HQ Demand Information EB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillilillilI Approach Movement L T Demand (v ), veh/h iiiiiiiiiiiiiiiiiiiiiillillillilililililill1111111 43 129 Signal Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillilillilI ������ Cycle, s 120.0 Reference Phase 2 Offset, s 0 Reference Point Begin IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green 3.5 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII "'''''''I''''' Uncoordinated Uncoordinated No Simult. Gap E/W On Yellow 3.5 onessommossomm ForceModeiiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillillFixed Simult. Gap N/S OniiiiiiiiiRed 0 0 Movement Group Results iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI Approach Movement iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillI Back of Queue ( Q ), ft/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Back of Queue ( Q ), veh/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Queue Storage Ratio ( RQ ) ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Control Delay ( d ), s/veh iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillilillillillilI Level of Service (LOS) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI ApproachDelay, s/veh /L OS iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilillillillilI Intersection Delay, s/veh / LOS WB NB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliilillilI R iiiiiiiiiiiiiiiiiiiiiillillillillillillilliilliillillillillillillilliillillillillillillillillillilliillillillillillillilliillillillillillillillilliillillillillillillillillillilliillillillillillillilliillillillillillillillilliillillillillillillillillillilliillillillillillillilliillillillillillillillilliillillillillillillillillillilliillillillilI L T iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillilillilI R IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII L iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillillilililI T R 8 199 184 57 8 451 154 ������������������������������������������������������������������������������������������������������������l������������������������������������������������������������������������������������������������������������������i�������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������� IIIMUL •Will III "L.... ��������������������������������������������������������������������������������������������l�������������������������������������������������������������������������������������� 11 17.1 IIIII ,,III !.. 1. 69.7 "I'l""I'll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I',���������������'ll""I'll""I'lI ....... 3.7 'll""II .... ............ "I'l""I'll""I'll'll""I'll""I'll",I . ...... 8.3IIIIIIIIIIIIIIIIIIIIIillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliI ......................................................................................................................... "I'l""I'll""I'll'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""II 12.4iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillilI 0.0 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliIIIIIIIIIIIIIIIIiiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliI 4.5 iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillilliillillilillillillillillillillillillilliillillilillillillilililI3.5 3.5 4.5 0.0 he 1.5 0.0 0.0 111,91T7 ... .. 0.0 SB L T R 62iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillliiiiiiiiiiiiiiiiiiiiiillillillillilliillillillillillillilliillillillillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilliillillillillillillillilliillillillillillilI708 60 EB WB NB SB L T R L T R L T R 11 L T R 54 97 96 291 113 77 79 78 iiiiiiiiiiiiiiiiiiiiiilllllllllI 104 31 92 104 2.2 3.8 3.8 11.5 4.4 2.7 3.1 2.9 3.7 1.2 3.5 4.1 0.52 0.00 0.00iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillillillillillillillillilliillillillillIiiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillillillilI 0.00iiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillillillililI 0.62iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillillillillillillillillilliillillillillI 0.00iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillI 0.00iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillililI 0.72iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillillillillillillillillilliillillillillilliI 0.15iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillilillilI 0.00iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillilliillillillillillillillillillillillillillilliillillillilliillillililI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillilillillillillillillillillillI 0.00 46.6 52.7 52.9iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillilliillillillillilillillillillillillillilliillillillillIiiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillilI 40.9iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillillilliillillillillillillillillillillillilliillillillillililI 40.8iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillillillillillillillillilliillillillillIiiiiiiiiiiiiiiiiiiiiiill 6.9iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillillillilI 6.8iiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillillillililI 12.4iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillillillillillillillillilliillillillillillI 9.0iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilllillillillillillillilliillillillillillillI 4.5iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillilliillillillillilillillillillillillillillilliillillilillillillillilI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillI 5.5 D D D A A 1111 B A A IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIID 51.3 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIJIDIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII D 8.3 A 5.3 1111111�A lI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillI IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIA IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 20.3 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 2.2 � 46.6 3.8 1 52.7 3.8 1 52.9 40.8 2.7 40.9 [ 4.4 66.7 ,°„°0? 11.5 6.9 6.8 12.4 13.1 2.9 3.7 Queue MMMM Delay � Queue Storage Ratio < 1 Queue Storage Ratio > 1 --- Messages --- WARNING: Since queue spillover from turn lanes and spillback into upstream intersections is not accounted for in the HCM procedures, use of a simulation tool may be advised in situations where the Queue Storage Ratio exceeds i.o. --- Comments --- I �.... 9 �� II III � � N I I I I I I I ...IIII, � � ��� II „ ..� � ...III,. V ..��,. ' I I..IVu I II 20211111 II ..�� ..�� ���� ...III, ' I II I II u I I I I � �� � I I ul,,I �� I ull,,,,, „ u ull,,,,, „ u u ull,,,, „ � I, III Ip III I I � � I � II I III II II I I �'�� � � I, ��I � I I IIII I, I I ��I, I, � II,�,II �I IIIII � IIIIII �, � ,IIIII I I�I ,IIIII I,,, I�I � IIIII IIIII III I I„�� IIIII � (IIII IIIII IIIII I I � �„ „u ,III �, � IIIII IIIII III IIII � IIIIII �, I IIIII III III �,�, �I„,, IIIII � I,�III, I,�,I � �, I,,,,,I,. � �IIIII IIIII IIIII � IIIII � IIIII I,�„ IIII��, �, I��„� ,IIIII,,,,,,,, � IIIII,,,,,,,,'„„I ,IIIII,,,,,,,, I�, � '� � � IIIII IIIII IIII I � I" „ ° I ii;, III IIII I G IIIII, IIIII,,,,,,,,,,, IIIII I I IIII' Iluu!!I IIII, � NIicI,,,,I :9 HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other°' °N'" Jurisdiction IDIIIIIIIIIIIOT Time Period IIIIIAM PHF III0.95 �ll �1 Urban Street DEMPSTER ���� ���������@ Analysis �111111111 Year NB 2032 ������ Analysis Period 1 > 7:00 �k ,c I�llllllntersection D E M P°IIIIIIIIIISTE R B UIIIIIIIIIIIISIIIIIIIIIIIISIE F i I e N a m e 21IIIIIIII01IIIIIIIII3�IIIIIII2 N B D E M P-B UIIIIIIIIIIIS AM .xus Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 43 147 8 209 194 58 8 466 156 64 728 60 Signal Information ���������� IIIIIIIIIIIC ������� IIIIII1�IIIIIIIIIIIII2�IIIIIIII0� IIIIIIIIIIOII ��������� ���������� ���� IIIIIIIIII21 � m11 "' "' .IIIIII y cll�lllllle s Re°Illflllllle re n ce Phase � �.��� II II �I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII . 1.. 1 , Offset, s 0 Reference Point BeginIlll IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated No Simult. Gap E/W On Green 3.6 68.0 3.6 9.0 13.2 0.0 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIII"IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII"IIIIIIIIIIIIIIIIIIIIIIII Yellow 3.5 4.5 3.5 3.5 4.5 0.0 Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 43 147 8 209 194 58 8 466 156 64 728 60 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 1900 1900 1900 2000 1900 1900 1900 2000 1900 1900 1900 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 0 1 2 4 16 11 15 8 7 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 3 4 3 3 4 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 105 0 175 0 125 0 145 205 0 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 40 40 40 40 40 40 40 40 40 35 35 35 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 15.6 26.4 25.2 36.0 49.2 19.2 68.4 Yellow Change Interval (Y), s 3.5 4.5 3.5 4.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 0.0 1.5 0.0 1.5 1.5 0.0 1.5 Minimum Green ( Gm►n), s 3 8 3 8 15 3 15 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 3.0 5.0 3.0 5.0 2.0 3.0 2.0 Recall Mode Off Off Off Off Min Off Min Dual Entry No Yes No Yes Yes No Yes Walk (Walk), s 7.0 7.0 7.0 7.0 Pedestrian Clearance Time (PC), s 20.0 20.0 20.0 20.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 I ,. IIII IIII I I .. I I I III I I � I I II III � � � ���� I� I IIII l 1 IIII �I III !III I �I . I l i � � u � I �I ���I�I� ���� ������ IIIIII � ,II��� ���� ���� � ����� ���� ��I �I� ����� � �Ili���l IIIII IIIIII II�������� ,I���'I� IIIII IIIII ��IL���� IIIII �� ��.II IIIII ��IL�I I �I� ��I ��� ��I IIIIII I .... I� � ��� �� IIIII � III � I I IIII IIII I I I I � � � I � I II II � � I II�� ��I � i��� iglu ����� I���������� ��� �II� III III I I I � � I II II I I I�� II�� I �„ I �����I I ������ � �I I �� �II��� II��� IIIIII I II�� I I ��� II��� � � � ��� IIIII IIIII ��„� ,IIII„. �„ IIIIN Il11lllll111111� IIIII°�I�� IIIII��ll��ll��ll IIIII IIIII°�I�IIIwIIIIII I�°�� II S ,IIllm�'�k, M IIII ������l �� l',',�,i s HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other°' °N'" Jurisdiction IDIIIIIIIIIIIOT Time Period IIIIIAM PHF III0.95 �ll �1 Urban Street DEMPSTER ���� ���������@ Analysis �111111111 Year NB 2032 ������ Analysis Period 1 > 7:00 �k ,c I�llllllntersection D E M P°IIIIIIIIIISTE R B UIIIIIIIIIIIISIIIIIIIIIIIISIE F i I e N a m e 21IIIIIIII01IIIIIIIII3�IIIIIII2 N B D E M P-B UIIIIIIIIIIIS AM .xus Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 43 147 8 209 194 58 8 466 156 64 728 60 Signal Information ���������� IIIIIIIIIIIC ������� IIIIII1�IIIIIIIIIIIII2�IIIIIIII0� IIIIIIIIIIOII ��������� ���������� ���� IIIIIIIIII21 � m11 "' "' .IIIIII y cll�lllllle s Re°Illflllllle re n ce Phase IR �.��� II II �I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII . 1.. 1 , Offset, s 0 Reference Point BeginIlll IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated No Simult. Gap E/W On illillilliillillillillillillilliillillillillillillillilliillillil illillillillilli llillillilliillillillillillillilliillillillillillill llillillillillilliillillillillillil lilliillillillillillillilliillillil lillillillillillillill lillillillilliillillillillillillillillill illilliillillillillillill illillilliillillillillill lilliillillillillillillillI Green 3.6 68.0 3.6 9.0 13.2 0.0 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIII"IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII"IIIIIIIIIIIIIIIIIIIIIIII Yellow 3.5 4.5 3.5 3.5 4.5 0.0 �....I' Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 7 4 3 8 2 1 6 Case Number 1.1 4.0 2.0 3.0 7.3 1.0 4.0 Phase Duration, s 7.1 19.2 19.6 31.7 74.0 7.1 81.2 Change Period, ( Y+R � ), s 3.5 6.0 3.5 6.0 6.0 3.5 6.0 Max Allow Headway (MAH ), s 4.0 9.1 4.0 9.1 0.0 4.0 0.0 Queue Clearance Time ( g S ), s 4.6 6.9 15.8 7.8 3.9 Green Extension Time ( g e ), s 0.0 6.3 0.3 8.0 0.0 0.2 0.0 Phase Call Probability 0.78 1.00 1.00 1.00 0.89 Max Out Probability 0.01 0.34 0.27 0.10 0.00 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 7 4 14 3 8 18 5 2 12 1 6 16 Adjusted Flow Rate ( v ), veh/h 45 82 81 220 204 61 259 240 164 67 420 409 Adjusted Saturation Flow Rate ( s ), veh/h/In 1810 1885 1851 1875 1752 1409 1783 1664 1422 1697 1796 1748 Queue Service Time ( g S ), s 2.6 4.8 4.9 13.8 5.8 4.3 0.0 5.2 6.8 1.9 6.7 7.9 Cycle Queue Clearance Time ( g � ), s 2.6 4.8 4.9 13.8 5.8 4.3 5.2 5.2 6.8 1.9 6.7 7.9 Green Ratio (g/C) 0.14 0.11 0.11 0.13 0.21 0.21 0.57 0.57 0.57 0.61 0.63 0.63 Capacity ( c ), veh/h 246 207 203 252 750 301 1042 943 806 563 1125 1095 Volume -to -Capacity Ratio (X) 0.184 0.395 0.400 0.873 0.272 0.203 0.248 0.255 0.204 0.120 0.373 0.374 Back of Queue ( Q ), ft/In ( 95 th percentile) 54 109 108 306 117 77 88 88 110 33 106 117 Back of Queue ( Q ), veh/In ( 95 th percentile) 2.2 4.3 4.3 12.1 4.5 2.7 3.5 3.2 3.9 1.3 4.0 4.7 Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.51 0.00 0.00 0.00 0.62 0.00 0.00 0.76 0.16 0.00 0.00 Uniform Delay ( d i ), s/veh 45.5 49.7 49.7 50.9 39.4 38.8 7.2 7.0 12.7 9.5 4.2 5.2 Incremental Delay ( d 2 ), s/veh 0.4 2.6 2.7 17.0 0.4 0.7 0.6 0.7 0.6 0.1 1.0 1.0 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 45.8 52.3 52.4 39.8 39.5 7.7 7.6 13.3 9.6 5.2 6.2 Level of Service (LOS) D D D D D A A B A A A Approach Delay, s/veh / LOS 50.9 D 9.1 A 6.0 A IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Intersection Delay, s/veh / LOS IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII . IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.31 B 2.30 B 2.41 B 2.24 B Bicycle LOS Score / LOS 0.66 A 0.89 A 1.03 A 1.23 A ., . I � � I� IIII IIII .� .� ��� w IIII IIII I �, �,..�I I� �, � �� � �II � .�I � � � ��� � � � � �� � �I ��������������� I������ � ,II��� � I � II I ���� ����� ��� I I � ����� I i���� ����� ������ ��I�„� ,I��'I� ����� ����� �IL���� I������� � ����� �IL � I � I L ��� I L�IIIIII � � � � � �� I I �I �� � I � � I I� I � I I ... � �I I� I� I ..�I � I..�I IIII � � �I I � � �� ����� � I �� ��� ��lu � I III III III I I II II II�� I I � ���������������� � I I � �II I.. .. �.� � I � I � � � I �� � ���� I I ������� I II � III I III III I II II I II�� II�� I IIIII I���� �I���� IIII III I I I� � I��� �II��� I � IIIII II � � � � IIII � I � I ����� ����� ii IIII IIIII IIIII IIIIII IIIII IIIII IIIIIIIIII IIII Its ,I11,11,," IM IIII'���1 lw HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other ""'' �'" JurisdictionDOT Time Period �����AM PHF III0.95 �1 Urban Street DEMPSTER Analysis Year NB 2032 Analysis Period 1 > 7:00 ���� �., ,c ����������������I�������ntersection ���� ��������D E M P�����������STE R ���������@ B U������������S������������S�E �111111111 F i I e N a m e ������ ����������2���������0����������3��������2 N B D E M P-B U�����������S AM .xus Project Description CLOUD HQ ""� � ° "° �����' � "' '� � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I'll""'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll",'ll""I'll""�I'll,'ll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�,'ll"�"�I'l Demand Information �l""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""I'll",,���������������'ll""I'll""�I'll,'ll"' EB 'I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll",'ll"�"I'll"�"�I'll,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' ��','ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll",'ll""I'll""�I'll,'ll""I'll""I'll WB NB ",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll",'ll""I'll""�I'll,'ll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�,'ll"�"I'll"�"�II SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 43 147 8 209 194 58 8 466 156 64 728 60 Signal Information ���������� �����������C ������� ������1��������������2���������0� ����������0�� ��������� ���������� ������e ���� ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... ����������21 "' "' c�l�������e s Rellllf y re n ce Phase �.��� Offset, s 0 Reference Point BeginIlll .T iiiiiiiiiiiiillillillillillillilliillillillillillillilliilillillilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillil llillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillilliillilliili illillillillillillilliillillillillillillilliil llillillilliillillillillillill lliillilliilillillillillillillillilliillillillilli Green 3.6 68.0 3.6 9.0 13.2 0.0 ""Ill""I'll""I'll",Ill""I'll "I'll",llIll""I'll""I'll",Ill""I'lIl illillillillillillillillillillillilliillilli lillillillillillillillillillilliillillililli illillilillillillillillillillilliillillililli lillilliillillillillillillillilliillillillill llillillilliillillillillillillilliillillillill Uncoordinated No Simult. Gap E/W On Yellow 3.5 4.5 3.5 3.5 4.5 0.0 4 Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 1.000 0.992 1.000 0.984 0.969 0.875 1.000 0.914 0.883 0.938 0.945 1.000 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 1.000 1.000 1.000 0.952 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 0.952 0.000 0.952 0.000 0.975 0.975 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.982 0.982 0.000 0.847 0.000 0.847 0.973 0.973 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) 1.00 Movement Saturation Flow Rate (s), veh/h 1810 3544 192 1875 3505 1409 58 3389 1422 1697 3274 270 Proportion of Vehicles Arriving on Green (P) 0.03 0.11 0.11 0.13 0.21 0.21 0.57 0.76 0.57 0.03 0.84 0.63 Incremental Delay Factor (k) 0.11 0.23 0.23 0.22 0.23 0.23 0.50 0.50 0.50 0.11 0.50 0.50 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 3.5 6.0 3.5 6.0 6.0 3.5 6.0 Green Ratio (g/C) 0.14 0.11 0.13 0.21 0.57 0.61 0.63 Permitted Saturation Flow Rate (sp), veh/h/In 1197 0 0 0 672 863 0 Shared Saturation Flow Rate (ssn), veh/h/In 0 Permitted Effective Green Time (gp), s 13.2 0.0 0.0 0.0 68.0 70.0 0.0 Permitted Service Time (gu), s 13.2 0.0 0.0 0.0 67.3 62.8 0.0 Permitted Queue Service Time (gps), s 0.0 0.0 0.6 Time to First Blockage (gf), s 0.0 0.0 0.0 0.0 40.1 0.0 0.0 Queue Service Time Before Blockage (gfs), s 5.2 Protected Right Saturation Flow (sR), veh/h/In 0 0 Protected Right Effective Green Time (gR), s 0.0 0.0 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.557 0.000 1.557 0.000 1.710 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.155 0.000 0.145 0.000 0.097 0.000 0.085 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 219.76 47.54 427.83 37.08 1133.92 11.25 1253.03 8.37 Bicycle Fw / F� -3. 64 0.17 -3. 64 0.40 -3. 64 0.55 -3. 64 0.74 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilliillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliilillilI Agency iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilI GHA Duration, h iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillI 0.250 Analyst iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillI M KP Analysis Date Apr 21, 2025 Area Type Other Jurisdiction IDOT Time Period AM PHF 0.95 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillI Urban Street DEMPSTER Analysis Year NB 2032 Analysis Period 1 > 7:00 Intersectioniiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillili DEMPSTER @ BUSSE lillillilli1111111:11111111111111111111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII111111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII111111111111IIIIIIIIIIIIIIIIIIIIIIillillilli�illillillillillillilliillillillillillilliilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillilI File Name 2032 NB DEMP-BUS AM.xus Project Description CLOUD HQ Demand Information EB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillilillilI Approach Movement L T Demand (v ), veh/h iiiiiiiiiiiiiiiiiiiiiillillillilililililill1111111 43 147 Signal Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillilillilI ������ Cycle, s 120.0 Reference Phase 2 Offset, s 0 Reference Point Begin IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green 3.6 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII "'''''''I''''' Uncoordinated Uncoordinated No Simult. Gap E/W On Yellow 3.5 onessommossomm ForceModeiiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillillFixed Simult. Gap N/S OniiiiiiiiiRed 0 0 Movement Group Results iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI Approach Movement iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillI Back of Queue ( Q ), ft/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Back of Queue ( Q ), veh/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Queue Storage Ratio ( RQ ) ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Control Delay ( d ), s/veh iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillilillillillilI Level of Service (LOS) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI ApproachDelay, s/veh /L OS iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilillillillilI Intersection Delay, s/veh / LOS WB NB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliilillilI R iiiiiiiiiiiiiiiiiiiiiillillillillillillilliilliillillillillillillilliillillillillillillillillillilliillillillillillillilliillillillillillillillilliillillillillillillillillillilliillillillillillillilliillillillillillillillilliillillillillillillillillillilliillillillillillillilliillillillillillillillilliillillillillillillillillillilliillillillilI L T iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillilillilI R IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIillillillillillillilliillillillillillillillillillillillilliillillillillillI L iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillilliillillillillilillilillilI T R 8 209 194 58 8 466 156 ������������������������������������������������������������������������������������������������������������l�����������������������������������������������������������������������������������������������������������������i��������������������������������������������������������������������������������������������������� IIIMUL •Will ����������������������������������������������������������������������������� ������������� III "L.... ������������������ ��������������������������������������������������������������������������������������������l�������������������������������������������������������������������������������������� 11 17.1 IIIII ,,III !.. 1. 68.0 3.6 ""I'llI .... ............. "I'l""I'll""I'll'll""I'll""I'll",I . ...... 9.0IIIIIIIIIIIIIIIIIIIIIillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliI ......................................................................................................................... "I'l""I'll""I'll'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""II 13.2iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillilI 0.0 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliIIIIIIIIIIIIIIIIiiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliI 4.5 iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillilliillillilillillillillillillillillillilliillillilillillillilililI3.5 3.5 4.5 0.0 he 1.5 0.0 0.0 111,91T7 ... .. 0.0 SB L T R 64iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillliiiiiiiiiiiiiiiiiiiiiillillillillilliillillillillillillilliillillillillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilliillillillillillillillilliillillillillillilI728 60 EB WB NB SB L T R L T R L T R L T R 54 109 108 306 117 77 88 88 iiiiiiiiiiiiiiiiiiiiiillllllllllI 110 33 106 117 2.2 4.3 4.3 1 2. 1 4.5 2.7 3.5 3.2 3.9 1.3 4.0 4.7 0.51 0.00 0.00iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillillillillillillillillilliillillillillIiiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillillillilI 0.00iiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillillillililI 0.62iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillillillillillillillillilliillillillillI iiiiiiiiiiiiiiiiiiiiiill 0.00iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillI 0.00iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillililI 0.76iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillillillillillillillillilliillillillillilliI 0.16iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillilillilI 0.00iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillilliillillillillillillillillillillillillillilliillillillilliillillililI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillilillillillillillillillillillI 0.00 45.8 52.3 52.4iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillilliillillillillilillillillillillillillilliillillillillIiiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillilI 39.8iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillillilliillillillillillillillillillillillilliillillillillililI 39.5iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillillillillillillillillilliillillillillI 7.7iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillillillilI 7.6iiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillillillililI 13.3iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillillillillillillillillilliillillillillillI 9.6iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilllillillillillillillilliillillillillillillI 5.2iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillilliillillillillilillillillillillillillillilliillillilillillillillilI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillI 6.2 DIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIID DIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII DIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIID A A 1111 B A A 50.9 D 9.1 A 6.0 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIA A IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII . IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 4.7 4 1.3 6.2 5.2 9.6 2.2 �= 45.8 39.5 2.7 4.3 Q52.3 39.8[ 4.5 4.3 Q 52.4 67.9 ,°„°0? 12.1 7.7 7.6 13.3 IL (. ~~~gip IG� 3.5 3•2 Queue Delay 3.9 111111111111111111 1...0S C 0 II...0S Ii:) � Queue Storage Ratio < 1 IL..OS IE Queue Storage Ratio > 1 --- Messages --- WARNING: Since queue spillover from turn lanes and spillback into upstream intersections is not accounted for in the HCM procedures, use of a simulation tool may be advised in situations where the Queue Storage Ratio exceeds i.o. --- Comments --- I �.... 9 �� II III � � N I I I I I I I ...IIII, � � ��� II „ ..� � ...III,. V ..��,. ' I I..IVu I II 20211111 II ..�� ..�� ���� ...III, ' I II I II u I I I I � �� � I I ul,,I �� I ull,,,,, „ u ull,,,,, „ u u ull,,,, „ � I, III Ip III I I � � I � II I III II II I I �'�� � � I, ��I � I I IIII I, I I ��I, I, � II,�,II �I IIIII � IIIIII �, � ,IIIII I I�I ,IIIII I,,, I�I � IIIII IIIII III I I„�� IIIII � (IIII IIIII IIIII I I � �„ „u ,III �, � IIIII IIIII III IIII � IIIIII �, I IIIII III III �,�, �I„,, IIIII � I,�III, I,�,I � �, I,,,,,I,. � �IIIII IIIII IIIII � IIIII � IIIII I,�„ IIII��, �, I��„� ,IIIII,,,,,,,, � IIIII,,,,,,,,'„„I ,IIIII,,,,,,,, I�, � '� � � IIIII IIIII IIII I � I" „ ° I ii;, III IIII I G IIIII, IIIII,,,,,,,,,,, IIIII I I IIII' Iluu!!I IIII, � NIicI,,,,I :9 HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other �"' °�'" JurisdictionDOT Time Period �����AM PHF III0.95 �ll �1 Urban Street DEMPSTER ����������������I�������ntersection ���� ��������D ���������@ Analysis �111111111 Year TOTAL ������ ����������2���������0����������3��������2� 2032 Analysis Period 1 > 7:00 �k ,c E M P�����������STE R B U������������S������������S�E F iI e N a me T����������OT D E M P-B U�����������S AM .xus Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 43 162 8 209 206 70 8 466 156 79 728 60 Signal Information ���������� �����������C ������� ������1��������������2���������0� ����������0�� ��������� ���������� ������e ���� ����������21 I�� S 511 "' c�l�������e s Rellllf y re n ce Phase .. �.��� ", 1 Offset, s 0 Reference Point BeginIlll iiiiiiiiiiiiillillillillillillilliillillillillillillilliilillillilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillil llillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillilliillilliili illillillillillillilliillillillillillillilliil llillillilliillillillillillill lliillilliilillillillillillillillilliillillillilli Uncoordinated No Simult. Gap E/W On IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII IIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII VVVVVVVVVVVVVVVVVV IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII VVVVVVVVVVVVV IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII . . Green 4.4 66.4 3.6 9.0 14.1 0.0 ""Ill""I'll""I'll",Ill""I'll "I'll",llIll""I'll""I'll",Ill""I'lIl IIIIIIIIIIIIlillillillillillillillillillilli llillillilillillillillillillilliillillililli illilillillillillillillillillilliillillillill lillilliillillillillillillillilliillillillill lillillilliillillillillillillilliillillillilli Yellow 3.5 4.5 3.5 3.5 4.5 0.0 �����. 4 Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 Q.0 0.0 1.5 0.0 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 43 162 8 209 206 70 8 466 156 79 728 60 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 1900 1900 1900 2000 1900 1900 1900 2000 1900 1900 1900 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 0 1 2 4 16 11 15 8 7 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 3 4 3 3 4 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 105 0 175 0 125 0 145 205 0 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 40 40 40 40 40 40 40 40 40 35 35 35 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 15.6 26.4 25.2 36.0 49.2 19.2 68.4 Yellow Change Interval (Y), s 3.5 4.5 3.5 4.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 0.0 1.5 0.0 1.5 1.5 0.0 1.5 Minimum Green ( Gm►n), s 3 8 3 8 15 3 15 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 3.0 5.0 3.0 5.0 2.0 3.0 2.0 Recall Mode Off Off Off Off Min Off Min Dual Entry No Yes No Yes Yes No Yes Walk (Walk), s 7.0 7.0 7.0 7.0 Pedestrian Clearance Time (PC), s 20.0 20.0 20.0 20.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 ��� ������ IIIII � ,������ �'��� � ����� � ����� ��� ������� ��� ����� �� � i���l IIIII IIIII�� � ������� ,���'�� IIIII IIIII ���.���� Illlh�� �.�� IIIII ���.�� � ��� ��� ��� ��� ������� Illlh � � �� ��� � � i��� ����� .����� ����������� ��� �� � ������ � ������ � �� � �� ���� ������ ��� ����� �� � ���� � ����� � ��� ����� ������������� 3��������������� �..... �...� �..... �...... IIIII���������) IIIIIIIIIIIIIIIIl� IIII IIIII ,,Illll���������llljj��u �,1�� ,�������� � III�,�l� ���l��,,,, ���������� HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other �"' °�'" JurisdictionDOT Time Period �����AM PHF III0.95 �ll �1 Urban Street DEMPSTER ����������������I�������ntersection ���� ��������D ���������@ Analysis �111111111 Year TOTAL 2032 ������ ����������2���������0����������3��������2� Analysis Period 1 > 7:00 �k ,c E M P�����������STE R B U������������S������������S�E F iI e N a me T����������OT D E M P-B U�����������S AM .xus Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 43 162 8 209 206 70 8 466 156 79 728 60 Signal Information ���������� �����������C ������� ������1��������������2���������0� ����������0�� ��������� ���������� ������e ���� ����������21 I�� S 511 "' c�l�������e s Rellllf re n ce Phase yillillillillillllllll111111111 .. �.��� . 1 Offset, s 0 Reference Point BeginIlll iiiiiiiiiiiiillillillillillillilliillillillillillillilliilillillilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillil llillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillilliillilliili illillillillillillilliillillillillillillilliil llillillilliillillillillillill lliillilliilillillillillillillillilliillillillilli Uncoordinated No Simult. Gap E/W On IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII VVVVVVVVVVVVVVVVVV IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII VVVVVVVVVVVVV IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII . Green 4.4 66.4 3.6 9.0 14.1 0.0 ""Ill""I'll""I'll",Ill""I'll "I'll",llIll""I'll""I'll",Ill""I'lIl IIIIIIIIIIIIlillillillillillillillillillilli llillillilillillillillillillilliillillililli illilillillillillillillillillilliillillillill lillilliillillillillillillillilliillillillill lillillilliillillillillillillilliillillillilli Yellow 3.5 4.5 3.5 3.5 4.5 0.0 �����. 4 Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 Q.0 0.0 1.5 0.0 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 7 4 3 8 2 1 6 Case Number 1.1 4.0 2.0 3.0 7.3 1.0 4.0 Phase Duration, s 7.1 20.1 19.6 32.6 72.4 7.9 80.3 Change Period, ( Y+R � ), s 3.5 6.0 3.5 6.0 6.0 3.5 6.0 Max Allow Headway (MAH ), s 4.0 9.0 4.0 9.0 0.0 4.0 0.0 Queue Clearance Time ( g S ), s 4.6 7.4 15.8 8.2 4.4 Green Extension Time ( g e ), s 0.0 6.7 0.3 8.7 0.0 0.2 0.0 Phase Call Probability 0.78 1.00 1.00 1.00 0.94 Max Out Probability 0.01 0.40 0.27 0.13 0.00 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 7 4 14 3 8 18 5 2 12 1 6 16 Adjusted Flow Rate ( v ), veh/h 45 90 89 220 217 74 259 240 164 83 420 409 Adjusted Saturation Flow Rate ( s ), veh/h/In 1810 1885 1854 1875 1752 1409 1784 1664 1422 1697 1796 1748 Queue Service Time ( g S ), s 2.6 5.3 5.4 13.8 6.2 5.2 0.0 5.6 7.0 2.4 7.1 8.3 Cycle Queue Clearance Time ( g � ), s 2.6 5.3 5.4 13.8 6.2 5.2 5.6 5.6 7.0 2.4 7.1 8.3 Green Ratio (g/C) 0.15 0.12 0.12 0.13 0.22 0.22 0.55 0.55 0.55 0.61 0.62 0.62 Capacity ( c ), veh/h 254 221 218 252 776 312 1019 921 787 559 1112 1082 Volume -to -Capacity Ratio (X) 0.179 0.406 0.410 0.873 0.279 0.236 0.254 0.261 0.209 0.149 0.378 0.378 Back of Queue ( Q ), ft/In ( 95 th percentile) 53 118 117 306 124 93 96 96 114 43 113 123 Back of Queue ( Q ), veh/In ( 95 th percentile) 2.1 4.7 4.7 12.1 4.8 3.3 3.8 3.5 4.1 1.6 4.3 4.9 Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.51 0.00 0.00 0.00 0.74 0.00 0.00 0.79 0.21 0.00 0.00 Uniform Delay ( d i ), s/veh 44.7 49.1 49.1 50.9 38.8 38.4 7.9 7.7 13.5 10.0 4.6 5.6 Incremental Delay ( d 2 ), s/veh 0.3 2.5 2.6 17.0 0.4 0.8 0.6 0.7 0.6 0.1 1.0 1.0 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 45.0 51.6 51.7 39.2 39.2 8.5 8.4 14.1 10.2 5.6 6.6 Level of Service (LOS) D D D D D A A B 6 A A Approach Delay, s/veh / LOS 50.3 D 9.9 A 6.5 A Intersection Delay, s/veh / LOS . Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.31 B 2.30 B 2.41 B 2.24 B Bicycle LOS Score / LOS 0.67 A 0.91 A 1.03 A 1.24 A ������ illl� 1 °�� ���i� 0 � IIIII �) IIIIII IIII Illlf°°"�°° 11111lIIIIII 1 IIIIi PS ,'uui'' M III,, �� "�w S HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other ""'' �'" JurisdictionDOT Time Period �����AM PHF III0.95 �1 Urban Street DEMPSTER Analysis Year TOTAL 2032 Analysis Period 1 > 7:00 ���� �., ,c ����������������I�������ntersection ���� ��������D E M P�����������STE R ���������@ B U������������S������������S�E �111111111 F iI e N ame ������ ����������2���������0����������3��������2� T����������OT D E M P-B U�����������S AM .xus Project Description CLOUD HQ ""�� °"°����� -°'°' �� ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I'll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll"�"I'll"�"I'll"�,'ll"�"�'ll"�"I'll"�"�I' Demand Information �ll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""I'll",,���������������'ll""I'll"'ll""I'll" EB "�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll"�"I'll"�,'ll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' WB ��','ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll NB ",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll"�"I'll"�"I'll"�,'ll"�"�'ll"�"I'll"�"I'll"�,lI SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 43 162 8 209 206 70 8 466 156 79 728 60 Signal Information ���������� �����������C ������� ������1��������������2���������0� ����������0�� ��������� ���������� ������e ���� ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... ����������21 "' "' c�l�������e s Rellllf y re n ce Phase �.��� Offset, s 0 Reference Point BeginIlll .T iiiiiiiiiiiiillillillillillillilliillillillillillillilliilillillilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillil llillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillilliillilliili illillillillillillilliillillillillillillilliil llillillilliillillillillillill lliillilliilillillillillillillillilliillillillilli Green 4.4 66.4 3.6 9.0 14.1 0.0 ""Ill""I'll""I'll",Ill""I'll "I'll",llIll""I'll""I'll",Ill""I'lIl illillillillillillillillillillillilliillilli lillillillillillillillillillilliillillililli illillilillillillillillillillilliillillililli lillilliillillillillillillillilliillillillill llillillilliillillillillillillilliillillillill Uncoordinated No Simult. Gap E/W On Yellow 3.5 4.5 3.5 3.5 4.5 0.0 4 Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 1.000 0.992 1.000 0.984 0.969 0.875 1.000 0.914 0.883 0.938 0.945 1.000 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 1.000 1.000 1.000 0.952 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 0.952 0.000 0.952 0.000 0.976 0.976 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.983 0.983 0.000 0.847 0.000 0.847 0.973 0.973 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) 1.00 Movement Saturation Flow Rate (s), veh/h 1810 3564 175 1875 3505 1409 58 3390 1422 1697 3274 270 Proportion of Vehicles Arriving on Green (P) 0.03 0.12 0.12 0.13 0.22 0.22 0.55 0.74 0.55 0.04 0.83 0.62 Incremental Delay Factor (k) 0.11 0.23 0.23 0.22 0.23 0.23 0.50 0.50 0.50 0.11 0.50 0.50 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 3.5 6.0 3.5 6.0 6.0 3.5 6.0 Green Ratio (g/C) 0.15 0.12 0.13 0.22 0.55 0.61 0.62 Permitted Saturation Flow Rate (sp), veh/h/In 1183 0 0 0 672 863 0 Shared Saturation Flow Rate (ssn), veh/h/In 0 Permitted Effective Green Time (gp), s 14.1 0.0 0.0 0.0 66.4 68.4 0.0 Permitted Service Time (gu), s 14.1 0.0 0.0 0.0 66.0 60.8 0.0 Permitted Queue Service Time (gps), s 0.0 0.0 0.8 Time to First Blockage (gf), s 0.0 0.0 0.0 0.0 39.6 0.0 0.0 Queue Service Time Before Blockage (gfs), s 5.6 Protected Right Saturation Flow (sR), veh/h/In 0 0 Protected Right Effective Green Time (gR), s 0.0 0.0 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.557 0.000 1.557 0.000 1.710 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.154 0.000 0.144 0.000 0.099 0.000 0.087 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 234.67 46.75 443.02 36.36 1107.24 11.96 1238.12 8.71 Bicycle Fw / F� -3. 64 0.18 -3. 64 0.42 -3. 64 0.55 -3. 64 0.75 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilliillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliilillilI Agency iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilI GHA Duration, h iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillI 0.250 Analyst iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillI MKP Analysis Date Jul 2, 2025 Area Type Other Jurisdiction IDOT Time Period AM PHF 0.95 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillI Urban Street DEMPSTER Analysis Year TOTAL 2032IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIAnalysis Period 1 > 7:00 Intersectioniiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillillilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillili DEMPSTER @ BUSSE File Name iiiiiiiiiiiiiiiiiiiiiilillillillillillillillilliillillillillillillilliilillillillillillillillillilliilliillillillillillillilliillillillillillillilliilillillillillillillillillilliilliillillillillillillilliillillillillillillilliilillillillillillillillillilliilliillillillillillillilliillillillillillillilliilillillillillillillillillilliilliillillillillillillilliillillillillillillilliilillillillillillillI 2032 TOT DEMP-BUS AM.xus Project Description CLOUD HQ Demand Information EB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillilI Approach Movement L T Demand (v ), veh/h iiiiiiiiiiiiiiiiiiiiiillillillilililililill1111111 43 162 Signal""I'll",'ll""I'll""I'll,'ll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll,'ll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll,'ll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll,'ll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll,'ll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll,'ll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll,'ll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll,'ll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll,'ll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I�ll,'ll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll,'ll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll,'ll""I'll",'ll""I'll""I'll",lI , I I "I',"",',,"",',,", Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillilillilI ������ Cycle, s 120.0 Reference Phase 2 Offset, s 0 Reference Point Begin IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green 4.4 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated No Simult. Gap E/W On Yellow 3.5 mossommossonom ForceModeiiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillillillillFixed Simult. Gap N/S OniiiiiiiiiRed 0 0 Movement Group Results iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI Approach Movement iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillI Back of Queue ( Q ), ft/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Back of Queue ( Q ), veh/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Queue Storage Ratio ( RQ ) ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Control Delay ( d ), s/veh iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillilillillillilI Level of Service (LOS) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI ApproachDelay, s/veh /L OS iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilillillillilI Intersection Delay, s/veh / LOS WB NB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliilillilI R iiiiiiiiiiiiiiiiiiiiiillillillillillillilliilliillillillillillillilliillillillillillillillillillilliillillillillillillilliillillillillillillillilliillillillillillillillillillilliillillillillillillilliillillillillillillillilliillillillillillillillillillilliillillillillillillilliillillillillillillillilliillillillillillillillillillilliillillillilI L T iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillilillilI R IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIillillillillillillilliillillillillillillillillillillillilliillillillillillI L iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillilliillillillillilillilillilI T R 8 209 206 70 8 466 156 ������������������������������������������������������������������������������������������������������������l�����������������������������������������������������������������������������������������������������������������i���������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������� MULIII •Will III "L.... ������������������������������������������������������������������������������������������������������������������������l�������������������������������������������������������������������������������������� 11 17.1 IIIII ,,III !.. 1. 66.4 3.6 ""I'llI .... ............. "I'l""I'll""I'll'll""I'll""I'll",I . ...... 9.0IIIIIIIIIIIIIIIIIIIIIillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliI ......................................................................................................................... "I'l""I'll""I'll'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""II 14.1iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillilI 0.0 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliIIIIIIIIIIIIIIIIiiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliI 4.5 iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillilliillillilillillillillillillillillillilliillillilillillillilililI3.5 3.5 4.5 0.0 he 1.5 0.0 0.0 111,91T7 ... .. 0.0 SB L T R 79iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillliiiiiiiiiiiiiiiiiiiiiillillillillilliillillillillillillilliillillillillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilliillillillillillillillilliillillillillillilI728 60 EB WB NB SB L T R L T R L T R 11 L T R 53 118 117 306 124 93 96 96 iiiiiiiiiiiiiiiiiiiiiillllllllllI 114 43 113 123 2.1 4.7 4.7 1 2. 1 4.8 3.3 3.8 3.5 4.1 1.6 4.3 4.9 0.51 0.00 0.00IIIIIIIIIIIIIIIIIIIIIillillillillillillilliillillillillillillillillilliillilliillillillillillillilliillillillillilI 0.00iiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillillillililI 0.74iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillillillillillillillillilliillillillillI 0.00iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillilI 0.00iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillillilliillillillillillillillillillillillilliillillillillililI 0.79iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillillillillillillillillilliillillillillilliI 0.21iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillilillilI 0.00iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillilliillillillillillillillillillillillillillilliillillillilliillillililI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillilillillillillillillillillillI 0.00 45.0 51.6 51.7 67.9 39.2 39.2 8.5 8.4 14.1 10.2 5.6 6.6 DIIIIIIIIIIIIIIIIIIIIIII DiiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliililIiiiiiiiiiiiiiiiiiiiiiillillillillillillilliililI D DIIIIIIIIII111111I AIIIIIIIIIIIII B B AIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII A IIIIIIIIIIIIIIIDiiiiiiiiiiiiiiiiiiiiiilililllllllllI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillI50.3 DIIIIIIIIIIIIIIIIIIIIIIIIIIIII iiiiiiiiiiiiiiiiiiiiiillillillillillillI IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII11111111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIA 9.9 A 6.5 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIA 4.9 4.3 i , 1.6 6.6 5.6 10.2 2.1 �= 45.0 39.2 3.3 4.7 1Q 51.6 39.2 [ 4.8 4.7 1Q 51.7 67.9 �0? 12.1 8.5 8.4 14.1 IL (. ~~~gip IG� 3.8 3.5 Queue Delay 4.1 111111111111111111 1...0S C 0 II...0S Ii:) � Queue Storage Ratio < 1 IL..OS IE Queue Storage Ratio > 1 --- Messages --- WARNING: Since queue spillover from turn lanes and spillback into upstream intersections is not accounted for in the HCM procedures, use of a simulation tool may be advised in situations where the Queue Storage Ratio exceeds i.o. --- Comments --- u n n II � � II � .� � � 'IIII :'�� � uul� ° �I � I I � .� .� 'ul� �� I III ��I u' � , W W ''Il V' '..'�IVI, ��������� i� � .�i'����, ' �� � 4 u � � i u v III � V pl I III i i °"um � I � II 4 I II III II II I I I I �'�� u'U u,� I � � � u7nl � � � � I I III a I � � I � I � �I� �'� I I��� IIII�� IIIIII � � IIIII I�I IIIII I�I � IIIII IIIII III � � I IIIII � IIIII IIIII IIIII I„ �I � � �� ,III uv,`� � IIIII IIIII II�.IIII � IIIIII � I IIIII II�. III ��� �� ����� IIIII°°°� ���II� I��� �' � � �.� �.I IIIII IIIII IIIII � IIIII ��� ' � IIIII I�� IIII��', � I�� ���� ����� � IIIII �� � ,IIIII ��I � I„I ����� � ���� � �� III ul� IIII w, u PIuP IIIIIIIIII IIII ullll 11 luul!!I'lill :Ilul„:, HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other°' °N'" Jurisdiction IDIIIIIIIIIIIOT Time Period IIIPM PHF III0.95 �ll �1 "" �illillillillillillillillillillilliillillillillillil� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Urban Street DEMPSTER IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII llntersection IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIII Analysis IIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIFile "IIIIIIII "IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIIIII Year EXISTING 2025 Analysis Period IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1> 7:00 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII l �� �k ,c lllllIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII DEMP°IIIIIIIIIISTER @ BUIIIIIIIIIIIISIIIIIIIIIIIISIE Name 21IIIIIIII01IIIIIIIII25 DEMP-BUIIIIIIIIIIIIS PM.xus ...... Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 105 245 23 180 182 121 18 740 313 114 549 74 Signal Information lllllle IIIIIIIIOII "IIIIIIII lllllle IIII "III IIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII IIIIIIII III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III III "' "'I Re°Illf 21 C cll s 1°IIIIIIIIIIIII3°IIIIIIIIO y, re n ce Phase IIIIIIIIIIIIIII IIIIII ��i���...� ��i���...� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIII� LIII :� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Offset, s 0 Reference Point Beginllll IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated No Simult. Gap E/W On . Green 5.9 70.7 8.6 3.2 19.1 0.0 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII"III"IIIIIIIIIIIIIIIIIIIII IIII"IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII"IIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIII,IIIIIIIIIIIIIIIIIIIIIIIIII" IIIIII"IIIIIIIIIIIIIIIIIIIIIIIIIIIII Yellow 3.5 4.5 3.5 3.5 4.5 0.0 Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 105 245 23 180 182 121 18 740 313 114 549 74 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 1900 1900 1900 2000 1900 1900 1900 2000 1900 1900 1900 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 0 1 3 3 3 1 1 1 6 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 3 4 3 3 4 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 105 0 175 0 125 0 145 205 0 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 40 40 40 40 40 40 40 40 40 35 35 35 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 15.6 28.6 24.7 37.7 57.2 19.5 76.7 Yellow Change Interval (Y), s 3.5 4.5 3.5 4.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 0.0 1.5 0.0 1.5 1.5 0.0 1.5 Minimum Green ( Gm►n), s 3 8 3 8 15 3 15 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 3.0 5.0 3.0 5.0 2.0 3.0 2.0 Recall Mode Off Off Off Off Min Off Min Dual Entry No Yes No Yes Yes No Yes Walk (Walk), s 7.0 7.0 7.0 7.0 Pedestrian Clearance Time (PC), s 20.0 20.0 20.0 20.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 ,. III � �II� I � I III I iiiiiiiii o u it it it II II � ...��II ���� � I�� ...III I���� ...�II� � ...� �I � II I l i � I � a � � � � LI�I�� � IIII � I� � I� I I �. I I� I� I�� ������ IIIIII � ,�II�� ���� ���� � ����� �I� ��� ��� ����� I� � i���l "IIII IIIIII � ������� ,I��'�� "IIII "IIII II�.���� "IIII �I � �� "IIII �I�.�� � ��� ��� ��� ��� ������� � .... �� �I II i � � I �I� "IIII � I� � I � �II� � II� III II ...�II � � ...�II� I� II II � I I I �I�� i I I ��� � i��� Iglu ����� ����������� ��� ���� �II �I� I I um ..�� �..�� �...�II II II I � �I II� I II� I �� � ������ � ������ � �� � �� �III�� III�� �� �II� ��� III � I �II I ��� �II�� � � �,�II�� � II� �II� II II III iiiiiw II II I �II�� �II�� "IIII "IIII III 2 "IIII) "IIII''''''''''' IIII "IIII °° ,1I S "IIII "III 11111lu111ll I I °�� HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other°' °N'" Jurisdiction IDIIIIIIIIIIIOT Time Period IIIPM PHF III0.95- �ll �1 "" �illillillillillillillillillillilliillillillillillil� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Urban Street DEMPSTER IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII llntersection IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIII Analysis IIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIFile "IIIIIIII "IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII Year EXISTING 2025 Analysis IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIIIII Period IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1> 7:00 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII l �� �k ,c lllllIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII DEMP°IIIIIIIIIISTER @ BUIIIIIIIIIIIISIIIIIIIIIIIISIE Name 21IIIIIIII01IIIIIIIII25 DEMP-BUIIIIIIIIIIIIS PM.xus ...... Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 105 245 23 180 182 121 18 740 313 114 549 74 Signal Information lllllle lllllle "III IIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII IIIIIIII III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIOII "IIIIIIII IIII III III "' "'I Re°Illf 21 C cll s 1°IIIIIIIIIIIII3°IIIIIIIIO y, re n ce Phase IIIIIIIIIIIIIII IIIIII ��i���...� ��i���...� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIII� LIII :� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Offset, s 0 Reference Point Beginllll IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated No Simult. Gap E/W On . Green 5.9 70.7 8.6 3.2 19.1 0.0 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII"III"IIIIIIIIIIIIIIIIIIIII IIII"IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII"IIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIII,IIIIIIIIIIIIIIIIIIIIIIIIII" IIIIII"IIIIIIIIIIIIIIIIIIIIIIIIIIIII Yellow 3.5 4.5 3.5 3.5 4.5 0.0 Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 7 4 3 8 2 1 6 Case Number 1.1 4.0 2.0 3.0 7.3 1.0 4.0 Phase Duration, s 12.1 25.1 18.8 31.8 76.7 9.4 86.1 Change Period, ( Y+R � ), s 3.5 6.0 3.5 6.0 6.0 3.5 6.0 Max Allow Headway (MAH ), s 4.0 8.9 4.0 8.9 0.0 4.0 0.0 Queue Clearance Time ( g S ), s 8.7 11.2 15.0 11.2 5.7 Green Extension Time ( g e ), s 0.1 7.9 0.3 9.6 0.0 0.3 0.0 Phase Call Probability 0.98 1.00 1.00 1.00 0.99 Max Out Probability 1.00 0.54 0.19 0.33 0.00 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 7 4 14 3 8 18 5 2 12 1 6 16 Adjusted Flow Rate ( v ), veh/h 111 142 140 189 192 127 411 387 329 120 334 322 Adjusted Saturation Flow Rate ( s ), veh/h/In 1810 1885 1828 1860 1766 1572 1916 1806 1598 1795 1811 1735 Queue Service Time ( g S ), s 6.7 9.0 9.2 13.0 6.0 9.2 0.0 10.7 15.4 3.7 5.7 7.1 Cycle Queue Clearance Time ( g � ), s 6.7 9.0 9.2 13.0 6.0 9.2 10.5 10.7 15.4 3.7 5.7 7.1 Green Ratio (g/C) 0.21 0.15 0.15 0.12 0.20 0.20 0.54 0.54 0.54 0.60 0.62 0.62 Capacity ( c ), veh/h 341 277 268 219 701 312 1071 982 869 460 1116 1070 Volume -to -Capacity Ratio (X) 0.325 0.514 0.522 0.867 0.273 0.408 0.384 0.394 0.379 0.261 0.299 0.301 Back of Queue ( Q ), ft/In ( 95 th percentile) 135 200 197 292 122 171 186 174 244 66 96 113 Back of Queue ( Q ), veh/In ( 95 th percentile) 5.4 7.9 7.9 11.4 4.7 6.7 7.5 6.9 9.7 2.6 3.7 4.5 Queue Storage Ratio (RQ) (95 th percentile) 0.00 0.00 0.00 . 0.00 0.00 0.32 0.00 0.00 Uniform Delay ( d i ), s/veh 42.9 51.2 51.2 56.4 44.2 45.5 9.9 9.6 17.0 11.6 4.9 6.5 Incremental Delay ( d 2 ), s/veh 0.5 3.1 3.3 17.1 0.4 1.8 1.0 1.2 1.3 0.3 0.7 0.7 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 54.3 54.6 44.6 10.9 10.8 11.9 5.6 7.2 Level of Service (LOS) D D D B B 6 A A Approach Delay, s/veh / LOS 7.3 A IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Intersection Delay, s/veh / LOS IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.31 B 2.31 B 2.41 B 2.25 B Bicycle LOS Score / LOS 0.81 A 0.91 A 1.42 A 1.13 A �� III �II� i ��I .�� � �� I��, � .� I, � .�I � :� ���w III III � �, � � � � � � I �� ��I ������ � ����� � II ,�II�� I I � I� � ���� ����� �I� � I � ����� � illll ����� ������������� ,I��'�� ����� ����� II�.���� � ������ � ����� �I�. � I � � �. ��� � � ������� � � ����� ����I ��� � �� I .�� � .�� � ����� � � �� �� ��lu � �II II� III � �� II I� I II I II�� ���������������� � I I � I�� �. �. I I .I � ���� I � ������� � �II III II�� II ����� �II� II �II� II �.� �I II I I ����� II��� �II��� �II� �II II II �III�� � � ����� I ,�II�� �I �� �II� �II II II II II II II ���� �II�� III�� ����� ����� illl)25 "IIII' IIIIII IIII Illlf �1111111,,,,ill, 11I Illlli;S Illlf°"� IIII ,ill ��I11I� � HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ���� �"���� �° °* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other ""'' �'" Jurisdiction IDIIIIIIIIIIIOT Time Period IIIPM PHF 1110.95 �1 "" Urban Street DEMPSTER Analysis Year EXISTING 2025 Analysis Period 1> 7:00 ���� �N ,c I ��ntersection D E M PIIIIIIIIIIISTE R@ B U S SIE 111111111 F i I e N a m e 2 ������0 �������25 D E M P-B U ���������S P M .xus Project Description CLOUD HQ ""�� °"°����� -°'°' �� ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll"�"I'll"�,'ll,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' ��','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll WB NB ",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�"I'll"�,I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 105 245 23 180 182 121 18 740 313 114 549 74 Signal Information ���������� �����������C ������� ������1��������������3���������0� ����������0�� ��������� ���������� ������e ���� ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... ����������21 m, I :W �,'�� �w'�� . ". c�l�������e s Rellllf re n ce Phase y� l�����111111�����111111�� �.��� Offset, s 0 Reference Point BeginIlll iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillil llillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliil illillillilliillillillillillil illiillillillillillillilillillillili,iiiiiiiiiiiii Green 5.9 70.7 8.6 3.2 19.1 0.0 iiiiiiiiiiiiiiiiiiillillillillillilli liilillillillillillillillillilliilliillillill lillillilliillillillillillillilliillillillil lillillillillilillillillillillillilliillillil liillillillillillillillillillilliillillillilli Uncoordinated No Simult. Gap E/W On Yellow 3.5 4.5 3.5 3.5 4.5 0.0 4 Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 1.000 0.992 1.000 0.977 0.977 0.977 1.000 0.992 0.992 0.992 0.953 1.000 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 1.000 1.000 1.000 0.952 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 0.952 0.000 0.952 0.000 0.965 0.965 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.970 0.970 0.000 0.847 0.000 0.847 0.958 0.958 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) 1.00 Movement Saturation Flow Rate (s), veh/h 1810 3397 316 1860 3533 1572 88 3633 1598 1795 3126 420 Proportion of Vehicles Arriving on Green (P) 0.07 0.15 0.15 0.12 0.20 0.20 0.54 0.73 0.54 0.05 0.82 0.62 Incremental Delay Factor (k) 0.11 0.23 0.23 0.21 0.23 0.23 0.50 0.50 0.50 0.11 0.50 0.50 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 3.5 6.0 3.5 6.0 6.0 3.5 6.0 Green Ratio (g/C) 0.21 0.15 0.12 0.20 0.54 0.60 0.62 Permitted Saturation Flow Rate (sp), veh/h/In 1210 0 0 0 790 699 0 Shared Saturation Flow Rate (ssn), veh/h/In 0 Permitted Effective Green Time (gp), s 19.1 0.0 0.0 0.0 70.7 72.7 0.0 Permitted Service Time (gu), s 17.8 0.0 0.0 0.0 70.7 60.0 0.0 Permitted Queue Service Time (gps), s 0.1 0.0 2.6 Time to First Blockage (gf), s 0.0 0.0 0.0 0.0 33.6 0.0 0.0 Queue Service Time Before Blockage (gfs), s 10.5 Protected Right Saturation Flow (sR), veh/h/In 0 0 Protected Right Effective Green Time (gR), s 0.0 0.0 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.557 0.000 1.557 0.000 1.710 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.155 0.000 0.150 0.000 0.104 0.000 0.091 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 293.61 47.32 396.71 41.77 1088.07 13.51 1232.90 9.56 Bicycle Fw l F� -3.64 0.32 -3.64 0.42 -3.64 0.93 -3.64 0.64 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilliillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliilillilI Agency iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilI GHA Duration, h iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillI 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillI Jurisdiction IDOT Time Period PM PHF 0.95 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillI Urban Street DEMPSTER Analysis Year EXISTING 2025 Analysis Period iiiiiiiillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillilI 1> 7:00 Intersectioniiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillili DEMPSTER @ BUSSE File Name 2025 DEMP-BUS PM.xus Project Description CLOUD HQ Demand Information EB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillilillilI Approach Movement L T iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliI Demand ( v ), veh/h 105 245 �������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������l������������������������������������������������������������������������������������������� ���������������������������������������������������������������������������������������������� SignalInformationiiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillilillilI . m, "I',"",',,"",',,',," �����'ll""I'll""I"ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I"ll""I'll""I"ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I"ll""I'll""I"ll""I'll""I'll",lI 1 Cycle, s 130.0 Reference Phase 2 Offset s 0 Reference Point Begin IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green 5.9 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated No Simult. Gap E/W On Yellow 3.5 onessommossomm ForceModeiiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillillFixed Simult. Gap N/S OniiiiiiiiiRed 0 0 Movement Group Results iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI Approach Movement iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillI Back of Queue ( Q ), ft/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Back of Queue ( Q ), veh/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Queue Storage Ratio ( RQ ) ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Control Delay ( d ), s/veh iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillilillillillilI Level of Service (LOS) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI ApproachDelay, s/veh /L OS iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilillillillilI Intersection Delay, s/veh / LOS WB iiiiiiiiiiiiiiiiiiiiiill R L T R L 23 l������������������������������������������������������������������������������������������������������������������l���������������������������������������������������������������������������������������������������������������������� 180 182 121 18 ��������������������������������������������� ��������������������� ���������������������������������������� ������������������ ������� MULIII III ���������������������������������������������������������������������������������� •Will "L.... 171IIIII ,,III ig!.. 707 86 32"I'l""I'll""I'll'll""I'll""I'll",I . 191iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillilI 00 "I'll", 4.5iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliIIIIIIIIIIIIIIII 3.5 3.5 4.5 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillI 0.0 1.5 0.0 0.0 1.5 0.0 NB SB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillilillIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillillilliillillillillillillillillillillillilliillillillillililI iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillilI T R iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillilillillillillillillillillillilliillillilillilI L T iiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillillillillilI R 740iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillililliiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillillI 313 114iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillilillill549 74 EB WB NB SB L T R L T R L T R 11 L T R 135 200 197 292 122 171 186 174 244 66 96 113 5.4 7.9 7.9 11.4 4.7 6.7 7.5 6.9 9.7 2.6 3.7 4.5 ® 0.00iiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillilillillilI 0.00iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillillillIiiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillilI 0.00 .iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillilillillill�lillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillillilI '""""""""I'll" 0.00iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillilI 0.00iiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillilillillilIiiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillillillillI 0.32iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilllillillillillillillilliillillillillillillI 0.00iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillilI 0.00 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillilI® 54.3 54.6 73.5 44.6 47.3 10.9 10.8 18.3 11.9 5.6 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillI 7.2 D D E D 1 11111 B B B A A iiiiiiiiiiiiiiiiiiiiiillillillillillillilliilll!lllllllllllllllll111111111illi1111111111111111111111iiiiiiiiiiiiiiiiiiiiiiillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillilillill�illillillillillillilliillillillillillillilliillillillillillilliIIIIIIIIIIIIIIIIIIIIIIillillillillillillilliillillillillillillilliililI ® . 73 A IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Iiiiiiiiiiiiiiiiiiii IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 4.5 3.7 2.6 7.2 5.6 11.9 5.4 Q 43.5 47.3 6.7 7.9 1Q 54.3 44.6 [ 4.7 7.9 Q 54.6 73.5 �0? 11.4 10.9 10.8 18.3 - IL..(: S IB Queue MMMMDelay 111111111111111111 1...0s c .9 0 II...0S Ii:) 7 5 6� Queue Storage Ratio < 1 IL..OS IE 9.7 === Queue Storage Ratio > 1 --- Messages --- WARNING: Since queue spillover from turn lanes and spillback into upstream intersections is not accounted for in the HCM procedures, use of a simulation tool may be advised in situations where the Queue Storage Ratio exceeds i.o. --- Comments --- I "0 9 @ 9 ������ ���II����� !�'.�������. !!���!Illi. :��'��i. !!���!!III� "�II����� II !!�'.� !!�'.� !!���!III� II II u I � , p W W ''ll V' ..'.IV,, ��������� i� � .�i!���, ' 14 u � � V pl ' ip I � III � I u i uIIV I ulll a uVl u u W W W � ,III p III I I °"� °� I � II 4 � II III II I � �'�� �� I� � ��I � � � � IIIII I� � I' � � �°� I� I� � � I ���� IIIII � IIIIII � �IIII I�I IIIII ��� � IIIII IIIII III � � � IIIII � IIIII IIIII IIIII I �� � � �� ,III �� � IIIII IIIII II�.IIII � IIIIII � � IIIII II�. III '�� �� ����� IIIII°°°� ���I�� „�„ �' � „„. �., IIIII IIIII IIIII � IIIII � � � ' � IIIII I�� IIII��', � I�� ��� � ����� '" Elul � Elul � � ,IIII I�� � ����� ��',�IIII ���� �IIIII 11114°°°� IIIII �" u I IIIII' "I IIIIIIIIIIIIIIII IIII IIIIIIIIIlu;6 IIIII IIII :Ilul:,,I„ HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other°' °N'" Jurisdiction IDIIIIIIIIIIIOT Time Period IIIPM PHF 1110.95 �ll �1 "" Urban Street DEMPSTER ����������������I�������ntersection ���� ��������D ���������@ Analysis �111111111 Year NB 2032 ������ ����������2���������0����������3��������2 Analysis Period 1 > 7:00 �k ,c E M P�����������STE R B U������������S������������S�E F i I e N a m e N B D E M P-B U�����������S P M .xu s Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 105 280 23 185 197 124 18 765 320 117 592 74 Signal Information � "' "' C cle s 130 0 Rellllference Phase 21 y, ����������I� Offset, s 0 Reference Point BeginIlll iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillil llillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliil illillillilliillillillillillil illiillillillillillillillillillillilliillillillill Uncoordinated No Simult. Gap E/W On .Tr Green 6.1 68.8 8.5 3.6 20.4 0.0 ""Ill""I'll""I'll",Ill""I'll "I'll",llIll""I'll""I'll",Ill""I'll ""I'll"Ill""I'll""I'll",Ill""""" I'll",ll,Ill""I'll""I'll",Ill""I'Ill "I'll""IIll""I'll""I'll",Ill""I'll" I'll",ll,Ill""I'll""I'll",Ill""I'Ill "I'll""IIll""I'll""I'll",Ill""I'll"" Yellow 3.5 4.5 3.5 3.5 4.5 0.0 Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 105 280 23 185 197 124 18 765 320 117 592 74 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 1900 1900 1900 2000 1900 1900 1900 2000 1900 1900 1900 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 0 1 3 3 3 1 1 1 6 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 3 4 3 3 4 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 105 0 175 0 125 0 145 205 0 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 40 40 40 40 40 40 40 40 40 35 35 35 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 15.6 28.6 24.7 37.7 57.2 19.5 76.7 Yellow Change Interval (Y), s 3.5 4.5 3.5 4.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 0.0 1.5 0.0 1.5 1.5 0.0 1.5 Minimum Green ( Gm►n), s 3 8 3 8 15 3 15 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 3.0 5.0 3.0 5.0 2.0 3.0 2.0 Recall Mode Off Off Off Off Min Off Min Dual Entry No Yes No Yes Yes No Yes Walk (Walk), s 7.0 7.0 7.0 7.0 Pedestrian Clearance Time (PC), s 20.0 20.0 20.0 20.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 ��� ������ IIIII � ,������ ���� � ����� � ����� ��� ��,��� ��� ����� �� � i���l IIIII IIIII�� � ������� ,���'�� IIIII IIIII ���.���� Illlh�l �.�� IIIII ���.�� � ��� ��� ��� ��� ������� II I Illlh � � �� �°��� � i��� I���� .����� ����������� ��� �� � ������ � ������ � �� � �� ������ ����� ��� ����� � � � �� � � IIIII IIIII °° IIIII°��� IIIIIIIIIIIIIIIIlIIII IIIII "° � ���� IIIII IIII HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other°' °N'" Jurisdiction IDIIIIIIIIIIIOT Time Period IIIPM PHF 1110.95- �ll �1 "" Urban Street DEMPSTER ����������������I�������ntersection ���� ��������D ���������@ Analysis �111111111 Year NB 2032 ������ ����������2���������0����������3��������2 Analysis Period 1 > 7:00 �k ,c E M P�����������STE R B U������������S������������S�E F i I e N a m e N B D E M P-B U�����������S P M .xu s Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 105 280 23 185 197 124 18 765 320 117 592 74 Signal Information � "' "' C cle s 130 0 Rellllference Phase 21 y, ����������I� Offset, s 0 Reference Point BeginIlll iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillil llillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliil illillillilliillillillillillil illiillillillillillillillillillillilliillillillill Uncoordinated No Simult. Gap E/W On .Tr Green 6.1 68.8 8.5 3.6 20.4 0.0 ""Ill""I'll""I'll",Ill""I'll "I'll",llIll""I'll""I'll",Ill""I'll ""I'll"Ill""I'll""I'll",Ill""""" I'll",ll,Ill""I'll""I'll",Ill""I'Ill "I'll""IIll""I'll""I'll",Ill""I'll" I'll",ll,Ill""I'll""I'll",Ill""I'Ill "I'll""IIll""I'll""I'll",Ill""I'll"" Yellow 3.5 4.5 3.5 3.5 4.5 0.0 Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 7 4 3 8 2 1 6 Case Number 1.1 4.0 2.0 3.0 7.3 1.0 4.0 Phase Duration, s 12.0 26.4 19.1 33.6 74.8 9.6 84.4 Change Period, ( Y+R � ), s 3.5 6.0 3.5 6.0 6.0 3.5 6.0 Max Allow Headway (MAH ), s 4.0 8.9 4.0 8.9 0.0 4.0 0.0 Queue Clearance Time ( g S ), s 8.6 12.3 15.4 11.3 5.9 Green Extension Time ( g e ), s 0.1 8.1 0.3 10.6 0.0 0.3 0.0 Phase Call Probability 0.98 1.00 1.00 1.00 0.99 Max Out Probability 1.00 0.65 0.26 0.39 0.00 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 7 4 14 3 8 18 5 2 12 1 6 16 Adjusted Flow Rate ( v ), veh/h 111 161 158 195 207 131 425 400 337 123 357 344 Adjusted Saturation Flow Rate ( s ), veh/h/In 1810 1885 1835 1860 1766 1572 1914 1806 1598 1795 1811 1740 Queue Service Time ( g S ), s 6.6 10.2 10.3 13.4 6.4 9.3 0.0 12.0 16.4 3.9 6.8 8.3 Cycle Queue Clearance Time ( g � ), s 6.6 10.2 10.3 13.4 6.4 9.3 11.7 12.0 16.4 3.9 6.8 8.3 Green Ratio (g/C) 0.22 0.16 0.16 0.12 0.21 0.21 0.53 0.53 0.53 0.59 0.60 0.60 Capacity ( c ), veh/h 350 296 288 224 749 334 1042 955 845 438 1093 1050 Volume -to -Capacity Ratio (X) 0.316 0.542 0.549 0.870 0.277 0.391 0.408 0.418 0.399 0.281 0.327 0.328 Back of Queue ( Q ), ft/In ( 95 th percentile) 133 219 216 300 130 171 205 195 258 71 114 131 Back of Queue ( Q ), veh/In ( 95 th percentile) 5.3 8.7 8.6 11.7 5.1 6.7 8.2 7.7 10.2 2.8 4.4 5.2 Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.00 0.00 0.00 . 0.00 0.00 0.35 0.00 0.00 Uniform Delay ( d i ), s/veh 41.9 50.5 50.5 56.2 42.9 44.0 11.0 10.8 18.3 12.6 5.7 7.2 Incremental Delay ( d 2 ), s/veh 0.5 3.3 3.5 18.1 0.4 1.6 1.2 1.3 1.4 0.3 0.8 0.8 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 53.7 54.0 43.3 12.2 12.1 12.9 6.5 8.0 Level of Service (LOS) D D D B B 6 A A Approach Delay, s/veh / LOS 8.1 A Intersection Delay, s/veh / LOS Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.31 B 2.31 B 2.42 B 2.25 B Bicycle LOS Score / LOS 0.84 A 0.93 A 1.45 A 1.17 A i ��� � IIII�������� �� IIIII � ,����� � � � �� � ���� ����� ��� � � � ����� � ��III IIIII IIIII ��� �:,� ,���'�� IIIII IIIII ���.���� �� IIIII � IIIII ���. � � � � � ��� � � �� ����� IIIII � � �� � � ����� � ���������������� � � � � � ���� � � ������� � � ����� ����� � ����� � ����� � � ����� � ���� � � � IIIII IIIII ������ 1i�l� �� IIIII ��� IIIIII IIIII IIIII �)IIIIIIIIIBII �ls IIIII �)IIII HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ���� �"���� �° °* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other ""'' �'" Jurisdiction IDIIIIIIIIIIIOT Time Period IIIPM PHF 1110.95 �1 "" Urban Street DEMPSTER Analysis Year NB 2032 Analysis Period 1 > 7:00 ���� �., ,c ����������������I�������ntersection ���� ��������D E M P�����������STE R ���������@ B U������������S������������S�E �111111111 F i I e N a m e ������ ����������2���������0����������3��������2 N B D E M P-B U�����������S P M .xu s Project Description CLOUD HQ ""� � ° "° �����' � "' '� � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I'll""'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll",'ll""I'll""�I'll,'ll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�,'ll"�"�I'l Demand Information �l""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""I'll",,���������������'ll""I'll""�I'll,'ll"' EB 'I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll",'ll"�"I'll"�"�I'll,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' ��','ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll",'ll""I'll""�I'll,'ll""I'll""I'll WB NB ",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll",'ll""I'll""�I'll,'ll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�,'ll"�"I'll"�"�II SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 105 280 23 185 197 124 18 765 320 117 592 74 Signal Information ���������� �����������C ������� ������1��������������3���������0� ����������0�� ��������� ���������� ������e ���� ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... ����������21 "' "' c�l�������e s Rellllf y re n ce Phase �.��� Offset, s 0 Reference Point BeginIlll .T iiiiiiiiiiiiillillillillillillilliillillillillillillilliilillillilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillil llillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillilliillilliili illillillillillillilliillillillillillillilliil llillillilliillillillillillill lliillilliilillillillillillillillilliillillillilli Green 6.1 68.8 8.5 3.6 20.4 0.0 ""Ill""I'll""I'll",Ill""I'll "I'll",llIll""I'll""I'll",Ill""I'lIl illillillillillillillillillillillilliillilli lillillillillillillillillillilliillillililli illillilillillillillillillillilliillillililli lillilliillillillillillillillilliillillillill llillillilliillillillillillillilliillillillill Uncoordinated No Simult. Gap E/W On Yellow 3.5 4.5 3.5 3.5 4.5 0.0 4 Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 1.000 0.992 1.000 0.977 0.977 0.977 1.000 0.992 0.992 0.992 0.953 1.000 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 1.000 1.000 1.000 0.952 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 0.952 0.000 0.952 0.000 0.965 0.965 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.973 0.973 0.000 0.847 0.000 0.847 0.961 0.961 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) 1.00 Movement Saturation Flow Rate (s), veh/h 1810 3439 281 1860 3533 1572 85 3635 1598 1795 3157 394 Proportion of Vehicles Arriving on Green (P) 0.07 0.16 0.16 0.12 0.21 0.21 0.53 0.71 0.53 0.05 0.80 0.60 Incremental Delay Factor (k) 0.11 0.23 0.23 0.22 0.23 0.23 0.50 0.50 0.50 0.11 0.50 0.50 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 3.5 6.0 3.5 6.0 6.0 3.5 6.0 Green Ratio (g/C) 0.22 0.16 0.12 0.21 0.53 0.59 0.60 Permitted Saturation Flow Rate (sp), veh/h/In 1193 0 0 0 757 682 0 Shared Saturation Flow Rate (ssn), veh/h/In 0 Permitted Effective Green Time (gp), s 20.4 0.0 0.0 0.0 68.8 70.8 0.0 Permitted Service Time (gu), s 19.2 0.0 0.0 0.0 68.8 56.8 0.0 Permitted Queue Service Time (gps), s 0.1 0.0 3.1 Time to First Blockage (gf), s 0.0 0.0 0.0 0.0 33.1 0.0 0.0 Queue Service Time Before Blockage (gfs), s 11.7 Protected Right Saturation Flow (sR), veh/h/In 0 0 Protected Right Effective Green Time (gR), s 0.0 0.0 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.557 0.000 1.557 0.000 1.710 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.154 0.000 0.148 0.000 0.107 0.000 0.093 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 314.38 46.17 424.27 40.35 1058.17 14.41 1206.56 10.23 Bicycle Fw / F� -3. 64 0.35 -3. 64 0.44 -3. 64 0.96 -3. 64 0.68 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilliillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliilillilI Agency iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilI GHA Duration, h iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillI 0.250 Analyst MKP Analysis Date Apr 21, 2025 Area Type Other iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillI Jurisdiction IDOT Time Period PM PHF 0.95 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillI Urban Street DEMPSTER Analysis Year NB 2032 Analysis Period 11111111 111111111111������11111111 > 7: 0 0 Intersection DEMPSTERBUSSE File Name 2032 NB DEMP-BUS PM.xus iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillillilillillillillillillilliillillillillillillilliillillillillillillilliillillililllillillillillillillilliillillillillillillilliillillillillillillilliillillililllillillillillillillilliillillillillillillilliillillillillillillilliillillililllillillillillillillilliillillillillillillilliillillillillillillilliillillililllillillillillillillilliillillillillillillilliillillillillillillilliillillililllillillillillillillilliillillillillillillilliillillillillillillilliillillililllillillillillillillilliillillillillillillilliillillillillillillilliillillililllillillillillillillilliillillillillillillilliillillillillillillilliillillililllillillillillillillilliillillillillillillilliilililI iiiiiiiiiiiiiiiiiiiiiilillillillillillillillilliillillillillillillilliilillillillillillillillillilliilliillillillillillillilliillillillillillillilliilillillillillillillillillilliilliillillillillillillilliillillilillillillilI Project Description ICLOUD HQ Demand Information EB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillilillilI Approach Movement L T iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillililililililililililillI iiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillillilI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilliillillillillillillilliillillillilillilI Demand ( v), veh/h �""I'll'll""I'll""'ll""I'll""I'll",lI , I I Signal Information )�,"I'I ����kw iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillilI �1 ... � Cycle, s 130.0 Reference Phase 2 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillI I Offset, s 0 Reference Point Begin iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilli�illillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilli11111IGreen6.1 111111111111111 1111111111111111 111111111111111111111111 1111111111111111 Uncoordinated No Simult. Gap E/W On IIIIIIIIIIIIIIIIIIIIIillillillillI e 1111111111111111111111 o 1111 w 1111111111 . 1111111 5 1111111111111111111111111111111 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillilliillillilliillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillillillillilliillillillillillillillillillillilillillillill,,IlllllllllilillilI ....... ..................................... 1,,IlllllllllllllllllllIIIIIIIIIIIIIIIII1111111 .................... I ....... 1111111111 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillilliillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillIllIIIIIIIIIIIIIIIIIII111111111 ��illillillllllllllllllllillillillillillillillillillillillillillillil,,IllllllillillillI ...................................... � Force Mode Fixed Simult. Gap N/S On Red 0.0 I I il Movement Group Results iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI Approach Movement iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillI Back of Queue ( Q ), ft/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Back of Queue ( Q ), veh/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Queue Storage Ratio ( RQ ) ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Control Delay ( d), s/veh iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillilillillillilI Level of Service (LOS) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI Approach Delay, s/veh / LOS iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilillillillilI Intersection Delay, s/veh / LOS WB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilliillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillI R L T R L I iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliilillilI 23 iiiiiiiiiiiiiiiiiiiiiillillilillilI iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillilllllllllllllllillillilillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillilI 185 197 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliilI 124 18 A-w- 511 F 0, Z- iiiiiiiiiiiiililill " � "I ..... ".. �� .... " ... 1111111 ... 1 li����iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiI 11 -7 . 7M " �IZ IIIIIIIIIIII ������111111�����111111�����l"""'�ll"I 1111�'1' 'I !"Ig '' 68.8 ""I'll""I'll",'ll""I,,���������������'ll""I'll""I'll",'llI 8.5 "I'l""I'll""I'll'll""I'll""I'l'll""I'll""I'll",'ll""I'll""I"ll""I'll""I'll",'ll""I'll""I'll,"'I Jl'',, . .... 6 ............................................................... � 'll""I'll'll""I'll"I 2b ....... ... ............ 4 .................................................... ................... 0 ................ ................ 0 ......... iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillllllllllllllllllllll111111111111IIIIIIIIIIIIIIIIIIIIIIillillillillillI 4.5 iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillilliillillillillilillillillillillillillilliillillillillilillilililI .5 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillillilI .5 4.5 0 [ "O 111111 I 1.5 1 1 111111111= 0.0 0.0 1.5 NB SB iiiiiiiiiiiiiiiiiiiiiillillilillillillillilIIIIIIIIIIIIIIIIIIIIII111111111111111111111111 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillilillillillillillillillillillillillillillilliillillilliIlI IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillillilliillillillIllIllIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIillillillillillillilliillillilillillillillillillilillilI T R L T R � iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillilillillillillillillillillillilliillillilillill� iiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillilillill� iiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillillillillilI 765 ������ 320 �������I��� 117 ������ 592 74 EB WB NB SB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillilI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillilI L T iiiiiiiiiiiiiiiiiiiiiillillillillilliillillillillillillilliillillillillillilliillillillillillillilliillillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillillillilI R L iiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillilillillilI iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillillillI T R iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillilI iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillillillillilI L T iiiiiiiiiiiiiiiiiiiiiillillillillilliillillillillillillilliillillillillillilliillillillillillillilliillillillillillI R iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillilillillillilI L iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillilliillillillillillillillillillillillillillilliillillillilliillillililI T iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillilillillillillillillillillillI R iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillilI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillilillillillillillillillillillillilliillillillillillilI 133 219 iiiiiiiiiiiiiiiiiiiiiillillillillilliillillillillillillilliillillillillillilliillillillillillillilliillillilillilI iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillillillillillillillillillillilliillillililI 216 300 130 171 iiiiiiiiiiiiiiiiiiiiiillillillillillillillilillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillilillilI 205 195 258 iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillillillillillillillillillillilliillI 71 114 131 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillilI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillilillillilI iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillilillilI iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillilillilI iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillilillillilI iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillillillI 6.7 iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillilI iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillilillillilI 8.2 7.7 iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillillillillI 10.2 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilllillillillillillillilliillillillillillillI 2.8 iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillilI 4.4 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillI 5.2 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillilI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillilillillilI ® 0.00 iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillilI 0.00 1.72 iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillilillillilI iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillillillI 0.00 1.37 iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillilI iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillilillillilI 0.00 0.00 iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillillillillI 1.78 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilllillillillillillillilliillillillillillillI 0.35 iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillilI 0.00 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillI 0.00 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillilI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilliilliillillillillillillilliillillilillillilI ® 53.7 iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillilI 54.0 74.2 iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillilillillilI iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillillillI 43.3 45.6 iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillilI iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillilillillilI 12.2 12.1 iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillillillillI 19.7 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilllillillillillillillilliillillillillillillI 12.9 iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillilI 6.5 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillI 8.0 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillilI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillilillillilI D D iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillilI D E iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillilillillilI iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillillillI D D iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillilI iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillilillillilI B B iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillillillillI B iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilllillillillillillillilliillillillillillillI B iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillilI A iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillI A iiiiiiiiiiiiiiiiiiiiiillillillillillillilliilll!lllI 11111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII11111111111 ® 6 IIIIIIIIIIIIIIIIIIIIIllIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII11111111111IIIIIIIIIIIIIIIIIIIIIIl1111 11 11 g 111111111111111111111 ''I'll,lill""I'll"Ill""I'll""I'll",Ill""I'll""II D � .2 111111111111111111111IIIIIIIIIIIIIIIIIIIIIIllillillllI E "I'l""I'll""I'llIll""I'lIll""I'll""I'll",Ill""I'll""I'll",ll,Ill""I'll""I'll",Ill""I'll'I i111411 111111111111 1111111111111111111111111111� ' .3 "I'l""I'll""I'llIll""I'll""I'll",Ill""I'll""I'll",ll'I B "I'l""I'll""I'llIll""I'll""I'll",Ill""I'll""Ill""I'll""I'll,Ill""I'll""I'll",Ill""I'll""I 11111111111111111111111 11111111111111111 ������111 8.1 "I'l""I'll""I'llIll""I'll""I'lIll""I'll""I'll",ll'I A "I'l""I'll""I'llIll""I'll""I'll",Ill""Ill""I'll""I'll",Ill",Ill"""Il""I iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillilillillillillillillillillillilliillillillillillillilliillillilillillillillillilillillillillillillillillillilliillillillillillillilliillillilillillillillillilillillillillillillillillillilliillillillillillillilliillillilillillillillillilillillillillillillillillillilliillillillillillillilliillillilillillillillillilillillillIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIillillillillilillillillillillilillillillillillillillilliillillillillillillilliillillillillilillillillillillilillillillillillillillilliillillillillillillilliillillillillilillillillillillilillillillilillilI 25.3 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1111111 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillilillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillilillilI � IIIIIIIIIIIIIIIIIIIII1111 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillilillilI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliilI C 5.2 4.4 2.8 1 1 1 8.0 6.5 12.9 5.3 = 42.4 45.6 6.7 8.7 1Q 53.7 43.3 [5.1 8.6 Q 54.0 74.2 �,°„°0? 11.7 12.2 12.1 19.7 , 111111111111111111 L 0"41) A 111111111111111111 IL..OS IB Queue MMMM Delay 111111111111111111 I 0S C I I I 0S [) 8.2 7.7 � Queue Storage Ratio < 1 IL..OS IE I2 === Queue Storage Ratio > 1 10. --- Messages --- WARNING: Since queue spillover from turn lanes and spillback into upstream intersections is not accounted for in the HCM procedures, use of a simulation tool may be advised in situations where the Queue Storage Ratio exceeds i.o. --- Comments --- II �.... @ 9 N � � III20211111� � I � ��� ���� ail �� � ..� � ......III,. a ..���. ' �������� I � I..IVo � i ail iI ����� ..�� ..�� ���� ...IV. ' i u i u u i �� I��,i� I II.. � III � I, I i I ull a uV u u ill III I III I I � � I '� IIIII II II I FFlu � IIIII I�I IIIII ��� � iiii IIIII III � ��� � iiiii � IIIII IIIII IIIII � �� � � ��u ,III �� � IIIII IIIII Il�.iiii � IIIIII � � IIIII II�., III �� �� ����� IIIII � ���I�� ���� � � � �.� �.� IIIII iiii� IIIII � iiii � iiii i�� iiii�� � i��� ����� Elul � Elul � � ,IIIII ��� � ����� '� � ���� �� IIIII IIIII „ ° ' „ III G IIIII IIIII IIIII IIIII IIIII' IIIII"'°° ;;'11(I,,I HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other �"' °�I" Jurisdiction IDIIIIIIIIIIIOT Time Period IIIPM PHF III0.95 �ll �1 "" �illillillillillillillillillillilliillillillillillil� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Urban Street DEMPSTER ���� ���������@ IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIII Analysis �111111111 IIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIII Year TOTAL ������ IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 2032 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIIIII Analysis Period IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1 > 7:00 l �k ,c l�llllllntersection D E M P°IIIIIIIIIISTE R B UIIIIIIIIIIIISIIIIIIIIIIIISIE F i I e N a m e 21IIIIIIII01IIIIIIIII3�IIIIIII21 TIIIIIIIIIIOT D E M P-B UIIIIIIIIIIIS P M .xus Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 105 287 23 185 213 140 18 765 320 124 592 74 Signal Information ���������� IIIIIIIIIIIC ������� IIIIII1�IIIIIIIIIIIII3�IIIIIIII0� IIIIIIIIIIOII ��������� ���������� ���� IIIIIIIIII21 I�� JIIII "' "' IIIII.. y cll�lllllle s Re°Illflllllle re n ce Phase IIL �.��� %I Offset, s 0 Reference Point BeginIlll iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillil IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated No Simult. Gap E/W On .Tr Green 6.5 67.9 8.5 3.7 21.0 0.0 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Yellow 3.5 4.5 3.5 3.5 4.5 0.0 ���.,. Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Traffic Information EB WB NB SI3 Approach Movement L T R L T R L T R L T R Demand (v), veh/h 105 287 23 185 213 140 18 765 320 124 592 74 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 1900 1900 1900 2000 1900 1900 1900 2000 1900 1900 1900 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 0 1 3 3 3 1 1 1 6 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (NI buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 3 4 3 3 4 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 105 0 175 0 125 0 145 205 0 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 40 40 40 40 40 40 40 40 40 35 35 35 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 15.6 28.6 24.7 37.7 57.2 19.5 76.7 Yellow Change Interval (Y), s 3.5 4.5 3.5 4.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 0.0 1.5 0.0 1.5 1.5 0.0 1.5 Minimum Green ( Gm►n), s 3 8 3 8 15 3 15 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 3.0 5.0 3.0 5.0 2.0 3.0 2.0 Recall Mode Off Off Off Off Min Off Min Dual Entry No Yes No Yes Yes No Yes Walk (Walk), s 7.0 7.0 7.0 7.0 Pedestrian Clearance Time (PC), s 20.0 20.0 20.0 20.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 ,. III � �II� I � I � ���� II � I� I� I � I � � �� I� ��II I� �II� � .� ���� IIIII�I III I� i I�� I u�� � � � � „I�I,I� �� °III I �� �,� I I � I I� I� I I�� ������ IIIII � ,�II��I ���� I ����I � ����� �I� ������� ��� ����� I� � i���l IIIII IIIII�� � ������� ,I��'�� IIIII IIIII II�.���� Illlh�l �.�� IIIII �I�.�� � ��� ��� ��� ��� ������� � .... �� � �I�I II I Illlh � I I� ��� I � �II� � II� 9 � III I� � � ��II �II� II�� I III i �I I � II II � � i��� I�I�� .����� ����������� ��� I��� I� ��� �II I� I ..�� �.�� � ��II � II � II I � �; � �� � ������ � ������ � �� � �� �I�I �III�� ��I �II� II� � I I �� I I III III I II �II�� �� I ���� � II I �II�� �� ICI I�I�� ulli;�l � wVp1 ° V.� uumq „�i�mlll�'umi ����������� 3��II����������� �..... �...� �..... �...... IIIII��������I) IIIIIIIIIIIIIIIIl�..III IIIII ,,Illll���������llljj��u oii �oll� u���i oiulli' "III ���15 IIIII IIIII �111� ��� �� ��..� HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other �"' °�I" Jurisdiction IDIIIIIIIIIIIOT Time Period IIIPM PHF III0.95- �ll �1 "" �illillillillillillillillillillilliillillillillillil� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Urban Street DEMPSTER ���������@ ���� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIII �111111111 Analysis IIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Year TOTAL 2032 ������ IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIIIII Analysis Period IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1 > 7:00 l �k ,c l�llllllntersection D E M P°IIIIIIIIIISTE R B UIIIIIIIIIIIISIIIIIIIIIIIISIE F i I e N a m e 21IIIIIIII01IIIIIIIII3�IIIIIII21 TIIIIIIIIIIOT D E M P-B UIIIIIIIIIIIS P M .xus Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 105 287 23 185 213 140 18 765 320 124 592 74 Signal Information ���������� IIIIIIIIIIIC ������� IIIIII1�IIIIIIIIIIIII3�IIIIIIII0� IIIIIIIIIIOII ��������� ���������� ���� IIIIIIIIII21 I�� JIIII "' "' IIIII.. y cll�lllllle s Re°Illflllllle re n ce Phase IIL �.��� %I Offset, s 0 Reference Point BeginIlll iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillil IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated No Simult. Gap E/W On IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII . Green 6.5 67.9 8.5 3.7 21.0 0.0 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Yellow 3.5 4.5 3.5 3.5 4.5 0.0 ���.,. Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 7 4 3 8 2 1 6 Case Number 1.1 4.0 2.0 3.0 7.3 1.0 4.0 Phase Duration, s 12.0 27.0 19.1 34.1 73.9 10.0 83.9 Change Period, ( Y+R � ), s 3.5 6.0 3.5 6.0 6.0 3.5 6.0 Max Allow Headway (MAH ), s 4.0 8.9 4.0 8.9 0.0 4.0 0.0 Queue Clearance Time ( g S ), s 8.5 12.6 15.4 12.5 6.2 Green Extension Time ( g e ), s 0.1 8.4 0.3 10.8 0.0 0.3 0.0 Phase Call Probability 0.98 1.00 1.00 1.00 0.99 Max Out Probability 1.00 0.68 0.26 0.45 0.00 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 7 4 14 3 8 18 5 2 12 1 6 16 Adjusted Flow Rate ( v ), veh/h 111 164 162 195 224 147 425 400 337 131 357 344 Adjusted Saturation Flow Rate ( s ), veh/h/In 1810 1885 1836 1860 1766 1572 1914 1806 1598 1795 1811 1740 Queue Service Time ( g S ), s 6.5 10.4 10.6 13.4 6.9 10.5 0.0 12.4 16.6 4.2 7.0 8.4 Cycle Queue Clearance Time ( g � ), s 6.5 10.4 10.6 13.4 6.9 10.5 12.0 12.4 16.6 4.2 7.0 8.4 Green Ratio (g/C) 0.23 0.16 0.16 0.12 0.22 0.22 0.52 0.52 0.52 0.59 0.60 0.60 Capacity ( c ), veh/h 347 304 296 224 764 340 1029 944 835 436 1085 1043 Volume -to -Capacity Ratio (X) 0.319 0.541 0.547 0.870 0.293 0.433 0.413 0.423 0.403 0.299 0.329 0.330 Back of Queue ( Q ), ft/In ( 95 th percentile) 132 223 219 300 140 195 210 200 261 77 118 134 Back of Queue ( Q ), veh/In ( 95 th percentile) 5.3 8.8 8.8 11.7 5.5 7.6 8.4 7.9 10.4 3.1 4.5 5.4 Queue Storage Ratio (RQ) (95 th percentile) 0.00 0.00 0.00 . 0.00 0.00 0.38 0.00 0.00 Uniform Delay ( d i ), s/veh 41.5 50.1 50.2 56.2 42.6 44.0 11.5 11.3 18.8 12.9 5.9 7.4 Incremental Delay ( d 2 ), s/veh 0.5 3.2 3.3 18.1 0.5 1.9 1.2 1.4 1.5 0.4 0.8 0.8 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 53.3 53.5 43.1 12.7 12.7 13.3 6.7 8.3 Level of Service (LOS) D D D B B 6 A A Approach Delay, s/veh / LOS 8.4 A IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Intersection Delay, s/veh / LOS IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.31 B 2.31 B 2.42 B 2.25 B Bicycle LOS Score / LOS 0.85 A 0.95 A 1.45 A 1.17 A I �� I III���I II � ��I .�� I� � I, I��, � .� I, � .�I � :� �w �� � � � °I��� � � I� a �� �� � I�.��I ������ � IIIII � ,�II��I I I � � I� � ���� ����� �I� � I � ����� � i�lll Illlh IIIII������� ,I��'�� IIIII IIIII II�.���� � IIIII � IIIII �I�. � I � � �. ��� � � �°����� I ����� I� �I Illlh°°°� � ����I ��� .�� � .�� � �����i� iglu � I II III III II�� ������liiii����� � I I � �. �. �.� I�� II I I� � I I � ���� I � ������� I I ������ ����� � II��� � III�� �I 5 II II II II ��� � � I I ����� � � ���� �II�� � I�� ��I�� ������illl� 1°�I���i� 0 � IIIII �)..IIIII ..III Illlf°°"I°°11111111lIIIIII 1.IIIII PS Illlf°°)IIIII III,, III( �w S HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other ""'' �'" Jurisdiction IDIIIIIIIIIIIOT Time Period IIIPM PHF 1110.95 �1 "" Urban Street DEMPSTER Analysis Year TOTAL 2032 Analysis Period 1 > 7:00 ���� �., ,c ����������������I�������ntersection ���� ��������D E M P�����������STE R ���������@ B U������������S������������S�E �11111111� F i I e N a m e ������ ����������2���������0����������3��������2� T����������OT D E M P-B U�����������S P M .xus Project Description CLOUD HQ ""�� °"°����� -°'°' �� ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I'll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll"�"I'll"�"I'll"�,'ll"�"�'ll"�"I'll"�"�I' Demand Information �ll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""I'll",,���������������'ll""I'll"'ll""I'll" EB "�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll"�"I'll"�,'ll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' ��','ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll WB NB ",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll"�"I'll"�"I'll"�,'ll"�"�'ll"�"I'll"�"I'll"�,lI SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 105 287 23 185 213 140 18 765 320 124 592 74 Signal Information ���������� �����������C ������� ������1��������������3���������0� ����������0�� ��������� ���������� ������e ���� ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... ����������21 m, I :W �,'�� �w'�� . ". c�l�������e s Rellllf re n ce Phase yI 111�111111���111111�� �.��� Offset, s 0 Reference Point BeginIlll iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillil llillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliil illillillilliillillillillillil illiillillillillillillilillillillili,iiiiiiiiiiiii Green 6.5 67.9 8.5 3.7 21.0 0.0 iiiiiiiiiiiiiiiiiiillillillillillilli liilillillillillillillillillilliilliillillil lillillilliillillillillillillilliillillillill lillilliillillillillillillillilliillillillill llillillillillillillillillillilliillillillilli Uncoordinated No Simult. Gap E/W On Yellow 3.5 4.5 3.5 3.5 4.5 0.0 4 Force Mode Fixed Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 1.000 0.992 1.000 0.977 0.977 0.977 1.000 0.992 0.992 0.992 0.953 1.000 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 1.000 1.000 1.000 0.952 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 0.952 0.000 0.952 0.000 0.965 0.965 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.974 0.974 0.000 0.847 0.000 0.847 0.961 0.961 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) 1.00 Movement Saturation Flow Rate (s), veh/h 1810 3447 274 1860 3533 1572 85 3635 1598 1795 3157 394 Proportion of Vehicles Arriving on Green (P) 0.07 0.16 0.16 0.12 0.22 0.22 0.52 0.70 0.52 0.05 0.80 0.60 Incremental Delay Factor (k) 0.11 0.23 0.23 0.22 0.23 0.23 0.50 0.50 0.50 0.11 0.50 0.50 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 3.5 6.0 3.5 6.0 6.0 3.5 6.0 Green Ratio (g/C) 0.23 0.16 0.12 0.22 0.52 0.59 0.60 Permitted Saturation Flow Rate (sp), veh/h/In 1175 0 0 0 757 682 0 Shared Saturation Flow Rate (ssn), veh/h/In 0 Permitted Effective Green Time (gp), s 21.0 0.0 0.0 0.0 67.9 69.9 0.0 Permitted Service Time (gu), s 19.2 0.0 0.0 0.0 67.9 55.6 0.0 Permitted Queue Service Time (gps), s 0.2 0.0 3.4 Time to First Blockage (gf), s 0.0 0.0 0.0 0.0 32.7 0.0 0.0 Queue Service Time Before Blockage (gfs), s 12.0 Protected Right Saturation Flow (sR), veh/h/In 0 0 Protected Right Effective Green Time (gR), s 0.0 0.0 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.557 0.000 1.557 0.000 1.710 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.153 0.000 0.148 0.000 0.108 0.000 0.094 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 322.32 45.74 432.68 39.92 1045.24 14.81 1198.62 10.44 Bicycle Fw / F� -3.64 0.36 -3.64 0.47 -3.64 0.96 -3.64 0.69 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilliillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliilillilI Agency iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilI GHA Duration, h iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillI 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillI Jurisdiction IDOT Time Period PM PHF 0.95 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillI Urban Street DEMPSTER Analysis Year TOTAL 2032IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIAnalysis Period iiiiiiiiiiiiiiiiiiiiiilillillillillillillillilliillillillillillillilliilillillillillillillillillilliilliillillillillillillilliillillillillillillilliilillillillillillillillillilliilliillillillillillillilliillillillillillillilliilillillillillillillillillilliilliillillillillillillilliillillillillillillilliilillillillillillillillillilliilliillillillillillillilliillillillillillillilliilillillillillillillI 1 > 7:00 Intersectioniiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillillilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillili DEMPSTER @ BUSSE File Name 2032 TOT DEMP-BUS PM.xus Project Description CLOUD HQ Demand Information EB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillilillilI Approach Movement L T Demand ( v ), veh/h 105 287 SignalInformationiiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillilillilI . m, "I',"",',,"",',,',," �����,,'ll""I'll""'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll'll""I'll""'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll'll""I'll""'ll""I'll""I'll",lI 1 Cycle, s 130.0 Reference Phase 2 Offset s 0 Reference Point Begin IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green 6.5 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated No Simult. Gap E/W On Yellow 3.5 onessommossomm ForceModeiiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillillFixed Simult. Gap N/S OniiiiiiiiiRed 0 0 Movement Group Results iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI Approach Movement iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillI Back of Queue ( Q ), ft/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Back of Queue ( Q ), veh/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Queue Storage Ratio ( RQ ) ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Control Delay ( d ), s/veh iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillilillillillilI Level of Service (LOS) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI ApproachDelay, s/veh /L OS iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilillillillilI Intersection Delay, s/veh / LOS WB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilliillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillI R L T R L 23 185 213 140 18 ����������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������l���������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������� ���������������������������������������������������������������������������������� MULIII III •Will "L.... 171IIIII ,,III ig!.. 679 85iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillilliillillilillillillillillillillillillilliillillilillillillilililI 37"I'l""I'll""I'll'll""I'll""I'll",I .IIIIIIIIIIIIIIIIIIIIIillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliI 210 00 4.5iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliIIIIIIIIIIIIIIII 3.5 3.5 4.5 0.0 1.5 0.0 0.0 1.5 0.0 NB SB IIIIIIIIIIIIIIIIIIIIIillillillillillillilliillillilillillillillillillilillilI TR LIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII TiiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillillilliillillillIllIllIIIIIIIIIIIIIIIIIIII iiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillillillillilI R iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillililliiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillillI 765 320 124 592 74 EB WB NB SB L T R L T R L T R 11 L T R 132 223 219 300 140 195 210 200 261 77 118 134 5.3 8.8 8.8 11.7 5.5 7.6 8.4 7.9 10.4 3.1 4.5 5.4 ® 0.00iiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillilillillilI 0.00iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillillillIiiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillilI 0.00 . '""""""""I'll" 0.00 0.00 0.38 0.00 0.00 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillilI® 53.3 53.5 74.2 43.1 11111111111111 45.9 12.7 12.7 20.2 13.3 6.7 8.3 D ID D D B BiiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillillIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIillillillillillillilliillillillilliillillillillillillilliillillillillillillillillillillillillillilliillillillilliillillillillillillilliillillillillillillillillillillillillillilliillillillilliillillillillillillilliillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillillilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliilI B A A ® 8.4 A IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III,III,III,IIIIIIIIII,IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 5.4 4.5 3.1 8.3 6.7 13.3 5.3 Q 42.0 45.9 7.6 8.8 1Q 53.3 4 3. 1 [ 5.5 8.8 Q 53.5 74.2 �0? 11.7 12.7 12.7 20.2 - IL..(: S IB Queue MMMMDelay 111111111111111111 1...0S C 0 II...0S Ii: 7.9 � Queue Storage Ratio < 1 8.4 IL..OS IE 10.4 Queue Storage Ratio > 1 --- Messages --- WARNING: Since queue spillover from turn lanes and spillback into upstream intersections is not accounted for in the HCM procedures, use of a simulation tool may be advised in situations where the Queue Storage Ratio exceeds i.o. --- Comments --- U19 � uo� ,IIII II ��� �I I �,,,,� �I � .� �,,,,� �III� : �� � uul, I � I I I .� .� Sul, �� I II � , W W ''ll V, 'IIV, � �' „ .,,,�,�„ � „ ly u i u i III W W � I i V V I � i� i i I ... III � � i i i uul,,,, i � I u„ i i i i I III I I � � I � II II II II II I I I � ,IIII ��� ,IIIII,,,,, ��� � IIIII IIIII III �, �„�� IIIII � IIIII IIIII IIIII � � � �,,,,,, „ ,�II �, � IIIII IIIII II� IIII � IIIIII �, ��� IIIII II� III �,�, ��,,,,,, IIIII � �,� I�, �,�,� � �, �,,,,,�,. � �um IIIII IIIII � IIIII � � � ' � IIIII I,�„ IIII��, �, I,��, ��„� � �Ilu,,,,,, �,,,,, ,IIIII,,,,,,,,, ��,� �" u ,,,,,,I,,,,,,,,,,,, IIIIII IIIIIIIIIIIIIIII IIII IIIIIIIIIII IIIII IIIII ul:, HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ����� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other'°' °N'" Jurisdiction CIIIIIIIIIICDIIIIIIIIIIIOTH Time Period IIIIIAM PHF III0.95 �ll �1 Urban Street DEMPSTER ST IIDEMP°IIIIIIIIIISTER IIIIIIIII@ Analysis Year EXISTING 2025 Analysis Period IIIIIII21IIIIIIIIOIIIIIIIIII25 1> 7:00 �� w �k �� 11 ,c LIIIIIIIIIINNEM.. IIIIIIIntersection File Name DEMP-LIIIIlIIIIIIN AM.xus Project Description CLOUD HQ "") 4 ° "°��' 11"I' � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",ll,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"I'll", Demand Information ����'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,,���������������'ll"�"I'll"�"I'll"�" EB ����I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll"' WB 'I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll"�"I'll"�,'ll"�"�I'l'll"�"I'll"' NB ����'I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 37 290 18 13 351 63 6 33 9 66 63 85 Signal Information IIIIIII6 "' I II � ���� " III C cIIIIIIIIe s 44 Re°IIIfIIIIIIerence Phase 21 yI���II IIIIII �� �� IIIIIIII .. "'II IIII' IIIIII W OIIIIIIIIIIff°IIIset s 0 Re°IIIfIIIIIIerence Point Be inIIIIIIIIII g IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green 0.5 0.7 15.0 0.2 1.8 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 7.4 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 0.0 4.5 3.5 0.0 4.5 Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 1.5 0.0 0.0 1.5 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 37 290 18 13 351 63 6 33 9 66 63 85 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 1900 2000 1900 1900 2000 1900 1900 2000 1900 1900 2000 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 8 4 23 3 0 0 0 3 0 4 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 3 3 3 3 3 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 200 0 140 0 125 0 125 125 0 125 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 40 40 40 40 40 40 30 30 30 30 30 30 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 15.0 55.0 15.0 55.0 15.0 35.0 15.0 35.0 Yellow Change Interval (Y), s 3.5 4.5 3.5 4.5 3.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 0.0 1.5 0.0 1.5 0.0 1.5 0.0 1.5 Minimum Green ( Gm►n), s 3 15 3 15 3 8 3 8 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 3.0 2.0 3.0 2.0 3.0 5.0 3.0 5.0 Reca I I Mode Off Min Off Min Off Off Off Off Dual Entry No Yes No Yes No Yes No Yes Walk (Walk), s 0.0 0.0 7.0 0.0 Pedestrian Clearance Time (PC), s 0.0 0.0 23.0 0.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 I ,. IIII IIII I I .. I I I I I I I � I I II III � � � ��� I� I I I I l I I� �� II II � ...���I IIII � � I �I ...��I IIII I...���I � ...� II �I I I l i � I u � I � I �I� � ��II � I� I� I � �. � I� I� I�I ������������IIIII � ,II��� ���� ���� � ����� ��� ��I �I� ����� I�I� II I i���l IIIII IIIIII I �������,,� ,I��'I� IIIII IIIII �IL����IIIII �I � III IIIII �IL�I I �I� ��I ��� ��I IIIIII I .... I� I I IIII IIII I �I II 1 �I III II ...��I � ...��II � III II II�� �I I � I II� i I I IIIII � III � ��I � i��� I�Iu ����� I���������� ��� �II� ..�I �..�I � I� I� �„ I �����I I ������ III III I I I I II �...��I II II I�� II�� I � �I I �� �II��� II��� IIIIII III I II � � I I C ��� II��� � � � IIII I I II�� II I � � �I IIIII IIIII ������ 2 � IIIII) IIIIIIIIIIIIIIII IIII IIIII°°)IIIIIIIII ,IIIII IIII'°1111,1 Iiilu!''!'�k IIII l;ullill;;„Il ,l uI�5 HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ����� �"���� �° °* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other'°' °N'" Jurisdiction CIIIIIIIIIICDIIIIIIIIIIIOTH Time Period IIIIIAM PHF III0.95 �ll �1 Urban Street DEMPSTER ST IIDEMP°IIIIIIIIIISTER IIIIIIIII@ Analysis Year EXISTING 2025 Analysis Period IIIIIII21IIIIIIIIOIIIIIIIIII25 1> 7:00 �� w �k �� 11 ,c IIIIIIIntersection LIIIIIIIIIINNEM.. File Name DEMP-LIIIIlIIIIIIN AM.xus Project Description CLOUD HQ "") 4 ° 11' '�-14" � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",ll,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"I'll", ����'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,,���������������'ll"�"I'll"�"I'll"�" Demand Information EB ����I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll"' WB 'I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll"�"I'll"�,'ll"�"�I'l'll"�"I'll"' NB ����'I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 37 290 18 13 351 63 6 33 9 66 63 85 Signal Information IIIIIII6 "' I II � ���� " III C cIIIIIIIIe s 44 Re°IIIfIIIIIIerence Phase 21 yI���II IIIIII 11111111111111 �� �� 1111 ., .. IIIIIIII "'II IIII' IIIIII W OIIIIIIIIIIff°IIIset s 0 Re°IIIfIIIIIIerence Point Be inIIIIIIIIII g IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green 0.5 0.7 15.0 0.2 1.8 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 7.4 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 0.0 4.5 3.5 0.0 4.5 Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 1.5 0.0 0.0 1.5 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 5 2 1 6 3 8 7 4 Case Number 1.1 4.0 1.1 4.0 1.1 3.0 1.1 3.0 Phase Duration, s 4.7 21.7 4.0 21.0 3.7 13.4 5.5 15.2 Change Period, ( Y+R � ), s 3.5 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Max Allow Headway (MAH ), s 4.0 6.6 4.0 6.6 4.1 8.2 4.1 8.2 Queue Clearance Time ( g S ), s 2.7 4.7 2.3 5.9 2.1 2.7 3.4 4.2 Green Extension Time ( g e ), s 0.0 8.9 0.0 8.9 0.0 2.9 0.1 2.8 Phase Call Probability 0.38 1.00 0.16 1.00 0.08 0.92 0.58 0.96 Max Out Probability 0.00 0.01 0.00 0.01 0.00 0.00 0.00 0.00 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 5 2 12 1 6 16 3 8 18 7 4 14 Adjusted Flow Rate ( v ), veh/h 39 163 161 14 222 214 6 35 9 69 66 89 Adjusted Saturation Flow Rate ( s ), veh/h/In 1697 1938 1897 1485 1953 1850 1810 2000 1610 1767 2000 1560 Queue Service Time ( g S ), s 0.7 2.7 2.7 0.3 3.8 3.9 0.1 0.7 0.2 1.4 1.2 2.2 Cycle Queue Clearance Time ( g � ), s 0.7 2.7 2.7 0.3 3.8 3.9 0.1 0.7 0.2 1.4 1.2 2.2 Green Ratio (g/C) 0.36 0.35 0.35 0.35 0.34 0.34 0.17 0.17 0.17 0.22 0.21 0.21 Capacity ( c ), veh/h 432 682 668 395 657 623 354 331 267 449 413 322 Volume -to -Capacity Ratio (X) 0.090 0.239 0.241 0.035 0.338 0.343 0.018 0.105 0.036 0.155 0.161 0.278 Back of Queue ( Q ), ft/In ( 95 th percentile) 9 40 38 4 57 54 2 13 4 23 23 35 Back of Queue ( Q ), veh/In ( 95 th percentile) 0.3 1.5 1.5 0.1 2.2 2.2 0.1 0.5 0.1 0.9 0.9 1.3 Queue Storage Ratio (RQ) (95 th percentile) 0.05 0.00 0.00 0.03 0.00 0.00 0.02 0.00 0.03 0.19 0.00 0.28 Uniform Delay ( d i ), s/veh 9.5 10.2 10.2 9.8 11.1 11.1 15.4 15.8 15.6 14.2 14.5 14.9 Incremental Delay ( d 2 ), s/veh 0.1 0.1 0.1 0.0 0.1 0.1 0.0 0.3 0.1 0.2 0.4 1.0 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 9.5 10.3 10.3 9.8 11.2 11.2 15.4 16.1 15.7 14.3 14.9 15.9 Level of Service (LOS) A B B A B B B B B B B B Approach Delay, s/veh / LOS 10.2 B 11.2 B 15.9 B 15.1 B IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Intersection Delay, s/veh / LOS IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 11.9 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII B IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.08 B 2.08 B 2.27 B 2.26 B Bicycle LOS Score / LOS 0.79 A 0.86 A 0.57 A 0.86 A II I � .,.I I���� � I I ��� I I I I � � I I I I II � � ..�I � �� � I��II .� I� ..�I � � .� ��� w II I I � � � � �� � � � � � ��� � � � � �� � �I ��������������� I������ � ,II��� � I � II I ���� ����� ��� I I � ����� I i���� ����� ������ ��I�„� ,I��'I� ����� ����� �IL���� I������� � ����� �IL � I � I L ��� I L�IIIIII � � � � � �� I I �I �� � I � � I I� I � I I���� I���I ��I III � I � ..�I � ..�I IIII � �I � �I I � � �� ����� � I �� ��� ��Iu � �II I III II III II I II�� I I � ���������������� � I I � II I IIIII IIII IIII II .. .. .� III II� � I I �� II�� III�� I I � � � I �� I � ���� I I ������� I I IIIII I���� �I���� I IIIIII II II I� � I� �II��� I � IIIII I II� IIII I I� I��� I I IIII � I ����� ����� II)25 IIIII' )IIII IIII IIIIf �I11111IIIIIIII IIIII IIIhill I1u11!'%, IIII ��1111� �I HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ����� �"���� �° I* Agency GHA Duration, h 0.250 ����� Analyst M KP Analysis Date Apr 21, 2025 Area Type Other ""'' �'° Jurisdiction CIIIIIIIIIICDIIIIIIIIIIIOTH Time Period AM PHF 0.95 �" W II ����. V ,,..",,. Urban Street DEMPSTER ST IIDEMP°IIIIIIIIIISTER IIIIIIIIII@ Analysis Year EXISTING 2025 IIIIIII21IIIIIIIIOIIIIIIIIII25 Analysis Period 1> 7:00 ���� �� �', ,c IIIIIIIntersection DEMP-LIIII"IIIIIIN LIIIIIIIIIINNEM.. File Name AM.xus Project Description CLOUD HQ ""I 4 ° II°�i, -�I"" ", ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I'll'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""I'll""I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll"' Demand Information 'I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""I'll""I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",,,'ll""I'll""I'll"�,,���������������'ll"�"I'll"�"I'll"�"�I'l EB �l""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",,,'ll""I'll""I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll"�"I'll"�,,,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' WB ��','ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""I'll""I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",,,'ll""I'll""I'll NB ",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",,,'ll""I'll""I'll",'ll""I'll"�"I'll"�,'ll"�"�I'l'll"�"I'll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 37 290 18 13 351 63 6 33 9 66 63 85 Signal Information IIIIIIII6°I IIIIII ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... „��I . C cIIIIIIIIe s 44 Re°IIIfIIIIIIerence Phase yII 21 IIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIII i... IIIIIIIIIIII II IIIIII IIIIII M" IIIIIIIIIIII IIII IIIIIIII IIIIII II . IIIIIIIIIIIIIIIIIIII �I III' II OIIIIIIIIIIff°IIIset s 0 Re°IIIfIIIIIIerence Point Be inIIIIIIIIII IIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII . g IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green 0.5 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII .�I� �.. 0.7 15.0 IIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIII i 0.2 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII III II��� 1.8 7.4 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 0.0 4.5 3.5 0.0 4.5 Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 1.5 0.0 0.0 1.5 5) Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 0.938 0.969 1.000 0.821 0.977 1.000 1.000 1.000 1.000 0.977 1.000 0.969 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 0.952 0.000 0.952 0.000 0.952 0.000 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.979 0.979 0.947 0.947 0.000 0.847 0.000 0.847 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) Movement Saturation Flow Rate (s), veh/h 1697 3612 223 1485 3229 574 1810 2000 1610 1767 2000 1560 Proportion of Vehicles Arriving on Green (P) 0.03 0.35 0.35 0.01 0.34 0.34 0.01 0.17 0.17 0.05 0.21 0.21 Incremental Delay Factor (k) 0.11 0.04 0.04 0.11 0.04 0.04 0.11 0.23 0.23 0.11 0.23 0.23 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 3.5 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Green Ratio (g/C) 0.36 0.35 0.35 0.34 0.17 0.17 0.22 0.21 Permitted Saturation Flow Rate (sp), veh/h/In 908 0 880 0 1356 0 1363 0 Shared Saturation Flow Rate (ssn), veh/h/In Permitted Effective Green Time (gp), s 15.0 0.0 15.0 0.0 7.4 0.0 7.7 0.0 Permitted Service Time (gu), s 11.2 0.0 11.0 0.0 6.0 0.0 6.7 0.0 Permitted Queue Service Time (gps), s 0.2 0.1 0.0 0.1 Time to First Blockage (gf), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Queue Service Time Before Blockage (gfs), s Protected Right Saturation Flow (sR), veh/h/In 0 0 Protected Right Effective Green Time (gR), s 0.0 0.0 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.389 0.000 1.389 0.000 1.557 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.090 0.000 0.092 0.000 0.110 0.000 0.106 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 703.65 9.36 673.09 9.81 331.19 15.52 412.71 14.04 Bicycle Fw / F� -3.64 0.30 -3.64 0.37 -3.64 0.08 -3.64 0.37 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other Jurisdiction CCDOTH Time Period AM PHF 0.95 Urban Street DEMPSTER ST Analysis Year EXISTING 2025 Analysis Period 1> 7:00 Intersection DEMPSTER @ LINNEM... File Name 2025 DEMP-LIN AM.xus Project Description CLOUD HQ Demand Information EB WB NB Approach Movement L T R L T R L T R Demand (v ), veh/h 37 290 18 13 351 63 6 33 9 Signal Information "' C cle s 44.6 Reference Phase 2 Offset, s 0 ������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������� ������������������������������������������������������������������������������������������������������� Reference Point ��� ���������������������������������������������������������������������������������������������������������� ������������������������������������������������������������������������������ ����������������������������������������������� Begin ������������������������������� ��������������������������������������������������� Green 0.5 ... 0.7 15.0 0.2 1.8 7.4 1 Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 0.0 4.5 3.5 0.0 4.5 Force Mode Fixed Simult. Gap N/S On •m Red 0 0 0 0 5 0 0 0 0 5 1 Movement Group Results Approach Movement Back of Queue ( Q ), ft/In ( 95 th percentile) Back of Queue ( Q ), veh/In ( 95 th percentile) Queue Storage Ratio ( RQ ) ( 95 th percentile) Control Delay ( d ), s/veh Level of Service (LOS) A rochDl vh L a ea s/ e / OS pp y Intersection Delay, s/veh / LOS SB L T R 66 63 85 EB WB NB SB L T R L T R L T R L T R 9 40 38 4 57 54 2 13 4 23 23 35 0.3 1.5 1.5 0.1 2.2 2.2 0.1 0.5 0.1 0.9 0.9 1.3 0.05 0.00 0.00 0.03 0.00 0.00 0.02 0.00 0.03 0.19 0.00 0.28 9.5 10.3 10.3 9.8 11.2 11.2 15.4 16.1 15.7 14.3 14.9 15.9 A B B A B B B B B B B B 10.2 B 11.2 B 15.9 6 15.1 B 11.9 B 1.3 0.9 0.9 15.9 14.9 14.3 0.3 9.5 11.2 2.2 1.5 = 10.3 11.2 2.2 1.5 = 10.3 9.8 0.1 15.4 16.1 15.7 0.1 0.1 0.5 0 II....... Q: S IC.:) Il...�:�S Ikm":m --- Messages --- No errors or warnings exist. --- Comments --- �� �ulo I III u� „� III 9 � � � „I U 9 I � i I I � , W pi I I �i � i i ���.� iii ...� i ...�. I ..�"��, ..� ..�i� W W ����� ..��h ...�. ��� ���'.� u��,� �I, I I I I III II ul � I � I tll � II III � � ��!!!!�� �, IIIII �I � � IIIII � IIIII � � !!!! !!!!! III !!!!!� IIIII IIIII IIIII � !!!!r� � ��,�� ,�II !�� � IIIII IIIII II�.II!! IIIIII I! IIIII II�. � III � ����� IIIII � ��� � � � � � IIIII � !!!!r� !!!!! � !!!! � �� !!!! � � ����� 2�I'w� ��8��i�, IIIII IIIIIIIIIIIIIII'i IIII IIIII I�Illl hull!'% �Jlcl tj HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ����� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, �����AM 2025 Area Type Other'°' III0.95 °N'" Jurisdiction CCDOTH Time Period PHF �ll �1 Urban Street DEMPSTER ST ��������@ �D �N �ntorsacti Analysis Year NB 2032 l���� Ill"""I0I'll""I3'll"2 Analysis Period 1 > 7:00 w �N, �� 11 ,c I o n E M P��������ST E R L I N E M .. F i l e Name N B D E M P-LIIIIIIIN AM .xu s Project Description CLOUD HQ "") 4 ° "°��' 11"I' � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",ll,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"I'll", Demand Information ����'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,,���������������'ll"�"I'll"�"I'll"�" EB ����I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll"' WB 'I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll"�"I'll"�,'ll"�"�I'l'll"�"I'll"' NB ����'I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 39 309 19 14 368 66 6 34 9 69 66 89 Signallnformation "' . ����� IIIII C cIe s 54.4 Rellllference Phase 21 y, iiiiiiiiiiiiiiiiiiiii111111 ��111111��11111111111 � �� Offset, s 0 Reference Point Begin iiiiiiiiiiiiillillillillillillilliillillillillillillilliilillillilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillill lillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillilli it illillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillil llillillillillillilliillillillillillillilliillillillillillillilliillilliilil llillillillillillilliillillillillillillilliill lillillilliillillillillillilli liillilliilillillillillillillillilliillillillillil Green 0.6 0.8 16.7 0.3 2.2 14.9 Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 0.0 4.5 3.5 0.0 4.5 Force Mode Float Simult. Gap N/S On Red 0.0 0.0 1.5 0.0 0.0 1.5 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 39 309 19 14 368 66 6 34 9 69 66 89 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 1900 2000 1900 1900 2000 1900 1900 2000 1900 1900 2000 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 8 4 23 3 0 0 0 3 0 4 Ped / Bike / RTOR, /h 0 0 0 0 0 0 50 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 3 3 3 3 3 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 200 0 140 0 125 0 125 125 0 125 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 40 40 40 40 40 40 30 30 30 30 30 30 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 15.0 55.0 15.0 55.0 15.0 35.0 15.0 35.0 Yellow Change Interval (Y), s 3.5 4.5 3.5 4.5 3.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 0.0 1.5 0.0 1.5 0.0 1.5 0.0 1.5 Minimum Green ( Gm►n), s 3 15 3 15 3 8 3 8 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 3.0 2.0 3.0 2.0 3.0 5.0 3.0 5.0 Reca I I Mode Off Min Off Min Off Off Off Off Dual Entry No Yes No Yes No Yes No Yes Walk (Walk), s 0.0 0.0 7.0 0.0 Pedestrian Clearance Time (PC), s 0.0 0.0 23.0 0.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 l � �� �� �I����� ��II ������ IIIII � ,����� ���� ���� � ����� ���� ��� ��� ����� I ���i���l IIIII IIIII ���������� ,���I'�� IIIII IIIII ����.���� IIIII �I ��.�� IIIII ����.�� � ��� ��� ��� ��� ������� � II 1 IIIII � �� � III o � ��� � i��� I���� ����� ����������� ��� � �� � ������ � ������ 1 11 � �� � �� ������ ����� ��� ����� � � pi ,����� � � IIIII IIIII ������ ���� Jlllu �������� � ��������������� ���������������� IIII �� ���ll��l � IIIII�� ����� III....IIII....� IIIII IIIII����������������� ����������� IIIII�������������� �� ���� IIII IIIII��� ���III�!��� �� � ����� ��������� I�������... HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ����� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other'°' °N'" Jurisdiction CCDOTH Time Period �����AM PHF III0.95 �ll �1 Urban Street DEMPSTER ST ��������@ �D �N �ntorsacti Analysis Year NB 2032 l���� Ill"""I0I'll""I3'll"2 Analysis Period 1 > 7:00 w �N �� 11 ,c I o n E M P��������ST E R L I N E M .. F i l e Name N B D E M P-LIIIIIIIN AM .xu s Project Description CLOUD HQ "") 4 ° "°��' 11"I' � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",ll,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"I'll", ����'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,,���������������'ll"�"I'll"�"I'll"�" Demand Information EB ����I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll"' WB 'I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll"�"I'll"�,'ll"�"�I'l'll"�"I'll"' NB ����'I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 39 309 19 14 368 66 6 34 9 69 66 89 Signallnformation "' . ����� lull C cIe s 54.4 Rellllference Phase 21 y, iiiiiiiiiiiiiiiiiiiii111111 ��111111��11111111111 � �� Offset, s 0 Reference Point Begin iiiiiiiiiiiiillillillillillillilliillillillillillillilliilillillilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillill lillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillilli it illillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillil llillillillillillilliillillillillillillilliillillillillillillilliillilliilil llillillillillillilliillillillillillillilliill lillillilliillillillillillilli liillilliilillillillillillillillilliillillillillil Green 0.6 0.8 16.7 0.3 2.2 14.9 Uncoordinated Yes Simult. Gap E/W On IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIII III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII VVVVVVVVVVVVV IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII����. Yellow 3.5 0.0 4.5 3.5 0.0 4.5 Force Mode Float Simult. Gap N/S On Red 0.0 0.0 1.5 0.0 0.0 1.5 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 5 2 1 6 3 8 7 4 Case Number 1.1 4.0 1.1 4.0 1.1 3.0 1.1 3.0 Phase Duration, s 4.9 23.5 4.1 22.7 3.8 20.9 6.0 23.0 Change Period, ( Y+R � ), s 3.5 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Max Allow Headway (MAH ), s 4.0 6.6 4.0 6.6 4.1 8.2 4.1 8.2 Queue Clearance Time ( g S ), s 2.9 5.7 2.4 7.2 2.1 2.7 3.6 4.4 Green Extension Time ( g e ), s 0.0 9.6 0.0 9.5 0.0 3.0 0.1 2.9 Phase Call Probability 0.46 1.00 0.20 1.00 0.09 0.96 0.67 0.99 Max Out Probability 0.00 0.02 0.00 0.02 0.00 0.00 0.00 0.00 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 5 2 12 1 6 16 3 8 18 7 4 14 Adjusted Flow Rate ( v ), veh/h 41 174 172 15 233 224 6 36 9 73 69 94 Adjusted Saturation Flow Rate ( s ), veh/h/In 1697 1938 1898 1485 1953 1850 1810 2000 1522 1767 2000 1560 Queue Service Time ( g S ), s 0.9 3.6 3.7 0.4 5.1 5.2 0.1 0.7 0.2 1.6 1.3 2.4 Cycle Queue Clearance Time ( g � ), s 0.9 3.6 3.7 0.4 5.1 5.2 0.1 0.7 0.2 1.6 1.3 2.4 Green Ratio (g/C) 0.33 0.32 0.32 0.32 0.31 0.31 0.28 0.27 0.27 0.33 0.31 0.31 Capacity ( c ), veh/h 365 624 611 337 600 569 484 546 415 567 626 488 Volume -to -Capacity Ratio (X) 0.113 0.278 0.281 0.044 0.388 0.394 0.013 0.066 0.023 0.128 0.111 0.192 Back of Queue ( Q ), ft/In ( 95 th percentile) 14 62 59 6 88 83 2 14 4 26 26 37 Back of Queue ( Q ), veh/In ( 95 th percentile) 0.5 2.4 2.4 0.2 3.4 3.3 0.1 0.6 0.1 1.0 1.0 1.4 Queue Storage Ratio (RQ) (95 th percentile) 0.07 0.00 0.00 0.04 0.00 0.00 0.02 0.00 0.03 0.21 0.00 0.30 Uniform Delay ( d i ), s/veh 12.7 13.8 13.8 13.0 14.8 14.9 14.3 14.7 14.5 12.7 13.3 13.7 Incremental Delay ( d 2 ), s/veh 0.1 0.1 0.1 0.1 0.2 0.2 0.0 0.1 0.0 0.1 0.2 0.4 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 12.8 13.8 13.9 13.0 15.0 15.0 14.3 14.8 14.5 12.8 13.5 14.1 Level of Service (LOS) B B B B B B B B B B B B Approach Delay, s/veh / LOS 13.7 B 14.9 B 14.7 B 13.5 B Intersection Delay, s/veh / LOS 14.2 B Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.09 B 2.09 B 2.26 B 2.26 B Bicycle LOS Score / LOS 0.81 A 0.88 A 0.57 A 0.88 A i ��� 1 1ii�� �� IIIII ��� IIIII IIIII IIIII �)IIIIIIIII �����IIIIIS 11111" HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ����� �"���� �° I* Agency GHA Duration, h 0.250 ����� Analyst M KP Analysis Date Apr 21, 2025 Area Type Other ""'' �'° Jurisdiction CCDOTH Time Period AM PHF 0.95 �" W II ����. V ,,..",,. Urban Street DEMPSTER ST ��������@ �D �N �ntorsacti Analysis Year NB 2032 l���� Ill"""I0I'll""I3'll"2 Analysis Period 1 > 7:00 ���� �., ,c I o n E M P��������ST E R L I N E M .. F i l e Name N B D E M P-LIIIIIIIN AM .xu s Project Description CLOUD HQ ""� 14 ° 1111, ,�- °'°' � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll"�"I'll"�,'ll,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' WB ��','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll NB ",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�"I'll"�,I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 39 309 19 14 368 66 6 34 9 69 66 89 Signal Information ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... „51 . C cIe s 54.4 Rellllference Phase y��111111��111 21 ., 1. � �� Offset, s 0 Reference Point Begin iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillil llillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliil illillillilliillillillillillil illiillillillillillillillillillillilliillillillill Green 0.6 0.8 16.7 0.3 2.2 14.9 Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 0.0 4.5 3.5 0.0 4.5 Force Mode Float Simult. Gap N/S On Red 0.0 0.0 1.5 0.0 0.0 1.5 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 0.938 0.969 1.000 0.821 0.977 1.000 1.000 1.000 1.000 0.977 1.000 0.969 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 0.952 0.000 0.952 0.000 0.952 0.000 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.979 0.979 0.947 0.947 0.000 0.847 0.000 0.847 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 0.952 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 0.945 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) Movement Saturation Flow Rate (s), veh/h 1697 3614 221 1485 3229 574 1810 2000 1522 1767 2000 1560 Proportion of Vehicles Arriving on Green (P) 0.03 0.32 0.32 0.01 0.31 0.31 0.01 0.27 0.27 0.05 0.31 0.31 Incremental Delay Factor (k) 0.11 0.04 0.04 0.11 0.04 0.04 0.11 0.23 0.23 0.11 0.23 0.23 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 3.5 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Green Ratio (g/C) 0.33 0.32 0.32 0.31 0.28 0.27 0.33 0.31 Permitted Saturation Flow Rate (sp), veh/h/In 890 0 863 0 1352 0 1362 0 Shared Saturation Flow Rate (ssn), veh/h/In Permitted Effective Green Time (gp), s 16.7 0.0 16.7 0.0 14.9 0.0 15.6 0.0 Permitted Service Time (gu), s 11.6 0.0 11.9 0.0 13.8 0.0 14.2 0.0 Permitted Queue Service Time (gps), s 0.2 0.1 0.0 0.1 Time to First Blockage (gf), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Queue Service Time Before Blockage (gfs), s Protected Right Saturation Flow (sR), veh/h/In 0 0 Protected Right Effective Green Time (gR), s 0.0 0.0 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.389 0.000 1.389 0.000 1.557 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.101 0.000 0.103 0.000 0.107 0.000 0.102 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 643.82 12.51 614.79 13.06 545.66 14.39 625.91 12.85 Bicycle Fw / F� -3. 64 0.32 -3. 64 0.39 -3. 64 0.09 -3. 64 0.39 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other Jurisdiction CCDOTH Time Period AM PHF 0.95 Urban Street DEMPSTER ST Analysis Year NB 2032 Analysis Period 1 > 7:00 Intersection DEMPSTER @ LINNEM... File Name 2032 NB DEMP-LIN AM.xus Project Description CLOUD HQ Demand Information EB WB NB Approach Movement L T R L T R L T R Demand (v ), veh/h 39 309 19 14 368 66 6 34 9 Signal Information "' C cl e s 54.4 y Rellllfe re n ce Phase 21 1111111111111��1 Offset, s 0 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliilillillillillillillillilliilillillillillillillillillilliillillillillillillilliilliillillillillillillilliilillillillillillillillillilliillillillillillillilliilliillillillillillillilliilillillill lillillillillillilliilliillillillillillillilliilillillillillillillillillilliillillillillillillilliilli Reference Point ii llilliillillillillillillilliilliillillillillillillilliilillillillillillillillillilliillillillillillillill illiilillillillillillillillillilliillillillillillillilliilliillillillillillil lillillilliillillillillillillilliilliillillili Begin Green 0.6 0.8 16.7 0.3 2.2 14.9 Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 0.0 4.5 3.5 0.0 4.5 Force Mode Float Simult. Gap N/S On • Red 0 0 0 0 5 0 0 0 0 5 r Movement Group Results Approach Movement Back of Queue ( Q ), ft/In ( 95 th percentile) Back of Queue ( Q ), veh/In ( 95 th percentile) Queue Storage Ratio ( RQ ) ( 95 th percentile) Control Delay ( d ), s/veh Level of Service (LOS) A rochDl vh L a ea s/ e / OS pp y Intersection Delay, s/veh / LOS SB L T R 69 66 89 EB WB NB SB L T R L T R L T R L T R 14 62 59 6 88 83 2 14 4 26 26 37 0.5 2.4 2.4 0.2 3.4 3.3 0.1 0.6 0.1 1.0 1.0 1.4 0.07 0.00 0.00 0.04 0.00 0.00 0.02 0.00 0.03 0.21 0.00 0.30 12.8 13.8 13.9 13.0 15.0 15.0 14.3 14.8 14.5 12.8 13.5 14.1 B B B B B B B B B B B B 13.7 B 14.9 B 14.7 B 13.5 B 14.2 B 1.4 1 1 14.1 13.5 12.8 0.5 �_ 12.8 15.0 3.3 2.4 _ 13.8 15.0 � 3.4 2.4 _ 13.9 13.0 � 0.2 14.3 14.8 14.5 0.1 0.1 q^ q 0.6 0 II....... Q: S IC.:) Il...�:�S Ikm":m --- Messages --- No errors or warnings exist. --- Comments --- Ca ipyiri IIIII �� D u�IIIIVV5 i I Ii IIIII IIIarilida, � i.."�� �� � W W W G n e� e„ ,2 l III 20,32 IIIIII Illllllllk� IIIII������ IIIIIIIIIIIIIIII� HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ����� �"���� �° I* Agency GHA Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 �����AM Area Type Other III0.95 �"' °�'" Jurisdiction CCDOTH Time Period PHF �ll �1 Urban Street DEMPSTER ST Analysis Year TOTAL 2032 Analysis Period 1 > 7:00 w �N, �� 11 ,c ����������������I������ntorsaction ���� �������D E M P����������STE R ��������@ L���I������N N E M . ��������� ���������� F it e Name ������ ���l���� Ill""�"�I0I'll"�"�I3'll"�"�2� Tl"�"I'llOT D E M P-L'll'l"�"�I'N AM .xu s Project Description CLOUD HQ "") 4 ° "°��' 11"I' � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",ll,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"I'll", Demand Information ����'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,,���������������'ll"�"I'll"�"I'll"�" EB ����I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll"' WB 'I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll"�"I'll"�,'ll"�"�I'l'll"�"I'll"' NB ����'I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 39 309 49 36 368 66 30 41 27 69 74 89 Signal Information i "' l I' �11 C cle, s 46 5 Relllference Phase 21 y �� . 5, ��� Offset, s 0 Reference Point Begin iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillil llillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliil illillillilliillillillillillil illiillillillillillillillillillillilliillillillill Green 1.2 16.3 1.0 1.2 7.8 0.0 Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 4.5 3.5 0.0 4.5 0.0 Force Mode Float Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 39 309 49 36 368 66 30 41 27 69 74 89 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 1900 2000 1900 1900 2000 1900 1900 2000 1900 1900 2000 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 8 4 23 3 0 0 0 3 0 4 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 3 3 3 3 3 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 200 0 140 0 125 0 125 125 0 125 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 40 40 40 40 40 40 30 30 30 30 30 30 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 15.0 55.0 15.0 55.0 15.0 35.0 15.0 35.0 Yellow Change Interval (Y), s 3.5 4.5 3.5 4.5 3.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 0.0 1.5 0.0 1.5 0.0 1.5 0.0 1.5 Minimum Green ( Gm►n), s 3 15 3 15 3 8 3 8 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 3.0 2.0 3.0 2.0 3.0 5.0 3.0 5.0 Reca I I Mode Off Min Off Min Off Off Off Off Dual Entry No Yes No Yes No Yes No Yes Walk (Walk), s 0.0 0.0 7.0 0.0 Pedestrian Clearance Time (PC), s 0.0 0.0 23.0 0.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 ��� ������ IIIII � ,������ �'��� � ����� � ����� ��� ������� ��� ����� �� � i���l IIIII IIIII�� � ������� ,���'�� IIIII IIIII ���.���� Illlh�� �.�� IIIII ���.�� � ��� ��� ��� ��� ������� Illlh � � �� ��� � � i��� ����� .����� ����������� ��� �� � ������ � ������ � �� � �� ���� ������ ��� ����� �� � ���� � � ����� ����� ��� ����� ����������������������������� ������������������������� IIIII����������IIIIIIIIIIIIIIII�IIII IIIII ��������������������IIII ��� ,����� �����IIII �����:��������������� HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ����� �"���� �° I* Agency GHA Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other �"' °�'" Jurisdiction CCDOTH Time Period �����AM PHF III0.95 �ll �1 Urban Street DEMPSTER ST Analysis Year TOTAL 2032 Analysis Period 1 > 7:00 w �N �� 11 ,c ����������������I������ntorsaction ���� �������D E M P����������STE R ��������@ L���I������N N E M . ��������� ���������� F it e Name ������ ���l���� Ill""�"�I0I'll"�"�I3'll"�"�2� Tl"�"I'llOT D E M P-L'll'l"�"�I'N AM .xu s Project Description CLOUD HQ "") 4 ° "°��' 11"I' � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",ll,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"I'll", ����'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,,���������������'ll"�"I'll"�"I'll"�" Demand Information EB ����I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll"' WB 'I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll"�"I'll"�,'ll"�"�I'l'll"�"I'll"' NB ����'I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 39 309 49 36 368 66 30 41 27 69 74 89 Signal Information i "' l I' �11 C cle, s 46 5 Relllference Phase 21 y �� . 5, ��� Offset, s 0 Reference Point Begin iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillil llillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliil illillillilliillillillillillil illiillillillillillillillillillillilliillillillill Green 1.2 16.3 1.0 1.2 7.8 0.0 Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 4.5 3.5 0.0 4.5 0.0 Force Mode Float Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 �) Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 5 2 1 6 3 8 7 4 Case Number 1.1 4.0 1.1 4.0 1.1 3.0 1.1 3.0 Phase Duration, s 4.7 22.3 4.7 22.3 4.5 13.8 5.7 15.0 Change Period, ( Y+R � ), s 3.5 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Max Allow Headway (MAH ), s 4.0 6.6 4.0 6.6 4.1 8.2 4.1 8.2 Queue Clearance Time ( g S ), s 2.7 5.4 2.8 6.2 2.7 2.9 3.6 4.4 Green Extension Time ( g e ), s 0.0 10.1 0.0 10.1 0.0 3.5 0.1 3.5 Phase Call Probability 0.41 1.00 0.39 1.00 0.34 0.97 0.61 0.98 Max Out Probability 0.00 0.02 0.00 0.02 0.00 0.01 0.00 0.01 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 5 2 12 1 6 16 3 8 18 7 4 14 Adjusted Flow Rate ( v ), veh/h 41 191 186 38 233 224 32 43 28 73 78 94 Adjusted Saturation Flow Rate ( s ), veh/h/In 1697 1938 1845 1485 1953 1850 1810 2000 1610 1767 2000 1560 Queue Service Time ( g S ), s 0.7 3.3 3.4 0.8 4.1 4.2 0.7 0.9 0.7 1.6 1.5 2.4 Cycle Queue Clearance Time ( g � ), s 0.7 3.3 3.4 0.8 4.1 4.2 0.7 0.9 0.7 1.6 1.5 2.4 Green Ratio (g/C) 0.38 0.35 0.35 0.37 0.35 0.35 0.19 0.17 0.17 0.22 0.19 0.19 Capacity ( c ), veh/h 432 680 648 390 683 647 353 334 269 442 388 302 Volume -to -Capacity Ratio (X) 0.095 0.281 0.286 0.097 0.341 0.346 0.089 0.129 0.106 0.164 0.201 0.310 Back of Queue ( Q ), ft/In ( 95 th percentile) 10 50 47 10 62 59 11 17 12 26 30 40 Back of Queue ( Q ), veh/In ( 95 th percentile) 0.4 1.9 1.9 0.4 2.4 2.4 0.5 0.7 0.5 1.0 1.2 1.5 Queue Storage Ratio (RQ) (95 th percentile) 0.05 0.00 0.00 0.07 0.00 0.00 0.09 0.00 0.09 0.21 0.00 0.32 Uniform Delay ( d i ), s/veh 9.5 10.9 10.9 9.7 11.2 11.2 15.6 16.5 16.4 14.9 15.7 16.1 Incremental Delay ( d 2 ), s/veh 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.4 0.4 0.2 0.5 1.2 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 9.6 11.0 11.0 9.8 11.3 11.3 15.7 16.9 16.8 15.1 16.3 17.3 Level of Service (LOS) A B B A B B B B B B B B Approach Delay, s/veh / LOS 10.8 B 11.2 B 16.5 B 16.3 B Intersection Delay, s/veh / LOS 12.5 B Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.08 B 2.08 B 2.27 B 2.27 B Bicycle LOS Score / LOS 0.83 A 0.90 A 0.66 A 0.89 A i illl IIIII IIIIII IIII Illlf°"Y°°11,11111,IIIII IIIIIN'1 ilu111I1pp„IIII 1111'��' �w HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ����� �"���� �° °* Agency GHA Duration, h 0.250 ����� Analyst MKP Analysis Date Jul 2, 2025 Area Type Other ""'' �'° Jurisdiction CCDOTH Time Period AM PHF 0.95 �" ����. �1 Urban Street DEMPSTER ST Analysis Year TOTAL 2032 Analysis Period 1 > 7:00 ���� w �k, ����,.. ,c ����������������I������ntersection ���� �������D E M P����������STE R ��������@ L���I������N N E M . ��������� ���������� F iI e Name ������ ���l���� Ill""�"�I0I'll"�"�I3'll"�"�2� Tl"�"I'llOT D E M P-L'll'l"�"�I'N AM .xu s Project Description CLOUD HQ 1`1 4 ° "°�i, -�I" ", ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I'll'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""I'll""I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll"' Demand Information 'I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""I'll""I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",,,'ll""I'll""I'll"�,,���������������'ll"�"I'll"�"I'll"�"�I'l EB �l""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",,,'ll""I'll""I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll"�"I'll"�,,,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' WB ��','ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""I'll""I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",,,'ll""I'll""I'll NB ",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",,,'ll""I'll""I'll",'ll""I'll"�"I'll"�,'ll"�"�I'l'll"�"I'll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 39 309 49 36 368 66 30 41 27 69 74 89 Signal Information ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... C cle, s 46 5 Rellllference Phase y 21 Offset, s 0 Reference Point Begin iiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillil llillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillil li lillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillilliillillillillillillilli illillillillillillilliillillilliillillillillil illillillilliillillillillillil lillillillillillillillillillillillilliillillillill Green 1.2 16.3 1.0 I�� 1.2 7.8 0.0 Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 4.5 3.5 0.0 4.5 0.0 Force Mode Float Simult. Gap N/S On Red 0.0 1.5 0.0 0.0 1.5 0.0 5) Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 0.938 0.969 1.000 0.821 0.977 1.000 1.000 1.000 1.000 0.977 1.000 0.969 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 0.952 0.000 0.952 0.000 0.952 0.000 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.952 0.952 0.947 0.947 0.000 0.847 0.000 0.847 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) Movement Saturation Flow Rate (s), veh/h 1697 3270 513 1485 3229 574 1810 2000 1610 1767 2000 1560 Proportion of Vehicles Arriving on Green (P) 0.03 0.35 0.35 0.03 0.35 0.35 0.02 0.17 0.17 0.05 0.19 0.19 Incremental Delay Factor (k) 0.11 0.04 0.04 0.11 0.04 0.04 0.11 0.23 0.23 0.11 0.23 0.23 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 3.5 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Green Ratio (g/C) 0.38 0.35 0.37 0.35 0.19 0.17 0.22 0.19 Permitted Saturation Flow Rate (sp), veh/h/In 890 0 839 0 1342 0 1353 0 Shared Saturation Flow Rate (ssn), veh/h/In Permitted Effective Green Time (gp), s 16.3 0.0 16.3 0.0 7.8 0.0 7.8 0.0 Permitted Service Time (gu), s 12.1 0.0 11.0 0.0 5.5 0.0 6.9 0.0 Permitted Queue Service Time (gps), s 0.2 0.2 0.1 0.0 Time to First Blockage (gf), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Queue Service Time Before Blockage (gfs), s Protected Right Saturation Flow (sR), veh/h/In 0 0 Protected Right Effective Green Time (gR), s 0.0 0.0 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.389 0.000 1.389 0.000 1.557 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.091 0.000 0.092 0.000 0.112 0.000 0.109 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 702.03 9.79 698.87 9.84 334.26 16.13 387.51 15.12 Bicycle Fw / F� -3. 64 0.34 -3. 64 0.41 -3. 64 0.17 -3. 64 0.40 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilliillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillI Agency iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilI GHA iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillilI Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillilI Jurisdiction CCDOTH Time Period AM PHF 0.95 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillilI Urban Street DEMPSTER ST Analysis Year TOTAL 2032 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIllIIIIIIAnalysis Period lIlIllIllIll1lIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIll1111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1 > 7:00 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Intersection iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliilililIProject DEMPSTER @ LINNEM...IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiiiiiiiiiiiiiiiiiiiiiilillillillillillillillilliillillillillillillilliilillillillillillillillillilliilliillillillillillillilliillillillillillillilliilillillillillilI File Name 2032 TOT DEM1111 P-LIN AM.xus iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillilI Description CLOUD HQ Demand Information EB WB NB ApproachMovement L T R L T iiiiiiiiiiiiiiiiiiiiiillillillillillillilliilliillillillillillillilliillillillillillillillillillilliillillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillilI R L iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillillilliillillillillillillillillillillillilliillillillillililI iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillI T Demand( v ), veh/h 39 309 49 36 368 66 30 iiiiiiiiillillillillillillilliillillillillillillilliillillillillillillilliI 41IIIIIIIIIIIIIIIIIIIIIillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillillIIlI 27 Signal Information "' 11 Cycle, llls 4161I 5 Reference Phase 21 iiiiiiiiiiiiillilli��/� IIIII � IIIIII 11111111 , I ,,, iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillill�illillillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillllllI11111" Offset, s 0 iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillillillillilliillillillillillillillillill IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Reference Point II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Begin IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green 1.2 16.3 1.0 1.2 7.8 0.0 Uncoordinated Yes IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Simult. Gap E/W IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII On IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Yellow II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 3.5 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 4.5 3.5 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 0.0 4.5 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 0.0 ',,. Force Mode Float Simult. Gap N/S On • Red 0 0 5 0 0 0 0 5 0.0 1m Movement Group Results iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI Approach Movement iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillI Back of Queue ( Q ), ft/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Back of Queue ( Q ), veh/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Queue Storage Ratio ( RQ ) ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Control Delay ( d ), s/veh iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillilillillillilI Level of Service (LOS) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI ApproachDelay, s/veh /L OS iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilillillillilI Intersection Delay, s/veh / LOS 1.9 1.9 SB L T R 69iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillliiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilliillillillillillillillilliillillillillillilI iiiiiiiiiiiiiiiiiiiiiillillillillilliillillillillillillilliillillillillillillI 74 89 EB WB NB SB L T R L T R L T R L T R 10 50 47 10 62 59 11 17 12 26 30 40 0.4 1.9 1.9 0.4 2.4 2.4 0.5 0.7 0.5 1.0 1.2 1.5 0.05 0.00 0.00 0.07 0.00 0.00 0.09 0.00 0.09 0.21 0.00 0.32 9.6 11.0 11.0 9.8 11.3 11.3 15.7 16.9 16.8 15.1 16.3 17.3 A B B A B B B B B B B B iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilI 111111111111 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillI 10.8 BIIIIIIIIIIIIIIIIIIIII 11.2 B �1111611111111151111111IIIIIIIIIIIIIIIIIIII. 6 16.3 B iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 12.5 IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII B IIIIIIIIIIIIIIIIIIIIIIIIIIII1111111111111111111111111111� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1.5 1.2 1 17.3 16.3 15.1 0.4 9.6 11.3 2.4 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIM I- 11.0 11.3 � 2.4 I- 11.0 9.8 0.4 15.7 16.9 16.8 �] T 0.5 0.7 --- Messages --- No errors or warnings exist. --- Comments --- a pyiri IIIII vt D 2IIIIII � I IIIII III irii a , III � � �I � � � uVlIII�� � i. t� ���� � ,25 ' 1 ��"� I "111111111111101 II II II ,�luu1!'1IIII1IL' ^'w I HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ����� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 ���PM Area Type Other'°' III0.95 °N'" Jurisdiction CCDOTH Time Period PHF �ll �1 Urban Street DEMPSTER ST ��������@ �D �N intersecti Analysis Year EXISTING 2025 Analysis Period l���� Ill"""I0I'll""I25 1> 7:00 �� w �k �� 11 ,c I o n E M P��������ST E R L I N E M .. F i l e Name D E M P-Lll"Ill"N P M .xus Project Description CLOUD HQ "") 4 ° "°��' 11"I' � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",ll,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"I'll", Demand Information ����'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,,���������������'ll"�"I'll"�"I'll"�" EB ����I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll"' WB 'I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll"�"I'll"�,'ll"�"�I'l'll"�"I'll"' NB ����'I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 102 558 12 9 407 79 12 67 30 53 43 64 Signal Information "' IIm„III III i . ����� ���III IIII I... a C cIe s 53 6 Relllference Phase 21 �������� ., � Offset s 0 Reference Point Be in iiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillillillil lillillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillillillil li lilillillillillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillill illillillillillillilliillillilillillillillillillillillillillilliillillililli illillilillillillillillillillillillillilliilli g Green 0.4 2.7 21.8 0.5 1.5 7.7 Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 0.0 4.5 3.5 0.0 4.5 Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 1.5 0.0 0.0 1.5 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 102 558 12 9 407 79 12 67 30 53 43 64 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 1900 2000 1900 1900 2000 1900 1900 2000 1900 1900 2000 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 0 0 11 3 0 0 3 0 0 0 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (AT) 3 3 3 3 3 3 3 3 3 3 3 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 200 0 140 0 125 0 125 125 0 125 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 40 40 40 40 40 40 30 30 30 30 30 30 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 15.0 55.0 15.0 55.0 15.0 35.0 15.0 35.0 Yellow Change Interval (Y), s 3.5 4.5 3.5 4.5 3.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 0.0 1.5 0.0 1.5 0.0 1.5 0.0 1.5 Minimum Green ( Gm►n), s 3 15 3 15 3 8 3 8 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 3.0 2.0 3.0 2.0 3.0 5.0 3.0 5.0 Reca I I Mode Off Min Off Min Off Off Off Off Dual Entry No Yes No Yes No Yes No Yes Walk (Walk), s 0.0 0.0 7.0 0.0 Pedestrian Clearance Time (PC), s 0.0 0.0 23.0 0.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 ��� ������ IIIII �� ,����� ���� � ����� � ����� ��� ��� ��� ����� �� � i���l IIIII IIIII�� � ������� ,���'�� IIIII IIIII ���.���� IIIII �I �.�� IIIII ���.�� � ��� ��� ��� ��� ������� II 1 IIIII � � �� � ��� � i��� I���� .����� ����������� ��� �� � ������ � ������ � �� � �� ������ ����� ��� ����� � � ��� �� � � IIIII IIIII ����� � Illllllllh IIII IIIII ���� IIIII IIII �� IIIII IIII ����� ���I��.I�� �� HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ����� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other'°' °N'" Jurisdiction CIIIIIIIIIICDIIIIIIIIIIIOTH Time Period IIIPM PHF III0.95 �ll �1 �illillillillillillillillillillilliillillillillillil� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Urban Street DEMPSTER ST IDEMPIIIIIIIIISTER IIIIIIII@ IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIII Analysis IIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIIIII Year EXISTING 2025 Analysis Period IIIIII21IIIIIIIOIIIIIIIII25 IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1> 7:00 l �� w �k �� 11 ,c llllllntersection LIIIIIIIIINNEM.. File Name DEMP-LIIIIlIIIIIN PM.xus Project Description CLOUD HQ "") 4 ° "°��' 11"J' � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",ll,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"I'll", ����'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,,���������������'ll"�"I'll"�"I'll"�" Demand Information EB ����I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll"' WB 'I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll"�"I'll"�,'ll"�"�I'l'll"�"I'll"' NB ����'I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 102 558 12 9 407 79 12 67 30 53 43 64 Signal Information IIIIIII6 "'I IIm„III III i . IIIII III���III IIII I... a C clllllllle s 51IIIIIII31I Re°Illfllllllerence Phase 21 �������� ., III 011lllllllff°Inset s 0 Re°Ilfllllle re n ce Point B e i n iiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillillillil IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII g Green 0.4 2.7 21.8 0.5 1.5 7.7 Uncoordinated Yes Simult. Gap E/W On illillillillillillilliillillillilliillillillillillillilliillillil IIIIIIIIIIIIIIII i lillillilliillilli IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Yellow 3.5 0.0 4.5 3.5 0.0 4.5 Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 1.5 0.0 0.0 1.5 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 5 2 1 6 3 8 7 4 Case Number 1.1 4.0 1.1 4.0 1.1 3.0 1.1 3.0 Phase Duration, s 6.6 30.5 3.9 27.8 4.0 13.7 5.5 15.2 Change Period, ( Y+R � ), s 3.5 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Max Allow Headway (MAH ), s 4.0 6.6 4.0 6.6 4.1 8.4 4.1 8.4 Queue Clearance Time ( g S ), s 3.7 7.2 2.2 7.0 2.3 3.7 3.4 3.9 Green Extension Time ( g e ), s 0.2 14.8 0.0 14.8 0.0 3.1 0.1 3.1 Phase Call Probability 0.80 1.00 0.13 1.00 0.17 0.97 0.56 0.98 Max Out Probability 0.00 0.10 0.00 0.10 0.00 0.00 0.00 0.01 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 5 2 12 1 6 16 3 8 18 7 4 14 Adjusted Flow Rate ( v ), veh/h 107 301 299 9 262 250 13 71 32 56 45 67 Adjusted Saturation Flow Rate ( s ), veh/h/In 1810 2000 1985 1654 1953 1843 1810 2000 1572 1810 2000 1610 Queue Service Time ( g S ), s 1.7 5.2 5.2 0.2 4.9 5.0 0.3 1.7 0.9 1.4 1.0 1.9 Cycle Queue Clearance Time ( g � ), s 1.7 5.2 5.2 0.2 4.9 5.0 0.3 1.7 0.9 1.4 1.0 1.9 Green Ratio (g/C) 0.49 0.46 0.46 0.41 0.41 0.41 0.15 0.14 0.14 0.18 0.17 0.17 Capacity ( c ), veh/h 523 915 908 393 794 749 311 288 227 353 343 276 Volume -to -Capacity Ratio (X) 0.205 0.329 0.329 0.024 0.330 0.334 0.041 0.245 0.139 0.158 0.132 0.244 Back of Queue ( Q ), ft/In ( 95 th percentile) 23 76 76 3 77 72 6 36 16 25 21 33 Back of Queue ( Q ), veh/In ( 95 th percentile) 0.9 3.1 3.0 0.1 3.0 2.9 0.2 1.4 0.6 1.0 0.9 1.3 Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.12 0.00 0.00 0.02 0.00 0.00 0.05 0.00 0.13 0.20 0.00 0.27 Uniform Delay ( d i ), s/veh 7.9 9.3 9.3 9.5 10.9 10.9 19.4 20.4 20.0 18.6 18.8 19.2 Incremental Delay ( d 2 ), s/veh 0.2 0.1 0.1 0.0 0.1 0.1 0.1 0.9 0.6 0.2 0.4 1.0 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 8.1 9.4 9.4 9.5 11.0 11.0 19.4 21.3 20.6 18.8 19.2 20.2 Level of Service (LOS) A A A A B B B C C 6 B C Approach Delay, s/veh / LOS 9.2 A 11.0 B 20.9 C 19.5 B IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Intersection Delay, s/veh / LOS IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 11.8 II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII B IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.07 B 2.08 B 2.28 B 2.27 B Bicycle LOS Score / LOS 1.07 A 0.92 A 0.68 A 0.77 A III �II� �� w II �� ��I ������ � IIIII � II ,�II�� I I � I� � ���� ����� �I� � I � ����� � ��III IIIII IIIII ��� � �� ,I��'�� IIIII IIIII II�.���� � IIIII � IIIII �I�. � I � � �. ��� � � �� ����� � � IIIII � � �� � � ulu � �II II� II ���������������� � I I � I�� � �II II 1�� � ���� I � ������� I I ����� �II� II���� �II� � II���� �II� � III��� � � ����� I I � ���� I � I IIIII IIIII �1)2 ) III, I�Ic HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ����� �"���� �° I* Agency GHA Duration, h 0.250 ����� Analyst M KP Analysis Date Apr 21, 2025 Area Type Other ""'' �'° Jurisdiction C..........CD...........OTH Time Period PM PHF 0.95 �" W II ����. V ,,..",,. �llilliillillillillillillillillilliillillillillillil� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Urban Street DEMPSTER ST IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIII IIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II Analysis Year EXISTING 2025 IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Analysis Period 1> 7:00 ���� �� �', ,c I.....ntersection DEMP.........STER @ L..I......NNEM.. File Name 21......IOI.......I25 DEMP-LI..I"...I.N PM.xus Project Description CLOUD HQ ""I 4 ° II°�i, -�I"" ", ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I'll'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""I'll""I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll"' Demand Information 'I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""I'll""I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",,,'ll""I'll""I'll"�,,���������������'ll"�"I'll"�"I'll"�"�I'l EB �l""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",,,'ll""I'll""I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll"�"I'll"�,,,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' WB ��','ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""I'll""I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",,,'ll""I'll""I'll NB ",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",,,'ll""I'll""I'll",'ll""I'll"�"I'll"�,'ll"�"�I'l'll"�"I'll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 102 558 12 9 407 79 12 67 30 53 43 64 Signal Information ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... „ . C c.I......e s 5°........3..........6°. Re°...f......erence Phase y.. III;I IIIIIIIIIIIIIIII � IIIIIIIIIIIIIIIIIIIIIIIIII L..J IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 2...� JII'" IIIIII IIIIII II II IIIIII IIIIII II II IIIIIIIIIIIIIIIIIIIIIIIIIIIIII..IIIIII III L..J .... ... ; 0..........ff°...set s 0 Re°...f......erence Point Be in.......... g Green 0.4 2.7 21.8 0.5 1.5 7.7 Uncoordinated Yes Simult. Gap E/W IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII .IIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII On Yellow 3.5 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 0.0 4.5 3.5 0.0 4.5 �� Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 1.5 0.0 0.0 1.5 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 1.000 1.000 1.000 0.914 0.977 1.000 1.000 1.000 0.977 1.000 1.000 1.000 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 0.952 0.000 0.952 0.000 0.952 0.000 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.992 0.992 0.944 0.944 0.000 0.847 0.000 0.847 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) Movement Saturation Flow Rate (s), veh/h 1810 3901 84 1654 3183 613 1810 2000 1572 1810 2000 1610 Proportion of Vehicles Arriving on Green (P) 0.06 0.46 0.46 0.01 0.41 0.41 0.01 0.14 0.14 0.04 0.17 0.17 Incremental Delay Factor (k) 0.11 0.04 0.04 0.11 0.04 0.04 0.11 0.23 0.23 0.11 0.23 0.23 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 3.5 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Green Ratio (g/C) 0.49 0.46 0.41 0.41 0.15 0.14 0.18 0.17 Permitted Saturation Flow Rate (sp), veh/h/In 903 0 760 0 1382 0 1351 0 Shared Saturation Flow Rate (ssn), veh/h/In Permitted Effective Green Time (gp), s 23.0 0.0 21.8 0.0 7.7 0.0 7.7 0.0 Permitted Service Time (gu), s 16.8 0.0 17.4 0.0 6.2 0.0 6.1 0.0 Permitted Queue Service Time (gps), s 0.8 0.1 0.0 0.1 Time to First Blockage (gf), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Queue Service Time Before Blockage (gfs), s Protected Right Saturation Flow (sR), veh/h/In 0 0 Protected Right Effective Green Time (gR), s 0.0 0.0 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.389 0.000 1.389 0.000 1.557 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.083 0.000 0.090 0.000 0.119 0.000 0.117 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 914.88 7.89 812.70 9.45 288.38 19.64 342.48 18.42 Bicycle Fw / F� -3.64 0.58 -3.64 0.43 -3.64 0.19 -3.64 0.28 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilliillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillI Agency iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilI GHA iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillilI Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillilI Jurisdiction CCDOTH Time Period PM PHF 0.95 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillilI UrbanStreet iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliililill!lllI DEMPSTER ST 11111111111111Analysis Year EXISTING 2025IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII, Analysis Period lIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIllIIIIIIIIIIIIIIIIIIIIII111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIllIIIIIIIIIIIIIIIIIIIIII111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIll111111 1> 7:00 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1111111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII111111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Intersection iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillillillilliillillillillillillillillillillillillilliillillillillilliillillillillIProject DEMPSTER @ LINNEM...IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillilI File Name 2025 DEMP-LINI11111111 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilliillillillillillillillillillillillillillillilliillillillillillillilliillillilI PM.xus Description CLOUD HQ Demand Information EB WB NB ApproachMovement L T R L T iiiiiiiiiiiiiiiiiiiiiillillillillillillilliilliillillillillillillilliillillillillillillillillillilliillillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillilI R L iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillillilliillillillillillillillillillillillilliillillillillililI iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillI T iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliilillilI Demand ( v ), veh/h ��������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������illilli�������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������� iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilI 102 iiiiiiiiiiiiiiiiiiiiiillillillilliillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilI 558 12 1 1111111111111111111 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillilillillillillillillillillillillilliillillillillillilI 9 1 407 iiiiiiiiiiiiiiiiiiiiiillillillillilliillillillillillillilliillillillillillilliillillillillillillilliillillilillilI iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillilillilI ������������������������������������� ��������������������������������������7�����������������������������������������1 ������������������������������������ ���� 11111 iiiiiiiiiiiiiiiiiiiiiillillillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillilillilI ���������������������������������������630 �� �������������������������������������������������������������������������������l���������������������������������������������������������������������������� SignalInformation 'll""I'll""I"ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",ll,'ll""I"ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",ll,'ll""I"ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",ll,'ll""I"ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",ll,'ll""I"ll""I'll""I ............... "I'l""I'll""I'll'll""I'll""I'll",'ll""I'll""I'll'll""I'll""I'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'l'll""I'll""I'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'l'll""I'll""I'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'l'll""I'll""I'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'l'll""I'll""I'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'l'll""I'll""I'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'l'll""I'll""I'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'l'll""I'll""I'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'l'll""I'll""I'll""I'll""I'll",'ll""I'll"I "' ----�- W�- W:- iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillillillillillillillillillillilliillillilillilI Cycle, s 53.6 Reference Phase 11111111111111" 2 .. ....... ����- iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillill�illillillillillillilliillillillillillillilliilliillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillilillilI Offset, s 0 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliill lillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliilli Reference Point ll llilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillill ilillillilliillillillillillillilliillillillillillillilliillillillillillillill lillillilliillillillillillillilliillillillilli Begin Green 0.4 ''� I ...", 2.� ,7 21.8 0.5 1.5 � 7.7 1 Uncoordinated Yes iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillilliillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliilillill Simult. Gap E/W On Yellow 3.5 0.0 4.5 3.5 0.0 4.5 ==/, Force Mode Fixed Simult. Gap N/S On •m Red 0 0 WMWWMWMWWMWMM 0 0 5 .... 0 0 0 :11,10 5 III 1 Movement Group Results iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI Approach Movement iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillI Back of Queue ( Q ), ft/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Back of Queue ( Q ), veh/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Queue Storage Ratio ( RQ ) ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Control Delay ( d ), s/veh iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillilillillillilI Level of Service (LOS) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI ApproachDelay, s/veh /L OS iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilillillillilI Intersection Delay, s/veh / LOS 3.1 3 SB L T R 53iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillliiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilliillillillillillillillilliillillillillillilI iiiiiiiiiiiiiiiiiiiiiillillillillilliillillillillillillilliillillillillillillI 43 64 EB WB NB SB iiiiiiiiiiiiiiiiiiiiiillillillillillillilli11111111111111111111111111111111111IIIIIIIIIIIII iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillilI L T iiiiiiiiiiiiiiiiiiiiiillillillillilliillillillillillillilliillillillillillilliillillillillillillilliillillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillillillilI R L iiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillillillililI iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillillillillillillillillilliillillillillI T R iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillillillillilI L T iiiiiiiiiiiiiiiiiiiiiillillillillilliillillillillillillilliillillillillillilliillillillillillillilliillillillillillI R 11 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillillillI L iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillilliillillillillilillillillillillillillillilliillillilillillillillillI T iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillillilillillillillillillI R iiiiiiiiiiiiiiiiiiiiiillillillillillillilliIIIIIIIIIIIIIIIIIIIIII1111111111111111111111111 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillillilillillillillillillillilliillillillillillilI 23 76 iiiiiiiiiiiiiiiiiiiiiillillillillilliillillillillillillilliillillillillillilliillillillillillillilliillillillilI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillilI 76 3 iiiiiiiiiiiiiiiiiiiiiillillillillillilliillillillillillillilliillillillillilliillillillillillillilliillillillillililI iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillillillillillillillillilliillillillillI 77 72 iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillilI iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillillilliillillillillillillillillillillillilliillillillillillilI 6 36 iiiiiiiiiiiiiiiiiiiiiillillillillilliillillillillillillilliillillillillillilliillillillillillillilliillillillillillI 16 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillilillilI 25 iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillilliillillillillillillillillillillillillillilliillillillilliillillililI 21 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillilillillillillillillillillillI 33 0.9 3.1 0.1 3.0 2.9 0.2 1.4 0.6 1.0 0.9 1.3 ,,,,,,,,,,,,,,,III,,,,,,,,, 1111111� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII0.12 0.00 IIIIIIIIIIIIIIIIIIIII1111111111113.0 0.00 0.02 0.00 0.00 0.05 0.00 0.13 0.20 0.00 0.27 11.0 11.0 19.4 21.3 20.6 18.8 19.2 20.2 AA A A B B C C B B C iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillilillilIiiiiiiiiiiiiiiiiiiiiilillillillillillillilliillilliIII 9.2 illilliillillillillillillilliillilI A 11.0������illillilliillilliillillillillillillilliillillillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliililillillilB iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillilliillillilillillillillillillillillillilliillillilillilI B20.9 iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilli111111111111111illillillillillillilliillillillillilI iiiiiiiiiiiiiiiiiiiiiililillillillllllllIIIIIIIIIIIIIII������illillilillillillillillillillillillilliillillillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillilliillillilillillillillillillillillillilliillillilillillilI CiiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilliillillillillillillilliillilillllllIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIll111111111illillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillilli�IIIIIIIIIIIIIIIIIIIIII11111111111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIillillillillillilljlllillillillillillillillillillillilliillillillillillillilliilililllllllllllllllllillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillill�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII11111111111,1111111111111111111illillillillillillilliillillillillillillilliillillillillillillillillillillilliilllll iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillill,'ll'Illilill,lIll""I'll""I'llillll'Ill'i'llillillilI 19.5 iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillil������illillilillillillillillillillillilliillillillilliillillilI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillI 6 11.8 B 0.9 8.1 9.4 9.4 1.3 0.9 1 20.2 19.2 18.8 11.0 M IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIn 2.9 11.0 � 3 9.5 I& 0.1 19.4 21.3 20.6 0.2 0.6 1.4 --- Messages --- No errors or warnings exist. --- Comments --- a pyiri IIIII vt D 20"IIII 5 i IIIII ,� i � � � u u W � ii� ,u l 4 5 3 IIIII IIIII 2�I'w� ��8��i�, IIIII IIIIIIIIIIIIIIIIAII IIIII I�Illl II jjjjj ,lull:l I HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ����� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other'°' °N'" Jurisdiction CCDOTH Time Period ���PM PHF III0.95 �ll �1 Urban Street DEMPSTER ST ��������@ �D �N �ntorsactio Analysis Year NB 2032 l���� Ill"""I0I'll""I3'll"2 Analysis Period 1 > 7:00 w �N, �� 11 ,c I n E M P��������STE R L I N E M .. F i l e Name N B D E M P-LIIIIIIIN P M .xu s Project Description CLOUD HQ "") 4 ° "°��' 11"I' � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",ll,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"I'll", Demand Information ����'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,,���������������'ll"�"I'll"�"I'll"�" EB ����I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll"' WB 'I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll"�"I'll"�,'ll"�"�I'l'll"�"I'll"' NB ����'I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 109 595 13 9 426 83 13 70 31 55 45 67 Signal Information "' I m,;'� 1111� 1 C cIe s 55.7 Relllference Phase 21 „I�S1 � , Offset, s 0 Reference Point Begin Green 0.4 3.0 23.3 1 0.6 1.6 11111 7.8 Uncoordinated Yes Simult. Gap E/W On IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII VVVVVVVVVVVVVVVVVV IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII VVVVVVVVVVVVV IIIIIIIIIIIIillilIIIIIIIIIIIIIIIIIIIIIIIIIIIII Yellow 3.5 0.0 4.5 3.5 0.0 4.5 ���� . Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 1.5 0.0 0.0 1.5 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 109 595 13 9 426 83 13 70 31 55 45 67 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 1900 2000 1900 1900 2000 1900 1900 2000 1900 1900 2000 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 0 0 11 3 0 0 3 0 0 0 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (AT) 3 3 3 3 3 3 3 3 3 3 3 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 200 0 140 0 125 0 125 125 0 125 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 40 40 40 40 40 40 30 30 30 30 30 30 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 15.0 55.0 15.0 55.0 15.0 35.0 15.0 35.0 Yellow Change Interval (Y), s 3.5 4.5 3.5 4.5 3.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 0.0 1.5 0.0 1.5 0.0 1.5 0.0 1.5 Minimum Green ( Gm►n), s 3 15 3 15 3 8 3 8 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 3.0 2.0 3.0 2.0 3.0 5.0 3.0 5.0 Reca I I Mode Off Min Off Min Off Off Off Off Dual Entry No Yes No Yes No Yes No Yes Walk (Walk), s 0.0 0.0 7.0 0.0 Pedestrian Clearance Time (PC), s 0.0 0.0 23.0 0.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 it lu' I ��������� �� ail it �� ���!I �� ll����� ��ll ������ IIIII � ,����� ���� ���� � ����� ll�� ��� ��� ����� I ���i���l IIIII IIIII ���������� „ ,��ll �� IIIII IIIII ����.���� IIIII �l ��.�� IIIII ����.�� � ��� ��� l�� ��� ������� ����� IIIII � �� it lu' '' � ��� � i��� l���l ����� ����������� ��� ����� �� � ������ � ������ i I' i � �� � �� ������ ����� Im i ��� ����� � � n" ����� � �� IIIII IIIII 3 IIII i IIIIk 1116 IIIII III IIIIIIIIIIIII lIII IIIII ��w IIIIIIIS IIIII )IIIII HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ����� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other'°' °N'" Jurisdiction CCDOTH Time Period ���PM PHF III0.95 �ll ���,� �1 Urban Street DEMPSTER ST ��������@ �D �N �ntorsactio Analysis Year NB 2032 l���� Ill"""I0I'll""I3'll"2 Analysis Period 1 > 7:00 w �b, �� 11 ,c I n E M P��������STE R L I N E M .. F i l e Name N B D E M P-LIIIIIIIN P M .xu s Project Description CLOUD HQ lk� * � ° "°��' 11"J' � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",ll,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"I'll", ����'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,,���������������'ll"�"I'll"�"I'll"�" Demand Information EB ����I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll"' WB 'I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll"�"I'll"�,'ll"�"�I'l'll"�"I'll"' NB ����'I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 109 595 13 9 426 83 13 70 31 55 45 67 Signal Information "' I . ������, m,;'� 1111� 1 C cIe s 55.7 Relllference Phase 21 „J�S1 � , Offset, s 0 Reference Point Begin Green 0.4 3.0 23.3 1 0.6 1.6 11111 7.8 Uncoordinated Yes Simult. Gap E/W On IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII VVVVVVVVVVVVVVVVVV IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII VVVVVVVVVVVVV IIIIIIIIIIIIillilIIIIIIIIIIIIIIIIIIIIIIIIIIIII Yellow 3.5 0.0 4.5 3.5 0.0 4.5 -----le. Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 1.5 0.0 0.0 1.5 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 5 2 1 6 3 8 7 4 Case Number 1.1 4.0 1.1 4.0 1.1 3.0 1.1 3.0 Phase Duration, s 6.9 32.3 3.9 29.3 4.1 13.8 5.6 15.4 Change Period, ( Y+R � ), s 3.5 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Max Allow Headway (MAH ), s 4.0 6.6 4.0 6.6 4.1 8.4 4.1 8.4 Queue Clearance Time ( g S ), s 3.9 7.6 2.2 7.3 2.4 3.8 3.5 4.1 Green Extension Time ( g e ), s 0.2 16.0 0.0 16.0 0.0 3.3 0.1 3.3 Phase Call Probability 0.83 1.00 0.14 1.00 0.19 0.97 0.59 0.99 Max Out Probability 0.00 0.13 0.00 0.13 0.00 0.01 0.00 0.01 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 5 2 12 1 6 16 3 8 18 7 4 14 Adjusted Flow Rate ( v ), veh/h 115 321 319 9 274 262 14 74 33 58 47 71 Adjusted Saturation Flow Rate ( s ), veh/h/In 1810 2000 1985 1654 1953 1842 1810 2000 1572 1810 2000 1610 Queue Service Time ( g S ), s 1.9 5.6 5.6 0.2 5.3 5.3 0.4 1.8 1.0 1.5 1.1 2.1 Cycle Queue Clearance Time ( g � ), s 1.9 5.6 5.6 0.2 5.3 5.3 0.4 1.8 1.0 1.5 1.1 2.1 Green Ratio (g/C) 0.51 0.47 0.47 0.43 0.42 0.42 0.15 0.14 0.14 0.18 0.17 0.17 Capacity ( c ), veh/h 525 946 939 388 819 773 303 280 220 343 336 271 Volume -to -Capacity Ratio (X) 0.218 0.339 0.340 0.024 0.335 0.339 0.045 0.263 0.148 0.169 0.141 0.261 Back of Queue ( Q ), ft/In ( 95 th percentile) 25 84 83 3 84 78 6 40 18 27 24 37 Back of Queue ( Q ), veh/In ( 95 th percentile) 1.0 3.4 3.3 0.1 3.3 3.1 0.3 1.6 0.7 1.1 0.9 1.5 Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.12 0.00 0.00 0.02 0.00 0.00 0.05 0.00 0.14 0.22 0.00 0.29 Uniform Delay ( d i ), s/veh 7.7 9.2 9.2 9.4 10.9 10.9 20.3 21.4 21.0 19.4 19.7 20.1 Incremental Delay ( d 2 ), s/veh 0.2 0.1 0.1 0.0 0.1 0.1 0.1 1.1 0.7 0.2 0.4 1.1 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 7.9 9.3 9.3 9.4 11.0 11.0 20.3 22.4 21.7 19.6 20.1 21.2 Level of Service (LOS) A A A A B B C C C 6 C C Approach Delay, s/veh / LOS 9.1 A 11.0 B 22.0 C 20.4 C Intersection Delay, s/veh / LOS 12.0 B Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.07 B 2.08 B 2.28 B 2.28 B Bicycle LOS Score / LOS 1.11 A 0.94 A 0.69 A 0.78 A l ��� 11 IIIII IIIII IIII IIIII �) ����� IIIII IIIII IIIII HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ����� �"���� �° I* Agency GHA Duration, h 0.250 ����� Analyst M KP Analysis Date Apr 21, 2025 Area Type Other ""'' �'° Jurisdiction CCDOTH Time Period PM PHF 0.95 �" W II ����. V ,,..",,. Urban Street DEMPSTER ST ��������@ �D �N �ntorsacti Analysis Year NB 2032 l���� Ill"""I0I'll""I3'll"2 Analysis Period 1 > 7:00 ���� �., ,c I o n E M P��������ST E R L I N E M .. F i l e Name N B D E M P-LIIIIIIIN P M .xu s Project Description CLOUD HQ ""� 14 ° 1111, ,�- °'°' � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll"�"I'll"�,'ll,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' WB ��','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll NB ",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�"I'll"�,I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 109 595 13 9 426 83 13 70 31 55 45 67 Signal Information ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... „ . C cIe s 55.7 Relllference Phase 21 „5� . Offset, s 0 Reference Point Begin iiiiiiiiiiiiillillillillillillilliillillillillillillillillilillillillillillillillillillilliillillillillillillilliillillilillillillillillilillillillillillillillillillilliillillillillillillilliillillilillillillillillilillillillillillillillil llillilliillillilillillillillillilillillillillillillillillillilliillillillillillillilliillillilillilli li lillillillillilliillillilillillillillillilillillillillillillillillillilliillillillillillillilliillillilil illillillillillillilliillillillillillillilliillillilillillillillillilillilli illillillillillillilliillillilillillillillilli llillillilliillillillillillill lillilillillillillillillillillillilliillillillilli Green 0.4 3.0 23.3 � 0.6 11 � 1.6 7.8 Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 0.0 4.5 3.5 0.0 4.5 Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 1.5 0.0 0.0 1.5 5 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 1.000 1.000 1.000 0.914 0.977 1.000 1.000 1.000 0.977 1.000 1.000 1.000 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 0.952 0.000 0.952 0.000 0.952 0.000 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.992 0.992 0.943 0.943 0.000 0.847 0.000 0.847 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) Movement Saturation Flow Rate (s), veh/h 1810 3900 85 1654 3180 615 1810 2000 1572 1810 2000 1610 Proportion of Vehicles Arriving on Green (P) 0.06 0.47 0.47 0.01 0.42 0.42 0.01 0.14 0.14 0.04 0.17 0.17 Incremental Delay Factor (k) 0.11 0.04 0.04 0.11 0.04 0.04 0.11 0.23 0.23 0.11 0.23 0.23 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 3.5 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Green Ratio (g/C) 0.51 0.47 0.43 0.42 0.15 0.14 0.18 0.17 Permitted Saturation Flow Rate (sp), veh/h/In 883 0 733 0 1380 0 1347 0 Shared Saturation Flow Rate (ssn), veh/h/In Permitted Effective Green Time (gp), s 24.8 0.0 23.4 0.0 7.8 0.0 7.9 0.0 Permitted Service Time (gu), s 18.0 0.0 18.7 0.0 6.3 0.0 6.0 0.0 Permitted Queue Service Time (gps), s 1.0 0.1 0.0 0.1 Time to First Blockage (gf), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Queue Service Time Before Blockage (gfs), s Protected Right Saturation Flow (sR), veh/h/In 0 0 Protected Right Effective Green Time (gR), s 0.0 0.0 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.389 0.000 1.389 0.000 1.557 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.082 0.000 0.090 0.000 0.121 0.000 0.119 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 945.71 7.73 838.90 9.38 280.29 20.57 336.19 19.26 Bicycle Fw / F� -3.64 0.62 -3.64 0.45 -3.64 0.20 -3.64 0.29 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other Jurisdiction CCDOTH Time Period PM PHF 0.95 Urban Street DEMPSTER ST Analysis Year NB 2032 Analysis Period 1 > 7:00 Intersection DEMPSTER @ LINNEM... File Name 2032 NB DEMP-LIN PM.xus Project Description CLOUD HQ Demand Information EB WB NB Approach Movement L T R L T R L T R Demand (v ), veh/h 109 595 13 9 426 83 13 70 31 Signal Information "' C cle s 55.7 y Rellllference Phase 21 1111111111111��1 Offset, s 0 ������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������� ������������������������������������������������������������������������������������������������������� Reference Point ��� ���������������������������������������������������������������������������������������������������������� ������������������������������������������������������������������������������ ����������������������������������������������� Begin ������������������������������� ��������������������������������������������������� Green 0.4 ... 3.0 23.3 0.6 1.6 � 7.8 1 Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 0.0 4.5 3.5 0.0 4.5 Force Mode Fixed Simult. Gap N/S On •m Red 0 0 0 0 5 0 0 0 0 5 1 Movement Group Results Approach Movement Back of Queue ( Q ), ft/In ( 95 th percentile) Back of Queue ( Q ), veh/In ( 95 th percentile) Queue Storage Ratio ( RQ ) ( 95 th percentile) Control Delay ( d ), s/veh Level of Service (LOS) A rochDl vh L a ea s/ e / OS pp y Intersection Delay, s/veh / LOS SB L T R 55 45 67 EB WB NB SB L T R L T R L T R L T R 25 84 83 3 84 78 6 40 18 27 24 37 1.0 3.4 3.3 0.1 3.3 3.1 0.3 1.6 0.7 1.1 0.9 1.5 0.12 0.00 0.00 0.02 0.00 0.00 0.05 0.00 0.14 0.22 0.00 0.29 7.9 9.3 9.3 9.4 11.0 11.0 20.3 22.4 21.7 19.6 20.1 21.2 A A A A B B C C C B C C 9.1 A 11.0 B 22.0 C 20.4 C 12.0 B 1 7.9 3.4 9.3 3.3 9.3 1.5 1.1 0.9 21.2 20.1 19.6 20.3 22.4 21.7 0.3 0.7 1.6 11.0 3.1 11.0 � 3.3 9.4 0.1 --- Messages --- No errors or warnings exist. --- Comments --- a pyi�i IIIII �� � W 0IIIII W5 i IIIII ,� I� � � t .s u (1u W iirate ,I5 � 3 6IIIII IIIII 20,32 PIIIl, t,i s HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ����� �"���� �° I* Agency GHA Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other �"' °�'" Jurisdiction CCDOTH Time Period ���PM PHF III0.95 �ll �1 Urban Street DEMPSTER ST ���� �������D ��������@ ����������������I������ntorsacti Analysis ���������� Year TOTAL 2032 ������ ���l���� Ill""�"�I0I'll"�"�I3'll"�"�2� Analysis Period 1 > 7:00 w �N, �� 11 ,c L���I������N N E M. ��������� o n E M P����������ST E R F i t e Name Tl"�"I'll0T D E M P-L'll'l"�"�I'N P M .xu s Project Description CLOUD HQ "") 4 ° "°��' 11"I' � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",ll,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"I'll", Demand Information ����'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,,���������������'ll"�"I'll"�"I'll"�" EB ����I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll"' WB 'I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll"�"I'll"�,'ll"�"�I'l'll"�"I'll"' NB ����'I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 109 595 27 19 426 83 45 78 55 55 48 67 Signal Information "' III„III III i . ����� ���III IIII I....a C cle s 56 2 Rellllference Phase 21 y�������������������������� II����� III ��� ��� ,�� Aw Offset s 0 Reference Point Be in g iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillilllillillilliillillillillilillil lillillillillillilliillillillillillillilliillillillillillillillillilliillillilliillillillilllillillill li llillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliililli illiillillillillillillilliillillillillillillilliilillillilliillillillillilli illiillillillillillillilliilillillilliillillil lillillillillilliillillillilli lillillillillillilliillillillillillillilliillillil Green 0.8 2.6 .. 23.7 1.7 0.4 7.9 Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 0.0 4.5 3.5 0.0 4.5 Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 1.5 0.0 0.0 1.5 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 109 595 27 19 426 83 45 78 55 55 48 67 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 1900 2000 1900 1900 2000 1900 1900 2000 1900 1900 2000 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 0 0 11 3 0 0 3 0 0 0 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 3 3 3 3 3 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 200 0 140 0 125 0 125 125 0 125 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 40 40 40 40 40 40 30 30 30 30 30 30 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 15.0 55.0 15.0 55.0 15.0 35.0 15.0 35.0 Yellow Change Interval (Y), s 3.5 4.5 3.5 4.5 3.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 0.0 1.5 0.0 1.5 0.0 1.5 0.0 1.5 Minimum Green ( Gm►n), s 3 15 3 15 3 8 3 8 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 3.0 2.0 3.0 2.0 3.0 5.0 3.0 5.0 Reca I I Mode Off Min Off Min Off Off Off Off Dual Entry No Yes No Yes No Yes No Yes Walk (Walk), s 0.0 0.0 7.0 0.0 Pedestrian Clearance Time (PC), s 0.0 0.0 23.0 0.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 � „��II�� �� °��II I �� �,� I � � � II II ��� ������ IIIII � ,������ �'��� � ����� � ����� ��� ������� ��� ����� �� � i���l IIIII IIIII�� � ������� ,���'�� IIIII IIIII ���.���� Illlh�l �.�� IIIII ���.�� � ��� ��� ��� ��� ������� II 1 9 � ���� i III Illlh � � �� ��� � � i��� I���� .����� ����������� ��� � � � �; � �� � ������ � ������ � �� � �� ���I ������ ��� � � I� ����� �� � ���� �� � �� II �� � � ��I I���� ������������� 3��������������� �..... �...� �..... �...... IIIII���������) IIIIIIIIIIIIIIIIl� IIII IIIII ,,����������������l IIII �I IIIII IIII �llll:,�o�ll(l��, HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ����� �"���� �° I* Agency GHA Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other �"' °�'" Jurisdiction CCDOTH Time Period ���PM PHF III0.95 �ll �1 Urban Street DEMPSTER ST ���� �������D ��������@ ���������� ����������������I������ntorsacti Analysis Year TOTAL 2032 ������ ���l���� Ill""�"�I0I'll"�"�I3'll"�"�2� Analysis Period 1 > 7:00 w �N, �� 11 ,c L���I������N N E M. ��������� o n E M P����������ST E R F i t e Name Tl"�"I'll0T D E M P-L'll'l"�"�I'N P M .xu s Project Description CLOUD HQ "") 4 ° "°��' 11"J' � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",ll,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"I'll", ����'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll"�,,���������������'ll"�"I'll"�"I'll"�" Demand Information EB ����I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll"' WB 'I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll"�"I'll"�,'ll"�"�I'l'll"�"I'll"' NB ����'I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",'ll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",'ll""I'll""I'll",,,'ll""I'll""I'll",'ll""�I'l'll""I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,,,'ll"�"I'll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 109 595 27 19 426 83 45 78 55 55 48 67 Signal Information "' III„III III i . ����� ���III IIIII I....a C cle s 56 2 Rellllference Phase 21 Aw Offset s 0 Reference Point Be in g iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillilllillillilliillillillillilillil lillillillillillilliillillillillillillilliillillillillillillillillilliillillilliillillillilllillillill li llillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliililli illiillillillillillillilliillillillillillillilliilillillilliillillillillilli illiillillillillillillilliilillillilliillillil lillillillillilliillillillilli lillillillillillilliillillillillillillilliillillil Green 0.8 2.6 .. 23.7 1.7 0.4 7.9 Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 0.0 4.5 3.5 0.0 4.5 Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 1.5 0.0 0.0 1.5 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 5 2 1 6 3 8 7 4 Case Number 1.1 4.0 1.1 4.0 1.1 3.0 1.1 3.0 Phase Duration, s 6.9 32.3 4.3 29.7 5.2 13.9 5.7 14.4 Change Period, ( Y+R � ), s 3.5 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Max Allow Headway (MAH ), s 4.0 6.6 4.0 6.6 4.1 8.3 4.1 8.3 Queue Clearance Time ( g S ), s 3.9 7.9 2.4 7.4 3.3 4.1 3.5 4.2 Green Extension Time ( g e ), s 0.2 16.2 0.0 16.3 0.1 3.8 0.1 3.8 Phase Call Probability 0.83 1.00 0.27 1.00 0.52 0.99 0.60 0.99 Max Out Probability 0.00 0.14 0.00 0.14 0.00 0.01 0.00 0.01 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 5 2 12 1 6 16 3 8 18 7 4 14 Adjusted Flow Rate ( v ), veh/h 115 330 325 20 274 262 47 82 58 58 51 71 Adjusted Saturation Flow Rate ( s ), veh/h/In 1810 2000 1969 1654 1953 1842 1810 2000 1572 1810 2000 1610 Queue Service Time ( g S ), s 1.9 5.9 5.9 0.4 5.3 5.4 1.3 2.1 1.8 1.5 1.2 2.2 Cycle Queue Clearance Time ( g � ), s 1.9 5.9 5.9 0.4 5.3 5.4 1.3 2.1 1.8 1.5 1.2 2.2 Green Ratio (g/C) 0.50 0.47 0.47 0.44 0.42 0.42 0.17 0.14 0.14 0.18 0.15 0.15 Capacity ( c ), veh/h 526 936 922 389 823 777 310 282 222 337 297 239 Volume -to -Capacity Ratio (X) 0.218 0.352 0.353 0.051 0.333 0.337 0.153 0.291 0.261 0.172 0.170 0.295 Back of Queue ( Q ), ft/In ( 95 th percentile) 25 89 88 6 84 79 23 45 33 28 26 39 Back of Queue ( Q ), veh/In ( 95 th percentile) 1.0 3.6 3.5 0.2 3.3 3.2 0.9 1.8 1.3 1.1 1.1 1.6 Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.13 0.00 0.00 0.04 0.00 0.00 0.18 0.00 0.26 0.22 0.00 0.31 Uniform Delay ( d i ), s/veh 7.9 9.5 9.5 9.3 10.9 11.0 19.9 21.6 21.5 19.6 20.9 21.3 Incremental Delay ( d 2 ), s/veh 0.2 0.1 0.1 0.1 0.1 0.1 0.2 1.2 1.3 0.2 0.6 1.4 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 8.1 9.6 9.6 9.4 11.0 11.1 20.1 22.8 22.8 19.8 21.5 22.8 Level of Service (LOS) A A A A B B C C C 6 C C Approach Delay, s/veh / LOS 9.4 A 11.0 B 22.1 C 21.4 C Intersection Delay, s/veh / LOS 12.6 B Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.07 B 2.08 B 2.28 B 2.28 B Bicycle LOS Score / LOS 1.12 A 0.95 A 0.80 A 0.78 A l ��� ������ 1ii� 1 � �111 " IIIII �)�I1 IIII IIIII �1111111,1111IIIII llll �� IIII IIIII IIII w HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ����� �"���� �° I* Agency GHA Duration, h 0.250 ����� Analyst MKP Analysis Date Jul 2, 2025 Area Type Other ""'' �'° Jurisdiction CCDOTH Time Period PM PHF 0.95 �" W II ����. V ,,..",,. Urban Street DEMPSTER ST ���� �������D ��������@ ����������������I������ntorsacti Analysis Year TOTAL 2032 ���������� ������ ���l���� Ill""�"�I0I'll"�"�I3'll"�"�2� Analysis Period 1 > 7:00 ���� w �k, ����,.. ,c L���I������N N E M. ��������� o n E M P����������ST E R F i t e Name Tl"�"I'll0T D E M P-L'll'l"�"�I'N P M .xu s Project Description CLOUD HQ ""I 4 ° "°�i, -�I"" ", ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I'll'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""I'll""I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll"' Demand Information 'I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""I'll""I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",,,'ll""I'll""I'll"�,,���������������'ll"�"I'll"�"I'll"�"�I'l EB �l""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""I'll""I'll",,,'ll""I'll""I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll"�"I'll"�,,,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' WB ��','ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""I'll""I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",,,'ll""I'll""I'll NB ",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'l'll""�I'll""�I'll",,,'ll""�I'll""�I'll",'ll""I'll""I'll",'ll""�I'l'll""I'll""I'll",,,'ll""I'll""I'll",'ll""I'll"�"I'll"�,'ll"�"�I'l'll"�"I'll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 109 595 27 19 426 83 45 78 55 55 48 67 Signal Information ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... „�� . C cle s 56 2 Relllference Phase y 21 ll""I' � Offset s 0 Reference Point Be in g iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillil llillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliil illillillilliillillillillillil illiillillillillillillillillillillilliillillillill Green 0.8 2.6 23.7 ����� 1.7 0.4 7.9 Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 0.0 4.5 3.5 0.0 4.5 Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 1.5 0.0 0.0 1.5 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 1.000 1.000 1.000 0.914 0.977 1.000 1.000 1.000 0.977 1.000 1.000 1.000 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 0.952 0.000 0.952 0.000 0.952 0.000 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.985 0.985 0.943 0.943 0.000 0.847 0.000 0.847 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) Movement Saturation Flow Rate (s), veh/h 1810 3797 172 1654 3180 615 1810 2000 1572 1810 2000 1610 Proportion of Vehicles Arriving on Green (P) 0.06 0.47 0.47 0.01 0.42 0.42 0.03 0.14 0.14 0.04 0.15 0.15 Incremental Delay Factor (k) 0.11 0.04 0.04 0.11 0.04 0.04 0.11 0.23 0.23 0.11 0.23 0.23 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 3.5 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Green Ratio (g/C) 0.50 0.47 0.44 0.42 0.17 0.14 0.18 0.15 Permitted Saturation Flow Rate (sp), veh/h/In 883 0 723 0 1376 0 1337 0 Shared Saturation Flow Rate (ssn), veh/h/In Permitted Effective Green Time (gp), s 24.8 0.0 23.7 0.0 7.9 0.0 7.9 0.0 Permitted Service Time (gu), s 18.3 0.0 18.4 0.0 5.1 0.0 5.9 0.0 Permitted Queue Service Time (gps), s 1.0 0.1 0.1 0.1 Time to First Blockage (gf), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Queue Service Time Before Blockage (gfs), s Protected Right Saturation Flow (sR), veh/h/In 0 0 Protected Right Effective Green Time (gR), s 0.0 0.0 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.389 0.000 1.389 0.000 1.557 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.083 0.000 0.090 0.000 0.122 0.000 0.121 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 936.13 7.95 843.01 9.40 282.46 20.72 297.24 20.37 Bicycle Fw / F� -3. 64 0.63 -3. 64 0.46 -3. 64 0.31 -3. 64 0.30 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information Agency GHA Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other Jurisdiction CCDOTH Time Period PM PHF 0.95 Urban Street DEMPSTER ST Analysis Year TOTAL 2032 Analysis Period 1 > 7:00 Intersection DEMPSTER @ LINNEM... File Name 2032 TOT DEMP-LIN PM.xus Project Description CLOUD HQ Demand Information EB WB NB Approach Movement L T R L T R L T R Demand ( v ), veh/h 109 595 27 19 426 83 45 78 55 Signal Information 51 C cle s 56.2 Reference Phase 2 Offset, s 0 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillill lillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliilli Reference Point ii llilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillill illiilillillillillillillillillilliillillillillillillilliillillillillillillill lillillilliillillillillillillilliillillillilli Begin lillillillillillillilliillilli lillillillilliilliilillillillillillillillillilliil Green 0.8 I��� 2.6 23.7 1.7 0.4 7.9 Uncoordinated Yes Simult. Gap E/W On Yellow 3.5 0.0 4.5 3.5 0.0 4.5 Force Mode Fixed Simult. Gap N/S On •m Red 0 0 0 0 5 0 0 0 0 5 5 Movement Group Results Approach Movement Back of Queue ( Q ), ft/In ( 95 th percentile) Back of Queue ( Q ), veh/In ( 95 th percentile) Queue Storage Ratio ( RQ ) ( 95 th percentile) Control Delay ( d ), s/veh Level of Service (LOS) A rochDl vh L a ea s/ e / OS pp y Intersection Delay, s/veh / LOS SB L T R 55 48 67 EB WB NB SB L T R L T R L T R L T R 25 89 88 6 84 79 23 45 33 28 26 39 1.0 3.6 3.5 0.2 3.3 3.2 0.9 1.8 1.3 1.1 1.1 1.6 0.13 0.00 0.00 0.04 0.00 0.00 0.18 0.00 0.26 0.22 0.00 0.31 8.1 9.6 9.6 9.4 11.0 11.1 20.1 22.8 22.8 19.8 21.5 22.8 A A A A B B C C C B C C 9.4 A 11.0 B 22.1 C 21.4 C 12.6 B 1 8.1 3.6 9.6 3.5 9.6 1.6 1.1 1.1 22.8 21.5 19.8 20.1 22.8 22.8 0.9 1.3 1.8 11.1 3.2 11.0 3.3 9.4 0.2 --- Messages --- No errors or warnings exist. --- Comments --- III � I � � III II�� �I�I III ,�� I I I � I � � I I� � �„I � � uI � � � uuI � I � � I III IIII �� � I U � IIII I� � � � I I � , W W i i ... ..�� . ..�"� , ..�"'l ..eI� ���� „ Ip IW ..� h W W IIIII IIII I I I I I I I I I � I � � I � I II IIII I � �� � � � I �I I� III � I .I � I � I IIII II i� � �� �.. I �I � I� II �� �� I� � I'�� �� �� � ��Iiiii�� IIIII �I � � IIIII � IIIII � � iiii IIIII III iiiii� IIIII IIIII IIIII � iiiir� � ��,�� ,III �� � IIIII IIIII Ill.iiii � IIIIII I! IIIII III. I III I ����� IIIII � I�I � I I � � (IIII I iiiir� IIIII � iiii � I� iiii � � ����� � � Illu � ,IIIII � � � ����� � � ���� � � III IIII IIII 20,32 II I IIIIII HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ��� ��"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 20, 2025 Area Type Other'°' °N'" Jurisdiction IDOT Time Period AM PHF 0.92 �w �In �� �:. Urban Street I L RTE 62 ALGONQU I N ... llntersectionIIIIIIIL IIIIIIIII6°IIIIIII21 IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Analysis Year EXISTING 2025 IIIIIIIII6°IIIIIIII21-BUIIIIIIIIIIIIS IIIIIIIIIIIIIIIIIIIIIIIIIIII.IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Analysis Period 1 > 7:00 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII °µ k ,c IllllIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII.IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII @ BUIIIIIIIIIIIISIIIIIIIIIIISIE File Name 21IIIIIIII01IIIIIIIII25 AM.xus ...... Project Description CLOUD HQ 1`1 , t " 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 329 414 89 257 60 305 552 151 75 832 8 Signal Information IIII IIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII IIIIIIII III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III III '1IIIIIII �����II �����II II II "IIIIIIIIIIII ',,,,,,,,IIII III ,III II�IIIIIIIIIII II�IIIIIIIIIII C cle s 120.0 Reference Phase 2 y IIIIIIIBe ... IIIIIIIIII II � II .III II IIIIII III � � ... II IIII II� ,II I � � I II � I .. ��i���...� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ��i���...� IIIIIIIIIIIIIIIIIIIIIIIIII III . ��� „ II I 1 r • 011lllllllff°Insets 0 Re°Ilflllllerence Point g inllllllllll IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ,IIIIIIIIIIII Uncoordinated No Simult. Ga E/W On IIIIIIIIIIIIIIIIIIIIIIIFIIIIIIIo IIIIIIIIIIIIIIIIIIIIIIM°Illlllo Illldllllllle IIIIIIIIIIIIIIIIIIIIIF Illdlllllllllllllllll IIIIIIIIIIIIIIIIIIIS p IIIIIIIIIIIIIIIII.IIIIIIIIIIII IIIIIIIIIIIIIIIIIII.IIIIIIIIIIII IIIIIIIIIIIIIIGIIIa IIIIIIIIIIIIIIIIIIIN�IIII/IIIIIIIIISIIIII IlllllllllllllO�n Green 5.0 8.1 49.5 6.9 28.0 0.0 IIIII"IIIIIIIIIIIIIIIIIIIIIII IIIIII,IIIIIIIIIIIIIIIIIIIIIIIIIIIII "IIIIII,IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIII,IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIY�IIIe�ll�lllllllllllo��llllll IIIIIIIIIIIIIIIIII3�III.IIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII31III.IIIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII41III.IIIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII31III.IIIIIIIIIIIIII5�IIIIII IIIIIIIIIIIIIIII4�III.IIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIIIIOIIII.11llllllllll1011llllll rce i xe i m uIIllllllllt p Red 0.0 0.0 1.5 0.0 1.5 0.0 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 329 414 89 257 60 305 552 151 75 832 8 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 2000 1900 1900 2000 1900 1900 2000 1900 1900 1900 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 5 13 10 7 7 17 11 11 7 6 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 4 3 3 4 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 0 75 205 0 75 295 0 150 100 0 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 45 45 45 45 45 40 40 40 35 35 35 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 30.0 14.4 44.4 26.4 62.4 13.2 49.2 Yellow Change Interval (Y), s 4.5 3.5 4.5 3.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 1.5 0.0 1.5 0.0 1.5 0.0 1.5 Minimum Green ( Gm►n), s 15 3 15 3 15 3 15 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 7.0 3.0 7.0 3.0 2.0 3.0 2.0 Recall Mode Off Off Off Off Min Off Min Dual Entry Yes No Yes No Yes No Yes Walk (Walk), s 7.0 7.0 7.0 7.0 Pedestrian Clearance Time (PC), s 20.0 20.0 20.0 20.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 ,. III � �II� I � I ��� I I � I� I� I � I � � I� � �� IIII �...��II ��� I, � �� � ��� �� I� .��II I� .�II� � ..� I II III i I�� I � ul � � � I �� � � I �I� � IIII I � � I� I� I I �. I I� I� I � ������ IIIIII �II�� � �� ����� � ����� �I� � � �I ����� I � i���l ,IIII IIIIII � ������ � ,I��'�� ,IIII ,IIII II�.���� ,IIII �I � ,IIII �I�.�� � �I � � ��� � � ������ � .... �� I � II 1 � � I� �.��II .�II� � I � I �I� i I I ,IIII � I � � � i Iglu II�� ����� � ����� ���� �II� � II� II � I III I I I I �I�� � � ���� ..�� �.�� I ��� � ������ � ������I �II �I� I I I I �.��II I III II II II II� II� �� � � � III�� III�� �� �II� �II � � �II� I I I I�I III III I � ���II��� � �II��� � � �II�� ,IIII ,IIII 2 11ii'.11 11,111311 I,�u �III� IIII IIII i,ii IIIlliIIII l i HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ��� ��"���� �° °* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 20, 2025 Area Type Other'°' °N'" Jurisdiction IDOT Time Period AM PHF 0.92 �w �In �� �:. Urban Street I L RTE 62 ALGONQU I N ... llntersectionIIIIIIIL IIIIIIIII6°IIIIIII21 IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Analysis Year EXISTING 2025 Analysis IIIIIIIII6°IIIIIIII21-BUIIIIIIIIIIIIS IIIIIIIIIIIIIIIIIIIIIIIIIIII.IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Period 1 > 7:00 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII °µ k ,c IllllIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII.IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII @ BUIIIIIIIIIIIISIIIIIIIIIIISIE File Name 21IIIIIIII01IIIIIIIII25 AM.xus ...... Project Description CLOUD HQ ""I , t " 11, ,�- °'r � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' Demand Information EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 329 414 89 257 60 305 552 151 75 832 8 Signal Information IIII IIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII IIIIIIII III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III III '4IIIIIII �����II II IIIIIIIIIIIII III "IIIIIIIIIIII �����II II IIIIIIIIIIIII ,III ',,,,,,,,IIII C cle s 120.0 Reference Phase 2 y IIIIIIIBe ... IIIIIIIIII II � II II IIIIII III � � ... II ���I II� ,II I � � I � II .. ��i���...� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII III . ��� „ II I ��i���...� 1 • • 011lllllllff°Insets 0 Re°Ilflllllerence Point g inllllllllll ,IIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green 5.0 8.1 49.5 6.9 28.0 0.0 IIIIIIIIIIIIIIIIIIIIY�IIIe�ll�lllllllllllo��llllll IIIIIIIIIIIIIIIIII3�III.IIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII31III.IIIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII41III.IIIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII31III.IIIIIIIIIIIIII5�IIIIII IIIIIIIIIIIIIIII4�III.IIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIIIIOIIII.11llllllllll1011llllll Uncoordinated No Simult. Ga E/W On IIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIII,IIIIIIIIIIIIIIIIIIIIIIIIII, IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIII IIIIIIIIII'IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIII,IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIII"IIIIIIIIIIIIIIIIIIIIII IIIIIIFIIIIIIo IIIIIIIIIIIIIIM°Illllo Illdlllle IIIIIIIIIIIIIIIIIIIF Illdlllllllllllllllll IIIIS p IIIIIIIN IIII/IIIIIIIISIIIII IIIIIIIIIIIIIIIIIII.IIIIIIIIIIII IIIIIIIIIIIIIIIIIII.IIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII i m ullllllllt Gllla rce i xe p O n Red 0.0 0.0 1.5 0.0 1.5 0.0 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 4 3 8 5 2 1 6 Case Number 7.3 1.0 3.0 1.1 3.0 1.1 4.0 Phase Duration, s 34.0 10.4 44.4 20.1 67.1 8.5 55.5 Change Period, ( Y+R � ), s 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Max Allow Headway (MAH ), s 9.9 4.0 9.9 4.0 0.0 4.0 0.0 Queue Clearance Time ( g S ), s 30.0 7.1 8.9 15.9 5.3 Green Extension Time ( g e ), s 0.0 0.1 22.8 0.7 0.0 0.1 0.0 Phase Call Probability 1.00 0.96 1.00 1.00 0.93 Max Out Probability 1.00 1.00 0.76 0.20 0.67 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 4 14 3 8 18 5 2 12 1 6 16 Adjusted Flow Rate ( v ), veh/h 358 450 97 279 65 332 600 164 82 457 456 Adjusted Saturation Flow Rate ( s ), veh/h/In 1830 1447 1668 1800 1522 1570 1741 1472 1711 1811 1805 Queue Service Time ( g S ), s 10.0 28.0 5.1 6.9 3.4 13.9 8.6 6.5 3.3 20.5 20.6 Cycle Queue Clearance Time ( g � ), s 10.0 28.0 5.1 6.9 3.4 13.9 8.6 6.5 3.3 20.5 20.6 Green Ratio (g/C) 0.23 0.37 0.31 0.32 0.36 0.57 0.51 0.57 0.45 0.41 0.41 Capacity ( c ), veh/h 854 537 300 1152 550 407 1773 834 456 748 745 Volume -to -Capacity Ratio (X) 0.419 0.838 0.323 0.243 0.119 0.815 0.338 0.197 0.179 0.611 0.611 Back of Queue ( Q ), ft/In ( 95 th percentile) 209 539 100 141 60 270 147 106 62 339 324 Back of Queue ( Q ), veh/In ( 95 th percentile) 8.0 19.5 3.7 5.4 2.3 9.5 5.4 3.9 2.4 12.9 13.0 Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.00 0.49 0.00 0.81 0.92 0.00 0.71 0.62 0.00 0.00 Uniform Delay ( d i ), s/veh 39.1 34.4 31.2 30.1 25.6 19.6 10.8 12.7 18.7 20.4 20.6 Incremental Delay ( d 2 ), s/veh 1.5 14.4 0.6 0.5 0.4 8.7 0.5 0.5 0.2 3.7 3.7 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 40.6 31.8 30.6 26.0 28.3 11.3 13.2 18.9 24.2 24.3 Level of Service (LOS) D C C C C B B B C C Approach Delay, s/veh / LOS 30.2 C 16.8 B 23.8 C IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Intersection Delay, s/veh / LOS IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 7. IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.45 B 2.29 B 2.42 B 2.28 B Bicycle LOS Score / LOS 1.15 A 0.85 A 1.39 A 1.31 A �� III �II� .I ��� w IIII�� III � �, � � � � � .�� I� � I, I��, � .� I, � .�I � :� �� ��I ������ � ����� � II ,�II�� I I � I� � ���� ����� �I� � I � ����� � i���� ����� �������������N ,I��'�� ����� ����� II�.���� � ������ � ����� �I�. � I � � �. ��� � � ������� � � I .�� � .�� �� ����� � � �� �� ��lu � �II II� II I II II I� II�� ���������������� � I I � I�� �. �. � ���� I � ������� � �II �.� �I II I I �II� I �II� I I I ����� II��� �II��� �II� �II �II II II II I I I I I I �III�� � � II��� ����� � � ���� III�� � ����� ����� ii u.klllll 1111 �I11I� u HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ��� ��"���� �° I* Agency GHA Duration, h 0.250 ����� Analyst M KP Analysis Date Apr 20, 2025 Area Type Other ""'' �'° Jurisdiction IDOT Time Period AM PHF 0.92 �1 �� �:. Urban Street I L RTE 62 ALGONQU I N ... Analysis Year EXISTING 2025 ��������S ��������S ��������S ������0 �������25 �������6�������21-B ��L �������62 Analysis Period 1 > 7:00 ' ', °°���� ,c ntorsection @ B U E F it e Name 2 U AM .xus Project Description CLOUD HQ ""�� °"°�����-°'°' �� ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I'll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll"�"I'll"�"I'll"�,'ll"�"�'ll"�"I'll"�"�I' Demand Information �ll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""I'll",,���������������'ll""I'll"'ll""I'll" EB "�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll"�"I'll"�,'ll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' WB ��','ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll NB ",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll"�"I'll"�"I'll"�,'ll"�"�'ll"�"I'll"�"I'll"�,lI SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 329 414 89 257 60 305 552 151 75 832 8 Signal Information ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... '� C cle s 120.0 Reference Phase y���� illillil illilliiOffset, 2 �, IIIIII iiiI.'lM L.... �� � 1 ��� . s 0 Reference Point Beg i n iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillil llillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliil illillillilliillillillillillil illiillillillillillillillillillillilliillillillill Green 5.0 8.1 49.5 6.9 28.0 0.0 ��������������������Y����e��l����l�������o�������� ������������������3����.�������������5�������� �����������������3����.��������������5�������� �����������������4����.��������������5�������� �����������������3����.��������������5������� ����������������4����.�������������5�������� ������������������0����.�������������0�������� U n co o rd i n ate d N o S i m u l t. G a E/W O n 11111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII llillillillillillillillillillilliillillilliil lll111111111111111111111illillilillillillill illillilliillillillillillillilliillillillill llillillillilillillillillillillillilliillilli lillillilliillillillillillillilliillillillil �������F �����o ��F p ��������N ���js 'l""I'll",S rce Mode i xe d i m u It G a p O n Red 0.0 0.0 1.5 0.0 1.5 0.0 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 1.000 0.961 0.899 0.922 0.945 0.945 0.867 0.914 0.914 0.945 0.953 1.000 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 0.952 1.000 1.000 0.952 1.000 1.000 0.952 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 1.000 1.000 0.952 0.000 0.952 0.000 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.000 0.847 0.000 0.847 0.000 0.847 0.997 0.997 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) 1.00 Movement Saturation Flow Rate (s), veh/h 0 3752 1447 1668 3600 1522 1570 3481 1472 1711 3582 34 Proportion of Vehicles Arriving on Green (P) 0.00 0.23 0.23 0.06 0.32 0.32 0.14 0.68 0.51 0.04 0.55 0.41 Incremental Delay Factor (k) 0.50 0.50 0.11 0.50 0.50 0.25 0.50 0.50 0.11 0.50 0.50 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Green Ratio (g/C) 0.23 0.31 0.32 0.57 0.51 0.45 0.41 Permitted Saturation Flow Rate (sp), veh/h/In 1117 959 0 539 0 786 0 Shared Saturation Flow Rate (ssn), veh/h/In 0 Permitted Effective Green Time (gp), s 0.0 30.0 0.0 51.6 0.0 49.6 0.0 Permitted Service Time (gu), s 0.0 18.0 0.0 29.0 0.0 49.6 0.0 Permitted Queue Service Time (gps), s 1.3 29.0 0.0 Time to First Blockage (gf), s 28.0 0.0 0.0 0.0 0.0 0.0 0.0 Queue Service Time Before Blockage (gfs), s Protected Right Saturation Flow (sR), veh/h/In 1447 1522 1472 Protected Right Effective Green Time (gR), s 16.6 5.0 6.9 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.710 0.000 1.557 0.000 1.710 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.143 0.000 0.133 0.000 0.107 0.000 0.121 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 466.61 35.27 639.92 27.75 1018.66 14.45 825.80 20.68 Bicycle Fw / F� -3.64 0.67 -3.64 0.36 -3.64 0.90 -3.64 0.82 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 20, 2025 Area Type Other Jurisdiction IDOT Time Period AM PHF 0.92 Urban Street I L RTE 62 ALGONQU I N ... Analysis Year EXISTING 2025 Analysis Period 1 > 7:00 Intersection IL 62 @ BUSSE File Name 2025 62-BUS AM.xus Project Description CLOUD HQ Demand Information EB WB NB Approach Movement L T R L T R L T R Demand (v ), veh/h 329 414 89 257 60 305 552 151 Signal Information 1IIIIIII II����I II����I C cle, s 120.0 y Reference Phase 2 11111111, ��� 1, 11, . , . 1 „„ �, IIIIIIIII 1111 Offset, s 0 iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilill IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Reference Point II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Begin IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green 5.0 8.1 49.5 11� 6.9 28.0 0.0 . '. Uncoordinated No IIIIIIIIIIIIIIIM°Illlllo Illldllllllle IIIIIIIIIIIIIIIIIII.IIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Illldlllllllllllllllll Simult. Gap E/W IIIIIIIIIIIIIIIIIII.IIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII On IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Yellow II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 3.5 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 3.5 4.5 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 3.5 4.5 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII',, 0.0 Flllllllo rce F ixe S i m ullllllllllt Gllla NIIII/IIIIIIIIISIIIII p D°n Red 0.0 0.0 1.5 0.0 1.5 0.0 SB L T 75 832 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Back of Queue ( Q ), ft/In ( 95 th percentile) 209 539 100 141 60 270 147 106 62 339 324 Back of Queue ( Q ), veh/In ( 95 th percentile) 8.0 19.5 3.7 5.4 2.3 9.5 5.4 3.9 2.4 12.9 13.0 Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.00 0.49 0.00 0.81 0.92 0.00 0.71 0.62 0.00 0.00 Control Delay ( d ), s/veh 40.6 31.8 30.6 26.0 28.3 11.3 13.2 18.9 24.2 24.3 Level of Service (LOS) D C C C C B B B C C Approach Delay, s/veh / LOS 30.2 C 16.8 B 23.8 C IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Intersection Delay, s/veh / LOS IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 13 12.9 2.4 24.3 24.2 18.9 8 Q 40.6 19.E 48.9 28.3 11.3 13.2 3.9 � II...�:�~~~�p IG� 5.4 0 II 0S Ii:) Il...�;;�S Ikm":m� I...�;:�� IG". 26.0 2.3 30.6 5.4 31.8 3.7 � Queue Storage Ratio < 1 Queue Storage Ratio > 1 --- Messages --- WARNING: Since queue spillover from turn lanes and spillback into upstream intersections is not accounted for in the HCM procedures, use of a simulation tool may be advised in situations where the Queue Storage Ratio exceeds i.o. --- Comments --- 9 � II@ �IIII� 9 W u" o" ������ ���II����� !�'.�������. !!���!III�. :��'���. !!���!!III� "�II����� II !!�'.� !!�'.� !IV. II II u '''I V ...Ip,, � ��������� � .�������� ���� ' �� � IV ' ' � i i i ul pl ' u p I I ������ � I i i uIIV��� ��� I ull��,� a ull���� �� u u uu pl III I I � � I � II 4 I II �II II I " ���� IIII�� IIIIII � � IIIII I�I IIIII ��� � IIIII IIIII III � � � IIIII � IIIII IIIII IIIII I �� � � �� ,III �� � IIIII IIIII II�.IIII � IIIIII � � IIIII II�. II�'�� �� ����� IIIII°°°� ��I�� „�„ �' � „„.� �., IIIII IIIII IIIII � IIIII ��� ' � IIIII I�� IIII��', � ���� ����� '" Elul � Elul � � ,IIIII I�� � � ����� ��� �� � ����IIIII �I' 11114°° IIIII �II"I" 0 2 5 III""'I;,. Ill :u HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ��� ��"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other'°' °N'" Jurisdiction IDOT Time Period AM PHF 0.95 �w �� �:. Urban Street I L RTE 62 ALGONQU I N ... IIIIIIIII61IIIIII21 Analysis Year N B 2032 IIIIIIII61IIIIIIII21-BUIIIIIIIIIIIIS Analysis Period 1 > 7:00 °µ k °°���� ,c lllllllntorsectionIIIIIIIL @ BUIIIIIIIIIIIISIIIIIIIIIIISIE File Name 21IIIIIIII01IIIIIIIII31IIIIII21 NB AM.xus Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 338 426 95 271 64 312 565 155 85 852 8 Signal Information 1 �, �15' C cle s 120.0 Reference Phase 2 y IIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ...� �, .� ...� L..J IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III L..J � .I v ',, < • • 011llllllllff°Inset s 0 Re°Illfllllllerence Point Be inllllllllll g IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII (IIIIIIIIIIII Uncoordinated No Simult. Ga E/W On IIIIIIFIIIIIIo p IIIIIIIN IIIII/IIIIIIIISIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Ildlllllllllllllllll IIIIS IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII.IIIIIIIIIIII IIIIIIIIIIIIIIM°Illllo illllllle IF Green 5.4 7.5 49.7 7.1 27.8 0.0 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIY�IIIe�ll�lllllllllllo��llllll IIIIIIIIIIIIIIIIII3�III.IIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII31III.IIIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII41III.IIIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII31III.IIIIIIIIIIIIII5�IIIIII IIIIIIIIIIIIIIII4�III.IIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIIIIOIIII.11llllllllll1011llllll i m ullllllllt Gllla rce i xe p O n Red 0.0 0.0 1.5 0.0 1.5 0.0 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 338 426 95 271 64 312 565 155 85 852 8 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 2000 1900 1900 2000 1900 1900 2000 1900 1900 1900 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 5 13 10 7 7 17 11 11 7 6 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 4 3 3 4 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 0 75 205 0 75 295 0 150 100 0 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 45 45 45 45 45 40 40 40 35 35 35 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 30.0 14.4 44.4 26.4 62.4 13.2 49.2 Yellow Change Interval (Y), s 4.5 3.5 4.5 3.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 1.5 0.0 1.5 0.0 1.5 0.0 1.5 Minimum Green ( Gm►n), s 15 3 15 3 15 3 15 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 7.0 3.0 7.0 3.0 2.0 3.0 2.0 Recall Mode Off Off Off Off Min Off Min Dual Entry Yes No Yes No Yes No Yes Walk (Walk), s 7.0 7.0 7.0 7.0 Pedestrian Clearance Time (PC), s 20.0 20.0 20.0 20.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 ,. III � �II� I � I I � (III lu' I ��������� �� III II I I I l i � � � l �� ���!I �I ���I��� I��� ������ IIIII � ,�II�� ���� ���� � ����� ��I� ��� ��� ����� � �I�i���l IIIII IIIII �I�������� I ,I���'�� IIIII IIIII III�.���� IIIII �� ��.�� IIIII I�I�.�� � ��� ��� ��� ��� ������� � .... �� ���� � IIIII � I� � I � �II� � II� � II � � �I�� ��� � i��� iglu ����� ����������� ��� ���� �II �I� I I I ����� I II� I II� �� � ������ � ������ � �� � �� �III�� III�� �� �II� ��� ��� I I ���� � ��� �II�� � � � ��� IIIII IIIII ���������� �,�II����� ���IY����� (III �� Illlllllllllu����; ����1������ ��� ��������� �� 'Illu�1'�.., �I ���"��„I I� �1u1���� �� �' :I.....UII� HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ��� ��"���� �° °* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other'°' °N'" Jurisdiction IDOT Time Period AM PHF 0.95 �w �� �:. Urban Street I L RTE 62 ALGONQU I N ... IIIIIIIII61IIIIII21 Analysis Year N B 2032 IIIIIIII61IIIIIIII21-BUIIIIIIIIIIIIS Analysis Period 1 > 7:00 °µ k °° ,c lllllllntorsectionIIIIIIIL @ BUIIIIIIIIIIIISIIIIIIIIIIISIE File Name 21IIIIIIII01IIIIIIIII31IIIIII21 NB AM.xus Project Description CLOUD HQ ""I , t ° 11, ,�- °'r � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' Demand Information EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 338 426 95 271 64 312 565 155 85 852 8 Signal Information 1 S �1��, C cle s 120.0 Reference Phase 2 y IIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ...� �, .� ...� 4I � .I L..J IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII III L..J v ',, < • • 011llllllllff°Inset s 0 Re°Illfllllllerence Point Be inllllllllll (IIIIIIIIIIII g IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green 5.4 7.5 49.7 7.1 27.8 0.0 IIIIIIIIIIIIIIIIIIIIY�IIIe�ll�lllllllllllo��llllll IIIIIIIIIIIIIIIIII3�III.IIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII31III.IIIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII41III.IIIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII31III.IIIIIIIIIIIIII5�IIIIII IIIIIIIIIIIIIIII4�III.IIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIIIIOIIII.11llllllllll1011llllll Uncoordinated No Simult. Ga E/W On IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIFIIIIIIo Illdlllllllllllllllll IIIIS p IIIIIIIN (III/IIIIIIIISIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII.IIIIIIIIIIII IIIIIIIIIIIIIIIIIII.IIIIIIIIIIII IIIIIIIIIIIIIIM°Illllo illllllle IF i m ullllllllt Gllla rce i xe p O n Red 0.0 0.0 1.5 0.0 1.5 0.0 �� Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 4 3 8 5 2 1 6 Case Number 7.3 1.0 3.0 1.1 3.0 1.1 4.0 Phase Duration, s 33.8 10.6 44.4 19.9 66.7 8.9 55.7 Change Period, ( Y+R � ), s 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Max Allow Headway (MAH ), s 9.9 4.0 9.9 4.0 0.0 4.0 0.0 Queue Clearance Time ( g S ), s 29.8 7.3 9.0 15.7 5.6 Green Extension Time ( g e ), s 0.0 0.1 22.8 0.7 0.0 0.1 0.0 Phase Call Probability 1.00 0.96 1.00 1.00 0.95 Max Out Probability 1.00 1.00 0.76 0.18 0.93 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 4 14 3 8 18 5 2 12 1 6 16 Adjusted Flow Rate ( v ), veh/h 356 448 100 285 67 328 595 163 89 453 452 Adjusted Saturation Flow Rate ( s ), veh/h/In 1830 1447 1668 1800 1522 1570 1741 1472 1711 1811 1805 Queue Service Time ( g S ), s 9.9 27.8 5.3 7.0 3.5 13.7 8.6 6.5 3.6 20.2 20.3 Cycle Queue Clearance Time ( g � ), s 9.9 27.8 5.3 7.0 3.5 13.7 8.6 6.5 3.6 20.2 20.3 Green Ratio (g/C) 0.23 0.37 0.31 0.32 0.36 0.57 0.51 0.57 0.46 0.41 0.41 Capacity ( c ), veh/h 847 533 302 1152 555 408 1762 832 464 750 748 Volume -to -Capacity Ratio (X) 0.420 0.842 0.332 0.248 0.121 0.805 0.337 0.196 0.193 0.604 0.604 Back of Queue ( Q ), ft/In ( 95 th percentile) 208 542 103 145 62 265 148 106 68 333 319 Back of Queue ( Q ), veh/In ( 95 th percentile) 8.0 19.6 3.8 5.5 2.4 9.3 5.4 3.9 2.6 12.7 12.8 Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.00 0.50 0.00 0.83 0.90 0.00 0.71 0.68 0.00 0.00 Uniform Delay ( d i ), s/veh 39.2 34.7 31.3 30.1 25.3 19.3 11.0 12.7 18.5 20.2 20.4 Incremental Delay ( d 2 ), s/veh 1.5 14.9 0.6 0.5 0.4 8.0 0.5 0.5 0.2 3.6 3.6 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 40.8 31.9 30.7 25.8 27.3 11.6 13.3 18.7 23.8 24.0 Level of Service (LOS) D C C C C B B B C C Approach Delay, s/veh / LOS 30.2 C 16.6 B 23.4 C IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Intersection Delay, s/veh / LOS IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 7. IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.45 B 2.29 B 2.42 B 2.28 B Bicycle LOS Score / LOS 1.15 A 0.86 A 1.38 A 1.31 A �� III �II� �� ��I������������ ������� � ,�II�� I I � I� � ���� ����� �I� � I � ����� � i���� ����� �����������„� ,I��'�� ����� ����� II�.���� �������� � ����� �I�. � I � � �. ��� � � ������� � � ����� � � �� ��� ��lu � �II II� II I I� II�� ���������������� � I I � I�� I I �. � ���� I � ������� � �II II I� I �II� II �II� II I I ����� II��� �II��� �II� I II ����� ���� �III�� � � ����� I � I ���� I I I I ����� ����� ������ 1ii�� 1 °��2 IIII�, II1 � 6�'1.,.., ill, � �5 I111111'° M 1111 �� :J �, HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ��� ��"���� �° I* Agency GHA Duration, h 0.250 ����� Analyst M KP Analysis Date Apr 21, 2025 Area Type Other ""'' �'° Jurisdiction IDOT Time Period AM PHF 0.95 �1 �� �:. Urban Street I L RTE 62 ALGONQU I N ... Analysis Year N B 2032 ��������S ��������S ������0 �������3������2 ���������S ������6�������21-B ��L �������62 Analysis Period 1 > 7:00 ' k, °°���� ,c ntorsection @ B U E F it e Name 2 N B U AM .xus Project Description CLOUD HQ ""�� °"°�����-°'°' �� ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll"�"I'll"�,'ll,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' WB ��','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll NB ",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�"I'll"�,I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 338 426 95 271 64 312 565 155 85 852 8 Signal Information ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 1, C cle s 120.0 Reference Phase y���IIIIII 2 �, iiiIl'lM L.... � 1 ���. 1 . � .Tr 11 Offset, s 0 Reference Point Begin iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillill lillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillilli it illillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillil llillillillillillilliillillillillillillilliillillillillillillilliillillillil llillillillillillilliillillillillillillilliill llillillilliillillillillillill lliillillillillillillillillillillilliillillillilli Green 5.4 7.5 49.7 7.1 27.8 0.0 U n co o rd i n ate d N o S i m u l t. G a E/W O n l""Ill""I'll""I'll",Ill""I'll "I'll",lIll""I'll""I'll",Ill""I'llI 111111111111lillillillillillillillillillilli llillillillilliillillillillillillillilillill illiillillillillilliillillillillillilliillill illiillillillillilliillillillillillilliillill llillillillilliillillillillillillilliillillil �����������������������F�������o ����������������������M�������o ����d�������e ���������������������F ����d����������������� �������������������S p Yello 3.5 3.5 4.5 3.5 4.5 0.0 ��������������G���a �������������������N�����j���������s����� ���������������Oln rce i xe i m u����l�����t p Red 0.0 0.0 1.5 0.0 1.5 0.0 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 1.000 0.961 0.899 0.922 0.945 0.945 0.867 0.914 0.914 0.945 0.953 1.000 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 0.952 1.000 1.000 0.952 1.000 1.000 0.952 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 1.000 1.000 0.952 0.000 0.952 0.000 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.000 0.847 0.000 0.847 0.000 0.847 0.997 0.997 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) 1.00 Movement Saturation Flow Rate (s), veh/h 0 3752 1447 1668 3600 1522 1570 3481 1472 1711 3582 34 Proportion of Vehicles Arriving on Green (P) 0.00 0.23 0.23 0.06 0.32 0.32 0.14 0.67 0.51 0.04 0.55 0.41 Incremental Delay Factor (k) 0.50 0.50 0.11 0.50 0.50 0.24 0.50 0.50 0.11 0.50 0.50 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Green Ratio (g/C) 0.23 0.31 0.32 0.57 0.51 0.46 0.41 Permitted Saturation Flow Rate (sp), veh/h/In 1111 960 0 543 0 790 0 Shared Saturation Flow Rate (ssn), veh/h/In 0 Permitted Effective Green Time (gp), s 0.0 29.8 0.0 51.7 0.0 49.7 0.0 Permitted Service Time (gu), s 0.0 17.8 0.0 29.5 0.0 49.7 0.0 Permitted Queue Service Time (gps), s 1.4 29.5 0.0 Time to First Blockage (gf), s 27.8 0.0 0.0 0.0 0.0 0.0 0.0 Queue Service Time Before Blockage (gfs), s Protected Right Saturation Flow (sR), veh/h/In 1447 1522 1472 Protected Right Effective Green Time (gR), s 16.4 5.4 7.1 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.710 0.000 1.557 0.000 1.710 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.143 0.000 0.133 0.000 0.108 0.000 0.121 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 463.17 35.43 639.93 27.75 1012.34 14.63 828.51 20.59 Bicycle Fw / F� -3.64 0.66 -3.64 0.37 -3.64 0.90 -3.64 0.82 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other Jurisdiction IDOT Time Period AM PHF 0.95 Urban Street I L RTE 62 ALGONQU I N ... Analysis Year N B 2032 Analysis Period 1 > 7:00 Intersection IL 62 @ BUSSE File Name 2032 NB 62-BUS AM.xus Project Description CLOUD HQ Demand Information EB WB NB Approach Movement L T R L T R L T R Demand (v ), veh/h 338 426 95 271 64 312 565 155 Signal Information C cle, s 120.0 y Reference Phase 2 "I'l""I'll""I'll'll""I'll""I'll" 11111111, ��� 1, 11, . , . 1 1111 „„ �� Offset, s 0 iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilill lillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillill Reference Point li llilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillilli lillillillilillillillillillillilliillillilillillillillillillillilliillillilli lillillilliillillilillillillillillillillilliil Begin ilillillillillillillilliillill illiillillillillillillillilillillillillillillilliil Green 5.4 11�� 7.5 49.7 7.1 27.8 0.0 . Uncoordinated No Simult. Gap E/W On Yellow 3.5 3.5 4.5 3.5 4.5 0.0 Force Mode Fixed Simult Ga Njs p O°n Red 0.0 0.0 1.5 0.0 1.5 0.0 Movement Group Results Approach Movement Back of Queue ( Q ), ft/In ( 95 th percentile) Back of Queue ( Q ), veh/In ( 95 th percentile) Queue Storage Ratio ( RQ ) ( 95 th percentile) Control Delay ( d ), s/veh Level of Service (LOS) A rochDl vh L a ea s/ e / OS pp y Intersection Delay, s/veh / LOS SB L T 85 852 EB WB NB SB L T R L T R L T R L T R 208 542 103 145 62 265 148 106 68 333 319 8.0 19.6 3.8 5.5 2.4 9.3 5.4 3.9 2.6 12.7 12.8 0.00 0.50 0.00 0.83 0.90 0.00 0.71 0.68 0.00 0.00 40.8 31.9 30.7 25.8 27.3 11.6 13.3 18.7 23.8 24.0 D C C C C B B B C C ® 30.2 C 16.6 6 23.4 C 12.8 12.7 2.6 24.0 23.8 18.7 8 Q 40.8 19.`' 49.6 27.3 11.6 13.3 3.9 � II...�:�~~~�p IG� 5.4 0 II 0S Ii:) Il...�;;�S Ikm":m� I...�;:�� IG". 25.8 2.4 30.7 5.5 31.9 3.8 � Queue Storage Ratio < 1 Queue Storage Ratio > 1 --- Messages --- WARNING: Since queue spillover from turn lanes and spillback into upstream intersections is not accounted for in the HCM procedures, use of a simulation tool may be advised in situations where the Queue Storage Ratio exceeds i.o. --- Comments --- II �.... � II@ �IIII� 9 W u" o" I N � �M III � � � III I I � � I � II �� II II II � IIIII I�I IIIII ��� � IIIII IIIII III � � � IIIII � IIIII IIIII IIIII � �� � � �� ,�II �� � IIIII IIIII II�.IIII � IIIIII � � IIIII II�. III �� �� ����� IIIII � ���I�� ���� � � � �.� �.� IIIII IIIII IIIII � IIIII ��� ' � IIIII I�� IIII�� � I�� ���°� ����� 'll'" �IIII� "II""'�" IIIIIII � � ,�IIIIP ��� � ����� ��' ���� � 111114°°°� IIIII ��III3 IIIIIIIIIIIIIIIIIIIIN ;°I,;E31 LIII'II Illlul!% Iictis HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ��� ��"���� �° I* Agency GHA Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other �"' °�'° Jurisdiction IDOT Time Period AM PHF 0.95 �w �� �:. Urban Street I L RTE 62 ALGONQU I N ... Analysis Year TOTAL 2032 Analysis Period 1 > 7:00 °µ k °°���� ,c Intersection IL 62 @ BUSSE File Name 2032 TOT 62-BUS AM.xus Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 375 426 107 302 64 312 565 170 85 852 8 Signallnformation C cle s 120.0 Reference Phase 2 y iiii �, � 111 w r � •T • Offsets 0 Rellfllllllerence Point Be in g iiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillill lillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilli it illillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillil llillillillillillilliillillillillillillilliillillillillilliillillillillillil llillillillillillilliillillillillilliillillill llillillilliillillillillillill illillillillillillillillillillillilliillillillilli U n co o rd i n ate d N o S i m u l t. G a E/W O n p Green 5.4 7.5 49.7 7.9 27.0 0.0 "Ill""I'll""I'll",Ill""I'll" I'll",ll,Ill""I'll""I'll",Ill""I'Ill ""I'll""Ill""I'll""I'll",Ill""I'l ""I'll",Ill""I'll""I'llIll""I'll"" Ill""I'll""I'll",Ill""I'll""I'll",I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ��������������������Y����e��l����l�������o�������� ������������������3����.�������������5�������� �����������������3����.��������������5�������� �����������������4����.��������������5�������� �����������������3����.��������������5������� ����������������4����.�������������5�������� ������������������0����.�������������0�������� Force Mode Fixed Simult Ga Njs Oln p Red 0.0 0.0 1.5 0.0 1.5 0.0 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 375 426 107 302 64 312 565 170 85 852 8 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 2000 1900 1900 2000 1900 1900 2000 1900 1900 1900 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 5 13 10 7 7 17 11 11 7 6 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 4 3 3 4 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 0 75 205 0 75 295 0 150 100 0 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 45 45 45 45 45 40 40 40 35 35 35 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 30.0 14.4 44.4 26.4 62.4 13.2 49.2 Yellow Change Interval (Y), s 4.5 3.5 4.5 3.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 1.5 0.0 1.5 0.0 1.5 0.0 1.5 Minimum Green ( Gm►n), s 15 3 15 3 15 3 15 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 7.0 3.0 7.0 3.0 2.0 3.0 2.0 Recall Mode Off Off Off Off Min Off Min Dual Entry Yes No Yes No Yes No Yes Walk (Walk), s 7.0 7.0 7.0 7.0 Pedestrian Clearance Time (PC), s 20.0 20.0 20.0 20.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 ��� ������ IIIII � ,����� ���� � ����� � ����� ��� ��� ��� ����� �� � i���l IIIII IIIII � ������� ,���'�� IIIII IIIII ���.���� IIIII �I � �� IIIII ���.�� � ��� ��� ��� ��� ������� II 1 IIIII � �� � 9 ��� � i��� I���� ����� ����������� ��� �� � ������ � ������ � �� � �� ���I ����� ����� ��� ����� �� � ,����� � ���� � I ��� IIIII IIII 3 � �� ,ill ° ���� IJ� S II � . ��i(l � HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ��� ��"���� �° I* Agency GHA Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other �"' °�'° Jurisdiction IDOT Time Period AM PHF 0.95 �w �� �:. Urban Street I L RTE 62 ALGONQU I N ... Analysis Year TOTAL 2032 Analysis Period 1 > 7:00 °µ k °°���� ,c Intersection IL 62 @ BUSSE File Name 2032 TOT 62-BUS AM.xus Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' Demand Information EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 375 426 107 302 64 312 565 170 85 852 8 Signallnformation C cle s 120.0 Reference Phase 2 y iiii �, � 111 w r � • Offsets 0 Rellfllllllerence Point Be in g iiiiiiiiiiiiillillillillillillilliillillillillillillilliilillillilillillillillillillillilliillillillillilll)lllllillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillilli illilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillil ll llillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillill lillillillillillilliillillillillillillilliillillillillillillilliillilliilill lillillillillillilliillillillillillillilliilli lillillilliillillillillillilli liillilliilillillillillillillillilliillillilillill Green 5.4 7.5 49.7 7.9 27.0 0.0 ��������������������Y����e��l����l�������o�������� ������������������3����.�������������5�������� �����������������3����.��������������5�������� �����������������4����.��������������5�������� �����������������3����.��������������5������� ����������������4����.�������������5�������� ������������������0����.�������������0�������� U n co o rd i n ate d N o S i m u l t. G a E/W O n "Ill""I'll""I'll",Ill""I'll" I'll",ll,Ill""I'll""I'll",Ill""I'Ill ""I'll""Ill""I'll""I'll",Ill""I'l ""I'll",Ill""I'll""I'llIll""I'll"" Ill""I'll""I'll",Ill""I'll""I'll",I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII �����������������������F�������o ����������������������M�������o ����d�������e ���������������������F ����d����������������� �������������������S p ��������������G���a �������������������N�����j���������s����� ���������������Oln rce i xe i m u����l�����t p Red 0.0 0.0 1.5 0.0 1.5 0.0 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 4 3 8 5 2 1 6 Case Number 7.3 1.0 3.0 1.1 3.0 1.1 4.0 Phase Duration, s 33.0 11.4 44.4 19.9 66.7 8.9 55.7 Change Period, ( Y+R � ), s 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Max Allow Headway (MAH ), s 10.0 4.0 10.0 4.0 0.0 4.0 0.0 Queue Clearance Time ( g S ), s 29.0 8.0 9.9 15.7 5.6 Green Extension Time ( g e ), s 0.0 0.1 23.2 0.7 0.0 0.1 0.0 Phase Call Probability 1.00 0.98 1.00 1.00 0.95 Max Out Probability 1.00 1.00 0.81 0.18 0.93 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 4 14 3 8 18 5 2 12 1 6 16 Adjusted Flow Rate ( v ), veh/h 395 448 113 318 67 328 595 179 89 453 452 Adjusted Saturation Flow Rate ( s ), veh/h/In 1830 1447 1668 1800 1522 1570 1741 1472 1711 1811 1805 Queue Service Time ( g S ), s 11.2 27.0 6.0 7.9 3.5 13.7 8.6 7.1 3.6 20.2 20.3 Cycle Queue Clearance Time ( g � ), s 11.2 27.0 6.0 7.9 3.5 13.7 8.6 7.1 3.6 20.2 20.3 Green Ratio (g/C) 0.23 0.36 0.31 0.32 0.36 0.57 0.51 0.57 0.46 0.41 0.41 Capacity ( c ), veh/h 823 523 291 1152 555 408 1762 842 464 750 748 Volume -to -Capacity Ratio (X) 0.479 0.857 0.387 0.276 0.121 0.805 0.338 0.213 0.193 0.604 0.604 Back of Queue ( Q ), ft/In ( 95 th percentile) 231 552 118 163 62 265 148 115 68 334 319 Back of Queue ( Q ), veh/In ( 95 th percentile) 8.9 20.0 4.4 6.2 2.4 9.3 5.4 4.2 2.6 12.7 12.8 Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.00 0.57 0.00 0.83 0.90 0.00 0.77 0.68 0.00 0.00 Uniform Delay ( d i ), s/veh 40.4 35.4 31.7 30.4 25.3 19.3 11.0 12.5 18.5 20.2 20.4 Incremental Delay ( d 2 ), s/veh 2.0 16.4 0.8 0.6 0.4 8.0 0.5 0.6 0.2 3.6 3.6 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 42.4 . 32.5 31.0 25.8 27.3 11.6 13.1 18.7 23.8 24.0 Level of Service (LOS) D C C C C B B B C C Approach Delay, s/veh / LOS 30.7 C 16.5 B 23.4 C Intersection Delay, s/veh / LOS . Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.45 B 2.29 B 2.42 B 2.28 B Bicycle LOS Score / LOS 1.18 A 0.90 A 1.40 A 1.31 A ����� � 1ii�� 1 °�� ��� � 0 � � ������ � 11111111, � l ..i��u S ii ��'Ik � III, ��(1 I S HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ��� ��"���� �° I* Agency GHA Duration, h 0.250 ����� Analyst MKP Analysis Date Jul 2, 2025 Area Type Other ""'' �'° Jurisdiction IDOT Time Period AM PHF 0.95 �1 �� �:. Urban Street I L RTE 62 ALGONQU I N ... Analysis Year TOTAL 2032 Analysis Period 1 > 7:00 ' k, °°���� ,c Intersection IL 62 @ BUSSE File Name 2032 TOT 62-BUS AM.xus Project Description CLOUD HQ ""�� °"°�����-°'°' �� ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I'll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll"�"I'll"�"I'll"�,'ll"�"�'ll"�"I'll"�"�I' Demand Information �ll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""I'll",,���������������'ll""I'll"'ll""I'll" EB "�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll"�"I'll"�,'ll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' WB ��','ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll NB ",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll"�"I'll"�"I'll"�,'ll"�"�'ll"�"I'll"�"I'll"�,lI SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 375 426 107 302 64 312 565 170 85 852 8 Signal Information ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 1, '� C cle s 120.0 Reference Phase y 2 �, � 1 Offset, s 0 Reference Point Begin iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillil llillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliil illillillilliillillillillillil illiillillillillillillillillillillilliillillillill Green 5.4 7.5 49.7 7.9 27.0 0.0 ��������������������Y����e��l����l�������o�������� ������������������3����.�������������5�������� �����������������3����.��������������5�������� �����������������4����.��������������5�������� �����������������3����.��������������5������� ����������������4����.�������������5�������� ������������������0����.�������������0�������� U n co o rd i n ate d N o S i m u l t. G a E/W O n illiillillillillillillilliillillillill lllllllllllIIIIIIIIIIIIIIIIIIIIII1111111 llllllllllllllillillillillillillilliillillil lillillillillillillillillillilliillillillill lillilliillillillillillillillilliillillillill llillillilliillillillillillillilliillillillil illillillilillillillillillillilliillillililli p Force Mode Fixed Simult Ga Njs p Oln Red 0.0 0.0 1.5 0.0 1.5 0.0 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 1.000 0.961 0.899 0.922 0.945 0.945 0.867 0.914 0.914 0.945 0.953 1.000 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 0.952 1.000 1.000 0.952 1.000 1.000 0.952 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 1.000 1.000 0.952 0.000 0.952 0.000 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.000 0.847 0.000 0.847 0.000 0.847 0.997 0.997 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) 1.00 Movement Saturation Flow Rate (s), veh/h 0 3752 1447 1668 3600 1522 1570 3481 1472 1711 3582 34 Proportion of Vehicles Arriving on Green (P) 0.00 0.22 0.22 0.07 0.32 0.32 0.14 0.67 0.51 0.04 0.55 0.41 Incremental Delay Factor (k) 0.50 0.50 0.11 0.50 0.50 0.24 0.50 0.50 0.11 0.50 0.50 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Green Ratio (g/C) 0.23 0.31 0.32 0.57 0.51 0.46 0.41 Permitted Saturation Flow Rate (sp), veh/h/In 1079 927 0 543 0 790 0 Shared Saturation Flow Rate (ssn), veh/h/In 0 Permitted Effective Green Time (gp), s 0.0 29.0 0.0 51.7 0.0 49.7 0.0 Permitted Service Time (gu), s 0.0 15.7 0.0 29.5 0.0 49.7 0.0 Permitted Queue Service Time (gps), s 1.8 29.5 0.0 Time to First Blockage (gf), s 27.0 0.0 0.0 0.0 0.0 0.0 0.0 Queue Service Time Before Blockage (gfs), s Protected Right Saturation Flow (sR), veh/h/In 1447 1522 1472 Protected Right Effective Green Time (gR), s 16.4 5.4 7.9 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.710 0.000 1.557 0.000 1.710 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.144 0.000 0.133 0.000 0.108 0.000 0.121 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 450.00 36.04 639.94 27.75 1012.32 14.63 828.49 20.59 Bicycle Fw / F� -3. 64 0.70 -3. 64 0.41 -3. 64 0.91 -3. 64 0.82 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information Agency GHA Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other Jurisdiction IDOT Time Period AM PHF 0.95 Urban Street I L RTE 62 ALGONQU I N ... Analysis Year TOTAL 2032 Analysis Period 1 > 7:00 Intersection IL 62 @ BUSSE File Name 2032 TOT 62-BUS AM.xus Project Description CLOUD HQ Demand Information EB WB NB Approach Movement L T R L T R L T R Demand ( v ), veh/h 375 426 107 302 64 312 565 170 Signal Information C cle, s 120.0 y Reference Phase 2 "I'l""I'll""I'll'll""I'll""I'll" 11111111, ��� 1, 11, . , . 1 1111 „„ �� Offset, s 0 iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilill lillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillill Reference Point li llilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillilli lillillillilillillillillillillilliillillilillillillillillillillilliillillilli lillillilliillillilillillillillillillillilliil Begin ilillillillillillillilliillill illiillillillillillillillilillillillillillillilliil Green 5.4 11�� 7.5 49.7 7.9 27.0 0.0 . Uncoordinated No Simult. Gap E/W On Yellow 3.5 3.5 4.5 3.5 4.5 0.0 Force Mode Fixed Simult Ga Njs p O°n Red 0.0 0.0 1.5 0.0 1.5 0.0 SB L T 85 852 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Back of Queue ( Q ), ft/In ( 95 th percentile) 231 552 118 163 62 265 148 115 68 334 319 Back of Queue ( Q ), veh/In ( 95 th percentile) 8.9 20.0 4.4 6.2 2.4 9.3 5.4 4.2 2.6 12.7 12.8 Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.00 0.57 0.00 0.83 0.90 0.00 0.77 0.68 0.00 0.00 Control Delay ( d ), s/veh 42.4 . 32.5 31.0 25.8 27.3 11.6 13.1 18.7 23.8 24.0 Level of Service (LOS) D C C C C B B B C C Approach Delay, s/veh / LOS 30.7 C 16.5 B 23.4 C Intersection Delay, s/veh / LOS . 12.8 12.7 2.6 24.0 23.8 18.7 8.9 Q 42.4 20 51.9 27.3 11.6 13.1 1...01'4 4.2 � II...�:�~~~�p IG� 5.4 0 II 0S Ii:) Il...�;;�S Ikm":m� I...�;:�� IG". 25.8 2.4 31.0 6.2 32.5 4.4 � Queue Storage Ratio < 1 Queue Storage Ratio > 1 --- Messages --- WARNING: Since queue spillover from turn lanes and spillback into upstream intersections is not accounted for in the HCM procedures, use of a simulation tool may be advised in situations where the Queue Storage Ratio exceeds i.o. --- Comments --- I����I ...� � I � � � .... III I III � III II�� III�� � � ulllIIIII II III II u � � U19 I � I � �025 '' ���� ���II���� !�'.����. !!���!IIII. :��'�I. !!���!!III� "�II���� II !!�'. !!�'. !IV. u u IIII � , W W ''ll V' '..'�IIV, � �' ��������� i� � .�i!���, ���i � �� � ly "' I W W I I I I V u I� I I ������ � I I I uIIV��� ��� I I I oI � � � III ' III I I �'�� �� I� � �� � � � � IIIII I� � I� I� I � IIIII I�I IIIII I�I � iiii IIIII III � I I iiiii � IIIII IIIII IIIII I„ �I � � �� ,III �� � IIIII IIIII IlLiiii � IIIIII � I IIIII IIL III ��� �I ����� IIIII°°°� I�III� I��I �' � I L� �.I IIIII iiii� IIIII � iiii ��� ' � iiii i�� iiii��', � i�l ���°� ����� � Ilul Illu , III III I 3I e III 1 ( 1 � uull;l iiiiiiiii BI II�II II IIIII d11111l 11111 ul110i Is HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ��� ��"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 20, 2025 Area Type Other'°' °N'" Jurisdiction IDOT Time Period PM PHF 0.95 �w �In �� �:. Urban Street I L RTE 62 ALGONQU I N ... llntersectionIIIIIIIL IIIIIIIII6°IIIIIII21 IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Analysis Year EXISTING 2025 IIIIIIIII6°IIIIIIII21-BUIIIIIIIIIIIIS IIIIIIIIIIIIIIIIIIIIIIIIIIII.IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Analysis Period 1 > 7:00 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII °µ k ,c IllllIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII.IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII @ BUIIIIIIIIIIIISIIIIIIIIIIISIE File Name 21IIIIIIII01IIIIIIIII25 PM.xus ...... Project Description CLOUD HQ ""I , t " 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 397 396 191 489 121 464 950 157 102 646 34 Signal Information IIII IIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII IIIIIIII III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II III 4IIIIIII II II II II III ,III II�IIIIIIIIIII II�IIIIIIIIIII "IIIIIIIIIIII ',,,,,,,,IIII C cle s 130.0 Reference Phase 2 y IIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIII II ... .III II II IIII II� ,II ... I � � I II � ��i���...� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ��i���...� IIIIIIIIIIIIIIIIIIIIIIIIII III . „ II w � V • • 011llllllllff°Inset s 0 Re°Illfllllllerence Point Be inllllllllll ,IIIIIIIIIIII g IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated No Simult. Ga E/W On Illdlllllllllllllllll p IIIIIIIIIIIIIIIIIII.IIIIIIIIIIII IIIIIIIIIIIIIIIIIII.IIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIM°Illlllo Illldllllllle IIII/IIIIIIIIISIIIII Green 7.5 17.6 35.1 13.1 34.3 0.0 IIIIIIIIIIIIIIIIIIIIY�IIIe�ll�lllllllllllo��llllll IIIIIIIIIIIIIIIIII3�III.IIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII31III.IIIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII41III.IIIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII31III.IIIIIIIIIIIIII5�IIIIII IIIIIIIIIIIIIIII4�III.IIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIIIIOIIII.11llllllllll1011llllll IIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIII,IIIIIIIIIIIIIIIIIIIIIIIIII, IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII,IIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Flllllllo rce F i xe S i m uIIllllllllt Gllla N O n p Red 0.0 0.0 1.5 0.0 1.5 0.0 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 397 396 191 489 121 464 950 157 102 646 34 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 2000 1900 1900 2000 1900 1900 2000 1900 1900 1900 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 4 4 6 3 2 2 1 10 1 6 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 4 3 3 4 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 0 75 205 0 75 295 0 150 100 0 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 45 45 45 45 45 40 40 40 35 35 35 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 31.2 26.0 57.2 37.7 57.2 15.6 35.1 Yellow Change Interval (Y), s 4.5 3.5 4.5 3.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 1.5 0.0 1.5 0.0 1.5 0.0 1.5 Minimum Green ( Gm►n), s 15 3 15 3 15 3 15 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 7.0 3.0 7.0 3.0 2.0 3.0 2.0 Recall Mode Off Off Off Off Min Off Min Dual Entry Yes No Yes No Yes No Yes Walk (Walk), s 7.0 7.0 7.0 7.0 Pedestrian Clearance Time (PC), s 20.0 20.0 20.0 20.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 ,. III � �II� I � I ��� I I � I� I� I � I � � �� I� .��II I� .�II� � ..� ���� IIIIII III i I�� ICI ul � � � I �� � � „I�I,I� �� IIII � I � �� "I� I I � I I� I� I I�� ������ IIIIII I� ,�II�� ���� I ����� � ����� �I� ��� ��� ����� I� � i���l ,IIII IIIII�� � ������� ,I��'�� ,IIII ,IIII II�.���� ,IIII �I �.�� ,IIII �I�.�� � ��� ��� ��� ��� ������� � .... �� I � II 1 I� �.��II .�II� � I � � �I�� i �I I ,IIII � � I� � ��� � i��� Iglu .����� II�� ����������� �II� � II� II � I III ��� �I�� ���� �II �I� I I I I ..�� �.�� �.��II I III II I � �I II� I II� �� � ������ � ������ � �� � �� �III�� III�� �� �II� I I � ��� �II�� � � ���� �I � II I � ,IIII ,IIII ����������� 2 �1ii�� ��ll����������� 11,111311�,,��,I,�u �III��� ,IIII ,III �1,11 �,IIIiliIIII� lLI HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ��� ��"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 20, 2025 Area Type Other'°' °N'" Jurisdiction IDOT Time Period PM PHF 0.95 �w �In �� �:. Urban Street I L RTE 62 ALGONQU I N ... llntersectionIIIIIIIL IIIIIIIII6°IIIIIII21 IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Analysis Year EXISTING 2025 Analysis IIIIIIIII6°IIIIIIII21-BUIIIIIIIIIIIIS IIIIIIIIIIIIIIIIIIIIIIIIIIII.IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Period 1 > 7:00 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII °µ k ,c IllllIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII.IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII @ BUIIIIIIIIIIIISIIIIIIIIIIISIE File Name 21IIIIIIII01IIIIIIIII25 PM.xus ...... Project Description CLOUD HQ ""I , t " 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' Demand Information EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 397 396 191 489 121 464 950 157 102 646 34 Signal Information IIII IIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII IIIIIIII III IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II �15' IIIIIIII II II III "IIIIIIIIIIII II�IIIIIIIIIII II II ,III II�IIIIIIIIIII ',,,,,,,,IIII C cle s 130.0 Reference Phase 2 y ... IIIIIIIIII II � II II IIIIII III � � ... II ���I II� ,II I � � I � II ��i���...� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII III . ��� „ II ��i���...� w � V • • 011llllllllff°Inset s 0 Re°Illfllllllerence Point Be inllllllllll ,IIIIIIIIIIII g IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green 7.5 17.6 35.1 13.1 34.3 0.0 IIIIIIIIIIIIIIIIIIIIY�IIIe�ll�lllllllllllo��llllll IIIIIIIIIIIIIIIIII3�III.IIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII31III.IIIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII41III.IIIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII31III.IIIIIIIIIIIIII5�IIIIII IIIIIIIIIIIIIIII4�III.IIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIIIIOIIII.11llllllllll1011llllll Uncoordinated No Simult. Ga E/W On IIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIII,IIIIIIIIIIIIIIIIIIIIIIIIII, IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII,IIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIM°Illlllo Illldllllllle IIIIIIIIIIIIIIIIIIIIIF Illldlllllllllllllllll IIIIIIIIIIIIIIIIIIIS p IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIFIIIIIIIo IIIIIIIIIIIIIIIIIII.IIIIIIIIIIII IIIIIIIIIIIIIIIIIII.IIIIIIIIIIII IIIIIIIIIIIIIIGIIIa IIIIIIIIIIIIIIIIIIIN�IIII/IIIIIIIIISIIIII IllllllllllllllO�n rce i xe i m uIIllllllllt p Red 0.0 0.0 1.5 0.0 1.5 0.0 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 4 3 8 5 2 1 6 Case Number 7.3 1.0 3.0 1.1 3.0 1.1 4.0 Phase Duration, s 40.3 16.6 56.8 32.1 62.2 11.0 41.1 Change Period, ( Y+R � ), s 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Max Allow Headway (MAH ), s 10.1 4.0 10.1 4.0 0.0 4.0 0.0 Queue Clearance Time ( g S ), s 26.5 12.6 14.7 27.6 7.6 Green Extension Time ( g e ), s 7.5 0.4 31.9 1.1 0.0 0.1 0.0 Phase Call Probability 1.00 1.00 1.00 1.00 0.98 Max Out Probability 1.00 0.01 0.86 0.30 0.43 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 4 14 3 8 18 5 2 12 1 6 16 Adjusted Flow Rate ( v ), veh/h 418 417 201 515 127 488 1000 165 107 361 355 Adjusted Saturation Flow Rate ( s ), veh/h/In 1845 1560 1725 1859 1585 1781 1889 1485 1795 1811 1779 Queue Service Time ( g S ), s 12.2 24.5 10.6 12.7 6.3 25.6 22.5 7.6 5.6 22.6 22.7 Cycle Queue Clearance Time ( g � ), s 12.2 24.5 10.6 12.7 6.3 25.6 22.5 7.6 5.6 22.6 22.7 Green Ratio (g/C) 0.26 0.48 0.38 0.39 0.45 0.51 0.43 0.53 0.33 0.27 0.27 Capacity ( c ), veh/h 972 753 387 1453 711 518 1634 791 298 490 481 Volume -to -Capacity Ratio (X) 0.430 0.553 0.519 0.354 0.179 0.943 0.612 0.209 0.361 0.737 0.737 Back of Queue ( Q ), ft/In ( 95 th percentile) 245 366 205 244 108 498 343 129 112 418 398 Back of Queue ( Q ), veh/In ( 95 th percentile) 9.5 14.2 7.8 9.5 4.3 19.6 13.6 4.8 4.5 15.9 15.9 Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.00 0.00 . 0.00 0.86 . 0.00 0.00 Uniform Delay ( d i ), s/veh 39.8 23.7 29.4 28.0 21.5 28.6 20.4 16.0 31.3 37.5 38.1 Incremental Delay ( d 2 ), s/veh 1.4 2.9 1.1 0.7 0.6 21.9 1.7 0.6 0.7 9.5 9.7 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 41.2 28.7 22.1 16.6 47.0 47.8 Level of Service (LOS) D C C B D D Approach Delay, s/veh / LOS . IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Intersection Delay, s/veh / LOS IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.45 B 2.28 B 2.43 B 2.30 B Bicycle LOS Score / LOS 1.18 A 1.18 A 1.85 B 1.17 A �� III �II� I II � � �..�� � I� � � � � � .� .�I � �� .� � ��� w II I � � I � � �� � I���� I I� � � � �I �� I I I � IIII�������� „IIIIII � ,�II�� I I � I� � ���� ����� �I� � I � ����� � i�lll ,IIII IIIIII ����„� ,I��'�� ,IIII ,IIII II�.���� �IIIII� � ,IIII �I�. � I � � �. ��� � � ������� � � ..�� � ..�� � � �� � � � � ,IIII � � �� �i� iglu � �II II� II II �II II I II�� ���������������� � I I � I�� .. .. I I � � � ���� I � ������� � �II �.� I�I III I �II� I �II� I I I ����� II��� �II��� �II�II II II I �III�� � � ����� I I I � ���� I � I ,IIII ,IIII ������ 1i��� 125 �' ���� 11111 U I�� , ,IIII )IIII i,ii �����IllI�� � HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ��� ��"���� �° I* Agency GHA Duration, h 0.250 ����� Analyst M KP Analysis Date Apr 20, 2025 Area Type Other ""'' �'° Jurisdiction IDOT Time Period PM PHF 0.95 �1 �� �:. Urban Street I L RTE 62 ALGONQU I N ... Analysis Year EXISTING 2025 IIIIIIIII61IIIIII21 IIIIIIIII6°IIIIIIII21-BUIIIIIIIIIIIIS Analysis Period 1 > 7:00 , °°���� ,c lllllllntorsectionIIIIIIIL @ BUIIIIIIIIIIIISIIIIIIIIIIISIE File Name 21IIIIIIII01IIIIIIIII25 PM.xus Project Description CLOUD HQ ""�� °"°�����-°'°' �� ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I'll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll"�"I'll"�"I'll"�,'ll"�"�'ll"�"I'll"�"�I' Demand Information �ll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""I'll",,���������������'ll""I'll"'ll""I'll" EB "�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll"�"I'll"�,'ll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' WB ��','ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll NB ",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""'ll""�I'll""�I'll",'ll"'ll""�I'll""�I'll",'ll""I'll""I'll",'ll""'ll""I'll""I'll",'ll"'ll""I'll""I'll",'ll"�"I'll"�"I'll"�,'ll"�"�'ll"�"I'll"�"I'll"�,lI SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 397 396 191 489 121 464 950 157 102 646 34 Signal Information ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... C cle s 130.0 Reference Phase y 2 �, II��� I � .. II��� 011llllllllff°Inset s 0 Re°Illfllllllerence Point Be inllllllllll IIIIIIIIIIIII g IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green 7.5 17.6 35.1 13.1 34.3 0.0 IIIIIIIIIIIIIIIIIIIIY�IIIe�ll�lllllllllllo��llllll IIIIIIIIIIIIIIIIII3�III.IIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII31III.IIIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII41III.IIIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIII31III.IIIIIIIIIIIIII5�IIIIII IIIIIIIIIIIIIIII4�III.IIIIIIIIIIIII51IIIIIII IIIIIIIIIIIIIIIIIIOIIII.11llllllllll1011llllll Uncoordinated No Simult. Ga E/W On IIIIIIIII p Force Mode Fixed Simult Ga Njs p Oln Red 0.0 0.0 1.5 0.0 1.5 0.0 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 1.000 0.969 0.969 0.953 0.977 0.984 0.984 0.992 0.922 0.992 0.953 1.000 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 0.952 1.000 1.000 0.952 1.000 1.000 0.952 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 1.000 1.000 0.952 0.000 0.952 0.000 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.000 0.847 0.000 0.847 0.000 0.847 0.982 0.982 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) 1.00 Movement Saturation Flow Rate (s), veh/h 0 3782 1560 1725 3719 1585 1781 3778 1485 1795 3410 179 Proportion of Vehicles Arriving on Green (P) 0.00 0.26 0.26 0.10 0.39 0.39 0.22 0.58 0.43 0.06 0.36 0.27 Incremental Delay Factor (k) 0.50 0.50 0.11 0.50 0.50 0.35 0.50 0.50 0.11 0.50 0.50 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Green Ratio (g/C) 0.26 0.38 0.39 0.51 0.43 0.33 0.27 Permitted Saturation Flow Rate (sp), veh/h/In 900 938 0 735 0 568 0 Shared Saturation Flow Rate (ssn), veh/h/In 0 Permitted Effective Green Time (gp), s 0.0 36.2 0.0 37.2 0.0 35.2 0.0 Permitted Service Time (gu), s 0.0 22.0 0.0 12.7 0.0 31.8 0.0 Permitted Queue Service Time (gps), s 3.9 12.7 0.8 Time to First Blockage (gf), s 34.2 0.0 0.0 0.0 0.0 0.0 0.0 Queue Service Time Before Blockage (gfs), s Protected Right Saturation Flow (sR), veh/h/In 1560 1585 1485 Protected Right Effective Green Time (gR), s 28.5 7.5 13.1 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.710 0.000 1.557 0.000 1.710 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.143 0.000 0.128 0.000 0.122 0.000 0.142 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 526.99 35.26 781.64 24.12 864.58 20.95 539.93 34.64 Bicycle Fw / F� -3. 64 0.69 -3. 64 0.70 -3. 64 1. 36 -3. 64 0.68 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilliillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliilillilI Agency iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilI GHA Duration, h iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillI 0.250 Analyst iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillI M KP Analysis Date Apr 20, 2025 Area Type Other Jurisdiction IDOT Time Period PM PHF 0.95 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillI UrbanStreet iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillillill I L RTE 62 ALGONQU IN ... Analysis Year iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillillilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillilliillillillillillillilliillillillillillillilliillilliilillillillillillillillill� EXISTING 2025111� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillillillilillillillillillillilliillillillillillillilliillillilillillillillillillillillilillillillillillillilliillillillillillillilliillillilillillillillillillillillilillillillillillillilliillillillillillillillI Analysis PerioiiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillillillilliillillillillillillillilillilId 1 > 7:00 11111111������1111111 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilI Intersection1111 liiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillillillilillillillillilillillillillillillillillilliillillillillillillilliillillillillilillillillillilillillillillillillillillilliillillillillillillilliillillillillilillillillillilillillillillillillillillilliillillillillillillilliillillillillilillillillillilillillillillillillillillilliillillillillillillilliillillillillillI IL 62 @ BUSSE File Name 2025 62-BUS PM.xus Project Description CLOUD HQ Demand Information EB WB NB SB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillilillillilI ApproachMovement L T R L T RillillillillillillilliillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillI L T R L T R ilillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillillillillilliillillillillI Demand ( v ), veh/h 397 396 191 489 121 464 950iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillillillillilliillillilill157 102 646 34 �������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������l����������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������� "I'll'I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll'I .................................................................................................................................................................................................. Signal Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillilillilI Cycle, s 130.0 Reference Phase 2 " iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillill�illillillillillillilliillillillillillillilliillillilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillilillilI Offset s 0 Reference Point Begin iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillilliillillillillillillilliillillillillillillillillilliillillillillillillilliillillillillillillillillilliillillillillillillillillilliillillillillillillilliillillillillillillillillilliillillillillillillillillilliillillillillillillilliillillillillillillillillilliillillillillillillillillilliillillillillillillilliillillillillillillillillilliillillillillillillillillilliillillillillillillilliillillillillillillillillilliillillillillillillillillilliillillillillillillilliillillillillillillillillilliillillillillillillillillilliillillillillillillilliillillillillillillillillilliillillillillillillillillilliillillillillillillilliillillillillillillillillilliillillillillillillillillilliillillillillillillilliillillillillillillillillilliillillillillillillillillilliilGreen 7.5 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated No Simult. Gap E/W On Yellow 3.5 Force Moiiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillde Fixed Simult. Gap N/S On11,1111, Redmmmmmm0 0 UJI 1 1 illillillillillillilliillilI �. .. �� 1 I��� "'II ........ 17.E 35.1 34.3 b.O iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillilillillillillillillillillillillilliillillillllllI 3.5 iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillillillillilliililI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliillillilillillillilllllI 4.5 iiiiiiiiiiiiiiiiiiiiiillillilliillillillillillillilliillillillillillillilliillillillillillillillilliillillillillillilillilI 4.5 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillI 0.0 111111111111111111=I 0.0 1111111111111111111=3.5 1.5 0.0 === 1.5 0.0 Movement Group Results EB WB NB SB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliililI Approach Movement L T R L T R L T R L T R iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliililI Back of Queue ( Q ), ft/In ( 95 th percentile) 245 366 205 244 108 498 343 129 112 418 398 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliilililI Back of Queue ( Q ), veh/In ( 95 th percentile) 9.5 14.2 7.8 9.5 4.3 19.6 13.6 4.8 4.5 15.9 15.9 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillI Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.00 11 4.88 1.00 0.00 1.45 1.69 0.00 0.86 1.12 0.00 0.00 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliilililllllllllllllllllIIIIIIIIIIIIIIIIIIIIIIillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillilliIII Control Delay ( d ), s/veh 41.211111111111111111111111� 30.4 28.7 22.1 50.5 22.1 16.6 32.0 47.0 47.8 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillilI Levelof Service (LOS) 11111111111111111111126.6 C C B D iiiiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillill Approach Delay, s/veh / LOS illiilillillilliillillillillillillilliillilli3llillillillilliillill3illillillillIIIIIIIIII'IIIIIIID IIIIIIIIJIiD IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Intersection Delay, s/veh / LOS IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 15.9 15.9 4.5 32.0 47.8 47.0 9.5 1Q 41.2 14. M 26.6 50.5 22.1 16.6 7 q^ 4.8 I..,.0s c 0 II 0S Ii: 13.6 IL..OS IE I...OS IG"m 19.6 22.1 111immmm 4.3 28.7 9.5 30.4 7.8 Queue MMMM Delay Queue Storage Ratio < 1 Queue Storage Ratio > 1 --- Messages --- WARNING: Since queue spillover from turn lanes and spillback into upstream intersections is not accounted for in the HCM procedures, use of a simulation tool may be advised in situations where the Queue Storage Ratio exceeds i.o. --- Comments --- II �.... � II@ �IIII� 9 W u" o" N � �M III � � � �'� "�II'� !�'.�������. !!���!III�. :��'���. !!���!!III� "�II����� II !!�'.� !!�'.� !IV. u u I I � , W W '''I V '...Ipl, � ��������� � .�������� ���� ' �� � IV ' ' � i i I III ��� � ul pl ' u I� I I ������ � I I I uIIV��� ��� I ull��,� a ull���� �� u i�' III � � � III ' ' �� I II� �II I iiii�� � IIIIII I IIIIII I I IIIIII I I iiii IIIII III � � I IIIII IIIII IIIII IIIII I �I � �� ,III �� � IIIII IIIII Il�.iiii � IIIIII I IIIII II�. II�'� �� ����� IIIII � � �II� I� � " ' � �. .I IIIII iiii� IIIII iiii � � ' iiii i � iiii� "' i � � � ����� '" IIIII � IIIII 025 ,� ����� ��� � ���� � I IIIII IIIII � � � � �" � � a � � � � � �� ��� � � � � � � � �� � �� �� 2 5 IIII' ;°I� IJIII� SIIIII IIII °IIIIIIII II III HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ��� ��"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 20, 2025 Area Type Other'°' °N'" Jurisdiction IDOT Time Period PM PHF 0.95 �w �� �:. Urban Street I L RTE 62 ALGONQU I N ... ��������S ��������S ��L �������62 Analysis Year N B 2032 ������0 �������3������2 ������6�������21-B Analysis Period ���������S 1 > 7:00 °µ k °° ,c l ntorsection l @ B U E F iI a Name 2 N B U P M .xus Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 407 408 205 524 130 475 973 161 104 661 35 Signal Information �� SI C cle s 130.0 Reference Phase 2 y 1 1111 I • • Offset s 0 Rellfllllllerence Point Be in illillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillill lillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillilli it illillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillil llillillillillillillilliillillillillillillilliillillillillillillilliillillil liillillillillillillilliillillillillillillilli g U n coo rd i n ate d N o S i m u l t. G a E/W O n � illilile IIIIIIIIIIIIIIIIS p ������F����orce Green 7.8 19.7 32.6 13.9 33.5 0.0 ��������������������Y����e��l����l�������o�������� ������������������3����.�������������5�������� �����������������3����.��������������5�������� �����������������4����.��������������5�������� �����������������3����.��������������5������� ����������������4����.�������������5�������� ������������������0����.�������������0�������� ""Ill""I'll""I'll",Ill""I'll" I'll",ll,Ill""I'll""I'll",Ill""I'Ill IIIIIIIIIIIIlillillillillillillillillillilli Mo Fixed i m u It Ga N��js On p Red 0.0 0.0 1.5 0.0 1.5 0.0 �� Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 407 408 205 524 130 475 973 161 104 661 35 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 2000 1900 1900 2000 1900 1900 2000 1900 1900 1900 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 4 4 6 3 2 2 1 10 1 6 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 4 3 3 4 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 0 75 205 0 75 295 0 150 100 0 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 45 45 45 45 45 40 40 40 35 35 35 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 31.2 26.0 57.2 37.7 57.2 15.6 35.1 Yellow Change Interval (Y), s 4.5 3.5 4.5 3.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 1.5 0.0 1.5 0.0 1.5 0.0 1.5 Minimum Green ( Gm►n), s 15 3 15 3 15 3 15 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 7.0 3.0 7.0 3.0 2.0 3.0 2.0 Recall Mode Off Off Off Off Min Off Min Dual Entry Yes No Yes No Yes No Yes Walk (Walk), s 7.0 7.0 7.0 7.0 Pedestrian Clearance Time (PC), s 20.0 20.0 20.0 20.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 ��� ������ IIIII �� ,������ ���� � ���� � ����� ��� ��� ��� ����� �� � i���l IIIII IIIII � ������� ,���'�� IIIII IIIII ���.���� IIIII �I �.�� IIIII ���.�� � ��� ��� ��� ��� ������� II 1 IIIII � � �� � ��� � i��� I���� .����� ����������� ��� �� � ������ � ������ � �� � �� ������ ����� ��� ����� � � �� � ����� IIIII IIIII 3 IIII N� IIIII 111 � 1111 °'�° �u S IIIII IIII 11,1 �11 JII' �� HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ��� ��"���� �° °* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 20, 2025 Area Type Other'°' °N'" Jurisdiction IDOT Time Period PM PHF 0.95 �w �� �:. Urban Street I L RTE 62 ALGONQU I N ... ��������S ��������S ��L �������62 Analysis Year N B 2032 ������0 �������3������2 ������6�������21-B Analysis Period ���������S 1 > 7:00 °µ k °° ,c ntorsection @ B U E F iI a Name 2 N B U P M .xus Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' Demand Information EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 407 408 205 524 130 475 973 161 104 661 35 Signal Information �� SI C cle s 130.0 Reference Phase 2 y 1 1111 I I • ll Offset s 0 Rellfllllllerence Point Be in g illillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillill lillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillilli it illillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillil llillillillillillillilliillillillillillillilliillillillillillillilliillillil liillillillillillillilliillillillillillillilli Green 7.8 19.7 32.6 13.9 33.5 0.0 ��������������������Y����e��l����l�������o�������� ������������������3����.�������������5�������� �����������������3����.��������������5�������� �����������������4����.��������������5�������� �����������������3����.��������������5������� ����������������4����.�������������5�������� ������������������0����.�������������0�������� U n coo rd i n ate d N o S i m u l t. G a E/W O n ""Ill""I'll""I'll",Ill""I'll" I'll",ll,Ill""IlIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ll1111111111lillillillillillillillillillilli �����������������������F�������o ����������������������M�������o ����d�������e ���������������������F ����d����������������� �������������������S p ... ��������������G���a �������������������N�����j���������s����� ���������������Oln rce i xe i m u����l�����t p Red 0.0 0.0 1.5 0.0 1.5 0.0 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 4 3 8 5 2 1 6 Case Number 7.3 1.0 3.0 1.1 3.0 1.1 4.0 Phase Duration, s 39.5 17.4 56.9 34.4 61.8 11.3 38.6 Change Period, ( Y+R � ), s 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Max Allow Headway (MAH ), s 10.2 4.0 10.2 4.0 0.0 4.0 0.0 Queue Clearance Time ( g S ), s 26.9 13.5 15.8 30.2 7.8 Green Extension Time ( g e ), s 6.2 0.4 31.7 0.8 0.0 0.1 0.0 Phase Call Probability 1.00 1.00 1.00 1.00 0.98 Max Out Probability 1.00 0.03 0.89 0.91 0.62 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 4 14 3 8 18 5 2 12 1 6 16 Adjusted Flow Rate ( v ), veh/h 428 429 216 552 137 500 1024 169 109 369 363 Adjusted Saturation Flow Rate ( s ), veh/h/In 1845 1560 1725 1859 1585 1781 1889 1485 1795 1811 1779 Queue Service Time ( g S ), s 12.7 24.9 11.5 13.8 6.7 28.2 23.6 7.8 5.8 24.2 24.3 Cycle Queue Clearance Time ( g � ), s 12.7 24.9 11.5 13.8 6.7 28.2 23.6 7.8 5.8 24.2 24.3 Green Ratio (g/C) 0.26 0.50 0.38 0.39 0.45 0.50 0.43 0.54 0.31 0.25 0.25 Capacity ( c ), veh/h 950 772 389 1457 716 526 1622 797 292 455 447 Volume -to -Capacity Ratio (X) 0.451 0.556 0.555 0.379 0.191 0.950 0.631 0.213 0.375 0.811 0.812 Back of Queue ( Q ), ft/In ( 95 th percentile) 253 369 219 260 117 551 358 131 118 460 438 Back of Queue ( Q ), veh/In ( 95 th percentile) 9.8 14.3 8.3 10.2 4.6 21.7 14.2 4.9 4.7 17.6 17.5 Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.00 0.00 . 0.00 0.87 . 0.00 0.00 Uniform Delay ( d i ), s/veh 40.5 22.9 29.6 28.2 21.4 31.9 20.9 15.8 32.9 40.4 40.9 Incremental Delay ( d 2 ), s/veh 1.5 2.9 1.2 0.8 0.6 24.7 1.9 0.6 0.8 14.5 14.8 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 42.1 29.0 22.8 16.4 54.9 55.7 Level of Service (LOS) D C C B D E Approach Delay, s/veh / LOS Intersection Delay, s/veh / LOS . Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.45 B 2.28 B 2.43 B 2.30 B Bicycle LOS Score / LOS 1.20 A 1.23 A 1.88 B 1.18 A 1 11 II ������ 1ii�� 1 °��2 IIII�, II1 � 6�'1,"1111 ill, IIIII IIII : HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ��� ��"���� �° I* Agency GHA Duration, h 0.250 ����� Analyst M KP Analysis Date Apr 20, 2025 Area Type Other ""'' �'° Jurisdiction IDOT Time Period PM PHF 0.95 �1 �� �:. Urban Street I L RTE 62 ALGONQU I N ... Analysis Year N B 2032 ���������S ��������S ��������S ������0 �������3������2 ������6�������21-B ��L �������62 Analysis Period 1 > 7:00 ' k, °°���� ,c ntorsection @ B U E F iI e Name 2 N B U P M .xus Project Description CLOUD HQ ""�� °"°�����-°'°' �� ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll"�"I'll"�,'ll,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' ��','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll WB NB ",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�"I'll"�,I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 407 408 205 524 130 475 973 161 104 661 35 Signal Information ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... � 51 C cle s 130.0 Reference Phase y 2 �, � . 11 Offsets 0 Reference Point Be in g iiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillill ii llillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillilliilli llillillillilliillillillillillillilliillillillilliillillillillillillillillil llillillillilliillillillilliillillillillillill iiiiiiiiiiiiiillillillillillil illiilliillillillillillillillillillilliillillillil Green 7.8 19.7 32.6 13.9 33.5 0.0 ��������������������Y����e��l����l�������o�������� ������������������3����.�������������5�������� �����������������3����.��������������5�������� �����������������4����.��������������5�������� �����������������3����.��������������5������� ����������������4����.�������������5�������� ������������������0����.�������������0�������� U n co o rd i n ate d N o S i m u l t. G a E/W O n ""IIll""I'll""I'll",Ill""I'll "I'll",llIll""I'll""I'll",Ill""I'lIll IIIIillillillillillillillillillillilillillil �����������������������F�������o ����������������������M�������o ����d�������e ���������������������F ����d����������������� �������������������S p ��������������G���a �������������������N�����j���������s����� ���������������Oln rce i xe i m u����l�����t p Red 0.0 0.0 1.5 0.0 1.5 0.0 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 1.000 0.969 0.969 0.953 0.977 0.984 0.984 0.992 0.922 0.992 0.953 1.000 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 0.952 1.000 1.000 0.952 1.000 1.000 0.952 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 1.000 1.000 0.952 0.000 0.952 0.000 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.000 0.847 0.000 0.847 0.000 0.847 0.982 0.982 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) 1.00 Movement Saturation Flow Rate (s), veh/h 0 3782 1560 1725 3719 1585 1781 3778 1485 1795 3409 180 Proportion of Vehicles Arriving on Green (P) 0.00 0.26 0.26 0.11 0.39 0.39 0.24 0.57 0.43 0.06 0.34 0.25 Incremental Delay Factor (k) 0.50 0.50 0.11 0.50 0.50 0.40 0.50 0.50 0.11 0.50 0.50 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Green Ratio (g/C) 0.26 0.38 0.39 0.50 0.43 0.31 0.25 Permitted Saturation Flow Rate (sp), veh/h/In 870 929 0 724 0 555 0 Shared Saturation Flow Rate (ssn), veh/h/In 0 Permitted Effective Green Time (gp), s 0.0 35.5 0.0 34.7 0.0 32.7 0.0 Permitted Service Time (gu), s 0.0 20.8 0.0 8.6 0.0 30.3 0.0 Permitted Queue Service Time (gps), s 4.5 8.6 0.6 Time to First Blockage (gf), s 33.5 0.0 0.0 0.0 0.0 0.0 0.0 Queue Service Time Before Blockage (gfs), s Protected Right Saturation Flow (sR), veh/h/In 1560 1585 1485 Protected Right Effective Green Time (gR), s 30.9 7.8 13.9 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.710 0.000 1.557 0.000 1.710 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.143 0.000 0.128 0.000 0.122 0.000 0.144 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 515.37 35.82 783.75 24.04 858.44 21.18 501.76 36.48 Bicycle Fw / F� -3. 64 0.71 -3. 64 0.75 -3. 64 1.40 -3. 64 0.69 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilliillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliilillilI Agency iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilI GHA Duration, h iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillI 0.250 Analyst iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillI M KP Analysis Date Apr 20, 2025 Area Type Other Jurisdiction IDOT Time Period PM PHF 0.95 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillI Urban Street I L RTE 62 ALGONQU IN ... Analysis Year NB 2032 Analysis Period111111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1 > 7:00 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilI Intersectioniiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillillill 111- 62 @ BUSSE File Name 2032 NB 62-BUS PM.xus Project Description CLOUD HQ Demand Information EB WB NB SB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliI Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 407 408 205 524 130 475 973 161 104 661 35 �������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������l����������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������l������������������������������������������������������������������������������������������������������������������������l�����������������������������������������������������������������������������������������������������������������l���������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������l���������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������� Signal Information iiiiiiiiiiiiiC llilliillillill1�lillillillill3�illillil0� llillillil0lillillilli llilliilliillilllliillilli21 liillillillillillillillillillillilliillillillillillillilliilililI ......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................."""""""""""""""""""""""""""""" 11 11111 ' "A 'W ELLU" �������IIIIIIIIIIIIIIIIIIIIIIililI tm Cycle, s ReferencelllllillilPhase iiiiiiiiiOffset, ����� . �� ...� i�� .� ... �� . I "��"�" """J III IIIIIIIIIIIIIIIIIIi......1,I III I����.��� "'ll """J 1, Y2 � v MV s 0 Reflillierence Point Begin� iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillill lillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliilli it llilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillill illillillillillillillillillillilliillillillillillillilliillillillillillillill lillillilliillillillillillillilliillillillilli lillillillillillillilliillilli lillillillilliillillillillillillillillillillilliil Uncoordinated No Simult. Gap E/W On llillillillillI ����������������������������������M�������o ����d�������e �������������Fixed ������������� ���������������S ��������������G���a �������������������N�����j���������s����� ���������������Oln �( Green 7.8 19.7 32.6 13.9 3 3.5 0.0 "I'l""I'll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I"ll,'ll""I'll""I'll",'ll""I'll""I'll",,� "I'l""I'll""I'll'll""I'l'll""I'll""I'll",'ll""I'll""I'll",���������������'ll""I'll""I'll'll""I'llI "I'l""I'll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",Ill"","I:Tr 1 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillillilillillillillillillillilliillillillillillillillI iiiiiiiiiiiiiiiiiiiiiillillillilI iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillilliillillillillillillilillilI iiiiiiiiiiiiiiiiiiiiiillillillillillillillilillI iiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillillI iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillilliillillillillillillillilillillillillillillilliillillilillillillillillI I " Yellow 3.5 3.5 4.5 3.5 4.5 0.0 .�� ' " dis * IIIIIIIIII F�������o Force i m u t p Red 0.0 0.0 1.5 0.0 1.5 0.0 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Backof Queue ( Q ), ft/In ( 95 th percentile) 253 369 219 260 117 551 358 131iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillillI 118 460iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilliillillillillillillillilliillillillillillillilliI 438 Back of Queue ( Q ), veh/In ( 95 th percentile) 9.8 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillilillilI 14.3 iiiiiiiiiiiiiiiiiiiiiillillillillilillillillillillillillillilliillillillillillillillillillillillilliillillillllllllllllillillillillillillilliillillillillillillillillillillillilliillillillillillilliillillillillillillilliillillililIiiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillilliillillillillillillillillillillillillillI 8.3 10.2 4.6 21.7 14.2 4.9 4.7 17.6 17.5 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillililllllllIIIIIIIIIIIIIIIIIIIIIIillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillilillilI Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.00 4.92 1.07 0.00 1.55 1.87 0.00 0.87 1.18 0.00 0.00 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilI Control Delay ( d ), s/veh 42.1 25.7 30.9 29.0 22.0 56.6 22.8 16.4 33.7 54.9 55.7 Level of Service (LOS) D C C C C E C B C D E iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilll11111111illiillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilli������llilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillilillillill������illilliilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliilli������illillilillillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliililI Approach Delay, s/veh / LOS 1111111111111111111111111111� . C �������������IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIl51111111111211:11511111IIIIIIIIIIIIIIIIIIIIIIll� D iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillllillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliill""IlI Intersection Delay, s/veh / LOS llllllllllillllllllllllillillillillillillilliillillillillillillilliillillilillillillillillillillillilillillillillillillilliillillillillillillilliillillilillillillillillillillillilillillillillillillilliillillillillillillilliillillilillillillillillillillillilillillillillillillilliillillillillillillilliillillilillillillillillillillillilillillilillillillillllIIIIIIIIIIIIIIIIIIIIII11111111111IIIIIIIIIIIIIIIIIIIIIIlillillillillillillilliillillillillillillilliillillilillillillillillillillillilillillillillillillilliillillilillilliiiiiliiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillllllI iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillilliliiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiI iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillililiiiiiiiiiliiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiI 17.5 17.6 4.7 33.7 55.7 54.9 9.8 1Q 42.1 14. M 25.7 56.6 22.8 16.4 I...01'4 4.9 I....... 0S C 0 II...0S Ii:) 14.2 IL..OS IE I...OS IF 21.7 22.0 IN==== 4.6 29.0 10.2 30.9 JIM======== 8.3 Queue MMMM Delay � Queue Storage Ratio < 1 Queue Storage Ratio > 1 --- Messages --- WARNING: Since queue spillover from turn lanes and spillback into upstream intersections is not accounted for in the HCM procedures, use of a simulation tool may be advised in situations where the Queue Storage Ratio exceeds i.o. --- Comments --- �.... II� � III I�'� III�� � �� �� I� @ 9 �� II 0 U19I II�� ������ ���II����� !�'.�������. !!���!III�. :��'���. !!���!!III� "�II����� II !!�'.� !!�'.� !IV. u u u II III III °'I u' '..'ull, � � � � V' "' U W W ' u I� I I ������ � I I I uIIV��� ��� I ull��,� a uIV���� �� u u W i�' III � � � III ' ' i I I �'�� �� I� � �� � � � � IIIII I� � I' � � �°� I� I� � � I I IIIII I�I IIIII I�I � iiii IIIII III � � I iiiii � IIIII IIIII IIIII I„ �I � � �� ,III �� � IIIII IIIII Il�.iiii � IIIIII � I IIIII II�. II�'�� �� ����� IIIII°°°� ���II� I��� �' � � �.� �.I IIIII iiii� IIIII � iiii ��� ' � iiii i�� iiii��', � i�� ���� ����� '" Ilul � Ilul � � ,IIIII I�� � ����� ��' � ���� �� 11114°°°� IIIII �� I I3 IIII III IIIIIIIIIIIIIN ;°I,;B, LIII ISIIIII IIII I « I Is HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ��� ��"���� �° I* Agency GHA Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other �"' °�'° Jurisdiction IDOT Time Period PM PHF 0.95 �w �� �:. Urban Street I L RTE 62 ALGONQU I N ... Analysis Year TOTAL 2032 Analysis Period 1 > 7:00 °µ k °° ,c Intersection IL 62 @ BUSSE File Name 2032 TOT 62-BUS PM.xus Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 424 408 221 564 130 475 973 168 104 661 35 Signal Information �� '1111111 C cle s 130.0 Reference Phase 2 y .. 1 • • 'll� Offsets 0 Rellfllllllerence Point Be inill111111 iiiiiiiiiiiiillillillillillillilliillillillillillillillilillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillill lillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillilli it illillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillil llillillillillillilliillillillillillillilliillillillillillillilliillillillil llillillillillillilliillillillillillillilliill g U n coo rd i n ate d N o S i m u l t. G a E/W O n p Green 7.8 19.8 32.4 15.0 32.6 0.0 ��������������������Y����e��l����l�������o�������� ������������������3����.�������������5�������� �����������������3����.��������������5�������� �����������������4����.��������������5�������� �����������������3����.��������������5������� ����������������4����.�������������5�������� ������������������0����.�������������0�������� ""Ill""I'll""I'll",Ill""I'll" I'll",ll,Ill""I'll""I'll",Ill""I'Ill IIIIIIIIIIIIlillillillillillillillillillilli llillillilillillillillillillilliillillililli illillilillillillillillillillilliillillillill lillillilliillillillillillillilliillillillill lillillilliillillillillillillilliillillillill Force Mode Fixed Simult Ga Njs Oln p Red 0.0 0.0 1.5 0.0 1.5 0.0 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 424 408 221 564 130 475 973 168 104 661 35 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 2000 1900 1900 2000 1900 1900 2000 1900 1900 1900 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 4 4 6 3 2 2 1 10 1 6 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 4 3 3 4 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 0 75 205 0 75 295 0 150 100 0 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 45 45 45 45 45 40 40 40 35 35 35 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 31.2 26.0 57.2 37.7 57.2 15.6 35.1 Yellow Change Interval (Y), s 4.5 3.5 4.5 3.5 4.5 3.5 4.5 Red Clearance Interval ( R�), s 1.5 0.0 1.5 0.0 1.5 0.0 1.5 Minimum Green ( Gm►n), s 15 3 15 3 15 3 15 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 7.0 3.0 7.0 3.0 2.0 3.0 2.0 Recall Mode Off Off Off Off Min Off Min Dual Entry Yes No Yes No Yes No Yes Walk (Walk), s 7.0 7.0 7.0 7.0 Pedestrian Clearance Time (PC), s 20.0 20.0 20.0 20.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 � � �I�� �� ��II ������ IIIII � ����� � �� ���� � ����� ���� � � �� ����� I ��i���l IIIII IIIII ��������� � ,���I'�� IIIII IIIII ����.���� IIIII �I � .� IIIII ����.�� � �� � � ��� � � ������ II 1 IIIII � � 9 � � � i I���� ����� � ����� ���� � � �� � ������ � ����� �� � � ���I ����� ����� � � ����� � � ,����� � � � IIIII IIII 3 � �� ,ill °���� II III S IIIII IIIII 111 ��11 �,� HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ��� ��"���� �° I* Agency GHA Duration, h 0.250 Analyst MKP Analysis Date Jul 2, 2025 Area Type Other �"' °�'° Jurisdiction IDOT Time Period PM PHF 0.95 �w �� �:. Urban Street I L RTE 62 ALGONQU I N ... Analysis Year TOTAL 2032 Analysis Period 1 > 7:00 °µ k °°���� ,c Intersection IL 62 @ BUSSE File Name 2032 TOT 62-BUS PM.xus Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' Demand Information EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 424 408 221 564 130 475 973 168 104 661 35 Signal Information '1111111 C cle s 130.0 Reference Phase 2 y �, 1 1111 � .. 1 1 • • 'll� Offsets 0 Rellfllllllerence Point Be inill111111 g iiiiiiiiiiiiillillillillillillilliillillillillillillillilillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillill lillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillilli it illillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillil llillillillillillilliillillillillillillilliillillillillillillilliillillillil llillillillillillilliillillillillillillilliill Green 7.8 19.8 32.4 15.0 32.6 0.0 ��������������������Y����e��l����l�������o�������� ������������������3����.�������������5�������� �����������������3����.��������������5�������� �����������������4����.��������������5�������� �����������������3����.��������������5������� ����������������4����.�������������5�������� ������������������0����.�������������0�������� U n coo rd i n ate d N o S i m u l t. G a E/W O n ""Ill""I'll""I'll",Ill""I'll" I'll",ll,Ill""I'll""I'll",Ill""I'Ill IIIIIIIIIIIIlillillillillillillillillillilli llillillilillillillillillillilliillillililli illillilillillillillillillillilliillillillill lillillilliillillillillillillilliillillillill lillillilliillillillillillillilliillillillill �����������������������F�������o ����������������������M�������o ����d�������e ���������������������F ����d����������������� �������������������S p ��������������G���a �������������������N�����j���������s����� ���������������Oln rce i xe i m u����l�����t p Red 0.0 0.0 1.5 0.0 1.5 0.0 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 4 3 8 5 2 1 6 Case Number 7.3 1.0 3.0 1.1 3.0 1.1 4.0 Phase Duration, s 38.6 18.5 57.0 34.5 61.7 11.3 38.4 Change Period, ( Y+R � ), s 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Max Allow Headway (MAH ), s 10.2 4.0 10.2 4.0 0.0 4.0 0.0 Queue Clearance Time ( g S ), s 27.3 14.5 17.0 30.3 7.8 Green Extension Time ( g e ), s 4.9 0.4 31.2 0.8 0.0 0.1 0.0 Phase Call Probability 1.00 1.00 1.00 1.00 0.98 Max Out Probability 1.00 0.07 0.91 0.99 0.69 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 4 14 3 8 18 5 2 12 1 6 16 Adjusted Flow Rate ( v ), veh/h 446 429 233 594 137 500 1024 177 109 369 363 Adjusted Saturation Flow Rate ( s ), veh/h/In 1845 1560 1725 1859 1585 1781 1889 1485 1795 1811 1779 Queue Service Time ( g S ), s 13.4 25.3 12.5 15.0 6.7 28.3 23.7 8.0 5.8 24.3 24.4 Cycle Queue Clearance Time ( g � ), s 13.4 25.3 12.5 15.0 6.7 28.3 23.7 8.0 5.8 24.3 24.4 Green Ratio (g/C) 0.25 0.49 0.38 0.39 0.45 0.50 0.43 0.54 0.31 0.25 0.25 Capacity ( c ), veh/h 924 762 388 1460 717 526 1619 807 291 453 445 Volume -to -Capacity Ratio (X) 0.483 0.563 0.599 0.407 0.191 0.951 0.633 0.219 0.376 0.816 0.817 Back of Queue ( Q ), ft/In ( 95 th percentile) 265 374 234 279 116 552 359 135 118 463 440 Back of Queue ( Q ), veh/In ( 95 th percentile) 10.3 14.5 8.9 10.9 4.6 21.8 14.2 5.0 4.7 17.7 17.6 Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.00 . 0.00 . 0.00 0.90 . 0.00 0.00 Uniform Delay ( d i ), s/veh 41.6 23.5 30.0 28.5 21.3 32.1 21.0 15.4 33.0 40.6 41.2 Incremental Delay ( d 2 ), s/veh 1.8 3.0 1.5 0.8 0.6 24.9 1.9 0.6 0.8 14.9 15.3 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 43.4 . 29.4 . 22.9 16.0 55.6 56.4 Level of Service (LOS) D C C B E E Approach Delay, s/veh / LOS . Intersection Delay, s/veh / LOS . Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 2.45 B 2.28 B 2.43 B 2.30 B Bicycle LOS Score / LOS 1.21 A 1.28 A 1.89 B 1.18 A �� ��� ������ � IIIII � �� ,����� � � � � �� � ���� ����� ��� � � � ����� � i�lll IIIII IIIII�������� ,���'�� IIIII IIIII ���.���� � IIIII � IIIII ���. � � � � �. ��� � � ������� IIIII � � �� �i� ����� � ����������������� � � � � ���� � � ������� � � ����� ���� ����� ����� � ����� I II l�� � ,����� ���� � ����� � � � IIIII IIII HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ��� ��"���� �° I* Agency GHA Duration, h 0.250 ����� Analyst MKP Analysis Date Jul 2, 2025 Area Type Other ""'' �'° Jurisdiction IDOT Time Period PM PHF 0.95 �1 �� �:. Urban Street I L RTE 62 ALGONQU I N ... Analysis Year TOTAL 2032 Analysis Period 1 > 7:00 ' k, °°���� ,c Intersection IL 62 @ BUSSE File Name 2032 TOT 62-BUS PM.xus Project Description CLOUD HQ ""�� °"°�����-°'°' �� ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""I'll""I'll",'ll",'ll""I'll""I'll",'ll",'ll""I'll""I'll",'ll"�"I'll"�"I'll"�,'ll"�,'ll"�"I'll"�"�I'l Demand Information �l",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",,���������������'ll""�I'll,'ll""I'll"' EB 'I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""I'll""I'll",'ll""I'll""I'll",'ll",'ll""I'll"�"I'll"�,'ll"�,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' WB ��','ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""I'll""I'll",'ll",'ll""I'll""I'll NB ",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll",'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll",'ll""I'll""I'll",'ll",'ll""I'll""I'll",'ll"�"I'll"�"I'll"�,'ll"�,'ll"�"I'll"�"I'll"�,"I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 424 408 221 564 130 475 973 168 104 661 35 Signal Information ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... '� C cle s 130.0 Reference Phase y 2 1 . 1.. I Offset s 0 Reference Point Be in g iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillil llillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillillillillillil illillillillillillilliillillillillillillillill illillillilliillillillillillil illillillillilliillillillillillillilliillillillill Green 7.8 19.8 32.4 15.0 32.6 0.0 ��������������������Y����e��l����l�������o�������� ������������������3����.�������������5�������� �����������������3����.��������������5�������� �����������������4����.��������������5�������� �����������������3����.��������������5������� ����������������4����.�������������5�������� ������������������0����.�������������0�������� U n co o rd i n ate d N o S i m u l t. G a E/W O n 11111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII llillillillillillillillillillilliillillilliil illiillillillillillillillillilliillillillill lillilliillillillillillillillilliillillillill llllll11111111111111111111111111 llilliilillillilliillillillillillillilliilli �������F �����o ��F p ��������N ���js 'l""I'll",S rce Mode i xe d i m u It G a p O n Red 0.0 0.0 1.5 0.0 1.5 0.0 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 1.000 0.969 0.969 0.953 0.977 0.984 0.984 0.992 0.922 0.992 0.953 1.000 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 0.952 1.000 1.000 0.952 1.000 1.000 0.952 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 1.000 1.000 0.952 0.000 0.952 0.000 0.952 0.000 Right -Turn Adjustment Factor (fRT) 0.000 0.847 0.000 0.847 0.000 0.847 0.982 0.982 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) 1.00 Movement Saturation Flow Rate (s), veh/h 0 3782 1560 1725 3719 1585 1781 3778 1485 1795 3409 180 Proportion of Vehicles Arriving on Green (P) 0.00 0.25 0.25 0.12 0.39 0.39 0.24 0.57 0.43 0.06 0.33 0.25 Incremental Delay Factor (k) 0.50 0.50 0.11 0.50 0.50 0.40 0.50 0.50 0.11 0.50 0.50 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 6.0 3.5 6.0 3.5 6.0 3.5 6.0 Green Ratio (g/C) 0.25 0.38 0.39 0.50 0.43 0.31 0.25 Permitted Saturation Flow Rate (sp), veh/h/In 837 914 0 724 0 555 0 Shared Saturation Flow Rate (ssn), veh/h/In 0 Permitted Effective Green Time (gp), s 0.0 34.5 0.0 34.5 0.0 32.5 0.0 Permitted Service Time (gu), s 0.0 19.1 0.0 8.3 0.0 30.1 0.0 Permitted Queue Service Time (gps), s 5.3 8.3 0.6 Time to First Blockage (gf), s 32.5 0.0 0.0 0.0 0.0 0.0 0.0 Queue Service Time Before Blockage (gfs), s Protected Right Saturation Flow (sR), veh/h/In 1560 1585 1485 Protected Right Effective Green Time (gR), s 31.0 7.8 15.0 Multimodal EB WB NB SB Pedestrian Fw / Fv 1.710 0.000 1.557 0.000 1.710 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.144 0.000 0.127 0.000 0.123 0.000 0.144 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 500.88 36.52 785.23 23.98 856.80 21.24 498.74 36.62 Bicycle Fw / F� -3. 64 0.72 -3. 64 0.79 -3. 64 1.40 -3. 64 0.69 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilliillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliilillilI Agency iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilI GHA Duration, h iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillI 0.250 Analyst iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillI MKP Analysis Date Jul 2, 2025 Area Type Other Jurisdiction IDOT Time Period PM PHF 0.95 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillI Urban Street I L RTE 62 ALGONQU IN ... Analysis Year TOTAL 2032 11111111111JAnalysis Period111111111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII������11111111 > 7:00 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilI Intersectioniiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillillill 1IL 62 @ BUSSE File Name 2032 TOT 62-BUS PM.xus Project Description CLOUD HQ Demand Information EB WB NB SB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillilillillilI ApproachMovement L T R L T RillillillillillillilliillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillI L T R L T R ilillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillillillillilliillillillillI Demand ( v ), veh/h 424 408 221 564 130 475 973iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillillillillilliillillilillillillillillillillillilliillillilillillillillillillillillillillilliillillilill168 104 661 35 �������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������l����������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������� "I'll'I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll",,'ll""I'll'll""I'll""I'll",'ll""I'll""I'll",'ll'I .................................................................................................................................................................................................. Signal Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillilillilI Cycle, s 130.0 Reference Phase 2 " iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillill�illillillillillillilliillillillillillillilliillillilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillilillilI Offset s 0 Reference Point Begin IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green 7.8 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated No Simult. Gap E/W On Yellow 3V 5 ForceMoiiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillde Fixed Simult. Gap N/S On Red UJI 1 1 illillillillillillilliillilI �. .. �� 1 I��� "'II 19.8 32. 32.E.O iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliililillllllllI 3.5 iiiiiiiiiiiiiiiiiiiiiillillilillillillillillillillillillillilliillillillillillillillillillillillilliillillillillillilliililI 1111111115.0 4.5 3.5 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillI 4.5 iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillilliI 0.0 0.0 1.5 0.111111111111111111=0 1.5 0.0 Movement Group Results EB WB NB SB iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliililI Approach Movement L T R L T R L T R L T R iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliililI Back of Queue ( Q ), ft/In ( 95 th percentile) 265 374 234 279 116 552 359 135 118 463 440 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliilililI Back of Queue ( Q ), veh/In ( 95 th percentile) 10.3 14.5 8.9 10.9 4.6 21.8 14.2 5.0 4.7 17.7 17.6 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillI Queue Storage Ratio ( RQ ) ( 95 th percentile) 0.00 4.99 1.140.00 1.55 1.87 0.00 0.90 1.18 0.00 0.00 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliilililllllllllllllllllIIIIIIIIIIIIIIIIIIIIIIillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillilliIII Control Delay (d ), s/veh 43.4 11 6.5 31.5 29.4 21.9 57.0 22.9 16.0 33.8 55.6 56.4 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillilI Levelof Service (LOS) 11111111111111111111111� D 1111111111111111111112 C CIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1111111111� Ciiiiiiiiiiiiiiiiiiiiiillillilill BIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII E E iiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillillIApproach Delay, s/veh / LOS"I'l""I'll""I'llIll""I'll""I'll",Ill""I'll""I'll",Ill""I'llllIll""I'll""I'll",Ill""I'll""I'll",Ill""������Ill""I'll""I'llllIll""I'll""I'll",Ill""I'll"I .11111 11� IIIIIIIIIIIIIIIIIIIIIllIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII11111111111IIIIIIIIIIIIIIIIIIIIIIl111111 11111 iiiiiiiiiiiiiiiiiiiiiillillilllllllllllI iiiiiiiiiiiiiiiiiiiiiillillilillill�������illillillillillillilliillilliCIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIlillillillillillillilliillillilillillilililI . "I'l""I'll""I'llIl""""""'I'Il,ll'I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Intersection Delay, s/veh / LOS IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII .1 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII D IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 17.6 17.7 4.7 33.8 56.4 55.6 10.0 1Q 43.4 14. W 26.5 57.0 11 11 22.9 16.0 � L 0"41) A T 11 0 II...0S li:) 14.2 IL..OS IE I...OS IF 21.8 21.9 IN==== 4.6 29.4 10.9 31.5 III&======== 8.9 Queue MMMM Delay � Queue Storage Ratio < 1 Queue Storage Ratio > 1 --- Messages --- WARNING: Since queue spillover from turn lanes and spillback into upstream intersections is not accounted for in the HCM procedures, use of a simulation tool may be advised in situations where the Queue Storage Ratio exceeds i.o. --- Comments --- iII'l' 'II� .�I I IIIIIIIII I I � iiii� I IIIII ��� iiii 202 uIIIII��� 0,' 5 �I�1 III 'l I I� II�, iii�� II .. !.�II ���� I.�' I:I �� � ���� 11114°° IIII I I3,111", m1" 1( I 1 6 I�2 BI IJi SIIIII IIIII :IIII10 I HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, IIIIIAM 2025 Area Type ,IIII Other III0.95 .- �'°' °N'" , :::: Jurisdiction IDIIIIIIIIIIIOT Time Period PHF �ll �1 �illillillillillillillillillillilliillillillillillil� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIII II II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Urban Street I L RTE 62 ALGONQU I N ... lllntersectionI�IIIIIIL IIIIIIIII6°IIIIIII21 IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIII Analysis IIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIII ,IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ,IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIIIII Year EXISTING 2025 Analysis Period IIIIIIIII6°IIIIIIII2�-LIIIII�IIIIIIN IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1 > 7:00 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII l �� �k ,c ��lllIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII @ L°IIIIIIIIIINNEMAN File Name 21IIIIIIII01IIIIIIIII25 AM.xus ...... Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 46 509 8 8 378 41 10 0 4 84 3 21 Signal Information IIIIIIIIIIIIIIIIIIIIIC IIIIII IIIIIIIIII21 IIII ,IIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII IIIIIIIII IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I IIIIIIIII31IIIIIIII81 IIIIIIIIII91 I IIIIIIIIIIRe°Illfllllllerence .� 0 ��i"'���I � III, II;����III���III. .� II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII .� cll�lllllle s Phase yIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I� IIIIIIIIIIIIIIII � IIIIIIIIIIIIIIIIIIIIIIIIII III . IIIIIIIIII,, ,� . II IIIIII IIIIII IL IIIIII ,IIIIIIIIIIIIIIIIIIIIIIIIII ,IIIIII III ,��� IIIIIIIIIIIIIIIIIIIIIIIIIIIII�� . �I ,IIII I III�� ��� IIIIII II� ,II IIIIII Aw �. 011llllllllff°Inset, s 0 Re°Illfllllllerence Point Beginllllllllll IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII III ,IIIIIIIIIIIIIIIIIII Green IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 0.3 1.0 1.. 16.7 ,IIIIIIIIIIIIIIIIIIIIIIIIII 11111 6.0 0.0 ,IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 0.0 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Uncoordinated Yes Simult. Gap E/W On IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ,,IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Yellow 3.0 0.0 4.5 4.5 0.0 0.0 Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 1.5 1.5 0.0 0.0 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 46 509 8 8 378 41 10 0 4 84 3 21 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 1900 2000 1900 1900 2000 1900 1900 1900 1900 1900 1900 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 7 5 13 7 7 0 5 33 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 3 3 3 3 3 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 225 0 115 0 0 0 300 0 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 45 45 45 45 45 45 45 45 45 45 45 45 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 15.0 85.0 15.0 85.0 20.0 20.0 Yellow Change Interval (Y), s 3.0 4.5 3.0 4.5 4.5 4.5 Red Clearance Interval ( R�), s 0.0 1.5 0.0 1.5 1.5 1.5 Minimum Green ( Gm►n), s 3 15 3 15 8 8 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 3.0 2.0 3.0 2.0 5.0 5.0 Recall Mode Off Min Off Min Off Off Dual Entry No Yes No Yes Yes Yes Walk (Walk), s 0.0 0.0 7.0 0.0 Pedestrian Clearance Time (PC), s 0.0 0.0 20.0 0.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 ,. III � �II� I � I IIII lu' I ��������� �� III II I I I l i � � � l �� ���!I �I ���I��� I��� ������ IIIIII � ,�II�� ���� ���� � ����� ��I� ��� ��� ����� � �I�i���l ,IIII IIIIII �I�������� ,I���'�� ,IIII ,IIII III�.���� ,IIII �� ��.�� ,IIII I�I�.�� � ��� ��� ��� ��� ������� � .... ����� ,IIII � I� �� I � �II� � II� II lu' Ii � � �I�� � ��� � i��� iglu ����� ����������� ��� ���� ����� �� � ������ � ������ �II �I� �� �II� I I I I' I Im II� I II� I � �� � �� �III�� III�� ��� �II�� � � ���� �� n" ���� II I � � ,IIII ,IIII �II�� � ��ii��ll��� ���� ,IIII IIII �� I��� ��� ����� �II���.� � �� HCS Signalized Intersection Results Summary General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, IIIIIAM 2025 Area Type ,IIII Other III0.95 .- �'°' °N'" , :::: Jurisdiction IDIIIIIIIIIIIOT Time Period PHF �ll �1 �illillillillillillillillillillilliillillillillillil� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIII II II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Urban Street I L RTE 62 ALGONQU I N ... IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII lllntersectionI�IIIIIIL IIIIIIIII6°IIIIIII21 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIII Analysis IIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIII ,IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ,IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIIIII Year EXISTING 2025 Analysis Period IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIII6°IIIIIIII2�-LIIIII�IIIIIIN IIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1 > 7:00 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII l �� �k ,c ��lllIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII @ L°IIIIIIIIIINNEMAN File Name 21IIIIIIII01IIIIIIIII25 AM.xus ...... Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' Demand Information EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 46 509 8 8 378 41 10 0 4 84 3 21 Signal Information IIIIII IIIIIIIIII21 IIIIIIIIIIIIIIIIIIIIIC IIII IIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIII IIIIIIIII IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I IIIIIIIII31IIIIIIIII81 IIIIIIIIII91 I IIIIIIIIIIRe°Illfllllllerence .� 0 "'I III ;IIIIIIIIII III. .� II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII .� cll�lllllle s Phase yIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I� IIIIIIIIIIIIIIII � IIIIIIIIIIIIIIIIIIIIIIIIII III . IIIIIIIIII,, ,� . II IIIIII IIIIII IL IIIIII ,IIIIIIIIIIIIIIIIIIIIIIIIII ,IIIIII III ,��� IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII . �I ,IIII I III�� ��� IIIIII II� ,II IIIIII Aw �. 011llllllllff°Inset, s 0 Re°Illfllllllerence Point Beginllllllllll IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Green IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 0.3 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1.0 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1.. 16.7 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ,IIII 6.0 0.0 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 0.0 Uncoordinated Yes Simult. Gap E/W On IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ,IIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Yellow 3.0 0.0 4.5 4.5 0.0 0.0 �� Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 1.5 1.5 0.0 0.0 Timer Results EBL EBT WBL WBT NBL NBT SBL SBT Assigned Phase 5 2 1 6 8 4 Case Number 1.1 4.0 1.1 3.0 8.0 6.0 Phase Duration, s 4.2 23.7 3.3 22.7 12.0 12.0 Change Period, ( Y+R � ), s 3.0 6.0 3.0 6.0 6.0 6.0 Max Allow Headway (MAH ), s 4.0 6.2 4.0 6.2 6.7 6.7 Queue Clearance Time ( g S ), s 2.6 5.5 2.1 4.8 2.3 4.5 Green Extension Time ( g e ), s 0.1 11.9 0.0 11.9 0.9 0.8 Phase Call Probability 0.41 1.00 0.09 1.00 0.75 0.75 Max Out Probability 0.00 0.00 0.00 0.00 0.01 0.02 Movement Group Results EB WB NB SB Approach Movement L T R L T R L T R L T R Assigned Movement 5 2 12 1 6 16 3 8 18 7 4 14 Adjusted Flow Rate ( v ), veh/h 48 273 271 8 398 43 15 88 25 Adjusted Saturation Flow Rate ( s ), veh/h/In 1711 1922 1911 1626 1800 1522 1505 1379 1219 Queue Service Time ( g S ), s 0.6 3.5 3.5 0.1 2.8 0.6 0.0 2.3 0.7 Cycle Queue Clearance Time ( g � ), s 0.6 3.5 3.5 0.1 2.8 0.6 0.3 2.5 0.7 Green Ratio (g/C) 0.46 0.45 0.45 0.44 0.43 0.43 0.15 0.15 0.15 Capacity ( c ), veh/h 579 872 867 442 1543 653 391 389 188 Volume -to -Capacity Ratio (X) 0.084 0.313 0.313 0.019 0.258 0.066 0.038 0.227 0.134 Back of Queue ( Q ), ft/In ( 95 th percentile) 6 36 34 1 28 6 4 28 10 Back of Queue ( Q ), veh/In ( 95 th percentile) 0.2 1.4 1.4 0.0 1.1 0.2 0.2 1.1 0.3 Queue Storage Ratio (RQ) (95 th percentile) 0.03 0.00 0.00 0.01 0.00 0.00 0.00 0.09 0.00 Uniform Delay ( d i ), s/veh 5.9 6.8 6.8 6.5 7.1 6.5 14.0 15.1 14.2 Incremental Delay ( d 2 ), s/veh 0.1 0.1 0.1 0.0 0.0 0.0 0.1 0.6 0.7 Initial Queue Delay ( d 3 ), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Delay ( d ), s/veh 6.0 6.9 6.9 6.5 7.2 6.6 14.1 15.7 14.9 Level of Service (LOS) A A A A A A B 6 B Approach Delay, s/veh / LOS 6.8 A 7.1 A 14.1 B 15.5 B IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Intersection Delay, s/veh / LOS IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 7.8 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII A IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Multimodal Results EB WB NB SB Pedestrian LOS Score / LOS 1.64 B 1.87 B 2.42 B 2.26 B Bicycle LOS Score / LOS 0.98 A 0.86 A 0.51 A 0.68 A �� IIII IIII .,.� I I � I� ll I ��� w III II � � ..�� � � � ��� .� ..�I � � .� I � ��� � I� �� �� �� � �� ��I������������ ������� � ,III�� I I � II I ���� ����� �I� I I � ����� � i���� ����� �����������„� ,I��'I� ����� ����� IIL���� �������� � ����� �I�. � I � � �. ��� � � ������� �� �� IIII ����� � � �� � ��� � ..�� ��..�� � � �� ��� ��lu � III III II II II II I II�� ���������������� � I I � III � III II III II I.. .. .� III IIII � I. I� III III � ���� I I ������� I I ����� II��� �II��� IIII I ll, ���� ��� IIII I �III�� � � ����� I I � ���� � I � ����� ����� ����� 1' 12 5 �' ��� ,,,,,,,ill, ����� IIhil I111111�111111k � III,, �I �� HCS Signalized Intersection Intermediate Values General Information Intersection Information ,1°' ���� �"���� �° °* Agency GHA Duration, h 0.250 ����� Analyst M KP Analysis Date Apr 21, 2025 Area Type Other ""'' �'° . Jurisdiction IDOT Time Period AM PHF 0.95 � ���I �1 �llilliillillillillillillillillilliillillillillillil� lillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillillii� lily il� ll� lillillilliillillillillillillil� illillilliillillillillillillilli� illillillillillillill� llilliill� illilliillillillillillillilliillillillillillilli� li� Urban Street I L RTE 62 ALGONQU I N ... Analysis Year EXISTING 2025 ��N ��N ������0 �������25 �������6�������21-L ��L �������62 lliillillillillillill� llillillilliillillillillillillil� illillilliillillilli� llillilliillil� illillillilliillill� llillillillillil� lilliillillillil� lillilliillillillil� liillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillill� Analysis Period 1 > 7:00 ���� , °°���� ,c ntorsection I @ L I N E MAN F it e Name 2 I AM .xus Project Description CLOUD HQ ""�� °"°����� -°'°' �� ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll"�"I'll"�,'ll,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll' WB ��','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll NB ",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�"I'll"�,I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 46 509 8 8 378 41 10 0 4 84 3 21 Signal Information ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... "' C cIe s 38 9 Rellllference Phase 21 Offset, s 0 Reference Point Begin iiiiiiiiiiiiillillillillillillilliillillillillillillillillillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillil llillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillillilillillili illillillillillillilliillillillillillillillili illillillilliillillillillillil illilillillilillillillillillillillilliillillillill Green 0.3 1.0 16.7 6.0 0.0 0.0 �. Uncoordinated Yes Simult. Gap E/W On Yellow 3.0 0.0 4.5 4.5 0.0 0.0 Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 1.5 1.5 0.0 0.0 Saturation Flow / Delay L T R L T R L T R L T R Lane Width Adjustment Factor (fw) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Heavy Vehicles and Grade Factor (fHvg) 0.945 0.961 1.000 0.899 0.945 0.945 1.000 1.000 1.000 0.961 0.743 1.000 Parking Activity Adjustment Factor (fp) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Bus Blockage Adjustment Factor (faa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Area Type Adjustment Factor (fa) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Lane Utilization Adjustment Factor (feu) 1.000 1.000 1.000 1.000 0.952 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Adjustment Factor (fLT) 0.952 0.000 0.952 0.000 0.826 0.792 0.726 0.000 Right -Turn Adjustment Factor (fRT) 0.994 0.994 0.000 0.847 0.000 0.792 0.864 0.864 Left -Turn Pedestrian Adjustment Factor (f�pa) 1.000 1.000 1.000 1.000 Right -Turn Ped-Bike Adjustment Factor (fRpa) 1.000 1.000 1.000 1.000 Work Zone Adjustment Factor (fwz) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 DDI Factor (fDDI) 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 Left -Turn Prot. CAV Adj. Factor (fcAvprot) 1.00 1.00 Left -Turn Perm. CAV Adj. Factor (fcAvperm) 1.00 1.00 Movement Saturation Flow Rate (s), veh/h 1711 3774 59 1626 3600 1522 1075 0 430 1379 152 1067 Proportion of Vehicles Arriving on Green (P) 0.03 0.45 0.45 0.01 0.43 0.43 0.15 0.00 0.15 0.15 0.15 0.15 Incremental Delay Factor (k) 0.11 0.04 0.04 0.11 0.04 0.04 0.23 0.23 0.23 Signal Timing / Movement Groups EBL EBT/R WBL WBT/R NBL NBT/R SBL SBT/R Lost Time (t�) 3.0 6.0 3.0 6.0 6.0 6.0 Green Ratio (g/C) 0.46 0.45 0.44 0.43 0.15 0.15 Permitted Saturation Flow Rate (sp), veh/h/In 948 0 787 0 1408 1379 Shared Saturation Flow Rate (ssn), veh/h/In 0 Permitted Effective Green Time (gp), s 16.7 0.0 16.7 0.0 6.0 6.0 Permitted Service Time (gu), s 14.0 0.0 12.2 0.0 5.3 5.8 Permitted Queue Service Time (gps), s 0.1 0.0 0.0 2.3 Time to First Blockage (gf), s 0.0 0.0 0.0 0.0 0.8 0.0 Queue Service Time Before Blockage (gfs), s 0.2 Protected Right Saturation Flow (sR), veh/h/In 0 Protected Right Effective Green Time (gR), s 0.0 Multimodal EB WB NB SB Pedestrian Fw / Fv 0.972 0.000 1.198 0.000 1.710 0.000 1.557 0.000 Pedestrian Fs / Fdelay 0.000 0.071 0.000 0.074 0.000 0.106 0.000 0.106 Pedestrian Mcomer / Mew 0.00 0.00 0.00 0.00 Bicycle ca / da 906.96 5.81 857.46 6.35 308.88 13.92 308.88 13.92 Bicycle Fw / F� -3.64 0.49 -3.64 0.37 -3.64 0.02 -3.64 0.19 HCS Signalized Intersection Results Graphical Summary General Information Intersection Information iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilliillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliillillillillillillillillillilliillillillillillillillilliillillillillillillilliilillilI Agency iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilillillillillillillillillilliillillillillillillilliillillillillillillilliilliilI GHA iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillI Duration, h 0.250 Analyst M KP Analysis Date Apr 21, 2025 Area Type Other iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillI Jurisdiction IDOT Time Period AM PHF 0.95 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilliillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillI Urban Street I L RTE 62 ALGONQU IN ... Analysis Year EXISTING 2025 Analysis Period 1 > 7:00 Intersection IL 62 @ LINNEMANiiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillilliillillilliillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillillillillilliillillillillillillillillillillilillillillilli Filll:lllllillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillillillillilliillillillillillillillillillillillillillillilliillillilliillillillillillillilliillillillillillillillillilillill",Ill""I'll""I'll,Ill""I'll""I'll",Ill""I'll""I'll",llIll""I'll""I'll",Ill""I'lIll""I'll""I'll",Ill""I'll""I'll",llIll""I'll""I'll",Ill""I'lIll""I'll""I'll",Ill""I'll""I'll",llIll""I'll""I'll",Ill""I'l"I"I'l""I'll""I'llIll""I'll""I'll",Ill""I'll""I'll",Ill""I'll"Ill""I'll""I'll",Ill""I'll""I'll",Ill""I'll""I'll",Ill""Ill"Ill""I'll""I'll",Ill""I'll""I'll",Ill""I'll""I'll",Ill""Ill"Ill""I'll""I'll",Ill""I'll""I'll",Ill'"'I'll""I'll",Ill""Ill"Ill""I'll""I'll",Ill""I'll""I'll",Ill""I'll""I'll",Ill""Ill"Ill""I'll'I ile Name 2025 62-LIN AM.xus Project Description CLOUD HQ Demand Information EB WB NB ApproachMovement L T R L T iiiiiiiiiiiiiiiiiiiiiillillillillillillilliilliillillillillillillilliIiiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillI R L iiiiiiiiiiiiiiiiiiiiiillillillillillillillillillillillillillilliillillilillillillillillillillillilliillillillillililI 11 Demand ( v ), veh/h 46 509 8 8 378 41 10 0 Signal Information 51 I . I Cycle, s 38.9 Reference Phase 2 IIILiiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillill�illillillillillillilliillillillillillillilliillilliillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillillillillilliillillillillillillillilillillilillillillillillillillilliillillillllllI..J III IIIIIIIIIIIIIII11iiiiiiiiiiiiiiiiiiiiiilli�IIIIIIIIIIII II IIIIi IIIIIIIIIIIIIIII11II111111�111IIIIIIIIIIIIII L..J ..� ...� , Offset, s 0 iiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillill llillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillill Reference Point it lillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillilli illillillillillillilillillillillillillillillilliillillillillillillilliillilli illillillillillillillilliillillillillillillill Begin llillillilillillillillillillil illilliillillilillillillillillillilillillillillili Green 0.3 I 1.0 16.7 6.0 0.0 Uncoordinated,111111111111111111 Yes11111111111111111, Simult. Gap E/W iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillillillillilliilillillilliillillillillillillilliillillillillillillilliillillillI OnillI IIIIIIIIIIIIIIIIIIIIIillillillillillillilliillillililI Yellow iiiiiiiiiiiiiiiiiiiiillillillillillillillilliillillillillillillilliillillilillillillillillillillillilillillillillillillilliillillillillillillilliillillilillillillillillillillillilillillillillillillilliillillillillillillilliillillilillillillilillill 3.0 0.0 4.5 4.5 0.0 i Force Mode Fixed Simult. Gap N/S�/ OnlllllllllllllllllllIIIIIIIIIIIIIIIII Red 0.0 0.0 1.5 1.5 0.0 Movement Group Results iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI Approach Movement iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillillillillillillillillillillillillilliillillillillillillilliillillillillilliillI Back of Queue ( Q ), ft/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Back of Queue ( Q ), veh/In ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Queue Storage Ratio ( RQ ) ( 95 th percentile) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliI Control Delay ( d ), s/veh iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillilillillillilI Level of Service (LOS) iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillillillillilillillillillillillillillilliillillillillillillilliillillilillillillilI ApproachDelay, s/veh /L OS iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliillilliillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillilillillillilI Intersection Delay, s/veh / LOS EB WB NB L T R L T R L T 6 36 34 1 28 6 4 0.2 1.4 1.4 0.0 1.1 0.2 0.2 0.03 0.00 0.00 0.01 0.00 0.00 0.00 6.0 6.9 6.9 6.5 7.2 6.6 14.1 A A A A A A B 6.8iiiiiiiiiiiiiiiiiiiiiillillillillillillilI A 7.1illillillilliillillillI A 1111111111111111111111111111 14.1 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillillillilliillilliil lillillillilliilillillillillillillillilliilli iillillillillillillilliillillillillillillilliilillillillillillillillilliillilliillillillillillillilliillillillillillillilliili llillillillillillillilliillilliililil lllllllllllllllIIIIIIIIIIIIIIIIIIIIII11 7.8 11illillillillillillillii llilliillil illillillillilliillillillillillillilliilillll'i' Ill""I'll""Ill""I'll""I'll",Ill""I'll""I'll ",ll",Ill""I'll""I'll",Ill""Ill""I'll""I'll",Ill""I'll""I'll",ll",Ill""I'll""I'll",ll'Il 1,Ill""I'll""I'll",Ill""I'll""I'll",ll",Ill""I'll""I'llillIllilliillillillillill""IllIll""I'hill,lilill,ilillll'i'lli'hill'i'llillll'i'llilililililil Ill""I'll""I'll",Ill","I 0.2 6.0 1.4 M 6.9 1.4 i M 6.9 14.1 0.2 6.6 0.2 7.2 =1.1 6.5 M 0 IV A all --- Messages --- No errors or warnings exist. --- Comments --- Ca pyI��IIIII �� �Il�lllI�II� III1 I IIIII III � �IIII!�'..'I ���� 2 (1 ulI�I�I II..rate �, � � � �1 �1 �l IIIII IIIII 2 1I°) 2 5 6 2 ........... IIIII IIII�II �Ilull!'��'�k�m �'�I, �.I������ �I�I HCS Signalized Intersection Input Data General Information Intersection Information ,1°' ���� �"���� �° I* Agency GHA Duration, h 0.250 Analyst M KP Analysis Date Apr 21, �����AM 2025 Area Type 11111 Other III0.95 .- �'°' °N'" , :::: JurisdictionDOT Time Period PHF �ll �1 �illillillillillillillillillillilliillillillillillil� lillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillilliilli� lily il� il� lillillilliillillillillillillil� Urban Street I L RTE 62 ALGONQU I N ... �����������������������ntersection ���� ������I������L ��������6�������2� ��������@ illillilliillillillillillillilli� illillillillillillill� Analysis ����������F:Ie llilliill� illilliillillillillillillilliillillillillillilli� l� lillillillillillillillillilliillillillillillillilliillillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillill� Year N B 2032 ������ ���������2��������0���������3�������2� �������6��������2�-L���I������N llillillilliillillillillillillii� illillilliillillilli� llilliillillil� illillillilliillill� llillillillillil� lilliillillillil� Analysis Period llilliillillillilli� illillillillillilliillillillillillillillillillillillilliillillillillillillilliillillillillillillii� 1 > 7:00 l �k ,c L���I������NNEMAN Name NB AM.xus Project Description CLOUD HQ ""I , t ° 11, ,�- °'I, � ��"�I'l""�I'll""�I'll'll""�I'll""�I�'ll",'ll""�I"�ll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I Demand Information 'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",,���������������'ll""I'll",'ll""I'll' EB "'I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll' WB ','ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll""�I'll""�I'll",'ll,'ll""�I'll""I'll",'ll""I'll""I'll",'ll""I'll""I'll""I'll",'ll,'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"�"I'll"�"I'll"�,'ll,'ll"�"I'll"�"�I'llI NB "�I'l""�I'll""�I'll'll""�I'll""�I'll",'ll""�I'll",'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""�I'll""�I'll"'ll""�I'll""�I'll",'ll""�I'll""�I'll",'ll""�I'll"'ll""I'll""I'll"'ll""I'll""I'll",'ll""I'll""I'll",'ll""I'll"'ll""I'll""I'll"�'ll"�"I'll"�"I'll"�,'ll"�"I'll"�"I'll"�,'ll"�"�I'll'I SB Approach Movement L T R L T R L T R L T R Demand ( v ), veh/h 46 524 8 8 398 42 10 0 4 88 3 22 Signal Information ���������� �����������C �� ����������0� ���������� ������e ������ ����������21 ��i"'���� � , ����I�����,,,. 4���������0�� c�l�������e s Rellllf re n ce Phase . �� �.��� ���� Aw �. Offset, s 0 Reference Point Begin iiiiiiiiiiiiillillillillillillilliillillillillillillilliillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillillillillillillillilliillillillillil llillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillillillill li lillillillillilliillillillillillillillillillillilliillillillillillillilliillillillillillillilliillillilli illillillillillillilliillillillillillillilliillillillillillillillillillillil illillillillillillilliillillillillillillillill llillillilliillillillillillill llI !,Ill llllllillillili Green 0.3 1. 0 1.. 17.6 11111 6.2 0.0 0.0 Uncoordinated Yes Simult. Gap E/W On Yellow 3.0 0.0 4.5 4.5 0.0 0.0 Force Mode Fixed Simult. Gap N/S On Red 0.0 0.0 1.5 1.5 0.0 0.0 Traffic Information EB WB NB SB Approach Movement L T R L T R L T R L T R Demand (v), veh/h 46 524 8 8 398 42 10 0 4 88 3 22 Initial Queue (Qb), veh/h 0 0 0 0 0 0 0 0 0 0 0 0 Base Saturation Flow Rate (so), veh/h 1900 2000 1900 1900 2000 1900 1900 1900 1900 1900 1900 1900 Parking (Nm), man/h None None None None Heavy Vehicles (PHV), % 7 5 13 7 7 0 5 33 Ped / Bike / RTOR, /h 0 0 0 0 0 0 0 0 0 0 0 0 Buses (Nb), buses/h 0 0 0 0 0 0 0 0 0 0 0 0 Arrival Type (A77 3 3 3 3 3 3 3 3 3 3 3 3 Upstream Filtering (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lane Width ( W ), ft 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 Turn Bay Length, ft 225 0 115 0 0 0 300 0 Grade (Pg), % 0 0 0 0 Speed Limit, mi/h 45 45 45 45 45 45 45 45 45 45 45 45 Phase Information EBL EBT WBL WBT NBL NBT SBL SBT Maximum Green (Gmax) or Phase Split, s 15.0 85.0 15.0 85.0 20.0 20.0 Yellow Change Interval (Y), s 3.0 4.5 3.0 4.5 4.5 4.5 Red Clearance Interval ( R�), s 0.0 1.5 0.0 1.5 1.5 1.5 Minimum Green ( Gm►n), s 3 15 3 15 8 8 Start -Up Lost Time ( It), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Extension of Effective Green (e), s 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Passage (P7), s 3.0 2.0 3.0 2.0 5.0 5.0 Recall Mode Off Min Off Min Off Off Dual Entry No Yes No Yes Yes Yes Walk (Walk), s 0.0 0.0 7.0 0.0 Pedestrian Clearance Time (PC), s 0.0 0.0 20.0 0.0 Multimodal Information EB WB NB SB 85th % Speed / Rest in Walk / Corner Radius 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 0.0 No 25.0 Walkway / Crosswalk Width / Length, ft 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 9.0 12.0 0.0 Street Width / Island / Curb, ft 0.0 0 No 0.0 0 No 0.0 0 No 0.0 0 No Width Outside / Bike Lane / Shoulder, ft 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 12.0 5.0 2.0 Pedestrian Signal /Occupied Parking No 0.50 No 0.50 No 0.50 No 0.50 it lu' I ��������� �� ail it �� ll����� ��ll ������ IIIII � ,����� ���� ���� � ����� ll�� ��� ��� ����� I ���i���l IIIII IIIII ���������� ,��ll �� IIIII IIIII ����.���� IIIII �l ��.�� IIIII ����.�� � ��� ��� l�� ��� ������� ����� IIIII � �� it lu' '' � ��� � i��� l���l ����� ����������� ��� ����� �� � ������ � ������ i I' i Im � �� � �� ������ ����� ��� ����� � � ��� n" ����� �� IIIII IIIII ���mi��, � ,�������� �����u�� � IN II11iiil'l1�l�6 ��� �u11iji�� �������� ��������� III�"��� �uul1�1��1l�lk�� III, ��l11(I�„... II„