Motion to accept a proposal from IMEG Group to provide design
and construction engineering services for the 2026 Water Main
Replacement Project for a fee not to exceed $183,,700.00.
October 28, 2025 - SPECIAL MEETING - AMENDED 10-27-2028 OF
THE MOUNT PROSPECT VILLAGE BOARD
Y
$1833700.00
Water and Sewer Enterprise Fund
CONSENT AGENDA
Action Item
As part of the 2017 and 2023 water and sewer rate studies, renewal and replacement of the
Village water mains, fire hydrants, valves, and other distribution system appurtenances were
identified as a high priority. One outcome of this study was an increase in funding for water
main replacement projects.
A primary goal of accelerating the pace of water main replacements is to reduce the life cycle
of water mains from an unsustainable 600 years to a more pragmatic 130 years. 2018 was the
first year of an accelerated water main replacement schedule supported by new water and
sewer rates. In the first six years of this accelerated program, the Village has replaced 68,844
feet of water main and rehabilitated an additional 7,882 feet of water main through the cured -
in -place pipelining process.
Staff seeks to replace 13,800 linear feet of existing water main in 2026. Locations include
Willow Lane, Tamarack Dr., Catalpa Lane, Wa Pella Avenue, School Street, Pine Street,
Tower Lane and Maple Street.
These pipe sections are scheduled for replacement due to multiple water main breaks within
the last 10 years. Plans are to abandon the existing water main in place and install a new
water main adjacent to the old one. Associated main line valves, fire hydrants and residential
buffalo boxes will be replaced. The water main size will also be increased from 6" to 8" and
from 10" to 12" on Pine Street. Planned changes will improve water flow and pressure. The
attached location map depicts the proposed project area.
RFP Results
On September 23, 2025, eight technical proposals and eight cost proposals were received.
Each proposal was evaluated based on the background of the firm, related project experience,
proposed services and scope of work, schedule of work effort and proposal content. Each firm
received a point ranking (total points = 100) for each criterion. Table 1 below summarizes this
analysis.
i aoie i : i ecnnicai rroposai cvaivation
Category
Max.
IMEG
Thomas
Burns &
Baxter &
Mackie
Chastain
Robinson
GSG
Points
Engineering
McDonnell
Woodman
Consultants Consulting
Engineering Consultants
Background
20
19
19
19
18
18
18
18
18
Experience
20
19
19
19
19
18
17
17
17
Scope
25
23
23
21
21
21
21
21
21
Schedule
15
14
14
14
14
14
15
14
14
Work Effort
10
9
8
8
7
8
8
7
6
Content
10
9
9
9
9
8
8
8
8
Totals:
100
93
92
90
88
87
87
85
84
The highest rated firm was IMEG Group of Gurnee, Illinois.
Each firm was asked to submit a cost proposal as well. Table 2 below summarizes staff's
analysis of costs.
Tablet: Cost Analvsis
Firm
Hours
Total Cost
Cost / Hour
IMEG
1,498
$167,000.00
$111
Thomas Engineering
1,312
$168,472.00
$128
Mackie Consultants
1,323
$170,875.00
$129
Chastain Consulting
1,335
$217,189.00
$162
Burns & McDonnell
1,189
$281,208.00
$236
Baxter & Woodman
31134
$400, 280.00
$128
GSG Consultants
51065
$591,395.00
$117
Robinson Engineering
31764
$5931396.00
$157
The lowest cost proposal was submitted by IMEG Group of Gurnee, Illinois.
Discwssinn
IMEG Group's proposal provided numerous examples of successful water main replacement
and rehabilitation projects similar in scale and scope to the proposed work. Examples provided
include water main replacement in the Village of Arlington Heights, Village of Stone Park,
Village of Fox Lake, Village of Wilmette and several surrounding municipalities. A copy of
IMEG'S technical proposal is enclosed.
IMEG Group provided civil, survey and construction engineering services for the Village's 2021,
20231 2024 and 2025 water main replacement and rehabilitation project. These projects
included the design and inspection of 50,000 linear feet of water main replacement and
rehabilitation in various parts of the Village. These projects also included the replacement of
all associated main line valves, hydrants, buffalo boxes, and the full replacement of 124 lead
water service lines. This work required rehabilitation of roadways, sidewalks, curbs and
parkways.
IMEG Group also provided construction inspection, measurements, computations and
documentation of quantities for the rehabilitation of the water main at 4 railroad crossings and
9 creek crossings using cured -in -place pipe lining within the Village in 2021.
They provided design and inspection services for the rehabilitation of 1,728 linear feet of a 16"
water main that cuts through the Mount Prospect Golf course in 2024.
IMEG is also proposing to utilize the same project team that has worked on previous water
main replacement projects for the Village. This team has demonstrated the ability to execute
full lead service line replacements, coordinating with the Village's Public Works Department
Engineering Division on road resurfacing program and communicating with residents.
Staff also contacted references from municipalities that have contracted with IMEG Group on
similar projects and received positive feedback. Staff believes that IMEG Group can
successfully complete this project for the fee requested.
Finally, staff concludes that IMEG has attributed a reasonable work effort (1,498 hours) to this
project and requested a competitive fee ($167,000 or approximately $111 /hour). Staff is
requesting a 10% contingency ($16,700.00) to address any unforeseen issues, should they
arise. A 10% contingency would bring the project award total to $183,700.00 (the
$167,000-00 base bid plus the 10% contingency of $16,700-00).
Alternatives
1. Accept the proposal from IMEG Group of Gurnee, Illinois for design and construction
engineering for 2026 Water Main Replacement Project.
2. Action at the discretion of the Village Board.
Staff Recommendation
Staff recommends that the Village Board accept the proposal from IMEG Group of Gurnee,
Illinois to provide design and construction engineering services for the 2026 Water Main
Replacement for a fee not to exceed $183,700.00.
Attachments
1. 2026 Water Improvements
2. imeg_cost proposal _2026 water main replacement —village of mt prospect
3. imeg_technical proposal-2026 water main replacement —village of mt prospect
Itw
ggg/55/i
Id AjJ9AeM S
S Kenilworth Ave
co
u-I &qqog S
S WellLn
I
Hi Luse Ave
.........
.........
pi 0E) am S
9AVj9jse:3ue-j
I
2
pa assng s
9AVu9IIeH 9AVU91leH
Ln
_0
>
c
Ln
.
U c
0
0
U
S Crestwood
XNe
S Deborah Ln
S Carol Ln
Audrey L,n
pa Jalaw S
S Prairie Ave
0
4-1
0
O=
S Leonard Ln >
0
S Helena Ave
9AVMOPPeH S
S Belmont Ave
9AV aUld S
Lk
I
E
F-
M4— (n
0 (A
0
4a U U
-C
U
0 0
-W
E
M
9AV PU 113,/
ply
s IIIf::::'alill
2026 WA Mi.virlim rAl1WIl[�,)II 1111 A 11131 111 Iiii iii rA riiiaim iii
AIMID riiaiiiq
Siii:":":]ii:,,) rIIII Iiii:, I IIII12,13,2025
�, ' , is �U .. ,� 0 �, `° \ .., u G , ' ?
III _� ,. .�u( � I. �.� � �..a � � � ��.. .�.v .. .� � � � �,� .} UV/�� A'`u'IF�°w ( "w O�.. 'V � �. I � R H V'"1U1 ..(N
1. Project Administration: Client Executive
Project Coordination and Review with Village Staff
Project Manager
16
$3,000.00
2. Route Survey
Land Surveyor
10
Verify Existing ROW/Easements
Senior Field Technician
70
Topographic Survey
Field Technician
70
Compile Existing Site Utility Information
Civil Designer IV
40
$23,750.00
3. Pavement Cores / LPS-663
Sub -Consultant
LS
$5,000.00
4. Project Design:
Preliminary Design
Senior Civil Engineer III
24
Coordination with Utility Companies to Access
Civil Field Technician
140
Possible Conflicts with Projected Water Main Install
Civil Designer IV
140
$35,030.00
Access Alternates for Water Main Location &
Material Types with Associated Costs
Determine Extent of Roadway Rehabilitation
Review with Village Staff
Final Design:
Construction Drawings and Documents to Include
Senior Civil Engineer III
24
Plan and Profiles with Existing and Proposed Water
Sr. Civil Technician Specialist
140
Main
Civil Designer IV
140
Specifications
Administration
16
$36,005.00
Quantiles
Estimate of Probable Cost
Bidding Documents
5. Permits
Civil Designer III
16
Coordination with Regulatory Agencies (IDOT, IEPA)
Civil Designer
24
Process Permit Applications
Administration
16
$6,440.00
6. Bidding Assistance:
Contract Prospective Bidders
Civil Designer III
8
Distribute Plans and Specifications
Civil Designer
8
Attend Pre -Bid Conference
Administration
8
$2,520.00
Attend Bid Opening
Bid Review and Recommendation
7. Full Time Construction Inspection:
Weekly Site Meetings with Project Manager, Village,
Senior Civil Engineer III
16
and Contractor
Field Technician IV
500
Pre -construction Photo Survey
Senior Civil Tech Specialist
20
Full Time Resident Inspector
Senior Field Technician
20
Construction Layout
Civil Designer IV
16
Site Verification to Pay Estimate Quantities
Administration
16
$55,255.00
Process Pay Request
Prepare Punch List
Verify Final Restoration
Provide As -Built CADD Files
TOTAL:
1,498
$167,000.00
(.0 ) <IIC � �II �� °�F:�.� �....II�,�, ,,(.II``'� �'II°�II�`; �� 4u /III, � �..,,m r C ( ��/nr wu pt,�rtll°� ,r ,l) €' r ) r \pII } }lI I ,� ,..` .�u I v III ,... .. � .,. � .J � � J .. � .�/ .., .a .,. �. I � � � 1... .) V V r������h I AAA I f �k � "w .. f t/ V III � ... I ... I '� V . J .... (�a` 1 .... ...J �I ..� ) ..,
a
BJr
Senior Client Exec/Senior Market Director/VP $260
Client Executive/Market Director $245
Project Executive $205
Senior Project Manager 2 $200
Senior Project Manager 1 $185
Engineer of Distinction/Landscape Architect of Distinction/ $210
Planner of Distinction
Senior (Engineer/Landscape Arch itect/P anner) 3
$195
Senior (Engineer/Landscape Arch itect/P anner) 2
$175
Senior (Engineer/Landscape Arch itect/P anner) 1
$165
Project (Engineer/Landscape Arch itect/P anner) 2
$155
Project (Engineer/Landscape Arch itect/P anner) 1
$145
Graduate (Designer/Survey) 2
$125
Graduate (Designer/Survey) 1
$115
Senior Land Surveyor 3
$165
Senior Land Surveyor 2
$150
Senior Land Surveyor 1
$140
Project Surveyor 2
$135
Project Surveyor 1
$13 0
Designer of Distinction
$175
Senior (Designer/Crew Chief) 3
$160
Senior (Designer/Coordinator/ Crew Chief) 2
$150
Senior (Designer/Coordinator/ Crew Chief) 1
$140
Project (Designer/Senior Technical Crew Chief )2
$130
Project (Designer/Senior Technical Crew Chief) 1
$125
Designer 2/Planner 2/Technician 4
$115
Designer 1/Planner 1/Technician 3
$105
Design Technician 2/Technician 2
$95
Design Technician 1/Technician 1/Intern
$85
Senior Construction Administrator
$145
Construction Administrator
$135
GIS System Architect
$135
GIS Analyst
$125
Graduate (GIS Ana yst) 2
$120
Graduate (GIS Ana yst) 1
$110
Administrative Assistant
$85
Note:
1. These rates are for staff located in the
office providing the service. Staff based
in one of IMEG's other offices may have
different billing rates. These rates can be
provided as requested
2. Rates are adjusted annually
Reimbursables:
• Postage and delivery charges
• Travel Expense: Automobile mileage will be
invoiced at the IRS rate in effect at the time
of travel. Travel expenses include mileage,
tolls, parking fees, taxi, train, airfare, rents
car, fuel, and other out of pocket travel
related expenses
• Meals and lodging, when required to travel
overnight
• Project -specific insurance coverage riders
or amendments necessary to comply with
required insurance requirements above
current IMEG limits and conditions
• Reproduction costs for existing facility doc-
uments, and for one record set of contract
document deliverables at each project
phase/milestone when not provided to
IMEG by the Client
• Reproduction and distribution costs associ-
ated with issuing contract documents
• Payment of plan review fees or other im-
posed governmental agency fees
• State filing and/or permit fees
• Necessary consultants as approved by
Client
ply
s IIIf::::'alill
2026 WA Mi.virlim rAl1WIl[�,)II 1111 A 11131 111 Iiii iii rA riiiaim iii
AIMID riiaiiiq
Siii:":":]ii:,,) rIIII Iiii:, 11112,13,2025
M ( .,u � �� ..,l ,.z c � .. ) � i �. wi I r " a .., � . 5 � c, ._a I t , r i � � } ,,.) V V A r I ,. M /�^; � % ,.. � � r } � r � r 4 ,. G ,. M ,.,,} . � N
INN M1141NN mgmir
lire
MOUNTVILLAGE OF PROSPECT
ATTN: CASEY BOTTERMAN, WATER AND SEWER SUPERINTENDENT
1700
•WEST CENTRAL ROAD
MOUNTPROSPECT, I L • • • •
• REQUEST
• •PROPOSALA
.NSPECTION SERVICES
Dear Mr. Botterman,
Since 2018, IMEG has been honored to serve as a trusted engineering partner to
the Village of Mount Prospect, delivering reliable solutions for your critical water
infrastructure. From the successful completion of water main replacement projects
in 2021, 2023, 2024, and 2025, our team has built a strong record of performance —
providing responsive service, technical expertise, and a commitment to minimizing
disruption for residents. It is with this proven foundation that we are pleased to submit
our proposal for the 2026 Water Main Replacement Project.
Top 5 Engineering Firm in the
115 Years of History
41
in the making
100+ locations
3,000 Employees
100% Employee -Owned
Asa licensed Professional Engineer and Professional Land Surveyor, I have personally overseen each of these efforts, ensuring consistency,
quality, and adherence to Village standards. Our familiarity with Mount Prospect's water distribution system, regulatory requirements, and
construction practices uniquely positions us to deliver a seamless continuation of your water main replacement program.
Key strengths we bring to this project inc ude-
• Proven Partnership — Eight years of direct collaboration with the Village on water main design, inspection, and construction
management.
• Experience with Similar Projects — Completion of multiple large-scale water main replacement projects, including the integration of
lead service line replacements, system upgrades, and roadway coordination.
• Regulatory Expertise — Success in navigating permitting with I DOT, I E PA, and county agencies, ensuring timely approvals and
compliance.
• Full -Service Capabilities — From survey and design through bidding, resident engineering, and daily inspection, our team provides
continuity and accountability across the entire project lifecycle.
We understand the importance of this project in advancing the Village'slong-term infrastructure strategy —rep acing more than 13,000
linear feet of aging main, upgrading capacity, and addressing lead service lines in residential neighborhoods. lust as with past projects,
our approach will emphasize proactive communication, effective coordination with residents and contractors, and vigilant oversight to
safeguard quality, budget, and schedule.
We deeply value our ongoing relationship with the Village of Mount Prospect and welcome the opportunity to continue serving as your
engineering partner for the 2026 Water Main Replacement Project. Please feel free to contact me directly by phone or email with any
questions.
Thank you for your continued trust and consideration of IMEG.
Si ncere y,
80
p�IIII:::::! MINI " IIII nn
IIIII ttw
i iii im IIL:::,IIII IIIII IIIII 1 6 ,
Harlan D. Doand, PE, PLS
III'): 8473c)6112,
CivilClient Executive
.... ...
I II11II 1% I . .113 I , i1 llf:: *
K C"J NNF) NU)(TU\1 JlGhM Rh,,�(j &"],',vu.x or\ � I 2026 VVMMAhN A(.w \,r I Vh A(A (A WXY\0
TABLE OF CONTENTS
'1111
Q',611111' ll!!!!!!lllRM lhIIMll:::::'0lRMAl riiiaim
IIIII�� T T
0111GAIII4117,"Al Ill ilialimi""mil Cill iiii.viiii, r A111*1113 IKII:11:11T ly
���wr
11:1,01 111:::T cl Ill M Ilm 1113 Ill 114 G JlIIA 111::,) 111:::) III ll I
0,11111111: T :1
v iii scill 111:11
M J f"""'`t V ..?" 'W ,. c, II u � d r.. Y �. IIIv. ,. w. W 4,,.., ,. ors, I I /" a/.... s A W I \. Ml"""'t III V W 1 t9 I "III I (_I Ci \ I I 'ef /' 4G G„...A I W I `...,A 1,..P V w. n,, f F,. ,
IMEG is the leading U.S.-based engineering design firm that delivers a rare combination
— the broad expertise of a national leader with the personal relationships and deep
collaboration of a local firm.
IMEG's civil water and wastewater engineering team has provided professional engineering
design services across the United States and into the Virgin Islands. Our team's strength
is found in our deep bench of 400 professional civil engineers and land surveyors
dedicated to building strong regional connections and reaching beyond the status quo. Our
expanded resources allow us to tap into the expertise of our entire corporation and involve
in-house experts from various fields to assist in the design process with our local project
partners.
IMEG has extensive experience providing civil engineering services for
municipalities and publicly -owned water and wastewater utilities.
Firm Headquarters
623 26th Avenue
Rock Island, IL61201
309.788.0673
I r) r 01 (1 �i r,n c
4850 Grand Avenue
Gurnee, IL 60031
847.336.7100
263 Shuman Blvd, Suite 550
Naperville, IL 60563
630.5753.8500
NumW alUuuouu Hum umlul INomop I�iW vyuuN loovmpl ollpl I uuuml pmWl
,,�,N I I ,�`�`��` �I�JI4U
"mlllluuum1lllr., ulBlluuu4�ll� '.. Ullllllllrl IIIUllllllll�lllr..., ���� �IIII� UUmuoUVu° 'u"IYwmu UwIIIIIA�y,I "�IIIIIVmum�lll��l UUUUUUU
"'III mUWnNm` 1�\ � NmINu i "II�NmmU ,,nnlUWmu uwll �IIII� oli WI �iVul lvum��N UImuIU Iri U� Illll�lll�umm uuum 4&
���II @�l` I mll '�4llmuplIlI
IltNuu Ilouuumlm. Ilumu VI uo IIIIIIIIp IVuuuumuu. Wloumu Iluuo Ullllumimuuv�
^�,�j�I�1�"�lpluuu4� � ImlUuu WI I. NmmN I�uuU �r M0. mu uom �loulll malUmmlul�ill�` 000lUl glUmmm ImomNu vuuumo- �� mWp1lpp}bluunlull1"��y1 IVuouuU
^�IIIVIUI I, IIIvoO�lll�l �1'�11 1'Yl�lllum �y'I��mIW'11111II pNuuUU��i�'+WIVI v�mm ��ulmO��I, uNO��� "�`IlpmlolVlu"1�
muuu� pamor �1pII 1�
i�"
um��°°m l�mllilUll"`,,I IIIII IIIII����IIVuuu. I�UIIII WUlooioWlllll�. romull F �V`\`11�� um�juuur unl7il�lumm0!I'I� IWull4 umulll� �pammyy` lopouull� W`�Ilmmuu
�lll 144 gym, IIIIII IIII�II°uul,l
flIIUI
Vumulp IVuuuUll111 VI I�iuly �ryvu Wllllw.l IU ",I WNII v,oaullllll IIIUVulllmlW Ip°uNVlkm IIIII IIV�im uiloi �� 1 �I� lu uullllll� m�lllmou
Iluumul�illG III \�1�� mllllmlw�� WWW ��I l IIIIIIIWIIII14 VV �'ylll
O0 Iomllu ` ""ItS"'It
ICill I 4 g0N
I..
i��
�Nmulllg
IOINIIUII ` Iommlvl UmuN ullp IIIII IIIIIII ���n4�ooUV���I,IIyII m4 n'n° OmIN Wmvoml NUN momU��``j� Nolllll�p14���1I� uuumull IIIVouoUlUlu' Iluuuu�lll� I� '"IIIIIuwmuNN"' � �IIII'I.. a ������ mumul�'¶Illllluuuuulml
d�,
INmvqUmmlvl�lwlg
mmNl ,Wlwluul muUl Y oNUUI. IUIIIImIIIG O muUIU` i�� N I ' W�oml�lll�. � vu
„m��li IIIII��°° IIIII,omIIIIIIIw�i mII' % IIIII�IIIIIII nmll I���� �l �I°������,IIIIII�������;. �� �� I�NIII;;;;� �IIIIr °°� IIIIII IIIIIIIIII��I
m� IIIIIIN m
• Top 5 Engineering Firm in U.S. (BD+Q
• 100% Employee -Owned
• Full -service Engineering & Consulting
• 100+ Locations
• 3,000 Tea m Me m be rs
• 650+ Licensed Engi neers
• $427M in Annual Revenue
• #48 / Top 500 Design Firm List (ENR)
WATER & WASTEWATER
• Lift Station and Collection Design
-Collection and Distribution Design
• Water Treatment and Distribution
• Raw and Treated Water
Supply Design
• Water Reclamation
• Treatment and Distribution
• Finished Water Storage
• Facilities Planning
• Wastewater Treatment Plant Design
• Wastewater Reclamation
-Sludge Handling
O.&L
I M E
The FUTURE. Built Smarter.
M� ( I J1 � �.)� S�cd\l /vvr) cnu"� OR R� I � �)O�)() WAR� R' AANHN "� AC � w "'r ('� �� � I � Vh �� A( J�� 0�� MOUN II (.1
SERVICES & SPECIALTIES
ENGINEERING, PLANNING, CONSULTING
Building Design:
Engineering & Planning
S
-i i in g tiructuirA ingiiineeir
...... ......
M ire giire eeir-iing
ire )irotectioire ire giire eeiring
Fec�)iriy Desiigin
S ecuirJineeiri i ire
)esig_ in & in g'
AcoL.istics, & Noise Coin tii6�
Airchili-tec-tuirA igh-ding
MedicA quipiment 11a iriinhrig
1arking [.)esigin III aininiirig
Sustainabillilty & Energy Solutions
ay i g h t i in g
[Decairboire ization 1a in in i in g
l..'..'..'ineirgy lift cad ehiing
bodied Cair-boin Seir-vices
. ... ...... ......
-h-fica-tioin [)l W I ........... ]US Ceir
INet ZeiFo Coinsukiling
Rapid I')eirfoiriFnaire ce Modehing
1 eiriewaINe l..'..'..'ire eirgy Assess irn e in'ts
Fo4� Carbon Aarea ysis
Building Performance
Coimirflissioning
Rehm Cointo into issiCCU iniing
Moiriitoired based Coinn ins ilissioire ing
[.'tJWiing If) eirfoinrnairice Op-thmiza-tioin
a
Process Engineering
ALitornatioire & Coire tirok
GheirnicA 1)irocess
Sio II rispection & [Desigin
B i flk Iliressiiing
Infrastructure:
Design & Planning
ingiiineeiring
GvH� / MuiriidpA II::::::: ""' 'D i
aind Surveying &Ii)eve o p im e in t
lira iris poirtatioire in g i in e e ir ii in g
-t i o in
[.3) r- i d g e D, e s [i g in & II in s 1p e c
Wa --i ire
Le it / Wa s Le Le it in g i in e e r
ire v'iiroinimeire � Seirvices
We-t: a in lirehinea-tioin & Mi-diga-doin
Materiak Fe-stiling & hrispechoire
Coinstiruction ObseiFvalLioiri
'3
athyirrie-tir�ic St.jirveys
GS I')hininiliing & I eimeire tatioiri
Subsii.jirface Ulihily ingiineeiris ng
Ilea h-ty Cap-tuire Seirvices
Urban Design, Planning, &
Engagement
FirairisIgo irtafiioiri II'hininiing
(Jirbain Il )esigire
andscape Airc[iiteckjire
S i -t to a in in i in g
inviiroinirrwintA II: hinire iliin
9
in v i iro in irn e in t a II'eirire ithirig & 1 esigire D
SUIPIpOlr"t
C o im im u in ii t Ifs a in in i in g
in ga ge im e in L
S-Lira -tegic Advisoiry Seirvices
Consulting & Advisory Services
13 a ii ii ire II iretelhigeire cII in t g ra t ii n
Fe chiri6�ogy Advisoiry Seirvices
........... Ieaflhcaire II nfoir-iFnatioin Fechiriogy
Secuiris ty IDsigin Coinsu� iiirig & I.....F
6 h.f 6 in IIirocureimen-t
Our work prioritizes
performance and
etnciency, and our team
is equipped to handle
full -service engineering,
planning and consulting
projects of all sizes and
complexities.
\1 A N "I':) c' �"i (i �� ,,1 Flit N C S FN C' �� S �� 0 1 (V () WA R' MA N R'. � F"' � AC � M �� \1 )I I � V o �� M i r'
S11111!111!11!1�C 11111 111110 1IIIIG A IN 1I ZA F 1I 0 N 11 N A III F AIN 1 0 IN N 11
• ' 1 1 I
W MLAM- - -AML M V M V MMMIL- MIN I
William Ulewicz Soil and Material Anthony Domino, EIT Theodore Morrill, PLS
Senior Civil Design Engineer Consultants, Inc. Civil Designer Lead Surveyor
*Subcontractor* Richard Lebeck, EIT Mike Hulback, PLS
Civil Designer Senior Field Technician
p'�(�pp j� (..I � , , � -U �,� �, I .,� �, - � O � II ( I � I N, ( .N I � . ., OR, r � � .� I �, I � G , r f } � r � �� , r \ �" ( G � MOUN 1, I� �, I � � �, �....,...
._J .. .... � � III � ..� .., � .� � d ..J � �. � .J .�Y .� ... .a . I � tF ��.. .) U V%� I � `�/ I f�'t v "w .%�,... f III '� . � .., I ... w.. I .� `�r` /fie ..1 .,.. 1 .. ...1 �I w..� ) ..,
IIIII111111' °"'lllll'°° 111110 II 0 IIIC, A IN II ZA r II O N C II N A III r A IN II.) I�
Harlan is a Senior Principal and Client Executive with IMEG. He is responsible for
compete management of the Naperville civil engineering team including principal
design, quality control, proposal preparation, client management, marketing,
establishing and maintaining schedules, establishing manpower needs, and
contract negotiations and administration. He is also experienced in boundary and
topographic surveys, preparation of plats and legal descriptions, and construction
management/inspection/layout.
• Village of Mount Prospect, IL, Water Main Replacement Projects 2021, 2023,
2024, 2025. IMEG provided project administration, survey, testing, project and
final design, permitting, bidding and construction inspection for the water main
replacement and rehabilitation projects.
• Village of Mount Prospect, IL, Public Works Fiber Connection Design, Provide
data collection, topographical survey, alignment design, preliminary design, soil
borings, document phase and construction administration.
• Village of Mount Prospect, Fiber Inventory Project Documentation and Map
Locates
• Village of Stone Park, IL, Water Main and Street Improvements 2020
• Village of Stone Park, IL, On -Call Engineering Services (1995 - Present)
including Utility Map Update, Water Atlas Update, Addison Creek Lift Station,
Italian Cultural Center, Police Station Permit and Flood Plain Development,
Avenue Infrastructure Improvements., Inflow Control Program, Pebbles Car Wash
Remodel, Stone Park Grading Plan.
• Village of Arlington Heights, IL, Water Main Project 2020
• Village of Arlington Heights, IL, CIPP Water Mains Replacement 2020
• Village of Arlington Heights, IL, Water Main Replacement Projects, 2011, 2012
and 2013
• Village of Wilmette, IL, Water Main Improvements
• Village of Buda, IL, Water Main Project
• Village of Addison, IL, Park & Withrop Water Main Replacement
• Village of Grand Ridge, IL, Water Main Extension
• Village of Third Lake, IL, Water Main
• Village of Third -Lake, IL, Grant Avenue Drainage Improvements
• Village of Third Lake, IL, On -Call Engineering Services (1996-Present)
including Lake Avenue Rehabilitation Construction Services, Serbian Storm
Sewer Realignment Survey, Mainsail Drainage Study, FEMA Map Update,
Retention Pond Outlet, Sunshine Avenue Easement Survey, Backup Generator
Experience
43 Total, 34 with IMEG
Education
University of Illinois, BS Civil Engineer
Registrations
Professional Engineer
Illinois (062-048891)
Indiana (11900224)
Michigan (6201068645)
Wisconsin (30390-6)
Professional Land Surveyor
Illinois (035-003121)
Affiliations
NSPE
ISPE
PLSA
ASCE
APWA
ACEC
Replacement.
p'�(�pp j� (..I � , , � -U �,� �, I .,� �, - � O � II ( I � I N, ( .N I � . ., OR, r � � .� I �, I � G , r f } � r � �� , r \ �" ( G � MOUN 1, I� �, I � � �, �....,...
._J .. .... � � III � ..� .., � .� � d ..J � �. � .J .�Y .� ... .a . I � tF ��.. .) U V%� I � `�/ I f�'t v "w .%�,... f III '� . � .., I ... w.. I .� `�r` /fie ..1 .,.. 1 .. ...1 �I w..� ) ..,
IIIII111111' °"'11111°° 111110 II 0 IIIC, A IN II ZA r II O N C II N A III r A IN II.) I�
Steve is responsible for assisting in design, quality control, proposal preparation,
client management, and project management for civil engineering projects. His
experience includes all phases of civil engineering, environmental engineering,
survey, and constructionlayout/guidance. Steve has experience in infrastructure
panning and feasibility studies, commercial and residential subdivision design, site
design, stormwater management, sanitary sewer, water main, storm sewer design,
transportation engineering, project permitting and coordination with regulatory
agencies.
• Village of Arlington Heights, IL, Water Main Project, Project Manager for
surveying and engineering assistance on the 13,395- f of water main replacement
• Village of Arlington Heights, IL, Water Main, Project Manager for survey and
engineering assistance to prepare construction drawings, specifications, bidding
documents and bidding assistance for 5,000- f of water main replacement.
• Village of Arlington Heights, IL, Water System Improvements Projects (2).
• Village of Arlington Heights, IL, Storm Sewer, Project Manager for construction
observation and civil engineering for the storm sewer repair at north point.
• Naperville Park District, Naperville, IL, Springbrook Golf Course New Water Main.
• Medline, Mundelein, IL, Engineering services to prepare plans for the
reconstruction of the existing parking lot and new fire loop.
• Lets Play Two, LLC, Kenosha, WI, Civil Engineering services for the construction of a
new turf baseball field for the Kenosha Kingfish.
• Zion Benton Township High School, IL, High School Auditorium. Design and
permitting of auditorium addition including potable and fire loop extension.
• JAS Environmental, East Hazel Crest, IL, EHC/ASC/S ug Calculation. Conducted a
limited Phase II investigation for historical PCE contamination, including oversight
of well construction, well development, Slug analysis for quantitative and qualitative
groundwater analysis. Designed Soil Vapor Extraction system for remediation of
shallow soils contamination.
• Anne Jeans Drainage, Burr Ridge, IL. Provided a detention design for rehabilitating
an existing wetland bottom detention basin and relocation an additional detention
pond within the F oodp ain meeting Dupage County and Illinois DNR requirements.
• Waukegan Park District, Waukegan, IL, Project Manager for the new sanitary
sewer, to include connection in Grandville Ave and restoration of roadway and
onsite pedestrian path, prepare watershed development permit app, IEPA permit
application.
• Village of Third Lake, IL, Mainsail Drainage Study, Provided a Drainage Study for
Mariners Cove/Mainsail Drive to determine existing storm sewer capacities and
causes of existing flooding.
Experience
19 Total, 10 with I M EG
Education
Southern Illinois University, BS Civi
Engineering
Registrations
Professional Engineer
Illinois (062-062539)
Wisconsin (46259)
Michigan (6201067064)
Indiana (PE11800276)
'�y �' ,.�' �, , - h � M �,II �, q' I '� _. �, t, 1 . - I h "1 u„ � ' f �` V � n. f �,, AAA
,.h... I �` I _ 4� �, f s 4 ] . �' f . C J� f f �' ` �' � �t �,. �....�' I I \ I .w (� 7 J �+....,...
� � "J III � ,.` "... � .. P v ...J � x. � ".. ,.� .� "... ,... .,. �, I � �° � �°�.. .l Wl...i I � V { f "t V "w .. I w. ". � ",.. I ",.. w. I � �! �t ...J ".,. 1 �" V ",. �.J "J �� ...
11111111111Z °°11111°° 111110 1IM 2 0 IIG A IN 1I ZA r 1I 0 N (-_.11 N A III r A IN 1 0 IN N 11.
William brings more than 15 years of experience providing construction oversite and
quality assurance on multiple construction projects. This vast experience 'includes
watermain installation, road paving, landfill, and concrete placement projects.
• Village of Mount Prospect, IL, Water Main Replacement Projects 2021, 2023,
2024, 2025. IMEG provided project administration, survey, testing, project and
final design, permitting, bidding and construction inspection for the water main
replacement and rehabilitation projects.
• Village of Mount Prospect, IL, Fiber Inventory Project Documentation and Map
Locates
• Village of Arlington Heights, IL, Surveying and Engineering Assistance for a
13,395- f Water Main Replacement
• Village of Arlington Heights, IL, IDOT Watermain Construction Services
• Village of Arlington Heights, IL, Water System Improvements Projects (2)
• Village of Arlington Heights, IL, Verify Existing Right -of -Way and Easements,
Topographic Survey and Compile Existing Utility Information
• Village of Stone Park, IL, Survey and Design Work for Alley Improvements
• Village of Stone Park, IL, Stone Park 2021 CDBG Application
• Village of Stone Park, I L, Construction Services to Frontage Road
• Village of Stone Park, IL, Construction on 40th Avenue
• Village of Addison, IL, Park & Withrop Water Main Replacement
• Village of Wilmette, IL, Water Main Improvements
• Illinois American Water, Woodridge, IL, Water Main Relocation
• School District Unit 46,E gin, IL, Coleman Elementary Water Main Replacement
• Burbank School District 111, IL, Liberty jr High School Forensic Analysis.
Storwater Detention evaluation for system failure reasoning.
• Oak Street Health, Aurora, IL, Aurora Commons Structural Analysis for New
RTUs on Existing Framing, Details for Slab on Grade Infill and Ceiling Hung
Partitions, and Exterior Was New Lintels Design
Experience
15 Tota 1, 4 with I MEG
Education
Morrison Institute of Technology, AS
Degree
A � I .. ,.z c � II "..� �,V r.. II II R II I G S II II �.� II - II ..) II ".�� IR f II � I ,) � } ) ` A f II I ' M A II I A ".. I . f" II I III f ) J I f II 1 I ' f II I I � II G..� II M ".,} l.! I � II I �)., II I
IIIII111111' °"'11111°° 111110 II III ', A IN II ZA PI O N C II N A III FAIN ILA IN
Anthony is responsible for civil engineering design and production of construction
documents for a wide variety of clients and projects. His experience includes the
design of water mains, sewer, drainage, parking improvements, utility replacements,
and more. Anthony also performs quality control, shop drawing review, project
permitting, and construction observation.
• Village of Arlington Heights, IL, Arington Heights, IL, Construction drawings,
specifications, permits, bidding documents and bidding assistance for the water
main and sewer installation projects and sewer spot repair projects.
• Village of Third Lake, Third Lake, IL, Topographic Survey, design -prepare plans,
site drawing, erosion contro plans, construction administration.
• R.S. Service Systems, Inc., Cook County, IL, Permits for the City of Rol ing
Meadows, Village of Palatine, Village of Schaumburg, Village of Inverness, Village
of Hoffman Estates, Village of South Barrington and IDOT.
• Burbank School District 111, Burbank, IL, Liberty Jr High School New Storm
Water Detention System Design.
• Camosy Construction, Mount Prospect, IL, Topographic survey, preliminary
geometric plan, coordinate the right-of-way with IDOT, prepare final roadway
pan, modify onsite plans.
• Comcast Cable - Addison, Lisle, IL, Topographic survey and prepare documents
required for the approval of the installation of approximately 560 feet of
underground and 233 feet of aerial CATV fiber.
• Community Consolidated School District 15, Palatine, IL, Survey, design,
bidding, construction and engineering services for parking improvements at
multiple facilities- Carl Sandburg Virgina Lake School, Carl Sandburg Jr. High
School, Lake Louise School, Plum Grove School, and Pleasant Hill Elementary
• Community Consolidated School District 15, Palatine and Hoffman Estates,
IL, Civil Engineering Design for Multiple Building Additions / Expansions: Frank
Whiteley Elementary, Lincoln Elementary, Pleasant Hill Elementary, Kimball Hill
Elementary, Willow Bend Elementary, Gray Sandborn Elementary, and Hunting
Ridge Elementary
• Waukegan Community Unit School District 60, Waukegan, IL, Parking Lot
Improvements for multiple facilities: North Elementary, Clark Elementary, Andrew
Cooke Elementary, Jack Benny Middle School, Glenwood Elementary, and Robert
Abbott Middle School.
Experience
6 Total, 5 with IMEG
Education
University of Illinois at Urbana -Champaign,
BS Civil Engineering
Registrations
Licensed Engineer in Training (IL)
pp j� (..I � , , � -U �,� �, I .,� �, - � O � II ( I � I N, ( .N I � . ., OR, r � �" ��/ r ' I �, I � G ,, r f } � r � �� , r \ �" ( G � MOUN 1, I� �, I � � �, �....,...
p'�(� ._J .. .... � � III � ..� .., � .� � d ..J � �. � .J .�Y .� ... .a . I � tF ��.. .) U V I � `u` I f�'t v "w .%�,... f III '� . � .., I ... w.. I .� `�r` /fie ..1 .,.. 1 .. ...1 �I w..� ) ..,
IIIII111111' °"'11111°° 111110 II 0 IIG A IN II ZA r II O N C II N A III r A IN II.) IN
Richard is responsible for performing as a resident engineer and quality control on
a variety of design and construction projects. He is also responsible for overseeing
construction inspection, surveying, documentation, paving, appurtenance work and
performing constructabi ity reviews.
• Village of Mount Prospect, IL, Water Main Replacement Projects 2021, 2023,
2024, 2025. IMEG provided project administration, survey, testing, project and
final design, permitting, bidding and construction inspection for the water main
replacement and rehabilitation projects.
• Village of Stone Park, IL, On -Call Engineering Services (1995 - Present). Richard
worked on the 1800 Block and Alley Infrastructure Improvements, Water Main
and Road Rehabilitation, Frontage Road Median Enhancements.
• Village of Arlington Heights, IL, Water System Improvements Projects 2022,
2023, 2024. Construction drawings, specifications, permits, bidding documents
and bidding assistance for the water main and sewer installation projects and
sewer spot repair projects
• Village of Arlington Heights, IL, 2021 Water Main. Verify existing right-of-way
and easements, topographic survey and compile existing utility information.
• Village of Cedar Point, IL, Water Main Design. Approximately 18,000- f of
6" water main, fire hydrants, air release valves and one booster pump station,
building and standby generator. Along North 23rd Road to the existing 8" water
main on Cedar Street.
• Illinois American Water, Wheeling, IL, Airport Water Main Relocation. IMEG
provided civil engineering design, survey, geotechniI
cal and bidding services.
• Village of Third Lake, IL, Topographic Survey, design -prepare plans, site drawing,
erosion control plans, construction administration
• Village of Lelan, IL, Preliminary Engineering Report. Prepare a reprot in
accordance with USDA requirements for a new water treatement facility
• Waukegan Community Unit School District 60, Waukegan, IL, Park Lot
Rehabilitation Projects. Andrew Cooke Elementary School, North Elementary
School, Clark Elementary School, Jack Benny Middle School, and Robert
Abbott Middle School. IMEG provided engineering design, survey, bidding and
construction services.
• College of Lake County, Grayslake, IL, Loading Dock and A/B Wing Drainage.
IMEG provided topographic survey, drainage evaluation, lift station modifications
/installation, preliminary estimate of cost, final plans and construction services.
• College of Lake County, Grayslake, IL, Sun Pivot Circe Reconstruction. IMEG
provided civil design, survey and construction administration services.
Experience
4 Total, 3 with IMEG
Education
University of Wyoming, BS Civil
Engineering
Certificate
Engineer in Training (EIT)
Wyoming (EI 6520)
pp' {,rye �,...,. �, /..�., � � �.,. ..,ry.. � y, , w, �,...., '�, ��x e, + � S....�. ,.0 � ( K,...... G . �....,,} , r ,) (..... ,) 6 � � / /� r ' �",. �, �? "i q� ry � .,r.. 7 x � r � y� . U r ... ` /p jA ( ` (, .,. �,....., � � .ti. �,. � . �,.....,...
N�f G �._J1 � ,III ,...0 � f *r � .. �� , 7 �.., II ,.i � � v..1 "r� \ III I 'k„ J ,. d \. \0 ,,... „) ..i s III I /" \ � /" s.: U V / '\ I \. � f 'l � "4 /�, .. f �l 1 "r I \ . } � ��.., I i \ III I `�f III f 4 .) 1„,.� 1 . ,} �,.� � w ,,. � ) �,..,
IIIII111111' °"'IIIII'°° 111110 II 0 IIG A IN II ZA r II O N C II N A III r A IN II.) I�
Theodore is responsible for land and route surveys. He schedules and oversees the
survey crews, providing boundary, topographic, and construction staking surveys
to a wide range of private and governmental clients. He currently heads Gurnee
Survey Department. He has experience in performing and directing field crews in
the accomplishment of ALTA surveys, topographic surveys and construction staking.
He has experience in writing legal descriptions and preparing plats. Ted currently
using AutoCAD/Civil 3D 2016. Set up control networks with traditional and GPS
equipment.
• Village of Mount Prospect, IL, Water Main Replacement Projects. IMEG
provided civil engineering, surveying and construction administration for (4)
water main replacements within the Village's potable water distribution system.
• Village of Wilmette, IL, Water Main Improvements Project.
• Village of Wilmette, IL, Relief Sewer, Verified and established control. Performed
staking and grading services for approximately 50 storm structures.
• Village of Wilmette, IL, Relief Sewer, Verified and established control, stake and
grade approximately 20 storm structures and staking of approximately 2100-ft.
curb and gutter with offsets and grades.
• Village of Wilmette, IL, Prepare easement plats for new underground fiber
located within the Com Ed Right -of -Way.
• City of Ottawa, IL, Constructed two new water treatment plants a new well, new
transmission mains, updated three other wells and made other associated water
system improvements. In conjunction with this we prepared a comprehensive
evaluation of the system, proposed a new rate structure and a system of user
charges.
• Village of Third Lake, IL, Mainsail Drainage Study, Provided a Drainage Study for
Mariners Cove/Mainsail Drive to determine existing storm sewer capacities and
causes of existing flooding.
• Village of Third Lake, IL, Lake Avenue Rehabilitation Construction Services.
• Village of Third Lake, IL, Serbian Storm Sewer Realignment Survey.
• Village of Third Lake, IL, Sunshine Avenue Easement Survey.
• Village of Downers Grove, IL. Resurfacing Survey Services ST-063
• PTB 168/14 Various Various Surveys, Various Locations, IL - This project
consisted of performing a full hydraulic topographic survey and creation of a
DTM south of Hanover, IL for Box Culvert #SN 043-1024 over an unnamed
tributary to the Apple River, 0.9-miles +/- NW off Whitton Rd. The survey
included topographic data from R.O.W. to R.O.W. Centerline data for IL Route 84
was provided by the Department.
Experience
35 Total, 34 with I M EG
Education
College of Lake County, AA Science
Santa Barbara City College, AS
California Polytechnic State University,
Construction Management
University of Wisconsin, Extension
Introduction to MicroStation
Registrations
Professional Land Surveyor
Illinois (035-003395)
Wisconsin (2396-8)
Member of IPLSA
MJ � A ND III NPON J..a H � RhNIC SN... .a ,III, � I t`Ot' ) UV/`�� Au'IN N "w A.. III � (_� w �.I VA(JMOUN ,. ) C.
Illlf 11!11!° °°11111°° 111110 1IM 2 0 RG A N 1I Z A.....r II O N C Il j A II .....F A N II ) < [ �' � �[ ��� S O III N
Mike brings more than 35 years of practical experience in construction survey, site
management and construction inspection. He is responsible for the observation
of construction procedures as they relate to acceptable practice, the testing of
construction materials for conformance with design plans and specifications, and
the tracking of project quantities and costs. Mike is highly experienced in resident
engineering and quality control functions on a variety of interstate, highway, local
roadway, building, site preparation, and utilities projects. His experience includes
construction inspection and layout for large scale roadway projects for the Village of
Third Lake, IL; Village of Stone Park, IL; Village of Gurnee, IL; and Abbott Labs, North
Chicago, IL along with other large scale projects including several roller coasters at
Six Flags in Gurnee, IL. Mike's years of knowledge and expertise have continued to
build on his effective problem solving skills and ability to build strong relationships
with co-workers, clients and contractors.
• Village of Mount Prospect, IL, Construction Administrative Services for survey,
testing, project and final design, permitting, bidding and construction inspection
for the water main replacement and rehabilitation project.
• Village of Stone Park, IL, On -Call Engineering Services. Construction
Administrative services for surveying and engineering services to prepare
construction drawings and bid documents.
• Village of Arlington Heights, IL, Construction Administrative Services for IDOT
watermain construction services
• Village of Lakemoor, IL, Construction Administrative Services for Route 120
Westerly Watermain Construction Services. Coordination with IDOT and IEPA,
construction layout, review shop drawings, process RFI, pay requests.
• Village of Wilmette, IL, Water Main Improvements
• Village of Third Lake, IL, On -Call Engineering Services. Design and prepare bid
documents, construction administration and coordination with IDOT.
• Leo J Fox Trucking & Excavating, Inc., Mount Prospect, IL, Construction
Administration services for the police including Storm Sewer and Sanitary Sewer.
• Fremont School District 79, Mundelein, IL, Prepared master site for district
property along N. Fremont Center Road along with concept plan for modified
parking and access to existing elementary and intermediate school. IMEG
provided design, topographical survey, final value engineering services.
• Gurnee Park District, IL, Construction Ad m i n Services for South Park ADA.
• Abbott Laboratories, Abbott Park, IL, Prepared ALTA/ACSM land title surveys
for Abbott Park and Abbott Park East.
Experience
36 Total, 31 with I M EG
Certifications
Hazardous Waste Site Worker Training
(HAZWOPER) Certified
,. ".. II �... ! II (a .� II V II ,",. II ) II . f II //1 f II M II FV� II f � ,�} J I f II f,,..1 I ' f II � I 'III II G..,� II . jai "�} U I 1 II C.), II . II
VILLAGE OF MOUNT PROSPECT
TRUSTED BUSINESS PARTNER
Since 2018, IMEG has served as a trusted engineering partner
to the Village of Mount Prospect, providing civil engineering,
surveying, and construction administration services for a variety
of i m provements. I n 2022, I M EG led the design and oversight
of a $2.8 million CIPP water main rehabilitation project,
which included 8,000 linear feet of new PVC water main across
several areas of the Village. The project also encompassed roadway
rehabilitation, sidewalk and curb replacement, and landscape
restoration.
IMEG's responsibilities included design, inspection, surveying,
quantity documentation, and full construction oversight. We also
managed permitting with IDOT and IEPA, demonstrating strong
coordination with regulatory agencies.
Additional services provided have included data collection,
topographic survey, alignment planning, preliminary design, soi
borings, and full construction -phase administration.
Other representative projects:
• Water Main Replacement Projects (2021, 2023, 2024, 2025)
• Water Distribution System Replacement and Rehabilitation
• Pubic Works Fiber Connection Design, Survey and Admin
• Fiber Inventory Project Documentation and Map Locates
COST Ongoing, Various
BUSINESS 2018 - Present
ALLIANCE
SERVICES Civil, Survey, Construction Administration
`t {W� �,...,. d �, a �.,, .. e �, , �...,. .._ :;x e � ` "' (...... a . e....• , f ,.... ( � .7 :�', G ; yV , .,f.. (" : � f C .=u f .,. � p ( .,. �,....., I� N P R' �. � . D . �,......,...
tf W �._JI .. � , , ....0 =� ,�`t "J ..,� III � ,.1 '+�... � u,,.� "� v =...1 '�� �. � (.J ..�Y '�. V ...... ,a '+�.� ,. I � � �...� t'....J V V /� I =. %�{ f�°e V "w P `, ,.. f t✓ V 'III I x . } � ...., I v...,� ,. I � `�t` � f�4 ,.1 G...% 1 ...,} l...J "J '�. ��� J _,...
VILLAGE OF STONE PARK
ON=CALL ENGINEERING SERVICES
For over four decades, IMEG has provided responsive, high -quality
p p COST
civil, surveying, and construction administration services to the CONTRACT
Village of Stone Park, IL. Our longstanding partnership reflects
a deep understanding of municipal infrastructure needs and a SERVICES
proven ability to consistently deliver effective solutions.
A key example includes the 2020 $3.9 million project involving
the design and inspection of 1.7 miles of new PVC water
mains, along with roadway rehabilitation, sidewalk and curb
replacement, and landscape restoration. IMEG's on -call services
have also included construction inspection, surveying and staking,
quantity verification, and detailed project documentation.
Other representative projects:
• Addison Creek Lift Station
• Stone Park Grading Plan
• Police Station Permitting & F oodp ain Development
• Italian Cultural Center
• USEPA Safe Drinking Water Updates
• Utility Map Update
• Water Atlas Update
• Inflow Control Program
• Avenue Infrastructure Improvements
• Pebbles Car Wash Remodel
Ongoing, Various
1980 - Present
Civil, Survey, Construction Administration,
Subsurface Utility Engineering (SUE)
II u ( (II " (a � Ic. " (.� , � 4 I c C) C �.1,wu � �� �.�� i� :(C)� � �.9
��/� L .�� L I . I I � I (I. I � ,.� I L .. � I V L I � ..� II I II I I � I I . � IL II v .,. II II � II , f II i L ,� �,( ., f IL I /"{ , I I � I I L .. I IL I � f I � . J L . � f II I , f II �I I `"' L II e"�.. � II .. II 11i'V .. .! I � II II � II II �.. II
TF' F ILLAGE OF ARLINGTON AEIGHTS
I �
TRUSTED BUSINESS PARTNER ARLINGTON HEIGHTS, IL
15+ YEARS OF SUSTAINED SUPPORT Other representative projects:
IMEG has served as a trusted engineering partner to the Village
• Construction observation for street rehabilitation
of Arington Heights for over 15 years, providing civil, surveying,
. Water System Improvements
and construction administration services across a range of Village
' Water Main Replacement Projects (2011, 2012, 2013)
infrastructure projects.
Over the most recent five-year period, IMEG delivered design
COST Ongoing, Various
and construction support for a $7.9 million water main
replacement project involving 6.5 miles of new ductile iron
BUSINESS 2010 - Present
pipe throughout the Village. The scope also included roadway
ALLIANCE
patching and overlays, sidewalk and curb replacement, and
landscape restoration.
SERVICES Civil, Survey, Construction Administration
That same year, IMEG supported a $1.33 million CIPP lining
project involving seven segments of aging or abandoned
water mains —many located beneath railroad crossings or in high -
traffic intersections. IMEG's roe extended beyond engineering
design and inspection to include coordination and permitting with
the IDOT, Union Pacific Railroad, and the Illinois Environments
Protection Agency (IEPA), underscoring our expertise in multi -
agency collaboration.
y � ' - G , ... a � ( �. ,J a � . �......
�`1/� L .�� � L. I , I I � I � I I � ..� I I . � I u L I � ..� II I II I I � I I . J � IL II �` ., Il a II .� II , f II I L ,� �,� _) w f II I /"{ , I I � I I L .. L IL I � f I � . J L .,f II I , f II i I "' L II e"4 .�� IL .. II 11i'V .. .J I � II II � � II IL �. II
2o
VILLAGE OF Fox LAKE
WATER MAIN IMPROVEMENTS
ENGINEERING FOR LAKEFRONT PARK REDEVELOPMENT
COST
IMEG has proudly partnered with the Village of Fox Lake for the
past 3 years, delivering full -service engineering support for the BUSINESS
redevelopment of Lakefront Park. IMEG collaborated with the ALLIANCE
Village through all phases of the Lakefront Park redevelopment
project, providing engineering, construction oversight and contract SERVICES
management services. Acting as the Village's lead consultant, IMEG
managed coordination with IDOT and other regulatory agencies,
secured approvals, and oversaw both technical execution and
administrative compliance.
Our scope included drainage and environmental analysis, traffic
review, civil design, utility planning, and permitting, followed by
documentation and contractor coordination. IMEG maintained
close communication with Village staff throughout the project,
offering progress updates and ensuring alignment with objectives
and funding requirements.
IMEG also competed the as -built survey and record drawings at
project completion and previously contributed to the Lakefront
Park Access Road Layout as a subconsu tant to Copenhaver
Construction. IMEG continues to support the Village through
DOT-prequalified bid opportunities for upcoming roadway and
subdivision projects within the park and surrounding areas.
Various, Ongoing
2022 - Present
Civil, Survey, Construction Administration
p ( � <. ( x e u a, ' ( � � / � q o )( � � , u � p ( I � J . u �- c � ..V..,
p'� _J , ....0 =� �`t � ..) III � , � �.. � �.� "� � =..a �� � � (. a ..�Y �.� ..... .a �.� , � � � � � � ,.J U V.�`i � =. /�{ f�°e "� "w r�, ,.. V III � x . } � ,.., � =...� � � `� III � F�4 ,.1 G . e` 1 . ,} �..� � �. � � � _,..
VILLAGE
WATER MAIN IMPROVEMENTS
The project: The Village of Wilmette undertook the
rehabilitation of a 12-inch water main located in the alleys
north of Greenleaf Avenue, stretching from Wilmette
Avenue to Sheridan Road. This 5,900-ft water main, originally
constructed over 100 years ago, had once served as a
transmission main when the Village received its water supply
from the City of Evanston.
The goal: The primary goal was to extend the service life of
the aging infrastructure, improve system reliability, and reduce
the risk of costly failures while minimizing disruption to
residents and businesses.
Design approach: IMEG performed topographic
surveys, inspections, and geotechnical and environmental
investigations to support the development of compete
engineering plans and specifications. Rehabilitation
methods included cured -in -place pipe lining and targeted
abandonment, supplemented with valve and vault repairs,
pavement patching, and other collateral work. The team also
prepared and coordinated permit submissions with IEPA, IDOT,
Cook County, and other agencies. Rigorous QC/QA reviews
and constructabi ity evaluations ensured the plans were
reliable, cost-effective, and ready for bidding.
Challenge: The primary challenge involved designing a cost-
effective rehab strategy for a century -old water main in narrow
alleys with active residential access. Careful panning was
required to balance constructabi ity,long-term performance,
and minimal disruption to surrounding properties.
Project outcome: The Village received a compete, bid -ready
design package that addressed both regulatory requirements
and community needs. The improvements provided a durable,
constructible solution that extended the life of the water main
and supported the continued delivery of safe, dependable
water service.
COST $400,000
COMPLETION 2024
SERVICES Civil, Survey, Construction
Administration and Inspection
p {,rye " �,...,. �, /..�., � � �.," .,. O � w, �,...", ', x e, / � � ".... ,wU � ( �,...... G . �....,,} , ,) /..... ,) 6 � � / ' /� �, �? "i q� ., .. 7 x � � y� . U .,. V /p � " ( �,....., � .ti. �,. � . � . �,...., .., ..
N�f G (._J1 � ,III ,...0 � f t � .. �� ,7 �.., � ,..� � Jv".'1 �� � III I t" a ,. d . �0 ,,... „) ..i � , � I /" \ � /" s.1 U V%� � \. � f '� � w4 /�, ".. �V�f III � � " } � ��.., � i \ � � V !�4 "" � G".} 1 ",} �,.� � w ,,.) ) ,..,
1141rATER
CITY OF HAMILTON
• CDBG Water Main Bidding and Construction Inspection
CITY OF MACOMB
• Engineering Services to Update the Plans for Water Main
Replacement In the NE and SW Parts of the City
• Bidding, Construction Inspection and Guidance for the NW Phase
2 Water Main Replacement
• CDBG Water Main Phase 3 Project, Bidding and Construction
Engineering Services
• Plans, Specifications and Permit Applications for the Replacement
of Existing Transite Water Main
CITY OF NORTHLAKE
• Water Main Replacement and 43rd Ave. Resurfacing
CITY OF ROCK ISLAND
• Water Main Replacement on 35th St. from 6th to 7th Ave
NAPERVILLE PARK DISTRICT
• New Water Main at Springbrook Golf Course
VILLAGE OF ARLINGTON HEIGHTS
• Water Main Lining Improvement Construction Administration
Services
• 13,395- f of Water Main Replacement
• 5,000 If of Water Main Replacement
• Water System Improvements for 3-year period
VILLAGE OF COAL VALLEY
• Water Main, Water Tower, Booster Station Design Along Niabi Zoo
Road and East 3rd Avenue
• Water Main Replacement at 22nd Ave
• Water Main Replacement at E & W 21st Avenue
VILLAGE OF GRAND RIDGE
• Water Main Extension Project
VILLAGE OF LONDON MILLS
• London Mills Additional Water Main Design
• Water Main Bidding and Construction Services for Phase 3 Water
Main Replacement
VILLAGE OF MOUNT PROSPECT
• 8,000- f CIPP Water Main Rehabilitation
• 14,600- f of Water Main Replacement
• (4) Water Main Replacement Projects
VILLAGE OF STONE PARK
• 13,395-Lf of Water Main Replacement
• On -call engineering services 1980 - Present
VILLAGE OF WILMETTE
• Water Main Improvements Project
• Water Main Extension Project from Smithfield to Bernadotte, an
unincorporated village located in Fulton County on the Spoon
River.
• Permit applications to IEPA, County Highway and US Army Corps
of Engineers.
• Water Main Replacement Including Topographic Survey and
Design
1W.1..._JI .. J� /vv.) III l ..1 c. nu d JN G & ',. lJ ...... .a i,..) u I .I tF O �).. ,.) WARA I R. AA N v "w AC f 'III I (_I ,...,� w.. I .I `v" A( J G .} I Via` 1 ...,} UJ �,... ,,.�,� ) ,,..,
Illlfllll; IIIIIIIIII III IROJ II � r (J IN L II III S FA INL) II IN II-) IP II��...�AC
ROJ E CT A P P ROAC F.
IMEG understands the Village is requiring the service of
a consulting engineer to provide design and construction
administration for 13,800 linear feet of water main rehabilitation
within the Village -owned potable water distribution system. Our
team has extensive experience with these types of projects. We
have outlined a brief design and construction phasing outline.
COLLECTION:DATA
Immediately upon selection, we will request copies of available
data including, but not limited to, existing city utility/street maps,
previous site improvements plans, and any other information
regarding the existing conditions for the site.
TOPOGRAPHIC SURVEYS:
After review of available information, we will schedule the field
surveys of the project site. This information will provide the base
necessary to develop plans sheets and identify any issues that need
to be addressed in the design phase.
INVESTIGATIONS:SOILS AND SUBSURFACE
Depending on the availability and relevance of existing
geotechnical information, soil borings and/or pavement cores may
be ordered to determine thickness of the existing pavement, as
well as physical composition of the soils to provide to contractor
for soil disposal.
PRELIMINARY DESIGN:
IMEG will coordinate with utility companies to obtain all possible
utility information to determine points of possible conflict. Access
alternatives for proposed water main location determine locations
for proposed valves and fire hydrants. Determine appropriate street
rehabilitation.
Once the preliminary plans are approved, we will begin preparation
of the plans and bidding documents. Upon completion, these
plans will be provided to the team along with the estimate of cost
at this time, we will also begin meeting and coordinating with the
regulatory agencies.
IMEG believes communication with the client, design team and
regulatory agency is essential to a successful project. The project
manager wil I be in constant contact with the city, design team
and regulatory agency to ensure all aspects of design and costs
are addressed to the satisfaction of the city and in accordance
with the requirements of the regulatory agencies. All work will be
coordinated with and in accordance with Village requirements.
PERMIT ACQUISITIONS -
We will obtain all necessary permit acquisitions from the IDOT,
County, IEPA and/or MWRDGC and any other agencies with
jurisdiction, as necessary.
CONSTRUCTION ADMINISTRATION PHASE
We will respond to all RFI's and questions the contractor may have,
review material submittals and pay application/pay order requests.
We will provide full time construction observation of the proposed
improvements, so they are constructed in substantial accordance
with the documents. We will, also, perform construction staking
of the proposed improvements. IMEG will prepare as-bui is and
incorporate them along with all RFI's and ASI's into the drawings.
The drawings will be submitted electronically to the team and will
assist in updating the GIS.
All work will be coordinated with and in accordance with city
requirements.
Our proposed team consists of staff from our local offices to utilize
local knowledge and experience —with a deep bench of additions
resources.
APPROACH TO PROJECT MANAGEMENT:
During all phases of the project the project manager will provide
the appropriate manpower necessary is available. The project
manager will be involved in all decision making and ensure that
QA/QC is performed on each phase of the project.
STAFFING COMMITMENT:
IMEG has a culture of can do and we exhibit that commitment
to all of our clients by doing what ever is necessary to exceed
exception. That includes involving senior staff in all projects.
We are committing the staff whose resumes are included in our
submittal, these are senior leaders who will remain involved in
the project from beginning to end. While we will involve younger
engineers in a production capacity they will work under constant
senior leadership and guidance.
COMMUNITY COMMUNICATION:
We keep an open line of communication with the residents and
business in the project area. We will provide a weekly schedule
updating to all residents and business, along with direct contacts
address any concerns or field issues.
� �.� l°�� �I.: .� � II � aIIII II RII C_ SII ,III .....II .a II .,%If= f II II ,)O�)_.) ` Af II I' MAIII� ..I II � f �JI f II �., I' f II .�I VIII I A( II (II. 1 ,.)l I d II I I=.��. II
IIIIII IIIIIIIIII IIIII III IRO II . C U IN 1 II III S FA IIN L) II IN II II III A I
x�nl
N IIIpIIIIII
NII
IIII�
I�
IIIIIIIIIIII
�u�1
9�
�..
11111
IIIIIIII
A�
1. Project Administration:
Client Executive
lill
Project Coordination and Review with Village Staff
Project Manager
16
2. Route Survey
Land Surveyor
10
Verify Existing R.O.W./Easements
Senior Field Technician
70
Topographic Survey
Field Technician
70
Compile Existing Site Utility Information
Civil Designer IV
40
3. Pavement Cores / LPS-663
Sub Consultant
LS
4. Project Design:
Preliminary Design
Senior Civil Engineer III
24
Coordination with Utility Companies to Access
Civil Field Technician
140
Possible Conflicts with Projected Water Main Install
Civil Designer IV
140
Access Alternates for Water Main Location & Material Types with Associated Costs
Determine Extent of Roadway Rehabilitation
Review with Village Staff
Final Design:
Construction Drawings and Documents to Include Plan and Profiles with Existing and
Proposed Water Main
Specifications
Senior Civil Engineer III
24
Quantiles
Sr. Civil Technician Specialist
140
Estimate of Probable Cost
Civil Designer IV
140
Bidding Documents
Administration
16
5. Permits
Civil Designer III
16
Coordination with Regulatory Agencies (IDOT, IEPA)
Civil Designer
24
Process Permit Applications
Ad m i in istration
16
6. Bidding Assistance:
Contract Prospective Bidders
Civil Designer III
8
Distribute Plans and Specifications
Civil Designer
8
Attend Pre -Bid Conference
Administration
8
Attend Bid Opening
Bid Review and Recommendation
7. Full Time Construction Inspection:
Weekly Site Meetings with Project Manager, Village, and Contractor
Senior Civil Engineer III
16
Preconstruction Photo Survey
Field Technician IV
500
Full Time Resident Inspector
Senior Civil Tech Specialist
20
Construction Layout
Senior Field Technician
20
Site Verification to Pay Estimate Quantities
Civil Designer IV
16
Process Pay Request
Administration
16
Prepare Punch List
Verify Final Restoration
Provide As -Built CADD Files
Total Hours
1,498
'� /� . N iiiiiii `ay ay F, g �, ..,ry.. �, .� II y .` ,. :,s] aryl : ,1 / ...., w. �,....,, , s r ,.. .., 6 � � /,ry r °,,, \ \J W �.7 �' , � pq � .,r.. } J �" � ` r ... "u r \ p '� �' " �„....., II a I
V � � �.Q .a �,... u J �t I ..,� �V ,.` ,.., II ,,.,.�' Y r� "a,..J � � =.III J t�..J ,.,.� w..\d i,..,. ,..r ,,.,.t` s. I � .r' G . eW %... s.i U V f...h I � `Mt` I d °� ,.. f t/ t ,III " ,� � ,",.. I �i"....� I � r`W e ,. J G .} 1 4,,.,,} ��.J J
I �7
PROJECT SCHEDULE
E OF MOUNT PROSPECT PROFESSIONAL SERVICES
41N REPLACEMENT AND INSPECTION PRQJECTSCHEDULE
Project Administration
Route Survey
Preliminary Design
Final Design
Permits
Bidding Assistance
Construction Inspection
IIIIII uuuu �mwll � IIIII � lllww' uuu I" IIIY �Iead�i���ng
Illilllllllll ��� II �IIIIM � IIIIII �IwIVI I vl �IIIU �wllllUllllw, Ir�I Illlllmr IIIIIIIII si i IIIII
(I II IIIIII ��bci�l wh m a W � III
I�IwW I,�Iww Vm Nub uuu uuuu ,�wml �,no�W ""'It
uu uuuu �Vul co ��rnIIWV�, i�iuuuimr um mu d a rVwl, ""'It
uu uuuu ��ru uuu uuuu d ���)a I,mwwW uuuiim �IIIIIP um mu
d mi ��l i�i milYo u ��r ( w wu mW l IIIII m�l m w mwWl ( ��n m
ImII Im We
1 � uuu mt wI I F I wm�IW ��nd
soi
r uuuu�I uuu I ��rn um I n ""'Its
uu ulww�. u�VM 4UV
uuu'• i uuummuu• uummwu
Civil Engineering
Structural Engineering
MEP / FP Engineering
Technology Design
Security Design & Engineering
Acoustics & Noise Control
Architectural Lighting
Medical Equipment Planning
Parking Planning & Design
Dayl ighti ng
Decarbonization Planning
CFD
Energy Modeling
Embodied Carbon Services
LEED, WELL, PHIUS Certification Services
Net Zero Consulting
Rapid Performance Modeling
Renewable Energy Assessments
Total Carbon Analysis
r
Commissioning
Retro-Commissioning
Monitoring -Based Commissioning
Building Performance Optimization & Operations
Civil Engineering
Land Surveying
Planning & Landscape Architecture
Environmental & Arborist
Materials Testing
Transportation (Roads, Highways, Bridges)
Parking Planning & Design
Subsurface Utility Engineering
Construction Observation
Building Intelligence & Integration
Technology Advisory Services
Healthcare Information Technology
Security Design Consulting
Visioning & Planning
Process Engineering
Automation & Controls
Chemical Process
<:IMEG