HomeMy WebLinkAbout9.1 Motion to waive the requirements for public bidding and accept the proposal from LPS Pavement Company for brick sidewalk replacement associated with the Central Gateway Project for a cost not to exceed $198,675.M+awn �'xytlts=e
Item Cover Page
Subject Motion to waive the requirements for public bidding and accept
the proposal from LPS Pavement Company for brick sidewalk
replacement associated with the Central Gateway Project for a
cost not to exceed $198,675.
Meeting August 6, 2025 - REGULAR MEETING OF THE MOUNT PROSPECT
VILLAGE BOARD
Fiscal Impact (Y/N)
Dollar Amount
Budget Source
Category
Type
Information
Y
$198,675.00
Prospect and Main TIF Fund
VILLAGE MANAGER'S REPORT
Action Item
This memorandum transmits staff's recommendation to procure a contractor for the
installation of new bricks and the replacement of existing bricks in and around the Central
Gateway site at 310 West Northwest Highway. This project has been identified as a high -
priority management action in the Village's 2025 Strategic Plan.
The Village purchased this property in June 2024 and took possession of the property on
November 30, 2024. The building and property were most recently the site of an automotive
repair facility. The property had previously been the site of a commercial gas station. The
building is currently vacant and undergoing demolition. The restoration plan for this site
features permeable surfaces including various plantings, trees, shrubs, turf, and seasonal
flowers. The site will also host a clocktower as the main architectural feature at the heart of
the plaza. A small amount of brick sidewalk will be installed within the plaza to access the
clocktower and six new public parking spaces will be installed along the eastern edge of the
property. A new garbage enclosure, some nominal pedestrian -level lighting, curb -cut removal,
and brick replacement on the adjacent Central Road and Northwest Highway rights -of -way will
also be included in the project scope.
Most of the above -referenced work is under way or under contract except for the brick
sidewalk work. To secure a contractor to perform this job, staff approached the Village's
current brick replacement contractor, LPS Pavement Company of Oswego, Illinois, and
requested a cost proposal. The Village Board awarded LP a three-year (2024-2026) contract
(the Brick Paver Maintenance Contract) to replace bricks on public rights -of -way at the June
4, 2024, Village Board meeting following a competitive bid process.
LPS submitted a written cost proposal to perform the specified work at the 2025 Brick Paver
Maintenance Contract prices. The calculated value of the proposed work at these rates is
$180,613.86. This fee includes the cost of brick pavers. A copy of LPS' cost proposal is
attached.
Discussion
LPS has performed brick paver installation and replacement work for the Village for many
years. All of their work has been completed efficiently and with good quality results.
In addition, the scale and scope of this proposed project is similar to projects LPS has
performed for the Village in the past. The award for the Brick Paver Maintenance Contract in
2024 was $262,000. The award in 2025 was $262,500. Staff is confident that the firm can
satisfactorily complete a project of this size at the prices proposed.
Staff recommends including a 10% contingency in the award which would increase the
proposed contract value to $198,675.
Alternatives
1. Waive the rules requiring public bidding and accept the proposal from LPS Pavement
Company to install bricks at the Central Gateway site.
2. Action at the discretion of the Village Board.
Staff Recommendation
Staff recommends that the Village Board waive the rules requiring public bidding and accept
the proposal from LPS Pavement Company of Oswego, Illinois to provide brick paver
installation and replacement work for the Central Gateway Project for a cost not to exceed
$198,675.
Attachments
1. LPS Proposal - VOMP Village Gateway Project 7-30-25
2. LPS BRICK PAVER REPLACEMENT AND INSTALLATION MAP
LPS PAVEMENT COMPANY Distributors/Contractors 67 Stonehill Road (500) 252 1770
Interlocking Concrete Pavers Oswego, Illinois 60543 (630) 551-2100
IN=Brick Pavers (630) 551210511P'ax
July 7, 2025
Mount Prospect Public Works Department
Attn: Scott Moe
1700 W. Central Road
Mount Prospect, IL 60056
RE: Village Gateway Project
Scott,
Per our discussion, LPS Pavement Company will hold our existing Brick Sidewalk Paver Maintenance contract
unit pricing for the above -referenced project. The following pricing is based upon the stated quantities on the
attached drawing dated 6/30/2025.
Installation of brick pavers - 9,480 SF @ $11.25/SF**........................................................................ $106,650.00
Regimental Red Belden pavers — 7,833.33 SF @ $6.75/SF................................................................ $ 52,874.98
Carbon Black Belden pavers — 2,088.89 SF @ $9.03/SF..................................................................... $ 18,862.68
Carbon Black ADA Belden pavers — 106.67 SF @ $2O.87/SF............................................................. $ 2,226.20
Grand Total = $180,613.86
** Installation unit price of $11.25/SF is derived from our existing contract Year 2 (2025 season) - Pay Item
Existing Remove and Replace of $13.5O/SF, less the cost of $2.25/SF for removal of existing brick pavers.
Additional Comments:
Pricing is based upon the work being performed during the 2025 working season.
Pavers cannot be installed in freezing weather or upon frozen aggregates or subgrade.
Removals of existing materials by others.
Stone base course (CA-6 stone) placed and compacted by others to minus 3-1/2".
Concrete curbs of any type by others to proper elevations.
Pricing assumes ADA pavers at the corner of Northwest Highway and Central Road.
Permits and lane closures by others as needed for the above project.
Materials will need to be secured in a timely manner for the Fall installation timeframe.
LPS Pavement Company will follow Cook County Prevailing Wage guidelines for this project.
Please let me know if you have any questions regarding the above information and pricing.
Sincerely,
Brian Simmons
I
I
m
I
0
74
z
I I
74
Ely
II
Cyl
jju I
CL
ce
Ell
IM nil
1111<
. ..
.ryI
q
nu
N
z
""m
Ill
4%, cly 0
N III
.. .. .. .. ..
I
Ex
W,
) ch ::::::::
ul I
Q. lilln
I
lN u