HomeMy WebLinkAbout7.2 Motion to accept the proposal from Sauber MFG for the Hose Wagon buildout through the Sourcewell National Auto Fleet Group Contract 091521 for an amount not to exceed of $56,632.00.M+awn �'xytlts=e
Item Cover Page
Subject Motion to accept the proposal from Sauber MFG for the Hose
Wagon buildout through the Sourcewell National Auto Fleet
Group Contract 091521 for an amount not to exceed of
$56,632.00.
Meeting April 15, 2025 - VILLAGE BOARD/COMMITTEE OF THE WHOLE
MEETING OF THE MOUNT PROSPECT VILLAGE BOARD
Fiscal Impact (Y/N)
Dollar Amount
Budget Source
Category
Type
Information
Y
$56,632
Capital Investment Plan
CONSENT AGENDA
Action Item
The Village of Mount Prospect is home to the O'Hare Tank Farms, which supports one of the
busiest airports in the United States —O'Hare International Airport. These large-scale fuel
storage facilities are important to airport operations, and it is estimated that approximately 300
tank cars, each carrying 9,600 gallons of fuel, travel in and out of Mount Prospect each day.
Given the potential hazards associated with these operations, the Mount Prospect Fire
Department has long maintained a specialty response vehicle equipped to handle incidents
involving flammable liquids and fuel transport vehicles.
Hose Wagon 12 was originally acquired in 2006, built on a repurposed 1989 Public Works
truck chassis. It was specifically designed to respond to petroleum -based emergencies, such
as those involving storage tanks and tanker trucks. Key features of the current Hose Wagon
include 550 gallons of foam concentrate, 600 pounds of Purple-K dry chemical agent for Class
B (flammable liquids) and Class C (electrical fires) and over 3,000 feet of 5" hose for use in
non-hydranted areas
The vehicle was scheduled for replacement in 2021. However, due to the COVID-19
pandemic, the project was delayed.
The Apparatus Committee, in collaboration with the Department's Hazardous Materials Team,
developed a proposal to modernize the vehicle. The new design offers significant
improvements in fire suppression, deployment speeds, and overall maneuverability.
Proposed Enhancements:
• Dry Chemical Delivery: The current configuration uses two 300-gallon wheeled units
requiring crane -assisted removal, which takes a long time to be able to deploy dry chem
onto a fire. The updated layout includes a 500-gallon Gorilla Unit that remains fixed on
the vehicle, enabling faster deployment via a hose line. Although this results in a 100-
gallon reduction, the increased response speed more than offsets the volume change.
Gorilla Units are widely used at similar fuel storage sites.
• HydroChem Monitor: A new mounted fire attack monitor will deliver up to 2,000 GPM of
HydroChem (dry chemical added with water). The previous layout did not allow for any
high -volume HydroChem delivery.
• Foam Capacity: The new design continues use of two foam totes, totaling 550 gallons.
• Design Improvements: Elimination of crane to streamline layout and a shorter overall
length to enhance maneuverability, especially for highway responses (e.g., 1-90).
Please see the attached quote detailing the scope, pricing, and other relevant terms.
Discussion
The Department has identified Sauber MFG to construct the custom body for the new Hose
Wagon. Sauber previously built the current unit and has also worked on projects for Public
Works, offering a trusted and proven track record. The quoted price for this build is $56,632,
which includes a discount of $5,663 through the Sourcewell National Auto Fleet Group
Contract (#091521). The platform will be 216 inches long by 96 inches wide, galvanized to
support and accommodate all necessary equipment. The Department will be repurposing a
2007 International truck previously used by Public Works. Originally serving as a vacuum
truck, it was replaced due to the need for significant repairs to the chassis -mounted equipment.
However, since the chassis itself is in excellent condition and has fewer than 13,000 miles,
Public Works and the Fire Department thought the best use would be to repurpose this for the
new Hose Wagon.
In 2021, the project was budgeted at $200,000. Since that time, the cost of vehicles and
equipment has risen, with comparable builds now exceeding $300,000. However, by
repurposing an existing Public Works vehicle and working with Sauber MFG, the Department
will complete the project well under the original budget. Sourcewell meets the Village's bidding
requirements, and the estimated production time is approximately six months. We are asking
that the Village Board approve the proposal from Sauber MFG for $56,632 for the construction
of the new Hose Wagon body.
Alternatives
1. Accept the proposal of $56,632.00 from Sauber MFG for the Hose Wagon buildout
through the Sourcewell National Auto Fleet Group Contract 091521.
2. Action at the discretion of Village Board.
Staff Recommendation
Staff recommends approval from the Village Board to accept the proposal of $56,632.00 from
Sauber MFG for the Hose Wagon buildout through the Sourcewell National Auto Fleet Group
Contract 091521.
Attachments
1. Hose Wagon Buildout Memo
2. Sauber Hose Wagon Sales Quote SQ12814
3. Sourcewell Quote ID#1000170
4. Hose Wagon Configuation Pics
5. Current Hose Wagon
Village of Mount Prospect
Fire Department
INTEROFFICE MEMORANDUM
TO: FIRE CHIEF JOHN DOLAN
FROM: DEPUTY CHIEF TOM WANG
DATE: APRIL 11, 2025
SUBJECT: HOSE WAGON 12 REPLACEMENT
The Village of Mount Prospect is home to the O'Hare Tank Farms, which supports one of the busiest
airports in the United States —O'Hare International. These large-scale fuel storage facilities are
important to airport operations, and it is estimated that approximately 300 tank cars, each carrying
9,600 gallons of fuel, travel in and out of Mount Prospect each day. Given the potential hazards
associated with these operations, the Mount Prospect Fire Department has long maintained a specialty
response vehicle equipped to handle incidents involving flammable liquids and fuel transport vehicles.
Hose Wagon 12 was originally acquired in 2006, built on a repurposed 1989 Public Works truck chassis.
It was specifically designed to respond to petroleum -based emergencies, such as those involving storage
tanks and tanker trucks. Key features of the current Hose Wagon include 550 gallons of foam
concentrate, 600 pounds of Purple-K dry chemical agent for Class B (flammable liquids) and Class C
(electrical fires) and over 3,000 feet of 5" hose for use in non-hydranted areas
The vehicle was scheduled for replacement in 2021. However, due to the COVID-19 pandemic, the
project was delayed.
The Apparatus Committee, in collaboration with the Department's Hazardous Materials Team,
developed a proposal to modernize the vehicle. The new design offers significant improvements in fire
suppression, deployment speeds, and overall maneuverability.
Proposed Enhancements:
• Dry Chemical Delivery: The current configuration uses two 300-gallon wheeled units requiring
crane -assisted removal, which takes a long time to be able to deploy dry chem onto a fire. The
updated layout includes a 500-gallon Gorilla Unit that remains fixed on the vehicle, enabling
faster deployment via a hose line. Although this results in a 100-gallon reduction, the increased
response speed more than offsets the volume change. Gorilla Units are widely used at similar
fuel storage sites.
• HydroChem Monitor: A new mounted fire attack monitor will deliver up to 2,000 GPM of
HydroChem (dry chemical added with water). The previous layout did not allow for any high -
volume HydroChem delivery.
9 Foam Capacity: The new design continues use of two foam totes, totaling 550 gallons.
Hose Wagon Custom Platform Body Replacement
April 11, 2025
Page 2
Design Improvements: Elimination of crane to streamline layout and a shorter overall length to
enhance maneuverability, especially for highway responses (e.g., 1-90).
The Department has identified Sauber MFG to construct the custom body for the new Hose Wagon.
Sauber previously built the current unit and has also worked on projects for Public Works, offering a
trusted and proven track record. The quoted price for this build is $56,632, which includes a discount of
$5,663 through the Sourcewell National Auto Fleet Group Contract (#091521). The platform will be 216
inches long by 96 inches wide, galvanized to support and accommodate all necessary equipment. The
Department will be repurposing a 2007 International truck previously used by Public Works. Originally
serving as a vacuum truck, it was replaced due to the need for significant repairs to the chassis -mounted
equipment. However, since the chassis itself is in excellent condition and has fewer than 13,000 miles,
Public Works and the Fire Department thought the best use would be to repurpose this for the new
Hose Wagon.
In 2021, the project was budgeted at $200,000. Since that time, the cost of vehicles and equipment has
risen, with comparable builds now exceeding $300,000. However, by repurposing an existing Public
Works vehicle and working with Sauber MFG, the Department will complete the project well under the
original budget. Sourcewell meets the Village's bidding requirements, and the estimated production
time is approximately six months. We are asking that the Village Board approve the proposal from
Sauber MFG for $56,632 for the construction of the new Hose Wagon body.
TW/tw
Sales Quote
Phone 630.365.6600
Sales Quote Number: SQ12814
Document Date: 11/26/24
Page: 1/3
Sell To
Mount Prospect Fire Department
Todd Novak
1601 West Golf Road
Mount Prospect, IL 60056
United States
10 Notli Sauber Road
Ship To
Mount Prospect Fire Department
Todd Novak
1601 West Golf Road
Mount Prospect, IL 60056
United States
VVr;ll, IL 60151-1,000
Salesperson Shipment Method Payment Terms Bill -to Customer No.
Josh Wicks Customer Pickup Net 30 Days CO2180
Unit Price Line Amount
No. Description Qty. Unit Excl. Tax Excl. Tax
10295 Custom Platform Installation
216"L x 96"W Overall - Galvanized
1 3/8" Shiplap Apitong Decking
Install Clip Every 3rd Crossmember
6"x8.2 #/Ft or Formed Perimeter
3"x4.1 #/Ft Cross Sills on 24" Centers
5"x6.7 #/Ft Long Sills
Sealed Beam LED Lighting
18067 Harness System
Installation & Modesty Panel
10250 Anti -Sail Mud Flap Brackets - Galy w/ Flaps
Torque Mounting Bolts & Check Fuel Fill
17957 Certification Sticker & 16819 Placard
19587 Thompson's WaterSeal Applied to Deck Top
11028 Truck Equipment Sealed Lighting System
Z1193 Front Bulkhead - Formed Tubing
1 1/2" x 1 1/2" x 3/16" Tubing Construction
Profile Approximates Cab Contour Angle
10 Gauge VisiPerf Bulkhead Window
Extends From Window Bottom to Bulkhead Top
11111 Bulkhead Mounted Full Width Light Bracket
77"L x 9.5"W Offset Over Cab - 56386
9.5"W Offset Over Cab
++ Underbody Toolbox ++
19664 Stainless Steel Tool Box - Single Door
24"D x 24"H x 72" L - Target Size
Bottom Hinge Along 72" Side
14 Gauge Stainless - Tig & Mig Welded
(3) 19665 Stainless Steel Hinges
(2) 21400 Vector 2 T-Handle Latches
10676 90-Degree Rubber Sealer
21608 Drawer/Shelf Liner
Stainless Steel Carriage Bolts & Lock Nuts
*Note: Review Toolbox Size @ Drawing Stage. May Require revision
due to Chassis Limitations.
++ Rear End ++
Z1195 ICC Tube Bumper - 4"x8"x.250" Tube - Galy
1 Each 56,632.00 56,632.00
6,144 Units
1 Each
4,032 Each
1 Each
Sales Quote
Sales Quote Number: SQ12814
Document Date: 11/26/24
Page: 2/3
10 Noth Sauber Road
No.
Description
Qty. Unit
Not Full Width Change to 6' W
12570 6000/30000# Rigid Pintle Hook
on Rear Bumper Not to Exceed 28"H
Z1217
Bumper Receiver Tube Installation
1 Each
2" Receiver Tube: 15,000# Trailer GVWR; 2500# Vertical Load
D-Rings & 19705 Stainless Eye Bolt For Breakaway
Effective Capacity May Be Less Due to Chassis Limits
Refer to S5567-BMP-00 - ICC Mount
Install Below Pintle Hook
G-MP
Lower 8" Tube Bumper to Support Receiver; Centered Vertically
1 Each
w/ Receiver Face 5" From Bumper Face
Z1215
Truck/Trailer Socket Installation
1 Each
11123 7-Way RV Socket Installed & Wired LS
Center Pin Location Empty - Per Todd
Provision For Chassis Supplied Socket Install & Wired LS
Z1213
Brake Controller Installation
1 Each
Electric Installation w/ 16054 Controller w/
Wiring & Fasteners
G-PP
Smart Alarm 77-97 dB(A); 12-48V
1 Each
Measures Ambient Noise & Adjusts Sound Levels
++ Fold Down Racks and Swing Down Steps ++
Install Fold Down Racks L/R sides from Front Bulkhead to
Mid -Mounted Bulkhead. Locate Steps 1 per side, Approx 50" from
Front Bulkhead
Directly Rear of Totes Behind 2nd Rack Section
1- Rack Ea. Side -Approx 50" W, Bulkhead - Enclosing Tote Area - 2 -
Racks Ea. Side
Totes to Mid -Mounted Bulkhead
Z1197
4-Slat Fold Down Azek Racks - 36" H
20 Foot
Galvanized Uprights
Stainless Safety Connector Hardware
17881 Lower Latch on Each Stake Upright per Rack
2"x3/8" Rub Rail; 4-Slat; (x) Side Sections
1"T x 5.5"H AZEK CPVC Slats; Wood Grain Outside
Installed w/ (4) 3/8" SS Truss Fasteners w/ Nuts
Outside; Boards @ 19142-16' / 19143-12'
Gates Labeled R1/R2.. & 1-1/1-2... Starting @ Front
19567
Swing Down Step Ladder w/ Dual Handles - Galy
2 Each
19707-End Cap Installed w/ Adhesive on Uprights
w/ 19704 Gas Spring Assist - 375# Capacity
(3) 18"W Steps w/ Built -In Dual Handles
56615 - Used w/ Platform Racks - Pocket Install, 3-Step
G-MP
Angle Iron for Tote Retention
1 Each
Z1165
Surface Mount D-Ring Installation - 9120# WILL
2 Each
3/4" x 4.5 w/ 12317 Bracket & 12316 D-Ring
Install 1 Ea. Side - Mid Point of Totes
One Strap Over Both Totes
Customer to Provide 4" Strap to Secure Totes to Platform
VVr;ll, IL 60151-1,000
Unit Price Line Amount
Excl. Tax Excl. Tax
Sales Quote
Sales Quote Number: SQ12814
Document Date: 11/26/24
Page: 3/3
10 Noth Sauber Road
VVr;ll, IL 60151-1,000
Unit Price Line Amount
No.
Description
Qty.
Unit Excl. Tax Excl. Tax
12216
3-Rung Stowaway Step - S4937-100
2
Each
Install One Ea. Side of Modesty Panel @ Rear
13309
17"L Stainless Steel Grab Handle
2
Each
w/ 5/16" x 1 5/16" Installation Stud Each End
Z1193
Mid - Bulkhead Formed Tubing
3,312
Units
1 1/2" x 1 1/2" x 3/16" Tubing Construction
36"H
Closed End of Hose Box
10 Gauge VisiPerf Bulkhead
G-MP
Hose Bed w/ Solid Sides & Center Divider
3
Each
(2) Sides (1) Center Divider - No Railing on Top Edge
Approx 8'L x 36"H at Rear of Platform
G-PP
Hose Bed Tarp (RED)
1
Each
13336
Stainless Steel Utility Hook
21
Each
304 SS w/ Polished Finish - 1/2" Projection
Customer to Provide & Install Netting to Retain Hose @ Hose Box
Rear
++ Hose Tray Box ++
G-MP
HD Box to House - Hose Trays w/ Opening Lid - Approx 89" L x 16"W x
1
Each
17" H
Locate on Floor Forward Mid -Bulkhead
Piano Hinged Lid to Double as Step
Open @ Ends - Customer to Provide & Install Netting to Retain Hose
@ Sides
Z1304
Install @ Deck Floor Forward Side Against Mid -Bulkhead
1
Each
G-PP
Cross -Lay Hose Tray- (2) Approx 88"L x 16"H x 7"W
2
Each
8500-FO
All Weather Wheel Chock w/ Urethane Grip - Orange Over Galy
2
Each
8505-B
Underbody Almag Chock Holder - 22' Angle - 53652
2
Each
++ Paint ++
G-MP
Paint Ea. Side of Hose Box Color Code OEM #90 RED, PPG #911659
1
Each
(2) 96" x 36" Sides = 48 Sq. Ft.
Z1295
Customer Approval Drawing @ Order
1
Each
Delivery/Freight Not Included
1
0.00 0.00
Subtotal (USD): 56,632.00
Total Tax (USD): 0.00
Total (USD): 56,632.00
11/26/2024 Quote 1101000170
Todd Novak
Mount Prospect Fire Department
111 E. Rand Road
Mount Prospect, IL 60056
National Auto Fleet Group is pleased to qLI0tC' the 6ollowing SOUreed(s) for YOUr consideration,
One (1) New/1,5nused (Sauber MKI'. Co. Custom Platform Body 216" L. x 96" W +
Handling $5663.20) each t*or
(1) One Unit
Contract Price $ 62,29520
Tax (0.00(m) $ 0.00
Total S62,295.20
-per your attached specifications:
This sourced(s) is available under the Sourcewell Contract 091521-1 AF. Ple.,�ise rcference this
Contract Number on all Purchase Orders to National ALItO Fleet Group.
Payment terms are Net 20 days after receipt of vehicle.
Thank you in advance for your consideration, Sh0UId YOU have any questions, please do riot,
hesitate to call.
Sincerely, -
Jesse Co(Marc
National FleetMariager
Of fice (855) 289-6572
Sales Quote
Sales Quote Nurnber: SQ12814
Document Date: 11/26/24
Page : 1/3
Mount Prospect Fire Department
Todd Novak
1601 West Golf Road
Mount Prospect, �L 60056
United States
Mount Prospect Fire Department
Todd Novak
1.601 West Golf Road
Mount Prospect, IL 60056
United States
it". C
Phoiw 630365 6600
SAUBIRMFGAM
'AgO, IL 6,'1151 MOD
______�h�)ment Method ent Terms Bill -to Customer No.
.Josh Wicks Customer Pickup Net 30 Days CO2180
Unit Price Line Amount
No. sealthan_Q!y riot Excl. c Tax �xll. Tax
Y_ _ _
10295 Custorn Platform lnstallatoon
216"L x 96"W Overall - Galvanized
13/8" Shiplap itong Decking
Install Clip Every 3rd Crossmerriber
6''x8.2 #/Ft or Formed Perimeter
3"x4A #/Ft Cross Sills on 24" Centers
5"x6.7 #/Ft Long Sills
Seaeed Bearn LED Lighting
18067 Harness System
Installation & Modesty Panel
10250 Anti -Sail Mud Hap Brackets .. Galv wl Flaps
Torque Mounting Bolts & Check Fuel FiH
17957 Certification Sticker & 16819 Na(ard
19587 Thotnpson's WaterSeal Applierl to Deck Top
11028 Truck Equipment Sealed Lighting System
Z1193 Front Bulkhead -formed Tubing
11/2" x 1 1/2" x 3/16"Tubing Construction
Profile Approximates Cab Contour, Angle
10 Gauge VisiPerf Bulkhead Window
Extends From Window Bottom to Bulkhead Top
11111 Bulkhead Mounted Full Width Light Bracket
77"L x 9,5"W Offset Over Cab - S6386
9.5"W Offset Over Calb
++ Underbody Toolbox ++
19664 Stainless Steel Tool Box - Single Door
24"'D x 24"H x '72" L - Target Size
Bottom Hinge Along 72" Side
'14 Gaupp, Stairflpss - Tie & Mia Welded
(3) 19665 Stainless Steel Hinges
(2) 21400 Vector 2 T-Handle Latches
10676 90- Degree Rubber Sealer
21609 Drawer/Shelf Liner
Stainless Steel Carriage Bolts & Lock Nuts
*Note: Review Toolbox Size @ Drawing Stage. May Require revision
due to Chassis Limitations.
+4- Rear, End ++
Z1195 ICC Tube Bumper - 4"x8"Y,2S0'-Tcube - Galv
Each 56,632.00 56,632.00
Im
ME
Sales Quote Phone 630,365,66CC
Sales Quote Number: SQ12814 SADDIRMFG.Com
DOCUment Date: 11/26/24 h) rq(""h S:3uber Fklpyd tL 60151 IWO
Page � 2/3
Unit Price Line Amount
No. _g2Lcription
Unit Excl, Tax kxcl, Tax
Not Full Width Change to 6'W
12570 6000/30000H Rigid Pintle Hook
on Rear Bun')per Not to Exceed 28"H
Z1217
Bumper Receiver Tube installation
1 Each
2" Receiver Tube: 1S,000# Trailer GVWR; 2500# Vertical Load
D-Rings & 19705 Stainless Eye Bolt For Breakaway
Effective Capacity May Be Less Due to Chassis Limits
Refer to S5567-BMP-00 - qCC Mount
install Beiow Pintle Hook
G-MP
Lower 8" Tube Bumper to Support Receiver; Ceritered Vertically
1 Each
wl Receiver Face 5" From Bumper Face
Z1215
Truck/TraHer Socket Installation
1 Each
1.1123 7-Way RV Socket Installed & Wired L.S
Center Pin Location Empty - Per Todd
Provision For Chassis Supplied Socket Install & Wired L.S
Z1213
Brake Controller Installation
1, Each
Electric Installation w/ 16054 Controller w/
Wiring & Fasteners
G-PP
Smart Alarm 77-97 dB(A); 12-48V
1 Each
Measures Ambient Noise & Adjusts Sound Levels
++ Fold Down Racks and Sw4ig Down Steps ++
install Fold Down Racks L/R sides from Front Bulkhead to
Mid -Mounted Bulkhead, Locate Steps 1 per side, Approx 50" frorn
Front Bulkhead
Directly Rear of Totes Behind Ind Rack Section
1 - Rack Ea. Side -Approx 50" W, Bulkhead .. EnciosingTote Area - 2
Racks Ea. Side
Totes to Mid- Mounted Bulkhead
Z1197
4-Slat Fold Down Azek Racks - 36" H
20 Foot
Galvanized Uprights
Stainless Safety Connector Hardware
17881 Lower Latch on Each Stake Upright per Rack
2"x3/8" Rub Rafln 4-Slat; (x) Side Sections
i"T x 5,5"H AZEK CPV('SlatsWood Grain Outside
Installed w/ (4) 3/8" SS Truss, Fasteners w/ Nuts
Outside; Boards @ 19142 16'/ 19143-12'
Gates Labeled RI/R2.. & LIA2... Starting (4) Front
19567
Swing Down Step I adder w/ Dual Handles .. Galv
2 Each
19707-End Cap Installed w/ Adhesive on Uprights
wl 19704 Gas Spring Assist - 375tt Capicitv
(;i) m'w step,, w/ owit-in Lhial Handles
S6615 - Used w/ Platform Racks - Pocket lnstalN, 3-Step
G-MP
Angle Iron for Tote Retention
1 Each
Z1165
Surface Mount DRing Installation - 9120# WLL
2 Each
3/4" x 4.5 w/ 1.2317 Bracket & 12316 D-Ring
Install 1 Ea. Side - Mid Point of T r otes
One Strap Over Both Totes
Customer to Provide 4" Strap to Secure Totes to Platform
Sales to
Sales Quote Nurnber: SQ12814
Document Date: 11/26/24
Page: 3/3
Phone 63(1365.6600
SAUDERMFG.Cam
Vfrgil IL 60151 VXX
No.
Unit Price Line Amount
0
Ay.
Unit Excl, Tax Excl, Tax
12216
3-Runp
, Stowaway Step - S4937-100
2
Each
Install One Ea, Side of Modesty Panel @ Rear,
13309
1.7% Stainless Steel Grab Handle
2
Each
wl 5/16" x 15/16" Installation Stud Each End
Z1193
Mid Bulkhead Formed Tubing
3,312
Units
11/2" x 11/2" x 3/16" Tubing Construction
36"H
Closed End of Hose Box
'10 Gauge VisiPerf Bulkhead
G-MP
Hose Bed w/ Solid Sides & Center Divider
3
Each
(2) Sides (1) Center Divider - No Railing on'Top Edge
Approx 8'L x 36"H at Rear of Platform
G-PP
Hose Bed Tarp (RED)
1
Each
13336
Stainless Steel Utility Hook
21
Each
304 SS wl Polished Finish - 1/2" Projection
Customer to Provide & Install Netting to Retain Hose @ Hose Box
Rear
+4- Hose Tray Box +
G-MP
HD Box to House - Hose"I'rays w/ Opening Lid - Approx 89" 1- x 16"W x
1
Each
17" H
Locate on Floor Forward Mid -Bulkhead
Piano Hinged Lid to Double as Step
Open @ Ends - Customer to Provide & Install Netting to Retain Hose
@ Sides
21304
Install @ Deck Hour Forward Side Against Mid. -Bulkhead
'I
Each
G-PP
Cross -Lay Hose Tray- (2) Approx 881. x 161-1 x 7"W
2
Each
8500-FO
AR Weather Wheel Chock we/ Urethane Grip Orange Over Gaiv
2
Each
8505. B
Underbody Almag Chock Holder ® 22' An& S3652
2
Each
+-+ Paint ++
G-MP
Paint Ea. Side of Hose Box Color Code OEM #90 RED, PPG #911659
1
Each
(2) 96" x 36" Sides - 48 Sq. Ft,
Z1.295
Customer Approval Drawing @ Order
1
Each
Delivery/Freight Not included
1
0.00 000
Subtotal (IJSD)� 56,632M
Total Tax (USD)� 00
Total (USD): 56,632.
Proposed new dry chemical unit
Proposed high flow water nozzles 2000 GPM
Proposed nozzle configuration with new dry chemical suppression unit
Proposed new fire hose configurations (currently existing fire hose configuration)