HomeMy WebLinkAbout6.2 Proposed Signage Design, Cost Estimate, and Schedule for the Construction of the South Mount Prospect Gateway Signage Project at 3229 S. Busse Road.M+awn �'xytlts=e Item Cover Page Subject Proposed Signage Design, Cost Estimate, and Schedule for the Construction of the South Mount Prospect Gateway Signage Project at 3229 S. Busse Road. Meeting April 8, 2025 - MEETING OF THE MOUNT PROSPECT COMMITTEE OF THE WHOLE Fiscal Impact Dollar Amount Budget Source Category Type Information Y $345,000 Capital Improvement Fund DISCUSSION ITEMS Presentation This memorandum transmits a proposed signage design, cost estimate, and schedule for the construction of a new gateway sign into south Mount Prospect at 3229 S. Busse Road. The Village has a commitment from Builder's Asphalt that is to be memorialized via an access and maintenance easement for the project. Initial sign design alternatives were presented for discussion at the January 7, 2025 Village Board Meeting (a link to that agenda packet is provided here, and a link to a video of the meeting is provided here). Feedback coming out of the meeting was for staff to create a cohesive public infrastructure design strategy ensuring future infrastructure was of the same design style. Additionally, staff was instructed to put "established" in front of the '1917' on the sign. Staff from the Village Manager's Office, Public Works, and Community Development held an internal infrastructure design meeting to discuss a way forward on January 22nd, 2025. Staff determined that key design materials to be incorporated into any future public infrastructure investment should consist primarily of masonry, with a 'fieldstone' appearance and black metal accents. Additionally, the Village's 'keystone' logo, should be prominently displayed. The proposed entry sign will feature a design and materials consistent with other village infrastructure and signage including the Village Hall sign, downtown civic events sign, Rand Road gateway sign, and the Edwin and Elsie Meyn Busse Park sign. The proposed sign would be constructed with a decorative 'fieldstone' design with black metal accents, with the Village logo as a prominent feature. The plantings surrounding the sign will consist of perennials and annuals, with plant species ultimately approved by public works staff. The estimated cost to construct the sign is $345,000 and includes a contingency (8.5%), general conditions (6%), overhead and profits (6%), and insurance/bonds (1.3%) along with an allowance for lighting design. Design fees for the project are $111,000 and include the design of two other gateway signs for the Kensington Business Center, which are forthcoming. The total project budget is $800,000, which has been allocated for this project from the Capital Improvement Fund. Staff proposes to let a bid for construction services in May and present a contract award recommendation to the Village Board in July. Construction would begin shortly thereafter with the sign being completed before the end of the year and plantings installed as weather allows. Discussion Alternatives 1. Staff requests direction in letting a bid to construct the proposed gateway sign. 2. Action at the discretion of the Village Board. Staff Recommendation Staff requests direction in letting a bid to construct the proposed gateway sign. Attachments 1. SMP Gateway Signage MOUNT PROSPECT MONUMENT SIGNAGE FINAL DESIGN CONCEPTS FARR ASSOCIATES MATERIAL INSPIRATION EXISTING ELEMENTS IN THE VILLAGE FARR ASSOCIATES MAIN ENTRANCE SIGNAGE LOCATION ASSQGIATES MARCH 120251 MOUNT PROSPECT MONUMENT SIGNAGE 4 MAIN ENTRANCE SOUTH MOUNT PROSPECT FARR ASSOCIATES `,• "RC- 7 2025, O NT-ROS-�(-T MON r ENT S tt\i=G.- 5 FINAL CONCEPT REACHING NEW HEIGHTS ASSOCIATES 6 FINAL CONCEPT REACHING NEW HEIGHTS ASSQGIATES MARCH -: MOUNT �dGOedNT PROSPECT M4> 4U_v_ENT S=�_ 7 N?=GE TOTAL CONSTRUCTION COST ESTIMATE CATS A SIGN CONS —RUC TION COS_- $345-1000 This estimate includes a contingency (8.5%), general conditions (6%), overhead and profits (6%), and insurance/bonds (1.3%) and an allowance for lighting design. _V", DESIGN R - _S: 000- Also includes the design of two Kensington Business Center entrance signs. Designs are forthcoming. $800,000 0� DRO..6—U BUDGE _: FARR ASSOCIATES K" 2025. MOM D 1­15D�-C- MON S.GNAG- 1I, 7 PROJECT TIMELINE TENTATIVE MAY 26- - - Project is Publicly Advertised to Contractors MAY 23RD N 3--- Y if- --- SD RM -NG 2026 Final Bid & Submitted Bids Bids are Estimated Construction are publicly presented to the Project Documents are opened Village Board & a Completion submitted to the Village U 26 FARRASSOCIATES -1 Construction Contract is Awarded MON-MENT S GNAGE IS IARC.. 7 2025. MO�N- -ROSD-C- gm :: / ƒ as / � ^ \ .A 7 x3 /�