Loading...
HomeMy WebLinkAbout6.3 A resolution authorizing the mayor to sign Amendment #4 to the Agreement between the Illinois Department of Natural Resources, the Illinois Department of Transportation, the City of Prospect Heights, and the Village of Mount Prospect for the Upper DesM+awn �'xyt�lts�=e Item Cover Page Subject A resolution authorizing the mayor to sign Amendment #4 to the Agreement between the Illinois Department of Natural Resources, the Illinois Department of Transportation, the City of Prospect Heights, and the Village of Mount Prospect for the Upper Des Plaines River Flood Damage Reduction Project Element, Levee 37. Meeting April 2, 2025 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD Fiscal Impact (Y/N) N Dollar Amount Not applicable. Budget Source Not applicable. Category CONSENT AGENDA Type Action Item Information Levee 37 was designed to protect homes from inundation by the Des Plaines River. The levee wall serves as a physical barrier between record river crests and the adjacent residential neighborhoods. It was designed and constructed by the United States Army Corps of Engineers (USACE). Local partners included the Illinois Department of Natural Resources (IDNR), the Illinois Department of Transportation (IDOT), the City of Prospect Heights, and the Village of Mount Prospect. The original Intergovernmental Agreement (IGA) to facilitate this work was executed in 2008. Construction was substantially completed in 2011. Amendment #1 of the IGA was executed in 2014. It granted additional permanent easements for access to the levee wall for purposes of maintenance, repair and rehabilitation. Amendment #2 of the IGA was executed in 2020. It authorized the construction of a supplemental pump station at Pump Station 2. Work is ongoing and expected to be completed later this fall. Amendment #3 was executed in 2022. It authorized construction of a closure structure on an existing 54" diameter storm sewer pipe in the City of Prospect Heights. The pipe outlet is located adjacent to the river near Palatine Road east of Milwaukee Avenue. Should river levels rise above the pipe outlet, the flap gate will close preventing water from backing up in the pipe. Water entering the pipe system upstream will be pumped over the levee wall by City of Prospect Heights staff. Amendment #3 also identified the estimated cost of the closure structure project at $500,000 and recognized a like amount of funding from the IDNR. Amendment #4 (the current amendment) revises the cost estimate for the closure structure to $1 million and recognizes $500,000 in funding from IDNR and an additional $500,000 in funding from the City of Prospect Heights. There is no cost to the Village of Mount Prospect. Amendment #4 also extends the term of the original agreement from June 30, 2025 until December 31, 2028. IDNR and the City of Prospect Heights are currently accepting bids for the construction of the closure structure. Construction is expected to take place this year. Completion of this closure structure is a vital element necessary to certify the levee and remove adjacent homes from the federally regulated Des Plaines River floodplain. The City of Prospect Heights executed this amendment at their regularly scheduled city council meeting on March 24, 2025. Attached for the Village Board's consideration is a resolution authorizing the mayor to sign Amendment #4. Discussion Alternatives 1. Approve a resolution authorizing the mayor to sign Amendment #4. 2. Action at the discretion of the Village Board. Staff Recommendation Staff recommends that the Village Board approve a resolution authorizing the mayor to sign Amendment #4 to the Agreement between the Illinois Department of Natural Resources, the Illinois Department of Transportation, the City of Prospect Heights, and the Village of Mount Prospect for the Upper Des Plaines River Flood Damage Reduction Project Element, Levee 37. Attachments 1. Levee 37 Amendment 4 et al 2. Resolution Levee 37 Amendment four AMENDMENT NUMBER FOUR to an AGREEMENT between the STATE OF ILLINOIS/DEPARTMENT OF NATURAL RESOURCES and the STATE OF ILLINOIS/DEPARTMENT OF TRANSPORTATION and the CITY OF PROSPECT HEIGHTS and the VILLAGE OF MOUNT PROSPECT forthe UPPER DES PLAINES RIVER FLOOD DAMAGE REDUCTION PROJECT ELEMENT, LEVEE 37 Contract Number OWR-243 THIS AMENDMENT NUMBER Four is made among the City of Prospect Heights, hereinafter referred to as the "CITY", the Village of Mount Prospect, hereinafter referred to as the "VILLAGE", the State of Illinois/Department of Natural Resources, hereinafter referred to as "NATURAL RESOURCES" and the State of Illinois/Department of Transportation, hereinafter referred to as "TRANSPORTATION"; and WHEREAS, the CITY, the VILLAGE, NATURAL RESOURCES and TRANSPORTATION entered into an agreement and Subsequent amendment numbers one, two, and three effective September 16, 2008, January, 31 2014„ September 4, 2020, and November 12„ 2024, respectively„ hereinafter collectively referredtoasthe"AGREEMENT," copies of which are attached hereto as EXHIBIT A, EXHIBIT B, EXHIBIT C and EXHIBIT D and incorporated herein by reference, covering the construction of the Levee 37 Project Element, hereinafter referred to as the "PROJECT"; and WHEREAS, the Army Corps of Engineers "CORPS" has estimated the total cost of construction of the PALATINE ROAD CLOSURE STRUCTURE to be approximately $1,000,000; and, WHEREAS, the CORPS has informed NATURAL RESOURCES, the CITY and the VILLAGE, that the CORPS does not have access to Federal Funds for the design and construction of the PALATINE ROAD CLOSURE STRUCTURE ELEMENT; and, WHEREAS, the Illinois General Assembly appropriated the funds needed to cornplete the installation of the PALATINE ROAD CLOSURE STRUCTURE ELEMENT to NATURAL RESOURCES under Public Act. 103-0589 Article 143, Section 60 in FY25 for expenditure by the Office of Water Resources for Flood Control and Water Development Projects; and, WHEREAS, the CORPS requested and NATURAL RESOURCES agreed to develop engineering plans and special provisions, advertise and award, provide resident engineering services during construction, and provide construction funding estimated at $500„000, for the PALATINE ROAD CLOSURE ELEMENT; and, WHEREAS, the CORPS requested and CITY agreed to provide construction funding estimated at $500,000, for the PALATINE ROAD CLOSURE ELEMENT; and, WHEREAS, NATURAL RESOURCES has determined that the execution of this AGREEMENT is subject to the signature requirements of the "State Finance Act," 30 ILCS 105/9,02; and WHEREAS, NATURAL RESOURCES has determined that 1) the circumstances necessitating this AMENDMENT NUMBER FOUR were not reasonably foreseeable at the time the AGREEMENT was executed and amended, 2) this AMENDMENT NUMBER FOUR is germane to the AGREEMENT, and 3) this AMENDMENT NUMBER FOUR is in the best interest of NATURAL RESOURCES and the State of Illinois. NOW THEREFORE, for and in consideration of these premises, the parties hereto agree to the following modifications therein: The existing second sentence of paragraph A.2 of the AGREEMENT shall be changed to the following: "NATURAL RESOURCES' funding obligation under this AGREEMENT will terminate upon the completion of the LEVEE 37 PROJECT ELEMENT, when the NATURAL RESOURCES' and the CITY cost share is expended, or December 31, 2028, whichever comes first." All other covenants under terms of the AGREEMENT remain unchanged and in full force and effect except and to the extent otherwise provided herein. IN WITNESS WHEREOF, the parties hereto set their hands and seals the day and year written, and represent that the signatories below are duly authorized to execute this AMENDMENT NUMBER FOUR on behalf of their respective bodies, and that the effective date of this amendment is the date approved and executed by the Director of NATURAL RESOURCES. RECOMMENDED Rick Pohlman, Acting Director Office of Water Resources Date: APPROVED: Renee Snow General Counsel Date: APPROVED: Natalie Phelps Finnie, Director Department of Natural Resources Date: APPROVED: Ellen King Chief Fiscal Officer Date: ATTEST: Karen Agoranos, Clerk Date: ATTEST: ob'a�rna Prisiajniou erk Date:-a��`._h RECOMMENDED: APPROVED: Paul Wm. Hoefert, Mayor Village of Mount Prospect Date: , z�� Patri�advioen, Mayor City of Prospect Heights Date: � - ) q 40'r A 11I �! IIII A ti Lora Rensing Director -Division of Highways Chief Engineer Date: APPROVED AS TO FORM`, Michael Prater, Chief Counsel Date: APPROVED: Gia Biagi, Acting Secretary m IAi AMENDMENT NUMBER THREE to an AGREEMENT between the STATE OF ILLINOIS/DEPARTMENT OF NATURAL RESOURCES and the STATE OF ILLINOWDEPARTMENT OF TRANSPORTATION and the CITY OF PROSPECT HEIGHTS and the VILLAGE OF MOUNT PROSPECT forthe UPPER DES PLAINES RIVER FLOOD DAMAGE REDUCTION PROJECT ELEMENT, LEVEE37 Contract Number OWR-243 THIS AMENDMENT NUMBER TNREE is made among the Oily of Prospect Heights„ heramafterreferred loss the "CITS", the Village ofMount Prospect, hereinafter referred to as the "VILLAGE"*, the State of IltinoisPDepartment of Natural Resources, hereinafter referred to as "NATURAL RESOURCES" and the State of Illinois/Department of "Transportation hereinafter referred to as "TRANSPORTATION"; and " Element, hereinafter referred to as the , Road,WHEREAS, a closure structure near Palatine ROAD CLOSURE provide. d protection in associationpreviously constructed aspects ROADPROJECT and the parties wish to amend the r PROJECT T. * WHEREAS, additional rights -of -way belonging to TRANSPORTATION are required for completion of the PALATINE ROAD CLOSURE STRUCTURE ELEMENT and are identified on EXHIBIT D; project site access is identified on EXHIBIT E. attached hereto, and. WHEREAS, the CIT1f` has acquired, in the name of the CITY and wilhout cost to NATURAL RESOURCES, TRANSPORTATION orVILLAGE, a Perrmnent easement to fad6t8te the construction" operation and maintenanceof the PROJECT from TRANSPORTATIOk and, WHEREAS, the CORPS has estimated the total cost of construction of the PALATINE ROAD CLOSURE STRUCTURE to be approximately $5M.OW, and, WHEREAS, the Illinois General Assembly appropriated the funds needed to complete the installation of the PALATINE ROAD CLOSURE STRUCTURE ELEMENT to RESOURCES under NATURAL re by the Office of Water Public Res rce fO in FY22 o I Control and Water for expenditure Dsveloprnw Projects, and, WHEREAS, the CORPS requested ,and NATURAL RESOURCES agreed to develop engheering plans and speclsi provisions, advertise and award, provide resident engineering services during construction, and provide constructim funding estimated at $W,OW. for the PALATINE ROAD CLOSURE ELEMENT; and, WHEREAS, NATURAL RESOURCES has determined that the execution of this AGREEMENT Is subject to the signature requirements of the "State Finance Act." 30 ILLS IM.02; and WHEREAS, NATURAL RESOURCES has data d that, ij the circumstances necesslating this AMENDMENT NUMBER THREE were not ressonably foreseeable at the time the AGREEMENT was executed and amended, 2 this AMENDMENT NUMBER THREE is germane to the AGREEMENT, and 3) this AMENDMENT NUMBER THREE It, In the best interest of NATURAL RESOURCES and the State of Ittinots NOW THEREFORE, for and in consideration of these premises, the parties hereto agree to the fogowIng mod: n: 1. The description of the LEVEE 37 PROJECT ELEMENT set forthin the 61,11 WHEREAS paragraph of the AGREEMENT shaft be amended toincfrrde the PALATINE ROAD CLOSURE STRUCTURE ELEMENT added to the Project pursuant to this Amendment Number 3. AN duties and responsibilities of the Wles regarding the LEVEE 37 PROJECT ELEMENT ,set forth In the AGREEMENT $hall locally Include and also apply to the PALATINE ROAD CLOSURE STRUCTURE ELEMENT added to the project pursuant to this Amendment Number 3. 2. At the end of paragraph D.6 of ow AGREEMENT. the 161100ino language shall W added: *TRANSPORTATION will grant SCOM to ifs property as shown on EXHIBIT D attached hereto sand incorporated herein by reference, which amends amended ATTACHMENT 4 to the AGREEMENT, the Intent herein being to rut additional s and upon the additional access SM89 shown on EXHIBIT D to the VILLAGE, CITY, !CORPS and NATURAL RESOURCES for the purpose of consimellon, operelions, lospedlOnS. maintenance, repair and rehabilitation of the LEVEE 37 PROJECT ELEMENT for so long as LEVEE to NATURAL RESOURCES under Public Act.102-0017 Article 141, Section 70 in FY22 for expenditure by the Once of Water Resources for Flood Control and Water Development Projects; and, WHEREAS, the CORPS requested and NATURAL RESOURCES agreed to develop engineering plans and special provisions, advertise and award. provide resident engineering services during construction, and provide construction funding estimated at $500,000, for the PALATINE ROAD CLOSURE ELEMENT: and, WHEREAS, NATURAL RESOURCES has determined that the execution of this AGREEMENT is subject to the signature requirements of the "State Finance Act," 30 ILCS 105.02; and WHEREAS, NATURAL RESOURCES has determined that 1) the circumstances necessitating this AMENDMENT NUMBER THREE were not reasonably foreseeable at the time the AGREEMENT was executed and amended, 2) this AMENDMENT NUMBER THREE Is germane to the AGREEMENT„ and 3) this AMENDMENT NUMBER THREE; Is in the best interest of NATURAL RESOURCES and the State of Illinois. NOW THEREFORE, for and in consideration of these premises, the parties hereto agree to the following modifications therein: The descriptionof the LEVEE 37 PROJECT ELEMENT set forthin the 61h WHEREAS paragraph of the AGREEMENT shall be amended to include the PALATINE ROAD CLOSURE STRUCTURE ELEMENT added to the Project pursuant to this Amendment Number 3. All duties and responsibilities of the parties regarding the LEVEE 37 PROJECT ELEMENT set forth in the AGREEMENT shall specifically Include and also apply to the PALATINE ROAD CLOSURE STRUCTURE ELEMENT added to the project pursuant to this Amendment Number 2. At the end of paragraph D.6 of the AGREEMENT, the following language shall be added: "'TRANSPORTATION will grant access to its property as shown on EXHIBIT D attached hereto and Incorporated herein by reference, which amends amended ATTACHMENT 4 to ft AGREEMENT, the intent herein being to grant such additional access over and upon the additional access areas shown on EXHIBIT D to the VtLt AC wE, CITY', CORDS and NATURAL RESOURCES for the purpose of construction, operations, inspections. maintenance, repair and rehabilitation of the LEVEE 37 PROJECT ELEMENT for so long as LEVEE 37 PROJECT ELEMENT remains authorized by the CORPS. Any actions of the VILLAGE CITY and/or NATURAL RESOURCES for the purpose of construction, operations, inspections, maintenance, repair and rehabilitation of the LEVEE 37 PROJECT ELEMENT that will Impact normal traffic flows will require an [DOT traffic access permit " 3 The parties to this AMENDMENT NUMBER THREE and the CORPS have determined that the Levee 37 project limits need to be expanded as shown on EXHIBIT D. TRANSPORTATION has agreed to expand the access area as shown on such EXHI BIT- 4 The existing second sentence of paragraph A.2 of the AGREEMENT "I be changed to the following: "NATURAL RESOURCES' funding obligation under this AGREEMENT will terminate upon the completion of the PUMP STATION ELEMENT and the PALATINE ROAD CLOSURE STRUCTURE ELEMENT, when the NATURAL RESOURCES' cost share is expanded, or June 30, 2026, whichever comes first" 5. After the first sentence of paragraph A.2 of the AGREEMENT, the following sentence shall be added: "Additionally, Natural Resources' funding obligation shall include the non-fedefaicash amount for the PALATINE ROAD CLOSURE STRUCTURE ELEMENT added to the LEVEE 37 PROJECT ELEMENT, estimated to be $500,000" 6 All other covenants under terms of the AGREEMENT remain unchanged and in full force and effect except and to the extent otherwise provided herein. IN WITNESS WHEREOF, the parties hereto set their hands and seals the day and year written, and represent that the signatories below are duty authorized to execute this AMENDMENT NUMBER THREE on behalf of their respective bodies, and that the effective date of this amendment is the date approved and executed by the Director of NATURAL RESOURCES 2a , Director of General Cosel Date: , ZZ �ZZ APPROVED FOR I IEGAL SUFFK,,LEN`1'T Date, . .. . tj- Legal Counsel CIO APPROVED: V-P APPROVED* Penrll Chief Fiscal ffit U I ( Date, Zn ATTEST: ar � C( arera Ayoranas, ,lerk Date: 9 Z`/"ZZ ATTEST: 0�'�ti��i��A E APPROVED: APPROVED: Karen Schultheis, arm MMOW uotmct;, .Acting Depul / ..1 „� Mayor Clerk �.r�►r,°,, Cityy of rospect He his Date: � Z � *tl # 7 Date: r 622— MTE — OF P RECOMMENDED: Director -Division of Highways Chief Engineer Date: APPROVED AS TO FORM: Chief Counsel Date: , w� n�..........� APPROVED: Omer Osman, Secretary Date: ATTEST: area Agoranols,berk ! Date:. 2Zl 00ZZ" ATTEST:��,,_,�, ! J G0RP0,0,4 SEAL Karen Schultheis,`•." Deput Clerk Date. APPROVED: APPROVED: m Mayor City of IRrospect He'Dhtss APPROVED: Omer Osman, Secretary Dante �--`- -roroun �oaa Lwu� 4- r•oro.ac SraRoe+ro co.s ucTn.. rMrawx rRatasto =�.� it emu_ C GY RN ST+%Tw uGtuM( al � ..l• �`r'. g,.�-.-_ , -'tom...- " � _ rm � - w s < F F q � 3xa>. ■Ouw(v... ,R 6,Y �16 3£ { - �'� � ��• tQ.rLr n�rK Wr �`� EXHIBIT D 7 1 �a . - !M 1 . CKSCLCO 5QU-ft tM INIFIC SY. K MMCTO(C St C RKS Q Me. n C r1LCOa RD. U. Sl. COW11 - �">�•—+o���y"� - �,��'`Kf Or KIM. CO. CLCr. L457 STATE OF ILUNOfS _ LEVEE TT CIOSM STSOC M AT FAEAM4 A"O PRISFECT JIMPITS,RUUM - c- . c s OEPARTNENT OF NATUPM RESOURCES ` OFFICE OF WATER RESOURCES PMPMD SITE FWV .,. � .,— o-..s-_�..Ya4 a: IF. •L� kAYr' s __- MILWAIAM AVE eRWP, .AWOLAVE - ` - pool W 8 8 E FIT: 4 IT �T$ / f Zia -�;�-i - DEPARTMENT Of NATURAL RESOURCES OFFICE OF WATER RESOURCES ' 410-111 ACCESS ALTERNATIVES TO CLOSURE STRUCTURF fOR OPERATION AND MAINTENANCE_ EXFSIF] TTE nM AT PALATM &DAD IN PLUKCT 116W. . LUX= INTERGOVERNMENTAL AGREEMENT between the STATE OF ILLINOIS/ DEPARTMENT OF NATURAL RESOURCES and the STATE OF ILLINOIS/DEPARTMENT OF TRANSPORTATION and the CITY OF PROSPECT HEIGHTS and the VILLAGE OF MOUNT PROSPECT forthe UPPER DES PLAINES RIVER FLOOD DAMAGE REDUCTION PROJECT ELEMENT, LEVEE 3T Contract No. OWR-243 Wltnesseth: au =s c. • . � MY rt • w •' a • ai °• ^ .i • • µ • N s � • y µt Em . „„ M • • + . M •untr • ♦ • 1 • . _ CORPS, of 1 Project WHEREAS, NATURAL RESOURCES will aPPIr a portion of towards the additional cash requirementthe EVEE 37 PROJECT NI � • � NOW THEREFORE, for and In consideration of the benefits to be derived from the completion of the PROJECT, (fie sufficiency of which is hereby acknowledged, it is agreed between the parties hereto as fo'Iows� FART A. SPECIAL CONDITION 1. The recltals set forth are incorporated by reference and made a part hereof, the same constituting the factual basis for this transaction, Z NATURAL RESOURCES' CES' funding obligation under this AGREEMENT is 5% of the LEVEE 37 PROJECT ELEMENT cost and is estimated to be $901,320. NATURAL RESOURCES' funding obligation will terminate upon the completion of the LEVEE 37 PROJECT ELEMENT, when NATURAL RESOD CER" cost share is expended, or June 0 2015, whichever comes first, NATURAL RESOURCES, CES, at its sole option, may terminate or suspend this contract, in whole or in part„ without penalty or further payment being required, If the 111nols General Assembly or the federal funding source faits to snake an appropriation sufficient to pay such obligation, or if funds needed are Insufficient for any reason. AGREEMENT is limited to thhospe expenses associated with MILWAUKE tVENUEer this IMPROVEMENTS, 4. All provisions of this AGREEMENT will be binding upon the successors and assigns of the principal parties hereto. 5. This AGREEMENT may only be modified, assigned, supplemented, amended or extended by mutual agreement, in writing, by the parties hereto. 6. Attached rked part hereof b reference, is aali`stingrof certifications, whiHMENT 2" p must be completng of four ed by CITY es and de and VILLA 1, work. In this instance the CITY and VILLAGE will reimburse NATURAL RESOURCES for any and all costs that may be incurred by NATURAL RESOURCES in connection therewith. «. .� • gym. ' "' � -��� � � z «, ♦,. « � ,�, M a � ,� � • • • � � � ♦ a w• !M. M 11 t IVw �, � Mr s 11I �y � A 4 � � � � i � � Y 1Y' •t f � M • " ! # � 4 #� ♦� A • • II M YM • • IX� • M. AI twrar uM ►*'ry • •, � �; � � � .. � • M M �^ � n N t m. �, � �. R. � i' i �� qy. � w• • ,. AY � � _ • � r �y � {. Y, w� � * � �, � w .� � M R �► • ••� � 402, as amenclact,w • w w • s tPVVFWl& PM 10 its preparation, - • 'w ��w ww �w w w � • M w w w + w ^ww w "" " • :• w w w � � •w. �» w �- +tw � w ,w w • w� w _ w.t w w w o w s w: M :w YM • � � ww*� w ww•� w w �:ww w 4 "� • w„ « PART C. DEPARTMPNT III: MAnM�AALLRRgEgSOqUQRFjM In accordanco with the PCA,l NATURAL REsoUFtCES will rqvj W wany s w w a+« w a• w w w w ►• .. . °k " • w w ww w -w • as w*'. w w uw, • w. .,r „,� 4w • w s w w � . zw .,• w � t. TRANSPORTATION will prepare fhe final design plans, specifications, and contract documents; advertise for bids, make the contraot award; supervise the construction (resident engineering); and pay, subject to reimbursement by other government agencies, for the construction costs associated exclustvely with the MILWAUKEE AVENUE IMPROVEMENTS. NATURAL RESOURCES will review and approve to writing the plans and specifications for the MILWAUKEE AVENUE IMPROVEMENTS as they pertain to the function of LEVEE 37 PROJECT ELEMENT . T NSPORTATION"s fans will showthe designated boundaries of all properties, easements or rights-ofway (hereinafter referred to as ""property rights required for the construction, ration, maintenance, re air, rehabilitation and replacement of the MILWAUIC AVENUE IMP RQEM?NTS. 3. TRANSPORTATION will be responsible for obtaining all permits from federal and State agencies required for the construction, maintenance, rehabilitation and replacement of the MILWAUKEE AVENUE IMPROVEMENTS. 4. TRANSPORTATION will ensure that its construction contractors carry all ne ssa insurance during each phase of the MILWAUKEE AVENUE IM PROV�MENTS. E. I' RANSPORTATION shall cause its contractor to hold and save NATURAL RESOURCES, CITY and VILLAGE free from al. damages arising from the construction, of the MILWAUKEE AVENUE IMPROVEMENTS except for damages due to the fault or negligence of NATURAL RESOURCES. 6. TRANSPORTATION will grant access to their property as shown on ATTACHMENT 4 to the VILLAGE, CITY, CORPS and NATURAL RESOURCES for the purpose of construcUon, operations, inspection, maintenance, repair and rehabilitation of the LEVEE 37 PROJECT ELEMENT for so long as LEVEE 37 PROJECT ELEMENT remains authorized by the CORP Any acfions of the VILLAGE, CITY, and/ow NATURAL RESOURCES for the purpose of inspection, operations, maintenance, repair and rehabilitation of the LEVEE 37 PROJECT ELEMENT that wilt Impact normal traffic; flows will require an IDOT traffic access permit. « . A • � �� � s,�� e , r r w ,�r : ow x ,� �..'� .+w. •.. .� � r Mrs. s `• •. If, WITNESS WHEREOF, the parties hereto have set their hands and seals the day and year written, and represent that the signatories below are duty authorized to execute this AGREEMENT for the UPPER DES PLAINES RIVER FLOOD DAMAGE REDUCTION PROJECT ELEMENT, LEVEE 37 on behalf of their respective bodies, and that the effective date of this AGREEMENT is the date approved and executed by the Director of NATURAL RESOURCES, RECOMMENDED: APPROVED: Gary . Clark, Director Sam Flood, Acting Director Office of Water Resources Department of Natural Resources Date: APPROVED: Ellen King -Pie - k, Chief Fiscal Officer APPROVED: William Richardson Chief Lega` Counsei YtLLAGE OF MOUNT PROSPECT ATTEST: APPROVED: ayor �4L& An �ell, Cfe�rk Irvana Vdl 4 Date: A�v L,lTy OF P P—ECTHEIG_HTS ATTEST: AP VET.: Patrick Udig rj, cling Mayor lox RECOMMENDED: APPROVED: —&OLIJImaj—, Christine M. Reed, P.E. Secretary of Milton R. Sees, P.E. Transportation Director -Division of Highways Chief Engineer Date--%Ls:�LC�K__ Attachments- 1, PCA 2, Conilkattons 3, Operation and MaintensncB Manual 4, 100T tights-of,waY required for project . ... .. .... AFIA IHNU-illv � AMENDMENT NUMBER ONE to an AGREEMENT between the STATE OF ILLINOISIDEPARTMENT OF NATURAL RESOURCES and the STATE OF ILLINOISIDEPARTMENT OF TRANSPORTATION and the CITY OF PROSPECT HEIGHTS and the VILLAGE OF MOUNT PROSPECT for the UPPER DES PLAINES RIVER FLOOD DAMAGE REDUCTION PROJECT ELEMENT, LEVEE 37 Contract Number OWR-243 THIS AMENDMENT NUMBER ONE is made among the City of Prospect Heights, hereinafter referred to as the "CITY*, the Village of Mount Prospect, hereinafter referred to as the 'VILLAGE", the State of IIIlnolsfDepadment of Natural Resources, hereinafter referred to as "NATURAL RESOURCES* and the State of Illinolsl'1Jepartment of Transportation, hereinafter referred to as "T NSPORTATION", and entered into this 1 L Day of 2W,14 WHEREAS, the CITY, the VILLAGE, NATURAL RESOURCES and TRANSPORTATION entered into an agreement, hereinafter referred to as the *AGREEMENT," effective September 18, 2008, a copy of which is attached hereto as EXHIBIT A and Incorporated herein by reference, covering the construction of the Levee 37 Project Element, hereinafter referred to as the "PROJECT"; and WHEREAS, additional rights -of -way belonging to TRANSPORTATION are required for completion of the PROJECT; and WHEREAS, NATURAL RESOURCES has determined that 1) the circumstances necessitating this AMENDMENT NUMBER ONE were not reasonably foreseeable at the time the AGREEMENT was originally executed, 2) AMENDMENT NUMBER ONE is germane: to the AGREEMENT as originally executed, and ) this AMENDMENT NUMBER ONE and the AGREEMENT are in the best interest of NATURAL RESOURCES and the State of Illinois; and WHEREAS, NATURAL RESOURCES has determined that the execution of this AGREEMENT is subject to the signature requirements of the "State Finance Act," 30 ILCS 105/9,02; and NOW THEREFORE, for and in consideration of these premises, the parties hereto agree to the following modifications therein: To end of paragraph B.6 of the AGREEMENT, add the following language: "TRANSPORTATION will grant access to their property as shown on EXHIBIT B attached hereto and Incorporated herein by reference, which amends ATTACHMENT 4 to the AGREEMENT the Intent herein is to grant such additional access over and upon the additional easement areas shown on the amended ATTACHMENT 4 to the VILLAGE, CITY, CORPS and NATURAL RESOURCES for the purpose of construction, operations, inspections, maintenance, repair and rehabilitation of the LEVEE 37 PROJECT ELEMENT for so long as LEVEE 37 PROJECT ELEMENT remains authorized by the CORPS. Any actions of the VILLAGE, CITY andfor NATURAL RESOURCES for the purpose of construction, operations, inspections, maintenance, repair and rehabilitation of the LEVEE 37 PROJECT ELEMENT that will impact normal traffic flows 01 require an IDOT traffic access permit." The parties to this AMENDMENT NUMBER ONE and the CORPS have determined the Levee 37 project limits need to be expanded as shown on EXHIBIT B. TRANSPORTATION has agreed to expand the easement as shown, The parties to this AMENDMENT NUMBER ONE have agreed that the CORPS shall prepare surveys desoribing the easement area as expanded by this AMENDMENT NUMBER ONE. Upon receipt of the revisedsurveys from the CORPS, the parties shall review said documents and, If alit concur, attach the surveys to this AMENDMENT NUMBER ONE post execution, Each party shall give its approval in writing. Said approval shall not be unreasonably wlthhefd. It Is understood by the parties hereto that should the Amended Easement surveys not be prepared, reviewed and approved within a reasonable time after the execution of this AMENDMENT NUMBER ONE, TRANSPORTATION shall have the right to revoke this Amendment. All other covenants under terms of the September 16, 2008 AGREEMENT remain unchanged and in full force and effect. IN WITNESS WHEREOF. the parties hereto set their hands and seals the day and year wtitlen, and represent that the signaluties below are (July qi,Mionzed to execute this AMENDMENT NUMBER ONE on b0alf of their respective bodies. 8"d (Ii4l the effective date of this amendment is the date Approved and eXeCUted by the Director of NATURAL RESOURCES. STATE OF, 1. ois DEPARTMENT RECOMMENDED: ;A41 1 Affa-6"q"""TL"XT" Office of Water Resources, 0 k L4 - ILA (Z 6-y" ATTEST: Lisa Angell, Date: APPROVED: Arlene A. Jura Mayor Village of Mount Prospect Date: b.--lp o./3 ATTEST: APPROVED: Stacey Adamson, CrIC Alas &JHKi�i�_r%--Mav_o_r" Date- .1-olo City of Prospect Heights STATE OF RECOMMENDED. APrPOVED,, AIMAt (V I * .­. 1 .11 ec6e' spo Director -Division of Highways Departrn n Tr sportation 7t Chief Engineer Date Data* w I've) Iftw Permanent Easment IM, Permanent Easement Temporary Easement Exhibit C AMENDMENT NUMBER TWO to an AGREEMENT between the STATE OF ILLINOIS/DEPARTMENT OF NATURAL RESOURCES and the STATE OF ILLINOISIDEPARTMENT OF TRANSPORTATION and the CITY OF PROSPECT HEIGHTS and the VILLAGE OF MOUNT PROSPECT for the UPPER DES PLAINES RIVER FLOOD DAMAGE REDUCTION PROJECT ELEMENT, LEVEE 37 Contract Number OWR-243 THIS AMENOMENT NUMBER TWO is made arnonE the City of Prospect Heights, hereinafter referred to as Ov *CITY*, the Village of Mount Pros , hereinafter referred to as the `1ltLLAGE% the State of 111100Is pas rat of Natural Resources, hereinafter referred to as WATURAL RESOURCES* and the State of 101noislDepattment of Transportation, hereirwrafter referred to as 'TRANSPORTATION and WHEREAS. the CITY, the VILLAGE, NATURAL RESOURCES and TRANSPORTATION er4ered into an agreement and subsequent amendment number one, effective September 16.200,8 and January, 312014 respectively, heteirafter collectively referred to as the 'AG EM #- copies of which are ,attached hereto as EXHIBIT A and EXHIBIT S and Incorporated herein by reference, covering the construction of the Levee 37 Project Element, hereinafter referred to as the "PROJECT" and � w �, w '' w% IY .� N t" �l w V" W w w W ♦ w it 4r w.. w � ,. i , w "r w, � 1 w .: • w WHEREAS, the VILLAGE has acquired, in the name of the VILLAGE and without coat to NATURAL RESOURCES, TRANSPORTATION or CITY, a pwmansnt easement to (ecllttets the construction, operation and maintenance of the PROJECT from the Forest Preserve District of Cook. County, end, WHEREAS, the CORPS has estimated the total cost of construction and materials of the PUMP STATION ELEMENT to be $3,699,660 and N+Netursl R960I additional nonfederal cash amount for the PUMP STATION ELEMENT payable to the CORPS to be $1,284,543, and, WHEREAS, the Illinois General Assembty appropriated the funds needed to complete installation of the PUMP STATION ELEMENT to NATURAL RESOURCES under Public Act 101-000Article 148, Section 45 In FY20 and Public Act, 101 8 Article 11, Suction 75 In FY'21, for expenditure by the 011 of Water Resources for Flood Control and Water Development Projects; end, WHEREAS, NATURAL RESOURCES has determined OW the execution of this AGREEMENT is subject to the signature requirements of 'State Finance Act," 30 iLCS 105*2.02; and WHEREAS, NATURAL RESOURCES has determined that 1) the circumstances necesobling this AMENDMENT NUMBER TWO were not reasonably foireseeable at the time the AGREEMENT was executed and amended, 2) this AMENDMENT NUMBER TWO is germane to the AGREEMENT, and 3) thla AMENDMENT NUMBER TWO is In the best Interest of NATURAL RESOURCES and the State of Iainwols. NOW THEREFORE, for and In consideration of these premises, the Parties hereto agree to the following modifications therein: .x ale :..try ♦ +: w:« +. wr r.. E YY b �en , .11tl aq Mk N �� @�1p W �Nm. 9M fit 1,. ♦ f 3. The parties to this AMENDMENT NUMBER TWO and the CORPS trewe determined that the Levee 37 prod Iimits need to be expanded as shown on EXHIBIT C. TRANSPORTATION has agreed to expand the access, area as shown on such EXHIBIT. 4. The existing second sentence of Paragraph A.2 of the AGREEMENT shall be changed to the following: 'NATURAL RE OURCES ' funding obligation under this AGREEMENT wig terminate upon the completion of the PUMP STATION ELEMENT, when ft NATURAL RESOURCES` cost share is expended, of June 30, 2025, whichever comes first," 5 After the first "ntewe of paragraph A,2 of the AGREEMENT, the sentence shallea d: itionaWy, Natural urces, banding obligation Shall Include ft non-federal cash amount for the pump STATION ELEMENT added to to LEVEE 37 PROJECT ELEMENT, estimated to be $1,284,543.0 6. All other cOvOnOrds under terms Of (he AGREEMENT remain unchanged and In full force and effect except and to the extent otherwrlse provided herein. IN WITNESS VMEREOF, theParties he set OWt hands and Seale ft day and year written, and represent that the signalories below are duly+ authorized to execute this AMENDMENT NUMBER TVVO an behalf of ftir respectift bodies, and that the ettective dads of this am ndrnent Is the date approved and executed by the Director of NATURAL RESOURCES. General Counsel APPROVED FOR EXECUTION Date:Legal �. l i uV11��1� 111 � ii r u�'y Chief Fiscal Officer 4 � D2tS ; f . . .... . ATTEST: APPROVED: d Car are w rk Arlene A. Jur .ayor Date: Q / L4� Village of 0 t Pa. part Date: q / two ATTEST: APPROVED: ,rl RECOMMENDED: r` -AA Date'(-Q(VWon of Highways ry Chief Ert#Meer »; «> APPROVED ° TO FORM: ��wtall�i�iwnvnu.. i 'i� iwx Ma�xn�mxnwowxm .wr ar:,n Chief Counsel P I AT 0 F S U R V F"i Y Pfl,:Lv( the F-W Haj 01 Lhe HM� of Sect4on 24 Tow ugjflp 42 Norf.1h, Range pp Easnof 1Lhe Third Prmpdi �AerWan,,Ccak Counky. pMnais Im Mi mim NOW vow., ry zf co 4, ft ry p D a IM7 L .......... tM11113114 L, RESOLUTION NO. A RESOLUTION AUTHORIZING THE MAYOR TO SIGN AMENDMENT #4 TO THE INTERGOVERNMENTAL AGREEMENT BETWEEN THE ILLINOIS DEPARTMENT OF TRANSPORTATION (IDOT), ILLINOIS DEPARTMENT OF NATURAL RESOURCES (IDNR), CITY OF PROSPECT HEIGHTS, AND VILLAGE OF MOUNT PROSPECT FOR THE UPPER DES PLAINES RIVER FLOOD DAMANGE REDUCTION PROJECT ELEMENT, LEVEE 37 WHEREAS; the Village of Mount Prospect is a unit of local government authorized to exist under the terms of the Illinois Compiled Statutes; and WHEREAS; IDOT, IDNR, City of Prospect Heights, and Village of Mount Prospect entered into an agreement and subsequent amendment numbers one and two, and three effective September 16, 2008, and January 31, 2014, September 4, 2020 and November 12, 2024 respectively, covering the construction of the Levee 37 Project Element; and WHEREAS, the Illinois General Assembly appropriated funds needed to complete the installation of the Palatine Road Closure Structure Element to the IDNR under Public Act 103-0589 Article 143, Section 60 in FY25 for expenditure by the Office of Water Resources for Flood Control and Water Development Projects; and WHEREAS, the Army Corps of Engineers requested and the IDNR agreed to develop engineering plans and special provisions, advertise and award, provide resident engineering services during construction, and provide construction funding for the Palatine Road Closure Element; and WHEREAS, IDNR and the City of Prospect Heights agreed to provide construction funding for the Palatine Road Closure Element; and WHEREAS, the term of the Agreement between IDNR, IDOT, Prospect Heights, and Mount Prospect must be extended from June 30, 2025 to December 31, 2028 to facilitate construction of the Palatine Road Closure Element; NOW THEREFORE BE IT RESOLVED; By the President and Board of Trustees of the Village of Mount Prospect, Cook County, Illinois SECTION ONE: The Mayor is hereby authorized to execute Amendment Number Fourto an Intergovernmental Agreement between the IDOT, IDNR, City of Prospect Heights, and Village of Mount Prospect for the Upper Des Plaines River Flood Damage Reduction Project Element, Levee 37. SECTION TWO: Amendment Number Four to an Intergovernmental Agreement between the IDOT, IDNR, City of Prospect Heights, and Village of Mount Prospect for the Upper Des Plaines River Flood Damage Reduction Project Element, Levee 37, Contract Number OWR-243, is attached to and made part of this Resolution. SECTION THREE: This Resolution shall be in full force and effect from and after its passage. AYES: NAYS: ABSENT: PASSED and APPROVED this 2"d day of April2025. Paul W. Hoefert, Mayor ATTEST: Karen M. Agoranos, Village Clerk