Loading...
HomeMy WebLinkAbout6.6 Motion to accept proposal for 2025 Cured-In-Place Pipe (CIPP) Lining Projects construction engineering services in an amount not to exceed $84,597.M+awn �'xyt�lts�=e Item Cover Page Subject Motion to accept proposal for 2025 Cured -In -Place Pipe (CIPP) Lining Projects construction engineering services in an amount not to exceed $84,597. Meeting March 18, 2025 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD Fiscal Impact (Y/N) Y Amount $84,597.00 Budget Source Water & Sewer Fund, Flood Control Construction Fund Category CONSENT AGENDA Type Action Item Information Funds have been requested in the current budget to continue combined sewer system repairs, separate sanitary sewer system repairs, and separate storm sewer repairs utilizing the cured - in -place -pipe (CIPP) process. This process entails rehabilitating existing sewer main segments by inserting a cured -in -place pipe (CIPP) liner inside a host pipe segment. This method is more cost-effective than open -cut excavation and far less disruptive. The Village has successfully utilized this process since the late 1970's. See attached map of all Village -owned sewers that were previously lined. The combined sewer repairs were identified during the review of the Combined Sewer System Evaluation Study (CSSES) completed in 2015. The separate sanitary sewer repairs were identified during an in-house televising program that is part of the Inflow and Infiltration Control Program (IICP) of the Metropolitan Water Reclamation District of Greater Chicago (MWRDGC). The storm sewer repairs were identified during storm sewer televising performed beginning in 2015 and running through 2021. Staff is recommending the award of a CIPP install contract to Hoerr Construction at the March 18 Village Board Meeting for combined sewer, separate sanitary sewer and storm sewer lining. Specific technical skills and experience are required to effectively monitor Hoerr Construction's work quality and assure end -product quality. Technical monitoring of the pipe cleaning process, liner inversion, curing, material core laboratory analysis, and post -construction video review are tasks required to successfully complete the project. Staff prepared a detailed request for proposals (RFP) to solicit their services. A copy of the RFP document is attached. Reauest for Proposals Consulting engineers were asked to submit a technical proposal detailing background, key personnel, and approach to the project. Each firm was also asked to submit two separate cost proposals indicating work effort anticipated and a not -to -exceed fee for each CIPP project. The required scope of work for the combined and separate sewer lining project includes 14,000 linear feet of pipe ranging in diameter from 8" to 42" and an installation cost of $1,606,926. The locations of the proposed pipe segments included in this year's project scope are depicted on the attached map. The required scope of work for the storm sewer lining project includes 9,379 linear feet of pipe ranging in diameter from 10" to 30" with an installation cost of $789,091. The locations of the proposed pipe segments included in this year's project scope are depicted on the attached map. RFPs were distributed to four engineering firms with expertise in the construction and rehabilitation of sewer mains through means of CIPP lining. The RFP was also posted on the Village's Demandstar site. RFP Results Five technical proposals and five cost proposals were received out of sixteen firms in possession of the proposal. Two additional firms declined to submit proposals due to their high workload in 2025. Each proposal was evaluated based on the background of the firm, related project experience, proposed services and scope of work, scheduled work effort and proposal content. Each firm received a point ranking (total points = 100) for each criterion. Table 1 below summarizes this analysis. Table 1: Technical Pro osal Category Max. Points Baxter & Woodman IMEG Spaceco Inc. Chastain & Associates Hey & Associates Background 20 20 19 19 18 18 Experience 20 20 19 18 18 18 Scope 25 25 24 24 24 24 Schedule 15 14 14 14 14 14 Work effort 10 8 8 8 8 7 Content 10 9 9 8 8 8 Totals: 100 96 193 191 90 189 The highest -rated firm was Baxter & Woodman of Crystal Lake, IL. Baxter & Woodman has performed this type of work in the Village over the past nine years. They have performed exceptionally well and understand the expectations of the Village for this project. Their staff have personnel who are certified in National Association of Sewer Service Companies (NASSCO) Pipeline Assessment and Certification Program coding. All checked references indicated that Baxter & Woodman performed well. Baxter & Woodman was also the firm that reviewed and rated both the combined sewer system evaluation study and the storm sewer system evaluation study. Baxter & Woodman has successfully completed several engineering projects for the Village over the course of the last 10 years. These projects include the development of the Village's lead service line replacement plan, development of the Village's water main condition assessment, deep well 16 rehabilitation program, the replacement of Booster Pumping Station #4 motor control center, flow monitoring, sanitary and combined sewer spot repair projects, deep well #17 rehabilitation Project, Lincoln relief station rehabilitation project, and the design and construction observation for the 2018 water main replacement project. Each firm was asked to submit a cost proposal as well. Table 2 and 3 below summarize staff's analysis of costs. Table 2: Cost Pro osal for Combined and Separated Sanitary Sewer Lining Cost per Firm Hours Cost hour Spaceco 286 $44,330 $155 Chastain & Associates 358 $44,840 $125 Baxter & Woodman 283 $49,852 $175 IMEG 368 52 520 143 Hey and Associates, inc 549 1 $78 295 1 $143 Table 3: Cost Proposal for Storm Sewer Lining Firm Hours Cost Cost per hour Chastain & 195 $24,943 $128 Associates Spaceco 192 $29,760 $155 Baxter & 199 $34,745 $175 Woodman IMEG 252 $36,680 $145 Hey and 285 $43,053 $151 Associates, Inc Discussion The lowest cost proposal was submitted by Spaceco for the combined and separate sanitary sewer lining project and Chastain & Associates for the storm sewer lining project. A copy of Spaceco's and Chastain & Associates cost proposal is attached. It is the opinion of staff that Spaceco and Chastain & Associates understand the proposed project but have not compiled a thorough proposal based on extensive experience. In their technical proposal, they provided several examples of a firm providing engineering inspection services for cured -in -place lining. However, the proposed project teams had minimal examples of completed cured -in -place lining projects. The extent of their experience is roadway improvement projects. Baxter & Woodman understand the proposed project, has prepared a thorough proposal based on extensive experience, requested a reasonable fee, and is well -qualified to perform the work. The resident engineer assigned to the project is certified by the National Association of Sewer Service Companies (NASSCO) in the industry -standard sewer pipeline assessment protocols. All the Village's sewer pipes have been evaluated utilizing these protocols. The preferred consultants from Spaceco and Chastain do not have this certification. A copy of Baxter & Woodman's cost proposal is attached. Alternatives 1. Accept Baxter & Woodman's proposal for provide construction observation for the 2025 cured -in -place lining project. 2. Action at discretion of Village Board. Staff Recommendation Staff recommends that the Village Board accepts the proposal for 2025 Cured -in -place pipelining project construction observation as submitted by Baxter & Woodman of Crystal Lake, Illinois in an amount not to exceed $84,597 Attachments 1. Project Overview Map Combined and Separate 2. RFP FOR 2025 CIPP INSPECTION ENGINEERING SERVICES 3. Baxter Woodman Cost Proposal 4. Baxter Woodman technical proposal 5. Spaceco technical proposal 6. Spaceco Cost proposal 7. Chastain Cost Proposal 8. Chastain Technical Proposal 0 1 ff I m OT, Timber Rj( ge School > 'OV, Prosect High Spchool F Coove St > W WghlaMpwo act < < I'D <> z E Park St' Davis Street m Z z Maintenance Carnpus z 0 3 0 0 83 > > < > F` b Fairview < z E I e rn e n ta ry z z C) School Commons Dog Park rY CL W Th,ler St M e ia s 11a r k < C, 8 2"14 69(Dft W, A E. > nr 691 ft VV Hey St M a) I Nf ?� z z C ..OnOal Rd t R6 �JsSe Mount Ave Prospe L w*Aj*mwfi"WwV Ave BontW Ave 4011ground 01, 674 ft Verde N > _c (D 0 dawmmmm o LincoinjUnior Fligh School > W Lincon St "Mom lcoin St Vr 675P IT? Big Sr 3 F5 fmovow z 01 W RUSAY M 5 Xter ' W Kh-n Ave Q 3, "D Mount Prospect VI (;oil' Club D C) a Welk.!r Creek Par( nT D rD Playgro d Playground REQUEST FOR PROPOSALS Inspection Engineering Services for Combined and Separate Sanitary Sewer Lining (CIPP) Storm Sewer Lining (CIPP) VILLAGE OF MOUNT PROSPECT PUBLIC WORKS Proposals due February 11, 2025 Mount PrOspec-t RFP for 2025 CIPP Inspection Services Page 1 of 6 REQUEST FOR PROPOSALS Professional Services / Combined and Separate Sanitary Sewer Lining & storm sewer (CIPP) Project inspection Services DATE: January 16, 2025 FROM: Casey Botterman, Water and Sewer Superintendent Village of Mount Prospect Public Works Department RE: Request for Proposal Combined and Separate Sanitary Sewer and Storm Sewer Lining (CIPP) Project. Your firm is invited to submit a Technical Proposal and Cost Proposal to become eligible for a possible interview for engineering construction management services for the Village of Mount Prospects, 2025 Combined and Separate Sanitary Sewer Lining and storm sewer lining (CIPP) Projects. Attached to this memo are: A list of materials and information that should be included with your Technical Proposal and Cost Proposal (Exhibit A). Two (2) cost proposals are required. One for the combined and separated sanitary sewer lining project and one for the storm sewer lining project. These projects are being bid separately. A general definition of the scope of work and a schedule of dates and requirements for the selection process (Exhibit B). The Village of Mount Prospect appreciates your interest in this project. Any questions regarding this Request for Proposals can be directed to Casey Botterman, Water and Sewer Superintendent with the Village of Mount Prospect, by phone at 847-870-5640 or email at cbotterman@mountprospect.org. A cover letter along with a Technical Proposal and Cost Proposal should be forwarded to the following address or emailed to h.otterm. „rr@mourn prospector and received no later than 3:00 p.m. on February 11, 2025. The Technical Proposal and Cost Proposal are to be submitted in separately, marked Technical Proposal for the Village of Mount Prospect Combined and Separate Sanitary Sewer & storm sewer Lining Projects and Two (2) separate Cost Proposals. one for the Village of Mount Prospect Combined and Separate Sanitary Sewer Lining Project and one for the Village of Mount Prospects Storm Sewer Lining Project. Mr. Casey Botterman Water and Sewer Superintendent Village of Mount Prospect 1700 W. Central Road Mount Prospect, Illinois 60056 RFP for 2025 CIPP Inspection Services Page 2 of 6 Exhibit A Requirements for Technical and Cost Proposal Agency: Village of Mount Prospect Project: Combined and Separate Sanitary Sewer & Storm Sewer Lining Project's Your Technical Proposal and Cost Proposal should include the following information: 1. Name, address and brief history of firm. 2. Organizational chart and resumes of key personnel to be assigned to this project. 3. Related experience during the last five (5) years. 4. Description of process to accomplish the required tasks of the project. This should include: a. An understanding of the project. b. Objectives to be met as part of the project. c. Your approach to completing the project. d. The projected number of hours to complete the project broken down by task and personnel. e. A project schedule. 5. A separate complete cost proposal broken down by task as described in the General Scope of Work. RFP for 2025 CIPP Inspection Services Page 3 of 6 Exhibit B General Scope of Work Agency: Village of Mount Prospect Project: Combined and Separate Sanitary Sewer and Storm Sewer Lining Project's Summary 1. The Village of Mount Prospect (Village) is seeking proposals from qualified civil engineering consultants to observe and inspect combined and separate sanitary sewers to be lined as part of the 2025 CIPP program. The Village will be lining an estimated 14,000 linearfeet of both combined and separate sanitary sewer mains. The Village has a bid posted for contractual lining services with a bid opening date of February 18, 2025. 2. The Village of Mount Prospect (Village) is seeking proposals from qualified civil engineering consultants to observe and inspect storm sewer to be lined as part of the DCEO Grant Agreement 23-203301_Storm Sewer Lining. The Village will be lining 8,912 linearfeet of separate storm sewer mains. The Village has a bid posted for contractual lining services with a bid opening date of February 18, 2025. Background 1. For the Combined and Separate sanitary sewer project, the pipe sizes range from 8" to 42" in diameter with estimated 170 service reinstatements. More than 60% of this year's project includes larger diameter combined sewer pipe (15"-42"). This year's list was developed from past CCTV efforts done by both Village staff and a contractor. All pipe segments were graded to NASCCO standards. The pipe segments being lined in 2025 are grades 3, 2 and 1. Attached is a spreadsheet showing the pipe segments being lined this year. 2. For the Separate Storm Sewer project, the pipe sizes range from 10" to 30" in diameter. This year's list was developed from past CCTV efforts done by a contractor. All pipe segments were graded to NASCCO standards. The segments being lined in 2025 are grades 5 and 4. Attached is a spreadsheet showing the pipe segments being lined this year. Problem Statement The Village seeks a qualified Consultant to provide specified civil engineering services necessary to implement and inspect a combined and separate sanitary sewer and Storm Lining (CIPP) project. The scope and scale of this proposed project will be limited by available funding. RFP for 2025 CIPP Inspection Services Page 4 of 6 Project Scope The consultant will provide professional engineering services and provide, at a minimum, the following: Construction Management and Inspection Phase 1. Consultant shall conduct a preconstruction conference with representatives of the Owner, Contractor(s), Utilities and other interested parties affected by the proposed construction. 2. Consultant shall provide resident engineers, inspectors, technicians, and surveyors for the project as follows: Provide a Resident Engineer/Inspector (RE/1) for Full-time observation of the work during the construction period to observe and record construction progress under the general guidance of the Engineer. On the basis of on -site observation, the Engineer will keep the Owner informed of the progress of the work, shall endeavor to guard the Owner against defects and deficiencies in the work of the Contractors, and may disapprove or reject work as failing to conform to the contract documents. ii. Prepare written daily inspection reports. Reports are to be delivered to Owner in an electronic format. Digital photographs documenting work tasks in progress as well as any potential problems or unusual conditions shall also be included with each report. iii. Review pre -lining videos to ensure documentation of all service laterals. iv. Review post -lining videos to ensure all documented service laterals have been reinstated. V. Assist the Owner in preparation of any necessary change order and/or field directives. vi. Process monthly applications for payment submitted by the Contractor(s), and forward to Owner with recommendations for approval and payment. vii. Assist the Owner with the resolution of inquiries, complaints, or concerns raised by residents or the public. RFP for 2025 CIPP Inspection Services Page 5 of 6 viii. Review shop drawings and other equipment/material submittals as may be required by the contract documents. ix. Perform a field observation of all completed work before a final application for payment is processed for the Contractor. Proposed Schedule Submit proposals February 2025 select firm February 2025 award contract to consultant March 2025 2025 Kick-off meeting March 2025 Pre -construction meeting with contractor April 2025 Construction May — August 2025 Substantial Completion August 2025 Post Project Review September 2025 RFP for 2025 CIPP Inspection Services Page 6 of 6 Submitted by: B A X T E PDMAN m el C:,�, o I s i r i E ri i i � r,,,,, r r s, Cost Proposal Village of Mount Prospect, Illinois Combined and Separate Sanitary Sewer Lining (CIPP) Project TASK FEE FIELD OBSERVATION ........ ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... 80 Total Liners 242 $41,140 ........ ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... Mileage Allowance - $1,742 ........ ......... ......... ......... ......... ......... ......... ......... ......... ...................................... TOTAL 242 $42,882 TOTAL HOURS AND FEE 283 $49,852 Price Per Additional Segment Lined: All Sizes $720 Baxter & Woodman, Inc. Cost Proposal • 14 Submitted by: B A X T E PDMAN m el C:,�, o I s i r i E ri i i � r,,,,, r r s, BAXTEOODMAN '��AIII�IDIm ' �f,,i (' <:) n ', 11 hn (,J n , P 11 U U 1—, February 11, 2025 Mr. Casey Botterman Water and Sewer Superintendent Village of Mount Prospect 1700 West Central Road Mount Prospect, Illinois 60056 Subject: Request for Proposals 2025 Combined and Separate Sanitary Sewer and Storm Sewer Lining (CIPP) Inspection Services Dear Mr, Botterman: Mount Prospect continues to make significant progress with rehabilitation of the Village's sewer system. Baxter & Woodman is looking forward to helping you successfully complete the Village's CIPP improvements planned for 2025. Project Manager and Main Point of Contact to the Village, Eric Murauskas, PE, has administered this program since its inception. He is ready to provide construction observation and contract administration services for you again this year. Our approach will continue to focus on: t`ost III',,,,,',1fectliive aind Slireairr lllliiiined Coinstuiriict:liioin Seii viiices based on our extensive knowledge of your system and delivered by professional staff well versed in infrastructure rehabilitation projects of all methods, shapes, and sizes. dafliouimdlll Asso rliiatliio in (3f See�reuu �A ���uivlii��i„ ���� Coiiinlllnauinliies Ill assco) C(:11irfiiifliied with specialized training in Cured in Place Pipe Inspection. ivav;muim A:uicmuimuuimliicm°tliiouin ii6tuiatctfliies that keep your staff informed, establish relationships with your residents, address challenges quickly, and keep construction moving forward. Eric is looking forward to working together with the Village to efficiently implement another round of infrastructure improvements and bring you closer to your sewer system maintenance goals. Please contact him at 815-444-3288 or by email at l .fair:a.�g5.lka..@Ibaxteirwoodmain,00irn if you have questions or need additional information. Sincerely, BAXTER & WOODMAN, INC. CONSULTING ENGINEERS Sean E. O'Dell, PE Executive Vice President 1. Firm Information Founded in 1946, Baxter & Woodman, Inc. provides consulting engineering and technology services to municipalities, state agencies, county governments, and sanitary districts throughout Illinois, Wisconsin, Florida, and Texas. Dedicated to promoting a sustainable future, our staff of talented engineers, surveyors, technicians, and support personnel incorporates innovative techniques along with tried and true processes. Our experience includes planning, design, construction and technology services for water, wastewater, stormwater and transportation facilities for municipalities, counties and state agencies, and more. Environmental, geographic information systems (GIS), water and wastewater operations, and advanced technology needs complement the firm's civil engineering expertise. The company has several subsidiaries including ones focused on Natural Resources, Municipal Technology, and Design -Build project delivery. Primary Contact: Eric Murauskas, PE 8678 Ridgefield Rd. Crystal Lake, IL 60012 815-444-3288 ernurauskasCa)baxterwoodrnan.co Regional Offices Baxter & Woodman's 17 regional offices provides our clients with local presence and responsive service. Our team offers services that expand well beyond typical engineering consulting. We are committed to building community value with each and every project we complete. Services for the Village's project will be provided primarily from our Crystal Lake office with readily available support from our Chicago and Naperville offices as needed. wi IN* ow 8678 Ridgefield Rd. 1548 Bond St., #103 8430 W. Bryn Mawr Ave., #400 Crystal Lake, IL 60012 Naperville, IL 60563 Chicago, IL 60631 Team We are a team of focused, committed, and service oriented professionals. Our combined work force totals 410+ talented individuals including wastewater, civil, transportation, mechanical, structural, electrical, and environmental engineers. The engineering staff is supported by trained technicians, licensed water and wastewater operators, licensed electricians, registered surveyors, GIS/GPS analysts, CAD operators, construction inspectors, and administrative assistants. Utility Rehabilitation Conventional or trenchless, Baxter & Woodman is at the forefront of efficient, cost-effective infrastructure rehabilitation methods. • Cured -in -Place -Pipe • (CIPP) Lining • Slip -Lining • Spiral -Wound Lining • Spray -On Epoxy Lining • Grouting • Pipe Bursting • Tunneling or Auguring • Directional Drilling • Pilot -Tube Microtunneling • Open Cut Repair • Point Repair Baxter & Woodman, Inc. 1, Firm Information • 3 2. Project Team Baxter & Woodman has the staff necessary to assist Mount Prospect with the successful construction of improvements. Project Manager, Eric Murauskas, has a solid understanding of the services required from his previous work for the Village and is committed to working with you to meet your goals and expectations. Resumes for key staff are included on the following pages for your review (*), Principal -in -Charge John Ambrose, PE Project Engineer Kaitlin Wright PE* Available Support GIS - Infrastructure - Survey - Administration Public Outreach - Funding Assistance Village Contact Andy Zaletel, GISP Baxter & Woodman, Inc. 2, Project Team - 4 Eric J. Murauskas, PE Project Manager Eric is well versed in many areas, including sanitary sewer evaluation studies, sanitary sewer flow monitoring, sanitary sewer rehabilitation, stormwater drainage studies, sewer system design, and municipal services. He has managed over 100 flow monitoring and sanitary sewer evaluation studies. Eric completed the CIPP Inspector Training and Certification Program from NASSCO, Inc. NASSCO's Inspector Training and Certification Program (ITCP) is a new standard national training and certification program that provides field construction professionals with comprehensive learning and tools to understand and inspect trenchless pipeline renewal technology. Joined Firm in 1989 REPRESENTATIVE PROJECTS Years of Experience: 35 Mount Prospect, IL I:.iIC UC wI"I I Annual CIPP Lining and Spot Repair Programs B.S. Civil Engineering, Iowa Project Manager assisting the Village with construction observation for State University,1989 sewer system improvements since 2005. Improvements have included CIPP lining and Spot Relays that average an estimated $1 million annual IwtI:..GIS I"Iwt wI"IONS construction value. Licensed Professional Engineer; Illinois Mount Prospect, IL Combined Sewer Evaluation Study and Mapping Project ASSOC ixrII wis Project Engineer for the comprehensive assessment of the Village's American Public Works combined sewer system. The scope of the project included an inventory Association and mapping of all sewer mains, manholes, inlets, catch basins, and other American Water Works structures in the combined sewer area. In total, over 260,000 linear feet Association of Village -owned combined sewers were televised and evaluated. Each National Groundwater sewer was given a condition score and a multi -year rehabilitation program Association was developed based on sewer ranking and the Village's annual financial Water Environment Federation capabilities. Lake Bluff, IL II'.1.1 IIIIIIG/Cl:::lw'f"I'°IIIwwIIC "i°II IyS Sanitary Sewer Rehabilitation Manhole Assessment Project Manager for the design engineering and on -site inspection services Certification Program, for the sanitary sewer rehabilitation project. Eric designed and observed NASSCO, Inc. the installation of approximately 15,000 feet of Cured in Place Pipe (CIPP), Lateral Assessment ranging in size from 8-inch to 42-inch in diameter. Certification Program, NASSCO, Inc. Hoffman Estates, IL Pipeline Assessment 2019 Sanitary Sewer Lining Project Manager for the design and construction engineering of a sanitary BAXTER�°°��� ��Idl►00DMAN sewer rehabilitation program, The Project scope included cured -in -place �NJ;�ys �'��ldll//m. rr, eitin,,, I uv}ui nerrra pipe (CIPP) lining of approximately 3,500 feet of 8-inch diameter sewer. Baxter & Woodman, Inc. 2, Project Team • 5 Eric J. Murauskas, PE Page 2 of 2 Mission Brook Sanitary District, IL Certification Program Sanitary Sewer System Rehabilitation NASSCO, Inc. Project Manager for the rehabilitation of approximately 16,100 feet of CIPP Certified Inspector, sanitary sewer using cured -in -place pipe (CIPP), approximately 21 point NASSCO, Inc. repairs using Cl PP, and six excavate and replace repairs. The rehabilitation work was based on our review of the completed internal pipe television inspections. Kirkland, IL Sanitary Sewer System Rehabilitation Project Manager for internal sewer television inspection of approximately 15,000 feet of the Village's sanitary sewers. A condition assessment of the sewer pipes was made from review of the television inspection videos and a sanitary sewer rehabilitation program was developed. The rehabilitation program consisted of the design and construction engineering for the rehabilitation of the sanitary sewer system using cured -in -place pipe (CIPP). The construction included placement of manhole -to -manhole sanitary sewer lining, ranging in size from 8-inch diameter to 12-inch diameter. Buffalo Grove, IL Storm Sewer Repairs Project Manager for a condition assessment of approximately 5,500 feet of storm sewer and development of a prioritized rehabilitation program. The condition assessment of the sewer pipes was made from review of television inspection videos. The rehabilitation design was developed using a combination of cured -in -place pipe (CIPP) and open excavation methods. The construction included placement of approximately 1,700 feet of manhole -to -manhole storm sewer lining, ranging in size from 10-inch diameter to 21-inch diameter, and open cut spot repairs in four locations South Barrington, IL Sanitary Sewer System Rehabilitation Project Manager for internal sewer television inspection of approximately 7,000 feet of the Village's sanitary sewers. A condition assessment of the sewer pipes was made from review of the television inspection videos and a sanitary sewer rehabilitation program was developed. The rehabilitation program consisted of the design and construction engineering for the rehabilitation of the sanitary sewer system using cured -in -place pipe M A N BA T E`�� (CIPP), The construction included placement of approximately 1,650 feet of %1�P114,1, „fx,�,,� 10-inch and 16-inch diameter manhole -to -manhole sanitary sewer lining, Baxter & Woodman, Inc. 2, Project Team • 6 Kaitlin A. Wright, PE Lead Service Expert Joined Firm in 2014 Years of Experience: 10 I::; I U C x'n I B.S., Civil Engineering, Bradley University, 2014 I E1 iIs' Iw't "I°I I S Kaitlin has experience in design engineering and project management of drinking water supply as well as the planning and design of water and wastewater infrastructure. She has performed many tasks ranging from sewer condition assessments and rehabilitation studies, flow monitoring, GIS integration, design, and construction coordination. REPRESENTATIVE PROJECTS Mount Prospect, IL Annual CIPP Lining Programs Project Engineer assisting the Village with construction observation for sewer system improvements since 2015. Mount Prospect, IL 2016 Sewer Condition Assessment Project Engineer for reviewing approximately 70,550 feet of sewer televising inspection videos to assess the condition of the sewers. The reviews and ratings were performed in accordance with the Pipeline Assessment and Certification Program (PACP) coding. Licensed Professional La Grange, IL Engineer: Illinois Blackstone/Ashland Water Main Design Project Engineer for the preparation of design drawings fora water main Cl::;lw'rriizic n I S and lead (Pb) water services replacement contract to be completed Manhole Assessment prior to the Village's FY 2019/20 Roadway Resurfacing Program, Certification Program, NASSCO, Inc. West Dundee & La Grange, IL Lateral Assessment Project Plans for Lead Service Line Replacement Certification Program, Project Manager working with the Villages of West Dundee and La NASSCO, Inc. Grange to prepare Project Plans to apply for principal forgiveness Pipeline Assessment to replace lead service lines within the Villages. The plans prioritize Certification Program five years' worth of lead service line replacement projects and is NASSCO, Inc. coordinated with the Villages' pavement replacement plans to facilitate proper sequencing of repairing pavement after each phase of lead SSOCI n i S service lines are replaced. American Water Works Glenview, IL Association (Sewer Collection Lead Service Line Inventory and Public Education Committee) Project Manager providing services to develop and implement the Village's Lead Service Line Replacement program, The project includes devising a systematic approach in collecting existing system pvg information, investigating outstanding unknowns, coordinating public BAXTER��°�����Idl►O4DMAN yNJdMN6 '��I�IIIIIa. ri> eitin III -0117 ierrra education and notification efforts, and maintaining clear communication and timelines both with internal Village staff and the community. Baxter & Woodman, Inc. 2, Project Team • 7 �� Project ��� Experience ��~�������� =~� N&�N��00���� ��0������������' �� �����~=���� ��N ��N������� �—������������� ��� � Annual /�|[�[3 Q, Spot Repair [� �00� [J f � /�����| ^�// / c� `��(�� / /������ Programs, c_u���—/ ������ Baxter & Woodman has been assisting the Village with construction observation for sewer system improvements since 2005. Improvements have included C|PPLining and Spot Relays that average anestimated $1.7 million annual construction value. Our tasks have included: General Construction Administration: ~ Attend pre -bid meeting, prepare summary ~ Review contractor's schedule ~ Check, review, and approve liner design calculations ~ Review and approve required submittals ~ Confirm compliance with K4VVRD8C requirements ~ Prepare Change Orders asapproved bvthe Village ~ Review and process contractor's Pay Requests ~ Research and respond tocontractor's Request for Information ~ Provide review of warranty and anniversary work by the contractors ~ Provide areview ofcurrent bid documents and suggest changes to improve future projects ~ Update the Village's ongoing (annual) spreadsheet for work oonnp|mtad Field Representation: ~ Provide full time and/or part time field representation for the C|PPpnojmot ~ Prepare Daily Reports ofthe contractor's activity for each working day ~ Review and approve pre- and post -lining video inspections (C|PP projects) ~ Provide weekly updates onthe status ofC|PP project including pno-andpost|iningvidnoraviaws dates lined, as -built quantities, and uptodate costs ~ Respond toresidents' questions and concerns and provide an acceptable solution ~ Collect lining samples from each C|PP installed and review laboratory test results for compliance with the design parameters (C|ppprojects) ~ Provide pout oonstruotion inspections to prepare written punch lists and follow-up to confirm the work is oonnp|mtod to the Village's satisfaction ~ Provide review of warranty and anniversary work as needed to assist the Village in enforcing claim, warranty or guarantee against the contractors Baxter & Woodman, Inc. 3, Project Experience - 8 Village of Mount Prospect, IL Combined Sewer System Evaluation, GIS, Design, and Construction Assistance Baxter & Woodman has been providing the Village of Mount Prospect with sewer evaluation studies, GIS services, and design and construction services for the combined sewer rehabilitation program since the early 2000's, The Village's sewer system consisted of a separate wastewater and storm sewer system as well as a combined sewer system that handled both wastewater and stormwater run-off. I n December 2002, the Village Board contracted Baxter & Woodman to conduct a comprehensive assessment of the Village's combined sewer system. The scope of the project included an inventory and mapping of sewer mains, manholes, inlets, catch basins, and other structures in the combined sewer area. In total, over 260,000 linear feet of Village -owned combined sewers were televised and evaluated. Each sewer was given a condition score and a multi -year rehabilitation program was developed based on sewer ranking and the Village's annual financial capabilities. In 2015, the Village commissioned another program to re -televise the sewers that had not been rehabilitated to determine their condition. This latest evaluation showed continued deterioration of the sewers. Approximately 32% of the sewers fell into the Grade 4 and 5 categories, and another 22% in the Grade 3 category (Grade 5 sewers require rehabilitation within one to two years, Grade 4 within three to four years, and Grade 3 within five to ten years). The majority of the structural defects can be rehabilitated by lining the sewers with cured - in -place pipe (CIPP). In most cases, CIPP can be installed without excavation, although a few combined sewers will require excavation and replacement of a section of pipe prior to CIPP installation. Approximately 18,000 feet of previously lined sewers was also televised to confirm the reliability of the rehabilitation technology. The review showed that previous CIPP repairs remain intact and in good condition. This is to be expected since CIPP repairs are designed for a minimum 50-year service life, SERVICES Sewer system evaluation, sewer system rehabilitation design and construction, CIP Planning, GIS and more! TEAM Eric Murauskas and Andy Zaletel have been assisting the Village since 2002. III���IIIII�IIIIIIIII����I�����Vu�uuiwmuouuiuouuuo�uu�ui�muuowuom�iuuoiiui�uimo�imuuwim��imouioioioCoioiooi�ouu�o��muuou y:h:na:r, ,i�! Of VOW11dI!Iu�n Ilx d:''s ('lB, Aii' �iy " fllrldi a 1.Iipl l&11y as: ik ; Oyu i hip yui 11' ull > airild \lol1Up vvdi��! u�lpiah�,s, Baxter & Woodman, Inc. 3, Project Experience • 9 Village of Hoffman Estates, IL Sanitary Sewer Rehabilitation Baxter & Woodman performed design engineering and on - site inspection services for the 2014 critical sanitary sewer repairs and 2015/16 sanitary sewer rehabilitation projects. Eric Murauskas designed and observed the installation of approximately 150,000 feet of Cured in Place Pipe (CIPP), ranging in size from 8-inch to 36-inch in diameter. Village of Lake Bluff, IL Sanitary Sewer Rehabilitation Baxter & Woodman performed design engineering and on -site inspection services for the sanitary sewer rehabilitation project. Eric Murauskas designed and observed the installation of approximately 15,000 feet of Cured in Place Pipe (CIPP), ranging in size from 8-inch to 42-inch in diameter. Baxter & Woodman, Inc. 3, Project Experience • 10 4. Project Understanding and Approach NO TIME OR MONEY WASTED, WE KNOW MOUNT PROSPECT! Since 2005, Mount Prospect has trusted Baxter & Woodman to assist with completion of the Village's annual sewer system improvements. With our experienced team behind you, the Village will not waste valuable time and financial resources on a "learning curve." Project Manager Eric Murauskas, PE, works with the Village regularly and has the required qualifications and background knowledge to start your project immediately. He knows the Village's system conditions and your program requirements. Our team can quickly build on previous knowledge and continue on your rehabilitation path. Full Service Construction Personnel Since 1946, Baxter & Woodman has provided design and construction engineering for a variety of municipal infrastructure projects utilizing both conventional and trenchless technologies. Our full service construction department includes degreed professionals and licensed engineers who are available to assist on projects ranging from simple layout to complex heavy construction. Certified Experts in Sustainable System Rehabilitation In tune with the Village's commitment to sustainable practices, our staff is a leader in "green" rehabilitation methods for underground infrastructure, including sewer lining. Experience in "trenchless technology" is vetted with proper certifications from NASSCO. Eric is certified in NASSCO's Cured in Place Pipe Inspector Training program, making him the ideal leader for this project. Creating Local Relationships with Your Residents Positive communication with residents is important for project success. Our construction services staff take a proactive approach while in the field, and frequently receive notes from residents regarding their courteousness, their attention to resident needs, and effective communication skills. Eric has assisted Mount Prospect with these services annually for many years, and he has established relationships and lines of communication with both the Village and your residents. You can rest assured that your improvements will move forward as planned and any challenges will be addressed quickly by Eric in the field. wc Ilnulvc �1 Ill iniiiq Ilnll^nh)iry Ilnu,l ,)l Iiq Ihnu nxuuuo;c d �IIn(� Illfl1ollll0�blllf'0 Q"pnll i�Y �?,II i v�d"It'll Irnfra�t flmlunlru;ll l i Ii�1111011�l 1l! Ovc 4 i`YIi,n011II11R Villil:l iuii V4 pnlil;° 3 VVgWII"II IIIIY', pnY i 2d,,,M u�l Ill��ull�lillliV��uoo,Iio Ilnu"���ilr��Ii�inw o%ql Baxter & Woodman staff have completed training courses from the National Association of Sewer Service Companies (NASSCO): Pipeline Assessment and Certification Program (PACP); Manhole Assessment Certification Program (MACP); Lateral Assessment Certification Program (LACP); and Cured in Place Pipe Inspector Training and Certification Program (ITCP). Baxter & Woodman, Inc. 4, Project Understanding And Approach • 11 Projected Number of Hours Efficient delivery of services will result in successful completion of the Village's project. (:ourelll lined & Sew,^Ill ziiiuira.te SaunliiWai y Sewer uIlll...liiiin�liing t;IIIIIIIII tlllls� SWoirirn Sewer IIIL.....liiin�liing S IIIIIII�III� � Projected Number of Hours Projected Number of Hours Field Observation ........ ......... ......... 80 Total Liners Total ------------------------- Total Hours 242 ............... 242 283 Field Observation ........ ......... ......... 41 Total Liners Project Schedule Our experience with similar projects will allow us to meet the Village's schedule. �14/ Submit Proposals February 2025 Select Firm February 2025 Award Contract To Consultant March 2025 2025 Kick -Off Meeting March 2025 Pre -Construction Meeting with Contractor April 2025 Construction May - August 2025 Substantial Completion August 2025 Post Project Review September 2025 Total Total Hours 2 20 158 ............. 158 199 Baxter & Woodman, Inc. 4, Project Understanding And Approach • 12 w Spacecc- - :r11:J111UNIN• vuatilriCar-le t Company Profile Project Team Project Experience 0 u r Process Index Company Profile COMPANY PROFILE An Introduction to Spaceco Spaceco was founded in 1977 on a commitment to transforming ideas into sustainable designs, resulting in hundreds of groundbreaking projects. With a legacy built on precision, sustainability, and human- focused engineering, Spaceco has helped set new benchmarks for the industry. Our suite of engineering and related services is underpinned by our commitment to quality, innovation, and the environment. Our approach for every project is always tailored to meet the unique needs of our clients while prioritizing the well-being of the communities we serve. History of Spaceco Spaceco has been at the forefront of engineering innovation in the Midwest since 1977. Starting with a small, ambitious team in Illinois, the firm has expanded its reach and expertise to meet evolving industry demands, while staying true to its mission of delivering impactful engineering solutions. spocecoinr corn su, port@soocecoinccom Thisjourney has solidified Spaceco's reputation as a leader in civil engineering, land surveying, and strategic consulting. The firm is recognized today as a vital contributor to the development and enhancement of residential, commercial, and public spaces across the Midwest and beyond. Spaceco's Region of Operation While our operations are rooted in Illinois, Indiana, and Wisconsin, our reach extends beyond. Spaceco has worked in, and has the ability to be licensed in, states across the country, enabling us to bring innovative engineering solutions to clients nationwide. COMPANY PROFILE Markets We Serve Spaceco is dedicated to a diverse spectrum of markets, each characterized by its own specific requirements and prospects. Our strength lies in our ability to identify these unique needs and providing customized, effective solutions. Industrial In the industrial realm, we provide robust and scalable engineering solutions focused on operational efficiency and ensuring safety standards. Residential CC E9 We engineer large-scale developments and smaller residential projects that add long-term value to communities, facilitating regional growth for decades to come. Commercial & Retail From large -store facilities to independent business centers, we engineer commercial spaces that enhance business productivity and customer experience. Municipal Municipalities across the Midwest partner with Spaceco for expert engineering and consulting services on projects that impact the public and move society forward. ❑I [3 o Institutional ®❑ Working with institutional clients, we deliver projects that exceed community and regulatory expectations, creating spaces that serve and elevate public well-being. Project Team r J N 3 bil a, Ln u a) CL Ln O a 4-J c O 2 4- 0 bl1 C }' O L N � u U1 4-J tin }, o w a) u m L o c a F m M u u N V 0O N a a a Ted Ward, P.E., DELI, CPII Construction Department Manager Joined Spaceco: 2007 Years of Experience: 20 As Construction Department Manager, Ted brings two decades of experience and earned a 3S in Civil Engineering from Purdue University. He oversees the day-to-day operations of the construction department. Ted leads capital planning studies, prepares project reports, reviews design plans for internal quality control, develops and reviews specifications, and provides construction cost estimates, bidding, and contract administration. In the field, he delivers construction management, engineering, and Resident Engineer services for the company's most complex projects. His responsibilities include external plan review, bid procurement and contracting, quality and quantity documentation, water and sanitary sewer installation inspection and testing, punch list development, project closeout, and government relations. Project Experience Pullman National Monument — Chicago, IL 36,000 SF State Historic Site on 13 acres. The project included advanced landscaping and City of Chicago permitting. Ravinia Business District Phase II Streetscape — Highland Park, IL Part of a multi -phase streetscape project, including the installation of 129 light poles and associated infrastructure. Lee Street Streetscape — Des Plaines, IL Improvements included the installation of roadway and pedestrian light poles, concrete base pavers, revised roadway geometry, resurfacing, and upgrades to storm sewer, sanitary sewer, and watermains. EDUCATION • BochelorofScience I Civil Engineering Purdue Universit1, 2010 REGISTRATION Professional Engineer • Illinois 1 062-067131 (2015) Illinois Deportment of Transportation • Documentation ofCon0oct Quantities • IDDT Mixture Aggregate Technician • IDDTHMAI&II • IDDT PCC I & II Designated Erosion Control Inspector API/VA Certified Public Infrostructure Inspector CAREER SUMMARY • Socceco I 2007-Present • Newport Builders J 2006-2007 AFFILIATIONS • American Public Works Association • American Society of Civil Engineers Samantha Baro, P.E., DECI Project Manager Joined Spaceco: 2016 Years of Experience: 13 As Construction Project Manager, Sam has over a decade of experience. She earned a BS in Civil Engineering from Marquette University and has spent close to ten years with Spaceco. Sam serves as the construction department's primary client contact, coordinating with other professionals, ensuring regulatory compliance, and overseeing construction observation activities. She is responsible for the overall performance, profitability, and timely completion of projects. Her additional duties include managing planning studies, project reports, design plans, specifications, grading and utility layouts, stormwater management designs, construction cost estimates, and permit applications. Project Experience King Street — Franklin Park, IL 2,640 LF of roadway improvements, including resurfacing, rehabilitation, reconstruction, drainage enhancements, and access road widening. Ontarioville District Streetscape — Hanover Park, IL Atwo-phased project including streetscape, roadway, lighting, Ontarioville Park, and Gateway Plaza improvements. 2019 Des Plaines Contract "C" — Des Plaines, IL 5,100 EF of 8" watermain was installed as part of a water system improvement project, which included open trench installation methods. EDUCATION • Bachelor of Science I Civil Engineering Marquette University, 2016 REGISTRATION Professional Engineer • Illinois 1 062-073532 (2021) Illinois Department of Transportation • Documentation of Contract Quantities No. 20-17772 • MixtureAgaregate Technician Certificate • PCC I & II Certificates • HP IAI & II Certificates (April 2018) • Soils Field Testing and Inspection Certificate CAREER SUMMARY • Spaceco J 2016-Present • The Walsh Group 1 2012-2016 AFFILIATIONS • American Public Works Association Brett Bennett, EIT, DECI Construction Engineer Joined Spaceco: 2019 Years of Experience: 32 As Construction Engineer, Brett has overthree decades of experience. He earned a BS in Civil Engineering from the University of Illinois Urbana -Champaign and has spent the past five years with Spaceco. Brett's responsibilities include reviewing construction plans, conducting daily progress checks with contractors, and ensuring adherence to contract specifications. He prepares revised plans when needed, coordinates contractors to avoid delays, and tracks project progress. Further, Brett prepares pay estimates, performs field surveys, and technical presentations. Project Experience Harnish Dr. Roadway Rehab IMS —Algonquin, IL Overtwo miles of roadway reconstruction, featuring milling, base stabilization, curb and gutter replacement, sidewalk upgrades, ADA ramps, storm sewers, paving, striping, landscaping, and erosion control. City of Des Plaines 2022 Street and Utility Improvements Contract — Des Plaines, IL Nine road improvement projects including milling, pavement removal, curb and gutter replacement, sidewalk and driveway apron upgrades, ADA ramps, storm and sanitary sewer repairs, HMA paving, striping, landscaping, and erosion control. Schiller Blvd. Roadway & Utility Improvements — Franklin Park, IL Five projects delivering extensive road improvements, including milling, pavement removal, curb and gutter replacement, sidewalk and driveway apron upgrades, ADA ramps, storm and sanitary sewer repairs, watermain installation, lead service retrofitting, base stabilization, HMA paving, striping, landscaping, and erosion control. EDUCATION • BochelorofScience I Civil Engineering Universitv of Illinois Urbana- Chompoign REGISTRATION • Engineer -in -Training Certification • Professional Engineer License (Not Renewed) 1 061-025682 CERTIFICATION • ACI Concrete Field -Testing Technicion I Grade 1 Certification • UW-Plotteville Highwroy Technician Certification Program (HTCP) for WisDOT Projects I MCT-D P loteriols Coordinator-WisDOT • Designated Erosion Control Inspector Illinois Department of Transportation • Documentation ofCcntract Quantities • /DOTMixtu-eAggregote Technician • PCC Level 1 & II Technician • IDOT HMA Level I & 11 Technician • Nuclear Density Guoge Technician CAREER SUMMARY • Sooceco120i9-Present • Michael Boker International 12015- 2019 • Engineering Consulting Services, Ltd. 1 2014-2015 • Lake County Dept. of Planning, Building, & Development Engineering, & Environmental Services Division 11993-2007 Project Experience Oak Meadows Sanitary District CLIENT: Oak Meadows Sanitary District PROJECT LOCATION: Cook County, I L Features Consultant for the Oak Meadows Sanitary District providing engineering and project management services for capital design projects and the enforcement of codes and building requirements. Services Provided • Sanitary Sewer Lining Inspection • Construction Observation/Inspection • Capital Design Planning • Final Engineering • Permitting �C2' 61 -� a Woodley Road Sanitary District CLIENT: Woodley Road Sanitary District PROJECT LOCATION: Wilmette, IF Features Consultant for the Woodley Road Sanitary District providing engineering and project management services for capital design projects and the enforcement of District codes and building requirements. Services Provided • Sanitary Sewer Lining Inspection • Construction Observation/Inspection • Capital Design Planning • Final Engineering • Permitting �C2, 61 -� a Peterson Avenue Chicago CLIENTS: K. Hovnanian Homes Chicago Department of Transportation Chicago Department of Water Management PROJECT LOCATION: Chicago, IL Features Provided construction inspection services forthe CIPP installation within existing54" City of Chicago brick sewer on Peterson Avenue. Services Provided • Resident Engineer for Kildare Ave and Public Alley Construction • Construction Observation/Inspection for Private Development • Shop Drawing Review • Punchlist • Project Closeout Our Process OSP co 9575 W. Higgins Rd, Suite 700, Rosemont, IL60018 spacecoinc.corn Surveying.. UNDERSTANDING OF THE ASSIGNMENT The Village of Mount Prospect is seeking a qualified civil engineering firm to provide full-time resident engineering/inspection services for the proposed combined and separate sanitary sewer and storm sewer lining improvements as part of the 2025 CIPP program. The combined and separate sanitary sewer lining is being contracted separately from the separate storm sewer lining. The contractor(s) to perform the scope of work have not been determined yet. The Village of Mount Prospect seeks for construction to commence in early May. There is an estimated 14,000 linear feet of both combined and separate sanitary sewer mains that vary in size from 8" to 42" in diameter with an estimated 170 services that will need to be reinstated into service immediately after lining. Additionally, there is an estimated 8,912 linear feet of separate storm sewer mains that vary in size from 10" to 30" in diameter with no services. The Village will provide our firm with the pre -lining videos which we would review prior to construction starting to ensure all laterals have been documented accurately. Post -lining videos will be reviewed as soon as they become available from the contractor. Our assigned staff will notify the contractor(s) and Village of any defects and/or laterals that were not reinstated. While ensuring the contractor(s) are on track with the projected schedule for project completion it will be our responsibility to maintain contract documentation through daily reports, photos, and reviewing/approving pay applications submitted by the contractor(s). OBJECTIVES Our main objectives will be to complete the planned improvements within the proposed construction schedule provided by the Village of Mount Prospect. We will provide knowledgeable staff who will communicate efficiently and effectively with the awarded contractor(s), the Village of Mount Prospect and it's residents in order to address any problems that may arise in the field. APPROACH Coordination and communication between contractor(s), Village and residents is the most important aspect to completing the project in a timely and efficient manner. Our Resident Engineers and Inspectors have worked closely on multiple capital improvement projects in local municipalities. We will keep residents and municipal staff up to date with the most recent schedule as well as any delays or conflicts. We will assist in the production and distribution of letter notifications prior to the start of sewer lining. Daily field reports will be submitted to the Village with monthly progress reports to ensure the contractor(s) are staying on schedule for completion. Rosemont Morris.. ... ." .'. 41.1 (815) 941-0260 " •� For Tomorrow's PROJECTED NUMBER OF HOURS Item Task Estimated Hours Task 1 Review of Pre -Lining & Post -Lining Videos 26 Task 2 Schedule & Attend Pre -Con Meeting 2 Task 3 Assist in Notifications to Businesses/Residents 10 Task 4 Construction Observation 240 Task 5 Construction Closeout 8 TOTAL HOURS I Item Task Estimated Hours Task 1 Review of Pre -Lining & Post -Lining Videos 20 Task 2 Schedule & Attend Pre -Con Meeting 2 Task 3 Assist in Notifications to Businesses/Residents 10 Task 4 Construction Observation 152 Task 5 Construction Closeout 8 192 PROJECT SCHEDULE Task Date 2025 Kick -Off Meeting March 2025 Pre -Construction Meeting with Contractor April 2025 Construction May — August 2025 Substantial Completion August 2025 Post Project Review September 2025 Rosemont P:(847) 696-4060 Indianapolis P:(317) 779-2194 Morris P:(815) 941-0260 9575 W. Higgins Pd, Suite 700 3850 Priority V,'ay S. Dr., Suite 110 2241/2 N. Liberty St. Rosemont, I L 60018 Indianapolis, I N 46240 Morris, IL 60450 Engineering Solutions For Tomorrow's Challenges w Spacecc- - •j►bN■UN01u•jzv! 1"�I1�IM IIIIIIIIM� I�r 400 1 M AM Casey Botterman Water and Sewer Superintendent Village of Mount Prospect 1700 W. Central Road Mount Prospect, Illinois 60056 Email.II,:���,uirniinicm�ir�tli.�ii�wlp;a�;�*u��u' 9575 W. Higgins Rd, Suite 700, Rosemont, IL 60018 spacecoinc.corn February 11, 2025 RE: CONSTRUCTION ENGINEERING INSPECTION SERVICES PROPOSAL COMBINED AND SEPARATED SANITARY SEWER LINING MOUNT PROSPECT, ILLINOIS (Spaceco Project No. 13760) Dear Mr. Botterman: In response to your request, Spaceco, Inc. is pleased to provide you with this proposal for engineering construction management services related to the observation and inspection of the various combined and separated sanitary sewers to be lined as part of the 2025 CIPP program in the Village of Mount Prospect. The purpose of these services is to provide Phase III Construction Observation and Inspection for the proposed project. The following scope of work attached are meant to supplement our Technical Proposal. Rosemont Morris.. ..,� ." .'. 41.1 (815) 941-0260 " •� For Tomorrow's This proposal is based on the requested scope of work and project size provided by the Village: SCOPE OF SERVICES TASK 1 — REVIEW OF PRE -LINING & POST -LINING VIDEOS: 1. Verification of the Scope of Work. 2. Review and approve pre -lining videos for accurate service lateral documentation. 3. Review post -lining videos to ensure all service laterals have been reinstated and CIPP of sewers has no defects. 4. Review shop drawings and other equipment/material submittals as may be required by the contract documents. TASK 2 — SCHEDULE AND ATTEND PRE -CONSTRUCTION MEETING: 1. Notify the contractor and Village's Utility Representatives of the Time and Place of Meeting. 2. Notify Affected Village Departments / Divisions 3. Transcribe Minutes of the Meeting. TASK 3 — ASSIST IN THE NOTIFICATION TO RESIDENTS AFFECTED BY CONSTRUCTION: 1. Draft Letters to Individual Households, Businesses, Schools, etc. with Proposed Schedule to be mailed by the Village or hand delivered by our staff. 2. Provide Contact Person for Information / Complaints — an Emergency 24 Hr. Phone will be required for each project engineer. 3. Provide the Village with pertinent information related to the project, i.e. schedule updates, milestone completion, traffic control and pedestrian access modifications, etc. TASK 4 — CONSTRUCTION OBSERVATION: 1. Provide Full Time Resident Engineer(s) / Inspector(s) for the various combined and separate sewer lining CIPP locations. 2. Provide support Inspector(s) / Technician(s) as needed. 3. Coordinate Quality Assurance / Quality Control of Materials as required by the Village. 4. Verify initial installation of Construction Warning Signs & Devices in Accordance with the Plans. 5. Inspect, document, and inform the Contractor and the Village of the adequacy of the establishment and maintenance of any traffic control. Perform all necessary traffic control checks. Spaceco, Inc. will document deficiencies and Contractor response to notice of. Spaceco, Inc. will also inform the Village of deficiencies and if Contractor does not correct enforce as contract stipulates. 6. Maintain Daily Inspection Reports with field photos. 7. Submit Daily Inspection Reports with photos and Monthly Progress Reports to Village. 8. Monitor and Coordinate the submittal Review Process. 9. Assist the Owner with the resolution of inquires, complaints, or concerns raised by residents or the public. 10. Construction Documentation a. Track Quantities Related to Each Pay Item. b. Establish and Maintain Schedule for Progress Payments. c. Process monthly pay applications submitted by the contractor and forward to Owner with recommendations for approval and payment. d. Assure that all Documentation follows IDOT Standards. 11. Assist Owner in preparation of any necessary change orders and/or field directives. TASK 5 — CONSTRUCTION CLOSE OUT: 1. Verify Final Measurements / Quantities with Contractor. 2. Prior to Final Inspection, submit to the Contractor a list of observed items requiring correction and verify that each correction has been made. 3. Develop a FINAL PUNCHLIST and verify satisfactory completion. 4. Provide a Final Project Accounting/Documentation. 5. Process Final Pay Request. 6. Complete Project Close -Out and Submit all Paperwork Required. FEES Amount Task 1- Review of Pre -Lining & Post -Lining Videos Task 2- Schedule and Attend Pre -Construction Meeting Task 3- Assist in the Notification to Residents and Businesses Affected by Construction Task 4- Construction Observation Task 5- Construction Close Out Tasks 1— 6 $44,300 Budget N.T.E.* * See attached Preliminary Estimated Workload Breakdown. Workload breakdown is based on our Estimate of Time and Cost based on projects of similar size and scope. Actual schedule should be verified alter contractor schedule has been provided. * Fees are inclusive of all overhead and expenses, including but not limited to employee vehicles and mileage and printing required for project documentation. Item Task Est. Hours Hourly Rate Budget Task 1 Review of Pre -Lining & Post -Lining Videos 26 155.00 $4,030.00 Task 2 Schedule & Attend Pre -Con Meeting 2 155.00 $310.00 Task 3 Assist in Notifications to Businesses/Residents 10 $ 155.00 $ 1,550.00 Task 4* Construction Observation 240 $ 155.00 $ 37,200.00 Task 5 Construction Closeout 8 $ 155.00 $ 1,240.00 TOTAL ESTIMATED BUDGET NOT TO EXCEED: $ 44,330.00 Additional Line Segments — As requested, Hourly Rate *If both the sanitary and storm lining projects run concurrently and Spaceco is awarded the Phase III contracts for both projects then the following efficiencies would apply: Task 4 1 Construction Observation Adjustment 120 155.00 18 600.00 REVISED AWARD TOTAL (SANITARY ONLY) $25 730.00 Our services will be on a time and materials basis. Our services will be invoiced monthly, payments are due within thirty days after invoicing. Work identified as payable on an hourly basis will be billed to you at the rates specified above. We will establish our contract in accordance with the enclosed General Terms and Conditions, which are expressly incorporated into and are an integral part of this contract for professional services. If you wish to discuss the terms, conditions and provisions of this agreement, I would be pleased to do so at your earliest convenience. We reserve the right to increase our fees by 5% on each annual anniversary of this Agreement. All reproductions and delivery services will be billed to the Client on a cost plus 10% basis. If this proposal meets with your approval, please sign and return to us for our files. Sincerely, Ted Ward, P.E., DECI, CPII Construction Department Manager c: R. Stawik, D. Stevens - Spaceco File Copy ACCEPTED FOR: BY: TITLE: DATE: N:\Projects 13000-13999\13760\DOCS\PROPOSAL\13760.Sanitary Cost Proposal. 02.11.2025.SB.docx Rosemont P:(847) 696-4060 Indianapolis P:(317) 779-2194 Morris P:(815) 941-0260 9575 W. Higgins Pd, Suite 700 3850 Priority V,'ay S. Dr., Suite 110 2241/2 N. Liberty St. Rosemont, I L 60018 Indianapolis, I N 46240 Morris, IL 60450 Engineering Solutions For Tomorrow's Challenges Ilun»pllll\ @ ulam�11111 �' >¶ul ¶�lu P pmN1p MM uulp �p\\o1111 \\Noll 6N9` Inml l umpl IW MunluO e \\p�4 v� IV��ul� � "'I� os" � �u I�� P t�" ��� �m� nM � N �11111u 4 w° INMItitil 1551,Il` ��Ill� M��1g VkOnlolooa, Nlu IoloMl louuuuuullluu WmoloMlam Bum au" °IUVu� uvmvima I ML Pirospect CIPP StOFM Sew eF Lining Phase III Inspection Di�r�ec!t Cost Estimate O Nr M „ W ', 77 Labor Subtotals ®�® __ Submitted by: B A X T E PDMAN m el C:,�, o I s i r i E ri i i � r,,,,, r r s, Cost Proposal Village of Mount Prospect, Illinois Storm Sewer Lining (CIPP) Project OFFICE SERVICES Review/Approve Pre -Lining Videos 8 $1,360 .... ......... ......... ......... ......... ......... ......... ......... Review Liner Thickness Calculations .... ......... ......... ......... ......... ......... ......... ......... ......... ......... 1 ......... ......... .................................................. $170 .................................................. Review Post -Lining Videos 8 $1,360 .... ......... ......... ......... ......... ......... ......... Review/Approve CIPP Sample Testing 1 .................................................. $170 .... ......... ......... ......... ......... ......... ......... ......... Update Annual Combined Sewer Assessment ......... ......... .................................................. 2 $340 Spreadsheet TOTAL 20 $3,400 Price Per Additional Segment Lined; ... .... .... .... .... .... .... .... .... .... .... .......................................... All Sizes $720 .... ....._._ ......... ....._._ ......... ......... ....._._ ......... ....._._ ....._._ ............... Baxter & Woodman, Inc. Cost Proposal • 16