HomeMy WebLinkAbout6.3 Motion to accept proposal from Rubino Engineering, Inc. for 2025 Material Testing Services in an amount not to exceed $49,600.M+awn �'xytlts=e
Item Cover Page
Subject Motion to accept proposal from Rubino Engineering, Inc. for
2025 Material Testing Services in an amount not to exceed
$49,600.
Meeting
Fiscal Impact (Y/N)
Dollar Amount
Budget Source
Category
Type
Information
February 18, 2025 - REGULAR MEETING OF THE MOUNT
PROSPECT VILLAGE BOARD
Y
$49,600.00
Street Resurfacing Construction Fund
CONSENT AGENDA
Action Item
The Public Works Department requires the services of a materials testing consultant to assure
that high quality asphalt and concrete materials are utilized by contractors in this year's Street
Resurfacing and Sidewalk Improvement Programs. Staff prepared and advertised a detailed
Request for Proposals (RFP) to procure these services. Tasks defined in the scope of work
include:
• Engineering Technician - HMA/PCC Field Inspection
• PCC Compressive Strength Tests (per cylinder)
• Cylinder Pickup
• Pavement Cores
• Nuclear Density Gauge
• Maximum Theoretical Specific Gravity
• Bulk Specific Gravity
• Binder Ignition / Reflux Extraction
• Project Management / Report Review
• Vehicle Charge
RFP Responses
Three (3) consultants submitted responses to the Village RFP, both technical and cost
proposals. The content within the technical proposals was reviewed, including the consultant's
understanding of the Village's goals and needs for the 2025 Material Testing Services.
Proposals were rated (with a maximum score of 50 points) according to the following specific
categories: Firm Background, Similar Project Experience, Scope of Services, and Key
Personnel. The results of the proposal review are provided in the tables below:
Category Max Points Rubino ECS Midwest Soil and
The RFP responses from the three consultants were all found to be generally acceptable. Each
consultant also submitted a cost proposal. These cost proposals are summarized below:
Consultant
Cost
Engineering
$47,230
Material
Consultants
Firm Background
10
10
9
8
Project
Experience
15
15
14
14
Scope of
Services
15
15
15
14
Key Personnel
10
9
9
9
Totals:
50
49
47
45
The RFP responses from the three consultants were all found to be generally acceptable. Each
consultant also submitted a cost proposal. These cost proposals are summarized below:
Consultant
Cost
Rubino Engineering
$47,230
ECS Midwest
$66,000
Soil and Material Consultants
$50,232
Engineer's Estimate $ 48,750.
Discussion
Rubino Engineering, Inc. (Rubino) has an experienced professional staff with a thorough
understanding of the material testing requirements necessary to successfully accomplish the
Village's projects. They are prequalified by IDOT to perform this work, operate an AASHTO
accredited laboratory, and have the capability to respond to our specific project needs. They
have successfully accomplished these same services for numerous communities in recent
years and received positive references from those communities. The cost proposal from
Rubino included a total amount of $47,060.00. However, a minor calculation error has the true
total amount to be $47,230.00.
It is Village staff's opinion that Rubino will provide high quality material testing services at a
reasonable cost. The services listed in the proposal are based on estimated jobsite work hours
using averages from previous years and prorated for the anticipated work for this year. Many
factors can influence the actual jobsite work hours for quality assurance testing. To allow for
contingencies and the possible need for additional testing, staff recommends that the contract
award be for the base amount ($47,230.00) + 5% contingency ($2,370.00) for a total amount
of $49,600.00.
Alternatives
1. Accept Rubino Engineering, Inc. proposal to provide materials testing services for the
2025 Street Resurfacing and Sidewalk Improvement Projects.
2. Action at discretion of Village Board.
Staff Recommendation
Staff recommends that the Village Board accept the proposal by
provide Material Testing Services for the 2025 Street Resurfacing
Improvement Projects for a not to exceed amount of $49,600.
Attachments
1. Rubino Cost Proposal
2. Rubino Technical Proposal
3. 2025 Material Testing RFP
Rubino Engineering, Inc. to
Program and Sidewalk
January 31, 2025
PROPOSAL
To: Mr. Matthew P. Lawrie, PE Re: QA Materials Testing Services
Village of Mount Prospect Village of Mount Prospect Public Works —
Public Works Department 2025 Material Testing Services
1700 W. Central Road Mount Prospect, Illinois
Mount Prospect, Illinois 60056
P: 847.870.5640 Proposal No. Q25.034
Via email: mlawrie()mountprospect.org
Dear Mr. Lawrie,
Rubino Engineering, Inc. is pleased to submit the following proposal to provide QA construction materials
testing and inspection services for the above referenced project. Please refer to our separate technical
proposal that outlines our qualifications as they pertain to this project.
PROJECT UNDERSTANDING
Rubino Engineering, Inc. received a request for proposal from the Village of Mount Prospect on January
16, 2025 and the following outlines our understanding of the requested scope of services:
P( a1 t,hl fat ,011�fxfJ'tl6f
Rubino understands the Village of Mount Prospect is seeking a firm to perform QA HMA and concrete
testing services for a variety of municipal projects in the Village including:
• 2025 Street Resurfacing Program
• 2025 Removal / Replacement Sidewalk Program
• 2025 New Sidewalk Program
BITUMINOUS PAVING AND CONCRETE
■ QA Field testing of hot mix asphalt (HMA) — density by the nuclear method
■ QA Laboratory testing of HMA - Bulk SG, Max SG, and Loss on Ignition
■ QA Field testing of uncured concrete and inspection of reinforcing steel
o Slump, air, temperature, and casting of cylinders
■ Laboratory testing of cured concrete — compressive strength
GEOTECHNICAL ENGINEERING SCOPE
Pavement Cores will be marked out by the Engineer and a location map will be provided to the
Consultant. The purpose of the coring is to provide information regarding the existing pavement
thickness, pavement condition, subbase thickness and subbase type at each location. After coring into
the existing pavement, core holes shall be patched to meet the existing grade. Project services do not
include a site evaluation to determine the presence or absence of wetlands, hazardous substances, or
toxic materials.
Efr........ ........ ........ ........,
■ Traffic Control
■ Re -inspection for failed tests
■ Work areas not ready for inspection at the time scheduled
■ Delays by the contractor
■ Cancellations
■ Overtime
■ Any services not described and listed above
Rubino Engineering, Inc. proposes to provide experienced, technical personnel to perform the requested
testing in general accordance with the client -provided project specifications. If any of the above information
is incorrect, please notify us or change it on the signed copy of the proposal.
Rubino Engineering, Inc. • 425 Shepard Drive • Elgin, IL 60123 • (847) 931-1555 • (847) 931-1560 fax
2025 Testing Proposal — Village of Mount Prospect Testing Services — QA Material Testing January 31, 2025
Rubino Proposal No. Q25.034
FEES
The work will be accomplished on a unit price basis in accordance with the Rubino Engineering, Inc.
Schedule of Services and Fees, and will be performed pursuant to the attached General Conditions. Copies
of our Schedule of Services and Fees and General Conditions are enclosed herewith and incorporated into
this proposal.
Rubino Engineering, Inc.'s fees will be determined by the actual amount of technical time expended for this
project and the amount of laboratory testing performed by the client's request.
Construction Material Testing Services
Description
Quantity
Unit Rate
Total
Engineering Technician - HMA/PCC Field Inspection
250
hours
$
100.00
$25,000.00
Vehicle Charge
70
day
$
30.00
$2,100.00
PCC Compressive Strength Test (per cylinder)
240
each
$
17.00
$4,080.00
Cylinder Pick up
30
trip
$
125.00
$3,750.00
Pavement Core Field
20
cores
$
175.00
$3,500.00
Nuclear Gauge
20
day
$
25.00
$500.00
Maximum Theoretical Specific Gravity
4
test
$
115.00
$460.00
Bulk Specific Gravity
4
test
$
110.00
$440.00
Binder Ignition/ Reflux Extraction
4
test
$
120.00
$480.00
Project Management/ Report Review
75
hour
$
90.00
$6,750.00
Estimated Total: $47,060.00
Rubino Engineering, Inc. will proceed with the planned work only after receiving a signed copy of this
proposal. Please complete the attached Project Data Sheet before returning the proposal to enable your
file to be properly established.
PROJECT SCHEDULING
Please book testing services prior to 4pm the day before testing is needed via our website:
https://rubinoenci.com/schedule-field-testing
The office and field project manager will be notified, and you will receive a confirmation email
and possibly a follow up phone call or email for additional project information.
Changes to the schedule or cancellations: scheduling(c-)rubinoeng.com
Please call the office with any questions or changes to the schedule between 8am to 4pm.
CLOSING
Rubino appreciates the opportunity to offer our services for this project and we look forward to working with
your company. Please contact me with questions pertaining to this proposal or requests for additional
services.
Respectfully submitted,
RUBINO ENGINEERING, INC.
Michel e A. Lipin E
President
michelle.lipinski(c�rubinoeng.com
Rubino Engineering, Inc. Page 2 of'6
2025 Testing Proposal — Village of Mnunt Prospect Testing Services — QA Material Testing January 31, 2025
Rubino Proposal No. Q25.034
AUTHORIZATION AND PROPOSAL ACCEPTANCE
If this proposal is acceptable to you, Rubino Engineering, Inc. will perform the work in accordance
with the attached General Conditions that are incorporated into and made a part of this proposal.
Please sign below as notice to proceed and return one copy of this proposal intact to our office.
We will proceed with the work upon receipt of signed authorization.
AGREED TO, THIS DAY OF , 20_,
BY (please print):
TITLE:
COMPANY:
SIGNATURE:
PROJECT INFORMATION:
1
2
3
4
5
6
Project Name:
Project Location:
Your Job No: Purchase Order No.:
Project Manager: Telephone No.:
Site Contact: Telephone No.:
Number and Distribution of Reports:
( ) Copies To:
Attn :
Email:
( ) Copies To:
Attn :
Email:
7. Invoicing Address:
L
( ) Copies To:
Attn :
Email:
( ) Copies To:
Attn :
Email:
Attn :
Email:
Other Pertinent Information Or Previous Subsurface Information Available:
Rubino Engineering, Inc. Page 3 of'6
2025 Testing Proposal — Village of Mnunt Prospect Testing Services — QA Material Testing January 31, 2025
Rubino Proposal No. Q25.034
INSERT RATE SHEET
REMARKS
1) All fees and services are provided in accordance with the attached Rubino Engineering, Inc. General Conditions.
2) Unit prices/rates are in effect for 6 months from the date of this proposal and are subject to change without notice thereafter if not noted
above.
Overtime rates are applicable for services performed in excess of 8 hours per day Monday through Friday, before 7:00 AM or after 3:00 PM,
3) and for all hours worked on Saturdays, Sundays and holidays. The overtime rate is 1.5 times the applicable hourly rate. Sundays and
holidays are double time.
4) All rates are billed on a portal-to-portal basis.
5) Standby time due to delays beyond our control will be charged at the applicable hourly rate.
6) Transportation and per diem are charged at the applicable rates per trip.
7) Rates involving mileage (including transportation, mobilization, vehicle and trip charges) are subject to change based upon increases in the
national average gasoline price.
8) A minimum charge of 4 hours applies to field testing and observation services up to 4 hours. Over 4 hours a minimum of 8 hours applies.
Time calculated portal to portal and includes equipment loading, travel, and report preparation.
9) Scheduling or cancellation of field testing and observation services is required no less than the working day prior to the date the services are
to be performed. Services cancelled without advance and/or inadequate notice will be assessed a minimum 4 -hour charge.
10) For all Rubino Engineering, Inc. services, a project management/engineering review charge will be billed for all reports issued for the
scheduling/supervision of personnel and the evaluation/review of data and reports.
11) The minimum billing increment for time is a half hour.
12) A project set-up charge of a minimum of two hours applies to all projects.
13) Professional Services rates are exclusive of expert deposition or testimony time.
This proposal is based on Rubino Engineering, Inc. being scheduled on an on-call basis and letters of certification will not be provided
14) unless Rubino Engineering, Inc. is notified in advance and Rubino Engineering, Inc. is scheduled for full time inspection and testing of the
area or item to be certified.
15) If special inspections are required by the city where the construction is to take place, it must be brought to the attention of Rubino
Engineering, Inc. prior to the start of construction as additional charges will apply.
16) Prevailing wage fees are subject to change based on the Illinois Department of Labor.
17) Services and fees not listed on this schedule may be quoted on request.
Rubino Engineering, Inc. Page 4 q16
2025 Testing Proposal — Village ofWnunt Prospect Testing Services — QA Material Testing January 31, 2025
Rubino Proposal No. Q25.034
cwtw1171677MAMENG
ACORM CERTIFICATE rAOF LIABILITY INSRAN
UCE uArt I
WN12,024
THIM CERTIMAIE 1SISSUEDASAMATTEROF WOMMTON041 AND CONFERS NO R"'TS UPON THE CLAITIMAM $40LDER, DQS
CER11FICAl"COOES ICN 01AFFIRMAVIVELY OR NEGMMLY ANWAID, 0111110 OR JI 1'14C COMERAGE AFFORDED BY THE POLIMS
SELOWAMS C*.R'rWf1CA1f.` ( INSURANCE M.S WYT CONSMUM A CONTRAC1 SEMEN THE 11SWNG MWRIEA(%» AWHOWED
REPREMATATM. OR PRODUCER, AND I'ME CEAMCATE WX.OER.
MMPORMNI;, It the cartgWato hddw is an AM110MAL INSURED, the laaftylin) nust have ADOMONAL INSURED poovistons or be endamd,
IN SUBRE)GA"Oh IS WAIVED, su"W to the Wms and! amMons art the policy, catan pc&csim imay rvqWte an &WOmmeM, A Mawnwit on
Itt" clatificate dcos no cor&r aov ochts to Ow ceitticaft hddw in hou of such endorsommWO.
PRODWIN
LIST In% Srvcs LLC Ar 71d -Prof
2W Spring Road, Suke 100
Oak BrOOK IL 60623
312 442-7200
"Wato
Rubino Ewfinottkvq, Inc,
426 Shepard Dt
Elgin, tL $0,123
COVERAGES CERMWATE UMSM
REM" NUI
YICV,�, M TO CMiFY 'MHAT Nf POIX9S O fWURAWC USTITO 8,44,N4 KAVE 8061% 'MlaXt) TO MIlff INIS.WdU raradC.W WMWuYmr IT OR 40", 1'10tK,V Wk ROU
hbWATED, WrA1TW,;TM4CWiG AM TrA(m oA ('x')NWK')rh (N AW
C!(*114 44J Ulk 011MA NKARW'447 VOTH fW�'J'Icr YO 00"'J14 '446
Cr'W1Tj'1CjI4( MAW 06., 45SL9,,r,4 C* MAV P[JOININ THE 04SUAANC1 Aff0°4wt44"1 BY 011f
POU'll"'A"s (PIESCRIKU 1016['A 0& MMACT W AIA THC 4M6M4',,'w
EXIL'I 1XV30S IWO C00"UXTKAS Of SOCH ("NAACS, LAITS SWAN MMI HAW bffN PC CRA,11) BY PAO UAW,
MWI AMiA
L 19 M` wC w WASOMM r, MA PXjcv w4ma'a
F%r1:v9wT FourvuwP
eA"=*vvM worm
A
X
LAAMMMA,X, ECKDCAR
PSBOCW7717
M112024 091OV2021
10,0M
R'PQC
VW)9Aj1:"f U W -MO
A
PSAW018,81
DM112024 0"112021
11�wo.ow
WpJW��W�I�
W'04' W 40 UP%' IfI IW."Iffo S
IX
I'W""CA, r AA UQ1 CIOW *x"'Of"6 I
KOH, 1'I1 x NA" CAMW ID
A 1,01 W, Oft,
A"a
Nrx
PSE, 002, 142
OM14024 OMV202
1 $.00010-V
x CAMPT"Mux"
t"t WIMMA0,
A
"ORM" Cf*w`S*"
MD 1"MUMS' I amiry v W s
AMM003 f(I TCUIVAR M& At X1 0, VIVA
c4r1j"IL1411MIKIR M"'I"'WIM"',
wo MY
WA
PSWM27"
'1 2024 0910112026
X rE
0
M"IAACCM We r
C: t "A W, Alm, 9X111 IT "0' L Os f 11.0MAM
Pm CA -'rd'.
I It - C1111
83CM05611"24
0WOU202410910112026 $4000,000 each claim I
Liability
S4,000,000 annuai AW.
MCACUPYWh Of MCMA TICAS 9 LOCATWAS (VCA*x 1 9 3 W1, AA$Wd#W Ibwm6m %c hot", "491 IN A"Utood 0 moro *Ww (w m"M
Prufes%lanal Liabifity K witt" on a 'clair" made'potky fornt.
Some, of aN oft -em are exeltided fftXn Wotkeft Compoilliation oaveraqC
S00UWAky (WINE AbOVE"t*%CM0f00(XJ0*sft( CAOXICTifDatfoRt
Rubim EngirwWing, kw, TtW EXPIMATWU WE Mit"Atof" NOW" Val 1IM, DELP"Atil w
426 Shqmtd Dr. AMADAMA NTH h*1 O(AXY MOVMTOMS.
E, *k IL 60123
0 19409,201S ACORD CORPO"YOU, AN rtghh rawtvad,
ACORD 21,S (206#03)1 The ACO" injime md kW are registwed nwilks od ACORD
#S41"2024WIA"024DOMP
Rubino Engineering, Inc. Page 5 of'6
1025 Testing Proposal — Village of Mount Prospect Testing Services— QA Material Testing January 31, 2025
Rubino Proposal No. Q25.034
GENERAL CONDITIONS
1. PARTIES AND SCOPE OF SERVICES: Rubino Engineering, Inc. shall include said company or its particular division, subsidiary or affiliate performing the services. "Services" means the specific
geotechnical, analytical, testing or other service to be performed by Rubino Engineering, Inc. as set forth in Rubino Engineering, Inc.'s proposal, Client's acceptance thereof and these General Conditions.
Additional services ordered by Client shall also be subject to these General Conditions. "Client" refers to the person or business entity ordering the services to be done by Rubino Engineering, Inc. If
Client is ordering the services on behalf of another, Client represents and warrants that it is the duly authorized agent of said party for the purpose of ordering and directing said services. Unless otherwise
stated in writing, Client assumes sole responsibility for determining whether the quantity and the nature of the services ordered by the client is adequate and sufficient for Client's intended purpose. Client
shall communicate these General Conditions to each and every third party to whom Client transmits any part of Rubino Engineering, Inc.'s services. Rubino Engineering, Inc. shall have no duty or
obligation to any third party greater than that set forth in Rubino Engineering, Inc.'s proposal, Client's acceptance thereof and these General Conditions. The ordering of services from Rubino Engineering,
Inc., or the reliance on any of Rubino Engineering, Inc.'s work, shall constitute acceptance of the terms of Rubino Engineering, Inc.'s proposal and these General Conditions, regardless of the terms of any
subsequently issued document.
2. TESTS AND INSPECTIONS: Client shall cause all tests and inspection of the site, materials and work performed by Rubino Engineering, Inc. or others to be timely and properly performed in accordance
with the plans, specifications and contract documents and Rubino Engineering, Inc.'s recommendations. No claims for loss, damage or injury shall by brought against Rubino Engineering, Inc. by Client or
any third party unless all tests and inspections have been so performed and unless Rubino Engineering, Inc.'s recommendations have been followed. Client agrees to indemnify, defend and hold Rubino
Engineering, Inc., its officers, employees and agents harmless from any and all claims, suits, losses, costs and expenses, including, but not limited to, court costs and reasonable attorney's fees in the event
that all such tests and inspections are not so performed or Rubino Engineering, Inc.'s recommendations are not so followed except to the extent that such failure is the result of the negligence, willful or
wanton act of omission of Rubino Engineering, Inc., its officers, agents or employees, subject to the limitation contained in paragraph 9.
3. SCHEDULING OF SERVICES: The services set forth in Rubino Engineering, Inc.'s proposal and Client's acceptance will be accomplished in a timely, workmanlike and professional manner by RUBINO
ENGINEERING, INC. personnel at the prices quoted. If Rubino Engineering, Inc. is required to delay commencement of the services or if, upon embarking upon its services, Rubino Engineering, Inc. is
required to stop or interrupt the progress of its services as a result of changes in the scope of the services requested by Client, to fulfill the requirements of third parties, interruptions in the progress of
construction, or other causes beyond the direct reasonable control of Rubino Engineering, Inc., additional charges will be applicable and payable by Client.
4. ACCESS TO SITE: Client will arrange and provide such access to the site as is necessary for Rubino Engineering, Inc. to perform the services. Rubino Engineering, Inc. shall take reasonable measures
and precautions to minimize damage to the site and any improvements located thereon as the result of its services or the use of its equipment; however, Rubino Engineering, Inc. has not included in its fee
the cost of restoration of damage which may occur. If Client desires or requires Rubino Engineering, Inc. to restore the site to its former condition, upon written request Rubino Engineering, Inc. will perform
such additional services as is necessary to do so and Client agrees to pay Rubino Engineering, Inc. for the cost.
5. CLIENT'S DUTY TO NOTIFY ENGINEER: Client represents and warrants that it has advised Rubino Engineering, Inc. of any known or suspected hazardous materials, utility lines and pollutants at any
site at which Rubino Engineering, Inc. is to perform services hereunder, and unless Rubino Engineering, Inc. has assumed in writing the responsibility of locating subsurface objects, structures, lines or
conduits. Rubino Engineering, Inc. may use such information in performing its services and is entitled to rely upon the accuracy and completeness thereof. Client agrees to defend, indemnify and save
Rubino Engineering, Inc. harmless from all claims, suits, loses costs and expenses, including reasonable attorney's fees as a result of personal injury, death or property damage occurring with respect to
Rubino Engineering, Inc.'s performance of its work and resulting to or caused by contact with subsurface of latent objects, structures, lines or conduits where the actual or potential presence and location
thereof were not revealed to Rubino Engineering, Inc. by Client and/or by any of Client's subcontractors or sub consultants
6. RESPONSIBILITY: Rubino Engineering, Inc.'s services shall not include determining, supervising or implementing the means, methods, techniques, sequences or procedures of construction. Rubino
Engineering, Inc. shall not be responsible for evaluating, reporting or affecting job conditions concerning health, safety or welfare. Rubino Engineering, Inc.'s services or failure to perform same shall not in
any way excuse any contractor, subcontractor or supplier from performance of its work in accordance with the contract documents. Rubino Engineering, Inc. has no right or duty to stop the contractor's
work.
7. SAMPLE DISPOSAL: Unless otherwise agreed in writing, test specimens or samples will be disposed immediately upon completion of the test. All drilling samples or specimens will be disposed sixty
(60) days after submission of Rubino Engineering, Inc.'s report.
8. PAYMENT: Client shall be invoiced once each month for services performed during the preceding period. Client agrees to pay each invoice within thirty (30) days of its receipt. Client further agrees to
pay interest on all amounts invoiced and not paid or objected to for valid cause in writing with said thirty (30) day period at the rate of eighteen (18) percent per annum (or the maximum interest rate permitted
under applicable law), until paid. Client agrees to pay Rubino Engineering, Inc.'s cost of collection of all amounts due and unpaid after sixty (60) days, including court costs and reasonable attorney's fees.
Rubino Engineering, Inc. shall not be bound by any provision or agreement requiring or providing for arbitration or disputes or controversies arising out of this agreement, any provision wherein Rubino
Engineering, Inc. waives any rights to a mechanics' lien, or any provision conditioning Rubino Engineering, Inc.'s right to receive payment for its services upon payment to Client by any third party. These
General Conditions are notice, where required, that Rubino Engineering, Inc. shall file a lien whenever necessary to collect past due amounts. Release of such lien shall be given only when payment in full
has been received for services duly rendered. Failure to make payment within thirty (30) days of invoice shall constitute a release of Rubino Engineering, Inc. from any and all claims which Client may have,
whether in tort, contract or otherwise and whether known or unknown at the time.
9. STANDARD OF CARE: RUBINO ENGINEERING, INC.'S SERVICES WILL BE PERFORMED, ITS FINDINGS OBTAINED AND ITS REPORTS PREPARED IN ACCORDANCE WITH ITS PROPOSAL,
CLIENT'S ACCEPTANCE THEREOF, THESE GENERAL CONDITIONS AND WITH GENERALLY ACCEPTED PRINCIPLES AND PRACTICES. IN PERFORMING ITS PROFESSIONAL SERVICES,
RUBINO ENGINEERING, INC. WILL USE THAT DEGREE OF CARE AND SKILL ORDINARILY EXERCISED UNDER SIMILAR CIRCUMSTANCES BY MEMBERS OF ITS PROFESSION. RUBINO
ENGINEERING, INC. MAKES NO WARRANTIES, EITHER EXPRESS OR IMPLIED, IN CONNECTION WITH ITS SERVICES PROVIDED AS SET FORTH IN ITS PROPOSAL, CLIENT'S ACCEPTANCE
THEREOF, AND THESE GENERAL CONDITIONS. STATEMENTS MADE IN RUBINO ENGINEERING, INC. REPORTS ARE OPINIONS BASED UPON ENGINEERING JUDGMENT AND ARE NOT TO
BE CONSTRUED AS REPRESENTATIONS OF FACT.
SHOULD RUBINO ENGINEERING, INC. OR ANY OF ITS PROFESSIONAL EMPLOYEES BE FOUND TO HAVE BEEN NEGLIGENT IN THE PERFORMANCE OF ITS WORK, OR TO HAVE MADE AND
BREACHED ANY EXPRESSED OR IMPLIED WARRANTY, REPRESENTATION OR CONTRACT, CLIENT, ALL PARTIES CLAIMING THROUGH CLIENT AND ALL PARTIES CLAIMING TO HAVE IN
ANY WAY RELIED UPON RUBINO ENGINEERING, INC.'S WORK, AGREE THAT THE MAXIMUM AGGREGATE AMOUNT OF THE LIABILITY OF RUBINO ENGINEERING, INC., ITS OFFICERS,
EMPLOYEES AND AGENTS SHALL BE LIMITED TO $10,000.00 OR THE TOTAL AMOUNT OF THE FEE PAID TO RUBINO ENGINEERING, INC. FOR ITS WORK PERFORMED WITH RESPECT TO
THE PROJECT, WHICHEVER AMOUNT IS GREATER.
NO ACTION OR CLAIM, WHETHER IN TORT, CONTRACT OR OTHERWISE, MAY BE BROUGHTAGAINST RUBINO ENGINEERING, INC., ARISING FROM OR RELATED TO RUBINO ENGINEERING,
INC.'S WORK, MORE THAN TWO (2) YEARS AFTER THE CESSATION OF RUBINO ENGINEERING, INC.'S WORK HEREUNDER.
10. INDEMNITY: To the fullest extent permitted by law, Client and Rubino Engineering, Inc. each agree to indemnify the other party and the other party's officers, directors, partners, employees, and
representatives, from and against losses, damages, and judgments arising from claims by third parties, including reasonable attorneys' fees and expenses recoverable under applicable law, but only to the
extent they are found to be caused by a negligent act, error, or omission of the indemnifying party or any of the indemnifying party's officers, directors, members, partners, agents, employees, subcontractors,
or subconsultants in the performance of services under this Agreement. If claims, losses, damages, and judgments are found to be caused by the joint or concurrent negligence of Client and Rubino
Engineering, Inc., they shall be borne by each party in proportion to its negligence.
11. TERMINATION: This Agreement may be terminated by either party upon seven (7) days' prior written notice. In the event of termination, Rubino Engineering, Inc. shall be compensated by Client for
all services performed up to and including the termination date, including reimbursable expenses and for the completion of such services and records as are necessary to place Rubino Engineering, Inc.'s
files in order and/or protect its professional reputation. Failure of Client to make payments when due shall because for suspension of services or, ultimately, termination, unless and until Rubino Engineering
Inc. has been paid in full all amounts due for services, expenses and other related changes.
12. DISPUTE RESOLUTION: In the event of a dispute arising out of or relating to this Agreement or the services to be rendered hereunder, the Client and Rubino Engineering, Inc. agree to attempt to
resolve such disputes in the following manner: 1) The parties agree to attempt to resolve any and all unsettled claims, counterclaims, disputes and other matters in question through direct negotiations
between the appropriate representatives of each party; 2) If such negotiations are not fully successful, the parties agree to submit any and all remaining unsettled claims, counterclaims, disputes and other
matters in question to mediation in accordance with the Construction Industry Mediation Rules of the American Arbitration Association, effective as of the date of this Agreement.
13. WITNESS FEES: Rubino Engineering, Inc.'s employees shall not be retained as expert witnesses except by separate written agreement. Client agrees to pay Rubino Engineering, Inc.'s legal expenses,
administrative costs and fees pursuant to Rubino Engineering, Inc.'s then current fee schedule for Rubino Engineering, Inc. to respond to any subpoena.
14. NO HIRE: Client agrees not to hire Rubino Engineering, Inc.'s employees except through Rubino Engineering, Inc. In the event Client hires a Rubino Engineering, Inc. employee, Client shall pay Rubino
Engineering, Inc. an amount equal to one-half of the employee's annualized salary, with Rubino Engineering, Inc. waiving other remedies it may have.
15. HAZARDOUS MATERIALS: Nothing contained within this agreement shall be construed or interpreted as requiring Rubino Engineering, Inc. to assume the status of an owner, operator, generator,
Storer, transporter, treater or disposal facility as those terms appear within RCRA, CERCLA, or within any Federal or State statute or regulation governing the generation, transportation, treatment, storage
and disposal of pollutants. Client assumes full responsibility for compliance with the provisions of RCRA, CERCLA, and any other Federal or State statute or regulation governing the handling, treatment,
storage and disposal of pollutants.
16. PROVISIONS SEVERABLE: The parties have entered into this agreement in good faith and it is the specific intent of the parties that the terms of the General Conditions be enforced as written. In the
event any of the provisions of these General Conditions should be found to be unenforceable, it shall be stricken and the remaining provisions shall be enforceable.
17. ENTIRE AGREEMENT: This agreement constitutes the entire understanding of the parties, and there are no representations, warranties or undertakings made other than as set forth herein. This agreement
may be amended, modified or terminated only in writing, signed by each of the parties hereto.
Rubino Engineering, Inc. Page 6 of 6
January 31st, 2025
Cover Letter
Attn: Matthew P. Lawrie P.E. Re: Construction Material Testing Services
Village of Mount Prospect 2025 Material Testing Services
Public Works Department Mount Prospect, Illinois
1700 W. Central Road
Mt. Prospect, IL 60056
P: 847.870.5640 Rubino Proposal No. Q25.034
Email: mlawriea_mountprospect.org
Dear Mr. Matthew P. Lawrie,
Rubino i ri , Inc. is pleased to submit the following information about our firm in response to
the request for proposal dated January 16th, 2025.
Rubino understands the Village of Mount Prospect is seeking a firm to perform Construction Material
Testing services for a variety of municipal projects in the Village including:
2025 Street Resurfacing Program — Group 1 and Group 2
2025 Removal/Replacement Sidewalk Program
2025 New Sidewalk Program
Rubino appreciates the opportunity to present our qualifications to the Village of Mount Prospect
again this year.
A more detailed table of contents can be found on the following page.
Respectfully submitted,
RUBINO ENGINEERING, INC.
Rubino Engineering, Inc. • 425 Shepard Drive . Elgin, IL 60123 0 847-931-1555 • 847-931-1560 fax
Rubino Engineering Proposal — Village of Mount Prospect 2025 Material Testing Services
Rubino Proposal No.: Q25.034
Village of Mount Prospect
2025 Material Testing Services
Rubino Proposal #Q25.034
Due 01/31/2025 at S:OOpm
Table of Contents
January 31", 2025
Historyof Firm............................................................................................................................ 3
OrganizationalChart................................................................................................................... 4
KeyStaff Resumes....................................................................................................................... 5
RelatedExperience...................................................................................................................... 7
Rubino Engineering, Inc. Iw Page 2
Rubino Engineering Proposal — Village ofMount Prospect 2025 Material Testing Services
Rubino Proposal No.: Q25.034
History of Firm
Established in 2009 Rubino Engineering, Inc. (Rubino) is an
experienced woman -owned small business providing geotechnical
engineering, construction materials testing and structural material
investigations throughout the Chicagoland area. Rubino was started by
Michelle Lipinski, PE with 3 other employees in 2009. Currently, Rubino
has over 25 employees and is steadily growing.
Rubino's Elgin laboratory is certified by the American Association of State
Highway Transportation Officials (AASHTO) and the Illinois Department
of Transportation (IDOT). In addition, Rubino is prequalified by IDOT to
provide General Geotechnical Services and Quality Assurance of
Portland Cement Concrete (PCC), Hot Mix Asphalt (HMA) and Aggregate
on IDOT projects.
January 31'`, 202.5
Rubino's in CONSTRUCTION MATERIALS TESTING SERVICES include jobsite and laboratory testing of
concrete, soils, masonry and asphalt materials for compliance with projects specifications; monitoring the
jobsite placement of construction materials for compliance with project drawings; quality control/quality
assurance (QC/QA) of materials on transportation projects including monitoring the mix production at the
production plant.
Rubino's in-house GEOTECHNICAL SERVICES include pavement
coring, traditional SPT drilling, and advanced field data
collection using our Vertek Cone Penetrometer (CPT). Data
collected from the field is transported to the lab for additional
laboratory testing, visual analysis, and documentation. Field
and laboratory test results are utilized by our experienced
geotechnical team to produce geotechnical engineering reports
for roadway improvement projects, utility projects, and
municipal building projects.
Rubino's in-house CCDD SERVICES include direct push
sampling using our Geoprobe 7822DT or hand held soil
sampling instruments. Samples are classified and scanned
with a photoionization detector (PID) before being sent to an
accredited analytical laboratory for testing consistent with the historical background search results. CCDD
results are reported and certificates are issued as applicable. Rubino has had the privilege to work for
the following municipalities listed below and highlighted on the Chicago county map below:
Algonquin
Arlington Heights
Aurora
Barrington
Bartlett
Batavia
Bensenville
Brookfield
Burr Ridge
Campton Hills
Carpentersville
Cary
Clarendon Hills
Crystal Lake
Deerfield
DeKalb
East Dundee
Elburn
Elgin
Elk Grove Village
Elmhurst
Evanston
Forest Park
Geneva
Glen Ellyn
Glencoe
Glenwood
Hampshire
Hanover Park
Harvard
Rockford
Hinckley
Hoffman Estates
Homer Glen
Itasca
Johnsburg
Lake in the Hills
Libertyville
Lilly Lake
Lombard
McHenry
Mt. Prospect
Montgomery
Mundelein
Naperville
Niles
North Aurora
Oak Brook
Oak Park
Oswego
Palatine
Palos Park
Pingree Grove
Richton Park
Rockford
Rolling Meadows
Romeoville
Roselle
Schaumburg
Skokie
Sleepy Hollow
Somonauk
South Elgin
Spring Grove
St. Charles
Streamwood
Sugar Grove
Warrenville
West Chicago
Westchester
Westmont
Wheaton
Winnetka
Woodridge
Woodstock
Wood Dale
Yorkville
Rubino Engineering, Inc. 1W Page 3
Rubino Engineering Proposal — Village ofMount Prospect 2025 Material Testing Services
Rubino Proposal No.: Q25.034
Organizational Chart
.Iarruary 31'`, 202.5
At Rubino Engineering, we want to be accessible to you when you need us, even if it is for last minute
scheduling by the contractor or questions outside of work hours. Therefore, we have provided contact
information for our core staff, including cell phone numbers when applicable. Feel free to contact Michelle
Lipinski with questions pertaining to this Statement of Qualifications or requests for additional information.
Additionally, please feel free to contact any of the core staff based on your needs.
Rubino Engineering, Inc. Organizational Chart (January 2025)
Illinois ! w
American
Advanciqg concrete knoudetAye UT
Rubino Engineering, Inc. 1W Page 4
Rubino Engineering Proposal — Village ofMount Prospect 2025 Material Testing Services January 31'`, 202.5
Rubino Proposal No.: Q25.034
Key Staff Resumes
r u b m n u MICHELLE A. LIPINSKI, PE
IE INCIIINIEIFR1NC fNC. PRESIDENT
�.,�..,. "� ... ..,...,...,...,....�.,.. ..,...,. ...�.,...
Education
Bachelor of Science in Civil Engineering, University of Illinois Urbana -Champaign, 2003
WorkExperfei.,�.,nce .....,.,..,.. .....,,
Professional Service Industries, Inc. — January 26, 2004 to August 31, 2009 (Staff Engineer to Branch Manager)
Rubino Engineering, Inc. — September 1, 2009 to present (President)
Certification .. .....,., ..,.. .....,, , ..,.., .....,.
ns/Registrations / Technical Training
• Professional Engineer, Illinois No. 062-061241
• OSHA 10, IDOT Training: HMA Level 1 (2010), HMA Level 2 (2011), HMA Level 3 (2011), PCC Level 1
(2010), PCC Level 2 (2011), PCC Level 3 (2011), S-33 (2010), Documentation of Contract Quantities
(2019), ACI Aggregate (2019), ACI Strength (2019)
Engineering Professional Experience —17 Years Geotechnical En
g g / Construction Material Testing
As President and sole owner of Rubino Engineering, Inc., Michelle prepares and reviews geotechnical engineering
reports as well as performs geotechnical and construction materials testing cost estimation. Specific experience
includes shallow and deep foundation design for structures, earth retention structures soil analysis, pavement
reconstruction and widening including subgrade stability, slope stability analysis and recommendations for sites with
unsuitable or organic soils, and soil modification.
„..,,„......,, �, „.,....
Representative Project Management Experience — QA Construction Materials Testing
• Huntley 2024 MFT Street Improvement Project, Huntley Illinois — CBBEL (2024)
• Libertyville 2024 Road Rehabilitation Program, Libertyville — Village of Libertyville (2024)
• Indian Trail Roadway Reconstruction, Aurora, Illinois— HR Green, Inc. (2024)
• 2024 Channahon MFT Resurfacing Project, Channahon Illinois —Village of Channahon (2024)
• Kane County 2024 Resurfacing (Sect. 23 -00565 -00 -RS) — STATE Testing (2024)
• Sidewalk and Courtyard Improvements, DuPage County — HLR (2024)
• 61 H95 Dauberman Road Extension, Big Rock, Illinois — (2023 — 2024)
• Various Road Rehab, Maintenance, and In -House Paving, Streamwood —Village of Streamwood (2011-2023)
• Cary 2023 MFT for HR Green, Inc, (2023)
• Souwanas, Schuett and Oceola Trail, Algonquin — HR Green (2023)
• Rolls Drive, Algonquin — Christopher B. Burke Engineering Ltd. (2023)
• Lake in the Hills 2023 MFT Program, Lake in the Hills Illinois — Chastain (2023)
• Tonbridge Subdivision, Algonquin for Christopher B. Burke Engineering Ltd. (2023)
• East New York Street, Aurora — HR Green (2021-2022)
• Village of Streamwood City Maintenance and MFT, Streamwood IL — Village of Streamwood (2009 — 2022)
• Libertyville MFT — Village of Libertyville (2014-2021)
• Aurora 2021 Resurfacing Overlay for HR Green, Inc. (2021)
• Kane County Division of Transportation Road Program, Various projects — (2012-2014) (2018-2021)
• Kendall County Division of Transportation Road Program, Various projects — (2009 - 2020)
• DeKalb County Division of Transportation Road Program, Various projects — (2019 — 2020)
• Randall Road HSIP (Stage 2) for Kane County (2020)
• Annual Rehabilitation Program, School District U-46 through HLR (2015-2020)
• Winnetka Roadway Program — Village of Winnetka (2014-2020)
• Deerfield MFT - Village of Deerfield (2009 — 2020)
• Bartlett MFT — Village of Bartlett (2015, 2017, 2019)
• Eastside CDGB Resurfacing, Carpentersville — Village of Carpentersville (2018 -Current)
• Westside Resurfacing and MFT Sidewalk, Carpentersville — Village of Carpentersville (2018 -Current)
• City of Elgin Resurfacing Program — Various Consultants (2009 - 2023)
Rubino Engineering, Inc. 1W Page 5
Rubino Engineering Proposal — Village ofMount Prospect 2025 Material Testing Services
Rubino Proposal No.: Q25.034
January 31'`, 202.5
Fubwnu CHRISTOPHER PETERSEN
ENGINEERING iiNc. QA FIELD TECHNICIAN
Certifications/Technical Training
■ Certified Nuclear Density Gauge Operator
■ ACI Level I Concrete — (2019)
■ PCC Level I - IDOT PCC Level 1 (2009)
■ HMA Level I - IDOT HMA Level 1 (2011)
■ IDOT S33 Geotechnical Field Testing and Inspection (2013)
■ OSHA 10
■ Hazmat
..,..,...
,. .,..,.. „......,, .,..,...
�,...,. �,�.,.. „......,, .,..,...
Professional Experience
Mr. Petersen is an Engineering Technician with over 16 years of experience in the construction materials testing and
inspection industry. Mr. Petersen has performed these services on hundreds of civil, commercial, residential and
transportation projects in the Chicagoland area. Mr. Petersen has extensive knowledge of cut and fill earthwork
operations, deep foundation installation including drilled shafts and driven piles, concrete and hot mix asphalt production
and placement methods, reinforcing steel and post -tensioning reinforcing placements and masonry construction. Mr.
Petersen is highly knowledgeable of the field and laboratory testing procedures and the relevant ASTM, AASHTO and ACI
specifications.
Mr. Petersen has performed Quality Control/Quality Assurance testing on hundreds of IDOT and other transportation
related projects, coordinated the testing operations of the field staff and producing the field and laboratory testing reports
for distribution to governing agencies. Mr. Petersen is highly experienced in monitoring and testing concrete and hot
mix asphalt at the production facilities, ensuring compliance with the mix design and project specifications.
Representative Project Experience — QA Material Testing
• Huntley 2024 MFT Street Improvements, Huntley Illinois — CBBEL (2024)
• Sidewalk and Courtyard Improvements, DuPage County — HLR (2024)
• Indian Trail Roadway Reconstruction, Aurora, Illinois— HR Green, Inc. (2024)
• 2024 Channahon MFT Resurfacing Project, Channahon Illinois — Village of Channahon (2024)
• Libertyville 2024 Road Rehabilitation Program, Libertyville — Village of Libertyville (2024)
• Sidewalk & Street Maintenance, Oswego IL — Brothers Asphalt Paving, Inc. (2024)
• Aurora 2023 MFT Resurfacing - Ardmore Roderick (2023)
• Montgomery Road, Aurora — Hancock Engineering (2023)
• Cary 2023 MFT for HR Green, Inc, (2023)
• Lake in the Hills 2023 MFT Program, Lake in the Hills Illinois — Chastain (2023)
• Eastern Avenue, Bellwood Resurfacing Improvements for Hancock Engineering (2023)
• Rodenburg Rd. Reconstruction, Schaumburg — BLA, Inc. (2023 -current)
• National Parkway, Schaumburg — HLR (2023)
• Bode Road, Schaumburg — Thomas Engineering (2023)
• Springinsguth Road, Schaumburg — Thomas Engineering (2023)
• Technology Boulevard, West Chicago — HR Green, Inc. (2023)
• Westside Resurfacing and MFT Sidewalk, Carpentersville for Village of Carpentersville (2018-2023)
• Libertyville MFT in Libertyville Illinois Village of Libertyville (2011-2022)
• Westside Resurfacing and MFT Sidewalk, Carpentersville — Village of Carpentersville (2018 -Current)
• Village of Streamwood City Maintenance and MFT, Streamwood IL — Village of Streamwood (2009 — 2022)
• Kane County Division of Transportation Road Program, Various Projects (2012-2014, 2018-2020)
• Eastside CDGB Resurfacing, Carpentersville for Village of Carpentersville (2018-2023)
• New Sidewalk Program, Mt. Prospect for Village of Mt. Prospect (2019)
• CDBD Sidewalks, Mt. Prospect for Village of Mt. Prospect (2019)
• Various Road Rehab, Maintenance, and In -House Paving, Streamwood for Village of Streamwood (2018-2023)
Rubino Engineering, Inc. 1W Page 6
Rubino Engineering Proposal — Village ofMount Prospect 2025 Material Testing Services
Rubino Proposal No.: Q25.034
Related Experience
January 31'`, 202.5
Rubino Engineering, Inc. Iw Page 7
Rubino Engineering Proposal — Village ofMount Prospect 2025 Material Testing Services
Rubino Proposal No.: Q25.034
January 31'`, 202.5
MFT — 2009 — 2021 Road Programs — Crystal Lake, IL
Client:
City of Crystal Lake
Contact:
Mr. Jason MacNally
Phone:
815-459-2020
Project Value:
---- ---- ---- ----
$20,000+
Location
Crystal Lake, Illinois
Performance Period
2009 —2021
Client Type
Municipal
Services Provided
QA Construction Materials Testing and
Inspection Services
Rubino Engineering, Inc. 1w Page 8
lk Mount Prospect
MAYOR VILLAGE MANAGER
Paul Wm. Hoefert Michael J. Cassady
TRUSTEES DIRECTOR OF PUBLIC WORKS
Agostino S. Filippone Sean Dorsey
Terri Gens
John J. Matuszak
William A. Grossi Phone: 847/870-5640
Colleen E. Saccotelli Village of Mount Prospect Fax: 847/253-9377
Vincent J. Dante Public Works www.mountprospect.org
1700 W. Central Road, Mount Prospect, Illinois 60056
REQUEST FOR PROPOSALS
DATE: January 10, 2025
FROM: Matthew P. Lawrie, P.E.
Village of Mount Prospect
Public Works Department
RE: Request for Proposals
Mount Prospect — 2025 Material Testing Services
The Village of Mount Prospect seeks Technical Proposals and Cost Proposals to provide
professional testing services related to construction requirements for the Village of Mount
Prospect.
Attached to this memorandum are:
• Exhibit A: Requirements for Technical Proposal and Cost Proposal
• Exhibit B: General Scope of Work
A cover letter along with a Technical Proposal and Cost Proposal should be emailed to the
following address and received no later than 5:00 p.m. on Friday, January 31, 2025.
Mr. Matthew P. Lawrie, P.E.
Village Engineer
Village of Mount Prospect
mlawrie@mountprospect.org
Phone �..^-�.�,�
�8 0 � uP:�;'e''�d()
ti w
Exhibit A
Requirements for Technical Proposal and Cost Proposal
Agency: Village of Mount Prospect Public Works Department
Project: Mount Prospect — 2025 Material Testing Services
Location: Village of Mount Prospect (various locations)
Your Technical Proposal and Cost Proposal should include the following information:
1. Name, address, and a brief history of firm.
2. Organizational Chart and resumes of key personnel to be assigned to this project.
3. Related experience during the last five years. For example:
a. MFT funded projects where professional testing services were performed.
b. Examples of other projects which are similar in scope. Include the name of the project, a
contact person, and dollar amount for each example.
4. A separate complete cost proposal broken down by task as described in Exhibit B, General
Scope of Work.
1°&°pono M47 056 1.0 AA'kNiN..a"a
Exhibit B
General Scope of Work
Agency: Village of Mount Prospect Public Works Department
Project: Mount Prospect — 2025 Material Testing Services
Location: Village of Mount Prospect (various locations)
Material testing services as shown in the chart below will be required for, but not limited to, the
following:
1. 2025 Street Resurfacing Program —Group 1 and Group 2 (6.8 miles)
a. HMA Jobsite and Plant Quality Assurance
i. Approximate estimate of total HMA binder: 12,200 tons
ii. Approximate estimate of total HMA surface: 9,900 tons
b. PCC Jobsite Quality Assurance
i. Approximate estimate of total concrete: 5,900 cubic yards
2. 2025 Removal/Replacement Sidewalk Program
a. PCC Jobsite Quality Assurance
i. Approximately 10 PCC compressive strength tests.
3. 2025 New Sidewalk Program
a. PCC Jobsite Quality Assurance
i. Approximately 10 PCC compressive strength tests.
Anticipated Tasks:
TESTING SERVICE
UNIT
EST. QUANTITY
Engineering Technician — HMA/PCC Field Inspection
HOUR
250
Vehicle Charge
DAY
70
PCC Compressive Strength Tests (per cylinder)
EACH
240
Cylinder Pickup
TRIP
30
Pavement Cores
CORE
20
Nuclear Density Gauge
DAY
20
Maximum Theoretical Specific Gravity
TEST
4
Bulk Specific Gravity
TEST
4
Binder Ignition / Reflux Extraction
TEST
4
Project Management / Report Review
HOUR
75
1°Ihone M47 0 56,10 IAA�AN.w`a
Material Testing Stipulations:
All work shall conform to IDOT QC/QA requirements, including but not limited to:
a) IDOT Standard Specifications for Road and Bridge Construction (1/1/2022)
b) IDOT Supplemental Specifications and Recurring Special Provisions (1/1/2025)
c) IDOT Project Procedures Guide (12/01/2024)
d) IDOT Manual for Materials Inspection (5/24/2024)
e) IDOT Manual of Test Procedures for Materials (12/1/2022).
• As part ofJobsite QA, the Consultant will provide an individual to act as the QA Manager. The
QA Manager will have at a minimum a HMA Level II Technician certification and PCC Level II
Technician certification.
• Services will be required from approximately March 7, 2025 to December 5, 2025.
• The Consultant will be required to attend the Pre -Construction Meetings for the Group 1 and
Group 2 Street Resurfacing Projects, as well as for the Sidewalk Programs.
• The Engineer will schedule consultant field testing services a minimum of one working day
prior to construction. The Engineer reserves the right to cancel field testing services at any
time, due to weather or unforeseen circumstances, at no expense to the Village.
• Field inspection hours will begin when the Engineering Technician arrives on the jobsite;
inspection hours will end once testing is complete, and the technician leaves the jobsite. The
Engineering Technician shall not exceed 8 hours on site, unless written permission is obtained
from the Village. The Consultant shall submit a field trip ticket to the Village to verify hours
on the jobsite.
• Each PCC compressive strength test shall consist of casting either six 4 x 8 inch or four 6 x 12
inch cylinders. (The quantity assumes use of 4 x 8 inch cylinders) The Consultant shall
coordinate with the Contractor performing quality control testing to determine cylinder size
to facilitate comparison of test results. Cylinders shall be tested 7 days after casting and 14
days after casting. The Consultant shall submit final PCC reports to the Village no later than 7
days after the 14 -day compressive strength test.
• The cost for Cylinder Pickup shall include all labor, vehicles, and materials necessary to travel
to the jobsite, retrieve test cylinders, and deliver the cylinders to the lab.
• The Consultant shall submit final field QA reports to the Village in digital, PDF format within
five (5) working days of the site visit; the Consultant shall submit final laboratory QA reports
to the Village in digital, PDF format within thirty (30) working days of the site visit.
• Pavement Cores will be marked out by the Engineer and a location map will be provided to
the Consultant. The purpose of the coring is to provide information regarding the existing
pavement thickness, pavement condition, subbase thickness and subbase type at each
location. After coring into the existing pavement, core holes shall be patched with full depth
hot -mix asphalt to restore the pavement in kind and meet the existing grade.
The Village reserves the rights to accept or reject any and all proposals, to waive any informality in
any proposals, and to accept any proposals considered advantageous to the Village.
The Village of Mount Prospect appreciates your interest in providing this service. Any questions
regarding this Request for Proposals can be directed to Project Engineer Eric Grzeskowiak, by phone
at 847-870-5640 or email at egrzeskowiak@mountprospect.org