HomeMy WebLinkAbout07/17/2018 VB Agenda PacketBoardDocs® Pro Page 1 of 2
Mo.,a h w»p
3
Tuesday, July 17, 2018
REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m.
Village of Mount Prospect
Village Hall - 3rd floor Board Room
50 S. Emerson Street
Mount Prospect, IL 60056
1. CALL TO ORDER
1.1 ROLL CALL
1.2 PLEDGE OF ALLEGIANCE — Trustee Zadel
1.3 INVOCATION — Trustee Grossi
2. APPROVAL OF MINUTES
2.1 Minutes of the Special Meeting for July 10, 2018
3. MAYOR'S REPORT
3.1 1st reading of an ORDINANCE AMENDING CHAPTER 13 (ALCOHOLIC LIQUORS) OF THE VILLAGE CODE OF
MOUNT PROSPECT. {This Ordinance will increase the number of Class F-8 licenses by one (1) HOMESTEAD
HOSPITALITY GROUP LLC. D/B/A THE RED BARN RESTAURANT & BREWERY located at 303 E. KENSINGTON}
3.2 REAPPOINTMENT TO BOARDS AND COMMISSION — Sandra DiCaro and Christina Greco reappointment to the
Special Events Commission
4. COMMUNICATIONS AND PETITIONS - CITIZENS TO BE HEARD
S. CONSENT AGENDA
5.1 Monthly Financial Report - June 2018
5.2 List of Bills - June 27 - July 10, 2018
6. OLD BUSINESS
6.1 None
7. NEW BUSINESS
7.1 A RESOLUTION APPROVING THE COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM YEAR 2018 ACTION PLAN
7.2 PZ -09-18 / 621 N. Main Street / ALA Architects & Planners, Inc. / 1st reading of AN ORDINANCE GRANTING A
CONDITIONAL USE FOR A DAYCARE CENTER FOR PROPERTY LOCATED AT 621 N. MAIN STREET, MOUNT PROSPECT,
ILLINOIS
7.3 AN ORDINANCE AMENDING CHAPTER 13 "ALCOHOLIC LIQUORS" OF THE VILLAGE CODE OF THE VILLAGE OF
MOUNT PROSPECT TO CREATE LIQUOR LICENSES FOR ESTABLISHMENTS WITH VIDEO GAMING.
In Workflow
Step: 3 of 3
Submitted by: Alex Bertolucci
Waiting for: Michael Cassady
https://www.boarddocs.com/il/vompBoard.nsf/Private?open&login 7/13/2018
BoardDocs® Pro
Agenda Item Details
Page 1 of 1
Meeting Jul 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m.
Category 1. CALL TO ORDER
Subject 1.1 ROLL CALL
Access Public
Type Procedural
Public Content
Administrative Content
Executive Content
https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login 7/13/2018
BoardDocs® Pro
Agenda Item Details
Meeting
Category
Subject
Access
Type
Public Content
Page 1 of 1
Jul 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m.
CALL TO ORDER
1.2 PLEDGE OF ALLEGIANCE — Trustee Zadel
Public
Procedural
Administrative Content
Executive Content
https://www.boarddocs.com/il/vompBoard.nsf/Private?open&login 7/13/2018
BoardDocs® Pro
Agenda Item Details
Meeting
Category
Subject
Access
Type
Public Content
Page 1 of 1
Jul 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m.
1. CALL TO ORDER
1.3 INVOCATION — Trustee Grossi
Public
Procedural
Administrative Content
Executive Content
https://www.boarddocs.com/il/vompBoard.nsf/Private?open&login 7/13/2018
BoardDocs® Pro
Agenda Item Details
Meeting
Category
Subject
Access
Type
Public Content
Page 1 of 1
Jul 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m.
2. APPROVAL OF MINUTES
2.1 Minutes of the Special Meeting for July 10, 2018
Public
Action, Minutes
Administrative Content
Executive Content
https://www.boarddoes.com/il/vomp/Board.nsf/Private?open&login 7/13/2018
BoardDocs® Pro Page 1 of 2
SPECIAL MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m. (Tuesday, July 30, 2018)
Generated by Karen Agoranos on Tuesday, July 10, 2018
1. CALL TO ORDER
Mayor Pro Tem Grossi called the meeting to order at 7:05 PM. Mayor Pro Tem Grossi stated Mayor Juracek is unable to attend
tonight's meeting.
1.1 ROLL CALL
Members present:
William Grossi, Paul Hoefert, Richard Rogers, Colleen Saccotelli, Michael Zadel
Members absent:
Arlene Juracek, Eleni Hatzis
1.2 PLEDGE OF ALLEGIANCE - Trustee William Grossi let the Pledge of Allegiance
1.3 INVOCATION - Trustee Richard Rogers provided the Invocation
2. APPROVAL OF MINUTES
2.1 Minutes of the Regular Meeting of June 19, 2018
Motion by Paul Hoefert, second by Richard Rogers
Yea: William Grossi, Paul Hoefert, Richard Rogers, Colleen Saccotelli, Michael Zadel
Final Resolution: Motion Carries
3. MAYOR'S REPORT
Mayor Pro Tem Grossi thanked all those responsible for the successful 4th of July parade and Lion's Club Festival,
4. COMMUNICATIONS AND PETITIONS - CITIZENS TO BE HEARD
None
S. CONSENT AGENDA
5.1 List of Bills - June 13 - June 26, 2018
5.2 Motion to accept proposal for for design and construction management services for Public Works HVAC replacement not to
exceed $33,550.
Accept the proposal for design and construction management services related to Public Works HVAC replacement as submitted
by CS2 Design Group of Elk Grove Village, Illinois in an amount not to exceed $33,550.
VBA 34-18
5.3 Motion to accept bid for 2018 Streetlight Painting Project in an amount not to exceed $28,578.
Accept the lowest cost, responsive bid for the 2018 Streetlight Painting Project submitted by Bill's Painting & Tuckpointing of
Mount Prospect, Illinois in an amount not to exceed $28,578.
VBA 35-18
5.4 Motion to authorize the Village Manager to execute a settlement agreement in the case of Kraman v. Hoskinson
Authorize the Village Manager to execute a settlement agreement in the case of Kraman v. Hoskinson in the amount of
$145,000.
VBA 36-18
5.5 APPOINTMENT/REAPPOINTMENT TO BOARDS AND COMMISSIONS — Reappointment of Fire Chief Brian Lambel to the
Firefighters Pension Board for a term to expire April, 2021
Motion by Michael Zadel, second by Richard Rogers to adopt the consent agenda as presented
Yea: William Grossi, Paul Hoefert, Richard Rogers, Colleen Saccotelli, Michael Zadel
Final Resolution: Motion Carries
6. OLD BUSINESS
None
7. NEW BUSINESS
None
S. VILLAGE MANAGER'S REPORT
8.1 Motion to accept bid for rehabilitation of 1 million gallon water storage tank at Booster Pumping Station 5 in an amount not
to exceed $533,830.
https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login 7/13/2018
BoardDocs® Pro
Agenda Item Details
Page 1 of 2
Meeting Jul 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m.
Category 3. MAYOR'S REPORT
Subject 3.1 1st reading of an ORDINANCE AMENDING CHAPTER 13 (ALCOHOLIC LIQUORS) OF THE
VILLAGE CODE OF MOUNT PROSPECT. {This Ordinance will increase the number of Class
F-8 licenses by one (1) HOMESTEAD HOSPITALITY GROUP LLC. D/B/A THE RED BARN
RESTAURANT & BREWERY located at 303 E. KENSINGTON}
Access Public
Type Action
Public Content
Information
On Wednesday April 4, 2018, the Village Manager, Assistant to the Village Manager, Executive Assistant, Mount
Prospect Chamber of Commerce President and Community Development Director met with owner Donald Harrington
and Frank Madaras regarding their request for the creation of a new Class "F-8" liquor license for the above
referenced establishment which was previously occupied by "Bogies Ale House". The Class 7-8" license provides for
the full service of alcohol in a restaurant that brews beer on its premise.
The Village first met Mr. Harrington when he opened Bar Louie as General Manager in 2010. While manager he
developed and implemented many of Bar Louie's operational liquor standards, which are still in place today. In
addition, while with Bar Louie Mr. Harrington took an active role in the community and Mount Prospect Chamber of
Commerce.
Mr. Madaras currently possesses three Tax and Trade Bureau (TTB) permits for microbreweries. He owns the Itasca
Brewing Company opened since 2015, with plans for microbreweries located in Arlington Heights and Mount Prospect.
A complete interior renovation of this 10,000 square foot building is currently underway. This rehab will feature two
bars with a multitude of entertainment in the form of a game room that will encompass pool tables, a library of board
games, dart and shuffle boards and live bands on weekends. The idea is to have an inviting atmosphere where
families can come and be social with friends.
The Red Barn will be open daily serving lunch and dinner. The restaurant will feature a full service menu specializing
in BBQ, pizza, burgers and beers. The brewpub will feature 30 taps of macro and micro brews including root beer for
the kids. An August opening is anticipated for the restaurant. Once Mr. Madaras finalizes all state brewery
requirements he will apply for the local Class S-8 brewery license and anticipates the operations of a brewery opening
the end of 2018.
Among the items discussed with the applicant were the requirements of the Village's Liquor Code including the need to
be mindful of sales to minors as well as obviously intoxicated persons. Also discussed was the need for new managers
to be fingerprinted and all employees involved in the delivery of alcohol to complete a certified liquor servers training
course. Per village code, Mr. Harrington has successfully completed a certified liquor servers' training course. The
requirements of the Village's Fight Ordinance were discussed and emphasized was the need for appropriate controls to
be in place to insure that restaurant employees do not inadvertently violate code requirements.
Alternatives
1. Motion to approve the Ordinance
2. Action at discretion of Village Board.
https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login 7/13/2018
r yL M
f
t4C
M C 4. y r
M 1!' i
A ORDO
CODE
■ o, UtO
f VILLA13F
O. r.
VILLAG�■ y� i
Ar r
M
R.y �p BOA r r. Code M R
illyCoUt4 f Licenses
k 13 '� Y w • * w C -f ISG ter 13 0( the '�
rUCenses
oE VT . M '. * •... •
P, -
, COOK
r
shall..
sr.�. Authoritiesith cordaricu e,
dif Liquor
T"a,t inw M' . m '�.
he w iar . Of E
iy,,. 0 ` lasSIM,•
• �e
•Wd inerea
„ «w
*°•. UP ` rI License
auth
Class
p2 Licens
wr w
3 Licenses•r, ss
Five (
T en (10)
ClassP-
Class P" License
One i1)
Zero 40)
C3assF-1 License
Class F-2 License
Zero (0)
Thirteen X10)
Class '. � i�nse
Class 4 License
Five (5)
T'Wenty-five 2)
Ltcanse
class
Ctass F.8 License
One (1)
Three ()
Class Fal License
C1 as F-8 License
-Two (2)
one (1)
Class S.1 License
Cass S-2 Licenses
one (1)S
one 1)
-Licenses
Class S License
Class
One 41)
One S1)
Class S-License
G ass S� .8 License
-zero (0)
One �1)
License'
Ctass S_7 icith conditions as
Class -8 to License)
Five '(8)
Attached
Zero (()) e„ approval,
Zero (0) and eller its assn
full force and effect from
shaft be in rovtded y fay.
TWO. That this Ordtnann the manner p
EEyicati�ran in pamphlet form
and
AYES
NAYS: 92018.
ASSENT: day of �
PASSED and APPROVED this
f�tkaor
ATTEST.
9L
BoardDocs® Pro
Agenda Item Details
Meeting
Category
Subject
Access
Type
Page 1 of 1
Jul 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m.
3. MAYOR'S REPORT
3.2 REAPPOINTMENT TO BOARDS AND COMMISSION — Sandra DiCaro and Christina Greco
reappointment to the Special Events Commission
Public
Action
Public Content
Information
cial (Even Commiis ion
Reappointment:
Sandra DiCaro Term to expire July 2022
116 S. Lancaster
Christina Greco Term to expire July 2022
411 S. Maple
ommendation:
Mayor Arlene Juracek recommends the above -listed individuals be reappointed and feels they will represent the Village
fairly and objectively.
h.fly reappoiintrneirts.gad (37 KB)
Administrative Content
Executive Content
https://www.boarddocs.com/il/vompBoard.nsf/Private?open&login 7/13/2018
Village of Mount Prospect
Mount Prospect, Illinois
INTEROFFICE MEMORANDUM
TO: BOARD OF TRUSTEES
VILLAGE MANAGER MICHAEL CASSADY
VILLAGE CLERK KAREN AGORANOS
SPECIAL EVENTS COMMISSION CHAIRS:
TERESA VANOPDORP-FRED STEINMILLER
FROM: MAYOR ARLENE JURACEK
DATE: JULY 11, 2018
SUBJECT: REAPPOINTMENT TO BOARDS AND COMMISSIONS
I hereby nominate the following individuals for reappointment to the following Board and
Commission:
Special iEvents Commission
Reappointment.-
Sandra
eappointment.Sandra DiCaro
116 S. Lancaster
Christina Greco
411 S. Maple
Term to expire July 2022
Term to expire July 2022
I recommend the above -listed individuals be reappointed and believe they will represent
the Village fairly and objectively.
Q, 944et�
ARLENE A. JURACEK
AJ/dj Mayor
BoardDocs® Pro
Agenda Item Details
Page 1 of 2
Meeting Jul 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m.
Category 5. CONSENT AGENDA
Subject 5.1 Monthly Financial Report - June 2018
Access Public
Type Action (Consent)
Preferred Date Jul 17, 2018
Absolute Date Jul 17, 2018
Fiscal Impact No
Budgeted No
Recommended Action Accept the monthly financial report for June 2018.
Public Content
Information
The monthly financial report contains a Cash Position Report and Fund Financials for the month ended June 30, 2018.
Alternatives
1. Accept the monthly financial report for May 2018
2. Action at discretion of Village Board.
Staff_Recom n ation
Staff recommends the Village Board accept the monthly financial report for June 30, 2018.
Combined Il::i nanurr uan i n p:"D 6 3:I.-2018.iad1f (7 41 KB)
Administrative Content
Executive Content
https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login 7/13/2018
VILLAGE OF MOUNT PROSPECT
BUDGET AVENUE
EXPENDITURE SUMMARIES
June 1— June 30, 2018
Accomt Gass. Ca"o^
Fund 002 - Debt Service Fund
RDIENUE
Property Taxes
Other Taxes
Intergovernmental Revenue
Investment Income
Ocher Revenue
Other Financing Sources
Lo;atg^ B_ C I ['IeC': eo liP'e":t '`r6"t" P-? YTD Bucget - s U `!G Uvec
3(.€cei t?"'E^ "'e'�' v�b et '"sac�or's �- ('il;`ances T.ansac o"?c€c Rec d PC[C_-lea-'-I'
2,380,000.00
.00
2,380,000.00
.00
.00
1,161,758.37
1,218,241.63
49
1,247,493.01
1,012,518.00
.00
1,012,518.00
227,816.55
.00
428,295.12
584,222.88
42
201,763.93
1,618,150.00
.00
1,618,150.00
.00
.00
109,988.37
1,508,161.63
7
123,142.51
1,000.00
.00
1,000.00
774.20
.00
2,318.21
(1,318.21)
232
541.94
.00
.00
.00
.00
.00
.00
.00
+++
.00
.00
.00
.00
.00
.00
.00
.00
+++
.00
REVENUE TOTALS $5,011,668.00
$0.00
$5,011,668.00
$228,590.75
$0.00
$1,702,360.07
$3,309,307.93
34%
$1,572,941.39
Fund 002 - Debt Service Fund Totals $5,011,668.00
$0.00
$5,011,668.00
$228,590.75
$0.00
$1,702,360.07
$3,309,307.93
$1,572,941.39
Z
M 5
z , ,
1, _ rM'
Repoft
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
Mooted
BLdap�
A:-::-_.-Ced
-LN-ent �2o-th
Y -D
YTD
Bucoet - uD
% Usec..'
Account Classification
Budget
Annendmems
Budget
Transactions
Encu- b,.:-:ces
Transactions
Transactions
Rec'd
Prior Year Y. D
Fund 023 -Street Improvement Construc Fund
PREVENIUr
Other Taxes
1,980,000.00
.00
1,980,000.00
353,892.36
.00
843,814.13
1,136,185.87
43
574,366.61
Licenses, Permits & Fees
1,650,000.00
.00
1,650t000.00
45,749.50
.00
1,511,906.50
138,093.50
92
1,533,101.00
Intergovernmental Revenue
.00
.00
.00
22,733.81
.00
22,733.81
(22,733.81)
+++
.00
Fines & Fuifeits
.00
.00
.00
.00
.00
.00
.00
+++
.00
Investmen[ Income
2,000.00
.00
2,000.00
560.26
.00
1,609.15
390.85
80
1,246.36
Reimbursements
.00
.00
.00
.00
.00
.00
.00
+++
.00
Other Revenue
30,000.00
.00
30,000.00
1,592.96
.00
177,716.26
(147,716.26)
592
25,242.63
Other Financing qouices
.00
.00
.00
.00
.00
.00
.00
+++
.00
REVENUE TOTALS
$3,662,000.00
$0.00
$3,662,000.00
$424,528.89
$0.00
$2,557,779.85
$1,104,220.15
70%
$2,133,956.60
Fund 023 - Street Improvement Construc Fund Totals
$3,662,000.00
$0.00
$3,662,000.00
$424,528.89
$0.00
$2,557,779.85
$1,104,220.15
$2,133,956.60
adopted Budget vended Current Porth .r -FD Budget -'y7D % :Used/
Accaunt v_ass `icat or BudgeBudgei Amendments Budget Transact o 's .1noumb2nces Transactions=nsactiors Recd Prior `jean t __ G
Fund 040 use Disposal Fund
REV_NUE
Property Taxes
.00
.00
.00
.00
.00
.00
.00
+++
.00
Charges For Seivices
4,175,000.00
.00
4,175,000.00
487,828.50
.00
2,091,482.94
2,083,517.06
50
2,075,410.12
Fines & Forteits
46,000.00
.00
46,000.00
2,179.34
.00
17,863.49
28,136.51
39
19,030.53
Investment Income
4,000.00
.00
4,000.00
822.74
.00
3,642.06
357.94
91
2,147.89
Reimbursements
1,000.00
.00
1,000.00
270.52
.00
270.52
729.48
27
203.89
Other Revenue
111,000.00
.00
111,000.00
10,614.45
.00
58,843.31
52,156.69
53
73,048.34
REVENUE TO. ALS $4,337,000.00
$0.00
$4,337,000.00
$501,715.55
$0.00
$2,172,102.32
$2,164,897.68
50%
$2,169,840.77
Fund 040 - Refuse Disposal Fund Totals $4,337,000.00
$0.00
$4,337,000.00
$501,715.55
$0.00
$2,172,102.32
$2,164,897.68
$2,169,840.77
51,
Repoft
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
8
;costed
I ucget
fime-re d
L_—e.-:t Monffi
'I Tu
Y
-get - YT
% Usedr
AC -Count Cl ss is -$ Cin
vueget
."endme"E6
Budget
c m br2nces
r a n S a at€,O S
ra Jn5
^R.
Phor Year t D
Fund 042 - CDBG
RF `I=NU
Intergovernmental Revenue
378,666.00
.00
376,666.00
.00
.00
.00
378,666.00
0
41,556.03
Investment Income
.00
.00
.00
.00
.00
.00
.00
+++
.00
Other Revenue
60,000.00
.00
60,000.00
.00
.00
25,000.00
35,000.00
42
59,437.73
<EIf NUE TOTALS $438,666.00
$0.00
$438,666.00
$0.00
$0.00
$25,000.00
$413,666.00
6%
$100,993.76
Fund 042 - CDBG Totals $438,666.00
$0.00
$438,666.00
$0.00
$0.00
$25,000.00
$413,666.00
$100,993.76
8
ACco nt C assiftation
Fund 044 - Federal Equi Ale Share Funds
REVENUE
Repoft
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
eo tec 0 diet ^€nded C_ eat Month
= YT's Budget - --�D % Used/
IILr enceTt cet 3act`o^s =-cu trees —`a^soot` os Tri_act:one Re.'d F o_ lea 0
Fines & Forfeits 1,800.00
.00
1,800.00
M
.00
.00
1,800.00 0
.00
Investment Income 200.00
.00
200.00
6.32
.00
64.77
135.23 32
71.51
REVENUE C`A;S $2,000.00
$0.00
$2,000.00
$6.32
$0.00
$64.77
$1,935.23 3%
$71.51
Fund 044 - Federal Equitable Share Funds Totals $2,000.00
$0.00
$2,000.00
$6.32
$0.00
$64.77
$1,935.23
$71.51
10
Account Olass fcation
Fund 046 - Foreign Fire Tax Board Fund
RE 'E1t E
Ado ted 6_d¢e' Amended _..Lin - Acnth YFO v"` Budget- v 7 !: Used
Burin t Arnendmen Budoe" Trar.s.-ctlons EnCi3mbrances Transactions Transactio^ Recd or "ear YTD
Other Taxes
90,000.00
.00
90,000.00
.00
.00
.00
90,000.00
0
10,322.57
Investment Income
2,000.00
.00
2,000.00
313.54
.00
1,430.41
569.59
72
766.07
Other Revenue
.00
.00
.00
.00
.00
M
.00
+++
.00
Other Financing Sources
.00
.00
.00
.00
.00
,00
.00
+++
.00
REVENUE IOTAS
$92,000.00
$0.00
$92,000.00
$313.54
$0.00
$1,430.41
$90,569.59
2%
$11,088.64
Fund 046 -Foreign Fire Tax Board Fund Totals
$92,000.00
$0.00
$92,000.00
$313.54
$0.00
$1,430.41
$90,569.59
$11,088.64
12
a
Report
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
14
Adooted
Bucket
Amencec
CL "eiit Month
`TD
{TQ
Suceet - "-0
% Usec
Account C:a&s'„ ca cn
OLdget
Amendments
Pr e
—-
;ars mt'v-s
Eel d a^ems
` a-sact'o-s
-ra act one
Fe'd
Fria- Year YTD
Fund 049 -Prospect and Main TIF District
REVENUE
Property Taxes
253,953.00
.00
253,953.00
.00
.00
.00
253,953.00
0
.00
Irivestmentlncome
.00
.00
.00
7,415.75
.00
36,943.19
(36,943.19)
+++
.00
Othei Revenue
.00
.00
.00
33,159.77
.00
33,159.77
(33,159.77)
+++
.00
Other Financing Sources
1,600,000.00
.00
1,600,000.00
.00
.00
7,318,879.30
(5,718,879.30)
457
.00
ps-=r,Us-0-AF5
$1,853,953.00
$0.00
$1,853,953.00
$40,575.52
$0.00
$7,388,982.26
($5,535,029.26)
399%
$0.00
Find 049 - Prospect and Main TIF District Totals
$1,853,953.00
$0.00
$1,853,953.00
$40,575.52
$0.00
$7,388,982.26
($5,535,029.26)
$0.00
14
•.cccunt Classification
Fund 051 - Village Parking System Fund
REVENUE
Other Taxes
Charges For Services
Investment Income
Other Revenue
Other Financing Sources
t '.enr ',jo ni" M ' D B_` ge` - 1M % t -ed/
Budget=1n`end—erts Budciet Transaetons Fncumlrances Transactions Transactions RecA pn--- gear -YTD
.00
.00
.00
.00
.00
.00
.00
+++
.00
193,600.00
.00
193,600.00
14,773.80
.00
97,168.80
96,431.20
50
102,118.60
1,000.00
.00
1,000.00
304.69
.00
1,354.84
(354.84)
135
653.55
3,000.00
.00
3,000.00
274.05
.00
1,446.55
1,553.45
48
1,527.40
.00
.00
.00
.00
.00
.00
.00
+++
.00
REVENUE TOTAFS $197,600.00 $0.00 $197,600.00 $15,352.54 $0.00 $99,970.19 $97,629.81 51% $104,299.55
Fund 051 - Village Parking System Fund Totals $197,600.00 $0.00 $197,600.00 $15,352.54 $0.00 $99,970.19 $97,629.81 $104,299.55
16
77� Z
;7F "It
z
Report
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
18
Adopted
Budaet
Amended
Current Month
YTD
YTID
Budget - 'T`TD
% lised!
A. -Count C'ass ffication
Bwget
Amendments
Budget
ransactions
L ncurnorance-s
an S a --t on. 5
Transactions
Recd
Prior Year YTD
Fund 060 - Vehicle Maintenance Fund
RII
Charges For Services
2,040,827.00
.00
2,040,827.00
170,068.90
.00
1,020,413.40
1,020,413.60
50
1,014,982.02
Investment Income
3,000.00
.00
3,000.00
553.14
.00
2,406.25
593.75
80
1,563.45
Other Revenue
.00
.00
.00
.00
.00
.00
.00
...
.00
Other Financing Sources
.00
.00
.00
.00
.00
.00
.00
+++
.00
—I'VENUE TOTALS
$2,043,827.00
$0.00
$2,043,827.00
$170,622.04
$0.00
$1,022,819.65
$1,021,007.35
50%
$1,016,545.47
Fund 060 - Vehicle Maintenance Fund Totals
$2,043,827.00
$0.00
$2,043,827.00
$170,622.04
$0.00
$1,022,819.65
$1,021,007.35
$1,016,545.47
18
ccLnt CbsSification
Fund 062 - Computer Replacement Fund
R t'ENUE
Report
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
Adopted B-dget A"e-dec CL:--en:t Mont' —D Oudget- D 9% UseC.I
0uager A—,e nCIT. n=s Bwaet —,afacl ons rd mb,a-ces 4r a tions s 'ons Rec` Pno�'.ea-�TID
Charges For Services 205,097.00
.00
205,097.00
17,091.41
.00
102,548.46
102,548.54 50
120,414.54
Investment Income 1,500.00
.00
1,500.00
482.16
.00
2,043.16
(543.16) 136
1,004.22
Other Financing Sources .00
.00
.00
.00
.00
.00
.00 +++
.00
REVENUE $206,597.00
$0.00
$206,597.00
$17,573.57
$0.00
$104,591.62
$102,005.38 51%
$121,418.76
Fund 062 - Computer Replacement Fund Totals $206,597.00
$0.00
$206,597.00
$17,573.57
$0.00
$104,591.62
$102,005.38
$121,418.76
ca
Account Class .: at`on
Fund 070 - Police Pension Fund
REVENUE
Repoft
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
Adopted Budget Amended Current month YTD YTD Budget - YT-- c/e Used/
S dgel Amendmen.v Budget Transactions E---u—B,ances Transactions Transactions Recd nrcrvec _-n
Charges For Seivices .00
.00
.00
.00
.00
.00
.00 +++
.00
Investment Income 5,261,000.00
.00
5,261,000.00
188,503.84
.00
1,260,492.19
4,000,507.81 24
4,397,847.73
Other Revenue 4,484,500.00
.00
4,484,500.00
56,777.77
.00
2,253,252.68
2,231,247.32 50
2,145,636.40
REVENUE OTALa $9,745,500.00
$0.00
$9,745,500.00
$245,281.61
$0.00
$3,513,744.87
$6,231,755.13 36%
$6,543,484.13
Fund 070 - Police Pension Fund Totals $9,745,500.00
$0.00
$9,745,500.00
$245,281.61
$0.00
$3,513,744.87
$6,231,755.13
$6,543,484.13
22
Expense Budget by Account Classification Repoft
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
eco`ed Budget Amended Cwn-e-,t Monlrl k D V O Buece' - ID % Lyse
¢ccou t Cass f c_tion vudoet Amendn ente B_dgE Transactions Encumbrances Transactions Transactions Recd Prior Year'TD
Fund 001 - General Fund
EtPE N S,E
Personal Services, Scheduled Salaries & Wages
26,905,037.00
.00
26,905,037.00
2,048,733.52
.00
12,394,175.72
14,510,861.28
46
12,033,351.97
Employee Benefits
14,494,234.00
.00
14,494,234.00
605,261.99
.00
7,261,040.99
7,233,193.01
50
6,707,650.28
Other Employee Costs
568,539.00
.00
568,539.00
41,237.30
24,654.06
232,365.37
311,519.57
45
236,095.91
Pension Benefits
46,950.00
.00
46,950.00
484.89
.00
2,909.34
44,040.66
6
23,389.80
Contractual Services
8,639,276.00
11,800.00
8,651,076.00
563,569.02
688,107,63
3,561,720.64
4,401,247.73
49
3,864,846.74
Utilities
334,056.00
.00
334,056.00
11,377.03
.00
83,721.55
250,334.45
25
71,156.31
lnswance
417,611.00
.00
417,611.00
34,776.42
.00
208,567.66
209,043.34
50
200,640.52
Commodities & Supplies
754,125.00
3,780.00
757,905.00
68,184.98
35,935.70
339,188.73
382,780.57
49
295,980.62
Other Expenditures
683,456.00
.00
683,456.00
.00
.00
.00
683,456.00
0
503,473.00
Bwlding Improvements
15,828.00
(6,400.00)
9,428.00
3.86
.00
392.16
9,035.84
4
1,551.15
Office Equipment
54,776.00
9,000.00
63,776.00
4,718.50
154.00
14,223.11
49,398.89
23
79,717.55
Other Equipment
253,530.00
6,400.00
259,930.00
13,775.78
39,769.45
125,878.31
94,282.24
64
76,659.78
Distnbuhon Systems
.00
.00
.00
.00
.00
.00
.00
+++
.00
lnfiastructure
898,000.00
162,438.00
1,060,438.00
19,726.51
579,285.89
140,167.35
340,984.76
68
144,495.77
Interfund Transfers
750,000.00
.00
750,000.00
.00
=00
.00
750,000.00
0
.00
EXPENH TOTALS
$54,815,418.00
$187,018.00
$55,002,436.00
$3,411,849.80
$1,367,906.73
$24,364,350.93
$29,270,178.34
47%
$24,239,009.40
Fund 001 - General Fund Totals
$54,815,418.00
$187,018.00
$55,002,436.00
$3,411,849.80
$1,367,906.73
$24,364,350.93
$29,270,178.34
$24,239,009.40
1
account Gassl4ica o-
Fund 020 - Capital Improvement Fund
_IDENSE
q1I 1111111111 11111111111111,1111 111111111! 11111111111
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
Adopted BLdcet Amended Current Month -D 4 7 `3Ldcet - -D /a used:
Budget Amendments Budget Transactions EncLTUra^des Transactions Transactions Recd prior `ear E
ContractualSeivices
78,030.00
110,000.00
188,030.00
.00
75,000.00
.00
113,030.00
40
65,663.80
Other Expenditures
.00
.00
.00
.00
.00
.00
.00
+++
17,351.20
Land Improvements
200,000.00
115,000.00
315,000.00
.00
.00
.00
315,000.00
0
77,566.21
Budding Improvements
480,000.00
58,225.00
538,225.00
983.20
18,661.77
25,972.42
493,590.81
8
120,563.45
Office Egwpinent
.00
.00
.00
.00
.00
,00
.00
+++
.00
Motor Equipment
.00
.00
.00
.00
.00
.00
.00
+++
.00
Other Equipment
412,247.00
.00
412,247.00
10,603.91
.00
128,171.85
284,075.15
31
141,315.08
Infrastructure
1,179,000.00
478,121.00
1,657,121.00
89,016.65
225,655.85
99,132.15
1,332,333.00
20
25,219.30
Interfund Transfers
.00
.00
.00
.00
.00
.00
.00
+++
.00
1XIDENSE `OTAL-
$2,349,277.00
$761,346.00
$3,110,623.00
$100,603.76
$319,317.62
$253,276.42
$2,538,028.96
18%
$447,679.04
Fund 020 - Capital Improvement Fund Totals
$2,349,277.00
$761,346.00
$3,110,623.00
$100,603.76
$319,317.62
$253,276.42
$2,538,028.96
$447,679.04
3
AI-CCLn' L, assl`'cabo-
Fund 024 - Flood Control Construction Fund
E DENSE
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
copied Budget Amerded burr ^t t'or:t D Y UOucdget TD Used/
St^get Ame".`ments Bwoet [r gsactimns Enc_lb`a"ces s.a.-S c ons T--- -ctoi:q kec_d Dr_n. Fear �D
Contractual Services
124,296.00
.00
124,296.00
7,306.62
7,320.50
16,860.62
100,114.88
19
19,532.20
Utilities
2,550.00
.00
2,550.00
1,300.20
.00
1,711.05
838.95
67
957.08
Commodities & Supplies
5,306.00
.00
5,306.00
.00
.00
880.81
4,425.19
17
27.90
Other Expendrtwes
5,306.00
.00
5,306.00
.00
.00
1,000.00
4,306.00
19
440.00
Other Equipment
.00
.00
.00
.00
.00
.00
.00
+++
.00
Distribution Systems
102,000.00
53,775.00
155,775.00
800.00
40,090.00
1,400.00
114,285.00
27
1,012.80
Infrastructure
580,500.00
247,445.00
827,945.00
4,863.57
322,050.69
107,242.07
398,652.24
52
42,252.20
ExE' SE TOTALS
$819,958.00
$301,220.00
$1,121,178.00
$14,270.39
$369,461.19
$129,094.55
$622,622.26
44%
$64,222.18
Fund 024 - Flood Control Construction Fund Totals
$819,958.00
$301,220.00
$1,121,178.00
$14,270.39
$369,461.19
$129,094.55
$622,622.26
$64,222.18
5
Acceu-t C ass `alio-
It 7
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
Adopted Budget Amended Curre-.t MWb YTD YTD Budget - '1—D 9% Used/
Bouget A-e-d^e-ts 3Ldget Transactions Encumbrances ra-S2etc-s Trarsactens RecdYear Prior :ear u --D
Fund 041 - Motor Fuel Tax Fund
XPENSc
Contractual Services
353,111.00
.00
353,111.00
11,307.14
121,422.35
114,364.30
117,324.35
67
71,394.17
Utilities
165,612.00
.00
165,612.00
15,850.02
.00
67,727.83
97,884.17
41
86,817.61
Commodities & Supplies
350,000.00
.00
350,000.00
.00
14,818.97
210,076.48
125,104.55
64
1,949.62
Bwlding Improvements
.00
.00
.00
.00
.00
.00
.00
+++
.00
Infrastructure
600,000.00
330,659.00
930,659.00
14,272.50
168,351.00
767,094.00
(4,786.00)
101
139,620.03
EXPENSs- TC T A.
$1,468,723.00
$330,659.00
$1,799,382.00
$41,429.66
$304,592.32
$1,159,262.61
$335,527.07
81%
$299,781.43
Fund 041 - Motor Fuel Tax Fund Totals
$1,468,723.00
$330,659.00
$1,799,382.00
$41,429.66
$304,592.32
$1,159,262.61
$335,527.07
$299,781.43
7
Account Ciassiticatio-
Fund 043 - Asset Seizure Fund
EXPENSE
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
ccotec Sucuet -ence Curee ' holt Y E Y71D 3ucq-t - Y C� % Used;
Budget "mend -rents Budget T;ansactio-s ncum b rances Tra sactio-s Transactons Re -_`c =riorYea- `i0
Other Employee Costs
1,000.00
.00
1,000.00
.00
.00
.00
1,000.00
0
12,857.70
Contractual Services
15,500.00
.00
15,500.00
.00
.00
7,108.88
8,391.12
46
.00
Commodities & Supplies
24,400.00
.00
24,400.00
957.17
.00
13,066.27
11,333.73
54
.00
Other Equipment
3,000.00
.00
3,000.00
.00
.00
5,857.82
(2,857.82)
195
.00
_X-IENSE TOTALS
$43,900.00
$0.00
$43,900.00
$957.17
$0.00
$26,032.97
$17,867.03
59%
$12,857.70
Fund 043 -Asset Seizure Fund Totals
$43,900.00
$0.00
$43,900.00
$957.17
$0.00
$26,032.97
$17,867.03
$12,857.70
0
Ac€1_n' Cassscation
Fund 045 - DUI Fine Fund
EYE; ti`E
Othei Employee Costs
Contractual Services
Other Egwpment
Interlund Transfers
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
Adopted Budget Amended Current Month YTD Y -FD Budget - ` ? 0/_ Used;`
Budget Amendments budget Transactions E-w—.prances Transactions Tra nsactions Recd Yror Year Y D
1,000.00
.00
1,000.00
.00
.00
.00
1,000.00
0
6,373.29
1,000.00
.00
1,000.00
.00
.00
,00
1,000.00
0
.00
1,000.00
4,000.00
5,000.00
.00
.00
3,330.30
1,669.70
67
917.23
.00
.00
.00
.00
.00
.00
.00
+++
.00
EXPENSE TOTALS $3,000.00
$4,000.00
$7,000.00
$0.00
$0.00
$3,330.30
$3,669.70
48%
$7,290.52
Fund 045 - DUI Fine Fund Totals $3,000.00
$4,000.00
$7,000.00
$0.00
$0.00
$3,330.30
$3,669.70
$7,290.52
11
Expense Budget by Account Classification Repoft
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
Adopted Budge` Amended Cul-ren- Month _ Budget - f % Used/
icvL t �� CCL'?:^: 3 ^ct e^L e a _� dC $ eC,' S _'c c es an _o:ns wSic 4 s cc` C_ Yea'
Fund 048 - Business District Fund
EXPENSE
Bond Puncipal
.00
.00
AO
.00
.00
.00
.00 +++
.00
Interest Expense
1,523,000.00
.00
1,523,000.00
360,057.24
.00
517,168.72
1,005,831.28 34
177,152.68
EXPENSE9GT;FS
$1,523,000.00
$0.00
$1,523,000.00
$360,057.24
$0.00
$517,168.72
$1,005,831.28 34%
$177,152.68
Fund 048 - Business District Fund Totals
$1,523,000.00
$0.00
$1,523,000.00
$360,057.24
$0.00
$517,168.72
$1,005,831.28
$177,152.68
13
Fund 050 - Water and Sewer Fund
EXP-' SE
1111 1 1 loll
111 111 lillillilillill Pill iiiiiiiiii
�
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
Adoptec Budget Arne -decd Current -Month '`TD �D BL act - Y -D % Used,
=_t{�G CarBudget Ame-d-nq B,caet "sa.01. .ub. 4r�auy
Personal Services, Scheduled Salaries & Wages
2,318,148.00
.00
2,318,148.00
168,384.54
.00
1,111,414.80
1,206,733.20
48
946,179.23
Employee Benefits
929,223.00
.00
929,223.00
108,370.48
.00
495,239.86
433,983.14
53
400,373.41
Other Employee Costs
43,599.00
.00
43,599.00
4,961.79
1,674.50
30,311.55
11,612,95
73
30,037.24
Contractual Services
8,885,882.00
.00
8,885,882.00
788,280.13
219,759.61
3,658,044.37
5,008,078.02
44
3,412,269.07
Utilities
171,292.00
.00
171,292.00
15,039.94
.00
58,617.58
112,674.42
34
59,365.93
Insurance
94,942.00
.00
94,942.00
7,911.84
.00
47,471.04
47,470.96
50
50,021.04
Commodities & Supplies
329,969.00
.00
329,969.00
13,026.79
40,966.22
54,833.02
234,169.76
29
116,688.63
Other Expenditures
.00
.00
.00
.00
.00
.00
.00
+++
.00
Buildings
.00
.00
.00
.00
.00
.00
.00
+++
.00
Building Inproveinents
70,000.00
.00
70,000.00
.00
4,800.00
1,450.00
63,750.00
9
.00
Office Equipment
1,060.00
.00
1,060.00
.00
.00
.00
1,060.00
0
326.19
Other Equipment
172,381.00
101,000.00
273,381.00
22,830.00
7,468.00
74,395.31
191,517.69
30
101,151.09
Drstiibutron Systens
5,462,414.00
242,500.00
5,704,914.00
42,806.74
1,633,103.94
185,005.06
3,886,805.00
32
282,808.24
Infrastructure
10,000.00
.00
10,000.00
.00
.00
.00
10,000.00
0
.00
Bond Principal
115,000.00
.00
115,000.00
.00
.00
.00
115,000.00
0
.00
Interest Expense
182,546.00
.00
182,546.00
.00
.00
74,297.58
108,248.42
41
.00
Interfund Transfers
.00
.00
.00
.00
.00
.00
.00
+++
.00
E\P:=-1SETO:.I=S
$18,786,456.00
$343,500.00
$19,129,956.00
$1,171,612.25
$1,907,772.27
$5,791,080.17
$11,431,103.56
40%
$5,399,220.07
Fund 050 - Water and Sewer Fund Totals
$18,786,456.00
$343,500.00
$19,129,956.00
$1,171,612.25
$1,907,772.27
$5,791,080.17
$11,431,103.56
$5,399,220.07
15
Account Cla=s f ca ;;,r
Fund 052 - Parking System Revenue Fund
��?ERCE
Expense Budget by Account Classification Report
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
cootee Buds et rmended cuere t Month v �O Bdo E`'YTn
Used.
Budget rerdrrents s- d^n' Tra-saci o -s Br cumbrance_ Trarsac Ions Transactlor s Recd Pr o- ear O
-�_
Personal Services, Scheduled Salaries & Wages
28,275.00
.00
28,275.00
2,114.82
.00
13,456.21
14,818.79
48
12,489.09
Employee Benefits
13,097.00
.00
13,097.00
1,008.72
.00
6,435.15
6,661.85
49
5,991.92
Contractual Services
108,898.00
.00
108,898.00
1,080.04
9,681.61
28,660.13
70,556.26
35
31,992.56
Utilities
11,387.00
.00
11,387.00
365.62
.00
2,308.63
9,078.37
20
2,760.09
Insurance
967.00
.00
967.00
80.58
.00
483.48
483.52
50
691.02
Commodities 3 Supplies
10,585.00
.00
10,585.00
213.45
.00
213.45
10,371.55
2
1,692.25
Other Expenditures
.00
.00
.00
.00
.00
.00
.00
+++
.00
Buildings
.00
.00
.00
.00
.00
.00
.00
+++
.00
Building hnprovernents
.00
.00
.00
5,773.75
23,560.00
9,783.35
(33,343.35)
+++
.00
Interfund Transfei s
.00
.00
.00
.00
.00
.00
.00
+++
.00
EX=E :SE `0T Ls
$173,209.00
$0.00
$173,209.00
$10,636.98
$33,241.61
$61,340.40
$78,626.99
55%
$55,616.93
Fund 052 - Parking System Revenue Fund Totals
$173,209.00
$0.00
$173,209.00
$10,636.98
$33,241.61
$61,340.40
$78,626.99
$55,616.93
17
Account Classllica."o.n
Fund 061 -Vehicle Replacement Fund
EXPENSE
Expense Budget by Account Classification Report
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
Adopted vu_get Amendea C_`=ent Month D D 3_dget - r D % tlsed
3udeet Amendments 0udget Transactions Enoumorances Transaotlons Transa tlorrs Recd °r or ea ``_
Other Expenditwes .00
.00
.00
.00
.00
.00
.00 +++
.00
Motor Egwpineiit 2,386,000.00
572,446.00
2,958,446.00
7,501.59
1,093,710.15
75,119.03
1,789,616.82 40
1,419,829.71
Interfund Transfers .00
.00
,00
.00
.00
.00
.00 +++
.00
E\DENS T OTA:S $2,386,000.00
$572,446.00
$2,958,446.00
$7,501.59
$1,093,710.15
$75,119.03
$1,789,616.82 40%
$1,419,829.71
Fund 061 -Vehicle Replacement Fund Totals $2,386,000.00
$572,446.00
$2,958,446.00
$7,501.59
$1,093,710.15
$75,119.03
$1,789,616.82
$1,419,829.71
19
Account Classification
Fund 063 - Risk Management Fund
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
dmpted Budget tamemdedCurrent Month ,`TO � C Budget - YfI) % Usedi
Budget Amendments Budget Transactions=ncumurances Transactions Transano s oi- .._.
Re --'d "TO
EXPENSE
Contractual Services
27,000.00
.00
27,000.00
.00
.00
.00
27,000.00
0
9,800.00
Insurance
8,566,338.00
.00
8,566,338.00
752,677.93
.00
5,438,028.76
3,128,309.24
63
4,529,961.26
Commodities & Supplies
20,000.00
.00
20,000.00
824.85
.00
1,520.35
18,479.65
8
2,452.13
Other Equipment
.00
.00
.00
.00
.00
1,112.65
(1,112.65)
+++
.00
Interlund Transfers
.00
.00
.00
.00
.00
.00
.00
+++
.00
EX EtbSETOTA_5
$8,613,338.00
$0.00
$8,613,338.00
$753,502.78
$0.00
$5,440,661.76
$3,172,676.24
63%
$4,542,213.39
Fund 063 - Risk Management Fund Totals
$8,613,338.00
$0.00
$8,613,338.00
$753,502.78
$0.00
$5,440,661.76
$3,172,676.24
$4,542,213.39
21
Account
Clay _'c e
Expense Budget by Account Classification Report
Through 06/30/18
Prior Fiscal Year Activity Included
Summary Listing
Adopted Budget Ame;-ded Cu--er' Monih Y"Q 17D B_dget - VTD % Used./
Budget Amendments BLcget T rrsa t' rs Erc mt anCes e s ct=ens T r a; t ors ReCd P -'c- Year � D
Fund 071 - Fire Pension Fund
EXPENSE
Pension Beiiefits
5,601,610.00
.00
5,601,610.00
489,761.51
.00
2,916,659.09
2,684,950.91
52
2,671,650.39
Contractual Services
133,500.00
.00
133,500.00
3,405.00
.00
53,244.17
80,255.83
40
45,980.59
Insurance
15,000.00
.00
15,000.00
.00
.00
.00
15,000.00
0
.00
Commodities & Supplies
100.00
.00
100.00
.00
.00
.00
100.00
0
.00
Other Expenditwes
10,000.00
.00
10,000.00
.00
.00
8,190.00
1,810.00
82
8,795.00
EXPENSE TC ALS $5,760,210.00
$0.00
$5,760,210.00
$493,166.51
$0.00
$2,978,093.26
$2,782,116.74
52%
$2,726,425.98
Fund 071 - Fire Pension Fund Totals $5,760,210.00 $0.00 $5,760,210.00 $493,166.51 $0.00 $2,978,093.26 $2,782,116.74 $2,726,425.98
Grancl Totals $123,691,763.00 $2,505,254.00 $126,197,017.00 $8,707,107.41 $8,016,976.23 $55,072,942.99 $63,107,097.78
23
$46,682,604.78
'y;uow ay; Jo; 8Zl,' l,60' l,$;o assajoep a sl sly! '6ZL' 6 6 '69$ pale;o; 08 aunt ;e s;uaLu;sanu! pue
yseo 'L98'Z09'09$ mann l,£ AeW ;e spun3 esljdj9;u3 pue le;u9Luw9no0 SOI s;uaw;sanu! pue yseo Ie;ol
,uollllw Z*g$ aje 08 aunt Je s;uaw;sanu! le;o1 -sesodind moll yseo jo; papeau sl;eynn anoge spun;
snldjns 6ul;s9nu! spun3 eldl;Inw ui aplsaj spun3 asljdj9;u3 pue le;uawuaano0 ay; u! Jo; pa;un000e s,(]o
PUB sa;oN -uolll!w £'(.$;o yseo 01 Ino jajsuej; a osle Senn ajayl -£gg'"$ Senn awooul;uaw;sanu! 'aunt
;o y;uow ay; 6uun(] '£66' l,OVL$ mann 6£ ABIN ;e spun3 asudja;u3 pue Ie;uaww9no0 ay; u! s;uaw;sanul
,uolll!w Z,£9$ mann 0£ aunt ;e s;ualenlnbe yseo pue
yseo '608' 6 l,$ pale;o; yseo o; suol;onpaj jay;o al!gm LZ£'£9$ pale;o; A;!nl;Oe pun}ia;ui woj; bul;lnsai snnogul
'Z£6'61?9'6$ mann sesuedxa IlojAed 994oldwe pue 9L8'£LO'9$ mann sJopuan o; s;uawAed ';unowe sly; ;0
'L00'£Z9'9$ pale;o; aunt 6uunp s;ualenlnbe yseo pue yseo u! suol;onpa�l .uollllw £' l,$;o s;uaw;sanu! waJ
u! Ja;suej; a osle seen ajayl 7768$ Senn awoOul;uaw;sanul pue Z89'99£'9$ pale;o; s;dlaoaj yseo 'aunt
6uljn(] -uolll!w 6-£9$ seen L£ AeW ;e s;ualenlnbe yseo pue yseo - spunq asljdja;u3 pue Ie;uawuJanoC)
-ueld
uol;esuedwoo elglxell gZl, uol;oas a o;;uensind suol;onpap llojAed aa/loldwe Jo; s;un000e puna nna3s3
dwoo x(]13 ay1 -s;uawanadwl 011gnd ;o uol;aldiuoO ainsue o; 96ellln ay; Aq play s;lsodep algepun;aj
jol s;un000e punk ;!soda(] nnw3s3 all 'spun3 nna3s3 dwoo xa13 pue ;!soda(] mOJ3s3 ay; apnloul
spun; Aouabe ay; ellynn (,sja;y6gan3 pue aollod) suolsuad A;ajes ollgnd onn; s,96ell!A ay; apnloul spun;;snjl
-spun3 6ulNaed (Z) onn; pue punk jannaS/ja;eM ay; jo;slsuoo spun3 esljdaa;u3 ayl
-spun3 eoweS lewa;ul pue spunk ;Oafaad le;ldeo 'spun] aolniaS ;q9(] 'spunk anuana�I IeloedS 'punct
le.ieua0 ay; apnloul spun} le;uaww9no0 spun; Aoua6e pue;sni; pue spun; asudja;ua pue Ie;uaww9no6
Aq ;no ueNojq 96ell!A ay; Jo; s;uaw;Sanu! pue yseo ;o tiewwns paIle;ap a sapino.id :Podai sly!
,p a e spun ', IIS" —:polae8 uol;l Od Iuaut; OAU! pue yseo
'96e1ln ay; 10 uol;lsod yseo ay; uo
Ile;ap jaq:pn; jo; snnollo;;ey; Aiewwns ay; peal aseald -Aluo 6ulpunj nnojose pue uolsued jo; pa;oli;sai aie
Aeq_L -suol;eaado 96eIIln Jo; alglssaooe spun;;ou aie asay; ':podaj uol;!sod yseo ay; u! spun] Aouebe pue
;sni; ay; papnloui aney am y6noy;Ie1ey; a;ou o;;ue}iodw! sl ;I spun; Aoue6e pue;snu; pue spun; aslidia;ue
PUB Ie;uaww9no6 Aq unnop ua�aq ule6e s;uaw;sanul;o;sll ay; s;uesaid;uawa;e;s pily; ay1 ads(; pun; Aq
uol;lsod yseO s,96ellln ay; s;uesaid ;uawa;e;s puooes ay1 spun; /louabe pue ;sna; pue spun; asudia;ue
PUB le;uawwan06 Aq unnop uaiIaq uol;!sod yseo s,96ellln ay; s;uesaid ;uawa;e;s ;sill ayl anlaOaJ
nog( sll!q;o 6ul;sll pue tiewwns ajn;lpuadxe pue anu9n9J196pnq ay;;uawalddns o; papua;ui aie pue pa;ou
a;ep pug y;uow ay; ;o se uol;!sod yseo s,96e11ln ay;;o;oysdeus a apinoid s;uawa;e;s asay! '840Z '0£
aunt Papua y;uow ay; Jo} 96ellln ay; ;o s;uawa;e;s;uaw;sanu! pue uol;lsod yseo ay; aje o;ajay payOe;;y
860Z 3Nnr—1210c! ] IVIONVNl3 AIH1NOIN d03rens
860Z'zl,Ai if :31` G
210103&0 30NVN13 IMMAJ
NOISSIWWOO 30NVNIJ
S931Sf121130 auvo8 (]NV 1N3(]IS321d 39VIIIA :01
Wfl(INVHOWHN H3I33O'HaINII
F IL s!ou!III `Iaadso.ad;unoW
laadmid JunOW Jo a2l"IIiA
Monthly Financial Report — June 2018
July 12, 2018
Page 3
$136,102,320 invested in a combination of fixed income and equity instruments. A detail list of holdings is
included with this report. Escrow refunds are processed two times per month. Investment of the Village's
pension funds is governed by an Investment Policy adopted by each Pension Board.
Investments for the Police and Firefighter Pension Funds consist of various fixed income securities as well
as equity mutual fund accounts. Wells Fargo is the third -party holder of the fixed income securities. The
funds are managed by three investment management firms, Galliard, Segall Bryant and Mesirow Financial.
Segall Bryant holds approximately half of the fixed income investments for the two pension funds while
Galliard and Mesirow manage the balance of fixed income investments for these two funds. Each manager
maintains a small portion of their portfolio in cash to help facilitate liquidity and trading.
Investments in equities consist of mutual funds spread across various sectors (small, mid and large -cap
stocks) as well as investment philosophies (value, core and growth). The funds also invest a small amount
in international stocks. Each year the investment mix is evaluated for optimal diversification to meet pension
fund investment policy goals and objectives. Equity investments held by the Police Pension Fund are
managed by Sawyer Falduto Asset Management. A breakdown of where pension funds are invested is
included with this report.
Conclusion
This cash position report is intended to provide a snapshot of the Village's cash position as of a particular
month end date. Using this report, we are able to provide trend information to support cash management
and maximize investment earnings while ensuring availability of funds to meet the Village's commitments.
This report is provided to the Village Board and Finance Commission on a monthly basis. Please do not
hesitate to contact me with any questions.
David O. Erb
Finance Director
VILLAGE OF MOUNT PROSPECT
GOVSRNI
MENTAL AND EN: aR°YISL FUNDS
TRUST A C AGEN- � lfe
�? Oi e
CAPITA.
-_ v { €
€`RE ANO
OTHER T=..€_ib-
R-`=V,'
ucr
PROJECT
TisSP=
L > TS
Pt[OFOG
AGENCYFRR
f
FUND
FUND
UNs�
UND
FUNDS
SERVICE FUNDS
FUNDS
PENSIONS
FUNS
TOTAL
CASH TEWAL
_.
_
T e=_e s a-nvesn-ents
3.995,6
� «
F_
= e
ansfels;a v sere—td
___
_ _<
DisbusemeP*d-o'lle`
__--fit
,-rG 08,
-
_�
-
Disbul-se,mentflex(. penc! rg
-
>
_
s
s
J-
DSbv—seen _.'s a3'"_
-F, ,
:. �:�: 921
-
`_" -.
9--
.'3i
.a 56'1
s'a Csz;C" _-4 EcCc7L€':is payabie
'- C9v =,
''39 8,458 9
-_€
t
�KG 842--
-_
r
�73___ 7
8,3'65-31
--
- - _
d- a
-4,845,55-1
.3 is
3
a ,
-
-8
}<
-
adv 99
[NV=ST ENTS
IV: S T-easur. anc -'gercv Notes a -d
# [Rates of Deposit
J. 472,f!62 uv
2 _ _- �.
6.:92.., €J 22
n els I':2,90 ;-vest-_or-°s
_
..
_
451 139 537 Gn
i fu t v ;.--Lilts
9--962,7K, 71
Ln
TOTAL CASH AND INVESTMENTS
$ 17,318.013.72
$ 9,894,350.15
$ 1,582,791.50
$ 4,433,840.16
$ 14,235,047.62
$ 11,947,685.70
59,4-1,728-85
$137.934.158.77
$ 1,205,377.78
$198,551,265.40
=is €s arms
BoardDocs® Pro
Agenda Item Details
Page 1 of 1
Meeting Jul 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m.
Category 5. CONSENT AGENDA
Subject 5.2 List of Bills - June 27 - July 10, 2018
Access Public
Type Action (Consent)
Public Content
Information
Please find the attached list of bills for July 10, 2018,
Alternatives
1. Approve List of Bills for July 10, 2018.
2. Action at discretion of Village Board.
Staff RgpQ- ,m-endation
Approve List of Bills - June 26 - July 10, 2018 - $1,047,120.73,
Administrative Content
Executive Content
All items under Consent Agenda are considered routine by the Village Board and will be enacted by one motion. There
will be no separate discussion of those items unless a Board member or member from the audience so requests, in
which the item will be removed from the Consent Agenda and considered in its sequence on the agenda.
https://www.boarddoes.com/il/vomp/Board.nsf/Private?open&login 7/13/2018
VILLAGE OF MOUNT PROSPECT
List of Bills
June 27 - July 10, 2018
Fund Vendor Name
Invoice Description
Amount
001 General Fund
A & J Sewer Service
Equipment Maintenance
$ 315.00
Equipment Maintenance
315.00
Equipment Maintenance
315.00
ACS State & Local Government Solutions
Illinois State Disbursement Unit
5,449.46
Active Alarm Company, Inc.
3rd qtr. alarm monitoring at the CCC
73.50
Air Comfort Corporation
HVAC repairs
1,385.00
Air One Equipment, Inc.
Wang Helmet Repair
88.00
MSA TIC Lanyard
235.00
Airgas, Inc.
Oxygen
356.33
Allscape, Inc.
Turf Mowing
9,103.50
Alpha Prime Communications
Radio Antenna for station 12 consolette
1,416.00
American Landscaping Inc.
Grass cutting -304 N. Elm
100.00
Grass cutting - 311 S. Albert
180.00
Grass Cutting - 1425 Birch
528.00
Grass Cutting - 1620 Burning Bush
1,380.00
American Soccer Company, Inc.
Soccer equipment for Kickin' It with the Cops program
457.64
Angarola, Michael
Reimburse training expenses 06/06-07/18
24.00
Arlington Power Equipment
Saw chain
256.99
Arrowhead Scientific Inc.
ET Supplies
464.10
Baudville, Inc.
Office Equipment
2,485.74
Bear Estates #1, LLC
Prisoner meals - May, 2018
168.22
Bedco Mechanical
HVAC repairs
562.35
HVAC repairs
310.50
HVAC repairs
287.50
HVAC repairs
2,624.10
HVAC repairs
994.65
HVAC repairs
325.10
HVAC repairs
345.00
Black Cow Kitchen & Bar Inc.
Employee Recognition 6/27/18
400.00
Bound Tree Medical, LLC.
Ambulance first in bags, megamover chairs
700.18
Brown, Christina
Transfer Stamp Rebate
856.00
Canon Financial Services, Inc.
Copier Lease Payment
210.23
Cardinal Fence & Supply Inc.
Equipment Maintenance
564.00
Carioti, Francis
Edit Mount Prospect Update
160.00
Edit Mount Prospect Update
128.00
CBS Awards
Retirement plaque
70.00
Retirement plaque
70.00
CDW LLC
Surface Pro Adapters
252.06
Surface Ruggedized Cases
108.76
Checkpoint Press
Firefighter/Paramedic Recruitment Listing
298.00
Chem -wise Ecological Pest Mgmt. Inc.
Pest Control
215.00
Pest Control
30.00
Pest Control
215.00
Pest Control
30.00
Chen, Paul
Refund Overpayment Police Ticket #P3962479
30.00
Chief Supply Corp.
Traffic templates
140.99
Clifford -Wald & Co., Inc. - A KIP Company
Equipment Maintenance
65.00
Crystal Maintenance Services Corp.
Custodial Services
7,474.56
CVS Pharmacy, Inc.
Prisoner medication #18-7032
11.99
Dennison Leafblad, Deborah
Camera Operator 4th of July
300.00
Dynegy Energy Services, LLC
Electrical Service Delivery
312.44
Eckert, Lisa
Ad Design for Journal & Topics
1,825.00
Designs of Ads, Poster, and banners
1,400.00
Design & Layout May/June Newsletter
2,020.00
Design & Layout July/August Newsletter
1,995.00
Design of Event Logo
350.00
Eldredge, Candace
Garnishment
706.15
Equipment Management Company
Annual service on extrication equipment
1,446.20
Page 1 of 9
VILLAGE OF MOUNT PROSPECT
List of Bills
June 27 - July 10, 2018
Fund Vendor Name
Invoice Description
Amount
McKesson Medical -Surgical Inc.
Inv. 29634991- Cholesterol Supplies
249.46
Melendez, Jose
Reimburse expenses: Basic ET course 06/18-22/18
60.00
001 General Fund (continued)
Menard Inc.
Building Maintenance
47.65
Maintenance and Repair Supplies
56.90
Power supply cord
7.99
Street Basin Supplies
50.67
Metro Door and Dock, Inc.
Door repairs at PW
762.23
Door Maintenance - Door #52-72
1,682.84
Metro Federal Credit Union
MP Fire Local 4119 Dues
2,433.28
Metropolitan Alliance - Police
MP Police Association Dues
1,338.00
Michael Wagner & Sons, Inc.
Maintenance and Repair Supplies
7838
Maintenance and Repair Supplies
41.64
Mobile Print Inc.
Trading cards of K-9 Unit
189.15
Calibration charts
89.24
Business Cards - Allen
106.70
Field Contact cards
122.00
Municipal Emergency Services, Inc.
Cassidy Gear
1,816.00
Murillo, Daniel
Refund Vehicle Sticker Fee & Refund Police Ticket #P3962377
25.00
Nationwide Mutual Insurance Company
Nationwide 457
14,584.19
Neopost USA Inc.
Postage Machine Replenishment -7/5/18
3,000.00
NICOR
1709 - 5/21- 6/20/18 - Acct: 03-35-77-9926 5 -
28.47
1711- 4/20 thru 6/20/18 - Acct: 97-78-90-2800 4
61.92
1713 - 4/20 thru 6/21/18 - Acct: 04-18-88-1317 6
65.62
Northeastern III. Regional Crime Lab
Membership assessment & maintenance agreement
43,879.00
Northshore University Healthsystem
Medical exam
453.00
0 & R Medical Sales and Service
Inv. 25425 - INR Supplies
231.70
Inv. 25516 - INR Supplies
228.00
Oliva, Rolando
Transfer Stamp Rebate
680.00
Oriental Trading Co. Inc.
Special Events Supplies
376.15
Paddock Publications, Inc.
PZ -9-18 legal notice
87.75
Panzica, Nicolas
Transfer Stamp Rebate
330.00
Pesche's Flower Shop
Flowers/Tree Replacement
27.93
Petty Cash
Petty Cash - June 2018
123.65
Petty Cash June 2018B
3.93
Police Pension Fund
Police Pension
31,064.79
Popovici, Florentina
Refund Ched Permit Fee (Permit R618-0948)
75.00
Prosafety, Inc.
Custodial Supplies
209.50
Other Employee Expenses
75.00
Ray O'herron Co., Inc.
Patch replacement
24.00
Uniform supplies
135.42
Rebel's Trophies, Inc.
Retirement Service Plaques
125.00
Retirement Service Plaque
35.00
Rhode, Diane
Reimburse expenses: Police/Fire picnic
93.00
Rose City Label
Police patch stickers
418.61
Russo Hardware, Inc.
Lawn Care Equipment
342.99
Salveo Inc.
Recording postage 6/25/18
9.63
Postage
10.59
Schaps, Lee
Reimburse clothing expenses
81.99
Schroeder, William
WMS Misc. Expenses
936.41
State of Illinois
Monthly Internet
724.00
Steiner Electric Company
Street Light Supplies
257.64
Sterling Codifiers, Inc.
Recording
1,726.00
Steve Piper & Sons, Inc.
Parkway Tree Stump Removal
4,489.92
Parkway Tree Stump Removal
2,705.58
Parkway Tree Stump Removal
3,260.34
Systems Forms, Inc.
Inspection Report Forms
517.92
Operating license reply envelopes
220.00
Reply envelopes rental license
220.00
Page 3 of 9
VILLAGE OF MOUNT PROSPECT
List of Bills
June 27 - July 10, 2018
Fund Vendor Name
Invoice Description
Amount
ICMA Retirement Trust - 457
ICMA 457
35.00
Illinois Department of Revenue
IL State Withholding
456.43
Internal Revenue Service
Federal Withholding
2,781.68
International Union of Operating Engineers
IUOE PW Membership Dues
129.77
040 Refuse Disposal Fund (continued)
Jakupovic, Kristina
Reimbursement
148.35
KC Printing Services Inc.
HHW Mailing
1,889.03
Nationwide Mutual Insurance Company
Nationwide 457
222.16
RHW Customized Graphics & Promotions
Special Events Supplies
1,057.33
Special Events Supplies
244.97
Third Millennium Assoc.inc.
06-15-18 & 06-30-18 Utility Bills
848.23
Village of Mount Prospect
Flex - Medical
182.30
040 Refuse Disposal Fund Total
$
8,073.71
041 Motor Fuel Tax Fund
Dynegy Energy Services, LLC
Electrical Service Delivery
$
15,596.36
Electrical Service Delivery
253.66
H & H Electric Co
Traffic Signal Maintenance
219.92
Traffic Signal Maintenance
414.67
Traffic Signal Maintenance
2,377.50
Hampton, Lenzini and Renwick, Inc.
Central Road Street Lighting
10,675.50
041 Motor Fuel Tax Fund Total
$
29,537.61
042 CDBG
Illinois Department of Revenue
IL State Withholding
$
86.03
Internal Revenue Service
Federal Withholding
427.60
King, Robert
2nd draw on Birch Manor 748-745 Dempster
15,000.00
1st draw on Birch Manor 754-762 Dempster
10,000.00
042 CDBG Total
$
25,513.63
043 Asset Seizure Fund
Scientific Animal Feeds
Supplies for K-9 Alex
$
44.79
043 Asset Seizure Fund Total
$
44.79
045 DUI Fine Fund
International Association of Chiefs of Police
Register for training class
$
550.00
045 DUI Fine Fund Total
$
550.00
046 Foreign Fire Tax Board Fund
Tivlin Holdings, Inc.
Gold Leaf lettering for new engine 516
$
952.28
046 Foreign Fire Tax Board Fund Total
$
952.28
050 Water and Sewer Fund
Burns & Mcdonnell Engineering Co.
Water distribution tank repair
$
5,339.68
Professional Engineering
3,399.73
Christine Moore
Utility Refund - 204 S Edward St
56.67
Ciorba Group Inc.
Sewer Lift Station Rehab
8,584.54
Dynegy Energy Services, LLC
Electrical Service Delivery
6,340.67
Giant Maintenance & Restoration, Inc.
Hydrant Painting
19,657.00
Guitar Center Stores, Inc.
Maintenance and Repair Supplies
387.17
HBK Water Meter Service
Meter Installation
9,231.00
Meter Installation
8,952.54
Meter Installation
1,845.34
HD Supply Facilities Maintenance LTD
Maintenance and Repair Supplies
631.79
Home Depot U.S.A., Inc.
Maintenance and Repair Supplies
327.17
ICMA Retirement Trust - 457
ICMA 457
1,230.47
Illinois Department of Revenue
IL State Withholding
3,706.81
Internal Revenue Service
Federal Withholding
21,796.31
International Union of Operating Engineers
IUOE PW Membership Dues
1,209.66
Page 5 of 9
VILLAGE OF MOUNT PROSPECT
List of Bills
June 27 - July 10, 2018
Fund Vendor Name
Invoice Description
Amount
Arlington Heights Ford
2732 hub lock
193.19
P-35 door lock lever
12.83
4503 hub assembly
189.23
4503 hub vacuum valve
68.27
P-9 bracket and bolts
28.18
Arlington Power Equipment
Vehicle Maintenance Supplies
192.43
060 Vehicle Maintenance Fund (continued)
Bamjak Inc.,
Heat shrink tubing
97.80
Fuel Hose
47.55
4558 U -bolts
5.96
P-54 headlights
19.20
Chicago Parts & Sound LLC
Vehicle Maintenance Supplies
78.32
2758 HVAC actuator
36.13
2758 throttle pedal
95.55
Cabin filters
57.00
Oil & air filters
86.64
P-9 axle shaft
156.88
Elliott Auto Supply Co, Inc.
Vehicle Maintenance Supplies
58.14
Vehicle Maintenance Supplies
299.50
Fleetpride, Inc.
Vehicle Maintenance Supplies
117.21
Vehicle Maintenance Supplies
42.80
Global Emergency Products
517 transmission oil cooler
2,190.12
ICMA Retirement Trust - 457
ICMA 457
1,450.00
Illinois Department of Revenue
IL State Withholding
1,623.13
Internal Revenue Service
Federal Withholding
9,253.61
International Union of Operating Engineers
IUOE PW Membership Dues
623.60
Interstate Battery of Western Chicago
2741 battery
173.95
Kelley Williamson Co.
Maintenance and Repair Supplies
186.45
Leach Enterprises, Inc.
Vehicle Maintenance Supplies
86.13
Liberty Automotive Technologies, LLC
Vehicle Maintenance Supplies
343.50
Mcmaster-carr Supply Co.
516 chain
52.33
Stainless screws
34.23
Stainless pan screws, washers and lock nuts
154.40
Hose Fittings
114.87
Key fob Batteries
18.96
Velcro
338.12
Washers and spacers
44.92
Napleton's Arlington Heights Motors Inc.
P-7 fuel pump o -ring
27.60
P-7 fuel pump
345.60
NCH Corporation
Maintenance and Repair Supplies
433.95
Overhead Material Handling II., Inc.
Vehicle Maintenance Supplies
266.43
Emergency Repair
618.03
Patlin Incorporated
Bolts, nuts and washers
251.00
Pomp's Tire Service, Inc.
Vehicle Equipment Maintenance
533.56
4550 Tire repair
45.00
Ronco Industrial Supply
Maintenance and Repair Supplies
186.00
Rubber Inc.
Vehicle Maintenance Supplies
456.09
Rush Truck Centers of Illinois, Inc.
Vehicle Maintenance Supplies
953.55
Credit
(949.07)
Sanders Hardware Supply
Vehicle Maintenance Supplies
245.70
Sauber Mfg. Co.
Vehicle Maintenance Supplies
65.75
Standard Equipment Company
Vehicle Maintenance Supplies
50.17
Maintenance and Repair Supplies
146.79
Vehicle Maintenance Supplies
1,967.96
Vehicle Maintenance Supplies
6.45
Credit
(1,387.65)
Standard Industrial Auto Equip
Vehicle Maintenance Supplies
496.00
Superior Signals, Inc.
Vehicle Maintenance Supplies
143.00
Verizon Wireless Services LLC
Cellular Service & Equipment Charges 6/20/18 - 7/19/18
299.15
Page 7 of 9
VILLAGE OF MOUNT PROSPECT
List of Bills
June 27 - July 10, 2018
Fund Vendor Name
Invoice Description
Amount
Krueger's Concrete & Excavation
Refund Escrow Permit # RB18-0395 (211 Eastwood Ave)
100.00
Lacson, Robert
Refund Escrow Permit # RB18-0940 (1726 Verde Dr)
100.00
Lincoln Hancock Restoration LLC
Refund Escrow Permit # 17-1289 (932 Boxwood Dr #B)
250.00
LMC Landscaping
Refund Escrow Permit # RB18-0353 (602 Dogwood Ln)
100.00
Maigler, John
Refund Escrow Permit # RB18-0880 (633 S Albert St)
100.00
Maximized Restoration
Refund Escrow Permit # 17-2122 (649 Pickwick Ct)
100.00
Mueller, Victoria
Refund Escrow Permit # RB18-0773 (2904 Briarwood Dr)
100.00
Noland's Landscaping Inc.
Refund Escrow Permit # RB18-0374 (232 Hatlen Ave)
100.00
073 Escrow Deposit Fund (continued)
Old State Mechanical
Refund Escrow Permit # RB18-0592 (810 S Albert St)
100.00
One Hour Heating
Refund Escrow Permit # 17-0758 (320 Eastwood Ave)
125.00
Pave Masters Inc.
Refund Escrow Permit # RB18-0703 (1823 Hopi Ln)
100.00
Pavestone Brick Paving Inc.
Refund Escrow Permit # RB18-0209 (320 S Albert St)
100.00
Refund Escrow Permit # RB18-0626 1508 S Pine St)
100.00
Psiuk, Mieczslawa
Ramsey, Michael
Ricks Sewer & Drainage
Russo, Stephanie M
Sign 4 U
The Fair Plumber
Third District Circuit Court
TS Landscaping
Value Pro Mechanical
Ventura's Brick Paving Inc.
Xttrium Laboratories Inc.
Zych, Dariusz
073 Escrow Deposit Fund Total
Grand Total
Refund Escrow Permit # RB18-0633 (1506 Catalpa Ln)
Refund Escrow Permit # RB18-0418 (1900 Hopi Ln)
Refund Escrow Permit # CB18-0047 (1003 Cardinal Ln)
Refund Escrow Permit # RB18-0597 (602 George St)
Refund Escrow Permit # RB18-0431 (201 S Can Dota Ave)
Refund Escrow Permit # SGN18-0004 (1764 W Algonquin Rd)
Refund Escrow Permit # 17-2462 (1739 Verde Dr)
Refund Escrow Permit # RB18-0690 (219 S Edward St)
Bond Check 6/28/18
Bond Check 7/3/18
Bond Check 7/5/18
Bond Check 7/10/18
Refund Escrow Permit # RB18-0462 (623 S Albert St)
Refund Escrow Permit # CB18-0148 (1701 E Kensington Rd)
Refund Escrow Permit # RB18-0445 (2004 W Lonnquist Blvd)
Refund Escrow Permit # CB18-0138 (1200 Business Center Dr)
Refund Escrow Permit # 17-0552 (306 N Maple St)
Page 9 of 9
100.00
100.00
125.00
100.00
100.00
125.00
125.00
100.00
100.00
500.00
575.00
606.00
100.00
125.00
100.00
100.00
200.00
$ 7,956.00
$ 1,047,120.73
BoardDocs® Pro Page 1 of 1
Agenda Item Details
Meeting Jul 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m.
Category 6. OLD BUSINESS
Subject 6.1 None
Access Public
Type
Public Content
Information
Alternatives
1.
2. Action at discretion of Village Board.
Administrative Content
Executive Content
https://www.boarddocs.com/il/vompBoard.nsf/Private?open&login 7/13/2018
Bo&dDocs® Pro Page 1 of 3
Agenda Item Details
Meeting Jul 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m.
Category 7. NEW BUSINESS
Subject 7.1 A RESOLUTION APPROVING THE COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM
YEAR 2018 ACTION PLAN
Access Public
Type Action
Preferred Date Jul 17, 2018
Absolute Date Jul 17, 2018
Fiscal Impact Yes
Dollar Amount 366,338.00
Budgeted Yes
Budget Source CDBG grant allocation (HUD funds), program income and carryover funds
Recommended Action Approve a Resolution to Approve the Program Year (PY) 2018 Action Plan for the
Community Development Block Grant Program.
Public Content
BACKGROUND INFORMATION
The Village of Mount Prospect is an entitlement community that receives an annual allocation from the Department of
Housing and Urban Development (HUD) for our Community Development Block Grant (CDBG) Program. As an
entitlement community, the Village was required to develop a Consolidated Plan that provides an outline for
community development needs and strategies over a five-year period. Each year the Village is required to submit an
annual Action Plan to HUD, which proposes eligible activities for the upcoming program year, which address the
priority needs described in our 2015-2019 Consolidated Plan. The Village's responsibility is to ensure that Mount
Prospect residents, specifically those considered as low/moderate-income, are benefiting from the CDBG grant.
Attached for your review and consideration of the Program Year (PY) 2018 Action Plan, are the following documents:
• Annual Action Plan PY2018 - for the time period of October 1, 2018 to September 30, 2019
• Proposed CDBG Budget PY2018
• Birch Manor Condominium Documentation (Fire Dept. and KTJ)
• May 24, 2018 Planning & Zoning Commission Meeting Minutes
PY2018 ACTION PLAN BUDGET
HUD has indicated our PY2018 allocation for the CDBG Program will be $244,793. Other revenue sources that
contribute to program funding include program income and carryover funds. Program income is generated from
repayment of outstanding 0% interest rehabilitation loans. With our carry-over funds and an estimated $60,000 in
program income, the total anticipated amount available for projects in PY2018 is $366,338. Please see the proposed
CDBG Budget PY2018 attached.
PROPOSED FUNDING FOR NON -VILLAGE AGENCIES
https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login 7/13/2018
BoardDocs® Pro
Page 3 of 3
In addition to the Planning and Zoning Commission public hearing on May 24, 2018, a required 30 day public review
period took place from June 7 through July 6, 2018. The Draft Action Plan was available on the Village website and
hard copies were available at the Library and at Village Hall. No additional comments were received.
Alternatives
1. Approve the Resolution to Approve the 2018 Annual Action Plan for the Community Development Block Grant
Program.
2. Action at discretion of Village Board.
a eccxa mer�dation
Staff recommends approval of the resolution to approve the PY2018 Annual Action Plan for the Community
Development Block Grant Program.
AAP l:1Y2018 is ra f .l.: df (811. KB) VB ResoU:iion PY201.3.pdf (86 NQS)
Birch Pllanor C DB G1 Menno,p df (1 76 KB) 1::11na;h Manor 1:m11::1B(.3 LIIe: r no ,..i"J.p:adf (39 KB)
Proposed (:T)BG p:."1aua:pget l: gY2018.pd11 (1.22 K1::1(
Administrative Content
p: &Z Meeting Nliirnu.ntes,pd (d1::15 KB)
Executive Content
Hira, this needs to be moved to New Business given the negative recommendation.
https://www.boarddoes.com/il/vompBoard.nsf/Private?open&login 7/13/2018
Village of Mount Prospect, Illinois
Community Development Block Grant
Program Year 2018 Action Plan
For the Period of October 1, 2018 through September 30, 2019
Prepared by:
Community Development Department
50 S. Emerson Street
Mount Prospect, IL 60056
P: (847) 818-5328
F: (847) 818-5329
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
1
This could be a restatement of items or a table listed elsewhere in the plan or a reference to
another location. It may also contain any essential items from the housing and homeless needs
assessment, the housing market analysis or the strategic plan.
The Village of Mount Prospect identified seven community priorities in their Strategic Plan through the
needs assessment and public participation:
1. Affordable Housing
2. Homelessness/Continuum of Care Services
3. Public Service Needs
4. Public Improvement Needs
5. Public Facility Needs
6. General Administration and Planning Costs
7. Economic Development
Mount Prospect's entitlement grant is limited; thus, not all programs will be funded with CDBG funding.
In the Consolidated Plan, the Village of Mount Prospect included programs that do not receive funding
to ensure that the priorities of the community are met through a variety of resources.
The Community Needs are listed by HUD codes and categories. Priorities are assigned as follows:
• High- Currently funded (with CDBG funds)
• Low- Reliant upon outside support and resources
3. Evaluation of past performance
This is an evaluation of past performance that helped lead the grantee to choose its goals or
projects.
Performance Measurements have been developed for each program funded through CDBG. Every
program has been assigned an objective, outcome, and indicators. The three objectives are: suitable
living environment, decent housing, and creating economic opportunities. The three outcome categories
are: availability/accessibility, affordability, and sustainability. Accomplishments for all programs are
reported in the Integrated Disbursement and Information System (IDIS). At the end of each Program
Year a Consolidated Annual Performance and Evaluation Report (CAPER) is submitted to the U.S.
Department of Housing and Urban Development (HUD) and posted on the Village website which
identifies the accomplishments and level of progress in meeting the priorities and goals identified in the
five year Consolidated Plan for that year.
4. Summary of Citizen Participation Process and consultation process
Summary from citizen participation section of plan.
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
PR -05 Lead & Responsible Agencies - 91.200(b)
1. Agency/entity responsible for preparing/administering the Consolidated Plan
The following are the agencies/entities responsible for preparing the Consolidated Plan and
those responsible for administration of each grant program and funding source.
Table 1— Responsible Agencies
_...._m__ _�._..... _---_.. __ _._.... ........................_...._._ _...... ._
Agency Role Name Department/Agency
CDBG Administrator
MOUNT PROSPECT Community Development
Department
Narrative
The Lead Agency and CDBG Administrator is the Village of Mount Prospect
Consolidated Plan Public Contact Information
Village of Mount Prospect
Community Development Department
50 S. Emerson Street
Mount Prospect, IL 60056
847-818-5328
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
5
Outreach Services, Health Education, Lifeline, Home Companion Program and the Nurse's Lending
Closet.
Social service activities are coordinated through the Village's Human Services Department in conjunction
with the Planning Division and the Police Department. The Human Services Department works with
several agencies, both locally and statewide, to help the clients that need assistance. Examples include
working with agencies that provide substance abuse treatment, townships that provide social services,
DCFS, etc. The Village's Human Services Department does not have the capacity to deal with those
individuals with severe mental illness. However, the Human Services Department does work with
Alexian Brothers, Resources for Community Living, Search Inc. and the Kenneth Young Center, which
provides specific services to individuals with severe mental illness.
Describe coordination with the Continuum of Care and efforts to address the needs of
homeless persons (particularly chronically homeless individuals and families, families with
children, veterans, and unaccompanied youth) and persons at risk of homelessness.
The Alliance to End Homelessness in Suburban Cook County, which is the Continuum of Care
Coordinator for Suburban Cook County, provided the Village with its most recent strategic plan (A
Strategic Plan Forward to End Homelessness 2014-2017 Strategic Plan, July 2014) as well as homeless
data that pertains to Mount Prospect.
Finding affordable housing with access to transportation and services is the overall goal of the
Continuum of Care. The Village of Mount Prospect will continue to work with the Alliance to End
Homelessness in Suburban Cook County to address all components of the Continuum of Care.
Prevention of homelessness is an important component of the Continuum of Care. The Village of Mount
Prospect will continue to support existing programs and services designed to prevent first time or
recurring homelessness through rent or mortgage assistance, and utility assistance, mediation programs
for landlord -tenant disputes, communicating landlord -tenant rights and responsibilities, and other
programs and prevention activities.
Another component of the Continuum of Care components is outreach to inform the public about
services available and distributing information to residents about available services to help avoid
homelessness or shorten the length of time a person is homeless. The Village of Mount Prospect helps
to publicize information relating to homelessness and homelessness prevention through the Human
Services Department located in Village Hall, the Community Connections Center located at 1711 W.
Algonquin Road, and by maintaining a strong referral network of social service agencies.
The Village places a high priority on providing basic shelter to homeless or at -risk homeless persons.
Emergency housing and foreclosure prevention are issues to which the Village continues to monitor. The
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
Table 2 —Agencies, groups, organizations who participated
1 Agency/Group/Organization
Village of Mount Prospect
Agency/Group/Organization Type
Other government -Local
What section of the Plan was addressed by
Housing Need Assessment
Consultation?
Market Analysis
Public Improvement Needs
Briefly describe how the Agency/Group/Organization
The Community Development Department consulted with other Village
was consulted. What are the anticipated outcomes of
Departments including Human Services, Finance Department, Fire
I the consultation or areas for improved coordination?
Department and Public Works, the anticipated outcome is an Action Plan and
goals supported by all departments.
2 Agency/Group/Organization
Northwest Compass, Inc.
Agency/Group/Organization Type
Services - Housing
Services -Children
Services -Elderly Persons
Services -Persons with Disabilities
Services -Persons with HIV/AIDS
Services -Victims of Domestic Violence
Services -homeless
Services -Health
Services -Education
Services -Employment
Service -Fair Housing
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
4 Agency/Group/Organization
WINGS
Agency/Group/Organization Type
Services -Housing
Services -Children
9
Services -Victims of Domestic Violence
Services -homeless
Services -Education
Services -Employment
Services - Victims
' What section of the Plan was addressed by
Homeless Needs - Families with children
Consultation?
Homelessness Strategy
Briefly describe how the Agency/Group/Organization
The agency submitted an application for funding which describes their
was consulted. What are the anticipated outcomes of
organization and services and was invited to a public hearing to discuss what
the consultation or areas for improved coordination?
impact their services provide in our community. The anticipated outcome is
I better understanding of how this organization can address the identified
needs in our community.
5 Agency/Group/Organization
Children's Advocacy Center
Agency/Group/Organization Type
Services -Children
Services -Victims of Domestic Violence
i
Services - Victims
i
What section of the Plan was addressed by
Non -Homeless Special Needs
Consultation?
Briefly describe how the Agency/Group/Organization
The agency submitted an application for funding which describes their
was consulted. What are the anticipated outcomes of
organization and services and was invited to a public hearing to discuss what
the consultation or areas for improved coordination?
impact their services provide in our community. The anticipated outcome is
better understanding of how this organization can address the identified
I
needs in our community.
Annual Action Plan 2018 11
OMB Control No: 2506-0117 (exp. 07/31/2015)
i
Briefly describe how the Agency/Group/Organization I
The agency submitted an application for funding which describes their
I was consulted. What are the anticipated outcomes of
organization and services and was invited to a public hearing to discuss what
the consultation or areas for improved coordination?
impact their services provide in our community. The anticipated outcome is
better understanding of how this organization can address the identified
needs in our community.
9 Agency/Group/Organization
i
Search Inc. I
Agency/Group/Organization Type
Housing
Services -Persons with Disabilities
What section of the Plan was addressed by
Housing Need Assessment
Consultation?
Briefly describe how the Agency/Group/Organization
The agency submitted an application for funding which describes their
was consulted. What are the anticipated outcomes of
organization and services and was invited to a public hearing to discuss what
the consultation or areas for improved coordination?
impact their services provide in our community. The anticipated outcome is [
better understanding of how this organization can address the identified
needs in our community.
Identify any Agency Types not consulted and provide rationale for not consulting
N/A
Other local/regional/state/federal planning efforts considered when preparing the Plan
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
13
AP -12 Participation - 91.401, 91.105, 91.200(c)
1. Summary of citizen participation process/Efforts made to broaden citizen participation
Summarize citizen participation process and how it impacted goal -setting
Refer to PR -15 in the Village's 2015-2019 CDBG Consolidated Plan for the Village's Citizen Participation Plan.
Regarding the Program Year 2018 Action Plan, a Request for Proposals was published in the Daily Herald Newspaper on March 15, 2018,
applications for funding were sent to all organizations that had requested one. Public Notice of the Action Plan draft and Planning and Zoning
Commission meeting was published in the Daily Herald Newspaper on May 09, 2018. Proposed allocations were discussed at the Planning and
Zoning Commission Public Hearing on May 24, 2018, which is also televised on the Village's cable station. See the PY2018 Action Plan Public
Participation Attachments for minutes of the Planning and Zoning Commission meeting. On June 7, 2018, the Daily Herald Newspaper published
Public Notice of the 30 day public review period which took place from June 7, 2018 through July 6, 2018. The draft Action Plan was also
available on the Village website and hard copies were available at the Mount Prospect Public Library and at Village Hall. No additional comments
were received during the public review period. Before the Village adopted the Annual Action Plan, the Village made available information
(including the amount of assistance anticipated, the various activities that will be undertaken, and the amount that will benefit persons of low -
and moderate -income) to citizens, public agencies and other interested parties.
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
15
Expected Resources
AP -15 Expected Resources — 91.420(b), 91.220(c) (1, 2)
Introduction
The Village's CDBG allocation is a major source of funding for addressing housing needs and other identified needs of our low -moderate income
residents.
Anticipated Resources
Table 5 - Expected Resources — Priority Table
Program Source of
Funds
Uses of Funds
Expected
Annual
Allocation:
$
Amount
Program
Income:
$
60,000
Available Year 2
Prior Year Total:
Resources: $
$
61,545 366,338
I Expected Amount
Available Reminder
of ConPlan
$
366,338
Narrative Description
[
For Program Years 5:
CDBG public - Acquisition 244,793
I federal
Admin and Planning
$244,793 Estimated
Economic Development
;annual allocation +
$60,000 Estimated
Housing
program income+
Public Improvements
$61,545 Estimated
Public Services
prior year funds=
$366,338 Estimated
annual funds x 1 Year=
$366,338
Explain how federal funds will leverage those additional resources (private, state and local funds), including a description of how
matching requirements will be satisfied
CDBG funds are leveraged by many sources. Sub -recipient agencies receiving funding leverage the funding in their budgets to assist more
residents. The Environmental Health Division and Human Services Department offer many resources for improving the quality of life for low- and
moderate -income residents through housing inspections, tenant rights information, food pantries, health clinics, and emergency financial
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
17
Annual Goals and Objectives
AP -20 Annual Goals and Objectives - 91.420, 91.220(c)(3)&(e)
Goals Summary Information
Table 6 - Goals Summary
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
19
4 Infrastructure
2015 2019 Public Improvement
Low/Mod
Public
CDBG:Public
Facility
Activities
Needs
census tracts
I Improvement
$125,000
or
Needs
i
Infrastructure
I
Activities other
than
Low/Moderate
Income
Housing
i
Benefit: 2000
Persons
i
Assisted
5 Housing with
2015 2019 Affordable Housing
Village Wide
Affordable
CDBG:
Public Facility
Supportive Services
Housing
` $20,000
or
Infrastructure
Activities for
Low/Moderate
Income
Housing
Benefit: 1 I
I
Households
Assisted
6 General
2015 2019 General
Village Wide
General
CDBG:
Other: 0 Other
Administration
Administration
I Administrative
$54,400
and Planning
Costs
Annual Action Plan 2018 21
OMB Control No: 2506-0117 (exp. 07/31/2015)
4 Goal Name
Infrastructure Activities I
Goal Description
The public Improvements in PY2018 will consist of the removal of hazardous and deteriorated public sidewalk and
replacement with new concrete sidewalk, within qualifying low/moderate income census tracts.
5 Goal Name
I Housing with Supportive Services
Goal Description
HUD defines group homes that provide housing and supportive services for adults with disabilities, as public facilities.
One group home, or public facility, for Search Inc. will be renovated in PY2018.
6 Goal Name
General Administration
Goal Description
Overall CDBG program management for PY2018.
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
23
• The activity must address a priority identified in the Village's CDBG 2015-2019 Consolidated
Plan.
Because of limited funding available to public service agencies, funding requests were further evaluated
by staff members of the Community Development Department and the Human Services Department
based on:
• To what extent do they address the priority needs identified in our Consolidated Plan;
• How do they broaden the scope of supportive services to our residents, beyond those offered by
our Human Services Department; and
• How much of an impact will our CDBG funding have on this organization and what other funding
sources do they have available for the program.
All of the public service agencies provide invaluable services to our residents, special consideration was
given to those organizations that address multiple priorities and provide comprehensive services to aid
our residents, and will use CDBG funding towards direct client costs as opposed to the payroll of
employees providing the client services. Because of the reporting burden, HUD has also provided
direction to fund fewer organizations for large amounts, rather than to fund many organizations for
small amounts.
The Village recently annexed property from unincorporated Cook County that includes the Birch Manor
Condominium complex at the intersection of Dempster Street and Linneman Road, and is located in a
low/moderate income census tract. Birch Manor includes eight building, each with 36 units and a
common basement. These buildings do not meet fire code requirements and pose a life safety risk. As a
result, the Fire Department is requiring the building owner/management to install a fire alarm system in
the general area of the building. To alleviate some of the housing cost burden for the residents, and
keep their housing affordable, CDBG funding has been allocated toward these high priority health/safety
improvements.
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
25
Description
The Emergency Repair Program assists eligible households that face an
emergency condition or serious health and safety issue.
Target Date
9/30/2019
Estimate the number
An estimated 2 households will benefit from our Emergency Repair
and type of families
Program
that will benefit from
the proposed
activities
Location Description
The program is available Village -wide to qualifying households
Planned Activities
Homes of extremely low, low, and moderate income homeowners will
be rehabilitated.
Project Name
Birch Manor Condominium Rehab
Target Area
Goals Supported
Maintain/Improve existing Housing Stock
Needs Addressed
Affordable Housing
Funding
CDBG: $56,000 ...... .....
io-
Description
....... ..
The Village recentlyannexed property from unincorporated Cook
County that includes the BirchManor Condominium complex at the
intersection of Dempster Street and Linneman Road, and is located in a
low/moderate income census tract. Birch Manor includes eight
buildings, each with 36 units and a common basement. These buildings
do not meet fire code requirements and pose a life safety risk. As a
result, the Fire Department is requiring the building
owner/management to install a fire alarm system in each building to
ensure they are code compliant. The project would consist of a fire
alarm system installation for each building to include the IFC required
smoke detection in the general areas of the building. To alleviate some
of the housing cost burden for the residents, and keep their housing
affordable, CDBG funding has been allocated toward the health/safety
improvements. The estimated cost for each building is $28,000. The
Village is proposing to do the work over a 2 year period. In PY2018 the
allocated $56,000 will assist with the cost of two buildings and the
condominium association would be responsible for the other two. The
same would be recommended for the second year.
Target Date
9/30/2019
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
27
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
29
Estimate the number
Pads to Hope Inc had requested $15,000 of CDBG funding in PY2018 to
and type of families
assist 40 income qualified residents; $9,500 of funding is allocated, so
that will benefit from
the estimated number of residents served with those funds is reduced
the proposed
to 27.
activities
Location Description
Programs and services are based out of their location at 1140 E
Northwest Hwy in Palatine 60074
Planned Activities
6
Project Name
WINGS
Target Area
Goals Supported
Homeless/Continuum of Care Services
Needs Addressed
Homelessness/ Continuum of Care
Funding
CDBG: $9,500
Description
Housing and support services to women and their children who are
homeless due to domestic violence or other causes.
Target Date
9/30/2019
Estimate the number
WINGS had requested $15,000 of CDBG funding in PY2018 to assist 15
and type of families
income qualified residents; $9,500 of funding is allocated, so the
that will benefit from
estimated number of residents served with those funds is 9.
the proposed
activities
Location Description
WINGS has shelters located throughout the north and northwest
suburbs and an emergency shelter in Chicago.
Planned Activities
7
Project Name
Northwest CASA
Target Area
Goals Supported
Supportive Services (Public Services)
Needs Addressed
Public Service Needs
Funding
CDBG: $3,719
Description
Their Sexual Assault Intervention Program provides specialized
counseling, crisis intervention and advocacy services for Mount
�
Prospect residents who are victims of sexual abuse and sexual assault.
.
.Y
g ate
Target D
9/30/2 019
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
29
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
31
Estimate the number
SPHCC had requested $4,000 of CDBG funding in PY2O18 to assist 5
and type of families
income qualified residents; $2,500 of funding is allocated, so the
that will benefit from
estimated number of residents served with those funds is 3.
the proposed
activities
Location Description
Physicians, laboratory/radiology sites and Walgreen pharmacies are
available throughout suburban Cook County suburbs.
Planned Activities
10
Project Name
www
Community Connections Center (CCC)
Target Area
Goals Supported
Supportive Services (Public Services)
Needs Addressed
Public Service Needs
Funding
CDBG: $2,500
Description
Funding will support the Center's programs focused on education,
health and wellness, and safety.
Target Date
9/30/2019
Estimate the number
Approximately 200 residents will benefit from the proposed activities
and type of families
that will benefit from
the proposed
activities
Location Description
The Community Connection Center provides programs for Mount
Prospect residents in the low/moderate income neighborhoods
surrounding the Center, located at 1711 W. Algonquin Road in Mount
Prospect.
Planned Activities
11
Project Name
Low/ Mod Area Sidewalk Improvements
Target Area
Goals Supported
Infrastructure Activities
Needs Addressed
Public Improvement Needs
Funding
CDBG: $125,000
Description
This project involves the removal of hazardous and deteriorated public
sidewalk and replacement with new concrete sidewalk.
Target Date
9/30/2019
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
31
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
33
Description
Overall program management, coordination, monitoring, and
evaluation. Village staff time includes providing information about
CDBG programs, preparing program budgets, schedules, agreements,
reports and other costs for goods or services needed for administration
of the CDBG Program.
Target Date
9/30/2019
Estimate the number
N/A
and type of families
that will benefit from
the proposed
activities
Location Description
N/A
Planned Activities
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
33
AP -85 Other Actions - 91.420, 91.220(k)
Introduction
Actions planned to address obstacles to meeting underserved needs
HUD allows entitlement communities to use a maximum of 15% of CDBG Entitlement funds plus 15% of
the previous year's program income for public service programs. Currently the Village uses close to the
maximum amount allowed. The Village had an increase in the requested funding amounts. The sub -
recipients provide invaluable services and activities for the low- and moderate -income residents of
Mount Prospect. Therefore, the Village will continue to monitor sub -recipients to ensure that CDBG
funds are used efficiently and effectively to meet the underserved needs of the Mount Prospect
community by identifying funding overlaps, gaps, and administrative capacity of the sub -recipient
agencies.
An obstacle to meeting underserved needs is the limited amount of developable land, rental units, and
affordable housing for low- and moderate -income residents. The Village's Handyman Program and CDBG
Rehab Programs alleviate some of the obstacles to affordable housing by providing financial assistance
to eligible low- and moderate -income residents of Mount Prospect to rehabilitate and fix their homes.
CDBG funding is also proposed to help homeowners with the required health/safety improvements at
the newly annexed Birch Manor Condominiums. The Village continues to work with developers
interested in building a mix of housing options including senior housing and housing for residents with
special needs.
Another obstacle in the delivery of services is the identification of populations and individuals who
might be in need of and eligible for assistance such public services offered or the CDBG rehab programs.
The Community Connections Center will continue to provide information to residents and businesses to
ensure the population is aware of all services available by the Village, other units of government, and
social service organizations.
Actions planned to foster and maintain affordable housing
The State of Illinois determined that 20% of the Village's housing stock is affordable. Mount Prospect is
investigating options to keep the housing affordable. In PY2018, the Village expects to provide at least 6
households with affordable housing through rehabilitation and emergency repair programs, and assist
the homeowners at the newly annexed Birch Manor Condominiums with required health/safety
improvements. The organizations funded through Public Service Programs will increase the amount of
affordable units by providing rental assistance and other housing activities.
The Village has recently supported two affordable housing projects. Myers Place is a mixed-use
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
35
investigate ways to keep housing affordable.
Actions planned to reduce lead-based paint hazards
Refer to SP -65
Actions planned to reduce the number of poverty -level families
Refer to SP -70
Actions planned to develop institutional structure
Refer to SP -40
Actions planned to enhance coordination between public and private housing and social
service agencies
Communication between the public, private and not-for-profit agencies is a key element in the provision
of housing and community development programs in the Village. Without open communication
between these groups, it is unlikely that the housing strategies set forth in this plan will be successful.
The Village of Mount Prospect coordinates with different entities to provide the resources necessary to
meet the community's needs. Monthly meetings with service providers and governmental organizations
are held at the Village's Human Services Department. The group discusses upcoming events and trends
that they are observing in their respective fields. The Community Connections Center is another way to
communicate with other governmental and social service agencies by hosting communication meetings
and by encouraging partnerships between local service providers.
The Northwest Suburban Housing Collaborative is also working to develop relationships between the
Public and Private sector to address housing related issues.
Discussion
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
37
Attachments
Proposed CDBG Budget PY2O18
Birch Manor Condominium Documentation
Planning and Zoning Commission Minutes from May 24, 2018
Annual Action Plan 2018
OMB Control No: 2506-0117 (exp. 07/31/2015)
39
RESOLUTION NO.
A RESOLUTION APPROVING THE PROGRAM YEAR (PY) 2018 ACTION PLAN
COMMUNITY DEVELOPMENT BLOCK GRANT ENTITLEMENT PROGRAM
WHEREAS, the Village of Mount Prospect has approved a 2015-2019 Consolidated Plan which provides
an outline for community development needs and strategies over a five-year period. A 2018 Annual
Action Plan has been prepared which proposes eligible activities to be undertaken in the upcoming
program year, October 1, 2018 to September 30, 2019; and
WHEREAS, the Village of Mount Prospect is entering its thirty eight year as an entitlement community
under the federal Community Development Block Grant Program; and
WHEREAS, in the past thirty seven years the Village has used its Community Development Block Grant
entitlement to implement various projects to address the community development and housing needs of
low and moderate -income and elderly residents, to reduce and prevent the occurrence of deterioration in
the Village, to increase accessibility for the handicapped, and to address other community needs in
conformance with the objectives of the Community Development Block Grant Program; and
WHEREAS, the Village of Mount Prospect expects to be allocated $244,793 for Program Year 2018
from the U.S. Department of Housing and Urban Development and expects to generate $60,000 in annual
program income, and anticipates carry-over funds in the amount of $50,000;
WHEREAS, the President and Board of Trustees have determined that the Consolidated Plan and the use
of CDBG funds can be of benefit in providing for residents' health, safety and welfare and in meeting the
community and housing needs of its citizens:
NOW THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES
OF THE VILLAGE OF MOUNT PROSPECT, COOK COUNTY, ILLINOIS ACTING IN THE
EXERCISE OF THEIR HOME RULE POWERS:
SECTION ONE: The Mayor and Board of Trustees of the Village of Mount Prospect hereby approve
the attached 2018 Action Plan. The Action Plan anticipates spending Community Development Block
Grant funds in the amount of $366,338:
Affordable Housing $116,000
Homeless/Continuum of Care $27,000
Supportive Programs for Persons w/Special Needs $15,219
Public Facility Needs $20,000
Neighborhood Safety/Public Improvements $120,000
General Administration $60,958
PY 2018 CDBG TOTAL FUNDS COMMITTED
Count Prospect
MF -
i?)
TO:
FROM:
DATE:
SUBJECT:
Village of Mount Prospect
Fire Department
INTEROFFICE MEMORANDUM
CONSUELO, ARGUILLES CDBG COORDINATOR
BRYAN LOOMIS ASSISTANT FIRE CHIEF
APRIL 14, 2018
BIRCH MANOR CONDOMINIUMS — FIRE ALARM PROJECT
Illustrated below are the requirements for a fire alarm system for Birch Manor Condominiums.
There are currently eight buildings located in the complex. Each building has 36 units with a
common basement. The State of Illinois has adopted the Life Safety Code (LSC), 2000 Edition, as
a minimum standard that all fire departments and municipalities must comply with. This code is
valid for existing and new buildings.
Condominium buildings with greater than three units are defined as apartment buildings
according to the Life Safety Code (LSC). LSC Section 31.3.4.1 states "Apartment buildings with
more than three stories or with more than 11 dwelling units shall be provided with afire alarm system
in accordance with section 9.6, except as modified by 31.3.4.2 through 31.3.4.5". Section 31.1.1 allows
four options for apartment buildings in regards to fire alarm requirements. At a minimum,
option one requires a fire alarm system, with manual pull station and notification devices.
Based on a review of the building(s) this would be the minimum requirement (Option 1).
The International Fire Code (IFC), 2012 Edition, Existing Building Section 1103.7.6 states "A
manual fire alarm system that activates the occupant notification system in accordance with section 907.5
shall be installed in all existing Group R-2 (condominium buildings) occupancies with more than three
stories in height or with more than 16 dwelling units or sleeping units. This section would apply to
the Birch Manor building(s) and would at a minimum require a fire alarm system, manual pull
stations, smoke detection and notification devices. The IFC is formally adopted by the Village of
Mount Prospect under section 24.102A of the Mount Prospect Fire Prevention Code.
Based on the review of these buildings, they do not meet fire code requirements and pose a life
safety risk. As a result of these factors, the Fire Department is requiring the building owner to
install a fire alarm system for these buildings to ensure they are code compliant.
OEM
K I E � N, 11110 R P 9, JENIKI
Attoieys at t..aw
April 14, 201;
4'O N. Wacker Unvc, Slu 1660
&-)606 21-XJ3
1 3 984 64(jo r 984 ()4-1,1
VIA P\EGULAR MAIL AND EMAIL (i mountprospect.org)
. ..... . . --- . ...... -- . . . . ...... AIL _ Usaewertn
Janet Sae,,vert, Neighborhood Plamier
Village of Mount Prospect
50 S. Emerson St,
Mount Prospect, IT, 60056
RE: Birch Manor Condomininni Complex
Dear Ms. Saewei:L:
3 1-101 U !" Ravivi�l AI .'le 110
Odin Irjwl fl�:Iva, Hhm)Is W46),T'A
f 108 3,'N 3FW�8 F 7C)B 619 PjOb
viww,ktjIaw.(.-,orn
This letter is regarding the Birch Manor Condoirdniurn complex located in Mount Prospect at
the intersection of Dempster Street and Linnernan Road. There are currently eight buildings
located in the complex. Each I-nii1ding has 3(-') units with a common basement. The State of
Illinois has adopted the Life Safety Code (LSC), 2000 Edition, as a minimum standard that all
fire departments and municipalities must comply ivith. This code is valid for existing and new
buildings.
The Village of Mount Prospect has also adopted the International Fire Code (IFC) 2015 Edition,
under section 24.102-A of the Village of T\-Iount Prospect Fire Prevent -ion Code. The IFC locally
adopted code also has existing and 1101V building requirements in regards to fire alarm systems.
Both of these codes are required to be enforced Linder the State a-nd locally adopted ordinance(s)
of the Village of Mount Prospect. In this case, the IFC is the more restrictive code and will
require additional smoke detection in order to achieve compliance. Due to the fact that the LSC
applies smte,,vide and the fact tl-iaL Birch Manor has now been anvlexed to the Village of Mount
Prospect, [lie LSC 2000 and JFC 2015 take precedence over the fire regulations applicable in
unincorporated Cook County.
KLEIN, TI- ORPE AND JENKINS., LTD,
[.1-/ince C. Malliltil
NIOUnt Prospect Village Attorney
cc: Michael Cassady, Village Manager (pic, i �,sa (1 1 rio k l I Up rwq %ec 1 c� n",O)
Brvan Loomis, Fire Marshal (blot
37W(AA
MT,A Eemil.d PY2I17 CDBG PIN -I income: 11 W,000
2 P,,- II,-. A 91.11.1-A fan -y"It If W-116119 ON, 1-111t loans
3, PY2018 MAPS Nl..U.P . $2.I9,79S M
I The ,, by HID AI 1171 Admill'In (20%d DIED me -d all�borl) plus $12,099 (20-K d MAAW ' PW -111 "'I'm dPIN- Y-1)
5 T,,. m, allowed by HUD I,, �20 0 P,blb: $36,719 (AS% & MEG --d P11,; $7500 (15% If $50,000 PIIII-1 VWs PIPR-1 I -PI)
6 N -b- ,0 "are s.b,.t to 0-gI
PROPOSED CDBG BUDGET PY201S
301:2019)
... . . . . ........
Priority Needs
PY 2017 Fundin
......
RftWGfta
PY 291I PrOV0.6d DiAdEl"t
GENERAL ADMINISTRATION'
_2j2OjJSFUadkftQ
SAWTOTAL
$54,700
beemm NA
PUBLICSERVICE PROGRAMS
N1N Compass inf., - Hogging
- -
$7,359
- --------
$10,090
$15,000
$9,500
NINOProgram Im. H-6- -
I.
$12,250
$15,000
$9,500
.
POOL. S-1.. Need..
_
en,ld-S OxNe,CS'.Y C-1-
. . ................. -
__I
$0
- ------ - -
$4,000
- --------------- -
. . . .
..........
$?.,Soo
- ------------ - - --
Aifordable Housing Opbon, 1,
$6,130
$3,060
$5,000
$7,000
$3,719
$9,000
•
w^1 r'iHeAlVe US11-C
•
$3,060
$4,000
$2,500
n �S- 111
$4,900
$4,000
52,500
See
SUB -TOTAL
$49,000
$43'229
rvae 05
AFFORDABLE HOUSING
Single Family Rehab &
$100,000
$80,000
$50,000
Ill -..d carry over funds finr PY2018
Im-Y Repm Arp 'Wen
10,000
%10.000
B- 1101 HIOIM & NSOMW$56,000
$56,000
SUB -TOTAL
0661
PUBLIC FACILITY NEEDS
3"'m
$20,000
$20,000
. .
. .........
............. .. . .
Fumm impRow mj�Lr
. ............ .
. .......
-.-
4..Ivw Am rft.04,
$176,038
--
$200,000
$125,000
�Su!:m
--
$200,000
$125,940
TOTAL FUNDS COMMITTED
j487,738
--$430I900
6364,171
HIS All-b7n7--
Qn�738
S244,793
511 I -Te #3
Pro ram 'Ile
W4,006
260,000
See P.1be 1, 92
C.,V ave, F.ndb, On
$100,000
--
CSnY over funds, available W
TOTAL WAGS AVAILABLE
$124,0001,141
140 na
....... . ....
MT,A Eemil.d PY2I17 CDBG PIN -I income: 11 W,000
2 P,,- II,-. A 91.11.1-A fan -y"It If W-116119 ON, 1-111t loans
3, PY2018 MAPS Nl..U.P . $2.I9,79S M
I The ,, by HID AI 1171 Admill'In (20%d DIED me -d all�borl) plus $12,099 (20-K d MAAW ' PW -111 "'I'm dPIN- Y-1)
5 T,,. m, allowed by HUD I,, �20 0 P,blb: $36,719 (AS% & MEG --d P11,; $7500 (15% If $50,000 PIIII-1 VWs PIPR-1 I -PI)
6 N -b- ,0 "are s.b,.t to 0-gI
MINUTES OF THE REGULAR MEETING OF THE
PLANNING & ZONING COMMISSION
Public Service Requests Hearing Date: May 24, 2018
PROPERTY ADDRESS: 50 S. Emerson Street
PETITIONER: Village of Mount Prospect
PUBLICATION DATE: May 9, 2018
REQUEST: Public Service Community Block Grant Funding Requests
for Program Year 2018 Action Plan
MEMBERS PRESENT Agostino Filippone
Thomas Fitzgerald
William Beattie
Walter Szymczak
Joseph Donnelly, Chair
MEMBERS ABSENT: Sharon Otteman
Lisa Griffin
Norbert Mizwicki
STAFF MEMBERS PRESENT: Consuelo Arguilles-Deputy Director of Community
Development
Hira Aamir-Neighborhood Planner
INTERESTED PARTIES: Various Public Service Organizations
Chairman Donnelly called the meeting to order at 7:00 pm. Commissioner Beattie made a motion seconded
by Commissioner Fitzgerald to approve of the minutes from the Planning and Zoning Commission meeting
on April 26, 2018. The minutes were approved 5-0. Chairman Donnelly introduced Item A on the Agenda,
Public Service Community Block Grant Funding Requests for Program Year 2018.
Mrs. Arguilles gave a brief background on the Community Development Block Grant (CDBG) and how
the Village of Mount Prospect has benefited from the grant. She also gave a brief summery regarding the
2018 program year and the action plan and the program income for the program year.
Mrs. Arguilles gave a brief explanation of the criteria Staff took into consideration while reviewing the
funding requests.
She stated that Staff is recommending the Planning and Zoning Commission recommend approval of the
proposed funding amounts as shown on Attachment 3, to be proportionally adjusted once the PY2018
allocation is confirmed.
Commissioner Filippone questioned the funding request from Birch Manor. He wanted more information
regarding the request and the sub -recipient.
Planning and Zoning Meeting- May 24, 2018 Public Service Requests- CDBG
Joseph Donnelly, Chair
Upon Roll Call Ayes: Fitzgerald, Beattie, Filippone, Szymczak, Donnelly
Nays: None
The Planning and Zoning Commission gave a positive recommendation (5-0) to Village Board.
Chairman Donnely made a motion seconded by Commissioner Donnelly to approve the funding allocation
for Birch Manor proposed in Attachment 3, to be proportionally adjusted once the PY2018 allocation is
confirmed.
Upon Roll Call Ayes: Fitzgerald, Szymczak
Nays: Beattie, Filippone, Donnelly
The Planning and Zoning Commission gave a negative recommendation (2-3) to Village Board.
Hearing no further discussions, Commissioner Beattie made a motion seconded by Commissioner Filippone
and the meeting was adjourned at 7:56 pm.
Jenna Noder
Jenna Moder- Community Development
Planning and Zoning Meeting- May 24, 2018 Public Service Requests- CDBG
Joseph Donnelly, Chair
BoardDocs® Pro Page 1 of 2
Agenda Item Details
Meeting Jul 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m.
Category 7. NEW BUSINESS
Subject 7.2 PZ -09-18 / 621 N. Main Street / ALA Architects & Planners, Inc. / 1st reading of AN
ORDINANCE GRANTING A CONDITIONAL USE FOR A DAYCARE CENTER FOR PROPERTY
LOCATED AT 621 N. MAIN STREET, MOUNT PROSPECT, ILLINOIS
Access Public
Type Action
Preferred Date Jul 17, 2018
Absolute Date Aug 07, 2018
Fiscal Impact No
Recommended Action Approval of a Conditional Use permit for a daycare center at 621 N. Main Street, Case No.
PZ -09-18, subject to the conditions listed in the staff report.
Public Content
Information
The Petitioner, Chris Russo of ALA Architects & Planners, Inc., is proposing to construct a daycare facility on the parcel
located at 621 N. Main Street (the "Subject Property"). The project requires conditional use approval.
The Subject Property is located at the northeast corner of N. Main Street and Judith Ann Drive and is zoned B3
Community Shopping. The Subject Property was formerly occupied by Quinlan & Fabish music store. It is currently
vacant with an existing parking lot. It is bordered by the B3 Community Shopping District to the north and south, the
R3 Low Density Residence District to the east, and the RA Single Family Residence District to the west. The Petitioner
has purchased and demolished the vacant structure on the property, and is proposing to reconfigure the parking lot
and construct a new daycare center with related improvements.
Village staff believes that the Petitioner's conditional use request complies with the conditional use standards and is
supportive of that request. Other departments reviewed the Petitioner's proposal and did not object to the use, found
that it would not adversely impact traffic, and that is acceptable to consider the Global Syn -Turf as pervious. The
proposed use complies with the Comprehensive Plan and will not be a detriment or endanger the welfare of the
general public. However, staff has concerns that the proposed elevations presented to the Planning and Zoning
Commission were not consistent with the surrounding neighborhood and will cause harm to properties in the
immediate vicinity. Staff recommended elevations be modified to minimize impact on the surrounding neighborhood.
On July 12, 2018, the petitioner submitted a revised elevation which muted the colors of the proposed roof and
turrets; this new elevation is also attached [Modified Rendering].
Staff has not received any comment to date, written or otherwise, from the public voicing concern about the
development. The Planning and Zoning Commission voted to approve the project unanimously by a vote of 7-0,
subject to the conditions in the staff report.
Alternatives
1. To Approve:
1. A Conditional Use permit for a daycare center at 621 N. Main Street, Case No. PZ -09-18, subject to the
following conditions:
https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login 7/13/2018
Prepared For:
III
Pro
Li
N
o w it
N Prindle Ave
N Wolf Rd
N Wolf Rd
N Forrest Ave
N Wolf Rd
N r
'o c
N Gibbons Ave
5
5
S
o 1C
S Stratford Rd Or
d
; Yates Ln
� u
mE N',
z
m
Stevenson Ln
E ul uor
N
w
m
�
tl
w ed
N Arthur Ave °+y inyuy N
c
J
Dr
r,
Center
«fi`�S
Horner Ln
�°
T
u,o
N Stratton Ln
Sar w °
Pd off -,m N
Rd w
`o
N We9"Ple
<j juniper Ln S
pe
p
v
N Westgate Rd ¢
L
3
0
2 WW
c w
o
mm
Ln a'
y�
v u
� ��tock
�
m y o
u
3
< a C Q\d\,p
`
Ob
Enc Cl
Q,ospect Rd m
= Gruen
r;°J
.$I
M. a'
wp,
S Nben Sl c�
N Crabtree Ln
O J
G
c fr to
a
ge v
S GeorS
Z
o�
y
�
ro laluaO
S
¢
'.
f7 =
U +++
w
N Whee\�
N Louis St
w m
'
P& 6ugaayM NEastman
Or
fp
eD
_ Boxwood Dr
b dgyspM
m
N Owen Sl S",
3
N School St
N School St S
a
wb � N Elm SI
N Elm S S Elm St
T
c
c
a rn
m
N Maple S ¢
m
V1
w
E
? m
N Emerson SI
to
U W
l'q k4au^I St
W
I s
wiil,f W
1dl +, `gut
":I I A { rcsr Sl
m y
° $
oNWilleS W
Y T
�aIINN
9Dosw
�¢
5 N Pine S
Fo
x N Russel St
;
N Elmhurst Ave
N Elmhurst Ave
a5
N Eastwood Ave
N Eastwood
Ave
a d
v °
N Prospect Manor Ave
r
c ¢
=
w' O
;p m S Wa Pella Ave
N Forest Ave
N Forest Ave
a
¢
c
�c
N Oak Ave
m
;t,a'"" .'
t
r Blvd
W 61,^�,. „�'
Ma -
LU Dale Ave
Dale Ave
m p
N Lancaster SI S We GoSva
S Evanston Ave
U S t N,U9:"I
in
N Waverly PI m Id 6paneM S
S Rammer Ave
t
S Donald Ave
N
Kendwonh Ave S
N Waterman Ave
S Waterman Ave
S Waterman Ave
; S 4Yazt�,r
to
¢ S Phelps Ave 6
61
��}
S Weller Ln
Pro
Li
N
o w it
N Prindle Ave
6 S Pnndle Ave ri
N Forrest Ave
Y any lsat�od S
w Busse Rd
N Gibbons Ave
any suoggiD S
N Stratford Rd
N Stratford Rd
S Stratford Rd Or
N Wilshire Ln
Windsor
S m
ut wwItwq y >
ul timO N
w
N Windsor Of
N Arthur Ave °+y inyuy N
Pro
Li
N
Existing transportation conditions in the vicinity of the site were documented based on field visits
conducted by KLOA, Inc. in order to obtain a database for projecting future conditions. The
following provides a description of the geographical location of the site, physical characteristics
of the area roadway system including lane usage and traffic control devices, and existing peak hour
traffic volumes.
Site Location
The site is located in the northeast corner of the intersection of Main Street with Judith Ann Drive.
Land uses within the vicinity of the site are primarily residential and commercial with MB
Financial Bank to the north, townhomes to the east, single-family homes to the west, and the
Liberty Plaza retail center to the south.
Existing Roadway System Characteristics
The characteristics of the existing roadways near the development are described below and
illustrated in Figure 3.
Main Street (IL 83) is a north -south, other principal arterial roadway that becomes in the vicinity
of the site generally provides two lanes in each direction. At its unsignalized intersection with
Judith Ann Drive, Main Street provides an exclusive through lane and a combined through/right-
turn lane on the northbound approach. On the southbound approach, Main Street provides an
exclusive through lane and a combined through/left-turn lane. On -street parking is not allowed on
either side of the road. Main Street is under the jurisdiction of the Illinois Department of
Transportation (IDOT), has a posted speed limit of 35 mph, is designated as a Strategic Regional
Arterial (SRA), and carries an Average Daily Traffic (ADT) volume of 15,800 (IDOT 2015)
vehicles.
Judith Ann Drive is an east -west local road that provides one lane in each direction. At its "T"
intersection with Main Street, Judith Ann Drive provides one inbound lane and one outbound lane
with outbound movements under stop sign control. Approximately 9 perpendicular on -street
parking spaces are provided on the northside of the street in the vicinity of the site. Judith Ann
Drive ends approximately 500 feet east of its intersection with Main Street. Judith Ann Drive has
a posted speed limit of 10 mph and is under the jurisdiction of the Village of Mount Prospect.
4 Ko nrgl k. Pr d5y .row,(:)"NArarr a, KIWOA
ExistingTraffic Volumes
In order to determine current traffic conditions in the vicinity of the site, KLOA, Inc. conducted
peak period traffic counts using Miovision Scout Collection Units on Wednesday, January 10,
2018 during the weekday morning (7:00 A.M. to 9:00 A.M.) and weekday evening (4:00 P.M. to
6:00 P.M.) peak periods at the intersection of Main Street with Judith Ann Drive. The results of
the traffic counts showed that the weekday morning peak hour of traffic occurs from 7:30 A.M. to
8:30 A.M. and the evening peak hour of traffic occurs from 4:45 P.M. to 5:45 P.M.
Figure 4 illustrates the existing peak hour traffic volumes for both peak periods that the counts
were performed. Copies of the traffic count summary sheets are included in the Appendix.
Crash Anallysis
KLOA, Inc. obtained accident data for the most recent available past five years (2011 to 2015) for
the intersections of Main Street with Judith Ann Drive. A review of the accident data revealed
there were no fatalities were reported at any intersection during the reviewed period. Table 1
shows a summary of the accident data.
Table 1
MAIN STREET WITH JUDITH ANN DRIVE - ACCIDENT SUMMARY
DISCLAIMER: The motor vehicle crash data referenced herein was provided by the Illinois
Department of Transportation. The author is responsible for any data analyses and
conclusions drawn.
6
KuimfqA.d eerdypa�son,�h'P°6urra^�,a'1 p�arn¢yri;� leap..
Frequency
"A
- - -
-------------- - - - - mm
M,
2011
0
1
1
0
0
0
2
2012
0
1
1
1
2
0
5
2013
0
0
0
0
1
0
1
2014
1
0
1
0
0
0
2
2015
0
1
1
0
0
1
3
Total
1
3
4
1
3
1
13
Average/Year
<1.0
<1.0
<1.0
<1.0
<1.0
<1.0
1.6
DISCLAIMER: The motor vehicle crash data referenced herein was provided by the Illinois
Department of Transportation. The author is responsible for any data analyses and
conclusions drawn.
6
KuimfqA.d eerdypa�son,�h'P°6urra^�,a'1 p�arn¢yri;� leap..
Ar ;a Trraffic Observations
Traffic flow in the area was observed during the peak periods, particularly the northbound queues
on Main Street at its intersection with Kensington Road and the westbound queues on Judith Ann
Drive at its intersection with Main Street. Based on KLOA, Inc.'s observations northbound queues
on Main Street at Kensington Road did not extended past the existing northern site access drive
during the weekday morning and evening peak hours. Further, it was observed that westbound
queues on Judith Ann Drive did not exceed one vehicle during the weekday morning and evening
peak hours and were able to exit onto Main Street efficiently.
Elm
A gap study was performed on Main Street at its intersection with Judith Ann Drive during the
weekday morning and evening peak hours in order to determine the availability of gaps or
interruptions in the Main Street traffic stream. The gap study was conducted on Wednesday,
January 10, 2018 during the morning and evening peak hours. The study examined gaps in the
southbound direction along Main Street, which would allow vehicles to turn left from Main Street
onto Judith Ann Drive and right from the development or Judith Ann Drive onto Main Street, as
well as gaps in both directions that would allow vehicles to turn left from Judith Ann Drive onto
Main Street. The results of the gap study, showing the total number of potential movements based
on gaps available for the peak hours, are summarized in Table 2.
Table 2
CTAP STI JDY SUMMARY MAIN STREET
Left Turn from Main Street
Left Turn from Judith Ann Drive
Right Turn from Access Drive and Judith Ann Drive
946
786
489
379
207
144
Children 's I'and I care
14(papil 8 KAL&A
9raarag 1.d�rr0spras Yu,�A"'#�9u¢cr�l4Parr�,�adrre,9ovx
Dircrcfla:nal Distrilbuutian
The directions from which employees and parents will approach and depart the site were estimated
based on existing travel patterns, as determined from the traffic counts. Figure 5 illustrates the
directional distribution of the development -generated traffic.
Pc,ak l lour 'J'raffiic olu:uu'm�"
The volume of traffic generated by a development is based on the type of land uses and the size of the
development. The number of peak hour vehicle trips estimated to be generated by the proposed
development of a 139 -student daycare was based on vehicle trip generation rates contained in Trip
Generation Manual, 9th Edition, published by the Institute of Transportation Engineers (ITE). Table
3 shows the site -generated traffic volumes for the proposed development.
Table 3
PROJECTED SITE -GENERATED TRAFFIC VOLUMES
Daycare
564 56
(139 Students)
50
106 47 53 100
n,"_°hihh'ei'i s /.and peri car
lel° uni Praspecl, l,lhnoi's 10
Koniq,8.,6"dr ,prwB.%�Klwpo�h
The total projected traffic volumes include the existing traffic volumes, increase in background
traffic due to growth, and the traffic estimated to be generated by the proposed subject
development.
Development Trafflk, Assignment
The estimated weekday morning and evening peak hour traffic volumes that will be generated by
the proposed development were assigned to the roadway system in accordance with the previously
described directional distribution (Figure 5). The traffic assignment for the development is
illustrated in Figure 6.
l ack ;rou�und Traffic Conditions
The existing traffic volumes (Figure 4) were increased by a regional growth factor to account for
the increase in existing traffic related to regional growth in the area (i.e., not attributable to any
particular planned development). Based on ADT projections provided by the Chicago
Metropolitan Agency for Planning (CMAP) in a letter dated January 17, 2018, the existing traffic
volumes are projected to increase by 0.25 percent per year. As such, traffic volumes were increased
1.5 percent (one-year buildout plus five years) to represent Year 2024 conditions. A copy of the
CMAP projections letter is included in the Appendix.
Total Projected T'raffic Volumes
The development -generated traffic was added to the existing traffic volumes accounting for
background growth to determine the Year 2024 total projected traffic volumes, as shown in Figure
7. It should be noted that although the typical morning drop-off and evening pick-up times occur
mostly outside of the peak hours of adjacent roadway traffic, it was assumed to occur at the same
peak hour times in order to provide a conservative analysis.
12
/rim 0' A
knrdiry,� 0...deialw�rarr�,fA"➢•pnran„J4.Nwrnenv raa.lnr.
14
Table 4
C'APAC'ITY ANALYSIS RESULTS — EXISTING CONDITIONS - UNSIGNALIZED
Table 5
CAPACITY ANALYSIS RESULTS — PROJECTED CONDITIONS - UNSIGNALIZED
Main Street with Judith Ann Drive
• Westbound Approach
• Southbound Left Turns
Judith Ann Drive with Full Access Drive
• Eastbound Left Turns
• Southbound Approach
Main Street with R1/R0 Access Drive
• Westbound Approach
LOS = Level of Service
Delav is measured in seconds.
Chddrvn
1,�1(mrl P (� l.pf �:"
C 23.4
D
32.1
A 1.6
A
1.6
A 6.3
A
4.8
A 8.5
A
8.5
B 10.6 B 11.3
16 )rim
K-9IkH;p,.4..�ie rv9 pr'u Mn ,Y`y drr�a�„t'+ga�luA�o-rn r� Briar.
Table 6 shows the total number of potential movements compared to the number of required gaps
that are needed to accommodate the projected traffic turning to and from the proposed access road.
As shown in Table 6, there are more than sufficient gaps in the Main Street traffic stream to
accommodate the southbound left turns onto Judith Ann Drive, westbound right turns onto Main
Street from Judith Ann Drive and the right-in/right-out access, and westbound left turns onto Main
Street from Judith Ann Drive for the weekday morning and evening peak hours of adjacent
roadway traffic. These results indicate that these movements will be completed without significant
delays and further confirms the results of the capacity analysis and simulation runs.
Table 6
REOU [RED GAPS — MAIN STREET
Left Turn from Main Street 946 35 786 37
Left Turn from Judith Ann Drive 489 30 379 41
Right Turn from Access Drive and 207 36 144 37
Judith Ann Drive
18 K"i6 g,k,6, rNg ren,�C�IfIWIO!U
Based on the preceding analyses and recommendations, the following conclusions have been
made:
The proposed development, given its size and type, will generated a limited amount of
traffic during the peak hours.
The results of the capacity analysis indicate that the roadway system has adequate reserve
capacity to accommodate the increase in traffic.
The proposed access system will be an improvement over existing conditions and will be
adequate in accommodating the site -generated traffic.
The results of the gap study indicate that adequate gaps exist in the Main Street traffic
stream to accommodate the projected site traffic.
The proposed number of parking spaces will be adequate in accommodating the projected
peak parking demand.
C dr d° s/ u doe N � r tl:"Oy"C
20
K xpikry ,L. d59 vin,Cp'Harax A R�i1QPXMP,.ReR er,
Traffic Count Summar Sheets
AMA6 WIN
Kenig Lindgren O'Hara Aboona, Inc
9575 W. Higgins Rd., Suite 400
Rosemont, Illinois, United States 60018
(847)518-9990
Turning Movement Peak Hour Data (7:30 AM)
Count Name: Main Street with Judith Ann Drive
Site Code:
Start Date: 01/10/2018
Page No: 2
Start Time [
U -Tum
Left
Judith Ann Drive
Westbound
R':-ttt Peri
_App T.dsa'+-Tum
T hru
Main Street
Northbound
?T;. €1i
is App, Total
U -Tum
Left
Main Street
Southbound
Thru
Peds
Ag7pTotalInt.
Tot.
7:30 AM
0
0
2
2 €
0
128
0
128
0
2
178
U
160 1
310
7:45 AM j
0
1
1
2
0
150
1
151
0
0
153
0
153 1
306
8:00 AM
8.15AM
Total
0
0
0
1
2
4
3
4
� - 10 0
4
6
140
0
0
160
116
554
1
3
5
161
119
559 '
0
0
0
0
3
5
205
_ 144
680
�. -�-�
205
147
685 1
370
272
126
� -
Appmatn %
0.0
28.6-
71.4
-
0.0
99.1
0.9
-
0.0
0.7
99.3
Total %
0.0
03
0.8
1 1
0.0
440
0.4
44.4
0.0
0.4
541
54.5
-
PHF
0.000
0.500
0-625
0.583 !
0.000
0_.866
0..417
0.868
0.000
0.417
0.829
0.835
0.850
LghU [
% Lilts
0
-
4
1000
10
100,0
14
100.0
0
528
95.3
5
1000
533
953
0
-
5
100-0
640
94.1
645
942
1192
9418
Buses
0
0
0
0
0
9
0
9
0
0
27
27
35
% Buses
Site -Unit Trucks - -
-
0
0.0
0
0.0
0
0.0
0
0
t.6
15
0,0
0
1.6
15 s
0
0.0
0
40
B
3.9
8
2:9
23
% Si Te-Umt Twckc
-
00
0..0
0.0
2.7
0.0
2.7
-
0,0
1,2
1.2 i
1-8
Articulated Trucks
0
0
0
0 s
0
2
D
2
0
0
5
5 i
7
Ariicst'4ted TrzXS -_
0.0
_ _ 0-0
0-0
-
0.4
0.0
04
0.0
0.7
0.7
9,5
S�-yes olt d
0
0
0
0
0
0
0
0
0
0
0
0
_ 0
% Bicpctes on Road °
-
0.0
0.0
0.0
0.0
00
00
-
00
00
00
00
uPjd ails Aivululljoid
CMAP Pro' ection Letter
Level of Service Criteria
CV,acity Analysis Summar Sheets
HCM Unsignalized Intersection Capacity Analysis
1: Main Street & Judith Ann Drive 01/19/2018
Children's Land Daycare Mt. Prospect 7:00 am 01/19/2018 Existing Morning Peak Synchro 9 Report
ANB Page 1
j-
4-,
I
/0�
Movement-
W L
WBR
NBT
NBR
BL '
8BT
Lane Configurations
Traffic Volume (veh/h)
4
10
554
5
5
680
Future Volume (Veh/h)
4
10
554
5
5
680
Sign Control
Stop
Free
Free
Grade
0%
0%
0%
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
Hourly flow rate (vph)
5
12
652
6
6
800
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right tum flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
1067
329
658
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
1067
329
658
tC, single (s)
6.8
6.9
4.1
tC, 2 stage (s)
tF (s)
3.5
3.3
2.2
p0 queue free %
98
98
99
cM capacity (veh/h)
219
673
939
ir(iah� La9�"t
I �
IV'1
,C�
1
B 2
Volume Total
17
435
223
273
533
Volume Left
5
0
0
6
0
Volume Right
12
0
6
0
0
cSH
418
1700
1700
939
1700
Volume to Capacity
0.04
0.26
0.13
0.01
0.31
Queue Length 95th (ft)
3
0
0
0
0
Control Delay (s)
14.0
0.0
0.0
0.3
0.0
Lane LOS
B
A
Approach Delay (s)
14.0
0.0
0.1
Approach LOS
B
Intrti�rrw rt�m�
_
Average Delay
0.2
Intersection Capacity Utilization
32.3%
ICU Level of Service A
Analysis Period (min)
15
Children's Land Daycare Mt. Prospect 7:00 am 01/19/2018 Existing Morning Peak Synchro 9 Report
ANB Page 1
HCM Unsignalized Intersection Capacity Analysis
1: Main Street & Judith Ann Drive 01/1912018
Children's Land Daycare Mt. Prospect 4:45 pm 01/19/2018 Existing Evening Peak Peak Synchro 9 Report
ANB Page 1
4
k,
t
/
i
N cve� n
VVBL,
WBIR
NBT
NV811
8BL
' BT
Lane Configurations
Traffic Volume (veh/h)
11
7
747
15
10
734
Future Volume (Veh/h)
11
7
747
15
10
734
Sign Control
Stop
Free
Free
Grade
0%
0%
0%
Peak Hour Factor
0.94
0.94
0.94
0.94
0.94
0.94
Hourly flow rate (vph)
12
7
795
16
11
781
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right tum flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
1216
406
811
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
1216
406
811
tC, single (s)
6.8
6.9
4.1
tC, 2 stage (s)
tF (s)
3.5
3.3
2.2
p0 queue free %
93
99
99
cM capacity (veh/h)
174
600
824
!rection,Lane
;1
N81
NB,2
S81
88
Volume Total
19
530
281
271
521
Volume Left
12
0
0
11
0
Volume Right
7
0
16
0
0
cSH
236
1700
1700
824
1700
Volume to Capacity
0.08
0.31
0.17
0.01
0.31
Queue Length 95th (ft)
7
0
0
1
0
Control Delay (s)
21.6
0.0
0.0
0.5
0.0
Lane LOS
C
A
Approach Delay (s)
21.6
0.0
0.2
Approach LOS
C
Nr�t�se(i S�ratim
Average Delay
0.3
Intersection Capacity Utilization
37.4%
ICU
Level of Service A
Analysis Period (min)
15
Children's Land Daycare Mt. Prospect 4:45 pm 01/19/2018 Existing Evening Peak Peak Synchro 9 Report
ANB Page 1
HCM Unsignalized Intersection Capacity Analysis
1: Main Street & Judith Ann Drive 01/2512018
0,
'kBL,
"B
Bi
SOL,,,,
I $T
Lane Configurations
Traffic Volume (veh/h)
29
15
552
33
33
690
Future Volume (Veh/h)
29
15
552
33
33
690
Sign Control
Stop
Free
Free
Grade
0%
0%
0%
Peak Hour Factor
0.85
0.85
0.85
0,85
0.85
0.85
Hourly flow rate (vph)
34
18
649
39
39
812
Pedestrians
Lane Width (ft)
Walking Speed (fUs)
Percent Blockage
Right turn flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
1152
344
688
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
1152
344
688
tC, single (s)
6.8
6.9
4.1
tC, 2 stage (s)
tF (s)
3.5
3.3
2.2
p0 queue free %
82
97
96
cM capacity (veh/h)
186
658
916
Li � et(r u tl i
'N81
NB1,
Volume Total
52
433
255
310
541
Volume Left
34
0
0
39
0
Volume Right
18
0
39
0
0
cSH
247
1700
1700
916
1700
Volume to Capacity
0.21
0.25
0.15
0.04
0.32
Queue Length 95th (ft)
19
0
0
3
0
Control Delay (s)
23.4
0.0
0.0
1.6
0.0
Lane LOS
C
A
Approach Delay (s)
23.4
0.0
0.6
Approach LOS
C
Average Delay
1.1
Intersection Capacity Utilization
49.7%
ICU
Level of Service A
Analysis Period (min)
15
Children's Land Daycare Mt. Prospect 7:00 am 01/19/2018 Projected Morning Peak Synchro 9 Report
ANB Page 1
HCM Unsignalized Intersection Capacity Analysis
3: Judith Ann Drive & Full Access 01125/2018
Children's Land Daycare Mt. Prospect 7:00 am 01/19/2018 Projected Morning Peak Synchro 9 Report
ANB Page 3
Movement,
SSL
SR
Lane Configurations
Traffic Volume (veh/h)
56
10
14
0
0
30
Future Volume (Veh/h)
56
10
14
0
0
30
Sign Control
Free
Free
Stop
Grade
0%
0%
0%
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
Hourly flow rate (vph)
66
12
16
0
0
35
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right tum flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
16
160
16
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
16
160
16
tC, single (s)
4.1
6.4
6.2
tC, 2 stage (s)
tF (s)
2.2
3.5
3.3
p0 queue free %
96
100
97
cM capacity (veh/h)
1602
797
1063
Dk dtiop Lane
I
Volume Total
78
16
35
Volume Left
66
0
0
Volume Right
0
0
35
cSH
1602
1700
1063
Volume to Capacity
0.04
0.01
0.03
Queue Length 95th (ft)
3
0
3
Control Delay (s)
6.3
0.0
8.5
Lane LOS
A
A
Approach Delay (s)
6.3
0.0
8.5
Approach LOS
A
Intersection umma
_
Average Delay
6.1
Intersection Capacity Utilization
20.3%
ICU
Level of Service A
Analysis Period (min)
15
Children's Land Daycare Mt. Prospect 7:00 am 01/19/2018 Projected Morning Peak Synchro 9 Report
ANB Page 3
HCM Unsignalized Intersection Capacity Analysis
1: Main Street & Judith Ann Drive 01/2512018
f k,
Lane Configurations
Traffic Volume (veh/h)
37
12
758
38
34
745
Future Volume (Veh/h)
37
12
758
38
34
745
Sign Control
Stop
Free
Free
Grade
0%
0%
0%
Peak Hour Factor
0.94
0.94
0.94
0.94
0.94
0.94
Hourly flow rate (vph)
39
13
806
40
36
793
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right tum flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
1294
423
846
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
1294
423
846
tC, single (s)
6.8
6.9
4.1
tC, 2 stage (s)
tF (s)
3.5
3.3
2.2
p0 queue free %
74
98
95
cM capacity (veh/h)
150
585
800
Dei�or, Large,#
,t
I"1B °1
B 2
Volume Total
52
537
309
300
529
Volume Left
39
0
0
36
0
Volume Right
13
0
40
0
0
cSH
184
1700
1700
800
1700
Volume to Capacity
0.28
0.32
0.18
0.05
0.31
Queue Length 95th (ft)
28
0
0
4
0
Control Delay (s)
32.1
0.0
0.0
1.6
0.0
Lane LOS
D
A
Approach Delay (s)
32.1
0.0
0.6
Approach LOS
D
vSuM .
Average Delay
1.2
Intersection Capacity Utilization
55.6%
ICU Level of Service B
Analysis Period (min)
15
Children's Land Daycare Mt. Prospect 4:45 pm 01/19/2018 Projected Evening Peak Synchro 9 Report
ANB Page 1
HCM Unsignalized Intersection Capacity Analysis
3: Judith Ann Drive & Full Access 01/25/2018
'A � 4— k, \,,
M vem nt
EBL
EBT
WBT
' BR
'SBL
B
Lane Configurations
Traffic Volume (veh/h)
47
25
18
0
0
31
Future Volume (Veh/h)
47
25
18
0
0
31
Sign Control
Free
Free
Stop
Grade
0%
0%
0%
Peak Hour Factor
0.94
0.94
0.94
0.94
0.94
0.94
Hourly flow rate (vph)
50
27
19
0
0
33
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right tum flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
19
146
19
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
19
146
19
tC, single (s)
4.1
6.4
6.2
tC, 2 stage (s)
tF (s)
2.2
3.5
3.3
p0 queue free %
97
100
97
cM capacity (veh/h)
1597
820
1059
0!*66n, n, Lane
EB, 1
W'B,1
"I
Volume Total
77
19
33
Volume Left
50
0
0
Volume Right
0
0
33
cSH
1597
1700
1059
Volume to Capacity
0.03
0.01
0.03
Queue Length 95th (ft)
2
0
2
Control Delay (s)
4.8
0.0
8.5
Lane LOS
A
A
Approach Delay (s)
4.8
0.0
8.5
Approach LOS
A
lntersetticrro Surma
Average Delay
5.1
Intersection Capacity Utilization
20.6%
ICU Level of Service A
Analysis Period (min)
15
Children's Land Daycare Mt. Prospect 4:45 pm 01/19/2018 Projected Evening Peak Synchro 9 Report
ANB Page 3
Judith Ano .Drive and Maio Street (Left Turn,
Adjusted for Four Lanes)
800
700
Left -Turn Treatment
Should be Considered
Left -Turns in VA
VA= Totaladvancing
traffic volume which
includes all turning
traffic
Vo = Total opposing
traffic volume which
includes all turning
traffic
tpa7 Instructions
The family of curves represent the percent of left turns
in the advancing volume (VA ). The designer should locate
the curve for the actual percentage of left turns.
f Jf�f� f)i, Jr �I? �,� When this is not an even increment of five, the
1 designer should estimate where the curve lies.
2.. Read VA and Vo into the chart and locate the intersection
of the two volumes,
" 401 3. Note the location of the point in u2 relative to the curve in
a1. If the point is to the right of the curve, then ❑ left -turn
lane should be considered_ If the point is to the left of
the curve,then a left turn lane is not warranted based on
traffic volumes,
Left -Turn
100 ent
Nott Necessary �
100 200 300 400 500 600 700 800
VA —Advancing Volume (VPH) During Design Hour
VOLUME GUIDELINES FOR LEFT -TURN LANES AT UNSIGNALIZED
INTERSECTIONS ON TWO-LANE HIGHWAYS
(40 mph Design Speed)
Figure 36-3.G
Judith Ann hive and .wain Street (dight Turn)
Illinois
of
INTERSECTIONS
Right -Turn Lane May
Not be Necessary
60
NA kjur
X96, 8)
Right -Turn Lane Should
be Considered
d
70I
;1CD 400 600 800 1000 1200 1400
DHV. In One Direction (VPH)
Note: For speeds less than 50 mph (80 km/hr), see Section 36-3.01(a).
October 2015
GUIDELINES FOR RIGHT -TURN LANES AT UNSIGNALIZED INTERSECTION
ON FOUR -LANE HIGHWAYS
(Design Speed of 50 mph (80 km/hr) or Greater)
Figure 363.13
)0
HARD COPIES UNCONTROLLED 36-33
It
Village of Mount Prospect
Community Development Department
50 S. Emerson Street
Mount Prospect, Illinois 60056
Phone: (847) 818-5328
Zoning Request Application
��I
officiammIT Use Only (To be completed by Villa
Datge e of Sua bm 1)101 t� He
—S i o n.
Case Number: P&Z i-s54��_(')
Project Name/Address:
1. Subject Property
Address es -S 0
Property Area (Sq.Ft. and/or Acreage):
Zoning District (s):
Parcel Index Number(s) (PIN(s
11, Zoning Request(s) (Check all that apply)
vconditional Use: For
El Variation(s), To
❑ Zoning Map Amendment: Rezone From To
❑ Zoning Text Amendment: Section(s)
[_1 Other:
III I Summary , , of , Proposal. us , 0 separate sheet if necessary)
- - --- ------
IV, Applicant (all correspondence will be sent to the applicant)
Corporation
Name:
Address:
City, State, zip Code: C kt'rSr*L LAW E i
Phone:
Interest in Property: Alizc6k�TEcr—,
(e g- owner, buyer, eveloper, essee,
1
Email
AeW i;acts f M_Jesi, I -_K x--
RUSSo 1R)ALAA9c1Ve'CTS-G0T
etc...)
MINUTES OF THE REGULAR MEETING OF THE
PLANNING & ZONING COMMISSION
CASE NO. PZ -09-18
PROPERTY ADDRESS:
PETITIONER:
PUBLICATION DATE:
REQUEST:
MEMBERS PRESENT
MEMBERS ABSENT:
STAFF MEMBERS PRESENT:
INTERESTED PARTIES:
Hearing Date: June 28, 2018
621 N. Main Street
ALA Architects & Planners, Inc.
June 13, 2018
Conditional Use to allow a daycare center
Thomas Fitzgerald
Agostino Filippone
William Beattie
Norbert Mizwicki
Walter Szymczak
Lisa Griffin
Joseph Donnelly, Chair
Sharon Otteman
Consuelo Arguilles-Deputy Director of Community
Development
Jason Shallcross-Development Review Planner
ALA Architects & Planners, Inc.
Chairman Donnelly called the meeting to order at 7:00 pm. Commissioner Beattie made a motion seconded
by Commissioner Mizwicki to approve of the minutes from the Planning and Zoning Commission meeting
on May 24, 2018. The minutes were approved 6-0 with Commissioner Mizwicki abstaining. Chairman
Donnelly introduced case, PZ -09-18 as 621 N. Main Street and stated the case is Village Board final.
Mr. Shallcross gave a brief description of Subject Property and explained the Petitioner has purchased and
demolished the vacant structure on the property and is proposing to reconfigure the parking lot and construct
a new daycare center with related improvements.
He further stated that the project requires a conditional use.
He gave a brief description of Staff's comments and stated that Staff finds that the daycare center meets the
conditional use standards subject to complying with the conditions listed below and that granting such
requests would be in the best interest of the Village.
He further explained based on these findings, Staff recommends that the Planning and Zoning Commission
make a motion to adopt staff's findings as the findings of the Planning and Zoning Commission and
recommend :tam -oval of the following motion:
Planning and Zoning Commission Meeting- June 28, 2018 PZ -09-18
Joseph Donnelly, Chair
Ms. Cahill gave a brief description of the existing elevations and explained that it is the company's
branding and "signature" colors. She gave some examples of other buildings around town that uses bright
colors.
Mr. Field explained that the red roof is a characteristic of all the locations; however, the Petitioner is willing
to work with staff to comply with code but would like to stay in the scheme of the colors of their brand.
There is one location that currently doesn't have the branding but will be going through renovations shortly.
There was general discussion between the Petitioner and the Commissioners regarding the longevity of the
business.
Commissioner Filippone questioned the Petitioner's opinion of the other locations. He stated that the
Subject Property is surrounded by residential properties and the design of the proposed building will not
conform.
There was in depth conversation between the Commissioners and the Petitioner regarding the color scheme
of the proposed building. Commissioner Beattie urged the Petitioner to work with staff as to what would
be acceptable to both parties when it comes to compromising on the color scheme.
Commissioner Fitzgerald suggested the Petitioner have a representative to discuss the traffic study at
Village Board.
Chairman Donnelly opened the meeting up to the public.
Citizens to be heard:
Dean Shauwalter (4 E. Judith Ann Drive)- Mr.Shauwalter stated his concerns about fencing and the current
brick retaining wall; he also asked the petitioner to address water runoff and traffic.
Megan (4 E. Judith Ann Drive)- She stated her concerns with the liquor store across the street from the
Subject Property and the broken liquor bottles in the parking lot. She also stated that the Village should
send out a notice to surrounding properties letting residents know that a building is going to be demolished
as a courtesy.
Hearing no further questions, the Petitioner addressed the residents' concerns as follows:
• The east fence line is a six foot (6') solid privacy fence
• The brick retaining wall will be either removed or repaired
• The water runoff will remain on the property
• Snow will be contained in the 3 extra parking spaces and or will be trucked off site
Mrs. Arguilles addressed the residents' concerns as follows:
The Village can provide the applicant with a list of address labels of the surrounding property for
further notification of the construction process
Shc encouraged the residents to call the Village when they have concerns of property maintenance
at the liquor store, and ensured the resident that the Community Development Department would
follow up on her complaint
Planning and Zoning Commission Meeting- June 28, 2018 PZ -09-18
Joseph Donnelly, Chair
Responses to Applicable Standards
1. That the establishment, maintenance, or operation of the conditional use will not be
detrimental to, or endanger the public health, safety, morals, comfort or general welfare:
The establishment, maintenance and operation of this children's daycare center will
not endanger the public health, safety, morals, comfort or general welfare, but
rather, enhance same. First, this proposed daycare facility has strict and thorough
rules regarding illnesses and any injuries that may occur. For example, if a child is
suffering from the flu, the child must stay at home. If a child becomes sick with the
flu during the day when he is at the daycare facility, parents are required to pick up
the child in an effort to prevent the spread of any illness. Second, given that the
daycare center focuses on the care of children, safety is of paramount, utmost
importance. Our other existing daycare operations are extremely safe. The daycare
center has a strict protocol that in the event that a child is hurt, the child's parents
are notified promptly. A description of any injury that occurs is uniformly provided
to the parents and the daycare center's personnel are trained that, if an injury is
serious, to call 911 as soon as possible. Next, the curriculum and atmosphere of the
daycare center is carefully developed to enhance the morals of the children by
fostering values of sensitivity, caring and interacting with other children and being
respectful toward daycare care providers and parents. A critical part of our
operation is to provide comfort to the children at this young age and to provide
assurance to the parents who entrust us with the care of their children that people
who are conscientious and sensitive to their children's needs will be taking care of
them during the day. The daycare center will fulfill a need in the community for
childcare and thus will not be detrimental to the general welfare of the area.
2. That the conditional use will not be injurious to the uses and enjoyment of other property in
the immediate vicinity for the purposes already permitted, nor substantially diminish and
impair property values within the neighborhood in which it is to be located:
The daycare operation will not be injurious to the use and enjoyment of other
property in the immediate vicinity for the purposes already permitted for several
reasons. First, the daycare center is located in a distinct triangular area with other
commercial properties and will have no adverse impact on same. Second, the
daycare center is across the street from a substantially residential neighborhood
which we anticipate having a need for child care and which would view the child
care center as an attractive amenity. The daycare center will not substantially
diminish or impair property values within the neighborhood in which it is proposed
insofar as people will appreciate the services that we provide. Our proposed design
for our daycare operation will enhance the neighborhood's aesthetics. In fact, a
daycare facility is a desirable conditional use that people will look forward to having
in their neighborhood. In fact, by virtue of the childcare facility being categorized
as a conditional use in this zoning district, the Village has acknowledged that the
proposed daycare center is an appropriate use. Importantly, we have never had any
issues with neighbors or landowners with our other daycare facilities.
7. That the conditional use shall, in all other respects, conform to the applicable regulations of
the district in which it is located, except as such regulations may, in each instance, be
modified pursuant to the recommendations of the Planning & Zoning Commission:
The daycare facility will conform to the applicable regulations of the district in
which it is located.
Z.\C\Childrens Land IneWount Prospect\Responses to Applicable Standards.docx
Village of Mount Prospect
Community Development Department
MEMORANDUM
TO: MOUNT PROSPECT PLANNING & ZONING COMMISSION
JOSEPH DONNELLY, CHAIRPERSON
FROM: JASON C. SIIALLCROSS, DEVELOPMENT REVIEW PLANNER
DATE: JUNE 20, 2018
HEARING DATE: JUNE 28, 2018
SUBJECT: PZ -09-18 / 621 N. MAIN STREET / CONDITIONAL USE (DAYCARE CENTER)
BACKGROUND
A public hearing has been scheduled for the June 28, 2018 Planning & Zoning Commission meeting to review [lie
application by Chris Russo from ALA Architects & Planners, Inc. (the "Petitioner""), regarding the property located
at 621 N, Main Street (the "Subject Property"). "J'he Petitioner is seeking a conditional use to allow a daycare center.
The P&Z Commission hearing was properly noticed in the June 13, 2018 edition of the Daily Herald newspaper.
In addition, the Petitioner completed the required written notice to property owners within 250 -feet and staff posted
public hearing signs on the Subject Property.
PROPERTY DESCRIPTION
The Subject Property is located at the northeast comer of N. Main Street and Judith Ann Drive. The Subject Property
is vacant with an existing parking lot. The Subject Property is zoned 133 Community Shopping. It is bordered by
the B3 Community Shopping District to the north and south, the R3 Low Density Residence District to the east,
and the RA Single Family Residence District to the west.
The Subject Property was formerly occupied by Quinlan & Fabish music store, which closed its doors in early 2018.
SUMMARY OF PROPOSAL
The Petitioner has purchased and demolished the vacant structure on the property, and is proposing to reconfigure
the parking lot and construct a new daycare center with related improvements. The project requires conditional use
approval to allow the proposed dayearc center. The various elements of the proposal are outlined below.
5i " i , e I " I " hu " i — The site plan indicates the building would be placed at the northeast corner of the site, away from the
intersection of N. Main Street and Judith Ann Drive. The building would be setback seventy-three feet, six inches
(73'-6") from the west property line, which is the front line. The building would be set back thirty-six feet, two and
one-half inches (36'-214") from the from the north interior lot line,17he building would be set back twenty feet (20')
from the eastern (rear) lot line and thirty-six feet, one and one-half inches (36'-11/2") from the exterior side (southern)
lot line. The proposed building meets all setback requirements.
The parking lot meets the minimum required ten foot (10') parking lot setback. One of the points of ingress and
egress is being moved from Main Street to Judith Ann Drive, and the other is being reduced to a right -out only.
PZ -09-18
Planning & Zoning Commission Meeting June 28, 2018 Page 4
�c ltl�r�4rl frd I.INpsty grw�,laurrl;1, — The plans indicate all rooftop mounted mechanical/utility equipment will be
screened. The plans do not indicate any ground mounted mechanical/utility equipment.
1kr¢Is.;11ir1g — The proposed landscape plan would not comply with all of the Village Code's landscape
requirements. The landscape plan will be required to be revised to provide additional perimeter landscaping. A
revised landscape plan will be required at time of building permit application.
The Zoning Ordinance requires the installation of an automatic underground sprinkling system. An irrigation plan
was not submitted and will be required for the proposed development.
(, glr�ing, — The photometric plan indicates the proposed lighting for the development. The proposed illumination
levels along the southern lot 1 ine exceed the allowed two foot-candles (2 fe.). The Petitioner is not seeking variations
to the lighting requirements and will be subject to comply with the Village Code.
Traffic — Staff requested and received a traffic study for this project due to concerns about potential traffic impacts.
Daycare centers are busiest during peak times, and there are no dedicated left turn lanes on either N. Main Street or
E. Judith Ann Drive for ingress or egress. The report, created by Kenig, Lindgren, O'Hara, Aboona, Inc. (KLOA),
finds that there will not be any detrimental impacts on traffic in the area as a result of this project. Engineering staff
have reviewed the traffic study and concurs with the results.
ADDITIONAL STAFF COMMENTS
Fire — A fire sprinkler system in accordance with NFPA 13 and a fire alarm system will be required. All new
sprinkler risers and associated equipment shall be located in a separate room with a minimum of one hour
construction.
�drauJ,gc,!I,W,plg — Public Works has no objection to the construction and operation of a daycare facility at 621. N. Main
Street. Because the site is greater than one-half of an acre (0.5 ac), the MWRD will require a Watershed
Management Permit including volume control measures. It is not clear how the MWRD will consider the synthetic
turf in determining the amount of volume control needed. No space is indicated on the plan for the volume control
measures that will be required by the MWRD.
COMPREHENSIVE PLAN DESIGNATION
The Village Comprehensive Plan designates the Subject Property as a neighborhood center. This land use
designation is appropriate for a mix of business offices, small-scale retail, restaurants, daycares, professional,
service, and other commercial uses. The proposed land use will be consistent with the Comprehensive Plan's
designation.
CONDITIONAL USE STANDARDS
The standards for conditional uses are listed in Section 14.203.F.8 of the Village Zoning Ordinance and include
seven specific findings that must be made in order to approve a conditional use. The following list is a summary
of these findings:
• The conditional use will not have a detrimental impact on the public health, safety, morals, comfort or
general welfare;
• The conditional use will not be injurious to the use, enjoyment, or value of other properties in the vicinity
or impede the orderly development of those properties;
• There is adequate provision for utilities, drainage, and design of access and egress to minimize congestion
on Village streets; and
April 6, 2018
GREENING PLANET EARTH
Mr. Carl Anderson
Carl Anderson Construction Services
411 Liberty Street
West Dundee, IL 60118
RE: Site Permeability
Dear Mr. Anderson,
Thank you for taking interest in Global Syn Turf and our Pet Turf. As you see from our ASTM test
results, our Pet Turf will allow over 121 inches of water through the turf per hour. The
permeability of the entire turf system, including stone base and drainage, is what needs to be
evaluated. The design of the system can be done and built in a way that will allow for almost
100% permeability if the correct materials and drain field is put in place.
Please call me any time to discuss your plans and we can make sure it is being done the way
your client wants it done.
Sincerely,
Greg Weitz
14
■
PH
,Q
e
.& ERONT amN
. « ;� ?
JEIEELV! m »
RE
M CALPIN INC
Railing
Fence Baltimore
d
Columns
Gates
Browse Catalog
Instructions,
literature, and
other
information
Gilpin Inc.
1819 Patterson Street
Decatur, IN 46733
(260)724-9155
(800)348-0746
Fax: (260) 724-9849
ts(ggilpininc .com
{F
Pickets
Like Pa
sq
I"sq.
Rails
Rails
1" x 1"
15/8" x 1 5/8"
Posts
" sq. x.060"
2 1/2" sq. x.070"
%.�
2" sq. x.125"
Gilpin
Inc.
abouts
years ago
7
8 1
Gilpin
Inc.
about 5
Baltimore fence offers a unique style. Baltimore has a smooth top with
alternating spear point pickets. Most heights are the standard 3 -bar
style. If Baltimore is 6' or taller, a fourth bar is added at the bottom.
Available in a variety of heights, you are sure to find the fence that will
complement your home or business.
Baltimore gates are available to match your fence. Gates are available
from a small walk gate, to a double drive gate. Cantilever gates are
available in Elite (Commercial) grade Baltimore.
Baltimore is available in two grades. The 1-5/8" cross bars and
1" pickets make Elite Grade ideal for commercial use. The
Standard Grade utilizes 1" cross bars with 5/8" pickets.
Powder coated in your choice of black, white or bronze, your
Baltimore Aluminum Fence will require minimal maintenance.
Product Specifications Part Numbers Other Information
Pickets
5/8" sq.
sq
I"sq.
Rails
Rails
1" x 1"
15/8" x 1 5/8"
Posts
" sq. x.060"
2 1/2" sq. x.070"
Gate Post
2" sq. x.125"
1/2" sq. x.125"
MAMAAM����Il�
ME 7:7
11 111 MINI
EcoStone fence panels available in:
" Tx 6'
36" High x 72" Wide
• 4'x 8'
48" High x 96" Wide
• 6'x 6'
72" High x 72" Wide
8' x 8'
Two 48" High x 96" Wide Panels Stacked
"
rrr. rr"r�.
All panels contain high-grade galvanized steel in both top and bottom rails. Panel heights cannot be
modified; however, panels can be cut to any custom width. Our panels have been engineered to allow
stacking to create 8ft, 12ft and 16ft high walls.
Posts available in:
8.5'(102") Posts
• 102" t irk.
Line Post 5" x 5" Outer Diameter x 102" Long
102" Corner Posh
Corner Post 5" x5" Outer Diameter x 102" Long
• 102"En Post
End Post 5" x 5" Outer Diameter x 102" Long
12'(142") Posts
• 142" Line 'Post
Line Post 5" x 5" Outer Diameter x 142" Long
*142" End Post
End Post 5" x 5" Outer Diameter x 142" Long
ul
W II
co
z
CL
< z
1�
LLI
U) z 4 i4
0
CL LU
0 z
xi
xk
IL
ul
W II
co
z
CL
< z
LLI
U) z 4 i4
0
CL LU
0 z
xi
xk
IL
■
REVIEW m
\\
owe.°
NOT m
_mU m
�
ƒ\\
2R«
\\\
�\
■.
�a
�
RARDSCAPE HARDSCAPE
PLAY PLAY _
SURFACE - SURFACE
f � m
3
...
d.
OIL E
S
n
a
Sig PROPNEW
\ \
ol SED N
BUILDING���
vATWO-WAY AISLE
11,026 $F
�\ ■ _ \\ PLAY
!$ "�' _ SURFACE
e Lanbscape Screening with
,� _ —SPLs: Ornamental Tref and,
PardnnlaUGroundcover
71 HARDSCAPE
�. •Y ........ PLAY ~� 'HARDSCAPE f �.
\ - SURFACE PLAI
Suq�e_
It
fi
�N
VAvM
JUDITH ANN DRIVE
CHILDREN'S LAND
DAYCARE
X11 INI N'I(111 nl.l.i
1
PROPOSED SI f E
PUN
S100
0oandary and o og aphic Snmcy
SYMM "ND
ABBREVIATION LEGEND
fi .. ..-_.
-
4 tee_
�a
,
u
... j
3c+s c= c
LINE TYPE LEGEND
0oandary and o og aphic Snmcy
,
u
... j
s
3
Page 1 of 1
m
https://www.boarddocs.com/il/vomp/Board.nsf/files/B2M4E474A810/$file/Modified%20Rendering.jpg 7/13/2018
lo
qmw—w
, III" w
ME
V IN
Page I of I
https://www.boarddoes.com/il/vomp/Board.nsf/flles/B2M4EE74B78C/$flle/Original%2ORenderingjpg 7/13/2018
ORDINANCE NO.
AN ORDINANCE GRANTING A CONDITIONAL
USE FOR A DAYCARE CENTER FOR PROPERTY LOCATED AT
621 NORTH MAIN STREET MOUNT PROSPECT ILLINOIS
WHEREAS, ALA Architects & Planners (`Petitioner), is seeking a conditional use to
construct a daycare facility on the parcel located at 20 W. Northwest Highway and
legally described as:
LOT 1 IN OLSON'S SUBDIVISION OF THE WEST 252.87 FEET OF THE NORTH
177.54 FEET OF THE SOUTH 636.08 FEET OF THE NORTHWEST QUARTER OF
THE NORTHEAST QUARTER OF SECTION 34, TOWNSHIP 42 NORTH, RANGE 11
EAST OF THE THIRD PRINCIPAL MERIDIAN, EXCEPT THE PORTION TAKEN FOR
PUBLIC HIGHWAY, IN COOK COUNTY, ILLINOIS
PIN: 03-34-200-073-0000
WHEREAS, the "Petitioner" seeks a Conditional Use to construct a daycare facility as
shown on the site plan attached as exhibit "A", and
WHEREAS, a Public Hearing was held on the request for a Conditional Use being the
subject of PZ -09-18 before the Planning and Zoning Commission of the Village of Mount
Prospect on the 28th day of June; and
WHEREAS, the Mayor and Board of Trustees of the Village of Mount Prospect have
given consideration to the request herein and have determined that the request meets
the standards of the Village and that the granting of the Conditional Use to allow a
daycare would be in the best interest of the Village.
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND BOARD OF
TRUSTEES OF THE VILLAGE OF MOUNT PROSPECT, COOK COUNTY, ILLINOIS
ACTING IN THE EXERCISE OF THEIR HOME RULE POWERS:
SECTION ONE: That the recitals set forth hereinabove are incorporated herein as
findings of fact by the President and Board of Trustees of the Village of Mount Prospect.
SECTION TWO: The Mayor and Board of Trustees of the Village of Mount Prospect
grant a Conditional Use permit for a daycare center at 621 N. Main Street, subject to the
following conditions:
a. The utility sheds shall be at least six feet (6) from any side and rear lot lines;
b. Compliance with all Development, Fire, Building, and other Village codes and
regulations
c. Submittal of a landscape, irrigation, and photometric plan that comply with
Village Code requirements;
d. Development of the site in general conformance with the site plan prepared by
ALA Architects & Planners, Inc. dated June 7th, 2018; and
e. Development of the building in general conformance with the elevation plans
prepared by ALA Architects & Planners, Inc. dated February 28th, 2018,
0
Yll
BoardDocs® Pro
Agenda Item Details
Meeting
Category
Subject
Access
Type
Page 1 of 2
"t,.n$I PPn^jj o
Jul 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m..
7. NEW BUSINESS
7.3 AN ORDINANCE AMENDING CHAPTER 13 "ALCOHOLIC LIQUORS" OF THE VILLAGE CODE
OF THE VILLAGE OF MOUNT PROSPECT TO CREATE LIQUOR LICENSES FOR
ESTABLISHMENTS WITH VIDEO GAMING.
Public
Action
Recommended Action Approve an ordinance creating liquor licenses for establishments with video gaming. Video
gaming revenues shall be restricted to property tax abatement and pay -down of callable
debt issues.
Public Content
Information
At the March 13, 2018 Committee of the Whole (COW) meeting the Village Board reviewed video gaming; local
establishments owners and operators were present to discuss the business need for video gaming in Mount Prospect.
Permitting video gaming would provide local establishments the opportunity to offer their customers the same
entertainment value afforded in surrounding municipalities like Elk Grove, Buffalo Grove, Prospect Heights.
Afterwards, staff with the Village Attorney created a draft ordinance with a variety of possible local restrictions
and several restated Illinois Video Gaming Act (the "Act") restrictions. The Economic Development Commission
(EDC) reviewed video gaming and the draft ordinance on May 9, 2018. The EDC supports permitting video gaming to
provide eligible local restaurants access to another revenue source which could be used to support operations and
improvements. EDC's recommendation and feedback on the drafted ordinance were presented to the Village Board at
the June 12 COW meeting. The draft ordinance was revised after the June 12 COW meeting and represented at the
July 10 COW meeting.
Overall, the proposed ordinance requires eligible establishments to have a video gaming license issued by the Illinois
Gaming Board and comply with all provisions of the Act and all rules, regulations and restrictions imposed by the
Illinois Gaming Board.
The proposed ordinance restates a few Act restrictions, which include:
• The operation of video gaming terminals shall not be permitted during the hours alcoholic liquor sales are
prohibited as provided in Section 13.403;
• Video gaming is prohibited in any establishment located within 100 feet of any school or place of worship as
defined under the Illinois Video Gaming Act 230 ILCS 40/1 et seq.;
• The total number of video gaming terminals located in the establishment shall not exceed five (5);
Home -rule municipalities have authority to further regulate video gaming beyond the Act. The proposed local
restrictions were refined through EDC and Village Board discussion. These restrictions are also found in surrounding
communities' video gaming codes.
• Prohibiting Video Gaming Cafes;
• Requiring the type of barrier utilized to segregate the video gaming area and the site plan to be approved by
the Village Manager;
• Unlawful to advertise for video gaming via any sign visible from any street, public right-of-way, etc;
• The establishment shall install, operate and maintain a video camera surveillance system capable of recording
the segregated video gaming area;
https://www.boarddocs.com/il/vompBoard.nsf/Private?open&login 7/13/2018
ORDINANCE NO.
AN ORDINANCE AMENDING CHAPTER 13 OF THE VILLAGE OF MOUNT
PROSPECT'S MUNICIPAL CODE, "ALCOHOLIC LIQUORS," SPECIFICALLY
SECTIONS 13.101, 13.204 AND 13.204.1; CHAPTER 23 OF THE VILLAGE OF MOUNT
PROSPECT'S MUNICIPAL CODE, "OFFENSES AND MISCELLANEOUS
REGULATIONS," SPECIFICALLY SECTION 23.503.1; AND APPENDIX A, DIVISION
II OF THE VILLAGE OF MOUNT PROSPECT'S MUNICIPAL CODE TO CREATE
LIQUOR LICENSES FOR ESTABLISHMENTS WITH VIDEO GAMING
WHEREAS, the Village of Mount Prospect ("Village") and its officials are authorized
pursuant to the provisions of Section 4-4 of the Illinois Liquor Control Act of 1934, (235 ILCS
5/4-1, et seq.), to provide for the control, management and licensing of the sale of alcoholic
beverages within the corporate boundaries of the Village of Mount Prospect; and
WHEREAS, the Village has determined it is necessary and desirable to provide additional
classes of liquor licenses, which would allow its recipients to operate video gaming in the Village;
and
WHEREAS, the President and Board of Trustees find it is in the best interests of the
community of the Village of Mount Prospect to approve the Ordinance as herein amended.
NOW, THEREFORE, BE IT ORDAINED by the President and the Board of Trustees
of the Village of Mount Prospect, County of Cook, State of Illinois:
SECTION A:
Section 13.101 of the Mount Prospect Municipal Code, "WORDS AND PHRASES," is
hereby amended to include a new definition of "Educational Facility" and "Video Gaming Cafe"
to read as follows:
e!ill„
l ft;ro CAIf:.. / n eslabfiau8n�rrn��ai....^�\�����r...ltM���;�� ��m �;;�n���: �a�� u�#uJ.-S Kiel -fin gr�!M
th
� �� aa��.l Coois incidental to thc�� ii.��ypmdeo �g—a:1141dea�
;a ° i..".:it: ,�@ _ kN�ut�4c l in Il ii. w iVV iae 0f" VivauugLPr0Sj.!i,, m
SECTION B:
Section 13.204 of the Village of Mount Prospect's Municipal Code,
"CLASSIFICATIONS," is hereby amended to read in its entirety as follows:
A. Licenses: Liquor licenses in the Village shall be divided into the following classifications:
1. Pucka e Licenses (P');
Class P-1
General package license .......
Class P-2
Secondary package license.
Class P-3
Wine and beer only package license.
394112,11
1. Management entity certification.
2. Outdoor certification.
SECTION C:
Section 13.204.1 of the Mount Prospect Municipal Code, "DESCRIPTIONS AND
RESTRICTIONS," is hereby amended to read in its entirety as follows:
The restrictions on a particular license, permit or certification classification shall be binding on the
licensee and no premises or activity may be operated in violation of the classification restrictions
and regulations. No license, permit or certification may be issued unless the applicant's business
is specific to one of the following classifications:
. aM.� m. l �. s ,�� lmum�m3lllrrumr rurmmwlll authorize v'ly rr�rxmw mturrumfl'
l he Ulllm:lrvmrm �.: wtm m tmsmuu t l trr mll Ill imrm mm .n.,.,�
illmrzrmummplr tll 1trCm°mmw arm°mS, em„,.nm.
,, m�:�tn�H�11uisll rrient �m�, sl iiav a yiuh
a Vu ” � ai muu rmll.� VCura m mm ;,
u. Tile
Board un a,earrmmmlal,iiU, wit t_he,_l�rrllmm lllmm� mt�:.w�Hmnl �ium�lmr �:u��mmiitm ct�..,,,3.0 ll C...�m...'lQ/I t
to ytu.ml m�u°mmu and restrrmc tuiomms iuui' m L!La sed 'b tmmill g B oIm��lll
lm. ,Video Glhlmioamumg_. rrw� � ru wdefjn dll umm Sectia"llm l leeeeal Q� 11 r r lam l gut m9
�3 rulr�ula1 � Stullll'll rarrmt l m m t��l�� �� (luwur m�m��m fli GwptirF
;. � ll..ro�lli°u ul�wi�uw dmf°..mmlu�mrrt�imurt ....
mull..l lrrrllaimm Illu irrmmmm4`�6u emit, i Er IL u m m' ��nu. _upmmSeclj g 13.40 3
mJ. Videohi,.;�;mmmny lablisf�gi uut �,��reat d wil ku „! 010 feel of ail s h0
� � l i la ul ... lmm llntl dt.°Iljlwued told u..iibelll�inoiiis Video t:�rrtliitlg m,1-. 9 ll t S ml0 l et
yllt�um°
rrw. Vmmt;lcgmg. ur°r°ming, s[j is
jj. r.lm m. mtm l„uru m,rgml m ttltll..,mlm m m mt _r tijeted
31"'m...u'm:9m1a..3..!>lu�lm.luuwau�ml„s1t9rufll_dluiuWwgmdu_,m,lmu_atul,lmu,�ro„ll lmul:'C
local, 'allll video 9 ��q��3..mu���.,,lm u�m�uum��u3uu �mm�'ll ��1 3x �o l.m�lrriee to �uaillz to &�eure ��ut�e
la.m�lm,�uauul rr3...m ....,�..�
flu mmm i u mw L dftjgwe =a� tau u.�.. sucli_ l�awlwgje s iall....111A m.�3mr�trtict the VicN of die Niueeo
�mmumirmma m7m �m m lm mHmialllI b vu ulatlt,.., to Mtm lml tra m rmt Ai(wmwtmr rolqu l,a lml arl such _i; ,
ish�lll.,a1111V�t mem �f�,r�°tl�wmn �wrr tlmt.,.,"~13�uMn��1� ��llla�am� m.muw m�l��mm�m�m mm....
Flie...total mmturil)er mtf'Vialc.ogg! ),jij j� ��m� gals located In [lie emltablishnmwerl3m.” luill n, (,A
c x mm eme� R....f.3.:3
lam 1011.3 ..lstalYr 4miuyiegi shdl„ mummummll li11 aIl.....” j119au_x�si n_:um�uu6m;u�ual�m� .un1V it slml.be
f6lll to �ujv m;tis m1m)nr....viud o m��rrmuuum a7ig lai2y_sii,lml...Kisiblll firo mm u~u�.m°1�street �mllm y_.l m„
mmrmM� ._...��„�
mtr�� r uOLI m1 rrlu at[1in lite 'lll�tt
f The ostablkliriiert ilv,ill be t rrualr l 2 nl �-, LD...gjlj cmt ._dull lmlu,l tmtm�au.....1 ideo m„Munw l,a
surveillance wu�ui._W..'camummla"lt. of recorrdinuuuclbslumum tm d.lro4ticmttm 111 °;.
Egprt'Scitadom mud flmml se;Are ated area of..tp,,mm... estimbliswlmummtrlmt �Njlere dw termuIinals are
Gr>su 1 1 1 � lelahl the video recOII- lull. ,; Baum (.umnlmal ed �';lp�u�ITjj,,mmmum�ufm r a 111u�im�mmIUM Of'
tllmml M. ll �l u u l ktq rcgjm<j._,.s shlm,lll b Muu,"ui tmm uum lmm iurrrmla m t@amu rol.ice
t�l�.l�:rrutmt��u'm� rm�tr�� r�uu^�l.tl,l���ttlr.:
L �lm�le , '�l�mw�lNl�luu�� ill Miall be cLgtl)l2m d vfth"rl...mluumol t cmma~e t lmµtirgiaau_ �t.Wumi.. systeiri...tci;',.
twrl."tliwest (_l mmimral Dis'ptmtch iii.io starices of in )e °�¢tmmmted w mum Nto time mslablirlmmm,�.mit,
����puWlm �«ar�m��mm�t� m�lm�tl� �m��llt,��mlllr�l� lmiy �kmr� rlumm;l`mml 2�mu�m�w,3
394112„„1
c. Wine And Beer Only Package License: Class P-3, for the delivery only of wine and beer
in its original package. Regulations specific to the Class P-3 license:
(1) No Class P-3 license shall be issued for a premises whose primary business is
the sale of groceries or other products not related to the sale of alcohol unless the
premises occupies at least ten thousand (10,000) square feet of floor area.
d. Wine Only Package License: Class P-4, for delivery only of wine in its original package.
Regulations specific to a Class P-4 license:
(1) No Class P-4 license shall be issued for a premises whose primary business is
the sale of groceries or other products unless the premises occupies at least ten
thousand (10,000) square feet of floor area.
e. Home Delivery License: Class P-5, for the storage or loading within the Village of
alcoholic beverages that are to be delivered to residences. Regulations specific to a Class
P-5 license:
(1) Only beer and wine may be delivered within the Village pursuant to a Class P-
5 license.
(2) Delivery within the Village must be made directly into the hands of an actual
individual and may not be "dropped off' at an address.
B. Class F Licenses (Food Service):
Restrictions Applicable To All Class F Licenses:
a. The premises shall be primarily devoted to the preparation, cooking and serving of meals.
b. The premises must have a kitchen, dining room, staff and equipment as deemed adequate
by the Village health authority.
c. Full food service including dinner and/or luncheon menus shall be offered at all times
while alcoholic beverages are served.
d. See subsection E2 of this section for off site catering privileges.
e. See subsection F 1 a of this section for outdoor service of alcoholic beverages at
establishments that are within three hundred feet (300') of a residential zoning district and
subsection 14.311 B of this Code for regulation of outdoor dining areas in other parts of the
Village. See section 13.408 of this chapter for the holding of events for civic organizations.
f. Spirits may not be sold, delivered or served by the bottle. (See banquet facility exception
at subsection B2e(2) of this section.)
g. Infused beverages may be delivered only in accordance with State regulations.
2. Specific Class F Licenses:
a. Restaurant Without Lounge License: Class F-1, for service of alcoholic beverages at a
restaurant. Regulations specific to a Class F-1 license:
(1) Consumption or allowing of consumption of alcoholic beverages at any place
other than dining tables is specifically prohibited.
(2) Service of alcoholic beverages shall be limited to those patrons dining in the
restaurant.
_._° �• 0/ 1
��"����lm¢�m�_���:m��i��t! a��_�l�ipa°u;�d underunder�ku�; ��b:��c�n" '�����,� w� �:�agmui� ,��� '�.�� ��w, ,....n,�
3941121
n mL R sta iarant t %n Wlmrc nrrnn w License: nn e: :;Maass t 3 �man.�.. �alraivalViunata ��� cn4lc cnitcnml�il� ana�n..t.a
n4 wa"�nRCn�nTnt nnntt�g9m llnnnn 'n' to �a Jaaa'�Ctt Qan nR a% '!!1 ' alp"���'�'�rize I C 0b ,q 147n o
�wa�__.._. n. „m.., ate, �_l_.. .... �. �.�..._.w..... _ .,. .......,,,,
gain�u de Ise ., :Lw ± is .nnsed j[�niisesR qL,, kLn
_ awnkn n mina ndn �u; k im a m
in (lie na n ml ;�nnno „ r the j2!: inniinayes shall b
Hci, ntct _taa thus pnaa�aamtaa� clnnlinn hl t,lnc nama,�lrrnauannnt
� .).. llccaholllcn beverages jjrlna....,.'ra�,a gd in thelka�m�innn�r�nnnm°�un��� ��� tkunw.lsnmarnais s it
.' ..m.. _i._.' mmic;Iw
orwithout tlil� �c irr"�ca � nta` lancncl....
)..�1 he total loungarea shall I)e no nnWnorrrl�yl`dnn lloor area,
Ld tl c naa nnuil na ra.
l hn ,, ncstaatntlnant �'n, �._ �._._. z' awns i �.... ° �ro
°cnaaauc �arnlnldr ��naaauun Vuc;cnu°a n... Sana Ian l uilncau aunnnnn�l.�
ctvnncb 'hi accoidance y/mk i tKn vo��^� on of the Video Gaanfine �ct, 230 ILCS 4011
n ew
and sh'lk cn,om a with nl� cn~�isjion s o tlae Illinois _ .�a_..__ dac t and
_. ..a � �"�nB�.nn t�nntnnnnnn�� �.e.
aall nnnke n nn nn n a�p�r¢ms and rest icti nn mn�mt��t�s t�, � �flnn ka�nnn �� t���tn�nre�anl .,ltn,'Lkla .
d. Private Club License: Class F-4, for providing of alcoholic beverages at a private club.
Regulations specific to a class F-4 license:
(1) Service of alcoholic beverages may be only to: a) members; and b) guests of a
specific member if that member is also on the premises.
(2) The organization must own or lease a premises of sufficient size and character
for the reasonable and comfortable use and accommodation of its members and
their guests.
(3) The licensee's affairs and management must be conducted by a board of
directors, executive committee or similar body chosen by the members at an annual
meeting.
(4) No member or any officer, agent or employee of the club may be paid or directly
receive as compensation, any profits from the distribution or sale of alcoholic
beverages at the club, beyond the amount of such salary as may be fixed and voted
at any annual meeting by the members or by its board of directors or other
governing body out of the general revenue of the private club.
' Video t mq�,n`�n:an nes dethiled mm�'mnmhIe tern: 1WVlnng.y: w'n,deo ttjnnin:A! 230 11—t..S 40/1
antt c sh;�nllll not dna allowed ina C' tai F4 Hceilr�na a��pnre nnisc s.
a
nl-all ,'H n lVaft._m!1�lUb License.,p ,..hiss N...^'ll . f6rr° lnnmm�r~tnwridirig (11 �ln«� lic)gnn ��n ��s � nn snit atm.lt�l � nt r.
club _a riid reaurlth(Irirzc, die as ncnrantiona cel n iclla"o..N an�nunnaa allt_✓n ass uapg!2 th w �uara nn �ccl,_ c nnn� as ..
lt.e nl<al,tnn ,, laecifi� �o a class l :1. ' liccnse.
.� �W ��...�,....a mm � d atenr n ('uta t llna,hi na nnts a�,'
annll li inn al....�n�ntc nann�l. �tanlln...... annc..... �nnnclV Ihaa a nn �a�..
a:iefjn�c.a'l...l) �kan.r �acln as �ana�nnnnc� c t . � ��NI�N� �t �i� md.,. t µca ,�a0 �e c llw�w�uiWe to rec�aWnive
���.� A
ac Glass IF -4 V l for ew!rre.
n acc car gull o'8mclWll..i.4. Ilkn °nc lnT, � ; be �nn�n�ll„V tcn: anwa�ll
Paaamnfln, Unnan�"u�mts�nwa� igl�nt_aantnww�o�s,�npncn�;rnn tlnanWfa;a.u�nK.y.
.Q ,H Lc )rgg1I;MWlGOn 11111st own Or lease a 'Calisa s f suffl 11 ntms6ze alntj c11karriwter
16'..the nt rnu�aann n�a�� �nnro��_�arnwanlrrtrrf�m�a�nn tnse and aaMauotaignodati nt of its me nta n s and
�;;�ma�laiam n�aru,a��ntnn.
...tic nn, e 's tnflaairs amll nn°lnnuaa�^uyg nWen t wwun�ast be coa"dgcte(lll [�Py an bcnanucl..mof'
dunaa tcaaarr c c antra a° counnardite can shnmaallla laod clnnnr�Lr ' _ a , ..... .
a � Ihn Linc nacc mm�l�ncn � atan �nunnnurlal
nleeti1-111— nun�..
3941121
1.-'2 1ima r....:j�� mmm aS dCfiimm0j UnCm 11 tfic 11kunw;wmwusmVk1eo Ga ctmm230 ILCS 44 r'.1
al al. sh aH math..be pmlovved mn a 'ISS �mm licensed
h. Brewpub License: Class F-8 for service of alcoholic beverages at a restaurant which
brews beer on its premises. Regulations specific to an F-8 license:
(1) All regulations applicable to a class F-3 license shall apply to an F-8 license.
(2) The licensee must be in compliance with state regulations applicable to a state
brewpub license.
(3) Growlers and howlers.
(A) May be filled only with beer manufactured on the premises; and
(B) Shall be filled and sanitized according to all applicable laws and
regulations; and
(C) Shall be sealed with a tamperproof seal; and
(D) May be sold for off premises consumption only.
'll.lw...iideo arr imma as k1e i" died Um1 r the x,11'1 inou.„u Vk,1eO:m,Qaq uint,A t 230 11. CS 410/II
ua m la alllll not be aall owc(:lll in ra Class 1�"...3 Vulwwe_m scd_ .� mmmmrr _a
Lt. nnnfa mr mm ac, CIlass F 8 lain„�,rriic1 (4mll ol.ia),u bmmr m m ,�,m!� rim� �......;m m N�mu�aw;'�h°m
brc%%as beer awa on ama,maaa t avid at,g "n'a tj e th 'a iktn.moti o vii o gug ni n ..devise ra )amau plat.
% maa)TmgMk ReMflatlmum sxl:,mfi to ""In 1`4-v lmcmnsc
III o „11.1 me; „uullam�mamma mllllama, Ilan a na„ lr:as 1 1...N lura;,m.se slmall �a r�m..l� m'r atm 1.
iCen e.
('21)
a+ Diana aw,a. wngsll be imi (']oj mrrum ✓i llstat.f-jktl�.�ns Zlgj is al°rlmd to a qg
lauaai� 0 license.
n:se.
. 1 pro lers, and liovders...
l l..lm aan ,p A a m mnaml w 1� 1 mww ma lu to l uu l awaam the JrILL!msgs: pan
lel ° I'm 111 m :.. mlllll mall„ m�u mpmMn mrn�l �m aaaa li;mi lo, etIII;Q„ aallac alflll !Il rsmn(m �1l.
r�r�lma�'mamaa�, t111a�1
lma�mll g , a ,litnd ll ma 'Oorseal. and
be...sold For ofl' tw ryw"� t.sw.00k1,amt;u !L! 'M1Y
ll...l lma m r r. au a a ld.lamai a vaalett l as mmmmam ftense a iied W�"a'.µ,111-e..1'VG�u a i u� �aa;mig,
(. ,.
Boamalll "n accordance e MtWt:...fficm m�o�am�_s ofifie VWeo.GamlmiuiutgS _ ll/..I.
al,. ally shall .rmmmminllr ung malllpaoAjsnlnns o tlmu�...Iffiaa�ois ViaJ<r,��w��;�umamaaa��m ..m m � �aal(lll
ll'IJ'll maaV nm nr ugiwaa�iia�maa! am al restoitt'.;omrs..11t. .mfr gm (L,at���m , �;� iivarmar �tatawmiiau tnnm�l..:.
C. Specialty Licenses: See section 13.408 of this chapter for the holding of events for civic
organizations. The following restrictions apply to all Class S Licenses which allow Video Gaming:
1. Hotel License: Class S-1, for the service of alcoholic beverages to guests of the hotel.
Regulations specific to the class S-1 license:
a. Alcoholic beverages may be served, consumed or allowed to be consumed only in
guestrooms, hospitality suites and other areas of the hotel that are designed, designated and
used as lounges or food service areas.
b. If the hotel premises is used for private events, then the regulations applicable to class
F-5 (banquet facility) shall apply.
3941121
4. Gourmet Beverage Shop License: Class S-4, the regulations governing class P (package license)
shall apply, except as follows:
a. A gourmet beverage shop license shall be available only in a B-5 zoning district.
b. No "spirits", as defined by this chapter, may be served.
c. Glasses or flights of wine or beer may be served on the licensed premises under the
following conditions:
(1) Hors d'oeuvres must be available for consumption with the wine or beer.
(2) No more than ten (10) ounces of wine or twenty (20) ounces of beer may be
served to any individual during any day.
(3) Each glass or flight of wine may contain no more than five (5) ounces and each
glass or flight of beer may contain no more than ten (10) ounces.
d. A class S-4 licensee may conduct off premises winetasting upon securing a daily or
annual sampling license endorsement and in accord with the regulations for such
endorsement. On premises samplings do not require a sampling endorsement, but
nonetheless must be conducted in accord with the regulations of subsection E1 of this
section.
e. A class S-4 licensee may serve wine and beer at an event where the sponsor has obtained
a permit even if the event is not on the S-4 licensed premises.
f. A class S-4 licensee may serve wine or beer at a Mount Prospect licensed business which
does not otherwise possess a Mount Prospect liquor license under the following conditions:
(1) Such service may take place at a promotional event inside the business premises
only.
(2) The business must have obtained an ad hoc permit.
(3) Such service at any single business may be made at not more than two (2) such
events in any license term.
(4) The S-4 licensee may not conduct such service for a total of more than twenty
(20) times in any license term. The licensee shall notify the commissioner, in
writing, not less than fourteen (14) days in advance of any such service event.
., ' Wee Q arrj�as cgs deflned ogder tfie fflirlois Vid a� :uku &� L il�i °., IT et ss 1;:..
sh,,illll utot be a IN owa d;,.iin as Class S -4lic errs Lljj[�,116SCIS
5. Movie Theater License: Class S-5, for delivery of alcoholic beverages at a movie theater.
Restrictions specific to a class S-5 license:
a. Service of alcoholic beverages shall be limited to a designated customer bar.
b. Service of alcoholic beverages may be made only to persons wearing a wristband
approved by the village of Mount Prospect police department ("alcohol wristband"). The
person dispensing alcohol wristbands shall have completed a certified alcohol awareness
training course as set forth in subsection 13.407F of this chapter. The alcohol wristband
shall be valid only for the date on which it is obtained from the movie theater. This
subsection C5b may be waived, in writing, by the commissioner if the commissioner is of
the opinion that other procedures instituted by the licensee provide acceptable substitute
measures to assure that underage persons are not served. This waiver may be made only
after a review of the written statement of practices that the applicant intends to institute. If
there is such a waiver, the waiver may be withdrawn by the Commissioner at such time as
the Commissioner makes a finding of service of alcohol to an underage person pursuant to
this chapter.
394112 1 11
provided by the licensee or brought to the licensed premises by the patron. No alcoholic
liquor beverages other than wine, sparkling wine, champagne or beer are permitted.
e. It shall be unlawful for the licensee, its agents, and employees to permit any patron to
leave the licensed premises with an open container of wine or beer regardless of whether
the container is provided by the licensee or brought to the licensed premises by the patron,
except as otherwise allowed by section 13.410 of this chapter related to an unsealed and
partially consumed bottle of wine brought to the licensed premises by a patron.
f. All employees of the licensee serving alcohol must have successfully completed online
BASSET certification.
g. The licensee must maintain host liability insurance as required by subsection 13.401A
of this chapter.
h. Complimentary service licenses issued prior to May 1, 2018 shall be valid until April
30, 2019.
i. Video Gr t nimu��M as (11C flTh d Lffld r the (Illluina is � Video �:���n��n in _1�� 230 11 ,CS 40/1 e �awq,.
sl, 111 igrb:i.,w[)e allllowed iip a Gass S 6 lliccnnsu�j�
7. Caterer's License: Class S-7, for the delivery of alcoholic beverages by a caterer. Restrictions
specific to a Class S-7 license:
a. Notice must be given in writing to the Village Manager of the time, location and
approximate number of guests at least seventy two (72) hours in advance of the event, at
which alcoholic beverages will be served.
b. A full menu of food must be available for consumption by patrons the entire time that
alcoholic beverages are available.
c. All servers or pourers of alcoholic beverages must have completed a certified alcohol
awareness training course.
d. The caterer may serve alcoholic beverages only at events to which specific persons (not
the general public) have been previously invited or at a Village sponsored event.
w�kIn:cu....(anfil�det" ied uilder dw f1linois Video (jim Act 230 U,CS 40/1 c! ,ic
c .
x.
shall not be a11(P)ved inn a Class S-) G,icensedp rw��w� ,
8. Craft Brewery Or Distillery License: Class S-8, for the manufacture and delivery of beer or
distilled spirits for on premises and off premises consumption by a craft brewery or distillery and
for guided tours of its facility. Restrictions specific to a Class S-8 license:
a. Must comply with all laws and regulations of the State of Illinois as may apply to craft
brewers or distillers.
b. Samplings may be conducted only pursuant to a Village sampling endorsement
(subsection E1 of this section).
c. Hours of sale shall be the same as a P -package license.
d. Retail sales are allowed as follows:
(1) On Premises Consumption:
(A) Not more than fifty two (52) ounces of beer or six (6) ounces of distilled
spirits may be served to any customer in one day and each serving shall be
limited to sixteen (16) ounces of beer or two (2) ounces of distilled spirits.
(B) At a minimum, must provide limited food service such as cheese,
crackers, snack food or other similar deli style items to customers who are
consuming craft beer or distilled spirits.
3941121 13
(2) The caterer may serve alcoholic beverages only at events to which specific
persons (not the general public) have been previously invited or at a Village
sponsored event.
(3) The permit shall be subject to such other conditions as may be established by
the Commissioner.
b. Ad Hoc Temporary Permit: The Commissioner shall have the authority to issue an ad
hoc temporary permit, where the Commissioner determines that such permit is in the best
interests of the public.
E. Endorsements:
1. Sampling Endorsement: An endorsement allowing the holder of any Class P or Class S-8 license
to serve wine, beer or distilled spirits without charge, in small and limited amounts, for sampling
purposes only and in conjunction with sales promotional efforts occurring on the licensed
premises. (See subsection C4d of this section with respect to an S-4 license.) Regulations specific
to a sampling endorsement:
a. The sampling shall be attended and supervised by a full time adult employee and may
occur only in a designated area on the licensed premises;
b. The actual amount of beer or wine in an individual sampling container may not exceed
two (2) ounces, or one-fourth (1/4) ounce for distilled spirits;
c. Signs or other materials advertising the availability of "sampling" may not be visible
from the exterior of the licensed premises. However, an establishment with an annual
sampling endorsement may post one (1) such sign, not to exceed three (3) square feet in
area, so long as it does not violate the Village sign ordinance; and
d. Quantities may not exceed a total often (10) ounces of beer or wine, or one (1) ounce of
distilled spirits, per customer per day.
2. Mount Prospect Caterer's Endorsement: A license endorsement for the service of alcoholic
beverages, at an otherwise unlicensed premises, by a Mount Prospect Class F or Class S-3 licensee.
Regulations specific to a Mount Prospect caterer's endorsement:
a. The caterer may serve alcoholic beverages only at events to which specific persons (not
the general public) have been previously invited or at a Village sponsored event.
b. A Mount Prospect caterer's endorsement may be purchased on an annual or daily basis.
c. The endorsement shall be subject to such other conditions as may be established by the
Commissioner.
3. Outdoor Entertainment Endorsement: An endorsement allowing outdoor live music for a Class
F licensee. Regulations specific to a temporary outdoor entertainment endorsement:
a. No such live music may be played between the hours of eleven o'clock (11:00) P.M. and
eleven o'clock (11:00) A.M.
b. The Commissioner may attach such other conditions to the endorsement as may be
advisable to protect the peace and quiet of the surrounding area.
c. The Commissioner, the Village Manager or a designee of either, shall have the absolute
right for cause, and without the necessity of a hearing, to order the immediate cessation of
such live music.
394112-1 15
(vii) An outdoor certification may be granted only upon receipt by
the Commissioner and approval by the Village Attorney of a
statement signed by the licensee, acknowledging and accepting the
terms of the certification; and
(viii) An outdoor certification is not transferable and if there is any
change in five percent (5%) or more of ownership of the business, a
new outdoor certification must be obtained by the licensee.
(2) For establishments that are more than three hundred feet (300') from a
residential zoning district: The regulations of subsection 14.311 B of this Code shall
apply.
(3) The application shall be accompanied by a nonrefundable application fee as set
forth in appendix A, division II of this Code, and no management entity may be
qualified unless a certification fee as set forth in appendix A, division II of this
Code has been paid.
b. Management entity certification allowing for the certification of an entity to be retained
to manage a licensed premises. It is recognized that a licensee may, from time to time,
desire to hire or retain, as an independent contractor, a management entity to manage,
generally operate and be responsible for the licensed premises. Regulations specific to a
management entity certification:
(1) No licensee shall permit a management entity to perform such a function unless
the management entity has been certified to do so by the Commissioner. In order to
be certified by the Commissioner, a management entity must execute a liquor
license application. A management entity must qualify for a management entity
certification in the same manner and meet the same standards as a licensee.
(2) The application shall be accompanied by a nonrefundable application fee as set
forth in appendix A, division II of this Code, and no management entity may be
qualified unless a certification fee as set forth in appendix A, division Il of this
Code has been paid.
(3) A management entity shall be subject to the jurisdiction of the Commissioner
in the same manner as a licensee. If there is a violation on the premises, the
management entity and the licensee shall be jointly and severally responsible for
all consequences of such a violation.
(4) An underlying Village liquor license must previously have been obtained for
the premises.
SECTION D:
Chapter 23.503.1 of the Village of Mount Prospect's Municipal Code, "VIDEO GAMING
PROHIBITED," is hereby repealed and replaced with the following:
3 `11111.1:%1111'[wrv0( Cir'IIQNGPIN 01111i 1Q1T,Jl) l XCF1'.1.1.1:1(YN
g ... . ".. isdefoom: rl urs /1111 11 fuel ii �� ulaii iummm ' „�l � w mO/ I c �beq °„
iala ua : aauauuruu1u<:� l gym: .�....,,,.., .
1.�1aa1 111ii pr lri the /_amok a <l 'l ro l ww(l .r pc H 1 � w l a �a (uu �a .t? �rstran 1cLS-- flw11S
13.204 ..atid 13.204.1. Video ��,rruaulruab a rwlaluahibited iri lru cla ���m1111 � da �G1�du �1ma�mi�mmu�rK�mm�as ciJig ��ww�:
�r1ur,C M., Video 1m auamlrr aplwl iµ..Vi" wdca Qau lum 'call ,'as defiged ill Swim 13. 101 haxll got
394112 1 17
_..........r
Class - I2fi750.00
g!ant to rA LVc4 gse v
:i: IL" ,Ldy a:� iILLI 1 , to the fflu' , iia �l�c ��Wna������� of � 500 �)0 video gaining l::��m�:�:u:ua (:�:�:�:
� 1��ii)::: um Fail I" !�� 1 aim iu ,..:°a !iiillll ��.��wult in �k°u�W ,> ,4 �i Gl ..n u�� ,....i�um�. �m,�'��.
in the, �
SECTION F:
Those sections, paragraphs and provisions of Chapter 13, "ALCOHOLIC LIQUORS," and
Chapter 23, "OFFENSES AND MISCELLANEOUS REGULATIONS" of the Mount Prospect
Municipal Code which are not expressly amended or repealed by this Ordinance are hereby re-
enacted; and it is expressly declared to be the intention of this Ordinance not to repeal or amend
any portion of the Mount Prospect Municipal Code other than those provisions expressly amended
or repealed in Sections A, B, C, D, and E of this Ordinance.
SECTION G:
This Ordinance shall be in full force and effect from and after its passage and approval in
the manner provided by law.
ADOPTED this day of _ „ �..., 2018, pursuant to a roll call vote as follows:
AYES:
NAYS:
..................
ABSENT:
APPROVED by me this day of ,__µµµµwww
......-, 2018, and attested to by the Village Clerk
this same day.
Mayor
ATTEST:
Village Clerk
3941121-1 19
STATE OF ILLINOIS )
) SS
COUNTY OF COOK )
CLERK'S CERTIFICATE
I, Karen Agoranos, Clerk of the Village of Mount Prospect, in the County of Cook and
State of Illinois, certify that the annexed and foregoing is a true and correct copy of that certain
Ordinance now on file in my Office, entitled:
ORDINANCE NO.
AN ORDINANCE AMENDING CHAPTER 13 OF THE VILLAGE OF MOUNT
PROSPECT'S MUNICIPAL CODE, "ALCOHOLIC LIQUORS," SPECIFICALLY
SECTIONS 13.101, 13.204 AND 13.204.1; CHAPTER 23 OF THE VILLAGE OF MOUNT
PROSPECT'S MUNICIPAL CODE, "OFFENSES AND MISCELLANEOUS
REGULATIONS," SPECIFICALLY SECTION 23.503.1; AND APPENDIX A, DIVISION II
OF THE VILLAGE OF MOUNT PROSPECT'S MUNICIPAL CODE TO CREATE
LIQUOR LICENSES FOR ESTABLISHMENTS WITH VIDEO GAMING
which Ordinance was passed by the Board of Trustees of the Village of Mount Prospect at a
Regular Village Board Meeting on the _ day of „ 2018 at which meeting a quorum
was present, and approved by the President of the Village of Mount Prospect on the _ day of
120l&
I further certify that the vote on the question of the passage of said Ordinance by the Board
of Trustees of the Village of Mount Prospect was taken by Ayes and Nays and recorded in the
minutes of the Board of Trustees of the Village of Mount Prospect, and that the result of said vote
was as follows, to -wit:
AYES;.
NAYS:
ABSENT:
I do further certify that the original Ordinance, of which the foregoing is a true copy, is
entrusted to my care for safekeeping, and that I am the lawful keeper of the same.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the Village
of Mount Prospect, this _ day of ......... , 2018.
Karen Agoranos, Village Clerk
[SEAL]
3941121 21
BoardDocs® Pro Page 1 of 3
Agenda Item Details
Meeting Jul 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m.
Category 8. VILLAGE MANAGER'S REPORT
Subject 8.1 Motion to Authorize the Village Manager to Enter into a Construction Management
Contract with Nicholas and Associates, Inc. of Mount Prospect, Illinois.
Access Public
Type Action
Preferred Date Jul 17, 2018
Absolute Date Jul 17, 2018
Fiscal Impact No
Budgeted Yes
Budget Source Capital Investment Plan
Recommended Action Motion to Authorize the Village Manager to Enter into a Construction Management Contract
with Nicholas and Associates, Inc. of Mount Prospect, Illinois for the new Fire Headquarters
at 111 E. Rand Road.
Public Content
Information
Similar to the process followed for the new Police Headquarters, the Village issued a request for proposals (RFP) for
Construction Management Services for the new Fire Headquarters to be located at 111 E. Rand Road on May 25,
2018. A Construction Manager (CM) delivery method allows for the CM to be part of the project team early in the
design process, continually pricing and budgeting ideas and concepts to remain on budget throughout the project.
This method allows for "value engineering" to happen during the design process, rather than waiting to bid a project
out after the design is completed, then having to go back to the drawing board if costs are over budget. The
Construction Manager delivery method is designed to save time and money, while providing an accurate budgeting
process throughout design. In addition, this method is known as CM at -risk because at the completion of the design
process, the CM will provide a guaranteed maximum price for the project. This allows the Village to set their budget,
remove any risk of cost overruns, and puts all bonding and contractual requirements for subcontractors on the CM.
This is the same method that has been used on the Village's other municipal building projects in the past.
The RFP was made available on our website through the transparency portal, was advertised in the Daily Herald, and
made available at the Community Development counter. The thrity-five page document is very similar to the RFP
recently completed for the Police Headquarters. It lays out the specific requirements for qualifications, the evaluation
criteria, and a request for a separate cost proposal that would be part of the evaluation process. Additionally, the RFP
provided a conceptual layout of the site, including some simple parking and access modifications and the addition of
an apparatus bay on the west side of the building under the existing overhang. Submittals were received by the
deadline on June 20, 2018 from Prairie Forge Construction, Riley Construction, RC Wegman Construction, Camosy
Construction, Nicholas and Associates, IHC, and The George Sollitt Companies. The evaluation team included staff
members from the Fire Department, Manager's Office, Public Works, Community Development, and Trustee Richard
Rogers.
Staff evaluated all seven submittals based on the following categories:
1. Fire Station Building experience
2. Experience constructing complex buildings
https://www.boarddocs.com/il/vompBoard.nsf/Private?open&login 7/13/2018
' BbardDocs® Pro
Page 3 of 3
members to run the construction, and demonstrated an ability to maintain tight schedules based on the amount of
school work in their portfolio.
The staff review team and Trustee Rogers did conduct an interview with the team from Nicholas and Associates on
July 9, 2018 to reinforce the written evaluations. Nicholas and Associates was able to answer any questions our
evaluation team had and proved to be well qualified to manage the construction of the new Fire Headquarters.
Similar to the Police Headquarter construction manager situation, the Village will need to enter into a contract with
Nicholas and Associates for the preconstruction services portion of the construction management contract. Once the
preconstruction services have been completed by Nicholas and Associates, and a Guaranteed Maximum Price
(GMP) has been identified, the construction management contract will require amendment by the Village Board to
include the Guaranteed Maximum Price and the values of the construction management portion of the contract.
In this case, Nicholas and Associates has provided a ze
corporate policy to provide these services at no cost. I
authorize the Village Manager to enter into a construction
the amount of zero dollars ($0.00).
-o dollar fee for preconstruction services, as they have a
i turn, the Board is being asked to approve a motion to
management contract with Nicholas and Associates, Inc. in
Alternatives
1. Motion to Authorize the Village Manager to Enter into a Construction Management Contract with Nicholas and
Associates, Inc. in the amount of zero dollars ($0.00).
2. Action at discretion of Village Board.
Staff Recommendation
Staff Recommends the Village Board Approve a Motion to Authorize the Village Manager to Enter into a Construction
Management Contract with Nicholas and Associates, Inc. of Mount Prospect, Illinois for the new Fire Headquarters at
111 E. Rand Road, in the Amount of zero dollars ($0.00).
Fire CM ir°fl.'.).pd (64 n KB)
Administrative Content
Next Steps?
Executive Content
Niirhdas.pdf (3,:359 KB)
https://www.boarddocs.com/il/vomp/Board.nsf/Private?open&login 7/13/2018
Village of Mount Prospect
Construction Management Services for
The Village of Mount Prospect
Fire Station #13
Advertised: May 25, 2018
Due: June 20, 2018, 3:00 p.m.
Request for Proposal
Village of Mount Prospect
MOUNT PROSPECT FIRE HEADQUARTERS
REQUEST FOR PROPOSALS
CONSTRUCTION MANAGEMENT (AT RISK) SERVICES
TABLE OF CONTENTS
Table of Contents ....................... ---l—.1 ...... ........... ......... ...„,.....3
Instructions for Pro osals...... „......,...,...................,.., ........,. .....„.....,.......4
Qualification Submittal Form.. ........................... . ...................... ..............
FeeProposal Form ............. ............................ .............................................. ....,.....7
GeneralConditions Form ............. .............. .... ........„.....,.,.. ............,................ ,..........,,....;1
Reference Documents
1. Conceptual Site Plan
End Table of Contents
Page 13
Village of Mount Prospect
d. Provide constructability reviews of construction documents.
e. Establish bidding procedures in conjunction with Owner and Architect.
f. Establish all scope of work bid packages for bidding.
g. Solicit a minimum of three (3) bids from pre -qualified subcontractors for all trades.
h. Conduct public bidding, open and record all bids from sub -contractors.
i. Evaluate all bids, prepare recommendations and make presentations to Owner.
j. Prepare a Guaranteed Maximum Price prior to construction commencement, at a
time acceptable to the Owner.
2. The Construction Management firm's basic scope of services are to include but not
necessarily be limited to:
a. Responsibility for all Construction Management and General Conditions services.
b. Construction scheduling of entire project.
c. Administration/Project Coordination.
D. Who Must Submit a Response to the RFP
1. All CM firms who wish to be considered for this project must submit the required
information as requested in the Construction Manager Qualification Submittal Form..
2. This RFP is an open invitation to any qualified vendors.
E. Evaluation Factors
1. Proposals will be opened in private to avoid disclosure of proprietary or confidential
information of competing submittals. A list of the names of those firms that have made
submittals will be made available following the closing.
2. In order to provide a fair basis for determining the qualification of CM firms, a
Qualification Submittal Form containing questions related to the respondent's experience
and ability to the type of work to be constructed must be submitted.
3. As part of the Qualification Submittal form, a Fee Proposal Form and General Conditions
Form are required to be submitted. While these costs will be considered in the overall
evaluation process, they will not be the sole determining factor.
4. Proposers are requested to submit their response to this RFP in tabbed sections, bound
in the following order. See Qualification Submittal Form for submittal requirements.
a. Cover Letter
b. Construction Manager Qualification Submittal Form
c. Table of Contents
d. Section 1. Company Introduction
Page 15
Village of Mount Prospect
Village will terminate those negotiations and enter into negotiations with the next highest
ranked firm.
9. Following completion of successful negotiations, the Selection Committee will make
recommendation to the Village Board for the award of a contract to the Construction
Management firm.
F. Submittal Information
Proposals are due and will be accepted until 3:00 P.M. on Wednesday, June 20, 2018 with
the following provisions:
1. Submit one (1) original and ten (10) Copies, and one (1) electronic pdf copy of the
response to the Qualifications and Request for Proposals Package on a USB drive. Do
not submit on a cd or dvd.
2. Submittals are to be contained in sealed envelopes/packages marked with the RFP Title
("Mount Prospect Fire Headquarters Construction Management Services Proposal'),
Proposal Due Date and Time.
PROPOSALS SUBMITTED BY FACSIMILE OR E-MAIL WILL NOT BE ACCEPTED
Proposal shall be submitted to: Village of Mount Prospect, Building Department
50 S. Emerson Street
Mount Prospect, Illinois 60056
Attn: Mark Rysavy, DD Building & Inspection Services
Proposals may not be withdrawn for a period of 90 days after proposal due date without the
consent of the Village of Mount Prospect.
Any Proposal submitted unsealed or unsigned, received via fax transmissions, electronically
or received subsequent to the aforementioned date and time, may be disqualified and
returned to the submitter.
All submittals shall become the property of the Village of Mount Prospect and will not be
returned to the submitting proposer.
All costs associated with the preparation of the response to this request for proposals will be
the full responsibility of the submitting proposer.
The Village of Mount Prospect reserves the right to reject any and all proposals or parts
thereof, to waive any irregularities or informalities in proposal procedures and to award the
contract in a manner best serving the interest of the Village.
Disqualification of Construction Management firm will be determined by the following factors:
• Late submittal.
• Non-compliance to the requested information.
• Incomplete submission and not signed or notarized.
• Reasonable grounds or belief that falsification of sworn statements have been made.
• Submission of more than one proposal, i.e. individual firm, joint venture, etc.
Page 17
Village of Mount Prospect
MOUNT PROSPECT FIRE HEADQUARTERS
CONSTRUCTION MANAGER QUALIFICATION SUBMITTAL FORM
SUBMITTED TO:
ATTENTION.
NAME OF PROJECT:
QUALIFICATION FOR:
Submitted By.-
Address:
y:Address:
Contact:
Phone:
Email
Prequalification Questions
Village of Mount Prospect
50 S. Emerson Street
Mount Prospect, IL 60056
Mark Rysavy, DD Building & Inspection Services
Mount Prospect Fire Headquarters
Construction Management Services (at risk)
(Name of Organization)
1. Has your company provided Construction Management Services for completing three or
more Fire Headquarters Projects since 2008 with a construction cost of $3,000,000 or
higher?
Yes No
2. Has your company provided Construction Management Services for an adaptive reuse
project in excess of $2,000,000 since 2008?
Yes No
3. Has your company provided Construction Management Services for a local governmental
entity (Village, Village, County, School, or Park District) since 2008 with a construction cost
of $5,000,000 or higher?
Yes No
We amnt:icipaut:e irec,6ving tmiu.clposaal s fiorn several C01[1Strm.1ct'i0r1 Il a. umdmmgeiineint: f'irryls who can
rrmeet our irniiru'iirn uffm If''Irer:tuur lllificatJbn IlRegrAren`1EMtS, If OU11' firm cannot rrmeet they irnir,lirn .urn
Preq uarliftcat:ion Re(p.uirerrments,t
I,lease consider not sr.mlbffllirtt:iing aim Ifmira.mlposa l unless yoiuir f1irrn
can demonstrate coirnpelfing reasons foir the Vilige to consider you fm this project.
Page 19
Village of Mount Prospect
C. Pre -Construction Services
1. Provide an overview of the services your firm provides during the pre -construction
phases (schematic design, design development, construction documents and bidding).
2. Identify the anticipated number of staff and hours that each staff will be dedicated to this
project over the course of the 6month design process. Include the time for staff to attend
and participate in 2 hour project team meetings that will occur every two weeks over the
entire 6 month process. Also include any time out of those meetings that staff is
anticipating spending on preconstruction services.
D. Capability to Staff Project Successfully
1. Provide a resume for each individual assigned to be involved in this project.
The Construction Management services firm shall maintain a "full time" Field
Superintendent on the site whenever an trade is workun on the ro ect. The supervisor
shall not be changed unless approved by the Owner and Architect. The supervisor must
demonstrate successful completion of a project of similar type and scope. Primary
duties of the supervisor are to supervise and coordinate all aspects of the work.
2. On a separate sheet, list name of projects, owners, architects, contract amounts, percent
complete, and scheduled completion of the major construction projects your organization
has currently in progress.
3. What percentage of your organization's resources are committed to these projects? _%
4. List current projects for which your firm is a candidate for contract award,
5. Describe your firm's quality -control process. If you have a quality control process, please
attach a copy of the process with your organization's response.
6. Describe how your firm ensures the use of quality sub -contractors.
Identify up to three (3) sub -contractors your firm typically works with. Include the
following trades:
a. Excavation
b. Site Utilities
c. Paving
d. Concrete
e. Masonry
f. Roofing
g. Glazing
h. HVAC
Page Ill
Village of Mount Prospect
6. Officers, Partners, or Owners:
Name
Title
7. Provide classification of work your organization performs with its own forces (list all
trades) if any:
8. Number of personnel in organization:
Administrative: Shop:
Engineering: Field:
Office: Other:
9. Is your organization licensed to do business in Illinois? Yes_ No
10. Is the organization in any way an outgrowth, result, continuation or reorganization of a
former business?
Yes No
If yes, give name and address of each predecessor business and the date of the change
in entity.
Questions 11— 16: Information to Assist the Village's Assessment of the Financial
Viability of Your Company.
11. Is the organization delinquent in the payment of any tax administered by the Illinois
Department of Revenue, unless the organization is contesting such payment in
accordance with the procedures established by the appropriate Revenue Act?
Yes No
12. Has the organization ever sought protection under bankruptcy or receivership laws?
Yes No
If yes, when and explain fully.
13. Attach a copy of the most recent audited financial statement (must be within the last
fifteen months) including an income statement and balance sheet which must contain
the following information (this can be included in a separate sealed envelope and will
Page 113
Village of Mount Prospect
Your Company's Safety Record
18. Describe construction safety program and safety record.
19. State your firm's insurance Experience Rating Modifier:
Questions 20 — 24 Relate to Your Company's Legal History
20. Has your firm, or any predecessor or principal of the company, been named in litigation,
or any proceeding involving past or present job performance since 2007? Are there any
claims or judgments pending or outstanding against your organization?
Yes No
If yes, explain the circumstances and include the following information: the name and
case number, name/jurisdiction of the court or administrative agency, and a summary of
each claim/case, including current status and if no longer pending, the disposition. The
foregoing includes but is not limited to information regarding any proceedings and
actions taken by any governmental agency to debar or disqualify your company from
proposing or bidding on public contracts, including the name of the agency initiating the
proceeding/action, the nature of the proceeding/action, the claimed basis for the
proceeding/action and the current status or disposition of the proceeding/action. Please
advise if your organization has been debarred or considered ineligible for public
contracts by another government agency.
21. Has your organization, or any predecessor or principal for the organization, been named
in an arbitration claim in conjunction with past or present job performance since 2007?
Yes No
If yes, explain the circumstances.
22. Has your organization or any predecessor or principal for the organization, ever failed to
complete any work awarded to you?
Yes No
If yes, explain when, where, and what were the circumstances.
23. Provide a list of all contracts to which your organization was a party and with respect to
which your organization was declared to be in breach of one or more provisions, provide
the type of contract, the project location where applicable, the names and addresses of
the parties to the contract, the name of the party declaring the breach, the nature of the
claimed breach and current status or resolution of the claim. If a construction contract,
also provide the name, address and telephone number of the architect and, if applicable,
the Construction Manager's or Owner's representative.
Page 115
Village of Mount Prospect
F. Contractual Requirements
Owner -Construction Manager Contract: The Owner will utilize a Standard Form of
Agreement Between Owner and Construction Manager at risk where the basis of
payment is the Cost of the Work Plus a Fee with a guaranteed maximum price to be
determined and the General Conditions of the Contract for Construction of the Project,
A.I.A. Document A201, 2007 Edition with modifications for this project. Details of this
contract will be determined during final negotiations with the selected Construction
Manager.
2. Provide evidence of ability to provide the following insurance requirements.
Construction Manager shall purchase and maintain all necessary and proper insurance
for the duration of the work to be performed, including comprehensive general liability
insurance and property damage insurance, worker's compensation insurance, as well as
automobile liability insurance as provided in this section or as otherwise required by
Owner. Successful Construction Manager must be covered for the following
requirements prior to receiving a contract with the Village:
All Contractors, Manufacturers/Distributors, and Suppliers shall be required to carry and
evidence insurance coverage with a standard Acord Certificate of Insurance with
minimum limits applicable.
A. Minimum Insurance Requirements and Limits
Coverage
1. Automobile Liability
2. Commercial General Liability
Limits
$1,000,000 Combined single limit
$1,000,000 Per occurrence
$2,000,000 General aggregate
All Commercial General Liability policies must include Blanket Contractual coverage
and Broad Form Vendors' Liability coverage.
3. Workers' Compensation
(Employers' Liability)
4. Umbrella Liability
B. Cancellation or Alteration
$500,000
Per accident
$500,000
Disease limit
$500,000
Each Disease
$5,000,000
Limit
The policies of insurance required by this exhibit shall provide that they cannot be
cancelled or altered in any way changing coverage except after 30 days' prior written
notice by certified mail to owner.
C. Workers' Compensation and General Liability Waiver of Subrogation in favor of the
Village.
Page 117
Village of Mount Prospect
have a products -completed operations aggregate of at least two times its each occurrence
limit.
It is mandatory for the Village Manager, or his designee, to be notified if the Construction
Manager fails to pay the premium for the above -required coverages.
Insurer shall agree to waive all rights of subrogation against the Village, its elected and
appointed officials, officers, agents, employees and volunteers.
The insurance carrier of the Construction Manager shall provide a minimum of thirty (30)
days written notice to the Village Manager, or his designee, before insurance limits and
scope of coverage are materially altered or insurance protection in cancelled.
No contract shall be approved by the Village, nor shall any work commence until the
successful Construction Manager has submitted evidence of compliance with the above
insurance requirements.
Subcontractors — Construction Managers shall include all subcontractors as insured
under its policies or shall furnish separate certificates and endorsements for each
subcontractor. All coverages for subcontractors shall be subject to all requirements
stated under "Insurance".
3. Required Certifications
The Village of Mount Prospect will require the following certification forms (see attached
documents) executed by each Construction Manger submitting a proposal. The forms
include:
a. Certificate of Non -Disqualification under Illinois Compiled Statutes, Ch. 720, Sec.
33E 11
b. Certificate of Compliance
c. Compliance Statement
d. Village of Mount Prospect, Illinois Tax Compliance Affidavit
e. Village of Mount Prospect, Illinois Anti -Collusion Affidavit and Certification
f. Certificate of Compliance with Public Act 87-1257 of the Illinois Human Rights Act
g. Fee Proposal
Submit the attached CM Fee Proposal and CM General Conditions Forms in a separate sealed
envelope labeled:
Mount Prospect Fire Headquarters
Construction Manager Fee Proposal
Submitted by:
Page 119
Village of Mount Prospect
CERTIFICATE OF NON -DISQUALIFICATION UNDER ILLINOIS
COMPILED STATUTES, CH. 720, SEC. 33E-11
The undersigned, upon being first duly sworn, hereby certifies to the Village of Mount Prospect,
Cook County, Illinois, that (proposer) not barred from
contracting with any unit of State or local government, as a result of a violation of Ch. 720, Sec.
33E-11 of the Illinois Compiled Statutes.
State of
ss
County of
Name of Proposer
0
Subscribed and Sworn to this day of 12018
Notary Public
SEAL
NOTE TO PROPOSER: Anyone who makes a false statement, material to this Certification,
commits a Class 3 Felony under Illinois Compiled Statutes, Ch. 720, Sec. 33 E-11 (b).
Page 121
Village of Mount Prospect
COMPLIANCE STATEMENT
Complete this form and submit it with Form of Proposal.
Offeror's Name. Signature:
TO: Village of Mount Prospect, Building Department
50 S. Emerson Street
Mount Prospect, IL 60056
ATTN: Mark Rysavy, DD Building & Inspection Services
FROM: Organization:
Address:
Village, State, Zip Code:
Contact Person;
Telephone Number:
Email:
Facsimile Number:
In compliance with this Request for Proposal, and subject to all conditions thereof, the
undersigned offers and agrees, if this proposal is accepted, to furnish the services as outlined
herein, for the Village of Mount Prospect in the amount indicated, subject to modification through
negotiations which may be conducted pursuant to conditions set forth in the Request for
Proposals.
Page 123
Village of Mount Prospect
VILLAGE OF MOUNT PROSPECT, ILLINOIS
ANTI COLLUSION AFFIDAVIT AND CERTIFICATION
being first duly sworn,
deposes and says: that he is
(Partner, Officer, Owner, Etc.)
of
(Proposer)
The party making the foregoing proposal or bid, certifies that such bid is genuine and not collusive,
or sham; that said bidder has not colluded, conspired, connived or agreed, directly or indirectly,
with any bidder or person, to put in a sham bid or to refrain from bidding, and has not in any
manner, directly or indirectly, sought by agreement or collusion, or communication or conference
with any person; to fix the bid price element of said bid, or of that of any other bidder, or to secure
any advantage against any other bidder or any person interested in the proposed contract.
The undersigned certifies that he is not barred from bidding on this contract as a result of a
conviction for the violation of State laws prohibiting bid rigging or bid rotating.
Individual)
Partnership)
(Name of Proposer if the Proposer is an
(Name of Partner if the Proposer is a
(Name of Officer if the Proposer is a Corporation)
The above statements must be subscribed a sworn to before a notary public.
Subscribed and Sworn to this day of 2018
Notary Public
SEAL
Failure to complete and return this form may be considered sufficient reason for rejection of the
proposal
Page 125
Village of Mount Prospect
MOUNT PROSPECT FIRE HEADQUARTERS
CONSTRUCTION MANAGEMENT SERVICES FEE PROPOSAL FORM
This Fee Proposal Form must be submitted by each proposer in conjunction with the
Construction Manager General Conditions Form.
A. Considerations
3. The Construction Management firm's pre -construction basic scope of services are to
include but not necessarily be limited to:
k. Providing cost estimating services throughout the design phase. Estimates are to be
provided during the schematic design, design development and construction
documents phases as a minimum.
I. Attend all design meetings with Owner and Architect, become an active participant in
the project team.
m. Provide value engineering during the design phases.
n. Provide constructability reviews of construction documents.
o. Establish bidding procedures in conjunction with Owner and Architect.
p. Establish all scope of work bid packages for bidding.
q. Solicit a minimum of three (3) bids from pre -qualified subcontractors for all trades.
r. Conduct public bidding, open and record all bids from sub -contractors.
s. Evaluate all bids, prepare recommendations and make presentations to Owner.
4. The Construction Management firm's basic scope of services are to include but not
necessarily be limited to:
d. Responsibility for all Construction Management and General Conditions services.
e. Construction scheduling of entire project.
f. Administration/Project Coordination.
g. On site management.
5. All laborers and mechanics employed by the contractors and/or subcontractors for this
project shall be paid wages at rates not less than those prevailing wages current at the
time work is performed as determined by the Illinois Department of Labor (Cook County).
The letting of this contract is subject to Illinois Compiled Statutes 820 ILCS 130/1-12.
6. All subcontracts will be required to public bid.
7. Owner retains and reserves the right to approve and/or reject the CM recommendation
of all sub -contractor contracts.
Page 127
Village of Mount Prospect
7. Provide mark-up for C.M. Fee and General Conditions on any changes in the work.
Add Deduct
General Conditions
C.M. Fee
9. State the cost for a 100% Performance Bond based on $7,277,000 contract value:
Provide a letter from your bonding company that indicates the overall contract
amount above, and the overall cost of the bond for that amount.
In addition, each CM shall provide with their submittal a letter from their insurance
company stating the cost of this project and the quoted cost of insurance
premiums for this project.
10 Construction Management services firm is invited to add any additional items that would
be customarily considered as required on this project.
being duly sworn, deposes and says that he/she is
the
Name
of Construction
Title Name of Organization
Management services firm(s), and the answers to the foregoing questions and all statements
therein contained are true and correct. He/she has examined and carefully prepared this
proposal based upon the pre -qualification documents and all issued addenda and have checked
the same in detail prior to submittal. I have full authority to make statements and submit this
proposal on this firm's behalf.
By:
Signature, Title
Subscribed and sworn before me this day of
Notary Public:
Notary Stamp:
Dated this day
2018.
2018.
Page 129
Village of Mount Prospect
MOUNT PROSPECT FIRE HEADQUARTERS
CONSTRUCTION MANAGEMENT SERVICES GENERAL CONDITIONS FORM
The following list represents items to be categorized as General Conditions, and are not to be
included as part of the proposed fee. This list is intended for evaluation purposes. During
negotiations with the selected Construction Manager, certain items may be negotiated into the
base fee. Provide an estimate for each item, and indicate whether or not the work will be
performed by your own forces, or assigned to a subcontractor. For the General. Conditions
assume a 12 -month construction includes demolition work and a three month construction
closeout duration.
All other indirect costs are to be included as a part of the base fee, no other indirect costs will be
considered for reimbursement after award of this work. Several Items are required to be
provided by the CM. If the box is already marked, no subcontracting will be allowed for that
item.
General Conditions shall minimally include all labor, materials, equipment and incidentals:
Item Cost By By
CM SC
Project Manager $ ® ❑
Full Time On -Site Superintendent $ ® ❑
Other Personnel (identify)
Temporary Jobsite Trailer
Temporary Jobsite Trailer Equipment (telephone/fax/
copy machine, including service and equipment)
Temporary Drinking Water
Temporary Job Site Toilets
Temporary Protection (Enclosures/Partitions)
In -Progress Cleaning
Final Cleaning
Dumpsters
$ ❑ ❑
$ ❑ ❑
$ ❑ ❑
$ ® ❑
$ ®
❑
$ ®
❑
$ ®
❑
$ ❑
❑
®
❑
$ ❑
❑
$ ®
❑
Page �31
Village of Mount Prospect
Preliminary Project Schedule
Release of RFP for CM at Risk:
Submittal Deadline for CM Proposals:
Staff Review of Proposals:
CM Interviews with Staff Review Team:
Board of Trustee Approval of Contract:
Project Kickoff Meeting:
Construction documents- Complete:
Public Bidding process:
Subcontractor negotiations and contracts:
Construction begins:
Construction Schedule:
Construction Manager's Estimate of construction schedule:
May 25, 2018
June 20, 2018
June 21- July 6, 2018
July 9-11, 2018
July 17, 2018
July 23, 2018
January 31, 2019
To be determined
Months
Please fill in the number of months above. If the number of expected months filled in above is
less than 12, provide a monthly value of credit to the general conditions listed above:
$ credit per month to general conditions (for each month less than
12. Also can be a addition for any months over 12)
Page 133
N-0 MI T PROSPECT FIRE P R
LOWER LEVEL
FGM ARCHITECTS
(52019 FGM ARCHITECTS, INC
UPPER LEVEL "
04/05/18
C-aNCEPT_UAL P_LAN__DIAG-RAII�1
n
Village of Mount Prospect
MOUNT PROSPECT FIRE HEADQUARTERS
CONSTRUCTION MANAGER QUALIFICATION SUBMITTAL FORM
SUBMITTED TO: Village of Mount Prospect
50 S. Emerson Street
Mount Prospect, IL 60056
ATTENTION: Mark Rysavy, DD Building & Inspection Services
NAME OF PROJECT: Mount Prospect Fire Headquarters
QUALIFICATION FOR: Construction Management Services (at risk)
Submitted By: Nicholas & Associates Inc.
(Name of Organization)
Address: 1001 Feehanville Drive Mount Prospect IL 60056
Contact: Wick E.@pall2igholag Jr.
Phone:
Email:nirkir@nicholaNqu.alily.com
Prequalification Questions
1. Has your company provided Construction Management Services for completing three or
more Fire Headquarters Projects since 2008 with a construction cost of $3,000,000 or
higher?
Yes No
2. Has your company provided Construction Management Services for an adaptive reuse
project in excess of $2,000,000 since 2008?
Yes X No
3. Has your company provided Construction Management Services for a local governmental
entity (Village, Village, County, School, or Park District) since 2008 with a construction cost
of $5,000,000 or higher?
Yes X No
We anticipate receiving Ipiroposaal s frorn srwvr„ irai Con stir U. ctioin Management firIP'Ir s who 41.an
meet rru.uu"' rr'ulnlirnurn Prr; quuarllifk a:uflolru ltrequlilreirlreints. if your flilrlrn cannot Ir'neet the r lilnirnuirn
PIrequuMi iu.artfr:rlr'u I[:?e fuliirerorrrrl,S, Iplease r,oinsider not, su.ubirnitting au Itruirrf'rosarl u.rlrrllruss youir"'filr"rTr
carry r.terrr'uu' nstrate compelling reasons for the Wlw:,ie to r.nr:rnsid ";lir your for" this project,
Nicholas & Associates Inc.
1oo1 Feehanville Drive
Mt. Prospect, Illinois 6o056
(847) 394-6200
(847) 394-6205 Fax
www.nicholasquality.com
Primary Executive Point of Contact:
Nick Papanicholas Jr.
nickjr@nicholasquality.com
(847) 878-6302 Cell
Principal Officers:
Nick Papanicholas Jr. - President
Joe Papanicholas -Vice President
Industry Organizations:
ASBA - American Sports Builders Association
IASBO - Illinois Association of School Business Officials
�.....�
After years of experience in the construction trades, Nick Papanicholas Sr. formed Nicholas & Associates, Inc.
a general contracting/construction management firm in 1978. Nicholas & Associates is incorporated in the
State of Illinois (1985) and the State of Wisconsin (2013). Initially specializing in school and church work, we
quickly expanded our presence in the commercial market. Projects range from new construction, renovation,
and expansion of K-12 schools, recreation and sports facilities, athletic fields, public libraries, fire and police
stations, city/village halls, churches, assisted living, multi -family, residential, retail and manufacturing
facilities.
Over 75% of the construction completed by Nicholas & Associates, Inc. since 1996 has been through the
Construction Management delivery method. The remaining projects are completed as General Contractor.
We have successfully completed over s1 billion in Construction Management projects since 2oo6. We hold
contracts both as Construction Manager as Agent and Construction Manager at Risk. Our success in the
industry has earned us the full faith and trust of the commercial insurance community. Our aggregate
bonding capacity is in excess of $25o million.
New Bedford Park Fire Station No. 2
Owner: Bedford Park Fire Department
Chief Sean Maloy
(708) 563-4513
IS Architect: Williams Architects
Scott Lange
(630) 221-1212
Completion Date: November 2008
ContractAmount: $3,200,000
Square Footage: lo,000 SF
Project Description: Construction Management project done under Nepco, Inc. Satellite fire station
consisting of 2 bays, living quarters, exercise room, service/turnout gear areas, fire prevention bureau,
chamber offices, and mezzanine. Site development of 1.19 acres that included patio, parking,
landscaping, public sidewalks, storm water retention basin and llo ft. radio antenna tower.
New Downers Grove Fire Station No. z
Owner: Downers Grove Fire Department
David Fieldman
(630)434-5500
Architect: Williams Architects
Scott Lange
(630) 221-1212
Completion Date: July 2oo8
Contract Amount: $6,800,000
Square Footage: 30,500 SF
Project Description: Project consists of a 4 bay, i story facility including administrative offices, training
tower, clock tower, kitchen, living quarters, exercise room, and mezzanine. Lower level includes
storage, mechanical and generator. Site development of 1.75 acres with landscaping with
underground sprinklers, patio, public walks, parking and underground storm water retention system.
New Streamwood Fire Station No.
EM Owner: Streamwood Fire Department
Chief John Nixon
(630)216-6300
so Architect: FGM Architects, Inc.
Joe DiSalvo
(847) 458-o8go
Completion Date: April 2002
10 Contract Amount: 61,620,000
IM Square Footage: Zo,000 SF
Project Description: Project consists of a new satellite fire station including 2 bays, administrative
offices, kitchen, living quarters, exercise room, and mezzanine. Site utilities including stand by
generator. Site development with landscaping, underground sprinklers, public walks, and parking.
Mount Pros ect Ice Arena
Owner: Grayhawk 4 LLC
Paul Kuczek
(847) 417-6710
Architect: Arcon Associates
Rick Cozzi
(630) 49S-1900
Completion Date: September 2016
01 ContractAmount: $12,000,000
Project Description: Mount Prospect Ice Arena is a newly renovated state of the arts facility ideally
suited for major tournaments and special events. The 71,000 square foot arena sits on 8 acres of land
with available parking for over 300 guests. The facility includes spectator seating for 450 fans at each
rink, so team locker rooms, and a full service pro shop.
Pace Bus Administration Buildin
Owner: Pace Bus
Mike Teeters
(847) 228-4207
Architect: Muller& Muller Architects
Susan Johnson
(312) 432-4180
is Completion Date: January 2009
Contract Amount: $13,700,000
Square Footage: 65,00o SF
Project Description: Demolition and removal of an existing slab and foundation and construction of
a new 2 story building with a steel frame and architectural precast concrete wall panels with aluminum
storefront systems with insulated glazing panels. Steel structure designed for a future 3rd floor.
Project is designed to comply with a Certification Level according to the US Green Building Council's
LEED Rating System.
New Public Works Fleet Garage
�uum�uuimimiu�mimuuuimimuuuui�m�imi�����������������immmmmmmmimimimimuuuuuuuu���o�u�m
Owner: Elk Grove Village
Vito Sammarco
(847) 734-8044
IN Architect: ARCON Associates
VPTrinh
(630) 495-1900
Completion Date: December 2017
ContractAmount: $6,400,000
it'd Square Footage: 98,000 SF
Project Description: Renovations included amain fleet garage renovation, new masonry facade,
epoxy shop floors, and a new office suite addition. There is also a new vehicle storage and a salt barn
facility.
Early Learning/ Professional Development Center
Owner: Community Consolidated School District 54
Ric King
(847) 357-5039
ff Architect: STR Partners
Colby Lewis
(312) 242-4158
Total Construction: $20,800,000
Project Description: Construction of a New 5o,000sf Early Learning Center/ Professional Development
Center and 3o,000sf renovation of existing space. This new facility includes classrooms, a playground,
multi -activity area, professional learning center, conference room, and multiple team meeting rooms. The
Early Learning / Professional Development Center was completed in February 2015. Nicholas & Associates,
Inc. holds a Construction Manager at Risk contract with the School District.
Arlington Heights School District 25
Owner: Arlington Heights School District 25
Stacey Mallek
(847) 758-4900
Architect: STR Partners
Don Hansen & Mike Henderson
(312) 464-0785
IM Total Construction Cost: $38,000,000
Project Description: Multiple projects were completed in 2016, the work consisted of additions and
renovations to Ivy Hill and Olive Mary Stitt Elementary Schools. New additions and renovations to Thomas
Middle School and Windsor Elementary School were completed in September 2017. Nicholas & Associates,
Inc. holds a Construction Manager at Risk contract with the School District.
Mount Pros ect Golf Course
Owner: Mount Prospect Park District
Jim Jarog
(847) 255-5380
Architect: Groundwork, Ltd.
(847) 541-4151
Completion Date: November 2014
ContractAmount: $6,000,000
Project Description: New maintenance building and course improvements.
Northeastern Illinois Public Safety Training Academy
Owner: NIPSTA Municipal Co -Op
NJ Architect: Teng & Associates, Inc.
(312) 606-0000
in Completion Date: 2002
Contract Amount: $11500,000
Square Footage: 19o,000 SF
Project. Description: The Northeastern. Illinois Public Safety Training Academy is an
intergovernmentalagency comprised of municipalities, fire protection districts, and other organizations
located in the Chicago metropolitan area that have combined energies and resources to create a
regional, state-of-the-art public safety training facility, Nicholas & Associates constructed a 1go,000 SIF
concrete surface that has been specifically designed) to improve vehicle operator performance. Drivers
of emergency vehicles (police cars, motorcycles, fire engines, ambulances, etc.) and non -emergency
vehicles gain valuable experience in a safe, controlled environment -either in the daytime or at night
under the lights.
Township High School District 211
m mmuuui��mim�m�iwmim�
1 Owner: Township High School District 23-3-
Chris Kontney
(847) 755-6648
Architect: ARCON Associates
Rick Cozzi
(630)495-3-900
Total Construction Cost: $3-0o mil +
Project Description: Addition, remodeling, and renovation of administration areas, natatoriums, and
cafeteria at multiple sites. Nicholas & Associates, Inc. holds a Construction Manager as Agent with the
School District.
:ICSLJ T1ION/�°:II:::::::GII "'rF FI IIS
Years Experience: 20 Years
University of New Hampshire
Bachelor of Science,
Business Administration, zooz
OSHA Certified Safety Manager, zooz
Continuing Education Courses
Triton College
- Blueprint Analysis
- Construction Management
Joe joined Nicholas & Associates in 3.998 as a laborer. He
advanced to field foreman in z000 while completing his
Bachelor's Degree. Some of his responsibilities included
scheduling labor forces and ordering construction material.
During the summer of 2002, he was trained in estimating, and
performed double -duty as Senior Project Estimator and Project
Manager with responsibility for overseeing job performance and
progression of work, project scheduling, contract negotiations,
client contact, and project closeout.
Joe is currentlyVice President of Nicholas & Associates,
overseeing all projects and working closely with the Project
Managers to ensure that construction is completed on time and
within budget. In addition to his corporate responsibilities, Joe
retains the Project Manager title on a select number of projects.
He performs all Project Manager responsibilities including
scheduling, supervision, contract negotiations, client contact,
bidding, and project closeout.
d[::::::SII....If;;;;;�,,,�IC::W�;;;;;;;
• Arlington Heights School District 25
• Evergreen Park High School
• Skokie School District 69
• Wheaton School District zoo
• Schuamburg School District 54
• Riverside Brookfield High School
• Darien School District 63.
• Community Consolidated School District 59
• Mendonta High School Athletic Field
• Geneva High School Athletic Field
• Community Consolidated School District 3.5
• West Chicago School District 33
• Orland Park School District 23o Athletic Fields
• Kaneland Harter Middle School
o New Plainfield 3.7 Elementary School
• Bethel Baptist Church Addition
• Vail Avenue Parking Garage Renovation
• Crete-Monee Elementary School
JIDU A..n N/F E II ILII ,,,1..II IN
Years Experience: 41Years
Chuckjoined Nicholas & Associates in 2oo6 as a field
superintendent. Chuck's previous work background is very
impressive. Before ending his 30 year masonry career tojoin
Nicholas & Associates, he spent -ii years with AlbertWendt
Masonry and 17 years with Jay Construction/Jayco Masonry.
As a field superintendent, Chuck uses his wealth of experience
to oversee job performance and progression of work on
site, coordinate trades, and strict adherence to budgets and
schedules. His many years of experience have demonstrated
a record of success in organizing and expediting trades to
complete projects in a timely fashion by utilizing an aggressive
approach to construction schedule. Chuck understands the
importance of on going communication. He takes great pride in
his scheduling and communication skills.
OSHA 10 and 3o Hour PROJEc
r E PEII II N E
Nicholas & Associates, Inc.
• Elk Grove Village
*Township High School District 211
• Homewood Flossmoor High School
• Oswego East High School
• DeKalb High School
• Cortland Elementary School
• Kaneland Middle School
• Christ Church of Oakbrook
• Hinsdale Public Library
• Fox Valley Church
• Downers Grove Fire Department
• Tyler Elementary School
• Summit Schools
Nick Papanicholas Jr.
President
Nicholas & Associates Senior Principal
Responsible for Nicholas & Associates daily operations
Monitors project from beginning to end
Participates in value engineering, sub -contractor prequalification, and sub -contract negotiations
Reviews and approves payout requests
Attends meetings as required
Dave Torres
Project Manager
Project set-up and management
Participates in all project -related meetings
Prepares and submits permit applications and inspection requests
Works closely with Architect on value engineering and field condition issues
Pre -qualifies sub -contractors
Utilizes extensive sub -contractor knowledge base
Participates in sub -contract negotiations
Develop contractors scope of work
Assigns trade sub -contracts
Monitor and review all shop drawings
Conducts weeklyjob meetings
Creates weekly project schedules
Conducts 1 year walk through
Compiles punch list
Conducts project close-out
Maintains conformity to construction documents
Ensures quality control throughout projects completion
Liaison between contractors, owner, architect, and municipal officials
Steve East
Director of Procurement
Policy and procedure creation and implementation
Construction project management
Product evaluation
Public relations
Budget development
Strategic planning
Contract administration
Buckingham Place Apartment Complex
Construction Management
Northbrook School District 27
Wood Oaks Junior High & Shabonee Elementary -
Classroom Renovations
Construction Management
Prospect Heights School District 23
MacArthur Middle School Toilet Room Renovation
Construction Management
Community Consolidated School District 59
District Admin Center & Professional Dev. Center
Arlington Heights, IL
Construction Management
Bannockburn School District 106
2018 Renovation at Bannockburn School
Construction Management
McHenry School District 15
Remodeling Work at Multiple Sites
Construction Management
Owner:
Four Peaks, LLC
Gina Bertolini (847) 394-6200
Architect:
Studio 222 Architects
Tim Schmitt (312) 850-4765
Contract:
$70,000,000
Completion:
July 2018
Owner: Northbrook School District 27
Douglas Heurich (847) 498-2610
Architect: ARCON Associates
Brian Kukla (630) 495-1900
Contract: $265,000
Completion: July 2018
Owner: Prospect Heights School District 23
Brian Rominiski (847) 870-5581
Architect: Studio 222 Architects
Erin Miller (630) 495-1900
Contract: $45,000
Completion, July 2018
Owner: Community Consolidated School District 59
Tony Rossi (847) 593-4300
Architect: ARCON Associates
Rick Cozzi (630) 495-1900
Contract: $16,000,000
Completion: August 2018
Owner:
Bannockburn School District 106
Scott Hermann (847) 945-5900
Architect:
ARCON Associates
Laurie Hoffman (630) 495-1900
Contract:
$400,000
Completion.,
August 2018
Owner:
McHenry School District 1s
Mark Bertolozzi (815) 385-7210
Architect:
ARCON Associates
Gaspare Pitrello (630) 495-1900
Contract:
$4,700,000
Completion:
August 2018
Glenbrook School District 225 Owner: Glenbrook School District 225
Glenbrook North & South High School Kimberly Ptak (847) 998-61o0
Life safety work, interior renovations & paving Architect: ARCON Associates
Construction Management Erin Miller (630) 495-1900
Contract: $4,800,000
Completion: August 2018
Oconomowoc Area School District -Oconomowoc
High School Main Campus
Construction Management
Oakton Street Properties
New Office and Shop Buildings
General Contractor
United Community Center
UCC Acosta Middle School
Construction Management
Schaumburg Community Consolidated School
District 54
Additions/Renovations at Multiple Sites
Construction Management
Skokie/Morton Grove School District 69
Thomas Edison Elementary School - Phase 2
Construction Management
The Dump Luxe Furniture Outlet - Deerfield Illinois
General Contractor
Owner:
Architect:
Contract:
Completion:.
Owner:
Architect:
Contract:
Completion.
Owner:
Architect:
Contract:
Completion.
Owner:
Architect:
Contract:
Completion:
Owner:
Architect:
Contract:
Completion:
Owner:
Architect;
Contract:
Completion:
Elk Grove Village -James Paul Petri Public Works Facility Owner:
Construction Management
Architect:
Contract:
Completion:
Oconomowoc Area School District
Greg Maroo (262) 560-3134
Eppstein Uhen Architect
Maclain Schramm (414) 271-5350
$2,000,000
August 2018
Arrow Road Construction
John Healy (847) 472-7260
Fox and Fox Architects
Jay Fox, III (312) 377-5074
$7,450,000
August 2018
United Community Center
(414)384-3100
JAKnetter Architect
Jay Knetter (262) 278-4383
$6,400,000
August 2018
Schaumburg Community Cons. School
District 54
Ric King (847) 357-5039
STIR Partners LLC
Colby Lewis (312) 464-1444
$10,000,000
August 2018
Skokie/Morton Grove School District 69
Dr. Margaret Clauson (847) 675-7666
ARCON Associates
George Demarakis (630) 495-1900
$9,000,000
August 2018
The Dump Luxe Furniture Outlet
(757) 552-1520
Ionic Design Studios
Eugene Thompson (804)780-0070
$3,000,000
August 2018
Elk Grove Village
Vito Sammarco (847) 734-8044
ARCON Associates
VPTrinh (630) 495-1900
$18,500,000
November 2018
3. Currently, 70% of our organization's resources are committed to projects in progress.
4. Nicholas & Associates continues to pursue opportunities for public and private work in the sectors we serve.
At this time, we are not finalists in any opportunities that would conflict with the Mount Prospect Fire Station.
S. QUALITY ASSURANCE
During the pre -construction phase, Nicholas & Associates pre -qualifies all contractors that will be considered
and personally contacts each one to ensure their ability to perform their portion of the work. To guarantee
quality control during construction, we observe the construction activities and workmanship to assure that
it is being performed in compliance with the contract plans and specifications. Weeklyjob meetings are
conducted with contractors to assist in the resolution of any questions that arise. A Daily Quality Control log
along with photographs is kept by the Superintendent to record all quality issues and resolutions.
6. SCREENING CONTRACTORS
Nicholas & Associates does not self -perform any work, thus guaranteeing a completely impartial position
with subcontractors. As part of the design -development pre -construction process, we will solicit local
subcontractor participation in the bidding process. Nicholas & Associates will pre -qualify all subcontractors
interested in bidding on individual trade packages. A major component of the pre -qualification process is the
submission of an AIAA305 Qualification Statement including a financial overview for any company interested
in submitting a bid. The other purpose of pre -qualifying subcontractors is to gain a comfort level that the
bidding contractors are able to perform their trade within the time line established for the project. We will
check their references on past projects and clients to assure they performed as required.
7. Sub -contractor list & sub -trade references. (see following page)
8/9. CONSTRUCTION SCHEDULE
Construction scheduling is done by the Project Manager and Superintendent assigned to the project. We
determine duration of tasks by a combination of input from the awarded trade contractors and previous
experience with similar projects. Nicholas & Associates utilizes Microsoft Project Managerfor the construction
schedules. Schedules are developed bi-weekly during the pre -construction phase and updated monthly
during the construction phase to ensure critical and final completion dates are met. All updated schedules will
be provided to the Architect, Owner, and Contractors at weekly meetings to ensure the project is delivered
on time. Utilizing short term schedules allows an immediate overview of the progress of the project to avoid
critical issues that may develop in the course of building a facility that will satisfy the community's desires and
needs. New facilities are developed with planning and public awareness, the community expects the facility to
be ready for use on a scheduled date. Nicholas & Associates will keep that commitment to the community.
PRE -CONSTRUCTION PHASE
Services that are provided in the pre-construction/masterplanning stage would include:
• Develop an initial cost estimate from both schematic and design development documents
• Value engineering review to determine the most effective use of available funds
Establish a quality control plan
• Enhance the design and construction quality by evaluation of proposed materials
• Develop a written scope of work for all trades
Consideration of alternate materials, systems, and processes
• Constructibility review
• Establish preliminary construction schedule to avoid delays, changes, and/or claims
• Prepare final cost estimate and schedule to ensure compliance with owner goals
• Establish a list of pre -qualified contractors
• Communicate with the Architect and Owner regularly to ensure proper exchange of information
CONFIRM PROJECT OBJECTIVES
Nicholas & Associates will review the client's objectives for the project and ensure that each element is
understood and addressed in the project plan. We prefer to participate in presentations and forums to gather
as much accurate data as possible.
SITE ASSESSMENT/EXISTING CONDITIONS
Nicholas & Associates will provide a detailed site assessment carefully identifying existing conditions so that
the design team can respond appropriately.
BUDGET PREPARATION
Based on the preliminary design and proposed project specifications, an initial estimate is developed by
the Nicholas & Associates estimating team. Historical cost data is utilized along with current contractor
estimates. Trade -by -trade detail is used to provide the most accurate result. As the project scope gets more
defined, the budget amounts are updated.
VALUE ENGINEERING
Nicholas & Associates can help our clients maximize the value of every construction dollar spent. We will
systematically evaluate the scope of the proposed project. High costs areas are broken out and cost efficient
alternatives are identified and proposed to the design team. We will never offer an alternative that would
jeopardize the quality or sustainability of the original design.
E. Company Information
1. What type of company are you? (check one):
a. Corporation X
b. Partnership
c. Sole Proprietorship
d. Joint Venture
e. Other Type:
2. If the organization is a corporation, provide:
State of incorporation: Illinois
Date of incorporation: 1978
Name and address of registered agent: Nicholas & Associates Inc.
1001 Eeehanvillle Drive, Mount Prospect IL 60056
3. How many years has your organization been in business as a Construction Management
company under your present name?. years 40 years
4. Under what other former names has your organization operated? None
5. Identify any ownership changes that have occurred since 2007. None
6. Officers, Partners, or Owners:
Name
Title
Nick Papanicholas Jr. President
Joe Papanicholas Vice President
Tony Pa anicholas Vice President
Gina Bertolini Treasurer
7. Provide classification of work your organization performs with its own forces (list all
trades) if any:
Nicholas & Associates, Inc. does not self -perform any trade work.
14. Provide bank references.
Please see attached
15. Name of bonding company and name and address of agent
Bonding Company: Fidelity and Deposit Company of Maryland -1299 Zurich Way, Schaumburg IL 60196
Bonding gent: Weible &Cahill - 2MO Cabotrive, Suite , s e
_1L 60532
State the number of years the bonding company has been of service to
your organization: IS Years
State your total bonding
capacity: $ 250 000 000
State your current total bonding capacity not assigned to a
contract: $_10-0-1.0-00 000
16. Can your firm purchase payment and performance bonds covering 100% of the entire
job cost? (Note that bonds from sub -contractors may not be an acceptable substitute for
bonding by the Construction Manager)
Yes —X No
If no, explain fully.
The Village would like to know if your company understands the requirements for
working with an Illinois municipality on a public works project in compliance with Illinois
law.
17. What percentage of your total workload has been performed for either the State of Illinois
or an Illinois municipality or other Illinois local governmental entity in the following
manner in the past five (5) years?
Construction Management: 85 %
General Contractor: 15 %
Your Company's Safety Record
18. Describe construction safety program and safety record.
19. State your firm's insurance Experience Rating Modifier: .85
Please see attached letter from Weible & Cahill.
24. Persons and Entities Subject to Disqualification
No person or business entity shall be awarded a contract or subcontract, for a stated
period of time, from the date of conviction or entry of a plea or admission of guilt, if the
person or business entity,
A. has been convicted of an act committed, within the State of Illinois or any state within
the United States, of bribery or attempting to bribe an officer or employee in the State
of Illinois, or any state in the United States in that officer's or employee's official
capacity;
B. has been convicted of an act committed, within the State of Illinois or any state within
the United States, of bid rigging or attempting to rig bids as defined in the Sherman
Anti -Trust Act and Clayton Act 15 U.S.C.;
C. has been convicted of bid rigging or attempting to rig bids under the laws of the State
of Illinois, or any state in the United States;
D. has been convicted of an act committed, within the State of Illinois or any state in the
United States, of price fixing or attempting to fix prices as defined by the Sherman
Anti Trust Act and Clayton Act 15 U.S.C. Sec. 1 et sig.;
E. has been convicted of price fixing or attempting to fix prices under the laws of the
State of Illinois, or any state in the United States;
F. has been convicted of defrauding or attempting to defraud any unit of state or local
government or school district within the State of Illinois or in any state in the United
States;
G. has made an admission of guilt of such conduct as set forth in subsection (A)
through (F) above which admission is a matter of record, whether or not such person
or business entity was subject to prosecution for the offense or offenses admitted to;
H. has entered a plea of nolo contendere to charges of bribery, price fixing, bid rigging,
bid rotating, or fraud; as set forth in subparagraphs (A) through (F) above.
Business entity, as used herein, means a corporation, partnership, trust, association,
unincorporated business or individually owned business.
Is your business entity potentially subject to disqualification due to any of the reasons
above?
Yes No X
If yes, explain the circumstances.
NICHOLAS & ASSOCIATES, INC.
BALANCESHEETS
DECEMBER 31, 2017 AND 2016
ASSETS
Current Assets 2017 2016
Cash and cash equivalents $ 3,012,916 942,478
Shareholder loans receivable 0 1,600,000
Accounts receivable - trade 11,368,208 649,751
Accounts receivable - retention 3,450,427 2,660,445
Cost and estimated earnings in excess of
related billings on contracts in progress 0 568,704
Prepaid expenses and other assets 0 0
Total 17,831,551 6,421,378
Property and Equipment, at Cost
Building and improvements 3,501,842 3,501,842
Accumulated depreciation (310,934) (275,789
Net 3,190,908 3,226,053
Total Assets S 21,022,459 $ 9,647,431
See Independent Accountants' Report
The Accompanying Notes are an Integral Part
of these Financial Statements
-2-
IT"TN"EIBLE
CAHILL
June 18, 2018
Village of Mt. Prospect
50 S. Emerson Street
Mt. Prospect, IL 60056
Re: Bid for Mt. Prospect Fire Station #13
Dear Reader:
I am the agent for Nicholas and Associates. I was requested to provide an Experience Modification
Letter on their behalf. Below listed you will find their Experience Modification Factors:
7/1/18-.85
3/1/17-.86
3/1/16 —1.33
3/1/15 —1.34
Please note during the 2016 & 2015 policy years there was a single claim that effected the
calculation. Had that single claim not occurred the Experience Modification would have been .88.
As you can see they are a very safe contractor.
Please advise if I can be of further assistance.
Sincerely yours,
Weible & Cahill
Molly M. Moran
MM:mm
2300 Cabot Drive, Suite 100 • Lisle, Illinois 60532 9 Phone: 630.245.4600 • Fax: 630.245.4601
BoardDocs® Pro Page 1 of 3
Agenda Item Details
Meeting Jul 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m.
Category 8. VILLAGE MANAGER'S REPORT
Subject 8.2 Motion to Authorize the Village Manager to enter into a contract with Williams Architects
for architectural services to design the new fire headquarters located at 111 E. Rand Road in
an amount not to exceed $498,000.00
Access Public
Type Action
Preferred Date Jul 17, 2018
Absolute Date Jul 17, 2018
Fiscal Impact Yes
Dollar Amount 498,000.00
Budgeted Yes
Budget Source Capital Improvement Plan
Recommended Action Motion to Authorize the Village Manager to enter into a contract with Williams Architects for
architectural services to design the new fire headquarters located at 111 E. Rand Road in an
amount not to exceed $498,000.00
Public Content
Information
Similar to the process followed for the new Police Headquarters, the Village issued a request for proposals (RFP) for
Architectural Design Services for the new Fire Headquarters to be located at 111 E. Rand Road on May 25, 2018. The
RFP was advertised in the Daily Herald, posted online on the Village website's transparency portal, emailed directly to
a number of experienced fire station Architects, and was made available at the Community Development counter. The
deadline for submittals was June 20, 2018 at 3:00 pm. Five firms responded with proposals.
Proposals were evaluated by a selection team of Village Staff from several departments including the Manager's
Office, the Fire Department, Public Works, Community Development, and by Trustee Richard Rogers. Evaluations were
based upon four major criteria weighted equally:
• specific project understanding,
• a thorough understanding of the scope of work,
• the qualifications of the proposed design team members, and
• overall experience with Police projects.
https://www.boarddocs.com/il/vompBoard.nsf/Private?open&login 7/13/2018
Specific Project
Identification of
Qualifications of
Experience with Public
TotaI
Firm Name
Understandinq
Scope of Work
Pro'ect Team
Fire Facilities
Score
FGM Architects
24
24
23
23
94
Williams Architects20
2.0
22
20
84
Cordogan Clark
19
19
20
18
76
Architects
Healy, Bender &
19
19
18
18
74
Associates
Studio GC
19
19
18
12
68
https://www.boarddocs.com/il/vompBoard.nsf/Private?open&login 7/13/2018
BoardDocs® Pro Page 3 of 3
2. Action at discretion of Village Board.
Staff Recarnrnendatio
Staff Recommends the Village Board Approve a Motion to Authorize the Village Manager to enter into a contract with
Williams Architects for architectural services to design the new fire headquarters located at 111 E. Rand Road in an
amount not to exceed $498,000.00
fflliarns Architects.pdf (5,491 KIB) RFP Arch'itect.pdf (659 i<IF3)
Administrative Content
Executive Content
https://www.boarddocs.com/il/vompBoard.nsf/Private?open&login 7/13/2018
20 June 2018
Mr. Mark Rysavy
Deputy Director Building and Inspection Services
Village of Mount Prospect
50 S. Emerson Street, 2nd Floor
Mount Prospect, IL 60056
rY WILLIAMS
ARCHITECTS
Architecture I Planning ( Aquatics I Interiors
Re: Response to Request for Proposal for the Village of Mount Prospect - Fire Station No. 13
Dear Mr. Rysavy and Selection Committee:
We are truly pleased to have the opportunity to respond to the Village of Mount Prospect's Request for Proposal with
regards to Fire Station No. 13.. Williams Architects has been dedicated to public clients throughout our 43+ years with a
concentration on fire facilities for over 25 years. We understand that Fire / EMS facilities are the home base and provide
important support for the Community's Fire Department. They must provide efficient and dependable support to the fire
fighters and staff. Based on our understanding of the Project, combined with Williams Architects' years of experience
with fire facilities, positions us as a well suited organization for this Project. We would be honored to be selected as your
Architect!
Our team of senior partners, Mark Bushhouse and Scott Lange, have been personally involved throughout all ourfire station
projects and will be our representatives to work directly with your staff and Village officials throughout the project. Mark
and Scott personally "handcraft" only a few select fire stations per year. They have worked together for over 20 years and
have developed, refined and honed their skills and understanding of the facility needs of today's fire fighter professionals
on dozens of facilities. Their consistent track record speaks volumes as to their skill and passion to meet their client's goals.
We have recently assisted the Village of Glenview with Fire Station No. 6 and are currently assisting the City of Highland
with plans fortheir new Public Safety Facility, the Carol Stream Fire Protection District with Planning, the Itasca Fire Protection
District with Facility Planning, the Huntley Fire Protection District with their Headquarters Facility, and the City of Highland
Park with Fire Station No. 2. We encourage you to contact our current and previous client references to learn first-hand
about our project process, approach and performance.
We look forward to meeting with you and the Selection Committee to discuss this Project. We want to affirm that we are
committed to being the Stewards of Your Vision. Should you have any further questions or require additional information
during the evaluation period, please contact me at your convenience.
Sincerely,
Mark S. Bushhouse, AIA, LEED AP
President / Principal -in -Charge
500 Park Boulevard, Suite 800 • Itasca, Illinois 60143 . P 630.221.1212 . F 630.221.1220 . www.williams-architects.com
A
COVERLETTER...............................................................................................................3
3.1 UNDERSTANDING OF PROJECT AND PROJECT APPROACH.....................................7
3.2 RELEVANT PROJECT QUALIFICATION AND EXPERIENCE AS A FIRM ...........................15
3.3 KEY STAFF/SUB-CONSULTANT QUALIFICATIONS AND RELEVANT EXPERIENCE ... ....... 29
3.4 FIRM WORKLOAD... ......................................................................................... ---47
3.5 REFERENCE..............................................................................................................51
3.6 PROPOSED SCHEDULE.............................................................................................55
/
m�rU�a�,u
Allalf
Poll
..............
w
i
�e rstlan',�/,//),r� �'r�
PROJECT UNDERSTANDING
WE understand that the Village of Mount Prospect is seeking qualifications from a highly -qualified, architectural -engineering firm to
ensure timely, fiscally, responsible, and successful completion of the adaptive reuse of 1 1 1 E. Rand Road into Fire Station No. 13.
What we know is that Fire Station No. 13 sits at 112 E. Northwest Highway and is collocated with the Police Station. Both departments
will be relocated to new sites in order to provide the necessary space required for modern facilities. A location for the relocation
of the Police Department has already been purchased and is in the design phase. The current site has many deficiencies such as:
• Lack of parking
• Need for renovated spaces
• Lack of training facilities
• Complicated site circulation
• Site lines in and out of the bays are limited and can be blocked by traffic during rush hour conditions
The Village has entered into a contract to purchase the former MB Financial building and site located at 1 1 1 E. Rand Road with the
intentions of adaptively reusing the site and building for the new Fire Station 13. The building itself is roughly 23,000 square feet
on two floors. The first floor is slightly raised on a plinth and the basement has limited windows along the east side of the building.
The existing building is a steel framed structure with a space frame roof that overhangs on all sides by at least 12 feet, and 58 feet
on the west. The existing facades are currently mostly glass and a limited amount of brick.
The concept is to demolish and reconstruct the interior of the building on both levels, build out the new apparatus bay on the
west side under the large overhang, possibly add some space under the south roof overhang as necessary, and provide slight
modifications to the site to allow for easier access of apparatus. The site itself already has stormwater detention facilities installed
at the southwest corner of the site and no impact to that system is anticipated.
ELEMENTS OF FIRE STATION
We will take into consideration the desires the Village of Mount Prospect has for the Fire Station. We understand the new station will
be designed to be approximately 30,000 SF in size and shall provide adequate and flexible space to accommodate the following
uses„
• 5 vehicle bays
• Living quarters for 10
• Kitchen and Dining area
• Day Room
• Administration Staff
• Fire Prevention Staff
• Training Space
• Exercise Room
Staffing Levels
• Minimum 8 shift personnel, but 13 are staffed full time
• 13 shift staff times 3 shifts = 39 personnel
• Administration Staff 11.5 employees, normal business hours
Parking
• Accommodations for up to 51 staff members
• Required ADA compliant parking
• Up to 40 additional stalls for training purposes
WL.IAMS Village of Mount Prospect n
ARCHITECTS Fire Station No. 13 7
During this phase, we would first submit all necessary plans and permit applications in a timely fashion, attend necessary meetings
with the permitting agencies, prepare formal written responses and make necessary changes in orderto receive timely permit approval.
CONSTRUCTION OBSERVATION AND ADMINISTRATION PHASE
During the Construction Observation/Administration phase, we visit the site on an every -other week basis and meet with the Owner
and CM to review all aspects of the Project, assisting the client in understanding the schedule and progress of the work, as well as
issuing field reports for each of our visits, informing the client and CM as to work that is acceptable and unacceptable. We also
review the payout requests as submitted by the CM and recommend payment to the Owner. We review, comment on and approve
shop drawings as submitted by the CM for the various systems and components within the building. We provide information and
clarification, and review change orders throughout the construction phase to administer the contract.
During the meetings with the Village of Mount Prospect, the CM and ourselves, we discuss the events of the previous week and any
upcoming events for the next week. The meetings follow a detailed agenda designed by our team. We review with the construction
project superintendent any and all subcontractor items that may require clarification. This allows us to either address the item in
the field or request the contractor issue a formal Request for Information (RFI) so items can be clarified prior to actual construction.
We also keep a photographic record of progress.
POST CONSTRUCTION PHASE
As part of our Basic Services, we walk the site with the Owner and CM and develop a comprehensive list of items to be completed
(Punchlist). We perform "wrap-up" tasks to ensure a smooth transition to owner occupancy.
We review all submitted "as built" documentation and maintenance manuals to verify that there are no conflicts with the design
intent, and to identify any ambiguities that require clarification.
Conscious of the need to assist our clients with achieving the full value of the initial construction effort, we visit the facility 11 months
after substantial completion for program/maintenance/operations review and documentation of warranty issues. During this visit
we walk through the facility with the owner to determine the items that are to be corrected as part of the construction warranty, and/
or assist the Owner to best operate and maintain their new facility.
Addftibnaliiiiu iiiiii VIII ��hill° hill 1111140IIII& li hi
COMPUTER TECHNOLOGY / VISUALIZATION
Depending upon the unique needs / project demands of our client, Williams Architects uses advanced project delivery systems
to assist in the delivery of high-quality technical and professional service to our clients. AutoCAD, augmented by the use of
PhotoShop and Sketch -Up, or Building Information Modeling (BIM) is utilized to provide design drawings, three-dimensional project
representation, computer renderings and animation of site and structure designs as well as construction documents.
The use of Building Information Modeling early in our design process allows us to illustrate our concepts. Instead of creating plan
and elevation drawings to illustrate our design concepts, we create a complete three-dimensional model of the entire building and
the proposed improvements. From this model, it is possible to create any number of eye -level, perspective views, allowing the Village
to better understand and react to the character of proposed improvements before drawings become finalized. The finalized model
is then used to create the construction documents for the work.
This innovative approach to design not only allows for greater understanding of the proposed improvements, but also leads to
higher quality construction documents. Since the design team is creating and modifying a model rather than a series of drawings,
changes are instantly coordinated throughout the set of drawings - potentially reducing change orders during construction.
VALUE ENGINEERING
Value engineering is something that has become common practice for nearly all construction projects. Williams Architects, with
the input of the Owner, will work to reduce project costs without sacrificing design, aesthetic qualities, performance and program
requirements that are at the core of the project's values. This is done by reviewing materials, building systems, and anticipated
construction methods, and recommending cost options. Our team is also concerned about providing a building that is economical
to construct while taking into consideration the life -cycle impact on maintenance costs. We provide cost comparisons of alternate
construction systems and materials, including value -engineering options where appropriate.
WILLIAMS Village of Mount Prospect 1 1
ARCHITECTS Fire Station No. 13 I I
We have also developed supplemental in-house programs to augment our QA/QC efforts. We conduct bi-weekly, firmwide tech-
nical staff meetings at which we request any person who has a detailed question or a problem in the field needing resolution to
bring the issue up for discussion, allowing team examination, and presenting an opportunity to assign appropriate individuals to
execute remedial action. This approach allows all present to gain from the knowledge learned from error in the field, in a drawing,
or caused by contractor negligence, and helps to build a "collective knowledge" that can help avoid future problems. In the other
program, twice a month a project team is asked to make a presentation to the key principal staff in the firm. The presentation format
follows that of a public presentation where the project staff is evaluated on project design, functionality, budget, job controls, and
presentation style and technique. This exercise supports staff training, affording an opportunity for less experienced staff to learn
from more experienced staff, and helps improve communication skills so that problems arising in the field during construction can
be addressed and resolved quickly and efficiently. At times, we invite clients to these meetings so that they can observe this valuable
critique process. We believe this approach promotes superior QA/QC by having all parties participating in a single meeting. Addi-
tionally, when multiple consultants are involved in a project, we host numerous consulting and coordination meetings.
In summary, our QA/QC program is implemented as follows:
• Initial inspections. The preliminary design is verified, and drawings and documents comprising specification are checked
for accuracy. Acceptable levels of design coordination are established and any discrepancies among assignments resolved.
Additionally, assurance of the availability of all required data concerning the facility and site is addressed.
• Follow-up inspections. These are performed to ensure that drawings conform to the specifications and requirements of the
clients.
• Pre -final inspections. Performed at the completion stage of all work or increments of work, pre -final inspections yield a
punch list of deficiencies identified in the built project that do not meet design specifications. A list of work to be performed
to rectify deficiencies is prepared, and a follow-up inspection performed to ensure that all discrepancies between design
and facility have been corrected. Inspections and corrective action will be performed within the time outlined for the
completion of the entire project or increments thereof.
O"WILLIAMS Village of Mount Prospect 13
ARCHITECTS Fire Station No. 13
The combined experience of each member of the Williams Team represents service to many municipalities locally as well as nationally.
Our Team's municipal experience is extensive and boasts a track record that consists of highly successful projects. The following list
represents our prior related design experience.
CITY OF ANKENY, IA
• Police & Fire / EMS Needs Assessment, Site Review &
Master Plan (in assoc. with McClaren Wilson. & Lawrie)
VILLAGE OF BARRINGTON, IL
• Combined Fire / EMS Station and Police Dept. Public
Safety Facility
• New Village Hall Facility
BARRINGTON COUNTRYSIDE FIRE PROT. DISTRICT
• New Barrington Hills Fire / EMS Station
VILLAGE OF BARTLETT, IL
• Police Department Facility Study
• New Police Facility
VILLAGE OF BEDFORD PARK, IL
• 2 New Fire / EMS Substations
VILLAGE OF BURR RIDGE
• Master Plan & New Police Facility
VILLAGE OF CAROL STREAM
• Village Hall & Police Needs Assessment and Planning
• Police and Village Hall Addition / Remodeling
CAROL STREAM FIRE PROTECTION DISTRICT
• Fire Protection District Station 29 Facility Planning
VILLAGE OF CARPENTERSVILLE, IL
• Municipal Facilities Master Plan Public Works, Police &
Village Hall
• Public Works Facility
CENTERVILLE-WASHINGTON, OH
• Maintenance Facility
VILLAGE OF DEER PARK, IL
• Village Hall Planning Study
VILLAGE OF DEERFIELD, IL
• Renovation/addition to Village Hall
CITY OF DEKALB, IL
• Police Facility Feasibility and Master Plan
CITY OF DELEVAN, WI
• Village Hall & Police Station Renovation
VILLAGE OF DOWNERS GROVE, IL
• New Fire / EMS Headquarters
• Police and Village Hall Planning & Design
DUPAGE COUNTY, IL
• On -Call Architectural Services
ELK GROVE PARK DISTRICT, IL
• New Maintenance Facility
CITY OF GENESEO, IL
• City Hall & Police Needs Assessment & Master Plan
VILLAGE OF GLENCOE, IL
• Municipal Center Police Renovation
VILLAGE OF GLENDALE HEIGHTS, IL
• Municipal and Police Facilities Master Plan
• New Senior Center
VILLAGE OF GLENVIEW, IL
• New Fire Station # 6
• Village Hall Relocation and Police Renovation
CITY OF HIGHLAND, IL
• New Police / Fire / EMS Facility
VILLAGE OF HIGHLAND PARK, IL
• New Fire / EMS Headquarters
VILLAGE OF HOFFMAN ESTATES, IL
• Police Needs Assessment and Master Plan
VILLAGE OF HOMER GLEN, IL
• New Village Hall Planning & Design Concept
HUNTLEY FIRE PROTECTION DISTRICT
• New Fire Station #4
• New Headquarter Facility
ITASCA FIRE PROTECTION DISTRICT, ITASCA, IL
• Headquarters Station Planning
LAKE COUNTY
• Sheriff Evidence Central Facility
MWILIJAMS Village of Mount Prospect 17
ARCHITECTS Fire Station No. 13
DOWNERS GROVE FIRE STATION NO. 4
r
auu " � uu rar roaemi t uk
This new fire station serves as the Department's headquarters facility, housing administration space, a training room, a four- bay
drive-through apparatus bay, living quarters for 12 firefighters, an exercise room, a kitchen, and a day room. Designed to be a
33,400 -square -foot facility, this new station also features a training tower.
CSI IIIIIIIPIINT. Crrrnlljett Sinr,m; 33,400 SF
Village of Downers Grove & Downers Grove Fire Dept. IWIriviil IIIlruirolject Cost: $6,900,000
801 Burlington Avenue Coiinnplllefioin Mote: 2008
Downers Grove, IL 60516
David B. Fieldman, Village Manager
(630) 434-5526
MW1L1JAM§7_
Village of Mount Prospect 19
ARCHITECTS Fire Station No. 13 I /
PALATINE FIRE STATION NO. 81
The Village of Palatine retained Williams Architects to design their newest fire station. The facility will operate as a Satellite station
for the Village to provide better service for a growing community. This satellite station is designed to have a residential appearance
to allow it to blend with the surrounding neighborhood and will contain a training room, kitchen, sleeping bunk space for six as well
as administrative spaces with 3 apparatus bays,
l,llllrll' T- 11uro,)ent Size: 8,736 SF
Village of Palatine IFiimnollll IIIPuir°o)entCost: $2,600,000
200 East Wood Street omIpl llletiior'r 1)ate: 2011
Palatine, IL 60067
Robert Falardeau, Fire Chief
(847) 202-6343
WILLIAMS Village of Mount Prospect 21
ARCHITECTS Fire Station No. 13
GLENVIEW FIRE STATION NO. 6
Williams Architects assisted the Village of Glenview with planning and design of their new Fire Department Headquarters facility. This
14,659 SF facility houses the vehicles in a 3 bay apparatus room and provides living quarters for 7, as well as training / apparatus
support spaces and administrative offices.
Fi1..1111111'rIII IIIIT:
Village of Glenview
1225 Waukegan Road
Glenview, IL 60025
Ralph Ensign, Chief
(847) 724-2141
Mroject Size:
Fiiric llll Project Celt-
Coirelli llletiioni IIII'Fete:
14,659 SF
$4,800,000
2014
WILLIAMS' Village of Mount Prospect 23
ARCHITECTS Fire Station No. 13
FIRE STATION
N0, 1111111
WEST ELEVATION
SOUTH ELEVATION
Williams Architects is currently assisting the City of Portage with the design of Fire Station No. 2 design. The new 18,300 square -
foot fire station will feature a four drive apparatus bay, hose tower and storage, workroom, offices, lobby, day room and kitchen,
sleeping quarters, locker rooms and fitness room.
C1111l,IIIIIIIIi1iIIINT: 114r'olje'c,t Size:
18,300 SF
City of Portage Plrriiiallll ProjectCost: $6,000,000
7900 S. Westnedge Ave. Coinmplllefloiri Date-, Est. 2020
Portage, MI 49002
John Podgorski, Sr. Deputy Fire Chief
(269) 329-4488
WIWAMS Village of Mount Prospect 25
ARCHITECTS Fire Station No. 13
PARK,BEDFORD
FIRE STATION No. 3
Williams Architects provided planning and design services, for anew fires ubstation for the Bedford Park Fire Department. The design
developed for a one-story, masonry facility to house seven firefighters, an exercise room, and a two -bay drive through.
IIHI F11"m
Village of Bedford Park
6701 S. Archer Road
Bedford Park, IL 60501
Sean Maloy, Fire Chief
(708) 458-2067
Project Sine
IIP'miiounolIIPiu"oIllle'c't Cont-
'oeclllfclllletlorc l„2ate,r
13,224 SF
$3,600,000
2007
MLLIAMS
. Village of Mount Prospect 27
ARCHITECTS Fire Station No. 13
ORGANIZATION
V VIIIIII m
The Williams Architects team has the capacity to complete the work for the Village of Mount Prospect in a timely fashion. The
following Williams Architects' personnel will be assigned to your project, with additional supportstaff assigned as necessary. These
staff members have the time necessary to provide you with quality professional services and successfully meet your project objectives.
MOUNT PROSPECT
FIRE STATION
I,LIJI S Village of Mount Prospect 1
ARCHITECTS Fire Station No. 13
SCOTTI E. L - ' , AIA, LEED° AP, NCARB
Vice President / Principal
EDUCATION: De Paul University, Bachelor of Arts MEMBERSHIPS / AFFILIATIONS:
University of Illinois at Chicago, School of Architecture AIA Northeast Chapter Member
William Rainey Harper College, A.A.S. Architectural National Council of Architectural Registration Boards
Technology LEED®Accredited Professional
LICENSED ARCHITECT: IL Construction Specifications Institute, Home Chapter 134
Northern Illinois
INDUSTRY EXPERIENCE: 31 Years
Scott joined Williams Architects in 1994 and is a licensed architect in the State of Illinois. Scott is responsible for establishing firm -
wide uniformly high production standards for design and contract documents and oversees the Quality Assurance process. He is
thoroughly familiarwilh the entire architectural process and possesses managerial skills with respectto leading, and directing activities
of all project team personnel while monitoring budget, scheduling, technical production and ensuring adherence to client goals. A
brief highlight of the projects he has been involved with is listed below.
PROJECT EXPERIENCE
• Village of Barrington: Public Safety Facility, Village Hall
• Village of Bedford Park: Fire Station No. 2 & No. 3
• Village of Downers Grove: Fire Station No. 2 Headquarters, Police & Village Hall Planning
• DuPage County: On -Call Architectural Services
• Village of Glenview: Village Hall and Police Expansion/Renovation, Fire Station No. 8
• City of Highland: Highland Public Safety Facility
• City of Highland Park: Fire Department Headquarters Facility, Station No. 32 Planning Study
• Huntley Fire Protection District: Fire Station No. 4 (LEED Certified), Headquarters Station
• Itasca Fire Protection District: Headquarters Station Planning
• Lake County: Multi Departmental Storage & Evidence Processing Facility
• Village of Palatine: Fire Station # 81
• City of Portage, MI: New Fire Station No. 2
• Village of Riverwoods: New Fire Station
• Village of Richton Park — Police, Fire, Village Administrative & Recreation Master Plan
• Village of Sandwich: Public Safety Complex
• Village of Schaumburg: Fire Stations No. 51, 52 and 53
• Village of Skokie: New Fire Station No. 17, Fire Station Nos. 16 & 18 expansion/remodel
• Village of Tinley Park: Fire Stations 2 & 3 Master Plan
• Village of Wheeling: Fire Station No. 24 & Police Department Planning and Design
• Village of Woodbridge: Municipal Campus Feasibility
N'wWLLJAM& Village of Mount Prospect 33
ARCHITECTS Fire Station No. 13
CONSULTANT OVERVIEW
Although Williams Architects performs all of the architectural design/ planning, interior design, cost estimating, project coordination
and construction administration work in-house; we retain specialized consultants and engineers to assist as needed on our projects.
We have long-standing excellent relationships with each of the consulting firms listed below and rely on them to provide the quality
of services expected of our firm. We will work with the Village of Mount Prospect in the final review and selection of the below noted
consulting firms and consider additional consultant suggestions you may have.
Williams Architects
500 Park Boulevard, Suite 800, Itasca, IL 60143
Mark S. Bushhouse, Principal -in -Charge
(630) 221-1212
www.williams-orchitects.com
Williams Interiors
500 Park Boulevard, Suite 800, Itasca, IL 60143
Carie Kotera, Director of Interior Design
(630) 221-1212
www.williams-orchitects.com
W -T Mechanical/Electrical Eng.
2675 Pratum Avenue
Hoffman Estates, IL 60192
Stephen Triphohn, President
(224) 293-6301
www.wtengineering.com
STRUCTURAL ENGINEERING
Johnson Wilbur Adams, Inc.
175 North Washington Street, Wheaton, IL 60187
Mike Wilbur, Principal
(630) 653-9060
www.iwase.com
CIVIL ENGINEERING
Provided by Owner
LOW VOLTAGECONSULTANT
Sentinel Technologies
2550 Warrenville Road
Downers Grove, IL 60515
Jim Michalik, RCDD, CTS
630.769.4354
www.sentinel.com
MWILUAMS'Village of Mount Prospect 35
ARCHITECTS Fire Station No. 13
OHNSON WILBURINC.
Structural Engineering
Key Personnel
MICHAEL J. WILBUR, P.E., S.E., SECB, LEED AP BD+C
Mr. Michael Wilbur has over 40 years of structural engineering experience. In his position as Principal, Mr. Wilbur directs
all structural design activities for, commercial, industrial, municipal, recreational and private development projects. Mr.
Wilbur is responsible for the management of the projects from proposal development through project completion.
Activities include scheduling, code review, design and analysis, review of design documents, verification of construction
conformance with design documents and quality control and assurance for the structural activities for a project. He has
also performed numerous structural condition assessments and prepared due diligence reports for a variety of structures
including commercial buildings and bridges.
Prior to joining JWA Mr. Wilbur worked as a Consulting Engineer in the power sector with Sargent & Lundy Engineers in
Chicago, IL and in the steel industry with American Bridge Division of U.S. Steel.
EDUCA"rION Bachelor of Science, Civil Engineering, University of Notre Dame,
1973 Master of Science — University of Illinois,
Champaign/Urbana, 1980
PROFESSIONAL Licensed Structural Engineer / Illinois (081-004248)
AFFII._IArION.S Licensed Professional Engineer / Arizona, Connecticut, District of Columbia, Florida, Illinois,
Indiana, Kentucky, Maryland, Massachusetts, Michigan, Minnesota, Nevada, New Jersey, New York,
North Carolina, Ohio, Pennsylvania, Rhode Island, Texas, Utah, Virginia, Washington, Wisconsin.
Structural Engineers Certification
Board National Council of
Engineering Examiners Structural
Engineers Associates of Illinois LEED
AP BD+C
KENT L. ADAMS, P.E., S.E.
Mr. Kent Adams has over 30 years of structural engineering experience and has acted as senior project engineer for
numerous projects with Johnson Wilbur Adams, Inc. He has performed and been responsible for design of municipal,
recreational, educational, residential, and commercial projects throughout the United States. Mr. Adams's
responsibilities as a structural engineer include scheduling, code review, design and analysis, review of design
documents, verification of construction conformance with design documents and quality control and assurance for all of
the structural activities for a project.
Prior to joining JWA Mr. Adams worked as a Consulting Engineer in the power sector with Sargent & Lundy
Engineers in Chicago, IL.
EDUCATION Bachelor of Science, Civil Engineering, Bradley University, Peoria, IL,1983
PROFESSIONAL Licensed Structural Engineer/ Illinois (081-005394)
AFFILIATIONS Licensed Professional Engineer/ Illinois, Mississippi, Louisiana, Kansas,
Colorado National Council of Engineering Examiners
American Society of Civil
Engineers American
Concrete Institute
Johnson Wilbur Adams, Inc. — Structural Engineering
175 N. Washington St, Wheaton, IL 60187 • p: 630-653-9060 E-mail: info@jwase.com
OLUAMS Village of Mount Prospect 37
ARCHITECTS Fire Station No. 13 /
Schematic Design
Cost & Estimates
Design Development
Bid Assistance
Construction Documents
Construction Management
Construction Observation
Existing Conditions Assessments
Apartments
Aquatic Facilities
Banks
Churches
Condominiums
Fire Stations
Grocery Stores
Hotels / Motels
Housing Authorities
Feasibility Studies
Permitting
LEED Design
Fire Alarm
Fire Protection
Heating, Ventilating & Air Conditioning
Electrical
Plumbing
Medical Facilities
Office Buildings
Police Stations
Public Work Facilities
Recreation Centers
Restaurants
Retail Centers
Schools
Village Halls
�N 'Trou
Engineering with Precision, Pace & Passion.
Education
Northern Illinois University
Bachelor of Science
-Mechanical Engineering
Professional License
Alabama, Arizona, California, Colorado,
Connecticut, District of Columbia,
Florida, Georgia, Illinois, Indiana, Iowa,
Kentucky, Maine, Maryland,
Massachusetts, Michigan, Minnesota,
Missouri, Nebraska, Nevada, New
Jersey, New York, North Carolina, Ohio,
Oregon, Pennsylvania, Rhode Island,
South Carolina, Tennessee, Texas,
Utah, Virginia, Washington, Wisconsin
Contact
PH: 224-293-6322
FX: 224-293-6444
Email:
Mark.Ventrelli@wtengineering com
Mark Ventrelli PE
Vice President I Mechanical/Electrical Division
BIO
Mark has more than twenty (20) years of experience in the Mechanical
Engineering field, His responsibilities include initial systems design and
preparation of complete contract documents, coordination in the field and
with other trades, specifications, and all duties through the construction
phase.
Mark specializes in commercial, residential and industrial HVAC systems
including heating, cooling, ventilation, refrigeration, hydronic, and piping
systems
Mark has completed designs on condominium buildings, aquatic centers,
HVAC equipment replacement projects, etc Mark's knowledge and
experience makes him a key member of our team.
Project Experience
Bartlett Fire Stations #2 & #3
01 East Dundee Fire Station Headquarters
• Hoffman Estates Fire Stations #23 & #24
Plainfield Fire Stations #1, #3, & #4
0, Schaumburg Fire Stations #1, #2, & #3
PROFESSIONAL AFFILIATIONS
• American Society of Heating, Refrigeration & Air Conditioning
Engineers
2675 Pratum Avenue I Hoffman Estates, IL 60192 1 www.wtengineering,com
ARCHITECTS Village of Mount Prospect ,1 `t1
MMLLIAMS
Fire Station No. 13
`11%1"
"' ro u
Engineering with Precision, Pace & Passion.
Education
Loyola University
McCormick Junior College
Contact
Karl J. Streitenfeld
Chief Electrical engineer
Mechanical/Electrical Division
Bio
Karl has over thirty-five (35) years of experience in design, contracting,
and management in the electrical field
Karl has extensive experience in lighting systems, power, service and
distribution, fire alarm systems, sound systems, security systems, etc for
local government, commercial, and institutional facilities
As our Senior Electrical Engineer, he has completed our most complicated
projects Karl has worked on high rises, aquatic centers, and police
stations to recreation centers, fire stations and public works facilities.
Karl's wealth of knowledge and vast experiences make him a very
important component on our team,
Project Experience
• Bartlett Fire Stations #2 & #3
• East Dundee Fire Station Headquarters
• Hoffman Estates Fire Stations #23 & #24
• Plainfield Fire Stations #1, #3, & #4
• Schaumburg Fire Stations #1, #2, & #3
PROFESSIONAL AFFILIATIONS
• National Fire Protection Association
• Illuminating Engineering Society (IES)
• National Electrical Association
PH: 224-293-6310
FX: 224-293-6444
Email: Karl Streitenfeld@wtengineering com
2675 Pratum Avenue I Hoffman Estates, IL 60192 1 www.wtengineering.com
MOLIJAMS' Village of Mount Prospect 43
A'RCHTE TS Fire Station No. 13
�'�rS NTI�"°��EL
lvirrs Michalik. RCD -D
Expert Knowledge: Cable plant design infrastructure, technology area design, UPS systems, CRAC / HVAC systems, physical security systems, au-
dio-visual and control systems, paging, sound masking, intercom, emergency communications and nurse call systems.
Education: Bachelor of Arts, Loyola University
Experience:
Sentinel Technologies
Baker Robbins & Company
Booz Allen & Hamilton
Project Experience:
Elk Grove Village Municipal Camera
City of Oakbrook Terrace Police Station
Naperville Park District Police
2003 - Present
1996-2003
1993- 1996
Village of Glenview - Police Station / Village Hall
City of Streator - Police Station
WILUAMS Village of Mount Prospect 45
ARCHITECTS Fire Station No. 13
FIRM WORKLOAD
The following are current projects that involve the key members of our Project Design Team. Please keep in mind that these
projects listed below are in various phases, and will not diminish or conflict with the time and attention necessary to provide you
with quality architectural services and successfully meet all your project expectations. The team members selected for this most
significant project will be available immediately upon the selection of our firm, and are fully prepared to move forward with your
Project.
1. Bartlett Park District - Schrode Gym Remodel
2. illl�. q cif V �,,.. s Il � i
\o l N' Iw�rliN�'iV� I`I �,�,w �r� � :.'i�uh,� �,_ � u�V1u.,w1',aI�W11 rrl��"Vu��;�r� +gVa,r t�ul°., +":~u1",�
3; '.,)�.l wV�*r;� r ry l+uf' r;'i "VI"'1 �Vu�VV 7c)iic Re11l'-,vofil u111 �,l_u"w.V'P6,.cfi uVV a"om1 I lif''i1k111V VVI k,_;➢dor110 )
4. CoioI l,",urVI+I d'wl': ���Ir"l��:VI0Ir
w �+r
7rvrll� tl 1
5. Waukegan Park District Belvidere Park Aquatic Center
6. Glenview Park District Ice Center
7. Chicago Park District Gately Park Track & Field Facility
8. Surry County, VA Community Recreation Center Study
9. Westerville, OH Community Center Expansion
1(). sV<'.o o lead II y1'�' ,c,�, I ,,'��iill�i'l1 ) w I:;��I�tl�;�'d)
� u� !� �;uir.r>"I�."Io�rlr� ��+ � � idol,
11. Round Lake Area Park District Community Center Lobby
12. Maywood Park District Recreation Center
13. LaGrange Country Club All Seasons Village
14. Carmel Clay West Park "The Groves" Pavilion
15. Villa Park Library Expansion & Renovation
16. Bloomingdale Park District Johnston Recreation Center
17. Schaumburg Park District Jerry Handlon Admin Renovation
18. Schaumburg Park District CRC Lobby & Program Rooms
19. Harris -Elmore, OH Library Expansion & Renovation
20. PoVtoqe Pvlll llhe k flh o u' 1 IIl o m )'" SI�l �0.tWll u�:VVY.I i 1Vi "? I II .�!y)
21. Centerville Washington Park District, OH Maintenance Facility
22. "iomJvJ-,Ih I:ufl:dic s uu Ay" u: 71u 1p1 e;w )IIl1ddni:'j ph usu)
23. Funway Entertainment Center Site Master Plan
24. Planet Fitness Elk Grove Relocation No. 1
25. IIT Baseball Stadium Study
26. Geneva Park District Sunset Pool Sprayground and Recreation Center Roof/HVAC Replacement
27. Indianapolis, IN Broad Ripple Park
?8, tv{1IIIIIk:i;w7+ou shil'::Ny (IIIrV11111imfll YV"u' iy" II111rqVi,:-Y')
29. Forest Park Library Roof Replacement
30. New Port Richey, FL Public Library
31. Lincolnwood Proesel Park Bathhouse
32. Indy Parks, IN Windsor Village Splash Pad
33. Schaumburg Park District St. Matthew's ADA Stair/Ramp
34. Mundelein Parks & Recreation Steeple Chase Golf Driving Range
95% �7 u
of our firm workload is made up of municipal projects.
MWILLIAMS Village of Mount Prospect n
ARCHITECTS Fire Station No. 13 �F 7
y1.
t�
I �
9
2, I'
YN a" r r �
r
r
0
w
O
�!�f'�� �tirr
r
-, i � w oitrff
r
/'� pl////O/ ,�, l 9Giri it ✓ 66 �91IgW�°%r,!',
a
�p
>r
j
drWll�
°irr J/�i
24"AM Ma
rlri�
iii
REFERENCES
Williams Architects strives to be a high quality architectural firm as measured by its professional staff, its satisfied clients, its projects,
and its success as a business. We encourage you to contact any of the references listed below in regards to our performance on
similar projects. Many of our first time clients become "life -time" clients.
New 1' ire Statu1orr 14eaclrirccnrtiers
lllllllllage of 12o ineiirs Grove
New Flute Sta lora itlllo. 84
llllllage of 1lHi rc'41riiig
New IW' lre Stcaflorn il 811
llllliage of IIII''rallllathruue
REFERENCE CONTACT: REFERENCE CONTACT: REFERENCE CONTACT:
David Fieldman, Village Manager Keith Maclsaac, Fire Chief Robert Falardeau, Fire Chief
630.434.5526 847.459.2662 847.202.6343
New Fhre Statiorruu IIII"dlllo. 4
I°°lrrrntlllleg IIIW""u1ure III I'rrrotectiiouu°uu Diatricill
New il Station 114o. F.
ii11111age, of OIIllernvule
rorwtage, Fire Malian No. 2
City of IIIFcrrmmtage, M1
REFERENCE CONTACT: REFERENCE CONTACT: REFERENCE CONTACT:
Scott Ravagnie, Fire Chief Ralph Ensign, Fire Chief John Podgorski, Sr. Deputy Fire Chief
847.5150.8850 847.724.2141 269.329.4488
ULUAMS Village of Mount Prospect 53
ARCHITECTS Fire Station No. 13
41,
o
1440 NO,
El
mm
o
1440 NO,
El
PROPOSED SCHEDULE
°°°11111 lull m IRA"nom
START UP, DATA COLLECTION, AND FACILITY TOURS 2 Weeks
. ............. . .... . -
SCHEMATIC DESIGN 8 Weeks
. ...................
DESIGN DEVELOPMENT 10 Weeks
II.--.- -- - ---- -
Al CONSTRUCTION DOCUMENTS 12 Weeks
BIDDING & NEGOTIATIONS N.I.C.
(Determined by the CM)
. . ... ... ... . . .......
8 CONSTRUCTION OBSERVATION/ADMINISTRATION
10 -12 Months
(Determined by the CM)
--- . ......... --
rLLIAMS Village of Mount Prospect 57
% ARCHITECTS Fire Station No. 13
�� m"'I;�
Village of Mount Prospect
CERTIFICATIONS BY AE FIRM
Eligibility to Contract
The undersigned hereby certifies that the AE Firm is not barred from bidding on or entering into
this contract as a result of a violation of either the bid -rigging or bid -rotating provisions of
Article 33E of the Criminal Code of 1961, as amended.
Williams Architects
Name of AE Firm (please print) Submitted by (signature)
President
Title
Certificate of Compliance with Illinois Human Rights Act
The undersigned hereby certifies that the AE Firm is in compliance with Title 7 of the 1964 Civil
Rights Act as amended and the Illinois Human Rights Act as amended.
Williams Architects
Name of AE Firm (please print)
President
Title
Submitted by (signature)
Certificate of Compliance with Illinois Drug -Free Workplace Act
The undersigned, having 25 or more employees, does hereby certify pursuant to section 3
Of the Illinois Drug Free Workplace Act (30 ILCS 580/3) that it shall provide a drug-free
workplace for all employees engaged in the performance of the work under the contract by
complying with the requirements of the Illinois Drug -Free Workplace Act and, further certifies,
that it is not ineligible for award of this contract by reason of debarment for a violation of the
Illinois Drug -Free Workplace Act.
Williams Architects
Name of AE Firm (please print)
President
Submitted by (signature)
Title
MMLLIAMS Village of Mount Prospect L 1
ARCHITECTS Fire Station No. 13 U
Village of Mount Prospect
VILLAGE OF MOUNT PROSPECT
PROJECT PROPOSAL FORM
We hereby agree to furnish to the Village, services as outlined in the accompanying proposal
in accordance with provisions, instructions, and specifications of the Village. This form must
be signed by an authorized agent of the Architect. If the Architect is a corporation, the
corporate seal must be affixed.
The successful Architect will be required to agree to sign the Village contract and attached
appendices (sexual harassment policy, tax liability, etc.).
The proposal shall be binding for ninety (90) days following the proposal due date.
My signature certifies that the Proposal as submitted complies with all terms and conditions as
set forth in the Notice of Request for Qualifications for ARCHITECTURAL SERVICES FOR THE
NEW POLICE HEADQUARTERS.
I/We certify that I/We am/are authorized to sign as an agent(s) of the firm:
PLACE CORPORATE SEAL HERE
By..............................:
Print Name .................
Position / Title .............
Company Name...........
Address Line 1......,....m..:
City, State, ZIP.... , , ........':
Telephone ........ ., .., .:.
Email .................. ...
Mark S. Bushhouse
President
Williams Architects
500 Park Blvd Suite 800
Itasca, IL 60143
630.221.1212
msbushhouse@williams-architects.com
WILLAMS Village of Mount Prospect 63
ARCHITECTS Fire Station No. 13
Village of Mount Prospect
Professional Architectural/Engineering Services
for
The Village of Mount Prospect
Fire Station #13
Advertised: May 25, 2018
Due: June 20, 2018, 3:00 p.m.
Village of Mount Prospect
REQUEST FOR PROPOSALS:
Architectural/Engineering Services
1.0 REQUEST
The Village of Mount Prospect ("Village") is seeking qualifications and fee based proposals for
professional services from highly -qualified, architectural -engineering (AE) firms to ensure timely,
fiscally responsible, and successful completion of the adaptive reuse of 111 E. Rand Road into
Fire Station #13.
1.1 GENERAL OUALIFICATIONS
The prospective AE firm shall have particular expertise in Fire Station design.
1.2 TERMS AND CONDITIONS
a. All costs associated with developing or submitting a qualifications statement in responseto
this RFP, or to provide oral or written clarification of its content shall be borne by the
respondent. The Village of Mount Prospect assumes no responsibility for these costs.
b. This RFP does not commit the Village to enter into a contract. The Village reserves the right to
award one, more than one, or no contract(s) in response to this RFP.
c. The Contract, if awarded will be awarded to the Firm whose submittal is deemed most qualified
to perform the architectural design services for the project based upon the evaluation criteria
including but not limited to the firm's experience, the ability of the professional personnel
assigned, past perfornancce record, ability and willingness to meet time requirements, current and
future workload ofthe firm, financial solvency of the firm, and value of the fee proposal.
d. The Village reserves the right to contact any Respondent for clarification, interviews or to
negotiate a contract with the most qualified firm if such is deemed desirable by the Village.
e. The purpose of this Request for Proposals is to identify an experienced Architectural Services firm
with the best combination of qualifications and fee offering to determine the best fit for the
Village.
1.3 VILLAGE OF MOUNT PROSPECT
The Village of Mount Prospect has a current population over 54,000 as of 2016 and is located
directly north of Chicago's O'Hare International Airport. The Village is bordered by Interstate 90
on the south, and is bisected by Illinois Route 83 in the north/south direction. Major corridors in
the east/west direction include Algonquin Road, Golf Road, Northwest Highway, Central Road,
Kensington Road, and Euclid Avenue. River Road and Wolf Road form the eastern boundary,
while the western boundary varies greatly past Busse Road. In addition to the major commercial
properties along most of these corridors, Randhurst Village sits between Euclid and Kensington,
and east of IL Route 83 and houses several "big box" retailers, along with dozens of smaller
retailers, a hotel, and a number of restaurants.
Daily commuter rail service to and from Chicago is provided by Metra (Metropolitan Rail
Service of the Regional Transportation Authority). The Metra commuter rail service reaches
Village of Mount Prospect
Staffin2 Levels
• Minimum 8 shift personnel, but 13 are staffed full time
• 13 shift staff times 3 shifts = 39 personnel
• Administration Staff 11.5 employees, normal business hours
Parking
• Accommodations for up to 51 staff members
• Required ADA compliant parking
• Up to 40 additional stalls for training purposes
The above general items are a basic summary of needs but a more detailed explanation of these
needs and a final layout of the facility to support these functions will be required as part of the
Preliminary Design Phase of the Project. A final site plan is also required as part of the
Preliminary Design Phase.
1.6 GENERAL ROLES AND RESPONSIBILITIES
Village (Owner): Village's sole role is to act as owner of the Project and to ensure that its
interests and rights are being protected through the assistance of the selected AE. The Village
has designated an on -staff representative, Mark Rysavy, Deputy Director of Building and
Inspection Services, to act on the Village's behalf as liaisons between the Village, AE and the
CM.
Construction Manager (CM): CM shall act as the primary constructor (at risk) of the project,
acting as Owner's Contractor with respect to the Project, and shall ensure coordination of all
activities required to properly execute the scope of work contained herein and in the contract
documents. The CM provides comprehensive coordination of project activities to ensure that the
discharge of responsibilities bythe appropriate parties is executed in a manner that serves and
protects the Village's overall and best interest. CM shall be selected shortly after the AE and shall
sit in and perform budget reviews and value engineering during the design and bidding process
Il. SCOPE OF SERVICES
2.0 GENERAL SCOPE OF SERVICES
2.1 The AE will coordinate with the CM and the Village in order to help ensure that the Project is
completed according to the Contract Documents within the currently approved project budget
and schedule.
2.2 The AE will be responsible for assisting the CM and the Village with advising on and assisting
with coordination of four primary phases including: 1) Schematic Design; 2) Design
Development; 3) Construction Documents; and 4) Construction Administration / Project
Closeout.
2.3 The AE shall establish and implement procedures for, and maintain coordination or activities
and communication on behalf of the Village and between the Village, Other Consultants and
Designers, Engineers, and the CM.
Village of Mount Prospect
III. RFP Submittal Requirements
3.0 QUANTITY AND FORMAT
Ten (10) copies of proposer's statement of qualifications in an 8 '/z x 11 format and one (1) flash
drive with all information contained on it shall be submitted. All submitted information shall be
organized generally as listed below. There is not a minimum or maximum page limitation but
information should be kept directly relevant and succinct.
• Cover letter
• Understanding of Project and ProjectApproach
• Relevant project qualifications and experience as a firm
• Key staff/sub-Consultant qualifications and relevant experience
• Firm Workload
• Proposed schedule of each phase of drawings and anticipated building permit submittal
date
• References
• Fee proposal- One copy shall be submitted in a separate sealed envelope. Do not include
fee proposal information in the qualifications information.
3.1 UNDERSTANDING OF PROJECT AND PROJECT APPROACH
The understanding of Project and Project Approach section shall summarize the AE's
understanding of the scope of service requirements and allows the AE to add any additional
information which the AE believes may help the Village determine that the AE fully understands
the Project and the needs of the Village and to help the Village determine the best overall
qualified AE.
3.2 RELEVANT PROJECT QUALIFICATION AND EXPERIENCE AS A FIRM
The AE's relevant experience shall be provided as part of the response. The AE shall provide
adequate information to show that the firm has particular expertise in assisting Municipalities with
the design of fire stations
The AE is encouraged to provide a short project synopsis of relevant and similar projects and a
photo, if appropriate, of previously completed facilities. The client/reference contact information
or the relevant projects should be provided in this section of the response for each similar project.
3.3 KEY STAFF/SUB-CONSULTANT QUALIFICATIONS AND RELEVANT EXPERIENCE
a. Provide a simple organizational chart identifying key members of the firm including consultants.
b. Provide resumes of projects designers, managers, key staff and consultants relevant to the
requirements of this RFP, including their work experience, education, affiliations and awards.
Resumes should not include project or general firm information. Particular reference should be
made to the firm's construction administration/observation personnel.
c. If any staffing changes should occur between the submission of qualifications and the award of a
contract, the architect must notify the Village in writing. Unapproved staffing changes may result
in rejection of qualification.
7
Village of Mount Prospect
IV. SELECTION PROCESS
4.0 THREE STEP SELECTION PROCESS
The selection process to determine the successful AE will be determined by the following
three-step process.
Sten One: Submitted qualifications will be distributed to members of a selection committee for
review. The committee will evaluate and rank the submittals based on the overall content,
relevant experience of the firm and personnel assigned to the project. The firms demonstrated
ability on past projects and ability to work with municipal agencies will also be taken into
account. Once qualifications have been decided, the fee proposals will be opened and ranked
lowest to highest. The qualification rankings and fee proposal rankings will then be combined
to obtain the most qualified bidder. The lowest fee may not be recommended as the most
qualified bidder.
Sten Two: The committee may conduct interviews with two or more of the top-ranked AEs
determined from Step One to get a more comprehensive view of qualifications.
S'tep "11,�h, =: After the interview process in Step Two (if conducted), the Village will select the
top ranked AE and recommend the Village Board authorize a contract with that firm.
The Village reserves the right to reject any and all proposals, to solicit additional proposals, and
make any additional decisions that are deemed to be in the best interest of the Village.
D
Village of Mount Prospect
Certificate Regarding Sexual Harassment Policy
The undersigned does hereby certify pursuant to section 2-105 of the Illinois Human Rights
Act (775 ILCS 5/2-105) that it has a written sexual harassment policy that includes, at a
minimum, the following information: (i) the illegality of sexual harassment; (ii) the definition of
sexual harassment under State law; (iii) a description of sexual harassment, utilizing examples;
(iv) an internal complaint process including penalties; (v) the legal recourse, investigative and
complaint process available through the Department of Human Rights and Human Rights
Commission; (vi) direction on how to contact the Department of Human Rights and Human
Rights Commission; and (vii) protection against retaliation.
Name of AE Firm (please print)
Title
11
Submitted by (signature)
Village of Mount Prospect
2. Controlling the Cost of Construction is a vital part of this project's success. The
Village believes this can be best achieved by the entire team (Owner, A/E and CM)
working together to achieve this goal. Will you agree to design to a Budget Amount for
each of the disciplines (Architectural, Structural, Electrical, HVAC, Plumbing and Fire
Protection)? The Budget Amount for each "trade" will be developed as part of the Pre -
Construction process with the collaborative effort of the Owner — Construction
Manager and A/E Team.
Yes No
If no, please explain why,
3. The Village believes that competition among subcontractors and suppliers during the
bidding phase is critical to ensuring best value results for the bidding of the
work. Therefore it is vitally important that the bidding documents are NOT proprietary
or "sole source" in any way. Will you agree to structure the design and specifications
to include a minimum of three named manufacturers or suppliers (Please Note: the
"basis of design" approach will NOT be an acceptable alternative to providing three
manufacturers or suppliers.) for all systems, products, materials, including but not
limited to:
a. HVAC systems and equipment, temperature control systems and equipment,
b. electrical systems and equipment, not including light fixtures,
c. plumbing systems and equipment,
d. building envelope systems and components (roofing, curtainwall, windows,
masonry, etc.) and,
e. most finish materials (ceiling systems, paint, wall protections, cabinets, etc.)
Only in circumstances where the Village specifically authorizes in advance a sole
source will a design and specification approach other than that described above be
allowed. Those instances are likely to be with ceramic tile, carpet, vinyl tile, and
lighting fixture selections.
Yes we agree No we do not agree
4. The Village believes in a negotiable terms for errors and omissions within the
drawings. At no point will compensation for errors and omissions be waived in the
contract between owner and architect. Do you agree to these terms?
Yes No
13
R
MOUNT ITMENT
PROSPECT H.E DR
s
e
R
' �srYXISM
PM;
FGM ARCHITECTS
N
04/05/18
CONCEPTUAL SITE PLAN
FoardDocs® Pro
Agenda Item Details
Meeting
Page 1 of 3
Jul 17, 2018 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - 7:00 p.m.
Category 8. VILLAGE MANAGER'S REPORT
Subject 8.3 Motion to accept the proposal from Altamanu, Inc. for public engagement and
architectural services to design Edwin and Elsie Meyn Busse Pocket Park located at 19 and
21 S. Emerson Street in an amount not to exceed $76,600.00 and authorize the Village
Manager to execute a contract for the same services subject to staff and attorney review.
Access Public
Type Action
Preferred Date Jul 17, 2018
Absolute Date Jul 17, 2018
Fiscal Impact Yes
Dollar Amount 76,600.00
Budgeted Yes
Recommended Action To approve a contract with Altamanu, Inc. for public engagement and architectural design
services for Edwin and Elsie Meyn Busse Pocket Park.
Goals 24. Downtown Splash Pad
Public Content
Information
The Village recently purchased the two single family homes at 19 and 21 S. Emerson Street located across the street
from the Village Hall with the intent to develop the property as a downtown pocket park. The pocket park has been a
strategic goal of the Village since the late 1990's and has been included in several versions of the Downtown
Implementation Plan that have been adopted since. The Village budgeted $750,OOp for the design and construction of
the park in the 2017 budget (page D-117) and has spent $75,530 on the demolition and regrading of the property.
Therefore $674,470 remains available for the design and installation of the pocket park.
The Village issued a Request for Proposals (RFP) on June 11, 2018 for public engagement and architectural design
services for the creation of the pocket park. The RFP was advertised on the Illinois Chapter of the American Planning
Association's website, the Illinois Chapter of the American Society of Landscape Architect's website, posted online on
the Village website, and was e-mailed directly to a number of experienced planning and landscape architecture firms.
The deadline for submittals was June 29, 2018. The RFP was well received by the design community; staff received
ten high-quality firms' responses with proposals.
The ten responding firms were Altamanu Inc., Design Perspectives Inc., Fieldwork Design Group, Hitchcock Design
Group, Ross Barney Architects, Site Design Group, Ltd., Terra Engineering, Teska Associates Inc., The Lakota Group,
and Upland Design Ltd. Proposals were evaluated by a selection team of Village Staff from the Manager's Office and
Community Development Department. The team chose to interview the top three rated firms for the project.
Evaluations were based upon five major criteria, weighted equally with a maximum of ten (best) possible in any one
category:
1. Bid amount
2. Past success record
https://www.boarddocs.com/il/vompBoard.nsf/Private?open&login 7/13/2018
Ple.axdDocs® Pro
Administrative Content
Confirm the 750K budget. I thought we were at 650. - NB
Executive Content
Page 3 of 3
https://www.boarddoes.com/il/vompBoard.nsf/Private?open&login 7/13/2018
0 -
La
— 11
_ � ��.,>�� b. �� _. ti� .,,�_ � �_ ,a ate_, -�•
Emerson at. (staff Photo)
Mount Prospect
3
Overview
Village of Mount Prospect
Mount Prospect is a northwest suburb of Chicago in Cook County, IL and home to
approximately 55,000 residents. The village boasts a thriving downtown located on a
Metra commuter train line. There is currently an influx of residential development in
downtown with new multi -family residential units under construction. The Community
Development Department would like to ensure that adequate open space remains in
the downtown. The site is across the street from the Village Hall and Centennial Green,
a large lawn that hosts events such as the summertime Fridays on the Green concert
series. Other popular events in the downtown include the Farmers Market and the
Bluesmobile Cruise Night Car Show. (See aae
op
s mp t o
The park will be located on the edge of downtown
Mount Prospect at 19 and 21 South Emerson Street. The
village recently purchased the two single family homes
on the site and will demolish them in early July. The
village owns the land, free and clear. Several previous
plans identified the site as potential parkland, including
the 2017 Comprehensive Plan and the 2013 Downtown
Implementation Plan.
To the west of the site is Village Hall and the Public
Library. To the north of the site is a townhome
development, and to the south there is a 6 -story office building. The site is adjacent
to a single-family residential neighborhood to the east. (See Appendix B) There are
four parks within a half mile of the site. Owen Park is a 5 -minute walk to the east and
contains a playground and open space. Moehling Park is located three blocks to the
west and contains a gazebo, butterfly garden, and live plantings. Busse Park, half a mile
to the northeast, provides ball courts and a playground. Finally, Lions Memorial Park,
half a mile to the southeast, has athletic fields, tennis courts, a playground,
and the Veterans Memorial Band Shell. The site offers an opportunity to c
provide more public open space for downtown residents and visitors.
\11?,
5
Goals
The goals presented here are based on the goals outlined in the Downtown
Implementation Plan (2013) and the Comprehensive Plan (2017).
The Downtown Implementation Plan (2013) (Volume 1 and Volume 2) offers a concept
of the pocket park as a Gateway Park that incorporates "decorative paving, benches,
lighting, and other site furnishings."
Other outlined goals include:
• To create unique and distinctive streetscapes and public spaces downtown
• To improve active transportation facilities to make downtown safer, more
accessible, and convenient for pedestrians and cyclists
The Comprehensive Plan outlines the following relevant goals:
• To preserve the historic resources in the community and integrate art, culture,
and learning opportunities to make the community a more vibrant place to live
and work
To protect and conserve Mount Prospect's natural resources and environment
To connect the village's parks, open space, greenways and waterways to the
regional green infrastructure network
The Mount Prospect Park District conducted a survey of commun-Itv r1eeds in 2017 as a
part of their strategic planning process. The top two priorities identified by residents in
the survey were fitness facilities and a splash park or indoor water park.
Proposals
The Community Development Department welcomes submission of proposals
conforming to the Request for Proposal (RFP) requirements for the pocket park site.
In this proposal, the respondent will provide a plan for public outreach and design,
commit to providing an estimated budget for park construction and provide any other
relevant details. Additional information on requirements for proposals are outlined on
the following pages. Successful proposals will address the goals and meet the Mount Prospect
requirements while offering creative solutions to involve the community mi
the design process.
&I
assigned to the project, including relevant experience, should be included. Similar
information should be provided for any partnering firms, as applicable.
6. Schedule - Time frame estimated to complete public outreach initiatives and design of
the pocket park, along with supplemental tasks deemed necessary for the completion of
the project. Provide updated design schedule as required.
Submittal may be supplemented with any existing brochures of the firm or partnership
that address the submission requirements.
Any questions regarding any substantive
matters arising during preparation of this
proposal should be addressed to:,
Bill Cooney,
Community Development Director
50 S. Emerson St.,
Mount Prospect, IL 60056
T: 847.818.5307
BCooiievC(iii-tiountp)rosL-)cct-4
Proposals must be received by June 29, 2018. Responses received after such time will
be deemed "not submitted" and will not be included in the evaluation process, unless
otherwise agreed to by all parties.
7
Appendix A:
Mount Prospect Map
Municipal Boundary
-
Interstate
Rail Line
Parks���
Hydrology
Downtown N
My'
0.5 1
ti
TTl11eS
NIap prepared b CIS, Susann0h L)L1Vidsun � R
Count Prospect
A I t a m a n u Inc.
landscape architecture + urban design + planning
PROPOSAL FOR PUBLIC INVOLVEMENT AND DESIGN SERVICES
i i, I � '' � , � ''I � 1 � !!I � � 1� � 1 1: 1: 1 � 11 1 r Ajulll-
SUBMITTED TO: VILLAGE OF MOUNT PROSPECT
JUNE 29,2018
PROJECT CONTACTS:
Josephine Bellalta, PLA, ASLA
Design Principal
Email: josephine@altamanu.com
Nilay Mistry, PLA, ASLA 1700 Irving Park Road, Suite 202
Chicago, Illinois 60613
Senior Landscape Architect Tel: 773.528.7492
Email: nilay@altamanu.com Web: http://www.altamanu.com/
Altamanu Inc.
Oevidsc apex orcl,Oec::Uea i uit,)an de;sk'Vl + .y0<: n n'onng
June 28, 2018
Mr. Bill Cooney
Community Development Director
Village of Mount Prospect
50 S. Emerson Street
Mount Prospect, IL 60056
bcooney@mountprospect.org
Re: Proposal for Public Involvement and Design Services
Edwin and Elsie Meyn Busse Pocket Park
Village of Mount Prospect, Illinois
Dear Bill,
It is an honor to submit a proposal for the design of an exciting new public space in the Village of Mount
Prospect. Asa resident of Mount Prospect for severaI years, I have seen the dramatic shift in development
opportunities downtown and believe in the potential for a dynamic new park to compliment the diverse
parks in the village. The provision for open space within the conversations to develop more of the
available space in downtown will certainly be valued by the young and elderly residents that could allow
Mount Prospect to thrive. Our approach to public involvement and preliminary design ideas have been
geared to impact the diverse audience in our community.
Altamanu has gathered a superb team of professionals with international acclaim but have long
trackrecords of building meaningful public spaces throughout Chicagoland. Our consulting civil
engineer, from V3 Companies, has also spent several years in the village as a resident and has played a
role in the recent streetscape improvements throughout the downtown. We look forward to bringing
local sensibilities to the next wave of design decisions.
Our goal in developing this proposal has been to craft a public involvement process to aid the design
team with valuable input while fostering investment in the project from our neighbors. A series of
innovative approaches to public involvement, such as Pop Up installations and new social media
platforms, will compliment the engaging charrettes that our team has conducted for years.
Through our extensive experience working with municipalities in the region, our team understands the
value of being available to a Village Board to aid in the journey of realizing a project. We look forward
to building a relationship with the Village of Mount Prospect as facilitators of beautiful public spaces.
Very truly yours,
Nilay Mistry, PLA, ASLA
Email: nilay@altamanu.com
Phone: 773.875.3663
1700 West Irving Park Road Suite 202 Chicago, IL 60613 T: 773.528.7492 www.altamanu.com
Project Team Description
Altamanu, Inc., a Landscape Architecture, Urban Design, and Planning
firm will act as Lead Consultant. John Mac Manus will be the Project
Principal and Community Outreach Facilitator. John has over 25 years
designing parks and working with municipalities throughout the
Chicagoland region. Josephine Bellalta is President and Design Principal
of Altamanu, Inc. and will serve as lead designer with decades of design
experience in public streetscapes and parks, Nilay Mistry is a Senior
Landscape Architect and Project Managerfor Altamanu, Inc. with several
years of practice in Chicagoland and is a Mount Prospect resident.. Nilay
will serve as regular contact for the projectand coordinate subconsultant
efforts.
V3 Companies are renowned internationally for their work in Civil
Engineering. V3 has worked extensively with the Village staff for
a number of years, from the Downtown Streetscape to pedestrian
improvements along Central Road to environmental engineering for the
remediation of the Central Plaza Redevelopment site. We are familiar
with the Village's processes for improvements and work with the Village
and stakeholders during the conceptual stage of the project to develop
consensus in the proposed designs. Similar to previous projects, V3
will provide the Village with cost effective survey and design services
that will provide the value and enable the Village to construct the park
near the funded amount. The concepts and designs will build upon
the previous streetscape work as well as what has been planned in the
Village's Downtown Implementation Plan.
Meeting ADA and PROWAG design requirements is always a major
concern for public areas and, having just completed the design of the
pedestrian improvements at Central Road and Arthru Avenue, V3 is well
versed in the latest requirements. We are confident in our qualifications
to serve the Village and are committed to providing a level of service
that will exceed the expectations of the Village of Mount Prospect staff.
V3 would like to continue to be a part of the Village's plans to improve
the downtown community.
TranSmart/EJM Engineering, Inc. is a leading provider of mechanical
and electrical engineering to public and private clients. TranSmart/EJM
has established a reputation throughout Chicagoland and the world for
our strong commitment to technical excellence and our dedicated staff
of professionals. With more than 30 years in the industry, TranSmart/
EJM has attracted and retained clients by providing superior service.
TranSmart/EJM Engineering, Inc. is a certified Disadvantaged Business
Enterprise (DBE), Minority Business Enterprise (MBE), and Women's
Business Enterprise (WBE). Altamanu has collaborated on several
projects with TranSmart/EJM and looks forward to establishing a
relationship with the Village of Mount Prospect.
am■ - I♦IL
Is
a IP ■ ■: A ■
011
To Central Ave. , or,
z
A I t am an ult,Inc.
I
y zulri,;0,a;ru:�al�a�, e'�rc,l-ouOeM�'.tw�r"'� a.arP:r��vr r�F;,oc.a� o- .a0ao°nroir'i,,,:�
e,
�
■- N
. M, ' so
do 660 on
0 awwp MID a ■
Future Condition
Changes are underway that will increase
the density of Mount Prospect. Taking
steps to ensure this growth contributes
to the existing character of downtown
will create a place that offers the
amenities of city life without destroying
the convenience and quietude that
encourages people to visit and perhaps
relocate.
To motivate people of all ages to come
downtown and spend time requires a
space that is flexible and responsive to
contemporary urban expectations. A
space that serves not only as threshold
to the commercial district, but as an
attraction on its own. Flexible in the
sense that this space can host multiple
programs throughout the year and
able to accommodate the needs of a
heterogenous population spanning
generations, from lifelong residents to
newcomers.
Minimal features like robustly built
structures can serve as a place where
adults can exercise, kids can play, and
riam
To Traln
Mr
■o
�■
IL ■..
■■
. ■ ■■
oraNo
■
_�
°
roll ■ •
■
■
� �
ss
Future Condition
Changes are underway that will increase
the density of Mount Prospect. Taking
steps to ensure this growth contributes
to the existing character of downtown
will create a place that offers the
amenities of city life without destroying
the convenience and quietude that
encourages people to visit and perhaps
relocate.
To motivate people of all ages to come
downtown and spend time requires a
space that is flexible and responsive to
contemporary urban expectations. A
space that serves not only as threshold
to the commercial district, but as an
attraction on its own. Flexible in the
sense that this space can host multiple
programs throughout the year and
able to accommodate the needs of a
heterogenous population spanning
generations, from lifelong residents to
newcomers.
Minimal features like robustly built
structures can serve as a place where
adults can exercise, kids can play, and
riam
To Traln
Mr
■o
�■
■l
an
010 s ■
us
N. m■
ss
To Rand Road
■
do
To Owen Park
4
anyone can just hangout. Its proximity to
other activities and transportation means
that it could quickly become a pedestrian -
friendly part of people's routines. Friends
can wander over after shopping, a family
might enjoy a picnic, or a library patron
doesn't have to walk far to find a place to
get lost in a new book.
New housing typologies and dining
options may try to orient to a specific
demographic, but a public space should
ensure people of all ages have a place to
engage. Having a beloved park to enjoy
would engender civic pride and a sense
of ownership. That involvement can lead
to community gardens, temporary art,
and events such as a summer block party,
or winter lights.
Although small in space, a good urban
park can enmesh with its vicinity to
facilitate larger functions. That synergy
can increase traffic to local businesses,
which in turn promote further use of the
park to gather, enjoy, and relax.
1700 West Irving Park Road Suite 202 Chicago, IL 60613 T: 773.528.7492 www.altamanu.com 6
Public Involvement Strategy
and Design Process Scope
to comply with Village of Mount Prospect practices. Popularity
of these programs provide opportunities to connect with existing
Village of Mount Prospect accounts and that of allied partners.
Postings regarding events and updates are planned to be created
every 48 hours or more frequently.
4. Administration access will be provided to Village of Mount Prospect
and Altamanu will turn over all access to the municipality upon
completion of project.
TASK 2: PUBLIC INVOLVEMENT: DOWNTOWN BLOCK PARTY POP UP
Goals: Foster imagination for Busse Pocket Park and establish exciting
forms of input gathering.
The Downtown Block Party is a strong opportunity to reach a large
audience at an event that exhibits how dynamic and enjoyable
downtown Mount Prospect can be. Altamanu will attend both days
of the event to engage the public for preliminary input on the park
design. Awareness of the project's public involvement process will
be promoted through a highly visible installation at the edge of the
Busse Pocket Park site. This Pop Up Public Engagement Space will
be scaled according to available space along the Emerson Street and
Busse Avenue parkways.
2. Altamanu will design fabric prints to be hung on the construction
barrier fencing that currently defines the edges of the site. The
bright graphic pattern will introduce a dynamic backdrop to the
intersection and supplement any desired screening from the
construction site.
3. The fence will serve as a tool to gain input as well as publicity for
the pocket park project. Altamanu will design rigid panels coated
with chalkboard paint for use by visitors to publicly note ideas for
the park, similar to many temporary art installations found in cities
around the world. Opportunities for input of ideas will therefore
be available on the site throughout the day and the accumulation
of text will alter the appearance of the wall over time. Comments
gathered during the Downtown Block Party will be documented by
the Altamanu team throughout the event.
4. The possibility of new activity on the Busse Pocket Park site will be
highlighted with initial offering of new seating opportunities during
the Downtown Block Party. Altamanu will design and fabricate
temporary wooden seating elements that will allow visitors to sit
and recline alongside tables. Standing in contrast to the benches
distributed throughout downtown Mount Prospect, these seating
elements will embody the spirit of what a new pocket park can
contribute to the existing open space network. Activities motivated
by the temporary furnishings can be themed around fitness,
community gardening, reading, playing games, and drawing ideas
for the eventual pocket park. The seating elements can remain be
Altamanut nc.
aaincisccupe r: ai"chdor•,6G.le , rJrf-)ori oesicgin i r1fl ani'di g
Sustainable Cities Collective
1700 West Irving Park Road Suite 202 Chicago, IL 60613 T: 773.528.7492 www.altamanu.com
Public Involvement Strategy
and Design Process Scope
preferred and disliked concepts.
b. Guided design exercise facilitiated by design team member,
examining the station topic as a priority within a design concept
for Busse Pocket Park. For example, what would the park look
like that focused on water display, for example? Participants will
be offer input through the following means:
i. Verbal Input
1. Discussing of aspects that are liked and disliked
about the element
2. Writingtop request about the theme on a board and
posting to group collection
ii. Visual input
1. Create drawings of site layouts or sketching on top
of photos
2. Modeling the site with clay
3. Graphic collage of plan layouts using scaled cutouts
of park features
4. A report of the charrette process and findings will be submitted to
the Village Staff to indicate progress. Findings will be discussed at a
meeting with Village Board.
TASK 4: PUBLIC INVOLVEMENT: STAKEHOLDER INTERVIEWS
Goals: To build relationships with representatives of local constituencies
to understand potentially underlying issues.
1. Altamanu team members will take park in scheduled interviews with
stated stateholders, as requested. It is assumed that the Village of
Mount Prospect will make initial contact with stakeholder groups
for coordination. Meetings will be scheduled to take place on same
days to reduce travel time.
2. Preliminary contact with stakeholders can be fostered with online
questionaires but an in person meeting will be planned for each
stakeholder. Altamanu to format private questionnaires.
3. Altamanu team members will prepare a written report of stakeholder
meetings and submit to Village Board.
TASK 5: SCHEMATIC DESIGN: INITIAL SCHEMES
Goals: Formulate multiple schemes to foster input and direction of
landscape concept.
1. Prepare schematic landscape designs based on public input findings
for Village Board review. Design options may utilize visualizations
(plans, perspectives, etc) and narratives.
Altamanu Inc.
nrid c upe, cr(arutectui,e ' uirloc'w dosiign F -)Mon n'irnC
J Mayer H
1700 West Irving Park Road Suite 202 Chicago, IL 60613 T: 773.528.7492 www.altamanu.com 10
Public Involvement Strategy
and Design Process Scope
anticipated in this phase. One (1) rendered plan revision is expected
for marketing purposes.
4. Participate in bi-weekly telephone conference team meetings.
5. Post approved design scheme on project website and to local
media. Altamanu to coordinate with Village of Mount Prospect
Public Relations staff.
TASK 8: DESIGN DEVELOPMENT
Goals: Design Development is to explore in detail the Site Landscape
Plan and its individual elements such as planting, site_Matures, materials
and furnishings, quantities and costs.
1. Coordinate with project team to deveftp,:details of landscape plans,
paving layout_ =pcLrnc site elements; materials palette, and planting
dpc;6,i as per schematic design review, comments.
2. Review and evaluate any new public input on from digital platforms.
3. Coordinate with Engineering consultants and Village Staff to review
drainage and grading issues, if any.
4. Further define specific site element designs and materials palette.
Plans and sections will be prepared to further define the character
of individual elements such as, but not limited to:
• Specialty paving type, style, color, and patterns
• Site and parkway plantings
• Site furnishings (seating, lighting, bike racks, trash receptacles,
play equipment) as applicable
5. Prepare outline specifications as related to landscape elements and
materials.
6. Prepare detailed cost estimate for construction budget based on
Design Development drawings.
7. Meet with Client and Team to review and coordinate current
landscape drawings and discuss final changes prior to Construction
Document Phase. Address any pending issues related to securing
applicable landscape approvals related to the project. One (1)
meeting is anticipated in this phase.
8. Submit electronic copy of landscape plans and drawings to Client for
review in PDF format.
9. Participate in bi-weekly team meetings via remote conferencing.
TASK 9: CONSTRUCTION DOCUMENTS
Goals: Finalize all design elements as shown in the Design Development
drawings of Task 8 as defined above, incorporate all Client's comments
Its m a nu Inc.
landscape architecture + urban design + planning
1700 West Irving Park Road Suite 202 Chicago, IL 60613 T: 773.528.7492 www.altamanu.com 12
Pop -Up Public Engagement Space
AItamanu Inc.
landscape orchil I.,e - urban design . planning
s i �
s
_
AND
Ir
a
I
it
� r
1
_
a
' jJ1 aim sz,
At
d
g
,Ot`' N ��pw YA " Ndw swacn►d4 AO
(tKt�N4sE.4p►+c� -� JoirJ
y 1,06""'4yyyy�
�i�ti pF�.1A 17W (o¢- ��ST�Nr1 fJFNKNIh�S
'Ct f- TAW
14
Fee Proposal
For Scope of Services
Altamanu Scope Items Fee
Project Initiation $1,450
Kickoff Meeting
Survey and Planning Study Review
Initial Site Visit and Documentation
Public Engagement + Meetings
Pop Up Installation Design and Installation
Engagement Event #1- Block Party
Engagement Event #2 - Public Charrette and Prep
Meeting with Village Board - Charrette Review
Stakeholder Interviews (2 sessions)
Presentation to Village Board (Up to 3 Schemes)
Engagement Event #3 - Schematic Presentation
Meeting with Village Board - Schematic Review
Presentation to Village Board- Refined Scheme
Coordination Conference Calls
Digital Outreach - Design and Maintenance
Written Reports for Client
Schematic Design $8,850
Schematic Design (Up to 3 Schemes)
Schematic Design - Single Scheme Refinement
Marketing Rendering - Approved Scheme
Conference Calls - Bi -Weekly
Design Development $6,050
Design Development Drawing Production
Team Drawing Coordination
Conference Calls - Bi -Weekly
Cost Estimate - Design Development
Construction Documentation $9,300
Construction Document Drawing Production
Conference Calls - Bi -Weekly
Review Meetings (Up to 2 Sessions)
Altamanu Fee Subtotal $39,950
Altamanu Reimbursible Expenses $1,500
[Altamanu Total $41,450
TranSmart/EJM Scope Items I Fee
Mechanical and Electrical Engineering $17
Project Management
Data Collection
Project and Agency Coordination
Meeting/Field Checks Coordination
Park Electrical Work
Splash Pad Electrical Work
V3 Companies Scope Items I Fee
Engineering 1 $18,100
Data Collection
Project and Agency Coordination
Meeting/Field Checks Coordination
Park Electrical Work
GRAND TOTAL $76,600
J l!r I'<^jrr I/,)rIr✓L1r'�ra'rJo f, n,1) "o
;rll�ria,i^,o)
,w" nilh "l ,✓ l/ voql o0('! hr. „ r, cr�1
JCalllef lr,' Yi inl'J��
hr i 'rr1';�, CII o ,o rporr,'
;Tl✓ iIYIf(rJfIII l I�Yf)I"Y -, Pi /I"i ,if (1;`101 1)�; (f
nrr rarc9[) iofr ti'wl ,,,r"s
O)of vM) N1 y1ru.
1700 West Irving Park Road Suite 202 Chicago, IL 60613 T: 773.528.7492 www.altamanu.com 16
Altamanut
nc.
[-Indii�rcjjpe
urhllt"d;,"l'l,.In'Ve
f f11 )an C,V+7;1<„'pn I 1 -Ju nlinli"1f
TranSmart/EJM Scope Items I Fee
Mechanical and Electrical Engineering $17
Project Management
Data Collection
Project and Agency Coordination
Meeting/Field Checks Coordination
Park Electrical Work
Splash Pad Electrical Work
V3 Companies Scope Items I Fee
Engineering 1 $18,100
Data Collection
Project and Agency Coordination
Meeting/Field Checks Coordination
Park Electrical Work
GRAND TOTAL $76,600
J l!r I'<^jrr I/,)rIr✓L1r'�ra'rJo f, n,1) "o
;rll�ria,i^,o)
,w" nilh "l ,✓ l/ voql o0('! hr. „ r, cr�1
JCalllef lr,' Yi inl'J��
hr i 'rr1';�, CII o ,o rporr,'
;Tl✓ iIYIf(rJfIII l I�Yf)I"Y -, Pi /I"i ,if (1;`101 1)�; (f
nrr rarc9[) iofr ti'wl ,,,r"s
O)of vM) N1 y1ru.
1700 West Irving Park Road Suite 202 Chicago, IL 60613 T: 773.528.7492 www.altamanu.com 16
A I t am an A Inc.
klind"calar,' alchHecture url:)a1i'l ries, � p
Project Team Resumes and Project Descriptions
18
Firm introduction
Alta ma nut nc.
landscape architecture + urban design + planning
Altamanu Inc. is a Chicago based, WBE/
MBE/DBE Landscape and Urban Design firm
founded in the year 2000.
The principals of Altamanu, Josephine
Bellalta and John Mac Manus, share over
50 years of experience planning and
designing public spaces and we seek to
make memorable, sustainable, signature
community spaces that are also practical
and functional.
Altamanu's projects include regional and
local parks, open space reserves, dog parks,
skate parks, schools, institutional campuses,
outdoor classrooms, healing gardens,
recreation facilities, as well as streets,
plazas, parkways, & bridges.
These projects feature improved ADA
access and green initiatives such as green
roofs, treatment wetlands, bio-swales and
rain gardens with educational signage,
native planting and innovative stormwater
management techniques.
We have received national, regional and
local awards for our work. Recent Awards
include:
2017 CNU Charter Award for the street
design of Fulton Market, Chicago IL
2016 ASLA Honor Award: Constructed
Project, Grant Park Skate Park & Performance
Space,
Chicago, IL
2013 IL-ASLA Merit Award: Constructed
Project, Urban Design: River Street
(woonerf), Batavia, IL
2009 Community Service Award, for
"Outstanding Contributions to the
Community and State"
Contacts
Josephine Bellalta
Telephone: 773-528-7492 or
Email: josephine@altamanu.com
John Mac Manus
Telephone: 773-528-7492 or
Email: john@altamanu.com
1700 West Irving Park Road Suite 202 Chicago, IL 60613 T: 773.528.7492 www.altamanu.com 20
Public 'Engagement
Em
Alta manu "lnc.
arld"r,a llpe are,,,aOr;ruure r ui^C:mn deign a lullaluil�in
'Just wanted to let you know how
impressed I was with Altamonu's
suggestions last night. You and John
have really captured the spirit of the site
and the range of input from its users.
Can't wait to see the finished product,
especially the creative kid's area."
Beth Burdi, Chair of the Greening
Taskforce Email: bethburdin@gmoil.com
:..1 was really impressed when I attended
the last meeting with the level of
attention to community perspectives.
It is more impressive to me now both
because I have been away forsome time,
and because in my current work I now
realize better how much effort is involved
on the part of you and your staff. So
kudos to all of you --it's a real inspiration
for me as I think about how to be more
open and consultative in all that I do as
an administrator."
Tom Philion
Associate Dean, Roosevelt University
Former Park District of Oak Park Board
Member Email: tphilion@roosevelt.edu
"This design is just what the committee
was looking for on River Street... letting
the beautiful buildings be showcased
and the rest of the environment is bright
refreshing, and most of all complements
the buildings... a perfect blend of the old
and the new. Don't let anyone change
W!"
Doris Sherer, Downtown Streetscape
Committee, City of Batavia
Email: disherer@hotmail.com
1700 West Irving Park Road Suite 202 Chicago, IL 60613 T: 773.528.7492 www.altamanu.com 22
Streetscapes
Alta manut nc.
Altamanu Inc. is fortunate to have been
engaged by the Chicago Department of
Transportation (CDOT) on the design of a
diverse range of project types primarily with
a focus on Complete Streets, community
spaces and making the city more livable.
Projects Includ :
Chicago Pedestrian Plan
Chicago Action Agenda
Streetscape Master Plans
Shared and Complete Streets
Road Diets
Flexible Streets
Streetscape Improvements
Plazas and Side Street Plazas
People Spaces
Bike Paths and Cycle Tracks
Multi -Use Path Systems
Gateways/Community Identity elements
Aesthetic Treatments for Bridges
Expressway and Roadway Improvements
and the integration of innovative Storm
Water Solutions
PrcI Examoles:
55th Street Streetscape Improvements
95th Street
99th Street and Walden Parkway
Addison Underbridge
Devon Avenue
Fulton Market and flex space
Harrison Street
Lawrence Avenue Streetscape Master Plan &
Streetscape Improvements & Road Diet
Lincoln Village Pedestrian Bicycle Bridge and
associated Riverfront Trail
2 sections of Madison Street
Roosevelt Rd. Bike Side -Track & Road Diet
Sauganash Community Gateway
Stony Island Streetscape Masterplan
South Michigan Avenue Flex Space
Services include planning, urban design,
landscape planting design, public outreach,
renderings, construction documents and
reports.
Ref: Luann Hamilton, Deputy Commissioner,
Email: LHamilton@cityofchicago.org
Ref: Lubica Benak, Director,
Streetscape and Sustainable Design Program
Email: Lubica.Benak@cityofchicago.org
1700 West Irving Park Road Suite 202 Chicago, IL 60613 T: 773,528.7492 www.altamanu.com 2,�
River Street
Batavia, Illinois
f f
TO PEACE BRIDGE
Alta manu 'Inc.
onvd5c alpe + iamkXm� d sIgn 1 pl¢�aii,.vnf g
Transition to curbless shared street
i Location for temporary bollards as needed
% Raised planters and retaining wall
Transition to curbless shared street
Location for temporary bollards as needed
Permeable clay brick pavers at site low point
Custom benches and precast planters, typ.
On -street parking
New tree in granite curb planter, typ,
/i
IJ
l
f
Outdoor cafe space, typ.
(Tables and chairs furnished by businesses)
Decorative alley screen by local artist
Entry archway
Transition to curbless shared street
Location for temporary bollards as needed
1700 West Irving Park Road Suite 202 Chicago, IL 60613 T: 773.528.7492 www.altamanu.com
26
Scoville Park
Oak *Pork, H11nois
Alta manutnc.
kindsar, alD e arch 11c:c,$w '! w uo0j,a„aii,i design 4 I:,Ila:oii,.Iri!i�g
Scoville Park is the historic central park of
the Village of Oak Park. The Park District of
Oak Park engaged Altamanu to carry out a
master plan for the park. Later Altamanu
was engaged to redesign and oversee the
complete renovation of the park.
Altamanu designed a new plaza for the
Peace Memorial, a new playground,
entryways, pathways, and an innovative
performance stage, redesigned the tennis
courts and added interpretive signage.
Altamanu also designed a new setting for
the library and its interaction with the park,
added native trees, flowers and grasses, and
introduced LED lighting.
All design work was carried out with an in-
depth public process.
Location: Oak Park
Ca�uastructiorti Coma%eted: June 2013
Proiect Owner: The Park District of Oak
Park
roipct Duration: 17 months
Project Cost: $2.4 million
Altamanu Inc. Fee: $221,500.00
E rad ect° Fundin. Oak Park
Scope: Community Engagement, Concept
Development, Construction Documents,
Construction Observation
Contact: Gary Balling
Former Executive Director of PDOP
Email: lgaryball@gmail.com
Tel: 708.932.2225
1700 West Irving Park Road Suite 202 Chicago, IL 60613 T: 773.528.7492 www.altamanu.com 28
Field Park
-01a i Pa 'K, Wirj is
Alta manu ''Inc.
Altamanu created a Master Plan for Field
Park and the grounds of Horace Mann School
with input by the community, the staff of
the school, and members of the Citizens
Committee under the direction of Park
District of Oak Park staff. The plan creates an
urban arboretum, with playgrounds in groves
of trees that surround a large multipurpose
field.
The plan calls for a continuous loop path
around the fields. The first phase addressed
the west side where children can stop to
enjoy three different playgrounds. The
most popular features are the mound and
an interactive fountain. A shelter provides
shade and a place of community members
to meet and socialize as they watch children
play.
Educational signage informs the children of
the species and characteristics of the trees in
the series of groves along the path.
Location: Oak Park, Illinois
Cons�tructigL Com lid: May 2008
Project Owner: Park District of Oak Park
I roq D rafts: 11 months
Project Cost: $1,867,560.00
Altamanu Inc. Fee,: $130,825.26
Lrgjec_gq.4J : Park District of Oak Park
and an OSLAD Grant of $399,000.00
Scope: Analysis of existing conditions,
Community Engagement, Master
Plan, Preliminary Design, Construction
Documents, Construction Observation
Contact: Gary Balling
Former Executive Director of
The Park District of Oak Park
Email: lgaryball@gmail.com
Tel: 708.932.2225
1700 West Irving Park Road Suite 202 Chicago, IL 60613 T: 773.528.7492 www.altamanu.com 30
Logan Square Orchard Plaza
cci�'I i 1 '1:315
hi—"
SO,i
Er, s
6a
'
Alta manut nc.
I( -'n ds( ,aq,e ra"c.hntecau, c, i �.arban des, iqn (Ipa aani^�iin(3
ooY.�weo a x�.: r
Altamanu Inc. and V3 Co. were engaged by
the Department of General Services and
under the direction of DHED, to develop a
market plaza for the site on historic Logan
Square. The design team worked with the
DHED, Neighbors Space, Landmarks, the
Chamber of Commerce, and a variety of
non -for-profit organizations and the local
alderman to develop a new and innovative
use for a site that has been dormant since
1949.
The new plan developed with the community
and the Community Rarities Orchard Project
(CROP) devotes the majority of the site to
Urban Agriculture, with an orchard for rare
and endangered fruit trees extending along
Milwaukee Avenue. The northern part of the
site will become a public plaza with historic
and interpretive signage, an educational/
art wall and planting exhibits. The plaza and
the orchard reflect the growing interest in
green solutions amongst the residents of this
burgeoning community.
Location: Chicago, Illinois
Construction Completed: Unbuilt
Project Owner: City of Chicago
Project N/A
Project Cost: Unknown
.A[ta earn Inc,. Fee: $47,869.43
Project Funding: City of Chicago TIF
Scope: Community Engagement, Master
Plan, Preliminary Design, Construction
Documents
Contact: Laura J. Shafer P.E.
Project Manager
V3 Companies
Email: Ishafer@v3co.com
Tel: 630.729.6216
1700 West Irving Park Road Suite 202 Chicago, IL 60613 T: 773.528.7492 www.altamanu.com 32
PART
N
EiRSH
I
P!
WITH
P
FOCUSED. GOAL ORIENTED.
ADAPTABLE. RESPONSIVE.
Your projects are challenging enough: the battle for funding, escalating costs,
impossible deadlines. When it's that tough just to get a project off the ground,
you need an engineering, natural resources and surveying firm that knows the
ropes and can deliver your objectives.
At V3, we understand your challenges. Our team members have spent time
in the trenches and have first-hand experience dealing with the dilemmas you
face. You can count on our deep base of technical and managerial experts to be
dedicated to achieving your objectives with excellence and superior service.
Our singular mission is to focus on your goals. We have long served
municipalities, counties, state agencies, commercial, industrial and residential
land developers and railroad clients with a full array of professional services.
V3's learn of experts across t.iriss wide rouge of disciplines will enhonc.e
your projects perfurmonce from initial programming to.finot clos(_,oul,
When it comes to public projects .,, we hove what it takes to get the job
dune right,.
IN
■ Founded in 1983
■ 240 Employees
■ Corporation
■ V3 is employee owned,
providing our team members
with the opportunity to
serve you from an owner's
perspective.
■ Construction Engineering
■, Highways & Traffic
■ Railroads
■ Structural
■ Water Resources
■ Wetlands & Ecology
■ Landscape Architecture
■ Sustainable Design &
Consulting
■ Geosciences
■ Environmental
■ Site Civil
■ Municipal Consulting
■ Planning
■ Surveying
is Contracting & Construction
Management
OFFICE LOCA1fVON S
• Illinois
■ Indiana
■ Ohio
■ Missouri
■ Alberta
■ Saskatchewan
■ Haiti
4
V 3.
MIKE RECHTORIK,
PTOE
.y
Senior Project Manager
YEARS OF ExPERIENCEMr. Rechtorik has 25 years of experience specializing in traffic and transportation
...... _-.° engineering. His expertise is in the areas of traffic studies, traffic design, traffic
With V3: 13 operations, intersection and roadway improvements, geometric design, streetscape
Other: 12 design, lighting design, and traffic signal construction. This experience includes a wide
range of planning and design projects for the Tollway, state and county transportation
EDUCATIONagencies, local municipalities, and private developers. Mr. Rechtorik's responsibilities
---- - rr -- rr- include management of public improvement and transportation projects and project
Master of Science quality assurance and quality control.
Engineering
University of South Florida NOTEWORTHY PROJECT EXPERIENCE
Bachelor of Science
Mathematics
University of Tampa
Professional Engineer:
Illinois, 062-058827, 2006
Indiana, 10607220, 2006
Professional Traffic
Operations Engineer:
Cert. No. 1353, 2004
S
401
Institute of Transportation
Engineers, (ITE)
Downtown Redevelopment $treetscape Improvements, Village of Mount
Prospect, Mount Prospect, Illinois ® Project Engineer responsible for the
preparation of lighting, electrical and traffic signal contract plan documents for Stage II
and III streetscape improvements for this downtown area. The project involved
conceptual studies of alternatives for streetscape improvements within the downtown
area. The concepts involved differing levels of investment in lighting, pedestrian lighting,
brick pavers, roadways, parking facilities and street furniture. The final plans included
the installation of new pedestrian level lighting, full brick paver sidewalks, parking and
roadway reconfiguration, street furniture, landscaping and an irrigation system. The
project also included the redesign of traffic signals and permitting through IDOT.
Ardmore Avenue Streetscape Enhancements, Village of Villa Park, Villa
Park, Illinois ® Project Manager for this $1.6 -million project which was funded by the
Illinois Transportation Enhancement Program (ITEP). V3 provided design of all aspects
of the streetscape improvements which included pedestrian improvements and the
redesign of non-compliant intersection crossings throughout the project limits to meet
ADA requirements as well as roadway improvements to provide on street parallel
parking. Streetscape enhancements included sidewalk pavers, stamped asphalt
crosswalks, gateway signing, ornamental LED lighting, landscaping, planter boxes and
architectural stone columns. V3 assisted the Village with the preparation of funding
applications and negotiations for this project.
CONTINUING I est Bartlett Road Streetscape Improvements, Village of Bartlett,Bartlett,
Illinois ® Project Manager for this streetscape improvement of approximately 1.5 miles
ACEC-Illinois / IDOT from IL Route 59 to Western Avenue. The project consisted of lighting and landscaping
Phase II Design enhancements and two new bike nodes along this section of road that served as the
gateway to the downtown area. The project was funded with an Illinois Transportation
IDOT Region I Local Roads Enhancement Program grant. The scope of work included survey, landscaping,
Seminar for Federally photometric analysis, lighting plans using LED decorative street lights, Com Ed
Funded Projects coordination, specifications and special provisions and coordination with both the
Village and IDOT.
ACEC-Illinois / IDOT IL
Route 59 Metra Station ParkingIntersection r ve a ts, City
Lighting Seminar of Aurora, Aurora, Illinois ® Project Manager for Phase I and 2 engineering services
consisting of resurfacing, reconfiguring, and expanding the parking lot from 2,228 to
Communispond 2,657 stalls and adding a new driveway to improve pedestrian, bike, vehicle and bus
Executive Presentation Skills access to the train station. V3 prepared design alternatives and budgetary cost
estimates that included reconfiguring the parking lot to north -south drive aisles, short
term drop-off and pick-up areas, motorcycle parking and a designated Pace bus area.
Pedestrian circulation and access was improved to meet current ADA standards.
36
Matt
Brolley, d
Vr Project Engineer
YEARS OF ExPERIENCEMr. Brolley brings a unique skillset resulting from his past experiences in both land
development and municipal government. In addition to working the past five years in
With V3: 6 the Land Development Department at V3, he has also served the Village of
Other:7 Montgomery in various roles. Originally appointed to the Village Plan
Commission/Zoning Board of Appeals in 2008, Mr. Brolley has since been elected
EDUCATIONChairman of the Commission, Village Trustee, Development Committee Co -Chair and
Bachelor of Arts ......................................................
most recently Village President.
Physics NOTEWORTHY PROJECT EXPERIENCE
North Central College
Naperville Silverwood Glen, K. Hovnanian Homes, Winfield, Illinois ® Project Engineer
providing land planning services for this 27 -acre infill site, creating a number of
Bachelor of Science alternatives to account for its unique shape and constraints that included a 5.5 -acre,
Civil Engineering high-quality wetland, a fire station site and an existing parcel. The design incorporated
University of Illinois 45 home sites in two independent parcels because of the centrally located wetland and
Chicago created the design challenge of balancing earthwork on each parcel to minimize
material handling. Additional services included roadway and infrastructure design
services, a bike/pedestrian path and tot -lot playground. Dry and wet naturalized
Executive Education drainage swales and water -quality basins were implemented to address post
Senior Executives in construction best management practices requirements. In total, the site included four
State & Local Government naturalized stormwater management facilities. The project scope also involved
Harvard University mitigation and enhancement design of the large wetland area.
REGISTRATIONS aria s Restaurant Sites, McDonald's USA, Illinois ® Project Engineer
responsible for providing and coordinating land planning, engineering, platting and
Professional Engineer: topographic surveys, environmental services, traffic studies and storm water
Illinois, 062-062492 management design, streamlining the process to achieve final approvals. V3 provides a
assist McDonald's with its program to rebuild existing restaurants throughout Illinois
Certified Floodplain on sites that range from 0.5 acres to 2.5 acres. Meeting McDonald's national standards
Manager IL -08-00373 and handicap accessibility requirements present new challenges, especially on smaller
sites. Coordination and planning includes meetings with municipal staff, advisory
PROFESSIONAL committees and elected officials.
Engineer's Without
Borders, Chicago
Professional Chapter
American Society for Civil
Engineers (ASCE)
Illinois Association for
Floodplain and Stormwater
Management (IAFSM)
Illinois Municipal League
(IML)
Chicago Premium lets, Aurora, Illinois ® Project Engineer over site civil
design of the mall expansion and reconstruction of the existing shopping mall. The
300,000 -square -foot retail expansion included the addition of 2,400 parking spaces on
40 acres. This project involved utility relocations including a 12 -inch, high-pressure gas
line, a 12 -inch watermain and sanitary and storm sewer systems. Electric, telephone
and communication services to the buildings also needed to be relocated. The project
site is adjacent to one of Aurora's key well sites. The design was careful to provide
necessary protection to the water facilities. As part of the work an access road to the
well site was replaced and upgraded. Close coordination was required with the
architect, landscape architect, client and other members of the design team.
Various Locations, CVS Pharmacy, Illinois & Wisconsin— Project Engineer
proving site civil design for sites ranging from 0.7 acres to 7.0 acres, and may include
future retail developments. Sites have encompassed all types of challenges including site
planning and layout issues, limited space for required stormwater detention volume,
complex traffic, utility & grading conditions and extensive permitting. V3 has provided
feasibility studies, civil engineering services and ALTA/topographic surveys.
38
MOUNT
PROSPECT DOWNTOWN
PARKING IMPROVEMENTS
MOUNT PROSPECT, ILLINOIS
a Conceptual studies of alternatives, final concept approval and final plan
preparation for streetscape improvements.
a Information used as a guideline for the development of contract documents
for construction of the second stage of the downtown redevelopment
project.
Final plans included installation of new parking lot and pedestrian decorative
lighting, full brick paver sidewalks, parking and roadway reconfiguration,
street furniture, landscaping, irrigation system and an automated parking
fee collection system.
Project included the planning and design of a new monument signage. A
design study was performed that included the zonceptual design of several
monument sign alternatives; one of which was selected for implementation
and use as the standard design for all future monument signage in the
Village. Electrical and structural design seriice for the sign were also
provided.
CLIENT
Village of Mount Prospect
VALUE
Construction Cost: $2,000,000
or Development of Preliminary
Concepts
Landscape Irrigation System
• Streetscape Amenities
• Lighting, Electrical
• Storm, Sewer, Utility Relocation
Roadway, Parking Lot
Rehabilitation
0 Funding & Railroad Coordination
a Resident Engineering
a, Topographic Survey
40
V! )I," VEPFFI?E,'/l „ �Il�FI;Ft,� ..II�`I F II F
/
Marius i
Electrical Engineer
Coursework in Geological
Science, University of Illinois
at Chicago, Chicago, Illinois,
1987-1989
Associate of Science, College
of Du Page, Glen Ellyn, Illinois,
1987
Continuing Education
ANSI/IES RP -8-14 Seminar,
2015
ACEC-IL/IDOT Lighting
Seminar, 2011
ACEC-IL/IDOT Traffic Signal
Seminar, 2009
CECI/I DOT Traffic Signal
Seminar, 2002
CECI/IDOT Spring CADD
Conference, 1999
CECI/I DOT Traffic Signal
Seminar, 1999
Marius has 25 years of engineering consulting experience in the supervision
and preparation of construction documents in the disciplines of roadway,
street, area, path, and tunnel lighting, traffic signals and ITS systems. His
qualifications include extensive knowledge of the Illuminating Engineers
Society of North America (IESNA), Federal Highway Administration (FHWA),
and Illinois Department of Transportation (IDOT) guidelines and recommended
practices for roadway illumination.
•
Lincoln Village Pedestrian and Bicycle Bridge, Phase II, Chicago Depar
Transportation, Chicago, Illinois
EJM is preparing plan, specification, and estimate documents for the lighting
design of the pedestrian and bicycle bridge. The scope includes performing
lighting and voltage drop calculations.
Program Management Oversight, Regional Transportation Authority,
Chicago, Illinois
EJM Engineering is a member of the program management oversight team for
the Regional Transportation Authority. EJM is assisting with the performance
of formal reviews for transit projects in the Chicago metropolitan area. EJM's
responsibilities include assisting with formal PMO review to determine
whether projects are being managed according to the project scope while
utilizing established current project management best practices.
Metra Positive Train Control — Positive Train Control is a computerized
system that prevents certain types of train -to -train collisions, helps avoid
derailments and other accidents caused by excessive speed, and increases
safety for railroad workers. As the electrical engineer for this project,
Marius attends bi-weekly progress meetings and communicates significant
cost and schedule issues to the RTA.
Transportation
EJM is providing engineering design for roadway lighting, electrical
installations, and other electrical and lighting facilities throughout the state.
These projects involve engineering design, electrical layout, and the
development of detail drawings and contract documents. Services also involve
the review of plans, special provisions, and contract documents that relate to
electrical, lighting, and pump stations work as well as the analysis of field
problems, site visits, and nighttime inspections.
Partnering in Solutions That Work for You
1 1 P a g e
42
Nathaniel R. Jones
Electrical Engineer
.r
Bachelor of Science, Electrical
Engineering, Howard
University, 2006
Professional Affiliations
Institute of Electrical and
Electronics Engineers
Illuminating Engineering
Society
ENGINEERS PLANNERS SPECIALISTS
Mr. Jones has 11 years of experience in the design of complex and typical
lighting systems. He has performed detailed surveys, calculations, designs, and
estimates for roadway lighting projects.
Lakefront LED Lighting Installation, Chicago Park District, Chicago,
Illinois
EJM is preparing final plan, specification, and estimate documents for the
installation of pedestrian LED lighting system for the Lakefront Trail separation
project between 31St Street and 41St Street.
Lindblom Math and Science Academy Parking Lot, Public Building
Commission, Chicago, Illinois
This project involved site preparation, design, and construction services for the
proposed school's parking lot lighting. EJM provided alternative lighting design
analysis for the 37,000 square feet parking lot in an effort to produce the most
cost efficient lighting system while still meeting or exceeding all parking lot
lighting design standards. EJM also provided Phase III construction services
with the review of electrical shop drawing reviews and project walk-throughs
during the final lighting system acceptance.
Traffic Signals and Roadway Lighting Design, Chicago Department of
Transportation, Chicago, Illinois
EJM is providing design engineering services for residential street lighting and
traffic signal modernization. The scope of services includes roadway lighting
systems including lighting calculations, fixture selection, pole selection,
foundation design, wiring, controls and power distribution design. Nate is
responsible for obtaining construction permits, providing cost effective
estimates for contractors, reviewing roadway lighting projects from outside
consultants, performing photometric analysis and voltage drop calculations for
street lighting systems.
Irving Park Road over Chicago River, Chicago Department of
Transportation, Chicago, Illinois
EJM is responsible for preparation of plans, specifications, and estimates for
replacement of the overhead lighting associated with this bridge replacement
project. EJM is also designing trail lighting associated with the improvement
and realignment of the bicycle path along the river, which requires extensive
coordination with the Chicago Park District.
Partnering in Solutions That Work for You
1 1 P a g e
44
Michael Todden
Electrical Engineer
B.S., Electrical Engineering,
Mathematics Minor,
Southern Illinois University
Edwardsville, 2015
ENGINEERS PLANNERS SPECIALISTS
Mr. Todden has experience with the development of electrical plans,
specifications, and estimates for roadway lighting and traffic signals. He is
familiar with the design standards and requirements for the City of Chicago, the
Illinois Department of Transportation, and the Illinois State Toll Highway
Authority.
South Blue Island Avenue Streetscape Improvement Project, Chicago
Department of Transportation, Chicago, Illinois
EJM provided roadway lighting design services for Blue Island Avenue from 21"
Street to Cullerton Avenue. EJM provided voltage drop calculations, quantity
calculations, contract plans, details, specifications, cost estimates, and site
investigations.
Traffic Signals and Roadway Lighting Design, Chicago Department of
Transportation, Chicago, Illinois
EJM is providing design engineering services for residential street lighting and
traffic signal modernization. The scope of services includes roadway lighting
systems including lighting calculations, fixture selection, pole selection,
foundation design, wiring, controls and power distribution design. Michael is
responsible for obtaining construction permits, providing cost effective
estimates for contractors, reviewing roadway lighting projects from outside
consultants, performing photometric analysis and voltage drop calculations
for street lighting systems.
1-8 Rehabilitation, Illinois State Toll Highway Authority, DeKalb and
Kane Counties, Illinois
EJM provided Phase II engineering services for the preparation of contract
plans and specifications and related permits for the proposed roadway and
bridge rehabilitation on the Reagan Memorial Tollway. The project covered
over 22 miles of mainline roadway, and included eight mainline and 13
crossroad bridges as well as many crossroad culverts. This project included the
design and relocation of roadway ITS and lighting systems within the limits of
this project. The project also included relocation of existing backbone fiber
optic cable.
1-88 Rehabilitation M.P. 126.9 to M.P. 139.1, Illinois State Toll
Highway Authority, Cook and DuPage Counties, Illinois
EJM is providing Phase II engineering services for the preparation of contract
plans and specifications and related permits for the proposed roadway and
bridge rehabilitation on the Reagan Memorial Tollway. The project covers
over 12 miles of mainline roadway. EJM is responsible for the design and
relocation of roadway ITS and lighting systems within the limits of this project.
Partnering in Solutions That Work for You
1 1 P a g e
46
ENGINEERS PLANNERS SPECIALISTS
iie'n'I": Fullerton Avenue Streetscape,Ashland v ue to Racine
Civiltech Engineering, Inc.
Avenue, Chicago Department of Transportation
Chicago, Illinois
0nI;,aCq:.
Michael Folkening, PE EJM was a subconsultant on this project for improvements to Fullerton Avenue
Civiltech Engineering, Inc. from Ashland Avenue to Racine Avenue. Improvements to the streetscape
450 E. Devon Avenue included pavement resurfacing, sidewalk widening, curb and gutter upgrades,
Itasca, Illinois 60143 landscaping, decorative lighting, community identifiers, and stamped
(630) 773-3900 crosswalks.
Flea od of I u ii°i°rf Pi°ieerfl�tifa�ul°sraMit::
12/2011-10/2012
Iutcil LlwrOI a, i C'r,JL(tto
$3,200,000
o tat I�"'ee 'Le('("iV ld by Firrrr
$32,071
K(, Lo- Pelsr,;onnffll Viwr,4lfrr da
Christopher Krueger, PE
EJM Principal
Mohammed Rashed, PE, LEED
Green Associate
EJM Sr. Electrical QA/QC
Engineer
Brigette Barr
EJM Electrical Engineer
Paul A. Scott
EJM Senior CADD Designer
EJM's scope of work for this project included the preparation of plans,
specifications and estimates for the installation of decorative street and
pedestrian lighting with integrated special -event electrical outlets.
EJM design included lighting calculations, removal plans, conduit plans, cable
plans, and standard drawings.
Partnering in Solutions That Work for You
1 1 Page
48
'wl�l ll• � l S
HR Green, Inc.
Con 'O!
Anthony P. Simmons, PE
HR Green, Inc.
651 Prairie Pointe Drive
Suite 201
Yorkville, Illinois 60560
(630) 553-7560
Tinie P12(l ad of
05/2014 — 07/2014
Poi k)i,i of f 1i nar^s II°r+ro6fean."W
05/2014 — 07/2014
Not Available
a�,.0 � �"e {,< c ,':v,,, h')y
$24,105
Mohammed Rashed, PE, LEED
Green Associate
EJM Project Manager
Brigette Barr
EJM Electrical Engineer
ENGINEERS PLANNERS SPECIALISTS
m fjv r f rd,Y i
� r vl!�^�Euvriorl�nK �o�foroi
„r
Transportation
Village of Sugar Grove, Illinois
EJM Engineering provided roadway lighting design services as a subconsultant
for this project that involved the realignment of the intersection of Granart
Road and Dugan Road in the Village of Sugar Grove and the incorporation of a
roundabout at that intersection. EJM provided a concept study, including
photometric and voltage drop calculations; and provided final plans,
specifications and special provisions, and estimate of cost. EJM was
responsible for coordination with the Village of Sugar Grove and with
Commonwealth Edison. Lighting was designed to IDOT standards.
Partnering in Solutions That Work for You
1 1 P a g e
50
TranSmortl` ENGINEERS PLANNERS SPECIALISTS
Lakefront LED LightingInstallation, Chis r District
AECOM Chicago, Illinois
Michelle Inouye
AECOM
303 E. Wacker Drive
Suite 1400
Chicago, Illinois 60601
(312)938-0300
f,' nn e Fl,'e i I r i d ol` P i e j e fi
02/2017 — 05/2018
r< <ieael of I iG°rn'slnvs :lverir' Utnt:
02/2017 —05/2018
E u l Do Ha[ Valu( Crl
Not Available
rI "J.i,p F� uurn
$92,414.45
Mohammed Rashed, PE, LEED
Green Associate
EJM Project Manager
Marius Kucinas
Electrical Engineer
EJM prepared final plan, specification, and estimate documents for the
installation of pedestrian LED lighting system for the Lakefront Trail separation
project between Ardmore Avenue to 56' Street. The lighting system includes
the installation of new embedded concrete poles, underground conduit/cables,
and post -top LED luminaires. This project also includes the utilization of
existing power feeds and lighting controllers and supplemental lighting
controllers.
Partnering in Solutions That Work for You
11Page
52