05/07/2024 Motion to accept lowest-cost, responsive bid for Kensington Business Center Basin #2 Dredging Project for an amount not to exceed $573,338.00.
M+awn �'xyt�lts�=e Item Cover Page Subject Motion to accept lowest -cost, responsive bid for Kensington Business Center Basin #2 Dredging Project for an amount not to exceed $573,338.00. Meeting Fiscal Impact (Y/N) Dollar Amount Budget Source Category Type Information May 7, 2024 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD Y $573,338.00 Capital Improvement Fund VILLAGE MANAGER'S REPORT Action Item The Village of Mount Prospect is responsible for maintaining several retention basins in the Kensington Business Center. Per an agreement with the business park in the 1980s, village maintenance includes sediment dredging, slope erosion protection, and outlet structure upkeep. The 2024 Village Budget has allocated funds for construction of the Kensington Business Center Basin #2 Dredging Project. Ciorba Group, Inc. has provided design engineering services to complete the construction plans and specifications for the project. The scope of construction will include pumping water out of the retention basin, loading accumulated sediment, and hauling it to an offsite landfill. The bottom and sides of the retention basin will then be reshaped to conform to the original design. In addition, the contractor will make repairs as necessary to the outlet structures. At project's end, the shoreline will be stabilized with stone and the site restored with grass. Subsequent rainfall will naturally refill the retention basin. Village staff is seeking at this time to enter into a construction contract. Work is expected to begin in June and be completed by the fall. Bid Results A Notice to Bidders was posted on the Demandstar website and staff contacted local contractors. Twelve (12) contractors downloaded the bid documents. A bid opening for the project was held on April 22, 2024, at 1:00 p.m. Four (4) contractors submitted a bid. Below is a summary of the bids: Bidder Total Bid Schwartz Excavating $371,055.52 Copenhaver Construction $521,216.00 Earthwerks $593,895.75 Martam Construction $597,155.00 Engineer's Estimate $699,320.00 Discussion All bid submittals were checked for accuracy. The bidders submitted a bid bond in the amount of 10% of their total bids, as required in the bid proposal packet. All required forms were completed and signed. The price from the low bidder, Schwartz Excavating, is considerably lower than the other three bids. In a phone conversation with them after the bid opening, Village staff learned of an error in their bid. The specifications require the excavated material to be specially handled and not considered clean debris. The material must go to a landfill that accepts special waste. Schwartz Excavating did not realize this requirement and provided an exceptionally low unit price for Earth Excavation that more appropriately reflects clean debris disposal. As Earth Excavation is the primary item on the project, this mistake has significantly altered their bid. Village staff believes this to be an honest mistake made by Schwartz Excavating. Requiring them to honor the bid will result in a financial loss for the company. The Village Attorney has reviewed the situation and supports rejecting their bid based on the error. The next low bidder, Copenhaver Construction, specializes in pond, creek, and river restoration. They have provided dredging services on three other retention basins in the Kensington Business Center. More recently, Copenhaver has completed similar work in the Village of Buffalo Grove, Village of Hoffman Estates, and City of Naperville. Their work has been acceptable. Copenhaver is prequalified with the Illinois Department of Transportation to bid on earthwork, drainage and landscaping projects. Their bid price reflects the requirement to properly dispose of the excavated material and is line with the other two bidders to accurately indicate the true cost of the project. Village staff recommends including a 10% contingency in the project award to allow for quantity variances and unanticipated construction conflicts. For the construction contract, a 10% contingency added to the bid would result in a total contract award of $573,338.00. (Base Bid: $521,216.00 + Contingency: $52,122.00 = Total Recommended Award: $573,338.00). Alternatives 1. Accept lowest cost, responsive bid for the Kensington Business Center Retention Basin #2 Dredging Project. 2. Action at discretion of Village Board. Staff Recommendation Staff recommends that the Village Board reject the bid from Schwartz Engineering and accept the bid from Copenhaver Construction of Gilberts, Illinois for construction of the Kensington Business Park Basin #2 Dredging Project in the amount not to exceed $573,338.00. Attachments 1. Bid Tab 2. Copenhaver Bid 3. Final Plans 4. location map 5. Schwartz Explanation for Rescinding Bid o � C V hp C C — Y O O 0 00 0 0 u'1 O l0 m N Vl V M O o vt vt 0 0 0 V of W O ` V W N V1 0 o a lD UT V? 0 0 0 0 O O N O (1 O N o n O W N a N N t/} 0 0 0 0 W N O lD Vf .-I o o a W N 0 0 0 0 0 6 O O... 0.'] O l/V W o o to O O U} 0 0 0 0 i L'i of N o o N N i/T OJ 0 0 O u9 Vf o o N 0 0 0 0 W O O O V -c Vl o o w O O V} oJ Q Uj rl m '^ w a ci ID 0�J O O 0 0 O O 0 0 O o 0 O o O O O O O O O O O o O o 0 0 0 0 0 0 Vl 0 0 0C 0 0 0 0 0 n p N 0 0 0 m a l0 O O Ol O h 00 O m p N u'I N a 00 m ni m o > H u ti m in an � ri vi E c � v. _ a a c J O y O O O O O O N O 0 0 0 0 0 0 0 0 Yd J O O O� O O N 0 O O 0 0 N O V} l0 0 vT O 0 0 rl O 0 O 0 0 r -I O y �, O UT tp O V} O ✓T m a V? vt u •n +n in 3 L A � .n an .`^n W O oo O p O p O o O p O o o p 0 O o 0 0 o o p O o p o o 0 o O o o o O m O o o 0 0 o 0 Q C O O OLq lL 3�Lr O O N r' n a O O t0 O t0 O W O O O� N O O 1p a Y O o Ol .-I Vl lD I� n n M M N N Vl lD N l"I N V M 1A m 1A LT V} N VT A N N 1A N VT Vf C O = V -� o o o o o o o o o 0 0 0 o o o > O Q O o O to 0 0 O m 0 0 o o 0 0 a o 0 0 o o 0 0 r -I o 0 o 0 0 o o �U' o +n .n m o an vx o ✓r o vi .n ,. V vT I—j O WW O l0 I� A V lD V N N N 7 O O 0 M 01 N l0 N t0 M O Ol O C O 01 V I� M I� m O� N n J O N Ol rq Ol O O m 7 W 01 7 1h N O y — y. O Ul � 01 O M V1 Q1 <0 n N N <0 M V1 V1 N M M lD � O l0 M <0 l0 1p � � yj N � Ol C O r V Vi V? Vf ah V1 rj V 3 Qj 6 ++ C O a m Ol CO OR O O m m v1 tD m dl W O M c -I N m 0 V O to o n m m +n a tD m N .-I +n O� yr tD I� ✓� a tD m m O m 3 „ c va v? c n in m " I o m .n L IA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O tD 01 N .--I O O O o vt O M v1 O O O O O O vt OO O O O a O C N � O Q W Ol N a W t0 M a0 O Ol v) O W O M yd, O V N tD O m N dl N O N N A tD N �Il E G `y Oo o O o O o o o o o o o o o JI y C N O p p vi p O -1 M p O o 0 toO o o OO o O O O o O o o O O F W a 0mI�M O v� O p OfZ1A too 'NN N N N— M— N— Vf 1/T .il WI NI �I WI OI SII NI MIriI QI ril Nl Ml rl H 0 2 W O O H H= 2 }}} u"}} O D O u u} J u u 0 „a CR 10 2 J 2 W¢I la u RETENTION BASIN DREDGING PROJECT/ KENSINGTON BUSINESS PARK, BASIN #2 Bid Form Page I BID FORM Retention Basin Dred Retention a �s lLngProl�ect 11"ensintonusiness ParkBIRNI�2AS '10 Village Of Mount Prospect Department of Public Works FROM: Co enhaver Construction Inc. HN 75 1 oni ---,-Die Drive Gilberts IL 60136 ,�,, t (5u,36 (hereinafter s L� Drive ,d� der.) Office of the Village Manager, 3rd Floor 50 South Emerson Street, Mount Prospect, Illinois 60056 (hereinafter called "Village" or "Village Of Mount Prospect") Bid For: "Retention Basin Dredging Project, Kensington Business Park, BASIN #271 The bidders have familiarized themselves with the work and probable work conditions required under this Bid affecting the cost of the work and with the Bid Documents which include - Notice to Bidders Table of Contents Instructions for Bidders General Conditions and Special Provisions Specifications Bid Form Bid Security Bid Sheet — Spot Repairs Affidavit — Bid Certification Form Other materials or standards provided or noted by the Village Contract Document Performance Bond Form Labor and Materials Payment bond form Therefore, the Bidder hereby proposes to furnish all supervision, technical personnel, labor, materials, tools appurtenances, equipment, and services (including all utility and with the above listed documents, I transportation services) required to construct and comip ete the Work, all in accordance Bidder agrees to perform all of the Work described in the Bid Documents, as follows: 40 and provide the equipment and materials RETENTION BASIN DREDGING PROJECT/ KENSINGTON BUSINESS PARK, BASIN #2 Bid Form Page 2 Bidder has bid on all items and has provided a price for all items. The Bidder will complete and provide all labor, equipment, materials and mobilization (if applicable) to perform the Work as incidental to the fixed item price for each item proposed. In submitting this bid, the Bidder understands that the Village of Mount Prospect reserves the right to add to or subtract from the estimated quantities. The Village of Mount Prospect intends to award one (1) contract (if at all) for the items bid. If written notice of award of this bid is mailed, emailed or otherwise delivered to the Bidder at any time before this bid is withdrawn, the Bidder agrees to execute and deliver the contract in the prescribed form and furnish payment and performance bonds„ or letter of credit, and the insurance certificates required by the Bid Documents to the Village within ten (10) days after receipt. The Bidder, and as successful bidder/Contractor upon award of the Contract understands and agrees to the following: 1) The Contractor agrees to provide all Work and items and material to the Village as noted in the Bid Documents and comply with the requirements of the Bid Documents. 2) The Contractor agrees to comply with all applicable state and federal laws, rules and regulations, and county and municipal ordinances, as described in the General Conditions. All Addenda pertaining to this project shall be acknowledged by the Bidder in the spaces provided below: Failure to acknowledge receipt, as provided above, may be considered sufficient grounds for disqualification of the of and rejection of his/her bid submittal. A reof all ord Addenda and copies of same will be available to all qualified bidders from thecVillage of Mount Prospect Public Works Department, 1700 West Central Road, Mount Prospect, Illinois two (2) days prior to the letting. It shall be the bidder's responsibility to become fully advised of all Addenda prior to submitting its bid, 41 RETENTION BASIN DREDGING PROJECT/ KENSINGTON BUSINESS PARK, BASIN #2 Bid Form Page 3 Upon award the contract the Village will send Notice of Award to the successful bidder, The bidder must then execute the contract and provide the required bonds or letter of credit and certificate of insurance to the Village within ten (10) days. The Village will then issue a written Notice to Proceed, which starts the performance period and the contractor then has ten (10) days to commence work. The contractor shall reach substantial comp e won within MT2t weeks after the Notice to Proceed with final completion two (2) weeks thereafter. Failure to complete the work in the designated time frame may result in the Director of Public Works withholding compensation due the contractor for failure to complete the said work in the designated time frame, calling the bonds, or taking such other action as may be available. Security in the sum of ten (10%) percent of the amount bid in form of (check one): XXX Bid Bond Certified Check Bank Cashier's Check is attached hereto in accordance with the "Instructions for Bidders". This Bid Submittal contains the following; 1) Bid Form 2) Affidavit —Bid Certification Form 3) Bid Security 3) BID SHEET(S) Respectfully submitted: Oonst S'ro Name of Firm/Bidder: Co enhaver Construction, p Inc ,MKK '` A"o C"OoO µ. By: SEAL (Signature) en open paver Title: President Date: April 22, 2024 Contact Information: Official Address: 75 Koppie Drive Gilberts, IL 60136 Telephone: 847-428-6696 Email: copenhaverinc ahoo.com ONE (1) SIGNED COPY OF THIS BID FORM AND BID SHEET (Page 43) ALONG WITH THE AFFIDAVIT — BID CERTIFICATION FORM, AND BID SECURITY SHALL BE SUBMITTED IN A SEALED MARKED ENVELOPE. 42 RETENTION BASIN DREDGING PROJECT/ KENSINGTON BUSINESS PARK, BASIN #2 VILLAGE OF MOUNT PROSPECT AFFIDAVIT — BID CERTIFICATION FORM Bidder: Company/Firm Name: Co enhaver Construction Inc. Address: 75 Kop pie Drive Gilberts IL 60136 As a condition of entering into a contract with the Village of Mount Prospect, and under oath and penalty of perjury and possible termination of contract rights and debarment, the undersigned, lCen Co enhaver, being first duly sworn on oath, deposes and states that he or she is President of Co enhaver Construction Inc. and Inas the authority to make all certifications required by this affidavit. Section I Non Collusion The undersigned certifies that this bid is genuine and not collusive or a sham, that said bidder has not colluded, conspired, connived or agreed, directly or indirectly, with any bidder or person, to put in a sham bid or to refrain from bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, to fix the bid price element of this bid, or of that of any other bidder, or to secure any advantage against any other bidder or any person interested in the proposed contract. Section II Bid Rigging and Rotating The undersigned further states that Co enhaver Construction Inc. (Name of Company) is not barred from bidding or contracting as a result of a conviction for violations of state laws prohibiting bid rigging or bid rotating or any similar offense of any state of the United States, as provided in Sections 33E-3 and 33E-4 of the Illinois Criminal Code, 720 ILCS 5/33E-3, 33E-4, Section III Drug Free- Workplace The undersigned further states that Co enhaver Construction Inc. (Name of Company) provides a drug free workplace pursuant to the Drug Free Workplace Act„ 30 ILCS 530/1, et seq., and has, to the extent not covered by a collective bargaining that deals with the subject of the Substance Abuse Prevention in Public Works Projects Act, 320 ILCS 265/1 et seq.„ a substance abuse prevention program that meets or exceeds these requirements of that Act. 43 RETENTION BASIN DREDGING PROJECT/ KENSINGTON BUSINESS PARK, BASIN #2 Page 2 - AFFIDAVIT — BID CERTIFICATION FORM Section IV Tax Payment The undersigned further states that Co enhaver Construction Inc. is (Name of Company) not delinquent in payment of any taxes to the Illinois Department of Revenue, in accordance with Illinois Compiled Statues, 65 ILCS 5/11-42.1. The undersigned understands that making a false statement regarding delinquency in taxes is a Class A Misdemeanor and, in addition voids the contract and allows the municipality to recover all amounts paid to the individual or entity under the contract in civil action. Section V Sexual Harassment Policy Pursuant to Section 2-105(A) of the Illinois Human Rights Act, 775 ILCS 5/2-105 (A), every party to a public contract must: "Have written sexual harassment policies that shall include, at a mini -mum, the following information: (1) the illegality of sexual harassment; (II) the definition of sexual harassment under State law; (III) a description of sexual harassment, utilizing examples; (IV) the vendor's internal complaint process including penalties; (V) the legal recourse, investigative and complaint process available through the Department (of Human Rights) and the Commission (Human Rights Commission); (VI) directions on how to contact the Department and Commission; and (VII) protection against retaliation as provided by Section 6-101 of the Act. (Illinois Human Rights Act)." A "public contract" includes: ... every contract to which the State, any of its political subdivisions or any municipal corporation is a party." 775 ILCS 5/1-103 (M) (2002), The undersigned further states that Co enhaver Construction jnc. has (Name of Company) a written sexual harassment policy in place in full compliance with 775 ILCS 5/2-105 (A) (4). It is expressly understood the foregoing statements and representations and promises are made as a condition to the right of the bid, r to receive payment under any award made under the terms and provisions o'�,�t�1�1'I .n jjj ',,,��r ........ 4r The undersigned certifies that all inf "` "ej jon contain (0 s Affidavit is true and correct. «�o Pots Signed by: -..: .. --� Title: President Signature O*". SEAL '• Name Printed: lien Cts enhaver • 200Q II11111110N�.��� Signed and sworn to before me this 22nd day of April, 2024. My commission expires: j 7 a^�"�y OFFICULL SEAL ,/I` ROSEMARY SIMARANO - m , ) NOTARY PUBLIC, STATE OF ILLINOIS Notary ubIIC MY COMMISSION EXPIRES 04/12/27 44 RETENTION BASIN DREDGING PROJECT/ KENSINGTON BUSINESS PARK, BASIN #2 BID SECURITY Included with this bid is a bank cashier's check, certified check or bid bond in the amount of Ten Percent of Total Bid, being ten percent: (10%) of the total amount bid by Co enhaver Construction Inc,, the Bidder„ in favor of the Village of Mount Prospect. It is hereby agreed that, should Bidder be awarded the Work contemplated under this bid and fail or refuse to execute a contract for said Work, or to provide the required payment and performance bonds, or letter of credit, and certificate of insurance, then this security, in the amount stipulated above, shall be forfeited and may be retained by the Village of Mount Prospect as liquidated damages and not as a penalty. All bids to remain firm for a period of ninety (90) days after bid opening date. SUBMITTED THIS 22nd DAY OF April, 2024. g141C I tliNl �P'PdfF� SEAL (if corporation) ``'° «•GORPoRAT4,. Bidder: SEAL �` Ken Copenhaver, PresidenT� Bidder's Agent and Agent's Livia Nelson Asst. Secretary Title Note: If bidder is a partnership, the bid must be signed by at least two of the partners. Note: If bidder is a corporation, the bid must be signed by an authorized officer of the corporation, attested and sealed by the secretary or other authorized officer. If a corporation, note here the state of incorporation: Incorporated under the laws of the State of Illinois. 45 Init 0-r-ocume i31 TM - 2010 CONTRACTOR: SURETY: Odine, legal V101"v Ona' addi ess) ('Vanle, lel status and principal place Copenhaver Construction, Inc. of business)ga 75 Koppie Drive Gilberts, IL 60136 The Gray casualty & Surety Company P.O. BOX 6202 OWNER: Metairie, LA 70009.6202 (Nalne, legal status and addres,sl Village Of Mount Prospect 50 Sm Emerson Street Mount Prospect, IL 60056 BOND AMOUNT, — TEN PERCENT OF ACCOMPANYING 131D PROJECT: (Name, 10'alr`on or address,and Project number, Uan Retention Basin Dredging ng Project - Kensington 56siness Park, Basin #2 This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other Party shall be considered Plural where applicable, The Contractor and Surety are bound to the O"nel, in the ralloutItSel r Contractor and Surebind themselves, their, heirS, executors,ft Payment adin iniStrators, successors and assigns, jointly and ted in the bid documents, t within the time sPecif S Bond are Stich that if he Owner accepts the bid of' the Contractor severally, tis Provided herein. I'lle Conditions of thh - Contractor. and tile Contractor either or within such time period as may be agreed to by the Owner arid bid. and gives such bond 01' bonds as (1) enters a contact with the Owner in accordance with the terms tic Ina), be specified in the bidding or Contract Doctiments, with a Surety admitted in tile I of It jurisdiction Of the Project and odierwise acceptable to the Owner, for the faithful Performance orsuch Contract and for the Prompt payment of labor and material furnished in the P"Osecution thereof*; or ()Pays to the Om lier the difference, not to exceed the amount of this Bond, between the amount Specified in said bid and such larger amount for which the Owner May it, good faith contract with another party to pertbrin the work, covered by said bid, then this obligation shall be null and void, Otherwise to remain in full force and eflect, The Surety y hereby waives any notice of an agreement between the Owner and Contr Clor to extend the tirne in which the Owner may accept the bid. Waiver of notice by the Surety shall "Or apply' to any extension c\cceding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid document& and the Owner and Contra an "tclision beyond sixty (60) da�y& Contractor shall obtain the Surety's consent for If this Bond is issued in connection with a subcontractor's bicl to a Contractor, the term Contractor i be deerned to be Subcontractor and the term Owner shall be deemed to � Contractor, n this Bond shall Whcn this Bond has been furnished to complyy he with a Statutory or other legal requirement it) the location of the -oe any, provision in this Bond conflicting With said statutory or le P1 j ct, Provisions collfbm"ng to Stich Statutory or otber, legal require gal requirement shall be deemed deleted her racin shall be deemed incorporated furnished, the intent is that this Bond shall be tans as a statutory bond and not as a Common taj� teloon 0 Signed and sealed this 22nd day ot'April, 2024 0 CloiDenhaver Construction I c0pol"A (PI -1 1pal) 0*:Zi Z 0'. 0 rile en Copan er,P 'a dent The Gra CasuakA Sur@ht COM ...___w __.y _n (SIUIFe�V) 03da DiPaola, Attorprl�.Fact — -------- CAUTIOW You should sign or, original AM Contract scat es will not bo obscured 00cumunt, on which this text aPpears in neo� 0 and 2010 b�� 00c 7 bV trcii 0' �op AlAu U n, A31 0 0i9inarass"r'#3 that_ - m ' I d saa 4 portion n I 1-w and Int I P it 'S' A!- to"Ps AIA V P U� c Py'Q a yr Purchasers a iin, sale ; i strap WAAN3W3cTW$ Al� n i os rhe M , W �H'd to rep 10) opia, 0 this dow t ibleur.rcielaw, " ' 1, t_ r tenCOQ iiia "ar h n t or contract Documents., 0 -mail n ------ 061110 G-23208-8 ss. STATE C)F|L COUNTY OF WILL 1, Brandie Catlin, Notary Public of Will County, in the State of Illinois, do hereby certify that of the The Gray Casualty 4 Surety CoLnony , who is personally known to me to be the same person whose name is subscribed to the foregoing instrument, appeared before me this day in person, and acknowledged that he signed, sealed and delivered said instrument, for and onbehalf ofthe for the uses and purposes therein set forth. Given under myhand and notarial seal at my office inthe City of Lockport in said County, this 22nd day of April OFFICIAL SEAL / NOTARY PUBLIC, STATE O� ILLINOIS IF my Commission Expires 3131126 a Catlin Notary Public THE GRAY INSURANCE comPANY THE GRAY CASUALTY & SURETy COMPANY GENERAL POWER OF ATTORNEY KNOW i ALL BY THESE PRESENTS, TflAT The Gray Insurance Cozaapany and The Cray Casualty & Surety Company. corparations duly organized and existing under the laws of Louisiana, and having their principal offices in Metairie, Louisiana,, do hereby make, constitute, and appoint: Brian DiPaaala and gavial A. Kotula of Geneva, Illinois jointly and severally on llac half oI`eacle of the Companies reamed alcove i true and lawful Attorney(s)-in-Fact, to make, s mite, s�cal and deliver, for and on its belaalfary nits deed, bonds, or other writings obligatory in the nature r un bond, as surety, contracts of suretyship as are or may be required or permitted by law, regulation, contract or otherwise, provided that no band or undertaking or contract of suretyship executed under this authority shall exceed the amount of S25,pll ,tl00, oQ. This Power of Attorney is granted and is signed by facsimile under and by this authority of the following Resolutions adopted by the Boards of June, 200 of both The Gary Insurance Company and The Gray Casualty & Surety Company at meetings duly called and held on the 201 day of June, 2irs "RESOLVED, that the President,Executive "Vice President, any Vice President, or the Secretary be and each or any of them hereby is authorized to ying the attorney named in the given Power of Attorney to execute on behall'of the Company bonds, execute a power of Attorney qualif undertakings, and all con tracts of surety, and that each or any of them is hereby authorieal tka attest to the execution of such Power of Attorney, and to attach the seal ofthe Company, and itis FURTHER RESOLVED, that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any certificate relating' thereto by fsesimile, and any such Power ofAttomey or certificate bearing such facsimile signature or facsimile seal shall be binding upon the Company now and in the fnture when so affixed with regard to any bond, undertaking or contract of surety to which it is attached. IN WITNESS WHEREOF, The Gray Insurance Company and The ,Gray Casualty, & Surety Company have caused their official seals to be hereinto axed, and these presents to be signed by their authorized officers this 40, day of November, 2022. a SEAL By: Michael T. Gray a — ,••• ^�• President Cullen S. Piske $$$L The Gray Insurance Company President oilThe Gray Casualty & Surety Company — a State of Louisiana as: Parish of Jefferson On this 41 day of November, 2022, before me, a Notary Public, personally appeared Company, and Cullen S. Piske, President of The Gray Casualty &Sure Company,Michael T'. Gray, President ourbe Gray lnsurance that they signed the above Power ofAttorney ano me d affixed the seals of the companiespas officers of andersonally known acknowledged gduly sworn, acknowledged to be the voluntary act and deed, of their companies, y 4LeiAnne Hanican Notary Public Notary tD hies. 92653 Leigh Anne Henican 0 Orleans Parish, Louisiana Notary Public, Parish of Orleans State of Louisiana My Commission is for life 1, Mark & Nfanguao, Secretary of The Gray lnsurance Company, do hereby certify that the above and forgoing is a true and correct copy of a Power of Attorney given by the companies, which is still in full force and effeet. IN WITNESS WHERE -OF, l 2024 affixed the seals of the Company this , fldday of P61have set my hand and 1, Leigh Anne Hanican, Secretary of The Gray Casualty & Surety Company. do hereby ooerr " ly, that the above I�rjongis-k!it�e'aii�d co copy of a Power ofAttomey given by the companies, which is still in full force and effect. IN WITNESS WH d EOF,I have set �t and affixed the seals of the Company this 2 ndday of 61 2024 my7�and SEAL SE -&L BID SHEET "Retention Basin Dredging Project, Kensington Business Park, BASIN #2" (TO BE FILLED OUT BY THE CONTRACTOR/BIDDER) The Bidder will complete pricing for all items mobilisation (if applicable) R 1-15) to provide all labor, to perform this work. The fixed item equipment, price given is to be materials and IIII�IIIII all inclusive, ITEM NO. DESCRIPTION I UNIT QUANTITY UNIT TOTAL CONSTRUCTION LAYOUT PRICE 2 L SUM 1 EARTH EXCAVATION 19 000 $19,000.00 3 CU YD 1,852 FURNISHED EXCAVATION 125 $231,5001.00 4 CU YD 546 SHORELINE STABILIZATION 10$5,460,00 5 SQ YD 1,633 RIPRAP OUTLET PROTECTION 53 $86,549.00 6 EACH 8 SEEDING, CLASS IA 900 $7„200.00 7 ACRE 0.35 EROSION CONTROL BLANKET, 10,000 $3,500.00 SPECIAL1,927” SQ YD 8 4 STABILIZED CONSTRUCTION ACCESS 247 $7,708.00 9 SQ YD 30 TEMPORARY FENCE (TREE PROTECTION) FOOT 360 $7^410.00 10 10 WATER MANAGEMENT, SPECIAL $3,60)0.00 11 L SUM 1 TEMPORARY CHAIN LINK FENCE 123,(10)0 $123„000.00 12 PRFCAS"1 REI�NF(RCI`I� CONCRETE FLARED FOOT 1,079 11 $11,869.00 END SECTION 18" EACH 1 13 PRECAST REINFORCEl: CONCRETE FLARED 2,000 $2,000.00 END SECTION 24" EACH 2 14 TOPSOIL. EXCAVATION 2,500 $5,000.00 AND PLACEMENT CU YD 321 15 20 MAINTENANCE BOND (24 -MONTH) 1 $6,420.00 L SUM 1,000 $1,000.00 TOTAL FOR ITEMS (I —16)`$521,216.00 46 Bidders Qualifications Retention Basin Dredging Project Kensington Business Park, Basin #2 Copenhaver Construction, Inc. 75 Koppie Drive Gilberts, IL 60136 Copenhaver Construction, Inc. Permanent Place of Business Documentation m -n x 0 Wv Cn 3 "0 ow z c CD 0-0 3 0- —L 0) 0 CD CO CD CO CD . :i _0 (D 0 h z m cr= Co. r 0 0 -8 z 0 CD 00 6 CD 0 0 a) 0 =3 Cl) MIL 46 z 0 o m • m z 0 r@ 0 0 CD CD Farm Request for Taxpayer 00va November 201?) Identification Number and Certification igkRgi T(eassw'y Revenueervice ► Go to iirs.gov/FormW9 for instructions and the latest information. as stary~aorn on your kaasrame tax rarturn). Nanhaver Construction, Inc.s rrafrae„rd't�egardad enM�itgp name, Nl dttl`fewrent 3 Check appropriate box for federal tax classification of the person whose name is entered on line 1. Check only one of the following seven boxes. ❑ Individual/sole proprietor or ® C Corporation El S Corporation single -member LLC p ❑ Partnership ❑ Trust/estate ❑ Limited liabitiz'y raornpany. Enter the tax olassiftoabon (C.0 corporatkan, S=S c rourat'ion, p�.Partnsrsh p) ► Notes Check the appropriate box in the Pine above for the tax cl (k aliora daa �skngpter r ua kamr ownear. Do no LLC if the LLC is classlked as a single-mornber LLC that is di�,garded from the owner -unless the owner D the t check to another LLC that is not disregarded from the owner for t„1.S tedoraf tax purposes. wner nt e« a he Owner Of th Lt.0 trial is disregarded from telae owner should check the appropriate box for thea tax Osss6tickhera of kis owner. Other (see ins€ru ntin—w r - --ab Vnumoer, street, and apt, or suite no )„) 75 Koppie Drive to tarty, stale, and ZIP code Gilberts, IL 60136 Enter your TIN in the appropriate box. The TNN provided must match the name given on line 1 to avoid backup wlthfrotding, For Individuals, this is generally your social Security number (SSN). However, for a resident alien„ sale proprietor, or disregarded entity, see the ustruotiolls lot, Part 1, Nater, For other entities, it Is your enlployer identification number (ENN). If you do not have a number, see How to get a TIN, later, Note: If the account is in more than one name, see the instructions for line 1. Also see What Name and Number To Give the Requester for guidelines on whose number to enter. name Give Form to the requester. Do not send to the IRS. 4 Exemptions (Codes appty ronly to certain entities, not iaada`vt'duais, sere instrue6ons On page 3)„ Exempt payee code (if any) Exemption from FATCA reporting code (if any) (Applies fo ---ft maintained outside the U.S.) Certification Under penalties of perjury, I certify that: 1. The number shown on this form is my correct taxpayer identificatfon number (or l am waiting fora number to be issued to me), and 2.1 am not subject to backup withholding because: (a) l arra exempt from backup withholding, or (b) I have not been notiffesf by the Intenaat Revenue Service (IRS) that f b subject to backup wltltPaoidang as a rarssult of a failure to report alt interest or dividends„ or (o) the IRS has notN'lad me that N acre no longer subject I backup withholding; and 3.1 am a U.S. citizen or other U.S. person (defined below)„ and 4The FATCA code(s) enterer,} on this fort (if any) indicating thatt aril exempt from FATCA reporting is correct.. Certification Instructions, YOU Must cross out item 2 above if you have been notified by the IRS that you are currwltl',y subject to backup withholding because YOU have failed to report all Interest and divt'dencis on your tax return. For read estate transactions, Item 2 does not apply. For mortgage interest paid„ acquisition or abandonment of secured prop”, canceRatlon of debt, Contributions to an individual retirement arrangement ('IRA), and generally, payments Other than Ingest and dividend's, you are not required to sign the Certification, but you must provide your correct TIN. See the instnactuons for part 11, lata. Sign Signature of Here I U.S. person b, rr I/ Ff c . General Instructi&ns Section references are to the Internal Revenue Code unless otherwise noted. Future developments. For the latest Information about developments related to Form W-9 and its instructions„ such as legislation enacted after they were published, go to www,drs„gov/FormW9, Purpose of Form An individual or entity (For r n W-9 requester) who is required to file an information return with the lRS must obtain your correct taxpayer identification number(TIN) which may be your social security number ( 'SN)„ individual tAxpayyer identification number (ITIN)„ adoption taxpayer identification number (ATIN), or arnployer Identification number (EIN), to report on art Informatiort return the amount paid to you, or other amount reportable on art information return. Examples of information returns include, but are not limited to, the following. • Form 1099 -INT (interest earned or paid) Date b- Aird 22r 2024 • Form 1099 -DIV (dividends, -including those from stocks or mutual funds) • Form 1099-MISC (various types of income, prizes, awards, or gross proceeds) • Form 1099-B (stock or mutual fund sales and certain other transactions by brokers) • Form 1099-S (proceeds from real estate transactions) • Form 1099-14 (merchant card and third party network transactions) • Form 1098 (home mortgage interest), 1098-E (student loan interest), 1098-T (tuition) • Form 1099-C (canceled debt) • Form 1099-A (acquisition or abandonment of secured property) Use Form W-9 only if you are a U.S. person (including a resident alien), to provide your correct TIN. If you db not return Form W-9 to the requester with a TIN, you might be subOct to backup withholding. See What is backup withholding, later'., .......... Cat. No. 10231X Form W-9 (Rev. 11-2017) „^ DATE (MMIDDIYYYY) �: CERTIFICATE OF LIABILITY INSURANCE 10/9/2023 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW, THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED„ subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s . PRODUCER company Assurance, a Marsh & McLennan Agency LLC com an C AC' ,NAME ..,.,..... ...90ti 137217 ............. ...._.. _. .,.,. _.,Ic',PL,.`I7.�� 440 91........, .., ONES ( 30 647) 20 North Martingale Road Suite 100 EMAIL _A1?Pf Betharn Morns ars MA colTT NA Schaumburg IL 60173 rNSURFRIaiITVFiiC8111NGCovERAGE Ica 7/8/2023BY 506- 907222-3 2024 INsuRERA United States Fire In Urance C 21113 ...... __. �..,................ .... i LCLi •02 INSUR11 E.D�������. �_��������_ ........������� _. _. _... .. 21.105 w , INSURER North River IR'tS.mm.I°''.fD. ...,, .. Copenhaver Construction, Inc. Insurance 38776 75 Gilberts IL 60136 dNSU EiRid... t!I y_Nat q� alllns„urance COM _ ...... m. .w_....... 38..91.1 ....w. XCU included ..--.. - Uincl.._. .,_.. ......... ..u,.. .......... µPI�LbJISL Pr:RS;'SNAt,„ &ADV INJURY $1,000,000 .........,. INSURER F COVERAGES t-rmi riwklC muU1w1OGr%-tuu ruVVu BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS INDICATED. NOTWITHSTANDING ANY REQUIREMENT, INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE ES. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AVE BEEN REDUCED LIMITS SHOWN MAY HAVE . _ PIDB ..., .. ..W.......,..� ..,, .... .... ........ ........ . .._.rvPE OF INSURANCE ADOL S CLAIMS ......., a _,..... . .. POLICY NUMBERw V EXP tY YYY LIMITS LTR A X COMMERCIAL GENERAL LIABILITY 7/8/2023BY 506- 907222-3 2024 EACH ¢"PC�""ULtRPNCE $ IpI CLAIMS -MADE X. OCCUR � iV"xibraaa^m�sblsmmr $1i L1 0Cb0 X. -i .... „ MED EXP (Any one ry22 $ 5 000 .l ..... XCU included ..--.. - Uincl.._. .,_.. ......... ..u,.. .......... µPI�LbJISL Pr:RS;'SNAt,„ &ADV INJURY $1,000,000 .........,. $ 000,000 OENrRAL ACC” kdC ,ATE... GEN'L /c¢,. G REti� AVE LIMIT APPLIES PER: an✓ PRO-1 V ROfbUf C S C%YMPgOVP AGG $ 2,,000 000........, ....._ POLICY JET �---_I LOC ., OTHER: A AUTOMOBILE LIABILITY 506-907222-3 7/8/2023 7/8/2024JF C"ibMEiu�JF O Lwftl�dULE V R LVCT 000000 ..X- (Per person) LY INJURYon) $ ANY AUTO ..00DL.....w-,. w . ........ ........ ..._....... _.. OWNED SCHEDULED ( accident) BODILY INJURY Pe n[ $ ......... AUTOS ONLY ........_ AUTOSROVr„1RTYAMAGLacc F $ X HIRED X NON -OWNED 0 arq,. 1 .... ... F -' "''„ AUTOS ONLY AUTOS ONLY 6 X UMBRELLA LAB X OCCUR 582-121676-7 7/8/2023 7/8/2024 EACH OCCURRENCE $10,000,000 .... EXCESS LIAB CLJOM�S„MADE AGdaVTL GAT V .., `6....i(& 000 000_.., ..,.., ..._, &TVOfYS — X...HAa„,C&DEN°f S C WORKESCOMPENSATION INS-WCP0001127 7/8/2023 7/8!2024 TE R AND EMPLOYERS'LIABILITY YIN EL EACH $1, OOO DDrJ R.NP.dt;R'i"C-3LDED?,E,CtG�,l'9?J'E ARI°I"ICER' .., tS&^rtCCRd'd!JEMBIEFCEXCLUDED? EMS FN N / A .» SE - EA EMPLOYEE E L DISEASE $ 1 ,000000 (Mandatory in 14H) ._...... �.,,�..µ . „�...,.. � .. _� .......,. .. -. If�x s atn5su,ahtue nandtnr e'PERA'T*NS E.L 01SEASE • P V.1LACY' LIMIT $1,000,000 i'7ESCRIr�i iC 7 OF bekls 475,000 D Leased/Rented Equipment MNP 1080598-50 7/8/2023 7/8/2024 1-Imil niit 620,000 Installation Floater DESCRIPTION OF OPERATIONS / LOCATIONS I VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) RE: Proof of Insurance Af-011I SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Proof of Insurance AUTHi)R72EDREP E T TIVE 'k � G -- ......, ...,wr Amon rnDDAD ATInki All riaht. rPCArvp_d ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD File Number 6334-748-5 0 To all to whom these Presents Shall Come, Greeting'. I, Alexi Giannoulias, Secretary of State of the State of Illinois, do hereby certify that I am the keeper of the records of the Department of Business Services. I certify that COPENHAVER CONSTRUCTION, INC., A DOMESTIC CORPORATION, INCORPORATED UNDER THE LAWS OF THIS STATE ON FEBRUARY 19, 2004, APPEARS TO HAVE COMPLIED WITH ALL THE PROVISIONS OF THE BUSINESS CORPORATION ACT OF THIS STATE, AND AS OF THIS DATE, IS IN GOOD STANDING AS A DOMESTIC CORPORATION IN THE STATE OF ILLINOIS. In Testimony ereo I hereto set my hand and cause to be affixed the Great Seal of the State of Illinois, this 23RD day of OCTOBER A.D. 2023 . Authentication #: 2329601032 verifiable until 10/23/2024 Authenticate at: https://www.ilsos.gov SECRETARY OF STATE Copenhaver Construction, Inc. Equipment List CoPenhaver Constructlon, Inc. Scheduts of Cont"Otoras Equipment 3/13/2022 Asaet Description _ 2022 Apprals9d Co "Pachon �IulPn"+ent Value Wacker Neuson Vibratory Plate Compactor SN 10866860 Model DPU6 546HEH Wacker Neuson Vibratory Plate Compactor SN Wacker TR82SC Shee P 10853499 Model DPU5545HEH S 5,og0,00 R 5 pfcot Roller SN 20157555 9,000.00 R 6 2012 Case SV212-pD Compaction Roller SIN DDDo01119 Wacker RD12A 1 TN Vbratory 16,000.00 R 6 Asphalt Roller SM: 20190327 2008 Ingerscii•Rand DD29 Tandem 49,000.00 R 4 Vibratory Roller - SIN: 196172 49" drum 2011 Wacker RD12A-W Vibratory Roller SIN 20012863 10,000.00 5,000.00 C 2 R 3 Wacker Hand Held Compactor WP1550AW SM; 3W 26964 1,000,00 Vib,Sheepsfoot 32" Roper S/N: 5641700 1,000,00 R 2 2006 JC8 VM 7Sn Vibratory Roller - OROPS ": JC81800589 69" Front Drum, Drum Drive, rear tires 4,Opo.00 of 1984 Cat Compactor SIN; 17 XW443 ,, 4 Wheel 38 Wide Padded Drums, levelln Blade 9 dR4Pe 20,000.00 'rota! Com pardon Equipment 65,000,Oa ----------.-„.,.._..., Hydraulic Excavator $ 195,o00.00 Komalsu PC88MR-1 I SN f 0083 Werk Brau 30' HD Bucket SN 6&30.107 Komatsu PC238USLC 11 SN 7759; E241,85 sco ES16161 24” GU B $ 115,000.00 .86 Komatsu PC238USLC- ueket; HN20018 Hensley 48112" 11 SN 8023; 186 Mona Boom 222000.00 E 19 E 16 2020 Komatsu PC210LC.11 SN C81116 w/ .24" 65 Cy HI Cap Bucket (3 feeth)1� 48 2,10 CY y 2013 JD 350C.,LC Excavator SNI 220,000, 00 160,000.00 E 17 FF350C 2011 John Deere 4500 Hydraulic E 18 Excavat�SN IFF ODXPBD914203 2017 Komatsu PC88MR-10 76,000.00 E15 S/N 8046 2004 JD 450c LC Excavator 85,000.00 E 14 SN CX091397 35" Pads,26" Bucket 2012 Kubota KXOOO 3 Midi Excavator 961000.00 E 6 S/N 25694 2014 Casa OX•160XL Excavator s/n DAC1 6NES6F1451 38,000fir dans 10' arm, 40" bucket, aux aullo, a/o 55,000.00 6s OQo.00 E4 pin on 2011 Cat 320DL Excavator SM CAT320DLBPNOW67 96` arm, aux hyd, a/c 1 bucket 2014 JD 350CL Excavator 85,000.00 E 2 _ 5/N 1FF350GXEEES09W 77,00x# class, 2.75 Cu Yd Med Ann, Quick Coupler, 2 Buckets 60,000,00 E 3 2012 Casa CXI ator SIN tIN F11a7 3 0t1 cl DAC1 Quick Coupler, Auxiilary Hydraulic 12 , . Cu Yd Med Arm, 110,000.00 2016 Case CX160C Excavator $IN a DAC1 SNFS6F1542 38 Arm- Quick Cou r class, 1.2 Cu Yd Med P� „Auxiliary Hydraulic 65,000,oa E 5 2013 Case CX146C s/n: DAC145K6NDSAE1207 31,50o* class, 1.0 Cu Yd Med Coupler 95,000.00 E 1 Arm, Quick 2007 JD 3600 Excavator S/N; FF350DX806922 72 2'75 Cu 90,000,00 E 5 Yd, Med Arm 2006 Komatsu P027MR-2 Mlni Excavator E 10 SIN: KMTPG 120TO6oI6l 11 2008 Komatsu PCISOLC-leo 65,000.00 Excavator- S/N: K46151 12:000.00 Ell 2006 Case Excavator C S/N DAC291347 65„000 * Class 45,000,00 E 12 2.15 Cu Yd Long Arm Aux Hyd 2006 Kot el+ o SK1641LC Excavator - SIN YM'OSUI357 37 Quick Cou�rler, Aux Hyd class„ 1,0 Cu Yd Long 40,000,00 E 13 Anna, 2006 Takeuchi TBI 76 Excavator SIN 17515104 30,000,00 Total Hydraulic Excavator 18,000,00 3 1,827,000,00 Copenhaver Construction, Inc. Schedule of Contractoes Equipment 3/13/2022 Asset Description 2022 Appraised e Vah1e 1 Loaders A Dozens & Komatsu WA270-8 Wheel Loader SN A29467 w/ Fork ZZ19271 96" X72" Tines; JRB JR21037 3,0 Coupler 99 New Holland LW13o Loader wl2 314 Yd a 1/4' Bucket SN 605328 176,000,00 c D 2 MS992 GPS Receiver - CoWrol Box • Mast Kit 30,000.00 9630 Track Loader - S/N LCSO1076 25,000,00 D 3 GPS - M$992 for now Dozer 901000.00 2013 Cot 06T LGP Crawler Tractor. S/N: CAT00D6TJKS601361 6,0 Cu Yd 6 -Way Dozer Blade, DROPS„ 36" SBG Track Shose, EROPS, CIPS 30,000.00 D 1 Equipped OPS - MS992 R00010f top rlew Dozer 125,000.00 L4 2016 Case CrOwj#r Dozer _ I IWM - SM: NFDC1100a 6.0 Cu Yd 6 -Way Dozer Blade, CROPS, 36" SBO: Track Shoes, EROPS, GPS Equipped 30,000.00 LI 2003 JD 624H Wheel LoaderSlN6,2 4H 3,0 Cu Yd Buokof, Forks, Qulclk Attach, CROPS„ 20,6x25 Tires 160,000,00 L2 2012 621 F Case SM: NCF216059 3.0 Cu Yd Bucket, Forks, Quick Attach, CROPS, 20,5x25 Tires 36,000,00 1_5 7012 Case 621E Wheel Loader - SIN NCF215217 3.0 Cu Yd Bucket, Forks, Quick Attach CROPS, 20„5X25 Tlres 76,000,00 D6 2011 Kubota Loader SIN 02012 88751 Utility Wheal Loader, 1.0 Ou Yd Demote Hydraulics OROPS 75,000,00 18,D00,00 L3 2W John Deere 660J 6 -way Blade -SIN 6 127487 2.3 Cu Yd 6 -way Dozer Blade, OROPS 0 D4 2011621E Case W l Loader w/Forks- S/N NSF2106$6 3,0 Cu Yd Bucket, Forks, Quick Attach, CROPS, 20,6X25 "Tires 45,000.00 2008 Cat 9638 Crawler Loader - S/N: 9BLO2249 2.6 Cu Yd Bucket, EROPS, 22” DBG Track 75,000 00 I Shoes Total Loadem A Dozers 30,000,00 S other Equipment 11008,000,00 SwoeperAttachment B072" SN 783750532 Gas Pressure Washer Model CWC7004 S/N: 11072409 6,000.00 Vibratory Plate WAC WPI6550A SN 11273776 7,000.00 Pao Van 16' Container SN 4716636 2'000'00 Pao Van 16' Container SN 4716540 4'0001 Covalen Pump, Panels 4,000,00 Honda Generator FM3600GX 5,000,00 Chicago Pneumatic CPS 185 KD7T4 Air Compressor SN HOP030585 600'00 2017 Bobcat 72" Sweeper Attachment SN 783741673 10,000,00 2016 Lil Beaver Wood Splitter 4,000,00 - 2011 Yale GLCO80 4550 th Forklift SN E816V03996J 12,000,00 72" Bucket for 470G SN 201340 7'000'04 Forks for Skldsteer 8,000.00 Trimble $603 DR 200+ SE -18211 SN 63325125 500,00 76" TAO GP Bucket w/2 new Pins for Model P0450/PC400 SN $617501 31000.00 2018 FrontierSS2067B Broadcast6,000.00 Spreader SN 1XFSS206PJ0353404 Lights - Diesel S/N 5N 3131414F1004872 Model WAN-WLT-4maK 1,000,00 Paving Breaker- Elecido Model BO BH2760VCB S?N 801000370 4,000,00 1,400.00 Copenhaver Constmovon, Inc. Schedule of Controclor"s Equipment 3/7.3/2022 2022 Appraised Asset Description value Symons Forms 20,000.00 Total C4her Equipment $ 264,000.00 Skid Steer Loader S13 Hydraulic Hammer CP RXS SIN BES0971133 6,000.00 2021 Cat 299D3 Track Loader SN: DY903822 Plug, Sleeve wI30' Inflation Hose d, Guage SM 314-405.OD4 SIN 323-30-063 2,000.00 2019 CForos4o0 ATV SN LCELDS222K6000373 4,000.00 3" Centrifugal Pump Honda Tsuruml NPH --3 60x.00 S24 3" Cenbffugal Pump Honda Tsuruml TE3�0HA 142GPM 500.00 2014 Case TR320 2 speed Loader SIN NEM482716 Pontoon Boat 1,000,0O 81 JD 450 68" Bucket 4,000.00 2009 Bobcat S300 Skit Steer SIN: ASGP35021 Cat 320B 54" Bucket - HES Equipment 3,000.00 S6 PC460 46" Bucket - HES Equipment 2,000.00 2010 Bobcat T300 Mulfl Terrain Loader - SIN: A5GU36$94 Saw Model FS7000 DUE SIN 001358572001 w/ 7 blades 26,000.00 H 1 2016 Ranger XP 900 EPS , SIN: 3NSRTE870GG815431 13,000.00 2008 JO 325 Skldsteer Loader SIN: T00326MI82857 2005 Ground Heater EB36M Troller - SM; 1GOUP15236S201275 18,000.00 T15 2015 FRD (KFi9) Hydraulic Breaker #4982 20,000,00 T 14 25KVA Multfqulp Generstorw1180 Gal Troller SIN: 7108526 5,000.00 C1 25KVA Multlqulp Generator w/180 Gal Troller 51000.00 Sullair Green 185 CFM Air Compressor SIN: 201206270061 6,000.00 36 WO" Portable RadlaI StochIng Conveyor SIN: 13316 6,000.00 L 1 1997 Rosco R848 Ride on Broom SIN; P8049A69 6,000.00 4 Light Towable Light Tower - SIN: GKF22210 2,ODO.DO 1991 Powerscreen MKII 11 SM; 3204518 30,ODO.00 Symons Forms 20,000.00 Total C4her Equipment $ 264,000.00 Skid Steer Loader S13 2021 Cot 29903 Track Loader SN; DY903813 S16 2021 Cat 299D3 Track Loader SN: DY903822 2016 Cat 299D Track Loader SN 664 2017 Bobcat t 760 Track Loader SN AT&T12208 825 2015 Bobcat 5750 2 spd Skid Steer SN ATDZ15112 S24 2014 Bobcat S750 2 Spd Skid Steer SIN ATDZ14396 82 2014 Case TR320 2 speed Loader SIN NEM482716 83 2013 Bobcat 3560 2 SpesdSkidstser Loader - SIN; A3NV20667 81 2012 Cat 299D Terrain Loader SIN: CA60299DEHCLOO467 S22 2009 Bobcat S300 Skit Steer SIN: ASGP35021 S4 2011 Bobcat S660 Skidsteer Loader SIN: A3NV15396 S6 2011 Case SR260 High Flow Skid Steer - SIN JAFSR260PBM434141 S6 2010 Bobcat T300 Mulfl Terrain Loader - SIN: A5GU36$94 S7 2010 Cat 262C Skid Steer S/N;CAT0262CEMST02719 Be 2011 Cat 289C Multi Terrain Loader SIN:JMP01974 so 2008 JO 325 Skldsteer Loader SIN: T00326MI82857 S i 1 2009 Cat 299 C - SIN JSP00746 516 2006 T300 Bobcat SIN: 532014104 S23 2004 Bobcat T300 Crawler #E626411627 S20 2001 Gehl SL7600 $kldsteer SN 701068 Total Skid Sher Loader $ 80,000.00 80,OD0.00 40,000.00 35,000.00 25,000,00 25,000.00 25,000,00 20,000.00 20,000.00 20,000,00 16,000,00 25,000.00 15,000.00 15,000,00 20,000,00 12,000.00 15,000.00 18,000.00 16,000,00 5,000.00 $ 525,000.00 m f Copenhaver Construction, Inc. 5ohedule of Contraatoft Equipment 3/13/2022 2022 Appraixed Asset Description ,,talus. .w.......w_e�__�....m Measuring Equipment GL -2706 Sewer Laser 5M. GW 1381 $ 1000.00 Sewer Laser ZOP01300 1,000,00 Total Measuring Equipment $ 2,000.00 i Cram Demolition Overhang Box $ 12,000.00 U ICE Model 26 Vibratory Driver SN V13167w/360 P&ftr Unit P06425 81400 Clamp C09608 440,000.00 ICE Model VD -40 Vibration Dampener 26,0D0.00 2014 16010 Mantis Crane SN 150-165 $30,000.00 Timber Mat 60 -12" X 48" X 20" for Crane 20,000,00 Total Crane $ 627,000,00 Finisher Gemco C466 -X Flnlaher $ 140,000,00 Gomaoo Spannit 2000 Bridge 12,000,D0 Rails for Gomaco Finisher 10,000.00 Total Finisher $ 162,000.00 Safety Emergent Safety Equipment $ 7,000.00 Minotaur Giant I Beamer 1,000.66 Angel Wing Seskets (2) 24'X 57" X 65' 5,000.00 Tow Safety $ 13,000.00 Attachments Werk Brau 36" Pavement Removal Bucket Wei2PRI336 SIN 0023226-1-1 $ 5,006,00 2018 Woods SU164BT Roller SN 1226796 3,000.00 Trencher Attachment 5,000•DD JBR 60" Wheel Loader Forks 3,000.00 j SEC 2 OVER TINE GRAPPLE FOR CAT $45 4,000.00 24" GP HI CAP Bucket - SM: 13090-01 2,D00,D0 Esco Bucket Model #"'PC17D - SN # 17.46-42 2,000•00 24" HD HI CAP BUCKET- SM: 1118340-01 2,x.00 24" Bucket for John Deere 200 - SIN: 40557-1 1,000.00 Geith 24" HD Bucket for JD 200 Exo - SIN: 458887A 1,000.00 48" Cat 320 Suc kel - SM: NBC07669 2,000.00 54" Bucket for 350DLO SIN. 61658-1 2,000,00 John Deere Quirk Coupler 2,000.00 18 x 56 Hyd Thumb 1,006,00 Breaker TNB-4MB SIN W4M-4510 2,000,00 36" PC36 Heavy Duty Bucket- SIN:C36-36-73 600,00 36" Bucket for Cat 345C Excavator - SM: OZIK11366 2,000•00 HT2458 Hydraulic Thumb Cylinder 1,000,00 p Kent KF6 Skklsteer Hammer SM 13130 3,000,00 Copenhaver Construcilon, Inc. Schedule of Contractor's Equipment 3/13/2022 2022.Apprahwd Asset DescripUGn Vow BUCKETaiEAVY DUTY 1,000.00 2 each 84" buckets M12011AA1201 and pallet forks 83264183266 2,000.00 Hydraullo Hemmer CP RX6 SM BESO41523 2,000.00 Planer 24' Hlgh Fkrw BC 24' HF SM 231712853 21000.00 Sweep Brush MN: 20572MM22 SM; 1431040 2,000.00 2016 AJLR 48' Hydraullc Skklshmr-trencher11000.00 4 each - 46"Skid Steer Fork Frames 11000.00 Harley MX7H Power Box Rake SM: MX77A126 1,000.00 2-Pellett Folks - SM's 63973 &43033 / Buckets • SM's None 2,000.00 Kent KF6 Hyd Breaker - SIN: 9440 2,000.00 Bobcat Sweeper 600.00 2012FFC New Holland 42" Tree Spade S/N:1216204 1,000.00 Bucket FOR 297 500.00 G72 Skid Steer Brush Grapple, 1,000.00 20M Bradco 625 Trencher (per C 2,000.00 Harley 72' Power Rake SN M X78AD081 5,000.00 24" Auger 2,000.00 Total Attachrnents $ 71,600.00 I Copenhaver Construction, Inc. Schedule of Contractor's Equipment 3/13/2022 2022 Appraised Asset Description Vakw Support Equip 6,000-00 Twin Post Hydraulic UR FOWDP�I&SND00 $ 4,000,00 ri8M 1 Wrap Rebar Tying Tool 012B18503E 500.00 #8X#9 1 Wrap Rebar Tying Tod #12G10504E 600.00 146 each 28" Cones 500,00 150 each 28" Cones 600.00 20 It Shipping Container S/N, BNGU208054S 1,000.00 20 Fl, One Way Container - S/N DSZU2034862 1,000.00 20 Ft, One Way Container - STN; DSZU2036107 1,000,00 20 Fl, One Way Container - S/N: DSZU2035030 1,000,00 20 FL One Way Container - SM: DSZU2034883 1,000.00 2007 Sod Cutter 1,000.00 2008 Indeco HP 3000 Concrete Breaker S/N: 1666 6,000.00 1395' Rock Box 2,000.00 Eft 81n x 13ft Rock Box - $2,688.13 2,000.00 Hercules D19 BO' x 27' Leadslliammer SN 1106611 10,000,00 Correct DI OM leads #1106611 10,000.00 Alum trench shield, Telescoping Adj struts, ATS Pins & KeepeT 2,000,00 ArrowBoard SM: 6F1151016131226439 3,000,00 ArrowBoard SM; 6171181016BI000285 3,000.00 AT-MPS30A Braker VX 4-1/4" SIN: 124212 2,000,00 AT-MPS30A Breaker 1"X 4-414" SM: 124214 2,000,00 100 - Orange Barrels 1,000.00 100 -Type 1 vwl Flasher 1,000,00 100 -Type 1 w/ Flasher 1,000,00 12 - Type 111 Barricades 1,000.00 Bardoades 1,000.00 Barricades 1,000,00 Barricades 4,000,00 Barricades 1,000.00 Barricades 1,000,00 Type 4 W/Flashers - Barricades 1,000.00 Sign/Barricades 1,000.00 100 Traffic Barrels w/ lights & Tire Rings 6,000-00 200 Traffic Barrels w/ lights & Tire Rings 12,000.00 35 slgns - 10 RCA; 40 Men Working, 10 Detour, 5 Flogger 5,000.00 35 signs - 10 RCA; 10 Men Working, 10 RT Lane Closed, 5 Flagger 6,000,00 Concrete Equipment - From Stetiner 11000,00 Concrete Forms 1,000,00 Concrete Forms 1,000.00 12'-6" Concrete Barriers w/Connecting Pin 1,000, DO Coupler, Fork, Carriage, Blanks 6,000,00 k copenhaver Construction, Inc. Schedule of Contractor's Equipment 3/13/2022 2022 Appraised Asset Description Value Double Wall, Spreader Pipe & pine 2,000.00 Forming Equipment- Dayton Superior 1,000.00 Gas Pressure Washer Model MITM CWC7D04 S/N:971013206 1,000,00 GME 81-7 Rock Box SIN 09041366 2,000.00 Grundomat 76P Boring Tool SIN P76625SI0220 2,000,00 Hammer Drill 1,000,00 Kubota RTV900 04 Utility Vehkde - SM; KRTV90OA51036358 2,000.00 , Lendprlde Cutter Model RG2512 - SM 695228 1,000,00 Mustang Plate Compactor 1,000.DO u Plate Compeotor - Mulllquip 1,000,00 Plate Compactor - S/N: No62012007 1,000,13 Plate Compactor - SIN: 30006441 1,000.00 Plate Compactor 15.6" x 25" SIN: 6702859 1,000.00 Plate Compactor SIN; 282012516 1,000.00 Purchase 24" x 310" Panel 1,000,00 Q.T. Signs - Signs 1,000,00 Sandblaster SCH 3,5C SM; 1 BL4487 1,000,00 Scaffold BrktlStralght Plate 1,000,00 Stone Saver 48"x64"x160', 5,000lbs - SM: 20208 2,000,00 Steel Plate 8'x20'xl"- SM: SX20XiSP 1,000.00 Steel Plates 1,000.00 S'x10'x1" Steel Plates, Trench Box eto.. 1,000,00 N 8x10x1" Street Plates 1,000.00 8'x20' Steel Road Plate - $14,430,08 2,000,00 exsxi" Street Plates 1,000,00 8'x8'x1" Street Plates - 88-003188-0134 1,000,00 2 EACH - 8'X20'X1I Street Plates - 820-009/820-008 2,000.00 Street Plate 8X20'21" SM: 8X20X1SP-006 1,000.00 Street Plate 87(20'X1" -SM: OX20XISP-006 1,000.00 Street Plate VX20'X1" � SM: 8XMX1 SP -251 1,000.00 Street Plate 8'X201X1" SM; 6X20X1SP-021 1,000,00 Street plates 1,000,00 Street Plates 41X8'X1" - SIN:4X8X1SP-029 / 4'X15X1" - SIN: 4Xi6X1 SP -001 1,000.00 Street Plates 8'XS%l" SM: 8X8X1•SP-0071601X8" SIN: 4 -613X8 -D42 i,000,00 Streetplates, manhole shield, Spreader, pin, 8 keeper 1,000.00 TralkAazer 325 Welder and Accessories 2,000.00 Trallbiwer Welder - SIN MD040428R 2,000.00 Honda WT30XKA S#V WABJ-1107218 1,000.00 Sub -Pump - SM: B-10832933 1,000,00 Trash Pump (Teuruml EPT3-10") SIN: 031992 1,000,00 4" Self -Priming Trash Pump (Sykes) w/T'raller SIN AP12091 and accessories 10,000.00 10 Ft X 8 Ft Trench Box 2,000,00 10 Ft X 8 Ft Trench Box 2,000.00 copenhaver construction, Inc, Schedule of Contractor's Equipment 3/13/2022 2422 AppOlsed Asset Description Value Trenc Box a A sorles 5,00D.00 Trench Box. Double Wall - SIN; 30129 6,0M.GD Trench Box Double Wall, Spreader pipe, Spreader Pin 8 Keeper 6,000.10 Trench Box with Accessories 6,000.00 Trench Box, Stack pins, Spreader Pins d Keeper 3,000.00 Trench Boxes 3,000.00 Trench Shields and Misd(see invoice) 3,000.00 Truax Flexll-86 Drill Seeder 6,000.00 Used 12'-6' Barrier WtPins 1,000.00 Walk Behind Concrete Saw, 1,000.00 W 2 2016 Mulllquip Arc Weider 400 Amp Dual Operator 2,000.06 W 1 2007 Miller DU -OP 600 AMP Portable Welder SM: LHM 3106 2,000.00 211,OOD.00 Total Construction Equipment $ 4,805,600M Copenhaver Construction, Inc. Schoduk of Contractor's Equipment 3/x.3/2022 2022 Appmised Asset Description Value Dump Trucks & Flatbeds 2017 Kenworth T980 SN 1NKZLPDX7HJ162300 $ 120,000.00 20119 Ford F4508D SN 1FDUF4HT1KEG67795 45,000,00 2013 Cat CTS60 Day Cab Truck Trador SN 1HSJKTKT8DJ239603 20,000,00 j 35 2006 Ford F650 SIN: 1 FDAF68P66ED36070 2.0 Cu Yd Dump Body 10,000,00 S4 2004 Chevy Sllverado White -VIN: 1G13JC340O4E224201 2.0 Cu Yd Dump Body 4,000.00 so 2000 Sterling Duran L9511 - SIN 2FZNNWEBXYAS40809 TIA Truck w/13 Yd Dump Body 25,000.00 28 1999 Kenworth T300 VINA NKMLD9X4XS816217 Flatbed Truck 12,000,00 27 2004 Ford Super F450 DRW - White - VIN: 1 FDXX46P44ED65095 2.0 Cu Yd Dump Body 6,000,00 m 26 2005 Volvo Dump - VIK 4V5KC9GHX5N377347 TIA Truck w/13 Yd Dump Body 30,000.00 w Total Dump Trucks 6 Flaffieds S 272,040,00 Trallem 2019 PJ Rondo 83X1814000# 2 Axei Trailer SN 3CVCC1823K2593816 $ 4,000,00 2019 Eager Beaver 25 TN Trailer SN 112HAX365KLOM56 23,000.00 2017 Eager Beaver Troller 25XPT SIN 112HAX3551-11-081638 22,000,00 T 13 2007 Ravens Metal Flatbed Trailer SN IR1F445237K570488 6,000.00 T 12 2014 PJ Rondo W)(20'14000 #4PBF82022EI 214902 3,000,00 T16 2013 Atlas Trailer SIN! 5HCKU1423MO28670 2,000.00 T 2 1997 Belshe 96)23 25500 #GVW Trailer - SIN 16JFOI 823VI 030039 3,000.00 T 3 2011 PJ 83xi4' 70000 Trailer - VIN; V5U8142282164850 1,000.00 T 4 2008 P.J. Trailer- SIN: 4P5F642281113714 1,000.00 T 5 Gooseneck, Tandem Axel 18,000.00 T 11 M Homemade Hydro -Seeder Trailer Mn: TD285842 2,000,00 2008 Eager Beaver Troller - SIN: 112H8V3206LO73937 Tandem Axel, Dual Wheel, Air Brakes, T 6 Beaver Tall 8, Ramps, 20 TN 9,000,00 T 7 2005 Cargo Mate Trailer - SIN; 5NHUCM42MO50270 (Green Enclosed Troller) 2,000.00 T10 2004 P.J. Trailer 04P5DE202641062399 1,000,00 96,000.00 VehlGle 2022 Ford Bmnoo SN IFMDUDH5MLA90469 $ 65,000.00 43 2021 Chevy Sllverado 2600 HD 4X2 Double Cab SN 1GB2WLE74MF232236 50,000.00 2021 Chevy Sllverado 2500 HD 4X2 Crew Cab SN 1GB4WLE79MF192937 50,000.00 2019 Ford F250 Super Duty SN 1 FT7W2BT6KEF99119 60,000•00 41 2019 Ford F350 XL Crew Cab 4 X 4 SN 1 FTBW386XKEC71478 30,000,00 2015 Ford F-450 SN IFDUF4GT4FED71953 18,000,00 2012 Ford Taurus SN 1FAHP2EW4CG121977 5,000,00 118 2012 Ford F360 XL SNiFD8W3GT6C1=A8W72 18,000.00 39 2012 Ford F350 SD SN 1 FT7W3ATOCEA17976 17,000.00 42 2012 Ford Fi 50 04 Crew Cab sin 1 FTFW 1 ET9CFA78778 9,000.00 33 2012 Ford F450 XL Super Duty Flatbed s/n 1 FDUF'4GYXCEC50755 12,000.00 Copenhaver Construction, Inc. Schedule of Contractor's Equlpnwnt 3/13/2022 2022 Appraised i 2022 Total $ 5,751,500.00 Asset Description Vakw N 37 2016 Ford 11250 SIN 1FTW2866GE554971 20,000.00 0 2012 GMC Denali Black SN 1GKS2MEF2CR113184 20,000.00 16 2008 Ford F550 White 993046,87- SIN 1FIDAF571168EC59199 10,000.00 40 2008 Ford F550 Red 6AL VB Diesel SM 1FDAF56R68ED75021 10,000.00 2010 Chevrolet Express G3500 Van 5,000.00 3 20i4 Ford F250 XL SuperDuty Crew Cab 4X4 Pickup SM iFTTW2667EEAD7807 10,D00.00 7 2011 Ford F250 XL SuperDuty Extended Cob 4X4 Plokup SIN 1 MX2B60BEC69029 7,000,00 f 4 2017 Ford F450 - SM VDTF4GT1 HE615199 32,000.00 8 2012 Ford F350 Pickup SIN IFTBX3B610EC95361 12,000,00 2 2014 Ford F250 White - SM: 1 MX2668EEA14911 12,000.00 ; 5 2013 Ford F260 White - SIN: 1 FT7X2WADEA61419 11,000.00 11 2011 Ford F260 Silver- SM: iFT7X2B6XBEA64284 10,000,00 10 2011 Ford F260 4A Crew SM: 1FT7W2683BEC95143 8,000.00 17 2006 Ford F4604A MIliyTruck SM: 1SFXF47P46EA70956 7,000.00 g 2015 Ford F350 - While - VIN: 1FT8X3B61 FED25737 Pick up Crew Cab, 44 SD 22,000.00 15 2012 White Chevy 1500 Crew - SIN 3GCPKREA6CG223075 Pick up 12,000.00 13 2008 F250 XL Red 4x4 Plok Up Vin: 1 FTSW21528EB24914 Plc k up 4X4 5,000.00 14 2008 Chevy 2500 Pick up SIN: 1GBHK23KOBF223528 Pick up 02 31000,00 1 2014 Ford F260 Super Black - SM: 1 FTIMMEEB32660 Pick up Crew Cab, 4x4 SD 16,OOD,00 19 2014 Ford 11250 Super White - SINA FTM2868EEM049 Pick up Crew Cab, 4x4 SD 16,000,00 21 2001 Ford F-250 White - SM: 3FTNF21 AW86939 Pick Up Truck 2,000.00 12 2011 Chevy Silverado Red -VIN: 1GCNKPEX7BZ438289 Pick Up Truck 4,000.00 $ 578,000,00 Total Vehicles, Trallers, Trucks & Flatbeds $ M,O00,00 a 2022 Total $ 5,751,500.00 e Copenhaver Construction, Inc Summary of Category Totals Total CoImpaction Equipment $ 195,000.00 Total Hydraulic Excavator $ 1,827,000.00 Total Loaders & Dozers $ 1,008,000,00 Total Other Equipment $ 264,000.00 Total Skid Steer Loader $ 525,000.00 Total Measuring Equipment S 2,000.00 Total Crane $ 527,000,00 Total Finisher Equipment $ 162,000.00 Total Safety $ 18,000.00 Total Attachments $ 71,500.00 Total Support Equipment $ 211,000.00 Total Construction Equipment $ 4,805,500.00 Total Dump Trucks & Flatbeds $ 272,000.00 Total Trailers $ 56,000.00 Total Vehicles $ 578,000.00 Total Vehicles, Trucks, Trailers $ 946,000.00 2020 Appraisal Total $ 5,751,500.00 Copenhaver Construction, Inc. Similar Projects Project References Pond and Dredging/ Shoreline Stabilization C,OPENH,XVF,1-1 C O N S T R U C T I© N INC 75 Koppie Dr., Gilberts, IL. 60136 Phone (847) 428.6696 Fax (847) 428.6798ylpen y; .0f,@yah. )M Project References Pond and River Dredging/Shoreline Stabilization Fox Lake/Boating Access Improvements Cost: $387,850.90 Project: 8,000 CY Shoreline stabilization and harbor dredging, stone riprap, slope toe protection, shoreline stabilization and shaping. Contact: Gewalt Hamilton, Dan Strahan, Engineer, t,j�rlk'IrC Jlikr�G1"�+t4B (847)226-9335 Start: November 2021 Completion: April 2022 Fox Lake/Fox Waterway Agency - 2019 Site Improvements Cost: $513,175.00 Project: Metal Seawall, interlocking Type Z steel sheet piling, excavation, bank stabilization, CIP Concrete Wharf, CIP boat ramp removal and replacement, precast concrete boat ramp planks, concrete pad removal and replacement, site lighting and electrical improvements, erosion control, riprap, site restoration. Contact: Rob Bowman - Fox Waterway Agency, (847) 587-8540 x 1101 Contact: Alex Dye - Trotter and Associates, P.E. (715) 577-1777 1 Itt Completion: June 2020 Lake County Division of Transportation, Washington Street Shoreline Stabilization, Carpentersville Cost: $191,697.00 Project: Shoreline stabilization (800 LF) Gabion wall installation, drainage, cofferdams, vegetated concrete erosion control mat installation, earth excavation, porous granular backfill, stone riprap installation. Contact: Robert Gibbons, 224-246-3909 Completion: May 2019 Village of Addison/Westwood Creek Dam and Pump Station-Forebay & Spillway Restoration Cost: $418,000.00 Project: Westwood Creek dredging of approx. 3,000 CY of sediment and disposal of the dredged spoils in an upland offsite disposal area, remove invasive tree species, wetland restoration, geo-grid, clean fill, site restoration, testing, surveying. Contact: Rick Federighi, Village of Addison - Public Works, (630)620-2020 rfp-u' Contact: Christopher B. Burke Engineering, William Schultz, Engineer, jt„ (847) 417-7502 Completion: 2019 Village of Hoffman Estates/Stonegate Pond Restoration Cost: $358,100.00 Project: Stonegate Pond dredging of approx. 7,200 cubic yards, remove invasive tree species, wetland restoration, and new storm sewer utilities. Contact: W -T Civil Engineering, Chris Slykas, P.E., CFM (224)293-6333,4' y(J jC411ge�I Completion: 2019 Village of Buffalo Grove, Buffalo Creek Restoration Cost: $279,179.00 Project: Streambank stabilization of (1,500 LF), slope regrading, install three J -hook riffle structures and one cross vane„ installation of stone toe protection and vegetated geogrid, and a twenty (20) foot wide native vegetation buffer along with erosion control matting adjacent to the stream that will total 1.5 acres. Received APWA Lake Branch Project of the Year Award for Environment January 2020. Contact: Darren Monico, P.E. Village Engineer (847) 459-2523 Completion: November 2018 CDB #102-311-094/Illinois Beach State Park, Zion Shoreline Stabilization Project Cost: $1,370,419.06 Project: Dredging of Lake Michigan, approx. 33,000 cubic yards and furnish and install Armor Stone rock barrier wall, CDB Contract #14-0569-81 Contact: Justin Jessogne, P.E. d��, OP 11iG t0 Contact: Jim Underwood, CDB Executive Director, (217) 782-2864 Completion: 2014 City of Naperville/River Walk Renovation Phase 1 Cost: $1,543,570.00 Project: Dredging DuPage River, GEO TECH Installed, Seawall Installation, retaining walls, irrigation, cofferdams, dewatering, riprap, concrete, brick pavers, landscaping, fencing, and stone masonry. Contact: Bill Novak, P.E., (630) 918-5223y;tkb@I: l.I Completion: 2014 Village of Mt. Prospect/Kensington Business Park Retention Basin #5B Dredging Cost: $186,763.00 Project: Retention Basin Dredging, Business Park Basin #5B. Contact: Donna Brown, P.E. Public Works, (847) 870-5640,1JJ1 11,E :+itiplliStR Completion: 2014 IDOT 40 Contract 60108/Four Locations Kane/Cook Counties Cost: $1,264,110.00 Project: Des Plaines River dredging and excavation, cofferdam installation, rip rap installation in water, gab ions/stab ilization, and dewatering, by-pass pumping. Contact: Iggy Bangash (847) 846-4328, pv Completion: April 2012 Village of Mt. Prospect/Kensington Business Park Retention Basin #7 Dredging Cost: $161,432.70 Project: Retention Basin Dredging, Business Park Basin #7. Contact: Donna Brown, P.E. Public Works, (847) 870-5640 yif iMOpw ` - Completion: 2012 Village of Mt. Prospect/Kensington Business Park Retention Basin #4 Dredging Cost: $154,000.00 Project: Retention Basin Dredging, Business Park Basin #4. Contact: Donna Brown, P.E. Public Works: Completion: 2011 Fox Waterway Agency/Ackerman Island Cost: $ 467,000.00 Project: Fox Lake Dredging and shoreline stabilization, weir structures, restoration, earth excavation, concrete, and landscaping. (2008 APWA Lake Branch Project of The Year Award) Contact: Christine Pierson (847) 220-0810 Completion: 2008 21 Page Copenhaver Construction, Inc. Projects Currently Under Contract IDOT Affidavit of Availability SamO, own" LL 0 N z UJ UjW Z Q O ? U co Z O LIJ 0 �Wd o 0=a: uj 0 Aw rwwtw U z � Ld � UJ z O CL + 0 O U W Z W -o O 0) Lli re ° o W CL ry 0 � LLo� U Ui "0) : W sow � 0� y p y � 6W Q U Z' 0 z O raLU C OZ t U p LL O C: LU 0-W W Z n W�U o LL 00 " >- O �Zz0 0c p W 0 0 0 o 0 0 ` 00<0 o to ui ui ui vi ctq U o U) F U40c 603. r �� WT 5 Og u- U cfl W n -j �od � O Mo 0 O Z zo C: U7 CL WZ 1 W CA O J 0 W0 u., 0 W LL W LLI U 0 � LU — , �-O OV W O k- z t LN C7 o U () Z '� U> 0z�c LU w v Q vo= U y0 o :2 > 0)° yO � 4� w o z (D < �- `C �" � U ul a W U S U ti W 0) 0W' r N 7 N �] Q o O W uj O L() 0 r� �W� . O O O O Illinois DepartmentAffidavit of Availability UV of For the Letting of 3/19/2024 Tran (Letting date) Bureau of Construction instructions, Complete thea fonxr by aither typing or using black Irak. 2300 South Dirksen Parkway/Room 322 "AutboriyAtbn to Bid" Will not be Issued unless beth Sides of this form are Springfield, Illinois 62764 completed In detaail. Use addidoraal forms as needed to list all work. Part I. Work Under Contract List below all work you have under contract as either a prime contractor or a subcontractor, it Is requRed to include all panding low bids not yet awarded or rejected. Ina joint venture, list only that portion of the worst which Is ttus responsibility of your° company, 'rhe uncompleted dollar value is to be based upon the most recent engineer's or owners estimate, and must include work subcontracted to other's. If no work is contracted, show NONE. 1 2 3 4 5 Downtown Paver Bdoka 007.60X74 Alsip Acacia Acres Contract Number & Punt.. Brld a Flood Relief Contract With Crystal Lake IDOT Lyons TWP Estimated Completion Date 4/30/2024 10/2812023 11120/2023 Accumulated Total Contract Price 264,925.00 7,156,871.27 724,355.00 Totals Uncompleted Dollar Value If Firm Is the Prime 264.925.00 20,846.75 37,630.00 0.00 323,401.75 Value of All Work Part II. Awards Pending and Uncompleted Work to be done with your own forces. List below the uncompleted dollar value of work for each contract and awards pending to be completed with y0or own forces. All work Subcontracted to others will be listed on the reverse of this form. In a joint venture, list only that portion of the work to be done by your company. If no work is contracted, show NONE. Accumulated Totals Earthwork 20,850.00 20,850.00 Portland Cement Concrete Paving 0.00 0.00 Demolition HMA Paving 11,000.00 11,000.00 Clean & Seal Cracks/Joints 0.00 Aggregate Bases & Surfaces 0.00 Highway,R.R. and Waterway Structures 0.00 0.00 Drainage Electrical 36,000.00 36,000.00 0.00 Cover and Seal Coats Concrete Construction 143,900.00 143,900.00 Landscaping 4,175.00 12,156.25 16,331.25 0.00 Fencing 0.00 Guardrail 0.00 Seeding & Sodding 0.00 Signing Tree Trim/Removal 000 Cold Milling, Planning & Rotomilling 0.00 Pavement Markings (Paint/ThermolPoly/Urethane) 0.00 Raised Pvt Markings/Pavement Texturing 8,690.50 8,690.50 Misc. Bonds/Layout Etc. 49,000.00 49,000.00 0.00 Engineer Field Office Trainees/Trainee Training Program 0.00 0.00 Traffic Control & Protection Totals 264,925.00 20,846.75 0.00 0.00 0.00 285,771.75 Disclosure of this Infomratdon is REQUIRED to accomplish the statutory purpose as outlined in the "Illinois t�rocuremenr Loae . ranurc w uu-piy win result in non -issuance of an "Authorization To Bid." This form has been approved by the State Forms Management Center. Printed 3/21/2024 Page 1 of 8 BC 57 (Rev. 08/17110 Part III. Work Subcontracted to Others Fnr each rnntmd desrrihed in Part I. list all the work you have subcontracted to others. I, being duly sworn, do hereby declare this affidavit is a true and correct statement relating to ALL uncompleted contracts of the undersigned for Federal, State, County, City and private work, including ALL subcontract work, ALL pending low bids not yet awarded or rejected and ALL estimated completion dates Subscribed and sworn to before me TypeorPnntName Ken CO enhaver fe nt on this 19th day of March. 2024. Y"ioea ae tvmskcr° OFFICIAL otary Public ^ Signed 4 ROSEMARY SJMAf NQDn ,press - ,[ Company Co enhaver Construction, Inc. NOTARY PUBLIC, STAT OlS � MY coMMtttsX'tRi�2d27� � Address 75 Ko ie Drive, Gilberts, IL 60136 Printed 3/21/2024 Page 2 of 8 BC 57 (Rev. 08/17/10 1 21 3 4 5 Subcontractor Metro Mex MBE Fence Type of Work Asphalt Fencing Subcontract Price 1,216,284.52 97,630.00 Amount Uncompleted 0.00 37,630.00 Subcontractor Kadilex Schroeder Asphalt Type of Work Rebar Installation Asphalt Subcontract Price 132,749.10 52,725.00 Amount Uncompleted 0.00 0.00 Subcontractor Work Zone Central Tree Type of Work TC&P Tree Removal/Clearing Subcontract Price 352,902.70 20,720.00 Amount Uncompleted 0.00 0.00 Subcontractor H&H Electric Type of Work Electrical Subcontract Price 602,080.80 Amount Uncompleted 0.00 Subcontractor Stalworth UG Type of Work Soldier Piles Subcontract Price 61,350.00 Amount Uncompleted 0.00 Subcontractor EEI, Inc. Type of Work Survey/Layout Subcontract Price 28,500.00 Amount Uncompleted 0.001 Subcontractor RA Mancini Type of Work Directional Drilling Subcontract Price 78,375.00 Amount Uncompleted 0.00 Subcontractor Millennia Type of Work i Quality Testing Subcontract Price 20,331.60 Amount Uncompleted 0.00 Subcontractor Mix On Site Type of Work Abandonment Subcontract Price 11,500.00 Amount Uncompleted 0.00 Total Uncompleted 0.00 0.00 37,630.00 0.00 0.00 I, being duly sworn, do hereby declare this affidavit is a true and correct statement relating to ALL uncompleted contracts of the undersigned for Federal, State, County, City and private work, including ALL subcontract work, ALL pending low bids not yet awarded or rejected and ALL estimated completion dates Subscribed and sworn to before me TypeorPnntName Ken CO enhaver fe nt on this 19th day of March. 2024. Y"ioea ae tvmskcr° OFFICIAL otary Public ^ Signed 4 ROSEMARY SJMAf NQDn ,press - ,[ Company Co enhaver Construction, Inc. NOTARY PUBLIC, STAT OlS � MY coMMtttsX'tRi�2d27� � Address 75 Ko ie Drive, Gilberts, IL 60136 Printed 3/21/2024 Page 2 of 8 BC 57 (Rev. 08/17/10 P 11finois Department of TranscIlbirtation Bureau of Construction 2300 South Dirksen Parkway/Room 322 Springfield, Illinois 62764 Part I. Work Under Contract Affidavit of Availability For the Letting of 3/19/2024 (Letting date) Instructions: Complete this form by either typing or using black ink. 'Authod� tion to Bio"' Wil nct be "ued t.rraiess both sides of this form are completed in detail. Use additional forms as needed to least all work. Lisa betow alt work you have unclar contract as eidter a prime contractor or a Subcontractor. it is required to lnrdude ail pending low bids not yet awarded or rejected. in a jolnt venture, list only that portion of ttwa work which is the respaonsilal* of your company. The uncompleted dollar value is to be based upon the most recent enginWs or owners esert ate, grad must hrcpude work subcxardmded to others if no work is contracted, show NONE., 1 2 3 4 5 West bundee Fox Lake Lakefront 004WAOIS Waukegan Grayslake Center Contract Number Downtown Restr Park Airport Street Park Contract With West Dundee Fox Lake IDOT Grayslake Estimated Completion Date 511612024 June 2024 61 CD April 2024 Acctarmulatad Total Contract Price 1,807,887.00 10,634,000.00 22,080.00 347,600.00 Totals Uncompleted Dollar Value if Firm is the Prime Contractor 22,827.00 3,760,000.00 4,106,228.75 Uncompleted Dollar Value if Firm is the 22,080.00 251,100.00 273,180.00 Subcontractor Total Value of All Work d_379.408.75 Part II. Awards Pending and Uncompleted Work to be done with your own forces. List below the uncompleted dollar value of work for each contract and awards pending to be cormpdoted with your own forces. All work Accumulated Subcontracted to others will be listed on the reverse of this forth. Ina joint venture, list only that portion of the work to be done by your :.. ,.,.,....,...ea n:nnrG Totals Earthwork 338,048.00 358,898.00 Portland Cement Concrete Paving 0.00 Demolition 0.00 HMA Paving 373,000.00 384,000.00 Clean & Seal Cracks/Joints 0.00, Aggregate Bases & Surfaces 300,000.00 300,000.00 Highway,R.R. and Waterway Structures 251,100.00 251,100.00 Drainage 0.00 Electrical 36,000.00 Cover and Seal Coats 0.00 Concrete Construction 875,000.00 22,080.00' 1,040,980.00 Landscaping 710,000.00 726,331.25 .Fencing 190,000.00 190,000.00 Grouting 0.00 Seeding & Sodding 10,047.00 20,000.00 30,047.00 Signing 12,780.00 125,000.00 137,780.00 Tree Trim/Removal 0.00 Cold Milling, Planning & Rotomilling 0.00 Pavement Markings (Paint/Thermo/Poly/Urethane) 45,000.00 45,000.00 Misc. BondslLayout 49,000.00 Traffic Control & Protection 0.00 Engineer Field Office/Items by Engineer 0.00 Install Raised Pvt/Pvt Texture Removal 8,690.50 Trainees/Trainee Training Program 0.00 Painting and Cleaning Totals 22,827.00 2,976,048.00 22,080.00 251,100.00 0.00 3,557,826.75 Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the 'Illinois Procurement Code". Failure to comply will result in non -issuance of an "Authorization To Bid." This form has been approved by the State Fortes Management Center. Printed 3/21/2024 Page 3 of 8 BC 57 (Rev. 08/17/10 Part III. Work Subcontracted to Others F h contract described in Part I list all the work yoau have subcontracted to others. or eac 1 2 3 4 5 Subcontractor Ahorn, Inc. Jasco Type of Work Masonry Electrical Subcontract Price 200,220.00 1,283,952.00 Amount Uncompleted 0.00 783,952.00 Subcontractor BOFO Waterproofing Type of Work Waterproofing Subcontract Price 39,600.00 Amount Uncompleted 0.00 Subcontractor Jasco Electric Type of Work Electrical Subcontract Price 152,008.00 Amount Uncompleted 0.00 Subcontractor TruSeal Type of Work Pavement Markings Subcontract Price 2,000.00 Amount Uncompleted 0.00 Subcontractor Excalibur Type of Work Roofing Subcontract Price 23,955.00 Amount Uncompleted 0.00' Subcontractor Lifeline Plumbing Type of Work Plumbing Subcontract Price 30,000.00 Amount Uncompleted 0.00 Subcontractor Northern IL Fence Type of Work Fencing Subcontract Price 14,600.00 Amount Uncompleted 0.00 Subcontractor Capital Glass Type of Work Glazier Subcontract Price 14,950.00 Amount Uncompleted 0.00 Subcontractor Mueller Ornamental Type of Work Glass Canopy Subcontract Price 21,000.00 Amount Uncompleted 0.00 Total Uncompleted 0.00 783,952.00 0.00 0.00 0.00 I, being duly sworn, do hereby declare this affidavit is a true and correct statement relating to ALL uncompleted contracts of the undersigned for Federal, State, County, City and private work, including ALL subcontract work, ALL. pending low bids not yet awarded or rejected and ALL estimated completion dates Subscribed and sworn to before me on this 19th day of March, 202¢, Type or Print Name Ken CO en ver ,Plov)�" Qfroou' resident ' OffCcar or Director Title Notary ubluc Signed m My commission expires: d� Company CO enhaver Construction, Inc. (Notary Seal) Address 75 Kopeie Drive, Gilberts„ IL 60136 Printed 3/21/2024 Page 4 of 8 lflinoLs Depteldment Affidavit of Availability UV of .�, For the Letting of 3/19/2024 ansporWon(Letting date) Bureau of Construction instructions. complete this form by either typing or using black ink. 2300 South Dirksen Parkway/Room 322 "Aulhorizallon to Bid" will not be Lssoed unless both sides of this form are Springfield, Illinois 62764 cormpleted in detail, Use additional forms as needed to list all work. Part I. Work Under Contract List below all work you have under contract as either a prime contractor or a subcontractor, It I$ rerluked to include all pending low bids not yet awarded or rejected. Ina joint venture, list only that portion of the work which is the responsibllity of your company, 'Tiv uncompleted dollar value is to be based upon the most recent engineer's or owners estimate, and must include work subcontracted to others. If no work is contracted. show NONE. 1 2 3 4 5 6fae2P69 Old York Washington St k Road Dog IOOT 006-61J76 Prairle6 Contract Number CulvertPxtanslon Wilson Batavia Downtown Park Hoffman Estates e Contract With IDOT IDOT Naperville Elmhurst Estimated Completion Date 45 WD 11/2212024 1 1012912024 08/0112024 Accumulated Total Contract Price 666,505.77 3,934,612.43 8,708,865.36 1,775,828.50 Totals Uncompleted Dollar Value if Firm Is the Prime ass 5ns 77 3.934.612.43 7.252,660.56 1,775,828.50 0.00 17,735,836.01 273,1 Total Value of All Work 1 18,009,016.01 Part II. Awards Pending and Uncompleted Work to be done with your own forces. List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work Accumulated Subcontracted to others will be listed on the reverse of this form. In a joint venture, list only that Portion of the work to be done by your company. If no work is contracted, show NONE. Totals Earthwork 95,635.00 137,364.33 633,495.00 282,200.00 1,507,592.33 Portland Cement Concrete Paving 0.00 'Demolition 0.00 HMA Paving 140,918.25 107,980.00 632,898.25 Soil Stabilization / Modification 6,460.00 4,534.00 10,994.00 Aggregate Bases & Surfaces 55,138.00 146,118.00 501,256.00 Highway,R.R. and Waterway Structures 106,820.00 172,200.00 530,120.00 Drainage 106,590.80 1,014,141.28 1,546,768.00 332,013.00 2,999,513.08 Electrical 46,535.63 60,258.40 114,000.00 256,794.03 Cover and Seal Coats 4,059.50 24,827.00 28,886.50 Concrete Construction 69,225.00 438,819.00 1,064,366.50 275,223.00 2,888,613.50 Landscaping 47,809.00 236,995.00 239,323.50 1,250,458.75 'Fencing 15,645.87 6,775.00 98,920.00 165,839.00 477,179.87 Guardrail 17,178.34 2,000.00, 19,178.34 Seeding & Sodding 4,983.47 21,682.90 130.10 70,000.00 126,843.47 ,Signing 6,070.00 23,392.80 13,050.00 180,292.80 Tree Trimming/Selective Removal 1,680.00 3,802.00 9,530.00 15,012.00 Cold Milling, Planning & Rotomilling 34,145.00 34,145.00 Pavement Markings (Paint/ThermolPoly/Urethane) 14,222.00 33,594.36 130,437.40 2,000.00 225,253.76 Misc. Bonds/Layout Etc. 14,000.00 514,337.00 0.00 2,000.00 579,337.00 Traffic Control & Protection 31,214.53 31,214.53 Engineer Field Office/Items by Engineer 24,000.00 25,000.00 136,000.00 185,000.00 Install Raised Pvt/Pvt Texture Removal 9,312.00 28,310.00 1,080.00 47,392.50 TraineesfTralnee Training Program 7,900.00 7,900.00 Painting and Cleaning Totals 558,622.01 2,409,220.80 4,234,377.65 1,775,828.50 0.00 12,535,875.71 Disclosure of INN, Information is REQUIRED to accomplish the statutory purpose as oumnea In me unncis rrr,curouioi . 1--- -----'- result a��........ ....•,-•,. result in non -issuance of an "Authorization To Bid." This farm has been approved by the State Forms Management Center. Printed 3/21/2024 Page 5 of 8 BC 57 (Rev. 08/17/10 Part III. Work Subcontracted to Others 0 i rr -,u +r.o , —L, ,.a— ».-.h-ve subcon-tran-t-p-ri to nthers rui eau i uui ni 1, being duly sworn, do hereby declare this affidavit is a trate and correct statefnent relating to ALL uncornroAerea L;UF1L14L;LZ:,U1L11W undersigned for Federal, State, County, City and private work, Including ALL subcontract work, ALL pending low bids not yet awarded or rejected and ALL estimated completion dates Subscribed and sworn to before me on this 19th day of March, 2024. My (Notary Type or Print Name Ken Ca enhaver , President Officer or Dmetor Tille 'lu L'bL�2 d Nota aal is.... rw Signed ��yy,, �k�.A��� NOTARY PUBLIC, STATE OF ILLINOIS Company CO enhaver Construction, Inc. '£ COMMISSION EXPIRES 04/17/27 Address 75 KOg7 ie Drive, Gilberts, IL 60136 Printed 3/21/2024 Page 6 of 8 BC 57 (Rev. 08/17/10 - 1 2 3 4 5 Subcontractor Tyro Construction Red Ants Boring Geneva Construction Type of Work Asphalt Patching Bore & Jack Asphalt Paving Subcontract Price 69,752.00 105,705.00 587,059.75 Amount Uncompleted 69,752.00 105,705.00 587,059.75 Subcontractor Industrial Fence Precision Pvt Mkg HighStar Traffic Type of Work Fence/Guardrail Pavement Mkgs Traffic Control Subcontract Price 38,131.76 17,326.54' 214,795.20 Amount Uncompleted 38,131.76 17,326.54 214,795.20 Subcontractor FCS LLC Thorne Electric Type of Work Traffic Control Electrical Subcontract Price 72,590.00 1,929,546.46 Amount Uncompleted 72,590.00 1,929,546.46 Subcontractor Western Asphalt Env MBE Fence Type of Work Reg. Substances Ornamental Fence Subcontract Price 112,828.67 99,880.00 Amount Uncompleted 112,828.67 99,880.00 Subcontractor Alas Trucking SRN Type of Work Trucking/Hauling Testing Services Subcontract Price 346,000.00 66,290.00 Amount Uncompleted 346,000.00 66,290.00 Subcontractor H&H Electric Surface Construction Type of Work Electrical Brick Print Sidewalks Subcontract Price 566,481.37 120,711.50 Amount Uncompleted 566,481.37 120,711.50 Subcontractor IMEG Type of Work Layout/As-Builts Subcontract Price 28,000.00 Amount Uncompleted 28,000.00 Subcontractor Geneva Construciton' Type of Work Asphalt Paving Subcontract Price 276,460.05 Amount Uncompleted 276,460.05 Total Uncompleted 107,883.76' 1,525,391.63 3,018,282.91 0.00 0.00 1, being duly sworn, do hereby declare this affidavit is a trate and correct statefnent relating to ALL uncornroAerea L;UF1L14L;LZ:,U1L11W undersigned for Federal, State, County, City and private work, Including ALL subcontract work, ALL pending low bids not yet awarded or rejected and ALL estimated completion dates Subscribed and sworn to before me on this 19th day of March, 2024. My (Notary Type or Print Name Ken Ca enhaver , President Officer or Dmetor Tille 'lu L'bL�2 d Nota aal is.... rw Signed ��yy,, �k�.A��� NOTARY PUBLIC, STATE OF ILLINOIS Company CO enhaver Construction, Inc. '£ COMMISSION EXPIRES 04/17/27 Address 75 KOg7 ie Drive, Gilberts, IL 60136 Printed 3/21/2024 Page 6 of 8 BC 57 (Rev. 08/17/10 Illinois Department of Transportation Bureau of Construction 2300 South Dirksen Parkway/Room 322 Springfield, Illinois 62764 Affidavit of Availability For the Letting of 3/19/2024 (Letting date) instructions: Complete this foam by either typing or using black ink. "Authorization to aid' wti not be issued unless both sides of this form are completed in detail. Use edditlonal forms as needed to list all work. Part I. Work Under Contract List below at work You h✓O under CO(AtaCt es either a prime contractor or a s ubcontructaar. n is ratinned to Include all pending low bids not yet awaaded or rejected, In a joint vamhara, list oily that porton of" work which is the nasloonsebitNty of your company, The uncompleted dollar valise is to be based upon the most went engineer's or owners estimate, areal mutat include work subcontracted to others, if no work Is contracted, show NONE. Part II. Awards Pending and Uncompleted Work to be done with your own forces. List below the uncompleted dollar value of work for each contract and awards pending to be compWed with your own forces. All work Subcontracted to others will be listed on the reverse of this forth. In a Joint venture, list only that portion of the work to be done by your company. If no work is contracted, show NONE. Accumulated Totals Earthwork 31,692.00 1 2 3 4 5 0.00 Conservancy 127.62Tn 012.62P42 APA Hero Playground HMA Paving 20,880.00 Contract Number Park Culvert Partial R&R Improvements 10,994.00 Aggregate Bases & Surfaces 19,200.00 520,456.00 Round Lake Area Contract With Gilberts IDOT IDOT park Dlst 3,428,928.08 Electrical Estimated Completion Date 4/15/2024 60 WD 45 WD 08115/2024 33,812.50 Concrete Construction 52,120.00 146,353.00 728,699.00 3,815,785.50 Landscaping 1,000.00 cumulated Total Contract Price 442,566.00 800,773.60 881,657.50 2,688,431.00 599,821.24 Totals 721,410,852.76 Uncompleted Dollar Value if Firm is the Prime 14,000.00 484,928.25 487,657.50 2,688,431.00 0.00 33,918.34 Contractor 16,272.00 60,000.00 Uncompleted Dollar Value if Firm is the Signing 5,360.00 273,180.00 Subcontractor 195,652.80 Tree Trimming/Selective Removal Total Value of All Work 21,684,032.76 Part II. Awards Pending and Uncompleted Work to be done with your own forces. List below the uncompleted dollar value of work for each contract and awards pending to be compWed with your own forces. All work Subcontracted to others will be listed on the reverse of this forth. In a Joint venture, list only that portion of the work to be done by your company. If no work is contracted, show NONE. Accumulated Totals Earthwork 31,692.00 31,235.50 624,880.00 2,195,399.83 Portland Cement Concrete Paving 0.00 Demolition 0.00 HMA Paving 20,880.00 79,860.00 6,580.00 740,218,25 Clean & Seal Cracks/Joints 10,994.00 Aggregate Bases & Surfaces 19,200.00 520,456.00 Highway„R,R, and Waterway Structures 60,785.00 185,000.00 775,905.00 Drainage/Drainage Cleaning 95,428.00 30,490.00 303,497.00 3,428,928.08 Electrical 64,281.00 93,000.00 414,075.03 Cover and Seal Coats 4,926.00 33,812.50 Concrete Construction 52,120.00 146,353.00 728,699.00 3,815,785.50 Landscaping 1,000.00 506,840.00 1,758,298.75 Fencing 29,126.37 931515.00 599,821.24 Guardrail 0.00 14,740.00 33,918.34 Seeding & Sodding 14,000.00 5,820.10 16,272.00 60,000.00 222,935.57 Signing 5,360.00 10,000.00 195,652.80 Tree Trimming/Selective Removal 15,012.00 Structures Repair 7,600.00 41,745.00' Pavement Markings (PaintlThermo/Poly/Urethane) 4,604.00 25,540.00 22,000.00 277,397.76 Misc. Bonds/Layout Etc. 20,000.00 599,337.00 Traffic Control & Protection 54,618.20 38,000.00 123,832.73 Engineer Field Office/Items by Engineer 0.00 13,200.00 198,200.00 Install Raised Pvt/Pvt Texture Removal 20,629.00 68,021.50 TraineesrrialneeTraining Program 0.00 7,500.00 ��57,840.00� Painting and Cleaning 8,160.00 49,680.00 Totals 14,0100.00F 417,022.671 487,657.50 2,688,431.00 0.00 16,142,986.86 Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the "Illinois Procurement Code". Failure to comply will result in non -issuance of an "Authorization To Bid." This form has been approved by the State Forms Management Center. Printed 3/21/2024 Page 7 of 8 BC 57 (Rev. 08/17/10 Part III. Work Subcontracted to Others -k- ..1, fcry +. Mh— rami- 1 2 3 4 5 Subcontractor Jasco Electric Industrial Fence Type of Work 28,465.00 Fence Subcontract Price 28,465.00 8,098.63 Amount Uncompleted 0.00 8,098.63 Subcontractor Troch McNeil Industrial Fence Type of Work Asphalt Guardrail Subcontract Price 61,000.00 75,069.15 Amount Uncompleted 0.00 45,069.15 Subcontractor Roadway Lines Type of Work Pavement Mkgs Subcontract Price 8,356.00 Amount Uncompleted 4,356.00 Subcontractor Work Zone Safety Type of Work Traffic Control Subcontract Price 24,381.80 Amount Uncompleted 10,381.80 Subcontractor Type of Work Subcontract Price Amount Uncompleted Subcontractor Type of Work Subcontract Price Amount Uncompleted Subcontractor Type of Work Subcontract Price Amount Uncompleted Total Uncompleted 0.00 67,905.58 0.00 0.00 0.00 I. being dtify sworn, do hereby declare this affidavit Is a true an correct statement relating to A uncompleted contra is t e undersigned for Federal, State, County, city ana private worK, inciuuuiy ML� �U—UI IL v— ��• •� -•• -•-_ .._. , __ _._.. _ _ or rejected and ALL estimated completion dates Subscribed and sworn to before me on this 19th day of March, 2024. Notap u"Ac My commission expires: (Notary Seal) t M ARANO OF ILLINOISES 04/12127 Type or Print Name Ken Copenhaver , President Officer or Director Title Signed _ ._,•. a� Company UpenlRaverGtr rLlo lOrl„ Inc. Address 75 Ko ie Nye, Gilberts, IL 60136 Printed 3/21/2024 Page 8 of 8 BC 57 (Rev. 08/17/10 75 Koppie Dr., Gilberts, IL. 60136 Phone (847) 428.6696 Fax (847) 428.6798 �dD);1L�w :.p ft.I Fox Lake/Boating Access Improvements Cost: $387,850.90 Project: 8,000 CY Shoreline stabilization and harbor dredging, stone riprap, slope toe protection, shoreline stabilization and shaping. Contact: Gewalt Hamilton, Dan Strahantmhan.thci-engineersx—o (847)226-9335 Completion: April 2022 Fox Lake/Fox Waterway Agency— 2019 Site Improvements Cost: $513,175.00 ***APWA Award 2020 Project of the Year*** Project: Metal Seawall, Interlocking Type Z steel sheet piling, excavation, bank stabilization, CIP Concrete Wharf, CIP boat ramp removal and replacement, precast concrete boat ramp planks, concrete pad removal and replacement, site lighting and electrical improvements, erosion control, riprap, site restoration. Contact: Rob Bowman - Fox Waterway Agency, (847) 587-8540 ro.b O. ate.r waY,co,na Contact: Alex Dye - Trotter and Associates, P.E. (715) 577-1777 ,.yc�.r+t.�r lr1.c c?.rlG► Completion: June 2020 Village of Addison/Westwood Creek Dam and Pump Station-Forebay & Spillway Restoration Cost: $418,000.00 Project: Westwood Creek dredging of approx. 3,000 CY of sediment and disposal of the dredged spoils in an upland offsite disposal area, remove invasive tree species, wetland restoration, geo-grid, clean fill, site restoration, testing, surveying. Contact: Village of Addison, Rick Federighi (630)620-2020 rf ! . Cig ..@ .. : ,!.-:g.,- r Contact: Christopher B Burke, William Schultz (847) 417-7502 wsc (t . k— ,, ,,Qr . Completion: 2019 C OPENHAVER 14 CODON STRUCTION INC 75 Koppie Dr., Gilberts, IL. 60136 Phone (847) 428.6696 Fax (847) 428.6798 91,r1I1)ci?l.l Financial References David A. Kotula President The Kotula Group 220 N. Green Street Chicago, IL 60607 davo@kotula rou .com Phone: 312-895-4565 Mobile: 312-459-0631 Surety Representative/Attorney-in-Fact for The Gray Casualty & Surety Company Chuck Mazzanti Vice President/Producer Assurance, a Marsh & McLennan Agency LLC Company 20 North Martingale Road, Suite 100 Schaumburg, IL 60173 chLIck.mazzanit,@(ilarshrnma.com Phone: 847-345-9887 Insurance Representative Michael A. Carlson Vice President Algonquin Bank & Trust A Wintrust Community Bank 4049 West Algonquin Road Algonquin, IL 60102 mcarlson@bankalgon,ouiti.com Phone: 847-669-7500 Banking Representative I D H R: 118216-00 FEIN: 20-076 78 38 Copenhaver Construction, Inc. Key Personnel Project Contacts Resumes U-xOPFNHNVER C' K, N SI Wk U C Y` FC> 14 q NC 75 Koppie Dr., Gilberts, IL 60136 Phone (847) 428-6696 Fax (847) 428-6798 Y&IIAUMD Ken Copenhaver President/Owner Cell: 847-627-0080 Email: co �oe i a �ve r i Steve Scanlan Construction Manager/Project Superintendent Cell: 847-417-6793 Email:Eq penhav—,�� u - Matt Chada General Manager Cell: 847-722-1158 Email: 1piatd)c C— Rosie Simarano Project Coordinator Office: 847-428-6696, Ext. 106 Email:r-ost I!9D-0-U-&-P—M s, -ie -Lib -go -p �Nrlhav� Howard Whatmore Project Superintendent Cell: 630-659-9545 Email: h(Lwa pg �avelr �*n t�r*Qn-"n� Anastasia Austin Project Superintendent Office: 847-428-6696, Ext. 112 Irrsi_@Cop�enan-ircpns ru ionx�j'n Melissa Williams Pay Application Process Specialist Office: 847-428-6696, Ext. 111 Email: inel` ssA, -jlhay rjLQp tru' J --c m , , Lo @__p_g --g- 9— Steve Scanlan 75 Koppie Drive, Gilberts, IL 60136 Email: copenhaver.ssl )911141CM Phone: 847-417-6793 . ....... . .. Copenhaver Construction, Inc. construction Manager - 2005 to Present summary of Qualifications: ts of botaide iProtecting and promoting the interesristics oveloping leader.Excellerit resource, planning, and demonstrating the personal characted delegation capabilities with a high level of time management skills. Superior management an financial responsibility. uction team to meet contractual conditions of • Coordinate subcontractors and the conStr performance. I reports relating to job status, daily progress, estimates, and • Prepare external and interna deliverables. daily basis to ensure quality construction standards exist and • Review active projects on a estimates remain within budget. e are documented and • Effectively manage project scope by ensuring any changes to scope approved wit project change request forms. • Work with project client and stakeholders to complete project charter outlining scope, goals, deliverables, required resources, budget and timing. • Supervise construction projects to ensure they are completed on time and all quantities are paid accurately. nvironment to plan and coordinate all aspects oft e • Work under deadlines in a fast -paced e project. zed and archived following project completion • Ensure all project documents are orgam • Enforce job' site safety and implement company safety policy and procedures Education University of Arizona, BA 75 Koppie Dr., Gilberts, IL. 60136 Phone (847) 428.6696 Fax (847) 428.6798,i,t'i.Cl�'I„ld4C�3SG Howard Whatmore 75 Koppie Drive, Gilberts, IL 60136 Email:,,-co,peiiliaver.ss'l@gniail.corrl Phone: 630-659-9545 Copenhaver Construction, Inc. Project Manager/Superintendent - 2017 to Present Summary of Qualifications: Having more than 20 years project management experience in Meavy Construction and 22 years as Resident Engineer, he has a proven track record of successful management of 100 thousand, to 20 million dollar projects. He has skilled communication skills and the ability to deliver complex information to diverse audiences. • Plan, schedule and coordinate construction team and project activities to meet contractual conditions of performance and deadlines. • Prepare external and internal reports relating to job status, daily progress, estimates, and deliverables. • Inspect or review projects to monitor compliance with building and safety codes, or other regulations. • Determine labor requirements for dispatching workers to construction sites. • Investigate damage, accidents, or delays at site to ensure proper construction procedures are in place and followed. • Oversee contracts or negotiate revisions to contractual agreements with consultants, suppliers, or subcontractors. • Implementation of a new or modified schedule in response to unforeseen delays, bad weather or site emergencies. • Work with project client and stakeholders to complete project charter outlining scope, goals, deliverables, required resources, budget and timing. • Work under deadlines in a fast -paced environment to plan and coordinate all aspects of the project. • Ensure all project documents are organized and archived following project completion Education Southern Illinois University - Carbondale, IL Civil Engineering, BA Morrison Institute of Technology - Morrison, IL Civil Engineering, Associate Degree 75 Koppie Dr., Gilberts, IL. 60136 Phone (847) 428.6696 Fax (847) 428.6798 i' p,wai.Ilz' ;1:1�I]I Rosie Simarano 75 Koppie Drive, Gilberts, IL 60136 Email: ro ie, cI en vercoiistrt ctel .cQm Phone: 847-428-6696 ext. 106 Copenhaver Construction, Inc. Project Coordinator/Manager - 2018 to Present Summary of Qualifications: Promoting the interests of the company with the owner and client in all ongoing matters of the project at hand. Coordinating with management to develop, manage and maintain communications with the subcontractors and vendors for a complete and timely project. • Manage all aspects of construction to ensure projects are built on time, on budget, and to specified plans, codes, and quality. • In coordination with management, develop an initial schedule and budget and provide detail to schedule as required for project. Update, maintain, communicate, and manage all subcontractors and vendors accordingly. • Responsible for managing subcontractors' progress against plans and schedules. • Develop and coordinate city inspections. • Order and coordinate material .delivery. • Communicate and maintain positive working relationships with subcontractors. • Provide general administrative and internal weekly progress reports. • Maintain all project records and monitor correspondence. • Participate in proposals and cost estimates as needed. • Work alongside team members daily to complete each phase of the project. • Gather and prepare close-out/warranty information for project completion. Featured Projects: Fox Lake/Fox Waterway Agency - 2019 Site Improvements Cost: $513,175APWA Award 2020 Project of the Year Project: Metal Seawall, steel sheet piling, excavation, bank stabilization, CIP Concrete Wharf, CIP boat ramp removal and replacement, precast concrete boat ramp planks, concrete pad removal and replacement, site lighting and electrical improvements, erosion control, riprap, site restoration Fox Lake/Boating Access Improvements Cost: $387,850 Project: 8,000 CY Shoreline stabilization and harbor dredging, stone riprap, slope toe protection, shoreline stabilization and shaping. VIEW � cn 90.10, < m U c� z z oc 2 w = y N O L" z cn LLJ CD 2 O Z N �: 0 z uc) W �e �- m O � � � OM z OC v O W Q z CD W v z Q N z w Y Oy � Of cm) W � CD Cc a y Whd 3 d o SII 0 I'D -.0 ®® + o LLJ ° CD J - _ 3 I l l l l f NN Vf w V1 w Vf -- o � N a K w v N 3 U 2 w O 2 0 01 N WOLFRD z 0 0 a o z v Q N z w Y Oy O Q Cr Of CD Cc a 3 d o z zdo z z u uj NF I��O�2y� G F m z w N w a o w �o w �c. as 000MX09 S � 2i a SONIM w z o z C) 4r Ir 00 N4a N R z N MAIN ST w a I l l l l f NN Vf w V1 w Vf -- o � N a K w v N 3 In W F__ O z J a w Z W C' w w Z� } p w� aw JO Q awo Ja �(/tUJ r o O a �p viof O Q N J w w �> U Z J W J N r Q om( Q � O � O W o> W w¢ x D 0 w Y N 3 W U O v) Ln Z U O O W J m Z Q w H '-' U S Q = U W O J w O N Ir O w0 Z J O 3 Z x r O } ti N r z3 O O J¢ J r r VI O J N p Z W T y Q W U H U O Z m O = W 0 N Z w W > W Z x 0 0 > Q V) U Z U w m W 0 � O O d O w0 J J r J .. r cr O IN N O N w 0 O V) 0 LLjJ Q w Z 5= O w p Q z Q � H- r w o> w r J O r w N r W Q Z IN O a U c w r W O 3 r Q ¢ U O o Q Q 0 ¢ N� o S w F r o ofrO N 3 U U H N N r ~> Q W O U U Z O w Z p l n U O w w m w Q CC r U ¢ r OU r Q w U CC W m W 0 OS Q w U m O J o rcr J O J Q[If p 3 Q W S w w W w W r U z w U Z W J Cw7 W w r W ~ J J o r W ccw J CC z H Or N Q O Z W~ r U .. = N w W Q J .J. Q x m = Q V) w W= x r = r p Q U a r m Z p = w m U Q V) W " Sw o N J W w r w w> N m n� r W W r p a m p U CO W ,J 3 Q N U N J Z J� N r O� w V W a Z p O O Z w � w O w p W Q r U w r w o U [[ p W O U W O W U x a N w O Z O"_ n n _ p= U O w > m U w W wO a m J Qo ti O m J w W J w Q r Z ii o' W W N w > O O W> H Q O W J Z J Q K W "f w W Y U J 3�ID _ O vo m Z> W r Q p m O w O w O w r O Z = 0 w J r> > V1 J O Z m > O Q m 3 d CC Z O w v) Jr o Q¢ m ¢ w Q Q Y x o :2 W z r= w w 0 0 U U w U CC U z W p J W W N z W J cr m o r r Inw N Oa� co :2 CC Q Z w 0 J � N Z ti r r z U U O V) r0 cD J r a z Q Q N w V) O N � p w V) Q CC Z z J N U O Q r Q x N > r N x Z 2 W Z w 2 O m z W p U Z r m o O Q w Z o w p w= 0 W w U W V1 Z m 0 N w N w (n O U U z 3 o U r w w U r w Z U U W Z U Z Q W z w J U J w W W Q T w � W w p r > In w p 0 W O clQ w-- U S D? V) > Q r W� to J z ¢ W J x x Q r r z X Q Q W m x= r p O z w w z J w z O Q O W z z O O Z .J. 3 Q W W W Z p U O J W W ¢ p r x O Z O O O U p z W U J z N w r 3'z. W J x O O Ww r U U ¢ m U O W w W W 0 J O O O K p Q Ym0 Q Q p w U � Q Y D zLn CC 61 rUZ Din a m Q NJ r� U 2 wOr wo= U r Z CCO ~ O W r V w ZO Z O r w w U ~ 0 0 o O r O O w > Y N 3 W O J O O Q n O O 3 D O o LU 0 m a o .-J. z O~ W 7 �w r x W z3 O O Q r O U Y Z O O O W V1 V1 g r VI ZO CC Z W N O O F O N N N W > Q N X N N O W O m U p a W U r r a r 0 w¢ ip D N O J z w m O r CC W Z Z IN O a U c W W N Z w W N M V �fl t➢ I� OJ m w U O Z r w > Y N 3 W J O p O 3 D O o LU �U. vi r� x J O J g O U .-J. z O~ W 7 �w r x W z3 O O Q r O U Y Z 0 r 0 w> w p¢ U w w Q o r J W V1 V1 g r VI ZO CC Z W Z J U Z O w w Q r W W w r r p W N w r 1 Q Z W ti O O W > Q Z O N W O w V) N Q O O ow Z Lw, Q W O m U p a W U r r a r 0 w¢ ip D N O J z w m O r CC W Z Z IN O a U c W W N Z w p J Q W Q U O m w iD - J a LL,U J w Q U p r Q N w w Z Z N VI VI O O N Q U Q _ N Q J O p lD o Q V) O W V) CC Z Q O v J Q w W W m w x� �N. O U O r r N O a w z u2 CC r U w r of U N In U m J M Z m .. M Q w U CC W m Z O r Q V w N1 w m o rcr J O J J W J Q N x J z r Q r Z r - Q )n zwr?x r U a )nr mr r N� Q<pZ wN O a z 3 N ccm -w~. W J z LD z a OOpN ccw J CC z H Or N Q O rN V1 Z Z w W¢ r ~ r U .. = N J O Q Z O r \ N w w 0- hl U Z Y U Q O U W d ¢ rU� r=a=��� ��m�v aomJN Jr v�N In to x,,;� Io' OQ� �r'� UZ pQ� w� Of ~�ao gyp" W W mZOUp gr Z r x r O U CO W ,J 3 Q N U N J Z O N W 3 N r O� w V Q Z V) Z O Z r O W K w W V1 O O O W w 3 w Q 0 O r Q U mW= J CC O W Z c� ro o z z> w w " o rW� x W w x .. =m r r o f ¢ L/) c, } z w z= w Z m O r O oOof )n o Q r pr m 0Uw Z J Q K W Q I J J -E<Z U V1 m Q} 4 w wO Q N E w O Q p VI Z r O¢ O- ZUZ V1Q Jr wz0 3� V)�m- O Oz wZ w (!) 0�W. L¢ J (/) r .. J}o,,, m W x V)Z Wpp Z J � ..z W� J Z J V1 ~ U Z r O W J W W N x U r Z ti W O Q O p w r w ae m m H U w W O G U r Z y W 0 w C O O K w w S� 0 z a r w ¢ (Y � r w t o W U z , Z o> Q a r w J > z W w Z w a r o a r 0 p J W ti J O W Vl Q Vl a O M J w O 0 U S U Q U o w p w= 0 W W w Vl W r U W w¢ U W U_p0 Q mZ U.J.¢ Z O x r Z Jm N S .~. w W p Z iY Z J> > c oz Q r x z U J N Q W r O r0 W N Y O Z .J. 3 Q W W W Z p U O J W W ¢ p r x O Z O O O U p z W U J z W OJ fn r W O w O W J N O ,-, N m l0 J O N w O D U, J w O r U '_" In N r U � p CC U o V p N O w Z W W Q U OQ x�N W mr 7 ~ w Ym0 Q Q p w U � Q Y D zLn CC 61 rUZ Din a m Q NJ r� U 2 wOr wo= U r Z CCO ~ O W r V w ZO Z O r o W m W w V l W W x w m U m .-. LD Z Q m O Q U r K l w o N O W m V p Z r Q U .J. < O Z m U Z m W w co U w U Z m r J J Q Q a Z Y M m O Kl c O OM w N Z O r Y w �f) O x CC U O 0 Q r Q- 7 p W J O x W> r m w J W J W W p J -ti x o2S O r U U c OUO U N Z N U Z Q UUP m CC W U 0 Z W NQ W r )n W W o r mr = o r Z Q Z Q o y p w W x d U m Q > U OJ J ... Q Z > OJ V) U W o< .. w O =) U J ¢ Q Z w W J Q r Q w Y .W. J r `n cu L H iN. W CC Q r v w W r> Q w Jarowooz Q m 6 o W S�Saz �SQ¢xw rcco ¢ 3 .. U CC 3 Z r In r V1 O r�:z m o o Z IV v N w L� p J N r wI U a o z z a w a~ J r o u = aO W w Z Z w Jo w o U m In OJ w m a W .. W w Z O x J w a¢ J ¢ a w o O ~ w W Z a W r } W of N 3 N ~ Q O Z d W} r m Q a a r r Z a U Z_ v a m Q Z Y J a m m z a J x r W N Q m O U J O m N Q V O p a N} m O O Z z W Q 7 a Q J J p r o Q? a 0 0 O Z W O a 0 V o x a N U p Z z Q O N O LJ Z a r �n x m w Q r- U w o r --� x r w r a J W Q U W W r Z 0 V a 0 p o w} U r J Z Q O J W a U O V Q j 0 o Q W m V1 r U N Z ¢ VI �m Z w QQ W JO W mZ w0 N Na ~� W Nw uo Q m U O w N 7== CC r r� z F. J O > r J .. g r W r 0 .. a w .. O Z Z W r- x O N Z W a a N Li W r N } r x J r Q U r Q} V w N J Y Z Q Q ^ Q J O O Z N w O O 3 N W N W O W W^ W r Z .. W Z r O O W Z¢ N J r} a Q r x N^ r ¢ Z O z m N m Z x �i N N ¢ ^ X S W r O x W U N J W w Z S a a S J S^ a O N Q-- Q } Z Q Q Q x Z W a m Z p U r 'o,Z m O ~ Q a¢ Q J W Q W m W W p a a r o z^ Q^ o U U r o a o a s U a m I n O Of O o ON N o r V " w o o Z w w a Z = � d w d Q J a w w 2 O a w x x w z N w x -. Q a c o a x � a r ,-. Q .. m W J W J m O ,-, U ,-, o w ,-, W ,-, U a z w o w V z w Z trn J z J (D r 3 r Q Q a r p a p O = W O a r a U Z Q O w m w x } r r a w r U O r W L U 3 H U U w a H cn-- N Lys a x Q U O N r a Q Z Z Z � o cn U ¢ to O r Z O W QUap O U W N N r- O W Q O U O .-. O J C) .-. Z a m w O O -10'92c02 } °o w a w W v z z O c m m z a J x z O m a Q :z>: N w J L n w a Q j U O N J N N O z N a N r Z W In o a J �i m > J J N } w 0 r Z N O N O U N-- m Z O a r w U W r W w z w = m O ~ Q a¢ Z w O O S V O } Q W U J J N Z w 0 ¢ O w O a s N¢ o r V " w o o a Z = W > x W a ~ N } co w W J W J m O N J N = W O a r a U Z Q O w m w x } r r a w N w w a W L w a H cn-- N Lys a x Q .. r J} O N r a Q Z z o U ¢ W O r Z JUw QUap O U N N r- O O x W a O W z O J O N J Q Q Z a m w O m Q} Q 0 a O O N Z m S N W O Z O '-' Z O Z (.7 N z U Q or W = Z a Z O W r r r ¢ N O r ~ V O a Z x W o a U Z w r W U 3 W} o ~ z �--� Q o U O d z r W o m L'aJ d W U Q z w Q z o S o = a ~ a U U Q U N Z x _ z W O N w Q Z '-' O V N o r N 3 p � W = r o a Q w a a g m a O o N Q C 7 m S W z a N r W a W Y J a r- Z a W Or ` O O W a 0 w W Q m O O .. O N Q z Z o r U O } N W W O O J W a Oc N aLU Z W r a Q g a w a a H a Q J Z W U W N Z o s ua ar .w. r Q ¢wr N ~ r- U of w Q W H ¢a Lnp W W �m a zQ J m W .. } N W W �xmJ O a a W r In Z Z CC a O U Q N v = Z F-- W ~ mW z a o O d 0 oo U a Umw o ¢ wr Z J p d 0 W ~ W O� N W a W LTJ Lai H U W N U Z 3 r Z W (n Z w r a O z W m Z W '-' U Q 3 o > O Sa xr r pa N O o W Oo C[ r LD ¢ O O O a a a s r o a r w o r a w a J ~ O U a w N z z _ O w ~ Z m z ww S a 0 Z O N V rzz} Z z O D Q W Z z r cn o m Q p N J m ¢ Z mQ r o O¢ W �- Z U Z N = Q O X ~ r S L -LJ W a U N ar 3 a Z Z a r o zQ U W W •' a az Q O r- '-'-' U r ¢ w ¢ ¢ U xo W^ a J N w z V p o o> .. r a W Z o w r w m a a r O W a a w r ¢ J r = L -LJ w Z> N W o r O Z L,,)> U r Q U O W r Z a S W O a m ¢ N W a x m z a a} N N¢ w a ¢ N O w Q �, S z w a_Z O o W r W ¢ a O w w 0 W O ZO o N N to W w w z J w? a Q o o w w a U o o z a a Z o w Z w vi Q z r zo Q a m Oa r N>O g m N � W U z ww� JO Q j> ¢ w = r- r < � w w O a z o J w ^ Nr a (n cO w rw ¢ r z Qzp zw wix U~ w, z www ¢zomw Z O V ? Xo O Z J ¢ x a r O z? Q a LQ,J r } O C7 } m �--� [7 wI N a LLJQ J r V x N W o r wm W �> LLjZ N Q O m N W W¢ m J ~ w x w U O W = J N U Q Q a OZ J w Q NO �Z z O_ rOW N a J W ap aQ J U Z O a'-' a 0 Q 2 w a ~ r W m w o �a J (n a ¢r N U m O N ,-, N r x U J ,46 x x a r a- U N w W N D a O W a O Z 3 O Z W r Z W N x W Z J W Z aww m ^U,r-, W war r}wz r Q Z 0 7o N Z W o w U Q r z a Q m w O zo p D O w O a �o Q N a w z 3 Q a N N V z Q N Z m J Q a Z N W W r- W r z ¢ J Q w a w a w W r- U W W N W 3 w a U Z J r a a o a O W O a O N o Q Z CC O d Q U Z � Q a Z; U w Z J W W z U J J ti 0 a a w O a ¢ _¢ 0LLI LLJr x r W a OD 00 W m0 QUZ�N S O Z Zw W Z w N W a C C rU x w Or Zj a J� x O x w r i --i W O U .. U N W w m a O W O r- w Z V7 W W r m w 7 r W O V J W N a o z r- O Z O In Q W O Z U In O^ p H CC o N z ¢ w a r w w? Z= a p¢ Z Z a Z U p Z J U Z z p Z Z Z ¢ Q CC a Z U Q m U w U Z Z O O U z N Z Z rO N m CC O w r a U O O Q r Z Z O O r U w Q O U � a O a O Z a r O Q a N Z U N O a w Q x= W U ,_, O w Z x V, x N w .. a r Q r W W a (.7 Q Z W r a Q o r Q p r J o > cD W w U a w r N m W a a w o a CD N W r z > w Q W J o a O m U a J W P a W m r Z z a N O ~ ~ a Q O a r ~ O J o� O 7 J0 W"fO Z U O Z.. Z CL W x z p O z a Z W a Q J 3 W a W U X Z O a W Z O¢ a Z w 0 O r a Z w U U GL H w w <.-) U 7 ^ W U r U Q U r- r a W r w U a W Q r Q W J Z N a Q wQa x J 0 woo x a a xa r r W W waoNr x W W} to W to W W wU X = J H O r a w r w a Q O m r x a N Z Ln C] ^ N O O .J N Nl V Lf1 lD I� Q r W O a -10'92c02 1 9 V A � x vlz' LLJ CD o� o - Imo /Ic� (Do z� ............... .. ....... Qflfw o +� x pw a w OQO w \ CY Wzo ,N. 11 O owe o Ln U Q, H a .J .-. z I a a u) ;z w -- n Z dq LU O_ J XZ Q~M O C7 z W z U..00 y W N 0= U O0_U f.0 OZ N zaN � 0_UX w QZ p =O > W 0_ dZ� 0_W ZL(1 ONS WZ C7 J coz O,. cc),W r Y J N m N ?LLI w _Er w U W Z ti X z O N J d HJ. -. W.. dm In W ��V1 ivMj OQ m O J p 0_ r zm�Q dV) _ Z W W D O � U U U O O W U H z IL O .o ,< N W T OJ zw 3 mcD m 07pZ �a wQ Q H O W J Z N V1 H V7 07 W w N w H O Z d a S S U H H Q Q 3 IL W O J J J J W a a > winmo Wo 0 p N v M Q Ln Q O N Q� N N 4z N� w .z. io v N p lfl - N O n N ul H W to 0 l0 N lD J I� J O 01 p O a, O N d m O z > v z > v z > w .. �� w .. p U Y J O U d z W W U W Z W W Uo Z W WJ 1 N O �1 Z 18dud-b0-10192f02i d � F o U Z F O O r 0: U a � �n r w Z w O � U r w LL O O W r Z � J J a Z ¢ _ Cl 3 x r Q = w U 7 N W a� w z ,v w 0 0? az N J W a aS w x W W r m W T J w m J r Q O N Q r U U H cs N Z N Z Q J 1N]AIAVd JNIlSIX3 �w w V) >o -jw U U } Q 3 � W d d J moa W F- L- V) N 7 N a a z 0 U W N Z O U LA J V) -10'92f02i o 0-o z w i LL J �\ a X > C w � � r w m i � O � Q Z 1 a � d � F o U Z F O O r 0: U a � �n r w Z w O � U r w LL O O W r Z � J J a Z ¢ _ Cl 3 x r Q = w U 7 N W a� w z ,v w 0 0? az N J W a aS w x W W r m W T J w m J r Q O N Q r U U H cs N Z N Z Q J 1N]AIAVd JNIlSIX3 �w w V) >o -jw U U } Q 3 � W d d J moa W F- L- V) N 7 N a a z 0 U W N Z O U LA J V) -10'92f02i (006) 9£ < •elp adld aoj (009) bZ (006) 9£ s 'elp adld ao4 (OSB) 8l d r 0 d 0 �. IIIIIIIIIIIIHII 1 � 1 1 I CS' 1 O � C � O ' U N N ✓i OC V ' N V O- I IIeM aagawelp adld IIPAA IIeM aa4awelp adld IIeM -10'92c02 I LL N Q W Z J Q J m — z > _O z W H W cc From: Garrett Schwartz To: Lawrie. Matt Cc: Brian Schwartz Subject: Kensington Business Park Basin #2 Dredge Date: Wednesday, April 24, 2024 12:03:29 PM Attachments: imaae001.ipa Matt, Upon review of our bid, we found an error in our bid regarding where the excavated material can be disposed at. Per the specification, the material needed to go to a non -special waste disposal location. We had the material going to a CCDD dump which is unacceptable per the earth excavation spec, resulting in our bid being much lower than the other bids. We are not able to complete work per plans and specs with the bid amount we had turned in. We are asking the village to please throughout our bid and move on to the second place bidder. May the Schwartz be with you. Garrett Schwartz L..:.:....I 708-639-4145 Ext: 16 708 -639 -4138 -Fax 708 -476 -0252 -Cell arrett schwartzexcavatin .com www...Ghwz.x...v...ti.n. m