HomeMy WebLinkAbout04/02/2024 Motion to accept the Builders Asphalt bid for the 2024 Street Resurfacing Program and award a contract for $7,289,137.87 with an authorized work limit not to exceed $5,892,000.00Subject
Meeting
Fiscal Impact (Y/N)
Dollar Amount
Budget Source
Category
Type
Information
Item Cover Page
Motion to accept the Builders Asphalt bid for the 2024 Street
Resurfacing Program and award a contract for $7.259.137.57
with an authorized work limit not to exceed $5,,892,000,00,
April 2, 2024 - REGULAR MEETING OF THE MOUNT PROSPECT
VILLAGE BOARD
Y
$5,892,000.00
Street Improvement Construction Fund and Motor Fuel Tax Fund.
VILLAGE MANAGER'S REPORT
Action Item
The purpose of the Village's Street Resurfacing Program is to maintain all Village streets on an
average 20 -year service life cycle. To meet this goal, at least 6.8 miles of Village streets must
be resurfaced on an annual basis. The 2024 Street Resurfacing Program includes 6.2 miles of
streets and is being funded through the Street Improvement Construction Fund and Motor Fuel
Tax (MFT) Fund. In addition, the Village will be resurfacing 0.5 miles of central Road this
summer under a separate contract for a total of 6.7 miles of Village streets to be resurfaced in
2024. Attached is a map and list denoting streets targeted in this year's program.
Of the 6.2 miles of streets included in this year's program, 2.2 miles will involve resurfacing
the 2024 water Main Replacement streets. Prior to 2023, water main replacement projects
included asphalt street resurfacing as part of the contract. Similar to last year, in order to
reduce the asphalt cost and allow additional water main to be replaced, staff has included the
street resurfacing portion in this bid. Because of the large amount of asphalt in the street
resurfacing contract, the unit price per ton of asphalt on the street resurfacing contract tends
to be less expensive than the unit price per ton of asphalt on the water main replacement
contract. once the water main work is complete this summer, Staff will coordinate to have the
street resurfacing contractor install the asphalt soon after. This same approach was taken last
year and shown to be successful.
A Notice to bidders was posted on the Demandstar website on February 26, 2024, and in the
Illinois Department of Transportation Contractors Bulletin on February 29th and March 7th
Five (5) general contractors obtained the bid documents.
On March 12, 2024, at 1:00 pm, sealed bids for the 2024 Street Resurfacing Program were
publicly opened and read aloud. one contractor, Builders Asphalt, LLC, submitted a bid for this
project. It was for an amount of $7,,289,,137.87, approximately 32% above the Engineer's
Estimate of $5,.481,,675.40. The bid submittal was checked for accuracy. No errors were
found. The bidder submitted the required bid bond in the amount of 5% of the total bid. The
bidder correctly signed their bid and bid bond.
Discussion
Builders Asphalt's resurfacing bid is $1,807,462.47 above the engineer's estimate. As evident
in many sectors, construction prices rose throughout 2022 and 2023, and the trend continues
in 2024. Village staff monitored prices over the past year and anticipated higher material,
equipment, and labor costs for this year's project but not to the level reflected in the bid. The
Engineer's Estimate was submitted to IDOT in early February 2024 and Volatility in prices
continued until the bid opening date. With this year's bid, there is a 27% increase in the cost
of sidewalk removal and replacement, 27% increase in the cost of curb removal and
replacement, and 14% increase in the cost of asphalt compared to last year's prices. There
were also dramatic price increases in storm sewer, traffic control, and driveway related items.
Village staff reached out to four surrounding communities who recently opened bids for street
resurfacing programs to compare prices. The prices of concrete and other work typically
performed by subcontractors they received were like those received for our project. Asphalt
prices we received were slightly higher than surrounding communities.
The low bidder, Builders Asphalt, has previously provided bids on past street resurfacing
projects for the Village but has never been awarded a contract. Arrow Road construction has
typically performed the work over the last several years. However, Arrow Road construction
was bought by Builders Asphalt over the winter and will no longer operate under the name.
Builders Asphalt has several asphalt plants in the Chicago area. They have recently been
awarded street resurfacing contracts in 2024 by Palatine, Arlington Heights, Rolling Meadows,
and Elk Grove. Builders Asphalt has also been awarded the central Road Resurfacing Project in
Mount Prospect scheduled for this summer. For reference, a copy of Builders Asphalt's bid
submittal is attached.
Staff contacted the four (4) contractors that picked up the bid documents but did not submit a
bid. Committed work, scheduling, and high trucking and concrete costs were reasons why
they did not submit a bid. In addition, the Village's program is typically larger than other
nearby communities and some smaller contractors who do not own their own asphalt plant
feel they cannot compete with those that do, particularly when the same company now owns
multiple nearby asphalt plants. It is an issue staff will consider when bidding future projects to
garner more interest. We do not, however, believe rebidding the project this year will increase
the number of bidders or decrease the prices and would delay completion of the work this fall.
The Village strives to resurface 6.8 miles of local streets each year to keep pace with the
average 20 -year service life cycle. Over the past 10 years, the Village has resurfaced on
average 8.9 miles per year. Efficient use of Village funds and the addition of Rebuild Illinois
funds (2021 - 2023) have allowed the Village to resurface 21 more miles than necessary to
keep pace. In this time, the Pavement Condition Index (PCI) has risen from 70.3 to 75.7
resulting in our streets being in very good condition overall.
For 2024, staff designed 7.4 miles of local streets to resurface and miscellaneous patching
with this contract based on anticipated prices and funding. This excludes the 0.5 miles of
Central Road that is being resurfaced under a separate contract using a Surface Transportation
Program (STP) grant. unfortunately, higher than expected costs of this year's bid will prevent
the Village from resurfacing the entire 7.4 miles. We will need to reduce the amount of work
to 6.2 miles with this contract and no miscellaneous patching.
A portion of the Street Resurfacing Program uses Motor Fuel Tax (MFT) funds. The Illinois
Department of Transportation (IDOT) administers the funding and must approve the scope of
work. IDOT staff confirmed with staff that the amount of work can be reduced to 750I0 of the
low bid without having to negotiate with the contractor. IDOT requires the contract to be
awarded to the full amount, but the authorized work can be reduced by up to 25%.
The bid received from Builders Asphalt is $7,,289,137-87 to resurface 7.4 miles of Village
streets. The cost to resurface 6.2 miles based on the unit prices is approximately $5,.615,000
and within the available funding. coupled with the resurfacing of Central Road, 6.7 miles of
Village streets will be resurfaced in 2024. This is just 0.1 miles below the Village's objective of
6.8 miles per year, but the work over the past 10 years has kept us ahead of schedule and our
streets in Very good condition. For the 1.2 miles of streets that will not be completed this
year, they will be moved to the 2025 program. These streets are in fair condition and can last
another year without resurfacing. Each of the next 5 years is currently programmed, with less
than 6.8 miles, allowing us to integrate the shifted 1.2 miles without greatly affecting future
years. Miscellaneous patching will be completed under separate contracts or moved to 2025.
Village staff recommends awarding the contract up to the full bid amount of $7.,289,137-87 to
satisfy IDOT requirements but issue a purchase order and authorize work to not exceed
$5,892,000.00. The total purchase order amount would fully utilize the following funds: Street
Improvement Construction $4f442.,000.00 + Motor Fuel Tax $1,450,000.00 = Total Authorized
Work: $5,,892,,000.00. This represents the anticipated cost for 6.2 miles of work ($5,615,000)
plus 5% contingency for unexpected work during construction ($277,,000). Staff has discussed
our intentions to reduce the amount of work with Builders Asphalt, and they have no
objections.
Alternativp-q
1. Accept the bid from Builders Asphalt for the 2024 Street Resurfacing Program.
2. Action at the discretion of the Village Board.
Staff Recommendation
Staff recommends that Builders Asphalt, LLC of Hillside, Illinois, be awarded the contract for
the 2024 Street Resurfacing Program in the amount of $7,,289,137,,87 with an authorized limit
of $5,892,999.
Attachments
1. 2024 Street Resurfacing List
2. 2024 Street Resurfacing M a p
3. Builders Asphalt Bid
4. Bid Tab
. . . . .............
..
.. iii.
IS
I.:l
..iii iii.
.... ..
.... ..
...
.. ...
..
.```` II
. ..iii .
..
...
..
...
..
...
.. TCS
..
..
..
..
..
..
...
. . . . . . .
1. . Sd iEl I` LED;
.. . ..
.. :: .... : ... : ... : .. .. . .
A. .. ...... .. ..
-
AZTEC LN
. ::: :
LAUREL DR
: .
....
:: .
ARAILA DR
. ::....�::
..
2024
A
AZTEC LN
ARAILA DR
ASPEN DR
2024
A
BURNING BUSH LN
KENSINGTON RD
BOULDER DR
2024
A
BURNING BUSH LN
BOULDER DR
APACHE LN
2024
A
BURNING BUSH LN
APACHE LN
HOPI LN
2024
A
COLUMBINE DR
CAMP MCDONALD RD
LARCH DR
2024
A
HOPI LN
QUINCE LN
BURNING BUSH LN
2024
A
HOPI LN
BURNING BUSH LN
SIOUX LN
2024
A
HOPI LN
SIOUX LN
CHOLO LN
2024
A
LARCH DR
COLUMBINE DR
MAYA LN
2024
A
LARCH DR
MAYA LN
MOHAWK LN
2024
A
LARCH DR
MOHAWK LN
ANDOA LN
2024
A
MAYA LN
VILLAGE LIMITS
LARCH DR
2024
A
QUINCE LN
HOPI LN
BITTERSWEET LN
2024
A
SIOUX LN
HOPI LN
CUL DE SAC
2024
B
HACKBERRY LN
WHEELING RD
BRENTWOOD LN
2024
B
NEWBERRY LN
KENSINGTON RD
IRONWOOD DR
2024
D
Business Center
Rand
H
2024
D
E GREGORY ST
MARCELLA RD
STRATTON LN
2024
D
E THAYER ST
MARCELLA RD
STRATTON LN
2024
d
EASTMAN CT
HILL ST
CUL DE SAC
2024
D
MARCELLA RD
CENTRAL RD
THAYER ST-
2024
d
MARCELLA RD
THAYER ST
THAYER ST
2024
D
MARCELLA RD
THAYER ST
ARDYCE LN
2024
d
MARCELLA RD
ARDYCE LN
GREGORY ST
2024
E
BOB 0 LINK RD
FOREST AV
PROSPECT MANOR
2024
E
PROSPECT MANOR AV
GREGORY ST
MEMORY LN
2024
E
W MEMORY LN
EASTWOOD DR
ELMHURST AV
2024
E
W MEMORY LN
PROSPECT MANOR
EASTWOOD DR
2024
E
W MEMORY LN
FAIRVIEW AV
PROSPECT MANOR
2024
F
S EDWAR❑ ST
BUSSE AV
CENTRAL RD
2024
F
S EDWARD ST
EVERGREEN AV
BUSSE AV
2024
F
S EDWARD ST
MILBURN AV
EVERGREEN AV
2024
F
S EDWARD ST
LINCOLN ST
MILBURN AV
2024
F
S EDWARD ST
NW HWY
LINCOLN 5T
2024
G
E LINCOLN ST
EMERSON ST
MAPLE ST
2024
G
E LINCOLN ST
MAPLE ST
SCHOOL ST
2024
G
EMERSON CT
EMERSON ST
CUL DE SAC
2024
G
GOLFHURST AV
EDWARD ST
GEORGE ST
2024
G
GOLFHURST AV
GEORGE ST
ALBERT ST
2024
G
GOLFVIEW PL
GOLFVIEW AV
CUL DE SAC
2024
G
S ALBERT ST
GOLFVIEW DR
GOLFHURST AV
2024
G
S EDWARD ST
SUNSET RD
GOLFHURST AV
2024
G
S EDWARD ST
GOLFVIEW DR
SUNSET RD
2024
ECTIfJN
........
STREET FROM
TU
.. ... ... ....
CHEC�ULEa
...
H
CENTRAL ALLEY END OF PAVE
WAPELLA
2024
....................................................................................................................................................................................................................................................................................................................................................
H Prospect Ave
.....................:.........................................................................:......................................................................:...............................................................:.....................................
PINE
......................................
WILLIE
.
2024.
H Prospect Ave
I OKA AV
ELMHURST RD
2024
H HI LUSI AV
BUSSE AV
PROSPECT AV
2024
H HI LUSI AV
.....................:.........................................................................:......................................................................:..............................................................:....................................
EVERGREEN AV
BUSSE AV
2024
.
H HI LUSI AV
MILBURN AV
EVERGREEN AV
2024
H HI LUSI AV
LINCOLN ST
MILBURN AV
2024
H W SUNSET RD
.....................:.........................................................................:......................................................................:..............................................................:.....................................
I OKA AV
ELMHURST RD
2024
.
H W SUNSET RD
HI LUSI AV
I OKA AV
2024
I BEVERLY LN
LINCOLN ST
HATLEN AV
2024
I Leonard
219
.......................................
Cul De Sac
2024
I PRAIRIE AV
WHITE OAK ST
END OF PAVE
2024
] CARBOY RD
.....................:.........................................................................:......................................................................:...............................................................:....................................
CUL DE SAC
NORDIC RD
2024
.
] CARBOY RD
NORDIC RD
CUL DE SAC
2024
] COTTONWOOD LN
..............:................................................:...............................................:..
CHESTNUT DR
ROBERT DR
........:......................................
2024
] COTTONWOOD LN
BIRCH DR
................................................................................................................................
CHESTNUT DR
2024
] COTTONWOOD LN
FERN DR
BIRCH DR
2024
] COTTONWOOD LN
..............:.................................................:...............................................:..........................................:......................................
BUSSE RD
FERN DR
2024
] NORDIC RD
CARBOY RD
ALGONQUIN RD
2024
] S LANCASTER AV
ASH DR
GOLF RD
2024
Alternate if Funds Allow
H.....
.. ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... .H
. .ROB... ... ... ... . ...ERT DR
... ... ...................................................................................................
ROBIN LN... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ..
LONN. ... ... ... ... ... ... ... ... ... ... ... ...QUIST BLV
2024
ROBERT DR
SUNSET RD
ROBIN LN
2024
H
ROBERT DR
GOLF RD
GLENN W
2024
H
ROBERT DR
GREENACRES W
SUNSET RD
2024
H
ROBERT DR
GLENN W
GREENACRES W
2024
�V
3`2`
os;
Cn
m
O
X
r0
(+
Ma
M
L ■
I
0
X
M
71
2024 STREET RESURFACING PRC
VILLAGE OF MOUNT PROSPECT, COOK CC
LOCATION MAP
W-3010011IMMIJIM,
�V_
,EUCLID Al 11
...TR.A-=0R � z,
BwLINK RC
..................
6LIMTIMC LN 3• OYF7RGRL
r�
x �
fALEZAL a
4
rr11u
I rf
{pR ..... fir,
w
1............KEN5INGTON RD
........................................................ .�:
....
...........;;;a:. »»,,... , ,. ...
c a { N C
0 101TH ANN On
w o
o � �
.......... +i.
............ ........... ����������............. ...........
S
LVoUOf,,,,,,,,,,,,,,,, ,,,,,,,,,,, .
����������������. ����������������. ����������.. ����������.. ������. ........... ...........
a GPEG QP." 51
. .........
l � ........... .........
J
1.
...icA ..SELL '........
..........
ST"...........
nrl IrHQRN " 'a
N
0
� LII ,,,, ,,,,
T
ww• lhllll.�'
..........
= Z
.........xx.. •a.
HE NRY... .GT... ',"�1'tN .N;.r...l. .. ».Y ,`.,IL'.
N w Y � 1141J I....T...1 �� �.
........................................ ............. ........4 ....... ,,,,,,,,,, {fir[ _
............................... „
l'.
......................
IIIIII yy CEN RAL RO
...... '�..i., ...r". ylli'E'TE.....�, iJFITEiJ'_TE CT 44414,vd0. a.�.
i ..:BU;S'....A.J.. ...1.
i
a
P ....
a EUaSE A� n
� r 1 �
I Ilgl[ y
Y f
!� II
] !II
N
y ls'
str,aH�L1 r =' Fs ,,,�
mw
1... ...I 1...
,fj' ...........'...ALU-fi 'Lf; ...................... ."...�,,,�,! ", "r'`,1.................."�.�' x...:;,BARBEf:f3YLN 4y z
.. f' ............................
rfq �p•ii'�i.........................................
.............................i ii ii ii i.'.....s
............... ..... iii..........................iii ......................... ir1 �, ' (r
..........
.....,,, ,,, ,,,BARE-RRY...Lr`J ,,,d ,,, LN ...a
A ............. y ... QU NC
,;;CEUA'; LN" 4¢ r..'z r .+,�,,,,, _ ......................... :;:
I
r
- ....5 RE�EfJ"
a
w
y -
T
...pUG'nrnrp'LN � - �.++ 2.. ...0 tt U LU�::
4 r4 nCy
o ...GU.7'Y I ..................... ...,Y. a •� .,, .. } IN7ErFE'
1 1 x r.r „,. :::::: r � ..
o LU tLl]tHHtKiY"LN�.,,.,�.�'E4r'Y::;: F ....................1.
LPI ... ' "S `� ...LINUtV'LN ..............r'�.7
•".c'"" s m > LIBER i'!
,rr +.......x.....
GREENvlOUG pZ ,� ...L �., .... .........................I ...................:
�.................,.r PEEG.7
py,........."r F
HAChBER;Y LV ❑ Fip CT � ....................r�
w
c
................... r.v HLHI I
......................IR9.1 W.W.R...9H..., m
1 1'„,,,,,,,,,,,,,,,,,,,,,,,,,,,,, J �................. ..........i w
KENSINGTON RU
... oRJ z ...1
CENTEk nR
om ...�.... l.l. z '' P E�;r �.�
el
o................... �✓
........... ......... .
..;l. (D
¢... . ”{ z '.0, .. .....................
"= Y
'h1tf7' 'I]RY" 'LN "HILL ... .. QST 0� a IIIIIIIIIIIIIIII�
n
vi
6ti1 s' WILUWUUU LV GREG: RY ST
,,,,,,,,,,,,, ,,,,,,,,,,,,, ,,,,,,,,,,,,, ...................... v� H....... LN ,. I...,................... Lp1•I7EN _N
l a .L i,......CAR011JF,LL�. i,,,� ? j 1tFFHtT
111 yG` - a z L.......SM,...1 �............
...CA ..w a ..pH...�
1.
f � � Ij
"'ISA BELLA 'ST" "j z k,,,,,,,
a „ CR...l. . a z 4911 LHLL
(. ...... r ... ............ 11 ......pfi
.......... +"......., �......... .......
. - THAYER
AftGYC= LN
,,,,,,,,,,,, ,,,,,,,,,,,,,, ,,,,,,,,,,,,,, ,..........,„,,,,,,,,,,,,,,,,,,,,,,,,,.. ,,,,,,, 4 ST MARS
THAYE7 5- 'P I ,,,,,,,,,,,,,,,, ,,.1-1
CEVTENN AL GP. H..YL T i
H G
'n HLNRY 51 '~ O HLNRY��51 A r
........'. ........:.`.:. ���������..... ............ ..... ............................... ^' u,
`Y J N J r AfB��, GRttN LN
................... ..r
............ ............. ............ ............. .............. ...........................1+.i.;, 7
���� IIIIII
�... ,,,I
............ .......... .............. .............. ............. ............. ..+ ............. ...,.......... ........iii. iii........
........ ..
....... iii u. ..... iiiu`S. iA ..i ....iQ .....v ii........
ii ii ii
i
.................
...... -
1:.F.: ....�'��
"EVER EEN
.....�. - EPEE RttN A - „r
h11LP.IJRV A4� ..� _
..... ~o ” ,
4 .:. j a
1 ... ..1.J.................
M LEURN AV,,,
I
L„ ,
'tea..
-...........
_ 1.1T
6 1 IL t3U "A
A S`
4 1 I
�A f
Tf -
4... If+r �n
........... ... �� �� a = F � cc ,�•�,� 414
""'FEIJCI� ETDIJFL ....4J� �,,, f
p
n
ICO_PI �T
4
........................................1 ......... ����� f 1
.r........... ... ............................... r... ,���� ..... ...N ..0 ...
L L IT,.
r 4 "'CiYJ 'CBY"17"`
"'�i'ri�'a�ri��sr�r
N
N I,:
1k'A
ST
F' l
4 I
l
I
U
c
I
l
- I
7� li"%Y• -3J ,. ,,,..... nnnnn. 4r44
TR 9 rr .
.. ll
n
.......� ........x...
GU'nrA VQC AV. '�'�a AV o SHA DME
N1 LHLINQ .0.
.I......��♦:OP•
w
Y
n
t4 ...r. ads- , ......CD
,,,,,, ..
E -
A 2
���nurl ��i�..
[n -
TP.
, N
IS
„. +l „ 4
o N 'S 5
n �,
a r
l� V .1rN rr. „
..........� .....+ r,.• � .... � �f• - w IIIIIIlWfk � F
•""""�i �'� " a�` Q• '� N 111111' � III II�
a
DR , �. „� k a
-
UP7ttNUH w LI
On 7 mc. �............TP.......
I..................I.., :::s
w I - ....... .... ... + .....................x........ .�....l...
LIiNNUUS 13Lr'U ,.... .....4........
0
l
r o
,,,
ROBIN LV y ................. z -
G FHJ �
q u
,� ""•• ........... SUNSET RD
4 a ...,Gx........x...'
,W..
¢
v! o '
SUNSET RG '•,,,,,,,,,,,,,, ...... ......... ,,,
.L.,,
GREEN 1CRESLN
............x...LEFJW LW
.................. J.11
a .•r•••
Yz
1J"
WIZ
.......P:..LM..G..........
GOLF RU -
a ... ... ..............x.....x.......x.. ..x.... a
„THCRNWQGG LN ..� o .o """ •••• o' w FALhI'U... .T� w
w" ............ o o w 11III i
LOEUST LN lIr............� z �...A.....,k
i............................1..1.1........ a L - ABEL"k'IR
'6 ... ............. "7�._LCW...:J�..........�:.......,,,.,...,,,,,,,,,, '�' ..............� VfILLQ'N LN LH
..... qp l'... 7H 'ok ... fit;;;,:... „r.
a lry CATALPA LN ...,I » •x...............F h ...:::::........1.1.1.'..1. V
.......11;...;1...1;1;1........;..1... ........
..r�J„ �.. E1•'P. LV
PHEASANT TR FHQS OF
6.... ...� . r. z . .,..r.
r
z •••� c = _'z ••••,•••••• I•HLSwC4wGl Ok CMMCsRS RCS
Other Work Locations
Leonard Av (Cul -de -Sac)
Na Wa Ta Av (Lincoln -Go Wando)
Business Center (Rand -Harvest)
Village Wide Patch (Per Engineer's Direction)
I
L ■
Cover Sheet
Legend & General Notes
Pavement Markings
Work Items
Section A
5 Section A Notes
6 Aztec Ln (Laurel-Aralia)
7 Aztec Ln (Aralia-Aspen )
8 Burning Bush Ln (Kensingt
Boulder)
9 Burning Bush Ln (Boulder-,
10 Burning Bush Ln (Apache -1
11 Columbine Dr (Camp McD(
Larch)
12a -12b Hopi Ln (Quince Burning Bi
13 Hopi Ln (Burning Bush -Sial
14 Hopi Ln (Sioux-Cholo)
15a -15b Larch Dr (Columbine -Maya
16 Larch Dr (Maya -Mohawk)
17 Larch Dr (Mohawk-Andoa)
18 Maya Ln (Village Limits -Lai
19 Quince Ln (Hopi-BittersweE
29 Sioux Ln (Hopi -Cul de Sac;
Section B
21 _ _ Section B Notes
0
„„„„,.x .........................................
CENTRAL LY...............
r..������
-
... PIVUtL pH FREDIA CT
............�.tlidh.........
a
,,-RGE GR y...........
� V4
"" ,
v Ffl
0 I
c
...........
•"•T
HATLEN AV
3,, ,,,,,,,,,,,,,,,...........
x
.......................E1,AVdl'
^. ",,.'
.SdT.........
,...............
SLU
tPtk
-
............................. R. ...
,,,,,,,,,,ST,,, ,,,,,,,r
HUti71t LN
..... x4.
,,,,,,,, ,,,,,,,; ..r .. ... A •.;';:' ;:;:' ,,,,,,,,
....................... ......11,....,..............��
' ,,,,,.,,,,,,
f "MFRK"
LP.'aHtNCt LV �U'LIVAP
o
w
L
��������,
N
....
,,,,
4
RUSTY...pR' ,I W
....................................A........
,`,`,;,;..
... CT
F^"
w w
w w w
� ........... ........... L
PR=IJCEZ-
.= GAST LN "•�,,,�
�•
z
"MYRTLE 'OR
..
iii....'+.............................. -
M.'.RTHA LN
w
',,,•MARTIN"LN...
�
�
"� """"J"'I •••=
m�iJ
'IIIIII � �;dr',JN
{
4 ::..................................... ....... ....
w •,
LONNQUIST BLJG
I
VILLAGE OF MOUNT PROSPECT, COOK CC
LOCATION MAP
W-3010011IMMIJIM,
�V_
,EUCLID Al 11
...TR.A-=0R � z,
BwLINK RC
..................
6LIMTIMC LN 3• OYF7RGRL
r�
x �
fALEZAL a
4
rr11u
I rf
{pR ..... fir,
w
1............KEN5INGTON RD
........................................................ .�:
....
...........;;;a:. »»,,... , ,. ...
c a { N C
0 101TH ANN On
w o
o � �
.......... +i.
............ ........... ����������............. ...........
S
LVoUOf,,,,,,,,,,,,,,,, ,,,,,,,,,,, .
����������������. ����������������. ����������.. ����������.. ������. ........... ...........
a GPEG QP." 51
. .........
l � ........... .........
J
1.
...icA ..SELL '........
..........
ST"...........
nrl IrHQRN " 'a
N
0
� LII ,,,, ,,,,
T
ww• lhllll.�'
..........
= Z
.........xx.. •a.
HE NRY... .GT... ',"�1'tN .N;.r...l. .. ».Y ,`.,IL'.
N w Y � 1141J I....T...1 �� �.
........................................ ............. ........4 ....... ,,,,,,,,,, {fir[ _
............................... „
l'.
......................
IIIIII yy CEN RAL RO
...... '�..i., ...r". ylli'E'TE.....�, iJFITEiJ'_TE CT 44414,vd0. a.�.
i ..:BU;S'....A.J.. ...1.
i
a
P ....
a EUaSE A� n
� r 1 �
I Ilgl[ y
Y f
!� II
] !II
N
y ls'
str,aH�L1 r =' Fs ,,,�
mw
1... ...I 1...
,fj' ...........'...ALU-fi 'Lf; ...................... ."...�,,,�,! ", "r'`,1.................."�.�' x...:;,BARBEf:f3YLN 4y z
.. f' ............................
rfq �p•ii'�i.........................................
.............................i ii ii ii i.'.....s
............... ..... iii..........................iii ......................... ir1 �, ' (r
..........
.....,,, ,,, ,,,BARE-RRY...Lr`J ,,,d ,,, LN ...a
A ............. y ... QU NC
,;;CEUA'; LN" 4¢ r..'z r .+,�,,,,, _ ......................... :;:
I
r
- ....5 RE�EfJ"
a
w
y -
T
...pUG'nrnrp'LN � - �.++ 2.. ...0 tt U LU�::
4 r4 nCy
o ...GU.7'Y I ..................... ...,Y. a •� .,, .. } IN7ErFE'
1 1 x r.r „,. :::::: r � ..
o LU tLl]tHHtKiY"LN�.,,.,�.�'E4r'Y::;: F ....................1.
LPI ... ' "S `� ...LINUtV'LN ..............r'�.7
•".c'"" s m > LIBER i'!
,rr +.......x.....
GREENvlOUG pZ ,� ...L �., .... .........................I ...................:
�.................,.r PEEG.7
py,........."r F
HAChBER;Y LV ❑ Fip CT � ....................r�
w
c
................... r.v HLHI I
......................IR9.1 W.W.R...9H..., m
1 1'„,,,,,,,,,,,,,,,,,,,,,,,,,,,,, J �................. ..........i w
KENSINGTON RU
... oRJ z ...1
CENTEk nR
om ...�.... l.l. z '' P E�;r �.�
el
o................... �✓
........... ......... .
..;l. (D
¢... . ”{ z '.0, .. .....................
"= Y
'h1tf7' 'I]RY" 'LN "HILL ... .. QST 0� a IIIIIIIIIIIIIIII�
n
vi
6ti1 s' WILUWUUU LV GREG: RY ST
,,,,,,,,,,,,, ,,,,,,,,,,,,, ,,,,,,,,,,,,, ...................... v� H....... LN ,. I...,................... Lp1•I7EN _N
l a .L i,......CAR011JF,LL�. i,,,� ? j 1tFFHtT
111 yG` - a z L.......SM,...1 �............
...CA ..w a ..pH...�
1.
f � � Ij
"'ISA BELLA 'ST" "j z k,,,,,,,
a „ CR...l. . a z 4911 LHLL
(. ...... r ... ............ 11 ......pfi
.......... +"......., �......... .......
. - THAYER
AftGYC= LN
,,,,,,,,,,,, ,,,,,,,,,,,,,, ,,,,,,,,,,,,,, ,..........,„,,,,,,,,,,,,,,,,,,,,,,,,,.. ,,,,,,, 4 ST MARS
THAYE7 5- 'P I ,,,,,,,,,,,,,,,, ,,.1-1
CEVTENN AL GP. H..YL T i
H G
'n HLNRY 51 '~ O HLNRY��51 A r
........'. ........:.`.:. ���������..... ............ ..... ............................... ^' u,
`Y J N J r AfB��, GRttN LN
................... ..r
............ ............. ............ ............. .............. ...........................1+.i.;, 7
���� IIIIII
�... ,,,I
............ .......... .............. .............. ............. ............. ..+ ............. ...,.......... ........iii. iii........
........ ..
....... iii u. ..... iiiu`S. iA ..i ....iQ .....v ii........
ii ii ii
i
.................
...... -
1:.F.: ....�'��
"EVER EEN
.....�. - EPEE RttN A - „r
h11LP.IJRV A4� ..� _
..... ~o ” ,
4 .:. j a
1 ... ..1.J.................
M LEURN AV,,,
I
L„ ,
'tea..
-...........
_ 1.1T
6 1 IL t3U "A
A S`
4 1 I
�A f
Tf -
4... If+r �n
........... ... �� �� a = F � cc ,�•�,� 414
""'FEIJCI� ETDIJFL ....4J� �,,, f
p
n
ICO_PI �T
4
........................................1 ......... ����� f 1
.r........... ... ............................... r... ,���� ..... ...N ..0 ...
L L IT,.
r 4 "'CiYJ 'CBY"17"`
"'�i'ri�'a�ri��sr�r
N
N I,:
1k'A
ST
F' l
4 I
l
I
U
c
I
l
- I
7� li"%Y• -3J ,. ,,,..... nnnnn. 4r44
TR 9 rr .
.. ll
n
.......� ........x...
GU'nrA VQC AV. '�'�a AV o SHA DME
N1 LHLINQ .0.
.I......��♦:OP•
w
Y
n
t4 ...r. ads- , ......CD
,,,,,, ..
E -
A 2
���nurl ��i�..
[n -
TP.
, N
IS
„. +l „ 4
o N 'S 5
n �,
a r
l� V .1rN rr. „
..........� .....+ r,.• � .... � �f• - w IIIIIIlWfk � F
•""""�i �'� " a�` Q• '� N 111111' � III II�
a
DR , �. „� k a
-
UP7ttNUH w LI
On 7 mc. �............TP.......
I..................I.., :::s
w I - ....... .... ... + .....................x........ .�....l...
LIiNNUUS 13Lr'U ,.... .....4........
0
l
r o
,,,
ROBIN LV y ................. z -
G FHJ �
q u
,� ""•• ........... SUNSET RD
4 a ...,Gx........x...'
,W..
¢
v! o '
SUNSET RG '•,,,,,,,,,,,,,, ...... ......... ,,,
.L.,,
GREEN 1CRESLN
............x...LEFJW LW
.................. J.11
a .•r•••
Yz
1J"
WIZ
.......P:..LM..G..........
GOLF RU -
a ... ... ..............x.....x.......x.. ..x.... a
„THCRNWQGG LN ..� o .o """ •••• o' w FALhI'U... .T� w
w" ............ o o w 11III i
LOEUST LN lIr............� z �...A.....,k
i............................1..1.1........ a L - ABEL"k'IR
'6 ... ............. "7�._LCW...:J�..........�:.......,,,.,...,,,,,,,,,, '�' ..............� VfILLQ'N LN LH
..... qp l'... 7H 'ok ... fit;;;,:... „r.
a lry CATALPA LN ...,I » •x...............F h ...:::::........1.1.1.'..1. V
.......11;...;1...1;1;1........;..1... ........
..r�J„ �.. E1•'P. LV
PHEASANT TR FHQS OF
6.... ...� . r. z . .,..r.
r
z •••� c = _'z ••••,•••••• I•HLSwC4wGl Ok CMMCsRS RCS
Other Work Locations
Leonard Av (Cul -de -Sac)
Na Wa Ta Av (Lincoln -Go Wando)
Business Center (Rand -Harvest)
Village Wide Patch (Per Engineer's Direction)
I
L ■
Cover Sheet
Legend & General Notes
Pavement Markings
Work Items
Section A
5 Section A Notes
6 Aztec Ln (Laurel-Aralia)
7 Aztec Ln (Aralia-Aspen )
8 Burning Bush Ln (Kensingt
Boulder)
9 Burning Bush Ln (Boulder-,
10 Burning Bush Ln (Apache -1
11 Columbine Dr (Camp McD(
Larch)
12a -12b Hopi Ln (Quince Burning Bi
13 Hopi Ln (Burning Bush -Sial
14 Hopi Ln (Sioux-Cholo)
15a -15b Larch Dr (Columbine -Maya
16 Larch Dr (Maya -Mohawk)
17 Larch Dr (Mohawk-Andoa)
18 Maya Ln (Village Limits -Lai
19 Quince Ln (Hopi-BittersweE
29 Sioux Ln (Hopi -Cul de Sac;
Section B
21 _ _ Section B Notes
Bid Request
For
2024 Street Resurfacing/Rebuild Illinois Program
BID OPENING: March 12th, 2024 — 1:00 P.M. Local Time
Mount Prospect Public Works Department
1700 W. Central Road, Mount Prospect, Illinois 60056-2229
NOTICE TO BIDDERS
Bid for
2024 Street Resurfacing
Sealed bids will be received until 1:66 p.m. on March 12th, 2024, in the office of the Village
Manager, 3rd Floor, 50 S. Emerson Street, Mount Prospect, Illinois 60056. In a separate,
g
sealed envelope please submit bid clearly marked:
"Sealed Bid for 2024 Street Resurfacing Program"
The project consists of resurfacing a,pproArr ately 7.36 miles of local streets at various
locations throughout the village. The project includes but is not limited to the following bid
items: HMA Surface Removal 2" and 3'J, HMA Leveling Binder and Surface Course, Curb
and Gutter Replacement, Sidewalk Replacement, Utility Structure Repair and
Replacement, Thermoplastic Pavement Markings and PVC storm sewer.
Illinois Department of Transportation Prequalification is required.
Plans and specifications may be obtained at the Village of Mount Prospect's Demandstar
website by using the following link: www.rnountprospect.org/bids
All work under, this Bid and the resulting contract shall comply with the Illinois
Prevailing Wage a Act 820 ILCS 130/0.01 et seq= and the other applicable laws and
ordinances.
Offers may not be withdrawn for a period of ninety (g0) days after the bid date without the
consent of the Board of Trustees.
Any Bid, submitted: unsealed, unsigned, sent via email or fax or received subsequent to
the aforementioned date and °lane, will be disqualified and returned to the bidder.
g
The: Villag e reserves the right in its sole discretion, to reject any and all bids or parts
.
thereof, to waive an irregularities technicalities and informalities in bid procedures and
to award the contract in a manner best serving the interests of the Village.
Qregarding Questions re ardin this project should be directed to Matt Lawrie, Village Engineer,
Village of Mount Prospect, Public Works Department, 847-870-5540.
Village Manager
Michael Cassady
Proposal Submitted By:
Contrpctoes Name
Builders Raving, LLC
Contra.ntoeS Addres
II
4401 Roosevelt Rd
Local Public Agency
Formal Contract PropOsal
COVER SHEET
PON
StateCode. . ....
rHillside
IL 60162
STATE OF ILLINOIS Cour Section Number
Loll Public A enc 2�4- 8�-00-R
Cool
[Vjlla a of Mount Prospect a f"nds
9
route � Street/ oad lame MFT, Local
2024. Resurfacing Program
proposal and Plans � Proposal only, plans are Separate
F-1 Pro
Proposal Only ® p
Submitted/Approved
For a ovum and Road Di tr ct P.ro ect
Submitted/Approved
Hi h ra Commissioner Si..natore
Gate
Submitted/Approved
Count � n f1�Su erintendent of lei hw s Date
For a Mnioipalm project
Submitted/Approved/Passed
ieparent of Transportation
Released for bid based on limited review
Re Date �
ion W Si.C�n �nee�a ire
2/28/2024
`
Bands, should be stapled together to prevent loss
including Proposal Gu.1 aranty Checks or proposal Bid
Note. All proposal documents, i 9
when bids are processed.
Page 1 of 6
Printed 01/30/24
BLR 12200 (Rev. 01121121)
Local Public A en Count Section Number Route s0 Street/Road Name
g Cook 24-001 80 -00 -RS 2024 Resurfacing Program
Vfllage of Mount Prospect
NOTICE TO BIDDERS
er Mana a
Sealed proposals for the project described below will be received at the office of Village g
Name of Office
50 S. Emerson Street Mount Prospect 160056 60056 until 1.00 PM on 03/12/24
Address Time Date
Sealedro osals will be opened and read publicly at the office of Village Manager
p p Name of Office
50 S
Emerson Street Mount Prospect IL 60056 at 1:00 PM on 03/12/24
Address Time Date
DESCRIPTION OF WORK
Locabon
Various Streets Throughout The Village of Mount Prospect
........................
Po _r FYI*' q' e�11�1
7.36 Miles
p[2p.oseAjMprovLement
HMA
Surface Removal 2" and 3", HMA Leveling Binder and Surface Course, Curb and Cutter Replacement,
Sidewalk Replacement, Utility Structure Repair and Replacement, Thermoplastic Pavement Markings, Roadway
Patches and PVC storm sewers
1 Plans and Proposal forms will be available in the office of
Mount Prospect Public Works Department
1 700 W. Centra! Rd, Mount Prospect IL, 60056
Contact Protect Engineer Brandon Saccone
2. ® Prequalification
If checked" p the 2 apparent as read low bidders must: file within 24 hours after the letting an "Affidavit of Availability" (Form BC 57) in
,
tri licateshowing all uncompleted contracts awarded to thea and all low bids pending award fbr Federal, State, County, Municipal
p �
andp rvate work., One original shall be filed with the Awarding Authority and two od inals with the IDOT District Office,,,
3. The AwardingAuthority reserves the right to waive tech nicalitit
es and to reject any or all proposals as provided in BLRS Special
Provision for Bidding Requirements and Conditions for Contract Proposals.
4. The following BLR. Forms shall be returned by the bidder to the Awarding Authority:
a. Local Public Agency Formal Contract Proposal (BLR 12200)
b. Schedule of Prices (BLR 12201)
c. Proposal Bid Bond (BLR 12230) (if applicable
.
d. Apprenticeship or Training Program Certification (BLR 12325) (do not use for project with Federal funds.
e. Affidavit of Illinois Business Office (BLR 12.326) (do not use for project with Federal funds)
5. 'The q u a ntrfies appea
ring in the bid schedule are approximate and are prepared for the co rn p anison of bids, Payment to the Contractor
will be made only fbr the actual quantities of work performed and accepted or materials furnished according to the contract, The
scheduled quantities of work to be done and materials to be furnished may be increased, decreased or ornitted as hereinafter
provided.
6. Submission of a bid shall be conclusive assurance and warranty the bidder has examined the plans and understands all requirements
for thep erfbrrnance of work. The bidder will be responsible for a I I errors in the proposal. resulting from failure or neglect. to conduct an
in depth examination, The Awarding Authority will, in no case, be responsible for any costs, expenses, losses or changes in
anticipated profits resulting from such failure or neglect of the bidder.
7. The bidder shall take no advantage of any error or omission in the proposal and advertised contract.
6, if a special envelope is supplied by: the Awarding Authority" each. proposal should be submitted in that: envelope furnished by the
� p
Awarding Agency end the. blank, spaces on the envelope shall be filled in correctly to clearly indicate. its contents. When an envelope
g y
other than, the special one furnished by the Awarding Authority is used, it: shall be marked to clearly indicate its contents. When sent
mail the sealed proposal shall be addressed to the Awarding Authority at the address and in care of the official in whose office the
by p p als shall be filed prior to the time and at the place, specified in the Notice to Bidders. Proposals
bids are to be received, All propos.
received after the time specified will be returned to the bidder unopened.
Permission will be given to a bidder to withdraw a proposal if the bidder makes the request in writing or in person before the time for
9
opening proposals.
Printed 02/27/24 Page 2 of 6 BLR 12200 (Rev. 01/21/21)
Local Public A lenc Count. Section Number Routes StreeRoad 1' arnp-
Village of Mount Prospect
Cook 24-00180-00-RS7., 2024 Resurfacing Program
llag p........
PROPOSAL
1. Proposal of Builders Pavi ,LLC
Confat;or� l�n�e
4401 Roosevelt Rd, Hillside, IL 60162
Contr c or's Address
2. The plans for the proposed work are those prepared by Mount Prospect Public Works
and approved by the Department of Transportation on
3. The specifications referred to herein are those prepared by the Department of Transportation and designated as "Standard
Specifications for Road and Bridge Construction" and the " Supplemental Specitzcations and Recurring Special Provisions" thereto,
adopted and in effect on the date of invitation for bids.
4u The undersigned agrees to accept, as part of the contract, the applicable Special Provisions indicated on the "Check Sheet for
Recurring Special Provisions" contained in this proposal.
5. The undersigned agrees to complete the work within working days or by 10/27/23 unless additional time
is granted in accordance with the specifications.
d:
6. The successful bidder at the time of execution: of the contract will be required to deposit a contract bond for the full amount o
the award, When a contract bond is not required, the proposal guaranty check will be held in lieu thereof* if this proposal is accepted
and the undersigned fails to execute a contract and contract boned as required, it is hereby agreed that the Bid. Bond of check shall be
forfeited to the Awarding Authority.
7. Each pay item should have a unit price and a total price, if no total price is shown or if there is a discrepancy between the products of
the unit price multiplied by the quantity, the unit price shall govern, If a unit prioe is omitted, the total price will be divided by the
quantity in order to establish a unit price. A bid may be declared unacceptable if neither a un it price nor a total price is shown,
8. The undersigned submits herewith the schedule of prices on BLR 12201 covering the work to be performed under this contract.
9. The undersigned further agrees that if awarded the contract for the .sections contained in the combinations on BLR 12201, the work
shall be in accordance. with the requirements of each individual proposal for the multiple bid specified in the Schedule for Multiple Bids
below.
10. A proposal guaranty in the proper amount, as specified in BLRS Special Provision for Bidding Requirements and Conditions for
Contract Proposals, will be required. Bid Bonds will be allowed as a proposal guaranty. Accompanying this proposal is either
a bid bond, if allowed, on Department form BLR 12230 or a proposal guaranty check, complying with the specifications, made payable
to Treasurer of
The amount of the check is Y
Attach Cashier's Check or Certified Check Here
In the event that one proposal guaranty check is intended to cover two or more bid proposals, the amount must be equal to the
sum of the proposal guaranties which would be required for each individual bid proposal. If the proposal guaranty check is
placed in another bid proposal, state below where it may be f-und.
The proposal guaranty check will be found in the bid proposal for: Section Number
Printed 02/27/24 Page 3 of 6 BLR 12200 (Rev. 01/21/21)
Section Number Route
'o s�
Local Public enc Count . . .......
Coo
Village of Mount Prospect Cook 24 -00180 -00 -RS 2024 Resurfacing Program
�m�wwwwww L........ . .
CONTRACTOR CERTIFICATIONS
The certifications hereinafter made by the bidder are each a material representation of fact upon which reliance is placed should the
Department enter into the contract with the bidder.
1. Debt Delinquency. The bidder or contractor or subcontractor, respectively, certifies: that it is not delinquent in the payment of any tax
administered by the Department of Revenue unless the individual or other entity is contesting, in accordance with the procedure
established by the appropriate Revenue Act, its liability for the tax or the amount of the tax. Making a false statement voids the
contract and allows the Department to recover a I I amounts paid to the individual o r entity under the contract in a civil action.
2. Bid -Rigging or Bid Rotating. The bidder or contractor or subcontractor, respectively, certifies that it is not barred from contracting
with the Department by reason of a violation of either 720 1 LCS 5/33E-3 or 720 1 LCS 5/33E-4.
A violation of section 33E-3 would be represented by a conviction of the crime of bid -rigging which, in addition to Class, 3 felony
sentencing, provides that a n y person convicted of this offense„ o r any similar offe nse of a n y state or the United Stateswhich co n ta i n s
m
the same eleents as this offense shall be barred for 5 years from the date of conviction from contracting with any unit of'State or
local government, No corporation shall be barred from contracting with any unit of State or local government as a result of a conviction
under this Section of any employee or agent of such corporation if the employee so: convicted is, no longer employed by the
corporation'. (1) it has been finally adjudicated not guilty or ('2 ) "if it demonstrates to the m
governental entity with which it seeks to,
contract that entity finds that the corpmission of the offensewas neither authonized, requested, commanded, nor performed by a
director, officer or a high managerial agent on behalf of the corporation.
A violation of Section 33E-4 would be represented by a conviction of the crime of bid -rotating which, in addition to Class 2 feJony
sentencing, provides that any person convicted of this offense or any similar offense of any state or -the United States which contains
the same elements as this offense shall be permanently barred from contracting with any unit of State, of Local government, No
corporation shall be barred from contracting with any unit of State or Local government as a result of a conviction Linder this Section of
any employee or agent. of such corporation if the employee so convicted is no longer employed by the corporation and::, (1) it has been
finally adjudicated not guilty or (2) if it demonstrates to the governmental entity with which it seeks to contract and that entity finds that
the commission of the offense was neither authorized, requested, comniandedo nor performed by a director, officer: or: a high
managerial agent on behalf of the corporation.
3. Bribery. The bidder or contractor or subcontractor, respectively, certifies that, it has not been convicted of bribery or attempting to
bribe an officer or employee of the State of Illinois or any unit of local government, nor has thefirm made an admission of guilt of such
conduct which is a matter or record, nor has an official, agent, or ernpioyeei of t ' he firm oornmitted bribery or: attempted bribery on
behalf of the firm and pursuant to the direction or authorization of a responsible official of the firm.
4. Interim Suspension or Suspension. The bidder or contractor or subcontractor, respectively, certifies that it is not currently under a
suspension as defined in Subpart I of Title 44 Subtitle A Chapter III Part, 6 of the Illinois Administrative code. Furthermore, if
suspended prior to completion of this work, the contract or contracts executed for the completion of this work may be canceled.
Printed 02/27/24 Page 4 of 6 BLR 12200 (Rev. 01121/21)
Limited Liability Company
Firm Name
��P
Builders Pa�vir�I LLC
Si nature Date
A.
3112/24
2010:
'"!"' ble
"IIB
Steven Salinas, Vice President
Business Address
B
4401 Roosevelt Rd
cit State ZJ Code
Hillside IL 60162 ::::
Insert -thee Names and Addresses of all Partners
SKEJG, LLC
321 Center Street
Hillside, IL 60162
Insert Names of Officers Prsicfent
Printed 02/27/24 Page 5 of 6 BLR 12200 (Rev. 01/21/21)
Attest:
Secretary
Treasurer
Printed 02127/24 Page 6 of 6 BLR 12200 (Rev. 01121121)
wr
fin DePaftMent Schedule of Prices
of, Transportabon
.
Contractor's Name
Builders Paving, LLC
Contractor's Address City.........................
State Zip Cade
4401 Roosevelt Road Hillside IL:1
60162
........ . .....
Local Public Agency County Section Number
Village of Mount Prospect Cook 2400180 -00 -RS
Route(s) (Street/Road Name)
Various Streets Throughout The Village of' Mount Prospect
Schedule for Multiple Bids
Combination Letter Section Included in Combinations Total
___._............................................ ... Schedule for Single Bid
(For complete information covering these items, see plans and specifications.). . .. . . ................................ --
. . . .
Item Number
.......... . . . -- ................ ................. --
It -- ems
Unit
Quantity
Unit Price
Tota
1
Earth Excavation
CU YD
200
$
5.00
$
15000.00
2
Aggregate For Temp Access
CU YD
1480
$
6.00
$
8,880.00
3
Agg Base Course, Type B, 4"
CU YD
583
$
6.00
$
3,498.00
4
Mix„ for Joints, Cracks & Flange
Ton
2
$
2,500.00
$
51)000.00
5
Class D Patches, Type Ill, 2"
SQ YD
1250
$
21.25
$
26,562.50
6
Class D Patches, Type IV, 2"
SQ YD
3750
$
21.25
$
79,687.50
7
Class D Patches, Type 11, 6"
SQ YD
1124
$
17.50
$
19,670.00
8
Class ❑ Patches, Type IV, 6"
SQ YD
1124
$
17.50
$
19,670.00
9
Pavement Removal, Special
SQ YD
249
$
20.00
$
4,980.00
10
HMA Surface Removal, 2.0"
SQ YD
1898
$
6.10
$
115577.80
11
HMA Surface Removal, 3.0"
SQ Y❑
107519
$
4.55
$
489,211.45
12
Bit Material (Tack Coat)
POUND
73422
$
0.01
$
734.22
13
Level Binder (MM), N50, 1.5"
TON
9137
$
97.85
$
894,055.45
14
HMA Surf Crse, Mix D, N50 1.5"
TON
9137
$
94.85
$
866,644.45
15
HMA Surf Crse, Mix D, N50 2"
TON
610
$
93.30
$
56,913.00
16
Class B Patches, Type ll, 10"
SQ YD
300
$
120.00
$
36,000.00
17
Class B Patches, Type Ill, 10"
SQ YD
400
$
120.00
$
48,000.00
18
Class B Patches, Type IV, 10"
SQ YD
400
$
120.00
$
48,000.00
19
PCC Pavement 10" Jointed
SQ YD
249
$
140.00
$
345860.00
20
Dowel Bars
EACH
112
$
20.00
$
25240.00
21
Comb Conc Curb & Gutter
FOOT
2450
$
1
25,.00
$
611250.00
22
Comb Conc Curb&Gutter R&R
FOOT
37349
$
31.00
$
1,157,819.00
23
PCC Sidewalk Removal
SQ FT
2100
$
1.25
$
2,625.00
24
... ..., --- I- I-
PCC Sidewalk 5"
............. I
SQ FTI
wvwp�
$
7.50
$
180,450.00
Printed 02127/24
Page 1 of 2
BLR 12201 (Rev. 05107121)
Local
Public Agency.
............ Section Number
Route(s) (Street/Road Name)
. . . . . . . . . . . ...
fillae
......... . .....County
of Mount Prospect Cook.
24-00180-00-RS
Various Streets Through
Item Number
Items
Unit
Quantity
Unit Price
Total
PCC Sidewalk 5" R & R
SQ FT
224134
$
8.25
1,849,105.50
125
26
Detectable Warnings
SQ FT
3680
$
27.00
99,360.00
27
PCC Driveway R&R 6"
SQ YD
5803
$
82.50
$
478747.50
28
HMA Driveway R&R 3"
SQ YD
1971
$
75.00
$
147,825.00
29
Driveway Base R&R 8"
SQ FT
948
10.00
9,480.00
30
Trench Backfill
CU YD
200
$
1.00
$
200.00
31
iStorm Sewer SDR 35, TY1, 8"
FOOT
100
$
78.00
$
77800.00
32
Storm Sewer SDR 35, TY1, 10"
FOOT
100
$
88.00
$
8,800.00
33
Storm Sewer SDR 35, TY1, 12"
FOOT
50
$
99.00
$
4,950.00
34
Structures to be Adjusted
EACH
353
$
450.00
$
158,850-00
35
Structures to be Reconstructed
EACH
22
$
1,435.00
$
311)570.00
136
Inlets, Type A, MP Frame &LID
EACH
9
$
1,785.00
761P065.00
:37
Catch Basins, Type C, TY 1 F1L
EACH
9
$
2,055.00
$
18,495.00
38
Catch Basins, Type A, TY 1 F1L
EACH
19
$
4x72.5.00
$
...
897775.00
139
Manholes, Type A, TY 1
EACH
5
$
4,670.00
$
23,350.00
40
Sodding, Special
SQ YD
600
$
10.00
$
6,000.00
41
Seeding, Special
SQ YD
2275
$
9.00
$
20,475.00
42
Erosion Control Blanket
SQ YD
200
$
30.04
$
67000.00
43
Thermoplastic PM - Line 4"
FOOT
1900
$
1.00
$
1,900 00
44
il Thermoplastic PM - Line 6"
FOOT
1161
$
1.50
$
1,741.50
45
Thermoplastic PM - Line 12"
FOOT
1798
$
3.00
$
5394.44
46
Thermoplastic PM - Line 24"
FOOT
124
$
6.00
$
744.00
47
Thermoplastic PM - Letter&Sym
EACH
16
$
5.00
$
84 44
48
TC&P, Standard 701501
L SUM
1
$
223,000.00
$
223`000.00
49
TC&P, Standard 701701
L SUM
1
$
1.00
$
1.00
50
TC&P, Standard 701801
L SUM
1
$
1.00
$
1.00
51
Mount Prospect Brick
SQ FT
330
$
45.00
$
14p854.00
52
Mount Prospect Brick R&R
SQ FT
150
$
35.00
$
5,250.40
Bidder's Total Proposal L$
7,289,137.87
Each pay item should have a unit price and a total price.
If no total price is shown or if there is a discrepancy between the product of the unit price multiplied by the quantity,
the unit price shall govern.
3. If a unit price is omitted, the total price will be divided by the quantity in order to establish a unit price.
4. A bid may be declared unacceptable if neither a unit price or total price is shown.
Printed 0212712.4 Page 2 of 2 BLR 12201 (Rev. 05/07/21)
Apprenticeship and
Iftois E s 9• N
Oftion T
Training Program Certification
Local Publi County . . . ...... Street Name/Road Name Section Number
Village of Mount Prc��ac �-�� Cook ...........................
�4 Resurfacing Program MQQ180-00-RS
All contractors are required to complete the following certification
® For this contract proposal or for all bidding groups in this deliver and install proposal.
For the following deliver and install bidding groups in this material proposal,,
.................................... . . . .
Illinois Department of Transportation policy, adopted in accordance with the provisions of the Illinois Highway Code, requires this contract
to be awarded to the lowest responsive and responsible bidder. The award decision is subject to approval by the Department. In addition
to all other responsibility factors, this contract or deliver and install proposal requires all bidders and all bidder's subcontractors to disclose
participation ation in apprenticeship or training programs that are (1) approved by and registered with the United States Department of Labor's
Bureau of Apprenticeship and Training, and (2) applicable to the work of the above indicated proposals or groups. Therefore, all bidders
are required to complete the following certification:
1.
as Except provided in paragraph 4 below, the undersigned bidder certifies that it is a participant, either as an individual or as part of a
groupram, in an approved apprenticeship or training program applicable to each type of work or craft that the bidder will perform with
program,
its own employees.
2. The undersigned bidder further certifies, for work to be performed by subcontract, that each of its subcontractors either A) is
at the
time of such bidsP articipati.ng in an approved, applicable apprenticeship or training programo or, (B) will, prior to commencement of
performance of work pursuant to this contract, establish participation in an approved apprenticeship or training program applicable to the
work of the subcontract.
3. The undersigned bidder, by inclusion in the list in the space below, certifies the official name of each program sponsor holding the
Certificate of Registration for all of the types of work or crafts in which the bidder is a Participant and that will be performed with the bidder's
YP
employees.Types of work or craft that will be subcontracted shall be included and listed as subcontract work. The list shall also indicate
anv tune of work or craft iob cateaory for which there is no applicable apprenticeship or training Program available.
International Union of Operating
Engineers Local 150
Laborers District Council of Chicago and
Vicinity _._____.....
4. Except Y t for an work identified above, if any bidder or subcontractor shall perform all or Part of the work of the contract or deliver and
install proposal solely by individual owners, partners or members and not by employees to whom the payment of prevailing rates of wages
P P �
would be required, check the following box, and identify the owner/operator workforces and positions of ownership.
The requirements of this certification and disclosure are a material part of the contract, and the contractor shall require this certification
provision to be included in all approved subcontracts. The bidder is responsible for making a complete report and shall make certain that
each type of work or craft job category that will be utilized on the project is accounted for and listed. The Department at any time before or
afterward may require the production of a copy of each applicable Certificate of Registration issued by the United States Department of
q
Labor evidencing such participation by the contractor and any or all of its subcontractors. In order to fulfill the participation requirement, it
shall not be necessary that any applicable program sponsors A pntly taking or that it will take applications for apprenticeship, training or
employment during the performance of the work of thi^� and install proposal
Bidder Si nater. Date
Builders Paving,LLC
Title -,
3112124
IS
Steven Salinas, Vice President 20
Address -1
060 YCit State Z.i Code•
4401 Roosevelt Rd
10��,� � �1Iside L.
60152
Printed 01126/24 Page 1 of 1 BLR 12325 (Rev. 01/21/21)
C� C
Affidavit of Illinois Business Office
Of oti.
Local Public Agency Count Street Name/Road Name Section Number
lVillage of Mount Prospect Cook 112024 Resurfacing Program I 24 -00180 -00 -RS
I,, Steven Salinas of Hillside IL
Name of Affiant City of Affiant State of Affiant
being first duly sworn upon oath, state as follows:
1. That I am the Vice President of Builders Pavin LLC
Officer or Position Bidder
2. That I have personal knowledge of the facts herein stated.
3. That, if selected under the proposal described above, Builders Paving, LLC , will maintain a business office in the
Bidder,
State of Illinois, which will be located in Cook County, Illinois.
County
4. That this business office will serve as the primary place of employment for any persons employed in the construction contemplated by
this proposal.
5. That this Affidavit is given as a requirement of state law as provided in Section 30-22(T of t e Illinois Procurement Code.
............................... ........."I"...., .............. n a.t.0 / .......b Date
X
��, �� °� 3112124
AW �a
1. ,Nol`S Print ame of Affiant
A L 1
4 2010 Steven Salinas, Vice President
*
10
0100
Notary Public
State of IL
County Cook
Signed (or subscribed or attested) before me on
3112124 by
(date)
Steven Salinas, authorized agent(s) of
.............
. . . . ............. . . . . . . ..................... .
(namels o perso s
Builders Paving, LLC
Biddr
ITA
ICIAL S
LYNN BROWN
[N (0) Ek;UTATE OF ILLINOIS
n, ExO A� u t 23 t 2025
Si nat ,re
of NotaEy Public
My commission expires 123/2:5
Printed 01/26/24 Page 1 of 1 BLR 12325 (Rev. 01121121)
1
Contractor Certification Statement
Prior to conducting any professional services at the site covered by this contract, the Contractor and every subcontractor
must complete and return to the Resident. Engineer the following certification. A separate certification rnust be submitted by
each firm, Attach to this certification all items required by Section II.G of the ,Storm 'mater Pollution Prevention Plan
(SWPPP) which will be handled by the Contractor/subcontractor completing this form.
Route. Marked Route Section Number
1202g g4 ResurfacinPro ram N/A 24 -00180 -00 -RS
..................
Pro"ect iurcber ot��. Contract Number
N/A Cook
This certification statement is a part of SWPPP for the project described above, in accordance with the General NPDES
Permit No. 1LR10 issued by the Illinois Environmental Protection Agency.
certify under penalty of law that I understand the terms of the Permit No. ILR 10 that authorizes the storm water discharges
associated with industrial activity from the construction site identified as part of this certification.
Additionally, I have read and understand all of the information and requirements stated in SWPPP for the above mentioned
pro I have received copies of all appropriate maintenance procedures; and, I have provided all dooumentat.'on required
to be in compliance with the Permit. ILRI9 and SWP'PP and will provide timely updates to these documents as necessary.
0 Contractor
E] Sub -Contractor
8`inature
'k%4404
5 I �%
ate
fZ!5
ILLINOIS 3112124
lop 2010
Pant Larne'
.................., ............... .
A Title
Steven Salinas
" s•ato o#o` �w Vice President
Name of Firm
Phone
Builders Paving, LLC
9
847-419-9990 71
Street Address
Cit. State od�
4491 Roosevelt Rd
Hillside IL nL
PPP
Items which this Conti t f contractor will be res onsible for as re ire in Section II.Gw of S v
Printed 01/30/24 BIDE 2342A (07119119)
ADDENDUM NO, 1
VILLAGE OF MOUNT PROSPECT, ILLINOIS
2024 STREET RESURFACING PROGRAM
DATE: March 1, 2024
BID OPENING: March 12th, 2024 at 1:00 pm
To: All Prospective Bidders. All BIDDERS for the above contract shall carefully read the enclosed
•
addendum and consider its impact in the preparation of their bid.
Project Manual:
N #These are the roadways for the 2024 'Village of M(,wnt Prospect Street Resurfacing
ote. "T"he lengths and widths are shown in the table above. Lengths are measured from
rogranimL
center of intersectlion. to center of intersection. These lengths may vary due to existing conditions
at the limits of each street.
. ... .. .... . ..
. .............................
in
ECT1 i F%'IW=E
. . . ..... . ...... . ... . .. . .. . . .... . .... .
FROM .
..TO
. . ... ....... .....
it
A
..... .... . . .. .. ... .. . . ..
............
Mimi ................ . . . . . ...... ... . . .....
ANDOA LN
. ... .............
LARCH DR
SEMINOLE LN
780
24
AAZTEC
LN
LAUREL DR
ARAILA DR
mmmm440
A
AZTEC LN
ARAILA DR
ASPEN DR
345 .
. .... -.23.9
A
BURNING BUSH LN
KENSINGTON
BOULDER DR
405
32
RD
A
BURNING BUSH LN
BOULDER DR
APACHE LN
320
32
A
BURNING BUSH LN APACHE LN
HOPI LN
295
32
A
COLUMBINE DR
CAMP
MCDONALD RD
LARCH DR
240
- --
32
--
A
HOPI LN
QUINCE LN
BURNING BUSH LN
968
24
A
HOPI LN
BURNING BUSH
SIOUX LN
277
24
LN
A
HOPI
SIOUX LN
CHOLO LN
304
24
A
LARCH DR
COLUMBINE DR
MAYA LN
m 1060
24
A
LARCH DR
MAYA LN
MOHAWK LN
825
24
A
LARCH DR
MOHAWK LN
ANDOALN
300
24
A
LAUREL DR
MAYA LN
AZTEC LN
1282
24
A
MAYA LN
VILLAGE LIMITS
LARCH DR
200
24
A
MAYA LN
BUCKTHORN AV
ONEIDA LN
350
24
A
MAYA LN
ONEIDA LN
BURNING BUSH LN
345
24
A
1 QUINCE LNHOPI
LN
BITTERSWEET LN
555
24
...... . .....
. ......
A SIOUX LN
HOPI LN
CUL DE SAC
290
30
B
HACKBERRY LN
WHEELING RD
BRENTWOOD LN
1025
24
B LINDEN LN
SYCAMORE LN
I END OF PAVE
634
24
B
NEWBERRY LN
KENSINGTON
IRONWOOD DR
574
24
RD
D
E GREGORY ST
MARCELLA RD
STRATTON LN
323 . . . ..........
1. 28
D
E THAYER ST
MARCELLA RD
STRATTON LN
310
24
D
....................
EASTMAN CT HILL ST
EAS . . ....... ......
. . . . ............................... . ...... .............. . . . . .
. . . ... ........
.... . ... ...
.. . . . . . . . .......... ...........
. . .
UL DE SAC
il ................. . . . . . . ............
. . ....... .
.. ......... . .. . . ............. ...
655
t .. .....
........... . ....
24 . . .........
...........
ADDENDUM NO. I
DATE: March 1, 2024
. . ..........
.... ... . . . ......
................ . . .. . .
........ ......... .. .... . . . . . . . . . . . .. ...
.. ... .... .
.............. ........... . .
. ... ...
..... ... ...
th
Width.
$TR
TQ
2 (1
D
. . ........... ..... ........ . .....
MARCELLA RD
CENTRAL RD
THAYER ST-
. . . ...........
1190
22
D
MARCELLA RD
THAYER ST
THAYER ST
142
28
D
MARCELLA RD THAYER ST
MR
ARDYCE LN
178
28
D
MARCELLA RD
MARI
ARDYCE LN
GREGORY ST
- - - ---- - - -
- 1110
-28
E
BOBOLINK RD
FOREST AV
. .....
PROSPECT MANOR
605
24
E
PROSPECT MANOR AV
GREGORY ST
MEMORY LN
. .....
--663
24
E W MEMORY 1EMORY LN
EA STWOOD DR
ELMHURST AV
300
24
E
W MEMORY LN
PROSPECT
MANOR
EASTWOOD DR
350
24
E
W MEMORY LN FAIRVIEW AV m_: -�PROSPECT
MANOR
3.23
24
F
S EDWARD ST
BUSSE AV CENTRAL RD
605
24
F
S EDWARD ST EVERGREEN AV
L
BUSSE AV--....--,
. .... . 650
24 ......
F
S EDWARD ST
MILBURN AV
EVERGREEN AV
670
24
......
S EDWARD ST LINCOLN ST
F. .....
MILBURN AV
675
24
..... ......
S ED
F WARD ST
.. . . .
NW H\AlY
LINCOLN ST
130
50
G
:LE LINCOLN ST
EMERSON ST MAPLE ST
373
28
G
E LINCOLN ST
MAPLE ST
SCHOOL ST
756
28
G
EMERSON CT
EMERSON ST _
CUL DE SAC
J C!
330
36
G
GOLFHURST AV
EDWARD ST
GEORGE ST
GEORGE
112
28.5
G
GOLFHURST AV GEORGE ST
ALBERT ST
.......
535
28.2
. . . .......
G
EW PL GOLFVIEW AV
GOLFVIEW
CUL DE SAC
710
28.5
G
S ALBERT ST
GOLFVIEW DR
GOLFHURST AV
785
28.2
mm--
G
S EDWARD ST
SUNSET RD
GOLFHURST AV
355
28.2
G
S EDWARD ST
GOLFVIEW DR
SUNSET RD
540
28.4
G
S MAPLE ST
LINCOLN ST PROSPECT AV
. .... .
930
28.1
H.
CENTRAL ALLEY
END OF PAVE
WAPELLA
......
160
16
H
HI LUSI AV BUSSE AV
PROSPECTAV
550
22
H
HI LUSI AV
EVERGREEN AV
BUSSE AV
657
22
H
HILUSIAV
MILBURN AV
EVERGREEN AV
667
22
H
HI LUSI AV
LINCOLN ST
MILBURN AV
564
22.5
H
ROBERT DR ROBIN LN
LO NN IST BLV
337
30
H
ROBERT DR
SUNSET RD
ROBIN LN
300
28
ROBERT DR
GOLF RD
GLENN LN
172
28 ......
H
ROBERT DR
. .. . .....
SUN
GREENACRES LN SET RD
320
28
H
ROBERT DR
GLENN LN
GREENACRES LN
440
28
H
W SUNSET RD
I OKA AV
ELMHURST RD �,µ
360
22.4
H
W SUNSET RD HI LUSI AV Nmm I OKA AV
350
22.4
BEVERLY LN
LINCOLN ST
HATLEN AV
695
24.4
PRAIRIE AV WHITE OAK S7
END OF PAVE
.650
24
ST CECILIA DR
1PRENDERGAST
LAWRENCE LN
584
30
3
LN
CARBOY RD CUL DE SAC NORDIC RD
650
30
3
CARBOY RD
NORDIC RD
CUL DE SAC
675
30
mm 3
COTTONWOOD LN
C
CHESTNUT DR
ROBERT DR
290
28.4
. . . ...........
3
.. .. ... . .
COTTONWOOD LN
COTTONWOOD
BIRCH DR
CHESTNUT DR
305
28.4
COTTONWOOD LN
COTTONWOOD
FERN DR
BIRCH DR
300
28.5
3
COTTONWOOD LN
COTTONWOOD
BUSSE RD
FERN DR
295
28.6
3
NORDIC 0
NORDIC RD
CARBOY RD
ALGONOUIN RD
932.
28
.
PALM DR
PALM
ROBERT DR
BEECHWOOD DR
307
28
3
PALM DR
BEECHWOOD
GRACE ST
G�
267
29
DR
3
S LANCASTER AV ASH DR
GOLF RD ... ..........
..............
1035
28
. ......... ...... . .. .....
.. . ...... . . .............. . . . . ...... ........ .......
. .
. . ........
. ........ .. .. . .
. ........... . ..... .
.... ........ .......... . ..
......... . ......
Page 2 of 3
ADDENDUM NO. 1
DATE: March 1, 2424
General:
I. Responses to questions from Bidders:
Q: What are the lengths and widths of streets being resurface in this year's
program?
A: The lengths and widths are shown in the table above. Lengths are measured
from center of intersection to center of intersection. These lengths may vary
due to existing conditions at the limits of each street.
BIDDER'S ACKNOWLEDGMENT OF RECEIPT
ADDENDUM NO. 1
VILLAGE OF MOUNT PROSPECT, ILLINOIS
2024 STREET RESURFACING PROGRAM
BIDDER hereby acknowledges receipt of Addendum No. 1
Company Name.......,.. Builders Paving, LLC
11
Byan N I..•.WWF0
Print Name �. �........ ��� : Nick Eichenold
PositionlTitle. M W N� Po k dK W N k VP of Estimating
Date .W. �W��Bkk.MOtlsWWHN�WWNMOAAW � 31'f12024
Note: This Addendum shall be included with and is considered part of the bid
documents. Failure to return this form may result in disqualification of
the BIDDER. Include this original in your bid.
Page 3 of 3
R. . . . . . . . . .
A
March 12, 2024
Re: Affidavit of Availability, Letting 3/12/2024
To Whom This May Concern:
Per the Illinois Department of Transportation Rules f6r, Prequalification of Contractors, Builders Paving, LLC is requesting to forego the
fifing of an Affidavit of Availability (BC -57), under Section 650,310 Sub D, based upon our Super Unlimited Financial rating and
Unlimited HMA Pant Mix rating as shown on the aftached Ii' C-ertifitate of Eligibility.
Sincerely,
Builders Paving, LLC
Steven Salinas
Vice President
s alines ;builders aurin lloWcorn
thehalldepsc
ww.
Au
1,62 Ar 047) 419 -MIN Ar x.- 047) 419-9blY Ar w. o.cam
44 1/ A gas, 6 Yelt road, Hillside. & 9, 9
r.
❑ LL
mono r, Z 0
$ � �. U) U?
ma CY W<
a� N w�❑
Z 0 2 w<
a.UW •
awwwwwww L :D W a p
W0 Cf = z Cc>
U WHA U)
WZ❑❑1 w U
❑� W U)
I Z >
Z t} �-- ❑
U 10 0 w 2 U) W W �
W~ _ J ❑ � v
14)aW Z Z Z 0)
LL�m W
W •-
�= ❑ Cl) � W C/)W
�
Z�_ _ >
WW U W
4)WQJ
❑
I-(nU) Q U
Q Z
toz 0 � C) z�
U Z LL :0
I% W U > U)
Cl)�LLJ
o �
L)
< a�
WW=LU 00�
a.❑Q W Z =
aWWL) ce,a
00
LL W o � 0
Zz 1w 0
z
Q¢ H W C) = o v COD ~ LL
UnF- LD •E v LD ti
a. 2 C � � LU �
0 Q~J
Z❑W� LL
Cl)
J_ W ❑ ❑ N
H�F-0 ~ �
W ZJ,a� Z
❑ Wd0J m Z) � Z
W 0
J M >- �¢W = [/3
= a. W❑ zZi
`J � U) LL Z
❑0
WDLL - 0 D J
J � Q ❑W0 W � ~� S �w
w
=QH< -
+! gz zQ 0zL❑L~HZi°gym UL
_
u� ❑ Z F. W O z �- Q < CL
•� p W - -� � LL, � W a-
m o J U � � � � U ❑ � LL U]
a' � J
LL C/< Z L)) _j
� � D Q � �
L d W 2 U C] Q W LL Z❑
0) = U z U LL W
OW
Z= Q W ❑
�� LU
CD q7:z0 vvvov =Wm: CO
��H cD v U H U)
m
Co
C)
4
rn
J
fflCI
,Oe�.
Ment indsDe. Local Public Agency p.µ,,
c T�,��,, partm � Proposal Bid Bond
Local Public 64 eracCounty Section Number
Ivinage of Mount ProspectlCook 1124 -00180 -00 -RS
.................
WE, Builders Pavin ,LLC as PRINCIPAL, and
Fidelity and Deposit Company of Maryland as SURETY, are held jointly,
severally and firmly bound unto the above Local Public Agency (hereafter referred to as "LPA") in the penal sum of 5% of the total bid
price, or for the amount specified in the proposal documents in effect on the date of invitation for bids, whichever is the lesser sum. We
bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly pay to the LPA this sum under the conditions of this
instrument.
WHEREAS THE CONDITION OF THE FOREGOING OBLIGATION IS SUCH that, the said PRINCIPAL is submitting a written
proposal to the LPA acting through its awarding authority for the construction of the work designated as the above section.
THEREFORE if the proposal is accepted and a contract awarded to the PRINCIPAL by the LPA for the above designated section
and the PRINCIPAL shall within fifteen (15) days after award enter into a formai contract, furnish surety guaranteeing the faithful
performance of the work, and furnish evidence of the required insurance coverage, all as provided in the "Standard Specifications for Road
and Bridge Construction" and applicable Supplemental Specifications, then this obligation shall become void; otherwise it shall remain in
full force and effect.
IN THE EVENT the LPA determines the PRINCIPAL has failed to eater into a formal contract in compliance with any
requirements set forth in the preceding paragraph, then the LPA acting through its awarding authority shall immediately be entitled to
recover the full penal sum set out above, together with all cou rt costs, all attorney fees, and a ny other expense of recovery.
IN TESTIMONY WHEREOF, the said PRINCIPAL and the said SURETY have caused this instrument to be signed by their
respective officers this 12th of March, 2024
--- Day on and Year
Principal
Com an Name t erne
Builders PAying,l�� � � �������������
1. . ,�0. -0 0
Date
Si natur.......... .0........ . ...
�^ Date " �` i a
.. .... ....
.......... . . . . . . ........................ . . . . . .
ALBy:ell „ww �" E .
J. NOIS
March 12, 202 I L.I1
;
Title
Steven Salinas, Vice President
(If Principal is a joint venture of two or more contractors, the company non" + + prized signatures of each contractor must be
affixed.) Surety
Nance of Suret Si nature March 12, 2024 of Attorney- Dates.
Fidelity and Deposit Company of Maryland By:
STATE OF I L Jam s I oore
COUNTY OF DUPAGE k .H
I Karen A. OConnell , a Notary Public in and for said county do hereby certify that
Steven Salinas and James 1. Moore
nseCIM
names o in i ua s signing --- on e a o RI
who are each personally known to me to be the same persons whose names are subscribed to the foregoing instrument on behalf of
PRINCIPAL and SURETY, appeared before me this day in person and acknowledged respectively, that they signed and delivered said
instruments as their free and voluntary act for the uses and purposes therein set forth,
Given under m hand and notarial seal this 12th day of March, 2024
y on an ear
day
OFFlCLAL SEAL
(SEAL) KAMAOCONNELL
NOTARY PUBLIC, SrAM OF WNCIS
COOK Cly
My COMWISWN EXPM QM5MW6
Printed 01/26/24 Page 1 of 2
Nota Pu lie Si nature
Date commission expires February 1 5, 2026
BLR 12230 (Rev. 01121121)
Local Public. Agency . . . ............... Count Section Number . .............. - - ------ - -
Village of Mount Prospect Cook 24-001 So -O0 -RS
. . . . ........ . . . ...........................
....... . . ..... . ................................ . ELECTRONIC BID BOND
Electronic bid bond is allowed (box must be checked by LPA if electronic bid bond is allowed)
The Principal may submit an electronic bid bond, in lieu of completing the above section of the Proposal Bid Bond Form, By providing an
electronic bid: bond ID code and signing below, the Principal is ensuring the identified electronic bid bond h as been executed a n d t h e
Principal and Surety are firmly bound unto the LPA, under the conditions of the bid bond as shown above. (If PRINCIPAL, is, a joint venture
of two or more contractors, an electronic bid bond ID code, company/Bidder name title and date must be affixed for each contractor in the
venture.)
Electronic Bid Bond ID Code Coni andder Name .................. ..... .....
--------------
. . ........
Ll................... . . . . . . ........ . .... ..................... ... .. I . . ..................... [ ----------
Signature Date
Title
L�
Printed 01/26/24 Page 2 of 2 BLR 12230 (Rev. 01/21/21)
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New
'York, div COLONIAL, AMERICAN CAStAIA"Y'AND S[J1tE1"Y COMPANY,, a cotporallon of the State of 1111nols, arld the FIDUrry
4 "Companies "), by Robeft
AND DEPOSIT COMPA'NYOF MARYI., AND a corporation of the State of (hereirl collectively called the:
D. Murray,. Vice President, in ptIrsuance ofauthority granted by Article V,: Section 9, of the BOANVS" Of sald (,'on'ipanies, which are. set l'ofth
on. the reverse, side hereof and are hereby certified to he in full force. and effect on the date, hereof, do hereby norninate,. constitute, and
appoint Kelly A. GARDNER, Sherry BACSKAI, Stephen T. KAZMER, Jennifer J. MCCOMB, Diane M. RUBRIGHT, James I. MOORS,
Melissa SCHMIDT all of Downers Grove, Illinois, its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver,
fior, and on iuq behalf as surety, and, as its act �uid deed: any and all bonds and undertakings, and the: execution of such bonds or
undertaking;; s in purstiance of these prye. senLs, shall be as binding Upon said Conipanies, as ftilly and amply, to all intents and purposes, as if
they had been duly executed and acknowledged by the regularly elected officers ofthc ZL.JRI(','('I,l AMERICAN INSURANCE COMPANY at
its office In New York, New York., the regularly elected, officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND
at its office in Owings Mills, Maryland., in their own proper persons.
The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of
the By -Laws of said Companies, and is now in force.
IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said
ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and
FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 27th day of July, A.D. 2023.
C
INN
N
N'
�*
0
SEAJ_
SEAL SEAL
ry,��in�. 1" N.w..� 4W' IX^LI' yM
11, fff ot
ATTEST;
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
rrrrrBy: Robert D. Murray
Vice President
By: Dawn E. Brown
Secretary
State of Maryland
County of Baltimore
On this 27th day; of'Juty, A,R, 2023, bef'Ore Oie suhscribcr, a Notary 1,lublic of the Stere of Maryland, duly commissioncd and qualified, Robert 1).
-
Murray, Vice, President and 1)awn E., Brown, Secretary of the Companies, to me personafly known to be die individuals M,,id officers describL d in and who
executed the preceding instrument, and acknowledged the executio'l of unie, and being 1)y me d sworn, deposeth and sa.ith, that he/she is the said officer of
the Comimny aforesaid, and that the seals affixed to the preceding in-sirunient are the Cor mate Seals: of said Companies, and that the said Corp.�orate Seals and
the signature as st0i officer- Mere duy affilxcd and subscribed to thew id instrument by the authority arra dire tion ofthe said Corporations,
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written.
Authenticity of this bond can be confirmed at bondvalidator.zurichna.com or 410-559-8790
fq fj
.....
IM�nH�e_.
Iva thea
Notary Public
My Commission Expires September 30, 2023
Authenticity of this bond can be confirmed at bondvalidator.zurichna.com or 410-559-8790
EXTRACT FROM BY-LAWS OF THE COMPANIES
ident or Vice President
H', I ficer, the Pres"dent, or any Executive Vice Pres
e Chief Executive Of
4A 11g, 1h
"Article V, Section. 8,AVL(&VSy_$
fna),q. by written in tri under ": the aucsted corporate, seal, appoint, attorneys-in-hict with authority, to cxecutc bonds, pollicies,
e s
recognizances, stipulations, undertakings, or other like itistruinents on. behalf'ofthe Conipany, and may authariIzally 0fricer or any uch
attomey-infact to affix the torpor seal thereto; and niay N"'th (,,)r without cause in(Wify or revoke any such appointnient or authority at any
-
time."
CERTIFICATE
L the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN
CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the
foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that Article V, Section 8, of
the By -Laws of the Companies is still in force.
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998.
RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary
and the Seal of the Company may be affixed by facsimile on any Power of Attorney ... Any such Power or any certificate thereof bearing such
facsimile signature and seal shall be valid and binding on the Company."
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of
May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a
meeting duly called and held on the 10th day of May, 1990.
RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature
of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a
certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect
as though manually affixed.
IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies,
this 12th day of ____March 2024 . .....
. . .............
P*j
6.
lot
0
EAL
SEAL
SEAL
Ile, 040
011
9 a4.&�Lk_,
By: Mary Jean Pethick
NM
Vice President
TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT A COMPLETE DESCRIPTION
OF THE CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND YOUR CONTACT
INFORMATION TO:
Zurich Surety Claims
1299 Zurich Way
Schaumburg, IL 60196-1056
fqvj m _ li Lam,
800-626-4577
Authenticity of this bond can be confirmed at bondvalidator.zurl*chna.com or 410-559-8790
VILLAGE OF MOUNT PROSPECT
2024 STREET RESURFACING PROGRAM
BID TABULATION
BID DATE: March 12 2024
Engineer's Estimate
Builders Paving
Item Description
Unit
Qty.
Unit Cost
Total Cost
Unit Cost
Total Cost
1
Earth Excavation
CU YD
200
$
12.25
$2,450.00
$5.00
$1,000.00
2
Aggregate for Temporary Access
CU YD
1,480
$
6.05
$8,954.00
$6.00
$8,880.00
3
Aggregate Base Course, Type B, 4"
TON
583
$
11.10
$6,471.30
$6.00
$3,498.00
4
Mix. for Joints, Cracks, & Flangeways
TON
2
$
192.05
$384.10
$2,500.00
$5,000.00
5
Class D Patches, Type III, 2"
SQ YD
11250
$
26.20
$32,750.00
$21.25
$26,562.50
6
Class D Patches, Type IV, 2"
SQ YD
3,750
$
24.75
$92,812.50
$21.25
$79,687.50
7
Class D Patches, Type 11, 6"
SQ YD
11124
$
31.00
$34,844.00
$17.50
$19,670.00
8
Class D Patches, Type IV, 6"
SQ YD
1,124
$
28.20
$31,696.80
$17.50
$19,670.00
9
Pavement Removal, Special
SQ YD
249
$
15.70
$3,909.30
$20.00
$4,980.00
10
Hot Mix Asphalt Surface Removal, 2.0"
SQ YD
1,898
$
2.80
$5,314.40
$6.10
$11,577.80
11
Hot Mix Asphalt Surface Removal, 3.0"
SQ YD
1071519
$
3.20
$344,060.80
$4.55
$489,211.45
12
Bit. Material (Tack Coat)
POUND
73,422
$
0.65
$47,724.30
$0.01
$734.22
13
Leveling Binder (Machine Method), N50, 1.5"
TON
91137
$
79.00
$721,823.00
$97.85
$894,055.45
14
Hot Mix Asphalt Surface Course, Mix "D", N50, 1.5"
TON
9,137
$
50.00
$730,960.00
$94.85
$865,644.45
15
Hot Mix Asphalt Surface Course, Mix "D", N501 2.0"
TON
610
$
85.00
$51,850.00
$93.30
$56,913.00
16
Class B Patches, Type 11, 10"
SQ YD
300
$
120.00
$36,000.00
$120.00
$35,000.00
17
Class B Patches, Type 111, 10"
SQ YD
400
$
110.00
$44,000.00
$120.00
$48,000.00
18
Class B Patches, Type IV, 10"
SQ YD
400
$
100.00
$40,000.00
$120.00
$48,000.00
19
PCC PVT, 10", Jointed
SQ YD
249
$
100.00
$24,900.00
$140.00
$34,860.00
20
Dowel Bars
EACH
112
$
9.90
$1,108.80
$20.00
$2,240.00
21
Comb. Conc. Curb & Gutter
FOOT
21P450
$
2.75
$6,737.50
$25.00
$61,250.00
22
Comb. Conc. Curb & Gutter Removal & Replacement
FOOT
37,349
$
20.35
$760,052.15
$31.00
$1,157,819.00
23
Sidewalk Removal
SQ FT
21100
$
1.00
$2,100.00
$1.25
$2,625.00
24
PCC Sidewalk, 5"
SQ FT
24,060
$
4.90
$117,894.00
$7.50
$180,450.00
25
PCC Sidewalk Removal & Replacement, 5"
SQ FT
2241134
$
6.15
$1,378,424.10
$8.25
$1,849,105.50
26
Detectable Warnings
SQ FT
3,680
$
22.00
$80,960.00
$27.00
$99,360.00
27
PCC Driveway Removal & Replacement, 6"
SQ YD
51803
$
60.00
$3481p180.00
$82.50
$478,747.50
28
HMA Driveway Surface Removal & Replacement, 3"
SQ YD
1,971
$
59.00
$116,289.00
$75.00
$147,825.00
29
Driveway Base Removal & Replacement, 8"
SQ YD
948
$
12.95
$12,276.60
$10.00
$9,480.00
30 Trench Backfill
CU YD
200
$
16.45
$3,290.00
$1.00
$200.00
31
Storm Sewer, PVC SDR 35, Type 1, 8"
FOOT
100
$
56.10
$5,610.00
$78.00
$7,800.00
32
Storm Sewer, PVC SDR 35, Type 1, 10"
FOOT
100
$
51.75
$5,175.00
$88.00
$8,800.00
33
Storm Sewer, PVC SDR 35, Type 1, 12"
FOOT
50
$
71.15
$3,557.50
$99.00
$4,950.00
34
Structures to be Adjusted
EACH
353
$
250.20
$98,910.60
$450.00
$155,850.00
35
Structures to be Reconstructed
EACH
22
$
1,121.25
$24,667.50
$1,435.00
$31,570.00
36
Inlets, Type A, MP Frame & Lid
EACH
9
$
1,276.15
$11,485.35
$1,785.00
$16,065.00
37
Catch Basins, Type -C, MP Frame & Lid
EACH
9
$
1,449.45
$13,045.05
$2,055.00
$18,495.00
38
Catch Basins, Type -A, MP Frame & Lid
EACH
19
$
2,790.75
$53,024.25
$4,725.00
$89,775.00
39
Manholes, Type -A, MP Frame & Lid
EACH
5
$
2,862.70
$14,313.50
$4,670.00
$23,350.00
40
Sodding, Special
SQ YD
600
$
8.50
$5,100.00
$10.00
$6,000.00
41
Seeding, Special
SQ YD
21275
$
3.95
$8,986.25
$9.00
$20,475.00
42
Erosion Control Blanket
SQ YD
200
$
5.00
$1,000.00
$30.00
$6,000.00
43
Thermoplastic Pavement Marking - Line 4"
FOOT
11900
$
0.90
$1,710.00
$1.00
$1,900.00
44 Thermoplastic Pavement Marking - Line 6"
FOOT
1,161
$
1.25
$1,451.25
$1.50
$1,741.50
45
Thermoplastic Pavement Marking - Line 12"
FOOT
11798
$
2.55
$4,584.90
$3.00
$5,394.00
46 Thermoplastic Pavement Marking - Line 24"
FOOT
124
$
5.25
$651.00
$6.00
$744.00
47 Thermoplastic Pavement Marking - Letters & Sym.
SQ FT
16
$
5.30
$84.80
$5.00
$80.00
48 Traffic Control & Protection, Standard 701501
L. SUM
1
$
124,939.45
$124,939.45
$223,000.00
$223,000.00
49 Traffic Control & Protection, Standard 701701
L. SUM
1
$
5,333.70
$5,333.70
$1.00
$1.00
50 Traffic Control & Protection, Standard 701801
L. SUM
1
$
1,038.65
$1,038.65
$1.00
$1.00
51
Mount Prospect Brick
SQ FT
330
$
18.00
$5,940.00
$45.00
$14,850.00
52
Mount Prospect Brick Remove & Replace
SQ FT
150
$
19.00
$2,850.00
$35.00
$5,250.00
Total j
j
$5,4811675.40
$7,2891137.87