Motion to authorize pre -construction design and engineering
service expenses for Fire Station 11 for Nicholas & Associates,
Inc. for $120,000.
March 19, 2024 - REGULAR MEETING OF THE MOUNT PROSPECT
VILLAGE BOARD
CONSENT AGENDA
Action Item
When the Elk Grove Rural Fire Protection District abruptly ceased operations on October 1 last
year, the Village of Mount Prospect assumed Fire and EMS operations for the unincorporated
Cook County area within Elk Grove Township. The Village of Mount Prospect, Elk Grove
Township, and Elk Grove Rural Fire Protection District entered a court -supervised settlement
agreement. The settlement agreement granted ownership of Fire Station 11 to the Village of
Mount Prospect. The building at 1415 E Algonquin Road (Fire Station 11) is in good condition.
However, it is not up to the village standards and needs rehabilitation. This item deals with the
design engineering portion of the rehabilitation of Fire Station 11.
Discussion
Nicholas & Associates is a Mount Prospect -based developer and construction management firm
specializing in the construction and rehabilitation of municipal buildings. The firm has
successfully performed this type of work for the Village using the design/build process. Most
notably, the firm successfully completed an adaptive reuse project at Fire Station 13 in 2020.
This project transformed a vacant bank building into our current Fire Department
Headquarters Station.
When the Elk Grove Rural Fire Protection District abruptly ceased operations on October 1 of
last year, staff contacted Nicholas & Associates and asked the firm to begin the process of
developing a guaranteed maximum price to upgrade the Elk Grove Rural Fire Protection
District building using a design/build project delivery process. The Village typically procures
professional services by identifying the best -qualified firm and negotiating a price. In the
design/build process, price takes the form of a GMP. Developing a viable GMP requires a
careful definition of the work. Specifically, a complete set of plans is essential to garner good
numbers. Accordingly, Nicholas & Associates contracted an architectural firm to prepare the
requisite drawings. The cost of this work is $120,000. In the original budget by Nicholas &
Associates, the A&E costs were estimated at $152,686. However, the actual cost of the design
and engineering project is $120,000, which is about 6.92 percent of the overall project cost.
Industry standards for the overall design and engineering services typically range from 8 to 12
percent of the project costs.
However, during the early stages of developing Nicholas & Associates' GMP, staff concluded
that costs were trending high. Consequently, staff suggested moving project delivery in-
house. In what can accurately be described as a grassroots initiative, staff felt that utilizing
existing employee skills, leveraging joint purchasing contracts, and self -performing some of
the work to reduce the need for contracted labor could result in substantial savings. In light of
the above, the scope of work to be performed by Nicholas & Associates was limited to design
and engineering services, and they have completed the assigned work. If the Village had
chosen to do an RFP/RFQ for the design, build, and construction management services for Fire
Station 11, it would have added anywhere from 6 to 8 months to the process, and that is not
a viable option as it is in the best interest of the Village to occupy and start Fire and EMS
operations from Fire Station 11 as early possible. Currently, areas south of the tollway are
served by the City of Des Plaines and Elk Grove Village. Once Fire Station 11 is up and
running, it will be the closest station to the unincorporated area and will become primary for
the Fire and EMS operations.
In light of the above, staff recommends authorizing pre -construction design and engineering
service expenses for Fire Station 11 for Nicholas & Associates, Inc. for $120,000.
Alternatives
1. Authorize pre -construction design and engineering service expenses for Fire Station 11
for Nicholas & Associates, Inc. for $120,000.
2. Action at the discretion of the Village Board.
Staff Recommendation
Staff recommends authorizing pre -construction design and engineering service expenses for
Fire Station 11 for Nicholas & Associates, Inc. for $120,000.
Attachments
VOMP - NA Design Planning Recap
1001 Feehanville Drive, Mount Prospect, IL 60056 1 Phone (847) 394.6200 1 Fax (847) 394.6205
January 22, 2024
Mr. Michael Cassady
Village Manager
Village of Mount Prospect
50 S. Emerson St.
Mount Prospect, IL 60056
RE: Mount Prospect Fire Station 11— Preconstruction Planning & Design Fee Recap
Dear Mr. Cassady,
Below is a summary of the costs incurred (to date) for Planning, Design & Budgeting for Fire Station 11.
- Concept/Design Development: $27,000
- CD/Permit Documents (Includes MEP FP Design): $73,000
- Preconstruction Planning & Budgeting: $20,000
Total: $120,000
NOTE: Construction Administration (CA) is not included above, but can be provided for an additional $30,000
Construction Administration Includes:
- Review of shop drawings and sample submittals.
- Prepare and issue supplemental instructions and bulletins/change orders.
- Review and respond to written Requests for information (RFI).
- Attend an average of one (1) on-site Construction meeting every other week to monitor the construction for
general conformance with the construction documents.
- Provide on-site observation visit in conjunction with Owner and Architect
- Monitor construction for general conformance with the construction documents.
- Prepare one (1) punch list site visit at Substantial Completion, or when directed by Owner.
- Follow-up punch list site visit once the Contractor has signed off stating the punch list is complete.
- Project closeout and warranty period.
- Review project closeout documents
Should you have any questions regarding the above or you need additional information, please do not hesitate to
contact our office or me directly.
Sincerely,
Dave Torres
Senior Project Manager
Nicholas & Associates, Inc.
Mount Prospect Fire Station 11- Preliminary Budget Assessment
1415 E. Algonquin Road, Arlington Heights, IL
Interior (non -load bearing walls) Remodel/Renovation
12.13.23
Area A: Entry, Public & Offices
722
Area B: Living Room
1,158
Area C: Kitchen & Related Storage
336
Area D: Washrooms
305
Area E: Bunk Rooms
764
Area F: General Storage
63
Area G: Locker Room
504
Area H: Maintenance
204
Area I: Back of House Storage
224
Area J: Basement and Exterior
n/a
Clarifications/Assumptions:
A & E services to be approved by 12/19/23
A & E to coordinate closely with MPFD to ensure correct scope assumptions /limited revisions by 2/6/24.
Related permits to be expedited by all entities and issued by 3/1/24 or sooner
Construction commencement by 3/13/24 or sooner and substantially complete by 6/1/24, in a single, 3 month project duration.
Exclusions:
IT Service Upgrades/Infrastructure
Low Voltage Systems
Emergency Management Systems
Specialty Equipment
Environmental/Abatement work
Exterior Site Work
Items pending confirmation:
General Demolition, to be performed and coordinated by Public Works.