Loading...
HomeMy WebLinkAbout6.6 Motion to waive the rule requiring public bidding and accept the cost proposal from DeFranco Plumbing for the installation of new plumbing at Fire Station 11 in an amount not to exceed $75,195. Plumbing scope defined per Studio222’s Drawing dated 2/9/2024 pages P000, P001, PD100, P100, P200, P300, P400 and P500 WASTE AND VENT  Install necessary underground piping to ?e in new bathroom #4 o Include toilet cradle. o Include Urinal flange and install. o Floor Drain in bathroom #4 o All Waste and Vent in bathroom per print  Install all necessary Drain and waste piping for Laundry Room o Drain / vent for mop basin – Village to supply mop basin. o Gray water box for Washing Machine – Drain / Vent Work and Hot and Cold stubbed up to 10? above ground.  Maintenance closet for Gear washer. o Install open site drain above concrete floor and ?e into waste line in kitchen wall. o The gear washer sits 16 inches off ground. o No water lines.  Replace all exis?ng above ground waste and vent pipes to PVC. o In the exis?ng 3 bathrooms and new kitchen area. o From slop basin to roof. o Connect to exis?ng roof cast iron and close to roof penetra?ons. o If new vents are needed, The Village will cover roof work.  Misc Items o Install stub cover plates where pipes pass through framing. o Change the exis?ng floor drain cover in the 3 bathrooms. o Replace Floor C.O. in Maintenance closet that was found broken during pipe inspec?on. o Purchase and install 3 custom Terrzazo shower bases for bathrooms 1,2,3. o Purchase and install 1 ADA shower base 39 x 60 in bathroom 4 o Cap floor drain in new kitchen o Convert 4in toilet drain to clean-out in bathroom that is being removed. COLD AND HOT WATER SUPPLY LINES  Rough in all Hot and Cold-Water lines per print, NO WATER LINE FOR FRIDGE  Tie in (1) cold ¾ Copper line for future drinking fountain that will be with-in 10? of bathroom 4 ceiling.  Rough in 4 shower valves – there are 2 outlets, wand, and fixed shower head. Village will supply Chicago Shower Valves  Rough in Sloan Flush Valves for 4 toilets and 1 urinal, Village will supply valves.  Install cold water for ice machine in maintenance room – no drain line needed.  Install Hot and Cold lines for gear washer in maintenance closet.  Plumb all water lines for new hot water tank, Village will purchase and have hot water tank in place with natural gas line hooked up. Purchase and Install expansion tank per code and pipe relief to drain within 50 ?.  Hook up hot / cold line to exis?ng slop sink, line was just cut on kitchen side of wall.  Install ¼ angel stops. o 4 bathroom sink loca?ons. o 1 dishwasher o 2 ice machines o 1 Coffee Maker  Install insula?on on all new water piping. Trimming Fixtures in Bathrooms ONLY  Trim Bathroom Fixtures o 4 Toilets o 1 urinal o 4 Lav Sinks o Village will supply fixtures. P Traps and water line to be supplied by contractor Village will self-perform.  Concrete cu?ng  Concrete slab removal  Remove spoil.  Supply stone for bedding new pipe and labor to bring in stone.  All floor restora?on