Loading...
HomeMy WebLinkAbout6.4 Waive the rules requiring two readings of an ordinance and adopt AN ORDINANCE TO AMEND WATER AND SEWER RATES SET FORTH IN APPENDIX A, DIVISION II, VILLAGE CODE OF MOUNT PROSPECT, ILLINOISM+awn �'xyt�lts�=e Item Cover Page Subject Waive the rules requiring two readings of an ordinance and adopt AN ORDINANCE TO AMEND WATER AND SEWER RATES SET FORTH IN APPENDIX A, DIVISION II, VILLAGE CODE OF MOUNT PROSPECT, ILLINOIS Meeting December 5, 2023 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD Fiscal Impact (Y/N) Dollar Amount Budget Source Category CONSENT AGENDA Type Ordinance Information The Village conducted an initial water rate study in 2017. The approved study concluded that the Village's Capital Improvement Plan was insufficient and would result in an overall replacement of the system over 600 years, while the actual lifespan of water/sewer infrastructure is 75 to 100 years. The Village adopted the new rate study and executed bond issuances in 2018, 2019, and 2022. To support the infrastructure improvement plan and pay for the added debt service payment, the study recommended an 8% increase in overall water and sewer rates. The Village executed planned increases of 8 percent in the water/sewer rates from 2018 to 2022. The study was revised in 2023, and the project life cycle and cash needs were evaluated. It was concluded that for the year 2024, a 5.95 percent combined increase will be sufficient. This includes a 6.0 percent increase in water rates and a 5.75 percent increase in sewer rates. The study calls for a 7.0 percent increase in water rates for 2025 and onwards, and a 5.75 percent increase will be necessary for sewer rates for 2025 and onwards. The Village normally adopts an ordinance fixing water/sewer rates for the coming two years, and the same has been proposed herewith. The approved budget for 2024 includes the above water and sewer rates. The attached ordinance formally adopts the rate proposed in the 2024 budget. The table below summarizes the rate changes from the current year. An average household using 5,000 gallons will see an increase of $68.88 annually and will pay an annual fee of $1,230.48 in water and sewer charges. The same amount will increase by $83.04 in 2025, resulting in annual charges of $1,313.52. 2023 (current) 2024, Increase 2025 1 ncretiase 'W ,ater Base IFee - IFixed (Monthly) 5,.00 8,.48, 0.48, 9.07 0.59 Vo Iurnetriic IFFee (p e r 1,,000 gallllIons)� 18.66, 14.48, G. 8,2 15.49 1.01 Seer Base IFee - IFixed (Monthly) 5.40 5.71 x.31 6.04 X0.93 VoIurnetrilctee(per1,,000gallons 8.02 8.19 0.17 8.88, 0.19 Combined Base IFee - IFixed 18.40 14.19 0.79 15.11 0®92 Volllurnetriic IFee (per 1,W000,gaIIIIIons� 16.68 17.67 0.99 18,87 1.20 Monthly RiI1- 5, gallons 96.80 S 102.54 S 5.74 S 109.46 S 6.92 AnnualWateJr/Sewer Hill l'ncretiase $1,101.60 S 1,2' 0.48 S 68.89 S1,313.52 S 83.04, TotailAnnual I n cre a se $1,101.60 $1,,230.418 S 69.98 S1,313.52 S 83.04 In light of the above, the staff recommends approval of the attached ordinance. Discussion Alternatives 1. Waive the rules requiring two readings of an ordinance and adopt the attached water/sewer rate ordinance for 2024 and 2025. 2. Action at the discretion of the Village Board. Staff Recommendation Waive the rules requiring two readings of an ordinance and adopt the attached water/sewer rate ordinance for 2024 and 2025. Attachments 1. Water/Sewer Rate Ordinance 2024-2025 ORDINANCE NO. AN ORDINANCE TO AMEND WATER AND SEWER RATES SET FORTH IN APPENDIX A, DIVISION II, VILLAGE CODE OF MOUNT PROSPECT, ILLINOIS WHEREAS, the Village of Mount Prospect is a home rule municipality as defined by Article VII, § 6 of the Illinois Constitution of 1970; and WHEREAS, the President and Board of Trustees of the Village of Mount Prospect desire to make certain amendments to the Village Code of Mount Prospect as set forth below; and WHEREAS, pursuant to the authority granted under the Illinois Municipal Code and in accordance with home rule authority granted to home rule municipalities, the President and Board of Trustees of the Village of Mount Prospect approve the amendments set forth below. NOW, THEREFORE, BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF MOUNT PROSPECT, COOK COUNTY, ILLINOIS: SECTION ONE: Appendix A, Section 9.410, "Water Rates," to Division II, "Fees, Rates and Taxes," to Chapter 9, "Public Utilities, Pavement and Tree Regulations," to the Mount Prospect Village Code shall be amended to read in its entirety as follows: Sec. 9.410 WATER RATES: The following rates are effective for water bills rendered on or after January 1, 2024: A. All village water users within the village, having a direct or indirect connection with village water mains or pipes: $14.48 per 1,000 gallons of water consumed or portion thereof. All village water users within the village shall have the following monthly Base Fees per account: 5/8 inch meter $8.48 3/4 inch meter $8.48 1 inch meter $8.48 1 '/2 inch meter $12.72 2 inch meter $19.08 3 inch meter $62.54 4 inch meter $78.44 6 inch meter $115.54 8 inch meter $159.00 All village water users outside the corporate limits of the village having a direct or indirect connection with village water mains or pipes: $28.96 per 1,000 gallons of water consumed or portion thereof. All village water users outside the village shall have the following monthly Base Fees per account: 5/8 inch meter $16.96 3/4 inch meter $16.96 1 inch meter $16.96 1 1/2 inch meter $25.44 2 inch meter $38.16 3 inch meter $125.08 4 inch meter $156.88 6 inch meter $231.08 8 inch meter $318.00 B. Hookup charge for water furnished by truckload: $14.48 The following rates are effective for water bills rendered on or after January 1, 2025: A. All village water users within the village, having a direct or indirect connection with village water mains or pipes: $15.49 per 1,000 gallons of water consumed or portion thereof. All village water users within the village shall have the following monthly Base Fees per account: 5/8 inch meter $9.07 3/4 inch meter $9.07 1 inch meter $9.07 1 '/2 inch meter $13.61 2 inch meter $20.42 3 inch meter $66.92 4 inch meter $83.93 6 inch meter $123.63 8 inch meter $170.13 All village water users outside the corporate limits of the village having a direct or indirect connection with village water mains or pipes: $30.99 per 1,000 gallons of water consumed or portion thereof. All village water users outside the village shall have the following monthly Base Fees per account: 5/8 inch meter $18.15 3/4 inch meter $18.15 1 inch meter $18.15 1 '/2 inch meter $27.22 2 inch meter $40.83 3 inch meter $133.84 4 inch meter $167.86 6 inch meter $247.26 8 inch meter $340.26 B. Hookup charge for water furnished by truckload: $15.49. SECTION TWO: Appendix A, Section 9.507, "Sewer Rates," to Division II, "Fees, Rates and Taxes," to Chapter 9, "Public Utilities, Pavement and Tree Regulations," to the Mount Prospect Village Code shall be amended to read in its entirety as follows: Sec. 9.507 SEWER RATES: The following rates are effective for sewer bills rendered on or after January 1, 2024: C. All village sewer users within the corporate limits of the village having a direct or indirect connection with the village sewer and water mains or pipes: $3.19 per 1,000 gallons of water consumed or portion thereof. All village sewer users within the corporate limits of the village having a direct or indirect connection with the village's sewer mains or pipes but not with village water mains or pipes: $7.76 utilization fee per month per account. All village sewer users outside the corporate limits of the village having a direct or indirect connection with the village's water and sewer mains or pipes: $6.39 per 1,000 gallons of water consumed or portion thereof. All village sewer users outside the corporate limits of the village having a direct or indirect connection with the village's sewer mains or pipes, but not with village water mains or pipes: $15.52 utilization fee per month per account. The monthly Base Fee per account for sewer users within the village shall be $5.71. The monthly Base Fee per account for sewer users outside the village shall be $11.42. The following rates are effective for sewer bills rendered on or after January 1, 2025: D. All village sewer users within the corporate limits of the village having a direct or indirect connection with the village sewer and water mains or pipes: $3.38 per 1,000 gallons of water consumed or portion thereof. All village sewer users within the corporate limits of the village having a direct or indirect connection with the village's sewer mains or pipes but not with village water mains or pipes: $8.34 utilization fee per month per account. All village sewer users outside the corporate limits of the village having a direct or indirect connection with the village's water and sewer mains or pipes: $6.75 per 1,000 gallons of water consumed or portion thereof. All village sewer users outside the corporate limits of the village having a direct or indirect connection with the village's sewer mains or pipes, but not with village water mains or pipes: $16.68 utilization fee per month per account. The monthly Base Fee per account for sewer users within the village shall be $6.04. The monthly Base Fee per account for sewer users outside the village shall be $12.08. SECTION THREE: that this Ordinance shall be in full force and effect from and after its passage, approval and publication in pamphlet form in the manner provided by law. AYES: NAYS: ABSENT: PASSED and APPROVED this day of , 2023. ATTEST: Karen M. Agoranos, Village Clerk E Paul Wm. Hoefert, Mayor