Loading...
HomeMy WebLinkAbout6.3 Motion to accept the proposal for 2022 Cured-In-Place Pipe Sewer Lining project construction observation submitted by Baxter & Woodman Consulting Engineers of Crystal Lake, Illinois in an amount not to exceed $76,157.40.Mr�GauC �'d'+rt;�iect Subject Motion to accept the proposal for 2022 Cured-In-Plac • Sewer Lining project construction observation submitted • y Baxter & Woodman Consulting Engineeof Crystal Lake, Illinois in an amount not to exceed $76,157.40. Meeting Fiscal Impact Dollar Amount Budget Source Category Type Information March 7, 2023 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - true $76,157.40 Water and Sewer Enterprise Fund I-V 11;4L Consent In the current budget, funds have been requested to continue combined and separate sewer system repairs utilizing the cured -in -place -pipe (CIPP) process. This process entails rehabilitating existing sewer main segments by inserting a cured -in- place (CIPP) liner inside a host pipe segment. This method is more cost effective than open -cut excavation and far less disruptive. The Village has successfully utilized this process since the late 1970's. The combined sewer repairs were identified during the review of the Combined Sewer System Evaluation Study (CSSES) completed in 2015. The separate sanitary sewer repairs were identified during Public Works in house televising program that is part of the revised inflow and Infiltration Control Program (IICP) of the Metropolitan Water Reclamation District of Greater Chicago (MWRDGC). As well from our routine maintenance and inspection programs. To effectively monitor the successful contractor's work quality and assure end -product quality, specific technical skills and experience are required. Specifically, technical monitoring of the pipe cleaning process, liner inversion, curing, material core laboratory 1 analysis, and post -construction video review are some tasks require to successfully prosecute the project. Staff prepared a detailed request for proposals (RFP) necessary to solicit there services. A copy of the RFP document is attached. Consulting engineers were asked to submit a technical proposal detailing the firm's background, key personnel, and approach to the project. In addition, each firm was also asked to submit a separate cost proposal indicating work effort anticipated and a not -to - exceed fee. The required scope of work includes 14,644 linear feet of pipe ranging in diameter of 8" to 42" and an installation cost of $1,388,784.50. The locations of the proposed pipe segments included in this year's project scope are depicted on the attached map. RFPs were distributed to three (3) engineering firms with expertise in the construction rehabilitation of sewer main through means of cured -in-place pipe lining. The RFP was also posted on the Demanstar website by Onvia. �m Four (4) technical proposals and four (4) cost proposals were received out of eight (8) firms in possession of the proposal. Two (2) additional firms declined to submit proposals due to their high work load in 2023. Each proposal was evaluated based on experience, proposed services and scope content. Each firm received a point ranking below summarized this analysis Table 1: Technical Proposal the background of the firm, related project of work, schedule work effort and proposal (total points = 100) for each criteria. Table 1 2 Category Max. Points xter & Woodman IMEG Robinson GSG Robinson Engineering 824 GSG Consultants 1804 Consultants Background 20 19 19 18 17 Experience 20 20 18 17 16 Scope 25 25 22 20 19 Schedule 15 14 13 13 13 Work effort 10 8 7 7 5 Content 10 9 8 8 7 Totals: 100 95 87 83 77 The highest rated firm was Baxter & Woodman of Crystal Lake, IL. Baxter & Woodman has performed this type of work for the Village for the past seven (7) years. They have performed exceptionally well and understand the expectations of the Village for a project of such importance. Their staff has personnel who are certified in the industry standard National Association of Sewer Service Companies (NASCO) Pipeline Assessment Certification Program (PACP) coding. All references checked indicated that Baxter & Woodman performed well. In addition, Baxter & Woodman has successfully completed and are currently working on several engineering projects for the Village over the course the last 10 years. These project include the development of the Villages Source Water Protection Plan, the replacement of Booster Pumping Station #4 motor control center, flow monitoring, sanitary and combined sewer spot repair projects, Deep Well #17 Rehabilitation Project, Lincoln relief station rehabilitation project and the design and construction observation for our 2018 water main replacement project. Each firm was asked to submit a cost proposal as well. Table 2 below summarizes staff's analysis of costs. Table 2: Cost Proposal Firm Hours Baxter & Woodman 351 IMEG 606 Robinson Engineering 824 GSG Consultants 1804 Cost $57,234 $97,470 $119,950 $201,858.14 Cost per hour $163 $160 $145 $112 The lowest cost proposal was submitted by Baxter & Woodman. A copy of Baxter & KI Woodman's cost proposal is attached. It is staff's opinion that each liner should require at least 4 hours of observation for the smaller diameter pipes and at least 6 hours of observation for the larger diameter pipes and 8 hours for the 42" pipe segments totaling 278 hours. Additionally, reviewing both pre and post CCTV videos of each segment will require 50 total hours. The total for both services is 328 hours and this does not include general administration and office services. Baxter & Woodman also included a price of $800 per additional liners. Since Hoerr Construction's bid came in below staff's estimate for the project staff recommends including an additional fifteen (15) liners for inspection to Baxter & Woodman's total cost. An addition fifteen (15) total liners will increase the total award by $12,000. Baxter & Woodman understand the proposed project, has prepared a thorough proposal based on extensive experience, requested a reasonable fee, and is well qualified to perform the work. Additionally, the resident engineer assigned to the project is certified with the National Association of Sewer Service Companies (NASSCO). A copy of Baxter & Woodman's cost proposal is attached. Staff recommends including a 10% contingency ($6,923) in the award for this proposed contract because time spent on construction engineering and inspection can vary due to circumstances beyond the engineering consultant's control. For example, contractor delays, material availability and inclement weather are all parameters that can lengthen anticipated construction time. Alternatives 1. Accept the Baxter & Woodman proposal to provide construction engineering services for the 2023 Cured -In Place -Pipe Sewer Lining Project; 2. Action at the discretion of the Village Board. Staff recommends that the Village Board accepts the proposal for 2023 Cured -In -Place Pipe Sewer Lining project construction observation as submitted by Baxter & Woodman of Crystal Lake, Illinois in an amount not to exceed $76,157.40. 4 ATTACHMENTS: Technical Proposal for the Village of Mount Prospect Water Combined and Separate Sanitary Sewer Lining Project B&W.pdf Cost Proposal for the Village of Mount Prospect Water Combined and Separate Sanitary Sewer Lining Project B&W.pdf Request For Proposals - CIPP Inspection Services.pdf Overview_Map. pdf 5 Submitted by: B A X T E WOODMAN �(Z cl nsulLllng En(gincels 4 BAXTE 0DMAN �1ti11111111 ����111111111 �� �11�� �1\1111111�� ����� February 15, 2023 Mr. Casey Botterman Water and Sewer Superintendent Village of Mount Prospect 1700 West Central Road Mt. Prospect, Illinois 60056 Subject: Combined and Separate Sanitary Sewer Lining (CIPP) Project Inspection Services Dear Mr, Botterman: Mount Prospect continues to make significant progress with rehabilitation of the Village's sewer system, Baxter & Woodman is looking forward to helping you successfully complete the Village's CIPP improvements planned for 2023. Project Manager, Eric Murauskas, PE, has administered this program for the Village since its inception, and he is ready to provide construction observation and contract administration services for you again this year. Our approach will continue to focus on: • Cost effective and streamlined construction services based on our extensive knowledge of your system and delivered by professional staff well versed in infrastructure rehabilitation projects of all methods, shapes, and sizes. National Association of Sewer Service Companies (NASSCO) Certified expertise with specialized training in Cured in Place Pipe Inspection, Proven communication strategies that keep your staff informed, establish relationships with your residents, address challenges quickly, and keep construction moving forward. Eric is looking forward to working together with the Village to efficiently implement another round of infrastructure improvements and bring you closer to your sewer system maintenance goals. Please contact him at 815-444-3288 or by email at emurauskas@baxterwoodman.com if you have questions or need additional information. Sincerely, BAXTER & WOODMAN, INC. CONSULTING ENGINEERS n i Sean E. O'Dell, PE Executive Vice President 7 1. Firm Information Founded in 1946, Baxter & Woodman, Inc. provides consulting engineering and technology services to municipalities, state agencies, county governments, and sanitary districts throughout Illinois, Wisconsin, Florida, and Texas. Dedicated to promoting a sustainable future, our staff of talented engineers, surveyors, technicians, and support personnel incorporates innovative techniques along with tried and true processes. Our experience includes planning, design, construction and technology services for water, wastewater, stormwater and transportation facilities for municipalities, counties and state agencies, and more. Environmental, geographic information systems (GIS), water and wastewater operations, and advanced technology needs complement the firm's civil engineering expertise. The company has several subsidiaries including ones focused on Natural Resources, Municipal Technology, and Design -Build project delivery, Regional Offices Baxter & Woodman's 13 regional offices provides our clients with local presence and responsive service. Our team offers services that expand well beyond typical engineering consulting. We are committed to building community value with each and every project we complete. Services for the Village's project will be provided primarily from our Crystal Lake office with readily available support from our Chicago and Naperville offices as needed. Team We are a team of focused, committed, and service oriented professionals. Our combined work force totals 325+ talented individuals including wastewater, civil, transportation, mechanical, structural, electrical, and environmental engineers. The engineering staff is supported by trained technicians, licensed water and wastewater operators, licensed electricians, registered surveyors, GIS/GPS analysts, CAD operators, construction inspectors, and administrative assistants. Utility Rehabilitation Conventional or trenchless, Baxter & Woodman is at the forefront of efficient, cost-effective infrastructure rehabilitation methods. • Cured -in -Place -Pipe • (CIPP) Lining • Slip -Lining • Spiral -Wound Lining • Spray -On Epoxy Lining • Grouting Baxter & Woodman, Inc. • Pipe Bursting • Tunneling or Auguring Directional Drilling • Pilot -Tube Microtunneling • Open Cut Repair • Point Repair Primary Contact: Eric Murauskas, PE 8678 Ridgefield Rd. Crystal Lake, IL 60012 815-444-3288 emurauskas@baxterwoodman.com 1. Firm Information • 3 0 8678 Ridgefield Rd. Crystal Lake, IL 60012 1548 Bond St., #103 Naperville, IL 60563 8430 W. Bryn Mawr Ave., #400 Chicago, IL 60631 Team We are a team of focused, committed, and service oriented professionals. Our combined work force totals 325+ talented individuals including wastewater, civil, transportation, mechanical, structural, electrical, and environmental engineers. The engineering staff is supported by trained technicians, licensed water and wastewater operators, licensed electricians, registered surveyors, GIS/GPS analysts, CAD operators, construction inspectors, and administrative assistants. Utility Rehabilitation Conventional or trenchless, Baxter & Woodman is at the forefront of efficient, cost-effective infrastructure rehabilitation methods. • Cured -in -Place -Pipe • (CIPP) Lining • Slip -Lining • Spiral -Wound Lining • Spray -On Epoxy Lining • Grouting Baxter & Woodman, Inc. • Pipe Bursting • Tunneling or Auguring Directional Drilling • Pilot -Tube Microtunneling • Open Cut Repair • Point Repair Primary Contact: Eric Murauskas, PE 8678 Ridgefield Rd. Crystal Lake, IL 60012 815-444-3288 emurauskas@baxterwoodman.com 1. Firm Information • 3 0 2. Project Team Baxter & Woodman has the staff necessary to assist Mount Prospect with the successful construction of improvements. Project Manager, Eric Murauskas, has a solid understanding of the services required from his previous work for the Village and is committed to working with you to meet your goals and expectations. Resumes for key staff are included on the following pages for your review (*). Baxter & Woodman, Inc. 2. Project Team • 4 0 Eric J. Murauskas, PE Project Manager Eric is well versed in many areas, including sanitary sewer evaluation studies, sanitary sewer flow monitoring, sanitary sewer rehabilitation, stormwater drainage studies, sewer system design, and municipal services. He has managed over 100 flow monitoring and sanitary sewer evaluation studies. Eric completed the CIPP Inspector Training and Certification Program from NASSCO, Inc. NASSCO's Inspector Training and Certification Program (ITCP) is a new standard national training and certification program that provides field construction professionals with comprehensive learning and tools to understand and inspect trenchless pipeline renewal technology. REPRESENTATIVE PROJECTS EDUUATiON Mount Prospect, IL B.S. Civil Engineering, Iowa Annual CIPP Lining and Spot Repair Programs State University, 1989 Project Manager assisting the Village with construction observation for sewer system improvements since 2005. Improvements have included CIPP lining and Spot Relays Joined Firm in 1989 that average an estimated $1 million annual construction value. Years of Experience: 33 Mount Prospect, IL Combined Sewer Evaluation Study and Mapping Project Ri'..OSTRATMNS Project Engineer for the comprehensive assessment of the Village's combined sewer Licensed Professional system. The scope of the project included an inventory and mapping of all sewer Engineer: Illinois mains, manholes, inlets, catch basins, and other structures in the combined sewer area. In total, over 260,000 linear feet of Village -owned combined sewers were ASSOCIAHONS televised and evaluated. Each sewer was given a condition score and a multi-year American Public Works rehabilitation program was developed based on sewer ranking and the Village's Association annual financial capabilities. American Water Works Lake Bluff, IL Association Sanitary Sewer Rehabilitation Project Manager for the design engineering and on-site inspection services for the National Groundwater sanitary sewer rehabilitation project. Eric designed and observed the installation of Association approximately 15,000 feet of Cured in Place Pipe (CIPP), ranging in size from 8 -inch to 42 -inch in diameter. Water Environment Federation Hoffman Estates, IL 1"RAiNiNG'/�"F°i't'i'ifDIC 1"DION 2019 Sanitary Sewer Lining Manhole Assessment Project Manager for the design and construction engineering of a sanitary sewer Certification Program, rehabilitation program. The Project scope included cured -in-place pipe (CIPP) lining NASSCO, Inc. of approximately 3,500 feet of 8 -inch diameter sewer. Lateral Assessment Mission Brook Sanitary District, IL Certification Program, Sanitary Sewer System Rehabilitation NASSCO, Inc. Project Manager for the rehabilitation of approximately 16,100 feet of sanitary sewer using cured -in-place pipe (CIPP), approximately 21 point repairs using CIPP, and six Pipeline Assessment excavate and replace repairs. The rehabilitation work was based on our review of the Certification Program completed internal pipe television inspections. Baxter & Woodman, Inc. 2. Project Team • 5 10 NASSCO, Inc. Kirkland, IL CIPP Certified Inspector, Sanitary Sewer System Rehabilitation NASSCO, Inc. Project Manager for internal sewer television inspection of approximately 15,000 feet of the Village's sanitary sewers. A condition assessment of the sewer pipes was made from review of the television inspection videos and a sanitary sewer rehabilitation program was developed. The rehabilitation program consisted of the design and construction engineering for the rehabilitation of the sanitary sewer system using cured -in-place pipe (CIPP). The construction included placement of manhole -to -manhole sanitary sewer lining, ranging in size from 8 -inch diameter to 12 -inch diameter. Baxter & Woodman, Inc. Buffalo Grove, IL Storm Sewer Repairs Project Manager for a condition assessment of approximately 5,500 feet of storm sewer and development of a prioritized rehabilitation program. The condition assessment of the sewer pipes was made from review of television inspection videos. The rehabilitation design was developed using a combination of cured -in-place pipe (CIPP) and open excavation methods. The construction included placement of approximately 1,700 feet of manhole -to -manhole storm sewer lining, ranging in size from 10 -inch diameter to 21 -inch diameter, and open cut spot repairs in four locations South Barrington, IL Sanitary Sewer System Rehabilitation Project Manager for internal sewer television inspection of approximately 7,000 feet of the Village's sanitary sewers. A condition assessment of the sewer pipes was made from review of the television inspection videos and a sanitary sewer rehabilitation program was developed. The rehabilitation program consisted of the design and construction engineering for the rehabilitation of the sanitary sewer system using cured -in-place pipe (CIPP). The construction included placement of approximately 1,650 feet of 10 -inch and 16 -inch diameter manhole -to -manhole sanitary sewer lining. Cary, IL Sanitary Sewer System Rehabilitation Project Manager for internal sewer television inspection of approximately 16,000 feet of the Village's sanitary sewers. A condition assessment of the sewer pipes was made from review of the television inspection videos, and a sanitary sewer rehabilitation program was developed. The rehabilitation program consisted of the design and construction engineering for the rehabilitation of the sanitary sewer system using cured -in-place pipe (CIPP). The construction included placement of approximately 11,000 feet of 8 -inch diameter manhole -to -manhole sanitary sewer lining. Lake County Public Works Sewer Siphon Lining Project Manager for the design and construction engineering of a sanitary sewer rehabilitation program. The Project scope included cured -in-place pipe (CIPP) lining of a double barrel sanitary sewer siphon under the Des Plaines River. The sewer sizes were 24 -inch and 36 -inch diameters. 2. Project Team • 6 11 Kaitlin A. Wright, PE Lead Service Expert I'MUC'dITIVON B.S., Civil Engineering, Bradley University, 2014 Joined Firm in 2014 Years of Experience: 8 REOVISTRA''i"'IONE Licensed Professional Engineer: Illinois CI:.117IFllCATIONS Manhole Assessment Certification Program, NASSCO, Inc. Lateral Assessment Certification Program, NASSCO, Inc. Pipeline Assessment Certification Program NASSCO, Inc. VI'CAVI' I':.RS PRI':.SI':.N°I".A°I"IVONS Pipeline Assessment & Certification Program (PACP) • WATERCON, March 2016 (Springfield, IL) • CSWEA, June 2016 (Aurora, IL) ASSOCIATIONS American Water Works Association (Sewer Collection Committee) Baxter & Woodman, Inc. Kaitlin has experience in design engineering and project management of drinking water supply as well as the planning and design of water and wastewater infrastructure. She has performed many tasks ranging from sewer condition assessments and rehabilitation studies, flow monitoring, GIS integration, design, and construction coordination. REPRESENTATIVE PROJECTS Mount Prospect, IL 2016 Sewer Condition Assessment Project Engineer for reviewing approximately 70,550 feet of sewer televising inspection videos to assess the condition of the sewers. The reviews and ratings were performed in accordance with the Pipeline Assessment and Certification Program (PACP) coding. Once the sewers were assessed, Baxter & Woodman developed a prioritized list of repairs. La Grange, IL Blackstone/Ashland Water Main Design Project Engineer for the preparation of design drawings for a water main and lead (Pb) water services replacement contract to be completed prior to the Village's FY 2019/20 Roadway Resurfacing Program. West Dundee and La Grange, IL Project Plans for Lead Service Line Replacement Project Manager working with the Villages of West Dundee and La Grange to prepare Project Plans to apply for principal forgiveness to replace lead service lines within the Villages. The plans prioritize five years' worth of lead service line replacement projects and is coordinated with the Villages' pavement replacement plans to facilitate proper sequencing of repairing pavement after each phase of lead service lines are replaced. Glenview, IL Lead Service Line Inventory and Public Education Project Manager providing services to develop and implement the Village's Lead Service Line Replacement program. The project includes devising a systematic approach in collecting existing system information, investigating outstanding unknowns, coordinating public education and notification efforts, and maintaining clear communication and timelines both with internal Village staff and the community. Berkeley, IL Lead Service Line Replacement Program and IEPA Project Plan Project Manager for working with the Village of Berkeley to develop and implement their Lead Service Line Replacement Program and prepare their Project Plan to apply for principal forgiveness to replace lead service lines. There was an opportunity to develop a comprehensive program that would incorporate ArcGIS Tools for a systematic approach in amassing existing system information, investigating outstanding unknowns, coordinating public education and notification efforts and maintain communication and timelines with internal Village staff and the community. 2. Project Team • 7 12 3. Project Experience Village of Mount Prospect, IL Annual CIPP & Spot Repair Programs, 2005 -Present Baxter & Woodman has been assisting the Village with construction observation for sewer system improvements since 2005. Improvements have included CIPP Lining and Spot Relays that average an estimated $1.7 million annual construction value. Our tasks have included: General Construction Administration: • Attend pre-bid meeting, prepare summary Review contractor's schedule Check, review, and approve liner design calculations • Review and approve required submittals • Confirm compliance with MWRDGC requirements • Prepare Change Orders as approved by the Village • Review and process contractor's Pay Requests • Research and respond to contractor's Request for Information • Provide review of warranty and anniversary work by the contractor(s) • Provide a review of current bid documents and suggest changes to improve future projects • Update the Village's ongoing (annual) spreadsheet for work completed Field Representation: Provide full time and/or part time field representation for the CIPP project • Prepare Daily Reports of the contractor's activity for each working day • Review and approve pre- and post -lining video inspections (CIPP projects) • Provide weekly updates on the status of CIPP project including pre- and post -lining video reviews, dates lined, as -built quantities, and up to date costs • Respond to residents' questions and concerns and provide an acceptable solution • Collect lining samples from each CIPP installed and review laboratory test results for compliance with the design parameters (CIPP projects) • Provide post -construction inspections to prepare written punch lists and follow-up to confirm the work is completed to the Village's satisfaction • Provide review of warranty and anniversary work as needed to assist the Village in enforcing claim, warranty or guarantee against the contractor(s) Baxter & Woodman, Inc. 3. Project Experience • 8 13 Village of Mount Prospect, IL Combined Sewer System Evaluation, GIS, Design, and Construction Assistance Baxter & Woodman has been providing the Village of Mount Prospect with sewer evaluation studies, GIS services, and design and construction services for the combined sewer rehabilitation program since the early 2000s. The Village's sewer system consisted of a separate wastewater and storm sewer system as well as a combined sewer system that handled both wastewater and stormwater run-off. I n December 2002, the Village Board contracted Baxter & Woodman, Inc. to conduct a comprehensive assessment of the Village's combined sewer system. The scope of the project included an inventory and mapping of sewer mains, manholes, inlets, catch basins, and other structures in the combined sewer area. In total, over 260,000 linear feet of Village -owned combined sewers were televised and evaluated. Each sewer was given a condition score and a multi-year rehabilitation program was developed based on sewer ranking and the Village's annual financial capabilities. In 2015, the Village commissioned another program to re -televise the sewers that had not been rehabilitated to determine their condition. This latest evaluation showed continued deterioration of the sewers. Approximately 32% of the sewers fell into the Grade 4 and 5 categories, and another 22% in the Grade 3 category (Grade 5 sewers require rehabilitation within one to two years, Grade 4 within three to four years, and Grade 3 within five to ten years). The majority of the structural defects can be rehabilitated by lining the sewers with cured - in -place pipe (CIPP). In most cases, CIPP can be installed without excavation, although a few combined sewers will require excavation and replacement of a section of pipe prior to CIPP installation. Approximately 18,000 feet of previously lined sewers was also televised to confirm the reliability of the rehabilitation technology. The review showed that previous CIPP repairs remain intact and in good condition. This is to be expected since CIPP repairs are designed for a minimum 50 -year service life. Baxter & Woodman, Inc. SERVICES Sewer system evaluation, sewer system rehabilitation design and construction, CIP Planning, GIS and more! TEAM Eric Murauskas and Andy Zaletel have been assisting the Village since 2002. : ,N" , "bid SO(oh . Px)h ^ =M MORMON] bcvR u t n:4 NWiiiu nt I!lno sp �.:u:'s �nlN, Andy , a. i:lci a . a�uull uNtr salsa � � iHl t� )ti i ('n � ,nirn ll V�,Vda iiulpi nh,�s, 3. Project Experience • 9 14 Village of Hoffman Estates, IL Sanitary Sewer Rehabilitation Baxter & Woodman performed design engineering and on-site inspection services for the 2014 critical sanitary sewer repairs and 2015/16 sanitary sewer rehabilitation projects. Eric Murauskas designed and observed the installation of approximately 150,000 feet of Cured in Place Pipe (CIPP), ranging in size from 8 -inch to 36 -inch in diameter. Village of Lake Bluff, IL Sanitary Sewer Rehabilitation Baxter & Woodman performed design engineering and on-site inspection services for the sanitary sewer rehabilitation project. Eric Murauskas designed and observed the installation of approximately 15,000 feet of Cured in Place Pipe (CIPP), ranging in size from 8 -inch to 42 -inch in diameter. Baxter & Woodman, Inc. 3. Project Experience • 10 15 4. Project Understanding and Approach NO TIME OR MONEY WASTED, WE KNOW MOUNT PROSPECT! Since 2005, Mount Prospect has trusted Baxter & Woodman to assist with completion of the Village's annual sewer system improvements. With our experienced team behind you, the Village will not waste valuable time and financial resources on a "learning curve." Project Manager Eric Murauskas, PE, works with the Village regularly and has the required qualifications and background knowledge to start your project immediately. He knows the Village's system conditions and your program requirements. Our team can quickly build on previous knowledge and continue on your rehabilitation path. Full Service Construction Personnel Since 1946, Baxter & Woodman has provided design and construction engineering for a variety of municipal infrastructure projects utilizing both conventional and trenchless technologies. Our full service construction department includes degreed professionals and licensed engineers who are available to assist on projects ranging from simple layout to complex heavy construction. Certified Experts in Sustainable System Rehabilitation In tune with the Village's commitment to sustainable practices, our staff is a leader in "green" rehabilitation methods for underground infrastructure, including sewer lining. Experience in "trenchless technology" is vetted with proper certifications from NASSCO. Eric is certified in NASSCO's Cured in Place Pipe Inspector Training program, making him the ideal leader for this project. Creating Local Relationships with Your Residents Positive communication with residents is important for project success. Our construction services staff take a proactive approach while in the field, and frequently receive notes from residents regarding their courteousness, their attention to resident needs, and effective communication skills. Eric has assisted Mount Prospect with these services annually for many years, and he has established relationships and lines of communication with both the Village and your residents. You can rest assured that your improvements will move forward as planned and any challenges will be addressed quickly by Eric in the field. Baxter & Woodman, Inc. ills:^. Iluiiavo a II¢;,Ing IlruSiOl y Ilru:llll)u Irug flW t"lillhgC u(+lLfl3C LII aIlll(l p111"aactivch/ 111nu111niuYllll"II �Irours�nvcr sy"ntd' iin nirastlrn 1°l Ii°cIlhe Shows ^;;pot 11c Iluaiii 361119 (allr]SilrW 0(J 0111 Ili )Ub!° 83 d uu ou°lk, lAOU11l '10'll'I uu IlualNillli'If[aiiouu Il)I O(Jur„1u'ua, Baxter & Woodman staff have completed training courses from the National Association of Sewer Service Cornpaniies (NASSCO); Pipeline Assessment and Certification Program (PACIP)p Manhole Assessment Certification Program (MACP), I...ateral Assessment Certification Program (I ACIP); and Cured in Place Pipe Iln.spector'Il'railning and Certification Program (I'MP). 4. Project Understanding And Approach • 11 `I1 Projected Number of Hours Efficient delivery of services will result in successful completion of the Village's project. M A-4 MIM M --------- ----- General Construction Administration ...................................................................................................................................................................................................................................................................................................................................... Attend pre- construction meeting ...... ......... ......... ......... ......... ......... ......... ......... 3 ............. Check/review submittals ...... ......... ......... ......... ......... ......... ......... ........................................... 2 Prepare pay requests/change orders 16 ........................................................................................................................................................................................................................G. ....................................... Total CA .. 21 ........................................................................................................................................................................................................................................................................................................................................................ Office Services ..... ......... ......... ......... ......... ......... ......... Review/approve pre -lining videos ............................................ 8 ...... ......... ......... ......... ......... ......... ......... Review liner thickness calculations ............................................ 1 ...... ......... ......... ......... ......... ......... ......... Review post -lining videos ............................................ 8 ...... ......... ......... ......... ......... ......... ......... Review/approve CIPP sample testing ...... ......... ......... ......... ......... ......... ......... ......... ......... ............. 1 ............. Update Annual Combined Sewer Assessment spreadsheet ...................................................................................................................................................................................................................................................................................................................................... 2 Total Office Services 20 ..................................................................................................................................................................................................................................................................................................................................................... Field Observation ...... ......... ......... ......... ......... ......... ......... 62 total liners (5 hrs each) ............................................ 310 ...................................................................................................................................................................................................................................................................................................................................... Total Field Observation 310 TOTAL HOURS 351 Project Schedule Our experience with similar projects will allow us to meet the Village's schedule. Baxter & Woodman, Inc. 4. Project Understanding And Approach • 12 17 Submitted by: BAXTE OODMAN 18 Cost Proposal iii III IIIage of IVIouin't Prospect, III III III iii Ilan iii iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillilillillillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliillillillillillillilliillillillilliillillillillillillillillillillillillillilliilillilI 2023 Combillined aindIl Ilan iii ir„Sewer Ill,,,,, iii Ilan iii IIS III IIP IIP Project III"'ask Hours F General l Construction Adimlinlistiratlion Attend pre -construction meeting 3 $ 480 Check/review submittals 2 $ 320 Prepare pay requests/change orders 16 $ 2,560 TOTAL GCA 21 $ 3,360 Office Services . ...... . Review/approve pre -lining videos 8 . . $ 1,280 Review liner thickness calculations 1 $ 160 Review post -lining videos 8 $ 1,280 Review/approve CIPP sample testing 1 $ 160 Update Annual Combined Sewer Assessment spreadsheet 2 $ 320 TOTAL OFFICE SERVICES 20 $ 3,200 II::1ellld Observation 62 total liners (5 hrs each) 310 $ 49,600 Mileage allowance $ 1,074 TOTAL OBSERVATION $ 50,674 .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... TOTAL FEE .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... $ 57,234 Price per Additional Segment Ili,,,,iined All sizes $ 800 Baxter & Woodman, Inc. Cost Proposal • 14 19 REQUEST FOR PROPOSALS Professional Services / Combined and Separate Sanitary Sewer Lining (CIPP) Project inspection Services Proposals Due: February 15, 2023 4:00 P.M. DATE: January 17, 2023 FROM: Casey Botterman, Water and Sewer Superintendent Village of Mount Prospect Public Works Department RE: Request for Proposal Combined and Separate Sanitary Sewer Lining (CIPP) Project. Your firm is invited to submit a Technical Proposal and Cost Proposal to become eligible for a possible interview for engineering construction management services for the Village of Mount Prospect's, 2023 Combined and Separate Sanitary Sewer Lining (CIPP) Project Attached to this memo are: 1. A list of materials and information that should be included with your Technical Proposal and Cost Proposal (Exhibit A). 2. A general definition of the scope of work and a schedule of dates and requirements for the selection process (Exhibit B). The Village of Mount Prospect appreciates your interest in this project. Any questions regarding this Request for Proposals can be directed to Casey Botterman, Water and Sewer Superintendent with the Village of Mount Prospect, by phone at 847-870-5640 or email at cbotterman@mountprospect.org. A cover letter along with a Technical Proposal and Cost Proposal should be forwarded to the following address or emailed to c°, I�rcaa.a.eirirm�n in(� it a it „p p as n irg and received no later than 4:00 p.m. on February 15, 2023. The Technical Proposal and Cost Proposal are to be submitted in separately, marked Technical Proposal for the Village of Mount Prospect Water Combined and Separate Sanitary Sewer Lining Project and Cost Proposal for the Village of Mount Prospect Combined and Separate Sanitary Sewer Lining Project. Mr. Casey Botterman Water and Sewer Superintendent Village of Mount Prospect 1700 W. Central Road Mount Prospect, Illinois 60056 20 L..L:L:r A Requirements for Technical and Cost Proposal Agency: Village of Mount Prospect Project: Combined and Separate Sanitary Sewer Lining Project Your Technical Proposal and Cost Proposal should include the following information: 1. Name, address and brief history of firm. 2. Organizational chart and resumes of key personnel to be assigned to this project. 3. Related experience during the last five (5) years. 4. Description of process to accomplish the required tasks of the project. This should include: a. An understanding of the project. b. Objectives to be met as part of the project. c. Your approach to completing the project. d. The projected number of hours to complete the project broken down by task and personnel. e. A project schedule. 5. A separate complete cost proposal broken down by task as described in the General Scope of Work. 21 Fvhihit R General Scope of Work Agency: Village of Mount Prospect Project: Combined and Separate Sanitary Sewer Lining Project Summary The Village of Mount Prospect (Village) is seeking proposals from qualified civil engineering consultants to observe and inspect combined and sanitary sewers to be lined as part of the 2023 CIPP program. The Village will be lining an estimated 14,600 linear feet of both combined and separate sanitary sewer mains. This project is currently out for bid. Bids are to be publicly opened on February 20, 2023. Background The pipe sizes range from 8" to 42" with estimated 190 service reinstatements. 30% of this year's project includes larger diameter combined sewer pipe (24"- 42"). This year's list was developed from past CCTV efforts done by both Village staff and a contractor. All pipe segments were graded to NASCCO standards. The pipe segments being lined for 2023 are grades 2 and 3. Problem Statement The Village seeks a qualified Consultant to provide specified civil engineering services necessary to implement and inspect a combined and sanitary sewer Lining (CIPP) project. The scope and scale of this proposed project will be limited by available funding. Project Scope The consultant will provide professional engineering services and provide, at a minimum, the following: Construction Management and Inspection Phase 1. Consultant shall conduct a preconstruction conference with representatives of the Owner, Contractor(s), Utilities and other interested parties affected by the proposed construction. 2. Consultant shall provide resident engineers, inspectors, technicians, and surveyors for the project as follows: Provide a Resident Engineer/Inspector (RE/1) for Full-time observation of the work during the construction period to observe and record construction progress under the general guidance of the Engineer. On the basis of on-site observation, the Engineer will keep the Owner informed of the progress of the work, shall endeavor to guard the Owner against defects and 22 deficiencies in the work of the Contractors, and may disapprove or reject work as failing to conform to the contract documents. ii. Prepare written daily inspection reports. Reports are to be delivered to Owner in an electronic format. Digital photographs documenting work tasks in progress as well as any potential problems or unusual conditions shall also be included with each report. iii. Review pre -lining videos to ensure documentation of all service laterals. iv. Review post -lining videos to ensure all documented service laterals have been reinstated. V. Assist the Owner in preparation of any necessary change order and/or field directives. vi. Process monthly applications for payment submitted by the Contractor(s), and forward to Owner with recommendations for approval and payment. vii. Assist the Owner with the resolution of inquiries, complaints, or concerns raised by residents or the public. viii. Review shop drawings and other equipment/material submittals as may be required by the contract documents. ix. Perform a field observation of all completed work before a final application for payment is processed for the Contractor. 23 Proposed Schedule Submit proposals February 2023 select firm February 2023 award contract to consultant March 2023 2023 Kick-off meeting March 2023 Pre -construction meeting with contractor March 2023 Construction April — September 2023 Substantial Completion September 2023 Post Project Review October 2023 24 ATTACHMENTA CAMP MCDONALD RD CENTRAL RD KENSINGTON RD LONNQUIST M 00 DEMPSTERJT 0 I— ,7 A<GpRg41�0 = pyo w y OAKTON ST EUCLID AV 0 w w a 0 O w a I— GOLF RD (RT 58) 0 LL J 0 SEMINOLE LN N W + E S Legend /\/ SEWER MAINS TO BE LINED 2023 MAP INFO AS OF JANUARY: ---- Printed by JJF 25 F:1\\\2023SEWER TOBELINED....___ VILLAGE OF MOUNT PROSPECT SEWER MAINS TO BE LINED 2023 CENTRAL RD KENSINGTON RD LONNQUIST M 00 DEMPSTERJT 0 I— ,7 A<GpRg41�0 = pyo w y OAKTON ST EUCLID AV 0 w w a 0 O w a I— GOLF RD (RT 58) 0 LL J 0 SEMINOLE LN N W + E S Legend /\/ SEWER MAINS TO BE LINED 2023 MAP INFO AS OF JANUARY: ---- Printed by JJF 25 F:1\\\2023SEWER TOBELINED....___