Loading...
HomeMy WebLinkAbout4.1 Second Village Board discussion of rehabilitation options for the Fairview Gardens Sewer Pump Station.Mr�GauC �'d'+rt;�iect Subject Second Village Board discussion of rehabilitatior options for the Fairview Gardens Sewer Pump Station. Meeting Fiscal Impact Dollar Amount Budget Source Category Type Information January 24, 2023 - COMMITTEE OF THE WHOLE - false •k u Discussion Item The Village Board will discuss proposed next steps to mitigate the Fairview Gardens neighborhood stormwater management problem. This is the second Village Board discussion of this topic. This matter was first considered at the July 2022 Committee of the Whole meeting (Agenda Packet / Meeting Video). The crux of the problem is that the sewer pump station serving the neighborhood is getting old and needs replacement. However, replacing the pump station requires a permit from the Metropolitan Water Reclamation District of Greater Chicago (MWRDGC). MWRDGC will NOT issue a permit to replace the pump station in kind. To obtain a permit, the discharge capacity of the pump station would hav,-. to be reduced by approximately two-thirds (66%). This reduction would result in frequent - - back-ups events. Mount Prospect Public Works Department staff, along with engineers from the Village's consultant, the Ciorba Group, will recap the problem as well as investigative work and corrective work completed since the last discussion of this matter. 1 Staff will also present a plan to launch a pilot project limited to a small group of homes (23). The pilot project will test the efficacy and affordability of disconnecting direct footing the connections and removing outdoor drains (driveway drains, exterior stairwell drains, etc.) from the sanitary sewer system. Disconnecting these systems will remove considerable amounts of clear (storm) water from the sanitary system and push it through the proper storm water systems, reducing the capacity need of the sanitary pump station. Additional information and supporting documents can be viewed on the project website: www.mountprospect.org/fairview Staff mailed a letter to the entire subdivision (301 homes) sharing the meeting date and time as well as communicated the meeting information through social media. Alternatives 1. Discuss options to rehabilitate Fairview Garden Sewer Pump Station. 2. Action at the discretion of the Village Board. ATTACHMENTS: 2