HomeMy WebLinkAbout0757_001Minutes
1 ♦A: clip_
April 28, 1992
Roll Call
The meeting was called to order at 7:40 p.m. by Mayor Gerald L. Farley. Trustees present
included Mark Busse, Tim Corcoran, Leo Floros, Paul Hoefert, and Irvana Wilks. Trustee
George Clowes was absent. Also present were Village Manager John Fulton Dixon, Planning
Director David Clements, Public Works Director Herbert L. Weeks, Finance Director David
Jepson, approximately 30 members of the Project P.E.O.P.L.E. group from River Trails Junior
HIgh School, six Village residents and four members of the print media. Additionally, Fred
Borich and Naros Statkus of Donohue, Don Weibel, Chairman of the Plan Commission and Hal
Predovich, Chairman of BDDRC were in attendance.
The minutes were accepted with the following correction on page 3, Item VI, the fourth
paragraph: Trustee Wilks made a motion that the building be called the Robgrt D. Tiechert
Police and Fire Facility rather than the Robert B. Tiechert Police and Fire Facility.
No citizens appeared before the Committee.
O ..
Mayor Farley read a Proclamation recognizing Project P.E.O.P.I-E. (People Educating Other
People for a Long-lasting Environment) which was created by Diana Feingold and her 6th grade
class at River Trails Junior High School. Project P.E.O.P.L.E. was created by Ms. Feingold and
her students who realized that people need to be more aware of Earth's manmade problems,
possible solutions, and each person's responsibility for putting those solutions into practice on
a daily basis. The group has been honored by President Bush on two occasions and currently
there are 17 grass roots groups with over 1,000 members throughout the world.
Ms. Feingold was joined by Holly Johnson, President of Project P.E.O.P.L.E. who stated that
all Village residents and businesses need to support and follow the lead of these students.
Village Manager Dixon stated that a tree will be planted at River Trails Junior High School as
a monument to the Project P.E.O.P.L.E. group.
Planning Director Clements stated that the update of the Comprehensive Plan has been
reviewed by the Plan Commission and recommended by a vote of 7 - 0. This update revises the
1981 Comprehensive Plan which had been previously updated in 1988. Some of the features
of the current update include incorporating more current information and new policy statements
into the plan. Some of the highlights Mr. Clements pointed out include the following:
A. On pages 12 and 52 language has been added to include housing goals identified in
the Village's new Comprehensive Housing Affordability Strategy, which has been sent
to and approved by HUD.
B. A recommendation on page 13 that a public facility's plan 'be prepared for
unimproved areas that have been annexed by the Village.
C. Added language on pages 15 and 57 that would encourage the implementation of the
2010 Regional Transportation Plan in Mount Prospect. This would include commuter
facilities for the Wisconsin Central Railroad.
D. A section on page 18 identifies special neighborhoods that may qualify for Community
Development Block Grant funded projects under certain conditions.
E. In the Downtown Section of the Plan, several revisions are proposed. On page 26,
a statement concerning relocating the commuter station further east has been deleted,
as is a statement on a future grade crossing at Maple Street.
F. On page 27, a multi -family designation for the east side of Maple Street, across from
the bank, has been deleted. This area will be shown as single family on the land -
use map.
G. Pages 28, 29 and 30 include an update on the Tax Increment Finance District and
Triangle Redevelopment Area. Also, the Objective and Design Guidelines approved
by the Village Board and B.D.D.R.C. are being added to the Plan.
H. The transportation section, on page 37, identifies the intersection of Rand Road,
Kensington and Elmhurst Roads as a problem intersection.
I. A recommendation on pages 37 and 39 that Busse Road from Golf to Central be
upgraded. Also, the zoning section on page 48 has been eliminated and a new
sentence added that the Zoning Ordinance is now being updated.
J. Page 57 begins a section on development and redevelopment sites. Most of the items
being deleted are previously vacant parcels that are now developed.
Mayor Farley stated that the Comprehensive Plan was a substantial document and it was not
the intention of the Committee to cover the entire document in one meeting. He added that
the elements that affect the downtown area will be reviewed by the Business Downtown
Development and Redevelopment Commission (BDDRC) for their input.
9
Mario Venticinque, 10 South Maple Street, said he was concerned about the effect of the Plan
on his property value. Dawn O'Malley, 20 South Maple Street, Patty Maro, 109 South Maple
Street, and Rob Campbell, 5 South Maple Street, each said they were concerned with South
Maple Street being designated as commercial on the West side of the street and multi -family
on the East side of Maple Street. Planning Director Clements said the revision would change
the designation on the East side of Maple to single family.
Don Weibel, Chairman of the Plan Commission, said the Plan Commission asked BDDRC for
their input and incorporated some of their recommendations into the revised Plan. Mr. Weibel
said the Plan Commission did not agree with BDDRC regarding a proposed Maple Street
railroad crossing and maintaining the East side of Maple Street as multi -family.
Hal Predovich, Chairman of BDDRC, said they had not received copies of the changes and that
they would give their input in a forthright fashion.
The Trustees reviewed the document on a page -by -page basis and made various recommenda-
tions regarding the stated objectives and certain grammatical changes.
Trustee Corcoran said he would like to see a 5 year plan for the development of all Village
assets and that an objective regarding property tax incentives should be included.
The Committee went through page 24 and agreed to continue their review on May 12, 1992.
VI Mount, Proapect _Ppfigg and Fire HeadQuarters Update
Village Manager Dixon presented a list of modifications and changes that were requested for
the Mount Prospect Police and Fire Headquarters. The changes were presented in four separate
schedules:
Schedule I included changes that were approved by Project Coordinator Herb Weeks
because of unforeseen construction problems and to keep the project on schedule. The
changes totaled $70,428 of which $19,424 had been previously approved by the Village
Board.
Schedule II included changes that were required to comply with building codes. The total
amounted to $23,312.
Schedule III includes upgrades and modifications requested by the Police Chief and Fire
Chief and recommended by the Village Manager. The schedule separated the requests into
changes that would lower maintenance costs, changes that would improve operational
efficiency and changes that would improve aesthetics. The schedule also included
additional engineering fees because of the changes. The total of these changes is $154,179.
Schedule IV included upgrades requested by the Police and Fire Departments that were
not recommended by the Village Manager. The total of this schedule is $187,461.
The Committee concurred with the recommendations of the Village Manager.
Fred Borich, Project Engineer, stated that the project was 20% complete and that he expected
the building to be completed by May or June 1993.
No report was presented.
Trustee Hoefert asked for an update on the Melas Park Improvements.
Trustee Busse thanked the Village Manager and Public Works Director for the resolution of the
traffic signal on Wolf Road and asked that the Kensington Business Center Owners Association
be informed about the progress.
Trustee Floros said he was concerned about the increase in personnel costs in the SWANCC
budget and would like an explanation. He also said he was concerned that decisions of the Sign
Review Board are often being, made by only two people. Additionally, he said that the Village
Hall should be identified by some type of signage.
IX Adjournment
The meeting adjourned at 10:55 p.m.
Respectfully submitted,
David C. Jepson, Finance Director
DCJ/sm
06/011, 64 eAjo �`55 1438 MT. PRSPCT. fK. D.Ef
Mt. Prospect Park District
411 South maoie & Mt Prospect,160056 * (708) 255-5380
May 1, 199-'2
Mr. John Dixon, Village Manager
VILLOGE OF MT. PROSPECT
100 S. Emerson
Mt. Prospect, IL 60056
Dear John;
Attached is the letter and s4'gn in sheet f. --Din our focl.(s gro!,Ap/
meeting with residents on Melas Pa?,k,
The comments on the plan were vary positive. There was some
concern for the amourt of drinking going on in the park evenings
and week—ends, and residents asked t;h:at we work together to make
sure tne police patrol this. I talked witih Chief Pavlock about
this concern and he is giving me his Fl..11 cooperation which I
appreciate.
The Board is anxious to move ahead on the project and has
expressed some conceer that the Village has been sitting an this
since the first week in March when I delivered the plan and
d-scussed it with you. Let me know when plan tc sign off on
the plan so that we can move ahead as residents are now anxious
to see the park developed.
7Th...-- T.
Director,
s t Recreation
MT. PROSPECT PARK DISTRICT
TT T/ I k
VILLAGE OF MOUNT PROSPECT
PLANNING DEPARTMENT
Mount Prospect, Illinois
TO: JOHN F. DIXON,V�LAGE MANAGER
FROM: DAVID M. CLEMNTS, DIRECTOR OF PLANNING
DATE: MAY 7, 1992
SUBJECT: CHURCHES IN RESIDENTIAL ZONING DISTRICTS
As we discussed, I have contacted the Northwest Municipal Conference and asked that they
conduct a survey of their member municipalities concerning churches in residential zoning
districts. The survey has been completed and submitted to me.
At my request, the survey included the following questions:
1. Do you.allow churches in residential zoning districts?
Permitted Use or Special Use?
2. Would the conversion of a single family home to a church be allowed?
3. Does your municipality have any building, zoning or life safety regulations that
would prohibit, regulate or control the conversion of a home to a church?
4. Has your municipality ever experienced the conversion of a home to a church?
If yes, how was required off-street parking provided?
Twenty-seven municipalities responded to the survey. Of this number, nine allowed
churches as permitted uses, similar to Mount Prospect Zoning Ordinance. Seventeen
communities require a Special Use/Conditional Use permit. One community requires
churches in an institutional district.
A majority of the respondents indicated that a house could be converted into a church, but
that building codes, life safety codes and zoning restrictions would make a conversion
difficult.
Four municipalities indicated that homes had been converted to churches, and that all
provided required on-site parking.
Considering this information and reviewing the issues at New Life Church, 1 West Euclid,
staff would recommend that the Zoning Ordinance be amended to require a Special Use
Permit for a church in residential zoning districts.
John Fulton Dixon
May 7, 1992
Page 2
The Special Use process allows the Village to review requests on a case-by-case basis, and
is the best way to look into matters like impact of parking lots, lighting, landscaping and
compatibility with adjoining properties. The Special Use process allows a petitioner the
opportunity to demonstrate how a proposed church would benefit the community and
immediate neighborhood, and meet all applicable building and zoning regulations. The
Special Use category should be looked at as a positive way for a church to tell the
community about their plans, rather than a way to limit individual rights.
A summary of the survey responses is attached. Please note that the complete surveys
would need to be reviewed for an explanation of certain responses.
DMC:hg
Attachmen
NWMC GIC ,SURVEY
CHURCHES IN RESIDENTIAL ZONING DISTRICTS
APRIL 1992
This compilation for comparative purposes only. Please consult
original surveys for full detail.
KEY
P = PERMITTED USE
S = SPECIAL / CONDITIONAL USE
0 = OTHER
Y = YES
N = NO
* = COMMENTS IN SURVEY
ACTUAL ADDITIONAL
REGULATIONS CONVERSION COMMENTS
Y N
Y N
Y N
Y N
Y Y
Y N
Y Y
Y Y
Y N
Y N
N
Y
Y
N
Y
Y
N
N
Y
Y
Y
Y
Y
Y
N
Y
Y
N
N
N
N
N
Y
N
N
N
N
N
N
N
N
N
*
*
*
CHURCHES
CHURCH
MUNICIPALITY
ALLOWED
CONVERT
ARLINGTON HTS
P
Y
BARRINGTON
P
Y
BARTLETT
P
N
BUFFALO GROVE
S
Y
DES PLAINES
P
Y
ELK GROVE
S
Y
EVANSTON
S
Y
GLENCOE
P
Y
HANOVER PARK
S
Y
HOFFMAN ESTATES
N
LIBERTYVILLE
S
Y
LAKE FOREST
S
N
LINCOLNSHIRE
S
Y
LINCOLNWOOD
S
Y
MORTON GRV
S
Y
NORTHBROOK
N
Y
NILES
S
Y
PALATINE
P
Y
PARK RIDGE
S
Y
ROLLING MDWS
P
Y
ROSELLE
P
Y
SCHAUMBURG
S
N
SKOKIE
P
Y
STREAMWOOD
S
Y
WHEELING
S
Y
WILMETTE
S
WINNETKA
S
Y
ACTUAL ADDITIONAL
REGULATIONS CONVERSION COMMENTS
Y N
Y N
Y N
Y N
Y Y
Y N
Y Y
Y Y
Y N
Y N
N
Y
Y
N
Y
Y
N
N
Y
Y
Y
Y
Y
Y
N
Y
Y
N
N
N
N
N
Y
N
N
N
N
N
N
N
N
N
*
*
*
VILLAGE OF MOUNT PROSPECT
PLANNING DEPARTMENT
Mount Prospect, Illinois
TO: JOHN F. DIXON, q " MANAGER �v
FROM: DAVID M. CLEMENTS, DIRECTOR OF PLANNING
DATE: MAY 8, 1992
SUBJECT: REVISIONS TO COMPREHENSIVE PLAN
On May 6, the Business District Development and Redevelopment Commission
(B.D.D.R.C.) completed their review of proposed changes to the Downtown Section of the
Comprehensive Plan. You will recall that B.D.D.R.C. wanted an opportunity to review
recommendations by the Plan Commission for certain land use and transportation issues on
Maple Street.
After discussion, B.D.D.R.C. is recommending to the Village Board that no changes be
made in the Comprehensive Plan for the three Maple Street issues that are summarized in
the attached memorandum and minutes.
Members of B.D.D.R.C. point out that the Maple Street issues have been in planning
documents since 1976, and it would be appropriate at this time to allow our preferred
developer, Broadacre, to complete their downtown market studies and project planning
before making any changes to planning policies on Maple Street. B.D.D.R.C. believes more
work by Broadacre will allow a more complete evaluation of key parts of the downtown
plan.
DMC:hg
Attachment
VILLAGE OF MOUNT PROSPECT
PLANNING DEPARTMENT
Mount Prospect, Illinois
TO: BUSINESS DISTRICT DEVELOPMENT & REDEVELOPMENT COMM,
HAL PREDOVICH, CHAIRMAN
FROM: DAVID M. CLEMENTS, DIRECTOR OF PLANNING
DATE: MAY 6, 1992
SUBJECT: PROPOSED AMENDMENTS TO COMPREHENSIVE PLAN
As you know, the Plan Commission has completed their review of the Comprehensive Plan,
and is recommending several changes to the Downtown Section.
You will recall that on August 28, 1991, B.D.D.R.C. reviewed the Downtown Section of the
Plan as part of the overall process for the Plan Commission. B.D.D.R.C. recommended
that no changes be made to the Downtown Section, but stated that more detailed studies
of the original 1976 Downtown Plan be updated to reflect strategy and policy changes.
With this information from B.D.D.R.C. the Comprehensive Plan Committee of the Plan
mi
Comssion continued their review, and the Plan Commission convened the required public
hearings.
After public hearings, the Plan Commission is recommending a number of changes in the
Downtown section. The following items are of particular interest to B.D.D.R.C.:
1. Changing the land -use designation on the east side of Maple Street from
Central to Northwest Highway from multi -family to single-family.
2. Deleting a statement about relocating the train station further east. Rather
than moving the station as proposed in the 1976 Plan, the Plan Commission
recommends that a study be conducted to determine if train platforms could
be expanded further east in an effort to relieve traffic back-ups at Emerson
and Elmhurst Road.
3. Deleting a statement about a future railroad grade crossing at Maple Street,
and recommending that Maple Street be classified as a residential street rather
than a collector street.
After initial discussion, the Village Board asked that B.D.D.R.C. review the Plan
Commission recommendation prior to any Village Board action. This was the result of a
request by Chairman Predovich.
Business District Development
and Redevelopment Commission
Hal Predovich, Chairman
May 6, 1992
Page 2
Concerning the three items discussed above, staff should point out that a number of
residents on Maple Street attended the public hearings and expressed concerns about the
multi -family designation, the Maple Street crossing and the collector street classification.
These residents explained to the Plan Commission that there are a number of young families
now on Maple Street and the area has proven to be an attractive, established residential
area. These residents believed that the above plan elements would prove disruptive to their
neighborhood. Further, one resident pointed out that the sale of a home had been lost
because of the multi -family land -use designation. The potential buyer did not want to
purchase the home since the Comprehensive Plan designated the area as multi -family.
At this time, B.D.D.R.C. may want to discuss the changes as proposed by the Plan
Commission, and their initial recommendation from August. Staff agrees that the approach
taken by B.D.D.R.C. in August suggesting a re-evaluation and update of the 1976 Plan is
very important now that the Plan Commission is recommending certain changes.
It should be recognized that our preferred developer, Broadacre, is undertaking market
studies for downtown and site planning for the triangle area west of Main Street. It might
be best to evaluate this information more fully before making any changes in the downtown
elements of the Comprehensive Plan. The market study will provide current conditions on
the downtown economy, and project site planning west of Main Street will help us
understand the development philosophy and specifics that Broadacre hopes to bring to our
downtown area. These items can have a residual effect on the Maple Street issues, and staff
believes the fact that this work is currently underway should be considered when reviewing
changes to the Comprehensive Plan.
As a summary, it is staff's recommendation that the Maple Street issues previously identified
not be changed in the current Comprehensive Plan revisions. Broadacre's planning tasks
should be completed, and the entire downtown strategy evaluated considering Broadacre's
development impact.
Staff understands that the Maple Street residents have very important reasons for their
opinions on these matters. It is hoped the residents understand that these long-range plan
elements have existed since 1976, and an additional period of time is reasonable to allow
Broadacre to complete their analysis of downtown conditions.
DMC:hg
BUSINESS DISTRICT DEVELOPMENT AND
REDEVELOPMENT COMMISSION
Wednesday, May 5, 1992
CALL TO ORDER:
A special meeting of the Mount Prospect Business District Development and Redevelop-
ment Commission (B.D.D.R.C.) was called to order by Chairman Predovich at 7:35 P.M. on
Wednesday, May 5, 1992 at the Village Hall, 100 South Emerson Street, Mount Prospect,
Illinois.
Members of the Commission present: John Eflering, Keith Youngquist, Bart Ke1jik (arrived
approximately 8:00 p.m.), and Chairman Hal Predovich. Members absent: John Metzenthin
and Joseph Janisch. Also present: Janet Hansen, Executive Director Mount Prospect
Chamber; Trustee Irvana Wilks; Donald Weibel, Plan Commission Chairman; David M.
Clements, Planning Department Director; and Kenneth Fritz, Economic Development
Coordinator. Residents from Maple Street present: Patty Maro, Tom and Tammy Sullivan,
Jim O'Malley and Richard Senoll.
Comprehensive Plan &3jsjons VmmjQmm Section
Chairman Predovich welcomed Don Weibel, Chairman of the Plan Commission, and asked
that Don give a briefing to the B.D.D.R.C. members present regarding the proposed changes
to the Downtown Section of the Comprehensive Plan, recommended by the Plan
Commission. After a brief discussion of the background of the process that the Plan
Commission has used to update the Comprehensive Plan, and the numerous Plan
Commission Committee meetings and public hearing process with residents in the Maple
Street area, Mr. Weibel indicated the following items were modified in the downtown
section of the Comprehensive Plan for consideration by the Village Board:
Changing the land -use designation on the east side of Maple Street from
Central to Northwest Highway from multi -family to single-family.
Deleting a statement relative to the relocation of the train station further east.
Rather than moving the station as proposed in the 1976 Plan, the Plan
Commission recommends that a study be conducted to determine if METRA
commuter trains create unsatisfactory street congestion at Emerson and Route
83, and if so, whether moving the stopping points of the commuter train would
adequately reduce the level of train blocking of these streets.
Deleting a statement about a future railroad grade crossing at Maple Street,
and recommending that Maple Street be classified as a residential rather than
a collector street.
Page 2
Residents from Maple Street summarized their concerns regarding the Comprehensive
Plan's long-range land -use and transportation designations relative to Maple Street and the
grade crossing. They indicated that:
1. They have made significant investments in the older single family homes on
Maple Street from Northwest Highway to Central. There are over 40 young
children within this two block stretch. Hence the concern for increased traffic
should the street be developed as a collector street from Northwest Highway
to Central as shown on the Comprehensive Plan.
2. For the same reasons listed above, Maple Street grade crossing is a concern.
3. Having properties designated multi -family on the east side of Maple Street
from Northwest Highway to Central is a concern for persons' sense of long-
term stability with regard to single family home ownership in this area.
(Through discussion with B.D.D.R.C. members, their concerns for the pressures for multi-
family development in this stretch in the immediate future were moderated. B.D.D.R.C.
having suggested that this is one of the last phases for redevelopment and requires restudy
along with other elements of the downtown redevelopment.)
1111, ,
:cram 1111�111111111111� I ill�iiji��ll��illillillillilli,!.,T
Following a continuing dialogue with residents of Maple Street, the following comments
were made by members.
KeiLh YoungqUi:st. He questioned the elimination of a grade crossing from the
Comprehensive Plan in light of the new Fire and Police Station re-establishment at
the same location at Maple and Northwest Highway and the possible need for a
grade crossing for better fire and police access north and south of the rail facilities.
He indicated that, in his opinion, most of the traffic movements that might be added
by a Maple Street grade crossing would be locally oriented, such as, movements from
Prospect Avenue to Northwest Highway. It was his opinion that the congestion
caused by interruption of north/south movements on Emerson and Route 83 were
significant, and in addition to the fire and police needs for better response and
access, the congestion in the morning and evening rush hour periods should be
studied before removing the option of a grade crossing from the Comprehensive Plan.
Bart Kgjli—k. He indicated, as a resident living south of the railroad for over 30 years,
there is still a need to keep the grade crossing option in the Comprehensive Plan
because of the congestion caused by trains in the downtown area interrupting
north/south through and local traffic.
John EjIgbU. He agreed that the congestion should be studied farther to allow
Broadacre to comment upon the larger downtown issues of multi -family housing and
circulation relative to the Maple Street area.
Page 3
Chairman HW Predovi . He indicated that until more complete studies were done
with Broadacre and others, he reiterated the earlier position taken by B.D.D.R.C. in
September, 1991 suggesting a re-evaluation/update of the 1976 Downtown Plan,
especially since more accurate information is being developed with regard to market
studies and planning strategies by Broadacre.
Motion
A motion was made by John Eilering, seconded by Bart Keljik, to recommend to the Village
Board that no deletions be made to the downtown section of the Comprehensive Plan until
Broadacre consultants have had an opportunity to evaluate these elements in larger context
of the more detailed Downtown Plan. The motion passed 4 ayes, 0 nays.
REDEVELOPMENT ISSUE
Disomimn 1
B.D.D.R.C. reviewed the summary of issues to be discussed at the May 12 Committee -of -
Whole Meeting as outlined by Broadacre management and staff. The major issues were as
follows:
1. Broadacre is not in a position to acquire land on its own account or as a part
of the project redevelopment. Broadacre will look to the Village to acquire
the land as the Village's equity in the project development with Broadacre
raising the investment capital for project improvements including residential
and commercial uses.
2. Broadacre is to demonstrate, through financial analysis, the need to amend
or expand the TIF boundaries in order that the financial mechanisms available
through TIF can help to ensure a successful project implementation.
3. Develop a land -use strategy consistent with the objectives and guidelines for
downtown redevelopment endorsed by B.D.D.R.C. and adopted by the Village
Board.
A preliminary concept plan was discussed having been transmitted by Broadacre and their
architectural consultants, Decker and Kemp, for the purposes of preliminary review prior
to the May 12 meeting. The major features of the concept plan show a residential
component made up of 334 apartment units in 4 separate buildings in the block occupied
presently by the Aldi's and old Public Works Facility. Two of the apartment buildings would
be 5 stories and 2 would be 6 stories in height. It is proposed that an underground parking
structure could support in excess of 700 parking spaces. It was anticipated that, of this
number, 300 spaces or more could be devoted to commercial and commuter parking.
Page 4
A retail component would be centered on either side of a new green belt with major access
from Main Street (Route 83) running westerly surrounding the green belt with local access
for shopper parking to retail stores located on either side of the green belt. It was also
anticipated that retail space would be provided on the first floor of some of the residential
apartment buildings. A senior citizen housing component has also been shown in the
concept drawing on property located at the southeast comer of Pine and Central on
property earlier purchased and cleared by the Village.
A major component of the concept plan is the relocation of Northwest Electric to properties
now occupied by the service station and auto body shop having frontage on Main Street and
Central.
As part of the concept for downtown Mount Prospect redevelopment and for a later
development phase, Broadacre has suggested the block containing the library and senior
citizen and associated municipal parking lot area complement the new development west
of Main Street. They propose a'public plaza at the surface level south of the library and
properties currently devoted to on -street parking between the library and the senior center.
This design would consider underground parking below the civic plaza area and a possible
extension of underground parking from the library facility to the north. Completing the
concept plan would be a proposed civic building located on the present First Chicago Bank
of Mount Prospect parking lot on the east side of Emerson Street between Busse and
Central.
A preliminary sketch is attached for identification of these areas. The proposed
development as shown in this preliminary sketch will contain roughly 400,000 square feet
of developed area with 85,000 square feet of that total devoted to commercial/office use.
It is projected that the total development cost will be in the neighborhood of $42 to $46
million, with the Village contributing roughly $3 million in land cost and Broadacre $8 to
$10. million in initial investment equity.
APPROVAL OF MINUTES:
The minutes of April 15, 1992 were approved on a motion by Keith Youngquist, seconded
by John Eilering. The motion to approve as submitted passed unanimously.
The meeting was adjourned at 9:25 p.m.
Kenheth H. Fritz,
Economic Develo
200,2094
09lw� ir, 21f a,
1
I
0O
Cl
ul
LL,
Phone: 70e / 392-6000
Fax: 70e / 392-6022
ZONING BOARD OF APPEALS
Special Meeting
May 14, 1992
7:30 P. M.
Trustees Room, Village Hall
100 South Emerson Street
L ZBA-19-,.92, Charles A. Luke, 1605 East Cedar Lane
The petitioner is requesting a variation to Section 21.601 of the Mount Prospect
Building Code to allow a six (6) foot fence instead of the maximum allowed five (5)
foot fence along the rear property line.
The Zoning Board of Appeals is final in this request.
2. Workshop No. 5
A. Continuation of Discussion of General Provisions
B. Residential Districts
NOTE: In all cases where the Zoning Board of Appeals is final, a fifteen (15) day
period is provided for anyone wishing to appeal their decision. No permit will
be issued until this period has elapsed.
MAYOR
GERALD L FARLEY
TRUSTEES
MARK W BUSSE
GEORGE A CLOWES
TIMOTHY J. CORCORAN
LEO FLOROS
PAUL WM. HOEFERT
IRVANA K. WILKS
Village of Mount Prospect
VILLAGE MANAGER
JOHN FULTON DIXON
VILLAGE CLERK
100 S. Emerson Mount Prospect, Illinois 60056
CAROL A FIELDS
Phone: 70e / 392-6000
Fax: 70e / 392-6022
ZONING BOARD OF APPEALS
Special Meeting
May 14, 1992
7:30 P. M.
Trustees Room, Village Hall
100 South Emerson Street
L ZBA-19-,.92, Charles A. Luke, 1605 East Cedar Lane
The petitioner is requesting a variation to Section 21.601 of the Mount Prospect
Building Code to allow a six (6) foot fence instead of the maximum allowed five (5)
foot fence along the rear property line.
The Zoning Board of Appeals is final in this request.
2. Workshop No. 5
A. Continuation of Discussion of General Provisions
B. Residential Districts
NOTE: In all cases where the Zoning Board of Appeals is final, a fifteen (15) day
period is provided for anyone wishing to appeal their decision. No permit will
be issued until this period has elapsed.