Loading...
HomeMy WebLinkAbout6.2 A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE AN INTERGOVERNMENTAL AGREEMENT WITH THE ILLINOIS DEPARTMENT OF TRANSPORTATION (IDOT), THE ILLINOIS DEPARTMENT OF NATURAL RESOURCES (IDNR), THE CITY OF PROSPECT HEIGHTS, AND THE VILLAGE OF MOUNT PROSPECT TOMr�GauC �'d'+rt;�iect Subject A RESOLUTION AUTHORIZING• • EXECUTE AN INTERGOVERNMENTAL ILLINOISTHE DEPARTMENT OF • • •T), THE ILLINOIS DEPARTMENT OF RESOURCES (IDNR), THE CITY OF PROSPECT AND THE VILLAGE OF MOUNT PROSPECTTO CLOSUREFACILITATE CONSTRUCTION OF A STORM SEWER ON Meeting September 20, 2022 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - Fiscal Impact false Dollar Amount N/A. Budget Source N/A. Category CONSENT AGENDA Type Consent Levee 37 was designed to protect homes from inundation by the Des Plaines River. The levee wall serves as a physical barrier between record river crests and the adjacent residential neighborhoods. It was designed and constructed by the United States Army Corps of Engineers (USACE). Local partners included the Illinois Department of Natural Resources (IDNR), the Illinois Department of Transportation (IDOT), the City of Prospect Heights, and the Village of Mount Prospect. The original Intergovernmental Agreement (IGA) to facilitate this work was executed in 2008. Construction was substantially completed in 2011. Amendment #1 of the IGA was executed in 2014. It granted additional permanent easements for access to the levee wall for purposes of maintenance, repair and rehabilitation. Amendment #2 of the IGA was executed in 2020. It authorized the construction of a supplemental pump station at Pump Station 2. Work is ongoing and expected to be completed later this fall. The purpose of Amendment #3 of the IGA is to authorize construction of a closure 1 structure to an existing 54" diameter storm sewer pipe in the City of Prospect Heights. The pipe outlet is located adjacent to the river near Palatine Road east of Milwaukee Avenue. Should river levels rise above the pipe outlet, the flap gate will close preventing water from backing up in the pipe. Water entering the pipe system upstream will be pumped over the levee wall by City of Prospect Heights staff. IDNR has secured $500,000 from the Illinois General Assembly for engineering and construction costs. Engineering plans are currently being developed by the IDNR in cooperation with the local partners. Construction is expected to take place in 2023 but a firm schedule has not yet been set. There will be no cost to the Village of Mount Prospect for the work. Once construction is complete, the USAGE will certify that all necessary work associated with Levee 37 has been accomplished and will formally request a Letter of Map Revision (LOMR) be issued by the Federal Emergency Management Agency (FEMA). FEMA will review all project documentation associated with Levee 37 including the flood control projects at Burning Bush Trails Park and Aspen Trails Park, and reissue floodplain maps showing the affected properties at the northeast part of Mount Prospect outside the floodplain. The new floodplain line will be drawn east of the levee wall, outside the Village limits. Residents will then no longer be required to purchase annual flood insurance but can still choose to do so at a discounted rate because of the Village's Class 6 rating in FEMA's Community Rating System program. It is expected for FEMA to take approximately one year to review the project documentation and issue the LOMR. Attached for the Village Board's consideration is IGA Amendment #3 that authorizes construction of a closure structure to an existing 54" diameter storm sewer pipe in the City of Prospect Heights. Upon completion, all required work associated with Levee 37 will be accomplished so that FEMA can proceed with issuing a LOMR and revising the floodplain maps. Alternatives 1. Pass a resolution authorizing an Intergovernmental Agreement with the IDOT, IDNR, City of Prospect Heights, and Village of Mount Prospect to construct a closure structure on a 54" diameter storm sewer pipe in the City of Prospect Heights. 2. Action at the discretion of the Village Board. Staff Recommendation Staff recommends that the Village Board pass a resolution authorizing the mayor to sign an intergovernmental agreement with IDOT, IDNR, Prospect Heights, and the Village to facilitate construction of a storm sewer closure on Levee 37. ATTACHMENTS: Levee_37_Amendment_3. pdf 2 Resolution.pdf AMENDMENT NUMBER THREE to an AGREEMENT between the STATE OF ILLINOIS/DEPARTMENT OF NATURAL RESOURCES and the STATE OF ILLINOIS/DEPARTMENT OF TRANSPORTATION and the CITY OF PROSPECT HEIGHTS and the VILLAGE OF MOUNT PROSPECT forthe UPPER DES PLAINES RIVER FLOOD DAMAGE REDUCTION PROJECT ELEMENT, LEVEE 37 Contract Number OWR-243 THIS AMENDMENT NUMBER THREE is made among the City of Prospect Heights, hereinafter referred to as the "CITY", the Village of Mount Prospect, hereinafter referred to as the "VILLAGE", the State of Illinois/Department of Natural Resources, hereinafter referred to as "NATURAL RESOURCES" and the State of Illinois/Department of Transportation, hereinafter referred to as "TRANSPORTATION"; and WHEREAS, the CITY, the VILLAGE, NATURAL RESOURCES and TRANSPORTATION entered into an agreement and subsequent amendment numbers one and two, effective September 16, 2008, January, 31 2014 and September 4, 2020, respectively, hereinafter collectively referred toas the "AGREEMENT," copies of which are attached hereto as EXHIBIT A, EXHIBIT B and EXHIBIT C and incorporated herein by reference, covering the construction of the Levee 37 Project Element, hereinafter referred to as the "PROJECT"; and WHEREAS, a closure structure near Palatine Road, herein referred to as the "PALATINE ROAD CLOSURE STRUCTURE ELEMENT, is required to adequately provide flood protection in association with the previously constructed aspects of the PROJECT and the parties wish to amend the PROJECT to include said PALATINE ROAD CLOSURE STRUCTURE ELEMENT; and, WHEREAS, additional rights-of-way belonging to TRANSPORTATION are required for completion of the PALATINE ROAD CLOSURE STRUCTURE ELEMENT and are identified on EXHIBIT D attached hereto; and, WHEREAS, the CITY has acquired, in the name of the CITY and without cost to NATURAL RESOURCES, TRANSPORTATION or VILLAGE, a permanent easement to facilitate the construction, operation and maintenance of the PROJECT from TRANSPORTATION; and, WHEREAS, the CORPS has estimated the total cost of construction of the PALATINE ROAD CLOSURE STRUCTURE to be approximately $500,000; and, WHEREAS, the Illinois General Assembly appropriated the funds needed to complete the installation of the PALATINE ROAD CLOSURE STRUCTURE ELEMENT 4 to NATURAL RESOURCES under Public Act. 102-0017 Article 141, Section 70 in FY22 for expenditure by the Office of Water Resources for Flood Control and Water Development Projects; and, WHEREAS, the CORPS requested and NATURAL RESOURCES agreed to develop engineering plans and special provisions, advertise and award, provide resident engineering services during construction, and provide construction funding estimated at $500,000, for the PALATINE ROAD CLOSURE ELEMENT; and, WHEREAS, NATURAL RESOURCES has determined that the execution of this AGREEMENT is subject to the signature requirements of the "State Finance Act," 30 ILCS 105/9.02; and WHEREAS, NATURAL RESOURCES has determined that 1) the circumstances necessitating this AMENDMENT NUMBER THREE were not reasonably foreseeable at the time the AGREEMENT was executed and amended, 2) this AMENDMENT NUMBER THREE is germane to the AGREEMENT, and 3) this AMENDMENT NUMBER THREE is in the best interest of NATURAL RESOURCES and the State of Illinois. NOW THEREFORE, for and in consideration of these premises, the parties hereto agree to the following modifications therein: The description of the LEVEE 37 PROJECT ELEMENT setforth in the 611 WHEREAS paragraph of the AGREEMENT shall be amended to include the PALATINE ROAD CLOSURE STRUCTURE ELEMENT added to the Project pursuant to this Amendment Number 3. All duties and responsibilities of the parties regarding the LEVEE 37 PROJECT ELEMENT set forth in the AGREEMENT shall specifically include and also apply to the PALATINE ROAD CLOSURE STRUCTURE ELEMENT added to the project pursuant to this Amendment Number 3. At the end of paragraph D.6 of the AGREEMENT, the following language shall be added: "TRANSPORTATION will grant access to its property as shown on EXHIBIT D attached hereto and incorporated herein by reference, which amends amended ATTACHMENT 4 to the AGREEMENT, the intent herein being to grant such additional access over and upon the additional access areas shown on EXHIBIT D to the VILLAGE, CITY, CORPS and NATURAL RESOURCES for the purpose of construction, operations, inspections, maintenance, repair and rehabilitation of the LEVEE 37 PROJECT ELEMENT for so long as LEVEE 5 37 PROJECT ELEMENT remains authorized by the CORPS. Any actions of the VILLAGE, CITY and/or NATURAL RESOURCES forthe purpose of construction, operations, inspections, maintenance, repair and rehabilitation of the LEVEE 37 PROJECT ELEMENT that will impact normal traffic flows will require an IDOT traffic access permit." 3. The parties to this AMENDMENT NUMBER THREE and the CORPS have determined that the Levee 37 project limits need to be expanded as shown on EXHIBIT D. TRANSPORTATION has agreed to expand the access area as shown on such EXHIBIT. 4. The existing second sentence of paragraph A.2 of the AGREEMENT shall be changed to the following: "NATURAL RESOURCES' funding obligation under this AGREEMENT will terminate upon the completion of the PUMP STATION ELEMENT and the PALATINE ROAD CLOSURE STRUCTURE ELEMENT, when the NATURAL RESOURCES' cost share is expended, or June 30, 2025, whichever comes first." 5. After the first sentence of paragraph A.2 of the AGREEMENT, the following sentence shall be added: "Additionally, Natural Resources' funding obligation shall include the non-federal cash amount for the PALATINE ROAD CLOSURE STRUCTURE ELEMENT added to the LEVEE 37 PROJECT ELEMENT, estimated to be $500,000." 6. All other covenants under terms of the AGREEMENT remain unchanged and in full force and effect except and to the extent otherwise provided herein. IN WITNESS WHEREOF, the parties hereto set their hands and seals the day and year written, and represent that the signatories below are duly authorized to execute this AMENDMENT NUMBER THREE on behalf of their respective bodies, and that the effective date of this amendment is the date approved and executed by the Director of NATURAL RESOURCES. STATE OF ILLINOIS/DEPARTMENT OF NATURAL RESOURCES RECOMMENDED: ..... .... ... ....www. ............ ..... ............... ........... Loren Wobig, Director Office of Water Resources Date: APPROVED: Renee Snow General Counsel Date: APPROVED: Colleen Callahan, Director Department of Natural Resources Date: APPROVED: Meta Darnell Chief Fiscal Officer Date: 1J VILLAGE OF MOUNT PROSPECT ATTEST: APPROVED: Karen Agoranos, Clerk Paul Wm. Hoefert, Mayor Village of Mount Prospect Date: .... ..... .._... _ _ Date:......... .......... ...... .__.wv -_-- CITY OF PROSPECT HEIGHTS ATTEST:. 0! Q ......... APPROVED: �0yfl6<0pP0,0q�• G SEAL co o" Matthew Dolick, Acting Karen Schultheis, Z %%N Mayor Deput Clerk w�''•;l(�01�',,������City of Prospect He i hts � Djwate: 2S O� Date:�J__ STATE OF ILLINOIS/DEPARTMENT OF TRANSPORTATION RECOMMENDED: Director -Division of Highways Chief Engineer Date: APPROVED AS TO FORM: Chief Counsel Date: APPROVED: Acting Secretary Date: 7 A RESOLUTION AUTHORIZING THE MAYOR TO EXECUTE AN INTERGOVERNMENTAL AGREEMENT WITH THE ILLINOIS DEPARTMENT OF TRANSPORTATION (IDOT), ILLINOIS DEPARTMENT OF NATURAL RESOURCES (IDNR), CITY OF PROSPECT HEIGHTS, AND VILLAGE OF MOUNT PROSPECT FOR THE CONSTRUCTION OF A STORM SEWER CLOSURE STRUCTURE AS PART OF THE LEVEE 37 PROJECT WHEREAS; the Village of Mount Prospect is a unit of local government authorized to exist under the terms of the Illinois Compiled Statutes; and WHEREAS; the IDOT, IDNR, City of Prospect Heights, and Village of Mount Prospect entered into an agreement and subsequent amendment numbers one and two, effective September 16, 2008 and January 31, 2014 and September 4, 2020 respectively, covering the construction of the Levee 37 Project; and WHEREAS, a storm sewer closure structure near Palatine Road is required to adequately provide flood protection in association with the previously constructed aspects of the project; and WHEREAS, additional rights-of-way belonging to IDOT are required for completion of the closure structure; and WHEREAS; the City of Prospect Heights has acquired in the name of the City and without cost to the IDOT, IDNR or Village of Mount Prospect, a permanent easement to facilitate the construction, operation and maintenance of the storm sewer closure structure from IDOT. NOW THEREFORE BE IT RESOLVED; By the President and Board of Trustees of the Village of Mount Prospect, Cook County, Illinois SECTION ONE: The Mayor is hereby authorized to execute Amendment Number Three to an Intergovernmental Agreement between the IDOT, IDNR, City of Prospect Heights, and Village of Mount Prospect for the Upper Des Plaines River Flood Damage Reduction Project Element, Levee 37. SECTION TWO: Amendment Number Three to an Intergovernmental Agreement between the IDOT, IDNR, City of Prospect Heights, and Village of Mount Prospect for the Upper Des Plaines River Flood Damage Reduction Project Element, Levee 37, Contract Number OWR-243, is attached to and made part of this Resolution. SECTION THREE: That this Resolution shall be in full force and effect from and after its passage. AYES: ABSENT: PASSED and APPROVED this 20"' day of September 2022. Paul W. Hoefert, Mayor ATTEST: Karen M. Agoranos, Village Clerk 0