HomeMy WebLinkAbout7. MANAGERS REPORT 03/04/2008 Mount Prospect Mount Prospect Public Works Department INTEROFFICE MEMORANDUM TO: VILLAGE MANAGER MICHAEL E. JANONIS FROM: PROJECT ENGINEER DATE: FEBRUARY 26, 2008 SUBJECT: 2008 STREET RESURFACING CONTRACT AWARD - $3,135, Background This year's project represents the twelfth year of the thirteen year extended street improvement program and includes the resurfacing of approximately 7.2 miles of Village streets. Again this year we also combined both the MFT funded program and the Village Street Improvement funded program into one project in order to secure an early and more favorable bid. Bids Results A notice to bidders was published in a local newspaper. Since this project uses MFT funds it was also published in the mOT construction bulletin. On February 25th, at 10:00 A.M. sealed bids for the 2008 Street Resurfacing Program were publicly opened and read aloud. Six general contractors picked up the bid documents and three contractors submitted bids. The bids ranged from a low of $3,277,791.00 by Arrow Road Construction Company to a high of $5,000,000.00 by A-Lamp Concrete Contractors Inc. The Engineer's estimate for the project is $3,202,415.00. Below is a summary of the bids. Bidders Arrow Road Construction Co. Johnson Paving Co. A-Lamp Concrete Contractors Inc. Total Bid $3,277,791.00 $3,470,118.40 $5,000,000.00 Engineer's Estimate $3,202,415.00 PAGE 2 2008 STREET RESURFACING CONTRACT AWARD FEBRUARY 26, 2008 Discussion All bidders submitted mOT Local Agency Bid Bonds in the amount of 5% of their total bids as required by the Bid Documents. All bids were checked for accuracy. All bidders correctly signed their bids and bid bonds. The low bidder Arrow Road Construction Co. has previously completed street improvements for the Village including the 2006 and 2007 Street Resurfacing Programs and their work was acceptable. The Village budget limit for this project is $3,135,000.00. The low bid is $3,277,791.00, and is 4.6% over the budget limit. Since the low bid exceeds the budget limit, we must reduce the contract to the budget limit. The bid quantities include contingencies that allow for unforeseen circumstances such as additional base repair, additional asphalt required because of thickness variation, etc. The full projected quantities for these items may not be needed. Based on my experience in previous years, I anticipate that this year's program can be completed with the available funds. Midway through the project I will evaluate the money spent vs. the money needed to resurface the remaining streets. At that time I will determine whether all of the streets scheduled for this year's program can be completed within the budget limit. Recommendation I recommend that the low bidder, Arrow Road Construction Co. be awarded the contract for the 2008 Street Resurfacing Program in the amount not to exceed $3,135,000.00. There are sufficient funds in the 2008 Budget to cover this proposed contract. d~e~~~ I concur with the above recommendation. Village of Mount Prospect Community Development Department Mount Prospect ~ MEMORANDUM TO: '1>> ~~ ~I&.t lea MICHAEL E. JANONIS, VILLAGE MANAGER FROM: DIRECTOR OF COMMUNITY DEVELOPMENT FEBRUARY 26, 2008 COMMUNITY DEVELOPMENT DEPARTMENT COPIER LEAS DATE: SUBJECT: The Community Development Department recently requested bids from companies to provide copier and printer services for our Department. The Department currently leases one copier from COTG and has been exceeding the allowed copier counts on a regular basis. In the fall of 2007, COTG conducted a print study for the Community Development Department to accurately monitor both the copier and printer use. The new proposal for contract includes adding a second copier, increasing the page allowance, an updated color printer, and supplies and maintenance for all machines, including printers and faxes in the department. COTG ($12,906) and Image Tech ($13,176) both provided the Village with bids based upon the revised print study. After reviewing the bids staff is recommending that the Village Board authorize staff to enter into a lease agreement with COTG in an amount not to exceed $12,906 for copier and printer services. The new contract will meet budget requirements by pooling the copier lease line item ($11,000) with the office supply increase for toner purchase ($3,000). The Department has a total $14,000 copier/printer maintenance budget. Printer Chan es Maintenance Included None HP Service Co ier Allowance Printer Allowance Overa e Annual Cost $13,176 COTG $1,075.50 2 co iers 2 new printers (including color and replace 6P Yes $12,906 Currently, the Department has a good working relationship with COTG and recommends that we enter into a new contract with COTG including two copiers and a new color printer for the annual cost of $12,906. Please forward this memorandum and attachment to the Village Board for their review and consideration at the March 4th Village Board meeting. t~~ 1, ~l, William J. Cooney Jr. Director of Community Development H:\ADMN\BILL\MEMOS\MEJ\2008\copier lease memo.doc