HomeMy WebLinkAbout0296_001MINUTES
COMMITTEE OF THE WHOLE
FEBRUARY 12, 1991
I. ROLL CALL
The meeting was called to order at 7:35 p.m. Present at the meeting were:
Mayor Gerald L. Farley; Trustees Ralph Arthur, Mark Busse, Timothy Corcoran,
George Van Geem and Don Weibel. Absent from the meeting was Trustee Leo
Floros. Also present at the meeting were: Village Manager John Fulton Dixon,
Assistant Village Manager John Burg, Public Works Director Herb Weeks,
Finance Director Dave Jepson, Planning and Zoning Director Dave Clements,)
Inspection Services Director Chuck Bencic, Assistant Finance Director Caroli
Widmer, Water and Sewer Superintendent Jerry McIntosh; Janet Hansen,t
Executive Director of the Chamber of Commerce; two members of the press and
seven persons in the audience.
II. MINUTES
The Minutes of the Committee of the Whole meeting of January 22, 1991 were
accepted and filed.
III. CITIZENS TO BE HEARD
There were no citizens who wished to be heard.
IV. STREET LIGHTING
Mayor Farley introduced the discussion on street lighting. Trustee Corcoran said
that he had requested the discussion of this item because he felt the Village
should consider using more energy-efficient lights when replacement is necessary.
He suggested using box lights which would aim the electricity in the desired areas
by the streets rather than diffusing the light throughout the neighborhood.
Assistant Village Manager John Burg provided information on street lighting.
After discussion, it was the consensus of the Committee that whenever possible,
the Village should change the street lighting to high-pressure sodium to save on
energy costs. Box lights should be used whenever possible and where appropriate.
The Committee also felt that the requirement for mercury vapor lighting in
residential areas should be changed to allow high-pressure sodium lights to save
on energy.
Assistant Manager Burg indicated that the Commonwealth Edison owned lights
would actually cost more for high-pressure sodium. The only potential savings
would be on the Village -awned lights.
V. HOME OCCUPATIOND Al's
Planning and Zoning Director Dave Clements summarized the recommendations
of the Zoning Board with regard to the proposed Home Occupation Ordinance.
He noted that the Ordinance relied on certain Performance Standards to regulate
home occupations.
Janet Hansen indicated that she would take exception to not allowing any outside
employees. She said the Chamber felt that one outside employee should be
allowed. She also felt that the Performance Standard related to the use of a
residence by a professional person should be deleted, from the proposed
Ordinance. She felt this item would be covered by the Performance Standard
related to the generation of traffic.
Trustee Arthur said the Village; is trying to improve the downtown. He did note,
feel that businesses should be allowed in the residential areas which wouldt
compete with the current businesses. He was completely opposed to this type oe
Ordinance.
Janet Hansen said that many of the businesses which have started in this
community did start in the home.
Trustee Corcoran asked how many complaints there are about businesses in the
homes. Mr. Clements said he receives two or three a month usually concerning
commercial vehicles. Trustee Corcoran felt he could not support this Ordinance
because he feels it is vague and unworkable. He feels that the language of the
Ordinance must be more specific.
Trustee Busse asked how the Village would identify businesses that were operating
in homes. He asked if the Village would send notice to all the companies who
have a Tax ID number. Mr. Clements said notices could be sent as suggested.
Mr. Clements said the staff would like to see this Ordinance adopted because staff
has been placed in an uncomfortable position when individuals call and ask how
they can start a business in their home. Staff must tell them a home occupation
is not allowed, but many times these residents say that they know of others
engaged in such a business.
Trustee Van Geem said he generally supports this type of Ordinance. However,
he is concerned about the proposed fee. He would like to see the Ordinance
adopted without any fee attached.
The Mayor then opened the floor to comments by residents.
A resident at 104 Stratford said she was vehemently opposed to the Ordinance.
She gave examples of various businesses that have operated in homes in her area
over the years.
Another resident at 211 South Hi-Lusi said he is a salesmen's representative and
has worked out of his home for 15 years. He keeps samples at his home and
then he goes out on sales calls. He said his neighbors do not even know that he
operates out of his home. He requested a copy of the current Ordinance
regulating home occupations and the proposed Ordinance. He was opposed to
regulation of home occupations.
Trustee Weibel asked how many existing businesses there are. Mr. Clements said
the Village could look at the Tax ID numbers and develop this information.
Trustee Corcoran would like to work with the staff and the Chamber of
Commerce to tighten up the language of the Ordinance.
It was the consensus of the Committee that staff should work with Trustee
Corcoran and the Chamber of Commerce on the wording of this Ordinance. nisr
matter should be brought back at the Committee of the Whole meeting on
March 12. Mayor Farley invited the interested parties to attend this meeting and
he requested that staff obtain the information on the number of businesses
operating in homes in the community.
V1. 1991-1992 UM
.... ........... GET HEARING
Mayor Farley gave opening remarks regarding the 1991-1992 Budget. Manager
Dixon then gave a Budget overview including Revenues and Expenditures.
Finance Director Dave Jepson then gave a presentation on the anticipated
Revenues for the year. He also discussed the information contained in the
Introductory Section of the Budget.
Mr. Jepson indicated that the Village tries to maintain a 15% balance in the
various Funds. He also pointed out that the Village receives 10.3% of the total
Tax bill.
Trustee Van Geem asked what assumption was used for the salary increases.
Mr. Jepson said that 5% was included in the salary figures.
Mr. Jepson explained the rationale behind the recommendation to institute an
Ambulance Fee for residents. Last year, there were 2200 ambulance transports
of which 80% were residents. We are currently collecting 79% of the ambulance
charges for non-residents. Mr. Jepson said that insurance covers such a charge
in many cases.
"3-
If Medicare is to pay ;for the ambulance charge for non-residents, Medicare would
also require that a fee apply to residents as well. Mr. Jepson 'said that the
average ambulance transport costs the Village $350 and so the $125 fee is very
reasonable. He noted that the Village does ;not pursue reimbursement other than
accepting the payments that individuals can afford or the payment made by
insurance and Medicare.
Trustee Corcoran said be is against the $125 Ambulance Fee. He feels this is
part of a service that should be provided by the Village. He also suggested
looking at a seasonally-adjusted water increase or an increase in the water fee
once the usage goes beyond a certain limit.
Trustee Arthur also opposes the $125 Ambulance Fee. He objected to transferring
the responsibility for the Newsletter to the Cable Administrator because he feels
she already has enough work to do.
Administratign Budggl
Village Manager John Dixon outlined the programs contained in thel
Administration Budget and explained the proposed expenditures for the 1991-19921
fiscal year.
Trustee Arthur recommended deleting the proposed $84,090 for the Personnel
Management and Training portion of the Budget. Village Manager Dixon
explained why this program is necessary.
Trustee Busse requested a road map for the Personnel Coordinator position.
Village Manager Dixon outlined some of the projects that have been undertaken
in recent months as well as work anticipated for the future.
Trustee Van Geem said he has always supported the need for a Personnel office
in an organization as large as the Village. He said this position relieves the
Finance Director of various duties, thereby allowing him to focus on fiscal matters.
Trustee Van Geem said he also supports the training of Supervisors which is being
performed.
Trustee Corcoran asked how much turnover there is in the Village. Manager
Dixon said there is very low turnover at this point. However, there can be more
turnover, especially in the Public Works Department, when the economy is good.
Trustee Corcoran said he would like to have a one-month action plan outlining
where the Personnel Coordinator will spend her time as well as long-range goals.
Trustee Van Geem felt this kind of oversight is interfering with the Village
Manager's prerogative of managing the .employees.
-4-
Trustee Weibel agreed with the need for a Personnel Department. He also felt
that oversight of this position by the Board is an infringement on the Manager's
rights.
Trustee Corcoran focused attention on the salary adjustments line item in the
Administration Budget. He suggested cutting this item to reflect the amount that
is expected to be expended.
It was the consensus of the Committee to reduce this item to $5,000.
The Committee continued the discussion on whether to transfer the Newsletter to
the Communications Division. The consensus of the Committee was to leave the
Newsletter under the responsibility of the Village Clerk with the use of an outside
writer. However, the Committee would like to see the Newsletter reduced to four
issues per year.
Trustees Van Geem and Weibel suggested reviewing the function of a Newsletter
at a future Committee of the Whole meeting to see if there may be a more
effective way of communicating with the residents.
Trustee Busse requested an evaluation of the Legal Counsel expenses. He also'
requested an evaluation of the cost of two part-time personnel as opposed to one
full-time secretary in the Communications Division.
Mayor Farley asked why there is such a large reduction in the organization
memberships in the Cable Budget. Cheryl Pasalic indicated she does not feel the
Village should continue to be a member of the Northwest Cable Council. Mayor
Farley said he has felt for years that the Northwest Cable Council should handle
cable complaints on behalf of the Village. He also indicated that there will be
negotiations in the near future regarding the Franchise and he felt that the
collective efforts that the Cable Council could offer would provide leverage in the
negotiations.
The Committee discussed whether the Village should remain a member of the
Northwest Cable Council. It was the consensus of the Committee that the Village
should not renew membership in this organization.
Finance Depal1mgnt Budpq
Finance Director Dave Jepson outlined the Finance Department Budget including
Risk Management.
Trustee Weibel noted that he hopes the EAP will help to cut medical expenses
for the Village. He requested that the Village track this trend.
-5-
V111.BUSI
ANY Y S5
—WER
NF
Village Manager Dixon indicated that the Citizens' Committee which supports the
new Fire and Police Station needs to know how much residents can expect to pay
for the new facility. The Committee discussed the financing of this project. It
was the consensus of the Committee to go with conventional financing and to
stress an increase of less than $10 per year. The Committee decided to be
consistent with the information previously distributed rather than developing an
alternative financing method.
Village Manager Dixon praised Fred Tennyson for the excellent work he did on
the new Budget format.
At 12:00 a.m., Trustee Corcoran moved, seconded by Trustee Busse to go into
Executive Session to discuss litigation, personnel and collective bargaining. Motion
carried unanimously.
JPB/rcw
Respectfully submitted,
J4, cp
JOHN P. BURG
Assistant Village Manager
-6-
Village of M'ount Prospect
Mount Prospect, Illinois
INTEROFFICE MEMORANDUM
TO: MAYOR GERALD L FARIEY AND BOARD OF TRUSTEES
FROM: VILJLAGE MANAGER
DATE: FEBRUARY 22, 1991
SUBJECT: SECOND OPINION OF THE STORMWATER MANAGEMENT
REPORT
Triton Engineering President, George March, will be present to give a brief presentation
to the Board on February 26 concerning the review of the Stormwater Management
Report conducted by RJN Environmental. Generally, the report is very positive in
indicating that all the appropriate measures have been reviewed and undertaken by RJN
Environmental and that there was sufficient time that has lapsed since the original
construction of some projects that were documented in 1972 to determine whether or not
there was impact from the Water Reclamation District's Deep Tunnel Project. At this
time, it is very clear that these projects that were identified in 1972 should proceed.
JFD/rcw
Village of ktount Prospect
Mount Prospect, Illinois �
INTEROFFICE MEMORANDUM
TO: MAYOR GERALD L. FARLEY AND BOARD OF TRUSTEES
FROM: VII.LAGE MANAGER
DATE: FEBRUARY 22, 1991
SUBJECT: NORTHWEST MUNICIPAL CONFERENCE TRANSPORTATION
UNIT
The attached information from the Northwest Municipal Conference Transportation Unit
outlines an ambitious program of studying all areas of transportation in the northwest
suburban area. This organization will develop a coordinated transportation processing
plan and serve as a research base and resource for transportation information
coordinating projects.
I believe it would be worthwhile for the Village to participate in this program at least
for the initial year to determine whether or not we do gain some benefit from this new
organization. There are a couple of projects of importance that I do believe need to be
reviewed and it would be a charge I would give to this transportation committee in the
first year. There is traffic congestion taking place in the Opus Business Park. While
alternate means of transportation have been discussed., there needs to be a coordinated
effort and this organization which has been involved with carpooling and van leasing and
other avenues could bring expertise to discussions with the Opus people. In addition,
there have been a number of conversations with Randhurst in the past concerning their
problems with attracting employees to their facility. While we have not been successful
in developing new bus routes; in fact, we have had a couple of bus routes eliminated in
the Village, this transportation unit would have the opportunity to review our present bus
routes to determine whether there should be an effort to modify those routes to give
better service to the community.
I am recommending that the Board become members of the Northwest Municipal
Conference Transportation Unit with review to be done before the end of the year to
determine whether or not we are receiving $5,000 worth of benefit from our participation.
JOHN FULTON DIXO
JFD/rcw
attachment
NaR THWEST MUNICIPAL CONFEAENCE
11118 E. GOLF ROAD
DES PLAINES.IL 110018
('108)208.8200 FAX: 298.9207
Arlington Heights
Barrington
eaeen
8uitaro Grove
Des Plarr«es
Elk Grove Village
Evenelon
Glance
Glenview
Hanover Park
Highland Park
HpMman Estates
Inverness
Lake Forest
Lake lunch
L0ert"be
Lineolnwooa
Morton Grove
Mount Prosoack
Ndas
Nonhorook
NoMheld
Palatine
Park Ridge
Ptowecl Heights
Rolling Maaoows
Roses.
Schaumour9
Skokie
$lrearnwood
Vernon HMIs
Wheeling
Wdmelte
Winnatke
E,k Grove Twp
Mame Twp
Now Trier Two
Norihhelo Twp
Wheeling Twp
NWMC
A REGIONAL ASSOCIATION OF ILLINOIS
MUNICIPALMES f lES AND TOWNSHIPS
REPRESENTING A POPULATION OF OVER ONE MILLION
FOVNDEO IN 1058
Date: �o � l 9 9 r
Deliver to:
Name;_ J,-!,�, &A -AL
Location: MI .
Phone;
OFFICERS
Pr I yen?
Frank) Chuley
1-meNnwoM Number of Pages. Cover plus
Vice-president
Sonya A.
Crewshaw
Hanover Park
SecrelaryTreaswer
Craig G Anoerson
Wheeling
Ek rcuove Dirac?or
Rim R. A1hes
Other Instructions: '- o� °o-10
M
IF YOU DO NOT RECEIVE ALL PAGES PLEASE CALL SENDER AT (708) 296-9200
'NWMC FACSIMILE MACHINE - NEC 300
t FROM N.iJ.M.0 0-7-0.1991 1 4;48 .__ .P.
The primary goals of the Transportation Unit would be to
provide the mechanists and resources to establish a
comprehensive and coordinated approach, on the sub --regional
level, to the issue of transportation.
+BUD regia ion a rials.,. �3`tu it and
E2.1 e1 nita n„zitagrat ,iar , This would be accomplished by
holding a strategic planning session including
municipalities, transportation agencies, and
representatives of the private sector. The objective of
the plan is to achieve a compact among the Conference
municipalities to implement consistent transportation
and development policies throughout the Conference area
and to establish a process that ensures early
consultation with other municipalities and transportation
agencies prior to approval of developments of a regional.
impact. This is envisioned as a two day session which
would, set the tone for the Conference Transportation Unit
and strengthen the transportation linkage between
municipalities andAransportation agencies.
2) garve a, = g2==ItJaI.L rase D= =d dA=Ri =
gjI rranS122rtation And dpvelgDZ2. jZID=tJgM., This would
involve surveying municipalities for perceived
transportation problems, cataloguing and mapping
ding and
development proposals with regional traffic pending
approved, and recommending possible
strategies.
3) Some Aa =A = mea.' t„rann"rtat2n "A"=
=WAIAItj= zzli 2tiAi ,„9"3fn^aYi4� .at%on ps21==--
These projects might include the continual development of
the Wisconsin central. Line, the Skokie swift Extension and
the Route o3 Extension. Project;.$ would be chosen and
prioritized by the Transportation committee and ratified by
the Conference membership.
fiAQZJJ,J2r-"nsl252xJ;Ar.1n. iZZU0, These projects might
include Station,tspecific he CT& kbus eorwrail ift Sapplications nand illow d
highways Of
regional impact.
The request for assistance would be reviewed by the
Transportation Committee.
FR(I" m rr.w.M.C,
��,on To avoid duplication of effort, THAs.
sliagain with the approval of the Transportation committee,
would be established and brought to the point where their
own board could take over operations with significant
private sector involvement. initial areas to be considered
would be the Techny area and Sears area.
To accomplish the above objectives, the following elements
would be completed in the first year.
A. Completion of a Strategic Transportation Plan for the
Conference area (Timeframe A first three months)
B. As an outgrowth of A above:
1. Develop and approve consistent transportation policy
statements.
2. Prepare a model transportation and traffic
mitigation ordinance. promote adoption by
conference municipalities by the end of the first
year of operation.
3. Prepare and approve a transportation planning
process which incorporates
otherfmunicipal
and developments of a
agency input prior to app
regional significance. (Timeframe first year)
(Currently Pace has established a system where
they review developments of a regional impact
for bus application. This process would be expanded
and institutionalized to include broader
applications.)
C. As a continued outgrowth of A above:
1. Catalogue. and map municipal economic development
plans, pandinq and approved public and private
sector development proposals, and active
development projects within the conference with
regional impact. Where possible, promote transit
applications.
D. Promote and develop at least two regional
transportation projects. (An example of the type of
project is the development of the Wisconsin central
Line.) Existincr Staff at Nortran brought the
communities together to support the project.
- 7
FPOM N. M.C. 02,20.1911 14:49 P. 4
The communities have committed, in concept, to fund and
build the needed stations. (Currently, the
municipalities and Metra are working together to try to
make the project a reality.)
E. Provide transportation resources on 5-7 specific
transportation requests. (Examples are CTA Skokie
Swift Station, Techny Willow Road Station and multi -
jurisdictional intersections.)
F. serve as the start-up team for at least one TMA.
W
MUNICIPALITY
POPULATION
CTU MEMBERSHIP
PREVIOUS
FEES FOR NWMC
NORTRAN
AND NORTRAN
MEMBERSHIP
(NON-NWMC)
FEES
COMMUNITIES
ARLINGTON HEIGHTS
71,614
$ 6,781
$ 14,875
BARRINGTON
10,220
968
--
BARTLETT
19,000
1,799
--
BUFFALO GROVE
32,337
3,062
6,787
DEERFIELD
17,430
1,650
3,428
DES PLAINES
55,374
5,243
14,875
ELK GROVE VILLAGE
33,205
3,144
6,787
EVANSTON
73,706
6,979
14,875
GLENCOE
9,200
871
3,428
GLENVIEW
37,000
3,503
6,787
GOLF
482
500
618
HANOVER PARK
32,000
3,030
--
HIGHLAND PARK
30,575
2,895
6,787
HOFFMAN ESTATES
45,174
4,277
--
INVERNESS
5,220
500
--
KENILWORTH
2,708
500
618
LAKE FOREST
18,000
1,704
--
LAKE ZURICH
13,407
1,269
--
LIBERTYVILLE
18,821
1,782
3,428
LINCOLNWOOD
11,921
1,129
3,428
MORTON GROVE
23,747
2,248
6,787
MOUNT PROSPECT
54,630
5,173
NILES
30,363
2,875
6,787
NORTHBROOK
33,206
3,144
6,787
NORTHFIELD
4,930
500
618
PALATINE
37,000
3,503
--
PARK RIDGE
38,704
3,665
6,787
PROSPECT HEIGHTS
13,262
1,256
3,428
ROLLING MEADOWS
21,861
2,070
•-
ROSELLE
19,603
1,856
--
ROSEMONT
4,137
500
618
SCHAUMBURG
64,042
6,064
--
SKOKIE
60,278
5,707
14,875
STREAMWOOD
29,498
2,793
--
VERNON HILLS
WHEELING
12,500
28,300
1,184
2,680
6,787
WILMETTE
28,229
2,673
6,787
WINNETKA
14,447
1,368
3,428
TOTAL
1,056,131
$ 100,845
***END***
710EI TRITON CONSULTING ENGINEERS, LTD.
mmNORTH mEACwAM ROAD ~oCHxwBUxa.ILLINOIS 60173-4922
708*605-9600
(FAX) 708-605-9610
February 18, 1991
Mr. John F. Dixon
Village Manager
Village of Mount Prospect
100 South Emerson Street
Mount Prospect, IL 50056
Reference: Engineering Review and Evaluation of the
COMPREHENSIVE STonwwxrEn w4wAaEmEmT REPORT
Dour Mr. Dixon:
We are pleased to provide you with this letter report of our
review and evaluation of the Mount Prospect Comprehensive
Stormwater Management Report. In general we found the stormwater
report to be of high standard and we generally support the
recommendations for improvement projects made in the report.
figgk_qround and General Findins
The Village Board authorized the preparation of o comprehensive
atormwater report on March 13. 1e90 by RJN Environmental
Associates. The study included the Weller Creek, Femhanville and
Des Plaines River Drainage Areas. The study reports were
completed on November 5' 1990 and resulted in the recommendations
of a comprehensive atormwater improvement program as shown on
Page Iv -10 of the report.
The need for the recommended projects has existed for many years'
In most cases the damage and potential damage from atormwater in
each of the drainage areas has significantly increased due to the
continual development of the remaining lands in and adjacent to
the Village. The availability of the Metropolitan Hater
Reclamation District of Greeter Chicago (MwnDGO) deep tunnel and
reservoir project (TARP) facilities provides an excellent
opportunity for the improvement of the local storm and sanitary,
and combined sanitary collection facilities.
The village over the last dozen years has had a good program for
the maintenance and improvement of the existing system of
combined sanitary and storm sewers. This program olono, though,
has not been sufficient to alleviate the serious flooding
hardships that exist to the residents of Mount Prospect. The
adoption and implementation of the recommended projects in the
Comprehensive Stormwatar Management program by the village would
significantly reduce the extent of flooding. The total cost of
the recommended project is $22'71M. The Village administration
has recognized and is recommending that significant portions of
the Phase VI projects namely' the Weller Creek Erosion control
($5.93M) and Des Plaines River Drainage Area Level ($2.45w) be
pursued through the sponsorship of the State of Illinois,
Division of Water Resources and the U.S. Army Corps of Engineers
'
Some local participation and responsibility is required. But, in
general, these projects are of a regional significance and not
directly the responsibility of the Village. They will, however,
require the earnest and constant sponsorship of the Village Board
and Administration to ensure their adoption and construction by
the appropriate agencies. The completion of both the Weller
Creek and Des Plaines River Area Improvements are of great
importance to the Region and Village residents and businesses.
The remaining recommended projects are estimated to cost *14'33m
and are the total responsibility of the Village. A detailed
review has been made by Triton Consulting Engineers staff of the
alternatives and recommended improvements for four (4) of the
projects. x general review was made of the remaining projects.
Our findings are reported in EXHIBIT A which is attached.
The "Practical Level" of betterment selected for the improvement
projects varies with the condition of the existing system and the
cost/benefit of the recommended solution. A 10-yeer level of
protection is provided for sanitary ansma while o 25 -year level
of protection is recommended for combined sanitary and storm
flooding areas. A000rdingly, it should be recognized by the
Village that although the program is adopted and the projects
constructed, there is no guarantee that the next storm will not
exceed m 100-vasr level of protection and thereby question the
wisdom of the planned expenditure for a lesser level of
protection' That, unfortunately' is the nature of the sxormwuter
management improvement design in that it must balance the desired
level of protection against the cost. It should be pointed out
that the extent of any damage to the community from any storm of
great intensity will be greatly reduced by the use of the 25 -year
level of protection for storm water and the 10 -year level of
protection for sanitary areas. It should also be noted' that in
our review of the consultant's recommended projeots, they address
only the new level of protection to be provided by the
improvement and not the extent of the benefitted residences. We
have with the assistance of the Village Public Works employees
attempted to determine those residences who are currently being
directly impacted by the storms and can expect to directly
benefit from the improvements as well as those residences who,
while not currently being damaged by stormo, will benefit by
receiving the indirect benefit of higher protection. Even though
a few of the projects beer a high coot for the number of directly
benefiting residencem, we believe that the circumstances leading
to the development of the potential for storm damages rests with
the flood control standards existing at the time of the issuance
of the building permit and the allowance of the building
construction by the Village. The storm damage in many of these
problem ureas has been aggravated by the continued development of
adjacent lands. Accordingly, we believe that the Village has a
responsibility to improve the existing chronic flooding areae. A
further explanation of the expected benefits to be derived from
the planned improvement is contained in the February 5. 1991
letter from RJw Environmental Associates' addressed to the
Director of Public Works, which is attached hereto as Exhibit B.
The village may also want to consider the adoption of a storm
backwater control ordinance for those areae and residences where
flooding is infrequent or widely scattered. This program would
probably include some financial assistance by the village to the
approved improvements.
The Mount Prospect Board of Trustees has in prior years worked
actively to ensure their residents are protected against flood
damage. Accordingly, the Village enjoys the benefits of pro-
active community reputation for stormwater management. we
believe that with the exceptions of the Weller Creek and Des
Plaines River projecta, which were previously recommended for
deletion by the Administration and approved by the Board' the
Comprehensive Stormwuter Management Report is strongly
recommended for adoption and implementation by the village Bourg
of Trustees.
Very truly yours,
A7�z=
EER8" LTD.
George T. March, P.E.
President
GTw:slz
cc: Mr. Herb L. Weeks
Director of Public Works
Mr. Chuck Bnncio
EXHIBITA
Review of the Recommended Improvement Projects
"COMPREHENSIVE STVRMwATER MANAGEMENT REPORT"
Village of Mount Prospect
Introduction
The primary purpose of this review was to 1) evaluate the
engineering methods used to develop the recommended plan for
atormwater management; o) determine if the recommended plans for
improved flood control in the Weller Creek, Feehanville, and Des
Plaines River drainage areas are the most viable alternatives'
,
and 3) perform a detailed review of four of the recommended
projects to determine their workability and accuracy of the
estimated cost.
During our review of the Comprehensive Stormwater Management
Report, we observed that the Consultant only addressed the new
level of protection to be provided by the improvement and not the
extent of the benefitted residences and businesses. with the
assistance of the village Public works employeau, we have
attempted to determine those residences and businesses who are
currently being directly impacted by storms (those experiencing
recurring flooding) and can expect to directly benefit from the
recommended improvements. Likewise, other residences and
businesses adjacent to the identified flooding areas and are
A_1
connected to the esma etorm, combined and/or sanitary sewer
conveyance system will benefit by receiving the indirect benefit
of higher protection against future storm events intensified by
continuing development in the region. A summary of those
directly and indirectly affected by flooding is provided in the
Detailed and General reviews of each recommended project.
Detailed Review.,.
As previously oteted, one of the purposes of the study was to
perform m detailed review of four of the recommended plans to
determine their workability and accuracy of the estimated oost.
We were specifically asked to review the Central and Wa-Pelle
Flooding Area project. The other three projects (namely the Gee-
Gwun and Golf Area, Stevenson and Thayer Flooding Area, and the
Fairview Gardens Sanitary Area projects) were selected at random
from the remaining list of projects.
During the review of these four projects we: 1) evaluated the
capacity of the existing sewer conveyance system based on
rainfall intensity charts, sewers sizes, and gradients and
general topography information; 2) evaluated the viability of
each alternative studied by checking required sewer sizes, outlet
oapacitiea, and rainfall intenoitiea, while also determining if
other alternatives not studied are worthy of consideration; 3)
compared the alternatives to determine if the recommended plan is
indeed the best alternative; and 4) determine the accuracy of the
estimated costs. In generel, we found the recommended plena to
be acceptable.
Central and Wa-Pella Floodin
During the evaluation of the existing system, we found the
rainfall intensities shown for various storm events in Table 1 of
the report to be alightly lower than those given in Table 13 of
the Illinois State Water Bulletin #TO. We found the existing
capacity of the existing 12^ combined sewer to be approximately 3
cfo and the required capacity for a 1 -year storm event is
approximately 21 cfa' which both agree with the report.
Therefore, the existing 12^ combined sewer is not adequate.
We evaluated the five alternatives presented in the report. If
the wwRD8C does not allow an increase in flow at the outlet' than
Alternative 1 is not a viable proposal. Alternative 2 has
sufficient capacity to accommodate e 25 -year storm event while
discharging into the NWRD8C interceptor at the existing rete.
The sizes for the storm sewers in Alternatives 3, 4. and 5 appear
to be adequate.
We concur with the recommended plan in the Central and wa-Pelle
Flooding Area to construct approximately 4.400 feet of separate
relief storm sewer (Alternative 3). This recommended plan would
A-3
directly and indirectly benefit approximately 267 homes and e
businesses. The cost of implementing this alternative
(approximately *1.11M) appears to be the least expensive of the
alternatives studied. A detailed review found the estimated
capital cost to be acceptable.
We analyzed the oepoolty of the existing combined storm sewer
conveyance system and found that the capacity of the existing
system to be approximately 24 cfm which basically agrees with the
report.
We evaluated the three alternatives presented in the report.
Alternative A involves the construction of m separate storm sewer
system and a limited rehabilitation of the existing combined
sewer system including disconnections of existing inlets and
reconnecting them to the new storm sewer. For Alternative B. it
is not clear how the existing combined sewer system will be
connected to the combined relief sewer. overflow pipes may he
required to transfer the surcharge flow on the existing system to
the new relief system. Alternative C, underground detontion, is
a costly alternative and provides no additional advantages.
We agree that Alternative A. 1700 feet of separate relief storm
sawar, is the most viable alternative. It has been estimated
that 135 homes will directly and indirectly benefit from this
project.
The estimated capital coot is $0.68M. we found this coat to be
high even after considering miscellaneous and incidental items
such as full pavement restoration and repaving' televising of
existing sewer linea' repairs and reconstruction of adjacent
oewers, flow metering, and other items. These items may or may
not be required during construction.
Stevenson and Thayer Floodina
During our review of the existing conditions, we found the
physical characteristics used in the computer modeling
(percentages of paved and grassy areas) and shown in Table I1I-2
add up to 110 percent instead of 100 percent. The capacities of
the existing storm sewers listed in the report agree with our
calculations.
For Alternative A, we found that overflow pipes connecting the
existing system to the proposed relief sewer may be required at
or near the Stevenson Lane and Thayer Street intersection. we
had no comments regarding Alternatives B and o (aboveground and
underground detention, respectively). Both are more costly than
Alternative A.
After our detailed raview, we found the recommended plan
000eptabla. It consists of constructing 2,600 feet of relief
storm sewer. Approximately 300 homes will directly and
indirectly benefit from this project. The estimated capital coat
is $1.30M. we found this estimate to be high, even after
addressing similar miscellaneous and incidental items described
above, such as full pavement restoration and reconstruction of
adjacent sewers. These items may or may not be required during
onnotruotion.
Fairview Gardens San.i.1Ary_,.A!jqA
We agree with the existing capacities outlined in the report.
The existing system cannot convey peak *et weather flows
generated by a 1 -year storm to the lift station located on Horner
Luna.
Two alternatives were reviewed. Alternative A consists of
constructing relief sanitary eo*ars and improvements to the
sanitary lift station. we agree that Alternative B. installation
of back-up control, is not o viable solution. Even though it
would reduce some basement flooding, it would not eliminate
street flooding and may transfer flooding to another location.
A -O
We found Alternative A to be on acceptable plan. Approximately
300 homes will directly and indirectly benefit by this plan. A
detailed review of the costs indicated that the estimate stated
in the report is high' even after addressing the miscellaneous
and incidental items stated previously. Flow metering will be
required in this area as well as coordinating with the MWRDGC.
General Review
We performed a general review of the remaining projects; namely
the See-8wun and Milburn Flooding area, See-Gwun and Milburn
Sanitary Area, Catalpa and Birch Flooding Area, Hatlen Heights
Flooding Area, Hatlen Heights Sanitary Area, Clearwater Flooding
Area, Weller Creek Study Area, orumlay and melao park Erosion
Control. Prospect Manor and North main Flooding Area. and Deo
Plaines River Drainage Area. We reviewed the alternatives
presented and found them to be acceptable. In genera}' we agree
with the recommended plans. The capital coat estimates also
appear to be high, which is consistent with what we found during
the detailed review of three of the four recommended plana
previously discussed.
For information purposes, we have included a summary of each of
the remaining recommended plans described in the Comprehensive
Stormweter Management Report. The summaries include descriptions
recommended plan, the estimated capital cost, and estimates of
the number of residences and businesses that will directly and
indirectly benefit by the recommended plan.
Area
The existing stnrmweter drainage system in the See-Gwun and
Milburn Flooding Area has insufficient capacity to convey runoff
generated by a 2 -year frequency, 60 -minute duration storm to
Weller Creek. The recommended plan consists of providing a 25 -
year level of protection against overland flooding through
construction of a 6.6 acre-feet above -ground detention facility
at Lincoln Junior High School, construction of 1'850 feet of
relief storm sewer, and construction of a side flow weir. The
estimated capital cost is $1.65 million. The recommended plan
would directly and indirectly benefit approximately 204 homes and
14 multi -family buildings.
See-Gwun and Milburn Sanitary_A
The existing sanitary sewer system in the Gee-Gwwn and Milburn
Sanitary Area has insufficient capacity to convey peak wet
weather flow generated by a 25 -year frequency, 30 -minute duration
storm to the MWRDGC interceptor. The recommended plan consists
of preventing surcharging of the MWRDGC interceptor on Lincoln
Street from hydraulically restricting the sanitary sewer system
sanitary relief station. The estimated capital costs to provide
o 10 -year level of protection is $0.38 million, The recommended
plan would directly and indirectly benefit approximately 204
homes and 14 multi -family buildingm.
The existing storm sewer system in the Catalpa and Birch Flooding
Area has insufficient capacity to convey runoff generated by e 2 -
year. 60 -minute duration storm event. The recommended plan
consists of providing u 25 -year level of protection against
overland flooding by constructing approximately 700 feet of
relief storm sewer. The estimated capital cost is $0-24 mi/lion.
The recommended plan will directly and indirectly benefit
approximately 76 homes. Although this project does not directly
benefit as many residences as other projects in the urogram we
believe it should still be included within the program but at m
lower priority.
The existing storm sewer system in the Hetlen Heights Flooding
Area has insufficient capacity to convey runoff generated by a 5 -
year. 60-m1nute duration storm event to the 72 -inch diameter
interceptor sewer which has capacity for e 50 -year storm event.
The recommended plan consists of providing a 25 -year level of
protection by constructing approximately 2'650 feet of relief
storm sewer to convey eturmwater from five low points in the area
to the existing 72 -inch diameter storm sewer that discharges into
the Crumley Detention Basin' The estimated capital cost is $0.88
million. The recommended plan will directly and indirectly
benefit approximately 114 homes.
The existing sanitary sewer system in the Hstlen Heights Sanitary
Area hes insufficient capacity to convey peak *et weather flow
generated by a 1 -year, 30 -minute duration storm event to s MwRDGC
interceptor. The recommended plan consists of increasing the
capacity of the existing sanitary conveyance system to a 10 -year
level of protection through construction of approximately 3,000
feet of parallel sanitary relief sewer. It also includes
improvements to the sanitary relief station located near Rob
Road. However' an increased discharge into the interceptor may
not immediately be allowed by the MwRDGC. Therefore, this
project may be delayed in its implementation. The estimated
capital costs is $0'76 million. The recommended plan will
directly and indirectly benefit approximately 325 homes.
The 66 -inch diameter sewer conveying flow from the Clearwater
Detention Basin and the Clearwater Flooding area to the Mount
Prospect Country Club golf course hes insufficient capacity to
A -1O
convey flow generated by a 100 -year, 12 -hour duration storm which
can be detained and released by the Clearwater Detention Basin.
Overflowing of the basin occurs when the 66 -inch diameter sewer
cannot convey the flow.
The recommended plan consists of providing a 100 -year level of
protection by constructing a new relief storm sewer from the
Clearwater Detention Basin to the Mount Prospect Country Club
Golf Course Creek and constructing a new junction chamber at the
Country Club Golf Course outfall. Coordination with the Golf
Course is essential. The recommended plan would provide
protection against overflowing of the Clearwater Detention Basin
for a storm event equal to the August 13-14' 1987 storm which was
greater than a 300 -year storm. The estimated capital cost is
$0.60 million. This project indirectly benefits the Colonial
Heights subdivision and the Elk Ridge Villa subdivision south of
Golf Rood both east and west of Busse Road. Due to the large
area and the number of residents impacted by this project' it is
recommended that it be raised to a higher construction priority,
Weller Creek exhibits severe erosion between School Street and
Elmhurst Avenue and between Lincoln Street and Central Road'
moderate erosion between Elmhurst Avenue and Gee-Gwun Avenue and
minor erosion between See-Gwun Avenue and Lincoln Avenue. The
elevation of the Emerson Street bridge is below the 100-yaar
flood stage of Weller creek.
The recommended plan is to improve conveyance characteristics by
lining and realignment of the channel and bridge replacement, and
provide erosion control with rip rap. The total estimated
capital costs is $6.08 million. The Division of Water Resources
has previously borne the responsibility for erosion protection
measures for Weller Creek and should be requested to sponsor this
project at the earliest date possible. Under prior agreements
the Village would be required to secure the rights-of-way
construction easement necessary to construct the project and
agree to the maintenance of the Creek. Bridge adjustments and
rehabilitation would also be the responsibility of the village.
Erosion control of the inlet spillways in the Crumley Detention
Basin and the Melas Park Detention Basin is recommended. The
estimated capital cost is $0.05 million.
I Manor and North Main F.I.00dip9—Aor:�L!
The existing combined sewer systems in the Prospect Manor and
North Main Flooding Areas have insufficient capacity to convey
runoff generated by a 2 -year, 60 -minute storm event to the MWRDGC
interceptor. The recommended plan consists of increasing the
capacity of the existing combined sewer system to a 25 -year level
of protection through construction of approximately 8,500 feet of
combined relief sewer from the flooding area to the MNRDGC TARP
drop shaft. The estimated capital cost is $4.95 million. The
recommended plan will directly and indirectly benefit
approximately 1459 homes, 25 businesses, and 2 institutions.
When the Deo Plaines River reaches a 5 -year flood stage, the Des
Plaines River causes the system outfalls to become ineffective in
transporting runoff out of the Study Area resulting in flooding.
Simultaneous occurrence of rainfall when the Das Plaines River is
at a 2 -year or greater flood stage is the primary cause of
flooding along Park Drive during moderate storm events.
The Recommended plan for improved flood control in the Dee
Plaines River Drainage Area and increase the level of protection
to o 25 -year storm consists of constructing a levee and pumping
facilities east of River Road, extending the existing Study Area
outfalls to the pumping facilities, construction of a gauging
station to transmit Des Plaines River elevations to the Village
of Mount Prospect Department of Public Works, construction of
relief sewer along Seminole Lane to convey runoff generated in
the City of Prospect Heights, and construction of a relief sewer
on Seneca Lane to improve conveyance capacity of the existing
4-13
storm sewer system. The estimated capital construction cost is
$0.4 million for backwater control and piping, which is the
responsibility of the village. and $2.15 million for the levee
and pumping facilities, which is the responsibility of the U.S.
Army Corps of Engineers. However, they will probably require a
local cost participation of 30 percent which could be funded by
the M#RDGC' Illinois Division of Water Reeouroes, and local
governmental bodies.
EXHIBIT B
RJRJN ENVIRONMENTAL ASSOCIATES, INC.
CONSULTING ENGINEERS
February 5, 1991
Mr. Herbert L. Weeks
Director of Public Works
Village of Mount Prospect
1700 West Central Road
Mount Prospect, IL 60056
Dear Mr. Weeks:
This letter is in response to Triton Consulting Engineers, Ltd.
request for additional information regarding the November, 1990
Stormwater Management Reports. The response to each item
included in the request is given in the following paragraphs:
RJN Environmental Associates, Inc. has participated in the
development of ordinances pertaining to building codes, zoning,
development, and the disconnection of extraneous sources of
stormwater from combined and separate sanitary sewer systems.
Although RJN Environmental is aware of and has been consulted in
preparation of ordinances pertaining to backwater control, we do
not have such an ordinance in our files.
In general, RJN Environmental agrees with the concept of an
ordinance for Village participation in funding of installation
backwater control. However, the Village should carefully
consider the content of such an ordinance. Key items that need
to be addressed include but are not limited to liability incurred
by the Village if a backwater control device operates incorrectly
or fails to eliminate basement flooding, a policy regarding
backwater control devices installed prior to implementation of
the ordinance, development of criteria to establish eligibility
of backwater control projects, and levels of participation by the
Village in funding of eligible projects.
RJN Environmental agrees with the concept of individual backwater
control in areas where flooding is infrequent or widely
scattered. In areas where flooding is pronounced, backwater
control may transfer a flooding problem from one home to another
or aggravate existing flooding in other parts of the system. In
these cases, the Village should consider detention, retention,
and increased conveyance capacities of its existing stormwater
infrastructure as well as individual backwater control.
202 W. FRONT STREET
WHEATON, ILLINOIS 60187
(708) 682-4777
Mr. Herbert L. Weeks
February 5, 1991
Page Two
RJN Environmental will make previously prepared documents
including foam core boards available for presentation at the
February 12, 1991 Village Board Meeting.
Implementation of recommendations presented in the November, 1990
reports will directly benefit those properties located in the
flooding area and indirectly benefit residents located adjacent
to identified flooding areas that are connected to the same
stormwater, combined, or sanitary sewer conveyance system.
Direct benefits will consist of increasing the level of
protection against flooding in each flooding or sanitary area
evaluated as specified in the November, 1990 reports. Properties
receiving direct benefits include properties located in the
immediate flooding area and properties located on streets where
the project would be constructed.
Indirect benefits consist of increasing the level of protection
against flooding in areas that are connected to a stormwater,
combined, or sanitary sewer conveyance system that would be
relieved through construction of recommended improvements. An
increase in the level of protection against flooding provided to
properties in these areas would be achieved through reducing the
peak load on or eliminating hydraulic restrictions in the
existing conveyance system.
It should be noted that tributary areas or areas "upstream" of an
area experiencing flooding often contribute significantly to the
flooding in an affected area. These "upstream" areas are
currently receiving a benefit from the area experiencing flooding
which is acting as a reservoir for the "upstream" area by storing
water generated in the "upstream" area in basements and on
streets. For this reason, "upstream" areas should be considered
as part of the area affected by construction of recommended
improvements even though they may not receive direct or indirect
benefits.
The primary objectives of the November, 1990 reports was to
present alternatives and recommendations for reducing the
magnitude and frequency of flooding in selected areas of the
Mr. Herbert L. Weeks
February 5, 1991
Page Three
Village without increasing or causing flooding in other areas of
the Village. RJN Environmental evaluated the impact of
recommended improvements on existing conveyance systems and
receiving streams including Weller Creek and the Feehanville
Ditch. Results of the evaluation showed that implementation of
recommended improvements would improve the operation of existing
conveyance systems relieved by the improvements without
increasing overland flooding caused by receiving streams
overflowing their banks.
It should be noted that construction of the Metropolitan Water
Reclamation District of Greater Chicago's (MWRDGC) deep tunnel
and reservoir project (TARP) has resulted in a reduction of water
entering Weller Creek through MWRDGC overflow structures during
and following storm events. Construction of the deep tunnel
portion of the O'Hare TARP system is essentially complete.
Construction of the reservoir portion of the project was
initiated in 1990. Completion of the reservoir portion of the
project will result in additional benefit to properties adjacent
to Weller Creek as a result of MWRDGC overflows activating less
frequently during or following storm events.
It= No. §: ederal or. a
_ a Fundina
As presented in the November, 1990 Des Plaines River Drainage
Area Stormwater Management Study, the U.S. Congress may approve
funding of up to 75 percent of eligible project costs after
review of the current U.S. Army Corps of engineers 42 month
feasibility study. The preliminary opinion of probable capital
cost to implement the recommended plan is $2.55 million.
Approximately $2.2 million of this cost is eligible for federal
funding. Assuming 75 percent funding of eligible costs, the
local cost incurred by the Village and the local sponsor, IDOT,
would be approximately $0.9 million. It is anticipated that
funding for construction of eligible portions of the recommended
plan in the Des Plaines River Drainage Area will not be available
until approximately the end of 1995.
In addition to the Des Plaines RJLver Drainage Area, approximately
$5.8 million out of $6.1 million of improvements to the Weller
Creek Channel may be eligible for funding through the Illinois
Department of Transportation - Division of water Resources
(IDOT/DWR). This funding is not readily available and would
require lobbying efforts on behalf of the Village by local
representatives. There is a possibility that the state will not
fund any improvements to the Weller Creek Channel.
Mr. Herbert L. Weeks
February 5, 1991
Page Four
However, it is recommended that the Village exhaust all funding
possibilities prior to construction of improvements to the
Channel.
We sincerely hope this information is satisfactory for your
purposes at this time and look forward to a continuing
professional relationship.
Very truly yours,
R,TN ENVIRONMENTAL ASSOCIATES, INC.
Randall L. Patchett
Project Manager
RLP:njc\427
cc: Mr. George T. March, Triton Consulting Engineers, Ltd.