HomeMy WebLinkAbout9.2 Motion to accept bid for 2022 Water Main Replacement Project in an amount not to exceed $3,541,711.53.Mr�GauC �'d'+rt;�iect Subject Motion •accept l • for 2022 Water Main Replacement Project• • • •'. Meeting May 17, 2022 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - Fiscal Impact true Dollar Amount $3,541,711.53 Budget Source Water and Sewer Enterprise Fund Category VILLAGE MANAGER'S REPORT Type Action Item • In the current budget, funds are allocated to replace aged and deteriorating Village -owned water main. Pursuant to the findings discussed in the 2017 Water Rate Study, this year's proposed project is scaled to continue a multi-year process of reducing the life expectancy of water mains to 130 years. The improvement will increase the reliability and sustainability of the water distribution system. Analysis performed during the Water Rate Study indicated that the Village's former rate of water main renewal approached 600 years. This project includes the replacement of 12,013' of existing 6" and 8" water main. The locations include: Deneen, Small, Stratton; the 1800 and 1900 blocks of Estates Drive; Waverly Avenue from Lonnquist Boulevard to Golf Road; Audrey Lane from Connie Lane to Bonita Avenue; Hatlen Avenue from Estates Drive to Lonnquist Boulevard; Pendleton Place from We Go Trail to Kenilworth Avenue; Waverly Place from Pendleton Place to Milburn Avenue; and Cottonwood Lane from Busse Road to Redwood Drive. The project includes 48 new valves in vaults, 30 new fire hydrants, 182 water service reconnections, abandonment of the existing 6" water main, and requisite 1 surface restoration. RHURT-771m The Village's engineering consultant for this project, Thomas Engineering, prepared detailed plans and bidding documents necessary to facilitate contractual performance of this work. The bid documents were sent to ten (10) area firms who have experience in water main replacement projects and to all firms that previously bid on past water main replacement projects. In addition the bid was publicly advertised on the Village's website and leveraged Demandstar bidding services. On Tuesday, May 3, 2022 a non -mandatory pre-bid meeting was held with four (4) contractors in attendance. Based on inquires at this meeting, one (1) addendum was issued to clarify pavement restoration requirements. After the pre bid meeting, contractors not in attendance at the pre-bid meeting submitted additional questions. Two (2) additional addendums were subsequently issued. One addendum solicited pricing to replace ductile iron pipe with water main quality PVC pipe. The third addendum requested an adder to utilize Class 56 ductile iron pipe throughout the project. On Monday, May 9, 2022 the bids were publicly opened and read as required by Village Code. The following seven (7) firm's submitted bids. Contractor Gerardi Sewer & Water Co. (Addison) Mauro Sewer Construction (Des Plaines) J Congdon Sewer Services (Carol Stream) Base Bid Alternate 1 Alternate 2 Alternate 3 $3,955,451.88 $163,980.50 $449,266.50 $1,892,077.50 $4,099,668.15 $195,283.06 $564,102.00 $1,738,748.00 $4,616,420.58 $186,550.22 $547,200.00 $2,198,064.00 2 Martam Construction (Elgin) Alamp Concrete Contractors (Schaumburg) Trine Construction Corp. (St. Charles) Holiday Sewer and Water Co. (Wauconda) $4,874,466.30 $181,602.32 $601,200.00 $1,951,204.30 $5,044,409.58 $189,895.22 $465,048.00 $2,194,049.00 $5,178,500.00 $158,686.94 $695,809.00 $2,442,040.25 $6,390,454.58 $218,100.00 $799,875.00 $4,188,400.00 Engineer's Estimate - $4,270,787.82. All bids were reviewed to ensure that the documents had all appropriate signatures, and bid security. All bids were submitted with requisite documents, security, and signatures on the addendum. Based on the review of the bids, reference checks, and past projects, the lowest responsible bidder is Gerardi Sewer & Water Company of Addison, Illinois (Gerardi). A bid tabulation is attached. The Village has no prior experience with this firm. However, reference checks indicate that Gerardi has satisfactorily completed similar water main replacement work in other communities. In 2020 and 2021, Gerardi completed projects of similar scale and scope for the Village of Oak Brook. Notably, the firm completed a multi-year water main replacement project worth $7 million. The project ended up $2.7 million under budget and was completed a year ahead of schedule. The firm also completed a large scale water main replacement project for the City of Elmhurst where they recently completed a $3.1 million water main replacement project. It is the opinion of staff that Gerardi Sewer & Water Company is qualified to successfully prosecute this project. A copy of Gerardi's references is attached. Included in the project were three (3) alternate bid items. Alternate 1 is for full - KI width resurfacing at each of the water main replacement locations. The work includes a 2" deep grind and pavement removal followed by a hot -mix asphalt surface course. Alternate 2 included using a water main quality polyvinyl chloride (PVC) pipe for horizontal directional drilling instead of ductile iron pipe. Alternate 3 costed the use of class 56 ductile iron pipe for the entire project. The base project (no alternates), as bid, is $416,076.80 over the available budget ($3.539 million). Prices are approximately 43% higher than costs incurred in 2021. To mitigate this variance, staff proposes to reduce the scope of work. Specifically, 3,519 feet of proposed water main replacement will be removed from the project quantities and rescheduled for a future program. The deleted work would include water main replacements on Deneen, Small, and Stratton. This reduction will yield a $527,850 cost savings. In addition, the scope of pavement repairs will be limited to trench extents. The base bid included pavement milling and resurfacing of half the street. Under the proposed scope reduction, the trench will be backfilled and topped with a binder course of asphalt to make the roadway serviceable during winter months. Staff will then include a full street -width 2" grind and resurfacing quantity in next year's street resurfacing bid. It is the opinion of staff that inclusion of the final paving work for this project will be cheaper if the work is included in the larger street resurfacing contract. This reduction will yield a $207,864.13 cost savings. The cumulative impact of proposed scope reduction is a $735,714.13 decrease in the cost of the base bid work. The revised base bid cost is $3,219,737.75: Less: Scope Savings: 14 $735,714.13 3,219,737.7 Applying the proposed scope reductions to the bid line items indicates that Gerardi 4 remains the lowest -cost, responsive bidder. A revised bid tabulation incorporating referenced scope reductions is attached. Staff has discussed these proposed changes with Gerardi. The firm has verbally agreed to the proposed scope and cost reductions. It is the recommendation of staff that the contract be awarded for the revised base bid scope of work. Since the project includes underground work, there is a possibility of quantity variances and unforeseen repairs. Staff is requesting a 10% contingency be included in the project award to address any of these unforeseen issues should they arise. A 10% contingency would bring the project award total to $3,541,711.53 ($3,219,737.75 revised base bid + 10% contingency of $321,973.78 = $3,541,711.53). Alternatives 1. Accept lowest -cost, responsive bid for 2022 Water Main Replacement Project revised scope of work submitted by Gerardi Sewer & Water Company of Addison, Illinois for an amount not to exceed $3,541,711.53. 2. Action at discretion of Village Board. Staff recommends that the Village Board accept the lowest responsible bid submitted by Gerardi Sewer & Water Company of Addison, Illinois to construct the 2022 Water Main Replacement Project revised scope of work for an amount not to exceed $3,541,711.53. ATTACHMENTS: 2022 PROPOSED WATER MAIN REPLACEMENTS. pdf BID TAB - REVISED SCOPE OF WORK.pdf Bid Tabulation (Final 5.11.22).pdf Gerardi bid submittal.pdf 5 2022 PROPOSED WATER MAIN IMPROVEMENTS CAMP MCDONALD RD o EUCLID AV :a,69I,rel to] ,t 7.7 tipRTy�'L CENTRAL RD ❑ F- U W CL O w 0 - GOLF GOLF RD (RT 58) 0 J SEMINOLE LN .. Tl ST Map as of October 2021 By JJP/P W F:\\\\\2022 PROPOSED WATER MAIN REPLACEMENTS—d F - 7 �u 1 � III6m�� Location of Proposed Replacement I CDRST YN s2 ST Map as of October 2021 By JJP/P W F:\\\\\2022 PROPOSED WATER MAIN REPLACEMENTS—d F - 7 0 PI Mount Prospect Bid proposal Request For 2022 Water Main Replacement project NON -MANDATORY PRE-BID MEETING: May 3, 2022 @ 10:00 A.M. Local Time BID OPENING: May 9, 2022 @ 1:00 P.M. Local Time Prepared for: Village of Mount Prospect Department of Public Works 1700 W. Central Road, Mount Prospect, Illinois 60056-2229 Prepared by: Thomas Engineering Group, LLC 762 Shoreline Drive, Suite 200 Aurora, Illinois 60504 April 20, 2022 10 BID FORM 2022 Water Main Replacement Project Village of Mount Prospect Department of Public Works FROM:- , �►='rriJ... "+� °`� (hereinafter called "Bidder") TO: Village of Mount Prospect Office of the Village Manager, 3rd Floor 50 South Emerson Street Mount Prospect, Illinois 60056 (hereinafter called "Village" or "Village of Mount Prospect") The bidders have familiarized themselves with the work and probable work conditions required under this Bid affecting the cost of the work and with the Bid Documents which include: • Cover Page • Table of Contents • Notice to Bidders • Instructions for Bidders • General Conditions and Special Provisions • Specifications • Bidder's Qualification Statement • Bid Form • Affidavit — Bid Certification Form • Bid Security • Bid Sheet — 2022 Water Main Replacement Project • Contract Document • Labor and Materials Payment Bond Form • Performance Bond Form • Engineering Plan Set Therefore, the Bidder hereby proposes to furnish all supervision, technical personnel, labor, materials, tools appurtenances, equipment, and services (including all utility and transportation services) required to construct and complete the Work, all in accordance with the above listed documents. Bidder agrees to perform all of the Work and provide the equipment and materials described in the Bid Documents, as follows: 2022 Water Main Replacement Project 11 Bidder has bid on all items and has provided a price for all items. The Bidder acknowledges that it is responsible for verification of all pipe sizes and depths prior to the ordering of materials. The Bidder will complete and provide all labor, equipment, materials and mobilization (if applicable) to perform the Work as incidental to the fixed item price for each item proposed. In submitting this bid, the Bidder understands that the Village of Mount Prospect reserves the right to add to or subtract from the estimated quantities. The Village of Mount Prospect intends to award one (1) contract (if at all) for the items bid. If written notice of award of this bid is mailed, emailed or otherwise delivered to the Bidder at any time before this bid is withdrawn, the Bidder agrees to execute and deliver the contract in the prescribed form and furnish payment and performance bonds, or letter of credit, and the insurance certificates required by the Bid Documents to the Village within ten (10) days after receipt. The Bidder, and as successful bidder/Contractor upon award of the Contract, understands and agrees to the following: 1. The Contractor agrees to provide all Work and items and material to the Village as noted in the Bid Documents and comply with the requirements of the Bid Documents. 2. The Contractor agrees to comply with all applicable state and federal laws, rules and regulations, and county and municipal ordinances, as described in the General Conditions. All Addenda pertaining to this project shall be acknowledged by the Bidder in the spaces provided below: Addendum Addendum .�.................... ............._�wvwvwtiw .�... ._o.:.w._.... Date..__.... 1 sl 11z Acknowledgement by Bidder or Date ri presentative Acknowlede, www .ut_o........zed Re. www._. _................_ _..�� ._.. �w�___m_.._..... .�.........w..... slblzz ._...w__ ................_..__ .__��wk .............wwwww. ._w._... ........................ sly I2;Z 3 � to 2Z �. Failure to acknowledge receipt, as ovOded a ove, may be considered sufficient grounds for disqualification of the bidder and rejection of his/her bid submittal. A record of all -------Addenda and copies of same will be available to all qualified bidders from the Village of Mount Prospect Public Works Department, 1700 West Central Road, Mount Prospect, Illinois two (2) days prior to the letting. It shall be the bidder's responsibility to become fully advised of all Addenda prior to submitting its bid. 2022 Water Main Replacement Project 2 .� Upon award the contract the Village will send Notice of Award to the successful bidder, the bidder must then execute the contract and provide the required bonds or letter of credit and certificate of insurance to the Village within ten (10) days. The Village will then issue a written Notice to Proceed, which starts the performance period and the contractor then has ten (10) days to commence work. The contractor shall reach Interim Completion by November 15, 2022 and Final Completion by May 30, 2023. Failure to complete the work in the designated time frame may result in the Director of Public Works withholding compensation due the contractor for failure to complete the said work in the designated time frame, calling the bonds, or taking such other action as may be available. Security in the sum of ten (10%) percent of the amount bid in form of (check one): ✓ Bid Bond Certified Check Bank Cashier's Check is attached hereto in accordance with the "Instructions for Bidders". This Bid Submittal contains the following: 1. Bidder's Qualification Statement 2. Bid Form 3. Affidavit — Bid Certification Form 4. Bid Security 5. Bid Sheet(s) — 2022 Water Main Replacement Project Respectfully submitted: Name of Fir ides: la °� ��=nature) Title: " Date: 5 1 lv k Z Z_ Contact Information: Official Address: T Telephone: 1- (01;0— 5 1 R — S%\ b Email: ONE (1) SIGNED COPY OF THIS BID FORM AND BID SHEETS ALONG WITH THE BIDDER'S QUALIFACTION STATEMENT, AFFIDAVIT — BID CERTIFCATION FORM, AND BID SECURITY SHALL BE SUBMITTED IN A SEALED MARKED ENVELOPE.VILLAGE OF MOUNT PROSPECT 2022 Water Main Replacement Project 13 1^1 BASIS FOR DETERMINING PRICES It is expressly understood and agreed that: 1. The approximate quantities set forth in this Bid Sheet for each Unit Price Item are Owner's estimate only, that Owner reserves the right to increase or decrease such quantities, and that payment for each Unit Price Item shall be made only on the actual number of acceptable units of such Unit Price Item installed complete in place, measured on the basis defined in the Contract. 2. Owner is not subject to state or local sales, use and excise taxes and no such taxes are included in this bid sheet. BIDDER agrees to reach Interim Completion by November 15, 2022 and Final Completion by May 30, 2023. BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement. The following documents are attached to and made a condition of this Bid: (a) Required bid security in the amount of ten percent (10%) of the Bid in the form of a bid bond, cash, certified check, cashiers check or bank money order as stipulated in the Advertisement for Bids. (b) A tabulation of subcontractors, suppliers and other persons and organizations required to be identified in this Bid. (c) Required BIDDER's Qualification Statement with supporting data. Written communications concerning this Bid shall be addressed to: 2022 Water Main Replacement Project 14 .. AFFIDAVIT — BID CERTIFICATION FORM Bidder: Company/Firm Name: Address: �`1$S "�.-ou-Z•C• �so"�a� �a1�1 As a condition of entering into a contract with the Village of Mount Prospect, and under oath and penalty of perjury and possible termination of contract rights and debarment, the undersigned, " being first duly sworn on oath, deposes and states that he or she is . (sole owner, partner, joint ventured, President, Secretary, etc.) of G "- C.a and has the authority to make all (Name of Company) certifications required by this affidavit. Section I Non Collusion The undersigned certifies that this bid is genuine and not collusive or a sham, that said bidder has not colluded, conspired, connived or agreed, directly or indirectly, with any bidder or person, to put in a sham bid or to refrain from bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, to fix the bid price element of this bid, or of that of any other bidder, or to secure any advantage against any other bidder or any person interested in the proposed contract. Section 11 Bid Rigging and Rotating The undersigned further states that _�4�QA_ (Name of Company) is not barred from bidding or contracting as a result of a conviction for violations of state laws prohibiting bid rigging or bid rotating or any similar offense of any state of the United States, as provided in Sections 33E-3 and 33E-4 of the Illinois Criminal Code, 720 ILCS 5/33E-3, 33E-4. Section III Drug Free Work lace The undersigned further states that ���*yC�•b W°► . (Name of Company) provides a drug free workplace pursuant to the Drug Free Workplace Act, 30 ILCS 580/1, et seq., and has, to the extent not covered by a collective bargaining that deals with the subject of the Substance Abuse Prevention in Public Works Projects Act, 820 ILCS 265/1 et seq., a substance abuse prevention program that meets or exceeds these requirements of that Act. 2022 Water Main Replacement Project 15 AFFIDAVIT — BID CERTIFICATION FORM Section IV Falx, Payment The undersigned further states that (p'-"r-a•�e.� . is (Name of Company) not delinquent in payment of any taxes to the Illinois Department of Revenue, in accordance with Illinois Compiled Statues, 65 ILCS 5/11-42.1. The undersigned understands that making a false statement regarding delinquency in taxes is a Class A Misdemeanor and, in addition voids the contract and allows the municipality to recover all amounts paid to the individual or entity under the contract in civil action. Section V Pursuant to Section 2-105(A) of the Illinois Human Rights Act, 775 ILCS 5/2-105 (A), every party to a public contract must: "Have written sexual harassment policies that shall include, at a minimum, the following information: (1) the illegality of sexual harassment; (11) the definition of sexual harassment under State law; (111) a description of sexual harassment, utilizing examples; (IV) the vendor's internal complaint process including penalties; (V) the legal recourse, investigative and complaint process available through the Department (of Human Rights) and the Commission (Human Rights Commission); (VI) directions on how to contact the Department and Commission; and (VII) protection against retaliation as provided by Section 6-101 of the Act. (Illinois Human Rights Act)." A "public contract" includes: ... every contract to which the State, any of its political subdivisions or any municipal corporation is a party." 775 ILCS 5/1-103 (M) (2002), The undersigned further states that C��2a.cA'+�c�. E has (Name of Company) a written sexual harassment policy in place in full compliance with 775 ILCS 5/2-105 (A) (4). It is expressly understood the foregoing statements and representations and promises are made as a condition to the right of the bidder to receive payment under any award made under the terms and provisions of this bid. The undersigned cer fi t Attire forma "on contained in this Affidavit is true and correct. Signed by: Title: o� Name Printed:"'�-R-42.x► Signed and sworn to before me this"" day of 20 My commission expires: I J / 111 <_�.... c 7 Notary, ubli 6 =-STATE L ANO OF ILLINOISES:06120123 2022 Water Main Replacement Project 16 BID SECURITY Included with this bid is a bank cashier's check, certified check or bid bond in the amount of , being ten percent (10%) of the total amount bid by ............_, the Bidder, in favor of the Village of Mount Prospect. It is hereby agreed that, should Bidder be awarded the Work contemplated under this bid and fail or refuse to execute a contract for said Work, or to provide the required payment and performance bonds, or letter of credit, and certificate of insurance, then this security, in the amount stipulated above, shall be forfeited and may be retained by the Village of Mount Prospect as liquidated damages and not as a penalty. All bids to remain firm for a period of ninety (90) days after bid opening date. SUBMITTED THIS DAY OF 2022. SEAL (if corporation) -.. Bidder's Agent and Agent's Title Title Note: If bidder is a partnership, the bid must be signed by at least two of the partners. Note: If bidder is a corporation, the bid must be signed by an authorized officer of the corporation, attested and sealed by the secretary or other authorized officer. If a corporation, note here the state of incorporation: Incorporated under the laws of the State of 2022 Water Main Replacement Project 17 RETURN WITH BID ADDENDUM #1 2022 WATER MAIN REPLACEMENT PROJECT Counly Cook BID SHEET - gency Mount E a�u� �,q »_..�w,..,....._._...._.,.,,.»....,........._._.._..,,,....._..,....,.�µ...._._,,._.................._.....�,...,........,... Route 2022 Wafer Mom P'd����ry&a�a ow•wa�d��C� F"a�cmpa�c�s.._......� �,.. �._. „_,„,�„,,._____.„. Prirted 5/3/2022 2022 Water Main Replacement Project CiLR 12200a (01/08!14) 112 18 RETURN WITH BID ADDENDUM #1 BID SHEET ........�n_ . . ..w...._........... .............�....................v-v,.�,.�,_...�.�.� � _ �radp��Ne tl'or ALTERNATE BID #1 _-. �.....( .-.....plete For complete 9 .. p _ _ _ �... ,. information covering these items,.. see.. plans and specifications).............��....�...................-_..�.�...........�..���� ...... �...� Item No. Items Unit Quantity Unit Price . Total 1 BITUMINOUS MATERIALS (TACK COAT) POUND 4645.6 • �": ' 2 HOTNMIXX�ASPHALT SURFACE COURSE, IL-9g5„rvMIX.....D.......N50, 2..ww-w-w..� 1 _4— � � .ww..w.......... HOT -MIX ASPHALT SURFACE REMOVAL, 2" SO YD 107686 ,.._......,,,,._.... t ..............T.ON ... _... _w-wALTERNATE BID #1 = TOTAL '* %orrip ........ ...........w.... ,...............----.._m....�_............_......W,,,.�,.. Se:N'rndtaNta for ALTERNATE BID #2 ..................__........_,....,....._._.......,,....-....,..................._m...............................wwwwwww.._........ ,.....................�......_......._..............�...,_.... (For complete information covering these items, see plans and specifications) Item No, '.. Items Unit �03u- it Total 1 HORIONTAL DIRECTIONAL DRILL PVC WATER MAIN, 6" FOOT2 PVC WATER MAIN, C-900, RESTRAINED JOINTS, TRENCHED 6" FOOT TOTAL ALTERNATE BID #2 Lk -AR Schedule for ALTERNATE BID #3 (For complete information covering these items, see plans and specifications) �-..Item No:._....w_.w..........................�w..-..v--.H._..,....._._.................w,..,.---__,,............_._.-...-....,_.......w,,.M............................. _wwwww...... ........_..wwwww........... �...,....----www..,....�,.m...........�.�_w�w_�w..._.v-__„..... _. _...._....�.. .._...M ............. w.... __...--..........- .............--w_-.. � y .. Price Total 1 DUCTILE IRON WATER MAIN, CLASS 56, 6” ...................._.._.. _...-w.mM.... - 2 DUCTILE IRON WATER MAIN, CLASS 56. 8" _ FOOT Q64951 Unit FOOT 264 3 HORIZONTAL DIRECTIONAL DRILL DUCTILE IRON WATER MAIN, CLASS 56, 6" FOOT 3516 r TOTAL ALTERNATE BID #3 L p'� Printed 5/3/2022 2022 Water Main Replacement Project BLR 12200a (01/08) 113 19 SUMMARY OF PRICES; CONTRACT PRICE (the SUM of extensio s of the Schedule of Prices — BASE BID): Q; �E stwaoa�., Dollars and Cents (In writing) (In writing) �* Dollars and Cents (In figure) (In figure) CONTRACT PRICE (the sum of extensions of the Schedule of Priceps,— ALTERNATE BID 1): aAtAu,aD r.1i`•Jf t%(*Dollars and Cents In writing) (In writing �► Dollars and 5"6 Cents (In figure) (In figure) CONTRACT PRICE (the sum of extensions of the Schedule of Prices — ALTERNATE BID 2): 2as,x� Dollars and Cents (In writing)mm (In writing) 26_ Dollars and Cents (In figure) (In figure) CONTRACT PRICE (the surn of exter i ns of the Schedule of Prices — ALTERNATE BID 3): ba SiycJt`Dollars and F ► Cents (In writing) (in writing) b1 -- -- Dollars and JF"{� Cents (In figure) (In figure) SUBMITTED THIS — DAY OF , 2022„ SEAL (if corporation) Bidder: c �* 4 Add Agent and Agent's Title Title 2022 Water Main Replacement Project 20 BIDDER'S QUALIFICATION STATEMENT Project Name: 2022 Water Main Replacement Project SUBMITTED TO: Village of Mount Prospect Village Manager's Office, Third Floor 50 S. Emerson Mount Prospect, IL 60056-2229 SUBMITTED BY: Company 't(xab;- W act., 611-1 Name �a� G* -0-4", Address Cc, ,_. ax— Principal Office V I$5 Cal. C� Corporation, partnership, individual, joint venture, other Contractor EXPERIENCE STATEMENT 1. Bidder has been engaged as a General Contractor in construction for y S years and has performed work of the nature and magnitude of this Contract for ys years. Bidder has been in business under its present name for LA years. 2. Bidder now has the following bonded projects under contract: On a separate sheet, list project name, owner, engineer/architect, amount of contract, surety, and estimated completion date. 3. Bidder has completed the following three (3) contracts consisting of work similar to that proposed by this Contract: On a separate sheet, list project name, owner, engineer/architect, amount of contract, surety, and date of completion and percentage of the cost of the Work performed with Bidder's own forces. 2022 Water Main Replacement Project 21 4. Has Bidder ever failed to complete any project? If so, state when, where, and why. f I/ WE 5. Bidder normally performs the following work with his own forces: 6. Construction experience of key individuals in the organization is as follows (continued on attached sheets if needed):z� ��a� �� (�i�s�awt 35 y� L1a1�. Cao��►��., 3�,``l�-kc (a Ac=0 7. In the event the Contract is awarded to Bidder, the required surety Bonds will be furnished by the following surety company including name and address of agent: SWISS. \Zvo s Sw�� foo FINANCIAL STATEMENT: Bidder possesses adequate financial resources as indicated by the following: a. Assets and Liabilities: Attach a financial statement, audited if available, including Bidder's latest balance sheet and income statements showing the following items: (1) Current assets (cash, joint venture accounts, accounts receivable, notes receivable, accrued income, deposits, materials inventory, and prepaid expenses). (2) Net fixed assets (3) Other assets (4) Current liabilities (accounts payable, notes payable, accrued expenses, provision for income taxes, advances, accrued salaries, and accrued payroll taxes). (5) Other liabilities (capital, capital stock, authorized outstanding shares par values, earned surplus, and retained earnings). (6) Name of firm preparing financial statement and date thereof: (7) If financial statement is not for identical organization named herein, explain relationship and financial responsibility of the organization furnished (8) Current judgements: The following judgements are outstanding against Bidder: 2022 Water Main Replacement Project 22 Judgement Creditors Where Docketed and Date Amount ($) a. b. Bidder hereby represents and warrants that all statements set forth herein are true and correct. Date 12022 Name of Organization t v Title (If Bidder is a partnership, the partnership name shall be signed, followed by the signature of at least one of the partners. If Bidder is a corporation, the corporate name shall be signed, followed by the signature of a duly authorized officer and with the corporate seal affixed). 2022 Water Main Replacement Project 23 ,. Part Ill. Work Subcontracted toOthers. For each contract described inPart | list all the work you hsubcontractedVooth Subcontractor Aa NA AX%^� 1E Z441AUNI, q^A Type of Work Subcontract Price S?-Ck(:'0.CXb Subcontractor MCAT iejuqua -M%-02-L'A;"4 Subcontract Price Amount Uncompleted Subcontractor Ak 'S dACAk Type of Work Q*AUS 11 1� Subcontractor Type of Work Subcontract Price Amount Uncompleted Subcontractor Type of Work Subcontract Price Amount Uncompleted Notary 1, being duly sworn, do hereby declare this affidavit is a true and correct statement relating to ALL uncompleted contracts of the undersigned for Federal, State, County, City and private work, including ALL subcontract work, ALL pending low bids not yet awarded or rejected and ALL estimated completion dates, Address State Z�p Code El Add pages for additional contracts Subscribed and sworn tobefore me My commission expires Q 3 MOFFICIAL SEAL MARY ANN ALFANO NOTARY PUBLIC - STATE OF ILLINOIS My COMMISSION EXPIRES:06/20/23 2 (Notary -Seal) Printed 06/30/21 Page 2 of 10 BC 57 (Rev. 02/16/21 � 25 & 5�d 1785 ARMITAGE COURT ADDISON, IL 60101 (630) 519-5116 Project List Oakbrook Orion Galey 2021 Watermain 1,826,966.00 70% Bartlett Blake Grenlie 2021 Watermain 1,027,196.00 70% Downers Grove Scott Vasko 2021 Watermain 1,303,831.50 70% Aurora John Hoffman 2021 Watermain 1,482,511.00 70% Schiller Park Jim Goumas 2021 Watermain 482,497.00 70% Geneva Elton Ororco 2021 Watermain 587,749.00 70% Oakbrook Orion Galey 2021 Watermain 2,134,757.00 70% Oakbrook Orion Galey 2020 Watermain 1,843,637.00 70% Elk Grove Will. Denton 2020 Watermain 1,043,260.00 70% Park Ridge ;Lou Arrigoni 2020 Watermain 389,905.00 70% Bartlett Blake Grenlie 2020 Watermain 1,144,336.00 70% Schaumburg Brad Huban 2020 Watermain 543,477.00 70% Palatine George Ruppert 2020 Watermain 287,120.00 70% Stone Park Harlan Dolan 2020 Watermain 830,350.77 70% Western Spring Barter & Woodman 2020 Watermain 431,229.00 70% Palatine George Ruppert 2019 Watermain 1,015,697.00 70% Streamwood Alex Riegler 2019 Watermain 671,390.00 70% Oakbrook Orion Galey, 2019 Watermain 1,252,131.00 70% Bartlett Mike Kozar 2019 Watermain 790,589.00 70% Elmhurst Kent Johnson 2019 Watermain 3,157,227.00 70% Schiller Park Jim Goumas 2019 Watermain 846,440.00 70% Elmwood Park Orion Galey 2019 Watermain 356,410.00 70% Park Ridge Lou Arrigoni 2019 Watermain 840,430.35 70% Streamwood Alex Riegler 2018 Watermain 632,261.00 70% Bartlett Mike Kozar 2018 Watermain 868,100.00 70% Norridge Brad Clark 2018 Watermain 1,262,277.00 70% Hanover Park Obaid Kahlid 2018 Watermain 603,459.00 70% North Aurora Paul Young 2017 Watermain 414,497.00 70% Aurora Jason Bauer 2017 Watermain 304,281.00 70% Schiller Park Patrick Glenn 2017 Watermain 698,645.00 70% Palatine Matt Grenning 2017 Watermain 376,885.00 70% Bartlett Mike Kozar 2017 Watermain 385,950.00 70% Elmhurst Tony Cuzzone 2017 Watermain 1,789,198.00 70% 26 VILLAGE OF MOUNT PROSPECT ADDENDUM NO. 1 FOR 2022 WATER MAIN REPLACEMENT PROJECT DATE: May 4, 2022 BID OPENING: Monday, May 9, 2022, at 1:00 PM CST TO: All Prospective Bidders All BIDDERS for the above contract shall carefully read the enclosed Addendum and consider its impact in the preparation of their bid proposal. This Addendum is provided to inform you of any changes or clarifications to the Contract Documents for the 2022 Water Main Replacement Project. Including this page, this Addendum is 5 pages — pages 1-2 this transmittal, page 3 Bidder's Acknowledgement of Receipt, and pages 4-5 revised Bid Sheets. This Addendum shall be included with and is considered part of the BID DOCUMENT. Failure to return this form may result in disqualification of the BIDDER. Include this original in your bid. 1. In the Contract Bid Manual, under (XNERAL CONDITIONS, Section 2.4 Substantial Performance; Final Completion. is hereby deleted in its entirety. Refer to the Special Provisions, pages 34 and 35, for the project's Final Completion Date, Interim Completion Date, and Staging Durations. 2. All Project proposed water mains are NOT to be encased with polyethylene or any other materials. In the Contract Bid Manual, under SPECIAL PROVISIONS, all polyethylene encasement wording is hereby removed from any and all Basis of Payment sections. Polyethylene encasement is NOT to be used on this project. 3. Tree Protection shall NOT be paid for separately but shall be included in the scope of the project. Tree Protection is NOT a separate pay item. In the Contract Bid Manual, under GENERAL CONDITIONS, Section 16.18 "Tree. Protection" is hereby revised to DELETE THE FOLLOWING SENTENCE: "Tree protection fencing shall be pair! for per FOOT of TEMPORARY FENCING': 4. Contract pay item "Exploration "try"rencli 48"" shall NOT be applicable to locating and/or verifying depths of any existing sanitary service line as may be necessary for directional drilling of the proposed water main. This pay item is designated for locating existing storm sewer mains, sanitary sewer mains, water mains, and/or existing private utility lines as directed by the Resident Engineer or the Village Staff. Locating existing sanitary 27 service lines, or any other utility, associated with directional drilling will NOT be paid for separately but shall be included in the cost of Pay Item #34 - Horizontal Directional Drill Ductile Iron Water Main, Class 52, 8", and Alternate Bid 93 Pay Item 43 - Horizontal Directional Drill Ductile Iron Water Main, Class 56, 8". 5. The Bid Sheet, pages 112 and 113, included with the Bid Manual is hereby deleted in its entirety and replaced with the attached to correct the project title. 6. Locations associated with Alternative Bid #1 (i.e., Bituminous Material (Tack Coat), HMA Surface Removal, 2", and HMA Surface Course, IL -9.5, Mix "D", N50, 2") are those roadways in which the proposed water main will be installed under existing pavement. For those roadways, the current engineering plans identify resurfacing to the roadway's centerline. Alternative Bid #1 will allow for resurfacing of the entire roadway. 2 28 VILLAGE OF MOUNT PROSPECT ADDENDUM NO. 1 FOR 2022 WATER MAIN REPLACEMENT PROJECT BIDDER'S ACKNOWLEDGMENT OF RECEIPT BIDDER hereby acknowledges receipt of Addendum No. 1 Company Name Co'E�2.�, �`'L z -C4 mss. By Print Name .................: �A►IME:s •a. Position/Title... ......... 1'C Date ............................: S I (,� 3 29 RETURN WITH BID ADDENDUM #1 2022 WATER MAIN REPLACEMENT PROJECT (: C7Ut'ify COCSif ............ Agency Pwl..-...._.,.,,..,W............. Pone »........... .._.�. Route TKB;.'a 1 Wale, Won R' &a cxredr�s�a¢G M ru vae�J BID SHEET - ..,......._.a-�.��.........-._,.--w _ _ Schedulds f(ar BASE BID (IFaf cornple2e ink€ounatiun covering these items, sLe _- � plans and specifications) w......... Item No Items Unit unit Price Total 1 M, TREE REMOVAL (6 TO 15 UNITS DIAMETER) wCKI.. UNIT 100 �. TREE REMOVAL �_�_-� wv..__.., ,. ...._...................... , (OV...... _----........_ ER 95 UNITS DIAMETER) ..._....._.__._.-� UNIT 50 ._.......-----w.v.wwww-,......_m-.........._..........._...._---. ....................vwv....,_.w 3 SUPPLEMENTAL ( _)...-w_... ....... WATERING SOD..............................�.-._.._v-v...w_...M.M._._.._,. _..UNIT .....�..10 .... ._.................._..�M..-..--...._._.W.,M.. ...........---........._. 4 TREE ROOT PRUNING EACH 75 5 TEMPORARY AGGREGATE TON 2,050 6 UNDERCUTTING FOR UTILITIES CU YD 10 7 TRENCH BACKFILL .....www CU YD 7430 6 . _._.wvwvw......... _. _. EXPLORATION TRENCH, 46" ...................__ r.....,,,...__- ..............._................ FOOT ..w...w-ww..,,,._..._. 50 ...........-.............w.......... 9 HOT -MIX ASPHALT SURFACE REMOVAL, 2" �..�...._w..w...._ _ ...O - D SQ YD M 7, W 7,857 —WWWW -w .._.w........—..........ww 10 DRIVEWAY REMOVAL SO YD 571 11 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT„ 6 INCH SO YD 307 12 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8 INCH SO YD 86 13 REPLACEMENT _ FOOT_ 1,100 14 ww SIDEWALK REMOVAL _ SQ FT 1,995 15 FENCE REMOVAL AND REPLACEMENT_ FOOT 20 ..................... 16 STORM SEWER AND REPLACEMENT WITH WMQ PIPE, W-12" W5 FOOT 654 17 STORM SEWER REMOVAL AND REPLACEMENT WITH WMQ PIPE, 15"-18" FOOT 103 18 STORM SEWER REMOVAL AND REPLACEMENT WITH WMQ PIPE, 21 - 24"� FOOT 20 19 SANITARY SEWER REMOVAL AND REPLACEMENT WITH WMQ PIPE, 8"-12" FOOT 120 20 ADJUSTING SANITARY SEWER SERVICE LINE EACH40 21 STEEL CASING PIPE, 16" FOOT 20 22 DUCTILE IRON PIPE INSTALLED IN STEEL CASING FOOT_ 20 23 DOMESTIC WATER SERVICE BOXES TO BE REMOVED EACH 182 24 FIRE HYDRANT WITH AUXILIARY VALVE AND VALVE BOX EACH 30 25 ............ FIRE HYDRANTS TO BE REMOVED .........ww_w...... EACH 27 26 __., VALVE VAULTS, TYPE A, 4' -DIAMETER, TYPE 1 FRAME, CLOSED LID _ EACH _ 48 ..............._. 27 VALVE VAULTS, TYPE A, 5' -DIAMETER, TYPE 1 FRAME, CLOSED LID EACH 1 28 BITUMINOUS MATERIALS (TACK COAT) POUND 7,633 29 HOT -MIX ASPHALT SURFACE COURSE, IL -9,5, MIX "D", N50, 2" TON 1,560 30 HOT -MIX ASPHALT DRIVEWAY PAVEMENT, 2" SO YD 178_ 31 NON -SPECIAL WASTE DISPOSAL _ CU YD 25 32 DUCTILE IRON WATER MAIN, CLASS 52, 6" FOOT 284 33 DUCTILE IRON WATER MAIN, CLASS _528" FOOT 6,495 34 HORIZONTAL DIRECTIONAL DRILLWDUCTILE IRON WATER MAIN, CLASS 52, e" FOOT 3,519 35 PORTLAND CEMENT CONCRETE SIDEWALK, 5" SQ FT 1,895 36 PORTLAND CEMENT CONCRETE SIDEWALK, 6" SO FT 100 37 DETECTABLE WARNINGS µw SQ FT 160 38 _._5" CLASS __ D_PATCHING, SPECIAL, 2.25" SQ YD 2,605 39 C. 7Z -,s D PA'TC'HING, SPECIAL.., 4' " SQ YD 2,084 40 CLASS D PA"6`fRIIRNG, SPEC.IAL, 6"" SQ YD 1,381 41 STRUCTURES TO BE ADJUSTED EACH 5 42 VALVE VAULTS TO BE ABANDONED EACH 34 43 THERMOPLASTIC PAVEMENT MARKING - LINE 4" FOOT 100 44 THERMOPLASTIC PAVEMENT MARKING - LINE d""-'__ FOOT 176 45 THERMOPLASTIC PAVEMENT MARKING - LINE 12" FOOT 16B 46 THERMOPLASTIC PAVEMENT MARKING - LINE 24" FOOT 251 47 CUT AND CAP EXISTING 6" WATER MAIN EACH 27 48 K';t91` ANDUT CAP EXISTING 8" WATER MAIN EACH 7 49 WATER MAIN LINE STOP, 6" EACH 1 50 WA"T'5R MAIN LINE STOP, 8" EACH 1 51 WATERSERVICE CONNECTION, NEAR -SIDE 1-1/2", SPECIAL, EACH 89 52 WATER SERVICE CONNECTION, FAR -SIDE 1-1/2"„ SPECIAL EACH 93 53 GA"L"E VALVES„ 8" � EACH 48 54 1°1ELD LOK GASKETS FOR DI WATER MAIN � �-� EACH 178 � 55 WATER SERVICE LINE, SPECIAL FOOT 100 56 PRESSURE CONNECTION 70 EXISTING WATER MAIN„ 6" EACH 1 57 PRESSURE CONNECTION TO EXISTING WATER MAI 8- � EACH 1 58 CUT -IN CONNECTIONS TO EXISTING WATER MAIN EACH 35 59 PARIK`WAY RrSOTRATII1N„ SPECIAL SQ YD 4878 ""........ 60 CONSTRUCTION L.AYGU 1' iT^1,RkI��R"'IC CO)N'TRV:7L & Pl'SK';Y'TEC;TgON L SUM L SUM 1 1 61 62 IN$GZJIRO'S ISIONS - COMPLETE L SUM 1 TOTAL BASE BID Printed 5/3/2022 2022 Water Main Replacement Project BLR 12200a (01/OE30 RETURN WITH BID ADDENDUM #1 BID SHEET .-....w�_............................,,.,._,,,.......................m..._... .......-.„. .� ... Schedule for ALTERNATE BID #1 ...,u;rr complete information a�uyaamuwr...__ -. ..�.... ....." ww� ................._._..._w.,..,, ..._._-w-....._.. ._.�._.w., BF' �p N q these see ptarm and spe+.�4'Boart wls) --Item No. '.. _ _ Items Unit Quanlity Unit Price Total 1 Ep7"IDpU41N0US MATERIALS (TACK COAT)_ ___ POUND 4845.6 2 HOT -MIX ASPHALTSOJRF'�CE' COURSE, IL -9.5" MIX °"F:F N50, 2"` TON 1206.016 __ 3 HOT -MIX ASPHALT SURFACE _.MREMO2" ._....--.....�®.......wwwwwww.. 0768 ......�....-....ww .......... TOTAL ALTERNATE BID #1 = Schedule for ALTERNATE BID #2 (For complete information coverdh g these iterns, see plans and spemftcaborm» Item�NoItems n41muwcilGC�UniC Price Total HORIZONTAL DIRECTIONAL DRILL PVC WATER MAIN, 8" F007 3519�2PVC WATER MAIN, C-900, RESTRAINED JOINTS, TRENCHED 6" FOOT 61 _ ...�.�w. TOTAL ALTERNATE BID #2 ............ Schedule for ALTERNATE BID #3 ...---- ..... 14 ._.,... .......... (For cmnplc�rw information covering these items, see plans and specv48wAficr�sc) Item No. ..................M.M.M.............._......._ ,..........._---......_...�_w.. �. I............�........��,,,-_......._.._....w...�.���_.. ... Unit.._ ....Quantity_.. ------ Unit Price ....-.w--_..�..�....�� to .......,..,...............-... 1 DUCTILE IRON WATER MAIN, CLAS _ terns ._. wwwww................._...w _ FOOT _ 284 2 D_UC_TILE IRON WATER MAIN, CLASS 56, 8" FOOT 8495 3 HORIZONTAL DIRECTIONAL DRILL DUCTILE IRON WATER MAIN, CLASS 56, 8" FOOT 3518 TOTAL ALTERNATE BID #3 Printed 5/3/2022 2022 Water Main Re3placement Project BLR 12200a (01/08,31 VILLAGE OF MOUNT PROSPECT ADDENDUM NO. 2 FOR 2022 WATER MAIN REPLACEMENT PROJECT DATE: May 5, 2022 BID OPENING: Monday, May 9, 2022, at 1:00 PM CST TO: All Prospective Bidders All BIDDERS for the above contract shall carefully read the enclosed Addendum and consider its impact in the preparation of their bid proposal. This Addendum is provided to inform you of any changes or clarifications to the Contract Documents for the 2022 Water Main Replacement Project. Including this page, this Addendum is 3 pages — pages I and 2 this transmittal, and page 3 Bidder's Acknowledgement of Receipt. This Addendum shall be included with and is considered part of the BID DOCUMENT. Failure to return this form may result in disqualification of the BIDDER. Include this original in your bid. 1. In response to questions received regarding pavement thicknesses and applicability of Pay Items #38 - Class D Patching, Special, 2.25", Pay Items #39 - Class D Patching, Special, 4", and Pay Items #40 - Class D Patching, Special, 6", the following is provided for your consideration. Cores were taken within the existing pavement of various streets throughout the Project limits and the surface conditions are as follows: BORING NO. / LOCATION B-01 (Audrey Lane) B-02 (Estates Drive) B-03 (Hatlen Avenue) B-04 (Cottonwood Lane) B-05 (Waverly Avenue) B-06 (Pendleton Place) B-07 (Small Lane) TOTAL OBSERVED PAVEMENT THICKNESS 4 INCHES OF ASPHALT 4 INCHES OF ASPHALT 6 '/2 INCHES OF ASPHALT 4 INCHES OF ASPHALT 8 INCHES OF ASPHALT 5 INCHES OF ASPHALT 3 INCHES OF ASPHALT TOTAL OBSERVED BASE STONE THICKNESS 10 INCHES OF SUBBASE STONE 7 INCHES OF SUBBASE STONE 7 %2 INCHES OF SUBBASE STONE 10 INCHES OF SUBBASE STONE 6 INCHES OF SUBBASE STONE 9 INCHES OF SUBBASE STONE 10 INCHES OF SUBBASE STONE 32 May 5, 2022 Addendum No. 2 For 2022 Watermain Replacement Project Village of Mount Prospect Please note that the above referenced thicknesses are considered approximate and based on visual observations and hand measurements. Pavement and sub -base type and thickness may vary between core locations. The appropriate depth of Class D Patching, Special, will be combined with Pay Item #29 — Hot Mix Asphalt Surface Course, IL -9.5, Mix "D", N50,2", to achieve, at a minimum, the existing pavement thickness as determined in the field by the Engineer. W 33 VILLAGE OF MOUNT PROSPECT ADDENDUM NO.2 FOR 2022 WATER MAIN REPLACEMENT PROJECT BIDDER'S ACKNOWLEDGMENT OF RECEIPT BIDDER hereby acknowledges receipt of Addendum No. 2 Company Name .......... By� ............................... Print Name .................. Position/Title..............: N ; Lam, Date............................. C 34 VILLAGE OF MOUNT PROSPECT ADDENDUM NO.3 FOR 2022 WATER MAIN REPLACEMENT PROJECT DATE: May 6, 2022 BID OPENING: Monday, May 9, 2022, at 1:00 PM CST TO: All Prospective Bidders All BIDDERS for the above contract shall carefully read the enclosed Addendum and consider its impact in the preparation of their bid proposal. This Addendum is provided to inform you of any changes or clarifications to the Contract Documents for the 2022 Water Main Replacement Project. Including this page, this Addendum is 40 pages — pages 1 and 2 this transmittal, and page 3 Bidder's Acknowledgement of Receipt, pages 4thru 40 Geotechnical Engineering Services Report. This Addendum shall be included with and is considered part of the BID DOCUMENT. Failure to return this form may result in disqualification of the BIDDER. Include this original in your bid. 1. In response to a question received regarding availability of soil boring reports, the attached Geotechnical Engineering Services Report prepared by Rubino Engineering, Inc., dated March 16, 2022, identified as Rubino Report No. G21.253, is provided for your consideration. DISCLAIMER: Limited investigation of subsurface conditions at the proposed site of Work has been made for the purpose of design. The Village of Mount Prospect assumes no responsibility whatsoever with respect to the sufficiency or accuracy of these preliminary investigations, nor their interpretation, and there is no guarantee, either expressed or implied that conditions indicated are representative of those existing throughout the Work or any part of it, or that unforeseen developments may occur. 2. In response to a question raised regarding Pay Item 932 — Ductile Iron Water Main, Class 52, 6", and verbiage contained in the Special Provision for "Fire Hydrants with Auxiliary Valve and Valve Box", the following is provided for your consideration. In the Contract Bid Manual, under SPECIAL PROVISIONS, the special provision for "Fire Hydrants with Auxiliary Valve and Valve Box" is hereby revised to DELETE THE FOLLOWING SENTENCE FROM "METHOD OF MEASUREMENT AND BASIS OF PAYMENT": "and 6" ductile iron pipe extension connecting the hydrant to the water main, ". 35 May 6, 2022 Addendurn No.3 for 2022 Watermain Replacement Project Village of'Mount Prospect VILLAGE OF MOUNT PROSPECT ADDENDUM NO. 3 FOR 2022 WATER MAIN REPLACEMENT PROJECT BIDDER'S ACKNOWLEDGMENT OF RECEIPT BIDDER hereby acknowledges receipt of Addendum No. 3 3 36 Laboratory Testing Geotechnical Analysis PREPARED BY: JONATHAN IGNARSKI Michelle A. Lipinski, PE President IL No. 062-061241, Exp. 37 2022 Water Main Replacement Project - Mount Prospect, Illinois Pat,7e - I - March 16, 2022 Rubino Engineering, Inc. (Rubino) understands that the Village of Mount Prospect is designing their 2022 Watermain Replacement Project along various streets in Mount Prospect, Illinois. Project Correspondence: RFP Email from Kevin C. VanDeWoestyne of Thomas Engineering Group, LLC (TEG) via email on November 18, 2021 The geotechnical recommendations presented in this report are based on the available project information and the subsurface materials described in this report. If any of the information on which this report is based is incorrect, please inform Rubino in writing so that we may amend the recommendations presented in this report (if appropriate, and if desired by the client). Rubino will not be responsible for the implementation of our recommendations if we are not notified of changes in the project. Purpose / Scope of Services The purpose of this study was to explore the subsurface conditions at the site in order to prepare geotechnical recommendations for utility installation and general site development for the proposed construction. Rubino's scope of services included the following drilling program: Table 1: Drilling Scope NUMBER OF DEPTH BOM MNt S WITH (FEET BEG*} LOCATION PAVEMENT :OM S 7 7 '/z See Boring Location Plan *BEG = below existing grade Representative soil samples obtained during the field exploration program were transported to the laboratory for additional classification and laboratory testing. This report briefly outlines the following: • Summary of client -provided project information and report basis • Overview of encountered subsurface conditions • Overview of field and laboratory tests performed including results • Geotechnical recommendations pertaining to: • Subgrade preparation and stability recommendations • Utility Installation and backfill recommendations • Trench box lateral earth pressures • Dewatering • Construction considerations, including temporary excavation and construction control of water Rubino Engineering, Inc. Rubino Project No, G21.253 38 2022 Water Main Replacement Project - Mount Prospect, Illinois Page - 3 - March 16, 2022 The water main replacement project is located in a residential neighborhood along Audrey Lane, Pendleton Place, Estates Drive, Hatlen Avenue, Waverly Avenue, Cottonwood Lane, and Stratton Lane in Mount Prospect, Illinois. Rubino Engineering, Inc. 1W Rubino Project No. G21.253 39 2022 Water Main Replacement Project - Mount Prospect, Illinois Page - S - March 16, 2022 Table 3: Subsurface Conditions Summary DEPTH T N - SPT RANGE VALUES MOISTURE ESTIMATED (FEET SOIL DESCRIPTION (BLOWS CONTENT SMEAR BEG*) PER FOOT) N STRENGTH Stiff to very stiff, gray to black silty CLAY, 1-31/2 trace sand and gravel Possible Fill (B-01 and 12-17 20 -- 8-04) 1-71/2 Stiff to very stiff, brown and gray silty CLAY, 9-18 16 — 31 c = 1,350 — trace sand and gravel 2,700 psf 31/2-71/2 Medium stiff„ brown or gray silty CLAY, trace 22 — 26 c = 750 — 900 sand and gravel (B-03 & B-04)5-6 psf *BEG = Below existing grade The native soils were visually classified as silty clay (CL) according to the Unified Soil Classification System (USCS). The above table is a general summary of subsurface conditions. Please refer to the boring logs for more detailed information. Estimated shear strength of clay soils is based on empirical correlations using N -values, moisture content, and unconfined compressive strength. Groundwater Conditions Groundwater was not observed in the borings during the drilling operations. However, it should be noted that fluctuations in the groundwater level should be anticipated throughout the year depending on variations in climatological conditions and other factors not apparent at the time the borings were performed. Groundwater may not have been observed in some areas due to the low permeability of soils. Additionally, discontinuous zones of perched water may exist within the soils. The possibility of groundwater level fluctuation should be considered when developing the design and construction plans for the project. Rubino Engineering, Inc. Rubino Project No. G21.253 40 2022 Water Main Replacement Project - Mount Prospect, Illinois Page - 7 - March 16, 2022 Rubino anticipates that the proposed water mains will be bearing between approximately 4 and 7 '/2 feet below existing grade. The silty clay soils encountered at that depth range appear generally suitable for support of the proposed water mains. Rubino recommends that the water mains be supported by a granular bedding material similar to the gradation of an IDOT CA -07 stone. The thickness of the bedding material should be at least 6 inches. Add additional bedding stone as needed to bridge over softer soils. If granular material is used for the backfill of the utility trench, the granular material should have a gradation that will filter protect the backfill material from the adjacent soils. If this gradation is not available, a geosynthetic non -woven filter fabric should be used to reduce the potential for the migration of fines into the backfill material. Granular backfill material shall be compacted to meet the above compaction criteria. Structural fill placed in utility trenches shall be evaluated in accordance with the following table: PROCTOR MIN % MATERIAL TESTED . DRY PLACEMENT MOISTURE FREQUENCY OF MAXIMUM LOOSE LIFT TYPE � TESTING 'y DENSITY CONTENT RANGE HEIGHT Utility Trench Backfill Standard 95% -2 to +2 % 1 per 200 LF of 4 — 6 inches fill placed "-' The test frequency for the laboratory reference shall be one laboratory Proctor test for each material used on the site. If the borrow or source of fill material changes, a new reference moisture/density test should be performed. `-2A minimum of one test per lift is recommended unless otherwise specified. In general, utifitv trench backfill materials should: • Have a Standard Proctor maximum dry density greater than 100 pcf • Be free of organic or other deleterious materials • Have a maximum particle size no greater than 3 inches • Each lift of compacted, engineered fill should be tested and documented by a representative of the geotechnical engineer prior to placement of subsequent lifts • Soils classified as GP, GW, SP, and SW will generally be suitable for use as utility trench backfill. • Soils classified as CL, ML, SC, SM, OL, OH, MH, CH, and PT should be considered unsuitable. • If water must be added, it should be uniformly applied and thoroughly mixed into the soil Tested fill materials that do not achieve either the required dry density or moisture content range shall be recorded, the location noted, and reported to the Contractor and Owner. A re -test of that area should be performed after the Contractor performs remedial measures. The above test frequencies should be discussed with the contractor prior to starting the work. Rubino Engineering, Inc. Rubino Project No. G21.253 41 2022 Water Main Replacement Project - Mount Prospect, Illinois Page - 9 - March 16, 2022 EARTH PRESSURE L❑EFFICIEI'JTS Feer` aCt ve oressurre - G Z The following table provides the recommended "at -rest" lateral earth pressure coefficients for the soils encountered. Also included are the "active" and "passive" lateral earth pressure coefficients if needed. Table 4: "K -Factor" Lateral Earth Pressures DEPTH EsriMATED RANGE 'TOTAL UNIT F I TIO (FEET' SOIL TYPE WEIGHT ANGLIt, Ko K4 KP BEG-) (LSIFT (DEG) 1 - 7'/z Silty CLAY 120-130 26° 0.56 0.39 2.56 *BEG = below existing grade The following equations were used to calculate the earth pressure coefficients "k"a At -Rest: k, = I - sin o if the walls are rigidly attached to the structure and not free to rotate or deflect at the top such as shallow tunnels Active: kG = tan z (45 -2) Walls that are permitted to rotate and deflect at the top Passive: kp = tang (45 i. , Passive pressure should be determined using a factor of safety of 2,0 Conditions applicable to the above conditions include: • For active earth pressure, wall must rotate about base, with top lateral movements 0.002Z to 0.004Z, where Z is the wall height • For passive earth pressure, wall must move horizontally to mobilize resistance • Uniform surcharge, where S is surcharge pressure Rubino R'ngineering, Inc. Rubino Project No. G21.253 42 Appendix A - Drilling, Field, and Laboratory Test Procedures ASTM D1586 Penetration Tests and Split -Barrel Sampling of Soils During the sampling procedure, Standard Penetration Tests (SPT's) were performed at regular intervals to obtain the standard penetration (N -value) of the soil. The results of the standard penetration test are used to estimate the relative strength and compressibility of the soil profile components through empirical correlations to the soils' relative density and consistency. The split -barrel sampler obtains a soil sample for classification purposes and laboratory testing, as appropriate for the type of soil obtained. Water Level Measurements Water level observations were attempted during and upon completion of the drilling operation using a 100 -foot tape measure. The depths of observed water levels in the boreholes are noted on the boring logs presented in the appendix of this report. In the borings where water is unable to be observed during the field activities, in relatively impervious soils, the accurate determination of the groundwater elevation may not be possible even after several days of observation. Seasonal variations, temperature and recent rainfall conditions may influence the levels of the groundwater table and volumes of water will depend on the permeability of the soils. Ground Surface Elevations At this time, no site-specific elevations were available to Rubino. The depths indicated on the attached boring logs are relative to the existing ground surface for each individual boring at the time of the exploration. Copies of the boring logs are located in the Appendix of this report. ASTM D2216 Water (Moisture) Content of Soil by Mass (Laboratory) The water content is an important index property used in expressing the phase relationship of solids, water, and air in a given volume of material and can be used to correlate soil behavior with its index properties. In fine grained cohesive soils, the behavior of a given soil type often depends on its natural water content. The water content of a cohesive soil along with its liquid and plastic limits as determined by Atterberg Limit testing are used to express the soil's relative consistency or liquidity index. ASTM D2974 Standard Test Method for Organic Soils using Loss on Ignition (Laboratory) These test methods cover the measurement of moisture content, ash content, and organic matter in peats and other organic soils, such as organic clays, silts, and mucks. Ash content of a peat or organic soil sample is determined by igniting the oven -dried sample from the moisture content determination in a muffle furnace at 440°C (Method C) or 750°C (Method D). The substance remaining after ignition is the ash. The ash content is expressed as a percentage of the mass of the oven -dried sample. 2.4 Organic matter is determined by subtracting percent ash content from 100. rubina E N ('Y o 14 E F R o N G 1 N C G21.253 2022 Water Main Replacement Project — Mount Prospect, Illinois Appendix C - Soil Classification General Notes DRILLING & SAMPLING SYMBOLS: SS: Split Spoon - 1 3/8" I.D., 2" O.D., unless otherwise noted PS: Piston Sample ST: Thin -Walled Tube - 3" O.D., Unless otherwise noted WS: Wash Sample PM: Pressuremeter HA: Hand Auger RB: Rock Bit HS: Hollow Stem Auger DB: Diamond Bit - 4", N, B BS: Bulk Sample Standard "N" Penetration: Blows per foot of a 140 -pound hammer falling 30 inches on a 2 -inch O.D. split spoon sampler (SS), except where noted. WATER LEVEL MEASUREMENT SYMBOLS: Water levels indicated on the boring logs are the levels measured in the borings at the times indicated. In pervious soils, the indicated levels may reflect the location of groundwater. In low permeability soils, the accurate determination of ground water levels is not possible with only short-term observations. DESCRIPTIVE SOIL CLASSIFICATION: Soil Classification is based on the Unified Soil Classification System as defined in ASTM D-2487 and D-2488. Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; they are described as: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are described as: clays, if they are plastic, and silts if they are slightly plastic or non -plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse grained soils are defined on the basis of their relative in-place density and fine-grained soils on the basis of their consistency. Example: Lean clay with sand, trace gravel, stiff (CL); silty sand, trace gravel, medium dense (SM). CONSISTENCY OF FINE-GRAINED SOILS: RELATIVE DENSITY OF COARSE-GRAINED SOILS Unconfined Compressive N-Blows/ft. Consistent N-Blows/ft. Relative Density Strength, Qu (tsf) y tY RELATIVE PROPORTIONS OF SAND & GRAVEL Descriptive Term % of Dry Weight Trace < 15 With 15 - 29 Modifier > 30 RELATIVE PROPORTIONS OF FINES Descriptive Term % of Dry Weight Trace < 5 With 5 - 12 Modifier > 12 *Descriptive Terms apply to components also present in sample rubona GRAIN SIZE TERMINOLOGY Major Component Boulders Cobbles Gravel Sand Size Range Over 12 in. (300mm) 12 in. To 3 in. (300mm to 75mm) 3 in. To #4 sieve (75mm to 4.75mm) #4 to #200 sieve (4.75mm to 0.75mm) �.. N (> 1 r J F LR � IN :� � N G, . G21.253 2022 Water Main Replacement Project — Mount Prospect, Illinois 44 < 0.25 < 2 Very Soft 0 3 Very Loose 0.25 0.5 2 - 4 Soft 4 9 Loose 0.5 - 1 4 8 Medium Stiff 10 29 Medium Dense 1 2 8 15 Stiff 30 49 Dense 2 4 15 30 Very Stiff 50 - 80 Very Dense 4 8 30 50 Hard 80+ Extremely Dense > _ 8 > 50 Very Hard RELATIVE PROPORTIONS OF SAND & GRAVEL Descriptive Term % of Dry Weight Trace < 15 With 15 - 29 Modifier > 30 RELATIVE PROPORTIONS OF FINES Descriptive Term % of Dry Weight Trace < 5 With 5 - 12 Modifier > 12 *Descriptive Terms apply to components also present in sample rubona GRAIN SIZE TERMINOLOGY Major Component Boulders Cobbles Gravel Sand Size Range Over 12 in. (300mm) 12 in. To 3 in. (300mm to 75mm) 3 in. To #4 sieve (75mm to 4.75mm) #4 to #200 sieve (4.75mm to 0.75mm) �.. N (> 1 r J F LR � IN :� � N G, . G21.253 2022 Water Main Replacement Project — Mount Prospect, Illinois 44 Appendix E - Site Vicinity Map & Boring Location Plans V foub. ina ENGINEERING MC, 621-253 2022 Water Main Replacement Project — Mount Prospect, Illinois Rubino Project # : 2022 Water Main Replacement F Thomas Engineering Group, I 46 As 425 Shepard Drive Elgin, Illinois 60123 Project Name: Project Location: Client: RubinoPnjont#: � 'oil 2O22Water Main Replacement F Cottonwood Lane Mount Prospect, Illinois Thomas Engineering Group, | 821.253 14 2022 Water Main Replacement F Pendleton Place Mount Prospect, Illinois Thomas Engineering Group, G21.253 48 WAR rubmna Project Name: Project Location: ENGINEERHAG Client: 425 Shepard Drive Rubino Project # : Elgin, Illinois 60123 2022 Water Main Replacement F Pendleton Place Mount Prospect, Illinois Thomas Engineering Group, G21.253 48 Appendix F - Pavement Core Summary Table IV fubvnia E N (3 o N F L� IR a N G 1 N C G21.253 2022 Water Main Replacement Project — Mount Prospect, Illinois Pavement Core Summary Table — 2022 Water Main Replacement in Mount Prospect, IL Core Photos Page 2 of 3 Rubino Grigineering Inc. lw Rubino Project No, G21.253 50 rubing] Appendix G - Borings Logs G21.253 2022 Water Main Replacement Project — Mount Prospect, Illinois 51 ... _.._ Rubino Engineering, Inc. . w _ ....... _. . rubmna 425 Shepard Drive Elgin, IL 60123 D LOG OF BORING 02 tQ ) i N 1! F P , tJ r', I ; I; Telephone: 847-931-1555 Fax: 847-931-1560 Sheet 1 of 1 Rubino Job No.: G21.253 Drilling Method: 3 % Hollow Stem Auger WATER LEVELS'`' Project: 2022 Water Main Replacement Project Sampling Method: Split Spoon SZ While Drilli.................. . ng . ..N/A Location: Various Streets Hammer Type: Automatic Upon Completion N/A. City, State: Mount Prospect, Illinois Boring Location: EB lane of Estates Drive Client: Thom ...as Engineering g GLLC roup, . ,,.,....... _ ................ 8 feet N of curb Delay N/ Station: N/A Offset: N/A ......... _,-...._., . .. STANDARD PENETRATION .,,,... ........ w o TEST DATA C ) 0 — u L a Z ~ a� a) a - MATERIAL DESCRIPTION ,U a o B @ X Moisture O PL f LL Additional �. a E E m "... j .. 4' Remarks -9 Lu ❑ CD cn U) o L U .... ... ..... j STRENGTH, tsf ® Qu (Ricrac) Qp Approximately 4 inches of ASPHALT t y 7 inches of SUBBASE STONEµ rrApproximate 'brown Stiff,and gray silty CLAY, trace sandand gravel A�. � , G 1 16 6-7-6 23 X N=13 Soils frozen to approximately 2% feet below existing grade. N -values may be elevated. x/114, d� 2 7 CL 3-4-5 24 > )K Qp=2.3 tsf N=9 5 '..... 3 10 2-5-7 20 ( X >> QP=4.5 tsf N=12 Ef its..... ..�..... td cif a g of apapr�xin�ateP� . � fest t�ddr existing grade. Completion Depth: _.. ...... _ _...p Types: .. I. Sample T es '� Pessuremeter ... w... .... Latitude: w_.�........ -_v, .- . __ ......... 42.0548441 _ ...__... _ _'. Date Boring Date Boring Started: Completed: 2/8/22 2/8/22 Auer Cutting S gg Shelby e..� y T Longitude: ube Drill Rig: -87.9670271 Geoprobe 7822DT Logged By: P. P. Split -Spoon Hand Auger Remarks: mmDrillin s ntracmor Rubino Rock C En ineenn Inc ore No Recovery ThPleasefication es re approximate • .. y be gradual boundaries The transition may ..,.._,._ a......... reference therepresent ecnt geotechnical report text for specific groundwater / dewatering recommendations. 52 ..._. .. _... _ .......... ...... ................. Rubino Engineering, Inc. 425 Shepard Drive LOG OF BORING 04 Elgin, IL 60123 .+� Telephone: 847-931-1555 Fax: 847-931-1560 Sheet 1 Of 1 �...... .... �.............. ... Rubino Job No.: G21.253 Drilling Method: 3'/< Hollow Stem Auger WATER LEVELS'' Project: 2022 Water Main Replacement Project Sampling Method: Split Spoon Q While Drilling N/ Location: Various Streets Hammer Type: Automatic City, State: Mount Prospect, Illinois Boring Location: EB lane of Cottonwood Lane Upon Completion N/A Client Thomas Engineering Group, LLC 8 feet N of curb Delay N/A Station: N/A STANDARD PENETRATION n Offset: N/A o c TEST DATA Q r0- N O C,, O U O U o o a MATERIAL DESCRIPTION X Moisture 0 PL f LL Additional w �, ° ._ d Remarks cu n n E E ° Si o c� �...... a......... STRENGTH, tsf A Qu (Rimac) SIE Qp ..... _........ .,..a �........._....... _ ..........., �..... ...................20._.. ., 4 Approximate 4 inches of ASPHALT ro - App roximateYy0 inc I l 1 h—es of SUt3BASE STONE ... s� �laks Very dark black silty CLAY , trace sand and gravel 1 18 Possible Fill 9-11-6 20 r N=17 CL Soils frozen to approximately 2% feet below " existing grade, N -values may be elevated. r M Wed' eoiuni sti " � gravel if, gray silt .. e � y CLAY, trao���� sand and 2 9 1-2-3 22 t X X Qp=2.3 tsf N-5 s, 5 , CL 3 13 1-2-4 22 X Qp=1.0tsf rs N=6 E -6d' kro m at ...m .. „-below-"- existing _ .... g a a roxaa u�ltety 71, feet elow existing grade. .. ... .. .. .. �.... ....0Comp)tion Depth: 7.5 ft Sample Types: Latitude423922..34 Date dg Started: 2/8/22 Pressuremeter Longitude. -87.9588268 68 Date Boring Completed: 2/8/22 Auger Cutting Shelby Tube ...............�,.._......,..�......... .._.. Drill Rig. Geoprobe 7822DT Logged By: P. P. Split -Spoon Hand Auger Remarks: Dr�llir ._. ontractor Rubino En eeri,n InRock -.. ocor Recovery No _Thestratificatioines rep approximate turg n bgradual. reference the geotechnical report text for specific groundwater dewatering recommendations. ns. ......... ._. ............_ ..� _.,_.._.. ...,......... . ,_ ...._ ..... a__ . 53 . ........... Rubino Engineering, Inc. 425 Shepard Drive rubmnElgin, IL 60123 LOG OF BORING B-06 G ( N" iR � f i 1',i fTelephone: 847-931-1555 Fax: 847-931-1560 Sheet 1 of 1 Rubino Job No.: G21,253 Drilling Method: 3 % Hollow Stem Auger WATER LEVELS*** Project: 2022 Water Main Replacement Project Sampling Method: Split Spoon QWhile Drilling . . ............ N/A Location: Various Streets Hammer Type: Automatic City, State: Mount Prospect, Illinois Boring Location: EB lane of Pendleton Place T Upon Completion N/A Client: Thomas Engineering Group, LLC 8 feet N of curb Delay N/A ...... .. .... .... .......... .. . . Station: N/A STANDARD PENETRATION Offset: N/A vTEST DATA (D Q o . = 0 @ L) Z C: A PL X Moisture (D Z_ U) a �11 MATERIAL DESCRIPTION (n .2 0 LL Additional E U) 25 Remarks > o E > Z U) 0 U) M 0 Lu U d) U) a- STRENGTH, tsf A Qu (Rimac) X Qp ...... 0 20 Approximately 5 inches of ASPHALT pproximately 9 inches of SUBBASE STONE ------------ Stiff, r and gray silty CLAY, trace sand and gravel rd 1 14 5-6-6 17 @ X >>) br)=4.5 tsf N=12 X Soils frozen to approximately 2% feet below existing grade. N-values may be elevated. X, 2 115-6-8 18 3 X CL t)P=4, 5 tsf N=14 5 3 15 3-4-7 19 e X >> 10p=4$tsf N=11 existing grade, Completion Depth: 7.5 ft Sample Types: Pressuremeter Latitude: 42.060011 Date Boring Started: 2/8/22 Longitude: de: -87.953569 n 1ru : Date Boring Completed. Auger Cutting Shelby Tube 0 gRig Geoprobe 7822DT 2/8/22 Drill Logged By: P. P. Split-Spoon Hand Auger Remarks: q Rubin E e Rock Core No Recovery ove The stratification lines represent approximate boundaries. The transition may be gradual. ***Please reference thee he geotechnical report text for specific groundwater / dewatering recommendations. 54