HomeMy WebLinkAbout0157_001COMMITTEE OF THE WHOLE
NOVEMBER 28, 19O9
Roll Call
The meeting was called to order at 7:30 p.m, Present at the meeting were:
Mayor Gerald L. parleys Trustees Ralph Arthur, " y
��r4 Busse, Timothy Corcoran,
Leo nuroa, George Van Gv*m, and Theodore Wattenberg. Also present
Village Manager John Fulton Dixon, Director of Public Works Herb Weeks, De,�--
-
pvulio Works Director Glen 4n^lrr, Street Superintendent Mel Both, Water
Superintendent Jerry McIntosh, Engineer Fred Tennyson, and Finance Director
—
David Jepson. Also present were three persons from the print media,two
representatives from the Metropolitan water Reclamation District of Greater
Chicago, e representative from Citizens Utilities, and approximately 75
residents of the Village.
If Minutes
The minutes of the Committee of the Whole Meeting of November 14, 1989 were
accepted and filed.
ID Citizens to be Heard
No citizens addressed the Village Board.
IV V,illage Storm Water and Flooding Concerns
Mayor Gerald L. Farley stated that flooding is a concern or residents through-
out the Village and that it was the village 8nard'a intention to review the
problems on a Village -wide basis. He then introduced Mr. Bill nacaitio, Asst.
Chief Engineer of the Metropolitan Nater Reclamation District of Greater
Chicago (wWRD) to present their role in storm water co"trol,
mr, waoeitis stated that MWRD is a regional agency with the sole purpose of
collecting and treating sewage. Sewage is collected from municipalities and
utility companies by means of e series or interceptor linea and is then
transported to one of seven treatment plants that they operote. The treatment
plant in 5Uckney, Illinois is the largest sewage treatment plant in the world,
treating 1.5 billion gallons per dmy. Sewage from Mount Prospect and the
neighboring communities is treated at their plant at O'Hare Airport. He stated
that wwRD is not responsible for storm water distribution systems or flood
control and indicated that there is no Storm Water Management Agency in Cook
County.
Mr. waoai±ia then reviewed the history or the MwRD and some or the circum-
stances that have contributed to the flooding problems that many communities
aro facing. In the early stagea of urban development in Cook County, a
combined system of sanitary and storm sewers had been developed with the flow
going directly into the streams and rivers. This condition became un-
acceptable, and during the 30'o and 40'a the wwRD started treating the flow
from the combined sewer system to protect the basic source of water supply. As
development of areas continued, more and more pressure was put on the sewer
m'sLews. The typical combined sewer system was designed to handle 1-1/2 times
the normal flow during dry weather and as development of the vacant land
continued, the sewer system became overloaded much more frequently.
Separate storm and sanitary sewer systemsdeveloped and required in new
developments, and in1963, txeHwRD started requiring developers to provide
detention on their own property. However, the unrestricted growth of the
previous loO years could not be reversed. The sewer systems Jvet could not
handle the volume of sewage and storm woter- wW*n developed two programs to
try to alleviate these problems: the Tunnel and Reservoir Project ([ARP) and
the Infiltration/Inflow Corrective Action Program (ICAp).
` .
Mr. weoeiUm explained that the TARP Program included the construction of e
series of tunnels 150 - 300 fent below ground which would be designed to
collect and hold the plow from the interceptor lines until it could be
processed in the sewage treatment plants. He ther displayed a map of the
tunnels that serve the Village of mount Prospect. Tunnels in this area consist
of 6.6 miles of tunnels 16 feet to 20 feet in diameter. He pointed out that
the deep tunnels were the 1st phase of the project and were only designed for
pollution control.
The second phase of the project in to build a series of reservoirs which would
hold storm water much like the tunnels would hold sewage. However,
Mr, Macai,ia pointed out that. Phase 2 of the project is the responsibility of
the U. S. Army Corps or Engineers and not the MNRD- Phase 2 in the local area
started in 1989 with e planned reservoir in the O'Hare area. It is being
designed to handle the storm water generated by a "40 year" storm. It is
expected that work will proceed although funding has not been aoovred,
rHe second Program initiated by wwRo is the ICAP Program which is intended to
control the infiltration of ground water into the sanitary
sewer systems.also ^ includes the requirements to eliminate illegal
connections. of downspouts and sump pumps to the sanitary sewer system.
Mr. Macuitio pointed out that during a 1 inch to 2 inch rainfall, night
downspouts or four mvmP pumps can fill a 12 inch combined sewer to capacity and
cause surcharging or backups. He stated that municipalities which did not
comply with the requirements of the lCuP Program would be subject to heavy
fines. He also indicated that the Village of Mount Prospect was progressing
very satisfactorily in implementing ICAp requirements.
0
Mayor Farley thanked Mr. wmcaitie for a very informative presentation, and
summarized the presentation by saying it appeared that the Village of Mount
Prospect was "on its own" regarding flooding problems. Considerable discussion
by the Committee and wc, nacaitin rouuveu resulting in the following questions
and comments;
Mayor Gerald Farley
Is it possible that as a result of the 1986 and 1987 rains that silt or some
foreign material had restricted flows in the system or could the inLprceptor
lines be damaged? Mr. Mo,aibo replied that the lines are operating ----ly
and that. the problem is uvo to the intensity of the rainfall in the--
at
several years. The reservoirs to be constructed in Phase 2 of the TARP project
will help when there are high-intensity rainfalls.
Also, Mayor Farley asked if the tunnel overflows in other areae affect the
Mount Prospect area. Mr. macaitie explained the way the gates and locks of the
system work to control the r)nw of water from Lexo Michigan and the flow of
sewage in the tunnels. He stated that overflows in one area do not affect
other areae, He related that normal flow of 35 million gallons per day
increases to 150 million gallons per day when it rains.
Trustee Corcoran
/t appears that the only real solution over the long term is the xeancvoica,
He asked Mr. Nacoitio if the reservoirs are a sure t»ing. His response: "We
think so."
Do you take the responsibility for cleaning the creeks (Weller Creek)? The
response from Mr. mocaitis was no but that the MwVD tries to be a good neighbor
and help local municipalities in maintaining waterways whenever noee/hle,
Trustee Arthur
Asked if Weller Creek was the only source for storm water run-o[f, The
response was that the Feexanville 0ucx also takes storm waters on the
Northeast portion of the Village.
George Van Geem
Asked if the technology was available to solve all the flooding problems if
money would not be an issue. Mr. necaitio replied that t^=cr had been 100
years of unregulated growth in the Cmnug" area and that technology is
available but that the estimated cost is $6 billion to resolve flooding
problems and an additional $1.5 billion for waterway maintenance.
Trustee van cemn then uokcu Mr. Macaitu: if the mwRD can help the Village of
Mount Prospect allocate resources to solve flooding prvolnme. His response was
that mNRn'e assistance would only be in the area of the tunnel and reservoir
4
Mayor Farley thanked Mr. Maraitio andcalled upon Mr. Bill Kvzie of Citizens
Utilities for a presentation of their role in flood control in the Village of
Mount Prospect. `
'
Mr. muzia stated that Citizens Utilities (CU) operates the water and sewer
utility in the Northeast section of the Village and provides essentially the
same service in that area as the Village provides in the rest of the Village.
He stated that CU has been one of the leaders in complying with the ICxp
Program and has removed 1348 illegal connections in their service area. He said
they will continue to monitor the sewer system. In response to a question from
the Mayor, he stated that all the sewers in the CU area are separate sewers and
the CU is only responsible for the sanitary sewers.
`
Don wim*el or 1e33 rano Len* oauvu why the flooding problem was more severe
this year than it had been in the past. Mr. Kuzia stated they have had the
same problem in the CU area that the Village had. The problem was primarily
due to the heavy rains.
Trustee Busse
Because of the seriousness or the situation, we need more surveillance and
monitoring of illegal connections, and we should do whatever we need to to
eliminate them.
Village Resident
David Shine of 512 ma -Vo -Ta stated that there are three reasons for more
flooding vow -man in prior yoaca`
1, High-intensity rainfall during the last few years;
2. Illegal connections of sump pumps and downspouts; and
3. Development of vacant land.
He stated that flooding is the Village's problem and not the problem of the
MWRD or CU.
Public Works Director Herb Weeks then introduced Catherine L. mmrb:y and Thomas
M. Cciae of R3w Environmental Associates, Inc. to present their report on the
flooding rc"uleme of the Central/waPella area. They explained the background
of the problem, their approach to collecting information, evaluation of the
existing system and alternatives to resolving the problems.
The drainage area comprises approximately 44 acres in an area uovnmnu by
Northwest Highway, Lancaster Street and Central Road. / The fundamental problem
is that the combined sewer system in the area was designed to xunulr approxi-
mately 2,8 cubic feet per second (CFS) and a "one year rainfall" produces 20.5
CFS. The existing system includes 12 inch line and it simply cannot handle
the demands in the area.
RJN, presented five alternatives and recommended an alternative which would
9
During the discussion that followed, it was stated that the project could be
completed in approximately one year depending upon the time of the year the
project in started. Additionally, it was confirmed that the mwRD Reservoir
project will not correct this problem because the existing sewer pipe is so
emall,
Village resident Paul Ho[ert asked the Village 8vaco to consider the effect
that any corrective action in this area would have on areas downstream on
Weller Creek.
Trustee Floron asked V°Fb He,ha if we were just shifting the problem. Herb
stated it would alleviate the problem in this area but that action should also
be taken to improve the flow in Weller Creek.
Two residents in the area, Vern McCain and Steve O'Mara, commented that the
flooding problem has gotten worse and they requested assistance from the
Village.
mr, weoxo then reviewed his memo of November 16, 1989 regarding flooding
concerns in the following areas:
Central Road and wa-Pella
Fairview Gardens
mvrm main Street
Lonnquiat and 8veoe
See-Gwu" and snlr Road
See-Gvmo and Birch
xauen Heights
Wheeling Road and Euclid School
Higgins Creek
McDonald Creek
South Mount Prospect Road
Herb presented estimated costs for some of the projects but stated that other
areas would need to be studied before estimated costs could be obtained. Herb
also recommended that the Village adopt an ordinance that would mandate the
disconnection of all downspouts from the sanitary sewer system.
Following aro comments from the committee and certain ceaiuonto/
Mayor Farley
Regardless of the resources allocated, all the flooding problems will not be
resolved under severe conditions. He would like to be evro we correct the
problem and not merely shift it to another area. He did not want to prioritize
the areas for corrective action, it should be all or nothing. He favored
moving ahead.
Trustee Wattenberg
Stated that he needed more information and questioned how ae,iuvo the problem
actually is.
6
Trustee Arthur '
Itmnk we should do whatever is needed toresolve the flooding problem.
Trustee Floros
/
Therm is nothing more devastating to a homeowner than flooding proulema. It
auunua like a large sum of money but we must be willing to pay for it. l
support the downspout ordinance and think it should be effective immediately.
Trustee Corcoran
I have a problem with spending $900,000 for Cent ral/wa-Poila without knowing
the total cost. He agreed that there should be hefty fines for residents with
illegal connections to the sanitary aewrre.
Trustee Busse
I think we should move .forward. There is nothing worse than worrying about
your house flooding. I favor moving ahead with Central/wu-polla and obtaining
studies for the remaining erooa. `
Trustee Van Geem
"Let's not dally." niect with Central/wa-Pellaunu determine what we need to
mm in other areas.
Jim Stasiek - 402 South Mount Prospect Road
My area was not included in Mr. Weeks' report; is the village going to do
anything for our area? Herb Weeks replied that C"vx County has the responsi-
bility for the mtvon sewers in his area. Mr. 5taoiek was informed that the
Village would encourage county officials to address the problem.
Asked that consideration be given to the Hatlev Heights area. He was informed
that this area was included in Mr. wemxo' report and would ^;nd to be included
in a future study. -
The Board agreed that Public wocue Director should proceed with proposals for
,he design specifications for the Cent ral/Wa-PeIla area and request proposals
for studies in the remaining areas of the Village with flooding problems.
7
V Cable
Because of the lateness of the hour, Mayor Farley asked that this /tmn be
deferred to a future Committee of the Whole meeting.
VI Manager's Report
Nothing to report.
VII Other Business
Trustee Corcoran questioned the necessity for putting the referendum question
regarding a new Public Safety Building on the March primary ballot. He stated
that on needed more information and did not think there was enough time bgh,co
the Ordinance would need to be adopted. He specifically asked thattxe
referendum he deferred until No,omUer. There was a consensus of the Committee
to defer consideration of the referendum question until the November election.
VIII Adjournment
~ There being no further business before the Committee of the Whole, the meeting
was adjourned at 11:25 p.m.
Respectfully Submitted
David C. Jepson
Finance Director
TO: MAYOR GERALD L. FARLEY AND BOARD OF TRUSTEES
FROM: R. A. BACHHUBER, CHAIRMAN, FINANCE COMMISSION
DATE: 7 DECEMBER 1989
SUBJECT: WATER TANK LOCATION
Pursuant to the recent Board directive concerning the future of
the water storage tank now located in downtown Mount Prospect,
the Finance Commission submits the following report.
The Commission thoroughly studied the report of the consultant,
Tank Industry Consultants, plus information supplied by Public
Works Director Herb Weeks, and by unanimous agreement have
determined that it is of significant,
economic advantage for the
tank to remain in its present location and for the Public Works
Department to perform or have performed the maintenance
procedures Indicated in the Consultant's report.
In reaching this conclusion, the Commission spent two meetings
and a number of hours of vigorous discussion covering all the
details involved in this determination.
Respectively submitted,
,Richard A. Bachhaber,
Commissior,t Chairman
Copies to:
Finance Director, Dave Jepson
Members of the Finance Commission
I
Vi! ot-,Aount Prospect --
Mount
oMount Prospect, Illinois
INTEROFFICE MEMORANDUM
TO: MAYOR GERALD L. FARLEY AND BOARD OF TRUSTEES
FROM: VILLAGE MANAGER
DATE: DECEMBER 7, 19$9
SUBJECT: CABLE TELEVISION DIVISION STAFFING
T
!.
I believe that we should place more emphasis on staffing at the appropriate Level so
that program work can be the primary consideration of the Cable Division. Emphasis
in the past has been on equipment and compliance. Some minor upgrading of
component parts are the only equipment needs that are seen at this time.
Reornmendation. I recommend in addition to the Cable Administrator, the part-time
Production Assistant be moved to a full -tune position at a salary of $18,000 per year
(approximately $4,000 more than presently allocated) and that we continue with the
college intern and the public relations intern. In addition, the secretary should be moved
from a part -gime position to a full-time position so that someone is able to answer the'
phones during days when the Administrator and Production Assistant are involved in
filming. It has become apparent to me that it is necessary for two people who have the
cable capabilities to be available if one becomes ill or not available, the other one would
be able to fill in. I believe that the Cable Division should again be encouraged to
explore the feasibility of coordinating use of our cable staff with other governmental
bodies.
I wish to have permission to start the Production Assistant on a full-time basis
commencing as soon as possible so that we would have two people trained to operate
the video equipment.
Attached is a cost breakdown and pay -back schedule for the Cable Division. Please note
that the difference in cost in the 1991 and. 1992 columns would change if the above
recommendations are approved by reducing the excess to $7,780 and $5,595 (or about
$1.0,000 less). And, ending balances would be reduced to $10,480 and $26,095
respectively.
I am pleased to announce that Cheryl Pasalic will be starting as Cable Administrator for
the Village on January 8, 1990. She was instrumental in bringing together the
governmental bodies in. Bensenville in a cooperative effort that has been very well
received by all governmental bodies.
�
JFD/rcw JOHN FUI., DION
C
Beginning Balance
Revenue
Expenditures:
Personal Services (1)
Contrctual Services (1)
Commodities (1)
Capital Equipment (2)
Cable TV Remodeling
Medical Insurance (2)
Pension, FICA, & Insurance
Total Expenditures
Excess <Deficiency> of
Revenues over Expenditures
VILLAGE OF MOUNT PROSPECT
CABLE TELEVISION
STATEMENT OF REVENUES AND EXPENDITURES
FOR THE PERIOD 5/1/83 - 4/30/92
Actual Actual
Actual
Actual
Actual
Actual
1983 1984
1985
1986
1987
1988
$ - $ 6,886
$ 57,791
$ 92,996
$<45,107>
$<35,148>
1,600
1,800
$6,994 $78,740
$116,061
1 124,572
$128,924
$1j5,111
$ $15,379
$ 28,829
$ 50,127
108 4,282
11,279
12,509
F
4,094
9,362
11,797
804
f 24,220
110,205
66,212
1,600
1,800
3,076
5,766
10,025
$ 108 $27,635
$ 81,056
$ 2622675
$6,886 $51,105 $ 35,005 $<138,103>
Ending Balance C Q��Qt af'`ve J 16,886 $57,991 1 92,996 < 45,107
(1) Expenditures for 1991 and 1992 projected to increase 5% annually
(2) Expenditures for 1991 and 1992 projected to increase 10% annually
I ----- eouncil membership lies beem excluded Fo. 1990, 1991, a d 1992-
/)C.7 -t.1 t
Eetrima -dBudget Projected Projected
1989 1990 1991 1992
Qc, etc_; '? 7z'� '� -Ic, 5=-iz7
$<25Z180 , , ,
1.371c;'7
BB $145,000 $150,000 $155,000
(1)
CS} toc
7f;5:J
75c,5c_
$ 51,379
$ 57,845
$--66;-05
;8,48()
8--$-
19,524
21,216
10,518
13,110
$e---
11,720
12,305
12,920
Aa Ilg4
25,268
19,207
23,�"s
7,730
8,500
9,350
C'ca'u
-;z r�.2�
, � 2 r,>2,000
2,200
2,420
,
, 440
1,c�
��
t
�5 c c
10,276
11,569
-43,:x0
x§;63
$118,965
$125,147
991#}
/ r ,5Es-
/ 7, '»�
$ 9,959
$ 9,964
,nc,
<35 148>
$<25,184
<25 184>
4djL
JgZ
->
Jj1b&LQ
J�;;� -
AGENDA
MOUNT PROSPECT RECYCLING COMMISSION
DECEMBER 14, 1989
Conference Room B, Public Works Facility
1700 West Central Road
7:30 PM
I. CALL TO ORDER
II. ROLL CALL
III. APPROVAL OF MINUTES NOVEMBER 7, 1989 MEETING
IV. OLD BUSINESS
A. BFI Contract Amendment
B. Multi -Family Units
C. Plastics
D. Bins in Public Buildings
E. Response from Local Newspaper Publisher(s)
V. NEW BUSINESS
A. Christmas Tree Recycling
B. Large Appliance(s) Disposal
C. Collection of Recyclables en masse, ie, Wheeling program
D. Mt. Prospect Chamber of Commerce Expo
E. Household Hazardous Materials
VI. NEXT MEETING
MOUNT PROSPECT RECYCLING COMMISSION
November 7, 1989 Meeting MInutes
PRESENT: Dick Bachhuber, Elizabeth Herbert, Paul Hoefert, Joe Kubik,
George Luteri, Steve P61it,,Ken Westlake, and Mary Winkler.
Glen Andler and Lisa Angell, Public Works Staff
Ron Otto, Mount Prospect resident
Eileen Berg, student
ABSENT: Brian Robertson
The meeting was called to order at 7:35 PM, at which time Chairman
Westlake called for approval of the October Meeting Minutes. As there
was some question as to whether the Commission had formally addressed
and supported the proposed transfer site for leaves and recyclables at
Melas Park, the following revision was made to the minutes: The
Recycling Commission unanimously supported the proposed method for the
collection and disposal of grass clippings, leaves and brush. However,
the proposed transfer site was only discussed rather than formally
acted upon. Following this clarification the minutes were approved.
The following topics were discussed under Old Business:
I. Yard Material
Glen Andler presented a rough draft of a memo to be presented to
the'Village Board of Trustees at the November 14, Committee of the
Whole Meeting. The memo outlined the Commissions recommendations
for the collection and disposal of yard materials. Although the
Commission supported the recommendations at the October 26
meeting a few of the Commission members had questions and
concerns regarding specifics of the program.
1) Dick Bachhuber questioned the price of the bag. Mr. Andler
reviewed itemized cost of the bag with the Commission. Members
again gave support for the proposed cost. Further points of the
bag system were highlighted:
a) Northbrook and Rolling Meadows both have successful bag
systems. (Northbrook, leaves only; Rolling Meadows, garbage)
b) The bags are treated for moisture and have been demonstrated
to be durable under wet conditions.
c) Research has proven degradability of bag occurs within a 5-6
week period.
2) George Luteri questioned various cost figures shown on the work
sheets. Again, cost figures were reviewed, corrected and
clarified, as needed. one factor emphasized regarding the cost
of the bag was; the critical issue of the program is to discourage
homeowners from bagging their grass clippings. Therefore the cost
should be an incentive for non -bagging.
3) Chairman Westlake asked about landscape materials from
multi -family units. Mr. Luteri stated most multi -family units
contracted for landscape service. If a multi -family unit does
not have landscape service and they have been utilizing dumpsters
for yard material disposal they will be subject to purchasing
Village bags, according to Mr. Westlake. Mr. Andler stated he
would check with BFI on this issue. He also stated an ordinance
would need to be adopted to prevent landscapers dumping into on-
site dumpsters.
4) Mr. Andler mentioned although brush collection would be assessed
for each household it is feasible a user cost similar to the
grass clippings bag system could be implemented. However, for
this contract the collection and disposal of brush would be a
flat fee. He reassured the Commission, homeowners would be
given written instructions regarding the collection of brush.
5) A few Commission members questioned whether all the work sheet
attachments should be submitted to the Board. Following'a brief
discussion the Commission voted to leave all attachments with
the proposal document.
II. Transfer Site
In response to the proposed transfer site the following questions
were raised:
1) Dick Bachhuber'stated it was his understanding Arlington
Heights had requested land space at'Melas. Mr. Andler
responded that Arlington Heights request would probably be
dropped and that Mount Prospect has a 20 year lease with the
Metropolitan Wate Reclamation District for Melas Park.
2) Steve Polit questioned whether any residents in the area
ever complained about leaves being dropped at the site.
Mr. Andler stated there had never been any complaints made
to Public 'Works."
3 ) George Luteri suggested the transfer site be used for
collection of plastics. He also mentioned a new recycling
center is going up on South Mt. Propsect Road and Touhy.
Chairman Westlake then called for a motion to approve, for
recommendation to the Board of Trustees, the `proposed 'transfer site for
leaves and recyclables. The motion was made, seconded and unanimously
accepted by Commission members. Chairman Westlake will summarize the
Commission's recommendations at the november 14 Committee of the Whole
Meeting.
Mr. Ron Otto, resident, stated he felt the Commission needed to make a
stronger opening statement to the Board in support of; leaving grass
clippings on the lawn and/or backyard composting. The Commission
agreed with Mr. Otto and the opening statement sball be reworded as
such.
Steve Polit suggested having an art contest for decorating the bag but
it was determined the Village logo should be used.
New Business
I. Education Video
Karen Giet's,'Cable Administrator, resignation from the Village,
will delay production of the recycling video. Since it is
questionable when work on the video will resume a letter will be
written to the schools explaining the situation. To encourage
school involvement though, the schools will be offered recycling
bins and curbside collection.
II. Recycled Paper
The Public Works Department and the Manager's office have ordered
recycled letterhead paper and business 'cards.
III. Recycled Products
Glen Andler informed the Commission the Public Works Department
purchases recycled toilet paper and paper towels.
Although there were additional topics mentioned, due to the time all
other recycling issues were postponed until next month's meeting.
In consideration of the holidays the Commission agreed to meet
Thursday, December 14, 7:30 PM at the Public works Building. The
meeting was adjourned at 9:55 PM.
Respectfully submitted
M. Lisa Angell
FINANCE COMMISSION
Minutes of the Meeting
November 30, 1989
The meeting was called to order at 7;30 p.m. Commission members in attendance
were Richard 8achxuber, Paul Davies, 3o»^ Engel, Vince Gruchocineki, Newt
Hallman, Jim Morrison, John M"aear" Tom Pokroo and Ann Smila"ic. Also present
were Finance Director David Jepson and Assistant Finance Director Carol Widmer.
D The minutes of the November 9, 1989 meeting were accepted as presented.
III Mr. Bachhubor began the discussion of the elevated tank rehabilitation by stating
that the Commission had two responsibilities regarding the storage tank question.
The first was to make a recommendation to the Village Board as to whether the
present tank should be repaired and brought into compliance with today's
standards or torn down and a new tank erected. The second recommendation was
whether the Commission feels the Village should enter into negotiations with the
Nater Reclamation District to purchase additional land at Neluo Perk for future
use.
The members of the Finance Commission carefully reviewed Herb wenxo' November 13,
1989 memo regarding Tank Industry Consultants report on the condition of the
present water tank and all of the recommended maintenance and improvement to the
tank. After considerable discussion by Commission members m motion was presented
by John Engel to the effect that it was not economically feasible to replace the
tank at this time and that the Village should follow the recommendations of the
Tank Industry Consultants. The motion was seconded by Ann Smilam1c and passed
unanimously. The Commission asked that Public Works Director Herb wovkm attend
the next meeting scheduled for January 4, 1990 and present the plans to implement
the recommended repairs and rehabilitation to the present tank.
The Commission then considered the topic of additional land acquisition at molms
lY The next topic on the agenda was purchasing policies and procedures. Mr. Jepson
gave some background on the Village's current system. It is o decentralized
system with each department responsible for their own budget and purchasing.
Current Village policy requires that each purchase order must be signed by the
Department Director and the Finance Director. Purchase orders for $500 or more
require the Village Manager's signature also. Purchases for items over $4°000
require o formal bid process unless waived by the Village Board, The purpose of
the new manual, "Village of Mount Prospect Purchasing Policies and Procedures,"
is to provide guidelines and procedures for the departments to follow. The
Finance Commission members made several recommendations they felt would
strengthen and improve the proposed policy including changing the amount
requiring the Village Manager's signature from $500 to $1 000. Also, it was
suggested that instead of requiring formal bids at $4,000 we include a statement
that we will conform to the state statute. This will raise the requirement to
$5°000 and change if and when state statutes are amended. Mc. Morrison suggested
we add a conflict of interest statement. Mr, Jepson said he would incorporate
all of the suggestions and present a revised policy and procedure manual at the
January meeting.
Mr. Jepson next presented a table of comparative information for 1988 on the 28
members of the Solid Waste Agency which was obtained from an Official Statement
of the Solid Waste Agonoy, Mr. Jepson pointed out that the fiscal policy of the
Village has been to maintain a General Fund balance of approximately 15"0' of
expenditures for working cash and cuntiogencien. Only nix communities have a
lower percent of pv^d balance to expenditures. Also noted were expenditures per
capita and general obligation debt per capita. In Momdy'a the average general
obligation debt per capita is $453 and the Village of mount Prospect's is $193.
For each comparison, the Finance Commission members concurred that the informa-
tion highlights the Village's conservative fiscal policy.
VI The 1989 Tax Levy Ordinance was briefly discussed. The 1989 tax rate was
expected to come down from $1.08 in 1968 to $.956 in 1989.
The meeting was adjourned at 10:30 p.m.