Loading...
HomeMy WebLinkAbout9.3 Motion to accept proposal for the McDonald Creek Streambank Stabilization Study for an amount not to exceed $65,430.00.Mr�GauC �'d'+rt;�iect Item Cover Page Subject Motion to accept proposal for the McDonald Creek Streambank Stabilization Study for. amount not• exceed $65,430.00. Meeting January 18, 2022 - REGULAR MEETING OF THE MOUNT PROSPECT VILLAGE BOARD - Fiscal Impact true Dollar Amount $65,430.00 Budget Source Flood Control and Construction Fund Category VILLAGE MANAGER'S REPORT Type Action Item • A key component of the Mount Prospect Strategic Plan is to improve the Village's infrastructure. Erosion is occurring along the banks of McDonald Creek and the Village is interested in developing a study that will document the existing conditions of the creek and will recommend measures to restore and stabilize the banks and minimize future erosion. For the purposes of this study McDonald Creek will be divided into six reaches, and one reach of Feehanville Ditch will be considered. Four reaches will be included in the Base Study and the Village will consider inclusion of three Alternate Study reaches upon review of the proposals. The reaches are described below: Base Study Reach : From the south side of Kensington Rd to the east side of Burning Bush Ln (1,660') Reach : From the east side of Burning Bush Rd to the east side of the CN Railroad tracks (1,450") Reach : From the east side of the CN Railroad tracks to the east side of Wolf Rd (1,880') Reach : From the east side of Wolf Rd to the Village limits for McDonald Creek 1 and Tributary B (3,120') Total Length Approximately 8,110' Alternate Study Reach : Tributary A from the south side of Camp McDonald Rd to the east side of Schoenbeck Rd (1,360) Reach : From the east side of River Rd to the south side of Kensington Rd (1,500 in unincorporated Wheeling Township) Reach 7: Feehanville Ditch from west side of River Road to west side of Lee Street (440' in unincorporated Wheeling Township) Total Length Approximately 3,300' A Request for Technical and Cost Proposals was posted on the Demandstar website. Nine (9) consulting engineering firms responded and submitted Technical and Cost Proposals. Each firm was asked to submit as part of their proposal the following information: 1. Name, address and brief history of firm 2. Resumes of key personnel 3. Related experience on similar type projects 4. Summary of the firm's approach to the project and project schedule 5. Staff hour estimate and cost proposal for major phases of work Tasks that are identified to be performed include: 1. Erosion Assessment to identify locations and extent of existing erosion and identify contributing causes and factors. 2. Plan Development to evaluate, recommend and prioritize bank stabilization alternatives to mitigate the erosion and develop a public involvement plan. 3. Implementation and Funding Plan that will develop an estimate of cost for each reach including maintenance costs, identify various funding opportunities and permitting requirements, research existing property ownership and easements and identify construction accessibility locations for each reach. 4. Delliverables include a Preliminary Study Report and Final Study Report. RFP It The consulting firms' Technical and Cost Proposals were reviewed on the basis of 2 their understanding of our goals and their methodology of the study. They were rated (with a maximum score of 100 points) according to these specific categories: company background, experience, scope of work, schedule, work effort and proposal content. The rankings are: Technical Proposals Score Firm Background Experience Scope Schedule Work Content Total 95.5 342 $46,490.00 $135.93 481 Effort Maximum Points 20 20 25 15 10 10 100 Hey & Associates 19.5 19.5 23.5 14 9 10 95.5 Ciorba Group 19 18 22.5 14.5 8 8.5 90.5 Terra Engineering 18.5 18 23.5 14 8 8.5 90.5 Christopher Burke 18.5 19 19 15 6.5 8 86 Eng ESI Consulting 77.5 540 Strand Associates 16 18.5 22 14 7 8.5 86 ESI Consulting 15 16 17.5 14 7.5 7.5 77.5 V3 17 15 16 14 7 6 75 GSG Consultants 16 15 16 14 7 7 75 Baxter & 15 14 14 14 9 6 72 Woodman Cost Comparison Base Base Work Base Base + Base + Base + Work Work Alternate Alternate Alternate Firm Score Hours Total Cost Cost/Hour Hours Hey & 95.5 342 $46,490.00 $135.93 481 Associates Ciorba 90.5 439 $81,699.60 $186.10 610 Group Terra 90.5 604 $1,393.00 $134.76 830 Engineering CBBEL 86 114 $20,532.00 $180.11 135 Strand 86 645 $91,200.00 $141.40 1,002 Associates ESI Consulting 77.5 540 $74,387.40 $137.75 771 V3 75 232 $29,380.00 $126.63 360 GSG Consultants 75 1,038 $130,300.00$125.53 1,604 Baxter & 72 319 $30,645.00 $96.07 458 Woodman Total Cost Cost/Hour $65,430.00 $136.03 $112,521.66$184.46 $111,893.00$134.81 $23,862.00 $176.76 $143,900.00$143.61 $103,484.24 $134.22 $46,150.00 $128.19 $199,855.00$124.60 $40,500.00 $88.43 KI Following staff review and ranking of the proposals, the top 3 consultants were interviewed. Hey and Associates, Inc. has put together a very strong project team with experience in studies, and design and construction engineering for numerous stream bank stabilization projects and stood out as the preferred consultant. They have very experienced professional engineers, ecologists, environmental scientists, and landscape architects committed to work on this study that have a thorough understanding of the project coordination, communication and documentation needs to successfully accomplish the project within the proposed schedule. Hey and Associates, Inc. recently completed a "Streambank Stabilization Guidebook" for the DuPage County Stormwater Management Department that serves as a standard for the County's projects. In addition, Hey and Associates has successfully completed planning, design and construction engineering for multiple projects within the Northeast Illinois region with references from those communities that they performed well and the projects are functioning as the communities envisioned. In addition, Hey and Associates has ample experience developing streambank stabilization projects with key area stakeholders including the Metropolitan Water Reclamation District of Greater Chicago, the Illinois Department of Natural Resources, and the U.S. Army Corps of Engineers. It is staff's opinion that Hey and Associates, Inc. will provide the best product at an appropriate number of hours dedicated to the study. Cost proposals were provided for the base study which included sections of McDonald Creek within the Village's boundary. In addition, cost proposals were requested and received for sections of McDonald Creek and Feehanville Ditch that are located outside of the Village's boundaries, but within areas that may be under consideration for annexation in the future. It was staff's intent that with favorable costs, analysis of these creek sections could be accomplished in conjunction with this study and this information would be useful to have available for any future annexation discussions. It is staff's opinion that the additional costs are reasonable and that the Alternate Study be included at this time. Alternatives 1. Accept proposal from Hey and Associates for the McDonald Creek Streambank Stabilization Study. 2. Action at the discretion of the Village Board. 4 Staff Recommendation Staff recommends that the Village Board accept the proposal submitted by Hey and Associations for the McDonald Creek Streambank Stabilization Study for an amount not to exceed $65,430.00. ATTACHMENTS: RFP. pdf Hey and Associates -Cost. pdf Hey and Associates-Technical.pdf Location_Map.pdf 5 MAYOR Paul Wm. Hoefert TRUSTEES Agostino S. Filippone Terri Gens John J. Matuszak Peggy Pissarreck Richard F. Rogers Colleen E. Saccotelli VILLAGE MANAGER Michael J. Cassady DIRECTOR OF PUBLIC WORKS Sean Dorsey Village of Mount Prospect Public Works 1700 W. Central Road, Mount Prospect, Illinois 60056 Request for Proposals Delivered Via E -Mail DATE: October 28, 2021 FROM: Jeff Wulbecker, Village Engineer Village of Mount Prospect Public Works Department RE: Request for Proposals McDonald Creek Bank Stabilization Study Phone: 847/870-5640 Fax: 847/253-9377 www.mountprospect.org Your firm is invited to submit a Technical Proposal and Cost Proposal to become eligible for a possible interview for engineering services for the McDonald Creek Bank Stabilization Study. Attached to this memo are: 1. A list of materials and information that should be included with your Technical Proposal and Cost Proposal (Exhibit A). 2. A general definition of the scope of work and a schedule of dates and requirements for the selection process (Exhibit B). A map identifying the project location/limits (Exhibit C). The Village of Mount Prospect appreciates your interest in this project. Any questions regarding this Request for Proposals can be directed to Jeff Wulbecker, Village Engineer with the Village of Mount Prospect, by phone at 847-870-5640 or email atv+1�rrra,uMrrcliagptAgwr�;. A cover letter along with a Technical Proposal and Cost Proposal (two hard copies and one electronic copy) should be forwarded to the following address and received no later than 5:00 p.m. on November 17, 2021. The Technical Proposal and Cost Proposal are to be submitted in separate, sealed packages clearly marked Technical Proposal for the Village of Mount Prospect McDonald Creek Bank Stabilization Study and Cost Proposal for the Village of Mount Prospect McDonald Creek Bank Stabilization Study. Mr. Jeff Wulbecker Village Engineer Village of Mount Prospect 1700 W. Central Road Mount Prospect, Illinois 60056 1J Village of Mount Prospect Public Works Department I Page 2 Exhibit A Requirements for Technical and Cost Proposal Agency: Village of Mount Prospect Project: McDonald Creek Bank Stabilization Study Location: Portions of McDonald Creek including portions of Tributaries A & B Your Technical Proposal and Cost Proposal should include the following information: 1. Name, address and brief history of firm. 2. Organizational chart and resumes of key personnel to be assigned to this project. 3. Related experience during the last five (5) years. 4. Description of process to accomplish the required tasks of the project. This should include: a. An understanding of the project. b. Objectives to be met as part of the project. c. Your approach to completing the project.. d. The projected number of hours to complete the project broken down by task and personnel. e. A project schedule. 5. A separate complete cost proposal broken down by task as described in the General Scope of Work. 7 Village of Mount Prospect Public Works Department I Page 3 Exhibit B General Scope of Work Agency: Village of Mount Prospect Project: McDonald Creek Bank Stabilization Study Location: Portions of McDonald Creek including portions of Tributaries A & B Erosion is occurring along the banks of McDonald Creek and the Village is interested in developing a study that will document the existing conditions of the creek and will recommend measures to restore and stabilize the banks and minimize future erosion. For the purposes of this study McDonald Creek will be divided into six reaches. Four reaches will be included in the Base Study and the Village will consider inclusion of three Alternate Study reaches upon review of the proposals. The reaches are shown in Exhibit C and described below: Base Study Reach 1: From the south side of Kensington Rd to the east side of Burning Bush Ln (1,660') Reach 2: From the east side of Burning Bush Rd to the east side of the CN Railroad tracks (1,450") Reach 3: From the east side of the CN Railroad tracks to the east side of Wolf Rd (1,880') Reach 4: From the east side of Wolf Rd to the Village limits for McDonald Creek and Tributary B (3,120') Total Length Approximately 8,110' Alternate Stud Reach 5: Tributary A from the south side of Camp McDonald Rd to the east side of Schoenbeck Rd (1,360) Reach 6: From the east side of River Rd to the south side of Kensington Rd (1,500) Reach 7: Feehanville Ditch from west side of River Road to west side of Lee Street (440') Total Length Approximately 3,300' At a minimum, the following tasks shall be included in the scope of services. The Village will consider additional tasks at the consultant's recommendation. Coordinate a Project Kick-off Meeting with Village Staff 1. Erosion Assessment a. Identify locations and extent of existing erosion b. Evaluate the erosion/sedimentation condition of structures (culverts/bridges) within each reach c. Identify causes and factors contributing to erosion d. Identify the location and condition of all storm sewer structures, outlet pipes and private sump pump discharges within the creek Plan Development a. Evaluate bank stabilization alternatives to mitigate the erosion b. Recommended streambank stabilization plan for each reach. It is understood that the study may include different approaches for the individual reaches, but each must be compatible with the adjacent approaches. Prioritization of stabilization projects Village of Mount Prospect Public Works Department I Page 4 d. Public Involvement plan 3. Implementation and Funding Plan a. Estimate of Cost (including design, construction and construction engineering) for every reach stabilization plan for the Base Study. Provide a separate cost for the Alternate Study. Analysis, recommendations and estimates of cost must be provided for each individual reach to facilitate the ability to stage the improvements over a multi-year program. b. Anticipated maintenance costs for each recommended stabilization plan c. Funding opportunities d. Required permits for recommended plan e. Perform jurisdictional determination researching easements and property ownership f. Identify Construction accessibility locations for each reach 4. Deliverables: a. Submit Preliminary Study to Village Staff b. Submit Final Study to Village Staff Task Deadline Submit Technical and Cost Proposals ................ .... November 17, 2021 .. .... Select consultants for interview November 22, 2021 _. W ..... Select consultant and negotiate contract November 29, 2021 ..... m..... Award contract to consultant ............ ........ December 7, 2021 .............. Kick -Off Meeting ............ _ December 20, 2021 ...... .......... Submit preliminary study to Village Staff May 31, 2022 Submit final study to Village Staff June 30, 2022 9 Village of Mount Prospect Public Works Department I Page 5 Exhibit C Project Location/Limits Map Agency: Village of Mount Prospect Project: McDonald Creek Bank Stabilization Study Location: Portions of McDonald Creek including portions of Tributaries A & B 10 Cost Proposal IIE;;,; I III IN IIE;;;,; IIE;;;,; IIIA III INGIIE;;;,; III III IIE;;;,, ...... II IC; IIS III,,,, 113A IN IIK S rA IIEIII III,,,, III "nI IIS s"'rIIE THE VILLAGE OF MOUN IF P R ,S P IFC IF He a-nd Associates, Inc. 26575 W. Commerce Drive, Suite 601 Volo, Illinois 60073 847-740-0888 IM 1111f1Pal ::P1, I Juvr:„jrjflb�,r 17, 2021 11 , / 21 Alli'; 11 Iley an d.A ss o cia tes, In c. Cost Estimate of Engineering Services Engineering, Ecology and Landscape Architecture A full breakdown of our costs by task and personnel is provided on the following page. VIII 11 AGIIii C1111i: VOU,J IVOIDOI�AII 1) CIRI::I::IK 1:1AINIK "!S AIIIIII 1"!:'A I 1l d', , I UIDY 12 O f '" O O O O ONi n O O W o o N Orvi M O rl O O O O N y a x O O N O V1 O V1 O N O � O N 0 V1 0 0 0 0 0 o a 0 oo N a n o o w n m 0 o r o N (/M in d 1. c m n rn w m �o N zn o o F = Z w _ 3 o u m 0 I ry u N v d i V •m wl � a Y 6 O. C N a` O O O IO O O O 3 D D N 3 v 15 0 a o E ou 0 o o 04 no o a o O o N — a > o .. a o. E E $ a m.1 ci o uN ct k29 H Technical Proposal IIE.:..INGIII IN ING .............. 11MCIE)OINA11 E.) C IIIA 113A IN IIK S rA 113 11 III ZA"noIIS s ruiiE)y R)R1 ME THE VILLAGE OF IMOUN IF PREC IF SUB&IITTED B I,," Heandassociates, .Inc. Y 26575 W. Commerce Drive, Suite 601 Volo, Illinois 60073 847-740-0888 C , I i ca I vlilvaa e I 171 2021 14 Hey and Associates, Inc. Engineering, Ecology and I...andscape Architecture 26979 W. ( omm a Rci" DrRr6Is, SUrr:r 601 i4RL WAUKE , &¢ 15COINSIN Vora, Crrzlt ois 60073 CHICAGO, Jr r,INOTS PrioNr; (847) 740-0888 November 17, 2021 Mr. Jeff Wulbecker Village Engineer Village of Mount Prospect 1700 W. Central Road Mount Prospect, Illinois 60056 Re: Request for Proposals for Engineering Services—McDonald Creek Bank Stabilization Study Dear Mr. Wulbecker, Hey and Associates, Inc. (Hey) is pleased to submit our proposal to provide engineering services for the McDonald Creek Bank Stabilization Study. Stream restoration projects of this type are one of our firm's specialties and our multi -disciplinary staff will bring a range of applicable skills and experience to your project. Several very recent or ongoing projects of particular relevance to this work include: • We recently completed a "Streambank Stabilization Guidebook" for the DuPage County Stormwater Management Department. This guidebook was developed to assist property owners to plan and permit streambank stabilization projects and includes guidance on the best stabilization techniques for our region. It can be found here: htti)s://www.dupapeco.org/EDP/Stormwater Management/1163/ • We are currently working for the MWRDGC to complete the final construction documents for the Addison Creek Channel Improvement Project. This major stream stabilization and flood control project includes almost two miles of channel improvements using a variety of stabilization techniques. • In November and December, our field staff will be working with the DuPage River Salt Creek Workgroup to complete streambank assessments for waterways in the Upper Salt Creek Watershed as part of the water resources inventory for the preparation of the Upper Salt Creek Watershed Based Plan. We sincerely look forward to an opportunity to work with the Village of Mount Prospect. Please do not hesitate to contact me if you require any additional information (jwickenkamp@heyassoc.com, 773-693-9200). Sincerely, Jeff Wickenkamp, P.E., CFM Vice President N��b" I'ir.Is,���:: lr� 1:1. 0413 15 .ffey and.Associates,.Inc. Engineering, Ecology and Landscape Architecture TABLE OF CONTENTS COVER LETTER TABLEOF CONTENTS........................................................................... i FIRM INFORMATION..........................................................................1 PROJECTTEAM................................................................................... 2 FIRM EXPERIENCE...............................................................................3 PROJECT UNDERSTANDING AND APPROACH.....................................5 UNDERSTANDING.................................................................. 5 OBJECTIVES............................................................................ 7 APPROACH............................................................................. 8 SCHEDULE............................................................................10 LEVEL OF EFFORT (HOURS)...............................................................11 APPENDIX A RESUMES APPENDIX B REPRESENTATIVE PROJECTS ('�IIIAI II wlll° 4' ,JII IR'`lGIA V111 V_A IE (Dill IVO IIA III1I3Q' S1::1ll,CI IVC111A INAII I d ��If�), l Il" I;3AI11 11, S I ABIll I ZAI101'J S'I U II)Y 1 16 ey and.Associates,.Inc. Engineering, Ecology and Landscape Architecture Corporate Office (Headquarters) 26575 W Commerce Drive, Suite 601 Volo, Illinois 60073 (p) 847-740-0888 (f) 847-740-2888 Chicago Office (Branch) 8755 W Higgins Road, Suite 835 Chicago, Illinois 60631 (p)773-693-9200 (f) 847-740-2888 Principals President Thomas L. Polzin, P.E., CFM, CPESC Vice President/Secretary Vincent J. Mosca Vice President/Treasurer Jeffrey A. Wickenkamp, P.E.,CFM IFEIN 36-4183789 Firm Information ABOUT THEY AILD ASSOCIINFE,S, IINC. Hey is a professional engineering, ecological consulting, and landscape architecture firm founded in 1976 to deliver comprehensive solutions to complex water resources and natural resources challenges. Over the last 40 years, the firm has grown to offer a full range of professional services. Hey's multi -disciplinary staff of engineers, scientists, landscape architects and support staff collaborate to identify opportunities, design creative solutions, and implement projects that are grounded in the fundamental principles of water resources, environmental science, and sustainability. Regulatory requirements, constructability, cost effectiveness, and long-term management requirements are thoughtfully considered for all projects to ensure we meet our clients' expectations. ENGIIHEERIING Our talented engineers are trained in traditional civil, ecological, and water resources engineering. Experienced in planning and designing stormwater management and flood control projects, green infrastructure, streambank and shoreline projects, conveyance improvements, site improvements, and utilities, Hey's engineering staff provides civil engineering services for institutional, public, and private sectors. IECOII..OGY Staff ecologists and environmental scientists have an excellent working knowledge of the wetland and water quality regulations of the federal, state and local governments and are some of the most experienced practitioners in the Midwest. They continually strive to be at the forefront of ecological restoration principles in order to deliver superior results. We work closely with our clients to identify restoration goals, and then tailor restoration plans to meet specific site opportunities, constraints, budgets, and schedules. II..ANIDSCAPE AIRCIHI'IFECTURE Parks and recreation, green infrastructure and resilient design, streetscapes and transportation, habitat restoration, and hardscape and landscape design are specialties of Hey's landscape architects. We address our clients' diverse needs throughout the analysis, planning, design, implementation, and maintenance stages of each project to create unique and consistently successful design solutions that are comprehensive, cost-effective, and environmentally sound. SIPECIAI.:'I"y AILD SDPIPOIR"I' SEIRVICES Additional specialty staff round out our team. These specialty departments include surveying, lakes management, erosion and sediment control planning, GIS, drain file services, and CAD. PRIEQUAII..IFICA-TIONS Hey is prequalified by the Illinois Department of Transportation in the following categories: Roads and Streets, Location Drainage Studies, Waterways Typical, Waterways Complex, Pump Stations, Landscape Architecture, and Construction Inspection. Other prequalifications include the City of Chicago, Cook County, DuPage County, KCDOT, WisDOT, and the Illinois State Toll Highway Authority. 114011IIAI II 131111114' 11 13 V ICI:S V 111 L AG 1: 011111 IV0lr.iA �5N✓b'CT ry.)ONAJR f ,AIN ` N1Imm !P v .. 0 Nd 1 .. I..d .,J' 17 ey and.Associates,.Inc. Engineering, Ecology and Landscape Architecture OIRGAINIIZA11-1101MAII.., CIl Project Team The following is our proposed organizational structure for key personnel for this project. Our team has tremendous breadth of experience working on projects to plan and design streams and riparian corridor restoration projects. Appendix A contains brief resumes for each of our key personnel that further highlight our individual experience. The assigned staff will all be available and have the capacity to complete this work in timeframe presented in the project schedule. ENGINEERING AND LANDSCAPE A110-iITECTLIRE Kirsten James, PE Civil Engineer III Patrick Lach, PE, CFM Senior Civil Engineer Tim Pollowy, PLA, ASLA Senior Landscape Architect \V PROJECT PRINCIPAL Jeff Wickenkamp, PE, CFM PROJECT MANAGER Dave Kraft, PE, CFM ENVIRONMENTAL SCIENCE AND ECOLOGY Wyatt Nusser Environmental Scientist III Steve Rauch, CWS Environmental Services Manager 111140III1jI II 131111°144' ,JII 13VIC11i S VI11 LA nll;,': t311 13"3 t:"I,.IIA I II11Q' S1::1l11: C f Mc"1INDIAA11 1) d F),E1:: 11" I;3A11 ll< S I AV',',`JIll ""A 1101'J S'f l..l I`tA I 18 .ffey and.Associates,.Inc. Engineering, Ecology and Landscape Architecture Il IFxIPIFIRIIIFIl Firm Experience Our experience and expertise makes us well-suited to assist the Village to complete a study that characterizes the existing conditions of waterways within the Village and to prepare a plan to prioritize permittable, cost-effective, and sustainable design solution to address the erosion problems and promote long-term sustainability and stability. Our project team, outlined in in previous section, includes our skilled ecological staff members. Our team will be led by project manager Dave Kraft and assisted by our Senior Landscape Architect, Tim Pollowy. This spring, Dave and Tim were the keynote speakers at The Conservation Foundation's annual Beyond the Basics Seminar focused on advanced stormwater management and water resources issues. They presented on modern waterway restoration in the face of urbanization and climate change. Many of these same issues will be key to best addressing this project, and they will lead our team founded on the expertise that allowed them to be regionally leading voices on this subject. Design & Pen ttimg Project Guidance for DuPage County Residents, Businesses &Stakeholders Hey very recently assisted DuPage County to develop a manual (clickable link: "Streambank Stabilization Guidebook") aimed at assisting residents and local municipalities with stream restoration and stabilization. This guidebook has just been published by the County on their Stormwater Management documents page. Some of the guidebook highlights relevant to the Mounty Prospect study include: • Problem identification and erosion assessment • Stabilization solutions including design applicability flowchart • Permitting requirements • Construction considerations • Typical construction costs • Maintenance and monitoring considerations The same key personnel who used their expertise to prepare this guidebook for DuPage County will be assigned to the Mount Prospect project. Over the last few weeks, our field staff has been working with the DuPage River Salt Creek Workgroup to complete streambank assessments for waterways in the Upper Salt Creek Watershed as part of the water resources inventory for the preparation of the Upper Salt Creek Watershed Based Plan. Our staff have been using a GPS collector application to identify, document and geolocate the field observations. This same technology will be used for the field assessments along Mount Prospect waterways and can ultimately be imported into the Village's GIS system. Additional information on many other relevant projects follows. Hey staff using collector application to document and geolocate field conditions. :I111140IIIAI II IWMI°AG,)II R'u'lGlAs'IIIV_AGIIE Cill IVO IIAIII`I3Q' SI::1l11:Cl 19 ��r��� ����� �~����~~��~~~~��__���~�~ Engineering, Ecology and Landscape Architecture Firm � `- Experience r The table below highlights key project components we feel will be critical to the success of this project, along with a substantial list of recent and ongoing Hey projects that demonstrate our depth of experience in these key areas. Appendix Bcontains more details on all of these projects, including project references. ENG|0Eii: R|NGSERVI[ES--VlLLAGEOFK8OUNTPROSPE[T�WC0DW�LD�REEK��0����0�AT��N8TUDY 20 .ffey and.Associates,.Inc. Engineering, Ecology and Landscape Architecture Ul IN ID IE IRs"rAIM IDII IN G Erosion is occurring along the banks of McDonald Creek and the Village is interested in developing a study that will document the existing conditions of the creek and will recommend measures to restore and stabilize the banks and minimize future erosion. Urban streams throughout northeastern Illinois share many of the same characteristics of McDonald Creek including being straightened, confined behind or within residential areas, adjacent to private property infrastructure, and overrun by unmanageable vegetation. Improving urban streams requires an understanding of what the best possible 1938 Aerial Photography for Base Study Area (Reaches 1-4) outcome of these projects can be. The hydrology of our landscape is so altered that restoring a stream to its pre -settlement condition is no longer feasible. Proposed stream configurations must be based on an understanding of how the landscape has been altered and how the stream can be "restored" to a healthy condition. Understanding the history of a waterway over the last 100 years can often help inform stream improvement studies. Historical aerial photography (shown on this page) reveals that much of the base study area had already been straightened by 1938. The predominant land use at that time was agricultural. Since that time, the land uses along McDonald Creek in the base study area (total length of 8,110 feet) have changed to an interesting mix of public and privately controlled lands. Project Understanding and Approach Some notable attributes of each reach are described below. Reach 1: This reach includes private properties such as single family homes and the McDonald Creek Condominiums along its north/northeast bank, while the south bank is characterized by the Mount Prospect Fire Department and the Prairie Trails School. The first 400 feet is an open channel with turf or slightly vegetated side slopes, while the remainder of the slopes and banks in this reach are wooded. Construction access through this reach would not be difficult if the River Trails School District 26 is a willing project partner. Private lot lines extend into the channel, so coordination would also be needed with adjacent private landowners. We generally recommend obtaining permanent easements along the stream corridor to allow for future operations, maintenance and monitoring of the constructed projects. Reach 2: This reach has wooded banks and is lined by private properties on both sides of the channel. This is a common configuration along urban streams in northeastern Illinois and project construction in these areas is often the most difficult construct due to limited access and regulatory requirements such as in -stream work plans. Access issues exist not only for construction, but future maintenance responsibilities are also important considerations. The time and expense to obtain easements also cannot be underestimated. (Our Addison Creek project with MWRD has included coordination of acquisitions, temporary or permanent easements on over 200 properties.) In addition, it is important to note what improvements (i.e. sheds, patios, etc.) have been made to the lots at or near the top of the channel banks in order to help identify and fine-tune potential stabilization options and treatments. 114 01111 NJ I II 113 II I11ll 4' 11 13VI CI: S V 111 LAG 1:011111 IV 0l'yII �II '�m CT ry a D N I f I OYii.�i 'q �5�,,.N✓b'„W,.. N�uF4 .�N,,,,,,N1�J'�+,�'�. LL„V ,����` , N1LL„ �P v,�... ��,f Nd 1�.. M..d .,J' 5 21 ey an d.A ss o cia tes, In c. Project Understanding and Approach Engineering, Ecology and Landscape Architecture Reach 3 Aerial Oblique from Cook County GIS viewer. Reach 3: This reach is primarily involves three parcels, the railroad crossing, a ComEd transmission corridor and an online pond or wetland owned by the Brentwood homeowners association. We will plan to avoid railroad access issues by viewing this property from either side. The ComEd property has an in -channel structure that has been breached around its west side. This structure does not appear to be shown currently in the FEMA Flood Insurance Study (FIS) or MWRD's Lower Des Plaines River Detailed Watershed Plan and it is not known at this time what the intent of the structure was when originally constructed. Part of the project will include research and documentation of this structure to the extent practicable. Finally the online pond or water body on the HOA property shows signs of sedimentation. This is typical of an online pond since it tends to accumulate sediment over time. The pond is over 20 years old. Reviewing historical records on the history and intent behind this pond as well as contacting the HOA regarding their current management strategy for the pond will help to define future efforts and responsibilities for this area. Reach 3 online pond on Brentwood HOA property. 11,4011"J II 3111°,JG ,JII 13VIC11i S VIII V AGIIIC t1II IVOr4 1°vII I li` I30' b II: T MCINDINA11 ) 4, :4 LLW : AINIK S I ABI II A 1 101'J S'fl.l DY Q 22 .ffey and.Associates,.Inc. Engineering, Ecology and Landscape Architecture Project Understanding and Approach Reach 4: The final reach of the base study area is located between Wolf Road and the Village limits. This reach is primarily contained within the Woodland Trails Park operated by the River Trails Park District. This area has a number of existing amenities such as a recreation center, driving range, and trails through a natural wooded area. The reach also includes the Grace Evangelical Lutheran Church parcel. Planning future improvements through this area should include coordination with the River Trails Park District to discuss objectives for the wooded naturalized area. Hey has completed many projects of this type for park districts and forest preserve districts and can help identify project recommendations that are consistent with these uses. In addition, our experience has demonstrated that early coordination with these property owners results in collaborative solutions that can meet the goals of the various stakeholders. Reach 4 Study Area includes Woodland Trails Park. It was also noted that the Lower Des Plaines River Detailed Watershed Plan prepared by MWRD recommended implementing Alternative MDCR-5 which addresses observed streambank erosion upstream and downstream of three pedestrian bridges within Woodland Trail Park. These areas will be included in the planning and may allow for future grant or funding opportunities. Alternate Study Area In addition to the Base Study Area, the RFP also identifies three reaches that comprise an Alternate Study (or potential additional) area. Reaches 5 through 7 total 3,300 feet and include an additional downstream reach on McDonald Creek (Reach 6) south of Kensington Road as well as two separate areas on Tributary A and Feehanville Ditch. Reach 5: This reach on Tributary A from the south side of Camp McDonald Rd to the east side of Schoenbeck Rd passes through the Old Orchard Country Club. Hey has completed a number of streambank projects in or along golf courses and are familiar with restoration techniques that are compatible with these environments. This may also require coordination with staff from the Prospect Heights Park District, which we would be happy to facilitate. Reach 6: This reach of McDonald Creek is just downstream of Reach 1 and passes through private commercial and residential properties. Reach 7: The final Alternate Study reach comprises 440 feet of Feehanville Ditch from west side of River Road to west side of Lee Street which is adjacent to approximately six residential properties. 0 IBYECTIIVIE This project will result in a plan that will accomplish the following objectives: • Identify existing erosion and sedimentation areas and provide assessment to document the severity and causes of problem areas. Include storm drain outfall inventory as part of the stream assessment. • Identify and prioritize streambank stabilization measures. • Develop an implementation plan including prioritized actions, design and opinions of probable construction cost, maintenance activities and cost, funding opportunities, permitting requirements and jurisdictional/ property ownership and access issues. 14011II"1 II 31111°14 G,JII I3VICll S VIII LA nlIE Cill l.,IIA III`I3Q' S1::1l1: C i IMCIN INAII I) d 113,1EE: II" I;3AII II< S I AV',',`JIV I ""A I li`I"J S'il..l I`tA 23 ey an d.A ss o cia tes, In c. Project Understanding and Approach Engineering, Ecology and Landscape Architecture The RFP provides a summary of the Scope of Services. We have reviewed and concur with these tasks and we have based our level of effort and cost estimate on the suggested task structure. Project management and project coordination meetings will be conducted as part of our work on the four main tasks and have not been broken out as a separate task. A summary of our approach to each of the tasks follows. 1. Erosion Assessment a. Identify locations and extent of existing erosion b. Evaluate the erosion/sedimentation condition of structures (culverts/bridges) within each reach c. Identify causes and factors contributing to erosion d. Identify the location and condition of all storm sewer structures, outlet pipes, and private sump pump discharges within the creek The erosion assessment task will begin with a project kick-off meeting with the Village. The primary focus of this task is the collection and processing of field data for the project. The erosion assessment task will continue with the preparation of base files using available County spatial data. Having prepared numerous Cook County plan sets and studies for agencies such as the MWRDGC and the FPDCC, we anticipate this task to be rapid and efficient. Base maps will be created using the cloud base ESRI Collector application so that GPS -based field assessments can be performed and additional spatial data including notes, photos, and points taken during the field inspection. Initial fieldwork will be planned to start in January but may be somewhat dependent on snow conditions. In any event, the fieldwork will be completed prior to leaf -out in the early spring of 2022 to maximize the ability to review streambank issues and identify outfalls without vegetative cover. We anticipate that the work product from this task will include an assessment of bank conditions over the entirety of the study reaches. Bank conditions will be classified and categorized by condition severity. Any spot locations of significance, such as erosion affecting a bridge crossing or structure will be specifically highlighted in the findings. Outfalls will also be visually inspected, measured and documented. Although it would be somewhat unexpected, we will also look for any obvious signs of illicit discharges at all located outfalls. 2. Plan Development a. Evaluate bank stabilization alternatives to mitigate the erosion b. Recommended streambank stabilization plan for each reach. It is understood that the study may include different approaches for the individual reaches, but each must be compatible with the adjacent approaches. c. Prioritization of stabilization projects d. Public Involvement Plan This task involves evaluating, recommending and prioritizing bank stabilization measures throughout the study reaches. We will apply the fundamental approach that we developed for the DuPage County Streambank Stabilization Guidebook. This approach uses a decision matrix/flowchart to identify and recommend appropriate stabilization measures. We will be applying our firsthand experience gained from the erosion assessment to prepare these recommendations. A stabilization plan will be developed for each reach that graphically depicts the recommended stabilization measures. In some cases, as noted in the project understanding section -and if directed to do so by the Village, we will conduct outreach with major property stakeholders to discuss their specific concerns and gather input on various stabilization measures. An initial or preliminary prioritization system may be developed based on the severity of erosion during this task. However, we will revisit and refine the prioritization system as we work on issues identified in Task 3. 114 0 11 NJ I II I3III11llG ,SII IR ICI:S V 111 LAG 1:011111 IV0l'yII �II '�m v rya DN I f I I OYii.��'q �5�,,.N✓b'„W,.. N�uF4 .�N,,,,,,N1�J'�+,�'�. LL„V ,���r�` , N1LL„ �P v,�... ��,f Nd 1�.. M..d .,J' 24 ey an d.A ss o cia tes, In c. Project Understanding and Approach Engineering, Ecology and Landscape Architecture We will also work with the Village to identify opportunities for public involvement. We have successfully implanted a website -based interactive web map on other similar projects. One such example that is currently available to the public can be viewed at the project website for the Upper Salt Creek Watershed Based Plan. (see www.ui)persaltcreek.com/home/interactive-web-map). We would also prepare announcements and coordinate with the Village to alert residents to the days when fieldwork would be conducted. 3. Implementation and Funding Plan a. Estimate of Cost (including design, construction and construction engineering) for every reach stabilization plan for the Base Study. Provide a separate cost for the Alternate Study. Analysis, recommendations and estimates of cost must be provided for each individual reach to facilitate the ability to stage the improvements over a multi-year program. b. Anticipated maintenance costs for each recommended stabilization plan c. Funding opportunities d. Required permits for recommended plan e. Perform jurisdictional determination researching easements and property ownership f. Identify Construction accessibility locations for each reach This task involves the development of an implementation and funding plan for the recommended stabilization measures. We will develop construction costs based on our extensive experience with the design of these types of projects over the last few years. We will also develop a maintenance plan and estimated costs for these measures. These have been required as part of our previous projects for the MWRD. In addition, Hey and Associates, Inc. has a field services department that conducts full-scale restoration and management of natural areas that will provide input into the development and scoping of recommended maintenance measures. Based on the recommended streambank improvements, we will identify potential funding opportunities as part of the study. A variety of permits and regulatory approvals will be required for the work recommended by this study . A brief description of each anticipated permit and authorization and our recommended approaches to streamlining these approvals will be included in the study. We will use Cook County parcel information to identify property ownership along each reach the study. Major public entity landowners will be highlighted since they will be major stakeholders in any future work. We will request any historical subdivision plans or records from the Village to review for potential easements or other historical agreements. At this time, we do not plan on conducting any Title searches or additional property records research, but we have previously coordinated these services for our projects if this level of detail is desired. Stream stabilization projects bring a myriad of challenges for construction including access, staging, in -stream work plans, easements, stakeholder/private property coordination, and subsequent maintenance and monitoring. Construction access and staging are typically overlooked during Phase I planning and it is critical to ensure that the proposed improvements can be performed by a contractor within the site and permitting constraints. For some reaches in the study area, the constructability challenge will be only accessing the channel from one side due to the residential properties with limited access on the opposite side of the creek. This will require construction equipment to access and work from the open area on the south side, which will require diligent coordination with the open space property owners. In other areas, Reach 2 in particular, the residential properties line both sides of the creek. Construction of the recommended improvements will most likely be recommended to occur during low -flow periods to enable a contractor to develop an appropriate in -stream work plan that will be accepted by North Cook Soil and Water :111140111"1 EII Iwlll°AG ,)II IR'`lGl S V111LAGIEf till IVO IIA II::`13 S1::1ll Cl 25 .ffey and.Associates,.Inc. Engineering, Ecology and Landscape Architecture Project Understanding and Approach Conservation District (NCSWCD). We have worked collaboratively with NCSWCD on similar projects impacting streams and would recommend coordinating with them during future work phases to discuss the challenges of implementation while also minimizing risk of construction erosion/sediment issues. 4. Deliverables a. Submit Preliminary Study to Village Staff b. Submit Final Study to Village Staff The final task includes the work to prepare and assemble the study report. This will include presentation of the work involved and outcomes of Tasks 1-3. In the schedule, we have allowed 10 days for the Village to review and comment on the preliminary study. SCIl..IF The RFP provides several key dates for the performance of the project. We have created a project schedule around those dates. This schedule was prepared for the base study area, but we would only expect minor interim deadline changes if the alternate study area is also included in the project. Even with the alternate study area, we would plan to complete the study by June 30, 2022. Task Date(s) Kick -Off Meeting December 20, 2021 Task 1. Erosion Assessment January 2, 2022 to March 15, 2022 Task 2 Plan Development January 15, 2022 to March 31, 2022 Task 3. Implementation and Funding Plan March 1, 2022 to April 30, 2022 Task 4. Preliminary Study Preparation May 1, 2022 to May 31, 2022 Task 4. Final Study Preparation June 10, 2022 to June 30, 2022 :111140111"1 EII Iwlll°AG ,)II IR'`lGl S V111LAGIE till IVO IIA III`IRQ' S1::1ll C���f��� �er��� ����� ���� �.~~~��~~~��~^-__��~�~~. Engineering, Ecology and Landscape Architecture Level of Effort The table below provides a summary of hours by task and personnel. The level of effort includes 342 hours for the Base Study area and 139 hours for the Alternate Study area. IAII:,etnate Study Cost , E0G11NEE3110GSERVI[ES--V111LAGE0111 K8OUNT11 27 Wickenkamp Project Principal Kraft - Project Manager Lach - Sr. Civil Engineer James - Civil Civil Engineer III Engineer 11 Senior Landscape Architect Env. Services Manager Nusser - Env. Scientist III Total Hours Task Description I Erosion Assessment, a Identify locations and extent of existing erosion. 2 6 4 8 28 8 4 28 88 b Evaluate the erosion/sedimentation condition of structures c Identify causes and factors contributing to erosion. 0 1 1 2 4 2 0 2 12 d Identify the location and condition of all storm sewer structures, a Evaluate bank stabilization alternatives to mitigate the erosion 1 2 2 8 4 2 0 0 19 b Recommended streambank stabilization plan for each reach. 1 4 2 12 8 1 0 0 28 3 implementation and Funding Plan d Required permits for recommended plan 0 2 2 2 0 1 2 0 9 Perform jurisdictional determination researching easements and f Identify construction accessibility locations for each reach. 0 1 2 0 2 2 0 0 7 a Submit Preliminary Study to Village staff. 1 6 2 is 24 4 2 2 b ,Submit Final Study t Village staff. 1 2 1 8 12 0 0 0 24 IAII:,etnate Study Cost , E0G11NEE3110GSERVI[ES--V111LAGE0111 K8OUNT11 27 .ffey and.Ass ociates,.Inc. Engineering, Ecology and Landscape Architecture :11114 111"11 IIi: IIIIIIAG ,)II IRVICliS VILAGIEtill IVOIIA I`IROSI::111:CI AppendIxA a.] Hi�yandAssociates, Inc. Education M.S., Env. Engineering in Civil Engineering, Univ. of Illinois Urbana -Champaign, 1994 B.S., Civil Engineering, Univ. of Illinois Urbana -Champaign, 1992 IPrevious IEimlplloyrnent Principal Water Resources Engineer, NE IL Planning Commission, 2004-2005 Senior Project Manager, Camp Dresser & McKee, Inc., 1998-2004 Water Resources Engineer, Hey and Associates, Inc., 1994-1998 Registration & Certification IL Professional Engineer, No. 062-052074 WI Professional Engineer, No. 40058-006 IL CFM, No. IL -06-00272 vr:ik) I C Iiici. qo I `aflillv,�alal 11r y awt ( 01TI Jeffrey A. Wickenkamp, P.E., CFM, D.WRE Project Principal Mr. Wickenkamp is a registered professional engineer, a certified floodplain manager, and a Diplomate, Water Resources Engineer. Mr. Wickenkamp has over 25 years of experience in stormwater management and flood mitigation projects. He has successfully managed design projects to implement drainage improvements, flood protection measures, green infrastructure, and water quality best management practices. He has also led the preparation and development of stormwater master plans, watershed plans, water quality studies, environmental compliance studies, and regulatory programs. He attended the University of Illinois where he received B.S. and M.S. degrees in Civil Engineering. Mr. Wickenkamp served for seven years on the Board of Directors for the Illinois Association for Floodplain and Stormwater Management. Representative (Projects Village of Niles – Greenwood Stormwater Management and Festival Park, Niles, Illinois. Led the design of a flood mitigation project incorporating conveyance and storage components. Project includes bore and jack sewers, underground storage below an event lawn, storage pond and a permeable paver streetscape. Improvements valued at over $11 million. Metropolitan Water Reclamation District of Greater Chicago – Addison Creek Channel Improvements, Cook County, Illinois. Flood mitigation project involves design and permitting of $40M of channel improvements that include conveyance improvements, streambank stabilization, and bridge/culvert replacements. City of Chicago – Resilient Corridors, Chicago, Illinois. Planned and designed green infrastructure and stormwater management improvements that new incorporated community amenities on vacant parcels. Solutions included permeable pavement, underground storage, off-street storage and bioinfiltration area. City of Chicago – 5th Avenue Eco -Orchard, Chicago, Illinois. Planned and designed green infrastructure and stormwater management improvements to address neighborhood flooding while allowing for implementation of an urban orchard. Village of Niles – Howard Street Relief Sewer, Niles, Illinois. Designed and permitted a 54 -inch relief sewer with energy dissipating outfall to address depressional flooding in urban watershed. Village of Niles – Stormwater Storage Basins and Relief Sewer, Niles, Illinois. Designed award-winning urban flood mitigation projects that included two stormwater relief basins and a major stormwater relief sewer. Improvements valued at over $10 million. Chicago Public Schools – Space to Grow Improvements, Chicago, Illinois. Stormwater management improvements were designed at Davis, Morrill and Leland to transform asphalt schoolyards into vibrant outdoor spaces that benefit students, the surrounding community, and the environment. Village of Downers Grove — Debolt, Linden, and Gierz Storm Sewer Improvements, Downers Grove, Illinois. Design of drainage and infrastructure improvements to provide level of service drainage capacity. Hi�yandAssociates, Inc. Village of Niles — Oak Park Bioswale and Permeable Pavement, Niles, Illinois. Designed bioswale and permeable pavement parking area; constructed with funding from an MWRD green infrastructure grant as well as the Royal Bank of Canada. Village of Niles — Bioinfiltration Facility, Niles, IL. Designed a bioinfiltration facility that decreases discharges to the combined sewer system and reduces flooding that received funding from the Illinois Green Infrastructure Grant program. Industrial Client — Stormwater Pump Station and Oil/Water Separator, Cook County, Illinois. Designed a drainage system retrofit and low -flow pump vault to direct baseflow from an unknown source to an oil/water separator for treatment. Milwaukee Metropolitan Sewerage District — McCarty Park Trash Rack and Flood Mitigation, West Allis, WI. Prepared XPSWMM model to analyze flooding caused by blockage on a trash rack where Honey Creek enters long reach of enclosed channel or tunnels. Prepared flood risk assessment for several existing conditions scenarios and developed conceptual solutions for spillover recapture and rerouting. City of Evanston — Stormwater Master Plan, Evanston, Illinois. Serving as project principal for stormwater master plan that includes flow monitoring, calibration, evaluation of drainage issues and planning of capital improvements. City of Chicago — Sangamon Paseo, Chicago, Illinois. Planned and designed green infrastructure for proposed multi -use trail. City of Chicago — Green Alley Program, Chicago, Illinois. Prepared design guide and designs for green alley pilot projects. City of Chicago — Sewer Studies. Chicago, Illinois. Modeled combined sewers in the Norwood Park and Beverly neighborhoods using SWMM to evaluate existing conditions and prepare recommended improvements to reduce basement backups and surface ponding. Chicago Park District — Park 566 Framework Plan, Chicago, Illinois. Developed a framework plan for a proposed park along the lakefront at the historic U.S. Steel (USX) property on Chicago's south side that identified stormwater management and civil engineering constraints and opportunities related to the made -land on the site consisting of slag and other debris. City of Chicago — Green Healthy Neighborhoods, Chicago, Illinois. Prepared a Green Infrastructure Dashboard and completed a green infrastructure plan for the Woodlawn and Washington Park Neighborhoods. City of Evanston — Feasibility Study of Alternative Stormwater Management Techniques, Evanston, Illinois. Prepared standard green infrastructure details for use in municipal projects; identified underground storage and permeable pavement project opportunities. Village of Niles — Stormwater Master Plan Update, Niles, Illinois. After five years of successful implementation, a new master plan was prepared using updated sewer system modeling to develop and prioritize $80M of proposed infrastructure improvements. Chicago Metropolitan Agency for Planning — Maine -Northfield Township Stormwater Planning, Cook County, Illinois. Worked with CMAP staff to assess stormwater and flood risks and to identify stormwater management opportunities. Chicago Metropolitan Agency for Planning — GIS Based Stormwater Management Planning, Cook County, Illinois. Worked with CMAP staff to refine a GIS -based tool to identify areas with high risk of urban flooding. Center for Neighborhood Technology — Residential Property Assessments and Improvements, Chicago, Illinois. Conducted assessments of residential structures and property and recommended improvements such as plumbing modifications, home repairs and green infrastructure to reduce private property flood risk at properties in the City of Chicago. The Nature Conservancy — Off-site Stormwater Storage Demand Assessment, City of Chicago, Illinois. Building off a successful project completed for Cook County, a new demand assessment was undertaken to assess the potential demand for off-site stormwater management facilities in the City of Chicago. City of Chicago — Best Management Practices Monitoring, Chicago, Illinois. BMP monitoring systems were designed, installed and operated at the Center for Green Technology and the Household Computer and Electronics Recycling Facility to measure the performance of green roofs, bioswales, gravel infiltration trenches, permeable pavement and cisterns. Center for Neighborhood Technology — Best Management Practices Monitoring, Northeastern Illinois. BMP monitoring systems were designed, installed and operated for rain gardens and bioswales at four locations to obtain data on BMP effectiveness for a research paper published by the Illinois Sustainable Technology Center. vr::ik) I CI I `aflillv,�alal ury awt ( 0 1 T I 30 Hi�yandAssociates, Inc. Education B.S., Civil/Environmental Engineering, University of Wisconsin, Madison, December 2002 Previous IEimlplloymeint Water Resources Engineer, Kabbes Engineering, Inc. 2003-2005 Dam Safety and Floodplain Management Engineering Specialist LTE, Wisconsin Department of Natural Resources, 2002-2003 Waste Management Specialist LTE, Wisconsin Department of Natural Resources, 2003 IRegiistiratiion & Ceirtiificatiion David A. Kraft, P.E., CFM Project Manager Mr. Kraft has over 18 years of professional experience in civil and water resources engineering design, permitting, construction observation, contract administration, project management, and review. He has managed and been lead engineer on dozens of projects, including natural areas restorations, streambank stabilizations, hydrologic restorations, access improvements, trail design, stormwater management systems, roadway and parking design, urban flooding improvements, and general site development tasks. In addition to design, he has substantial experience with hydrologic and hydraulic modeling and all facets of water resources permitting. Mr. Kraft is a registered Professional Engineer in Illinois and Wisconsin, a Certified Floodplain Manager, and a Certified Professional in Erosion and Sediment Control. Mr. Kraft received a Bachelor of Science degree in Civil/Environmental Engineering from the University of Wisconsin at Madison. IMajoir Stream (Projects Hanover Township— Izaak Walton Reserve Site Improvements, Elgin Illinois. Acted as project manager and principal for civil engineering and floodplain permitting services associated with trail and site improvements at the Izaak Walton Reserve. Lake Forest Open Lands Association - McCormick Ravine Access and Trail Improvements, Lake Forest, Illinois. Acted as project engineer for design and permitting of ravine restoration, site access, and new trail at the John and Jean Green Nature Preserve. Village of Mount Pleasant - Hoods Creek Phase 1 Improvements, Mount Pleasant, Wisconsin. Acted as project engineer for design of regional trail, water quality, and stream and wetland restoration improvements along Hoods Creek. Schaumburg Park District — Lancer Creek Streambank Stabilization, Schaumburg, Illinois. Acted as project manager and engineer for design and permitting of repairs t failed gabion basket and steel sheetpile bank treatments with lower gabion walls and shallow graded banks and native seeding. IL Professional Engineer, No. 062-060860 Nippersink Watershed Association — 319 Grant Projects, McHenry County, Illinois. Acted as project manager and engineer for preparation of design and permit WI Professional Engineer, No. 40397-006 documents for nine non -point sources pollution control projects in the Nippersink IL Certified Floodplain Manager, watershed funded through the IEPA 319 grant program, including stream, lake No. IL -06-00236 shoreline, ravine, and wetland restoration and enhancement. Qualified Engineer Review Specialist E-197, Kane County, Illinois IDPH Prequalified Swimming Facility Engineer IProfessiionall Memberships & Services Illinois Association of Floodplain Managers Wisconsin Association for Floodplain, Stormwater and Coastal Management Chairman, Vill. of Lindenhurst Lakes Commission Alternate Member, McHenry Co.. Stormwater Technical Advisory Committee President, Country Place HOA Board vr::ik) I C li x,;io I vlillV°, aal e 11yF awt 01TI Schaumburg Park District — Atcher and Campanelli Park Bridge Replacements, Schaumburg, Illinois. Acted as project manager and engineer for design and permitting for replacement of two pedestrian bridges over creeks at park district properties. McHenry County Conservation District — Prairie Trail South Crystal Creek Bank Stabilization, Algonquin, Illinois. Acted as project principal for design and permitting of stabilization and restoration measures long an approximately 1,500 section of Crystal Creek with the regional Prairie Trail immediately adjacent to it at risk of impact due to bank erosion. Lake County Forest Preserves — Grant Woods Preserve Hydrologic Restoration, Lake County, Illinois. Acted as project manager and engineer for design and permitting of hydrologic restoration elements such as file disablement, surface drainage improvements, water level modification, and channel restoration at the Grant Woods Preserve. 31 FleyandAssociates, Inc. McHenry County Conservation District — Prairie Trail South Crystal Creek Bank Stabilization, Algonquin, Illinois. Acted as project principal for design and permitting of stabilization and restoration measures long an approximately 1,500 section of Crystal Creek with the regional Prairie Trail immediately adjacent to it at risk of impact due to bank erosion. Schaumburg Park District — Abrahamsen Park Stream Restoration, Schaumburg, Illinois. Acted as project manager and engineer for design and permitting to restore a tributary that experienced aggressive bank erosion. The Arlington Club HOA — Buffalo Creek Concept Stabilization Report, Wheeling, Illinois. Acted Assisted the HOA with identification of solutions to stabilize portions of Buffalo Creek and two Association owned trail bridges on HOA property. McHenry County Conservation District — School Springs Streambank Mitigation, McHenry County, Illinois. Acted as project engineer for design, permitting, and mitigation criteria establishment for restoration of a tributary to Nippersink Creek as the first stream mitigation bank in the Chicago USACE District. Lake County Forest Preserves — McCormick Ravine Remediation, Lake Forest, Illinois. Acted as project manager and engineer for redesign of previous ravine stabilization project designed by USACE that experienced failure as a result of a substantial 2017 rain event. Mequon Nature Preserve — Trinity Creek Restoration, Mequon, Wisconsin. Acted as project manager and engineer for restoration design and permitting of Trinity Creek on MNP property, including remeandering, floodplain terracing, and in -stream habitat. Schaumburg Park District— Abrahamsen Park Stream Restoration, Schaumburg, Illinois. Acted as project manager and engineer for stabilization design of a tributary of Salt Creek to address aggressive erosion, and also naturalize the stream reach. McHenry County Conservation District — School Springs Streambank Mitigation, McHenry County, Illinois. Acted as project manager and engineer for design, permitting, and mitigation criteria establishment for restoration of a tributary to Nippersink Creek as the first stream mitigation bank in the Chicago USACE District. Illinois Department of Transportation — Scranton Avenue Drainage Investigation, Lake Bluff, Illinois. Oversaw preparation of drainage investigation and hydraulic technical memorandum for investigation of drainage improvements at Scranton Avenue and potential impacts to downstream ravine system. Lake County Forest Preserves — Cuba Marsh Hydrologic Restoration, Lake County, Illinois. Acted as project engineer and QA/QC for design of hydrologic restoration elements such as file disablement, surface drainage improvement, water level modification, and channel restoration at the Cuba Marsh Preserve. Lake County Forest Preserves — Ray Lake Cuneo Hydrologic Restoration, Lake County, Illinois. Acted as project engineer and QA/QC for design of hydrologic restoration elements such as file disablement, surface drainage improvement, water level modification, and channel restoration at the Ray Lake — Cuneo Property. Lake County Forest Preserves — Southern Des Plaines Hydrologic Restoration, Lake County, Illinois. Acted as project engineer and QA/QC for design of hydrologic restoration elements such as file disablement, surface drainage improvements and channel restoration on several preserves in the southern Des Plaines River region. Lake County Forest Preserves — Des Plaines River Streambank Stabilization, Gurnee, Illinois. Prepared design and permit documents for stabilization of approximately 500 linear feet of the Des Plaines River bank that was experiencing sever erosion, threatening a portion of a regional trail. Village of Lake Bluff — Moffett Ravine Restoration, Lake Bluff, Illinois. Acted as project manager and project engineer for IDOT funded design and permitting of toe and bed stabilization, culvert headwall, scour pool, and roadway embankment and slope stabilization efforts at the Moffett Ravine. Village of Mount Pleasant— Hoods Creek Improvements Study, Mount Pleasant, Wisconsin. Prepared planning level study of over five miles of the Hoods Creek corridor to identify improvements opportunities such as stream restoration, wetland restoration and enhancement, water quality management, flood control, regional stormwater management, and recreational opportunities. DuPage County Stormwater— Streambank Stabilization Manual, DuPage County, Illinois. Provided engineering insight and support for preparation of a Countywide streambank stabilization manual aimed at assisting residents and local riparian owners with navigating stream restoration design and permitting. 0?11 5a, (01Ti 32 Hi�yandAssociates, Inc. Education B.S., Hydrology, University of Wisconsin, Stevens Point, 2016 Previous IEm plloyirneint Program Assistant, University of Wisconsin Extension Lakes, Stevens Point, 2015 - 2016 Lead Project Coordinator, Groundwater Model Project, Stevens Point, Wisconsin, 2014-2016 IRegiistiratiions & Certifications WI Professional Engineer, No. 48677-6 IProfessiionallIMeirnbeirshiilps & Services American Water Resources Association, Wisconsin Section, 2015 - Present Des Plaines River Watershed Plan Committee, Lake County, Illinois 2016 - Present Des Plaines River Watershed Workgroup, Lake County, Illinois 2018 - Present IPirofessiionall Advancement Wisconsin Lake Leaders Graduate, Crew 13, Wisconsin Lakes Partnership, 2021 Geographic Information Systems Professional Certificate, University of Wisconsin, Stevens Point, 2016 Geographic Information Systems Focal Certificate in Environmental Management, University of Wisconsin, Stevens Point, 2016 vr:ik) I CII `aflillv,�alal 11 y awt ( 01TI Kirsten N. James, PE Civil Engineer Ms. James has prepared hydrologic, hydraulic, and water quality modeling, permitting documentation, and design support for a variety of stormwater and floodplain management projects and natural areas hydrologic restoration projects. She has experience in comprehensive lake and watershed assessment, planning, and management studies focusing on analyzing site data and spatial information to target best management practices and improvements projects. Ms. James received a Bachelor of Science degree in Hydrology, a Professional Geographic Information Systems (GIS) Certificate, and a GIS Certificate in Environmental Management from the University of Wisconsin at Stevens Point and is a licensed Professional Engineer in the State of Wisconsin. Ciiviill IEingii neeirii ng Forest Preserve District of Cook County - Dam Maintenance Projects, Cook County, Illinois. Assisted in creating an Operation and Maintenance Plan and prepared a hydraulic model for Illinois Department of Natural Resources, Office of Water Resources permitting for Tampier Lake Dam repairs. City of Lake Forest - Forest Park Bluff Monitoring and Pre -Design, Lake Forest, Illinois. Utilized soil borings, inclinometers, groundwater gauges, field observations, and topographical survey to develop a conceptual pre -design bluff stabilization plan. Northbrook Sports Club - Berm and Water Features Sports Shooting Course, Hainesville, Illinois. Aided in design of earthen berms and enhancement of water and wetland features as part of a sports shooting facility. City of Wilmington - Ridgeport Development Storm Sewer Extension, Wilmington, Illinois. Reviewed detailed engineering plans and created a XP-SWMM hydrologic and hydraulic model of the storm sewer and detention system for planning ultimate industrial park site discharge design. Stormwater & Floodplain Management McHenry County Conservation District - School Springs Stream Channel Mitigation, Glacial Park, McHenry County, Illinois. Assisted in restoration design, hydraulic modeling, and preparation of engineering plans and support documentation to meet McHenry County Stormwater Management Ordinance standards and U.S. Army Corps of Engineers mitigation guidelines. Forest Preserves of Cook County - Powderhorn Lake Hydrologic Restoration, Chicago, Illinois. Aided in preparation of construction and permit documents to restore dune and swale system native hydrology, manage water levels, and improve outlet system conveyance. Village of Mount Pleasant - Hoods Creek Improvements, Mount Pleasant, Wisconsin. Designed and completed a comprehensive site assessment, utilizing spatial data and field investigation and analyzed hydraulic models to identify potential improvement opportunities. City of Fort Atkinson - Larson Lagoon Stormwater Quality Improvements, Fort Atkinson, Wisconsin. Performed topographic and bathymetric survey, assisted in concept design, performed hydrologic, hydraulic, and water quality modeling, and prepared permit documentation for a relic settling basin retrofit. Village of Barrington - Village of Barrington Stormwater Improvements, Barrington, Illinois. Updated a XP-SWMM hydrologic and hydraulic model and performed analysis for a storm and flooding event. 33 Hi�yandAssociates, Inc. Nippersink Watershed Association - Nippersink Watershed 319 Grant Projects, McHenry County, Illinois. Performed hydraulic analysis and prepared engineering permit sets and stormwater reports for culvert replacement, restoration, and shoreline and streambank stabilization projects for McHenry County permitting. Lake County Forest Preserve District - Grant Woods Forest Preserve Hydrologic Restoration, Lake Villa, Illinois. Prepared hydrologic and hydraulic modeling to support preparation of engineering and permitting documentation for hydrologic restoration, channel stabilization, and installation of storm sewer infrastructure. Lake County Forest Preserve District - Prairie Wolf Forest Preserve Hydrologic Restoration, Lake Forest, Illinois. Aided in design and preparation of permit documents for hydrologic restoration, including subsurface drain file disablement and surface drainage improvement. Lake County Forest Preserve District - Cuba Marsh Forest Preserve Hydrologic Restoration, Deer Park, Illinois. Aided in design and permitting of hydrologic restoration, including subsurface drain file disablement, surface drainage improvement, water level modification, and channel restoration. Lake County Forest Preserve District - Lakewood Forest Preserve Drainage Modification and Planning Services, Lake County, Illinois. Created a XP-SWMM hydrologic and hydraulic model and water budget analysis to aid in site planning and restoration concept design. Woodmont Land Company - Barron Boulevard Parcels, Grayslake, Illinois. Aided in commercial site design and prepared permitting documentation for FEMA to obtain a Conditional Letter of Map Revision based on Fill. Cook County Forest Preserves - Busse Woods Canoe Launch Riverwalk Park, Schaumburg, Illinois. Secured stormwater and floodplain permits through the Metropolitan Water Reclamation District, Cook County Department of Building and Zoning, and North Cook County Soil and Water Conservation District for a canoe launch. J Condon and Associates - Parkland School Improvements, McHenry, Illinois. Identified alternative project improvements utilizing HEC -RAS to simplify mapped floodplain requirements from compensatory storage design to pedestrian pathway culvert replacement. Private Land Owner - Residential Drainage Improvement, Barrington, Illinois. Utilized hydraulic and hydraulic models to design and prepare permit documents for residential drainage improvements. Private Land Owner - Private Roadway Culvert Replacement and Stabilization, Long Grove, Illinois. Designed and permitted a culvert replacement project, including minor grade stabilization structures on a private roadway. Water Quality IPlanning George Lake Rehabilitation District - George Lake Water Quality Improvements, Bristol, Wisconsin. Performed a watershed -scale investigation, integrating spatial data and field investigation, to identify and develop best management practices. Designed and permitted inlet an inlet channel restoration and wetland basin retrofit to improve water quality. Nippersink Watershed Association - Nippersink Creek Watershed Pollutant Loading Analysis, McHenry and Lake County, Illinois and Walworth and Kenosha County, Wisconsin. Prepared a pollutant loading model, utilizing spatial data and field investigation, to update the Nippersink Creek Watershed Plan. IFcollogiicall Restoration & Mainagement Forest Preserve District of Kane County - Pingree Grove Forest Preserve Hydrologic Restoration, Pingree Grove, Illinois. Aided in design of amphibian and avian habitat improvements to a 100+ acre marshland, including wetland scrapes, railroad turtle crossing structures, and woody debris and granular material berms for nesting habitat. Illinois Department of Natural Resources - Boger Bog Conservation Area, Bull Valley, Illinois. Aided in concept design for a fen restoration. Village of Volo - Arborist Services, Volo, Illinois. Maintains a GIS database to seamlessly integrate field data collection with analysis and final product preparation. IProfessiioirnall Advancement Geographic Information Systems Focal Certificate in Environmental Management Geographic Information Systems Professional Certificate Professional Development Hours associated with AWRA meetings, watershed planning meetings, and Innovyze - XP SWMM program vr:ik) I C Iii4-.xigo I `aflillv,�alfl e 11 y awt ( 01TI 34 Hi�yandAssociates, Inc. Education B.S., Civil Engineering, University of Notre Dame, Notre Dame, Indiana, 2001 IPrevious Employment Drainage Engineer, HDR Engineering, Inc., Chicago, Illinois, 2005-2007 Civil Engineer, Camp, Dresser & McKee, Inc. (CDM), Chicago, Illinois, 2001-2005 Registration & Ceirtiificatiion IL Professional Engineer, No. 062-058745 Patrick M. Lach, P.E., CFM Senior Civil Engineer Mr. Lach has 19 years of water resources and civil engineering experience and management, is a registered professional engineer, a certified floodplain manager and recently served as President of the Illinois Section of the American Society of Civil Engineers. He currently serves as a Senior Civil Engineer for Hey and Associates and is responsible for civil engineering staff in the Chicago office. His areas of expertise include civil and site design, stormwater infrastructure design, green infrastructure planning and design, and hydrologic and hydraulic modeling practices. He has extensive experience in developing design plans, specifications, cost estimates, and construction observation for civil engineering and water resources projects. Representative IProJects Metropolitan Water Reclamation District of Greater Chicago – Addison Creek Channel Improvements Final Engineering, various municipalities in Cook County, Illinois. Mr. Lach managed the project team to develop construction documents, permits, and cost estimates for channel conveyance improvements, gabions, soldier pile walls, civil infrastructure, utilities, and recreational park improvements. Metropolitan Water Reclamation District of Greater Chicago – Buffalo Creek Reservoir Expansion, Buffalo Grove, Illinois. Mr. Lach prepared hydrologic and hydraulic analyses for design, prepared grading plans, designed grade control for tributary streams, developed detailed cost opinions, prepared permit applications and prepared an update to the Emergency Action Plan (EAP). Cook County Department of Transportation and Highways – Hydraulic and Wetlands Services, Cook County, Illinois. Mr. Lach served as the project manager and completed hydraulic reports, location drainage studies, drainage design plans, wetland delineation reports, while also reviewing highway permit submittals and obtaining permits for construction. WI Professional Engineer, No. 39017-006 Metropolitan Water Reclamation District of Greater Chicago – Roberts Road MI Professional Engineer, No. 6201053889 Drainage Improvements Preliminary Engineering, Palos Hills, Illinois. Mr. Lach IN Professional Engineer, No. PE10809287 managed and oversaw the hydraulic modeling, storm sewer design, preliminary IL Certified Floodplain Manager, IL -10-00569 engineering plans and specifications to reduce the risk of urban flooding. Qualified Engineer Review Specialist, Village of Carol Stream – Kehoe Blvd. Streambank Stabilization, Carol Stream, E-0189 Kane County Illinois. Mr. Lach prepared design plans, pool and riffles, and permitting to stabilize an eroding stream between Kehoe Blvd. and private commercial property. City of Elmhurst – Police Department Green Infrastructure Plan, Elmhurst, Illinois. Mr. Lach successfully prepared a DuPage Water Quality Improvement Program grant and prepared design plans for the construction of a bioinfiltration rain garden facility as part of the first phase of a green infrastructure plan for the property. City of Chicago Department of Housing and Economic Development – Sangamon Paseo, Chicago, Illinois. Mr. Lach prepared design plans for a new trail including incorporation of green infrastructure, pocket parks, and gateways. Village of Niles — Relief Sewer and Storage Basin Design, Village of Niles, Illinois. Mr. Lach prepared plans and specifications for sewer designs, detention basin grading, site restoration, and utility relocation. Village of Niles – Illinois Green Infrastructure Grant (IGIG) Design Services, Niles, Illinois. Mr. Lach conducted hydraulic modeling and prepared final design for a bioinfiltration facility to alleviate flooding in a combined sewer area. vr:ik) I C Iii4-.xigo IHilly, a al 11 y „o. ( 01TI 35 Hi�yandAssociates, Inc. Village of Schaumburg — Municipal Center Woodland Restoration Project, Schaumburg, Illinois. Mr. Lach oversaw hydraulic analysis and designed stream improvements to stabilize and restore the existing eroded channel. City of Chicago Department of Planning and Development — Resilient Corridors, Chicago, Illinois. Mr. Lach prepared design plans and details for neighborhood pocket parks including stormwater management and green infrastructure. Chicago Public Schools — Space to Grow — Leland and Morrill School Improvements, Chicago, Illinois. Mr. Lach designed stormwater improvements including drainage, detention, and green infrastructure systems. Chicago Department of Transportation — Fullerton Bridge over Lincoln Park Lagoon, Chicago, Illinois. Mr. Lach completed a drainage analysis and design for the bridge and a new underpass. Private Industrial Client — Stormwater Capture and Reuse Facility, Chicago, Illinois. Mr. Lach performed construction inspection for the installation of water quality structures, storm sewers, and StormTrap underground detention systems. Northern Illinois University — Storm Waterway Improvements, Dekalb, Illinois. Mr. Lach performed construction observation and inspection for detention lagoon and control weir, pedestrian bridges, channel improvements, culverts and utility relocations. Village of Downers Grove — Stormwater Master Plan, Downers Grove, Illinois. Mr. Lach managed and oversaw the development of GIS -based analyses to develop a tool to determine level of service of stormwater infrastructure throughout the Village and to create an evaluation framework for prioritization of future stormwater improvement projects. Additional XP-SWMM modeling was also completed to identification and analysis of Stormwater problem areas for future capital improvement projects. Village of Downers Grove — Debolt / Linden / Gierz Drainage Improvements, Downers Grove. Mr. Lach oversaw hydrologic and hydraulic XP-SWMM model development and assisted with alternative developments. Chicago Metropolitan Agency for Planning — Berwyn Stormwater Management Plan, Berwyn, Illinois. Mr. Lach participated in the stormwater committee, conducted sewershed analysesand prepared a stormwater management plan document. Village of Bayside — Flowpath Model, Bayside, Wisconsin. Mr. Lach conducted GIS -based analysis of surface stormwater runoff and developed design parameters for municipal stormwater details. Center for Neighborhood Technology — RainReady Home Property Assessment and Construction Inspection Services, Chicago, Illinois. Mr. Lach conducted home assessments and inspected lot grading, stormwater runoff, downspouts, plumbing, gutters and other storm and sanitary sewer components. Village of Niles — Stormwater Management Plan, Niles, Illinois. Mr. Lach conducted data collection, GIS analysis, and XP-SWMM 2D hydrologic and hydraulic modeling of the sewer system to develop flood improvement projects. City of Chicago Department of Housing and Economic Development — Green Healthy Neighborhoods Stormwater Planning, Chicago, Illinois. Mr. Lach analyzed surface drainage patterns and the combined sewer system City of Chicago Department of Housing and Economic Development — Chicago Stormwater Flowpath Diagram Data Analysis, Chicago, Illinois. Mr. Lach analyzed surface drainage patterns and the combined sewer system utilizing GIS to provide a City-wide flowpath data layer and conduct a training session for the City. City of Chicago Department of Water Management — Miscellaneous Ad -Hoc Hydrologic & Hydraulic Services, Sewer GIS Data Review and Full Pipe Model Development, Chicago, Illinois. Mr. Lach assisted with the analysis, review and updating of City of Chicago sewer atlases to GIS -based databases and features. DuPage County Stormwater Management — Spring Brook Watershed Plan Update, DuPage County, Illinois. Mr. Lach completed FEQ hydraulic modeling, alternative analysis, streambank stabilization, damage estimates, cost estimates and reporting. Chicago Park District — Big Marsh Hydrologic Master Plan Design, Chicago, Illinois. Mr. Lach developed the hydrologic and hydraulic model using XP-SWMM and XP-SWMM 2D in order to design the outlet control structure to meet the master plan requirements. City of Evanston — Feasibility Study of Alternative Stormwater Management Techniques, Evanston, Illinois. Mr. Lach worked on the development of green infrastructure standard municipal and the overland flow path analysis. City of Chicago Department of Water Management — Stormwater Management Program. Mr. Lach helped prepare the 2008 stormwater management ordinance, regulations and technical manual. r::ik) I C Iii4-.xigo IHilly, a al u e y „o . ( 01 T I 36 FleyandAssociates, Inc. Timothy R. Pollowy, PLA, ASLA Senior Landscape Architect Built upon an education in landscape architecture and natural resources from the University of Illinois, Mr. Pollowy has over 28 years of experience in landscape architecture, environmental planning, and ecological restoration. Areas of expertise include sustainable and resilient site design, green infrastructure, the restoration and management of natural areas, transportation, and parks and recreation. He is an experienced project manager, using his organizational and communication skills to keep projects on track and within budget. Tim has a thorough hands-on understanding of construction management, and has overseen the successful implementation of a wide variety of projects. Mr. Pollowy possesses an IDOT Documentation of Contract Quantities certificate, has successfully completed IDOT/ FHWA Context Sensitive Solutions (CSS) training for public consensus building, and is a Registered Landscape Architect in Illinois and Wisconsin. 11 Forest Preserve District of Kane County — Lake Patterson Access Improvements at IEducation Oakhurst Forest Preserve, Aurora, Illinois. Project manager during design of parking Master of Landscape Architecture, expansion, trail development, shelter and bathroom facility upgrades, boating access, University of Illinois, 1992 and related improvements. Bachelor of Landscape Architecture, DuPage River Salt Creek Work Group — Salt Creek Restoration at Fullersburg Woods University of Illinois, 1990 Forest Preserve, Oak Park, Illinois. Project manager during design and permitting of dam IPreviious IEimplloyirnent removal, river and floodplain restoration, public access improvements, and preservation of historic mill building. Consulting and Design Manager, Landscape Resources, Inc., Montgomery, IL, 1999-2003 Staff Ecologist, Applied Ecological Services, Inc., Brodhead, WI, 1996-1999 Associate Staff, Otis Associates, Inc., Schaumburg, IL, 1994-1996 Landscape Planner, Village of Schaumburg, Schaumburg, IL, 1993-1994 Associate Staff, Johnson Johnson & Roy, Chicago, IL, 1992 IRegiistiratiion & Certlificatiion Illinois Registered Landscape Architect 157001200 Wisconsin Registered Landscape Architect 594-014 IDOT Documentation of Contract Quantities (S-14) FHWA/IDOT Context Sensitive Solutions (CSS) r�llr::r I Cl�i�xiaic:a I I`�lill�,r,��a�al�,�;� ?` ( 01Yi Waste Management — The Wild Mile, Chicago, Illinois. Developed preliminary plans to implement bank stabilization, habitat improvements, water quality protection, and public awareness for the largest privately -owned portion of The Wild Mile , an initiative lead by Urban Rivers to restore and provide public recreation on the North Branch Canal at Goose Island. Village of Orland Park — Stellwagen Family Farm, Orland Park, Illinois. Developed plans and specifications and provided construction phase support during restoration of 20 acres of prairie and oak woodland at new community open space. Village of Orland Park — Olde Mill Open Space, Orland Park, Illinois. Developed plans and specifications for restoration of stream corridor and naturalized stormwater basins in open space at the center of a residential development. Village of Orland Park — Naturalized Stormwater Basin Program, Orland Park, Illinois. Completed inspections of and reporting on dozens of naturalized stormwater basins across the community. Village of Schaumburg — Municipal Center Woodland Restoration and Creek Stabilization, Schaumburg, Illinois. Prepared plans and provided construction engineering services for invasive species removals, seeding, and tree planting for a 6 - acre woodland restoration, and stabilization of over 1,200 lineal feet of creek using natural channel design and constructed riffle -pool structures. Lake County Forest Preserves — Southern Des Plaines River Hydrologic Restoration and Enhancement Project, Lake County, Illinois. Completed site investigation and prepared plans to stabilize and restore an existing channel tributary to the Des Plaines River. 37 Hi�yandAssociates, Inc. City of Aurora — Mastodon Island, Aurora, Illinois. Plans were prepared to restore the shoreline of Mastodon Island, a 4 -acre island at Phillips Park including removal of invasive trees and brush, herbaceous weed control, a seeding and planting program, and on- going maintenance to maintain ecological quality, improve visibility and public safety, and enhance visitor enjoyment at this site. Lake County Forest Preserves — Fort Sheridan Preserve Remediation and Restoration, Highland Park, Illinois. Project manager for environmental clean-up and ecological restoration of approximately 100 -acre site, including sorting and disposal or re -use of over 200,000 cubic yards of construction and demolition debris. MWRDGC — Addison Creek Channel Improvements, Cook County, Illinois. Work included assessment and design of several miles of biotechnical streambank stabilization, riparian buffer plantings, in -stream habitat improvements, and related work. MWRDGC — Buffalo Creek Reservoir Expansion: Guided preparation of plans, specifications, and cost estimates for an approximately 170 -acre foot expansion of an existing flood control reservoir located on Forest Preserve property. Village of Glenview — Reach 1 Habitat Restoration, Glenview, Illinois. Prepared design documents for stream meandering, riffle -pool structures, and stream -side wetland restoration for an over one-half mile reach of the West Fork of the North Branch Chicago River. DuPage County — Spring Brook Stabilization Plan, Bloomingdale, Illinois. Completed stream assessment and preliminary streambank stabilization plans which promoted the use of restoration measures to protect infrastructure, property, and public safety while still allowing dynamic stream processes and channel evolution to occur. Village of Northbrook — CBD River Corridor Restoration, Northbrook, Illinois. Led design team and oversaw construction of $1.8 million urban stream stabilization and water quality enhancement project on the West Fork North Branch Chicago River. The Morton Arboretum — Willoway Brook, Lisle, Illinois. Designed several water quality and streambank stabilization projects including a level spreader connected to an existing drain file originating off-site and vegetated swale to emulate a natural groundwater seep along Willoway Brook, floodplain wetland restoration and streambank stabilization along Willoway Brook near the Prairie Visitor's Center, and stabilization of a severely eroded tributary conveying off-site drainage to Willoway Brook. Illinois Tollway — Pine Dunes Wetland Mitigation, Lake County, Illinois. Served as the Phase III Quality Representative (QR) on the Construction Manager (CM) team during implementation of an Illinois Tollway wetland mitigation project at Lake County Forest Preserve's Pine Dunes Preserve. IDOT — Roadside BMP Design, northeastern Illinois. Prepared plans and specifications for permanent roadside stormwater best management practices (BMPs) including naturalized detention areas, comp storage areas, bioswales, channel improvements/stabilization, and associated work. IDOT — Roadside Natural Areas Management, northeastern Illinois. Identified, assessed, and prepared plans for managing roadside natural areas such as remnant or planted prairies and wetlands. IDOT — Landscape Maintenance Program, northeastern Illinois. Led multi-year contract to prepare new "green" roadside maintenance program focused on reduction of mowing, improved weed control, and expansion of native vegetation. Lake County DOT — Buffalo Creek Wetland Mitigation Bank, Lake County, Illinois. Worked with project engineers and ecologists to create plans and specifications necessary to publicly bid and construct an approximately 65 -acre wetland mitigation bank. Park District of Highland Park — The Preserve, Highland Park, Illinois. Project landscape architect during conversion of a public golf course to a passive recreation natural area with trails, scenic overlooks, specialty gardens, and related site amenities. Oakhurst Forest Preserve — Public Access Improvements, Aurora, Illinois. Project manager and landscape architect during final design of new trails, parking lot expansion, and replacement of aging site amenities including a picnic shelter, bathroom facility, boat ramp and dock, and fishing stations. Lake Forest Open Lands — McCormick Ravine Trails and Public Access Improvements, Lake Forest, Illinois. Project manager and landscape architect during final design and permitting of new trails, driveway, and parking lot at this high-quality natural area overlooking Lake Michigan. Lake Forest Open Lands — West Westleigh Parcel, Lake Forest, Illinois. Project Manager and landscape architect during planning and design of trails, boardwalks, parking, public gathering areas, overlooks, and ecological restoration at this unique site dominated by wetlands. vr::ik) I C Iiici. qo I `aflillv,�alal ury awt ( 0 1 T I 38 Hi�yandAssociates, Inc. Education B.A, Environmental Studies, Augustana College, 2019 IPrevious IEim plloyirrneirnt Crew Leader, Lake County Conservation District, 2019 Representative, Rock Island Parks Department & Augustana Environmental Department Partnership, 2018-2019 Registrations & Ceirtfficatiioirns Illinois Commercial Pesticide Applicator - Categories: General Standards, Aquatic vr:ik) I C Iii4-.xigo I `aflillv°, alfl er 11 y awt ( 01TI Wyatt Nusser Environmental Scientist Mr. Nusser has 3 years of professional experience in Land Management. Prior to Hey, he has worked with the Lake County Forest Preserve District Youth Conservation Corps Program, City of Rock Island Parks Department, Western Illinois University Geography Department, and the Upper Mississippi Center for Sustainable Communities on various socio -ecological projects with experiences in land and vegetation management, data collection, data analyzation, aquatic and biologic survey, native installation, report production, team management, and stakeholder engagement. Mr. Nusser received a bachelor's degree in Environmental Studies from Augustana College with minors in Biology and Geography. IEcollogiicall Restoration & IMainageimeint Sun City Community Association of Huntley, Inc. – Del Webb Sun City including Del Webb Sedge Meadow and Grove Nature Preserve, Huntley, Illinois - Implement ecological restoration practices within the Sun City Development and an associated Illinois Nature Preserve which was dedicated following completion of mitigation requirements. Village of North Aurora - North Aurora Towne Center Mitigation Project, North Aurora, Illinois – manage and implement wetland enhancement activities within a nearly 150 acre wetland and buffer complex. Land and Water Resources, Inc. — Mill Creek Wetland Mitigation Bank, Lake County, Illinois. Apply various natural resource management practices to meet Lake County Stormwater Management Commission and U.S. Army Corps of Engineers permit requirements for 130 + acres of native plant communities. I1...alke Assessment & IMainageirn✓neint City of Crystal Lake Parks Department — Crystal Lake, McHenry County, III. Assessment and management of aquatic vegetation within Crystal Lake to maintain native biodiversity and allow for community recreational activities. IEcollogiicall inventories/Surveys Manhard Consulting, Ltd — Central Park Drive Property, McHenry County, Illinois Performed tree inventory to determine the potential for authorized removal of trees for a fire access lane. Milwaukee Metropolitan Sewerage District 2020 Green Infrastructure Overpass Contest Finalist, March 2021 39 Hi�yandAssociates, Inc. Education Graduate Studies, Urban Planning and GIS, University of Wisconsin -Milwaukee 2005-2006 B. A., Environmental Studies (major), History (minor), Northeastern Illinois University 1998 Previous IEirm plloyinrneint Environmental Consultant, Integrated Lakes Management, Gurnee, Illinois 1999-2000 Watershed Intern, Lake County Stormwater Management Commission, Libertyville, Illinois 1998-2000 Registration & Ceirtiiilicaltiions Certified Wetland Specialist C-052, Lake County, Illinois Qualified Wetland Review Specialist W- 048, Kane County, Illinois Certified Wetland Specialist, McHenry County, Illinois IPirofessiionall Memberships & Services Wisconsin Wetlands Association Illinois Association of Environmental Professionals vr:ik) I C Iii4-.xigo I `aflillv°, alfl e 11 y awt ( 01TI Steven J. Rauch Senior Environmental Scientist Mr. Rauch has 21 years of experience conducting field surveys such as wetland delineations, tree surveys, and vegetation inventories. He is well versed in regulatory permitting issues, having successfully obtained federal, state, and county wetland permits for many public and private sector clients throughout northeastern Illinois and in southeastern Wisconsin. From 2010 through 2014, Mr. Rauch was a consultant to IDOT-District 1. His main responsibilities were wetland impact evaluations review, Section 404 permit applications review and coordination, and participating in meetings covering projects that were in the NEPA/404 merger process and in Phases 1, 2, and 3 of IDOT's process. Mr. Rauch received his Bachelor of Arts in Environmental Studies from Northeastern Illinois University and completed graduate coursework in Urban Planning at the University of Wisconsin -Milwaukee. As Environmental Services Manager since 2004 at Hey and Associates, Mr. Rauch's supervisory role includes staff coordination and he is responsible for wetland delineations, wetland reports, wetland permitting, and listed species consultations. In 2020, Mr. Rauch was appointed a supervisory role for Hey's natural area restoration services. He is a Certified Wetland Specialist in Lake and McHenry Counties, Illinois and a Qualified Wetland Review Specialist in Kane County, Illinois. Wetland Delineation & Perirniilttiing Village of Winfield—Riverwalk Park, Winfield, DuPage County, Illinois. Performed wetland delineation and coordinated the U. S. Army Corps of Engineers (USACE) and DuPage County wetland permit. Oakbrook Terrace Park District—Dorothy Drennan Park, Oakbrook Terrace, DuPage County, Illinois. Performed wetland delineation and coordinated the DuPage County wetland approval. Park District of Highland Park—The Recreation Center at Community Park, Highland Park, Lake County, Illinois. Performed wetland delineation and coordinated the Isolated Waters of Lake County permit. McHenry School District 15—Parkland School, McHenry, McHenry County, Illinois. Performed wetland delineation and coordinated the USACE approval. Fiduciary Real Estate Development—Seasons at Romeoville, Romeoville, Will County, Illinois. Performed wetland delineation and coordinated the USACE approval. Park District of Highland Park—The Recreation Center at Community Park, Highland Park, Lake County, Illinois. Performed wetland delineation and coordinated the Isolated Waters of Lake County permit. Schaumburg Park District—Abrahamsen Park, Schaumburg, Cook County, Illinois. Performed wetland delineation and coordinated the USACE permit. Forest Preserve District of Cook County—Buses Woods Canoe Launch, Elk Grove Village, Cook County, Illinois. Performed wetland delineation and coordinated the USACE permit. City of Aurora -Parks Division—Mastodon Lake at Phillips Park, Aurora, Kane County, Illinois. Performed wetland delineation and coordinated the USACE permit. Lake County Forest Preserve District—Fort Sheridan Preserve, Lake Forest, Lake County, Illinois. Performed wetland delineation and coordinated the Isolated Waters of Lake County permit. Itasca Park District—Ray Frozen Bird Sanctuary, Itasca, DuPage County, Illinois. Performed wetland delineation and coordinated the USACE and DuPage County 40 Hi�yandAssociates, Inc. wetland permits. Life Time Fitness Center—Lake Zurich, Lake County, Illinois. Performed tree inventory and coordinated the Isolated Waters of Lake County permit. Frankfort Township/Will County DOT/IDOT- Bureau of Local Roads—Ironwood Drive over South Branch Hickory Creek, Frankfort Township, Will County, Illinois. Performed wetland delineation and coordinated the USACE permit. Will County Office of the Executive—Layaway Campus Animal Control Facility and EMA Storage, Joliet, Will County, Illinois. Coordinated the USACE permit. Canadian National Railroad—Canadian National Railroad and Elgin, Joliet and Eastern Railway merger, Lake County, Indiana and Du Page, Lake, and Will Counties, Illinois. Performed wetland delineations and coordinated the USACE permits. Central Lake County Joint Action Water Agency—Water System Expansion -Northeast, Northwest, and West Routes, Lake County. Performed wetland delineations and coordinated USACE and Isolated Waters of Lake County approvals. Forest Preserve District of Will County—Kankakee Sands Forest Preserve Hydrologic Restoration and Trail Improvements, Wilmington, Will County, Illinois. Performed wetland delineation and coordinated the USACE permit. IDOT-District 1—Review and coordination of the Section 404 wetland permit applications and biological/cultural resource consultations to the USACE-Chicago District and Rock Island District 2010-2014. Wauconda Park District—Phil's Beach Improvements, Wauconda, Lake County, Illinois. Performed wetland delineation and coordinated USACE approval. M/I Homes—Westbury and Wentworth Residential Subdivisions, Kildeer, Lake County, Illinois. Performed wetland delineation and coordinated the USACE and Isolated Waters of Lake County permits. Witco -Wisconsin Southern Railroad—Hebron Siding, Hebron and Richmond Townships, McHenry County, Illinois. Performed wetland delineation and coordinated the USACE permit. Bristol Business Park Roadway Improvements—County Trunk Highways Q and U Intersection, Bristol, Kenosha County, Wisconsin. Performed wetland delineation, obtained wetland boundary concurrence from the Wisconsin Department of Natural Resources (WDNR), and coordinated wetland permits from WDNR. Prairie Produce Farm—Greenhouse Facility, Pleasant Prairie, Kenosha County, Wisconsin. Performed wetland delineation, obtained wetland boundary concurrence from the WDNR, and coordinated wetland permits from WDNR and USACE. Kenosha Airport—Hangars and Taxi Ways Expansion, Kenosha, Kenosha County, Wisconsin. Performed wetland delineation and obtained wetland boundary concurrence from the WDNR. ciII) I li �-,a;In I Mill V°(aIalwe u ?'550( 01Ti 41 .ffey and.Ass ociates,.Inc. Engineering, Ecology and Landscape Architecture 114 0 11 NJ E: 11:: IR 11 11J4' 11 IRVI C I: S V 111 LAG 1:C, 11 IV 0 l � NI 11:� 1:::',OS 1::::� 1: CIT rya ADN A 111 RE E: K 1:: AIN < S I A B I LI "!:'A I 10 Nd S 11, J I )Y Appendix B 42 Hi�yandAssociates, Inc. Owner illl,1ge0r ca Iru,iriul.)Ulg Contact LMI Co nt:i Vuuu :uiru 8,,17c 3 66,07' tc trnna� iiuv���"kaaBV���u�g= :N�is�::a�� :reuuuuuu:u�uu�ln ��,u.uir��ud Status �rnunn�llu �wC�ni:: iinl,g Services IProvided III umt!„liui ieermun,g tiryiWunru :1 r Nlaivagernrnernt Wn u s i Glu..0 hty 1 1 a n rn ii n,g Su:;�l V iii sii; n lr Sediihni:pn u'::oruu o Cii;;iir „u i u ui tiio n V rupglrnee ling Eci rd r°.u'C''v y \tt etllanuid•tl Dchniimtion C u 11��Iicinnflthing L. aurni^:idrnnrapmi^ Aurm;lnliillRer°tauru, 'Jatuui dll Areas IProject Highlights St.re,nurubaurlld ��:�nllriilli rCiirn�ru I'ultllud/ll; oou r ru.si uu ries lur u;;'h,uurureN vii, uiJe ii::oruCror 13u11paiJain rcsWraUoini rn°va uve slud i ies ii::aniirC:rou rirotroilV�i�BN`ii� II i t:i';:"II nCrlu'riri Vlefl,nrid + ruha ncern Brit vr::,llrr I CNcix qo I `nflillv,�alfl er d erru Municipal Center Woodland and Creek Restoration Schaumburg, Illinois The Village of Schaumburg retained Hey and Associates, Inc. (Hey) to provide site analysis, design, permitting, and construction engineering services for the Municipal Center Woodland and Creek Restoration Project. The first part of the project included enhancement of an approximately six and a half acre floodplain woodland located south of the Prairie Center for the Arts on the Municipal Center grounds. The second part entailed stabilization of approximately 1,200 lineal feet of Salt Creek West Branch Tributary 5, also located on the Village's Municipal Center grounds. Plans, specifications, and cost estimates detailing selective clearing, removal of many dead ash trees that succumbed to EAB, enhancement seeding, and planting of over 150 native trees and shrubs were developed for the woodland restoration portion of the project. A small adjacent floodplain wetland area was also enhanced. This work was prioritized as Phase I of the project. Phase II involved preparation of plans, specifications, and cost estimates, and obtaining regulatory permits necessary to stabilize and enhance an existing creek channel which was actively eroding. A series of riffle/pool structures were designed to stabilize the channel and improve water quality and habitat. Bank stabilization included an interplanted boulder toe, outcropping stone walls with a gabion basket footing below, and regrading banks to soften slopes. Invasive species control and native seeding throughout the stream corridor was also included. Construction of Phase I was completed spring 2018. Logs and woodchips from cut trees and brush were used to delineate pathways throughout the site. Construction of Phase II stream improvements began summer 2018 and were completed by the end of the same year. 43 Hi�yandAssociates, Inc. Ciiient y"ulll7agfn of Ca "''lti'(',!nu''1 Contact Greg i..H i oich 6 3 f 1 x,68 a 2 64 i;iolleiclr@c-:lal^,b4";;in, < S Status sii.ullr taint nll dcoiin"nll;:ullr iiiow'n Jove nihi:wn y0 O Earned IFee $5 7,00 Kehoe Boulevard Streambank Stabilization Carol Stream, Illinois ; Seirviices IPiroviicled Hey and Associates, Inc. worked with the Village of Carol Stream to prepare final Uvd 119111 N'(11 iicT, engineering plans for the Kehoe Boulevard Streambank Stabilization project on 3'oi iriwM:ei f"w Nlaina� eineiu'k: Thunderbird Creek upstream of the Gary-Kehoe Reservoir. The existing grass channel P, : Wkkar f.:piy II'VMi iii iMp had failing slopes threatening Village infrastructure and private commercial property. Y• "c+i& °_d'ukw'i4 coin i'o= The lower channel was overgrown with invasive species and causing significant Cc:ulI >b r4VM`b'll,':iin 3 V"i„I I'1ec'^G"Vinfdifficulties for commercial traffic to safely turn onto Kehoe Boulevard. '", wa^daind II"belll iiza3iroiI, 8. I14211rnili,ing As part of the project, Hey evaluated multiple stabilization concepts to address failing grass slopes on the existing channel while improving the function of the stream channel. The final concept plan that was implemented in the design plans included a stone toe with native vegetated streambank slopes, a stone toe with wetland / native vegetation shelf in front of a precast modular block retaining wall, and stream riffles and pools to reduce the gradient of the stream to reduce the risk of erosion and to improve water quality. The project was bid in fall 2020 and came in under budget with substantial completion of all earthwork done by end of November 2020. Final planting will be completed in spring 2021. Hey completed design plans, details, specifications and cost estimates for this project. Permitting included compliance with DuPage Countywide Stormwater and Floodplain Ordinance, IDNR-OWR Part 3700 rules, USACE Regional Permits, and Kane - Du Page SWCD. iDlialMniir4.�rV a D03age nier.3�lQ�s�nli� y In addition, Hey staff assisted the Village in successfully applying for DuPage Water nul)ie l!y" inui umnu Quality Improvement Grant funding for this project which allowed for an expanded CuV,wt:eal i iiinlr,s Vinr± lrcaral,; tcV iir7nppuov;r nnpcwir.. native vegetation/wetland shelf in front of the proposed retaining wall. p3I uurfty ai id i educe 9 stair, -arii gnafiiierL Consitii Cast 266,04:30 r:,roIk) I oic a;, o I A 11 11 Va(a I R I< e1: 44 Hi�yandAssociates, Inc. Client scha ulmlmll„nt.,urw I'arl,, Db ,Itr° ct Todd i Ir 3, 2 J.J1) tail II t;3n'+;hIn1 cxCa n S'ta'tus O N'n i n o N Irn;g Services IProvided sol lrrw atel t4 Ilcnoclpk liI IIM,m a,molrru.urrt C�:'i 111 L I Ig it rl e e i, i ng °yC"a LVo,;IQ::'al'n & °we4 iIriVu'I'Iq 4,,InIntI, aA IProject: Highlights r WIi t'Da,,;c;: IlIvnn ii Cuoirti''ill:at ono SU,&n iurrlibar.ul SW!uliznation vr::,llrr I C Iil4-.xigo IHilly, anal u e y „o . a 01"r r Lancer Creek Stabilization Cook County, Illinois Hey has been working with the Schaumburg Park District for several years addressing areas of bank erosion along Lancer Creek and its tributaries. Various locations have experienced bank failures of previous stabilization installations as well as unimproved banks. In 2016 Hey designed and permitted a fresh approach to an area with failing nearly ten foot tall gabion baskets and steel sheetpile. The new approach included grading of overbank conveyance and creation of native planted floodplain to limit the need for vertical treatments to shorter less intrusive gabion walls. The project also included three new stone riffles for bed grade control and habitat. Hey is currently working to address a new section of the creek where steep banks have failed to a vertical state. The Park District is currently evaluating two concepts that include new gabion wall or more extensive floodplain terrace grading of the opposite bank on Village property. 45 Hi�yandAssociates, Inc. Client yAec;IGso n Nature I:rIr z rnu.vcr Contact (oc u1ive Director 262 242 8055 ,ir, c;ruri r�,uM": u u uC !ra?l)f:.s ^ w ,o Status Annual IEarned IFee $,U),000 Services IProvided tol irrwatel 4 IIc)oclpk ll IIIV,ui iagolnwllt Civll I ggiiiieei ing Desgi W:a eii lb?sources es IIIei inii "ung IPil Highlights l a storedtui II desiigi I I lath al9cgft and I°i drzw{ ic ^ui„i^ul ,,lr "luregrin remoraa�ll'*� c N u0ii a1 c ill 11aI'll (AD M0u'.1� vr::rolk) I u c.a;: o I ii llV,�aIRI e::: ?` c vi"rI Trinity Creek Restoration Mequon, Wisconsin In partnership with the Mequon Nature Preserve and Habitat Restoration Partners, Hey provided engineering and permitting support for the restoration of the remaining ditched portion of Trinity Creek on the Mequon Nature Preserve. Restoration included remeandering of the ditched creek, excavation of a floodplain and wetland scrapes, breaking of existing tiles, in -stream riffles and tree structures, and native corridor restoration. Hey prepared hydraulic modeling to support and refine the concept design, and completed permitting through the City of Mequon, and assisted with WDNR permitting for the project. The project completes restoration of the on-site portion of the creek, which has been a long-standing goal of the MNP since first restoring the upstream reach in 2008. 46 Hi�yandAssociates, Inc. Client °J1!)1!ra;ITi°sinl:llntaMi°s117ec� wso Iabon 4602VlaIuo+a la; Lei ave " `a-,ndei L -eke; VL t 0097 Contact lfa,rus': y Sw�owv ::,, 1l"a"a tfN shf?d IV a naSe, 815 648 2252 Earned IFee $100,00 Nippersink Watershed 319 Grant Projects McHenry County, Illinois Services IProvided Hey and Associates, Inc. (Hey) was retained by the Nippersink Watershed tolinwa tel 4 IIurVclpk liI Il auiia,m.ai7wnt Association (Association) to prepare design plans and permit documents for nine gill Lryii 1a_ f, L ra,u ,ru projects located within the Nippersink Creek watershed. These projects were WMeii. 13esources rc es IIIei rnii dng awarded funding through the Illinois EPA (TEPA) 319 grant program to address non- "c:a l 110,51 rmiu & sedi-likani4 coni i,cd point source pollution in 2016. The projects consist of two shoreline stabilization project on Wonder Lake, shoreline and riparian stabilization of two islands on Wonder Lake, four streambank stabilization projects, totaling nearly one mile of stream on the Nippersink Creek and it's tributaries, and a ravine stabilization and stream realignment and stabilization of two direct tributaries to Wonder Lake. Protection measures include rock and vegetative shoreline treatments, ravine bed stabilization, rock riffles, hybrid rock and vegetative streambank stabilization, culvert replacement and enhancement, drain file disablement, and restoration of many acres of agricultural plains to native prairie and wetland habitats. r:,rolk) I oIc a;: o IVfiillV°(aIRI<e1:, 111P1'SO c rai"ri 47 Hey performed field reconnaissance to assess conditions at each site and conducted topographic survey at each site. Hey prepared nine separate engineering plans, and permit documents through McHenry County, the Village of Wonder Lake, the Illinois Department of Natural Resources, McHenry County Soil and Water Conservation Project: Highlights District, and the US Army Corps of Engineers. We worked close with the Association G:J 111 S I; 111 f IC' IuC1IV;u iLlr„rzc;l aaIIt11 :u fa('Iil'ity to prepare plans to fulfill for permit and construction needs, while taking into 1ydiok)giV and iuydi'zquhc anl .,is account grant and Association budget concerns. Typical stabilization practice details l,egt laWry pei nrAJI'lig were developed and utilized at multiple sites to streamline the design and permitting °4ul:)lire access, uiripl cive nei its process and to save fees. Dain sa�ety ric�� In addition to the stabilization projects, Hey also assisted the Association in �,zur� �; �licroc.i V cc�ariiu r�^ habitat r�o�llra�uur°c�auitc^ t preparing water quality modeling for the Illinois portion of the Nippersink Creek Watershed, using the IEPA STEPL modeling spreadsheet, in an effort to update the existing watershed plan. We worked closely with Wisconsin Department of Natural Resources staff, who are prepared modeling for the Wisconsin portion of the watershed, to achieve a consistent and unified study. Construction was completed in 2017-2019 for the 319 projects. The water quality modeling effort was completed in 2019. r:,rolk) I oIc a;: o IVfiillV°(aIRI<e1:, 111P1'SO c rai"ri 47 Hi�yandAssociates, Inc. Client Pylaa Nrai°"ury °C)1, linty collaerva iloI°u f::7 S i°id' T2 10 Keystc�i �e I ua,:Viimr ri°d4 VLG 007,;i. Contact Il a°rad Woodsol.0 5 678 4532 Blal600Q: sola@lnn aAl.Sti O,oi g 0 IEarned IFee `;` m,00 School Springs Stream Channel & Wetland Mitigation McHenry County, Illinois Seirviices IProvided McHenry County Conservation District's (MCCD) Glacial Park is home to both a sol inwaatel 4 Ilcaraclpk ll I Ilam agolnwrat wetland mitigation bank and a stream channel mitigation bank. This particular site Ci will ryii 1a_ a , Lr a ,u ,ru was previously home to a series of agricultural ditches, discharging to the Nippersink W ateii lb?sou,ai-u.e°, IIIei int ung Creek at the northern extent of the site. Historical aerial imagery of the site, prior to agricultural use -associated channelization, was used as a guide to design the spatial pattern for channel restoration of this portion of stream channel. Additionally, EPA's Functional Loss Determination quantification method was used to guide assessment of existing conditions and representative functioning channel segments to guide design. Determination of channel function was derived for existing reaches, reference reaches, and designed reaches to quantify the improvement in channel hydrologic, hydraulic, geomorphologic, physiochemical, and biologic components. Hydrologic and hydraulic models, meander patterns, riffle to pool structure and spacing, relative discharge ratios, field measurement, and field surveys were used to quantify the recovery of channel function. Calculated and measured hydrologic elements, including channel forming, bankfull, peak, and critical duration discharges were used Project Highlightsincluding guide hydraulic design, including bank height ratios, entrenchment ratios, channel 113est:araau ui I c esiigi I stage capacities, stream power, bankfull velocities, and bed sheer stresses. Ilydirak)gic and I'°uydi'zwa ic ,ai.i,aly.,ia ,awgaul,aWry Ilaei niAdiag Permit and construction documents were prepared to obtain required permits, fulfill yiiealia "e"aWraaLial'ii the EPA approved mitigation bank prospectus, and guide construction. Staging I)itateinhai cernc-nt design for this project was critical, as intermediate staging areas were required to stockpile material following new channel excavation and prior to filling the decommissioned channel to guide flow reintroduction. During construction, historical bed material was uncovered in the mapped locations of old channel pathways and was incorporated into grade control and habitat riffles. Additionally, field surveys have confirmed that fish and aquatic invertebrate communities native to this class and structure of tributary channel have returned and are thriving. r::rIlt:A I � I i�ic.as;,pc:a I I`a�iilla",� azul ��;n,, I`ur ya a �saar a rar"r`� 48 SAY a � ssoc ates . ic® Engineering, Ecology and I...andscal Architecture Client Vletru;otnn„nNlit. nrn Water V "u Al'lill't: Contact kn,tor h old tun Honor t i 2 inn n n 301) �2 unnil�°:;Nn a�N � �n„;Napu�t���u"a'p�au:il,n�na=„ S'ta'tus t.. N'ntd':nli II'nt IEairirned IFee Addison Creek Channel Improvements Final Engineering Cook County, Illinois Services Provided Following the completion of the preliminary engineering for Addison Creek Channel Stmui& lill��lip;ul�sliru II'w�l,.nun��.�u d.nun�nunt. Improvements, MWRDGC retained Hey and Associates, Inc. (Hey) to complete the ''ivfl V rngi neleri ng V u�esn g,rn final engineering plans for approximately 5 -miles of various structural and Wetland DeIhn ? J n »u II' ru tniuuliru, stabilization improvements along Addison Creek. Existing conditions for the 100 -year Vaill db,ca13iii. Architi:EuAru11112 storm event inundates hundreds of homes in this study reach. The improvements tnnwll II rn),Joll & "rpeuiliunipnt Guru so� have an opinion of construction cost of approximately $30 million. Work includes final hydraulic modeling and analysis of designed alternatives, design of gabion and soldier pile walls, streambank stabilization improvements, and bridge/culvert removals and replacements, storm and sanitary sewer design, utility relocations, and civil and site improvements (roads, parking lots, grading, etc.). As part of the Addison Creek Channel Improvement project, Hey conducted a detailed site investigation of the project corridor including topographical survey, outfall identification, right-of-way/ property ownership research and analysis, public and private infrastructure, existing channel conditions, and utility information. In addition, soil borings were completed for a geotechnical report to aid in design and environmental sampling was completed to characterize project materials for appropriate disposal methods. IPil IHiighllliglh'ts Hey is currently completing the final design and producing construction documents 11 Jrhan fflu:ua'::ouN urls1ruduc li it for the channel modifications and associated infrastructure improvements. The Connrey zlin�� e and ;Uoi ul;e lin'q,;uno %ei nerut:s project also involves permitting coordination with regulatory agencies and I Vu bueuudy II IIVL II'AS I11`0o112lhng„ coordination with stakeholders and municipalities. The project deliverables include toll ,.Alin lrl6lJu:;ur unuulln Hun nuu.nlrnt: final engineering plans, specifications, cost estimates and reporting. Vollo I Chicago I Milwaukee heyassoc.com Hi�yandAssociates, Inc. Prairie Trail Stream Erosion & Trail Stabilization McHenry County, Illinois Client PVC1 Nrt1°'urya (°C)1,lint:yr colllserva iloI°u f::C�uw41°1d' s 71 +I 11 IItu1I ii IeI SI 1„01"II1)64r,t1'4't1a,u duSt:l'ua'9,a.ru"! S'ta'tus to I1;4;;,0 111 > IPil Cost N600,04. 0 Services IProvided CV I1g111I,"eI I I I g atoi I riwatei "a:IIr: cxJ� :)l,:Jin Management °y'i L110sit::kIV MIS. °we4 iIriV4'I"Iq 4,,InIntloa Cti(edt ::fl id II,)'a'flii4i'a dili'm <'+ I'C'U' nitt`fng I:a':aallr.ag0r..aIaor,to0 rinr lI, OICu� ,rur,�,, aarugeniu't,. a:� I ,latG.uraul Aivis :Ial Ik' Mi(ICc.>� l vatia': r ;alr;)gI ad lour; & B,i L hfy"u"1Iv I I i SI�odieIs; IProject Highlights The McHenry County Conservation District (MCCD) contracted Hey to design and ::dvull II urvngiiurvne( rl ng permit streambank stabilization and restoration for a linear section of creek adjacent y,,Ve dzln d DeNneadon a nili I11:111 in inks llung to their Prairie Trail in unincorporated McHenry County. MCCD had long l rdl°d)logil-,a1 d h-Nyadu,wusll'ic inar y.:,is experienced erosion issues of the creek banks, with multiple instances resulting in Rtcagul,rt': Iya II1eirinllWi71g damage to their pedestrian trail. Following installation of numerous temporary q11, r7 I ral1s stabilization efforts to prevent further damage, they enlisted Hey to help develop a sttcanl I„ r;totati0111 long-term, comprehensive approach to prevent future erosion of the banks and to Si•oi cince, i daaVvill bt noiovina;:emor.nt: enhance the corridor. The project included hydrologic and hydraulic modeling of the creek corridor utilizing HEC -RAS software to ensure the proposed stabilization methods would hold up against anticipated creek flows. Proposed solutions include a variety of methods to protect the trail, including stone toe protection, modified lunker structures, and creation of a stream meander. The project has been designed, and MCCD is currently seeking grant funding for a portion of the project with a goal of 2022 construction. vr::,llrr I C1c:a I `aflillv,�alal h11 e ya 1 „ort r 0 1 T I 50 Hi�yandAssociates, Inc. Clients Me,t,ro1"a6Ita ur Watnir IRefdhaI°71riation I:DIri4uld' afGteaei 4;11 is a ;r,(V tIuIYIILu (:;1 arl,r 4`A;u.alatA Lou u';laaur 9µl ..I..tan.sI.;roi t atiaarl (LCD4..t..( I albs= County II cars 1 I'I°rurralVOs (11..4 111`) Contacts V1ti RI::bG- Ju adin Ilu",iIH- 3] a 71311 3171. Klil'II<Jltrralu„AVlu ,org 4"DOf lBet!:m Dusukei,t, 847 377 71,100 auc:;la:4 u4(xal,ala'4aa.ukaulutAlll gov 847 968 3262 0 Services IProvided S't i nwa'teI Sk Vf n;ageilla-'al"u'L Ci Ill Ingnc r I Ilut„ IfM igi1u ts" et;ll,"allay INflliiIo kiorn Il I1r�u'rrr11tling I inrJ w,.aalpc A;ur.Iriit:r rtlul'-v S,r;,r'il rlro &su^rdlniol t Q:aoIlr1'.Iro t, io p„'IsU l n %': . oI I ILu"igll"'I4 i"V III"V IProject Highlights Xa:Jal°°nu Ion of I r Ek)l iam flood col Itil or facI IIty I lydi al^a„ft and I"I}ru1rzw{ it ,ul'"Iau ysis I,eg ul,a4:ory Ipei u'i'Atill,ut I rv;all; Wllrl 143, r°rlrnp,mlll,^:u :1 al"$JI1g ('X1aa�alrl^:auurI'll I)atill waIe4Y SU cairn rc;r;rtot aticia''I Shoteline habitat euaha imwu ei l aa,n't: Jl:)alnitl habiut O resLoiral olriI w,rP:IIMaln(J rr„r'i't:''gaat'iu':aIa a1estgnl r::'rolk) I uIc.as;: o Ivtiilly, aul �;n,, ?` r 0I"ra Buffalo Creek Forest Preserve Lake County, Illinois Hey and Associates, Inc. was retained by the MWRDGC and LCDOT to design and permit improvements on the Lake County Forest Preserve's Buffalo Creek Forest Preserve site. Working for the MWRDGC, the eastern portion of the preserve was enhanced to increase the flood control capacity of Buffalo Creek Reservoir, as well as enhance recreational elements with new and improved trails and boardwalks. Hey worked with LCDOT on the western portion of the 408 acre preserve to implement a wetland mitigation and full site restoration for future LCDOT roadway projects, as well as over a mile of new trail and trail connection to the reservoir project and adjacent neighborhoods. Leaning on the trusted decades long relationship between Hey and the LCFPD, years of inter -agency coordination was key to the execution and implementation of these projects. Having worked on dozens of LCFPD sites, Hey brought this experience and understanding of the site owner's mission to these projects, helping facilitate communication and ultimate adoption of inter -governmental agreements for these projects, as well as stewarding them through to construction. Both projects began with mirrored planning efforts, built off of years of careful data gathering and concept development. Weaving strengths in site design, water resources, and environmental science, Hey worked with the goals of all three entities to maximize site improvements to accomplish myriad goals. Regional flood control, localized drainage improvements, ecologic and hydrologic restoration, recreational opportunity, and community engagement and outreach were all accomplished as part of this full preserve multi -agency enhancement. Construction on both projects was completed in 2019 and 2020, and Hey remains engaged in site management and monitoring efforts at the preserve. 51 Hi�yandAssociates, Inc. Client Contact off Hansel ui usel l &47 234 (17711 .I I.iagic^r;�i ulrf�q:uq�;;�lwulu,iiq,a,u Status n":4Nni„ohn;g IEarned IFee `a 2fx),,tl,)oo Moffett Ravine Restoration Lake Bluff, Illinois Services IProvided Over the last decade Hey has worked with the Village of Lake Bluff to improve the Uvill 1 gill cei Ing Village's ravine systems. In the Moffett Ravine we have cooperated to address n ,4 nuc una:'r q ur4irla_+ u'q 'u) slope stability, bed erosion, and drainage concerns. Our work together has Ei osk-.)n aiudSe6nreiul Caiiiird improved the stability of this reach of the ravine and improved water quality of poi iin atei & ::]oi:�)• :l)lain Management runoff to Lake Michigan while building resilience for Village and private infrastructure. To date, Hey has performed the following work for the Village at the Moffett Ravine: PrHighlights . Prepared design and permit plans for nearly 500 -feet of toe and bed ,Iavgri: leestai,aLk) n stabilization measures using stone riprap in 2017, including construction 91o1x StaINlzztaii observation. toi in 4Jis U� St alblillz alk)n • Prepared design and permit plans for energy dissipation/scour protection and project permitting at the Moffett bridge culvert lining project funded in part with IDOT funds and completed in 2019. • Prepared concept plans for future ravine stabilization measures for private property owners along the ravine • Facilitated negotiation of easement agreement between Village and private residents for construction and maintenance within the ravine. • Prepared design and permit plans for repairs to two Village storm sewer outfalls to the ravine crossing private property. This project also included associated slope stabilization repairs and two large stone grade control structures to stabilize the ravine slopes and bed, and arrest downcutting. This work was constructed in 2020. ar::rolk) I u c.a;; o I Aiillv,�aIul eI::: ey�::assoc col n 52 Hi�yandAssociates, Inc. Client I'fII'm County I oirnst I1311°s eli'v I[)istu iCt Contact Matt i..h ltzei,I 8110 96,11 .i29i,..d u iri uc�l k �r'vl u@ Ic:fIori,a�u g Status 01°1 go, i rg Estimated IFee Construction Cast u,oiinplced Mei-;„6yuin, housic Services IProvided Di iiia ule5:1Q1v1r0 i':'ivll V_iigiin ei,i u,g vva+ilainf:i Cmsl4a4fon I ycioIogic and III drauHc I” a,:,a16ii ig p"eP"Iirii l it g and Q"4:;ws V ucti(:;rin Doa: ul inei"i�ts v::rolk) Hydrologic Restoration Lake County, Illinois IPii Highlights The Lake County Forest Preserve District (LCFPD) has contracted Hey and Associates, Velli a.zlrr& IRes� :or aiioi ii Inc. (Hey) locate existing drain tile and storm drainage features throughout dozens of G ii a i it iiidiii g their Preserves. Following these inventories, LCFPD has contracted Hey to provide hydrologic restoration planning, design and permitting services to support LCFPD restoration activities. The work includes file disablement to maximize available hydrology, file re-routing to maintain off-site drainage, placement of structures for water level management and grade control, streambank and channel stabilization, and installation of native vegetation. Restoration measures have also included planning and design for interaction with current and future recreation elements. ?` ( vi"rI Implementation and restoration has been completed at the Middlefork Forest Preserve, the Southern Des Plaines Forest Preserve (including Grainger Woods, the historic Adlai E. Stevenson Homesite and Daniel Wright Woods), Cuba Marsh Forest Preserve, and Ray Lake Forest Preserve. Design and permitting have been completed for work at the Lakewood Forest Preserve, Prairie Wolf Forest Preserve, and the Grant Woods Forest Preserve with construction slated for 2021. Additional design and permitting services for the Ryerson Woods and Wright Woods Forest Preserves will be performed in 2020 and 2021. 53 Hi�yandAssociates, Inc. Client Contact Tony 1:3eyvi 2E,2 (u'64 78119 S'ta'tus Ongohng Earned IFee $200,000 p Hoods Creek Improvement Planning Study Mount Pleasant, Wisconsin Services Provided In 2016 the Village of Mount Pleasant began the initial planning phases for the `A/ ii rel I(c aG ul COS I 1 1l ;I1 u1 uA Hoods Creek watershed. Hoods Creek, a tributary to the Root River, drains the A a+Cll;ul"rA ( aulC:uCi uu northern half of the Village. Portions of the watershed also include the rapidly I ytlI oIof;Ic ai,i i Il lydrulk:I" 114;:a4y6ii iig developing and modernizing 1-94 corridor. \Jaa4w i al Asses°Nuaient Initially, Hey worked with the Village and a group of watershed stakeholders to prepare a comprehensive planning document for the entire watershed and stream reach, focusing on identifying and defining opportunities and constraints within the watershed and stream corridor. The plan explored opportunities for development within several tax districts, recreational amenities such as regional trail, drainage improvements, water quality enhancement, and ecologic and habitat restoration. Upon completion and publication of the "Hoods Creek Improvement Planning" study in Hey and the Village have set to work beginning the work improving the Hoods Creek watershed. Initially Hey prepared construction and permit documents for the removal of the Village municipal compost facility from the floodplain, which included enhanced stormwater management and water quality improvements as well. Hey has also prepared preliminary engineering plans for trail, green infrastructure, Project Highlights and stream improvements along a portion of the creek in the Route 20 corridor, with watv15r 11vfi I13 m1u1u1ura, the intent to implement the project as development progresses in the reach. Ail:Ill1 A a,,l lr rly Concept wetland mitigation planning documents have also been prepared and Hey is I(ecieat:ion ml PVarur•uivaR working with the Village to require restorable agricultural lands with the intent to IrpIgli;)raaal Sga:zrraaw4mU r Design enhance and restore wetlands, potentially as a Village wetland mitigation bank. r:ik) I C IiIci. qo IHilly, a al a u e y 1 „o .( as 1 I 54 Project Location Map 55