HomeMy WebLinkAbout5.4 Motion to accept proposal for 2018 Reservoir 5N rehabilitation project design and construction engineering services in an amount not to exceed $29,374.0
m
Alk
Professional Setv*lces
Rebabiffiltation of thl 1 000,000 Gallillon Stablon SN Ground Storage tank
Thell Village of Mowt Prospect (Village) i's seeking proposals, ftolm quallfllil��
W,
consultants for engt'neering and inspectionz services, assOCiated ith the,
rehabilitalion of the Station 5,N ground storage tank. (Aftachment, A, Map,)
Profect Scope
'The consultant will provide professional engineering sermces and pro We,, at a minimum,
thie folllowmg,,
uWu
W, W wool
6. Cwsultant shiall evaluate, Ndsi,, chec rI a ef6renices, verify eontr c�oir
I
rep resentat'ibns-, and' make, a written recornimendabon for aiwad rto the
'Vl*lllage,,
in
tn asse
T, Consultant shall assi'stthe Village Mbling all coin striuctio, contract
documentsfbr nefcessary for exec,utjoin of the awardied contract,,
1. Consultant shall conduct a precons, tw�dloi conference Wit,
representatives, of the Ownefr,,, Contractor(s), Uti'lities and other intereste
part"'es, aff cted by the proposed coinstr ction.
2
spectors, techniciansus„ . Consultarit, siha I pirovidei resident enginfeers, in
surveyors for the projed as follows'.
iv,, Prepare wriften dairly inspecti I on re,ports,,. Reports are to be
dieflivered 'to Ownefr in an el�lect�ronic, format. Digital
4
h
photograp s documenting work tasks, tn progres,s as wiell
as ainy, potential probliernis or unu�su�al, cionditions, shall alsfo
be,'Included w"thea,ch repoirt.
AFPfur Prof Services .1"Water Main Construdion Design and InsW*oin, Febfuary 7',, 2,018
Page 3-af!S
V. Ass,'I'st the Owner in preparation of any, necessary chainge
0,
order and/or field directives.
V1, Process rnonthly applications for payment 1'.''X. by
t I I forwrd tOwnerw4th
,he Contriactor(s), and ao
1,
recommendations for approval and payment,.
VII. Assist the Owner with the resolution of inquines,
COMPI ai�nts", or coincerns raised
Idle, residents, lor the general
public.
Review shop draWngs and other equiprvientft aterW
submittals-, as may be requi,red by the contract documents.
Ix. Perform. a field observation ofall completed work before a
finial apIplication for payment isl Processed for the
Coint actor.
X". Revise the oNginal plans in accordance Wit, 'h c,, ol nst uction
observation records of the Resident Engineer, Inspectors,,
ctor, and!
asupply-the Owner with one set of
,n'd the Contra
as-bufl"t drawings in a suitabie ellectronic format.,
Cost Proposall for Engineering Servi"ces
Raxe hab]'101tation of Mite 11,000,000 Gallon Stahion SN Ground� Storage tank
Prop,o,,sals due Februwy16, 2,018
Present Work, Load
A complete tabulation of thie Consultant s current prqect wforkload Is to be Included,. Each
roject P ;amu be j1dntified by rtame, type, silze 11dura� on �ll nid peso�nneel assigned.,
r
RF'P lot, Prafessiooa4 Services I Water Mali Consiructilon Design n iInspecton, February T, 2018
Rage 4of 5
Persomel
ProMssionalij resumes, including, education work expenenice, professional credentials,
'th the firm, Job desicrip'tion)fdr
and employment status, (e.g. full-time,,. pa ime, years %M
each Individual to be assigned to, the prPiect, descr"bed herein should be provideau-'J.,
0 a
a A
AL
low
W'w
Casey Bofterman
WaterlSewer Superintenftnt
Mount Prospect Public Works Department,
11700 W. Centrial Rd.,, Mount Prospect, IL 60056:
IProi I I posalls can also be defivered via e -ma"'
iras oefet, or
proposals should be clearly labeled in the foilowing manner: 111 , Al I
Proposal for Engineering Services
Ramu" habiliftatloon of the 1,000,000, Gallon Sitation o tank
Proposals due February 16, 2018
All proposais, must be received at the
, I
Mount Prospect Public Wbrks'factlity no later, tha,
IZOO PMj2ggLfiMg on February 1'6,,, 2018.
AFP for Professionaf Services I WaterMovin Construldon Design ari4� Inspection Februaty 7 , 2018
page, 5 of 5,
),l
. ��' a-
/J!N � � 11 ,„ I i
' ;N /l gie9 aC�
i , � �,
„� -r
ori ; m , � „ � r � ,��t %�„Y
■
S�
i � BURN'`MCIDONNELL.
• February 16, 2018
Casey Botterman,,,'Water/Sewer Superintendent
Village of Mount Prospect
1700 W. Cent.,ral Road,
Mount Prospec,t,,IL 6,0056
R ; , ', 11 0 e,* Ppo
rofl,. I fbIr kyr ,w Services - Rehabil ltaUm of 'th e, 100, X00 0, Ga ,o,n Statt n� SN Ground
A sa
Storage TAnk
municip
Ma,intaining w,,ater'tni,fras,tr,u�ic,,tuire in aIn economical way can be a challenge, for, Iallits'es, likethe
Villaige of Mount'Prospect (Villarge). Meeting thischallenge requires a strong part'ner that unde,rstands,
your goels"
Burns & McDo,nnell understands the obiec,t,ives'f,ofr''th,,i�s',p,r,o(�e fiedl to providle'the design
,j d'and is quall 1 1 1
and construction services outlined in �rua,ry Z 201l8,,,,, request foir, proposals,,We, bring the
following advantages to the Village."
anldll within budget.
Ir proposals. Feel free'to contacit me
Elbdose,d pleasefind our, submit:tall in res, onse tO YOUr, request fo
p
IL
at 63,00-724-32,76 orrp-gtchett,,�', b C "Din if You have, any, q, estions.
Iu
m Sincerely,
v
LO.-
0
cl
Ra;nL Patchett, PIE
'Water, & Munilcipal Services Man,at
11431 01,clOLis Plalc(,, 4,0(') D'.-Ilroir"iers, UL 6(C)SIS
0 630-72 ,3200
■
■
IIS
'#0
'12 Pr,qjeclt team
Organ,izational c,,,,�iart
Resurries,
4
.. f..
� � I
i
r
i
[I
I
AWOL
no rof�i 1,
&,sum M�U, M.21111111Mi
A VB, U r ri, s & M ic'D o' r, r, P g ,ito si
C
D
, � �jj 1,� ( ')nJSt t" U C t, i 0, �;,711 ',[� ro e s s o n a-.,, I -s. s d e ri, t
lt-ar'its do i,-rnor-e fl -,an s i rr'%�, p I y �p �; a
C 0 r) Is 11
,n
U ri,c h a n g e d s i,, n c e '189 8 t 0) Mva 1< E 0 LPI"
cl,rAS s cce s s f I I -- o �i r ITTo re t I-) an 5, 700
pmfes,s'K,,)r)aIs patetner" wJtl"",� y�OLJ to, tak':e
Y
0 1,-ij, t �-i, e t, o u g I -i e st c ha I e r -i g as, r -,)(s Ua, I,
w o r k i r'i!ghi)or",(
a rri a z 11 r") g p I a c le
Local Presence & Depth of Staff
Bas Missouri, Burns & McDo,nl,- e
,ed in Kansas City 1 11
has more than,410 offices nationwide, allowing us,
to provide i,r)nio,vlat,ive,,tit,",niely and cost-effective
service, to clkients. With over 5,700 employele-
own�ers,, Burns, & McDonnell has professionals
w 'th exte�nsive exi ide ran ge of
perte,nce ii,i a wi
engineering, clonstruction and environmenta"I
d 'R
i'sciplin, e,s,.
Locafly,, Burns & McDonnel! has been, prov"d4ng
water services, to rnunlcipal ch'ents iri, northteasteirn,
Illinoi,s for over.20 years. We, have lbcal offices',
located in Downers Grove and the City,of Chicago
with, a combined stcaff of over 330 profe)-ssionals. We,
anticlipate that all: of the services in the, Jankjaryl&,,
2018, reqUe-st for proposa! will be provided by staff
f
located in our Down-er's Grove office. We will call
upon nabotial experience a's required.
Our, Downers, Grove office locaVo,,n.-
Burns& McDowell Et,gltie erig ng nC
1431 Opus Pi'lace, Sulte, ,400
Downers,G(rove, Illinds 60515
630-724-3200 1 www,burnsmcd.com
B U R NSli $tIS,D0 NN EL L"
BURNS & McDON N ELL
INDUSITRY'RANKINGS
Corporate, Structure & Services
We provide compreheii�sjve services that cm,,,over the
fuIli life,cycle of a project,finding cost-effective
Solutions tio meet your specific needs. Ou,ir services
CIOIVU,all mar,ke,,ts in theengineeiling
Co'I"I'S"b"Llct'jion sectors', to bring you and! your projects,
selamless breadth and deptb of knowledge and
s, k i I I s.
Water &Transportation 0" Comme,rcia,11, Retail
Environmental Institutionz.31,
ConstrUCtiont s-, Manufacturing &
o Aviation Indusbial
Governmienta] 0H & Gas
0 M i 1, i tzi ry
& MLU)idpal eower
. . . . . . . . . . . . . . . . . . . . . . .
In 2017�,ENR MidWest- named 1 urns & McDonnelll
No. 2
h
Designer of te Yb,airl. Alsoin 20-17,29 of our
'I ustry services eamed spots inthetop 4
Spec ic ind 0
ra
in their fielld In E, I`s, indIustry-specific nkings'.
-v
JIM
For the sixth consecutive
year' theProfies's"I"O''na/ SeirviCeS,
Mx')"aagemen` J6,tjrnal (P MJ) has
PREMIER AWARD
0,01, cut"I M
presented Burns,& cDonnell
with the Premier Awa�rdfor Client Satisfaction
for
revel ving ratings "lin key ctient
service categoriles, P.SMJ,, the leading ptibi ishierya
trainer, and clof,nSLJII'lt,ancy''to't,,hie A/E/C Jndustry,
an�tivally conducts an indepenclent SUrvey of
A/E/C service, provider clientts to cleter miit'ie ovet'I
'lu
saItlsfactibn, levels in seven categories,- helpf' Iness,
i
responsi.iveness, quahty, accuracy, sched,ulle
adherence, budiget adberence and scopeand fees.
Defivering qu,ality
work is a cornerstone
Of,01jr-fia,icking
the skills, knowledge,,,
!i%J%%
and exper lience of
me, pirofessiona Is Is
OUr robust Quality,
A s si,u ra, nce/Q uz I i ty
Contro-1 (QA/QQ
Program.
Providing the, framewor,k
to cm our, project
exceifence,,,, out °/ Progui-m includes, check
and balances blaseId on lessons learned througjhOLA
or more thian 118 -year history, and the experience
of our employee -owner's, Wo perforrisk reviews,
Y & -nitigate
to jidient'f , aSses'S crand develop pilairi to i
risks, and create p, ofect instruIctions, which includle
scopeancl respons,ibifitles,, sc'he,dule and budgets,
a n d p rol I ect-specific require-rnients. We build SiN-
step, internal quakty reviews, into pro'llect schedules
that involve r1egular coordlination, n,,,i,eetlings, a�nd
b
evaJuatlon,s by eixpeiriiencedl� professional's ajt, strategi,c
milestones throughout the des4gn and coInstrLIart ion
Burns, & McDonnell has, been successfully� roviding,
Ip
consulting, desj,gn and consitrUction,ser"vices to
the Villageffor 15 yeairs. Ouir proposied staff are
exper,JIenced in working with the'Village on simillar
project'S.'W'ca keep projects on budget aind on
scheIdu�lle whHe mIalintalnlng effective comi-nunicati,
i i J
We, pride ourselves on being qualified and
nd look,
responsive. We, vaJUe, our' plartners,hipa'; I
forwat,d to clontinuing to serve, the Village of'Mount
El
1:1
E
0
N
■
O •
L
L
L
L
17
171
BURNIS,;$V�C-DONNELL*
Caift Burns &I McDonnell recently SUpported the
Til age with; development o,f a Water Main Asset
Kanage;ment Pro,grarn!and Water Rate Studly,
so we und'erstand that this project is, tIhe start of
many pro`it ects ItJ�ie Vill1age, will be con-11pleting in'the
Upcot"I'ling years® Managiiing costlis kyey tio maki'ngi
sure thie Vfllag�,e, can lmplemen�t tbe[r,program
thie way 'Iftwasintended. Siirnpfe design fe isions
d,d
like coag ngtype and 'met hodology',(e.g, overcoa,t
vs. f)U11 blast, & recoat) can have, a drastic effect oni
cost,, The Village needs w opportutlity tO consider
thes,e is,s,uef.s, to t'inake data -driven diebsbns. We,
will identify feasible -options, discuss themwith the
"Village, then design and bild the project it a matiner
that allows fbirbid al I �'ternadves, This Will a1low the
Village to obtain Tor ii prici I ng anddecide
what to do based onactual in -stalled closts.,
�Heavy Me, I M'e�m, en t & IDI spo,sal Thi, x`01
iris pection, repurl idient'li"fied the potential preese�xe
o f I e ad i' n t h e e xte r i o r a nd i rAe rl o r co,a It i n g s. ysite m s.
Appropriate d1siposall of'llea,dl-bas,ed in car) add
cost tothe projiect,''We. willcoinplete addibotial
tesbnrg of the,exisIting coating systems, to verify
t1w poIter'i,'bal' fc)r flie prelsence of avy m,etals.
hee
The, pro'ect specif"Itabons will! include, i',IISUres
,for prop erI verification and d1i"I'sposal of heavy rnetal
based pallnts. Burns & McDorin,elf fhas over, 60
envirnonrnental staff lociatedin our Downers Grove,
office -ti,)e can assJst thle Village, Jf nereded.
PIe,,,,rmJ1tflngTh1e propos,ed improvements will r,eq!LJJ,re
obtaininga constrUCtIan permit frorn IEIPA. We have,
anexc-ellen't rel iations hip wfffi 1EPA z.,v-xi are confidervt
that this, will result i�,'i atimely permit rewiew, al'I
issuance.
ifir"I
"bass k 2.,@, Pre, Ift"Inary, Design,
w
2*1 Existing Data Review Request andrievie
exist ,ingdatapertii enttoc'L elpro,"ect.'rhis
is anticipainclud'e-as-bUllit dratwings
provided by th,e Villageand the, 20112 and 2017
inspection, reports,
Lodi
23
I� 9
n I n, Coating adheslon a, id ! h�eav,y m0al wst]`
COrTlple,te testing tio cofnfirmaxis tingi
conditions.
Task, 4: Per mitting''SUPP,Ort'
Prepare and submit a construction per,mit,
appfilcatjbn�Permit application fees are not
A L ' I is proposal.,
tricluded n tffi'
SURNS SDONNELU
'Task Sw-- 81dP ase Support,
Provide, Rid Documents Dectroniccopies, of the
fi
I'S na]'' sueld for bid documents,'will �be mede availlable
to prospective bi'ddersl in PIN formatfor a noiminai
'fee. Bidders wIll be abie to purchase hard copies of
the documents at, pri"Int"Ing cost..
Attend andCoord*n,ate, One, (1) Pre --,I Meefling
I g
Prepare meeting aqet(ida and meeting notes.,
Provide Bld'di) 9 Assistance Review bidder
I n
s -'0
questbniai,i�d� requests if rciaIrificaIIS ond
to questioitriis inwritinIgg andl prepare, addendia as -i
necess-,ary,
Attend anid Cio,oridilnate,One (1) B140penjing.
Bild RievIew and Recommendation Review and
e'vaivate. bids, for corTi,plete,nue,s,s,,,die'v,ellopiand review
bid tabulatioti,, verify contrarctor representations,
cheic,k references, and rrake a written
re,c,oi,�*ner+'ll'on for, contract awa�rd.
Assemble, Constrructlion Contract D,Ocuments I
executionof the awarded coi.liltract.
P,roJe,ct,Adml�'I'ini'st�ra,tion�
Assist th,e Owner ihn, preparatibn, ofany nec,,,ess,ary
clha n g e o rde r a n d'/dr f i elld d it ct i ves.
Process monthly, ap,plicati�ons for Payment,
submitted by the Contractor(sland forward to,
Owner with recommenclatio,ns for approval 'a n,d
paymerit.
Assist the Owner with the resolution ofinquir I tes,
comp,Ill aints, o,r concerns ra, J',sed by residleritts o,rthe
PUblic.
Rlesi'dent EngiinneerIng Provide a Resident Project
Reipresentative (RPR) for arttjme ser ,on,
of the mrk during the comtrUCtio"n periodl to
obs,e,rve an,d reco,rd coi,istrucbon progress under
general,quildance o,f: the Engineer,, Based o,n on-
site oFeel rvation,,the Engineer, wit] keep(the Owner
Sl
infortmiled of the, Progress o,f thie work, i�a 11 endeavor
to,
J guard the, Owner agairnsit def cOcts anddeficiencies
in the, work of the Contractors and may,disiap,prove
or reject work as, faillinng to co,niform to tlh�e co,ntract
docurments. Orther 'tasks includ:e:
Prepare written inspection rep�oirts when o11117
site. Reipo,rts are to be delivered to Owner
in an electronic,format.. Digita] photograpbs
d:,Ocumentling work tasks, in progress, as, well as any
potenballpob'lms coionhala;fir
so
I
be hUded with each retd),o,rt.
Com,Plete site,visitsto frisp,ect Co,ti tracto� s, work
and confj�rrn it co,,,nmplies, with'the specificabiw's.
Site " isits will occur :he fdtowing key
milestones in'the project.
'Task 3: Pr9jectCloseout
Punch Ust: Perf6irm a f"ield o,bsiervation of al]
comip4eted wo,rk beforea flinal'appficabon for
payment is, processedI for the, Co,ntractor. Prepare
puncl�i, list, and com Iete- a field O'sit to ic
P onfirm items
have been addressed.
oo, Conforming to Comtruction Documents, Re-Ose
the, o,riginal plans in accordance wi�th, cms:,tructjon
observation recordsiof the Resident Enqrneer,
supply thie
lns;,,)ect,ors, avnd the Cmtractor, atiid
Owtier with o6ne set olif as-builtdrawings, in a suitable,
Yois flormiat'.1
BURN S MISS DON N E LL
0
Mir
Pr... t
ec
MIA'Affak'', disk"
11111160ta t�eami!!
Prw,j=�
I o the extra, m0le
E m pl oyfee-ow �n e rs w il "to, g
Anenthusiastic and innovajtivespirit
Proven track, record with the Village
Proven record cyf serwinig, as Problemsolvers, rathier
UI pro,,,,pa- gator's
100% Commitment to the succes It
s of t1h,e Vil I age
i.
Jul I "Lug
* Wiel have succe,ssfully completed tank proj,ects
fir the, Village., Randy Patchett anclJoe
I f
Darlington weIre both Pairt afour esi
dgn teairn
for piping modif"J"cations to the, Village 1, s, elevated
water storagetank anId Steve Crede was the
Co n st ruct, i o n Ma na ge r fo r, "t h e co n str Ll ct i o n cf
this connectibn. Wb understand Niel agestandard
collit-ttract docurnents and constrUction details.
0 Randy Patchett was part of our tearn; thIat
sulpp'led theNjillage, by developing, thie 2017
Water and Sewer, Ra"teStUdy" That study proposed
lutflitly rates, toadeqLl,ately, and equitably i"'ecove'r
COIIst,s for the Village,"s water, and seweIr utillities.,
ThIS project,Yvas include,d iin the rate, study, so wie
I
know the Village's budget expectalboris, and the
nee,dl to the ge,,t most of their fflone:y.
T,Oam Strength
A team orglanizabonal chart is provided on page 14.
The brief' bios of key, members provided 'below list
proplosed rolesandi the value eaich Wil provide to
'this project.,
Bu NislWiDONNELU
I
171
Offaft OEM
BURNSIDONNELV
Rim
An organlizal"on, aIl chart and doUfled �msumes of
Sums & Mc
Donnell personnei foilow this �)age.
E
1:1
E
Bi,,-irns &'McDor, ineH I-ias asse,,,,rr�),bled qualifie(J, experler")cled arid kr,)owledgeable
project, team to pt-ovide professllo,nal serva'cesto tl,-�ie Village of Maint
o r -i o f t [,,�)rte,or"') St a t i o, n 5, 1j, G r o ;w, t o, r a g, e T�,,i ri, k ro J e c t
We are car,"'ifider-it., tl-)e tear-irri vv'lll dieliver a [:.)roject cm, --i scl)edLde witi-iii-ri budget, Arl
organ,zatioi,,��,�ial �s Provided ar-)d dietailed reS'Unrels of' Burns & con!r-,),P----,,H
perslorvr-,iel follovv tl,,iis piage,,
vilta e ot Maulnt Prospect
B'UR'N,,S,;&MS`DONNEL!:p
BS, Civill Engineering
Re tration
*Professioln,,al Engline
33
RanOY PatchjetV[`,,,),IIS yea rs of'
A
Project, Manager experience,
L-1
El
1:1
17
ZEN,
AXT
M'A,
BURNS'�S�SDONNELL
po' Bs' 0,01 Engime.,er" i ng
e 'i R st
gi, -rations,
Professional Eng"Ineer ("IL, IN)
OSHA 10 -HR Construction
Certified
Joe Darffijgton PE
Design Manager
it
REM, Jim"
years 'Olf
A4
17
E
L
■
L
Joe Darffi7g,ton, PE
Desi"gn Leald
BURNSI\Z�SDONNIELLI
lo, BS, Civil Erigineering
Regilistraltions
P OSHAIiR Construction
* OSHA 30 -HR Conistriuction
* OSHA 40( -HR HAZWOPER
Designated Erosion Control
Inspector
IDIOT Docru rnentaion, of
Contract Quantiti,es Certified
FermiLaib Electrical Safety
Certified
Ferm,'i'Llab Radioactive Safety
Ce rt if ii eld
19
Steve Crede ye a rs o f
cOnstrUCbO,!,n Manager exp eri e n c le
Its
1 MIM
IL
if
BURNS;&MISDONNELL
El
L
1:1
ul
171
0 1
11
E
1
Matt DunIO1," 14Y
j p fir. years of
Staff Eng"neer/Resident Project
Representative experience
BURNS, � MSDONNELV
Education
BS, OvIllil Etitgineering
BA,, Engineering Physf,cs,
I ions
RVIgos"trat"m
IDOT Documentation
Certification ofContract
alival"Icities ,
OSHA 10 -HR, Construction
0 1
11
E
1
Matt DunIO1," 14Y
j p fir. years of
Staff Eng"neer/Resident Project
Representative experience
BURNS, � MSDONNELV
MUML
Wf ast
S N U
TA DPIPE (STR CTURAL & COATING REHABILITATION
Nort'hft,est St..,iburban Mu,nicipal Joint ACtioriWateAgeincy Elk G, ove'Villa,ge-I
The- Northwest Su,burblan MUnxipail Joint Action
Water Agency (NS,M'JAWA) ownsandope,rates,
two 5.0 -million -gallon potabie water storage ta,riks,
and engaged Burns &t4cDonnell to provibe des'ign,
bidding aEnd construct,ion services, �for the repair ,and
recoabing of bothutanks, BuJilt In 1,984 andlast pair)ted
III, n 19197, "t he "t a n k s, ne e ded ryi a i n te, nia nce a t tention.
vin it the previbLIS, winter' rnonths, s[ginlificant
M `
Ucingwithin the west, Standpipe darnnaged, thte 8 ft',
x '12ft. overflow cone, causing it to, break freeof its,,
momIting, and openeda hoie in the tank wa,11.The
overflow con,e,w,,a�,,s,,cof*nple'tely, separated f1ron') the
tank interior md,settled, at the, bottamn of thretank
whIch remalinedi'ini service. Included in the project
specificationswas the., repair or repilacement of the
overflow cone. Burns& McDoti�tiefll I rovided Olans, for
,P
the fabrjicationof a ne,wooneas, an alternat,e bid,for
the roject.
ip
CoInstruction of tl,),e Project was completed 11111
two, separatephases. The west, standpil
;p
rehabH[tated first and included repairstothe,
ci I I p
l,amagied� s,ection of' the west Standpipe wa,]I) repaii
�n
or, replaiceme,nt of thewestSta� dpipe overflowcone
addilbonai sup Iort for theoverflow cone In e,:,St
,St a nd pJ pe, b I ast it n g a n cl re coa t 1 n g h e ext er io ir
and interior of the west Standpipe, disInfection and
site restot,atlon. The erst staridpipe is, schedu'led
for rehabilitation in 2018 and": inclbdies, repalt,, or
replacement of the east Standpipe -overflow cone,
UP ing
aidditional s pliort for the overflow cone, blast,
and recoating ofthe exterior and! interloke, east
Sta,ndpipe,, dis,infectlon and s1te restoratt,on. The
easteta ndpiicon'ttract allso includes coti
of a new gravel access road a;nd site drainage
rov e m en t s,,
BURNS SNE
Blurns, McDonnell; provided bid 14nig pha
wries
aid mdInfistration servicie's llogginig inq
distribluting ptans, in plaper and e1jectron c format,
i
tablUlating bids an.d providing a bid recomir,-nenclatio, n
he Project.
for a,walrid oftl
Burns & McDonnJ1
,01 also,, prov'ded construction
dbservation, and inns pectionservices. On site.
constructibn 11, iiiisp ectil on for the, duration, of'
theproject including o,bserving -the, work, -for
,Coll �
. nformance, with the con,"trac"t cons,truction
dbcu�ments,, review, submittais and shiop dralw,ibgs,
i
review progress, andfinal pay re,qi
,�uiestspreplared
Eby the, contractor, reviiew, chi e, orders ,not ify the
agency of items not in conforma.,nce and provljide
ph,oto docwiientatl'ion & the profect
BARNS SDE LL*
c
ELEVATED TANK 510 STRUCTURAL & OATING REHABILITATIOV
rn i o n, C 1L, n t y, I IN
N e, wP 0 1, t C h e triJl c a I D ePot Ret ise Atithl;orlity Vet 'I I 1" 0
One aspelict of,the project involved relhabi I itation, of
a exis,
n tirng 100,000 gaillon legged el'evated water
storage tank. Services, provided inclulded'."
B,URNS$e,S,DO,RNELLfy
(AMPBELL & MAPLEWOOD ELEVATED TANK STRUCTURAL & MATING
ATION
REHABILIT
Village of Ra,itoul Rantoul, I L
'The, Project, jincluded b1lastirig and reacoating ofthe
iii ntler'Jilor, and exterlor of, the Campbell E'lleivatedTaO,
spot�blalsting and over-coatinIg of thile inte-rilor and
exteriorcif the Maplewood Elevate,d'Tank,, various
improverMetits to theTanks," safety measwes,,,
steel work, disin,fedi on andiii restoration.
Burns & McDonneil preparIed bid'docuryiiletils with a
complete, scope, of worki-A constwction petrmlt from
the 1111itiois Environmentai Protectiont Agency was
aI so obtaMe,d.
Burm &, McDonnell provided bidding pha,,tse
administration se; ' Iog 4 1 , So
NI[Ces, iging inquirte-
distributillng pians in paper and electronic format,
tabutatIng bids, an,d prowd[Mig a bld redat ion
for award ofthe proje,ct.
Burns & McDonnell also provided construction
obserwitimi and inSpection services. On sitte,
consitructim jit'ispection for, the durati,m of the
P ro
jI nCkng rev , i I ew of' submittals and si,iop
ectitdil
drawings, observing the work for cotiformance
"th the contract construct'ondocuments, review
wi I I f
progress-aind final pay requests, prepared, by the
ly
contractor,, revifew ciliange orders,, nIiotif ''the Viltage
Of items in,confbrmance and providing photo
documentation, of OrProject
q
BURNS'&�SDONNEU:
■
■
■
i■
■
■
■
■
■
■
■
■
■
■
■
F]
SAIML
Pr,e
I ad.,
f
IT') with over "10 ds,-t��inc-l��� businiess linies. Staiffassigt�ied 'to
Burns, & Mc-`,Do�nnefll is a globa�,, fii
t��,ie'Vllllager of' rNOIIO�,,Int Pr-,c)srI)ect Reha�:)Hit,abor) of tl-ie 1,000,000—Galbri Statliot-�',ii 511`�J Groi...Iinb
pi,,Oject aref a part of our, Chic-,z-igo-area Water, PraIctIK-',e,,A tab,.,daboi,-) of this
g ro u p"s c lu r re n t �p ro, �e c t w c �r
BURNS, 5DONNELL",
Sidewalk
Desig n,(C'14'11�)j
70',0100
6 months
Crede
10%
Elk e of
G1111fee,deaf8t, m, P
i n,(Villag
Des'g: , Water")
$"40001DOO
I'Veat
Dar"I"n an
10%
Rehabilitation
(($20oxwo),
Lo� rdS,,t r,.,e, et, Phas,,e I I an, d
Des gn & (bnstructiofl
$30A00;00G
llginoGf ty 0)
Basin 02A,Ombined,,Stwer
Se,,r,,, v"Ices ( n,'' :
, WaM, er�o
($3,50,01 ON
5years,
(rede
"Sepwara,fia
"n
Stormater & Wasrtewat*)
Fox Rlllver'Water RecIamatibn
Ph,,ase I R & ITSIludge, Force
(onstructionServices
'
$30 700,0000
9 m o n th, s�
(rede
25%
D I
Istri"d
Main
`
(W, "asterw r)
"
($20,00,1000)
! ,jdop
Du
of
Wast ewater eint Plant
pro am
PgirMantag"ement
$60,0001000
5years
(red e
30%
(b:nso"11(dation Rrogitam
Mmstewafte;
($1,200, 000)
Darlington
Gein,tal [1ectri[c, Cbrp-
Str�,�othet "Field
Program'Management
nflal
0 ng 0 1 g
Pat(bett
Serytice
mort NeChemka,] Depot w
Reuse, Auth of t; (RKDR4),
Ngred Order Support
's eering
OwnterEngin
$28,000,
6 minth's,
to
Da lingn
501%
NibN est Su"butban, Join
4
Owner's Engine tin
t" "ig
Owner, s Engineering
As,
1 -requested
On ing
Patchett
(N, N''JAWA)
R18006"I'L V"JI'ange-of,
't rforce' a,
Indusuirial'Pa k b
,,'
"S'a
$,,151000
I yea r
Apket
Darlington
Ran#wuf Village of
Vilhage, Enigine, ring
e
Village lEngineering,
As-requ ested
0
Ji,I
Ing"O*
Dail ng�tbn
,ahhett:
Rant,oul, VII,"Mage of,,
Sodium Hyot(blorite System
Designi Mateif)
$110,500
3 months
Darlington,
Patchett
BURNS, 5DONNELL",
horn Sas,in Sanitary
Annex, North RoA "od"
SI'ludy ('(ivill)
$25,000
"Ap 75%11
Distnict,
11IFellding,"Rek b"Ibb
a I Jofl
rb"nio 'g
HangarS r
Ofl',,/Wate;'
't errvlke'
Consouction's i s
140,000
3 mon'Ihs
D!,,,u,'n,,f'op 80%
Seperaltor
Otormwater)
Wet W10"athe"""r, f low
"Treatment
I'
t
VirvrvIII
llag �e 01
F�cHJ't,,'y-0$M
Stuid st, wale
y (Wo �e( r
3 moniths,
'
Schiedule
Wwet, WeatheII
r to
Villa farkNjIlagie-of
Treatment,'Faci
siginu( stew'a",ter),
0 0 '00
6',"month"s",
Pla I JI
'tic e#
f1i"ght Re, tacemen't
BURNS&�C.DONNELI:
Village of'Momiit Pros,ple A
Of C11'e'11000
, I, "t at * o tj 5N G t-ott n, d S to ora, ge, T a til k
ON Galloti Sl I
Est"jint;,ited Fees
for Design f,'nglillivering, & Bid, Phase,
Servives,
'Fe,bI7tjAaU y 16, 2018,
oj c
"e"
...... ..... ...
cixto
,r,
Asis*
ista/,,tit
0 t
c
Pr q "'r
pi*j,"t,
V
, "aco, A ge r
Eu ggmuter
Pt t
El m
�;u �!jc
gto 'r,
'A :A,
ssi
E
""
T�Sik,
IV ,an,, ot gpr,
'D esk ption,
Yl
(9'
rask 1, ect oord i u ta t, i t)ti
P.r
S
9,66
Kickoff Me,eting
25
7$
309
Project Managernent& Adiminisitration
2
298,
Des,iignReview, Meetingsw/ Village (3)
S
75
0
11 S
3,5 9
Task 2 - PreLinluittary Destg= [1.
11,549,
Existing Data Revilew
2
si",
346
!Field Investigation
4
4
25
$
1.010 1,
41 Test i ng
Coating Adhesion & Heavy Met,L
. .....................
'I
I
IfIN)
S
2(),2
Fi n it I D
� �������� ��
�""""
21356
,.._. .,,,, ,. ;
ConstrUCtion BA'Documents
$ 1010
S
1,484
Final SPCC"
1
2
3,46
Quality Assurance Review
2
11 21,
$
I,ask,, 4, 11'ernflItin, S11, ppmrt
ISS
3,711
IIEPA -Water Main Construction Pernriit
$
25
$
7 1,
'F as k, .5, ® T:3 11 d P lusASCX 11 ot"'t
S
2,330
Provide Bid Documents
3r2
Pre -Bid Me�eting
2
2'
$
25
S
,513
...... ... . . .... . .......
BidAssIII stance
. . . . . ............ 2
2
488
r Bid Opening
2,
25
$
09,
Bid Review& Recommendatjon ISI1
2
$
Assemble ConIractl DoCUments
4
50
362
0 2 2.'
7"
'10,
HourIly 1311fing 16,11c
St") 'IS,322 S3,264) $2,754
Vilb"I'ge of Mott"t I'll"*o'spect
Rehab t,,),f the 1,000,000 Gallon Statlon.5,N (101*01"Ind Storage "Irank,
Esti, mated Fees f6r ("onstruction Mittiagemet-it t"on Servi
Fcbnj-,,,,to-y 16,2018
1-10"I"Irl1 10, 2
S 11 bt o ta, I S S966 $"," 16, 47 2 S408, SSAI 56 S 8roo S, I K,80,2
No,w;
,,i,ase(l on, �,,,illt,.Aidirtg (1) v- S."S 1"I'le,
flasc.d on RIpux, ((,J) hot"Irs I n d I' -C 1, 11 g
I Ol L S I le %, Isl I S i�,,] 41
1�') , I 11, t"),u rrj, ic I'l 'I a
1"otal Hours 154
S 18181102
`(x