HomeMy WebLinkAbout1247_001VILLAGE OF MOUNT PROSPECT
PLANNING DEPARTMENT
Mount Prospect, Illinois
TOO MICHAEL E. JANONIS9 VILLAGE MANAGER
FROM-, WILLIAM J. COONEY, JE., DIRECTOR OF PLANNING W7C
DATE: SEPTEMBER 13, 1994
SUBJECT: ZBA-12-Z-94, ANGELO AND BETTY ANAST
ANAST PRELIMINARY PLAT OF RESUBDIVISION AND
DEVELOPMENT CODE MODIFICATIONS
ft
LOCATION: 306 WEST RAND ROAD
Jt �Mr
Znials Bund 91ADDeals
The Zoning Board of Appeals transmits for your consideration their recommendation on a request
for a rezoning at 306 Rand Road. Specifically, the applicants are seeking to rezone the subject
property from R -X Single Family to R.-1 Single Family in order to create a two -lot subdivision.
The request was reviewed at the regular Zoning Board of Appeals meetings of April 28 and August
25) 1994. At the meetings, Mr. Philip Anast presented the request. Mr. Anast indicated that they
would like to rezone and subdivide the property in order to build two homes. He indicated that the
lots would meet all R-1 standards for lot area and minimum width. Mr. Anast indicated that he has
sought legal advise in regards to the restrictive covenants covering the property. He indicated that
in their opinion the covenants are not enforceable.
Ray Forsythe, Planner, summarized the staff report. Mr. Forsythe 'Indicated that the location on a
comer allows the lot to be subdivided and meet the standards of the Zoning Ordinance but would
require Development Code modifications for lot depth. He indicated that this request would be "spot
zoning" and that, if this area is to be redeveloped, it should be done on a larger scale. He stated that
the comer lots will be the only lots in this subdivision which could be subdivided individually. Several
interior lots will need to be combined to be redeveloped. Mr. Forsythe concluded that staff would
recommend that this area be redeveloped in a nature similar to Thomas More and Elmhurst Place.
Nancy 'o i jan E b keCzl . of the Homeowmer'sAssoc indicated that the members of the
association, do not support s request. She *indicated that the Association accepted the Elmhurst
Ph -ice Subdivision as a compromise to the townhouse development which was proposed. She stated
that they have concerns with over -crowding, flooding and stormwater control.
Michael
chael E. Janonis
Page 2
September 13, 1.994
The Zoning Board of Appeals held a lengthy discussion on this request. The members discussed the
standards for Map Amendments. Peter Lannon indicated that the property could be developed using
the R -X zoning and further stated that R -X is a valid classification and new construction has taken
place recently on similar lots.
By a vote of 6-1, the Zoning Board of Appeals recommended denial of the requested Map
Amendment.
Plan Commission
The subject parcel consists of a 100'x 200' lot located on the northeast comer of Rand Road and
Wedgewood Lane. The owner is requesting approval to subdivide the property into two lots for
single family residential use. In order to do so, the owner will also need a Development Code
modification to permit a 1001 lot depth for the proposed lots. The owner is also requesting
Development Code modifications to waive the requirement for sidewalk, curb and gutter.
The Plan Commission met in regular session on Wednesday, September 7, 1994, and voted 8-0 with
one abstention to recommend denial of the Anast preliminary plat of subdivision.
The Plan Commission then voted 2 ayes, 4 nays with 3 abstentions to concur with staff's
recommendation to deny the owners request for a 100 foot lot depth Development Code
modification. The Plan Commission then voted 0 ayes, 7 nays with 2 abstentions to recommend
denial of the owner's request for sidewalk, curb and gutter Development Code modification. The
three Commissioners abstained because they did not want to vote on Development Code
modifications when the preliminary plat had failed.
WJC:hg
OF
r4NASTi-S M SON
� O NC S7 LOT $ 5
I„ CS R, ,�wr � 5 Y ASSa
NOR1rH
17
SG44F I IN. _ M FEET
or
p
of /
j
bb
UTlUTY LQC.OT/OW APPROXIMATE
E�MER S 1,
115 WeS7AA6417NC
AA44r,A4C 144 W 1$, ' 5 C
��Av
MINUTES OF THE REGULAR MEETING OF I
MOUNT PROSPECT ZONING BOARD OF APPEALS
ZBA CASE NO. ZBA- 12-Z-94 Hearing Date: August 25, 1994
PETITIONER: Angelo and Betty Anast
SUBJECT PROPERTY: 306 W. Rand Road
PUBLICATION DATE: April 12, 1994 (Herald)
REQUEST- The petitioners are requesting a Map
Amendment as allowed in Article 11.,
Section 14.203.3 to rezone the subject
property from R -X Single Family to R-1
Single Family in order to allow a two -lot
subdivision.
MEMBERS PRESENT: Gilbert Basnik, Chairman
Robert Brettrager
Ronald Cassidy
Leo Floros
Peter Lannon
Elizabeth Luxem.
Jack Verhasselt
ABSENT: None
OBJECTORS/INTERESTED PARTIES: Nancy Bobikewicz
Chairman Basnik then introduced case ZBA-12-Z-94 being a request for a MAP
Amendment as allowed in Article 11, Section 14.203.D to rezone the subject property from
R -X Single Family to R-1 Single Family in order to allow a two -lot subdivision. This case
was continued from the May 26, 1994, Zoning Board meeting.
Philip Anast, 206 N. Russell, Mount Prospect, 11finois,'Introduced hi',mself to the Zoniffig
Board of Appeals. Mr. Anast is the son of the petitioners. Mr. Anast stated that they
would like to subdivide their lot on Rand and,'Wedgewood intotwo lots so that, they may
build two houses. He stated that he has obtained 3 independentopinions from counsel
with regards to the covenents, of his property. Mr Anast stated that the covenent dates
back to 1947. The Wedgewood committee consisted of 3 individuals or a representative
designated by the majority of members to approve the architecture of homes built in the
subdivision. He noted that two major points of the covenant includes restrictions that no
ZBA-12-Z-94
Page 2
building shall have less than a 50 foot setback and no building is permitted on less than a
20,000 square foot lot. The committee has no authority to waive the clauses and this is an
objective in the covenant. Mr. Anast stated that it is up to the courts to decide on the
enforcement of the covenants. He stated that he submited 2 plans with two houses on the
lot with a 35 or 55 foot setback. He noted other previously approved requests in the area
with a variation of 30 foot or less; which includes the Thomas More subdivision
approximately 5 lots down from his property. Mr. Anast presented a copy of the Sidwell
Map to the Zoning Board of Appeals. He stated that a precedent has already been set. He
will follow all Village codes and states that the property meets the minimum requirement
for an R- I lot. He feels the property does present a hardship and he has presented plans to
his neighbors as to the conformity of the houses to the neighborhood. Mr. Anast
referenced comments by Ms. Bobikewicz from the May meeting with respect to the
conformity of the houses, He stated that he spoke with the developer of the Oxford Place
Subdivision. The houses were 2,600 square feet with an approximate building pad of 50'x
40'. Mr. Anast proposes to build a house 2,620 square feet with a building pad of 53' x
43'. Mr. Anast urged the Zoning Board to grant the Zoning Classification of R- 1.
Planner, Ray Forsythe then stated that the petiitoners are looking to rezone the subject
property from R -X Single Family to R-1 single Family noting the development code
modifications will be heard by the Plan Commission before this case is presented to the
Village Board. He stated that staff would prefer the rezoning of several lots compared to
single lots. He indicated that the rezonings in this area included several lots and a unified
plan.
Ms. Nancy Bobikewicz, 1114 N. Meadow Lane, Mount Prospect, Illinois, introduced
herself to the Zoning Board of Appeals as President of the Homeowners Association. Ms.
Bobikewicz stated that as advised by her attorney, if the area starts to go through a severe
change the covenants are no longer valid which is the main issue Mr. Anast is trying to
prove. The Thomas More and Arlington Green/Arlington Meadow subdivisions are not
part of the Wedgewood subdivision and are not covered by the covenant. The subdivision
along Route 83 originally were petitioned for commercial property and when new homes
were proposed, the Association preferred homes vs. commercial, further noting the
Elmhurst Place subdivision which includes 4 lots. The R -X single family zoning allows for
a lot coverage of 3 5% and the R-1 single family zoning allows 45% coverage on each lot.
She stated that this area currently has flooding problems and the additional lot coverage
would add to this problem. Also, Ms. Bobikewicz stated that Mr. Anasts' plans indicates
the driveway situated very close to Rand Road. This area has traffic problems and feels
one house is suitable for this parcel. Ms. Bobikewicz stated that Gene Nauert is building
6 homes with a detention pond as opposed to Mr. Anasts' request to build 2 homes on a
1/2 acre lot. The majority of the Homeowners Association is against the rezoning of this
property and urges the Zoning Board to keep the subdivision as R -X Single Family.
I `A -12-Z-94
Az)
Page 3
Mr. Lannon asked the petitioner when the property was acquired. In response, Mr. Anast
stated the property was purchased in 1987 and it has been vacant since that time.
Mr. Floros asked about lot size and the size of the proposed homes. Mr. Anast stated that
the lot size is approximately 20,000 square feet. Mr. Anast stated that he proposes to
build two 2,600 square foot homes. He then presented pictures to the Zoning Board
further noting that the precedent has already been set in the neighborhood as to R -I
zoning and he meets all R-1 zoning requirements except for the depth variation which is
being presented to the Planning Commission. Mr. Anast feels the rezoning of this parcel
and the building of 2 houses on this property is the best use of the land.
Mr. Floros commented to staff that this parcel could accomodate 2 houses. He further
asked staff how long should the petitioner "sit" on their property before development.
Planning Director, Bill Cooney, stated that the only lots that would be able to subdivide to
R-1 Standards would be comer lots. He asked the Board to look at the Standards for
MAP Amendments noting: 1. Compatibility with existing uses and 2. compatibility with
the zoning classification. Mr. Cooney further stated that staff has no objection to R-1
Zoning however, this entire subdivision is R -X Zoning and the proposed request is not
consistent with the neighborhood lots.
,Chairman Basnik then read the standards for a MAP Amendment. The Zoning Board of
Appeals discussed each standard as it applied to the petitioners request.
Mr. Brettrager added that subdividing this I parcel of land into (2) 100' x 1001 parcels
hinders the development of the other parcels.
Mr. Lannon noted that this parcel was purchased in 1987 which was before any R-1
Zoning in that area finiher stating that R -X zoning is a valid zoning classification which
was assigned to any properties annexed to the Village. Currently, there are many new
homes being developed as R -X single family. He further stated that the Board should
take note of staff position of "spot" redevelopment.
The Zoning Board of Appeals discussed the petitioners request for rezoning.
Mf_ Cassidy then moved that the Zoning Board of Appeals approve a MAP Amendment
as allowed in Article 11, Section 14.203.D to rezone the subject property from R -X Single
Family to R -I Single Family in order to allow a two -lot subdivision. The motion was
seconded by Mr. Floros.
ZBA-12-Z-94
Page 4
Upon Roll CA AYES: Floros
NAYS: Basnik, Brettrager, Cassidy, Lannon, Luxem, Verhasselt
The motion was denied by a vote of 6-1.
Mr. Brettrager noted that his vote had no reflection with regards to the covenant,,
Respectfufly submitted,
Jube Ann Bouris
Secretary
MINUTES OF THE REGULAR MEETING OF THE
MOUNT PROSPECT ZONING BOARD OF APPEALS
ZBA CASE NO. ZBA-12-Z-94
Hearing Date: April 28, 1994
PETITIONER:
Angelo and Betty Anast
SUBJECT PROPERTY:
306 W. Rand Road
PUBLICATION DATE:
April 12, 1994
REQUEST:
The, petitioners are requesting a Map
Amend,mentasalto wed In Article 11,
Section 14.201D to rezone the subject
property frorn R -X Single Family to R-1
Single Family in order to allowa two -tot
subdivision.
MEMBERS PRESENT:
Gilbert Basnik, Chairman
Leo Floros
Peter Lannon
Elizabeth Luxem
Jack Verhasselt
ABSENT:
Robert Brettrager
Ronald Cassidy
OBJECTORS/INTERESTED PARTIES:
Nancy Bobikewicz
Chairman Basnik then introduced case ZBA-12-Z-94 being a request for a MAP Amendment as
allowed in Article 11, Section 14.203.D to rezone the subject property from R -X Single Family to
R-1 Single Family in order to allow a two -Lot subdivision.
In 11
Philip Anast, 206 N. Russell, Mount Prospect, 11"It 01s, Introduced � �h
Imself to theZoning Board of
Appeals. Mr. Anast is the, son of the pet loners. Mr. An stated that they would like to
subdivide their lot on Rand and Wedgewood intotwo parcels so that they may buildtwo houses,
one for himself and one for his sister. He feels th, is would be'the best use of the land. Mr. Anast
further stated that they were unaware of the required 50 foot setback. His current plans provide
a 20 foot setback however, he is willing to revise the plans to provide a 50' setback.
Planner, Ray Forsythe then summarized the staff report for, the Zoning Board of Appeals. Mr,
Forsythe stated that thepeti'tioners, are looking tosubdived one 20,0GO square foot tot into two
10,000 square foot lots,. "The subject pry perty Is located on a comer which all the orae ntation
,n se e lofts wo
,of the two, ;new lots to, change from Rand' Road to Wedgewood Drive. Becau the to uld
face Wedgewood, the lot, on the corner of Rand and Wedg,ewood Would have ,an exterior
sideyard setback of 20 feet from Rand Road. The current homes along Rand have an
establisheed 50 foot setback along this roadway. The Zoning Ordinance would also permit a
fence to be Installed along the rear and extedor sideyards up to 3 feet from the property line
along Rand Road.
Mr.Forsythe further commented on the 50 foot issue. He statedthat on the recorded plat of
subdivislon for the Wedoewood Association:, there is a 50, foot setback on their plat of survey.
I They also have pd, vatecovenants,which prohibits subdloons ofless than 20,000 square feet or
buildings In front of the 50 foot building line. He stated that the Plan Commission reviewedthe
Page 2
ZBA-12-Z-94
request and tabled their review until the Homeowners Association had a meeting to discuss the
subdivision. Mr. Forsythe stated he spoke with the Homeowners Association President and at
this time they do not support this request.
Chairman Basnik asked Mr. Forsythe how the size of these lots compare to the lots approved for
construction along Rand Road (Thomas More). Mr. Forsythe stated that there were several lots
combined and those lots meet the R-1 standards.
Chairman Basnik asked if those lots conformed to the 50 foot setback. Mr. Forsythe stated that
those lots did not conform to the 50 foot setback and the Homeowners Association approved
them with R-1 standards which include a 30 foot setback.
Mr. Floros asked about the setback of the homes on Rand Road toward Euclid. Mr. Forsythe
stated that the homes that face Rand Road are setback 50 feet.,
Mr. Lannon asked if the Planning Department was aware of the 50 foot and 20,000 square foot
private covenants when considering the other developments. Mr. Forsythe stated that they were
aware and the other developments were approved by the Homeowners Association.
Ms. Nancy Bobikewicz, 1114 N. Meadow Lane, Mount Prospect, Illinois, introduced herself to the
Zoning Board of Appeals as President of the Homeowners Association. Ms. Bobikewicz read the
covenant to the Board emphasizing that the petitioners need to present new plans and discuss
with the Homeowners Association what they propose to do. Then the Homeowners committee
would vote on suitability of the proposed project and if it conforms to the standards setforth by
the covenant. Ms. Bobikewicz stated the Association would like single family homes. However,
they have concems about future subdivisions with regards to overcrowding. Ms. Bobikewicz
further stated that she will work with staff and the petitioners and see If they all could come to an
agreement with regards to the subdivision.
This case was then continued to the Zoning Board of Appeals meeting of May 269 1994.
Res pectfull'ysubm4ed,,
Julie Ann Bouris
Secretary
E
FROM:
DATE:
CASE NO.:
APPLICANT:
ADDRESS:
LOCATION MAP:
VILLAGE OF MOUNT PROSPECT
PLANNING DEPARTMENT
Mount Prospect, Illinois
MOUNT PROSPECT ZONING BOARD OF APPEALS
GEL BASNIK9 CHAIRMAN
RAY P. FORSYTHE, PLANNER
APRIL 18, 1994
ZBA-12-Z-94
ANGELO AND BETTY AVAST
306 WEST RAND ROAD
►
7771
I
PROPERTY DESCRIPTION:
ZONING: Current R -X; Proposed R-1 Single Family Residential
LOT SIZE: Current 20,000 sq. ft.; Proposed 10,000 sq. ft. each
%COVERAGE: N/A
1'
Gil Basnik, Chairman Page 2
Mount Prospect Zoning Board of Appeals
REO'EST
The petitioners are requesting a Map Amendment as allowed in Article H, Section 14.203.D to rezone
the subject property from R -X Single Family to R-1 Single Family to allow a two -lot subdivision.
N NTS C ,
El—AAND ONCERNS_NTNG A.ND Z0NRjfi'_C0
Summary of Application: The petitioners have indicated that the rezoning is requested in order
to subdivide the subject property into two lots which meet the R-1 standards of the Zoning
Ordinance. Also indicated is that the two new homes will be compatible with the surrounding
properties and will pose little impact to the area.
Impact on Surrounding Properties: The petitioners are looking to subdivide one 20,000 square
foot lot into two 10,000 square foot lots. The subject property is located on a comer which allows
the orientation of the two new lots to change from Rand Road to Wedgewood Drive. Because the
lots would face Wedgewood, the lot on the comer of Rand and Wedgewood would have an exterior
sideyard setback of 20 feet from Rand Road. The current homes along Rand have an established 50
foot setback along this roadway. The Zoning Ordinance would also permit a fence to be installed
'along the rear and exterior sideyards up to 3 feet from the property line along Rand Road. Staff is
concerned with the visual impact on the neighborhood as well as the potential problems the
homeowner could encounter should Rand Road be widened and additional right-of-way requested.
The Wedgewood Homeowner's Association has been contacted on this request and at this time is not
in support of the request.
Previous rezonings and subdivisions have been approved by the Village Board, however, a number
of lots have been combined to create a subdivision which poses less of an impact. Further
subdivisions of this nature could only occur on the comer lots. Lots would have to be combined and
resubdivided in order for other R-1 standard lots to be created.
Engineering Department indicated that the setback along Rand Road should be increased from the
minimum allowed 20 feet in order to allow for the future improvements to Rand Road. All
Development Code items apply to this subdivision.
Inspection Services indicates that unsuitable fill has been placed on the lot. Soil borings will be
required to determine adequate building sod.
RY/RECOMMENDATTOIrT
The petitioners are requesting to rezone the subject property from R -X to R-1 Single Family in order
to subdivide the subject property into two lots. Staff is concerned with the 2.0 foot setback along
Rand Road that would be created by this subdivision. In addition, staff has concerns with the
proposal impact on the redevelopment of this area. In fight of these concerns, staff recommends
denial of the petitioner's request.
VILLAGE OF MOUNT PROSPECT
PLANNING DEPARTMENT
Mount Prospect, ]Illinois
TO: MICHAEL E. JANONIS, VILLAGE MANAGER
FROM: WILLIAM J. COONEY, JR., DIRECTOR OF PLANNINGO
DATE: SEPTEMBER 8, 1994
The applicant is seeking approval of a plat of consolidation in order to create one legal lot of record
by consolidating part of Lot 12 with all of Lot 11 and the west 33 feet of the vacated road right-of-
way that was previously Waverly Avenue. The owner states that this plat is not being prepared as
a result of any new uinprovements on the site. It is simply to create a single lot out of the contiguous
property at 1201 West Lincoln Street. The owner feels this may simplify a future sale of property.
This plat is not being presented as a requirement of the Development Code.
The Plan Commission met in regular session on Wednesday, September 7, 1994, and voted 9-0 to
recommend approval of the WeInhofer's Plat of Consolidation. Staff has reviewed the plat and finds
that it has been properly prepared and signed by all appropriate entities. Staff would recommend
approval of the WelnhofeesPlat of Consolidation.
WJC-hg
WeInhofer's Plat of Consolidation
BEING A RESUBDIVISION IN THE SOUTHWEST 1/4 OF SECTION 11, TOWNSHIP 41 NORTH,
RANGE (l, EAST OF THE THIRD PRINCIPAL MERIDIAN, IN COOK COUNTY, ILLINOIS.
lett 80
SCrr1 :E 1N FEET
- HEREMFORE DEPIcArEa FOR FUBLIc srRjEr
LINE OF ruF SW f4 OF SEC. 11-4141
t'l
'F OF ILLINOIS) SS
'NTY OF COO10
r?9VE0 A}` TI IF PnESiQENT ANC? BOARD OF Tf7USTEES Or- T14E VILLAGE OF MT. P170SPFCT,
fe f"l-,l fA ITV r/ ( r W1If" 71 it r, r_+AN? 'I's I— . F
aa.o
W
EASEMENT PROVISIONS
An easement for serving the subdivision and other property with el -
communications service Is hereby reserved for and granted to
COMMONWEALTH EDISON COMPANY,
TCI CABLE,
AMERITECH TELEPHONE COMPANY,
GNANTEES,
their respective successor; and assign@, jointly end severally, to install, operAt-
and remove, from time to time, taclllila; used in connection with underground It:
and distribution of electricity and sounds and signals tn. under, across, along Fin
surface of the property designated In the Declaration of Condominium and/or on
Common Elements' and the property designated on the plat Fie a'Common are
tier with the right to Install required gervIce conngolon@ over or under tha
toobb tot to serve movements Maroon. Ilse right to overhand all lots with or
wires to serve adjacent lots, ilia right to cut, frim or remove trees, bushes and r-
be reasonably requlred incident to the rights herein +given, and the right to ent*,
subdivided properly for all such pwposes, Obelruciloing shall not be plawne ovr
t. fa hies or In. upon or over the prop vAihfn the dotted lines marked 'Essem,
the prior written consent of grantees. After instniletlon of any such facilities, ilia c,
subdivided property shall not be altered In a manner to as to interfere with
operation and maintenance thereof.
The term 'Common Elements' shall have that meaning set forth for such tern
2(e) of 'An act In rotation to condominiums' (Illinois Revised Statutes. Ch_ 30, r
as amended from time to time.
The term 'common area or areas' Is defined as in lot, parcel or area of reel t"
beneficial use and enjoyment of which is reserved In whole as an eppurtenr
separately owned lots, parcels or areas within the planned development, even ti
be otherwise designated on the plat by terms such as, 'ouitots', 'common Worn,
apace-, 'open area', 'common ground'. 'parking and common area'. The tem,
area or areas' and 'Common Elements' includes real property surfaced
driveways and walkways, but excluded real property physically occupied by n
structures such as a pool or retention pond, or mechanical equipment.
flelocatton of iacflltles will be done by Grantees of cost of Granlor/Lot r-
written request.
EASEMENTS APPnOVED AND ACCErTED
BY- (&_&_1-- DATE
COMM LriA EDISON CO.
BY _ DAT
AES}ECS
rtv rl A T r-
/1f0^1U5-t6N7"
146.0
rr
BVILDIN6 L11YE lis
�
QC3•"`
.r
1.1
(:J
1�1
ILI
L
OT
�
t ;
t; tt4
5Q 78
62.22 33-0
f4I54�NT FOR PUBLIC Uf1L1 r1 F.S
j�. X101 + DRf#tNAQE
J_L10FT
#
r-rq0 e -
146.0
'F OF ILLINOIS) SS
'NTY OF COO10
r?9VE0 A}` TI IF PnESiQENT ANC? BOARD OF Tf7USTEES Or- T14E VILLAGE OF MT. P170SPFCT,
fe f"l-,l fA ITV r/ ( r W1If" 71 it r, r_+AN? 'I's I— . F
aa.o
W
EASEMENT PROVISIONS
An easement for serving the subdivision and other property with el -
communications service Is hereby reserved for and granted to
COMMONWEALTH EDISON COMPANY,
TCI CABLE,
AMERITECH TELEPHONE COMPANY,
GNANTEES,
their respective successor; and assign@, jointly end severally, to install, operAt-
and remove, from time to time, taclllila; used in connection with underground It:
and distribution of electricity and sounds and signals tn. under, across, along Fin
surface of the property designated In the Declaration of Condominium and/or on
Common Elements' and the property designated on the plat Fie a'Common are
tier with the right to Install required gervIce conngolon@ over or under tha
toobb tot to serve movements Maroon. Ilse right to overhand all lots with or
wires to serve adjacent lots, ilia right to cut, frim or remove trees, bushes and r-
be reasonably requlred incident to the rights herein +given, and the right to ent*,
subdivided properly for all such pwposes, Obelruciloing shall not be plawne ovr
t. fa hies or In. upon or over the prop vAihfn the dotted lines marked 'Essem,
the prior written consent of grantees. After instniletlon of any such facilities, ilia c,
subdivided property shall not be altered In a manner to as to interfere with
operation and maintenance thereof.
The term 'Common Elements' shall have that meaning set forth for such tern
2(e) of 'An act In rotation to condominiums' (Illinois Revised Statutes. Ch_ 30, r
as amended from time to time.
The term 'common area or areas' Is defined as in lot, parcel or area of reel t"
beneficial use and enjoyment of which is reserved In whole as an eppurtenr
separately owned lots, parcels or areas within the planned development, even ti
be otherwise designated on the plat by terms such as, 'ouitots', 'common Worn,
apace-, 'open area', 'common ground'. 'parking and common area'. The tem,
area or areas' and 'Common Elements' includes real property surfaced
driveways and walkways, but excluded real property physically occupied by n
structures such as a pool or retention pond, or mechanical equipment.
flelocatton of iacflltles will be done by Grantees of cost of Granlor/Lot r-
written request.
EASEMENTS APPnOVED AND ACCErTED
BY- (&_&_1-- DATE
COMM LriA EDISON CO.
BY _ DAT
AES}ECS
rtv rl A T r-
Village of Mount Pros, ect,
Mount Prospect, Illinois
INTEROFFICE MEMORANDUM
TO: VILLAGE MANAGER MICHAEL E. JANONIS
FROM: ASSISTANT TO THE VILLAGE MANAGER
DATE: SEPTEMBER 13, 1994
SUBJECT: FLEX PLAN AMENDMENT
The recent approval of the Firefighters' Collective Bargaining Agreement included a
revision to the Sick Leave payout at retirement for medical insurance premiums and
expenses. After extensive discussions with a Benefits' Attorney, we have developed a
policy to adhere to the Agreement and still minimize the reduction of this benefit through
tax liability. In order to achieve this goal, it was determined that the retirees could
participate in the Village's Flex Plan after retirement.
The Village's Flex Plan allows for employees to designate an annual wage amount to be
allotted to an employee's account for payment of eligible insurance premiums and
expenses. The benefit of such an account allows employees to designate the funds
without incurring an income tax liability. In essence, the insurance -related expenses are
paid with wages prior to paying of income taxes; therefore, the employee's overall tax
liability is reduced. The Flex Plan is only available to employees on the active payroll due
to ability to contribute.
The Flex Plan needs to be amended to allow retirees to participate in the Village's Flex
Plan the same as employees on the active payroll. The retiree insurance plan is basically
as follows:
1. An employee who currently retires with 20 years or more of Village
employment receives one-half of accumulated Sick Leave at time of
retirement. The maximum number of hours paid out is 360 hours for
Firefighters currently. Under the new policy, the employee will have an
account established up to the maximum number of, Sick Leave hours (720)
to be paid out over a four-year period. The account funds will remain with
the Village and be invested and managed by the Village.
2. The retired employee will have the option of designating a portion of the
monthly payment for insurance premiums and insurance -related expenses
eligible under Flex Plan regulations or the employee may receive the
amount directly. The employee will be liable for any Income Tax obligations
if the employee opts to receive the funds directly. To be eligible for the
program, a Firefighter must retire between May 1, 1994 and April 30, 1997.
3. After four years of equal monthly payments, the account will be exhausted
and the retiree will then be required to pay the insurance premium directly
to the village. By law, the Village must offer the retiree the option of
continuing on the insurance plan.
The savings to the Village is the wage difference between an employee who retirees and
a new hire. In order to allow the program to be implemented, a resolution will need to
be approved by the Village Board to amend the Village's Flex Plan to allow retirees to
participate in the Flex Plan. The Resolution and the necessary Flex Plan amendment
were prepared by the Benefits' Attorney for consideration of the Village Board.
I would recommend approval of the attached Resolution to amend the Village's Flex Plan.
The addition of the amendment will fully comply with the Firefighters' Collective
Bargaining Agreement.
DAVID STRAHL
-FI—R-EFIGHTER RETIREE HEALTH INSURANCE PROGRAM
Any Firefighter who retires from the Village of Mount Prospect between May 1, 1994 and
April 30, 1997 shall establish a sick leave deferred compensation account (SLDCA) with the
Village. Ile SLDCA shall be funded with the value of the Firefighter's accumulated sick leave
hours up to a maximum of 720 hours. The value of the Firefighter's accumulated sick leave
hours shall be determined by multiplying the number of accumulated sick leave hours (up to a
maximum of 720 hours) by the Firefighter's regular hourly rate at the date of retirement. The
Village shall establish and fund the SLDCA with the value so determined on the first day of the
Firefighter's retirement.
The amount established M' each Retiree's SLDCA shall be distributed to the Retiree in forty-eight
(48) consecutive monthly installments commencing on the last day of the month of retirement.
Subsequent installments shall be paid on the last day of each month. Each Retiree with an active
SLDCA shall receive an annual statement of account from the Village.
Any Retiree with a balance in his/her SLDCA shall be eligible to participate in the Village of
Mount Prospect's Section 125 Flexible Compensation Plan (Flex Comp Plan) for the payment
of qualified medical expenses on a pre-tax basis. The Retiree has the option of designating any
or all of his/her SLDCA monthly *installment as his/her contribution to a Medical Spending
Account in the Flex Comp Plan. The balance of any monthly installment not designated for the
Flex Comp Plan shall be subject to all applicable taxes. When the Retiree's SLDCA is depleted,
the Retiree shall no longer be eligible to participate in the Village's Flex Comp Plan.
The Medical Spending Account (MSA) may be used for the payment of medical insurance
premiums of the Village's Medical Insurance Plan or any other qualified medical expenditures.
Reimbursements to the Retiree from the MSA will be made pursuant to provisions of the Flex
Comp Plan. If the portion of a Retiree's SLDCA monthly *installment designated as a
contribution to the Flex Comp Plan is not sufficient to pay the Retiree's medical insurance
premium, the balance shall be paid from the Retiree's pension.
If there is a balance in the SLDCA at the time of death of a Retiree, the Retiree's beneficiary(s)
shall have the option of receiving the balance in the SLDCA in a lump -sum or continue to
receive the remaining monthly installments. A deceased Retiree's spouse or eligible dependents
may continue as participants in the Village's Medical Insurance Plan, but they are not eligible
to participate in the Village's Flex Comp Plan.
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE AMENDMENT OF THE VILLAGE
OF MOUNT PROSPECT FLEXIBLE COMPENSATION PROGRAM
WHEREAS, the Village of Mount Prospect has instituted a Flexible Compensation
Program,, as amended and restated February 1, 1986 (the "Plan"); and
WHEREAS, current full-time employees of the Village of Mount Prospect are eligible
to participate in the Plan; and
WHEREAS, individuals who have retired, quit or who are otherwise not classified as
current full-time employees are not eligible to participate in the Plan; and
WHEREAS, participation in the Plan is on a completely voluntary basis, except that the
Plan automatically provides for the payment of an Employee's medical insurance contribution
with pre-tax dollars; and
WHEREAS, the Mayor and Board of Trustees have determined that the benefits of the
Plan should be available to retired employees of the Village of Mount Prospect; and
WHEREAS, pursuant to Section ?.1, Article VH, of the Plan, the Village of Mount
Prospect wishes to amend the Plan to allow retired employees of the Village of Mount Prospect
to participate in the Plan.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND BOARD OF TRUSTEES
OF THE VILLAGE OF MOUNT PROSPECT, COOK COUNTY, ILLINOIS:
SECTION ONE: That the Village President and Village Clerk of the Village of Mount
Prospect are hereby authorized to execute an amendment to the Plan which will provide that any
Retiree who is receiving Sick Leave Deferred Payments from the Employer may participate in
the Plan.
SECTION TWO: That a Retiree's participation in the Plan will be on a completely voluntary
basis.
SEMON THREE: That this Resolution shall be in full force and effect from and after its
passage and approval in the manner provided by law.
AYES:
NAYS:
PASSED and APPROVED this day of -- 1 1994.
A=T:
Carol A. Fields
Village Clerk
Gerald L. Farley
Mayor
Amendment No. I - Effective May 1, 1994
I. Section 1.3 of Article I entitled "Definitions" is hereby amended as follows:
, so that hereinafter said
Paragraph (i): Participant is 'hereby amended mi- its entirety,
Paragraph (i) of Section, 1. 3 ofArticle I shall be and read as follows.*
(i) Participant:,, An Employee or Retiree of theEmployer
who is eligible to participate, in this Plan M", accordance with
Article IE[ hereof. "
Paragraph (m) is hereby added so that hereinafter said Paragraph (m) of Section 1.3 of
Article I shall be and read as follows:
(M) Retiree- Any person
previously employed by the
Employer who has terminated employment, with the
Employer and who receives Sick Leave Deferred Payment
amounts from the Employer. "
IL Article III entitled "Eligibility for Participation" is hereby amended as follows:
Attest:
The following paragraph is hereby added to Article H:
An individual who is a Retiree of the Employer may
become a Participant so long as the Retiree � i Sick
receives
Leave Deferred Payments from the Employer. 0
Carol L. Fields
Village Clerk
111111111�
Gerald L. Farley
Village President
MAINTAIN
Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM TM CI'T'Y use
TO: Village Manager•
FROM: Director Public Works
DATE: September 15, 1994
SUBJECT: Sealed Bids - New Pool Cars
Sealed
."'• • • opened .10.-00 on " • " • " 1994 • pro-
posed
vehicles are intended for general tua�no�®rt�at�-Lon by an inspector
'It
• i • Services !� ' +AIMk i Y� +r, 1 +AIMIM�, i are
• nw
i
i tkaf f
Eight
fSar . ... ... . jes i:z:UYEgi��';�1994,/199t��tscal budget.
•
i i invitational • • were mailed, • d i • notice was placed
local papers. Threebids i • . • b•results are as•
i
Bidder Year,/Make Unit Cost Total Cost
Lattof Chevrolet, 1995 Chevrolet,
Inc. Cavalier $11,613.40(,. $23,225.$0
Schmerler Ford * 1995 Ford Escort $12,201.50 $24,403.00
Spring Hill Ford 1995 Ford Escort $12,671.70 $25,343.40
* It must be noted that the bid submitted by Schmerler Ford did not
comply with our specifications. To comply with our specifications, it
would cost an additional $877.00 per unit. The $877.00 added to the
original bid price of $11,324.50 per unit, brought the cost per unit
to $12,201.50. Lattof Chevrolet and Spring Hill Ford complied with
our specifications.
Funds for this proposed purchase are on page 224 of the current budg-
et, account #67-077-93-8605, in the amount of $28,000, which includes
11
the purchase of radios, equipment, and rustproofing.
I recommend acceptance of the lowest compliance bid from Lattof Chevro-
let, Inc. for the purchase of the two 1995 Chevrolet cavalier four -
door sedans, as specified for an amount not to exceed $23,226.80.
Herbert L. Weeks
JC/td
attach.
COMSDN94.RES/FILES/BIDS
MAANTAIN
Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM IM CM USA
TO: Village Manager
FROM: Director Public Works
DATE: September 15, 1995
SUBJECT: Sealed Bid Results - Pool Car Replacement
Pursuant to our vehicle replacement schedule, funds were allocated in
the current budget to e two compact station wagons The units
are both eight years old. On th,4"attached sheet is ai_7breakdown showing
mileages and maintenance costs of the vehicles to date. Eighteen invi-
tational bids were mailed, and a bid notice was placed in local pa-
pers. Two bids were received, and the bid results are as follows:
Bidder Year/Make Unit Cost Total Cost
....... ...
'fl'odx'' 2 4 4 0 C
3
Schmerler Ford* 1995 Ford Escort Wagon $12,201-50 0
Spring Hill Ford 1995 Ford Escort Wagon $12,963.20 $25,926.40
* - It must be noted that the bid submitted by Schmerler Ford did not
comply with our specifications. To comply with our specifications, it
would cost an additional $877.00 per unit. The $877.00 added to the
original bid price of $11,324-50 per, brought the cost per unit to
$12,201.50. Spring Hill Ford complied with our specifications.
Funds for this proposed purchase are on page 224 of the current budget,
account #67-077-93-8617, in the amount of $14,000 and account
#67-077-93-8618, in the amount of $14,000, which also includes purchase
of radios, equipment, and rustproofing.
I recommend acceptance of the modified bid from Schmerler Ford for the
purchase of two 1995 Escort wagons, which complies with our specifica-
tions and is the lowest cost per unit, for an amount not to exceed
$24,403.00. The vehicles being replaced will be held for public auc-
tion in the fall of 1995.
Q
JG/td
attach.
COMWGN94.RES/FILES/BIDS
Maintenance
Life to Current Original Budgete
Village Current Life to Current Date Cost Year Cost Purchase Replacemet
'ehicle ID Year MakehWodel Mileage Date Costs Year Costs Per Mile Per Mile Price Allocatio
—%1'.-4
304��14' 1986
Chevrolet Cavalier Wagon
38,885
$3,855
$469
$0.10
$0.23
$8,000
$14,000
306 1986
Chevrolet Cavalier Wagon
52,022
$6,534
$1,027
$0.13
$0.25
$8,000
$14,000
2736 1986
Chevrolet Pickup
47,426
$4,759
$730
$0.10
$0.20
$8,500
$20,000
2744 1985
Ford 4x4 Pickup
43,901
$10,504
$2,338
$0.24
$0.56
$11,420
$26,000
MAtNTAIN
Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM 7MCMVM
TO: Village Manager
FROM: Director Public Works 91
DATE: September 15, 1994
SUBJECT: Sealed Bids - Two Snow Plows
Sealed bids were opened at 10:00 AM on September 13, 1994 for
the proposed purchase of two 101 wide,, 4211 high,, reversing snow
plows. Invitational bids were mailed, and a bid notice was
placed in local papers. Five bids were received, and bid re-
sults are as follows:
Bidder Make/Model Bid Price
R.G. Smith Equipment Baker/Flink 2PR459UA-MP
Mid America Baker/Flink 2PR459UA-MP $12,782.00
Flink Co. Baker/Flink 2PR459UA-MP $12r977.60
He'll Chicago Baker/Flink 2PR459UA-MP $13,598.00
BSI Baker/Flink 2PR459UA-MP $14,043.00
These are replacement snow plows. The snow plows being replaced
will accompany the corresponding dump trucks and offered for
sale as a package (dump truck, snow plow, salt spreader) at the
NWMC fall auction of 1995.
Funds for this proposed purchase are on pages 170 and 224 of the
current budget, account #01-071-05-8044 in the amount of $7000
and account #67-077-93-8608 in the amount of $62,000 (which
includes the purchase of truck chassis and needed equipment).
I recommend acceptance of the lowest bid from R.G. Smith Equip-
ment for the purchase of two Baker/Flink Model 2PR459UA-MP 101
wide, 42" high, reversing snow plows, as specified, for an
amount not to exceed $11,895. All bids received complied with
our specifications.
-----
Herbert L. Weeks
JG/td
SNWP.LW94.RES/FILES/BIDS
MAI,,, rAIN
4*
Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM nM, CM, 45A
TO Village Manager
FROM: Director of Public Works
ZP:
DATE: September 15, 1994
SUBJ: Sealed Bid Results Pick Up 'truck,4eplaceme
nt.,
Pursuant to our vehicle replacement schedule, funds were allocat-
ed in the current budget to replace one three-quarter ton pick
up truck this fiscal year. The unit is eight years old. On the
attached sheet is a breakdown showing current mileage and mainte-
nance costs to date. Twenty-one invitational bids were mailed
and a bid notice was placed in local papers. Five bids were
received and the bid results are as follows:
Bidder Make Unit Cost Deliver
19 6 0 3 6
Lattof Chevrolet Chevrolet 12 days
Bob Fish GMC GMC $16,498.04 75 - 90 days
Spring Hill Ford Ford $16,797.00 50 - 70 days
Chgo Truck Center GMC $1,61835.00 90 days
Jerry Biggers
Chevrolet, Inc. Chevrolet $18,354.00 90 - 120 days
Funds for this proposed purchase are on page 223 of the current
budget, account #67-077-93-8609, in the amount of $20,000, which
also includes the purchase of emergency lighting and equipment.
I recommend acceptance of the lowest bid from Lattof Chevrolet,
Inc. for the purchase of one 1995 Chevrolet three-quarter ton
pick up truck, as specified for an amount not to exceed
$16,196.36. The pick up truck which was bid is a standard,
two -wheel drive vehicle and all bids received complied with our
.
speci 1fIcationsThe vehicle being replaced will be held for
public auction in the fall of 1995.
I
X6&d ay
erbert L. Weeks
HLW/eh
TRY%BIDRE.SLT/FILES/BIDS
Village
Vehicle 1D Year MakelMlodel
304
1986
Chevrolet Cavalier Wagon
306
1986
Chevrolet Cavalier Wagon
2736
1986
Chevrolet Pickup
2744
1985
Ford 04 Pickup
Cuffent Original Budgeted
Year Cost Purchase Replacement
Per Mile Pace Allocation
$ 0;23
$ 8,000
Maintenance
$ 0®25
$ 8,000
$14,000
Lire t
Current
L& to
Current
Date Lest
Mileage
Date Cos
dear Costs
Per Mlle
38,885
x,855
$ 469
$'0.1'0
52,022
0,3
1,27
$ 0:1
47,426
-� - J59
r
- $ 730
$-0.10.
43,901
$1 50
$ 2,338
$ 0.2-4
Cuffent Original Budgeted
Year Cost Purchase Replacement
Per Mile Pace Allocation
$ 0;23
$ 8,000
$ 14,000
$ 0®25
$ 8,000
$14,000
$ 0.20
$ 8,500
$ 20,000
$ M6
$11,420
$ 26,000
MAINTAIN
Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM Im C M'' tSA
------
TO: Village Manager
FROM: Director of Public works
DATE: September 15, 1994
SUBJ: Sealed bid Results - Four Wheel Drive
Pick Up Truck Replacement
Pursuant to our vehicle replacement schedule, funds were allocat-
ed in the current budget to replace one four wheel drive three-
quarter -ton pick up truck. The unit is nine years old. on the
attached sheet is a breakdown showing current mileage and mainte-
nance costs to date. Twenty-one invitational bids were mailed,
and a bid notice was placed in local papers. Five bids were
received and the bid results are as follows:
Bidder Make Unit Cost Delivery
Lattof Chevrolet Chevrolet $181556-69 8 12 weeks
Bob Fish GMC GMC $18?617.00 75 90 days
Chgo Truck Center GMC $19,119.50 90 days
Spring Hill Ford Ford $19,159.00 50 - 70 days
Jerry Biggers
Chevrolet Chevrolet $20,842.00 90 - 120 days
Funds for this proposed purchase are on page 223 of the current
budget, account #67-077-93-8610, in the amount of $26,000, which
also includes the purchase of emergency lighting, snow plow, and
related hydraulic equipment.
I recommend acceptance of the lowest bid from Lattof Chevrolet,
Inc. for the purchase of one 1995 Chevrolet four-wheel drive
three -quarter -ton pickup truck, as specified for an amount not
to exceed $18,556.69. The pickup truck which was bid is a stan-
dard four-wheel drive vehicle and all bids received complied
with our specifications. The vehicle being replaced will be
held for public auction in the fall of 1995.
Herbert L. Weeks
HLW/eh
FOURWHDR-RST/FILES/BIDS
Maintenance
Life to Current Original Budgetc
Village Current Life to Current Date Cost Year Cost Purchase Replaceme�
6hicle ID Year MakelModol Mileage Date Costs Year Costs Per Mile Per Mile Price Allocatic
304 1986 Chevrolet Cavalier Wagon
38.885
$3,855
$469
$0.10
$0.23
$8,000
$14,000
306 1986 Chevrolet Cavalier Wagon
52,022
$6.534
$1,027
$0.13
$0.25
$8,000
$14,000
2736 1986 Chevrolet Pickup
47,426
$4,759
$730
$0.10
$0.20
$8,500
$20,000
2744 1985 Ford 4x4 Pickup
43,901
$10,504
$2,338
$0.24
$0.56
$11,420
$26,000
VILLAGE OF MOUN PROSPECT
T
FINANCE DEPARTMENT
I I z 1 VO ZT-9) a V M
TO: Michael E. Janonis, Village Manager
FROM: David C. Jepson, Finance Director
DATE: September 15, 1994
SUBJECT: Computer Hardware Bid Results
On September 15, 1994 at 10:00 a. m, sealed bids were received and opened for the purchase
of computer hardware and operating software along with the installation and maintenan%of the
computer hardware. Seventeen bid specification packages were maii 6`4—to-ni–A ui'g-guit 19,, 1994
and a bid notice was published in. the Mount Prospect Herald on August 25, 1994. Four
additional bid specification packages were mailed prior to September 1, 1994 bringing the total
invitations to bid to twenty-one (21).
Seven of the names of the initial seventeen vendors had been supplied by AEK and the other ten
were vendors that the Village has either done business with or who had specifically requested
bid specifications for this project. The last four were vendors who either heard about our
project or saw the bid notice in the Herald.
The bid specifications provided for four possible computer configurations to allow the greatest
number of vendors the opportunity to bid on the computer systems. The only difference between
the four options was in the central processing unit (CPU) of the primary computer system. The
first two options called for two Intel CPU's with the second option specifying approximately
50% more capacity than the first option. The second two options called for the CPU's to be
RISC processing units with the last of the options again about 50% more capacity than the first
option.
Intel "chips" or processing units are used in IBM compatible personal computers and the RISC
"chips" are used in the IBM RS6000 computer system and the Hewlett-Packard 9000 computer
system. All of the other specifications were the same for each of the options.
When the bids were opened, there was only one complete bid and one partial bid. The complete
bid provided bid prices for the two Intel CPU options and. the partial bid was only for the
connectivity devices. In addition there were six letters from vendors declining to bid. Three
of the letters did not give a reason for declining to bid, two of the letters said they could not
install or maintain Unix based systems and one letter (from Hewlett-Packard) said they only sold
their products through channel dealers.
Michael E. Janonis
Page 2
Computer Hardware Bid Results
The Project Team was concerned that we only had one bid to evaluate and we called as many
of the other vendors that had received the bid documents as possible. Several of the vendors
said they did not have the time they thought they needed to submit a bid; several said they could
not install or maintain, Unix systems; and several said they were only interested in certain items
in the specifications. We also discussed our concerns with AEK and they also were surprised
that we had only received one bid.
AEK contacted several of the vendors they had suggested as suppliers and the prominent
response was that the vendors did not have the personnel or could not address the connectivity
requirements of the Village. Concerns were expressed that the vendor was required to install
the hardware and was required to guarantee that it would operate to AEK's and the Village's
satisfaction. The concerns were based on the different computer environments that would need
to be connected. AEK said they will try to get the suppliers who distribute IBM and Hewlett-
Packard equipment to provide comparative quotations.
The bid specifications called for the following work to be performed:
A) Supply of computer system including peripherals and software.,
B) Installation of computer system including new and existing peripherals and
software to detailed AEK and manufacturer's specifications for final certification
by AEK before acceptance.
C) Service and Support of computer system, peripherals and software after
installation for a minimum of one year.
During our initial discussions with AEK regarding the specifications, it was pointed out that one
of the most important features of the specifications was the requirements for installation,
6
certification, service and ongoing support. This will protect the Village if problems surface in
the future and places the responsibility with one provider. This feature seemed to be one of the
main reasons most of the suppliers declined to submit bids.
The one complete bid was from Elite Computer Support, Inc. AEK has worked with Elite in
the past and they have found them to be competent and responsive. Additionally, the references
Elite provided were all positive.
s s
bid by Elite were also very favorable. Our estimated cost for the total package was
Z$85�;O1
<so"th Elite's Alternate Al at $65,475 and Alternate A2 at $75,475. The specific - 7,*
-N
r�
ansons are listed on the attached schedule.
The difference between the bid prices for Alternate Al and Alternate A2 is in the size and
capacity of the central processing units. Following is a comparison of these differences:
Mi 0
chael E. Janonis
Page 3
Computer Hardware Bid Results
Alternate Al Alternate A2 Current System
Processing Speed (Megahertz) 66 MHz 90 MHz 4 MHz
Internal Memory (Millions)
Disk Storage (Billions)
64 MG 128 MG
4.2 GB 6.3 GB
1 MG
0.72 GB
Based upon current calculations, Alternate Al would satisfy the expected needs of the Village,
but Alternate A2 would provide for much faster processing and ensure that disk space would not
have to be upgraded in the near future. The bid price of $24,900 for the CPU in Alternate A2
is a very favorable price for this type of capacity. In comparison, our current IBM System 36
CPU cost $45,504 when it was purchased in 1986.
Initially, our reaction was that all bids should be rejected but the bid from Elite Computer
Support, Inc. is complete and it is responsible. The positive features of their bid are:
1. Their references are good and AEK has worked with them in other installations.
2. They are prepared to start installation by October 15, 1994 and to complete
installation and certification by December 31, 1994.
3. The amount bid for Alternate A 1 is $19,541 less than our estimate and Alternate A2
is $9,541 less than our estimate.
If the bid is rejected, we do not know how many valid bids we would receive or if they would
be more favorable than the Elite bid. Also, we would lose four to five weeks going through the
bid process again.
. ..... . ....
Rry
dation that we accept
Based upon the positive featurd"""&f"'—the Elite bid, it is my recom' ti,
Alternate A2 from the Ei'40"Computer Supply, Inc. for $75,475.
. ............
DCJ/srn
Enc
UNIX Server,
Processor
Clock Speed
Memory
Disk Storage
,CONNECTIVITY DEVICES,:
Public Works
Leased Modems
Bridges
Adapter
Police & Fire
Transceivers
Senior Center
Transceivers
Multiplexors
Village Hall
Adapters
Remote Modem
COMPONENT DEVICES:
Tape Drive
Terminals
Printer
U P S, Device
Cash Receipts System:
Operating System
Connectivity Software
Emulation Utility
RPG Compiler
Report Writer
VILLAGE OF MOUNT PROSPECT
HARDWARE REQUIREMENTS
Minimum
Elite Computer
Elite Computer
Retirements
Alternate Al
,_A2
Akmair
INTEL 486 Multi Processor
486/66(2)
486 190 (2)
66190 Mhz
m
66 Mbz
90 Mhz
641128 MG
MG
128 MG
4/6GB
4.2 GB
5�3 GB
T otal CPU costs
S33,1 70, 00
$14,900,00
$24*900.00
56 Kbps CSU / DSU
$460.00
$1,120=
512 Kbps Remote Ethernet 2
$3,066.00
$$,150,00
$3,1%00
Ethernet
$300,00
$2.345.00
$3,S26�00
$6,615,00
$6,61&'00
Fiber, Optic ( 2 )
$ ,.,00
$640=
$640,00
Fiber Optic ( 2 )
$364,00
$640,=
$640.00
16 port ASYNC ( 2)
$3,600,00
$1,650.00
$1,650.00
$3,964,00
$,?,290,00
$2,290,00
RS232 Adapters ( 17)
$340,,00
$250.00
$250,00
14A Call Back Modem
$529,00
$170.00
$170-100
$869.010
$420,00
$420,100
Total Connectivity Costs
$%023.00i
$9.965.DO
$9 5'00
8 GS DAT
$105.00,
$1,320,00
$1,320.00
Wyse 325 ( 18)
$10,350.00
'$14,660,00
$14,580.00
600 1pm
VASO,OD
$6,500 00
$6,500.010
,2000 KVA
$1,099,001
$1,250 00
$1,250.00
Cash Drawers
$400,Ob
$900,00
$W1,10110
Receipt Printers
$500,,0,01
Inc,, wl0rawer
Inc, wl Draw
Magnetic Strip Readers
$800.00
$Sao 010
$58000
Wedges ( 3 devices)
$800,00
ft. wl Rieaders
hic, wl Readers
Total CIR System Cpsts
$2,600,00
$1,480.00
$1,480..00
Unix based -128 user
$4,990.00
$4,250.00
$4,250.00
Telpilp
$000,00
$1,200,00
$1,200,00
Wyse 60 emulation
$400.00
$1,250.00
$1,250,00
Lattice
$24500.00
$1,680.00
$1,680,00
Thoroughbred Inquiry IV (64 U's0r)
$10'000:00
$71 100.00
$7,100.00
Total Compmeht Costs,
$42,82100
!$40,610..00
$40,610.00
Total Hardware Costs
$85,016-00
$6$,475'.00
$75,475.00
Village of Mount'Prospect
Mount Prospect, Illinois IVA qw:::111110
INTEROFFICE MEMORANDUM
1 0
Nbo�IA 4W
7)
TO : VILLAGE MANAGER MICHAEL E. JANONIS
FROM: ASSISTANT TO THE VILLAGE MANAGER
DATE: AUGUST 30, 1994
SUBJECT: COMPUTER PURCHASE PROGRAM
When the Village Board approved the original Village -Assisted Computer Purchase
Program, they approved a maximum number of employees that may participate as 20.
As of this date, we have reached the 20 -employee maximum and have loaned
approximately $41,000 to employees for the purchase of computers. At this time, we are
also moving forward with the implementation of the Village's Computer Program relating
to Finance and relational data bases for use by other Departments.
I would recommending extending the program through the end of the year to correspond
with the implementation of the Village's Computer Program. The program has worked
extremely well so far. There have been very few complaints and very little confusion as
to the mechanics of the program. The vast majority of employees that participate in the
program are extremely excited about the assistance to purchase a computer and are very
interested in learning how to use the computer as part of their job to enhance their
abilities.
Extending t, I e program through the end of the year will allow increased participation but
it will also minimize the number of participants. I feel it is important to not run the
program for an extended period which may burden the Village with excessive costs in
order to provide the assistance. However, after one year to 18 months, enough money
will be repaid and at that time, we could possibly consider opening the program for a
short period of time, if necessary, due to the demand of additional purchases. Even if the
program is reopened after a period of time, I would recommend allowing people to
participate a second time who have already utilized the program. The general idea of the
program is to encourage use for as many employees as possible.
I would recommend extending the Village -Assisted Computer Purchase Program through
December 31, 1994. Depending on the demand for assistance and the repayment
schedules, we can determine whether the program should be renewed in 1996.
t
DAVID STRAHL
lJ.�lL� iJ
MAINTAIN
Mount Prospect Public Works Department
02 INTEROFFICE MEMORANDUM nu, crn, I "SA
TO: Village Manager
FROM: Director of Public Works
DATE.- September 15, 1994
SUBJECT,-, Sewer System Evaluations
See-Gwen/Milburn Drainage Area
Maple/Berkshire Drainage Area
Several years ago, all communities that had their wastewater
treated by The Metropolitan Water Reclamation District (MWRD)
were required to conduct numerous tests on their sanitary sew-
ers. Communities that had excessive infiltration problems were
required to make all cost-effective repairs to their systems to
eliminate extraneous flows. Repairs consisted of spot replace-
ment, relining, and water proofing manholes. The Village spent
several hundred thousand dollars in an attempt to control these
extraneous flows, but was unable to meet the optimum flow re-
quested by the MWRD. After an extensive review of our final
report, the MWRD accepted our system, recognizing that we had
done everything we could which was cost-effective.
A few years ago, as an aftermath of our flooding conditions
during 1986 and 1987, several areas in the community were identi-
fied as still having chronic sewer problems. A subsequent study
of the problem areas was conducted, and a'five-year program was
initiated to make major improvements to help those areas. Even
though specific areas were targeted for improvement, we were
confident that other areas not identified would also benefit by
the program. Although This has occurred in many areas, there
are a few drainage areas where we are still experiencing prob-
lems.
Two specific drainage areas are currently causing hardships to
the residents, and we are requesting additional studies be con-
ducted in an attempt to resolve their sewer problems. The area
referred to as the see-Gwen/Milburn service area was and still
is listed as part of the original five-year improvement pro-
gram. A course of action had been recommended to us by a prior
consultant, but it was not approved by the MWRD as being accept-
able. Even though this area had benefited by prior rehabilita-
tion efforts, the rate of flow still remains high. The old test
data performed in 1979 and 1986 may be outdated and new testing
procedures need to be performed. A viable solution to the prob-
lems needs to be identified and researched to assure the communi-
ty it is a doable project.
A
The second sewer area that we are recommending to be addressed
is referred to as the Maple/Berkshire system. This area has
also had some rehabilitation work done in the late 70's and
early 80's, but again, the residents are experiencing basement
flooding. This area has never had a separate study conducted or
a recommended major improvement project formulated.
On June 23, 1994, we received between five and six inches of
rain within a relatively short period of time. Both sewer areall
described experienced sewer backup into their basements.
Both of these sewer service areas have separate sanitary and
separate storm sewers. The sanitary sewers in both of the areas
discharge into a 54" diameter combined interceptor sewer owned
by the MWRD. AltIfough the sewers in this community and others
have benefitted from the construction of the deep tunnel
project, there are still some localized problems.
We have been told that a MWRD operational policy is in place
whereby when the capacity of the deep tunnel reaches 500, all
flows coming from combined sewers are prohibited from entering
the tunnel. Allegedly, the theory is to save the remaining
capacity for straight sanitary flows only. Even though both our
areas described here have a separate sanitary sewer system they
are discharging into a MWRD combined interceptor sewer, so we
have no access to the deep tunnel after it reaches 50% capacity.
A solution needs to be found to resolve our high flows in these
areas plus find a means to offset the surcharging problems creat-
ed by the MWRD interceptor sewers. To accomplish this, we need
to have reinspections of all homes in the flooding areas to look
for illegal sump pump connections or other sources of extraneous
flows. Then, smoke testing needs to be performed to see if
there are any breaks in individual house underground sewer lines
and finally to conduct flow tests in our main sewers during wet
weather conditions to further determine where our problems are.
We sent out several requests for proposals and offer for your
consideration the response from two major engineering firms.
Their fees for the studies are as follows:
Rust Environment &
Metcalf & Infrastructure
Maple/Berkshire
Service Area (60 homes) $14,100 $18,024
See-Gwun/Milburn
Service Area (220 homes) $41,900 $34?111
Total combined areas
not to exceed $56FOOO
Both proposals are predicated upon receiving both 's-f�Eres in
order to use field personnel more efficiently.
I recommend awarding the contract to the lowest proposal as sub-
mitted by Rust Environment & Infrastructure for an amount not to
exceed $52,135Ts will "Include testingas•
describgAand
recommendations 1111!�. �LL oodl cerns. Includ-
�d— facility plan on the See-)Gw�ilburn
area, which had previously been approved for IEPA low interest
funding.
—00*1111111 MaNji
OM
Herbert L. Weeks
HLW/td
SWRSYSEV.ALU/FILES/SEWERS
Minutes
COFFEE WITH COUNCIL
September 10,, 1994
The meeting was called to order by Mayor Gerald L. Farley at 9:00 a.m. Trustees
present were George Clowes, Timothy Corcoran, Paul Hoefert, Michaele Skowron and
Irvana Wilks. Also present were Assistant to the Village Manager David Strahl and
Police Chief Ronald Pavlock. Village residents present were: Charles Klein, Mr. & Mrs.
Zapfel, Frank Smith, Harold Hinrichs and Douglas Moore.
Charles Klein, 1518 Park Drive, expressed his concern with the number of persons
working on landscaping for the Village. He was also concerned about trees and what
they are doing to the sidewalks and sewers. It was explained that this work is usually
contracted out. This information was passed onto Director Weeks.
Mr. & Mrs. Zapfel, 321 N. Maple, complained about the water taste during August.
They reported they called the Water Superintendent who explained about temperature
change during the summer. Dave Strahl explained that this does happen due to algae
composition. Trustee Skowron explained that even though the taste may change, the
water is safe. The Water Superintendent should check further.
Frank Smith, 903 Quince, reported there is poison ivy by the railroad tracks off
Kensington and also on the north side of Burning Bush. Poison ivy has wrapped itself
along a light standard/fence. Mr. Smith also questioned the number of garbage cans
and recycling bins for a large family. A general discussion ensued about the
responsibilities we have to recycle.
Hal Hinrichs, 206 S. loka, stated he has lived in Mount Prospect since 1951 and
discussed its past history. He explained he is a past Trustee and made positive
comments on services of the Village.
Trustee Irvana Wilks stated Giordino's Pizza has still not been repaired. Advised that
the Village has sent notices and staff is keeping an eye out.
A discussion was held on Trustee Clowes' memo regarding moving the Coffee with
Council meeting to different locations. The general consensus was to keep the same
Coffee with Council schedule, but to look for alternative dates to move around the
Village, i.e., every month that there is a fifth Tuesday.
The meeting was adjourned at 10:50 a.m. The Mayor and Trustees were attending
the Historical Museum groundbreaking.
Respectfully Submitted,
"o-CIYez,.
Ronald W. Pavlock, Chief of Police
RWPJd
Attachment
AGENDA
SIGN REVIEW BOARD
Monday, September 19, 1994
Trustees' Room, 2nd Floor, Village Hall
100 South Emerson Street
7:30 P. Mo
,LIC
201
xN-4"94. Ray �N gelp -2,09, 1Eut,Eurlid, Avenj�e
,at 3
Petitioner requests a special use equity option in order to install a 6' X 8' freestanding sign located
within 30 feet of the east interior sideyard instead of 60 feet as required by Ordinance. Property
owner will trade off permitted wall sign area as a condition of the request.
4
GEMLO L FARLEY
GEORGE, A, CLOWES
TIMOTHY J.004CORAN
RICHARON,'HEUDRICI S
PAUL WI HOEFEAT
Village Mount 'Prospect
MIC I-WELE WSKOWAGN
or"m
IAVANA k,'ZLKS
VILLAGE MANAMER
100 South Emerson Street Mount Prospect, Illinois 60056
MICHAEL I- JANONIS
V1UJ= CLERK
CAROL A. FIELDS
Phone: 708 / 392-6000
Fax: 708 / 392-6022
TOO: 708 / 392-6064
AGENDA
SIGN REVIEW BOARD
Monday, September 19, 1994
Trustees' Room, 2nd Floor, Village Hall
100 South Emerson Street
7:30 P. Mo
,LIC
201
xN-4"94. Ray �N gelp -2,09, 1Eut,Eurlid, Avenj�e
,at 3
Petitioner requests a special use equity option in order to install a 6' X 8' freestanding sign located
within 30 feet of the east interior sideyard instead of 60 feet as required by Ordinance. Property
owner will trade off permitted wall sign area as a condition of the request.
ZONING BOARD OF APPEALS
Regular Meeting
Thursday, September 22, 1994
7:30 P.M.
Senior Citizen Center
50 South Emerson Street
ZRA-41-V-94, Richard L. and Colleen Anda, . ...... 4 Jerry,p Drive
The petitioners are requesting a variation to Section 14.346.B.1 to allow an existing 156 square foot
shed on a 214 square foot slab to remain instead of the maximum allowed 120 square foot.
Upon completion of the public hearing, Village Board action will be required for this case at their
meeting of October 4 , 1994.
ZBA-42-V-941 Tno Lane
Kevin .'Bq*' in,.I- A a
The petitioners are requesting a variation to Section 14.203.D to allow a fence with a height of 6 feet
instead of the maximum allowed 5 foot.
The Zoning Board of Appeals is final in this case. (SEE NOTE)
NOTE*- In all cases where the Zoning Board of Appeals is final, a five (5) day period is
provided for anyone wishing to appeal their decision. No permit will be issued until
this period has elapsed. Appeal forms are available in the Planning Department.
MAYOR
GERALD L FARLEY
TRUSTEES
GEORGE A, CLOWES
TIMOTHY J. CORCORAN
RICHARD N. HENDRICKS
PAUL WM. HOEFERT
V111'age Mount Prospect
MICHAELE W. SKOWRON
of
IRVANA K. WILKS
VILLAGE MAkASEA
100 South Emerson Street Mount Prospect, Illinois 60056
MICHAEL E. JANONIS
VILLAGE CLERK
CAROL A. FIELDS
Phone: 708 / 392-6000
Fax: 708 / 392-6022
TDO: 708 / 392-6064
ZONING BOARD OF APPEALS
Regular Meeting
Thursday, September 22, 1994
7:30 P.M.
Senior Citizen Center
50 South Emerson Street
ZRA-41-V-94, Richard L. and Colleen Anda, . ...... 4 Jerry,p Drive
The petitioners are requesting a variation to Section 14.346.B.1 to allow an existing 156 square foot
shed on a 214 square foot slab to remain instead of the maximum allowed 120 square foot.
Upon completion of the public hearing, Village Board action will be required for this case at their
meeting of October 4 , 1994.
ZBA-42-V-941 Tno Lane
Kevin .'Bq*' in,.I- A a
The petitioners are requesting a variation to Section 14.203.D to allow a fence with a height of 6 feet
instead of the maximum allowed 5 foot.
The Zoning Board of Appeals is final in this case. (SEE NOTE)
NOTE*- In all cases where the Zoning Board of Appeals is final, a five (5) day period is
provided for anyone wishing to appeal their decision. No permit will be issued until
this period has elapsed. Appeal forms are available in the Planning Department.
MINUTES OF THE REGULAR MEETING OF THE
MOUNT PROSPECT PLAN COMMISSION
September 7, 1994
CALL TO ORDER
The regular meeting of the Mount Prospect Plan Commission was called to
order by Chairman Weibel at 8:00 PM at Village Hallf 100 South Emerson
Street, Mount Prospect, Illinois.
ROLL CALL
Present at Roll Call: Frank Boege William Reddy
Edwin Janus Carol Tortorello
Thomas McGovern Louis Velasco
Marshall Ponz"i Angela Volpe
Donald Weibel, chairman
Village Staff Present: Michael Sims,, Planner
Others Present: Nancy and Robert Winkates
Robert Regan
Phil and Angela Anast
Nancy Bobikewl*_cz,, Pres., Wedgewood Homeowners Assoc,
Frances Molitor
Chairman Weibel introduces and welcomes Bill Reddy as the newest member of
the Plan Commission.
APPROVAL OF MINUTES
A motion was made by Mr. Boege, with a second by Mrs* Volpe to approve the
minutes of August 3. 1994 as presented. Motion passed 6-2 pass,
SUBDIVISIONS
Welnhofer's Plat of Consolidation - 1201 West Lincoln
The applicant wants to consolidate part of lot 12 with all of lot 11 and
the west side of the vacated road right-of-way that was Waverly Avenue to
create one legal lot of record out of the contiguous property at 1201 West
Lincoln, The owner feels this may simplify a future sale of the property.
This plat is not being prepared as a requirement of the Development Code.
The plat has been properly prepared and staff has no objection to approval.
There is some discussion and a motion is made by Mx. McGovern, with a second
by Mr. Janus to approve Vielnhofer's Plat of Consolidation and authorize the
Chairman and Secretary to sign the plat, Motion passes 8-o,,
Anast Preliminary Plat of Resubdivision - 306 West Rand Road
This is 'the second time the petitioner has appeared since April 20, 1994 to
ask, approval, to subdivide the property into two lots for single family resi-
dential �use from R -X to R-1, design, at op. At that time the decision was
tabled and the owner was asked, by the Commission to meet with the Wedgewood
Homeowners Association on issues related to the restrictive covenant that
includes the subject parcel, The Association voted 44-0 to deny the ownerts
request to create two lots that would be smaller than that permitted in the
covenant.
The owner is also asking for Development Code modifications for lot depth,
curb and gutter and sidewalk for the entire parcel. Much discussion followed
with ,Mr. Anast claiming three attorneys saying they have been broken and Mrs.
BobikeiFricz s,ay3"'-ng two attorneys she spoke to said the covenants will hold up.
Mr. Anast was aware of covenants but saw that Elmhurst Place subdivision had
gained permission by the Association on to build. This area and Thomas More sub
are not part of the Association and both are several acres in size.
PLAN COMMISSION MINUTES - September 7. 1994 , Page 2
The consensus of the Commission. was the only hardship was being created by
the owner in creating two parcels, each would have 100 foot lot depth
instead of the 120 minimum in the code. There would also be problems W11 th
the setback from Rand Road (which is Pcheduled to be widened in the future
and could increase right-of-way footage). Mr.Anast states he would face
both houses into 01edgewood with drives. Mrs,. Bobikewicz states the
Association has members that have been there 40 years and have children
moving back and purchasing properties because of the lot sizes and cove-
nant restrictions* This would set a precedent for a property within the
Association,. Vie will ignore the Covenant and go with Codes which govern
Village properties. Mr.Sims reads from the Development Code on Modifi-
cations 16.111 to refresh all memories.
A vote is then taken to approve the Plat of Resubdivilsion with a motion
by Mr. Boege with a second by Mrs. Volpe. Vote fails 8-1 pass.,
A vote is then taken to approve the modification on lot depth to 100 feet
from 120 feet with a motion by Mr. Ponzi with a second by Mr. Velasco.,
Vote fails with 6 nays and 3 ayes.
A motion is then made by Mr. McGovern to approve modification on curb and
gutter. Motion fails with lack of a second.
A motion is then made by Mr. Boege to re --consider the previous vote on the
100 foot lot depth with a second by Mrs, Volpe. Vote 4 ayes, 3 nays, 1
pass and 1 abstain! Mr. Boege wants to go on record stating his motion
to re -consider the earlier vote is because he finds it superfluous in
view of the fact that the subdivision did not pass. Mr. Velasco agrees.
It is then decided the pass of the previous vote goes with the ayes so then
a motion is made by Mr. Ponzi with a second by Mr. Reddy to again re -consider
the 100 foot vote. The vote is 2 ayes, 4 nays,, 3 pass, 1motion fails.
A motion is then made by Mrs. Volpe to table the Development Code modifi-
cations on sidewalk and curb and gutter with a second by Mr. Velasco. Vote
fails with 2 ayes and 7 nays.,
A motion is then made by Mr. McGovern for approval of curb and gutter
Development Code modifications with a second by Mr. Ponzi. Vote fails
with 7 nays and 2 pass.
A motion is made by Mrs. Volpe to approve Development Code modifications
on the sidevialk with a second by Mr. Ponzi, Motion denied 7-2 pass,
Again the pass votes reflect, the alleged superfluous nature of the vote
because of not passing the resubdivision,
C01,94ITTEE REPORTS
A. Community Development No report
B. Comprehensive Plan Mr. Sims states the Village Board Will finish
reviewing the recent changes at a regular Board
meeting very soon.
C. Development Code A meeting is set up for 9-14-94 to start review.
D. Text Amendment No report
OLD ,BUSINESS
Mr. McGovern asks "who is staff?" noted in administration memos., Mr. Sims
states that t1staff" could be any of the various village departments that
would have any input and concern with any request for change. It was then
asked if any denials could be noted on our "Information and why,
Chairman Weibel than asked that Mr. Reddy be added to the roster and
appropriate committees.
PLAN C01�111ISSION MINUTES - September 7, 1994 Page 3
NEW BUSINESS
Mr. Sims states that three Ke*nsington Center developers would need modifi-
cation in the Development Code for 75 foot setbacks from detention ponds.
This question has been discussed of late with a change to 25 feet being
recommended as a change in the Development Code, A Public Hearing will be
needed in this regard and *111s being scheduled for a Special Plan Commission
meeting on September 28 at 8:00 PM. A public notice will be published,
Chairman �,Veibel then reflects on his tenure with praise for Staff and
Commission members for carrying out responsibilities with insight and
thought and thanks everyone for their efforts.
Mr. Sims says his time working with Chairman Weibel has been very enjoyable.
Mir. Boege echoes the rest with his extreme regret to accept Chairman 'Weibel's
resignation. All wished Chairman ',deibel their best in his new home in
Gurnee and thanked him for his service to the Plan Co ssion and the
Village of Mount Prospect.
V'Jith no further business the meeting was adjourned at 9:40 PM
Respectfully submitted,