Loading...
HomeMy WebLinkAbout06/16/2020 Motion to accept bid for 2020 Backyard Drainage Improvements Project (for properties: 310 Hi Lusi, 318 S. Albert, 914 Burning Bush and 1306 Burning Bush) in an amount not to exceed $116,234.Item Cover Page wubject Motion to accept bid for 2020 Backyard Drainagc Improvements Project (for properties: 310 Hi • Albert,, BurningBush and 1306 Burning Bush)• • toexceed $116,r234M 2=� June 16, 2020 MOUN— PROSPECT VILLAGEBOARD Many properties in Mount Prospect experience recurring backyard flooding after any significant rain event. Often water will pond in their yards and remain there for a considerable length of time. On May 13,, 2008, the Village Board authorized Staff to proceed with the Backyard Drainage Program in an effort to assist residents in reducing the backyard flooding they experience. Staff has received requests for assistance through the Backyard Drainage Program for over 200 residential properties. Surveys of existing conditions have been completed and plans have been prepared to improve surface drainage at each of these properties. Each design includes an inlet in the backyard draining through a pipe connecting to the existing sewer system in the public right of way. To protect the receiving system from being overwhelmed, each design includes a restrictor that controls and slows the discharge into the receiving sewers. These restrictors, while serving to protect the Village sewer systems, may cause water to pond in the backyards during heavy rain events for a short duration. To accommodate this pondingrain gardensare installed around the inlets. These raingardens provide a place for any ponding water to accumulate,, and provide a mechanism for the water to infiltrate into the ground quickly. 1 Following construction,, the property owners are responsible for maintenance of the storm sewer and rain gardens on the private properties; however it is the Village's responsibility to maintain the new storm sewer in the public right of way. Each design on / ''property,,avoiding the need •easements ' ' ! agreements between property owners. Staff identified seventy-one (71) properties that experience ponding severe �tnough w floodwatersreach house foundation. forty-five properties have benefited from the program. At the February 10, 2015, Committee of the Whole Meeting, the Village Board determined to continue moving forward with the Backyard Drainage Program while requiring a cost. •m the property owners. The Village i•. • committed to paying the majority of the cost of the improvements, a minimum of 75% of the total cost. The property owner is required to pay 25% of the cost up to a maximum of 111. Staff estimates the average total!for the improvements • property r b over 111. Therefore ..! - the homeowner cost is estimated to be $5,000. All the property owners participating in this year's Backyard Drainage Program have submitted checks covering their participation in the • • The Backyard Drainage Program was reviewed by the board at the July 9., 2019 Committee of the Whole meeting, with guidance to continue the program as currently designed. ■ A Notice to Bidders was posted on the Village's website using Demandstar online bid services. In addition, notices were sent to twelve (12) contractors. The bid opening for the 2020 Backyard Drainage Program was held on June 1, 2020 11 PM. Seven• • '• bids forproject. The r• ranged from a low of $84,667-10 by Semper Fi Land Services, Inc. to a high of $138f847-00 by Mauro Sewer Construction, Inc. Below is a summary of the bids: 2 Bidders Total Semper Fi Land Services,, $84f667.10 Inc. Drains, Inc. $96f491.74 Archon Construction Co. $97,r341.00 Martam Construction, Inc. $104,F386-00 Vian Construction Co.,, $118f598-00 Inc. Copen haver Construction, $130,005.00 Inc. Mauro Sewer $138f847.00 Construction, Inc. Engineer's Estimate: $148,655.20 P] � _, M=6 All bidders submitted a bid bond in the amount of 10% of the total bid as required' in the bid proposal packet. All bids were checked for their accuracy. A mistake was found in the bid by Drains, Inc., but it did not impact the order of the bids. All bidders correctly signed their bids and bid bonds. The low bidder, Semper Fi Land Services, Inc. is qualified to complete the work involved with this project and meets the requirements of the contract documents. Semper Fi Land Services, Inc. submitted numerous references includinliv LF references from Barrington Township and the City of Aurora for similar projects Those agencies reported that the work was completed to their satisfaction. 111111111� i The bid price which includes three (3) sites is significantly under the engineer's estimate, which was based on the 2019 bid prices, and under the available budget creating an opportunity to add an addonal site at 914 Burning Bush Lane. Semper Fi Land Services, Inc. has agreed to extend the contract for an additional site and a fourth owner was contacted and has agreed to pay their cost share. That site is estimated to cost $21,,000. Staff recommends that a fourth site be VJ !!-! and the contract be awarded in the amount of - bid price $84.,667.10 $21,000 • • $10f566-90 1% contingency to allow for ,Auantity variations and unanticipated conflicts) for a total award of $116,,234.00. n Staff recommends that the Village Board accept the lowest cost,, responsive,, bid for the 2020 Backyard Drainage Program Improvements Bid as submitted by Semper Fi Land Services,, Inc. of Yorkville., Illinois, in an amount not to exceed $116,f234. Alternatives Alternatives 1. Accept lowest cost Alternate Bid for 2019 Backyard Drainage Program. 2. Action at discretion ofVillageBoard. Staff Recommendation Accept the lowest cost, responsive,, bid for the 2020 Backyard Drainage Program Improvements Bid as submitted by Semper Fi Land Services,, Inc. of Yorkville,, Illinois,, in an amounttoexceed $116,,234. ATTACH M E NTS: Bid Document.pdf Semper Fi Land Bid. pdf 1306 Burning Bush. pdf 310 Hi Lusi.pdf 318 S Albert.pdf 914 Burning Bush. pdf Ell