TO:
MICHAEL E. JANONIS, VILLAGE MANAGER
--e't>. "^~
a\ \5\0(0
FROM:
MICHAEL J. FIGOLAH, FIRE CHIEF
DATE:
AUGUST 11, 2006
SUBJECT:
FACILITY STUDY RECOMMENDATION
On April 26, 2006 a presentation was given to the village board that illustrated the
need to evaluate existing facilities. The age of some facilities and the expansion of
services have created a need to modify and/or in some cases, build new facilities
to house staff operations in the Fire, Police and Publics Works Departments. Prior
to moving forward with a recommendation for any plans to remodel or rebuild any
buildings a facility study is recommended that will provide an assessment of needs
and detailed cost estimates.
Since the meeting in April a "Request for Qualifications and Proposal" was
developed and advertised then qualified firms were interviewed. An interview team
consisting of members of the Fire, Police, Public Works, Finance and Village
Manager's Departments conducted interviews with three (3) firms. Those firms and
their not-to-exceed amount for conducting the facility study are as follows:
. Legat Architects $56,600
. Sente-Rubel-Bosman-Lee Architects Ltd. $68,400
. Larson and Darby Group $80,000
Based upon the interviews, references and information provided the interview team
recommends Sente-Rubel-Bosman-Lee Architects. The team felt that this firm was
the most qualified to perform the identified scope of work.
Recommendation
Enter into an agreement with Sente-Rubel-Bosman-Lee Architects to perform a
facility study in an amount not to exceed $68,400. A contingency fund of $10,000 is
recommended to allow site survey, topographical maps or other associated work
that may be necessary. There is $100,000 allocated in account # 5107701-540112
Space Needs Study in the FY2006 budget.
MF
Attachment
I:\MF-Facility Study Recommendation-MEJ.doc
Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM
FROM:
DEPUTY DIRECTOR OF PUBLIC WORKS
~D. H~
efts/ob
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
DATE:
AUGUST 8, 2006
PUBLIC WORKS UNIFORM RENTAL AND CLEANING CONTRACT
(NOT TO EXCEED $12,580.36/ YEAR FOR 24 MONTHS)
SUBJ:
Background
For many years, the labor agreement for the Public Works Department bargaining unit
employees has stipulated that the Village must supply 100% cotton work uniforms. In an
effort to comply with this requirement, staff has routinely let bids for a contract to supply
and launder industrial work uniforms. The current contract was initiated in 2003 and is
due to expire in August 2006.
Bid Results
At 10:00 AM on Monday, July 24, 2006, sealed bids were opened for the weekly rental
and cleaning of uniforms worn by Public Works Department maintenance personnel.
The term of this proposed contract is 24 months. A legal notice was placed in the Daily
Herald and six (6) invitational bids were distributed to local vendors. Three (3) bids were
received. The results are listed below:
100% Cotton Shirts & Pants
100% Cotton Indura Flame Resistant Shirts & Pants
100% Cotton Shirts & Pants
Total Annual Cost:
34
6
3
5
5
3
$5.35
$8.40
$3.21
$9,458.80
$2,620.80
$500.76
$12,580.36
G & K Services., Lombard, IL
100% Cotton Shirts & Pants 34 5 $6.40 $11,315.20
100% Cotton Indura Flame Resistant Shirts & Pants 6 5 $8.70 $2,714.40
100% Cotton Shirts & Pants 3 3 $3.84 $599.04
Total Annual Cost: $14,628.64
Unifirst, Elk Grove Village, IL
100% Cotton Shirts & Pants 34 5 $6.16 $10,890.88
100% Cotton Indura Flame Resistant Shirts & Pants 6 5 $9.13 $2,848.56
100% Cotton Shirts & Pants 3 3 $5.81 $906.36
Total Annual Cost: $14,645.80
Page 2 of 2
August 8, 2006
Public Works Uniform Rental and Cleaning Contract
Discussion
Based on this tabulation, the lowest annual cost for this proposed contract is $12,580.36
as submitted by Lechner & Sons of Mount Prospect, Illinois.
Lechner & Sons has provided uniform rental and cleaning services to the Village of
Mount Prospect Public Works Department for the past 3 years. They have proven
themselves to be a reliable and competent supplier of laundered public works uniforms.
Staff has also checked the references provided by Lechner & Sons and all gave
satisfactory reports with regard to their service and the quality of their garments.
Lechner has provided uniform services to several local municipalities including the
Village of Winnetka, Village of Lindenhurst, Village of Lake Bluff, as well as High School
District 211.
Additionally, it is relevant to note that Lechner & Sons' primary business office is located
in the Kensington Business Center (420 Kingston Court).
Recommendation
I recommend that the Village Board accept the lowest qualified bid of $12,580.36 per
year for a 24-month uniform rental and cleaning contract as submitted by Lechner &
Sons of Mount Prospect, Illinois. Funds for this proposed contract are available in the
current budget. Expenditures in 2007 and 2008 will be limited to approved budgeted
amounts.
~
Sean P. Dorsey
I concur.
~~
Director of Public Works
SPD/spd
C:IDocuments and SetlingslsdorseylMy DocumentslPERSONNELIUniformslBidslAward Recommendation 2006.doc
Cc: Director of Public Works Glen R. Andler
Streets Foreman Dan Jones
Account Clerk Julie Bolin
File
Mount Prospect
INTEROFFICE MEMORANDUM
@}
TREE CITY USA
Mount Prospect Public Works Department
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
~.~~
a"s-Iol.
FROM:
FORESTRY/GROUNDS SUPERINTENDENT
DATE:
AUGUST 8, 2006
BID RESULTS - CREEK CLEANING/TREE WORK - $29,200.00
BACKGROUND
In the 2006 budget, funds have been appropriated to continue the ongoing cleanup of Mount
Prospect waterways. Each year since 1997 we have been hiring a contractor to remove garbage
and other debris from the bed and banks of our creeks, remove dead trees, and prune dead limbs
over 6" in diameter. This year we propose to continue the clean up along McDonald Creek,
starting from the Mount Prospect/Prospect Heights corporate limits working southeasterly
towards the Wolf Road/Euclid Avenue intersection.
SUBJECT:
BID RESULTS
Sealed bids for this year's contract were opened on July 31, 2006. Fourteen invitational bids
were mailed and a bid notice was placed in the local paper. In addition, a Pre-bid conference
was held on July 18,2006. Four bids were received and two "No Bid" letters. Contractors were
asked to submit lump sum prices for all labor and equipment required to perform the specified
work for the area listed above. Bid results were as follows:
Bidder
Winkler's Tree and Landscaping
Clean Cut Tree Service
Kramer Tree Service
Landscape Concepts Management
Nels J. Johnson and Son
Arbor Team Plant Health Care
Total cost to complete creek area
$27,199.66
$30,600.00
$31,450.00
$108,926.82
No Bid
No Bid
DISCUSSION
The low bidder, Winkler's Tree and Landscaping, Inc. has performed satisfactorily on our
Creek Cleaning/Tree TrimminglRemoval Contracts in 2001,2002 and 2004. Additionally, they
also held contracts for our Tree and Stump Removal Contracts in 2001 and 2002.
This bid award is based on estimated quantities of trees and tree sizes. Consequently, it is
feasible that actual quantities encountered in the field may vary slightly. Therefore, staff
requests that the bid award include a small contingency (approximately $2,000.00) to facilitate
efficient management of tree quantity and size variances.
Page 2 of 2
BID RECOMMENDATION
Sufficient funds for this proposed expenditure exist in the current budget (Acct. #5907704-
690079 in the amount of $23,000.00 and Acct. #5907704-690013 in the amount of $6,200.00,
both on page 288). Therefore, I recommend award of contract to the low bidder, Winkler's
Tree and Landscaping, Inc., in an amount not to exceed $29,200.00.
I concur:
A!fI!~,
Director of Public Works
I /"'/1_
~~~
:.../' Sandy Clark
H:FORESTR Y /WORD/2006/CREEK/MEMO-CREEK2006.DOC
Mount Prospect
~
Mount Prospect Public Works Department
INTEROFFICE MEMORANDUM
FROM:
DEPUTY DIRECTOR OF PUBLIC WORKS
AUGUST 8, 2006
RFP RESULTS I PROSPECT MEADOWS WATER MAIN PHASE 2
ENGINEERING SERVICES ($39,857)
TO:
VILLAGE MANAGER MICHAEL E. JANONIS
DATE:
SUBJ:
Background
Attachment A denotes the Prospect Meadows subdivision. In 2005, the Village initiated
a multi-phased (multi-year) water main improvement project intended to replace almost
4,200 lineal feet of the existing 4" diameter water main that serves the area. Key
features of this project include increasing the main size to 8" diameter and relocating
most water mains and service connections from rear-yard easements to the public right-
of-ways.
The first phase of this project was completed in 2005 and included the replacement of
almost 1,450 lineal feet of water main and the reinstatement of 48 water service lines.
The area shaded in green on Attachment A is completed. The area shaded in yellow is
the proposed target area for 2006. In the current budget, staff has requested funding to
replace between 1,000 and 1,500 lineal feet of water main in this area.
The area in red depicts remaining work to be slated in future phases of this project.
Remaining work will be prosecuted in multiple phases over the course of the next three
years.
In order to facilitate this work, staff has requested proposals from qualified civil
engineering consultants to provide necessary design and construction engineering
services. The scope of work requested included site survey, project design, bid
document preparation, bidding assistance, construction inspection, and contract
administration.
Request for Proposals
Proposals were received on July 25, 2006. Proposals were requested from four (4)
qualified civil engineering consulting firms. Four (4) proposals were received. Staff has
reviewed all proposals and determined that all are thorough, competitive, and
responsive. The results are noted in Table 1 on the following page:
Page 2 of 2
August 8, 2006
RFP Results / Prospect Meadows Water Main Phase 2 Engineering Services ($39,857)
Table 1
Firm Not-to-Exceed Fee
CE Desi n, LTD. ,Rollin Meadows, IL
Burns & McDonnell, Downers Grove, IL
Pavia - Martin & Co., Roselle, IL
Stanle Consultants, Inc., Chica 0, IL
$39,857.00
$40,484.50
$47,826.40
$64,750.00
Discussion
The apparent lowest cost proposal has been submitted by CE Design, LTD. of Rolling
Meadows, Illinois. Although CE Design has not performed work for the Village of Mount
Prospect in the past, they have a long history of successful civil engineering projects,
including water main installations, with neighboring communities and municipal
agencies. Their references include the Village of Arlington Heights, the City of Rolling
Meadows, the Mount Prospect Park District, and the Arlington Heights Park District. All
references were favorable.
In addition, CE Design's principal is John Pezl, P.E. Mr. Pezl is a former village
engineer for the Village of Arlington Heights. He is well known to staff and has an
outstanding reputation as a municipal engineer.
It is the opinion of staff that CE Design is well qualified to perform the work requested.
Recommendation
I recommend that the Village Board accept the lowest cost proposal to provide
requested design and construction engineering services for the Prospect Meadows
Water Main Replacement Project Phase 2 from CE Design, LTD., of Rolling Meadows,
Illinois at a cost not to exceed $39,857. Sufficient funds for this prop sed expenditure
exist in the current budget.
Sean P. Dorsey
I concur.
Glen R. Andler
Director of Public Works
Attachment A
3002
3002
. BBoxes
. Hydrants
" Valves
- Service Lines
- Mainlines
Proposed Mainlines
Completed Area
CJ Proposed Target Area
Remaining Future Work